{{#Wiki_filter:As Given Operating Test Attached are the two job performance measures (JPM's) which were changed after final exam approval. The first, JPM S2, was changed to a different main steam isolation valve train based on a simulator fidelity issue documented in exam report 05000458/2014301. The JPM is otherwise unchanged. This issue did not impact any other portion of the administered exam. The second, JPM P1, was also changed to different chilled water | {{#Wiki_filter:As Given Operating Test Attached are the two job performance measures (JPM's) which were changed after final exam approval. The first, JPM S2, was changed to a different main steam isolation valve train based on a simulator fidelity issue documented in exam report 05000458/2014301. The JPM is otherwise unchanged. This issue did not impact any other portion of the administered exam. The second, JPM P1, was also changed to different chilled water train s due to actual maintenance work that was being performed on the original components during exam administration. This maintenance only affected this one in | ||
-plant JPM, and the JPM was otherwise unchanged. | -plant JPM, and the JPM was otherwise unchanged. | ||
RJPM-NRC-M14-S2Rev 3River Bend Station Initial License | RJPM-NRC-M14-S2Rev 3River Bend Station Initial License ExamPage 1 of 8NUCLEAR PLANT OPERATOR JOB PERFORMANCE MEASURE SRO ROALTERNATE PATHTITLE:Perform STP-109-6302 (MSIV Quarterly Partial Stroke Operability Test)OPERATOR:DATE:EVALUATOR:EVALUATOR SIGNATURE:CRITICAL TIME FRAME:Required Time (min): | ||
NAActual Time (min): | NAActual Time (min): | ||
NAPERFORMANCE TIME:Average Time (min):15 Actual Time (min):JPM RESULTS*:(Circle one) | NAPERFORMANCE TIME:Average Time (min):15 Actual Time (min):JPM RESULTS*:(Circle one) | ||
*Refer to Grading Instructions at end of JPM SATUNSATEVALUATION METHOD | *Refer to Grading Instructions at end of JPM SATUNSATEVALUATION METHOD | ||
:EVALUATION LOCATION | : EVALUATION LOCATION | ||
: | : XPerformPlantSimulate XSimulatorControl RoomPrepared:Dave Bergstrom Date:March 4, 2014Reviewed:Jeff Reynolds Date:March 4, 2014 (Operations Representative)Approved:Joey ClarkDate:March 4, 2014(Facility Reviewer) | ||
RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14- | RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14-S2 Rev 3Page 2 of 8EXAMINER INFO SHEETTask Standard:MSIV Partial Stroke Operability Test has been completed for B21-AOVF028B.(STP-109-6302, Section 7.3) | ||
.Synopsis:The reactor is operating with the reactor at 100%. This task will test MSIVspartial stroke.NOTE: If in the Plant or the Control Room,Caution the operator NOT to MANIPULATE thecontrols, but to make clear what they would do if this were not a simulated situation. | .Synopsis:The reactor is operating with the reactor at 100%. This task will test MSIVspartial stroke.NOTE: If in the Plant or the Control Room,Caution the operator NOT to MANIPULATE thecontrols, but to make clear what they would do if this were not a simulated situation. | ||
1)Read to the operator | 1)Read to the operator | ||
:"I will provide the initial conditions and initiating cues to you. I may also provide cuesduring the performance and ask follow-up questions at the conclusion of this JPM. Whenyou complete the task successfully, the objective for this JPM will be satisfied.Inform me when you have completed the task.2) Initiating Cues:The CRS has directed you to perform STP-109-6302 (MSIV Quarterly Partial StrokeOperability Test) for B21-AOVF028B.3) Initial Conditions: The reactor is operating at 100%. All MSIV's are open. The status lights on the back panels have been verified ENERGIZED, STP-109-6302 iscomplete through step 6.6.16. Step 6.7 is ready to be performed.4) Solicit and answer any questions the operator may have. | :"I will provide the initial conditions and initiating cues to you. I may also provide cuesduring the performance and ask follow-up questions at the conclusion of this JPM. Whenyou complete the task successfully, the objective for this JPM will be satisfied.Inform me when you have completed the task.2) Initiating Cues:The CRS has directed you to perform STP-109-6302 (MSIV Quarterly Partial StrokeOperability Test) for B21-AOVF028B.3) Initial Conditions: The reactor is operating at 100%. All MSIV's are open. The status lights on the back panels have been verified ENERGIZED, STP-109-6302 iscomplete through step 6.6.16. Step 6.7 is ready to be performed.4) Solicit and answer any questions the operator may have. | ||
RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14- | RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14-S2 Rev 3Page 3 of 8DATA SHEETTASK Title:Task NumberK&A SYSTEM | ||
:K&A RATING | :K&A RATING | ||
:MSIV Partial Stroke Operability Test239017001001239001 A4.014.2 / 4.0Reason for RevisionRevision 3 is due to changing which MSIV is tested to support a simulator DR. | :MSIV Partial Stroke Operability Test239017001001239001 A4.014.2 / 4.0Reason for RevisionRevision 3 is due to changing which MSIV is tested to support a simulator DR. | ||
Line 35: | Line 35: | ||
==REFERENCES:== | ==REFERENCES:== | ||
APPLICABLE OBJECTIVESSTP-109-6302, Rev 15RLP-STM-0109, Obj 7, 8REQUIRED MATERIALS:SAFETY FUNCTION:Marked up copy of STP-109-6302,__3__MSIV Quarterly Partial Stroke Operability TestSIMULATOR CONDITIONS & SETUP:1. IC # 2172. Rx Power: 100% operating.CRITICAL ELEMENTS:Items marked with an " | APPLICABLE OBJECTIVESSTP-109-6302, Rev 15RLP-STM-0109, Obj 7, 8REQUIRED MATERIALS:SAFETY FUNCTION:Marked up copy of STP-109-6302,__3__MSIV Quarterly Partial Stroke Operability TestSIMULATOR CONDITIONS & SETUP:1. IC # 2172. Rx Power: 100% operating.CRITICAL ELEMENTS:Items marked with an " | ||
*" are Critical Steps and are required to beperformed. Failure to successfully complete a Critical Step requires theJPM to be evaluated as Unsatisfactory. | *" are Critical Steps and are required to beperformed. Failure to successfully complete a Critical Step requires theJPM to be evaluated as Unsatisfactory.TASK STANDARD:MSIV Partial Stroke Operability Test has been completed for B21-AOVF028B. (STP-109-6302, Section 7.3) | ||
RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14- | RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14-S2 Rev 3Page 4 of 8PERFORMANCE:START TIME:STP-109-6302MSIV Quarterly Partial Stroke Operability TestPrerequisites 1.Procedure Step:6.7 Record pressure as indicated from IAS-PI105, INSTRUMENT AIRHEADER PRESS on Panel H13-P870:StandardApplicant records instrument air pressure from correct pressure instrument. | ||
Cue NotesResults SATUNSATPROCEDURE NOTEWhen performing STP-051-0201 in conjunction with this procedure...This note is NA7 PROCEDURE 7.1 B21-AOVF028B, MSL B OUTBD MSIV (Partial Stroke Close), Operability TestPROCEDURE CAUTION RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14-S2 Rev 3Page 5 of 8 2.Procedure Step:7.3.1 Verify Main Steam Lines A, C, and D are not isolated.StandardApplicant verified red lights ON and green lights OFF for inboard andoutboard A, C, and D MSIVs. | |||
Cue NotesResults SATUNSAT 3.*Procedure Step:7.3.2 Place B21H-S1E, MSL B OUTBD MSIV handswitch inOPEN/SLOW TEST.StandardApplicant positioned the B outboard MSIV switch from AUTO to Open/SlowTest (turning the switch clockwise). | |||
Cue NotesResults SATUNSATPROCEDURE NOTEThe next two steps meet the partial stroke exercise requirement. | |||
4.*Procedure Step:7.3.3 Depress B21H-S3E, MSL B OUTBD MSIV TEST pushbutton to beginslow closing B21-AOVF028B. WHEN the remote position indicationdepicts a not fully open valve (dual indication), THEN immediatelyrelease B21H-S3E.StandardApplicant depressed the S3E pushbutton.Applicant released the S3E pushbutton, when dual indication (red and greenlights ON), and prior to high flow in any other steam line. | 4.*Procedure Step:7.3.3 Depress B21H-S3E, MSL B OUTBD MSIV TEST pushbutton to beginslow closing B21-AOVF028B. WHEN the remote position indicationdepicts a not fully open valve (dual indication), THEN immediatelyrelease B21H-S3E.StandardApplicant depressed the S3E pushbutton.Applicant released the S3E pushbutton, when dual indication (red and greenlights ON), and prior to high flow in any other steam line. | ||
Cue NotesResults SATUNSAT RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14-S2 Rev 3Page 6 of 8 5.Procedure Step:7.3.4 Verify that the remote position indication depicts a fully open valve(red light only).StandardApplicant verifies that the green light is OFF and the red light is ON. | |||
Cue NotesResults SATUNSAT 6.Procedure Step:7.3.5 IF B21-AOVF028B was successfully partial stroke closed and fullyopened as indicated in steps 7.3.3 and 7.3.4, THEN record as Acceptable forB21-AOVF028B on Data Sheet 1, OTHERWISE record as Unacceptable.StandardApplicant circled "A" on Data Sheet 1 for B21-AOVF028B Cue NotesResults SATUNSAT 7.Procedure Step:7.3.6 Place B21A-S1E, MSL B OUTBD MSIV handswitch in AUTO.StandardApplicant positioned the B outboard MSIV switch from Open/Slow Test toAUTO (turning the switch counter-clockwise). | |||
Cue NotesStep 7 is not critical due to the logic still enabling all trips to close the MSIVsThe next two steps are for independent verification of valve/switch positionResults SATUNSATTerminating Cue:MSIV Partial Stroke Operability Test has been completed for B21-AOVF028B. (STP-109-6302, Section 7.3).This completes this JPM.STOP TIME: | |||
RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14- | RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14-S2 Rev 3Page 7 of 8JPM COMMENT SHEETCRITERIA FOR SATISFACTORY EVALUATION1. 100% of critical elements/steps identified in the JPM successfully completed.2. Critical Time Frame is met if applicable.3. No actual safety violation (radiological or industrial) requiring evaluator intervention.CRITERIA FOR UNSAT EVALUATION1. Any critical element/step is graded as "UNSAT"2. Critical Time Frame is not met if applicable. *3. Actual safety violation (radiological or industrial) requiring evaluator intervention.4. Operator's actions would have damaged plant equipment, created a personnel safety hazard, orotherwise reduced the level of safety of the plant RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14-S2 Rev 3Page 8 of 8OPERATOR CUE SHEETINITIAL CONDITIONS: The reactor is operating at 100%. All MSIV's are open. The status lights on the back panels have been verified ENERGIZED,STP-109-6302 is complete through step 6.6.16. Step 6.7 is ready to be performed.INITIATING CUE:The CRS has directed you to perform STP-109-6302 (MSIV Quarterly Partial StrokeOperability Test) for B21-AOVF028B. | ||
RJPM-NRC-M14-P1Rev 1River Bend Station Initial License | RJPM-NRC-M14-P1Rev 1River Bend Station Initial License ExamPage 1 of 9NUCLEAR PLANT OPERATOR JOB PERFORMANCE MEASURE SRO ROALTERNATE PATHTITLE:Alternate Control Building Chilled Water Pumps within the Standby DivisionOPERATOR:DATE:EVALUATOR:EVALUATOR SIGNATURE:CRITICAL TIME FRAME:NANAPERFORMANCE TIME:JPM RESULTS*:EVALUATION METHOD | ||
:EVALUATION LOCATION | :EVALUATION LOCATION | ||
:XXPrepared: Date:Reviewed: Date: (Approved:Date: | :XXPrepared: Date:Reviewed: Date: (Approved:Date: | ||
RJPM- | RJPM-NR C-M14-P1 Rev 1Page 2 of 9EXAMINER INFO SHEETTask Standard:Synopsis:NOTECautionNOTRead to the operator RJPM-NR C-M14-P1 Rev 1Page 3 of 9DATA SHEETTASK Ti tle:Task NumberK&A SYSTEM | ||
:K&A RATING | :K&A RATING | ||
: | : | ||
Line 54: | Line 54: | ||
==REFERENCES:== | ==REFERENCES:== | ||
APPLICABLE OBJECTIVESREQUIRED MATERIALS:SAFETY FUNCTION:__9__SIMULATOR CONDITIONS & SETUP:CRITICAL ELEMENTS:* | APPLICABLE OBJECTIVESREQUIRED MATERIALS:SAFETY FUNCTION:__9__SIMULATOR CONDITIONS & SETUP:CRITICAL ELEMENTS:*TASK STANDARD: | ||
RJPM- | RJPM-NR C-M14-P1 Rev 1Page 4 of 9PERFORMANCE:START TIME:*Procedure Step:*Procedure Step: | ||
RJPM- | RJPM-NR C-M14-P1 Rev 1Page 5 of 9PROCEDURE NOTEOil level can be lower than normal if service water temperature islow, greater than or equal to 65°F and less than or equal to 75°F.For a non-operating chiller an oil level in or above the upper sightglass is normal. When idle, the level may be higher due to theabsorption of refrigerant by the oil.Procedure Step:Procedure Step:Procedure Step: | ||
RJPM- | RJPM-NR C-M14-P1 Rev 1Page 6 of 9Procedure Step:Procedure Step:Procedure Step: | ||
RJPM- | RJPM-NR C-M14-P1 Rev 1Page 7 of 9Procedure Step:Procedure Step: | ||
This completes this JPM.STOP TIME: | This completes this JPM.STOP TIME: | ||
RJPM- | RJPM-NR C-M14-P1 Rev 1Page 8 of 9JPM COMMENT SHEET | ||
RJPM- | RJPM-NR C-M14-P1 Rev 1Page 9 of 9OPERATOR CUE SHEETINITIAL CONDITIONS:INITIATING CUE:}} |
Revision as of 17:25, 9 July 2018
ML14112A080 | |
Person / Time | |
---|---|
Site: | River Bend |
Issue date: | 03/27/2014 |
From: | Vincent Gaddy Operations Branch IV |
To: | Entergy Operations |
laura hurley | |
References | |
05-458/14-03, RJPM-NRC-M14-S2, Rev 3 | |
Download: ML14112A080 (18) | |
Text
As Given Operating Test Attached are the two job performance measures (JPM's) which were changed after final exam approval. The first, JPM S2, was changed to a different main steam isolation valve train based on a simulator fidelity issue documented in exam report 05000458/2014301. The JPM is otherwise unchanged. This issue did not impact any other portion of the administered exam. The second, JPM P1, was also changed to different chilled water train s due to actual maintenance work that was being performed on the original components during exam administration. This maintenance only affected this one in
-plant JPM, and the JPM was otherwise unchanged.
RJPM-NRC-M14-S2Rev 3River Bend Station Initial License ExamPage 1 of 8NUCLEAR PLANT OPERATOR JOB PERFORMANCE MEASURE SRO ROALTERNATE PATHTITLE:Perform STP-109-6302 (MSIV Quarterly Partial Stroke Operability Test)OPERATOR:DATE:EVALUATOR:EVALUATOR SIGNATURE:CRITICAL TIME FRAME:Required Time (min):
NAActual Time (min):
NAPERFORMANCE TIME:Average Time (min):15 Actual Time (min):JPM RESULTS*:(Circle one)
- Refer to Grading Instructions at end of JPM SATUNSATEVALUATION METHOD
- EVALUATION LOCATION
- XPerformPlantSimulate XSimulatorControl RoomPrepared:Dave Bergstrom Date:March 4, 2014Reviewed:Jeff Reynolds Date:March 4, 2014 (Operations Representative)Approved:Joey ClarkDate:March 4, 2014(Facility Reviewer)
RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14-S2 Rev 3Page 2 of 8EXAMINER INFO SHEETTask Standard:MSIV Partial Stroke Operability Test has been completed for B21-AOVF028B.(STP-109-6302, Section 7.3)
.Synopsis:The reactor is operating with the reactor at 100%. This task will test MSIVspartial stroke.NOTE: If in the Plant or the Control Room,Caution the operator NOT to MANIPULATE thecontrols, but to make clear what they would do if this were not a simulated situation.
1)Read to the operator
- "I will provide the initial conditions and initiating cues to you. I may also provide cuesduring the performance and ask follow-up questions at the conclusion of this JPM. Whenyou complete the task successfully, the objective for this JPM will be satisfied.Inform me when you have completed the task.2) Initiating Cues:The CRS has directed you to perform STP-109-6302 (MSIV Quarterly Partial StrokeOperability Test) for B21-AOVF028B.3) Initial Conditions: The reactor is operating at 100%. All MSIV's are open. The status lights on the back panels have been verified ENERGIZED, STP-109-6302 iscomplete through step 6.6.16. Step 6.7 is ready to be performed.4) Solicit and answer any questions the operator may have.
RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14-S2 Rev 3Page 3 of 8DATA SHEETTASK Title:Task NumberK&A SYSTEM
- K&A RATING
- MSIV Partial Stroke Operability Test239017001001239001 A4.014.2 / 4.0Reason for RevisionRevision 3 is due to changing which MSIV is tested to support a simulator DR.
REFERENCES:
APPLICABLE OBJECTIVESSTP-109-6302, Rev 15RLP-STM-0109, Obj 7, 8REQUIRED MATERIALS:SAFETY FUNCTION:Marked up copy of STP-109-6302,__3__MSIV Quarterly Partial Stroke Operability TestSIMULATOR CONDITIONS & SETUP:1. IC # 2172. Rx Power: 100% operating.CRITICAL ELEMENTS:Items marked with an "
- " are Critical Steps and are required to beperformed. Failure to successfully complete a Critical Step requires theJPM to be evaluated as Unsatisfactory.TASK STANDARD:MSIV Partial Stroke Operability Test has been completed for B21-AOVF028B. (STP-109-6302, Section 7.3)
RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14-S2 Rev 3Page 4 of 8PERFORMANCE:START TIME:STP-109-6302MSIV Quarterly Partial Stroke Operability TestPrerequisites 1.Procedure Step:6.7 Record pressure as indicated from IAS-PI105, INSTRUMENT AIRHEADER PRESS on Panel H13-P870:StandardApplicant records instrument air pressure from correct pressure instrument.
Cue NotesResults SATUNSATPROCEDURE NOTEWhen performing STP-051-0201 in conjunction with this procedure...This note is NA7 PROCEDURE 7.1 B21-AOVF028B, MSL B OUTBD MSIV (Partial Stroke Close), Operability TestPROCEDURE CAUTION RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14-S2 Rev 3Page 5 of 8 2.Procedure Step:7.3.1 Verify Main Steam Lines A, C, and D are not isolated.StandardApplicant verified red lights ON and green lights OFF for inboard andoutboard A, C, and D MSIVs.
Cue NotesResults SATUNSAT 3.*Procedure Step:7.3.2 Place B21H-S1E, MSL B OUTBD MSIV handswitch inOPEN/SLOW TEST.StandardApplicant positioned the B outboard MSIV switch from AUTO to Open/SlowTest (turning the switch clockwise).
Cue NotesResults SATUNSATPROCEDURE NOTEThe next two steps meet the partial stroke exercise requirement.
4.*Procedure Step:7.3.3 Depress B21H-S3E, MSL B OUTBD MSIV TEST pushbutton to beginslow closing B21-AOVF028B. WHEN the remote position indicationdepicts a not fully open valve (dual indication), THEN immediatelyrelease B21H-S3E.StandardApplicant depressed the S3E pushbutton.Applicant released the S3E pushbutton, when dual indication (red and greenlights ON), and prior to high flow in any other steam line.
Cue NotesResults SATUNSAT RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14-S2 Rev 3Page 6 of 8 5.Procedure Step:7.3.4 Verify that the remote position indication depicts a fully open valve(red light only).StandardApplicant verifies that the green light is OFF and the red light is ON.
Cue NotesResults SATUNSAT 6.Procedure Step:7.3.5 IF B21-AOVF028B was successfully partial stroke closed and fullyopened as indicated in steps 7.3.3 and 7.3.4, THEN record as Acceptable forB21-AOVF028B on Data Sheet 1, OTHERWISE record as Unacceptable.StandardApplicant circled "A" on Data Sheet 1 for B21-AOVF028B Cue NotesResults SATUNSAT 7.Procedure Step:7.3.6 Place B21A-S1E, MSL B OUTBD MSIV handswitch in AUTO.StandardApplicant positioned the B outboard MSIV switch from Open/Slow Test toAUTO (turning the switch counter-clockwise).
Cue NotesStep 7 is not critical due to the logic still enabling all trips to close the MSIVsThe next two steps are for independent verification of valve/switch positionResults SATUNSATTerminating Cue:MSIV Partial Stroke Operability Test has been completed for B21-AOVF028B. (STP-109-6302, Section 7.3).This completes this JPM.STOP TIME:
RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14-S2 Rev 3Page 7 of 8JPM COMMENT SHEETCRITERIA FOR SATISFACTORY EVALUATION1. 100% of critical elements/steps identified in the JPM successfully completed.2. Critical Time Frame is met if applicable.3. No actual safety violation (radiological or industrial) requiring evaluator intervention.CRITERIA FOR UNSAT EVALUATION1. Any critical element/step is graded as "UNSAT"2. Critical Time Frame is not met if applicable. *3. Actual safety violation (radiological or industrial) requiring evaluator intervention.4. Operator's actions would have damaged plant equipment, created a personnel safety hazard, orotherwise reduced the level of safety of the plant RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14-S2 Rev 3Page 8 of 8OPERATOR CUE SHEETINITIAL CONDITIONS: The reactor is operating at 100%. All MSIV's are open. The status lights on the back panels have been verified ENERGIZED,STP-109-6302 is complete through step 6.6.16. Step 6.7 is ready to be performed.INITIATING CUE:The CRS has directed you to perform STP-109-6302 (MSIV Quarterly Partial StrokeOperability Test) for B21-AOVF028B.
RJPM-NRC-M14-P1Rev 1River Bend Station Initial License ExamPage 1 of 9NUCLEAR PLANT OPERATOR JOB PERFORMANCE MEASURE SRO ROALTERNATE PATHTITLE:Alternate Control Building Chilled Water Pumps within the Standby DivisionOPERATOR:DATE:EVALUATOR:EVALUATOR SIGNATURE:CRITICAL TIME FRAME:NANAPERFORMANCE TIME:JPM RESULTS*:EVALUATION METHOD
- EVALUATION LOCATION
- XXPrepared: Date:Reviewed: Date: (Approved:Date:
RJPM-NR C-M14-P1 Rev 1Page 2 of 9EXAMINER INFO SHEETTask Standard:Synopsis:NOTECautionNOTRead to the operator RJPM-NR C-M14-P1 Rev 1Page 3 of 9DATA SHEETTASK Ti tle:Task NumberK&A SYSTEM
- K&A RATING
291011001001
REFERENCES:
APPLICABLE OBJECTIVESREQUIRED MATERIALS:SAFETY FUNCTION:__9__SIMULATOR CONDITIONS & SETUP:CRITICAL ELEMENTS:*TASK STANDARD:
RJPM-NR C-M14-P1 Rev 1Page 4 of 9PERFORMANCE:START TIME:*Procedure Step:*Procedure Step:
RJPM-NR C-M14-P1 Rev 1Page 5 of 9PROCEDURE NOTEOil level can be lower than normal if service water temperature islow, greater than or equal to 65°F and less than or equal to 75°F.For a non-operating chiller an oil level in or above the upper sightglass is normal. When idle, the level may be higher due to theabsorption of refrigerant by the oil.Procedure Step:Procedure Step:Procedure Step:
RJPM-NR C-M14-P1 Rev 1Page 6 of 9Procedure Step:Procedure Step:Procedure Step:
RJPM-NR C-M14-P1 Rev 1Page 7 of 9Procedure Step:Procedure Step:
This completes this JPM.STOP TIME:
RJPM-NR C-M14-P1 Rev 1Page 8 of 9JPM COMMENT SHEET
RJPM-NR C-M14-P1 Rev 1Page 9 of 9OPERATOR CUE SHEETINITIAL CONDITIONS:INITIATING CUE: