December 1, 2011
SUBJECT:
FORT CALHOUN STATION - NRC SECURITY INSPECTION
REPORT 05000285/2011402
Dear Mr. Bannister:
On November 4, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Fort Calhoun Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on November 4, 2011, with Mr. D. Bannister, Site Vice President and Chief Nuclear Officer, and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings were identified.
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, (ADAMS).
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns UNITED STATES NUCLEAR REGULATORY COMMISSION R E GI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 Omaha Public Power District
- 2 - contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Michael C. Hay, Chief
Plant Support Branch-1
Division of Reactor Safety
Docket: 50-285 License: DPR-40
Nonpublic Enclosure:
NRC Inspection Report 05000285/2011402 w/Attachment: Supplemental Information
cc w/o enclosure:
Jeffrey A. Reinhart Site Vice President Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550 Fort Calhoun, NE 68023-0550
Ms. Susan E. Baughn Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm P.O. Box 550 Fort Calhoun, NE 68023-0550 Omaha Public Power District
- 3 - Distribution w/enclosure:
Ronald Albert, (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN/T-3A5M Clay Johnson, (Clay.Johnson@nrc.gov), NSIR/DSO/DDSO/SPEB, TWFN/3D43 Douglas Garner, (Douglas.Garner@nrc.gov) NSIR/DSP/MWSB, TWFN/4 F6 Branch Chief, RI DRS (James.Trapp@nrc.gov)
Branch Chief, RII DRS/PSB2 (Binoy.Desai@nrc.gov Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov)
Senior Resident Inspector (John.Kirkland@nrc.gov)
Distribution w/o enclosure:
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Tom.Blount@nrc.gov)
Resident Inspector (Jacob.Wingebach@nrc.gov)
Branch Chief, DRP/F (Jeffrey.Clark@nrc.gov)
FCS Administrative Assistant (Berni.Madison@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)
Project Manager (Lynnea.Wilkins@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource RIV/ETA: OEDO (Mark.Franke@nrc.gov)
DRS/TSB STA (Dale.Powers@nrc.gov)
Security Related Complete Report - OUO:
SUNSI Review Completed: ETB ADAMS: : Yes
Initials: ETB
- Non-Publicly Available : Sensitive-Security-Related-Periodic Review Required
Letter Only:
SUNSI Review Completed: __ETB___
ADAMS: : Yes
Initials: ETB___
- Publicly Available
- Non-Sensitive
ML SPSI:PSB1 SPSI:PSB1 PSI:PSB1 C:PSB1 C:PBE C:PSB1 EByre JLarsen MBrooks MHay JClark MHay
/RA/
/RA/
/RA/
/RA/
/RA/
/RA/
11/22/2011 11/29/11 11/29/11 11/31/11 12/1/11 12/1/11 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax