{{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Saba, FaridehSent:Wednesday, April 22, 2015 2:45 PMTo:Schrull, Edward Dustin (edschrull@tva.gov); Williams, Gordon Robert (grwilliams1@tva.gov)Cc:Chernoff, Margaret
{{#Wiki_filter:1NRR-PMDAPEm Resource From:Saba, Farideh Sent:Wednesday, April 22, 2015 2:45 PM To:Schrull, Edward Dustin (edschrull@tva.gov
); Williams, Gordon Rober t (grwilliams1@tva.gov)
Cc:Chernoff, Margaret


==Subject:==
==Subject:==
Acceptance review of License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-460-A, Revision 0, "Control Rod Scram Time Testing Frequency" (TS-501) (MF5827)Importance:HighEd and Gordon, By letter dated March 9, 2015 (ML15111A396), Tennessee Valley Authority (the licensee, TVA) submitted a license amendment request (LAR) for Unit 1 of the Browns Ferry Nuclear Plant (BFN). The proposed LAR would revise the Technical Specification (TS) testing frequency for the surveillance requirement (SR) in TS 3.1.4, "Control Rod Scram Times." The proposed change would be consistent with Technical Specifications Task Force (TSTF) Traveler TSTF-460-A, Revision 0, "Control Rod Scram Time Testing Frequency," which was approved generically for the boiling water reactor (BWR) Standard TS, NUREG-1433 (BWR/4). The required frequency of SR 3.1.4.2, control rod scram time testing, would be changed from "120 days cumulative operation in MODE 1" to "200 days cumulative operation in MODE 1."
Acceptance review of License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-460-A, Revision 0, "Control Rod Scram Time Testing Frequency" (TS-501) (MF5827)
Importance:
HighEd and Gordon,  
 
By letter dated March 9, 2015 (ML15111A396), Tennessee Valley Authority (the licensee, TVA) submitted a license amendment request (LAR) for Unit 1 of the Browns Ferry Nuclear Plant (BFN). The proposed LAR would revise the Technical Specification (TS) testing frequency for the surveillance requirement (SR) in TS 3.1.4, "Control Rod Scram Times." The proposed change would be consistent with Technical Specifications Task Force (TSTF) Traveler TSTF-460-A, Revision 0, "Control Rod Scram Time Testing Frequency," which was approved generically for the boiling water reactor (BWR) Standard TS, NUREG-1433 (BWR/4). The required frequency of SR 3.1.4.2, control rod scram time testing, would be changed from "120 days cumulative operation in MODE 1" to "200 days cumulative operation in MODE 1."  
 
The purpose of this e-mail is to provide the results of the NRC staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant   
The purpose of this e-mail is to provide the results of the NRC staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant   


Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.  
The NRC staff has reviewed TVA's application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. The licensee will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
 
The NRC staff has reviewed TVA's application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. The licensee will be advised of any further information needed to support the NRC staff's detailed techni cal review by separate correspondence.  
: Thanks,  
: Thanks,  


Farideh Farideh E. Saba, P.E. Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV 2
Farideh Farideh E. Saba, P.E. Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV
Hearing Identifier:  NRR_PMDA Email Number:  2024  Mail Envelope Properties  (Farideh.Saba@nrc.gov20150422144500)  
 
2 Hearing Identifier:  NRR_PMDA Email Number:  2024  Mail Envelope Properties  (Farideh.Saba@nrc.gov20150422144500)


==Subject:==
==Subject:==
Acceptance review of License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-460-A, Revision 0, "Control Rod Scram Time Testing Frequency" (TS-501) (MF5827)
Acceptance review of License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-460-A, Revision 0, "Control Rod Scram Time Testing Frequency" (TS-501) (MF5827)
Sent Date:  4/22/2015 2:45:06 PM  Received Date:  4/22/2015 2:45:00 PM From:    Saba, Farideh Created By:  Farideh.Saba@nrc.gov Recipients:    "Chernoff, Margaret" <Margaret.Chernoff@nrc.gov>  Tracking Status: None  "Schrull, Edward Dustin (edschrull@tva.gov)" <edschrull@tva.gov>  Tracking Status: None "Williams, Gordon Robert (grwilliams1@tva.gov)" <grwilliams1@tva.gov>  Tracking Status: None Post Office:      Files    Size      Date & Time MESSAGE    2899      4/22/2015 2:45:00 PM Options  Priority:    High  Return Notification:    No  Reply Requested:    Yes  Sensitivity:    Normal  Expiration Date:      Recipients Received:}}
Sent Date:  4/22/2015 2:45:06 PM  Received Date:  4/22/2015 2:45:00 PM From:    Saba, Farideh Created By:  Farideh.Saba@nrc.gov  
 
Recipients:    "Chernoff, Margaret" <Margaret.Chernoff@nrc.gov>  Tracking Status: None  "Schrull, Edward Dustin (edschrull@tva.gov)" <edschrull@tva.gov>  Tracking Status: None "Williams, Gordon Robert (grwilliams1@tva.gov)" <grwilliams1@tva.gov>  Tracking Status: None Post Office:      Files    Size      Date & Time MESSAGE    2899      4/22/2015 2:45:00 PM
 
Options  Priority:    High  Return Notification:    No  Reply Requested:    Yes  Sensitivity:    Normal  Expiration Date:      Recipients Received:}}

Revision as of 01:37, 1 July 2018

2015/04/22 NRR E-mail Capture - Acceptance Review of License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-460-A, Revision 0, Control Rod Scram Time Testing Frequency (TS-501) (MF5827)
ML15114A042
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/22/2015
From: Saba F E
Plant Licensing Branch II
To: Schrull E D, Williams G R
Tennessee Valley Authority
References
Download: ML15114A042 (3)


Text

1NRR-PMDAPEm Resource From:Saba, Farideh Sent:Wednesday, April 22, 2015 2:45 PM To:Schrull, Edward Dustin (edschrull@tva.gov

); Williams, Gordon Rober t (grwilliams1@tva.gov)

Cc:Chernoff, Margaret

Subject:

Acceptance review of License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-460-A, Revision 0, "Control Rod Scram Time Testing Frequency" (TS-501) (MF5827)

Importance:

HighEd and Gordon,

By letter dated March 9, 2015 (ML15111A396), Tennessee Valley Authority (the licensee, TVA) submitted a license amendment request (LAR) for Unit 1 of the Browns Ferry Nuclear Plant (BFN). The proposed LAR would revise the Technical Specification (TS) testing frequency for the surveillance requirement (SR) in TS 3.1.4, "Control Rod Scram Times." The proposed change would be consistent with Technical Specifications Task Force (TSTF) Traveler TSTF-460-A, Revision 0, "Control Rod Scram Time Testing Frequency," which was approved generically for the boiling water reactor (BWR) Standard TS, NUREG-1433 (BWR/4). The required frequency of SR 3.1.4.2, control rod scram time testing, would be changed from "120 days cumulative operation in MODE 1" to "200 days cumulative operation in MODE 1."

The purpose of this e-mail is to provide the results of the NRC staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed TVA's application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. The licensee will be advised of any further information needed to support the NRC staff's detailed techni cal review by separate correspondence.

Thanks,

Farideh Farideh E. Saba, P.E. Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV

2 Hearing Identifier: NRR_PMDA Email Number: 2024 Mail Envelope Properties (Farideh.Saba@nrc.gov20150422144500)

Subject:

Acceptance review of License Amendment Request for the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-460-A, Revision 0, "Control Rod Scram Time Testing Frequency" (TS-501) (MF5827)

Sent Date: 4/22/2015 2:45:06 PM Received Date: 4/22/2015 2:45:00 PM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov

Recipients: "Chernoff, Margaret" <Margaret.Chernoff@nrc.gov> Tracking Status: None "Schrull, Edward Dustin (edschrull@tva.gov)" <edschrull@tva.gov> Tracking Status: None "Williams, Gordon Robert (grwilliams1@tva.gov)" <grwilliams1@tva.gov> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 2899 4/22/2015 2:45:00 PM

Options Priority: High Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date: Recipients Received: