ML13336A395: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 19
| page count = 19
}}
}}
=Text=
{{#Wiki_filter:ES-301 Administrative Topics Outline Form ES-301-1 NRC EXAM Facility:
Catawba Nuclear Station Date of Examination:
Sept. 2013 Examination Level:  RO SRO  Operating Test Number: 2013301  Administrative Topic (See Note)
Type Code* Describe activity to be performed Conduct of Operations R,N Determine boric acid required from RHT for Makeup to the FWST.
G2.1.25 Ability to interpret reference materials, such as graphs, curves, tables, etc.
Conduct of Operations S,D  Complete a Unit Vent Flow Calculation G2.1.23 Ability to perform specific system and integrated plant procedures during all modes of plant operation.
Equipment Control R,D Classify a DG start and complete log entry.
G2.2.12 Knowledge of surveillance procedures.
Radiation Control M,R Calculate Low Pressure Service Water Discharge Flow for Radioactive Release G2.3.11 Ability to control radiation releases.
Emergency Procedures/Plan
  --- NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
* Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (
< 3 for ROs;
< 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (
> 1) (P)revious 2 exams (
< 1; randomly selected)
ES 301, Page 22 of 27
Page 12 of 19  Facility:  Catawba Nuclear Station Date of Examination: Sept. 2013 Exam Level:  RO SRO-I  SRO-U  Operating Test Number:
2013301  Control Room Systems (8 for RO); (7 for SRO
-I); (2 or 3 for SRO
-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function a. Establish N C System Feed and Bleed 002A2.04  Control/mitigate loss of heat sink. 4.3/4.6 A,D,L,P,S 4P b. Restore power to 1ETA from offsite power 062A4.01  Operate/monitor breakers (including switchyard). 3.3/3.1 A,D,L,P,S 6 c. Emergency Boration per FR
-S.1  004A1.14  Control Emergency Boration. 3.8/3.9 A,D,S 1 d. Secure ND Pump due to miniflow valve failure 006A2.02  For ECCS, mitigate loss of flow path. 3.9/4.3 A,N,EN,L,S 3 e. Increase 1A CLA pressure 006A1.03  Operate ECCS controls for accumulator. 3.5/3.7 D,EN,S 2 f. Shift operating RC Pumps 075A2.02  Mitigate/control loss of circulating water pumps.
2.5/2.7 A,D,S 8 g. Align the NS System for Cold Leg Recirculation 026A4.01  Operate/monitor CSS controls  4.5/4.3 M,L,S 5 h. Main Turbine Weekly Trip Test 012A2.06  Mitigate failure of RPS signal to trip the reactor  4.4/4.7 A,N,S 7 In-Plant Systems
@ (3 for RO); (3 for SRO
-I); (3 or 2 for SRO
-U) i. Unit 2 Spent Fuel Pool makeup from RN 033A2.03  Control/mitigate abnormal SFP water level. 3.1/3.5 M,R 8 j. Establish NC Pump Seal Injection from the SSF 015/017AA1.07  Operate RCP seal water injection system. 3.5/3.4 M,E 4P k. Shifting Main Transformer Auxiliaries 062A2.01  Operate loads that would degrade plant operation. 3.4/3.9 M 6 @ All RO and SRO
-I control room (and in
-plant) systems must be different and serve different safety functions; all 5 SRO
-U systems must serve different safety functions; in
-plant systems and functions may overlap those tested in the control room.
*Type Codes Criteria for RO / SRO
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3  < 9 / < 8 / < 4  > 1 / > 1 / > 1    - /  -  / > 1  > 1 / > 1 / > 1  > 2 / > 2 / > 1  < 3  < 3  / < 2 (randomly selected)
  > 1 / > 1 / > 1 ES-301 Administrative Topics Outline Form ES-301-1 NRC EXAM Facility:
Catawba Nuclear Station Date of Examination:
Sept. 2013 Examination Level:  RO SRO  Operating Test Number: 2013301  Administrative Topic (See Note)
Type Code* Describe activity to be performed Conduct of Operations S,D Quantify steam leak size G2.1.20 Ability to interpret and execute procedure steps.
Conduct of Operations S,D  Complete a Unit Vent Flow Calculation G2.1.23 Ability to perform specific system and integrated plant procedures during all modes of plant operation.
Equipment Control R,D Classify a DG start and complete log entry.
G2.2.12 Knowledge of surveillance procedures.
Radiation Control M,R Calculate Low Pressure Service Water Discharge Flow for Radioactive Release G2.3.11 Ability to control radiation releases.
Emergency Procedures/Plan R,D Classify an Emergency and Make Initial Notifications G2.4.40 Knowledge of SRO responsibilities in emergency plan implementation.
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
* Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (
< 3 for ROs;
< 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (
> 1) (P)revious 2 exams (
< 1; randomly selected)
ES 301, Page 22 of 27
Page 13 of 19  Facility:  Catawba Nuclear Station Date of Examination: Sept. 2013 Exam Level:  RO SRO-I  SRO-U  Operating Test Number:
2013301  Control Room Systems (8 for RO); (7 for SRO
-I); (2 or 3 for SRO
-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function a. Establish N C System Feed and Bleed 002A2.04  Control/mitigate loss of heat sink. 4.3/4.6 A,D,L,P,S 4P b. Restore power to 1ETA from offsite power 062A4.01  Operate/monitor breakers (including switchyard). 3.3/3.1 A,D,L,P,S 6 c. Emergency Boration per FR
-S.1  004A1.14  Control Emergency Boration. 3.8/3.9 A,D,S 1 d. Secure ND Pump due to miniflow valve failure 006A2.02  For ECCS, mitigate loss of flow path. 3.9/4.3 A,N,EN,L,S 3 e. Increase 1A CLA pressure 006A1.03  Operate ECCS controls for accumulator. 3.5/3.7 D,EN,S 2 f. Shift operating RC Pumps 075A2.02  Mitigate/control loss of circulating water pumps.
2.5/2.7 A,D,S 8 g. N/A  h. Main Turbine Weekly Trip Test 012A2.06  Mitigate failure of RPS signal to trip the reactor  4.4/4.7 A,N,S 7 In-Plant Systems
@ (3 for RO); (3 for SRO
-I); (3 or 2 for SRO
-U) i. Unit 2 Spent Fuel Pool makeup from RN 033A2.03  Control/mitigate abnormal SFP water level. 3.1/3.5 M,R 8 j. Establish NC Pump Seal Injection from the SSF 015/017AA1.07  Operate RCP seal water injection system. 3.5/3.4 M,E 4P k. Shifting Main Transformer Auxiliaries 062A2.01  Operate loads that would degrade plant operation. 3.4/3.9 M 6 @ All RO and SRO
-I control room (and in
-plant) systems must be different and serve different safety functions; all 5 SRO
-U systems must serve different safety functions; in
-plant systems and functions may overlap those tested in the control room.
*Type Codes Criteria for RO / SRO
-I / SRO-U ES-301, Page 23 of 27
Page 14 of 19  Facility:  Catawba Nuclear Station Date of Examination: Sept. 2013 Exam Level:  RO SRO-I  SRO-U  Operating Test Number:
2013301  Control Room Systems (8 for RO); (7 for SRO
-I); (2 or 3 for SRO
-U, including 1 ESF)
System / JPM Title Type Code* Safety Function a. N/A  b. N/A  c. Emergency Boration per FR
-S.1  004A1.14  Control Emergency Boration. 3.8/3.9 A,D,S 1 d. Secure ND Pump due to miniflow valve failure 006A2.02  For ECCS, mitigate loss of flow path. 3.9/4.3 A,N,EN,L,S 3 e. N/A  f. N/A  g. Align the NS System for Cold Leg Recirculation 026A4.01  Operate/monitor CSS controls  4.5/4.3 M,L,S 5 h. N/A  In-Plant Systems
@ (3 for RO); (3 for SRO
-I); (3 or 2 for SRO
-U) i. Unit 2 Spent Fuel Pool makeup from RN 033A2.03  Control/mitigate abnormal SFP water level. 3.1/3.5 M,R 8 j. Establish NC Pump Seal Injection from the SSF 015/017AA1.07  Operate RCP seal water injection system. 3.5/3.4 M,E 4P k. N/A  @ All RO and SRO
-I control room (and in
-plant) systems must be different and serve different safety functions; all 5 SRO
-U systems must serve different safety functions; in
-plant systems and functions may overlap those tested in the control room.
ES-301, Page 23 of 27}}

Revision as of 13:48, 3 July 2018

Catawba 2013-301 Draft Administrative Documents
ML13336A395
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 11/26/2013
From:
Duke Energy Carolinas
To:
NRC/RGN-II
References
50-413/13-301, 50-414/13-301
Download: ML13336A395 (19)


Text

ES-301 Administrative Topics Outline Form ES-301-1 NRC EXAM Facility:

Catawba Nuclear Station Date of Examination:

Sept. 2013 Examination Level: RO SRO Operating Test Number: 2013301 Administrative Topic (See Note)

Type Code* Describe activity to be performed Conduct of Operations R,N Determine boric acid required from RHT for Makeup to the FWST.

G2.1.25 Ability to interpret reference materials, such as graphs, curves, tables, etc.

Conduct of Operations S,D Complete a Unit Vent Flow Calculation G2.1.23 Ability to perform specific system and integrated plant procedures during all modes of plant operation.

Equipment Control R,D Classify a DG start and complete log entry.

G2.2.12 Knowledge of surveillance procedures.

Radiation Control M,R Calculate Low Pressure Service Water Discharge Flow for Radioactive Release G2.3.11 Ability to control radiation releases.

Emergency Procedures/Plan

--- NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.

  • Type Codes & Criteria:

(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (

< 3 for ROs;

< 4 for SROs & RO retakes)

(N)ew or (M)odified from bank (

> 1) (P)revious 2 exams (

< 1; randomly selected)

ES 301, Page 22 of 27

Page 12 of 19 Facility: Catawba Nuclear Station Date of Examination: Sept. 2013 Exam Level: RO SRO-I SRO-U Operating Test Number:

2013301 Control Room Systems (8 for RO); (7 for SRO

-I); (2 or 3 for SRO

-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function a. Establish N C System Feed and Bleed 002A2.04 Control/mitigate loss of heat sink. 4.3/4.6 A,D,L,P,S 4P b. Restore power to 1ETA from offsite power 062A4.01 Operate/monitor breakers (including switchyard). 3.3/3.1 A,D,L,P,S 6 c. Emergency Boration per FR

-S.1 004A1.14 Control Emergency Boration. 3.8/3.9 A,D,S 1 d. Secure ND Pump due to miniflow valve failure 006A2.02 For ECCS, mitigate loss of flow path. 3.9/4.3 A,N,EN,L,S 3 e. Increase 1A CLA pressure 006A1.03 Operate ECCS controls for accumulator. 3.5/3.7 D,EN,S 2 f. Shift operating RC Pumps 075A2.02 Mitigate/control loss of circulating water pumps.

2.5/2.7 A,D,S 8 g. Align the NS System for Cold Leg Recirculation 026A4.01 Operate/monitor CSS controls 4.5/4.3 M,L,S 5 h. Main Turbine Weekly Trip Test 012A2.06 Mitigate failure of RPS signal to trip the reactor 4.4/4.7 A,N,S 7 In-Plant Systems

@ (3 for RO); (3 for SRO

-I); (3 or 2 for SRO

-U) i. Unit 2 Spent Fuel Pool makeup from RN 033A2.03 Control/mitigate abnormal SFP water level. 3.1/3.5 M,R 8 j. Establish NC Pump Seal Injection from the SSF 015/017AA1.07 Operate RCP seal water injection system. 3.5/3.4 M,E 4P k. Shifting Main Transformer Auxiliaries 062A2.01 Operate loads that would degrade plant operation. 3.4/3.9 M 6 @ All RO and SRO

-I control room (and in

-plant) systems must be different and serve different safety functions; all 5 SRO

-U systems must serve different safety functions; in

-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO

-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in

-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 < 9 / < 8 / < 4 > 1 / > 1 / > 1 - / - / > 1 > 1 / > 1 / > 1 > 2 / > 2 / > 1 < 3 < 3 / < 2 (randomly selected)

> 1 / > 1 / > 1 ES-301 Administrative Topics Outline Form ES-301-1 NRC EXAM Facility:

Catawba Nuclear Station Date of Examination:

Sept. 2013 Examination Level: RO SRO Operating Test Number: 2013301 Administrative Topic (See Note)

Type Code* Describe activity to be performed Conduct of Operations S,D Quantify steam leak size G2.1.20 Ability to interpret and execute procedure steps.

Conduct of Operations S,D Complete a Unit Vent Flow Calculation G2.1.23 Ability to perform specific system and integrated plant procedures during all modes of plant operation.

Equipment Control R,D Classify a DG start and complete log entry.

G2.2.12 Knowledge of surveillance procedures.

Radiation Control M,R Calculate Low Pressure Service Water Discharge Flow for Radioactive Release G2.3.11 Ability to control radiation releases.

Emergency Procedures/Plan R,D Classify an Emergency and Make Initial Notifications G2.4.40 Knowledge of SRO responsibilities in emergency plan implementation.

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.

  • Type Codes & Criteria:

(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (

< 3 for ROs;

< 4 for SROs & RO retakes)

(N)ew or (M)odified from bank (

> 1) (P)revious 2 exams (

< 1; randomly selected)

ES 301, Page 22 of 27

Page 13 of 19 Facility: Catawba Nuclear Station Date of Examination: Sept. 2013 Exam Level: RO SRO-I SRO-U Operating Test Number:

2013301 Control Room Systems (8 for RO); (7 for SRO

-I); (2 or 3 for SRO

-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function a. Establish N C System Feed and Bleed 002A2.04 Control/mitigate loss of heat sink. 4.3/4.6 A,D,L,P,S 4P b. Restore power to 1ETA from offsite power 062A4.01 Operate/monitor breakers (including switchyard). 3.3/3.1 A,D,L,P,S 6 c. Emergency Boration per FR

-S.1 004A1.14 Control Emergency Boration. 3.8/3.9 A,D,S 1 d. Secure ND Pump due to miniflow valve failure 006A2.02 For ECCS, mitigate loss of flow path. 3.9/4.3 A,N,EN,L,S 3 e. Increase 1A CLA pressure 006A1.03 Operate ECCS controls for accumulator. 3.5/3.7 D,EN,S 2 f. Shift operating RC Pumps 075A2.02 Mitigate/control loss of circulating water pumps.

2.5/2.7 A,D,S 8 g. N/A h. Main Turbine Weekly Trip Test 012A2.06 Mitigate failure of RPS signal to trip the reactor 4.4/4.7 A,N,S 7 In-Plant Systems

@ (3 for RO); (3 for SRO

-I); (3 or 2 for SRO

-U) i. Unit 2 Spent Fuel Pool makeup from RN 033A2.03 Control/mitigate abnormal SFP water level. 3.1/3.5 M,R 8 j. Establish NC Pump Seal Injection from the SSF 015/017AA1.07 Operate RCP seal water injection system. 3.5/3.4 M,E 4P k. Shifting Main Transformer Auxiliaries 062A2.01 Operate loads that would degrade plant operation. 3.4/3.9 M 6 @ All RO and SRO

-I control room (and in

-plant) systems must be different and serve different safety functions; all 5 SRO

-U systems must serve different safety functions; in

-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO

-I / SRO-U ES-301, Page 23 of 27

Page 14 of 19 Facility: Catawba Nuclear Station Date of Examination: Sept. 2013 Exam Level: RO SRO-I SRO-U Operating Test Number:

2013301 Control Room Systems (8 for RO); (7 for SRO

-I); (2 or 3 for SRO

-U, including 1 ESF)

System / JPM Title Type Code* Safety Function a. N/A b. N/A c. Emergency Boration per FR

-S.1 004A1.14 Control Emergency Boration. 3.8/3.9 A,D,S 1 d. Secure ND Pump due to miniflow valve failure 006A2.02 For ECCS, mitigate loss of flow path. 3.9/4.3 A,N,EN,L,S 3 e. N/A f. N/A g. Align the NS System for Cold Leg Recirculation 026A4.01 Operate/monitor CSS controls 4.5/4.3 M,L,S 5 h. N/A In-Plant Systems

@ (3 for RO); (3 for SRO

-I); (3 or 2 for SRO

-U) i. Unit 2 Spent Fuel Pool makeup from RN 033A2.03 Control/mitigate abnormal SFP water level. 3.1/3.5 M,R 8 j. Establish NC Pump Seal Injection from the SSF 015/017AA1.07 Operate RCP seal water injection system. 3.5/3.4 M,E 4P k. N/A @ All RO and SRO

-I control room (and in

-plant) systems must be different and serve different safety functions; all 5 SRO

-U systems must serve different safety functions; in

-plant systems and functions may overlap those tested in the control room.

ES-301, Page 23 of 27