ML13347B326: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 13: Line 13:
| page count = 8
| page count = 8
}}
}}
=Text=
{{#Wiki_filter:December 16, 2013
Mr. Michael J. Pacilio, Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer
Exelon Nuclear 4300 Winfield Road Warrenville, IL  60555
==SUBJECT:==
DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1- 2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION
==Dear Mr. Pacilio:==
On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1, and Peach Bottom Atomic Power Station, Unit 1 as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.
In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electroni cally for public inspection in the NRC Public Document Room or from the Publicly Avail able Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
.        Sincerely, 
      /RA/ John B. Hickman, Project Manager
Reactor Decommissioning Branch Decommissioning and Uranium Recovery          Licensing Directorate Division of Waste Management          and Environmental Protection Office of Federal and State Materials  and Environmental Management Programs
Docket Nos. 50-010 and 50-171
==Enclosure:==
RAI for Dresden Unit 1 and Peach Bottom, Unit 1
cc:  Dresden, Unit 1 and Peach Bottom, Unit 1 Service Lists Mr. Michael J. Pacilio, Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road
Warrenville, IL  60555
==SUBJECT:==
DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1- 2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION
==Dear Mr. Pacilio:==
On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1, and Peach Bottom Atomic Power Station, Unit 1 as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.
In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electroni cally for public inspection in the NRC Public Document Room or from the Publicly Avail able Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
.        Sincerely, 
      /RA/ John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery          Licensing Directorate Division of Waste Management          and Environmental Protection Office of Federal and State Materials  and Environmental Management Programs
Docket Nos. 50-010 and 50-171
==Enclosure:==
RAI for Dresden Unit 1 and
Peach Bottom, Unit 1
cc:  Dresden, Unit 1 and Peach Bottom, Unit 1 Service Lists DISTRIBUTION:  ROrlikowski, RIII MFerdas, RI AKock, NRR KLois, NRR ML13347B326 OFC DWMEP DWMEP DWMEP DWMEP DWMEP NAME JHickman CHolston SGiebel BWatson JHickman DATE 12 / 16 / 2013 12 / 16 / 2013 12/16 /2013 12 / 16 / 2013 12 / 16 / 2013 OFFICIAL RECORD COPY Enclosure REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2012 DECOMMISSIONING FUNDING STATUS REPORT FOR DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1 The requests for additional information (RAIs) are in response to the 2013 Decommissioning Funding Status (DFS) Report for Dresden Nuclear Power Station, Unit 1 and Peach Bottom Atomic Power Station, Unit 1. On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning
Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1 (Dresden 1), and Peach Bottom Atomic Power Station, Unit 1 (Peach Bottom) as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii).
RAI #1:  Minimum Formula Amount On April 1, 2013, EGC provided radiological decommissioning costs associated with license termination for Dresden 1 and Peach Bottom. EGC did not provide the required minimum funding assurance amount, based on the formula from 10 CFR 50.75(c).
Per 10 CFR 50.75(f)(1), "-the information in this report must include, at a minimum the amount of decommissioning funds estimated to be required under 10 CFR 50.75(b) and (c)."
For both Dresden 1 and Peach Bottom provide the amount of decommissioning funds estimated to be required based on the formula from 10 CFR Sections 50.75(b) and (c).
RAI # 2:  Decommissioning Costs
On April 1, 2013, EGC did not provide the estimated total cost of decommissioning activities as stated in the most recent Site Specific Cost Estimate (SSCE) update. EGC did provide the estimated cost of remaining decommissioning activities.
Per 10 CFR 50.82(a)(8)(v)(A) and (B) , "-the report must include the following information, current through the end of the previous calendar year: the amount spent on decommissioning, both cumulative and over the previous calendar year, the remaining balance of any decommissioning funds, and the amount provided by other financial assurance methods being relied upon; an estimate of the costs to complete decommissioning, reflecting any difference
between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based."
For both Dresden 1 and Peach Bottom provide the estimated total cost of decommissioning activities as stated in the most recent SSCE update.
RAI # 3:  Decommissioning Costs
On April 1, 2013, EGC did not provide the difference between actual and estimated costs for decommissioning work performed during the previous year.
2  Per 10 CFR 50.82(a)(8)(v),
The report must include the following information, current through the end of the previous calendar year: an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based."  For both Dresden 1 and Peach Bottom provide the difference between actual and
estimated costs for decommissioning work performed during the previous year.
Dresden Nuclear Power Station, Unit 1 Service List
cc:  Site Vice President - Dresden Nuclear Power Station Exelon Generation Company, LLC
6500 North Dresden Road
Morris, IL  60450-9765 Plant Manager - Dresden Nuclear Power Station Exelon Generation Company, LLC
6500 North Dresden Road Morris, IL  60450-9765
Manager Regulatory Assurance - Dresden
Nuclear Power Station Exelon Generation Company, LLC 6500 North Dresden Road Morris, IL  60450-9765
Senior Vice President, Midwest Operations Exelon Generation Company, LLC
4300 Winfield Road Warrenville, IL  60555
Vice President, Midwest Operations Exelon Generation Company, LLC
4300 Winfield Road Warrenville, IL  60555
Senior Vice President - Operations Support Exelon Generation Company, LLC
4300 Winfield Road
Warrenville, IL 60555 Vice President - Operations Support Exelon Generation Company, LLC
4300 Winfield Road
Warrenville, IL  60555 Vice President - Licensing and Regulatory
Affairs Exelon Generation Company, LLC
4300 Winfield Road
Warrenville, IL  60555 Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC
4300 Winfield Road
Warrenville, IL  60555
Manager Licensing - Clinton, Dresden, and Quad Cities Exelon Generation Company, LLC
4300 Winfield Road
Warrenville, IL  60555 Vice President and Deputy General Counsel Exelon Generation Company, LLC 200 Exelon Way, KSA-3E
Kennett Square, PA  19348 Document Control Desk - Licensing Exelon Generation Company, LLC
4300 Winfield Road
Warrenville, IL  60555
Associate General Counsel Exelon Business Services Company, LLC
4300 Winfield Road
Warrenville, IL  60555
Associate General Counsel Exelon Business Services Company, LLC 200 Exelon Way, KSA-3E
Kennett Square, PA  19348
U.S. Nuclear Regulatory Commission Resident Inspectors Office Dresden Station
6500 North Dresden Road
Morris, IL  60450-9765
Chairman Grundy County Board Administration Building
1320 Union Street
Morris, IL  60450
Regional Administrator U.S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Lisle, IL 60532-4352
Illinois Department of Nuclear Safety Office of Nuclear Facility Safety  1035 Outer Park Drive Springfield, IL  62704 Peach Bottom Atomic Power Station, Unit 1 Service List
cc:  Mr. Michael J. Pacilio Senior Vice President Exelon Generation Company, LLC
4300 Winfield Road
Warrenville, IL  60555 Mr. Christopher M. Crane President and Chief Operating Officer Exelon Corporation
4300 Winfield Road Warrenville, IL  60555
Mr. Charles G. Pardee Chief Operating Officer (COO)
Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL  60555
Ms. Susan R. Landahl Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL  60555
Mr. Ronald J. De Gregorio Senior Vice President, Operations Support Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N
Kennett Square, PA  19348
Mr. Joseph P. Grimes, Jr.
Senior Vice President, Mid-Atlantic Operations Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N
Kennett Square, PA  19348
Mr. Stephen E. Kuczynski Senior Vice President, Engineering and Technical Services Exelon Generation Company, LLC
4300 Winfield Road
Warrenville, IL  60555 Mr. Bryan C. Hanson Senior Vice President, Midwest Operations Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL  60555
Mr. Keith R. Jury Vice President, Licensing and Regulatory Affairs Exelon Generation Company, LLC
4300 Winfield Road
Warrenville, IL  60555
Mr. Timothy J. Tulon Vice President, Midwest Operations, Exelon Generation Company, LLC
4300 Winfield Road
Warrenville, IL  60555 Mr. Christopher H. Mudrick Vice President, Mid-Atlantic Operations Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N
Kennett Square, PA  19348 Mr. Robert J. Hovey Vice President, Nuclear Oversight Exelon Generation Company, LLC
4300 Winfield Road Warrenville, IL  60555
Mr. Tom Dougherty Site Vice President - Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA  17314
Plant Manager - Peach Bottom Atomic Power Station  Exelon Generation Company, LLC 1848 Lay Road
Delta, PA  17314
Manager Regulatory Assurance - Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road
Delta, PA  17314
Mr. Roland Fletcher Department of Environment
Radiological Health Program 2400 Broening Highway Baltimore, MD  21224
Director, Licensing and Regulatory Affairs Exelon Generation Company, LLC
Correspondence Control P.O. Box 160 Kennett Square, PA  19348
Manager Licensing Exelon Generation Company, LLC Correspondence Control P.O. Box 160 
Kennett Square, PA  19348
Chief-Division of Nuclear Safety PA Bureau of Radiation Protection Dept. of Environmental Protection P.O. Box 8469
Harrisburg, PA  17105-8469
Board of Supervisors Peach Bottom Township R.D. #1 Delta, PA  17314
Public Service Commission of Maryland Engineering Division Chief Engineer
6 St. Paul Center
Baltimore, MD  21202-6806
Ms. Susan Grey Power Plant and Environmental  Review Division Department of Natural Resources B-3, Tawes State Office Building Annapolis, MD  21401 Manager-Financial Control & Co-Owner
Affairs Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, NJ  08038-0236 Vice President, Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL  60555
Associate General Counsel Exelon Generation Company, LLC
4300 Winfield Road Warrenville, IL  60555
Correspondence Control Desk Exelon Generation Company, LLC 200 Exelon Way, KSA 1-N-1 Kennett Square, PA  19348}}

Revision as of 11:26, 3 July 2018

M. Pacilio Ltr. Request for Additional for Decommissioning Funding Status Report for Dresden Unit 1 and Peach Bottom Unit 1
ML13347B326
Person / Time
Site: Dresden, Peach Bottom  Constellation icon.png
Issue date: 12/16/2013
From: Hickman J B
NRC/FSME/DWMEP/DURLD/RDB
To: Pacilio M J
Exelon Generation Co, Exelon Nuclear
Hickman J B
References
Download: ML13347B326 (8)


Text

December 16, 2013

Mr. Michael J. Pacilio, Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer

Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1- 2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION

Dear Mr. Pacilio:

On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1, and Peach Bottom Atomic Power Station, Unit 1 as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.

In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electroni cally for public inspection in the NRC Public Document Room or from the Publicly Avail able Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

. Sincerely,

/RA/ John B. Hickman, Project Manager

Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs

Docket Nos.50-010 and 50-171

Enclosure:

RAI for Dresden Unit 1 and Peach Bottom, Unit 1

cc: Dresden, Unit 1 and Peach Bottom, Unit 1 Service Lists Mr. Michael J. Pacilio, Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1- 2013 DECOMMISSIONING FUNDING STATUS REPORT - REQUEST FOR ADDITIONAL INFORMATION

Dear Mr. Pacilio:

On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission the 2013 Decommissioning Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1, and Peach Bottom Atomic Power Station, Unit 1 as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii). In order to complete our review of your DFS report we require additional information as detailed in the enclosure. Please provide a response to our request for additional information within 30 days from the date of this letter.

In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electroni cally for public inspection in the NRC Public Document Room or from the Publicly Avail able Records component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

. Sincerely,

/RA/ John B. Hickman, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs

Docket Nos.50-010 and 50-171

Enclosure:

RAI for Dresden Unit 1 and

Peach Bottom, Unit 1

cc: Dresden, Unit 1 and Peach Bottom, Unit 1 Service Lists DISTRIBUTION: ROrlikowski, RIII MFerdas, RI AKock, NRR KLois, NRR ML13347B326 OFC DWMEP DWMEP DWMEP DWMEP DWMEP NAME JHickman CHolston SGiebel BWatson JHickman DATE 12 / 16 / 2013 12 / 16 / 2013 12/16 /2013 12 / 16 / 2013 12 / 16 / 2013 OFFICIAL RECORD COPY Enclosure REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 2012 DECOMMISSIONING FUNDING STATUS REPORT FOR DRESDEN NUCLEAR POWER STATION UNIT 1 AND PEACH BOTTOM ATOMIC POWER STATION UNIT 1 The requests for additional information (RAIs) are in response to the 2013 Decommissioning Funding Status (DFS) Report for Dresden Nuclear Power Station, Unit 1 and Peach Bottom Atomic Power Station, Unit 1. On April 1, 2013, Exelon Generation Company, LLC (EGC) submitted to the U.S. Nuclear Regulatory Commission (NRC) the 2013 Decommissioning

Funding Status (DFS) report for Dresden Nuclear Power Station, Unit 1 (Dresden 1), and Peach Bottom Atomic Power Station, Unit 1 (Peach Bottom) as required under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.75(f)(1) and 10 CFR 50.82 (a)(8)(v)-(vii).

RAI #1: Minimum Formula Amount On April 1, 2013, EGC provided radiological decommissioning costs associated with license termination for Dresden 1 and Peach Bottom. EGC did not provide the required minimum funding assurance amount, based on the formula from 10 CFR 50.75(c).

Per 10 CFR 50.75(f)(1), "-the information in this report must include, at a minimum the amount of decommissioning funds estimated to be required under 10 CFR 50.75(b) and (c)."

For both Dresden 1 and Peach Bottom provide the amount of decommissioning funds estimated to be required based on the formula from 10 CFR Sections 50.75(b) and (c).

RAI # 2: Decommissioning Costs

On April 1, 2013, EGC did not provide the estimated total cost of decommissioning activities as stated in the most recent Site Specific Cost Estimate (SSCE) update. EGC did provide the estimated cost of remaining decommissioning activities.

Per 10 CFR 50.82(a)(8)(v)(A) and (B) , "-the report must include the following information, current through the end of the previous calendar year: the amount spent on decommissioning, both cumulative and over the previous calendar year, the remaining balance of any decommissioning funds, and the amount provided by other financial assurance methods being relied upon; an estimate of the costs to complete decommissioning, reflecting any difference

between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based."

For both Dresden 1 and Peach Bottom provide the estimated total cost of decommissioning activities as stated in the most recent SSCE update.

RAI # 3: Decommissioning Costs

On April 1, 2013, EGC did not provide the difference between actual and estimated costs for decommissioning work performed during the previous year.

2 Per 10 CFR 50.82(a)(8)(v),

The report must include the following information, current through the end of the previous calendar year: an estimate of the costs to complete decommissioning, reflecting any difference between actual and estimated costs for work performed during the year, and the decommissioning criteria upon which the estimate is based." For both Dresden 1 and Peach Bottom provide the difference between actual and

estimated costs for decommissioning work performed during the previous year.

Dresden Nuclear Power Station, Unit 1 Service List

cc: Site Vice President - Dresden Nuclear Power Station Exelon Generation Company, LLC

6500 North Dresden Road

Morris, IL 60450-9765 Plant Manager - Dresden Nuclear Power Station Exelon Generation Company, LLC

6500 North Dresden Road Morris, IL 60450-9765

Manager Regulatory Assurance - Dresden

Nuclear Power Station Exelon Generation Company, LLC 6500 North Dresden Road Morris, IL 60450-9765

Senior Vice President, Midwest Operations Exelon Generation Company, LLC

4300 Winfield Road Warrenville, IL 60555

Vice President, Midwest Operations Exelon Generation Company, LLC

4300 Winfield Road Warrenville, IL 60555

Senior Vice President - Operations Support Exelon Generation Company, LLC

4300 Winfield Road

Warrenville, IL 60555 Vice President - Operations Support Exelon Generation Company, LLC

4300 Winfield Road

Warrenville, IL 60555 Vice President - Licensing and Regulatory

Affairs Exelon Generation Company, LLC

4300 Winfield Road

Warrenville, IL 60555 Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC

4300 Winfield Road

Warrenville, IL 60555

Manager Licensing - Clinton, Dresden, and Quad Cities Exelon Generation Company, LLC

4300 Winfield Road

Warrenville, IL 60555 Vice President and Deputy General Counsel Exelon Generation Company, LLC 200 Exelon Way, KSA-3E

Kennett Square, PA 19348 Document Control Desk - Licensing Exelon Generation Company, LLC

4300 Winfield Road

Warrenville, IL 60555

Associate General Counsel Exelon Business Services Company, LLC

4300 Winfield Road

Warrenville, IL 60555

Associate General Counsel Exelon Business Services Company, LLC 200 Exelon Way, KSA-3E

Kennett Square, PA 19348

U.S. Nuclear Regulatory Commission Resident Inspectors Office Dresden Station

6500 North Dresden Road

Morris, IL 60450-9765

Chairman Grundy County Board Administration Building

1320 Union Street

Morris, IL 60450

Regional Administrator U.S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Lisle, IL 60532-4352

Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, IL 62704 Peach Bottom Atomic Power Station, Unit 1 Service List

cc: Mr. Michael J. Pacilio Senior Vice President Exelon Generation Company, LLC

4300 Winfield Road

Warrenville, IL 60555 Mr. Christopher M. Crane President and Chief Operating Officer Exelon Corporation

4300 Winfield Road Warrenville, IL 60555

Mr. Charles G. Pardee Chief Operating Officer (COO)

Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

Ms. Susan R. Landahl Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

Mr. Ronald J. De Gregorio Senior Vice President, Operations Support Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N

Kennett Square, PA 19348

Mr. Joseph P. Grimes, Jr.

Senior Vice President, Mid-Atlantic Operations Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N

Kennett Square, PA 19348

Mr. Stephen E. Kuczynski Senior Vice President, Engineering and Technical Services Exelon Generation Company, LLC

4300 Winfield Road

Warrenville, IL 60555 Mr. Bryan C. Hanson Senior Vice President, Midwest Operations Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

Mr. Keith R. Jury Vice President, Licensing and Regulatory Affairs Exelon Generation Company, LLC

4300 Winfield Road

Warrenville, IL 60555

Mr. Timothy J. Tulon Vice President, Midwest Operations, Exelon Generation Company, LLC

4300 Winfield Road

Warrenville, IL 60555 Mr. Christopher H. Mudrick Vice President, Mid-Atlantic Operations Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N

Kennett Square, PA 19348 Mr. Robert J. Hovey Vice President, Nuclear Oversight Exelon Generation Company, LLC

4300 Winfield Road Warrenville, IL 60555

Mr. Tom Dougherty Site Vice President - Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314

Plant Manager - Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road

Delta, PA 17314

Manager Regulatory Assurance - Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road

Delta, PA 17314

Mr. Roland Fletcher Department of Environment

Radiological Health Program 2400 Broening Highway Baltimore, MD 21224

Director, Licensing and Regulatory Affairs Exelon Generation Company, LLC

Correspondence Control P.O. Box 160 Kennett Square, PA 19348

Manager Licensing Exelon Generation Company, LLC Correspondence Control P.O. Box 160

Kennett Square, PA 19348

Chief-Division of Nuclear Safety PA Bureau of Radiation Protection Dept. of Environmental Protection P.O. Box 8469

Harrisburg, PA 17105-8469

Board of Supervisors Peach Bottom Township R.D. #1 Delta, PA 17314

Public Service Commission of Maryland Engineering Division Chief Engineer

6 St. Paul Center

Baltimore, MD 21202-6806

Ms. Susan Grey Power Plant and Environmental Review Division Department of Natural Resources B-3, Tawes State Office Building Annapolis, MD 21401 Manager-Financial Control & Co-Owner

Affairs Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, NJ 08038-0236 Vice President, Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

Associate General Counsel Exelon Generation Company, LLC

4300 Winfield Road Warrenville, IL 60555

Correspondence Control Desk Exelon Generation Company, LLC 200 Exelon Way, KSA 1-N-1 Kennett Square, PA 19348