ML13280A907: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 4
| page count = 4
| project = TAC:MF0316
| project = TAC:MF0316
| stage = Other
| stage = Approval
}}
}}


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:October 29, 2013  
October 29, 2013


Mr. Raymond A. Lieb Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-DB-3080 5501 North State, Route 2 Oak Harbor, OH  43449-9760  
Mr. Raymond A. Lieb Site Vice President  
 
FirstEnergy Nuclear Operating Company Mail Stop A-DB-3080 5501 North State, Route 2  
 
Oak Harbor, OH  43449-9760  


==SUBJECT:==
==SUBJECT:==
Line 30: Line 33:
By letters dated August 20, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12234A484), and November 30, 2012 (ADAMS Accession No. ML12339A071), FirstEnergy Nuclear Operating Company (the licensee) submitted information summarizing the results of the 2012 steam generator (SG) tube inspections at Davis-Besse Nuclear Power Station (DBNPS), Unit 1 during refueling outage 17. In addition to this report, the U.S. Nuclear Regulatory Commission staff summarized a conference call about the 2012 SG tube inspections at DBNPS in a letter dated July 16, 2012 (ADAMS Accession No. ML12167A026).  
By letters dated August 20, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12234A484), and November 30, 2012 (ADAMS Accession No. ML12339A071), FirstEnergy Nuclear Operating Company (the licensee) submitted information summarizing the results of the 2012 steam generator (SG) tube inspections at Davis-Besse Nuclear Power Station (DBNPS), Unit 1 during refueling outage 17. In addition to this report, the U.S. Nuclear Regulatory Commission staff summarized a conference call about the 2012 SG tube inspections at DBNPS in a letter dated July 16, 2012 (ADAMS Accession No. ML12167A026).  


The NRC staff has completed its review of the submittals pertaining to the DBNPS, Unit No. 1,  SG inspections, and the associated review summary is enclosed. The NRC staff finds that the licensee has provided the information required by the technical specifications. In addition, the staff did not identify any technical issues that warrant follow-up action at this time. Based on these considerations, the subject TAC is being closed.
The NRC staff has completed its review of the submi ttals pertaining to the DBNPS, Unit No. 1,  SG inspections, and the associated review summary is enclosed. The NRC staff finds that the licensee has provided the information required by the technical specifications. In addition, the staff did not identify any technical issues that warrant follow-up action at this time. Based on these considerations, the subject TAC is being closed.  
Sincerely,        / RA /  Eva A. Brown, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346  
 
Sincerely,  
         / RA /  Eva A. Brown, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
 
Docket No. 50-346  


==Enclosure:==
==Enclosure:==
Steam Generator Review Summary cc w/encl:  Distribution via Listserv Mr. Raymond A. Lieb Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-DB-3080 5501 North State, Route 2 Oak Harbor, OH  43449-9760
Steam Generator Review Summary  


==SUBJECT:==
cc w/encl: Distribution via Listserv  
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1 - REVIEW OF THE SPRING 2012 STEAM GENERATOR TUBE INSPECTIONS  (TAC NO. MF0316)(L-12-274)  


==Dear Mr. Lieb:==
ML12339A071), FirstEnergy Nuclear Operating Company (the licensee) submitted information summarizing the results of the 2012 steam generator (SG) tube inspections at Davis-Besse Nuclear Power Station (DBNPS), Unit 1 during refueling outage 17. In addition to this report, the U.S. Nuclear Regulatory Commission staff summarized a conference call about the 2012 SG tube inspections at DBNPS in a letter dated July 16, 2012 (ADAMS Accession No. ML12167A026).  


By letters dated August 20, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12234A484), and November 30, 2012 (ADAMS Accession No. ML12339A071), FirstEnergy Nuclear Operating Company (the licensee) submitted information summarizing the results of the 2012 steam generator (SG) tube inspections at Davis-Besse Nuclear Power Station (DBNPS), Unit 1 during refueling outage 17. In addition to this report, the U.S. Nuclear Regulatory Commission staff summarized a conference call about the 2012 SG tube inspections at DBNPS in a letter dated July 16, 2012 (ADAMS Accession No. ML12167A026).  
The NRC staff has completed its review of the submi ttals pertaining to the DBNPS, Unit No. 1,  SG inspections, and the associated review summary is enclosed. The NRC staff finds that the licensee has provided the information required by the technical specifications. In addition, the staff did not identify any technical issues that warrant follow-up action at this time. Based on these considerations, the subject TAC is being closed.  


The NRC staff has completed its review of the submittals pertaining to the DBNPS, Unit No. 1,  SG inspections, and the associated review summary is enclosed. The NRC staff finds that the licensee has provided the information required by the technical specifications. In addition, the staff did not identify any technical issues that warrant follow-up action at this time. Based on these considerations, the subject TAC is being closed.
Sincerely,      / RA / Eva A. Brown, Senior Project Manager  Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346  
Sincerely,      / RA / Eva A. Brown, Senior Project Manager  Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346  


Line 49: Line 54:
Steam Generator Review Summary  
Steam Generator Review Summary  


cc w/encl:  Distribution via Listserv DISTRIBUTION: PUBLIC    LPLIII-2 R/F  RidsNrrDorlLplIII-2 RidsNrrPMDavis-Besse  AJohnson, NRR  RidsNrrLASRohrer    RidsRgn3MailCenter Resource RidsOgcRp  RidsNrrDeEsgb RidsAcrsAcnw_MailCTR  KKarwoski, NRR ADAMS Accession No. ML13280A907
cc w/encl:  Distribution via Listserv  
* via memo OFFICE  NRR/DORL/LPLIII-2/PM NRR/DORL/LPLIII-2/LA NRR/DE/ESGB* NRR/DORL/LPLIII-2/BC NAME EBrown SRohrer GKulesa TTate  DATE 10/ 21 /13 10/ 8 /13 8/27/2013 10/ 29 /13                    OFFICIAL RECORD COPY
 
DISTRIBUTION:
PUBLIC    LPLIII-2 R/F  RidsNrrDorlLplIII-2 RidsNrrPMDavis-Besse  AJohnson, NRR  RidsNrrLASRohrer    RidsRgn3MailCenter Resource RidsOgcRp  RidsNrrDeEsgb RidsAcrsAcnw_MailCTR  KKarwoski, NRR    
 
ADAMS Accession No. ML13280A907
* via memo OFFICE  NRR/DORL/LPLIII-2/PM NRR/DORL/LPLIII-2/LA NRR/DE/ESGB*
NRR/DORL/LPLIII-2/BC  


STAFF EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION  RELATED TO THE STEAM GENERATOR TUBE INSPECTIONS  PERFORMED DURING THE 2012 REFUELING OUTAGE NO. 17  DAVIS-BESSE NUCLEAR POWER STATION  FIRSTENERGY NUCLEAR OPERATING COMPANY  UNIT NO. 1  DOCKET NO. 50-346  By letters dated August 20, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12234A484), and November 30, 2012 (ADAMS Accession No. ML12339A071), FirstEnergy Nuclear Operating Company (the licensee) submitted information summarizing the results of the 2012 steam generator (SG) tube inspections at Davis-Besse Nuclear Power Station (DBNPS), Unit 1 during refueling outage 17. In addition to this report, the U.S. Nuclear Regulatory Commission (NRC) staff summarized a conference call about the 2012 SG tube inspections at DBNPS in a letter dated July 16, 2012 (ADAMS Accession No. ML12167A026).
NAME EBrown SRohrer GKulesa TTate DATE 10/ 21 /13 10/ 8 /13 8/27/2013 10/ 29 /13                   


There are two Babcock and Wilcox once-through steam generators (OTSG), designated 1-B and 2-A, at DBNPS. Each SG has approximately 15,500 Alloy 600 tubes in the mill-annealed condition. The tubes have a nominal outside diameter of 0.625 inches and a nominal wall thickness of 0.037 inches. Both OTSG 1-B and 2-A contain tubes with sleeves and tubes with shop re-rolls.  
STAFF EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO THE STEAM GENERATOR TUBE INSPECTIONS PERFORMED DURING THE 2012 REFUELING OUTAGE NO. 17 DAVIS-BESSE NUCLEAR POWER STATION FIRSTENERGY NUCLEAR OPERATING COMPANY UNIT NO. 1 DOCKET NO. 50-346 By letters dated August 20, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12234A484), and November 30, 2012 (ADAMS Accession No. ML12339A071), FirstEnergy Nuclear Operating Company (the licensee) submitted information summarizing the results of the 2012 steam generator (SG) tube inspections at Davis-Besse Nuclear Power Station (DBNPS), Unit 1 during refueling outage 17. In addition to this report, the U.S. Nuclear Regulatory Commission (NRC) staff summarized a conference call about the 2012 SG tube inspections at DBNPS in a letter dated July 16, 2012 (ADAMS Accession No. ML12167A026).
 
There are two Babcock and Wilcox once-through steam generators (OTSG), designated 1-B and 2-A, at DBNPS. Each SG has approximately 15,500 Alloy 600 tubes in the mill-annealed condition. The tubes have a nominal outside diameter of 0.625 inches and a nominal wall thickness of 0.037 inches. Both OTSG 1-B and 2-A contain tubes with sleeves and tubes with  
 
shop re-rolls.
 
The licensee provided the scope, extent, methods, and results of their SG tube inspections in the documents referenced above. In addition, the licensee described corrective actions, e.g., tube plugging, taken in response to the inspection findings.  


The licensee provided the scope, extent, methods, and results of their SG tube inspections in the documents referenced above. In addition, the licensee described corrective actions, e.g., tube plugging, taken in response to the inspection findings.
As a result of the review of the information provided by the licensee, the NRC staff has the following comments/observations:
As a result of the review of the information provided by the licensee, the NRC staff has the following comments/observations:
* In a conference call with the NRC on May 9, 2013, the licensee confirmed that the equivalent plugging percentage in SG-2A is 937 tubes, and that all tubes in the 2012 inspections with detected indications attributed to corrosion were plugged during the 2012 outage.
* In a conference call with the NRC on May 9, 2013, the licensee confirmed that the equivalent plugging percentage in SG-2A is 937 tubes, and that all tubes in the 2012 inspections with detected indications attributed to corrosion were plugged during the 2012 outage.
* The 2012 inspections were the last scheduled inspections for these SGs, which are scheduled to be replaced in the spring of 2014.
* The 2012 inspections were the last scheduled inspections for these SGs, which are scheduled to be replaced in the spring of 2014.  


ENCLOSURE  
ENCLOSURE  
Line 65: Line 81:
Based on a review of the information provided, the staff concludes that the licensee provided the information required by their technical specifications. In general, the SG tube inspections at DBNPS appear to be consistent with the objective of detecting potential tube degradation and the inspection results appear to be consistent with industry operating experience at similarly-designed and operated units.   
Based on a review of the information provided, the staff concludes that the licensee provided the information required by their technical specifications. In general, the SG tube inspections at DBNPS appear to be consistent with the objective of detecting potential tube degradation and the inspection results appear to be consistent with industry operating experience at similarly-designed and operated units.   


The NRC staff's review did not reveal any issues warranting follow-up action.
The NRC staff's review did not reveal any issues warranting follow-up action.}}
}}

Revision as of 00:48, 4 July 2018

Davis-Besse Nuclear Power Station, Unit No. 1 Review of the Spring 2012 Steam Generator Tube Inspections (TAC No. MF0316)(L-12-274)
ML13280A907
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/29/2013
From: Brown E A
Plant Licensing Branch III
To: Lieb R A
FirstEnergy Nuclear Operating Co
Eva Brown, NRR/DORL 415-2315
References
L-12-274, TAC MF0316
Download: ML13280A907 (4)


Text

October 29, 2013

Mr. Raymond A. Lieb Site Vice President

FirstEnergy Nuclear Operating Company Mail Stop A-DB-3080 5501 North State, Route 2

Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1 - REVIEW OF THE SPRING 2012 STEAM GENERATOR TUBE INSPECTIONS (TAC NO. MF0316)(L-12-274)

Dear Mr. Lieb:

By letters dated August 20, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12234A484), and November 30, 2012 (ADAMS Accession No. ML12339A071), FirstEnergy Nuclear Operating Company (the licensee) submitted information summarizing the results of the 2012 steam generator (SG) tube inspections at Davis-Besse Nuclear Power Station (DBNPS), Unit 1 during refueling outage 17. In addition to this report, the U.S. Nuclear Regulatory Commission staff summarized a conference call about the 2012 SG tube inspections at DBNPS in a letter dated July 16, 2012 (ADAMS Accession No. ML12167A026).

The NRC staff has completed its review of the submi ttals pertaining to the DBNPS, Unit No. 1, SG inspections, and the associated review summary is enclosed. The NRC staff finds that the licensee has provided the information required by the technical specifications. In addition, the staff did not identify any technical issues that warrant follow-up action at this time. Based on these considerations, the subject TAC is being closed.

Sincerely,

/ RA / Eva A. Brown, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket No. 50-346

Enclosure:

Steam Generator Review Summary

cc w/encl: Distribution via Listserv

ML12339A071), FirstEnergy Nuclear Operating Company (the licensee) submitted information summarizing the results of the 2012 steam generator (SG) tube inspections at Davis-Besse Nuclear Power Station (DBNPS), Unit 1 during refueling outage 17. In addition to this report, the U.S. Nuclear Regulatory Commission staff summarized a conference call about the 2012 SG tube inspections at DBNPS in a letter dated July 16, 2012 (ADAMS Accession No. ML12167A026).

The NRC staff has completed its review of the submi ttals pertaining to the DBNPS, Unit No. 1, SG inspections, and the associated review summary is enclosed. The NRC staff finds that the licensee has provided the information required by the technical specifications. In addition, the staff did not identify any technical issues that warrant follow-up action at this time. Based on these considerations, the subject TAC is being closed.

Sincerely, / RA / Eva A. Brown, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346

Enclosure:

Steam Generator Review Summary

cc w/encl: Distribution via Listserv

DISTRIBUTION:

PUBLIC LPLIII-2 R/F RidsNrrDorlLplIII-2 RidsNrrPMDavis-Besse AJohnson, NRR RidsNrrLASRohrer RidsRgn3MailCenter Resource RidsOgcRp RidsNrrDeEsgb RidsAcrsAcnw_MailCTR KKarwoski, NRR

ADAMS Accession No. ML13280A907

  • via memo OFFICE NRR/DORL/LPLIII-2/PM NRR/DORL/LPLIII-2/LA NRR/DE/ESGB*

NRR/DORL/LPLIII-2/BC

NAME EBrown SRohrer GKulesa TTate DATE 10/ 21 /13 10/ 8 /13 8/27/2013 10/ 29 /13

STAFF EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO THE STEAM GENERATOR TUBE INSPECTIONS PERFORMED DURING THE 2012 REFUELING OUTAGE NO. 17 DAVIS-BESSE NUCLEAR POWER STATION FIRSTENERGY NUCLEAR OPERATING COMPANY UNIT NO. 1 DOCKET NO. 50-346 By letters dated August 20, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12234A484), and November 30, 2012 (ADAMS Accession No. ML12339A071), FirstEnergy Nuclear Operating Company (the licensee) submitted information summarizing the results of the 2012 steam generator (SG) tube inspections at Davis-Besse Nuclear Power Station (DBNPS), Unit 1 during refueling outage 17. In addition to this report, the U.S. Nuclear Regulatory Commission (NRC) staff summarized a conference call about the 2012 SG tube inspections at DBNPS in a letter dated July 16, 2012 (ADAMS Accession No. ML12167A026).

There are two Babcock and Wilcox once-through steam generators (OTSG), designated 1-B and 2-A, at DBNPS. Each SG has approximately 15,500 Alloy 600 tubes in the mill-annealed condition. The tubes have a nominal outside diameter of 0.625 inches and a nominal wall thickness of 0.037 inches. Both OTSG 1-B and 2-A contain tubes with sleeves and tubes with

shop re-rolls.

The licensee provided the scope, extent, methods, and results of their SG tube inspections in the documents referenced above. In addition, the licensee described corrective actions, e.g., tube plugging, taken in response to the inspection findings.

As a result of the review of the information provided by the licensee, the NRC staff has the following comments/observations:

  • In a conference call with the NRC on May 9, 2013, the licensee confirmed that the equivalent plugging percentage in SG-2A is 937 tubes, and that all tubes in the 2012 inspections with detected indications attributed to corrosion were plugged during the 2012 outage.
  • The 2012 inspections were the last scheduled inspections for these SGs, which are scheduled to be replaced in the spring of 2014.

ENCLOSURE

Based on a review of the information provided, the staff concludes that the licensee provided the information required by their technical specifications. In general, the SG tube inspections at DBNPS appear to be consistent with the objective of detecting potential tube degradation and the inspection results appear to be consistent with industry operating experience at similarly-designed and operated units.

The NRC staff's review did not reveal any issues warranting follow-up action.