ML14316A595: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:(l Xcel Energy November 12, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets 50-282 and 50-306 Renewed License Nos. DPR-42 and DPR-60 Prairie Island Independent Spent Fuel Storage Installation Docket 72-10 Materials License No. SNM-2506 414 Nicollet Mall-MP4 Minneapolis, MN 55401 L-XE-14-020 10 CFR 50.54(a)(4) Monticello Nuclear Generating Plant Docket 50-263 Renewed License No. DPR-22 Supplement to Request for Review and Approval of Northern States Power Company Quality Assurance Topical Report  
{{#Wiki_filter:(l Xcel Energy Nove mber 12, 2 01 4 A TT N: Doc um e nt C ontrol Des k U.S. Nucl ea r Re gul a tory C ommi ss ion W as hington, DC 2 0555-0001 Pra iri e Isla nd Nucl ea r Genera tin g Pla nt Units 1 a nd 2 Docket s 50-282 a nd 50-306 Re newed License Nos. DPR-42 a nd DPR-60 Prairie Island Independent Spent Fuel Storage Installation Docket 72-10 Materials License No. SNM-2506 414 Nicollet Ma ll-MP 4 Minne a polis, MN 554 01 L-XE-1 4-020 10 CFR 50.54(a)(4) Montic e llo Nucl ea r Genera ting Pla nt Docket 50-2 63 Renewed Licen se No. D PR-22 Supplement to Request for Review and Approval of Northern States Power Company Quality Assurance Topical Report  


==Reference:==
==Reference:==


Letter from Northern States Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy to Document Control Desk, "Request for Review and Approval of Northern States Power Company Quality Assurance Topical Report",
Letter from Northern States Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy to Document Control Desk, "Request for Review and Approval of Northern States Power Company Quality Assurance Topical Report", dated October 31, 2014 (ADAMS Accession ML 14304A353).
dated October 31, 2014 (ADAMS Accession ML 14304A353).
On October 31, 2014, NSPM submitted a revision to the Quality Assurance Topical Report (QATR) for review and approval in accordance with 10 CFR 50.54(a)(4) (Reference).
On October 31, 2014, NSPM submitted a revision to the Quality Assurance Topical Report (QATR) for review and approval in accordance with 10 CFR 50.54(a)(4)  
(Reference).
The proposed change revises previously submitted requirements related to the conduct of Independent Assessments.
The proposed change revises previously submitted requirements related to the conduct of Independent Assessments.
Specifically, this change divides the Independent Assessment function of the Nuclear Oversight (NOS) organization into two distinct functions:
Specifically, this change divides the Independent Assessment function of the Nuclear Oversight (NOS) organization into two distinct functions:
Independent Audits and Independent Assessments.
Independent Audits and Independent Assessments.
To aid to the staff's review of the QATR revision, a redline/strikeout version of the QATR is enclosed.
To aid to the staff's review of the QATR revision, a redline/strikeout version of the QATR is enclosed.
Summary of Commitments This letter makes no new commitments and no revisions to existing commitments. Enclosure cc: Administrator, USNRC, Region Ill USNRC NRR Project Manager, PINGP USNRC Senior Resident Inspector, PINGP USNRC NRR Project Manager MNGP USNRC Senior Resident Inspector, MNGP}}
S umm a ry of C ommitm e nt s T hi s le tter mak es no new co mmitme nts a nd no re visions to exis tin g co mmitm e nts. E nclo s ure cc: Administrator, USNRC, Region Ill USNRC NRR Project Manager, PINGP USNRC Senior Resident Inspector, PINGP USNRC NRR Project Manager MNGP USNRC Senior Resident Inspector, MNGP}}

Revision as of 11:20, 9 July 2018

Prairie Island, Units 1, 2 and ISFSI and Monticello - Forwards Supplemental to Request for Review and Approval of Northern States Power Company Quality Assurance Topical Report
ML14316A595
Person / Time
Site: Monticello, Prairie Island  Xcel Energy icon.png
Issue date: 11/12/2014
From: Murphy M C
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML14316A593 List:
References
L-XE-14-020
Download: ML14316A595 (2)


Text

(l Xcel Energy Nove mber 12, 2 01 4 A TT N: Doc um e nt C ontrol Des k U.S. Nucl ea r Re gul a tory C ommi ss ion W as hington, DC 2 0555-0001 Pra iri e Isla nd Nucl ea r Genera tin g Pla nt Units 1 a nd 2 Docket s 50-282 a nd 50-306 Re newed License Nos. DPR-42 a nd DPR-60 Prairie Island Independent Spent Fuel Storage Installation Docket 72-10 Materials License No. SNM-2506 414 Nicollet Ma ll-MP 4 Minne a polis, MN 554 01 L-XE-1 4-020 10 CFR 50.54(a)(4) Montic e llo Nucl ea r Genera ting Pla nt Docket 50-2 63 Renewed Licen se No. D PR-22 Supplement to Request for Review and Approval of Northern States Power Company Quality Assurance Topical Report

Reference:

Letter from Northern States Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy to Document Control Desk, "Request for Review and Approval of Northern States Power Company Quality Assurance Topical Report", dated October 31, 2014 (ADAMS Accession ML 14304A353).

On October 31, 2014, NSPM submitted a revision to the Quality Assurance Topical Report (QATR) for review and approval in accordance with 10 CFR 50.54(a)(4) (Reference).

The proposed change revises previously submitted requirements related to the conduct of Independent Assessments.

Specifically, this change divides the Independent Assessment function of the Nuclear Oversight (NOS) organization into two distinct functions:

Independent Audits and Independent Assessments.

To aid to the staff's review of the QATR revision, a redline/strikeout version of the QATR is enclosed.

S umm a ry of C ommitm e nt s T hi s le tter mak es no new co mmitme nts a nd no re visions to exis tin g co mmitm e nts. E nclo s ure cc: Administrator, USNRC, Region Ill USNRC NRR Project Manager, PINGP USNRC Senior Resident Inspector, PINGP USNRC NRR Project Manager MNGP USNRC Senior Resident Inspector, MNGP