{{#Wiki_filter:REPORT OF SOILS EXPLORATION ZION SOLUTIONS October 2, 2008 L -72,070 ZION NUCLEAR POWER PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION PREPARED FOR: SARGENT & LUNDY LLC 55 EAST MONROE STREET CHICAGO, ILLINOIS 60603 PREPARED BY: TESTING SERVICE CORPORATION 457 EAST GUNDERSEN DRIVE CAROL STREAM, ILLINOIS 60188 (630) 653-3920 Section I. TEXT 1.0 2.0 Introduction Field Work TABLE OF CONTENTS Page ............
{{#Wiki_filter:REPORT OF SOILS EXPLORATION ZION SOLUTIONS October 2 , 2008 L -72 , 070 ZION NUCLEAR POWER PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION PREPARED FOR: SARGENT & LUNDY LLC 55 EAST MONROE STREET CHICAGO, ILLINOIS 60603 PREPARED BY: TESTING SERVICE CORPORATION 457 EAST GUNDERSEN DRIVE CAROL STREAM, ILLINOIS 60188 (630) 653-3920 Sect i on I. TEXT 1.0 2.0 Introdu ct i on Field Work TABLE OF CONTENTS Page ............
..........
....................
..........
....................... 2 2 3.0 Geophysica l Testing ................................
....................... 2 2 3.0 Geophysica l Testing ................................
....*.......... 4 4.0 5.0 Laboratory Testing Closure 4 5 II. APPENDIX REPORT OF SOILS EXPLORATION ZION SOLUTIONS ZION NUCLEAR POWER PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION  
....*.......... 4 4.0 5.0 Laboratory Testing C l osure 4 5 II. APPEND I X REPORT OF SOILS EXPLORATION ZION SOLUTIONS ZION NUCLEAR POWER PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION  


==1.0 INTRODUCTION==
==1.0 INTRODUCTION==


October 2, 2008 L-72,070 Presented in this report are the results of the soils investigation performed to determine the general subsurface conditions for the proposed construction of an Independent Spent Fuel Storage facility.
October 2 , 2008 L-72,070 Presented in this report are the results of the soils investigation performed to determine the general subsurface conditions for the proposed construction of an Independent Spent Fuel Storage facility.
The proposed structure will be constructed at the Zion Nuclear Power Plant in Zion, IL. This work was performed in general accordance with Technical Specification Subsurface Investigation Specification Z-5701 prepared by Sargent and Lundy and dated July 29, 2008. 2.0 FIELD WORK A total of two(2) soil borings (1-20 and 1-21) were performed for this project with each of them being extended to a depth of 100.0 feet. Boring 1-20 was subsequently converted into a seismic cross hole survey source hole. Additionally, two (2) boreholes were drilled and completed with 3" PVC casing for cross hole seismic testing.
The proposed structure will be constructed at the Zion Nuclear Power Plant in Zion, IL. This work was performed in general accordance with Technical Specification Subsurface Investigation Specification Z-5701 prepared by Sargent and Lundy and dated July 29 , 2008. 2.0 FIELD WORK A total of two(2) soil borings (1-20 and 1-21) were performed for this project with each of them being extended to a depth of 100.0 feet. Boring 1-20 was subsequently converted into a seismic cross hole survey source hole. Additionally, two (2) boreholes were drilled and completed with 3" PVC casing for cross hole seismic testing. Upon completion of the drilling and testing , ground surface elevations as well as Northing and Easting coordinates were determined for the drilling locations using a Trimble R8 GPS. The vertical and horizontal data shown on the Boring Location Plan was retrieved from a National Geodetic Survey data base located approximately 1.2 miles south of Zion, Illinois.
Upon completion of the drilling and testing, ground surface elevations as well as Northing and Easting coordinates were determined for the drilling locations using a Trimble R8 GPS. The vertical and horizontal data shown on the Boring Location Plan was retrieved from a National Geodetic Survey data base located approximately 1.2 miles south of Zion, Illinois.
Sargent & Lundy L -72,070 October 2, 2008 The boreholes were initially advanced by 4 1/4" hollow stem auger methods to the ground water table and then completed by rotary wash methods using bentonite and potable water in accordance with ASTM D 5783. Upon completion, each borehole was sealed with cement-bentonite grout placed by tremie methods. Soil samples were collected at 1-20 on 2.5 foot intervals for the entire 100 foot depth. At location 1-20 the sampling interval was 2.5 feet for the first 10 feet and 5.0 feet thereafter.
Sargent & Lundy L -72,070 October 2, 2008 The boreholes were initially advanced by 4 1/4" hollow stem auger methods to the ground water table and then completed by rotary wash methods using bentonite and potable water in accordance with ASTM D 5783. Upon completion, each borehole was sealed with cement-bentonite grout placed by tremie methods.
Standard Penetration Tests (SPT) -N Values (ASTM D 1586), were determined using an automatic hammer which allows a 140 pound weight to free fall from a 30 inch drop to drive the sampler. The samples were collected using standard split spoon procedures during SPT since granular soils and/or very stiff clays prevented the use of Shelby tube samplers.
Soil samples were collected at 1-20 on 2.5 foot intervals for the entire 100 foot depth. At location 1-20 the sampling interval was 2.5 feet for the first 10 feet and 5.0 feet thereafter.
Standard Penetration Tests (SPT) -N Values (ASTM D 1586), were determined using an automatic hammer which allows a 140 pound weight to free fall from a 30 inch drop to drive the sampler.
The samples were collected using standard split spoon procedures during SPT since granular soils and/or very stiff clays prevented the use of Shelby tube samplers.
Liners were not used with the split spoon samplers.
Liners were not used with the split spoon samplers.
Dynamic energy measurements have not been made on this automatic hammer. However, Pile Driving Analyzer's (PDA) have been used to process dynamic measurements of strain and acceleration between the drill string and similar hammers made by the same manufacturer (Boart Longyear).
Dynamic energy measurements have not been made on this automatic hammer. However, Pile Driving Analyzer's (PDA) have been used to process dynamic measurements of strain and acceleration between the drill string and similar hammers made by the same manufacturer (Boart Longyear).
Line 39: Line 35:
PVC casing was installed shortly after the completion of the drilling and reaming at location 1-20. Boring 1-21 was sealed with grout immediately following the drilling and sampling to prevent an open hole hazard. Therefore, 24 hour water level readings were not obtained.
PVC casing was installed shortly after the completion of the drilling and reaming at location 1-20. Boring 1-21 was sealed with grout immediately following the drilling and sampling to prevent an open hole hazard. Therefore, 24 hour water level readings were not obtained.
The ground water depth measured during the hollow stem auger drilling is considered the most accurate indication of the undisturbed ground water levels at the site.
The ground water depth measured during the hollow stem auger drilling is considered the most accurate indication of the undisturbed ground water levels at the site.
Sargent & Lundy L -72,070 October 2, 2008 3.0 GEOPHYSICAL TESTING Geophysical testing consisting of a Cross Hole Seismic Investigation, was performed at location 1-20. The original bore hole (1-20) was reamed to a depth of 100 feet using a 6" tri cone roller bit and then cased with 3" PVC casing sealed in place with cement-benton ite grout. Two additional holes (1-20A and 1-20B) were drilled using a 6" tri cone roller bit to a depth of 100 feet and were located in a straight line at approximate distances of 10 and 20 feet from 1-20. These bore holes were also completed with the installation of 3" PVC casing sealed in place with cement-bentoni te grout. The Cross Hole testing was performed by Geotechno logy, Inc. In general conformance with Section 4.31 of ASTM 04428. A copy of the report prepared by Geotechno logy, Inc. summarizing the test results is included in the Appendix of this report. Following the testing each of the PVC casings were sealed with bentonite chips which were hydrated upon placement.
Sargent & Lundy L -72,070 October 2, 2008 3.0 GEOPHYS I CAL TEST IN G Geophysical testing consist in g of a Cross Hole Seismic In vest i gation , was performed at l ocation 1-20. The or i gina l bore hole (1-20) was reamed to a depth of 100 feet using a 6" tri cone roller bit and then cased with 3" PVC casing sea l ed in place w ith cement-benton it e grout. Two add iti ona l holes (1-20A and 1-20B) were drilled using a 6" tri cone roller bit to a depth of 100 feet and were l ocated in a st r a i ght lin e at approximate distances of 10 and 20 feet from 1-20. These bore holes were a l so comp l eted w ith the in sta ll at i on of 3" PVC cas in g sea l ed in place with cement-bentoni t e grout. The Cross Hole testing was performed by Geotechno l ogy, In c. In genera l conformance w ith Section 4.31 of ASTM 04428. A copy of the report prepared by Geotechno l ogy, In c. summa ri zing the test results i s includ ed in the Append i x of this report. Following the testing eac h of the PVC cas in gs were sea l ed w ith bentonite c hip s wh i c h were hydrated upon placement.
In addition the PVC was cut off near the ground surface and topsoil was place over the holes. 4.0 LABORATORY TESTING The soil samples obtained from the borings were examined in our laboratory and visually classified according to the Unified Soils Classification System (ASTM 0 2488). Cohesive soils were measured for moisture content (ASTM 0 2216) and unconfined compressive strength (ASTM 0 2166). Additional testing including grain size distribution (ASTM 0422, 0 1140), Alterberg Limits (ASTM 04318), pH (ASTM G 51) and dry unit weight determinations (EM 1110-2-1906) were performed on samples selected by Sargent and Lundy. The results of this testing has been summarized and incorporated into the Soil Test data Sheets included in the Appendix.
In addition the PVC was cut off near the ground surface and topsoil was place ove r the hol es. 4.0 LABORATORY TESTING The so il samples obta in ed from the bor in gs were exam in ed in our l aboratory and v i sual l y classified accord in g to the Unified Soi ls C l ass ifi cation System (ASTM 0 2488). Co h es i ve so il s were measured for moisture content (ASTM 0 2216) and unconfined compressive streng th (ASTM 0 2166). Add iti onal testing including grain size distribution (ASTM 0422, 0 1140), Alterberg Limits (ASTM 04318), pH (ASTM G 51) and dry unit we i ght determinations (EM 1110-2-1906) we r e performed on samp l es se l ected by Sa r gent and Lundy. The results of this testing has been summarized and in corporated in to the Soi l Test data Sheets included in the Appendix.
Two (2) soil samples selected by the client were analyzed for soluble chlorides (Method 4500CL,C) and soluble sulfates (Method 4500S04, E) by First Environmental Laboratories.
Two (2) so il samp l es se l ected by the client were ana l yzed for so l ub l e ch l or i des (Method 4500CL,C) and so lubl e sulfates (Method 4500S04, E) by First Env ironm enta l Laboratories.
A copy of their report is Appended.
A copy of their report is Appended.
Sargent & Lundy L -72,070 October 2, 2008 5.0 CLOSURE The data and results presented in this report are based upon the conditions encountered at the two (2) locations investigated as indicated on the Soil Boring Location Plan. This report does not reflect any variations that may occur between these locations, the nature and extent of which may not become evident until the construction phase of the project. We are appreciative of the opportunit y to assist you with this project and look forward to working with you in the future. Please call if you have any questions or are in need of further information. Respectfully Submitted, Machalinski Vice !'5resident Registered Professional Engineer Illinois No. 062-038559  Prepared By,. Darin Delaney Project Geologist APPENDIX UNIFIED CLASSIFICATION CHART LEGEND FOR BORING LOGS TWO (2) BORING LOGS (6 pages) BORING LOCATION PLAN (1 page) GEOPHYSICAL DATA REPORT Geotechnology, Inc. (16 pages) SOIL DATA SHEETS (12 pages) TWO (2) ANALYTICAL REPORTS First Environmental Laboratories, Inc. (5 pages)
Sa r ge nt & Lundy L -72, 070 October 2, 2 008 5.0 C L OS URE Th e d a ta a nd r es ult s pre se nted in thi s r epo rt a r e b ased up o n th e conditions e n co unt e r ed a t th e two (2) l oca ti o n s in ve s ti ga t e d as indi cated o n the So il B or in g L oca ti o n Pl a n. Thi s r epo rt does n ot r e fl ec t a ny va ri a tion s th at m ay occur between th ese l ocatio n s, th e natur e an d ex t e nt of w hi c h may not beco m e ev id e nt until th e co n s tru c ti o n ph ase o f th e pr o j ec t. W e are a ppr e ciati ve of th e opportunit y t o ass i s t yo u with thi s project a nd l ook f o rward to wo rking w ith yo u in th e futur e. Pl ease ca ll if you h ave a n y qu es ti o ns o r a r e in ne e d of furth e r inform a tion. R es pe c tfully S ubmitted , M ac h a lin s ki V i ce !'5 r es id e nt R eg i s ter ed Prof ess ional Engine e r Illin o i s No. 0 62-038559  Pr e pared By,. Darin D e l a n ey Proj ec t Geo l og i s t APPENDIX UNIFIED CLASSIFICATION CHART LEGEND FOR BORING LOGS TWO (2) BORING LOGS (6 pages) BORING LOCATION PLAN (1 page) GEOPHYSICAL DATA REPORT Geotechnology, Inc. (16 pages) SOIL DATA SHEETS (12 pages) TWO (2) ANALYTICAL REPORTS First Environmental Laboratories, Inc. (5 pages)
H
H
* x TESTING SERVICE CORPORATION UNIFlEO CLASSIFICATION CHART 0 0 " " z " -CRITERIA FOR ASSIGNING GROUP SYMBOLS AND GROUP tlAMES USING LABORATORY TESTS 0 GRAVELS Mort Ihon CLEAN GRAVELS of CGo'U Lus Ihon 5&deg;10 ,.oclion relolned fines C Cu <4 ond/o. I> Cc > 3 e 00 No.4 siev.. GRAVELS WITH Fines (Iouify as ML 0' Mil SOIL CLASSIFICATION GROUP HW80L GW GP GM GROUP NAME b Poo.lyg'oded g.ovel f Silly g.ovt'l f,O,1I GC Cloyey q.ovel f ,q ,II FINES Mo.e Ilion Fines clossHy os CL or CH 0 f-____________ i ,,,, w 0 _0 * " , o o , SANDS 50 &deg;/0 0' more of eoo,st' Iroclion pOISU No.4 sieve CLEAN SANDS Lus Ilion 5 &deg;/0 ,jnes d SANDS WITII FINES Mo,e Ilion 120/0 flnt's" Cu'-:'60nd/o' I> Cc!>3e Fines clossj,y as ML o. Mil Fines clossi'y as CL 0< CH SW SP SM SC CL Wt'II-q'oded sond , Poo.ly q.oded liond 1 Silly sand 0,11,' Cloyt'y sand 0, II, I Leon cloy k ,I,m 0 SILTS e CLAYS Liquid limil leu Ilion 500/0 PI:> 7 ond plols on or above "A' line j Ino.qon;c f-------------------
* x TES TI NG SERV I CE CORPORA TION UNIFlEO CLASS I F I CAT I ON C H ART 0 0 " " z " -CRITERIA FOR ASSIG N I N G GRO U P SYMBOLS AND GROUP tlAMES US ING LABORATORY TESTS 0 GRAVELS M ort I hon CLEA N GRAVELS o f CGo'U Lus Ih on 5&deg;10 ,.oclion relolned fine s C C u <4 ond/o. I> Cc > 3 e 0 0 No.4 siev.. G R AVE L S WITH Fines (I oui fy as M L 0' Mil S OI L CLASSIFICATION GROUP HW80L GW GP GM GROUP NAME b Poo.lyg'oded g.o ve l f Si lly g.ovt'l f,O,1I GC Cloyey q.ovel f , q , II FI N ES M o.e Ilion Fines c lo ssHy os CL or CH 0 f-____________ i ,,,, w 0 _0 * " , o o , SA ND S 50 &deg;/0 0' more of eoo,st' Iroclion pOISU N o.4 sieve CL EAN SANDS Lus I lion 5 &deg;/0 ,jnes d SAN D S WITII FINES Mo, e Ilion 1 2 0/0 flnt's" C u'-:'60nd/o' I> Cc!>3 e Fines clossj ,y as M L o. Mil Fines c l ossi'y as C L 0< C H SW SP S M SC CL Wt'II-q'oded sond , Poo.l y q.oded liond 1 S illy sand 0,11,' C l oyt'y s and 0 , II, I L eon cl oy k ,I , m 0 SI LT S e CLAY S Liquid l imil leu I lion 50 0/0 PI:> 7 ond plo l s on or above "A' line j Ino.qo n;c f-------------------
--'-----------------------
--'-----------------------
--------------+----+
--------------+----+
--------------------
--------------------
_1 0 PI <: 4 a. plots bt'low .. A" line j z . , w ** z ** ;;
_1 0 PI <: 4 a. plots b t'low .. A" lin e j z . , w ** z ** ;;
O,oonic Liquid Ii mil oven dried Liquid limil -nol dried "'" 0.75 * ". o P I plats on a. obove "A' line , w 0 z , ;:;: :; SILTS {} CLAYS Liquid limil 50 0/0 a. mo.e PI plotli bela .. ''A'' line Orqonic liquid limil -oven droed <0 Liquid limil -nol dried . IHOhly a.oanic soits Primarily o.gonic motte',dork 'n color, and o''Jonic ado.
O,oonic Liquid Ii mil oven dried Liquid lim il -nol dried "'" 0.75 * ". o P I p l ats on a. obove "A' line , w 0 z , ;:;: :; S ILT S {} CLAYS Liquid limi l 50 0/0 a. mo.e PI p lo t li bela .. ''A'' l ine O r qon i c liquid limil -oven droed <0 Liqu i d li m il -nol dri e d . IHOhly a.oanic soit s Prima r ily o.g onic mo tt e',do rk 'n colo r, and o''Jonic a d o.
* o. BaHd onlhe molt.lol passing Ihe J-in 175-mm) Ileve. b.1I field cOnloil'led cobbles ond/o. boulders,odd " .. ith cobbles al'ld/o' boulder" 10 g.oup nome. c. Grovels wilh 510 12 ala fint'S require dual symbols GW-GM 1,,11 oroded grovel .. ith sill GW-GC .. ell oroded grovel .. ith cloy GP -GM poorly (traded growel .. illl s.1t GP-GC poorly qroded q.ovel .. illI cloy d. Sands .. illl 5010 10 12 &deg;/0 fil'les ** quire duol symbols SW-SM .. ell (traded sond .. ill, silt .. SW-SC .. til (traded SOlid .. illI clOl SP -SM poo.ly I)rod.d sOl'ld .. ilt, s;lI Sf>-SC poo"y g.oded sand .. illI cloy , C _ (030' " soil conlains 15 0/0 SOlld,Odd" .. itll sand" 10 I)roup nom *. g.1f finesclonilyos CL-ML,lIu dual symbol GC-GM,SC-SM.
* o. B a H d on l he molt.lol passing I he J-i n 17 5-mm) Ileve. b.1I fi el d cO nl oil'led cobbles ond/o. bo u ld ers,odd " .. ith cobbl es al'ld/o' boul de r" 1 0 g.o u p nom e. c. Grove l s wi l h 5 1 0 1 2 ala f int'S r e quire dual sym b ols GW-GM 1,,11 oroded grovel .. ith sill GW-GC .. ell oroded g r ovel .. ith cloy GP -GM poorly (traded g r owel .. illl s.1t GP-GC poor ly qroded q.ovel .. illI c l oy d. Sa nd s .. i l ll 5 0 10 1 0 1 2 &deg;/0 fil'les ** quire duo l s ymbol s S W-SM .. ell (traded sond .. ill , si lt .. SW-SC .. t il (traded SOli d .. illI clOl SP -S M poo.ly I)rod.d sOl'ld .. ilt, s;lI Sf>-SC poo"y g.od e d sand .. il lI cloy , C _ (030' " so il conla i n s 1 5 0/0 SOll d,Odd" .. itll sand" 1 0 I)roup nom *. g.1f fines clon ily os CL-M L,lIu dua l s y m b o l GC-GM,SC-SM.
II. It fil'lu art' a''Jonie,odd'' .. itll o.gonic fines" 10 ?rOUP l'Iome. I II soil conloil'l l? 15 &deg;/0 orovel,odd" .. ilh orov.I' 10 I)roup nome. 0 ML Sill .,I,m OL O'oonic cloy .,I,m,n Organic sill -, I ,m,o '" roO cloy k,I,m M" Eloslic sill k,l,m 0" O.qonic cloy*,I,m,P O''Jonic sill k,I,m,q PT Pt'ol I. If Alle.berg limits pial 11'1 hOlched area, soil is a CL-ML, ,illy cloy. k.1I soil conloins 1510 29 &deg;/0 plus No. 200,odd " .. "hsond" Or "",illl 9rovt'I" .... hichever 'S predominol'll. .... soil conloins?;,. 30&deg;10 plus No. 200,p.edomll'lonlly  
II. It f il'lu a r t' a''Jonie , odd'' .. itll o.gonic fines" 10 ?r OU P l'I ome. I II soi l conloil'l l? 15 &deg;/0 o r ovel ,odd" .. ilh orov.I' 10 I)ro u p nome. 0 ML Sill .,I,m OL O'oonic cloy .,I,m,n Organic si ll -, I ,m,o '" roO cloy k ,I ,m M" Elos l ic si ll k, l ,m 0" O.qonic cloy*,I , m,P O''J onic s i ll k ,I, m,q PT P t'ol I. If A lle.berg limit s pial 11'1 hOlched area, soi l i s a CL-ML, ,i lly c l oy. k.1I so il con l oins 15 10 2 9 &deg;/0 p lus No. 200,odd " .. " hsond" O r "",illl 9rov t'I" .... h ic h e v e r 'S predomin o l'l l. .... soi l conloins?;,. 30&deg;10 plus No. 200 , p.e d omll'lonlly  
!ol'ld, odd "sandy" 10 (t.oup nome. m.1I soil
!ol'ld, odd "sandy" 10 (t.oup n ome. m.1I soi l
&deg;/oP11l5 Na.200,p'eda rninOl'llly Olavel, odd ''orovrIlY'' 10 oroup nome.
&deg;/oP11l5 Na.200,p'eda rn inOl'llly O la ve l, odd ''o r ovr Il Y'' 1 0 oroup nom e.
and plols 01'101 obovt"h" IIl'Ie. o. 4 0. plols btto .. ':{Io':, line. :: IIl'Ie. V / V // / 0 V :? / / v' 0 / // / -. V / 0 V V * // / 'v MH OR 0 0 V / / // / 0 r --;;; / V ML 0 OL L-ML)!:; '///,Y oV 0 , o '0 JO .0 '0 .0 10 80 90 '00 L10UID LIMIT ( LLl FILL TOPSOIL SAMPLE TYPE: TESTING SERVICE CORPORATION LEGEND FOR BORING LOGS -.... ---..... PEAT GRAVEL SS Split Spoon ST Thin:Walied Tube A = Auger SAND SILT CLAY FIELD AND LABORATORY TEST DATA: N = Standard Penetration Resistance in Blows per Foot Wc Qu In-Situ Water Content Unconfined Compressive Strength in Tons per Square Foot DOLOMITE
and plo l s 01'101 obovt"h" IIl'Ie. o. 4 0. p l o l s btto .. ':{Io': , l ine. :: IIl'Ie. V / V // / 0 V :? / / v' 0 / // / -. V / 0 V V * // / 'v MH OR 0 0 V / / // / 0 r --;;; / V ML 0 O L L-ML)!:; '///,Y o V 0 , o '0 JO .0 '0 .0 10 80 90 '00 L10UID LIM I T ( LLl FILL TOPSOIL SAMPLE TYPE: TESTING SERVICE CORPORATION LEGEND FOR BORING LOG S -.... ---..... PEAT GRAVEL SS Sp lit Spoon ST Thin:Walied Tube A = Auger SAND SILT CLAY FIELD AND LABORATORY TEST DATA: N = Sta ndard Penetration Resistance in Blows per Foot Wc Qu In-S itu Water Content Unconfined Co mpressi ve S tr e ngth in Tons p e r Sq u a r e F oo t DOLOMITE
* Pocket Penetrometer Measurement; Maximum Reading = 4.5 tsf yD Dry Unit Weight in Pounds per Cubic Foot WATER LEVELS: SOIL DESCRIPTION: V \l ... While Drilling End of Boring 24 Hours MATERIAL BOULDER COBBLE Coarse GRAVEL Small GRAVEL Coarse SAND Medium SAND Fine SAND SILT and CLAY COHESIVE SOILS CONSISTENCY Qu Very Soft Soft Stiff Tough Very Tough Hard Less than 0.3 0.3 to 0.6 0.6 to 1.0 1.0 to 2.0 2.0 to 4.0 4.0 and over MODIFYING TERM Trace linle Some PARTICLE SIZE RANGE Over 12 inches 12 inches to 3 inches 3 inches to '/. inch '/. inch to No.4 Sieve No.4 Sieve to No.1 0 Sieve No. 10 Sieve to No. 40 Sieve No. 40 Sieve to No. 200 Sieve Passing No. 200 Sieve COHESIONLESS SOILS RELATIVE DENSITY Very Loose Loose Firm Dense Very Dense PERCENT BY WEIGHT 1 -10 10 -20 20 -35 _N_ 0-4 4 -10 10 -30 30 -50 50 and over   
* Pocket Penetrometer M eas ur e m e nt; Maximum Re ad ing = 4.5 t s f yD Dry Unit Weight in Pound s p e r Cubic Foot WATER LEVELS: SOIL DESCRIPT I ON: V \l ... While Drilling End of Boring 24 Hours MATER I AL BOULDER COBBLE Coarse GRAVEL Sma ll GRAVE L Coarse SAND Medium SAN D Fine SA ND S ILT and CLAY COHESIVE SOILS CONSISTENCY Qu Very Soft Soft St iff Tough Very Tough Hard L ess than 0.3 0.3 to 0.6 0.6 to 1.0 1.0 to 2.0 2.0 to 4.0 4.0 a nd over MODIFY I NG TERM Trace linle Some PARTICLE SIZE RANGE Over 1 2 inches 1 2 in c h es to 3 inch es 3 inch es to '/. inch '/. in c h to No.4 S iev e No.4 S i eve to No.1 0 S ieve No. 10 Sieve to No. 40 S ie ve No. 40 S i e ve to No. 200 Sieve Passing No. 200 Sieve COHESIONLESS SO I LS RELATIVE DENS I TY Very Loo se Loo se Firm Dense Very D e n se PERCENT BY WEIGHT 1 -10 10 -20 20 -35 _N_ 0-4 4 -10 10 -30 30 -50 50 a nd over   
.... "' "' "' z H "' "' is Ul :;: 0 ,.., "' III "' U .... Ul H Cl Q " o o 5 10 15 20 25 30 35 40 PROJECT ISFSI Zion Nuclear Power Plant CLIENT Sargent & Lundy, LLC BORING 1-20 '-="'-----DATE ST ARTED _-,8,-.. ELEVATIONS ___ _ END OF BORING ___ _ ,.: (90 SAMPLE YDRY zu N WC au DEPTH ELEV. NO. TYPE -> -' , 1 SS 5* 11*13 3.0 584.2 .. Ixi -> < 2 SS 2* 2*4 5.5 581.7 -... X* -3 SS 2* , 1-1 -' .. X* -. 4 SS 1* 2*3 10.5 576.7 -...... xl -' .. 5 SS 8* , . 10-12 -' ... . . -... 6 SS 7* -: .... 8-10 ;....;....;
.... "' "' "' z H "' "' is Ul :;: 0 ,.., "' III "' U .... Ul H Cl Q " o o 5 10 1 5 2 0 25 30 35 40 PROJECT I SFS I Z ion Nu c lear Power P l ant C LI E NT Sargent & Lundy, LLC BORING 1-2 0 '-="'-----DATE ST ARTE D _-, 8 ,-.. EL EVAT I ONS ___ _ E N D OF BOR IN G ___ _ ,.: (90 SAMPLE Y DR Y zu N WC au DEPTH ELEV. N O. TYPE -> -' , 1 SS 5* 11*1 3 3.0 584.2 .. Ixi -> < 2 SS 2* 2*4 5.5 58 1.7 -... X* -3 SS 2* , 1-1 -' .. X* -. 4 SS 1* 2*3 10.5 576.7 -...... x l -' .. 5 SS 8* , . 10-1 2 -' ... . . -... 6 SS 7* -: .... 8-10 ;....;....;
15.5 571.7 -,",', Ixl -' .... 7 SS 9* 23*22 -' -" *x. 8 SS 10* -' 17-19 -' .. xl 9 SS 13* -. 14*21 23.0 564.2 -xl 10 SS 14* -' 30*29 25.5 561.7 -tl -11 SS 8-26.6 5*5 28.0 559.2 -12 SS 8-11.0 4.5+' 129.9 -10*11 --13 SS 8* 11.2 6.73 128.4 9*13 --xl 14 SS 7* 20.5 4.73 108.5 -7*10 -xl -15 SS 10* 12.8 6.90 125.2 14-15 38.0 549.2 -IX. 16 SS 31* 14.8 120.4 5015" .. DRILL RIG NO. 315 DIVISion lines beh.ccn depoSits represent dppro-:irna le boundClli
15.5 571.7 -," ,', Ix l -' .... 7 SS 9* 23*2 2 -' -" *x. 8 SS 1 0* -' 17-1 9 -' .. x l 9 SS 13* -. 14*2 1 23.0 564.2 -x l 10 SS 14* -' 30*29 25.5 5 6 1.7 -tl -11 SS 8-26.6 5*5 28.0 559.2 -1 2 SS 8-1 1.0 4.5+' 129.9 -1 0*11 --1 3 SS 8* 11.2 6.73 1 28.4 9*1 3 --x l 14 SS 7* 20.5 4.73 1 08.5 -7*10 -x l -1 5 SS 10* 1 2.8 6.90 1 25.2 14-15 38.0 549.2 -IX. 1 6 SS 31* 14.8 120.4 50 1 5" .. DRILL RIG NO. 315 DIV I Sion lines beh.ccn d epoSi t s r ep resent dppro-:irna l e boundClli (!s Ile l::een sOl ll Wes IIl-S!Il1.
(!s Ilel::een sOlllWes IIl-S!Il1.
the transition may ba grmJlI<l1 D ATE CO MPL ETED _-'8 ..... 1.:..4.:.. .. "'0.:..8_ J OB L .. 72,070 WATER L EVE L OBSERVAT I O N S V W HI LE DR I LLIN G 3.5 ' \l AT E ND OF BORING __ ---'M"'u::.d::..:..R::: o..:: ta:..: r ,L y-'W"'a::: s:..: h-'-__ ... 24 H O U RS (PVC P i pe I nsta ll ed) SO IL DE SCR I PTIONS Firm brown a nd g r ay fine to medium SA ND , tra ce gravel , damp (SP) v Lo ose brown a nd gray fin e t o medium SA ND , tr ace gravel , sa turat ed (SP) \ S-2: % Graval = 8 / % Sa nd = 86 oj" Silt a nd -6 L oose d a r k gray fine t o m ed ium SA ND , t race gra ve l , sa tur ated (SP) Firm gray fin e to medium SA ND , tra ce gravel, saturated (SP) S-7: % Gravel = 5 % Sand = 9 1 % S ilt a nd C la y = 4 D e n se gray fin e t o m ed ium SA ND , tr ace gr ave l , s atur a t e d (SP) Den se gra y fin e SA ND , tr a ce s ilt , sa tur a t ed (SP-SM) Firm gr ay sa ndy S ILT, sa turated (Ml) S-1 2: (ll , Pl , P I) 22,11 , 11 % Grav e l = 3 % Sand = 24 % Si lt = 52 % C l ay = 2 1 Ve r y t o ugh to h a rd g r ay s ilt y CLAY , so m e sa nd , trac e gravel , moi s t (Cl) Ve r y dense gray c lay ey S i lT , very m o i s t (Ml) Pag e 1 of 3 f-< '" '" u. z H '" u. g; UJ :;: 0 '"' '" 00 '" f-< UJ H " &sect; o u i" PROJ ECT I S FS I Z ion N u c l ea r Pow 0'...r.'.P .. l a .. n ... t __ _ CLIENT Sargent & Lund y, LLC BORIN G .'.1-.=2 c::.0 __ _ DAT E STARTED _--, 8'...-.:.: 1 2::.-", 08:::....._
the transition may ba grmJlI<l1 DATE COMPLETED _-'8 ..... 1.:..4.:.. .. "'0.:..8_ JOB L .. 72,070 WATER LEVEL OBSERVATIONS V WHILE DRILLING 3.5 ' \l AT END OF BORING __ ---'M"'u::.d::..:..R:::o..::ta:..:r,Ly-'W"'a:::s:..:h-'-__ ... 24 HOURS (PVC Pipe Installed) SOIL DESCRIPTIONS Firm brown and gray fine to medium SAND, trace gravel, damp (SP) v Loose brown and gray fine to medium SAND, trace gravel, saturated (SP) \ S-2: % Graval = 8 / % Sand = 86 oj" Silt and -6 Loose dark gray fine to medium SAND, trace gravel, saturated (SP) Firm gray fine to medium SAND, trace gravel, saturated (SP) S-7: % Gravel = 5 % Sand = 91 % Silt and Clay = 4 Dense gray fine to medium SAND, trace gravel, saturated (SP) Dense gray fine SAND, trace silt, saturated (SP-SM) Firm gray sandy SILT, saturated (Ml) S-12: (ll, Pl, PI) 22,11,11 % Gravel = 3 % Sand = 24 % Silt = 52 % Clay = 21 Very tough to hard gray silty CLAY, some sand, trace gravel, moist (Cl) Very dense gray clayey SilT, very moist (Ml) Page 1 of 3 f-< '" '" u. z H '" u. g; UJ :;: 0 '"' '" 00 '" f-< UJ H " &sect; o u i" PROJECT ISFSI Zion Nuclear Pow0'...r.'.P .. la .. n ... t __ _ CLIENT Sargent & Lundy, LLC BORING .'.1-.=2c::.0 __ _ DATE STARTED _--,8'...-.:.:12::.-",08:::....._
E L EVAT I ONS GROUND S URF ACE _-'5 ,,8 .. 7 ... 2=--___ _ E ND OF BORING _..::4,,8  
ELEVATIONS GROUND SURFACE _-'5,,8 .. 7 ... 2=--___ _ END OF BORING _..::4,,8  
.. 7 .. , 2=--___ _ ;..; "0 SAMPLE Y DR Y zu N WC Qu DEPT H ELEV. NO. TYPE 55 60 65 40.5 546.7 --I -1 7 SS 11-9.6 1 0.7 1 133.8 14-14 --I 1 8 SS 10-10.6 5.90 13 1.0 11 -xl -19 SS 11-10.5 9.38 131.3 13-1 3 --x l 20 SS 8-12.9 5.1 2 1 24.4 1 5 -x l -2 1 SS 9-1 3.8 5.06 1 22.7 1 0-13 --x l 22 SS 8-13.4 5.32 123.7 14 -6 1 -23 SS 12-13.4 6.23 123.7 17 -ZI 2 4 SS 1 2-1 5.7 5.1 2 118.3 1 5-1 5 -C>I -25 SS 10-20.3 4.0 7 108.8 11-1 3 -xl -26 SS 8-20.1 3.93 1 06.9 11 -;;; 127 -;;; SS 8-13.8 4.53 11 7.7 8-8 40 45 50 68.0 519.2 -;;; 1 28 SS 1 0* 17.4 3.0 1 114.6 -;;; 50/6" -;;; -/ 29 SS --70 72.5 5 14.7 -;;; -;;; X 30 SS 25-7.6 14.57 113.8 --34-42 -;;; 1 31 -;;; SS 21-11. 1 4.5* ..
.. 7 .. ,2=--___ _ ;..; "0 SAMPLE YDRY zu N WC Qu DEPTH ELEV. NO. TYPE 55 60 65 40.5 546.7 --I -17 SS 11-9.6 10.71 133.8 14-14 --I 18 SS 10-10.6 5.90 131.0 11 -xl -19 SS 11-10.5 9.38 131.3 13-13 --xl 20 SS 8-12.9 5.12 124.4 15 -xl -21 SS 9-13.8 5.06 122.7 10-13 --xl 22 SS 8-13.4 5.32 123.7 14 23 SS 12-13.4 6.23 123.7 17 -ZI 24 SS 12-15.7 5.12 118.3 15-15 -C>I -25 SS 10-20.3 4.07 108.8 11-13 -xl -26 SS 8-20.1 3.93 106.9 11 -;;; 127 -;;; SS 8-13.8 4.53 117.7 8-8 40 45 50 68.0 519.2 -;;; 128 SS 10* 17.4 3.01 114.6 -;;; 50/6" -;;; -/ 29 SS --70 72.5 514.7 -;;; -;;; X 30 SS 25-7.6 14.57 113.8 --34-42 -;;; 131 -;;; SS 21-11. 1 4.5* ..
* 1 29.6 / 3 1-36 75 78.0 509.2 -IX 1 32 SS 37* 10.7 1 30.7 50/5" -80 RIG NO. 3 1 5 DI V ISion hnes bc t'.-.een del}QSl l s represen t appfO"una t c buum t[lries beh'.een soil l ypes in*Sl l u tile tr ansitio n may be gradual DATE COMPLETED
* 129.6 / 31-36 75 78.0 509.2 -IX 132 SS 37* 10.7 130.7 50/5" -80 RIG NO. 315 DIVISion hnes bct'.-.een del}QSlls represent appfO"una tc buumt[lries beh'.een soillypes in*Sllu tile transition may be gradual DATE COMPLETED
_-,8'..-1.'.4.'.-.:: 0 8 ,,-_ JOB L-72, 0 7D WATE R LEVEL OBS ERVATION S V W H IL E DR I LLIN G 3.5 ' \l AT END OF BORI N G __ ---'M .. __ " 24 H OURS (PVC Pip e Install e d) SO IL DES CR I PTIONS Very tough to hard gray si lt y CLAY, l i ttl e sand , tr ace gr ave l , moist (Cl) S-22: (ll, Pl , P I) = 31 , 1 2 , 1 9 % Grave l = 1 % Sand = 15 % Si lt = 50 % C l ay = 34 Ve r y to ugh t o h a rd g r ay si lt y CLAY, littl e sa nd , tr ace gra ve l, o ccas i o n a l Cobb l es, mo i s t (Cl) Bould e r Zo n e 69.5 to 72.5' Ve r y t oug h to hard gray s ilty C L AY , littl e sa nd , t r ace gravel , occasio n al s ilt sea m s, moi s t (C l) Ve r y d e n se gray c l ayey S i lT , lilli e sa ncl , moi st (Cl-Ml) Page 2 o f 3 PROJECT ISF S I Z i on Nuclear Power Plant C LI E NT Sargent & Lund
_-,8'..-1.'.4
* LLC BORING ;..1-.=2 ,-=0 __ _ DATE STARTED ___ 8'---1.:.: 2:...-0::: 8'----_ DA T E COMPL ETED _-, 8 ,---1;..4;..-", 0", 8_ JOB L-72, 070 E LEV A TI O N S WA TER L EVEL OB SERVAT ION S GROUND SURFACE ___ 5::8:.:.7.:.:.2=--___ _ V WHILE DR I LLING 3.5 ' END OF BOR IN G 487.2 'V AT END OF BOR IN G __ ----'M", u::: d"-'.: R:: o:.:.ta::.: r.!.y __ W=as ... ___ >< '"
.'.-.::08,,-_ JOB L-72,07D WATER LEVEL OBSERVATIONS V WHILE DRILLING 3.5 ' \l AT END OF BORING __ ---'M .. __ " 24 HOURS (PVC Pipe Installed) SOIL DESCRIPTIONS Very tough to hard gray silty CLAY, little sand, trace gravel, moist (Cl) S-22: (ll, Pl, PI) = 31,12,19 % Gravel = 1 % Sand = 15 % Silt = 50 % Clay = 34 Very tough to hard gray silty CLAY, little sand, trace gravel, occasional Cobbles, moist (Cl) Boulder Zone 69.5 to 72.5' Very tough to hard gray silty CLAY, little sand, trace gravel, occasional silt seams, moist (Cl) Very dense gray clayey SilT, lillie sancl, moist (Cl-Ml) Page 2 of 3 PROJECT ISFSI Zion Nuclear Power Plant CLIENT Sargent & Lund
to 0 SAMP L E ... 24 H OUR S (P V C Pip e I nstalled)
* LLC BORING ;..1-.=2,-=0 __ _ DATE STARTED ___ 8'---1.:.:2:...-0:::8'----_ DATE COMPLETED _-,8,---1;..4;..-",0",8_ JOB L-72,070 ELEVATIONS WATER LEVEL OBSERVATIONS GROUND SURFACE ___ 5::8:.:.7.:.:.2=--___ _ V WHILE DRILLING 3.5 ' END OF BORING 487.2 'V AT END OF BORING __ ----'M",u:::d"-'.:R::o:.:.ta::.:r.!.y __ W=as ... ___ >< '"
N WC Q u Y DRY D EPT H ELEV. SO IL DESCR I PTIONS Z U f-.'-'''':''=
to 0 SAMPLE ... 24 HOURS (PVC Pipe Installed)
N WC Qu Y DRY DEPTH ELEV. SOIL DESCRIPTIONS Z U f-.'-'''':''=
--j NO. TYPE
--j NO. TYPE
__ -"Xl 33 % Gravel = &deg; _ SS 43-12.0 127.3 % Sand = 27 50/4" % Silt and Clay = 73 --Xl 34 SS 44-85-50/4" /'11 SS 9-8-9 --XI36 90-SS 7-8-11 = Xl SS 8-12-13 --IXI 38 95-'" SS 8-12-13 -*:<1'11 SS 26-27-15 -12.1 13.2 15.1 2.55 18.0 3.21 16.0 2.48 16.2 4.0' 17.3 3.0' 12.1 13.9 2.0 86.0 501.2 87.0 500.2 119.7 gray clayey SILT, little sand, moist Firm gray clayey SAND, saturated (SC) Very tough to hard gray very silty CLAY, little sand, occasiona l silt seams, moist (CL-ML) Dense gray fine to medium SAND, saturated (SP) Very tough gray very silty CLAY, little sand, occasional silt seams, moist (CL-ML) _---l'l..l.JL4'IX
__ -" X l 33 % G r ave l = &deg; _ SS 43-12.0 1 27.3 % Sand = 27 50/4" % Silt a nd C l ay = 73 --X l 34 SS 44-85-50/4" /'11 SS 9-8-9 --X I 36 90-SS 7-8-11 = Xl S S 8-12-1 3 --IXI 38 95-'" SS 8-12-13 -*:<1'1 1 SS 26-27-15 -12.1 1 3.2 1 5.1 2.55 1 8.0 3.21 1 6.0 2.48 1 6.2 4.0' 1 7.3 3.0' 1 2.1 1 3.9 2.0 86.0 5 01.2 87.0 5 00.2 119.7 g r ay c layey SILT , littl e sa nd , moist Firm gray cl a yey SAND, saturated (SC) Ve r y tough t o hard gray very s ilty C L AY, little sand, occasiona l silt seams, m o i s t (CL-ML) Den se gr a y fin e to medium SA ND , sa turat ed (SP) Very t oug h gray ve ry silty CLAY, littl e sand , occasional s ilt sea ms, moi s t (CL-ML) _---l'l..l.JL4'IX
--'1 40 SS 11.9 2.0' 5 100 w In W [-0 (J) '4 ---Cl 105-" " ----110----115----End of Boring at 100.0'
--'1 40 SS 11.9 2.0' 5 100 w In W [-0 (J) '4 ---Cl 105-" " ----110----11 5----End of Boring a t 100.0'
* Approximate unconfined compressive strength based on measurements with a calibrated pocket penetrometer. Diedrich D-120 Truck Rig (#315) CME Automatic Hammer R ,_ DIVISion hnes between deposits represent DRILL RIG NO. 315 <'lpprOXnllale boundaries bel\'.'een salt types in-sllu, the transition be gradual Page 3 of 3 PROJECT ISFSI Zion Nuclear Power ________________
* Approx im ate un co nfined compressive s tr e n gth ba se d o n mea s ur eme nts w ith a ca libr a t ed po c ket penetrom e t e r. Diedri c h D-1 20 Truck Rig (#3 1 5) CME Autom a ti c H a mmer R ,_ DIVISion hnes be t wee n deposits repre se nt DRI LL RIG NO. 3 1 5 <'lpprO X nllale b o undar i es bel\'.'e e n salt t ypes i n-sl l u , the t ransi t ion be gr a dua l Pag e 3 of 3 PR OJ ECT I SFS I Z i on Nuclear Power ________________
_ E-< '" '" "-Z H '" "-!3 Ul " 3 '" "' '" Ul H '" i;l , " CLIENT Sargent & Lundy, LLC BORING 1-21 .:...::'-'----DATE START E D _-'8'--".::18::.":0&deg;8"---_ ELEVATIONS GROUND SUR FACE _--'5,,8,,7.:.:.1'---___ _ END OF BORING _-=4,,8,,7.:.:,1'---___ _ E-< '-'0 SAMPLE YDRY zu N WC Qu DEPTH ELEV. NO, TYPE h IX 1 SS 6--... 8-9 3.0 584.1 o -,> IX 2 SS 4-f-' 7-10 5.5 581.6 5 -,'.'. xl -:< 3 SS 4-5-9 , -, . -:'"-XII 4 SS 10-,-.". 13-15 10 ..... -" , -:' , .. , -.. ", . -' X_ SS 5 8-,-. >: 13-14 15 -' -. .. -. -: , -, 'IX. 6 SS 11--' 13-13 20 -;:' 22.0 565.1 -:,' X. -'. 7 SS 10--15-12 25 -. 27.0 560.1 ... -.. -"0' X 8 SS 6--8-11 30 --, 32.0 555.1 --xl 9 SS 16-12.7 5.41 122.7 21 --35 38.0 549.1 --i 10 SS 36-12.2 4.5+' 50/4" 40 ,. DIVISion lines bel' .. een depoSits represent appro)[unate boundaries beh&deg;.'een S!)III}PCS. in-sllll, the tranSItion may be gradual DRILL RIG NO. 315 DATE COMPLETED 8"18"08 ----'-'--'-''-------
_ E-< '" '" "-Z H '" "-!3 Ul " 3 '" "' '" Ul H '" i;l , " CLIENT Sa rg e nt & Lundy, LLC BORING 1-2 1 .:...:: '-'----DATE S T A RT E D _-'8'--".:: 1 8::.":0&deg;8"---_ E L EVAT I ONS GROUND S UR FAC E _--'5 ,, 8 ,, 7.:.:.1'---___ _ END OF BO RING _-=4,,8 ,,7.:.: , 1'---___ _ E-< '-'0 S AMPLE Y D RY z u N WC Qu DEPTH ELEV. NO , TYPE h I X 1 S S 6--... 8-9 3.0 584.1 o -,> I X 2 SS 4-f-' 7-10 5.5 581.6 5 -,'.'. xl -:< 3 SS 4-5-9 , -, . -:'"-X II 4 SS 1 0-,-.". 1 3-1 5 10 ..... -" , -: ' , .. , -.. ", . -' X_ SS 5 8-,-. >: 1 3-14 1 5 -' -. .. -. -: , -, 'I X. 6 SS 11--' 13-13 20 -;:' 22.0 565.1 -: ,' X. -'. 7 S S 10--1 5-12 25 -. 27.0 560.1 ... -.. -"0' X 8 SS 6--8-11 3 0 --, 32.0 5 5 5.1 --x l 9 SS 1 6-1 2.7 5.41 122.7 21 --35 38.0 5 4 9.1 --i 1 0 S S 36-1 2.2 4.5+' 50/4" 40 ,. DI V ISion lines be l' .. een d e poSits repre se n t appro)[u na t e boundaries beh&deg;.'een S!)II I}PCS. in-sllll , t he t ranSIti on ma y be gradual DR I LL R I G N O. 3 1 5 D ATE CO M P LET ED 8" 1 8" 08 ----'-'--'-''-------
JOB L"72,070 WATER LEVEL OBSERVATIONS V WHILE DRILLING 5,5 ' \l AT END OF BORING ___ --'-R"'oc:ta.:::r"'y_W'-'-=a-=-sh"---__ _ l' 24 HOURS Grouted Upon Completion SOIL DESCRIPTION S Firm brown and gray clayey SAND and GRAVEL, damp (SC-GC) Firm brown and gray SAND, trace gravel, damp (SP) \S-2: % Gravel = 1 I % Sand = 95 % Silt and Clav 4 S-5: % Gravel = 24 % Sand = 72 % Silt and Clay = 4 Firm gray SAND, some gravel, occasional Cobbles, saturated (SP) Firm gray SAND, saturated (SP) Firm gray silty fine to medium SAND, saturated (SM) S-9: (LL, PL, PI) = 28, 14, 14 % Gravel = 1 % Sand = 8 % Silt = 59 % Clay = 32 Very tough to hard gray silty CLAY, trace sand, trace gravel, moist (CL) Very tough to hard gray very silty CLAY, little sand, trace gravel. occasional silt searns, damp ICL-IVILl _ --' rage 1 of 3 Co OJ OJ '" z H OJ ;;! '" !3 (f) '" &deg; .., W '" W u ::i! Co (f) H 0 o " U 40 45 50 55 60 65 70 75 80 PRO,IECT ISFSI Zion Nuclear Power Plant CLIENT Sargent & Lundy, LLC BORING ,-1-=2-,-1 __ _ DATE STARTED _-,8,--1.:.:8,--",08,,--_ ELEVATIONS GROUND SURFACE ___ 5.,.8.:.7'-',1 _____ _ END OF BORI NG _--=4:::8,,7.:.,1'--___ _ Co "0 SAMPLE YDRY zu N WC Qu DEPTH ELEV, NO. TYPE -42,0 545.1 -V -xl 11 SS 16-13,0 4.0' 124.7 25 ---
JO B L"72, 070 WAT E R LEVE L OB SE R VA TI O N S V WH I L E DRILLING 5,5 ' \l AT END OF BOR I NG ___ --'-R"'o c: t a.::: r"'y_W'-'-=a-=-sh"---__ _ l' 2 4 HOURS Grouted Upon Comp l etion S O I L DESCRIPTION S Firm brown a nd gray clayey SAND and GRAVEL, damp (SC-GC) Firm brown a nd gray SAND , trace g r avel, damp (SP) \S-2: % G r ave l = 1 I % Sa nd = 95 % S ilt a nd C l av 4 S-5: % G r ave l = 24 % Sa nd = 72 % S ilt a nd C lay = 4 Firm gray SAND, so m e gra ve l , occas i onal Cobb l es, sa tur a t e d (SP) Firm g r ay SA N D, sa turat ed (SP) F irm g r ay s ilt y fin e to m ed ium SAND, sa tur a t e d (SM) S-9: (LL , PL, PI) = 28, 14 , 14 % G r ave l = 1 % Sand = 8 % S ilt = 59 % Clay = 32 Ve r y tou g h to h a rd gray sil t y CLAY , tr ace sand , trace grave l , moist (CL) Very tough to hard gray ve ry s ilt y CLAY , little sa nd , t rac e grav e l. occas i o n a l s ilt se arns , damp I CL-IVILl _ --' r a ge 1 of 3 Co OJ OJ '" z H OJ ;;! '" !3 (f) '" &deg; .., W '" W u ::i! Co (f) H 0 o " U 40 45 5 0 55 60 65 70 75 80 P RO ,IEC T I SFS I Z i o n Nucl ea r Power P l a nt CLIENT Sa rg e nt & Lundy, LL C BORING ,-1-=2-,-1 __ _ DATE S TARTED _-, 8 ,--1.:.: 8 ,--", 0 8 ,,--_ ELE VAT I ONS GROU N D SURFACE ___ 5.,.8.:.7'-', 1 _____ _ EN D OF BORI N G _--=4::: 8 ,, 7.:., 1'--___ _ Co "0 SAMP LE Y DRY zu N WC Qu DEPTH ELEV, NO. TYP E -42,0 545.1 -V -xl 11 SS 16-1 3,0 4.0' 124.7 25 ---
-Xl 12 SS 15-9.7 9.22 133.5 34 -52,0 535.1 -13 SS 26-9,9 3.5' 50/3" --58,0 529,1 IX. 14 SS 17-29 5011" .. .. IX* 15 ss 27--:: 24-24 .-.......:::
-X l 1 2 SS 1 5-9.7 9.22 133.5 -3 1-34 -52,0 535.1 -1 3 SS 26-9,9 3.5' 50/3" --58,0 529,1 IX. 14 SS 17-29 5011" .. .. I X* 1 5 ss 27--:: 24-2 4 .-.......:::
68.0 519.1 --'" IX 16 SS 14-14,5 7,73 121.1 -; 17-20 -/: ---xl 17 SS 14-15.7 2,5' 118,3 23 --? -? -rt1lxl 18 5S 16-13,3 6.23 124.0 16*18 ......J..1LI
68.0 5 1 9.1 --'" I X 16 SS 1 4-14 , 5 7,73 1 21.1 -; 17-20 -/: ---x l 17 SS 14-15.7 2,5' 1 18 , 3 23 --? -? -rt1 lxl 1 8 5S 16-13 , 3 6.23 124.0 1 6*18 ......J..1LI
__ , .. DRILL RIG NO, 315 01'/'510n hnes bel .. cen depoSits represent approxllna!C bOllildarics bel\".ecn sOlllypes. In-situ. tile tranSition be gradual DATE COMPLETED 8-18-08 ---'-'-'-'-
__ , .. DR ILL RIG NO , 3 1 5 01'/'510n hnes bel .. ce n depoSi t s represen t approx lln a!C bOllilda r ics bel\".ecn sOll lyp es. In-situ. til e tr anSition be gradual DATE CO MPL E TED 8-18-08 ---'-'-'-'-
JOB L-72,070 WATER LEVEL OBSERVATIONS V WHILE DRILLING 5,5 ' '\! AT END OF BORING ___ __ _ ... 24 HOURS Grouted Upon Completion SOIL DESCRIPTIONS very tougn to hard gray very silty GLAY, lillie sand, trace gravel, occasional silt seams, damp (CL-Ml) S-11 : (ll, Pl, PI) = 23, 12, 11 % Gravel = 5 % Sand = 20 % Silt = 51 % Clay = 24 Very tough to hard gray silty CLAY, little sand, trace gravel, moist (Cl) Very tough to hard gray very silty CLAY, little sand, trace gravel, moist (Cl) Dense to very dense gray SAND and GRAVEL, occasional Cobbles and Boulders, saturated (SP-GP) Very tough to hard gray silty CLAY, little sand, trace gravel, moist (Cl) S-17: (ll, Pl, PI) = 25,12,13 % Gravel = 3 % Sand = 19 % Silt = 51 % Clay = 27 ----Page 2 of 3   
JOB L-72,070 WA T ER LE VEL OBSERVATIONS V W HI LE DR I L LIN G 5,5 ' '\! AT E N D OF BORING ___ __ _ ... 24 HOURS Grout ed Upon Completion SO IL DESCRIPTIONS very t o u gn t o ha rd g ray ve ry s ilty GLAY, lilli e sa nd , tr ace g r ave l , occas i o n a l s ilt sea m s, damp (CL-Ml) S-11 : (ll , Pl , PI) = 23 , 1 2, 11 % G r ave l = 5 % Sa nd = 2 0 % S ilt = 5 1 % C l a y = 2 4 Ve r y tou g h to h ard gray s ilt y C L AY, littl e sand , tra ce grave l , moi s t (Cl) Very tou gh to h ard gray ve r y s ilty C L AY, littl e sa nd, tr ace grave l , moist (Cl) D e n se t o ve r y d ense gray SA ND a n d GRAV EL , occa s i o n a l Co bbles a nd Bou l d e r s, sa turated (SP-GP) Ve r y t oug h to h a rd gray s ilty C L AY, little sa nd, trace grave l , moist (Cl) S-1 7: (l l , Pl , P I) = 25 , 1 2 , 1 3 % G r avel = 3 % Sa nd = 1 9 % Sil t = 5 1 % C l ay = 27 ----Pag e 2 o f 3   
,... '" '" u. z H '" i;! u. !3 Ul 3 0 .., '" "' '" U c' Ul H Cl " 00 PROJECT ISFSI Zion Nuclear Power Plant CLIENT Sargent & Lundy, LLC BORI NG .:.1--=2:..:1'-----
,... '" '" u. z H '" i;! u. !3 Ul 3 0 .., '" "' '" U c' Ul H Cl " 00 PRO JEC T I SFS I Z i on Nuclear Power P l a nt CLIE NT Sarge nt & L undy, LL C BORI NG .:.1--=2:..:1'-----
__ _ DATE STARTED _-,8:.-.:.:18:.-.::0:.8_ ELEVATIONS
__ _ DATE S T ARTED _-, 8:.-.:.: 18:.-.:: 0:.8_ ELE VA TION S
___ _ END OF BORING _--=4 ..
___ _ E ND OF BORING _--=4 ..
___ _ ,... 00 SAMPLE YDRY zu N WC Qu DEPTH ELEV. '" NO. .., TYPE 80 ---IX_ -19 SS 10-13.4 4.5+" 21 85 -87.0 500.1 --IX 20 SS 11-17.5 3.5' 26 90 ---95 -!X 21 SS 15-13.2 4.5+* 25 ---100 -10122 SS 20-10.3 4.5+" 29-37 ----105 -----110 --
___ _ ,... 00 SAMPLE Y DRY zu N WC Qu DEPTH E L EV. '" NO. .., TYPE 80 ---IX_ -19 SS 10-1 3.4 4.5+" -1 8-2 1 85 -87.0 500.1 --IX 20 SS 11-1 7.5 3.5' 26 90 ---95 -!X 2 1 SS 15-1 3.2 4.5+* 25 ---100 -10122 SS 20-10.3 4.5+" 29-37 ----10 5 -----11 0 --
-
-
--115 -----120 " DRILL RIG NO. 315 D,VISion lines bell.cen deposits represent approxllnatc boumlMlcs beh':een 5011 types. in-situ. the IranSI\lon may be gractl1at Ii &--131 DATE COMPLETED
--1 1 5 -----1 2 0 " DRILL RIG N O. 315 D,VISion lines bell.cen deposits represen t approx lln atc b o umlMl cs beh':een 5011 t y pes. in-situ. the Ir anSI\l on may be gractl 1 at Ii &--131 DATE COMPLETED
_-,8:.-.:.:18:.-..:::0.::8_ JOB L-72,070 WATER LEVEL OBSERVATIONS V WHILE DRILLING 5.5 ' \l AT END OF BORING ___ ---'R"'o"'t.::a:Jry'--W=a":'s"h
_-, 8:.-.:.: 18:.-..::: 0.:: 8_ JOB L-72,070 WA T ER LEVEL OBSERVATIONS V W HILE DRILLING 5.5 ' \l AT END OF BOR I NG ___ ---'R"'o"'t.::a:J ry'--W=a":'s"h
__ _ T 24 HOURS Grouted Upon Completion SOIL DESCRIPTIONS Very tOUgll to Ilard gray silty CLAY, liltle sand, trace gravel, moist (Cl) Very tough to hard gray very silty CLAY, little sand, occasiona l silt seams, moist (Cl-Ml) End of Boring at 100.0' . Approximate unconfined compressive strength based on measurements with a calibrated pocket penetrome ter. Diedrich 0-120 Truck Rig (#315) CME Automatic Hammer Page 3 of 3 Boring I 1-20 1-21 EXYWIT Z5701-1 BORING LOCATION ZION .NUCLEARPo\&#xa5;ER PLANT ISFSI SITE #1 *. ,""'. 587.2 587.1 N DRAWN BY: TRP TESTING SERVICE CORPORA nON CHECKED BY:
__ _ T 24 H OURS Grouted Upon Comp l etion SO IL DESCR I PT I ONS Ve r y tOUgll t o Il ard gray s ilt y C LAY , liltle sa nd , trace grave l , moi st (Cl) Very tough t o h a rd gray very s ilty C LAY , little sand, occasiona l si lt sea ms, moist (Cl-Ml) End of Boring at 100.0' . Approx im a t e unconfined co mpr essive st r eng th based on m eas ur e m e nts with a ca lib rated pocket penetrome t er. Di edr ich 0-1 20 Truck R i g (#315) CME A utom a ti c H ammer Page 3 of 3 Boring I 1-20 1-21 EXYWIT Z5701-1 BORING LOCATION ZION .NUCLEARPo\&#xa5;ER PLANT ISFSI SITE #1 *. ,""'. 587.2 587.1 N DRAWN BY: TRP TESTING SERVICE CORPORA nON CHECKED BY:
457 EAST GUNDERSEN DRIVE . . * . (L .mJ CAROL STREAM, ILLINOIS 60188 JOB NO.: L-72,070 1 OF 1 DATE: October 2008 ProjectslDeliverables1979802
457 EAST GUNDERSEN DRIVE . . * . (L .m J CAROL STREAM, ILLINOIS 60188 JOB NO.: L-72,070 1 OF 1 DATE: October 2008 ProjectslDeliverables1979802
_ crosshole.doc GEOPHYSICAL DATA REPORT CROSSHOLE SEISMIC RESULTS ZION NUCLEAR POWER PLANT ZION, ILLINOIS Preparedfor:
_ crosshole.doc GEOPHYSICAL DATA REPORT CROSSHOLE SEISMIC RESULTS ZION NUCLEAR POWER PLANT ZION, ILLINOIS Preparedfor:
TESTING SERVICE CORPORATION Carol Stream, illinois Prepared by: GEOTECHNOLOGY, INC. St. Louis, Missouri Geotechnology, Inc. Report No. 0979802.851S September 15,2008 GEO! ECHNOlOGY, INC. ENGINEERING AND ENVIRONMENTAL SERVICES SAINT LOUIS* COLLINSVILLE' KANSAS CITY September 15,2007 Mr. Darin Delaney Testing Service Corporation 457 East Gundersen Drive Carol Stream, lllinois 60188  
TESTING SERVICE CORPORATION Carol Stream, illinois Prepared by: GEOTECHNOLOGY, INC. St. Louis, Missouri Geotechnology, Inc. Report No. 097980 2.851S September 1 5,2 008 GEO! ECHNOlOGY, IN C. E NGIN E ERING AND ENVIRONMENTAL S E RVICES SAINT LOUIS* COLLINSVILLE' KANSAS CITY September 1 5 ,2007 Mr. Darin Delaney Testing Service Corporation 457 East Gundersen Drive Carol Stream, lllinois 60188  


==Reference:==
==Reference:==


Geophysical Data Report Crosshole Seismic Results Zion Nuclear Power Plant Zion, llIinois  
Geophysical Data Report Crosshole Seismic Results Zion Nuclear Power Plant Zion , llIinois  


==Dear Mr. Delaney:==
==Dear Mr. Delaney:==
0979802.85IS Presented herein are the results of the crosshole seismic test for the referenced site. This work was conducted in general accordance with proposal P14676.00.85IS dated July 31, 2008. Presented in this report is a description of the geophysical method and data plots. It is a pleasure to be of service to you on this project If you have any questions or comments, please contact the undersigned at (314) 997-7440.
0979802.85IS Presented herein are the results of the crosshole seismic test for the referenced site. This work was conducted in general accordance with proposal P14676.00.85IS dated July 31, 2008. Presented in this report is a description of the geophysical method and data plots. It is a pleasure to be of service to you on this project If you have any questions or comments, please contact the undersigned at (314) 997-7440.
Very truly yours, GEOTECHNOLOGY, INC. Glen 1. Adams Senior Geophysicist GLAlDWL:gla/sjc Copies Submitted:  
Very truly yours, GEOTECHNOLOGY, INC. Glen 1. Adams Senior Geophysicist GLAlDWL:gla/sjc Copies Submitted:  
(3) @prifllf1don recyded paper Dougl . Lambert, P.G. Senior Project Manager-Geophysics 11816LACKLAND ROAD. SUITE 150' SAINT LOUIS. MISSOURI 63146
(3) @p rifllf1don recyded pa p er Dougl . Lambert, P.G. Senior Project Manager-Geophysics 11816LACKLAND ROAD. SUITE 150' SAINT LOUIS. MISSOURI 63146
* 314/997-7440
* 314/997-7440
* FAX: 314/997-2067 GEOPHYSICAL DATA REPORT CROSSHOLE SEISMIC RESULTS ZION POWER STATION ZION, ILLINOIS TABLE OF CONTENTS 0979802.85IS 1.0 IN1RODUCTION  
* FAX: 314/997-2067 GEOPHYSICAL DATA REPORT CROSSHOLE SEISMIC RESULTS ZION POWER STATION ZION, ILLINOIS TABLE OF CONTENTS 0979802.85IS 1.0 IN1RODUCTION  
Line 111: Line 104:
...........
...........
..........................
..........................
.................... 1 1.2 Scope of Work .............................
.................... 1 1.2 Scope o f Work .............................
.................................
.......................................................................... 1 2.0 GEOPHYSICAL METI:lODOLOGY  
........................................
. 1 2.0 GEOPHYSICAL METI:lODOLOGY  
...................
...................
...........................................................
...........................................................
Line 123: Line 114:
.....................
.....................
.............................
.............................
.............................
.............................. 1 P l an of Site and Boring Locations  
. 1 Plan of Site and Boring Locations  
...............................
...............................
.....................
.....................
...........
...........
...................................
...................................
2 Relative Borehole Locations  
2 Re l ative Borehole Locations  
.....................................
.....................................
............
............
Line 136: Line 126:
.............  
.............  
.3 Shear (S) Wave Velocity and Shear Modulus vs. Depth ........................................................
.3 Shear (S) Wave Velocity and Shear Modulus vs. Depth ........................................................
...... .4 Compressional (P) Wave Velocity, Poisson's Ratio, and Young's Modulus vs. Depth ...............
...... .4 Compressional (P) Wave Velocity, Poisson's Ratio, and Young's Modul u s vs. Depth ...............
5 Summary Table -Crosshole Results ..................
5 Summary Tab l e -Crosshole Results ..................
.........................
.........................
...............
...............
Line 143: Line 133:
.....................
.....................
6 Source Boring Deviation  
6 Source Boring Deviation  
.........
......................................................
.............................................
.................................................
.................................................
.........
......... 7 Geophone Boring I Deviation  
7 Geophone Boring I Deviation  
.................................
.................................
.................
.................
Line 158: Line 146:
...............
...............
..............
..............
..........
.............. 9 APPENDIX Limitations of Report .............................................
.... 9 APPENDIX Limitations of Report .........
....................................
..........................
..........................
..................................
..................................
Line 170: Line 156:
0979802.851S 1.1 Site Description.
0979802.851S 1.1 Site Description.
The site consists of an existing nuclear power plant near Zion, illinois. A site location map is presented on Plate 1. The crosshole borings were located approximately 900 feet soufu of fue switch yard within the plant perimeter fence, as shown on the site plan on Plate 2. 1.2 Scope of Work. The scope of work included mobilizing geophysical equipment and personnel to the site, conducting a crosshole seismic test, and processing/interpreting the data. The seismic data were processed, and shear and compressional wave velocities were calculated to detennine dynamic soil properties.
The site consists of an existing nuclear power plant near Zion, illinois. A site location map is presented on Plate 1. The crosshole borings were located approximately 900 feet soufu of fue switch yard within the plant perimeter fence, as shown on the site plan on Plate 2. 1.2 Scope of Work. The scope of work included mobilizing geophysical equipment and personnel to the site, conducting a crosshole seismic test, and processing/interpreting the data. The seismic data were processed, and shear and compressional wave velocities were calculated to detennine dynamic soil properties.
The seismic data were plotted and the results are presented in this report. Engineering analysis or reco=endations based on this data are outside our scope of work. 2.0 GEOPHYSICAL METHODOLOGY The crosshole seismic testing method involves generating compressional (P) and shear (S) wave seismic energy at periodic depth intervals within a borehole and measuring the seismic wave travel-times at geophones situated at the source depth between two adjacent boreholes (per ASTM Standard D4428). The seismic wave arrivals at the geophones are transmitted through cables to the seismograph for digital recording.
The seismic data were plotted and the results are presented in this report. Engineering analysis or reco=endations based on this data are outside our scope of work. 2.0 GEOPHYSICAL METHODOLOGY The crosshole seismic testing method involves generating compressional (P) and shear (S) wave seismic energy at periodic depth intervals within a borehole and measuring the seismic wave travel-times at geophones situated at the source depth between two adjacent borehole s (per ASTM Standard D4428). The seismic wave arrivals at the geophones are transmitted through cables to the seismograph for digital recording.
The data are interpreted by analyzing the differences in elapsed travel-time from the source to geophones.
The data are interpreted by analyzing the differences in elapsed travel-time from the source to geophones.
P-and S-wave velocities can be calculated for each depfu interval by analyzing the travel-time data. The distance between boreholes may vary wifu depth; fuerefore borehole deviation logging is conducted to adjust fue borehole separation distance wifu depfu for the velocity calculations.
P-and S-wave velocities can be calculated for each depfu interval by analyzing the travel-time data. The distance between boreholes may vary wifu depth; fuerefore borehole deviation logging is conducted to adjust fue borehole separation distance wifu depfu for the velocity calculations.
3.0 RESULTS Crosshole seismic testing was conducted using a source boring and two adjacent receiver (geophone)  
3.0 RESULTS Crosshole seismic testing was conducted using a source boring and two adjacent receiver (geophone) borings, indicated as Borings 1-20 (source), 1-20A (Geophone 1), and I-20B (Geophone 2), respectively, as shown on Plate 3. Crosshole data were recorded on 5-foot intervals throughout the depfu of fue borings. Due to a physical limitation of the crosshole equipment, data could only be co llected to a depfu of 97 -feet from the surface. The borings were cased to   
: borings, indicated as Borings 1-20 (source),
1-20A (Geophone 1), and I-20B (Geophone 2), respectively, as shown on Plate 3. Crosshole data were recorded on 5-foot intervals throughout the depfu of fue borings.
Due to a physical limitation of the crosshole equipment, data could only be collected to a depfu of 97 -feet from the surface.
The borings were cased to   
========================c
========================c
-!!! Testing Service Corporation September 15, 2008 Page 2 0979802.851S approximately 99-feet and the downhole equipment requires approximately 2-feet from the bottom of the casing to collect data. Seismic velocities calculated between the source boring and the two geophone borings are presented on Plates 4 and 5. A table of all tabulated values and velocities is presented on Plate 6. Plates 7 through 9 are plots of the deviation from vertical for the three borings used for the crosshole test. Due to the inherent noise in the earth, and lateral variations in soil velocities between the test borings, some variations in velocities were calculated between the two receiver holes. An average velocity is plotted on the crosshole data plots that allows a smoother fit to the data. Densities used for the moduli calculations were based on lab values provided by the client as wet uoit weights.  
-!!! Testing Service Corporation September 15, 2008 Page 2 0979802.851S approximately 99-feet and the downhole equipment requires approximately 2-feet from the bottom of the casing to collect data. Seismic velocities calculated between the source boring and the two geophone borings are presented on Plates 4 and 5. A table of all tabulated values and velocities is presented on Plate 6. Plates 7 through 9 are plots of the deviation from vertical for the three borings used for the crosshole test. Due to the inherent noise in the earth, and lateral variations in soil velocities between the test borings, some variations in velocities were calculated between the two receiver holes. An average velocity is plotted on the crosshole data plots that allows a smoother fit to the data. Densities used for the moduli calculations were based on lab values provided by the client as wet uoit weights. @ Ill/nrad (In I,cycled paper NOTES Plan adapted from a 7.5 minute U.S.G.S. map for Z ion, illinois Q u adrang l e, last revised In 1993. 1 IN C. ENGINEERING NlD ENVIRONfwENTAlSERVICES ST. LOU IS* COUlNSV1lJ.E*
@ Ill/nrad (In I,cycled paper NOTES Plan adapted from a 7.5 minute U.S.G.S. map for Zion, illinois Quadrangle, last revised In 1993. 1 INC. ENGINEERING NlD ENVIRONfwENTAlSERVICES ST. LOUIS* COUlNSV1lJ.E*
KANSAS CITY Z i on Nucl ea r Power Plant Z i on , illinois PLATE 1 NOTES --. "
KANSAS CITY Zion Nuclear Power Plant Zion, illinois PLATE 1 NOTES --. "
* 1.:20 (SOURpe) : (GEQP H9NJ:! 1} 1-2 0 8 (GEOP HONE Z) 1. P l an adapted from an aeria l photograph courtesy of Goog l e Earth. LEGEND
* 1.:20 (SOURpe) : (GEQPH9NJ:! 1} 1-208 (GEOPHONE Z) 1. Plan adapted from an aerial photograph courtesy of Google Earth. LEGEND
* Boring Location / I I ,.. V ., / t ' o 300 --600 ! SCALE IN FEET PLATE 2 10 8 6 4 2 *2 -4 .fl. *10 1_-------19.9811-------** .. 10.5 II 2 4 6 SOURCE 9.48ft 8 10 12 14 16 18 20 22 GEOPHONE1 GEOPHON E 2 ----------
* Boring Location  
IN C. ENGINEERING AND ENVIRONMENTAl..
/ I I ,.. V ., / t ' o 300 --600 ! SCALE IN FEET PLATE 2 10 8 6 4 2 *2 -4 .fl. *10 1_-------19.9811-------** .. 10.5 II 2 4 6 SOURCE 9.48ft 8 10 12 14 16 18 20 22 GEOPHONE1 GEOPHONE2 ----------
SERVI CE S ST. LOUIS* COLlJNSVIUE.
INC. ENGINEERING AND ENVIRONMENTAl..
CITY Z ion Nuclear Pow e r Plant Z ion. Illinois PLAT E 3 Shear Wave V elocity (!psi 0 300 600 900 1200 1500 1800 2100 0.0 5.0 ---,.1>>-
SERVICES ST. LOUIS* COLlJNSVIUE.
CITY Zion Nuclear Power Plant Zion. Illinois PLATE 3 Shear Wave Velocity (!psi 0 300 600 900 1200 1500 1800 2100 0.0 5.0 ---,.1>>-
10.0 .. +tJ"-:--* ---:-----i----
10.0 .. +tJ"-:--* ---:-----i----
15.0 20.0 25.0 ---.... ____ . __ 4-____ I-___ ___ _ 30.0 I 1 I I I I 35.0
15.0 20.0 25.0 ---.... ____ . __ 4-____ I-___ ___ _ 30.0 I 1 I I I I 35.0
_ 40.0 5. 450 J:
_ 40.0 5. 450 J:
* is.. SO.O a 55.0 60.0 ---.... ----l-------at-------.... ----+----1-... t----... ----65.0 I I I I I I 70.0 75.0 ---,----{-----:----{-.o-:----,----80.0 ._-85.0 90.0 95.0 -- ---:------------+ ----1-----it'"" ----4 ----I.VS(S-Gl) .VS(S-G2) DVS eAVERAGEVS I Soil DescripUoo Sand SiR Clay 0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 _ 40.0 S 450 .c . 15. so.o 55.0 SO.O 65.0 70.0 75.0 80.0 85.0 90.0 95.0 Shear Modulus (Ksil . 20 40 60 80 __  
* is.. SO.O a 55.0 60.0 ---.... ----l-------at-------.... ----+----1-... t----... ----65.0 I I I I I I 70.0 75.0 ---,----{-----:----{-.o-:----,----80.0 ._-85.0 90.0 95.0 -- ---:------------+ ----1-----i t'"" ----4 ----I.VS (S-Gl) .VS(S-G2) DVS e AVERAGEVS I Soil DescripUoo Sand SiR Clay 0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 _ 40.0 S 450 .c . 15. so.o 55.0 SO.O 65.0 70.0 75.0 80.0 85.0 90.0 95.0 Shear Modulus (Ksi l . 20 40 60 80 __  
-----+-:-------l-------+ -------
-----+-:-------l-------+ -------
-------1--------4" -----+-------, , ,  
-------1--------4" -----+-------, , ,  
Line 201: Line 181:
-------:-----+l-------+ --------------!--------!$ -----+-------INC. ENGINEERING AND ENVIRONMENTAl..
-------:-----+l-------+ --------------!--------!$ -----+-------INC. ENGINEERING AND ENVIRONMENTAl..
SBMCES ST. LOUIS* COWNsvtL1.E*
SBMCES ST. LOUIS* COWNsvtL1.E*
KANSAS CITY Zion Nuclear Power Plant Zion, Illinois COMPRESSION (P) Waw Velocity (fps) 1000 2000 3000 4000 5000 6000 0.0 I I 5.0 10.0 15.0 20.0 25.0 30.0 35.0 _ 40.0 S 450 . ii 50.0 2l 55.0 60.0 65.0 70.0 75.0 80.0 85.0 90.0 95.0 I I I I ----,-----,------r-----T------4i-ef-----I ______ L.. _____ .L ____ _ I I I I I I I I  
KANSAS CITY Z i on N uc l ear Po w er P l a n t Z i on, Illi no i s COMPRESSION (P) Waw V e locity (fp s) 1000 2 000 30 00 4000 5000 6000 0.0 I I 5.0 10.0 1 5.0 2 0.0 25.0 3 0.0 35.0 _ 40.0 S 450 . ii 5 0.0 2l 55.0 60.0 65.0 70.0 75.0 80.0 85.0 90.0 95.0 I I I I ----,-----,------r-----T------4i-ef-----I ______ L.. _____ .L ____ _ I I I I I I I I  
-----.,------r------1" ---------C .. 1-&:'--.-----:------+ ----------+
-----.,------r------1" ---------C .. 1-&:'--.-----:------+ ----------+
_____ _____ ______ I J I I -----.. --+--D---I I I I -----1'.----r------1" -----
_____ _____ ______ I J I I -----.. --+--D---I I I I -----1'.----r------1" -----
-----1 ----3-:---.-:------i-----------{-
-----1 ----3-:---.-:------i-----------{-
-----ofo------{------.... :1---++ -----
-----ofo------{------.... :1---++ -----
... ---_____ l _____ J ______ L _____ L [ .VP(S-G1) -.W(5-G2) ow .AVERAGEW I Soil Descr1ption Sand Silt Clay Posslon's Ratio and Young's Modulus (193 ksl) 0.000 0.100 0.200 0.300 0.400 0.500 0.0 +1--I--!---+---:-
... ---_____ l _____ J ______ L _____ L [ .VP (S-G 1) -.W(5-G2) ow .AVERAG E W I Soil Descr1ption Sand S ilt C lay Po ss l o n's Ratio and Young's M o dulus (193 ksl) 0.000 0.100 0.200 0.300 0.400 0.5 00 0.0 +1--I--!---+---:-
"1 5.0 10.0 15.0 20.0 25.0 30.0 ----r -----+ -----+\------:------.:=---r -----+--------.. ----__ :1 __ L._ ----+ ------I -+ __ -_1_ ----I I I I _____ L._= ___ + _____ -I ___
"1 5.0 10.0 15.0 20.0 25.0 30.0 ----r -----+ -----+\------:------.:=---r -----+--------.. ----__ :1 __ L._ ----+ ------I -+ __ -_1_ ----I I I I _____ L._= ___ + _____ -I ___
1 I I I --------T ------1------I" ---g 35.0 ,5 40.0 ! 45.0 CD 50.0 :g 55.0 60.0 m 65.0 70.0 ---------t ------t -----*,-----75.0 .... 60:0 .... ---85.0 -----t-i:'!---+ ----------+-----I I I I 90.0 -----I:::-----T-----'-----.,--+--95.0 . -----I Poisson's Ratio I
1 I I I --------T ------1------I" ---g 35.0 ,5 40.0 ! 45.0 CD 50.0 :g 55.0 60.0 m 65.0 70.0 ---------t ------t -----*,-----75.0 .... 60:0 .... ---85.0 -----t-i:'!---+ ----------+-----I I I I 90.0 -----I:::-----T-----'-----.,--+--95.0 . -----I Poisson's Ratio I
* Y ClUng's Modulus INC. ENGINEERING AND ENVIRONM:NTALSERVICES sr. LoutS* COlUNSVlUE*
* Y ClUng's Modulu s INC. ENGINEERING AND ENVIRONM:NTALSERVICES sr. LoutS* COlUNSVlUE*
KANSAS arv Zion Nuclear Power Plant Zion, Illinois DEPfH (FT) SHEAR VELOCITY P-WAVE VELOCITY UNIT WEIGHT SHEAR MODULUS POISSON RATIO YOUNG'S MODULUS (AVERAGE. FTfSEC) (AVERAGE FT/SEC) (LBICU FT) (KSI) (KSI) 5 455 836 128 575 029 1483 10 752 1865 128 1573 040 44.13 15 802 1890 128 1788 039 4971 20 807 1590 128 1798 033 4771 25 866 1609 128 20.84 030 54.01 30 1246 2030 130 43.81 020 104.91 35 1159 2379 109 31.75 034 85.38 40 1371 2921 120 4895 036 13302 45 1420 4263 131 5736 044 164.92 50 1371 2970 124 5059 036 138.06 55 1272 3360 124 43.52 0.42 123.29 60 1184 3230 118 3590 042 102.12 65 1066 2839 107 26.39 0.42 74.85 70 1181 2806 115 3476 039 9686 75 1390 2890 114 4776 035 12896 80 1528 4208 131 66.37 0.42 169.04 85 1302 3073 127 46.70 0.39 129.88 90 1193 3963 115 35.54 045 10306 95 1304 5448 115 4246 047 12481 97 1279 5200 122 43.34 047 12723 Drawn By: SLC Ck'dBy: eM Dais; 011-15-08 Dais; 1 Iisio 8  
KANSAS arv Z ion Nuclear Power Plant Zion, Illinois DEPfH (FT) S H EAR VELOCITY P-W AVE V ELOC I TY U NI T WE I GHT SHEAR M OD U LUS PO I SSO N R A T I O Y OU N G'S M OD U L U S (AVERA GE. FTfSEC) (AVERAGE FT/SEC) (LBICU FT) (KS I) (K S I) 5 455 836 1 28 575 029 1483 10 752 1865 128 1573 040 44.13 1 5 802 1890 128 1788 039 497 1 20 807 1 590 1 28 1798 033 4771 25 866 1 609 128 20.84 030 5 4.01 30 1 246 2030 130 43.81 020 1 04.9 1 35 1 159 2379 109 31.75 034 85.38 40 1 371 2921 120 4895 036 1 3302 45 1 420 4263 131 5736 044 16 4.92 50 1371 2970 124 5059 036 1 38.06 55 1272 3360 124 43.52 0.4 2 1 23.29 60 11 84 3230 118 3590 042 102.12 65 1066 2839 107 26.39 0.42 74.85 70 1181 2806 115 3476 039 9686 75 1 390 289 0 1 1 4 4776 035 1 2896 80 1528 4 208 131 66.37 0.42 169.04 85 1 302 3073 127 46.70 0.39 1 29.88 90 1193 3963 115 35.54 045 1 0306 95 1304 5448 115 4246 047 1 2 4 8 1 97 1 279 52 0 0 1 22 43.34 047 1 2723 Drawn By: SLC C k'dBy: eM Dais; 011-1 5-08 Dais; 1 Iisio 8 .GEOTECHNOLOGY'N C. ENG I NEERI N G AN D ENVJRON MENT AL SERVICES ST. LOU I S. COW N SVIU.E. KAN SAS C ITY Z ion Nucl ea r Pow e r Pl a nt Zion, Illinois  
.GEOTECHNOLOGY'N C. ENGINEERING AND ENVJRONMENTAL SERVICES ST. LOUIS. COWNSVIU.E. KANSAS CITY Zion Nuclear Power Plant Zion, Illinois SUMMARY TABLE
 
* CROSSHOLE RESULTS I PLATE 6 -----  
==SUMMARY==
--* n --nn e-..... Cl .!: .... .t 0 -:: .0 *2 0 1 0 20 30 40 5 0 z n _n OV . -Eastlng (ft) Drawn By: SLC Ck"d By: Ct.t App'vd .... /g." Date: rlm'R ST. LOUIS. COUJNSVILlE*
TABLE
KANSAS CITY Zion Nuclear Power Plant Zion, illinois ctnIID"" ..... n, Ilun PLATE 7
* CROSSHOLE RESULTS I PLAT E 6 -----  
--* n --nn e-..... Cl .!: .... .t 0 -:: .0 *2 0 1 0 2 0 3 0 40 5 0 z n _n OV . -Eastlng (ft) D ra wn By: S LC Ck"d By: Ct.t App'vd .... /g." D ate: rlm'R ST. LOUIS. COUJNSVILlE*
KANSAS CITY Z i o n Nu clea r Power P l an t Z i o n, illin o i s ctn I ID"" ..... n , I lun PLATE 7
* t , "'" * ..... II: ..... :E :; 0 . I 1:: -.0 -4 .0 0 -1.0 0 1 0 20 30 40 50 0 Z
* t , "'" * ..... II: ..... :E :; 0 . I 1:: -.0 -4 .0 0 -1.0 0 1 0 20 30 40 50 0 Z
* n "n * '" Easting (ft) Drawn By: SLC Ck'dBy:6'U App'Vd Date:'}1dO;>  
* n "n * '" East in g (ft) Drawn By: SLC Ck'dBy: 6'U App'Vd Date:'}1dO;>  
-. AND sr. LOUIS* COWNSVIUE*
-. AND sr. LOUIS* COWNSVIUE*
KANSASQTY Zion Nuclear Power Plant Zion, illinois ---.j ::.::;;_ ...... ,IIUN PLATE 8 An '>" 'In n iE' -CD .e = 1::: 0 0 -4 0 .0 -;; .0 -1 0 00 1 0 20 30 40 50 z . " '>" ''In A " Eastlng (ft) Drawn By: SLC Ck'd By:(,'Z-? . App'vd Date: I Date: "II<!"" I I ... ",. IT INC. ENGiNEERING AND ENVIRONMENTAL SERVICES ST. LOUIS. COWNSVILLE*
KANSASQTY Z ion Nucl ea r P ow e r Pl a nt Z ion, illinoi s ---.j ::.::;;_ ...... ,II UN PLATE 8 An '>" 'In n iE' -CD .e = 1::: 0 0 -4 0 .0 -;; .0 -1 0 00 1 0 20 30 40 50 z . " '>" ''In A " East l ng (ft) Drawn By: SLC Ck'd By: (,'Z-? . App'vd Date: I D ate: "II<!"" I I ... ",. I T IN C. ENGiNEERING AND ENVIRONMENTAL SERVICES ST. LOUIS. COWNSVILLE*
KA.NSAS arv Zion Nuclear PoWer Plant Zion, illinois 2 .. ,llun PLATE 9 APPENDIX A LIMITATIONS OF REPORT GEOPHYSICAL SERVICES LIMITATIONS OF REPORT 1. This report was prepared for the exclusive use of the owner, architect, and engineer for evaluating the project as it relates to the technical aspects discussed herein. It can be made available to prospective contractors for information on factual data only and not as a warranty of subsurface conditions included in this report. Unless other contractual agreements were made, the services described in this report were carried out in accordance with the Terms for Geotechnology's Services which were attached to the proposal.  
KA.NSAS arv Zi on Nucl ea r P oW e r P l a nt Zi on, illinois 2 .. ,ll un P LATE 9 APPENDIX A LIMITATIONS OF REPORT GEOPHYSICAL SERVICES LIMITATIONS OF REPORT 1. This report was prepared for the exc lusiv e use of the owner, architect, and engineer for evaluating the project as it relates to the technical aspects discussed herein. It can be made available to prospective contractors for information on factual data only and not as a warranty of subsurface conditions included in this report. Unless other contractual agreements were made, the services described in this report were carried out in accordance with the Terms for Geotechnology's Services which were attached to the proposal.  
: 2. Geotechnology endeavored to perform the crosshole seismic geophysical survey in accordance with generally accepted practices of other consultants undertaking similar studies at the same time and in the same geographical area. The findings and conclusions stated herein must be considered not as scientific certainties, but rather as professional opinions concerning the significance of the limited data gathered during the course of the survey. No warranty, express or implied, is made. 3. The geophysical analyses and conclusions contained in this report are based on the site conditions, project layout, sampling  
: 2. Geotechnology endeavored to perform the crossho l e seismic geophysical survey in accordance with generally accepted practices of other consultants undertaking similar studies at the same time and in the same geographical area. The findings and conclus ions stated herein must be considered not as scientific certainties, but rather as professional opinions concerning the significance of the limited data gathered during the course of the survey. No warranty, express or implied, is made. 3. The geophysical analyses and conclusions contained in this report are based on the site conditions, project layout, sampling interval, geophysical data, and interpretive procedures described herein. Geotechnology can make no interpretation of underground conditions beyond the test location.
: interval, geophysical data, and interpretive procedures described herein. Geotechnology can make no interpretation of underground conditions beyond the test location.
Geophysical exploration methods are indirect and potentially influenced by a variety of natural or man-made conditions.
Geophysical exploration methods are indirect and potentially influenced by a variety of natural or man-made conditions.
The resulting interpretations are based on the quality of the recorded data as limited by site conditions Revised 03/09/04 Stdparl9798crosshole
The resulting interpretations are based on the quality of the recorded data as limited by site conditions Revised 03/09/04 Stdparl9798crosshole.do c TESTING SERV I CE CORPORATION 457 Eas t Gund e r s e n Drive C LI ENT: PROJECT: Sa r gen t & Lund y, L LC 55 Eas t Monroe S t reet C hi cago, I L I SFS I Projec t Z i o n Nucl ea r power Plant Z i on, IL Caro l Stream , 111inois SO IL TEST DATA LOCATION BOR IN G NUMBER 1-20 1-20 SAMP LE NUMBER 2 7 DEPT H IN FEET 3.5 -5.0 16.0 -1 7.5 HRB CLASS I F I CAT I O N & GROUP INDE X UNI F I ED CLASS IFI CAT I ON SP SP GRA IN SIZE CLASS I FICATION GRADAT I ON -PASS IN G 1" S I EV E % GRADAT I O N -PASS IN G 3/4" S I EVE % 100 1 00 GRADATION  
.doc TESTING SERVICE CORPORATION 457 East Gundersen Drive CLIENT: PROJECT:
-PASSING 3/B" S I EVE % 95 99 GRADA TI O N -P ASS IN G # 4 SIEVE % 92 95 GRADAT I ON -PASSING # 10 S IEV E % BB 9 1 GRADAT I O N -PA SS IN G # 40 S I EVE % 79 71 GRADAT I O N -PASSING # 100 S I EVE % 1 4 B GRADA TI ON -PASS IN G # 200 S I EVE % 6 4 SA N D AN D GRAVE L % 94 96 S IL T OR S IL T AND CLAY COMB INED % 6 4 CLAY % <<0.002 MM) LIQUID LIMIT % PLAS TI C LIMIT % PLAST I CITY I NDEX % NATURAL MOISTURE CONTENT % DRY UN I T WE I G HT pH 9.26 SOLUB LE C HLORID ES <50 SOLUB LE S ULF ATES <1 50 ORGAN I C L-O-I % CONTE NT WET COMB U ST I O N % 1-20 12 2B.5 -30.0 C L 1 00 99 97 95 B5 77 73 27 52 2 1 22 11 11 11.0 1 29.9 TSC Job N o. L -72,070 Sep t e mber 9, 2008 1-20 1-20 22 32 53.5 -55.0 7B.5 -BO.O C L C L 1 00 99 99 97 10 0 92 9B BB BB B4 73 16 27 50 73 3 4 3 1 17 1 2 10 1 9 7 13.4 10.7 12 3.7 130.7 TES TI NG SE R V I CE CO RP ORATION 457 East G un d e r se n Drive C LIENT: Sa r ge nt & Lund y, LL C 55 East M o n roe S tr ee t C hi cago, IL PR OJ E C T: I S F S I Pr o j ect L OCA TI O N BOR IN G NUMB E R SA MPL E NUMB E R DEPT H IN FEET Z i o n Nu c l ear p owe r Pl a nt Z i o n , IL H RB CLASS IFI CA T IO N & GRO U P IN DEX UNI F I ED CLA S S I F I CA TI O N U N CO NFINED COMPRESS I VE S TREN G TH (TSF) GRADA n ON -P ASS IN G 1" S I EVE % GRADA TI O N -PASS IN G 3/4" S I EVE % GRADA TI O N -P ASS I NG 3/8" SIEVE % GRA D A TI O N -P ASSI N G # 4 SIEV E % GRADA TI O N -PASS IN G # 10 S I EV E % GRADAT I O N -PASS IN G # 40 S I EVE % GRADAT I O N -PASS IN G # 1 00 S I EVE % GRADAT I O N -P ASS IN G # 20 0 S I EVE % SAND A N D GRAVEL% S I LT OR S I L T A ND CLAY COMBI N ED% CLAY % <<0.0 0 2 MM l LI Q UI D LI MIT % PLAST I C LI M IT % PL A S TI C IT Y IN DEX % N AT U RAL M O I ST U RE CO N TE NT % DR Y UNIT W EI G HT p H SOLUBLE C HL O RID ES Caro l S t rea m , Illi no i s SO I L T EST D A T A 1-2 1 1-21 2 5 SP SP 86 86 1 00 79 99 7 6 99 7 1 96 62 9 7 4 4 96 96 4 4 9.11 <50 SOL U BLE S ULF AT E S <1 50 ORGA NI C L-O-I % CO NT E NT W E T CO M B U S TI O N % NP -N o t P o ssi bl e 1-2 1 9 C L 5.41 10 0 99 98 95 92 91 9 59 32 28 1 4 14 1 2.7 1 22.7 T SC J ob N o. L -72,07 0 Se pt e mb e r 9, 2 0 08 1-2 1 11 C L N P 1 00 98 95 93 8 5 79 76 25 5 1 24 23 1 2 11 1 3.0 1-2 1 1 7 C L N P 100 98 97 96 89 83 78 22 5 1 2 7 25 1 2 11 3 1 5.7 1 2 4.7 11 8.3 oc z w "i 6 '" u.s. SIEVE OPEN I NG I N I NCHES I U.S. S I EVE NUMBERS I HYDROMETER 6 4 3 2 1.5 1 4 1/2 3/8 3 4 6 81014162030405070 1 00140200 100 I I I I I I I 90 ----. 80 70 60 50 40 30 20 \ \ 1 0 , \ 0 1 00 1 0 1 0.1 0.0 1 0.001 GRA IN S I ZE IN M ILLI METERS GRAVE L SA N D S I L T OR C L AY COBB L ES coa r se fin e coarse m ed i um f i ne SPEC IM EN I DE NTI F I CAT I O N S I E V E % P A SS SO I L CLASS I F I CAT I O N Bo ri ng: 1-20 3 inch 1 00 Brown SAND, tr ace s il t, c l ay a n d grave l Samp l e: 2 2 1 00 (SP) 1 1/2 100 1 100 %GRAVE L %SAND %S I LT %CLAY N OTES: 3/4 100 8 86 (6% Com ined) 3/8 95 #4 92 #1 0 88 # 40 79 # 1 00 14 # 200 6 PRO J EC T I SFS I Z i o n Nu c l e ar Po w e r P l a n t JOB N O. L-72, 0 7 0 L OCA TI O N Z i o n, Illin o i s DA T E Se pt e mb e r 8, 2 00 8 '-LU SO I L DAT A S H EET Test in g Se rvi ce Co rp o r a ti o n Caro l S t ream, I L 60 1 88 u.s. SIEVE OPEN IN G IN IN C H ES I U.S. S I EVE NUMBER S I HYDROMETER 6 4 3 2 1.5 1 "4 112 3/8 3 4 6 81014162030405070100 1 40200 100 I I , T I I I I I "'-I'---< 90 " 80 70 60 50 40 30 20 10 \ , 0 100 10 1 0.1 0.0 1 0.001 GRA IN S I ZE IN M ILLIMETER S I I GRAVE L SA ND S ILT ORCLAY COBB LE S I co arse I fin e coa r se m edium fin e SPECIMEN I DENT I FICATION S I E VE % PASS SOIL CLASSIF I CATION Boring: 1-20 3 inch 100 Brown SA ND, Ir ace si ll, c l ay an d gravel Sa mp l e: 7 2 10 0 (SP) 1 1/2 1 00 1 1 00 %GRAVEL %SA NO %S ILT %C LAY NOT ES: 3/4 10 0 5 91 (4% Com ine d) 3/8 99 #4 95 #10 9 1 #40 71 # 100 8 # 200 4 PROJECT ISFS I Z ion Nuclear Pow e r Plant J OB NO. L-72,070 LO CAT I O N Z i on, Illinois DATE S ep tember 8, 2008 I-<U SO IL DATA SHEET Testing Service Corporation Caro l S tr eam, IL 60188   
Sargent & Lundy, LLC 55 East Monroe Street Chicago,IL ISFSI Project Zion Nuclear power Plant Zion,IL Carol Stream, 111inois SOIL TEST DATA LOCATION BORING NUMBER 1-20 1-20 SAMPLE NUMBER 2 7 DEPTH IN FEET 3.5 -5.0 16.0 -17.5 HRB CLASSIFICATION & GROUP INDEX UNIFIED CLASSIFICATION SP SP GRAIN SIZE CLASSIFICATION GRADATION -PASSING 1" SIEVE % GRADATION -PASSING 3/4" SIEVE % 100 100 GRADATION  
" " z w '3 6 00 l,J.S. SIEVE OPENING IN INCHE S I U.S. S I EVE NUMBERS I HYDROMETER 6 4 3 2 1.5 1 4 112 3/8 3 4 6 81014 1 62030405070100140200 100 I I T I I I I t-90 .f'--80 70 60 " t 50 1\ "\ 40 30 20 'I'-.. 10 0 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN M I LLIMETERS GRAVEL I SAND J S IL T OR CLAY COBBLES coarse fine Icoarse medium fine I SPEC IM EN I DENT I FICAT I ON SIEVE % PASS SO I L CLASS I F I CATION Boring: 1-20 3 inch 100 Gray silty CLAY, some sand, trace grave l Samp l e: 12 2 100 (Cl) 1 1/2 100 1 100 %GRAVEL %SAND %SILT %CLAY NOTES: 3/4 100 3 24 52 21 3/8 99 #4 97 #10 95 #40 85 # 100 77 # 200 73 PROJECT I SFSI Z i o n Nuclear Power P l ant JOB NO. L-72,070 LOCATION Zion, Illin o i s DATE September 8 , 2008 1-ZU SO IL DATA SHEET Testing Serv i ce Corporation Caro l Stream, IL 60188 u.s. S I EVE OPEN I N G IN I NCHE S I U.S. S I EVE NUM B ER S I H Y DR O METER 6 4 3 2 1.5 1 4 11 2 3/8 3 4 6 8 1 0 14 16 20 30 40 50 7 01 00 14 0200 1 00 I I * , f-l, I ----90 80 "---* \ 70 60 \ 50 40 " 1\ 30 "'---20 1 0 0 1 00 1 0 1 0.1 0.0 1 0.001 GRAI N S I ZE IN M ILLI METER S GRAVE L SA N D S ILT ORC L AY COBB L ES coa r se fi ne coarse m ed iu m fi ne SPEC IM EN I DE N T I F I C A T I O N S I E V E % PASS SO I L CL A SS I F I CAT IO N Bo ri ng: 1-2 0 3 in c h 100 Gr ay s il ty CLAY, l i ttl e sand, t r a c e g r ave l Sa m p l e: 22 2 10 0 (Cll 1 1/2 1 0 0 1 1 00 %GRAVEL %S AND %S IL T %CLAY NOT E S: 3/4 1 00 1 1 5 50 34 3/8 9 9 #4 9 9 #1 0 97 #40 92 # 1 00 8 8 # 200 84 PROJECT I SFS I Zion Nu c l ea r Po w er P l an t J OB N O. L-72 ,0 7 0 LOCA TI O N Z ion, Illin o i s DA T E Se pt e mb e r 8, 2 00 8 ,-.u SO IL D A T A S H EET Test in g Serv i ce Co rp o r a ti o n Ca r o l S tr ea m , IL 60 1 88 U.S. S I EVE OPE NI N G I N I N C H ES I U.S. S I E VE NUM B E RS I HYD RO MET ER .6 4 3 2 1.5 1 3/4 1/23/83 4 6 8 1 0 1 4 1 6 20 30 40 50 70 1 00 1 40200 1 0 0 I I I I I I I I ,'-.., "'-9 0 " 8 0 \ 7 0 6 0 50 40 3 0 20 10 0 100 1 0 1 0.1 0.0 1 0.001 GRA IN S I ZE IN M I L LI ME T ERS G R AV E L S AND S IL T OR C L AY C OBBLE S c oa r s e fine c oars e m e di u m fin e SP E C IM EN I DE NTI F I C A T I O N S I E V E % P ASS SO I L CL A SS I F I CAT I O N B o rin q: 1-2 0 3 i nc h 10 0 G ray s ill y C LAY, s om e sa nd (C l) S amp l e: 32 2 100 1 1/2 100 1 1 0 0 %G RA VE L %SA N D %S IL T %C LAY NOTES: 3/4 10 0 0 27 (73% C orr b in e d) 3/8 1 00 #4 100 #1 0 100 # 40 98 # 1 00 8 8 # 200 73 PRO J E C T I SFS I Z i o n Nu cle ar P ow e r P l a n t JOB N O. L-7 2 ,0 7 0 L OCAT I O N Z ion, Illin o i s DA T E Se pt e mb er 8, 2 008 '-LU SO IL D ATA S H E E T Tes tin g Se rvi ce Co rp o r at i o n Caro l S tr ea m , I L 60 1 88 u.s. S I EVE OPE NIN G IN I NCHES I U.S. S I EVE NU MBERS I H YDROMETER 6 4 3 2 1.5 13/4 112 8 3 4 6 8 10 14 1 6 20 30 40 50 70100140200 10 0 I I . I I 90 80 70 60 50 40 30 20 1 0 '\ 0 100 10 1 0.1 0.0 1 0.001 GRA IN S I ZE IN MILLIMETERS GRAVE L SA ND S IL T OR C L AY COBB LE S coarse I fin e coarse med ium fin e SPEC IM EN IDENTIFICATION S I E V E % PASS SO I L CLASS I FICAT I ON Bor in g: 1-2 1 3 inch 100 Brown SA N D, tr ace s ilt, clay and g rav e l Sa mple: 2 2 1 00 (SP) 1 1/2 100 1 1 00 %GRAVE L %SA ND %S ILT %CLAY NOT ES: 3/4 1 00 1 95 (4% Com in e d) 3/8 1 00 #4 99 #10 99 # 40 96 # 100 9 # 200 4 PROJECT ISFS I Z i o n Nuclear Powe r P l a nt JOB N O. L-72, 0 70 LOCATION Z i on, Ill i noi s DATE Septe mb er 8, 2 008 '-L' SO I L DATA SHEET Test ing Serv i ce Corporation Caro l St r eam, IL 60188 U.S. S I EVE OPE NIN G IN I N C H ES I U.S. S I EVE NU MBERS I H Y D ROME T E R 6 4 3 2 5 1 314 11 2 318 3 4 6 8 1 0 1 4 1 62030405070 1 00 14 0200 1 0 0 I \ I I I I I I I 90 I-8 0 ."" .1"----..... 70 60 II 50 40 30 20 10 1\ 0 100 10 1 0.1 0.01 0.001 G RA IN S I Z E IN MILLIMETER S GRAVEL SA ND S IL T OR C LAY C OBBLE S coarse fine c oarse medium f in e SP E C IM EN ID E NTIFICATION S I E V E % PASS SOIL CLA S S I F I CAT ION BorinQ: 1-21 3 in c h 1 0 0 Light brown SA ND , so m e gr a v e l , Ir ac e s ill S amp l e: 5 2 10 0 and c l ay (S P) 1 1/2 100 1 8 6 %GRAVE L %SA ND %S ILT %CLAY NOTES: 3/4 8 6 24 72 (4% C om in e d) 3/8 79 #4 7 6 #10 7 1 #40 6 2 # 100 7 # 2 00 4 PROJECT I SFS I Z ion Nuclear Power P l a nt JOB NO. L-72 , 070 LOCATION Z ion, Illin ois DATE Septembe r 8, 2 008 '-L' SO I L DATA SH E ET Testing Service Corporat i on Carol Stream, I L 601 8 8 u.s. S I EVE OPE NIN G IN IN C H ES I U.S. S I EVE NUM BERS I HYDROMET ER 6 4 3 2 1.5 1 3/4 1/2 8 3 4 6 8 10 14 16 20 30 40 50 70 1 00 1 40200 100 I I I I I I r--.. 90 r-.--.. "\ 80 * \ 70 \ 60 50 40 1\ \ 30 "-20 10 0 100 10 1 0.1 0.01 0.001 GRA IN SIZE IN MILLIMETER S GRAVEL SAND S ILT OR C LAY COBBLES coarse 1 fine coarse medium fine SPEC IM EN IDENTIFICATION S I E V E % PASS SOIL CLASSIFICATION Bor in g: 1-2 1 3 inch 100 Gray s ilt y C L AY, tr ace sa nd and grave l Samp l e: 9 2 100 (Cl) 1 1/2 100 1 100 %GRAVEL %SA NO %S IL T %CLAY NOTES: 3/4 1 00 1 8 59 32 3/8 1 00 #4 99 #10 98 #40 95 # 100 92 # 200 91 PROJECT ISFSI Zion Nuclear Power P lant JOB NO. L-72,070 LOCATION Zion, Illinois DATE Septembe r 8, 2008 1-[1 SO IL DATA S HEET Testing Serv ic e Corporat ion Caro l S tr eam, IL 60188 u.s. S I EV E OP EN I N G I N I N C H ES I U.S. S I EV E NUM BERS I H YDROMETER 6 4 3 2 1.5 1 11 4 1123/83 4 6 8 1 0 1 4 1 6 20 30 40 50 70 1 00 140 200 1 00 I I * 'i--I I I I I 90 .1'--8 0 "'----7 0 6 0 \ 5 0 I' "\ 40 30 .. 20 ". 1 0 0 1 00 10 1 0.1 0.01 0.00 1 G RA IN S I ZE IN M ILLI METER S I I GR A VEL I SA N D I S IL T OR C L AY CO BB L E S I co a r se fi ne I c o ars e med iu m I f i n e I SPEC IM EN I D E NT I F I CAT I O N S I E V E % PASS SO I L CLASS I F I C A T I O N Bor i ng: 1-2 1 3 i n c h 100 G ray s i lty C L A Y, l i ttl e sa nd , t r a ce gra ve l Sa mp l e: 11 2 1 00 (C l) 1 1/2 10 0 1 100 %G RA V E L %SA N D %S IL T %CLAY N OT E S: 3/4 100 5 2 0 51 24 3/8 98 #4 95 #1 0 9 3 -# 40 85 # 1 00 7 9 # 200 76 PRO J E C T I SFS I Z i o n Nu c l ear P owe r P l a nt J OB N O. L-72 ,0 7 0 LOCAT I O N Z i o n , Illin o i s D A T E Septe m be r 8 , 2 00 8 I-L I S O I L DATA SH E ET Te s tin g Se rvi ce Co r po r at i o n Ca ro l St r eam , IL 6 0 1 8 8 U.S. S I EVE OPEN I N G I N I N C HE S I U.S. SIEVE NUMBERS I HYDROMETER 6 4 3 2 1.5 1 4 11 2 3/8 3 4 6 81014162030405070 1 00140200 100 I I . "l-I I I I I 90 1"1"-80 70 ... 60 '\ 50 40 " f\ 30 '. 20 1 0 0 1 00 1 0 1 0.1 0.0 1 0.00 1 GRA IN S I ZE IN MILLI METERS GRAVEL SA ND S IL TOR C L AY COBBLES coarse fin e coarse med i um f i n e SPEC IM EN I DE N T I F I CAT I ON S I E V E % P A SS SO I L CL A SS I F IC A TI O N Bor i ng: 1-2 1 3 i nch 100 Gray s ilt y CLAY , littl e sa n d, t race g r ave l Sa m p l e: 17 2 100 (eL) 1 1/2 100 1 100 %GRAVEL %SAND %S I LT %CLAY NOTES: 3/4 100 3 1 9 5 1 27 3/8 98 #4 97 #1 0 96 #40 89 # 1 00 83 # 200 78 PRO J EC T I SFS I Z i o n Nu c l ear Powe r P l a nt JOB N O. L-72,07 0 L OCAT I O N Z ion , Illin ois DATE Sep t e m be r 8 , 20 0 8 1-'" SO IL D A T A S H EET Tes ting Se rvi ce Co rp o r a ti o n Caro l Stream, I L 60 1 88 First En vironmental Laboratories, Inc. IL ELAP / N ELAC A cc r e dit ation # 100 292 1600 S h ore Road* N ap e rvill e , Illin oi s 60563
-PASSING 3/B" SIEVE % 95 99 GRADATION -PASSING # 4 SIEVE % 92 95 GRADATION -PASSING # 10 SIEVE % BB 91 GRADATION -PASSING # 40 SIEVE % 79 71 GRADATION -PASSING # 100 SIEVE % 14 B GRADATION -PASSING # 200 SIEVE % 6 4 SAND AND GRAVEL % 94 96 SILT OR SILT AND CLAY COMBINED % 6 4 CLAY % <<0.002 MM) LIQUID LIMIT % PLASTIC LIMIT % PLASTICITY INDEX % NATURAL MOISTURE CONTENT % DRY UNIT WEIGHT pH 9.26 SOLUBLE CHLORIDES <50 SOLUBLE SULFATES <150 ORGANIC L-O-I % CONTENT WET COMBUSTION % 1-20 12 2B.5 -30.0 CL 100 99 97 95 B5 77 73 27 52 21 22 11 11 11.0 129.9 TSC Job No. L -72,070 September 9, 2008 1-20 1-20 22 32 53.5 -55.0 7B.5 -BO.O CL CL 100 99 99 97 100 92 9B BB BB B4 73 16 27 50 73 34 31 17 12 10 19 7 13.4 10.7 123.7 130.7 TESTING SERVICE CORPORATION 457 East Gundersen Drive CLIENT: Sargent & Lundy, LLC 55 East Monroe Street Chicago,IL PROJECT: ISFSI Project LOCATION BORING NUMBER SAMPLE NUMBER DEPTH IN FEET Zion Nuclear power Plant Zion,IL HRB CLASSIFICATION & GROUP INDEX UNIFIED CLASSIFICATION UNCONFINED COMPRESSIVE STRENGTH (TSF) GRADA nON -PASSING 1" SIEVE % GRADATION -PASSING 3/4" SIEVE % GRADATION -PASSING 3/8" SIEVE % GRADATION -PASSING # 4 SIEVE % GRADATION -PASSING # 10 SIEVE % GRADATION -PASSING # 40 SIEVE % GRADATION -PASSING # 100 SIEVE % GRADATION -PASSING # 200 SIEVE % SAND AND GRAVEL% SILT OR SILT AND CLAY COMBINED% CLAY % <<0.002 MMl LIQUID LIMIT % PLASTIC LIMIT % PLASTICITY INDEX % NATURAL MOISTURE CONTENT % DRY UNIT WEIGHT pH SOLUBLE CHLORIDES Carol Stream, Illinois SOIL TEST DATA 1-21 1-21 2 5 SP SP 86 86 100 79 99 76 99 71 96 62 9 7 4 4 96 96 4 4 9.11 <50 SOLUBLE SULFATES <150 ORGANIC L-O-I % CONTENT WET COMBUSTION % NP -Not Possible 1-21 9 CL 5.41 100 99 98 95 92 91 9 59 32 28 14 14 12.7 122.7 TSC Job No. L -72,070 September 9, 2008 1-21 11 CL NP 100 98 95 93 85 79 76 25 51 24 23 12 11 13.0 1-21 17 CL NP 100 98 97 96 89 83 78 22 51 27 25 12 113 15.7 124.7 118.3 oc z w "i 6 '" u.s. SIEVE OPENING IN INCHES I U.S. SIEVE NUMBERS I HYDROMETER 6 4 3 2 1.5 1 41/23/83 4 6 81014162030405070 100140200 100 I I I I I I I 90 ----. 80 70 60 50 40 30 20 \ \ 10 , \ 0 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS GRAVEL SAND SILT OR CLAY COBBLES coarse fine coarse medium fine SPECIMEN IDENTIFICATION SIEVE % PASS SOIL CLASSIFICATION Boring: 1-20 3 inch 100 Brown SAND, trace silt, clay and gravel Sample: 2 2 100 (SP) 1 1/2 100 1 100 %GRAVEL %SAND %SILT %CLAY NOTES: 3/4 100 8 86 (6% Com ined) 3/8 95 #4 92 #10 88 # 40 79 # 100 14 # 200 6 PROJECT ISFSI Zion Nuclear Power Plant JOB NO. L-72,070 LOCATION Zion, Illinois DATE September 8, 2008 '-LU SOIL DATA SHEET Testing Service Corporation Carol Stream, IL 60188 u.s. SIEVE OPENING IN INCHES I U.S. SIEVE NUMBERS I HYDROMETER 6 4 3 2 1.5 1 "4 112 3/8 3 4 6 81014162030405070100 140200 100 I I , T I I I I I "'-I'---< 90 " 80 70 60 50 40 30 20 10 \ , 0 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETER S I I GRAVEL SAND SILTORCLAY COBBLES I coarse I fine coarse medium fine SPECIMEN IDENTIFICATION SIEVE % PASS SOIL CLASSIFICATION Boring: 1-20 3 inch 100 Brown SAND, Irace sill, clay and gravel Sample: 7 2 100 (SP) 1 1/2 100 1 100 %GRAVEL %SANO %SILT %CLAY NOTES: 3/4 100 5 91 (4% Com ined) 3/8 99 #4 95 #10 91 #40 71 # 100 8 # 200 4 PROJECT ISFSI Zion Nuclear Power Plant JOB NO. L-72,070 LOCATION Zion, Illinois DATE September 8, 2008 I-<U SOIL DATA SHEET Testing Service Corporation Carol Stream, IL 60188   
* Phon e (630) 77 8-1 20 0
" " z w '3 6 00 l,J.S. SIEVE OPENING IN INCHES I U.S. SIEVE NUMBERS I HYDROMETER 6 4 3 2 1.5 1 4 1123/83 4 6 81014162030405070100140200 100 I I T I I I I t-90 .f'--80 70 60 " t 50 1\ "\ 40 30 20 'I'-.. 10 0 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS GRAVEL I SAND J SILT OR CLAY COBBLES coarse fine Icoarse medium fine I SPECIMEN IDENTIFICATION SIEVE % PASS SOIL CLASSIFICATION Boring: 1-20 3 inch 100 Gray silty CLAY, some sand, trace gravel Sample: 12 2 100 (Cl) 1 1/2 100 1 100 %GRAVEL %SAND %SILT %CLAY NOTES: 3/4 100 3 24 52 21 3/8 99 #4 97 #10 95 #40 85 # 100 77 # 200 73 PROJECT ISFSI Zion Nuclear Power Plant JOB NO. L-72,070 LOCATION Zion, Illinois DATE September 8, 2008 1-ZU SOIL DATA SHEET Testing Service Corporation Carol Stream, IL 60188 u.s. SIEVE OPENING IN INCHES I U.S. SIEVE NUMBERS I HYDROMETER 6 4 3 2 1.5 1 4 1123/83 4 6 810141620 30 40 50 70100140200 100 I I * , f-l, I ----90 80 "---* \ 70 60 \ 50 40 " 1\ 30 "'---20 10 0 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS GRAVEL SAND SILTORCLAY COBBLES coarse fine coarse medium fine SPECIMEN IDENTIFICATION SIEVE % PASS SOIL CLASSIFICATION Boring: 1-20 3 inch 100 Gray silty CLAY, little sand, trace gravel Sample: 22 2 100 (Cll 1 1/2 100 1 100 %GRAVEL %SAND %SILT %CLAY NOTES: 3/4 100 1 15 50 34 3/8 99 #4 99 #10 97 #40 92 # 100 88 # 200 84 PROJECT ISFSI Zion Nuclear Power Plant JOB NO. L-72,070 LOCATION Zion, Illinois DATE September 8, 2008 ,-.u SOIL DATA SHEET Testing Service Corporation Carol Stream, IL 60188 U.S. SIEVE OPENING IN INCHES I U.S. SIEVE NUMBERS I HYDROMETER .6 4 3 21.5 1 3/41/23/83 4 6 810141620 30 40 50 70100140200 100 I I I I I I I I ,'-.., "'-90 " 80 \ 70 60 50 40 30 20 10 0 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS GRAVEL SAND SILT OR CLAY COBBLES coarse fine coarse medium fine SPECIMEN IDENTIFICATION SIEVE % PASS SOIL CLASSIFICATION Borinq: 1-20 3 inch 100 Gray silly CLAY, some sand (Cl) Sample: 32 2 100 1 1/2 100 1 100 %GRAVEL %SAND %SILT %CLAY NOTES: 3/4 100 0 27 (73% Corr bined) 3/8 100 #4 100 #10 100 # 40 98 # 100 88 # 200 73 PROJECT ISFSI Zion Nuclear Power Plant JOB NO. L-72,070 LOCATION Zion, Illinois DATE September 8, 2008 '-LU SOIL DATA SHEET Testing Service Corporation Carol Stream, IL 60188 u.s. SIEVE OPENING IN INCHES I U.S. SIEVE NUMBERS I HYDROMETER 6 4 3 2 1.5 13/4112 83 4 6 810141620 3040 50 70100140200 100 I I . I I 90 80 70 60 50 40 30 20 10 '\ 0 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS GRAVEL SAND SILT OR CLAY COBBLES coarse I fine coarse medium fine SPECIMEN IDENTIFICATION SIEVE % PASS SOIL CLASSIFICATION Boring: 1-21 3 inch 100 Brown SAND, trace silt, clay and gravel Sample: 2 2 100 (SP) 1 1/2 100 1 100 %GRAVEL %SAND %SILT %CLAY NOTES: 3/4 100 1 95 (4% Com ined) 3/8 100 #4 99 #10 99 # 40 96 # 100 9 # 200 4 PROJECT ISFSI Zion Nuclear Power Plant JOB NO. L-72,070 LOCATION Zion, Illinois DATE September 8, 2008 '-L' SOIL DATA SHEET Testing Service Corporation Carol Stream, IL 60188 U.S. SIEVE OPENING IN INCHES I U.S. SIEVE NUMBERS I HYDROMETER 6 4 3 2 5 1 314 112 318 3 4 6 81014162030405070 100140200 100 I \ I I I I I I I 90 I-80 ."" .1"----.....
* Fax (63 0) 778-1 233 September 03, 2008 Mr. Darin Delaney TESTING SERVICE CORP. 360 So, Main Place Carol Stream, IL 60188 Proj ec t lD: 72070 First E nvironmental File ID: 8-3902 Date Received: August 27, 2008  
70 60 II 50 40 30 20 10 1\ 0 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETER S GRAVEL SAND SILTOR CLAY COBBLES coarse fine coarse medium fine SPECIMEN IDENTIFICATION SIEVE % PASS SOIL CLASSIFICATION BorinQ: 1-21 3 inch 100 Light brown SAND, some gravel, Irace sill Sample: 5 2 100 and clay (SP) 1 1/2 100 1 86 %GRAVEL %SAND %SILT %CLAY NOTES: 3/4 86 24 72 (4% Com ined) 3/8 79 #4 76 #10 71 #40 62 # 100 7 # 200 4 PROJECT ISFSI Zion Nuclear Power Plant JOB NO. L-72,070 LOCATION Zion, Illinois DATE September 8, 2008 '-L' SOIL DATA SHEET Testing Service Corporation Carol Stream, IL 60188 u.s. SIEVE OPENING IN INCHES I U.S. SIEVE NUMBERS I HYDROMETER 6 4 3 21.5 1 3/41/2 83 4 6 810141620 30 40 50 70100140200 100 I I I I I I r--.. 90 r-.--.. "\ 80 * \ 70 \ 60 50 40 1\ \ 30 "-20 10 0 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETER S GRAVEL SAND SILTOR CLAY COBBLES coarse 1 fine coarse medium fine SPECIMEN IDENTIFICATION SIEVE % PASS SOIL CLASSIFICATION Boring: 1-21 3 inch 100 Gray silty CLAY, trace sand and gravel Sample: 9 2 100 (Cl) 1 1/2 100 1 100 %GRAVEL %SANO %SIL T %CLAY NOTES: 3/4 100 1 8 59 32 3/8 100 #4 99 #10 98 #40 95 # 100 92 # 200 91 PROJECT ISFSI Zion Nuclear Power Plant JOB NO. L-72,070 LOCATION Zion, Illinois DATE September 8, 2008 1-[1 SOIL DATA SHEET Testing Service Corporation Carol Stream, IL 60188 u.s. SIEVE OPENING IN INCHES I U.S. SIEVE NUMBERS I HYDROMETER 6 4 3 2 1.5 1 1141123/83 4 6 810141620 30 40 50 70100140200 100 I I * 'i--I I I I I 90 .1'--80 "'----70 60 \ 50 I' "\ 40 30 .. 20 ". 10 0 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS I I GRAVEL I SAND I SILT OR CLAY COBBLES I coarse fine Icoarse medium I fine I SPECIMEN IDENTIFICATION SIEVE % PASS SOIL CLASSIFICATION Boring: 1-21 3 inch 100 Gray silty CLAY, little sand, trace gravel Sample: 11 2 100 (Cl) 1 1/2 100 1 100 %GRAVEL %SAND %SILT %CLAY NOTES: 3/4 100 5 20 51 24 3/8 98 #4 95 #10 93 -# 40 85 # 100 79 # 200 76 PROJECT ISFSI Zion Nuclear Power Plant JOB NO. L-72,070 LOCATION Zion, Illinois DATE September 8, 2008 I-LI SOIL DATA SHEET Testing Service Corporation Carol Stream, IL 60188 U.S. SIEVE OPENING IN INCHES I U.S. SIEVE NUMBERS I HYDROMETER 6 4 3 2 1.5 1 4 1123/83 4 6 81014162030405070 100140200 100 I I . "l-I I I I I 90 1"1"-80 70 ... 60 '\ 50 40 " f\ 30 '. 20 10 0 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS GRAVEL SAND SILTOR CLAY COBBLES coarse fine coarse medium fine SPECIMEN IDENTIFICATION SIEVE % PASS SOIL CLASSIFICATION Boring: 1-21 3 inch 100 Gray silty CLAY, little sand, trace gravel Sample: 17 2 100 (eL) 1 1/2 100 1 100 %GRAVEL %SAND %SILT %CLAY NOTES: 3/4 100 3 19 51 27 3/8 98 #4 97 #10 96 #40 89 # 100 83 # 200 78 PROJECT ISFSI Zion Nuclear Power Plant JOB NO. L-72,070 LOCATION Zion, Illinois DATE September 8, 2008 1-'" SOIL DATA SHEET Testing Service Corporation Carol Stream, IL 60188 First Environmental Laboratories, Inc. IL ELAP / NELAC Accreditation # 100292 1600 Shore Road* Naperville, Illinois 60563
* Phone (630) 778-1200
* Fax (630) 778-1233 September 03, 2008 Mr. Darin Delaney TESTING SERVICE CORP. 360 So, Main Place Carol Stream, IL 60188 Project lD: 72070 First Environmental File ID: 8-3902 Date Received: August 27, 2008  


==Dear Mr. Darin Delaney:==
==Dear Mr. Darin Delaney:==
 
The above referenced project was a nalyzed as directed on th e enclosed chain of custody record. All Quality Control criteria as outlined in th e methods and current IL ELAPINE LAP have been m e t unle ss ot h e rwis e not ed. QAlQC documentation and raw data will remain on fi l e for future reference.
The above referenced project was analyzed as directed on the enclosed chain of custody record. All Quality Control criteria as outlined in the methods and current IL ELAPINELAP have been met unless otherwise noted. QAlQC documentation and raw data will remain on file for future reference.
Our accreditation numb er is 100 292 and our current cert i ficate i s number 002045: effective 05/14/08 through 02/28/09. I thank yo u for the opportunity to be of service to you and look forward to working with you again in the future. Shou l d you h ave any question s r ega rding any of the e nclo sed ana l yt ical data or n eed additional informati o n , pleas e contact m e at (630) 778-1200. Project Page lo f4 First Environmental Laboratories, Inc. IL ELAP / NELAC Acc r e di ta ti o n # 100292 1600 S h o r c R oad* N ap e r v ill e , Illin ois 6 0 563* Phon c (63 0) 778-1 2 00* Fax (63 0) 778-1 233 Case NalTative TESTING SERVICE CORP. Project ID: 72 0 70 Fir s t E nvironmental File JD: 8-3902 D ate Received:
Our accreditation number is 100292 and our current certificate is number 002045: effective 05/14/08 through 02/28/09. I thank you for the opportunity to be of service to you and look forward to working with you again in the future. Should you have any questions regarding any of the enclosed analytical data or need additional informati on, please contact me at (630) 778-1200. Project Page lof4 First Environmental Laboratories, Inc. IL ELAP / NELAC Accreditation # 100292 1600 Shorc Road* Naperville, Illinois 60563* Phonc (630) 778-1200* Fax (630) 778-1233 Case NalTative TESTING SERVICE CORP. Project ID: 72070 First Environmental File JD: 8-3902 Date Received:
August 27, 2 008 I Ftagl Des cr iplion I Ftag I D escriplion
August 27, 2008 I Ftagl Descriplion I Ftag I Descriplion
< Anal y l e not det ec t e d at or ab o v e th e repottin g limit. L+ L eS r ecove r y oll t s id e co ntrollilllil s; hi g h biil S. D Ana l y tc dete c te d in associa t ed m e thod blank. L-L eS r ecove r y out s i de control l i mil s; low bia s. C Id enti fi ca ti on co n fillned b y GC/MS. M MS r ecovery out s ide co nlrollimil s; LeS acceptable.
< Analyle not detected at or above the repotting limit. L+ LeS recovery olltside controllilllil s; high biilS. D Analytc detected in associated method blank. L-LeS recovery outside controllimils; low bias. C Identification confillned by GC/MS. M MS recovery outside conlrollimil s; LeS acceptable.
D Surrogates dilut e d o ut; recov e ry not availabl e. M+ MS r e covery ollt s id e co nlrollimit s hi g h bia s; L eS acceptabl e. E E s timated re s ult; co n ce nt ration excee d s ca li brJ li o n ran ge. M-MS recove ry o llt si d e c o ntr o l limit s low bia s; L eS acceptable. F Fi e ld measurem e nt. N Ana l y t e is 11 0 t pmt of a liI' NE LA C accreditation. G S urr ogate recovcry outs id e co nt ro l limit s; matri x effec t. 1-1 Analysis or extraction holdin g tim e exceedcd.
D Surrogates diluted out; recovery not available. M+ MS recovery olltside conlrollimit s high bias; LeS acceptabl
E s timat e d r es ult; conce ntrati o n i s le ss than c alib rang e. K RPD o ut s ide co ntr o l l imit s. R o utin e Reportin g Limit (Low es t amount that can b e RL det ec ted when routin e weight s/vo lulllcs a r e u se d without di luti o n.) NO Analyt e was not d e t ec tcd usin g a librar y searc h routine; No calibration s tandard wa s ruml yzc d. P C h e mi ca l pre se l vation pH adju s t e d in lab. Q 'lll C ana l y te was d c t e nnined by a GC/MS dattlba se se ar c h. S T Analyt e was sub-contrac t ed to anot h er lab o rat o r y for anal ys i s. Sa mpl e t e mp e ratur e up o n receipt exceeded 0_6&deg;C \V Rep or ting limit e l ev ated due to sa mple matrix. All quality co ntr o l criter i a, as outl in ed in the m ethods, have been met except as noted below or o n the foll o wing analytical rep o rt. Sample Batch Com m e nt s: Samp l e acceptance criter i a were m et. P age 20f4 First Environmental Laboratories, Inc. IL ELAP / NELAC Ac cr e ditnti o n ll [00 2 9 2 1 600 S h o r e Rand* N ap e r v ill e, I ll inoi s 60563* Phon e (63 0) 778-1 2 00* Fax (630) 778-1233 C licnt: Ana l ytica l Report TESTfNG SERV I CE CORP. Project ID: 72 0 7 0 Sa lll pie ID: 1-20 S-2 S ample N o: 8-3902-00 I Analyte C hloride , So lubl e A n alysis D ate: 09/03/08 C hl o rid e, Solubl e S ulfate, Soluble Analy s i s Date: 09/03/08 Su l fa t e, Soluble pH@2 5&deg;C, 1:10 Analysis Date: 08 128/08 1 3: 3 0 pH @ 25&deg;C, I: I 0 Result Method: 4500CL,C < 50 Method: 4500S04,E  
: e. E Estimated result; concentration exceeds calibrJlion range. M-MS recovery olltside control limits low bias; LeS acceptable
< 1 50 Method: 45 00H+B 9.26 Date Co llected: 08/27/08 T illie Co ll ec ted: 10:0 0 Date Received:
. F Field measurement. N Analyte is 110t pmt of aliI' NELAC accreditation
. G Surrogate recovcry outside control limits; matrix effect. 1-1 Analysis or extraction holding time exceedcd.
Estimated result; concentration is less than calib range. K RPD outside control limits. Routine Reporting Limit (Lowest amount that can be RL detected when routine weights/volulllcs are used without dilution.) NO Analyte was not detectcd using a library search routine; No calibration standard was rumlyzcd. P Chemical preselvation pH adjusted in lab. Q 'lllC analyte was dctennined by a GC/MS dattlbase search. S T Analyte was sub-contracted to another laboratory for analysis. Sample temperature upon receipt exceeded 0_6&deg;C \V Reporting limit elevated due to sample matrix. All quality control criteria, as outlined in the methods, have been met except as noted below or on the following analytical report. Sample Batch Comments: Sample acceptance criteria were met. Page 20f4 First Environmental Laboratories, Inc. IL ELAP / NELAC Accreditntionll [00292 1600 Shore Rand* Naperville, Illinois 60563* Phone (630) 778-1200* Fax (630) 778-1233 Clicnt: Analytical Report TESTfNG SERVICE CORP. Project ID: 72070 Salll pie ID: 1-20 S-2 Sample No: 8-3902-00 I Analyte Chloride, Soluble Analysis Date: 09/03/08 Chloride, Soluble Sulfate, Soluble Analysis Date: 09/03/08 Sulfate, Soluble pH@25&deg;C, 1:10 Analysis Date: 08128/08 13:30 pH @ 25&deg;C, I: I 0 Result Method: 4500CL,C  
< 50 Method: 4500S04,E  
< 150 Method: 4500H+B 9.26 Date Collected:
08/27/08 Tillie Collected: 10:00 Date Received:
Date Reported:
Date Reported:
R.L. Units 50 mg/kg ISO mg/kg Units 08/27/08 09/03/08 Flags Page 30f4 First Environmental Laboratories, Inc. IL ELAP I NELAC Accreditation # 100292 1600 Shore Road* Naperville, Illinois 60563* Phone (630) 778-1200* Fax (630) 778-1233 Client: Analytical Report TESTING SERVICE CORP. Project ID: 72070 SampleID: 1-21 S-2 Sample No: 8-3902-00 2 Analyte Chloride, Soluble Analysis Date: 09103/08 Chloride, Soluble Sulfate, Soluble Analysis Date: 09103/08 Sulfate, Soluble pH @25&deg;C, 1:10 Analysis Date: 08/28/08 13 :30 pH @ 25&deg;C, I: 1 0 Resnlt Method: 4500CL,C  
R.L. Units 50 m g/kg I SO m g/kg Units 08/27/08 09/0 3/08 F lag s P age 30f4 First Environmental Laboratories, Inc. IL ELAP I NELAC Accr e dit at ion # 100 2 92 1600 S hor e Road* Nape r v ill e, Illin ois 60563* Phon e (630) 778-1 2 00* Fa x (630) 778-1233 Client: Analytical Report TESTING SERVICE CORP. Project ID: 72070 Sa mpleID: 1-2 1 S-2 Sample No: 8-3902-00 2 Analyte Chloride, Soluble Analy s i s Date: 09 1 0 3/08 Ch l o ride , Soluble Sulfate, Soluble Analysis Date: 09 1 03/08 Sulfate, Soluble pH @25&deg;C, 1:10 Analysis Date: 08/2 8/08 13 :30 pH @ 25&deg;C, I: 1 0 Resnlt Method: 4500CL,C < 50 Method: 4500S04,E  
< 50 Method: 4500S04,E  
< 150 Method: 4500H+B 9.11 Date Collected:
< 150 Method: 4500H+B 9.11 Date Collected:
Time Collected:
Time Collected:
Date Received:
Date Received:
Date Reported:
Date Reported:
R.L. Units 50 mglkg 150 mglkg Units 08/27/08 10:00 08/27/08 09103/08 Flags Page 4of4  
R.L. Units 5 0 mglkg 150 m glkg Units 08/27/08 10:00 08/27/08 0910 3/08 Flags Pag e 4 o f4  
.. First Environmental Laboratories, Inc. First Environmental Laboratories 1600 Shore Road, Suite D Naperville, Illinois 60563 Phone: (630) 778-1200* Fax: (630) 778-1233 E-mail: firstinfo@firstenv.com  
.. First Environmental Laboratories, Inc. First Environmental Laborato ries 1600 Sho re Road, Suite D Nape r ville, Illinois 60 5 63 Phone: (6 30) 778-1200* Fax: (630) 778-1233 E-mail: firstinfo@firstenv.com  
!EPA Certification  
!EPA Certification  
#100292 Project 1.0.: 12010 P.O.#.: Matrix Codes: S = Soil W=Water 0= Other DatefIime Taken Sample Description  
#100 292 Project 1.0.: 1201 0 P.O.#.: Matrix Codes: S = S o il W=Water 0= Other DatefIime Taken Sample Description  
----------------FOR LAB USE ONLY: r f Cooler Temperature
----------------FOR LAB US E ONLY: r f Coo ler Temperature
:
:
Yes_ N/ I) s: ' QC Received within 6 hrs. of co ction: __ _ Ice Present: Yes_ No CHAIN OF CUSTODY RECORD Pagc __ of __ pgs Name: Streel Address: City: State: Zip: Phone: Fax: e-mail: Send Report To:... Via: Fax 0 cornall 0 Sampled By: ,I I 1/1 I hi 7 Analyses Matrix Comments Lab LD. B-] 5 -------------_ .. --Sample Refrigerated
Yes_ N/ I) s: ' Q C Received w i thin 6 hrs. o f co ction: __ _ Ice Presen t: Yes_ No CHAIN OF CUSTODY RECORD Pagc __ of __ pgs Name: Streel Add r ess: City: State: Z i p: Phone: Fax: e-mail: Send Report To:... Via: Fax 0 cornall 0 Sampled By: ,I I 1/1 I h i 7 Analyses Matrix Co mmen ts Lab LD. B-] 5 -------------_ .. --Sample Refrigerated
: Yes_ No_ Containers Received Preserved: 0 No Refrigerator Temperature:
: Yes_ No_ Containers Received Preserved: 0 No Refrigerator Temperature:
___ 'C 5035 Vials Frozen: Yes_ No_ Freezer Temperature:
___ 'C 5035 Vials F ro ze n: Yes_ No_ Freezer Temperature:
___ 'C Notes and Special Instructions:
___ 'C Notes and Specia l Instructions:
______________
______________
_______________
______________________________________ _ Relinquished By: r j ), .A? DatefJlme Q-2.t-6:':1  
_______________________ _ Relinquished By: r j ), .A? DatefJlme Q-2.t-6:':1  
<? z.' 3 ., Rece ived By: I -j..----0 \, ../ DalefJlme v { v 'I II v '-" ( Relinquished By: DatefIime Received By: r Date!Time
<? z.' 3 ., Received By: I -j..----0 \, ../ DalefJlme v { v 'I II v '-" ( Relinquished By: DatefIime Received By: r Date!Time
___ 1 ________ _ Rc\'.-'lOIl}}
___ 1 ________ _ Rc\'.-'lOIl}}

Revision as of 01:53, 9 July 2018

TSC Report No. L-72,070, Report of Soils Exploration Zion Solutions Zion Nuclear Power Plant Independent Spent Fuel Storage Installation - Final - 10-2-08
ML15188A190
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 10/02/2008
From:
Testing Service Corp
To:
Office of Nuclear Material Safety and Safeguards, Sargent & Lundy
Shared Package
ML15188A105 List:
References
ZS-2015-0084 L-72, 070
Download: ML15188A190 (49)


Text

{{#Wiki_filter:REPORT OF SOILS EXPLORATION ZION SOLUTIONS October 2 , 2008 L -72 , 070 ZION NUCLEAR POWER PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION PREPARED FOR: SARGENT & LUNDY LLC 55 EAST MONROE STREET CHICAGO, ILLINOIS 60603 PREPARED BY: TESTING SERVICE CORPORATION 457 EAST GUNDERSEN DRIVE CAROL STREAM, ILLINOIS 60188 (630) 653-3920 Sect i on I. TEXT 1.0 2.0 Introdu ct i on Field Work TABLE OF CONTENTS Page ............ .................... ....................... 2 2 3.0 Geophysica l Testing ................................ ....*.......... 4 4.0 5.0 Laboratory Testing C l osure 4 5 II. APPEND I X REPORT OF SOILS EXPLORATION ZION SOLUTIONS ZION NUCLEAR POWER PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION

1.0 INTRODUCTION

October 2 , 2008 L-72,070 Presented in this report are the results of the soils investigation performed to determine the general subsurface conditions for the proposed construction of an Independent Spent Fuel Storage facility. The proposed structure will be constructed at the Zion Nuclear Power Plant in Zion, IL. This work was performed in general accordance with Technical Specification Subsurface Investigation Specification Z-5701 prepared by Sargent and Lundy and dated July 29 , 2008. 2.0 FIELD WORK A total of two(2) soil borings (1-20 and 1-21) were performed for this project with each of them being extended to a depth of 100.0 feet. Boring 1-20 was subsequently converted into a seismic cross hole survey source hole. Additionally, two (2) boreholes were drilled and completed with 3" PVC casing for cross hole seismic testing. Upon completion of the drilling and testing , ground surface elevations as well as Northing and Easting coordinates were determined for the drilling locations using a Trimble R8 GPS. The vertical and horizontal data shown on the Boring Location Plan was retrieved from a National Geodetic Survey data base located approximately 1.2 miles south of Zion, Illinois. Sargent & Lundy L -72,070 October 2, 2008 The boreholes were initially advanced by 4 1/4" hollow stem auger methods to the ground water table and then completed by rotary wash methods using bentonite and potable water in accordance with ASTM D 5783. Upon completion, each borehole was sealed with cement-bentonite grout placed by tremie methods. Soil samples were collected at 1-20 on 2.5 foot intervals for the entire 100 foot depth. At location 1-20 the sampling interval was 2.5 feet for the first 10 feet and 5.0 feet thereafter. Standard Penetration Tests (SPT) -N Values (ASTM D 1586), were determined using an automatic hammer which allows a 140 pound weight to free fall from a 30 inch drop to drive the sampler. The samples were collected using standard split spoon procedures during SPT since granular soils and/or very stiff clays prevented the use of Shelby tube samplers. Liners were not used with the split spoon samplers. Dynamic energy measurements have not been made on this automatic hammer. However, Pile Driving Analyzer's (PDA) have been used to process dynamic measurements of strain and acceleration between the drill string and similar hammers made by the same manufacturer (Boart Longyear). The Average Energy Transfer Ratio is accepted as 75% for this model hammer. The soil types were logged in the field by the drill crew and representative portions of each sample were contained in glass jars per ASTM D 4220 and brought back to our laboratory. Boring Logs defining the soil lithology and ground water observations is included in the Appendix of this report. Ground water depth was determined during hollow stem auger drilling only. The borings were completed using wet rotary methods and therefore, the water levels inside the boreholes at the completion of the drilling were not representative. PVC casing was installed shortly after the completion of the drilling and reaming at location 1-20. Boring 1-21 was sealed with grout immediately following the drilling and sampling to prevent an open hole hazard. Therefore, 24 hour water level readings were not obtained. The ground water depth measured during the hollow stem auger drilling is considered the most accurate indication of the undisturbed ground water levels at the site. Sargent & Lundy L -72,070 October 2, 2008 3.0 GEOPHYS I CAL TEST IN G Geophysical testing consist in g of a Cross Hole Seismic In vest i gation , was performed at l ocation 1-20. The or i gina l bore hole (1-20) was reamed to a depth of 100 feet using a 6" tri cone roller bit and then cased with 3" PVC casing sea l ed in place w ith cement-benton it e grout. Two add iti ona l holes (1-20A and 1-20B) were drilled using a 6" tri cone roller bit to a depth of 100 feet and were l ocated in a st r a i ght lin e at approximate distances of 10 and 20 feet from 1-20. These bore holes were a l so comp l eted w ith the in sta ll at i on of 3" PVC cas in g sea l ed in place with cement-bentoni t e grout. The Cross Hole testing was performed by Geotechno l ogy, In c. In genera l conformance w ith Section 4.31 of ASTM 04428. A copy of the report prepared by Geotechno l ogy, In c. summa ri zing the test results i s includ ed in the Append i x of this report. Following the testing eac h of the PVC cas in gs were sea l ed w ith bentonite c hip s wh i c h were hydrated upon placement. In addition the PVC was cut off near the ground surface and topsoil was place ove r the hol es. 4.0 LABORATORY TESTING The so il samples obta in ed from the bor in gs were exam in ed in our l aboratory and v i sual l y classified accord in g to the Unified Soi ls C l ass ifi cation System (ASTM 0 2488). Co h es i ve so il s were measured for moisture content (ASTM 0 2216) and unconfined compressive streng th (ASTM 0 2166). Add iti onal testing including grain size distribution (ASTM 0422, 0 1140), Alterberg Limits (ASTM 04318), pH (ASTM G 51) and dry unit we i ght determinations (EM 1110-2-1906) we r e performed on samp l es se l ected by Sa r gent and Lundy. The results of this testing has been summarized and in corporated in to the Soi l Test data Sheets included in the Appendix. Two (2) so il samp l es se l ected by the client were ana l yzed for so l ub l e ch l or i des (Method 4500CL,C) and so lubl e sulfates (Method 4500S04, E) by First Env ironm enta l Laboratories. A copy of their report is Appended. Sa r ge nt & Lundy L -72, 070 October 2, 2 008 5.0 C L OS URE Th e d a ta a nd r es ult s pre se nted in thi s r epo rt a r e b ased up o n th e conditions e n co unt e r ed a t th e two (2) l oca ti o n s in ve s ti ga t e d as indi cated o n the So il B or in g L oca ti o n Pl a n. Thi s r epo rt does n ot r e fl ec t a ny va ri a tion s th at m ay occur between th ese l ocatio n s, th e natur e an d ex t e nt of w hi c h may not beco m e ev id e nt until th e co n s tru c ti o n ph ase o f th e pr o j ec t. W e are a ppr e ciati ve of th e opportunit y t o ass i s t yo u with thi s project a nd l ook f o rward to wo rking w ith yo u in th e futur e. Pl ease ca ll if you h ave a n y qu es ti o ns o r a r e in ne e d of furth e r inform a tion. R es pe c tfully S ubmitted , M ac h a lin s ki V i ce !'5 r es id e nt R eg i s ter ed Prof ess ional Engine e r Illin o i s No. 0 62-038559 Pr e pared By,. Darin D e l a n ey Proj ec t Geo l og i s t APPENDIX UNIFIED CLASSIFICATION CHART LEGEND FOR BORING LOGS TWO (2) BORING LOGS (6 pages) BORING LOCATION PLAN (1 page) GEOPHYSICAL DATA REPORT Geotechnology, Inc. (16 pages) SOIL DATA SHEETS (12 pages) TWO (2) ANALYTICAL REPORTS First Environmental Laboratories, Inc. (5 pages) H

  • x TES TI NG SERV I CE CORPORA TION UNIFlEO CLASS I F I CAT I ON C H ART 0 0 " " z " -CRITERIA FOR ASSIG N I N G GRO U P SYMBOLS AND GROUP tlAMES US ING LABORATORY TESTS 0 GRAVELS M ort I hon CLEA N GRAVELS o f CGo'U Lus Ih on 5°10 ,.oclion relolned fine s C C u <4 ond/o. I> Cc > 3 e 0 0 No.4 siev.. G R AVE L S WITH Fines (I oui fy as M L 0' Mil S OI L CLASSIFICATION GROUP HW80L GW GP GM GROUP NAME b Poo.lyg'oded g.o ve l f Si lly g.ovt'l f,O,1I GC Cloyey q.ovel f , q , II FI N ES M o.e Ilion Fines c lo ssHy os CL or CH 0 f-____________ i ,,,, w 0 _0 * " , o o , SA ND S 50 °/0 0' more of eoo,st' Iroclion pOISU N o.4 sieve CL EAN SANDS Lus I lion 5 °/0 ,jnes d SAN D S WITII FINES Mo, e Ilion 1 2 0/0 flnt's" C u'-:'60nd/o' I> Cc!>3 e Fines clossj ,y as M L o. Mil Fines c l ossi'y as C L 0< C H SW SP S M SC CL Wt'II-q'oded sond , Poo.l y q.oded liond 1 S illy sand 0,11,' C l oyt'y s and 0 , II, I L eon cl oy k ,I , m 0 SI LT S e CLAY S Liquid l imil leu I lion 50 0/0 PI:> 7 ond plo l s on or above "A' line j Ino.qo n;c f-------------------

--'-----------------------


+----+


_1 0 PI <: 4 a. plots b t'low .. A" lin e j z . , w ** z ** ;; O,oonic Liquid Ii mil oven dried Liquid lim il -nol dried "'" 0.75 * ". o P I p l ats on a. obove "A' line , w 0 z , ;:;: :; S ILT S {} CLAYS Liquid limi l 50 0/0 a. mo.e PI p lo t li bela .. A l ine O r qon i c liquid limil -oven droed <0 Liqu i d li m il -nol dri e d . IHOhly a.oanic soit s Prima r ily o.g onic mo tt e',do rk 'n colo r, and oJonic a d o.

  • o. B a H d on l he molt.lol passing I he J-i n 17 5-mm) Ileve. b.1I fi el d cO nl oil'led cobbles ond/o. bo u ld ers,odd " .. ith cobbl es al'ld/o' boul de r" 1 0 g.o u p nom e. c. Grove l s wi l h 5 1 0 1 2 ala f int'S r e quire dual sym b ols GW-GM 1,,11 oroded grovel .. ith sill GW-GC .. ell oroded g r ovel .. ith cloy GP -GM poorly (traded g r owel .. illl s.1t GP-GC poor ly qroded q.ovel .. illI c l oy d. Sa nd s .. i l ll 5 0 10 1 0 1 2 °/0 fil'les ** quire duo l s ymbol s S W-SM .. ell (traded sond .. ill , si lt .. SW-SC .. t il (traded SOli d .. illI clOl SP -S M poo.ly I)rod.d sOl'ld .. ilt, s;lI Sf>-SC poo"y g.od e d sand .. il lI cloy , C _ (030' " so il conla i n s 1 5 0/0 SOll d,Odd" .. itll sand" 1 0 I)roup nom *. g.1f fines clon ily os CL-M L,lIu dua l s y m b o l GC-GM,SC-SM.

II. It f il'lu a r t' aJonie , odd .. itll o.gonic fines" 10 ?r OU P l'I ome. I II soi l conloil'l l? 15 °/0 o r ovel ,odd" .. ilh orov.I' 10 I)ro u p nome. 0 ML Sill .,I,m OL O'oonic cloy .,I,m,n Organic si ll -, I ,m,o '" roO cloy k ,I ,m M" Elos l ic si ll k, l ,m 0" O.qonic cloy*,I , m,P OJ onic s i ll k ,I, m,q PT P t'ol I. If A lle.berg limit s pial 11'1 hOlched area, soi l i s a CL-ML, ,i lly c l oy. k.1I so il con l oins 15 10 2 9 °/0 p lus No. 200,odd " .. " hsond" O r "",illl 9rov t'I" .... h ic h e v e r 'S predomin o l'l l. .... soi l conloins?;,. 30°10 plus No. 200 , p.e d omll'lonlly !ol'ld, odd "sandy" 10 (t.oup n ome. m.1I soi l °/oP11l5 Na.200,p'eda rn inOl'llly O la ve l, odd o r ovr Il Y 1 0 oroup nom e. and plo l s 01'101 obovt"h" IIl'Ie. o. 4 0. p l o l s btto .. ':{Io': , l ine. :: IIl'Ie. V / V // / 0 V :? / / v' 0 / // / -. V / 0 V V * // / 'v MH OR 0 0 V / / // / 0 r --;;; / V ML 0 O L L-ML)!:; '///,Y o V 0 , o '0 JO .0 '0 .0 10 80 90 '00 L10UID LIM I T ( LLl FILL TOPSOIL SAMPLE TYPE: TESTING SERVICE CORPORATION LEGEND FOR BORING LOG S -.... ---..... PEAT GRAVEL SS Sp lit Spoon ST Thin:Walied Tube A = Auger SAND SILT CLAY FIELD AND LABORATORY TEST DATA: N = Sta ndard Penetration Resistance in Blows per Foot Wc Qu In-S itu Water Content Unconfined Co mpressi ve S tr e ngth in Tons p e r Sq u a r e F oo t DOLOMITE

  • Pocket Penetrometer M eas ur e m e nt; Maximum Re ad ing = 4.5 t s f yD Dry Unit Weight in Pound s p e r Cubic Foot WATER LEVELS: SOIL DESCRIPT I ON: V \l ... While Drilling End of Boring 24 Hours MATER I AL BOULDER COBBLE Coarse GRAVEL Sma ll GRAVE L Coarse SAND Medium SAN D Fine SA ND S ILT and CLAY COHESIVE SOILS CONSISTENCY Qu Very Soft Soft St iff Tough Very Tough Hard L ess than 0.3 0.3 to 0.6 0.6 to 1.0 1.0 to 2.0 2.0 to 4.0 4.0 a nd over MODIFY I NG TERM Trace linle Some PARTICLE SIZE RANGE Over 1 2 inches 1 2 in c h es to 3 inch es 3 inch es to '/. inch '/. in c h to No.4 S iev e No.4 S i eve to No.1 0 S ieve No. 10 Sieve to No. 40 S ie ve No. 40 S i e ve to No. 200 Sieve Passing No. 200 Sieve COHESIONLESS SO I LS RELATIVE DENS I TY Very Loo se Loo se Firm Dense Very D e n se PERCENT BY WEIGHT 1 -10 10 -20 20 -35 _N_ 0-4 4 -10 10 -30 30 -50 50 a nd over

.... "' "' "' z H "' "' is Ul :;: 0 ,.., "' III "' U .... Ul H Cl Q " o o 5 10 1 5 2 0 25 30 35 40 PROJECT I SFS I Z ion Nu c lear Power P l ant C LI E NT Sargent & Lundy, LLC BORING 1-2 0 '-="'-----DATE ST ARTE D _-, 8 ,-.. EL EVAT I ONS ___ _ E N D OF BOR IN G ___ _ ,.: (90 SAMPLE Y DR Y zu N WC au DEPTH ELEV. N O. TYPE -> -' , 1 SS 5* 11*1 3 3.0 584.2 .. Ixi -> < 2 SS 2* 2*4 5.5 58 1.7 -... X* -3 SS 2* , 1-1 -' .. X* -. 4 SS 1* 2*3 10.5 576.7 -...... x l -' .. 5 SS 8* , . 10-1 2 -' ... . . -... 6 SS 7* -: .... 8-10 ;....;....; 15.5 571.7 -," ,', Ix l -' .... 7 SS 9* 23*2 2 -' -" *x. 8 SS 1 0* -' 17-1 9 -' .. x l 9 SS 13* -. 14*2 1 23.0 564.2 -x l 10 SS 14* -' 30*29 25.5 5 6 1.7 -tl -11 SS 8-26.6 5*5 28.0 559.2 -1 2 SS 8-1 1.0 4.5+' 129.9 -1 0*11 --1 3 SS 8* 11.2 6.73 1 28.4 9*1 3 --x l 14 SS 7* 20.5 4.73 1 08.5 -7*10 -x l -1 5 SS 10* 1 2.8 6.90 1 25.2 14-15 38.0 549.2 -IX. 1 6 SS 31* 14.8 120.4 50 1 5" .. DRILL RIG NO. 315 DIV I Sion lines beh.ccn d epoSi t s r ep resent dppro-:irna l e boundClli (!s Ile l::een sOl ll Wes IIl-S!Il1. the transition may ba grmJlI<l1 D ATE CO MPL ETED _-'8 ..... 1.:..4.:.. .. "'0.:..8_ J OB L .. 72,070 WATER L EVE L OBSERVAT I O N S V W HI LE DR I LLIN G 3.5 ' \l AT E ND OF BORING __ ---'M"'u::.d::..:..R::: o..:: ta:..: r ,L y-'W"'a::: s:..: h-'-__ ... 24 H O U RS (PVC P i pe I nsta ll ed) SO IL DE SCR I PTIONS Firm brown a nd g r ay fine to medium SA ND , tra ce gravel , damp (SP) v Lo ose brown a nd gray fin e t o medium SA ND , tr ace gravel , sa turat ed (SP) \ S-2: % Graval = 8 / % Sa nd = 86 oj" Silt a nd -6 L oose d a r k gray fine t o m ed ium SA ND , t race gra ve l , sa tur ated (SP) Firm gray fin e to medium SA ND , tra ce gravel, saturated (SP) S-7: % Gravel = 5 % Sand = 9 1 % S ilt a nd C la y = 4 D e n se gray fin e t o m ed ium SA ND , tr ace gr ave l , s atur a t e d (SP) Den se gra y fin e SA ND , tr a ce s ilt , sa tur a t ed (SP-SM) Firm gr ay sa ndy S ILT, sa turated (Ml) S-1 2: (ll , Pl , P I) 22,11 , 11 % Grav e l = 3 % Sand = 24 % Si lt = 52 % C l ay = 2 1 Ve r y t o ugh to h a rd g r ay s ilt y CLAY , so m e sa nd , trac e gravel , moi s t (Cl) Ve r y dense gray c lay ey S i lT , very m o i s t (Ml) Pag e 1 of 3 f-< '" '" u. z H '" u. g; UJ :;: 0 '"' '" 00 '" f-< UJ H " § o u i" PROJ ECT I S FS I Z ion N u c l ea r Pow 0'...r.'.P .. l a .. n ... t __ _ CLIENT Sargent & Lund y, LLC BORIN G .'.1-.=2 c::.0 __ _ DAT E STARTED _--, 8'...-.:.: 1 2::.-", 08:::....._ E L EVAT I ONS GROUND S URF ACE _-'5 ,,8 .. 7 ... 2=--___ _ E ND OF BORING _..::4,,8 .. 7 .. , 2=--___ _ ;..; "0 SAMPLE Y DR Y zu N WC Qu DEPT H ELEV. NO. TYPE 55 60 65 40.5 546.7 --I -1 7 SS 11-9.6 1 0.7 1 133.8 14-14 --I 1 8 SS 10-10.6 5.90 13 1.0 11 -xl -19 SS 11-10.5 9.38 131.3 13-1 3 --x l 20 SS 8-12.9 5.1 2 1 24.4 1 5 -x l -2 1 SS 9-1 3.8 5.06 1 22.7 1 0-13 --x l 22 SS 8-13.4 5.32 123.7 14 -6 1 -23 SS 12-13.4 6.23 123.7 17 -ZI 2 4 SS 1 2-1 5.7 5.1 2 118.3 1 5-1 5 -C>I -25 SS 10-20.3 4.0 7 108.8 11-1 3 -xl -26 SS 8-20.1 3.93 1 06.9 11 -;;; 127 -;;; SS 8-13.8 4.53 11 7.7 8-8 40 45 50 68.0 519.2 -;;; 1 28 SS 1 0* 17.4 3.0 1 114.6 -;;; 50/6" -;;; -/ 29 SS --70 72.5 5 14.7 -;;; -;;; X 30 SS 25-7.6 14.57 113.8 --34-42 -;;; 1 31 -;;; SS 21-11. 1 4.5* ..

  • 1 29.6 / 3 1-36 75 78.0 509.2 -IX 1 32 SS 37* 10.7 1 30.7 50/5" -80 RIG NO. 3 1 5 DI V ISion hnes bc t'.-.een del}QSl l s represen t appfO"una t c buum t[lries beh'.een soil l ypes in*Sl l u tile tr ansitio n may be gradual DATE COMPLETED

_-,8'..-1.'.4.'.-.:: 0 8 ,,-_ JOB L-72, 0 7D WATE R LEVEL OBS ERVATION S V W H IL E DR I LLIN G 3.5 ' \l AT END OF BORI N G __ ---'M .. __ " 24 H OURS (PVC Pip e Install e d) SO IL DES CR I PTIONS Very tough to hard gray si lt y CLAY, l i ttl e sand , tr ace gr ave l , moist (Cl) S-22: (ll, Pl , P I) = 31 , 1 2 , 1 9 % Grave l = 1 % Sand = 15 % Si lt = 50 % C l ay = 34 Ve r y to ugh t o h a rd g r ay si lt y CLAY, littl e sa nd , tr ace gra ve l, o ccas i o n a l Cobb l es, mo i s t (Cl) Bould e r Zo n e 69.5 to 72.5' Ve r y t oug h to hard gray s ilty C L AY , littl e sa nd , t r ace gravel , occasio n al s ilt sea m s, moi s t (C l) Ve r y d e n se gray c l ayey S i lT , lilli e sa ncl , moi st (Cl-Ml) Page 2 o f 3 PROJECT ISF S I Z i on Nuclear Power Plant C LI E NT Sargent & Lund

  • LLC BORING ;..1-.=2 ,-=0 __ _ DATE STARTED ___ 8'---1.:.: 2:...-0::: 8'----_ DA T E COMPL ETED _-, 8 ,---1;..4;..-", 0", 8_ JOB L-72, 070 E LEV A TI O N S WA TER L EVEL OB SERVAT ION S GROUND SURFACE ___ 5::8:.:.7.:.:.2=--___ _ V WHILE DR I LLING 3.5 ' END OF BOR IN G 487.2 'V AT END OF BOR IN G __ ----'M", u::: d"-'.: R:: o:.:.ta::.: r.!.y __ W=as ... ___ >< '"

to 0 SAMP L E ... 24 H OUR S (P V C Pip e I nstalled) N WC Q u Y DRY D EPT H ELEV. SO IL DESCR I PTIONS Z U f-.'-'':= --j NO. TYPE __ -" X l 33 % G r ave l = ° _ SS 43-12.0 1 27.3 % Sand = 27 50/4" % Silt a nd C l ay = 73 --X l 34 SS 44-85-50/4" /'11 SS 9-8-9 --X I 36 90-SS 7-8-11 = Xl S S 8-12-1 3 --IXI 38 95-'" SS 8-12-13 -*:<1'1 1 SS 26-27-15 -12.1 1 3.2 1 5.1 2.55 1 8.0 3.21 1 6.0 2.48 1 6.2 4.0' 1 7.3 3.0' 1 2.1 1 3.9 2.0 86.0 5 01.2 87.0 5 00.2 119.7 g r ay c layey SILT , littl e sa nd , moist Firm gray cl a yey SAND, saturated (SC) Ve r y tough t o hard gray very s ilty C L AY, little sand, occasiona l silt seams, m o i s t (CL-ML) Den se gr a y fin e to medium SA ND , sa turat ed (SP) Very t oug h gray ve ry silty CLAY, littl e sand , occasional s ilt sea ms, moi s t (CL-ML) _---l'l..l.JL4'IX --'1 40 SS 11.9 2.0' 5 100 w In W [-0 (J) '4 ---Cl 105-" " ----110----11 5----End of Boring a t 100.0'

  • Approx im ate un co nfined compressive s tr e n gth ba se d o n mea s ur eme nts w ith a ca libr a t ed po c ket penetrom e t e r. Diedri c h D-1 20 Truck Rig (#3 1 5) CME Autom a ti c H a mmer R ,_ DIVISion hnes be t wee n deposits repre se nt DRI LL RIG NO. 3 1 5 <'lpprO X nllale b o undar i es bel\'.'e e n salt t ypes i n-sl l u , the t ransi t ion be gr a dua l Pag e 3 of 3 PR OJ ECT I SFS I Z i on Nuclear Power ________________

_ E-< '" '" "-Z H '" "-!3 Ul " 3 '" "' '" Ul H '" i;l , " CLIENT Sa rg e nt & Lundy, LLC BORING 1-2 1 .:...:: '-'----DATE S T A RT E D _-'8'--".:: 1 8::.":0°8"---_ E L EVAT I ONS GROUND S UR FAC E _--'5 ,, 8 ,, 7.:.:.1'---___ _ END OF BO RING _-=4,,8 ,,7.:.: , 1'---___ _ E-< '-'0 S AMPLE Y D RY z u N WC Qu DEPTH ELEV. NO , TYPE h I X 1 S S 6--... 8-9 3.0 584.1 o -,> I X 2 SS 4-f-' 7-10 5.5 581.6 5 -,'.'. xl -:< 3 SS 4-5-9 , -, . -:'"-X II 4 SS 1 0-,-.". 1 3-1 5 10 ..... -" , -: ' , .. , -.. ", . -' X_ SS 5 8-,-. >: 1 3-14 1 5 -' -. .. -. -: , -, 'I X. 6 SS 11--' 13-13 20 -;:' 22.0 565.1 -: ,' X. -'. 7 S S 10--1 5-12 25 -. 27.0 560.1 ... -.. -"0' X 8 SS 6--8-11 3 0 --, 32.0 5 5 5.1 --x l 9 SS 1 6-1 2.7 5.41 122.7 21 --35 38.0 5 4 9.1 --i 1 0 S S 36-1 2.2 4.5+' 50/4" 40 ,. DI V ISion lines be l' .. een d e poSits repre se n t appro)[u na t e boundaries beh°.'een S!)II I}PCS. in-sllll , t he t ranSIti on ma y be gradual DR I LL R I G N O. 3 1 5 D ATE CO M P LET ED 8" 1 8" 08 ----'-'--'-------- JO B L"72, 070 WAT E R LEVE L OB SE R VA TI O N S V WH I L E DRILLING 5,5 ' \l AT END OF BOR I NG ___ --'-R"'o c: t a.::: r"'y_W'-'-=a-=-sh"---__ _ l' 2 4 HOURS Grouted Upon Comp l etion S O I L DESCRIPTION S Firm brown a nd gray clayey SAND and GRAVEL, damp (SC-GC) Firm brown a nd gray SAND , trace g r avel, damp (SP) \S-2: % G r ave l = 1 I % Sa nd = 95 % S ilt a nd C l av 4 S-5: % G r ave l = 24 % Sa nd = 72 % S ilt a nd C lay = 4 Firm gray SAND, so m e gra ve l , occas i onal Cobb l es, sa tur a t e d (SP) Firm g r ay SA N D, sa turat ed (SP) F irm g r ay s ilt y fin e to m ed ium SAND, sa tur a t e d (SM) S-9: (LL , PL, PI) = 28, 14 , 14 % G r ave l = 1 % Sand = 8 % S ilt = 59 % Clay = 32 Ve r y tou g h to h a rd gray sil t y CLAY , tr ace sand , trace grave l , moist (CL) Very tough to hard gray ve ry s ilt y CLAY , little sa nd , t rac e grav e l. occas i o n a l s ilt se arns , damp I CL-IVILl _ --' r a ge 1 of 3 Co OJ OJ '" z H OJ ;;! '" !3 (f) '" ° .., W '" W u ::i! Co (f) H 0 o " U 40 45 5 0 55 60 65 70 75 80 P RO ,IEC T I SFS I Z i o n Nucl ea r Power P l a nt CLIENT Sa rg e nt & Lundy, LL C BORING ,-1-=2-,-1 __ _ DATE S TARTED _-, 8 ,--1.:.: 8 ,--", 0 8 ,,--_ ELE VAT I ONS GROU N D SURFACE ___ 5.,.8.:.7'-', 1 _____ _ EN D OF BORI N G _--=4::: 8 ,, 7.:., 1'--___ _ Co "0 SAMP LE Y DRY zu N WC Qu DEPTH ELEV, NO. TYP E -42,0 545.1 -V -xl 11 SS 16-1 3,0 4.0' 124.7 25 --- -X l 1 2 SS 1 5-9.7 9.22 133.5 -3 1-34 -52,0 535.1 -1 3 SS 26-9,9 3.5' 50/3" --58,0 529,1 IX. 14 SS 17-29 5011" .. .. I X* 1 5 ss 27--:: 24-2 4 .-.......::: 68.0 5 1 9.1 --'" I X 16 SS 1 4-14 , 5 7,73 1 21.1 -; 17-20 -/: ---x l 17 SS 14-15.7 2,5' 1 18 , 3 23 --? -? -rt1 lxl 1 8 5S 16-13 , 3 6.23 124.0 1 6*18 ......J..1LI __ , .. DR ILL RIG NO , 3 1 5 01'/'510n hnes bel .. ce n depoSi t s represen t approx lln a!C bOllilda r ics bel\".ecn sOll lyp es. In-situ. til e tr anSition be gradual DATE CO MPL E TED 8-18-08 ---'-'-'-'- JOB L-72,070 WA T ER LE VEL OBSERVATIONS V W HI LE DR I L LIN G 5,5 ' '\! AT E N D OF BORING ___ __ _ ... 24 HOURS Grout ed Upon Completion SO IL DESCRIPTIONS very t o u gn t o ha rd g ray ve ry s ilty GLAY, lilli e sa nd , tr ace g r ave l , occas i o n a l s ilt sea m s, damp (CL-Ml) S-11 : (ll , Pl , PI) = 23 , 1 2, 11 % G r ave l = 5 % Sa nd = 2 0 % S ilt = 5 1 % C l a y = 2 4 Ve r y tou g h to h ard gray s ilt y C L AY, littl e sand , tra ce grave l , moi s t (Cl) Very tou gh to h ard gray ve r y s ilty C L AY, littl e sa nd, tr ace grave l , moist (Cl) D e n se t o ve r y d ense gray SA ND a n d GRAV EL , occa s i o n a l Co bbles a nd Bou l d e r s, sa turated (SP-GP) Ve r y t oug h to h a rd gray s ilty C L AY, little sa nd, trace grave l , moist (Cl) S-1 7: (l l , Pl , P I) = 25 , 1 2 , 1 3 % G r avel = 3 % Sa nd = 1 9 % Sil t = 5 1 % C l ay = 27 ----Pag e 2 o f 3 ,... '" '" u. z H '" i;! u. !3 Ul 3 0 .., '" "' '" U c' Ul H Cl " 00 PRO JEC T I SFS I Z i on Nuclear Power P l a nt CLIE NT Sarge nt & L undy, LL C BORI NG .:.1--=2:..:1'----- __ _ DATE S T ARTED _-, 8:.-.:.: 18:.-.:: 0:.8_ ELE VA TION S ___ _ E ND OF BORING _--=4 .. ___ _ ,... 00 SAMPLE Y DRY zu N WC Qu DEPTH E L EV. '" NO. .., TYPE 80 ---IX_ -19 SS 10-1 3.4 4.5+" -1 8-2 1 85 -87.0 500.1 --IX 20 SS 11-1 7.5 3.5' 26 90 ---95 -!X 2 1 SS 15-1 3.2 4.5+* 25 ---100 -10122 SS 20-10.3 4.5+" 29-37 ----10 5 -----11 0 -- - --1 1 5 -----1 2 0 " DRILL RIG N O. 315 D,VISion lines bell.cen deposits represen t approx lln atc b o umlMl cs beh':een 5011 t y pes. in-situ. the Ir anSI\l on may be gractl 1 at Ii &--131 DATE COMPLETED _-, 8:.-.:.: 18:.-..::: 0.:: 8_ JOB L-72,070 WA T ER LEVEL OBSERVATIONS V W HILE DRILLING 5.5 ' \l AT END OF BOR I NG ___ ---'R"'o"'t.::a:J ry'--W=a":'s"h __ _ T 24 H OURS Grouted Upon Comp l etion SO IL DESCR I PT I ONS Ve r y tOUgll t o Il ard gray s ilt y C LAY , liltle sa nd , trace grave l , moi st (Cl) Very tough t o h a rd gray very s ilty C LAY , little sand, occasiona l si lt sea ms, moist (Cl-Ml) End of Boring at 100.0' . Approx im a t e unconfined co mpr essive st r eng th based on m eas ur e m e nts with a ca lib rated pocket penetrome t er. Di edr ich 0-1 20 Truck R i g (#315) CME A utom a ti c H ammer Page 3 of 3 Boring I 1-20 1-21 EXYWIT Z5701-1 BORING LOCATION ZION .NUCLEARPo\¥ER PLANT ISFSI SITE #1 *. ,""'. 587.2 587.1 N DRAWN BY: TRP TESTING SERVICE CORPORA nON CHECKED BY: 457 EAST GUNDERSEN DRIVE . . * . (L .m J CAROL STREAM, ILLINOIS 60188 JOB NO.: L-72,070 1 OF 1 DATE: October 2008 ProjectslDeliverables1979802 _ crosshole.doc GEOPHYSICAL DATA REPORT CROSSHOLE SEISMIC RESULTS ZION NUCLEAR POWER PLANT ZION, ILLINOIS Preparedfor: TESTING SERVICE CORPORATION Carol Stream, illinois Prepared by: GEOTECHNOLOGY, INC. St. Louis, Missouri Geotechnology, Inc. Report No. 097980 2.851S September 1 5,2 008 GEO! ECHNOlOGY, IN C. E NGIN E ERING AND ENVIRONMENTAL S E RVICES SAINT LOUIS* COLLINSVILLE' KANSAS CITY September 1 5 ,2007 Mr. Darin Delaney Testing Service Corporation 457 East Gundersen Drive Carol Stream, lllinois 60188

Reference:

Geophysical Data Report Crosshole Seismic Results Zion Nuclear Power Plant Zion , llIinois

Dear Mr. Delaney:

0979802.85IS Presented herein are the results of the crosshole seismic test for the referenced site. This work was conducted in general accordance with proposal P14676.00.85IS dated July 31, 2008. Presented in this report is a description of the geophysical method and data plots. It is a pleasure to be of service to you on this project If you have any questions or comments, please contact the undersigned at (314) 997-7440. Very truly yours, GEOTECHNOLOGY, INC. Glen 1. Adams Senior Geophysicist GLAlDWL:gla/sjc Copies Submitted: (3) @p rifllf1don recyded pa p er Dougl . Lambert, P.G. Senior Project Manager-Geophysics 11816LACKLAND ROAD. SUITE 150' SAINT LOUIS. MISSOURI 63146

  • 314/997-7440
  • FAX: 314/997-2067 GEOPHYSICAL DATA REPORT CROSSHOLE SEISMIC RESULTS ZION POWER STATION ZION, ILLINOIS TABLE OF CONTENTS 0979802.85IS 1.0 IN1RODUCTION

.................................................. ............... ...................... .................... .. I 1.1 Site Description ....................... ..................... ........... .......................... .................... 1 1.2 Scope o f Work ............................. .......................................................................... 1 2.0 GEOPHYSICAL METI:lODOLOGY ................... ........................................................... 1 3.0 RESULTS ............................................................... ........................ : .................................. 1 ILLUSTRATIONS Site Location and Topography ....................... ..................... ............................. .............................. 1 P l an of Site and Boring Locations ............................... ..................... ........... ................................... 2 Re l ative Borehole Locations ..................................... ............ ............. .............................. ............. .3 Shear (S) Wave Velocity and Shear Modulus vs. Depth ........................................................ ...... .4 Compressional (P) Wave Velocity, Poisson's Ratio, and Young's Modul u s vs. Depth ............... 5 Summary Tab l e -Crosshole Results .................. ......................... ............... ............... ..................... 6 Source Boring Deviation ...................................................... ................................................. ......... 7 Geophone Boring I Deviation ................................. ................. ................................. .............. ...... 8 Geophone Boring 2 Deviation ............................ .................. ............... ............... .............. .............. 9 APPENDIX Limitations of Report ............................................. .......................... .................................. ............ A GEOPHYSICAL DATA REPORT CROSSHOLE SEISMIC RESULTS ZION POWER STATION ZION, ILLINOIS

1.0 INTRODUCTION

0979802.851S 1.1 Site Description. The site consists of an existing nuclear power plant near Zion, illinois. A site location map is presented on Plate 1. The crosshole borings were located approximately 900 feet soufu of fue switch yard within the plant perimeter fence, as shown on the site plan on Plate 2. 1.2 Scope of Work. The scope of work included mobilizing geophysical equipment and personnel to the site, conducting a crosshole seismic test, and processing/interpreting the data. The seismic data were processed, and shear and compressional wave velocities were calculated to detennine dynamic soil properties. The seismic data were plotted and the results are presented in this report. Engineering analysis or reco=endations based on this data are outside our scope of work. 2.0 GEOPHYSICAL METHODOLOGY The crosshole seismic testing method involves generating compressional (P) and shear (S) wave seismic energy at periodic depth intervals within a borehole and measuring the seismic wave travel-times at geophones situated at the source depth between two adjacent borehole s (per ASTM Standard D4428). The seismic wave arrivals at the geophones are transmitted through cables to the seismograph for digital recording. The data are interpreted by analyzing the differences in elapsed travel-time from the source to geophones. P-and S-wave velocities can be calculated for each depfu interval by analyzing the travel-time data. The distance between boreholes may vary wifu depth; fuerefore borehole deviation logging is conducted to adjust fue borehole separation distance wifu depfu for the velocity calculations. 3.0 RESULTS Crosshole seismic testing was conducted using a source boring and two adjacent receiver (geophone) borings, indicated as Borings 1-20 (source), 1-20A (Geophone 1), and I-20B (Geophone 2), respectively, as shown on Plate 3. Crosshole data were recorded on 5-foot intervals throughout the depfu of fue borings. Due to a physical limitation of the crosshole equipment, data could only be co llected to a depfu of 97 -feet from the surface. The borings were cased to ========================c -!!! Testing Service Corporation September 15, 2008 Page 2 0979802.851S approximately 99-feet and the downhole equipment requires approximately 2-feet from the bottom of the casing to collect data. Seismic velocities calculated between the source boring and the two geophone borings are presented on Plates 4 and 5. A table of all tabulated values and velocities is presented on Plate 6. Plates 7 through 9 are plots of the deviation from vertical for the three borings used for the crosshole test. Due to the inherent noise in the earth, and lateral variations in soil velocities between the test borings, some variations in velocities were calculated between the two receiver holes. An average velocity is plotted on the crosshole data plots that allows a smoother fit to the data. Densities used for the moduli calculations were based on lab values provided by the client as wet uoit weights. @ Ill/nrad (In I,cycled paper NOTES Plan adapted from a 7.5 minute U.S.G.S. map for Z ion, illinois Q u adrang l e, last revised In 1993. 1 IN C. ENGINEERING NlD ENVIRONfwENTAlSERVICES ST. LOU IS* COUlNSV1lJ.E* KANSAS CITY Z i on Nucl ea r Power Plant Z i on , illinois PLATE 1 NOTES --. "

  • 1.:20 (SOURpe) : (GEQP H9NJ:! 1} 1-2 0 8 (GEOP HONE Z) 1. P l an adapted from an aeria l photograph courtesy of Goog l e Earth. LEGEND
  • Boring Location / I I ,.. V ., / t ' o 300 --600 ! SCALE IN FEET PLATE 2 10 8 6 4 2 *2 -4 .fl. *10 1_-------19.9811-------** .. 10.5 II 2 4 6 SOURCE 9.48ft 8 10 12 14 16 18 20 22 GEOPHONE1 GEOPHON E 2 ----------

IN C. ENGINEERING AND ENVIRONMENTAl.. SERVI CE S ST. LOUIS* COLlJNSVIUE. CITY Z ion Nuclear Pow e r Plant Z ion. Illinois PLAT E 3 Shear Wave V elocity (!psi 0 300 600 900 1200 1500 1800 2100 0.0 5.0 ---,.1>>- 10.0 .. +tJ"-:--* ---:-----i---- 15.0 20.0 25.0 ---.... ____ . __ 4-____ I-___ ___ _ 30.0 I 1 I I I I 35.0 _ 40.0 5. 450 J:

  • is.. SO.O a 55.0 60.0 ---.... ----l-------at-------.... ----+----1-... t----... ----65.0 I I I I I I 70.0 75.0 ---,----{-----:----{-.o-:----,----80.0 ._-85.0 90.0 95.0 -- ---:------------+ ----1-----i t'"" ----4 ----I.VS (S-Gl) .VS(S-G2) DVS e AVERAGEVS I Soil DescripUoo Sand SiR Clay 0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 _ 40.0 S 450 .c . 15. so.o 55.0 SO.O 65.0 70.0 75.0 80.0 85.0 90.0 95.0 Shear Modulus (Ksi l . 20 40 60 80 __

+-:-------l-------+ -------


1--------4" -----+-------, , ,


:--------.. ---i --------------[--------{--


.+--------------:-------l---+---+-------


:-----

.. ------7 --------_____ ___ , , ,


:---------.----------


:-----+l-------+ --------------!--------!$ -----+-------INC. ENGINEERING AND ENVIRONMENTAl..

SBMCES ST. LOUIS* COWNsvtL1.E* KANSAS CITY Z i on N uc l ear Po w er P l a n t Z i on, Illi no i s COMPRESSION (P) Waw V e locity (fp s) 1000 2 000 30 00 4000 5000 6000 0.0 I I 5.0 10.0 1 5.0 2 0.0 25.0 3 0.0 35.0 _ 40.0 S 450 . ii 5 0.0 2l 55.0 60.0 65.0 70.0 75.0 80.0 85.0 90.0 95.0 I I I I ----,-----,------r-----T------4i-ef-----I ______ L.. _____ .L ____ _ I I I I I I I I


.,------r------1" ---------C .. 1-&:'--.-----:------+ ----------+

_____ _____ ______ I J I I -----.. --+--D---I I I I -----1'.----r------1" -----


1 ----3-:---.-:------i-----------{-


ofo------{------.... :1---++ -----

... ---_____ l _____ J ______ L _____ L [ .VP (S-G 1) -.W(5-G2) ow .AVERAG E W I Soil Descr1ption Sand S ilt C lay Po ss l o n's Ratio and Young's M o dulus (193 ksl) 0.000 0.100 0.200 0.300 0.400 0.5 00 0.0 +1--I--!---+---:- "1 5.0 10.0 15.0 20.0 25.0 30.0 ----r -----+ -----+\------:------.:=---r -----+--------.. ----__ :1 __ L._ ----+ ------I -+ __ -_1_ ----I I I I _____ L._= ___ + _____ -I ___ 1 I I I --------T ------1------I" ---g 35.0 ,5 40.0 ! 45.0 CD 50.0 :g 55.0 60.0 m 65.0 70.0 ---------t ------t -----*,-----75.0 .... 60:0 .... ---85.0 -----t-i:'!---+ ----------+-----I I I I 90.0 -----I:::-----T-----'-----.,--+--95.0 . -----I Poisson's Ratio I

  • Y ClUng's Modulu s INC. ENGINEERING AND ENVIRONM:NTALSERVICES sr. LoutS* COlUNSVlUE*

KANSAS arv Z ion Nuclear Power Plant Zion, Illinois DEPfH (FT) S H EAR VELOCITY P-W AVE V ELOC I TY U NI T WE I GHT SHEAR M OD U LUS PO I SSO N R A T I O Y OU N G'S M OD U L U S (AVERA GE. FTfSEC) (AVERAGE FT/SEC) (LBICU FT) (KS I) (K S I) 5 455 836 1 28 575 029 1483 10 752 1865 128 1573 040 44.13 1 5 802 1890 128 1788 039 497 1 20 807 1 590 1 28 1798 033 4771 25 866 1 609 128 20.84 030 5 4.01 30 1 246 2030 130 43.81 020 1 04.9 1 35 1 159 2379 109 31.75 034 85.38 40 1 371 2921 120 4895 036 1 3302 45 1 420 4263 131 5736 044 16 4.92 50 1371 2970 124 5059 036 1 38.06 55 1272 3360 124 43.52 0.4 2 1 23.29 60 11 84 3230 118 3590 042 102.12 65 1066 2839 107 26.39 0.42 74.85 70 1181 2806 115 3476 039 9686 75 1 390 289 0 1 1 4 4776 035 1 2896 80 1528 4 208 131 66.37 0.42 169.04 85 1 302 3073 127 46.70 0.39 1 29.88 90 1193 3963 115 35.54 045 1 0306 95 1304 5448 115 4246 047 1 2 4 8 1 97 1 279 52 0 0 1 22 43.34 047 1 2723 Drawn By: SLC C k'dBy: eM Dais; 011-1 5-08 Dais; 1 Iisio 8 .GEOTECHNOLOGY'N C. ENG I NEERI N G AN D ENVJRON MENT AL SERVICES ST. LOU I S. COW N SVIU.E. KAN SAS C ITY Z ion Nucl ea r Pow e r Pl a nt Zion, Illinois

SUMMARY

TABLE

  • CROSSHOLE RESULTS I PLAT E 6 -----

--* n --nn e-..... Cl .!: .... .t 0 -:: .0 *2 0 1 0 2 0 3 0 40 5 0 z n _n OV . -Eastlng (ft) D ra wn By: S LC Ck"d By: Ct.t App'vd .... /g." D ate: rlm'R ST. LOUIS. COUJNSVILlE* KANSAS CITY Z i o n Nu clea r Power P l an t Z i o n, illin o i s ctn I ID"" ..... n , I lun PLATE 7

  • t , "'" * ..... II: ..... :E :; 0 . I 1:: -.0 -4 .0 0 -1.0 0 1 0 20 30 40 50 0 Z
  • n "n * '" East in g (ft) Drawn By: SLC Ck'dBy: 6'U App'Vd Date:'}1dO;>

-. AND sr. LOUIS* COWNSVIUE* KANSASQTY Z ion Nucl ea r P ow e r Pl a nt Z ion, illinoi s ---.j ::.::;;_ ...... ,II UN PLATE 8 An '>" 'In n iE' -CD .e = 1::: 0 0 -4 0 .0 -;; .0 -1 0 00 1 0 20 30 40 50 z . " '>" In A " East l ng (ft) Drawn By: SLC Ck'd By: (,'Z-? . App'vd Date: I D ate: "II<!"" I I ... ",. I T IN C. ENGiNEERING AND ENVIRONMENTAL SERVICES ST. LOUIS. COWNSVILLE* KA.NSAS arv Zi on Nucl ea r P oW e r P l a nt Zi on, illinois 2 .. ,ll un P LATE 9 APPENDIX A LIMITATIONS OF REPORT GEOPHYSICAL SERVICES LIMITATIONS OF REPORT 1. This report was prepared for the exc lusiv e use of the owner, architect, and engineer for evaluating the project as it relates to the technical aspects discussed herein. It can be made available to prospective contractors for information on factual data only and not as a warranty of subsurface conditions included in this report. Unless other contractual agreements were made, the services described in this report were carried out in accordance with the Terms for Geotechnology's Services which were attached to the proposal.

2. Geotechnology endeavored to perform the crossho l e seismic geophysical survey in accordance with generally accepted practices of other consultants undertaking similar studies at the same time and in the same geographical area. The findings and conclus ions stated herein must be considered not as scientific certainties, but rather as professional opinions concerning the significance of the limited data gathered during the course of the survey. No warranty, express or implied, is made. 3. The geophysical analyses and conclusions contained in this report are based on the site conditions, project layout, sampling interval, geophysical data, and interpretive procedures described herein. Geotechnology can make no interpretation of underground conditions beyond the test location.

Geophysical exploration methods are indirect and potentially influenced by a variety of natural or man-made conditions. The resulting interpretations are based on the quality of the recorded data as limited by site conditions Revised 03/09/04 Stdparl9798crosshole.do c TESTING SERV I CE CORPORATION 457 Eas t Gund e r s e n Drive C LI ENT: PROJECT: Sa r gen t & Lund y, L LC 55 Eas t Monroe S t reet C hi cago, I L I SFS I Projec t Z i o n Nucl ea r power Plant Z i on, IL Caro l Stream , 111inois SO IL TEST DATA LOCATION BOR IN G NUMBER 1-20 1-20 SAMP LE NUMBER 2 7 DEPT H IN FEET 3.5 -5.0 16.0 -1 7.5 HRB CLASS I F I CAT I O N & GROUP INDE X UNI F I ED CLASS IFI CAT I ON SP SP GRA IN SIZE CLASS I FICATION GRADAT I ON -PASS IN G 1" S I EV E % GRADAT I O N -PASS IN G 3/4" S I EVE % 100 1 00 GRADATION -PASSING 3/B" S I EVE % 95 99 GRADA TI O N -P ASS IN G # 4 SIEVE % 92 95 GRADAT I ON -PASSING # 10 S IEV E % BB 9 1 GRADAT I O N -PA SS IN G # 40 S I EVE % 79 71 GRADAT I O N -PASSING # 100 S I EVE % 1 4 B GRADA TI ON -PASS IN G # 200 S I EVE % 6 4 SA N D AN D GRAVE L % 94 96 S IL T OR S IL T AND CLAY COMB INED % 6 4 CLAY % <<0.002 MM) LIQUID LIMIT % PLAS TI C LIMIT % PLAST I CITY I NDEX % NATURAL MOISTURE CONTENT % DRY UN I T WE I G HT pH 9.26 SOLUB LE C HLORID ES <50 SOLUB LE S ULF ATES <1 50 ORGAN I C L-O-I % CONTE NT WET COMB U ST I O N % 1-20 12 2B.5 -30.0 C L 1 00 99 97 95 B5 77 73 27 52 2 1 22 11 11 11.0 1 29.9 TSC Job N o. L -72,070 Sep t e mber 9, 2008 1-20 1-20 22 32 53.5 -55.0 7B.5 -BO.O C L C L 1 00 99 99 97 10 0 92 9B BB BB B4 73 16 27 50 73 3 4 3 1 17 1 2 10 1 9 7 13.4 10.7 12 3.7 130.7 TES TI NG SE R V I CE CO RP ORATION 457 East G un d e r se n Drive C LIENT: Sa r ge nt & Lund y, LL C 55 East M o n roe S tr ee t C hi cago, IL PR OJ E C T: I S F S I Pr o j ect L OCA TI O N BOR IN G NUMB E R SA MPL E NUMB E R DEPT H IN FEET Z i o n Nu c l ear p owe r Pl a nt Z i o n , IL H RB CLASS IFI CA T IO N & GRO U P IN DEX UNI F I ED CLA S S I F I CA TI O N U N CO NFINED COMPRESS I VE S TREN G TH (TSF) GRADA n ON -P ASS IN G 1" S I EVE % GRADA TI O N -PASS IN G 3/4" S I EVE % GRADA TI O N -P ASS I NG 3/8" SIEVE % GRA D A TI O N -P ASSI N G # 4 SIEV E % GRADA TI O N -PASS IN G # 10 S I EV E % GRADAT I O N -PASS IN G # 40 S I EVE % GRADAT I O N -PASS IN G # 1 00 S I EVE % GRADAT I O N -P ASS IN G # 20 0 S I EVE % SAND A N D GRAVEL% S I LT OR S I L T A ND CLAY COMBI N ED% CLAY % <<0.0 0 2 MM l LI Q UI D LI MIT % PLAST I C LI M IT % PL A S TI C IT Y IN DEX % N AT U RAL M O I ST U RE CO N TE NT % DR Y UNIT W EI G HT p H SOLUBLE C HL O RID ES Caro l S t rea m , Illi no i s SO I L T EST D A T A 1-2 1 1-21 2 5 SP SP 86 86 1 00 79 99 7 6 99 7 1 96 62 9 7 4 4 96 96 4 4 9.11 <50 SOL U BLE S ULF AT E S <1 50 ORGA NI C L-O-I % CO NT E NT W E T CO M B U S TI O N % NP -N o t P o ssi bl e 1-2 1 9 C L 5.41 10 0 99 98 95 92 91 9 59 32 28 1 4 14 1 2.7 1 22.7 T SC J ob N o. L -72,07 0 Se pt e mb e r 9, 2 0 08 1-2 1 11 C L N P 1 00 98 95 93 8 5 79 76 25 5 1 24 23 1 2 11 1 3.0 1-2 1 1 7 C L N P 100 98 97 96 89 83 78 22 5 1 2 7 25 1 2 11 3 1 5.7 1 2 4.7 11 8.3 oc z w "i 6 '" u.s. SIEVE OPEN I NG I N I NCHES I U.S. S I EVE NUMBERS I HYDROMETER 6 4 3 2 1.5 1 4 1/2 3/8 3 4 6 81014162030405070 1 00140200 100 I I I I I I I 90 ----. 80 70 60 50 40 30 20 \ \ 1 0 , \ 0 1 00 1 0 1 0.1 0.0 1 0.001 GRA IN S I ZE IN M ILLI METERS GRAVE L SA N D S I L T OR C L AY COBB L ES coa r se fin e coarse m ed i um f i ne SPEC IM EN I DE NTI F I CAT I O N S I E V E % P A SS SO I L CLASS I F I CAT I O N Bo ri ng: 1-20 3 inch 1 00 Brown SAND, tr ace s il t, c l ay a n d grave l Samp l e: 2 2 1 00 (SP) 1 1/2 100 1 100 %GRAVE L %SAND %S I LT %CLAY N OTES: 3/4 100 8 86 (6% Com ined) 3/8 95 #4 92 #1 0 88 # 40 79 # 1 00 14 # 200 6 PRO J EC T I SFS I Z i o n Nu c l e ar Po w e r P l a n t JOB N O. L-72, 0 7 0 L OCA TI O N Z i o n, Illin o i s DA T E Se pt e mb e r 8, 2 00 8 '-LU SO I L DAT A S H EET Test in g Se rvi ce Co rp o r a ti o n Caro l S t ream, I L 60 1 88 u.s. SIEVE OPEN IN G IN IN C H ES I U.S. S I EVE NUMBER S I HYDROMETER 6 4 3 2 1.5 1 "4 112 3/8 3 4 6 81014162030405070100 1 40200 100 I I , T I I I I I "'-I'---< 90 " 80 70 60 50 40 30 20 10 \ , 0 100 10 1 0.1 0.0 1 0.001 GRA IN S I ZE IN M ILLIMETER S I I GRAVE L SA ND S ILT ORCLAY COBB LE S I co arse I fin e coa r se m edium fin e SPECIMEN I DENT I FICATION S I E VE % PASS SOIL CLASSIF I CATION Boring: 1-20 3 inch 100 Brown SA ND, Ir ace si ll, c l ay an d gravel Sa mp l e: 7 2 10 0 (SP) 1 1/2 1 00 1 1 00 %GRAVEL %SA NO %S ILT %C LAY NOT ES: 3/4 10 0 5 91 (4% Com ine d) 3/8 99 #4 95 #10 9 1 #40 71 # 100 8 # 200 4 PROJECT ISFS I Z ion Nuclear Pow e r Plant J OB NO. L-72,070 LO CAT I O N Z i on, Illinois DATE S ep tember 8, 2008 I-<U SO IL DATA SHEET Testing Service Corporation Caro l S tr eam, IL 60188 " " z w '3 6 00 l,J.S. SIEVE OPENING IN INCHE S I U.S. S I EVE NUMBERS I HYDROMETER 6 4 3 2 1.5 1 4 112 3/8 3 4 6 81014 1 62030405070100140200 100 I I T I I I I t-90 .f'--80 70 60 " t 50 1\ "\ 40 30 20 'I'-.. 10 0 100 10 1 0.1 0.01 0.001 GRAIN SIZE IN M I LLIMETERS GRAVEL I SAND J S IL T OR CLAY COBBLES coarse fine Icoarse medium fine I SPEC IM EN I DENT I FICAT I ON SIEVE % PASS SO I L CLASS I F I CATION Boring: 1-20 3 inch 100 Gray silty CLAY, some sand, trace grave l Samp l e: 12 2 100 (Cl) 1 1/2 100 1 100 %GRAVEL %SAND %SILT %CLAY NOTES: 3/4 100 3 24 52 21 3/8 99 #4 97 #10 95 #40 85 # 100 77 # 200 73 PROJECT I SFSI Z i o n Nuclear Power P l ant JOB NO. L-72,070 LOCATION Zion, Illin o i s DATE September 8 , 2008 1-ZU SO IL DATA SHEET Testing Serv i ce Corporation Caro l Stream, IL 60188 u.s. S I EVE OPEN I N G IN I NCHE S I U.S. S I EVE NUM B ER S I H Y DR O METER 6 4 3 2 1.5 1 4 11 2 3/8 3 4 6 8 1 0 14 16 20 30 40 50 7 01 00 14 0200 1 00 I I * , f-l, I ----90 80 "---* \ 70 60 \ 50 40 " 1\ 30 "'---20 1 0 0 1 00 1 0 1 0.1 0.0 1 0.001 GRAI N S I ZE IN M ILLI METER S GRAVE L SA N D S ILT ORC L AY COBB L ES coa r se fi ne coarse m ed iu m fi ne SPEC IM EN I DE N T I F I C A T I O N S I E V E % PASS SO I L CL A SS I F I CAT IO N Bo ri ng: 1-2 0 3 in c h 100 Gr ay s il ty CLAY, l i ttl e sand, t r a c e g r ave l Sa m p l e: 22 2 10 0 (Cll 1 1/2 1 0 0 1 1 00 %GRAVEL %S AND %S IL T %CLAY NOT E S: 3/4 1 00 1 1 5 50 34 3/8 9 9 #4 9 9 #1 0 97 #40 92 # 1 00 8 8 # 200 84 PROJECT I SFS I Zion Nu c l ea r Po w er P l an t J OB N O. L-72 ,0 7 0 LOCA TI O N Z ion, Illin o i s DA T E Se pt e mb e r 8, 2 00 8 ,-.u SO IL D A T A S H EET Test in g Serv i ce Co rp o r a ti o n Ca r o l S tr ea m , IL 60 1 88 U.S. S I EVE OPE NI N G I N I N C H ES I U.S. S I E VE NUM B E RS I HYD RO MET ER .6 4 3 2 1.5 1 3/4 1/23/83 4 6 8 1 0 1 4 1 6 20 30 40 50 70 1 00 1 40200 1 0 0 I I I I I I I I ,'-.., "'-9 0 " 8 0 \ 7 0 6 0 50 40 3 0 20 10 0 100 1 0 1 0.1 0.0 1 0.001 GRA IN S I ZE IN M I L LI ME T ERS G R AV E L S AND S IL T OR C L AY C OBBLE S c oa r s e fine c oars e m e di u m fin e SP E C IM EN I DE NTI F I C A T I O N S I E V E % P ASS SO I L CL A SS I F I CAT I O N B o rin q: 1-2 0 3 i nc h 10 0 G ray s ill y C LAY, s om e sa nd (C l) S amp l e: 32 2 100 1 1/2 100 1 1 0 0 %G RA VE L %SA N D %S IL T %C LAY NOTES: 3/4 10 0 0 27 (73% C orr b in e d) 3/8 1 00 #4 100 #1 0 100 # 40 98 # 1 00 8 8 # 200 73 PRO J E C T I SFS I Z i o n Nu cle ar P ow e r P l a n t JOB N O. L-7 2 ,0 7 0 L OCAT I O N Z ion, Illin o i s DA T E Se pt e mb er 8, 2 008 '-LU SO IL D ATA S H E E T Tes tin g Se rvi ce Co rp o r at i o n Caro l S tr ea m , I L 60 1 88 u.s. S I EVE OPE NIN G IN I NCHES I U.S. S I EVE NU MBERS I H YDROMETER 6 4 3 2 1.5 13/4 112 8 3 4 6 8 10 14 1 6 20 30 40 50 70100140200 10 0 I I . I I 90 80 70 60 50 40 30 20 1 0 '\ 0 100 10 1 0.1 0.0 1 0.001 GRA IN S I ZE IN MILLIMETERS GRAVE L SA ND S IL T OR C L AY COBB LE S coarse I fin e coarse med ium fin e SPEC IM EN IDENTIFICATION S I E V E % PASS SO I L CLASS I FICAT I ON Bor in g: 1-2 1 3 inch 100 Brown SA N D, tr ace s ilt, clay and g rav e l Sa mple: 2 2 1 00 (SP) 1 1/2 100 1 1 00 %GRAVE L %SA ND %S ILT %CLAY NOT ES: 3/4 1 00 1 95 (4% Com in e d) 3/8 1 00 #4 99 #10 99 # 40 96 # 100 9 # 200 4 PROJECT ISFS I Z i o n Nuclear Powe r P l a nt JOB N O. L-72, 0 70 LOCATION Z i on, Ill i noi s DATE Septe mb er 8, 2 008 '-L' SO I L DATA SHEET Test ing Serv i ce Corporation Caro l St r eam, IL 60188 U.S. S I EVE OPE NIN G IN I N C H ES I U.S. S I EVE NU MBERS I H Y D ROME T E R 6 4 3 2 5 1 314 11 2 318 3 4 6 8 1 0 1 4 1 62030405070 1 00 14 0200 1 0 0 I \ I I I I I I I 90 I-8 0 ."" .1"----..... 70 60 II 50 40 30 20 10 1\ 0 100 10 1 0.1 0.01 0.001 G RA IN S I Z E IN MILLIMETER S GRAVEL SA ND S IL T OR C LAY C OBBLE S coarse fine c oarse medium f in e SP E C IM EN ID E NTIFICATION S I E V E % PASS SOIL CLA S S I F I CAT ION BorinQ: 1-21 3 in c h 1 0 0 Light brown SA ND , so m e gr a v e l , Ir ac e s ill S amp l e: 5 2 10 0 and c l ay (S P) 1 1/2 100 1 8 6 %GRAVE L %SA ND %S ILT %CLAY NOTES: 3/4 8 6 24 72 (4% C om in e d) 3/8 79 #4 7 6 #10 7 1 #40 6 2 # 100 7 # 2 00 4 PROJECT I SFS I Z ion Nuclear Power P l a nt JOB NO. L-72 , 070 LOCATION Z ion, Illin ois DATE Septembe r 8, 2 008 '-L' SO I L DATA SH E ET Testing Service Corporat i on Carol Stream, I L 601 8 8 u.s. S I EVE OPE NIN G IN IN C H ES I U.S. S I EVE NUM BERS I HYDROMET ER 6 4 3 2 1.5 1 3/4 1/2 8 3 4 6 8 10 14 16 20 30 40 50 70 1 00 1 40200 100 I I I I I I r--.. 90 r-.--.. "\ 80 * \ 70 \ 60 50 40 1\ \ 30 "-20 10 0 100 10 1 0.1 0.01 0.001 GRA IN SIZE IN MILLIMETER S GRAVEL SAND S ILT OR C LAY COBBLES coarse 1 fine coarse medium fine SPEC IM EN IDENTIFICATION S I E V E % PASS SOIL CLASSIFICATION Bor in g: 1-2 1 3 inch 100 Gray s ilt y C L AY, tr ace sa nd and grave l Samp l e: 9 2 100 (Cl) 1 1/2 100 1 100 %GRAVEL %SA NO %S IL T %CLAY NOTES: 3/4 1 00 1 8 59 32 3/8 1 00 #4 99 #10 98 #40 95 # 100 92 # 200 91 PROJECT ISFSI Zion Nuclear Power P lant JOB NO. L-72,070 LOCATION Zion, Illinois DATE Septembe r 8, 2008 1-[1 SO IL DATA S HEET Testing Serv ic e Corporat ion Caro l S tr eam, IL 60188 u.s. S I EV E OP EN I N G I N I N C H ES I U.S. S I EV E NUM BERS I H YDROMETER 6 4 3 2 1.5 1 11 4 1123/83 4 6 8 1 0 1 4 1 6 20 30 40 50 70 1 00 140 200 1 00 I I * 'i--I I I I I 90 .1'--8 0 "'----7 0 6 0 \ 5 0 I' "\ 40 30 .. 20 ". 1 0 0 1 00 10 1 0.1 0.01 0.00 1 G RA IN S I ZE IN M ILLI METER S I I GR A VEL I SA N D I S IL T OR C L AY CO BB L E S I co a r se fi ne I c o ars e med iu m I f i n e I SPEC IM EN I D E NT I F I CAT I O N S I E V E % PASS SO I L CLASS I F I C A T I O N Bor i ng: 1-2 1 3 i n c h 100 G ray s i lty C L A Y, l i ttl e sa nd , t r a ce gra ve l Sa mp l e: 11 2 1 00 (C l) 1 1/2 10 0 1 100 %G RA V E L %SA N D %S IL T %CLAY N OT E S: 3/4 100 5 2 0 51 24 3/8 98 #4 95 #1 0 9 3 -# 40 85 # 1 00 7 9 # 200 76 PRO J E C T I SFS I Z i o n Nu c l ear P owe r P l a nt J OB N O. L-72 ,0 7 0 LOCAT I O N Z i o n , Illin o i s D A T E Septe m be r 8 , 2 00 8 I-L I S O I L DATA SH E ET Te s tin g Se rvi ce Co r po r at i o n Ca ro l St r eam , IL 6 0 1 8 8 U.S. S I EVE OPEN I N G I N I N C HE S I U.S. SIEVE NUMBERS I HYDROMETER 6 4 3 2 1.5 1 4 11 2 3/8 3 4 6 81014162030405070 1 00140200 100 I I . "l-I I I I I 90 1"1"-80 70 ... 60 '\ 50 40 " f\ 30 '. 20 1 0 0 1 00 1 0 1 0.1 0.0 1 0.00 1 GRA IN S I ZE IN MILLI METERS GRAVEL SA ND S IL TOR C L AY COBBLES coarse fin e coarse med i um f i n e SPEC IM EN I DE N T I F I CAT I ON S I E V E % P A SS SO I L CL A SS I F IC A TI O N Bor i ng: 1-2 1 3 i nch 100 Gray s ilt y CLAY , littl e sa n d, t race g r ave l Sa m p l e: 17 2 100 (eL) 1 1/2 100 1 100 %GRAVEL %SAND %S I LT %CLAY NOTES: 3/4 100 3 1 9 5 1 27 3/8 98 #4 97 #1 0 96 #40 89 # 1 00 83 # 200 78 PRO J EC T I SFS I Z i o n Nu c l ear Powe r P l a nt JOB N O. L-72,07 0 L OCAT I O N Z ion , Illin ois DATE Sep t e m be r 8 , 20 0 8 1-'" SO IL D A T A S H EET Tes ting Se rvi ce Co rp o r a ti o n Caro l Stream, I L 60 1 88 First En vironmental Laboratories, Inc. IL ELAP / N ELAC A cc r e dit ation # 100 292 1600 S h ore Road* N ap e rvill e , Illin oi s 60563

  • Phon e (630) 77 8-1 20 0
  • Fax (63 0) 778-1 233 September 03, 2008 Mr. Darin Delaney TESTING SERVICE CORP. 360 So, Main Place Carol Stream, IL 60188 Proj ec t lD: 72070 First E nvironmental File ID: 8-3902 Date Received: August 27, 2008

Dear Mr. Darin Delaney:

The above referenced project was a nalyzed as directed on th e enclosed chain of custody record. All Quality Control criteria as outlined in th e methods and current IL ELAPINE LAP have been m e t unle ss ot h e rwis e not ed. QAlQC documentation and raw data will remain on fi l e for future reference. Our accreditation numb er is 100 292 and our current cert i ficate i s number 002045: effective 05/14/08 through 02/28/09. I thank yo u for the opportunity to be of service to you and look forward to working with you again in the future. Shou l d you h ave any question s r ega rding any of the e nclo sed ana l yt ical data or n eed additional informati o n , pleas e contact m e at (630) 778-1200. Project Page lo f4 First Environmental Laboratories, Inc. IL ELAP / NELAC Acc r e di ta ti o n # 100292 1600 S h o r c R oad* N ap e r v ill e , Illin ois 6 0 563* Phon c (63 0) 778-1 2 00* Fax (63 0) 778-1 233 Case NalTative TESTING SERVICE CORP. Project ID: 72 0 70 Fir s t E nvironmental File JD: 8-3902 D ate Received: August 27, 2 008 I Ftagl Des cr iplion I Ftag I D escriplion < Anal y l e not det ec t e d at or ab o v e th e repottin g limit. L+ L eS r ecove r y oll t s id e co ntrollilllil s; hi g h biil S. D Ana l y tc dete c te d in associa t ed m e thod blank. L-L eS r ecove r y out s i de control l i mil s; low bia s. C Id enti fi ca ti on co n fillned b y GC/MS. M MS r ecovery out s ide co nlrollimil s; LeS acceptable. D Surrogates dilut e d o ut; recov e ry not availabl e. M+ MS r e covery ollt s id e co nlrollimit s hi g h bia s; L eS acceptabl e. E E s timated re s ult; co n ce nt ration excee d s ca li brJ li o n ran ge. M-MS recove ry o llt si d e c o ntr o l limit s low bia s; L eS acceptable. F Fi e ld measurem e nt. N Ana l y t e is 11 0 t pmt of a liI' NE LA C accreditation. G S urr ogate recovcry outs id e co nt ro l limit s; matri x effec t. 1-1 Analysis or extraction holdin g tim e exceedcd. E s timat e d r es ult; conce ntrati o n i s le ss than c alib rang e. K RPD o ut s ide co ntr o l l imit s. R o utin e Reportin g Limit (Low es t amount that can b e RL det ec ted when routin e weight s/vo lulllcs a r e u se d without di luti o n.) NO Analyt e was not d e t ec tcd usin g a librar y searc h routine; No calibration s tandard wa s ruml yzc d. P C h e mi ca l pre se l vation pH adju s t e d in lab. Q 'lll C ana l y te was d c t e nnined by a GC/MS dattlba se se ar c h. S T Analyt e was sub-contrac t ed to anot h er lab o rat o r y for anal ys i s. Sa mpl e t e mp e ratur e up o n receipt exceeded 0_6°C \V Rep or ting limit e l ev ated due to sa mple matrix. All quality co ntr o l criter i a, as outl in ed in the m ethods, have been met except as noted below or o n the foll o wing analytical rep o rt. Sample Batch Com m e nt s: Samp l e acceptance criter i a were m et. P age 20f4 First Environmental Laboratories, Inc. IL ELAP / NELAC Ac cr e ditnti o n ll [00 2 9 2 1 600 S h o r e Rand* N ap e r v ill e, I ll inoi s 60563* Phon e (63 0) 778-1 2 00* Fax (630) 778-1233 C licnt: Ana l ytica l Report TESTfNG SERV I CE CORP. Project ID: 72 0 7 0 Sa lll pie ID: 1-20 S-2 S ample N o: 8-3902-00 I Analyte C hloride , So lubl e A n alysis D ate: 09/03/08 C hl o rid e, Solubl e S ulfate, Soluble Analy s i s Date: 09/03/08 Su l fa t e, Soluble pH@2 5°C, 1:10 Analysis Date: 08 128/08 1 3: 3 0 pH @ 25°C, I: I 0 Result Method: 4500CL,C < 50 Method: 4500S04,E < 1 50 Method: 45 00H+B 9.26 Date Co llected: 08/27/08 T illie Co ll ec ted: 10:0 0 Date Received: Date Reported: R.L. Units 50 m g/kg I SO m g/kg Units 08/27/08 09/0 3/08 F lag s P age 30f4 First Environmental Laboratories, Inc. IL ELAP I NELAC Accr e dit at ion # 100 2 92 1600 S hor e Road* Nape r v ill e, Illin ois 60563* Phon e (630) 778-1 2 00* Fa x (630) 778-1233 Client: Analytical Report TESTING SERVICE CORP. Project ID: 72070 Sa mpleID: 1-2 1 S-2 Sample No: 8-3902-00 2 Analyte Chloride, Soluble Analy s i s Date: 09 1 0 3/08 Ch l o ride , Soluble Sulfate, Soluble Analysis Date: 09 1 03/08 Sulfate, Soluble pH @25°C, 1:10 Analysis Date: 08/2 8/08 13 :30 pH @ 25°C, I: 1 0 Resnlt Method: 4500CL,C < 50 Method: 4500S04,E < 150 Method: 4500H+B 9.11 Date Collected: Time Collected: Date Received: Date Reported: R.L. Units 5 0 mglkg 150 m glkg Units 08/27/08 10:00 08/27/08 0910 3/08 Flags Pag e 4 o f4 .. First Environmental Laboratories, Inc. First Environmental Laborato ries 1600 Sho re Road, Suite D Nape r ville, Illinois 60 5 63 Phone: (6 30) 778-1200* Fax: (630) 778-1233 E-mail: firstinfo@firstenv.com !EPA Certification

  1. 100 292 Project 1.0.: 1201 0 P.O.#.: Matrix Codes: S = S o il W=Water 0= Other DatefIime Taken Sample Description

FOR LAB US E ONLY: r f Coo ler Temperature

Yes_ N/ I) s: ' Q C Received w i thin 6 hrs. o f co ction: __ _ Ice Presen t: Yes_ No CHAIN OF CUSTODY RECORD Pagc __ of __ pgs Name: Streel Add r ess: City: State: Z i p: Phone: Fax: e-mail: Send Report To:... Via: Fax 0 cornall 0 Sampled By: ,I I 1/1 I h i 7 Analyses Matrix Co mmen ts Lab LD. B-] 5 -------------_ .. --Sample Refrigerated

Yes_ No_ Containers Received Preserved: 0 No Refrigerator Temperature:

___ 'C 5035 Vials F ro ze n: Yes_ No_ Freezer Temperature: ___ 'C Notes and Specia l Instructions: ______________ ______________________________________ _ Relinquished By: r j ), .A? DatefJlme Q-2.t-6:':1 <? z.' 3 ., Rece ived By: I -j..----0 \, ../ DalefJlme v { v 'I II v '-" ( Relinquished By: DatefIime Received By: r Date!Time ___ 1 ________ _ Rc\'.-'lOIl}}