ML15233A289: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:REV 0  11/30/84  
{{#Wiki_filter:REV 0  11/30/84


APPENDIX 1 GLOSSARY 1-1 REV 39  12/04 GLOSSARY Term Definition AIM analog input module ALARA As Low as Reasonably Achievable  
APPENDIX 1 GLOSSARY  
 
1-1 REV 39  12/04 GLOSSARY Term Definition AIM analog input module ALARA As Low as Reasonably Achievable  


CRT cathode ray tube CSC Customer Service Center CSF critical safety function CSFST critical safety function status tree CVCS chemical and volume control system DEFACS Department of Family and Children Services DHEC Department of Health and Environmental Control of South Carolina DMA direct memory access DNR Department of Natural Resources DOD Department of Defense DOE Department of Energy DOE SR Department of Energy - Savannah River Operations Office DOE SRS Department of Energy - Savannah River Site DPM data processing module EAS Emergency Alerting System  ED emergency director EMA Emergency Management Agency ENC Emergency News Center ENN Emergency Notification Network ENS Emergency Notification System EOC emergency operations center EOF emergency operations facility  
CRT cathode ray tube CSC Customer Service Center CSF critical safety function CSFST critical safety function status tree CVCS chemical and volume control system DEFACS Department of Family and Children Services DHEC Department of Health and Environmental Control of South Carolina DMA direct memory access DNR Department of Natural Resources DOD Department of Defense DOE Department of Energy DOE SR Department of Energy - Savannah River Operations Office DOE SRS Department of Energy - Savannah River Site DPM data processing module EAS Emergency Alerting System  ED emergency director EMA Emergency Management Agency ENC Emergency News Center ENN Emergency Notification Network ENS Emergency Notification System EOC emergency operations center EOF emergency operations facility  


1-2 REV 39  12/04 GLOSSARY (Continued) Term Definition EOP emergency operating procedure EPA Environmental Protection Agency EPC emergency preparedness coordinator EPD Environmental Protection Division of Georgia EMD Emergency Management Division of South Carolina  EPO Emergency Plan Overview EPZ emergency planning zone ERF emergency response facilities FEMA Federal Emergency Management Agency FEOC forward emergency operations center FRERP Federal Radiological Emergency Response Plan FSAR Final Safety Analysis Report FT fire training GEMA Georgia Emergency Management Agency GET general employee training GPC Georgia Power Company HP health physics HPN Health Physics Network HVAC heating, ventilation, and air conditioning I&C instrumentation and control INPO Institute of Nuclear Power Operations IPC Integrated Plant Computer MSIV main steam isolation valve MSL mean sea level  
1-2 REV 39  12/04 GLOSSARY (Continued)
Term Definition EOP emergency operating procedure EPA Environmental Protection Agency EPC emergency preparedness coordinator EPD Environmental Protection Division of Georgia EMD Emergency Management Division of South Carolina  EPO Emergency Plan Overview EPZ emergency planning zone ERF emergency response facilities FEMA Federal Emergency Management Agency FEOC forward emergency operations center FRERP Federal Radiological Emergency Response Plan FSAR Final Safety Analysis Report FT fire training GEMA Georgia Emergency Management Agency GET general employee training GPC Georgia Power Company HP health physics HPN Health Physics Network HVAC heating, ventilation, and air conditioning I&C instrumentation and control INPO Institute of Nuclear Power Operations IPC Integrated Plant Computer MSIV main steam isolation valve MSL mean sea level  
 
1-3 REV 49 08/08 GLOSSARY (Continued)
Term Definition MSRE medical support of radiological emergencies NACOM National Communication NAWAS National Warning System NCHPD Nuclear Chemistry and Health Physics Department NEI Nuclear Energy Institute NDOP Natural Disaster Operations Plan NOAA National Oceanic and Atmospheric Administration NRC Nuclear Regulatory Commission NSCW nuclear service cooling water NSSS nuclear steam supply system NWS National Weather Service NUE Notification of Unusual Event ODA offsite dose assessment OPS operational protection system OS operations supervisor OSC operations support center PA public address PAG Protective Action Guideline PAR Protective Action Recommendation PBX private branch exchange PEO plant equipment operator PERMS process and effluent radiation monitoring system PO plant operator PRA peak recording accelerograph R&CA repair and corrective action
 
1-4 REV 56  09/10 GLOSSARY (Continued)
Term Definition RCP reactor coolant pump RCS reactor coolant system REC radiation emergency coordinator RERP Radiological Emergency Response Plan RET radiological emergency team RET/E radiological emergency team/environmental RET/I radiological emergency team/in plant
 
RO reactor operator RPU remote processing unit RTD resistance temperature detector RVLIS reactor vessel level instrumentation system RWP radiation work permit
 
SAT satisfied SC South Carolina SCORERP South Carolina Operational Radiological Emergency Response Plan SEC security SG steam generator SLED State Law Enforcement Division of South Carolina SMA strong motion accelerometer SNC Southern Nuclear Operating Company SOE sequence of events SPDS safety parameter display system SRO senior reactor operator SRS Savannah River Site 
 
1-5 REV 22  5/95 GLOSSARY (Continued)
Term Definition STA shift technical advisor SUR startup rate
 
TC thermocouple TLD thermoluminescent dosimeter TMI Three Mile Island TSC technical support center UFM universal field multiplexer
 
USDA United States Department of Agriculture VEGP Vogtle Electric Generating Plant WOG Westinghouse Owners Group


1-3 REV 49 08/08 GLOSSARY (Continued)  Term Definition MSRE medical support of radiological emergencies NACOM National Communication NAWAS National Warning System NCHPD Nuclear Chemistry and Health Physics Department NEI Nuclear Energy Institute NDOP Natural Disaster Operations Plan NOAA National Oceanic and Atmospheric Administration NRC Nuclear Regulatory Commission NSCW nuclear service cooling water NSSS nuclear steam supply system NWS National Weather Service NUE Notification of Unusual Event ODA offsite dose assessment OPS operational protection system OS operations supervisor OSC operations support center PA public address PAG Protective Action Guideline PAR Protective Action Recommendation PBX private branch exchange PEO plant equipment operator PERMS process and effluent radiation monitoring system PO plant operator PRA peak recording accelerograph R&CA repair and corrective action
REV 46 07/07


1-4 REV 56  09/10 GLOSSARY (Continued)  Term Definition RCP reactor coolant pump RCS reactor coolant system REC radiation emergency coordinator RERP Radiological Emergency Response Plan RET radiological emergency team RET/E radiological emergency team/environmental RET/I radiological emergency team/in plant RO reactor operator RPU remote processing unit RTD resistance temperature detector RVLIS reactor vessel level instrumentation system RWP radiation work permit SAT satisfied SC South Carolina SCORERP South Carolina Operational Radiological Emergency Response Plan SEC security SG steam generator SLED State Law Enforcement Division of South Carolina SMA strong motion accelerometer SNC Southern Nuclear Operating Company SOE sequence of events SPDS safety parameter display system SRO senior reactor operator SRS Savannah River Site  
APPENDIX 2 LETTERS OF AGREEMENT AND MEMORANDUMS OF UNDERSTANDING


1-5 REV 22 5/95 GLOSSARY (Continued)  Term Definition STA shift technical advisor SUR startup rate TC thermocouple TLD thermoluminescent dosimeter TMI Three Mile Island TSC technical support center UFM universal field multiplexer USDA United States Department of Agriculture VEGP Vogtle Electric Generating Plant WOG Westinghouse Owners Group
2-1 REV 62 10/14 LETTERS OF AGREEMENT AND MEMORANDUMS OF UNDERSTANDING On File The following letters of agreement and memorandums of  


REV 46 07/07   
understanding are maintained on file with the Site Emergency


APPENDIX 2  LETTERS OF AGREEMENT  AND  MEMORANDUMS OF UNDERSTANDING 2-1 REV 62  10/14 LETTERS OF AGREEMENT AND MEMORANDUMS OF UNDERSTANDING  On File  The following letters of agreement and memorandums of understanding are maintained on file with the Site Emergency Preparedness Supervisor.
Preparedness Supervisor.
* Burke County Emergency Management Agency
* Burke County Emergency Management Agency
* WJBF-TV Channel 6
* WJBF-TV Channel 6
* WRDW-TV Channel 12
* WRDW-TV Channel 12
* WAGT-TV Channel 26
* WAGT-TV Channel 26  
 
* (UAB) University of Alabama Hospital Birmingham, Alabama
* (UAB) University of Alabama Hospital Birmingham, Alabama
* Doctors Hospital
* Doctors Hospital
Line 52: Line 73:
* INPO
* INPO
* B. Lamar Murray, M.D.
* B. Lamar Murray, M.D.
* WFXG - TV Channel 54 2-2 REV 46  07/07
* WFXG - TV Channel 54  
 
2-2 REV 46  07/07
* Aiken County South Carolina
* Aiken County South Carolina
* Allendale County South Carolina
* Allendale County South Carolina
Line 58: Line 81:
* Georgia Emergency Management Agency
* Georgia Emergency Management Agency
* South Carolina Emergency Management Division
* South Carolina Emergency Management Division
* Department of Energy - Savannah River REV 0  11/30/84 APPENDIX 3 MEANS FOR PROVIDING PROMPT ALERTING AND NOTIFICATION OF THE PUBLIC MEANS FOR PROVIDING PROMPT ALERTING AND NOTIFICATION OF THE PUBLIC   3-1 REV 61  06/14 A. INTRODUCTION Prompt alerting and notification of the public within the plume exposure pathway EPZ is the obligation of State and local government or other responsible authority. The responsibility that means exist for this purpose rests with Southern Nuclear Operating Company. An overview of these means excluding the Savannah River Site is given in this Appendix.  
* Department of Energy - Savannah River REV 0  11/30/84 APPENDIX 3 MEANS FOR PROVIDING PROMPT ALERTING AND NOTIFICATION OF THE PUBLIC MEANS FOR PROVIDING PROMPT ALERTING AND NOTIFICATION OF THE PUBLIC 3-1 REV 61  06/14 A. INTRODUCTION Prompt alerting and notification of the public within the plume exposure pathway EPZ is the obligation of State and  
 
local government or other responsible authority. The  
 
responsibility that means exist for this purpose rests with  
 
Southern Nuclear Operating Company. An overview of these  
 
means excluding the Savannah River Site is given in this  
 
Appendix.  
 
Initial notification of the public will occur in a manner
 
consistent with assuring the public health and safety. The
 
design objective for the system is to meet the acceptance
 
criteria which are provided in a subsequent section of this
 
Appendix. The design objective does not constitute a
 
guarantee that prompt notification can be provided for
 
everyone with 100% assurance, or that the system when tested
 
under actual field conditions will meet the design objective
 
in all cases.
 
In the event of an emergency the Emergency Director at VEGP
 
is responsible for notifying appropriate State and local
 
response organizations, plant emergency personnel, and DOE's
 
Savannah River Site. The initiating conditions for each
 
emergency class are delineated in Section D in the main body
 
of this emergency plan. The capability for 24-hour-per-day
 
alerting and notification of offsite response organizations
 
and plant emergency personnel is described in Section E.
 
Prompt alerting and notification of the public within the
 
plume exposure pathway EPZ will be accomplished by a
 
combination of several means. Initial alerting will be made
 
primarily by both tone-alert radios and a system of fixed
 
sirens. Those who are not alerted by the primary means will
 
be alerted by vehicles or boats equipped with sirens, and/or
 
loudspeakers, or by door to door contact. Having been
 
alerted, the public will turn on their radio or television to
 
receive additional instructions from the Emergency Alert
 
System (EAS). A full Alert and Notification System (ANS) description is provided in the FEMA approved Alert and Notification System Design Report (ANS-VEGP-001) located in the SNC document management system.
B. CONCEPT OF OPERATIONS In the event of a serious emergency at VEGP, the primary
 
means for alerting and providing initial instructions to the
 
public will be by a combination of tone-alert radios and a
 
system of fixed sirens. The specific tone-alert radio system
 
to be employed is the National Oceanic and Atmospheric
 
Administration's (NOAA) Alert System. The National Weather
 
Service (NWS) has agreed to activate the NOAA tone alert
 
radio system in the plant vicinity when required by
 
appropriate governmental officials. This means of
 
notification is available 24 hours per day.
3-2 REV 19  1/94 The tone-alert radios will broadcast an acoustic alerting signal immediately followed by a vocal emergency message. 
 
The initial message will state that an emergency condition
 
exists at VEGP and will also advise of any appropriate
 
instructions for protective actions. NOAA will periodically
 
broadcast short, updated messages as warranted. 
 
The siren system consists of a network of 47 rotating
 
electronic sirens mounted on poles strategically located
 
throughout the populated area of the plume exposure EPZ. 
 
Based upon Appendix 3 of NUREG-0654 and FEMA REP-10, the
 
system is designed to provide a minimum of 60 dBC coverage to
 
all residences within the plume exposure EPZ, plus adequate
 
coverage for people outdoors in all other areas of the plume exposure EPZ open to the public.
 
The locations and design coverage contours of the sirens are
 
shown on the attached map labeled "Figure 3-1, 60 and 50 dBC
 
Siren Design Coverage Contours."
 
Anyone not notified by the primary means will be notified by
 
using State and local resources on an as needed and/or as
 
available basis. These resources consist of the following: 
: 1. Vehicles ready for immediate dispatch are equipped with sirens and/or loudspeakers. In Georgia these vehicles
 
will be dispatched upon request of the Burke County EMA
 
Director (initially) or upon request of the senior GEMA
 
representative when he arrives at the FEOC. The EMA
 
Director, having either made the decision himself or
 
having been requested by GEMA, will direct the Burke
 
County Central Dispatcher (in the Burke County EOC) to
 
dispatch the desired vehicles. This is a 24-hour
 
capability. These vehicles will be supplied by the
 
Burke County Sheriff's Department and/or the County
 
Emergency Management Agency, both located in Waynesboro,
 
Georgia. The central dispatcher has direct radio
 
contact with the Burke County EMA vehicles, and will
 
contact Sheriff's vehicles by radio either directly or
 
through the Sheriff's dispatcher. Additional vehicles
 
will be provided by the Georgia State Patrol barracks
 
located in Sylvania, Georgia (Post 21) which can also be
 
contacted by radio from the Central Dispatcher in the
 
Burke County EOC.
3-3 REV 5  2/86 In South Carolina, vehicles will be dispatched upon request of the senior official in charge of the respective county's emergency operation center; or if the SEOC or FEOC is operational, when requested by the senior state official. Dispatch of the vehicles is a 24-hour capability and will be made through the sheriff's dispatcher of the respective county. Because any people located in the Barnwell County portion of the plume exposure pathway EPZ are accessible only through Allendale County, Allendale County warning teams will have primary responsibility to warn the Barnwell populace.
Barnwell County will provide backup warning teams if necessary. Vehicles will be supplied by the respective county sheriff's department.
: 2. Boats equipped with a voice or sound device will notify sportsmen or recreationers on the Savannah River. These boats will be supplied locally by the
 
Georgia Department of Natural Resources-Law
 
Enforcement Section and the Burke County Emergency
 
Management Agency and are stationed in Waynesboro.
 
They will be dispatched by the Burke County Central
 
Dispatcher, at the direction of the EMA Director.
 
This is a 24-hour capability. For the DNR boat, the
 
dispatcher will radio or telephone the Resident
 
Ranger in Waynesboro. The dispatcher has direct
 
radio contact with County EMA personnel to access
 
the EMA boat. The boats will usually be launched
 
from the Georgia Power Company boat ramp at Plant
 
Vogtle. From this point, the boats will be sent up
 
and downstream, depending upon the plume pathway, to
 
the boundaries of the plume EPZ. The boats will be
 
prepositioned at the boat ramp at an Alert or higher
 
classification to await orders to launch.
 
Notification of persons on the river will be
 
coordinated with the South Carolina Department of
 
Wildlife. 
: 3. Door-to-door contact may be conducted in acute areas. This will be done as deemed necessary by
 
offsite authorities. It might be carried out after
 
completion of a portion of Item No. 1 above in
 
conjunction with confirmation of evacuation. 
 
3-4 REV 56  09/10 Detailed information and instructions will be provided on local EAS radio and television stations. Seven commercial
 
radio stations and three commercial television stations whose
 
broadcasts are received in the plume exposure pathway EPZ
 
have agreed to broadcast emergency instructions and
 
information in cooperation with offsite officials. Each of
 
these stations is a member of the EAS. Not all of these
 
stations broadcast 24 hours per day. In the event of an


Initial notification of the public will occur in a manner consistent with assuring the public health and safety. The design objective for the system is to meet the acceptance criteria which are provided in a subsequent section of this Appendix. The design objective does not constitute a guarantee that prompt notification can be provided for everyone with 100% assurance, or that the system when tested under actual field conditions will meet the design objective in all cases.
emergency, the stations have agreed to come on the air; their FCC licenses permit off hour broadcasts in case of an


In the event of an emergency the Emergency Director at VEGP is responsible for notifying appropriate State and local response organizations, plant emergency personnel, and DOE's Savannah River Site. The initiating conditions for each emergency class are delineated in Section D in the main body of this emergency plan. The capability for 24-hour-per-day alerting and notification of offsite response organizations and plant emergency personnel is described in Section E.
emergency. Most stations expect to be ready for broadcasting


Prompt alerting and notification of the public within the plume exposure pathway EPZ will be accomplished by a combination of several means. Initial alerting will be made primarily by both tone-alert radios and a system of fixed sirens. Those who are not alerted by the primary means will be alerted by vehicles or boats equipped with sirens, and/or loudspeakers, or by door to door contact. Having been alerted, the public will turn on their radio or television to receive additional instructions from the Emergency Alert System (EAS). A full Alert and Notification System (ANS) description is provided in the FEMA approved Alert and Notification System Design Report (ANS-VEGP-001) located in the SNC document management system. B. CONCEPT OF OPERATIONS  In the event of a serious emergency at VEGP, the primary means for alerting and providing initial instructions to the public will be by a combination of tone-alert radios and a system of fixed sirens. The specific tone-alert radio system to be employed is the National Oceanic and Atmospheric Administration's (NOAA) Alert System. The National Weather Service (NWS) has agreed to activate the NOAA tone alert radio system in the plant vicinity when required by appropriate governmental officials. This means of notification is available 24 hours per day.
in approximately one-half hour following notification.  
3-2 REV 19  1/94 The tone-alert radios will broadcast an acoustic alerting signal immediately followed by a vocal emergency message.
The initial message will state that an emergency condition exists at VEGP and will also advise of any appropriate instructions for protective actions. NOAA will periodically broadcast short, updated messages as warranted.  


The siren system consists of a network of 47 rotating electronic sirens mounted on poles strategically located throughout the populated area of the plume exposure EPZ.
These continuing instructions will provide more specific or
Based upon Appendix 3 of NUREG-0654 and FEMA REP-10, the system is designed to provide a minimum of 60 dBC coverage to all residences within the plume exposure EPZ, plus adequate coverage for people outdoors in all other areas of the plume exposure EPZ open to the public.


The locations and design coverage contours of the sirens are shown on the attached map labeled "Figure 3-1, 60 and 50 dBC Siren Design Coverage Contours."
detailed information of any protective actions advised for


Anyone not notified by the primary means will be notified by using State and local resources on an as needed and/or as available basis. These resources consist of the following: 
affected areas. Information on the nature of the accident,  
: 1. Vehicles ready for immediate dispatch are equipped with sirens and/or loudspeakers. In Georgia these vehicles will be dispatched upon request of the Burke County EMA Director (initially) or upon request of the senior GEMA representative when he arrives at the FEOC. The EMA Director, having either made the decision himself or having been requested by GEMA, will direct the Burke County Central Dispatcher (in the Burke County EOC) to dispatch the desired vehicles. This is a 24-hour capability. These vehicles will be supplied by the Burke County Sheriff's Department and/or the County Emergency Management Agency, both located in Waynesboro, Georgia. The central dispatcher has direct radio contact with the Burke County EMA vehicles, and will contact Sheriff's vehicles by radio either directly or through the Sheriff's dispatcher. Additional vehicles will be provided by the Georgia State Patrol barracks located in Sylvania, Georgia (Post 21) which can also be contacted by radio from the Central Dispatcher in the Burke County EOC.
3-3 REV 5  2/86  In South Carolina, vehicles will be dispatched upon request of the senior official in charge of the respective county's emergency operation center; or if the SEOC or FEOC is operational, when requested by the senior state official. Dispatch of the vehicles is a 24-hour capability and will be made through the sheriff's dispatcher of the respective county. Because any people located in the Barnwell County portion of the plume exposure pathway EPZ are accessible only through Allendale County, Allendale County warning teams will have primary responsibility to warn the Barnwell populace. Barnwell County will provide backup warning teams if necessary. Vehicles will be supplied by the respective county sheriff's department. 2. Boats equipped with a voice or sound device will notify sportsmen or recreationers on the Savannah River. These boats will be supplied locally by the Georgia Department of Natural Resources-Law Enforcement Section and the Burke County Emergency Management Agency and are stationed in Waynesboro.
They will be dispatched by the Burke County Central Dispatcher, at the direction of the EMA Director.
This is a 24-hour capability. For the DNR boat, the dispatcher will radio or telephone the Resident Ranger in Waynesboro. The dispatcher has direct radio contact with County EMA personnel to access the EMA boat. The boats will usually be launched from the Georgia Power Company boat ramp at Plant Vogtle. From this point, the boats will be sent up and downstream, depending upon the plume pathway, to the boundaries of the plume EPZ. The boats will be prepositioned at the boat ramp at an Alert or higher classification to await orders to launch.
Notification of persons on the river will be coordinated with the South Carolina Department of Wildlife. 3. Door-to-door contact may be conducted in acute areas. This will be done as deemed necessary by offsite authorities. It might be carried out after completion of a portion of Item No. 1 above in conjunction with confirmation of evacuation.
3-4 REV 56  09/10 Detailed information and instructions will be provided on local EAS radio and television stations. Seven commercial radio stations and three commercial television stations whose broadcasts are received in the plume exposure pathway EPZ have agreed to broadcast emergency instructions and information in cooperation with offsite officials. Each of these stations is a member of the EAS. Not all of these stations broadcast 24 hours per day. In the event of an emergency, the stations have agreed to come on the air; their FCC licenses permit off hour broadcasts in case of an emergency. Most stations expect to be ready for broadcasting in approximately one-half hour following notification.


These continuing instructions will provide more specific or detailed information of any protective actions advised for affected areas. Information on the nature of the accident, on any releases, and on the progress in ameliorating or terminating the emergency event will also be provided periodically on the commercial stations, along with a prognosis for escalation or termination of the event.
on any releases, and on the progress in ameliorating or  
C. CRITERIA FOR ACCEPTANCE 1. Within the plume exposure pathway EPZ, the prompt alerting and notification system will provide an alerting signal and notification by NOAA radio and an alerting signal by fixed sirens; further notification will also be provided by local commercial radio and television stations which will be activated via EAS. 2. The minimum acceptable design objectives for coverage by the system are: a) Capability for both an alerting signal and an informational or instructional message to the population on an area-wide basis throughout the plume exposure pathway EPZ, within 15 minutes. b) The initial notification system will assure direct coverage of essentially 100% of the population within five miles of the site. c) Special arrangements will be made to assure 100% coverage, within 45 minutes, of the population who may not have received the initial notification within the entire plume exposure pathway EPZ. People in remote areas, such as those engaged in hunting and fishing, will be reached by the fixed siren system.
3-5 REV 52  12/08  Assurance of continued notification capability will be verified on a statistical basis similar to engineering calculation DOEJ-HX2008100234-M001. Periodically, perhaps in conjunction with an exercise at VEGP, the public alert and notification system will be activated; Southern Nuclear Operating Company, and/or the State and local governments will survey a sample of the residents in the plume exposure pathway EPZ. The survey results shall be used to assess the public's ability to hear the alerting signal and their awareness of the meaning of the prompt notification message, as well as the availability of information on what to do in an emergency. In response to the findings of these surveys, appropriate corrective measures will be taken to provide reasonable assurance that the required coverage is maintained. 3. Local and State agencies have the capability to provide information promptly over local commercial radio and television at the time of the activation of the alerting signal. An agreement has been made with NOAA; arrangements have been made with local commercial radio and television stations. Authority for activation of the EAS, whereby designated governmental officials are permitted to issue emergency information and instruction in threatened or actual emergencies, is given by 47CFR part 11, EAS Rules. D. PHYSICAL IMPLEMENTATION In the event of an emergency, Vogtle Electric Generating Plant (VEGP) has developed and will maintain plans, systems, procedures and relationships that are effective in notifying appropriate governmental and other responsible authorities.
These authorities will have available to them the means for alerting and notifying the general public, and for advising of appropriate responses by the public.


The communications system between the plant and the responsible authorities (Federal, State and local) features the following capabilities:
terminating the emergency event will also be provided
a) Twenty-four hour coverage at VEGP and at the primary points to receive and act upon notification. b) Section D of the main body of this emergency plan describes the conditions for assured dissemination of alerting and warning information by VEGP to appropriate State and local warning points, Section E describes the methods and procedures for notifying these warning points. Communications equipment is described in Section F.
3-6 REV 31  12/00 c) VEGP assumes primary responsibility for net control since effectively all of the emergency information originates at VEGP. Notification of VEGP response personnel is described in Section E of the main body of this emergency plan.
Notification of the response personnel of the State and local response organization is described in their respective emergency plans.


Southern Nuclear Operating Company in conjunction with Georgia Power Company provides NOAA radio receivers for all known establishments (residence, businesses, schools, etc.)
periodically on the commercial stations, along with a  
within the plume exposure pathway EPZ who choose to accept them. The radios are distributed by the SNC Emergency Communications staff. During the distribution to those accepting the radios, a brochure is handed out.


The brochure distributed with the radios is entitled "Questions and Answers About Your Plant Vogtle NOAA Weather Radio."  That brochure will be redistributed on an annual basis to NOAA recipients. This brochure includes the following information:
prognosis for escalation or termination of the event. 
 
C. CRITERIA FOR ACCEPTANCE
: 1. Within the plume exposure pathway EPZ, the prompt alerting and notification system will provide an alerting signal and notification by NOAA radio and
 
an alerting signal by fixed sirens; further
 
notification will also be provided by local
 
commercial radio and television stations which will
 
be activated via EAS. 
: 2. The minimum acceptable design objectives for coverage by the system are:
a) Capability for both an alerting signal and an informational or instructional message to the
 
population on an area-wide basis throughout the
 
plume exposure pathway EPZ, within 15 minutes.
b) The initial notification system will assure direct coverage of essentially 100% of the
 
population within five miles of the site.
c) Special arrangements will be made to assure 100%
coverage, within 45 minutes, of the population
 
who may not have received the initial
 
notification within the entire plume exposure
 
pathway EPZ. People in remote areas, such as those engaged in hunting and fishing, will be reached by the fixed
 
siren system.
3-5 REV 52  12/08 Assurance of continued notification capability will be verified on a statistical basis similar to engineering calculation DOEJ-HX2008100234-M001.
Periodically, perhaps in conjunction with an exercise at VEGP, the public alert and notification
 
system will be activated; Southern Nuclear Operating
 
Company, and/or the State and local governments will
 
survey a sample of the residents in the plume
 
exposure pathway EPZ. The survey results shall be used to assess the public's ability to hear the
 
alerting signal and their awareness of the meaning
 
of the prompt notification message, as well as the
 
availability of information on what to do in an
 
emergency. In response to the findings of these
 
surveys, appropriate corrective measures will be
 
taken to provide reasonable assurance that the
 
required coverage is maintained.
: 3. Local and State agencies have the capability to provide information promptly over local commercial
 
radio and television at the time of the activation
 
of the alerting signal. An agreement has been made
 
with NOAA; arrangements have been made with local
 
commercial radio and television stations. Authority
 
for activation of the EAS, whereby designated
 
governmental officials are permitted to issue
 
emergency information and instruction in threatened
 
or actual emergencies, is given by 47CFR part 11,
 
EAS Rules.
D. PHYSICAL IMPLEMENTATION In the event of an emergency, Vogtle Electric Generating Plant (VEGP) has developed and will maintain plans, systems,
 
procedures and relationships that are effective in notifying
 
appropriate governmental and other responsible authorities.
 
These authorities will have available to them the means for
 
alerting and notifying the general public, and for advising
 
of appropriate responses by the public.
 
The communications system between the plant and the
 
responsible authorities (Federal, State and local) features
 
the following capabilities:
 
a) Twenty-four hour coverage at VEGP and at the primary points to receive and act upon notification.
b) Section D of the main body of this emergency plan describes the conditions for assured dissemination
 
of alerting and warning information by VEGP to
 
appropriate State and local warning points, Section
 
E describes the methods and procedures for notifying
 
these warning points. Communications equipment is
 
described in Section F.
3-6 REV 31  12/00 c) VEGP assumes primary responsibility for net control since effectively all of the emergency information originates at VEGP.
Notification of VEGP response personnel is described in
 
Section E of the main body of this emergency plan. 
 
Notification of the response personnel of the State and local
 
response organization is described in their respective
 
emergency plans.
 
Southern Nuclear Operating Company in conjunction with
 
Georgia Power Company provides NOAA radio receivers for all
 
known establishments (residence, businesses, schools, etc.)
 
within the plume exposure pathway EPZ who choose to accept
 
them. The radios are distributed by the SNC Emergency Communications staff. During the distribution to those
 
accepting the radios, a brochure is handed out.
 
The brochure distributed with the radios is entitled  
 
"Questions and Answers About Your Plant Vogtle NOAA Weather  
 
Radio."  That brochure will be redistributed on an annual  
 
basis to NOAA recipients. This brochure includes the  
 
following information:
* What is NOAA.
* What is NOAA.
* Why NOAA radios are provided.
* Why NOAA radios are provided.
Line 103: Line 462:
* Backup battery power for power failures.
* Backup battery power for power failures.
* What to do if the NOAA radio doesn't work.
* What to do if the NOAA radio doesn't work.
* How to replace radio batteries. A public information calendar entitled "The Plant Vogtle Emergency Information Calendar" will be distributed on an annual basis to the NOAA radio recipients.
* How to replace radio batteries.
A public information calendar entitled "The Plant Vogtle  


Both the brochure and the calendar advise residents to contact VEGP or their local EMA if their radio is defective. The telephone number and address of both offices are provided in each brochure. SNC will replace any defective radios upon request or discovery that the radios are defective. SNC will also annually distribute replacement batteries to all recipients of tone alert radios.  
Emergency Information Calendar" will be distributed on an
 
annual basis to the NOAA radio recipients.
 
Both the brochure and the calendar advise residents to  
 
contact VEGP or their local EMA if their radio is defective.
The telephone number and address of both offices are provided  
 
in each brochure. SNC will replace any defective radios upon request or discovery that the radios are defective. SNC will also annually distribute replacement batteries to all  
 
recipients of tone alert radios.  


SNC will maintain a register of all radio recipients.
SNC will maintain a register of all radio recipients.
3-7 REV 31  12/00 The electric service to all Burke County recipients within the plume EPZ is provided by either Georgia Power Company or the Planters Electric Membership Corporation (EMC). Planters EMC has agreed to provide information monthly to the Emergency Communications staff concerning any persons requesting new electric service or disconnection of existing electric service.   
3-7 REV 31  12/00 The electric service to all Burke County recipients within the plume EPZ is provided by either Georgia Power Company or  
 
the Planters Electric Membership Corporation (EMC). Planters  
 
EMC has agreed to provide information monthly to the Emergency Communications staff concerning any persons requesting new electric service or disconnection of existing  
 
electric service.   
 
The Emergency Communications staff uses that information,
 
together with its knowledge of its own electrical hookups or
 
disconnections in the Georgia plume EPZ, to identify new
 
residents. The Emergency Communications staff distributes
 
tone alert radios to any new residents and updates the
 
register of radio recipients periodically. 
 
The Emergency Communications staff also determines whether
 
there are any permanent Burke County plume EPZ residents
 
without electricity. A list of these residents is
 
maintained. A survey of the Burke County portion of the
 
plume EPZ will be made annually by the Emergency
 
Communications staff to assure that the list of any such
 
residents is current. This updated list is provided to the
 
Burke County EMA director. The primary means of notification
 
for these residents will be the siren system.
 
The recipients of tone-alert radios in the South Carolina


The Emergency Communications staff uses that information, together with its knowledge of its own electrical hookups or disconnections in the Georgia plume EPZ, to identify new residents. The Emergency Communications staff distributes tone alert radios to any new residents and updates the register of radio recipients periodically. 
portion of the plume EPZ are so few that similar indirect


The Emergency Communications staff also determines whether there are any permanent Burke County plume EPZ residents without electricity. A list of these residents is maintained. A survey of the Burke County portion of the plume EPZ will be made annually by the Emergency Communications staff to assure that the list of any such residents is current. This updated list is provided to the Burke County EMA director. The primary means of notification for these residents will be the siren system.
methods for checking the distribution of radios are not


The recipients of tone-alert radios in the South Carolina portion of the plume EPZ are so few that similar indirect methods for checking the distribution of radios are not necessary. Rather, annual surveys of the entire South Carolina portion of the plume EPZ will be made directly by the Emergency Communications Staff. 
necessary. Rather, annual surveys of the entire South  


The tone alert radios are routinely tested by the National Weather Service every Wednesday around noon unless severe weather is threatening. The effectiveness of the tone alert radios will be tested and evaluated at least once a year per procedure 91706-C, Alert Notification System. 
Carolina portion of the plume EPZ will be made directly by


The testing and maintenance of the public alerting sirens in the VEGP EPZ are the responsibility of VEGP. The maintenance program will consist of both periodic routine checks and, as required, corrective maintenance. The actual performance of these maintenance actions will be conducted by Southern Company Services maintenance personnel or contract personnel.
the Emergency Communications Staff.  
In either case, this program will be under the direction of the VEGP emergency preparedness coordinator.  


The periodic routine maintenance program will be based on the manufacturers' recommendations and experience gained with the installation. It will consist of quarterly inspections to verify the proper physical condition of each siren location and checks to verify the proper operation of each location utilizing the built-in test and monitoring features of this system.
The tone alert radios are routinely tested by the National
3-8 REV 38  05/05 The periodic test program will consist of a weekly silent test, from the county activation points, and an annual full scale activation of the system.


The weekly silent test will consist of activation of the siren from the County EOC. Each siren location is activated and responds in the normal manner, with the exception that the radiated noise of the siren is above the normal audible range and is therefore silent. Proper activation of each siren is confirmed utilizing a monitoring system. This monitoring system verifies the proper activation of the major components of the siren. 
Weather Service every Wednesday around noon unless severe


Once each year the system will be activated from the associated county EOC in the normal mode. Advance notice of the test will be provided to the public. Activation of each siren will be verified by the WSMRFC. Reports of siren failures or inadequate coverage will be investigated by VEGP.
weather is threatening. The effectiveness of the tone alert


Unsatisfactory conditions detected by any means will be promptly repaired by Southern Company Services maintenance or contract personnel under the direction of the VEGP emergency preparedness coordinator.
radios will be tested and evaluated at least once a year per


GEMA and SC EMD procedures detail the process for activating the prompt notification system for VEGP and will contain messages for first alert, shelter notice, evacuation notice, and all clear.   
procedure 91706-C, Alert Notification System.   


Following initial notification of an emergency at VEGP by plant officials, GEMA and SCEPD will coordinate any decision to activate the prompt notification system. When a decision to activate the NOAA tone alert radios has been made, GEMA will request activation. 
The testing and maintenance of the public alerting sirens in


Authorization to activate the NOAA alert system for an emergency situation at VEGP rests with the GEMA director, executive director, and chief of operations. One of these individuals will instruct a GEMA staff officer (predesignated staff officers are listed by position and name in the GEMA's procedure) to initiate activation of the alert system. The GEMA staff officer will instruct the GEMA radio operator to call National Weather Service - of Columbia, (NWS-Columbia) for activation of the NOAA alert system and provide the radio operator with his phone number (EOC, FEOC, home). The radio operator will call the meteorologist-on-duty at NWS-Columbia using the National Warning System (NAWAS) circuit and request an emergency call to GEMA.
the VEGP EPZ are the responsibility of VEGP. The maintenance
3-9 REV 38  05/05 (If NAWAS malfunctions, GEMA will call the NWS on either a commercial phone number or their FTS phone number.)  The meteorologist-on-duty will call the GEMA radio operator on one of three numbers with patch call capability that are identified in GEMA's procedure. The GEMA radio operator will patch the Weather Service call through to the GEMA staff officer's phone number.


The GEMA staff officer will identify himself, and the NOAA operator will verify his name against the predesignated list in the GEMA procedure. 
program will consist of both periodic routine checks and, as


The GEMA staff officer will request activation of the NOAA alert system and specify the desired message to be broadcast by the tone-alert radios from the prescripted messages contained in the GEMA procedure which include pertinent information for South Carolina portions of the plume EPZ. He will also fill in any blanks in the prescripted message and specify the length of time the message is to automatically repeat. The entire activation process is estimated by GEMA to take 5 to 10 min starting at the time the decision to activate the prompt notification system is made.
required, corrective maintenance. The actual performance of  


Additional follow up messages which are not prescripted will be similarly activated. 
these maintenance actions will be conducted by Southern


Each position identified in these activation steps is either staffed or on-call 24 hr. a day. 
Company Services maintenance personnel or contract personnel.


The Burke County EMA director may request NOAA activation through GEMA. He also has the authority to request activation of the EAS. The Burke County EMA Director, or his designee, may activate the EAS by telephoning (commercial lines) either the EAS Control Station for the area, (WBBQ-FM Augusta) or any local radio or television station which is an EAS member. Each member station can notify the other member stations. Certain member stations operate 24 h per day, enabling activation regardless of the hour. The Burke County EOC communication facility will also have the ability to activate the EAS directly through a local radio station (WBRO); however this station does not operate 24 h per day.
In either case, this program will be under the direction of  
GEMA may also activate EAS by calling the same stations described above, or through WSB in Atlanta. 


Each of the three South Carolina counties within the plume EPZ may also activate the EAS system in the event of an immediate declaration of a Site Area Emergency or a General Emergency by VEGP and if the South Carolina SEOC is not yet operational. This activation can be made by telephoning (commercial lines) any EAS Control Station for the area (WAKN-FM, Aiken Common Program Control Station (CPCS-1);
the VEGP emergency preparedness coordinator.  
WTCB, Orangeburg Common Program Control Station (CPCS-1) or any local radio or television station which is an EAS member.  


3-10 REV 38  05/05 Fixed sirens are radio controlled by the county in which they are located. Forty-six of the sirens are controlled from the Burke County EOC. The remaining siren is controlled from the Barnwell County 911 Center. When a coordinated decision for activation of the prompt notification system has been made between GEMA and SCEMD, the respective state will instruct each affected county to activate its siren(s) at a predesignated time synchronized with NOAA radio and EAS activation. Each county may also activate its siren(s) when deemed necessary for protection of its populace if the states' EOC/FEOC are not yet activated. This siren activation would be synchronized with activation of the EAS directly by the county.   
The periodic routine maintenance program will be based on the
 
manufacturers' recommendations and experience gained with the
 
installation. It will consist of quarterly inspections to
 
verify the proper physical condition of each siren location
 
and checks to verify the proper operation of each location
 
utilizing the built-in test and monitoring features of this
 
system.
3-8 REV 38  05/05 The periodic test program will consist of a weekly silent test, from the county activation points, and an annual full
 
scale activation of the system.
 
The weekly silent test will consist of activation of the
 
siren from the County EOC. Each siren location is activated
 
and responds in the normal manner, with the exception that
 
the radiated noise of the siren is above the normal audible
 
range and is therefore silent. Proper activation of each
 
siren is confirmed utilizing a monitoring system. This monitoring system verifies the proper activation of the major
 
components of the siren. 
 
Once each year the system will be activated from the
 
associated county EOC in the normal mode. Advance notice of
 
the test will be provided to the public. Activation of each
 
siren will be verified by the WSMRFC. Reports of siren
 
failures or inadequate coverage will be investigated by VEGP.
 
Unsatisfactory conditions detected by any means will be
 
promptly repaired by Southern Company Services maintenance or
 
contract personnel under the direction of the VEGP emergency
 
preparedness coordinator.
 
GEMA and SC EMD procedures detail the process for activating the prompt notification system for VEGP and will contain
 
messages for first alert, shelter notice, evacuation notice,
 
and all clear. 
 
Following initial notification of an emergency at VEGP by
 
plant officials, GEMA and SCEPD will coordinate any decision
 
to activate the prompt notification system. When a decision
 
to activate the NOAA tone alert radios has been made, GEMA
 
will request activation. 
 
Authorization to activate the NOAA alert system for an
 
emergency situation at VEGP rests with the GEMA director,
 
executive director, and chief of operations. One of these
 
individuals will instruct a GEMA staff officer (predesignated
 
staff officers are listed by position and name in the GEMA's
 
procedure) to initiate activation of the alert system. The
 
GEMA staff officer will instruct the GEMA radio operator to
 
call National Weather Service - of Columbia, (NWS-Columbia)
 
for activation of the NOAA alert system and provide the radio
 
operator with his phone number (EOC, FEOC, home). The radio
 
operator will call the meteorologist-on-duty at NWS-Columbia
 
using the National Warning System (NAWAS) circuit and request
 
an emergency call to GEMA.
3-9 REV 38  05/05 (If NAWAS malfunctions, GEMA will call the NWS on either a commercial phone number or their FTS phone number.)  The
 
meteorologist-on-duty will call the GEMA radio operator on
 
one of three numbers with patch call capability that are
 
identified in GEMA's procedure. The GEMA radio operator will
 
patch the Weather Service call through to the GEMA staff
 
officer's phone number.
 
The GEMA staff officer will identify himself, and the NOAA
 
operator will verify his name against the predesignated list
 
in the GEMA procedure. 
 
The GEMA staff officer will request activation of the NOAA
 
alert system and specify the desired message to be broadcast
 
by the tone-alert radios from the prescripted messages
 
contained in the GEMA procedure which include pertinent
 
information for South Carolina portions of the plume EPZ. He
 
will also fill in any blanks in the prescripted message and
 
specify the length of time the message is to automatically
 
repeat. The entire activation process is estimated by GEMA
 
to take 5 to 10 min starting at the time the decision to
 
activate the prompt notification system is made.
 
Additional follow up messages which are not prescripted will
 
be similarly activated. 
 
Each position identified in these activation steps is either
 
staffed or on-call 24 hr. a day. 
 
The Burke County EMA director may request NOAA activation
 
through GEMA. He also has the authority to request
 
activation of the EAS. The Burke County EMA Director, or his
 
designee, may activate the EAS by telephoning (commercial
 
lines) either the EAS Control Station for the area, (WBBQ-FM
 
Augusta) or any local radio or television station which is an
 
EAS member. Each member station can notify the other member
 
stations. Certain member stations operate 24 h per day,
 
enabling activation regardless of the hour. The Burke County
 
EOC communication facility will also have the ability to
 
activate the EAS directly through a local radio station
 
(WBRO); however this station does not operate 24 h per day. 
 
GEMA may also activate EAS by calling the same stations
 
described above, or through WSB in Atlanta. 
 
Each of the three South Carolina counties within the plume
 
EPZ may also activate the EAS system in the event of an
 
immediate declaration of a Site Area Emergency or a General
 
Emergency by VEGP and if the South Carolina SEOC is not yet operational. This activation can be made by telephoning
 
(commercial lines) any EAS Control Station for the area
 
(WAKN-FM, Aiken Common Program Control Station (CPCS-1);
 
WTCB, Orangeburg Common Program Control Station (CPCS-1) or
 
any local radio or television station which is an EAS member.
 
3-10 REV 38  05/05 Fixed sirens are radio controlled by the county in which they are located. Forty-six of the sirens are controlled from the  
 
Burke County EOC. The remaining siren is controlled from the  
 
Barnwell County 911 Center. When a coordinated decision for  
 
activation of the prompt notification system has been made  
 
between GEMA and SCEMD, the respective state will instruct each affected county to activate its siren(s) at a  
 
predesignated time synchronized with NOAA radio and EAS  
 
activation. Each county may also activate its siren(s) when  
 
deemed necessary for protection of its populace if the  
 
states' EOC/FEOC are not yet activated. This siren activation  
 
would be synchronized with activation of the EAS directly by  
 
the county.   


REV 7     
REV 7     


FIGURE 3-1 60 and 50 dBC Siren Design Coverage Contours This figure is available in hard copy only. See Christopher E. Boone, Emergency Planning Coordinator, (205) 992-6635.
FIGURE 3-1 60 and 50 dBC Siren Design Coverage Contours This figure is available in hard copy only.
REV 0 11/30/84 APPENDIX 4 EMERGENCY EQUIPMENT LISTS 4-1 REV 60  07/13 TABLE 4-1 CONTROL ROOM/TSC EMERGENCY EQUIPMENT (TYPICAL)  
See Christopher E. Boone, Emergency Planning Coordinator, (205) 992-6635.  
: 1. Survey meters:  Ion chamber, minimum range 0-50 R/h; Frisker, minimum range 0-50 k cpm 2. Dosimeters (0-99.99 Rem) 3. OSLDs 4. Air sampler  
 
REV 0 11/30/84 APPENDIX 4 EMERGENCY EQUIPMENT LISTS 4-1 REV 60  07/13 TABLE 4-1 CONTROL ROOM/TSC EMERGENCY EQUIPMENT (TYPICAL)  
: 1. Survey meters:  Ion chamber, minimum range 0-50 R/h; Frisker, minimum range 0-50 k cpm 2. Dosimeters (0-99.99 Rem)  
: 3. OSLDs 4. Air sampler  
: 5. Silver zeolite cartridges for air sampler  
: 5. Silver zeolite cartridges for air sampler  
: 6. Particulate filter papers for air sampler  
: 6. Particulate filter papers for air sampler  
Line 184: Line 791:
: 29. Check sources  
: 29. Check sources  


4-2 REV 49 08/08 TABLE 4-2 EOF EMERGENCY EQUIPMENT (TYPICAL)   EOF Supplies 1. First aid kit 2. Flashlights 3. Clipboards, writing materials, and secretarial supplies  
4-2 REV 49 08/08 TABLE 4-2 EOF EMERGENCY EQUIPMENT (TYPICAL)
EOF Supplies
: 1. First aid kit  
: 2. Flashlights 3. Clipboards, writing materials, and secretarial supplies  
: 4. Area maps  
: 4. Area maps  


4-3 REV 25  4/97 TABLE 4-3 EMERGENCY FIELD MONITORING KITS (3) (TYPICAL)  
4-3 REV 25  4/97 TABLE 4-3 EMERGENCY FIELD MONITORING KITS (3) (TYPICAL)
: 1. Ion chamber survey meter minimum range 0-5 R/h 2. Frisker minimum range 0-5 k cpm 3. Dosimeters (0-99.99 Rem) 4. Air sampler 5. Silver zeolite cartridges for air sampler 6. Particulate filter papers for air sampler 7. Sample counting equipment 8. Field monitoring log forms 9. Area and road maps 10. Clipboard and writing materials 11. Radios 12. Smears 13. Plastic bags 14. Soil scoop 15. Knife 16. 1-liter bottles 17. Tape 18. Cotton gloves and rubber gloves 19. Protective clothing 20. First aid kit 21. Flashlight 22. Calculator 23. Tape measure 24. Stop watch 25. Respirators 4-4 REV 60  07/13 TABLE 4-4 OSC EMERGENCY EQUIPMENT (TYPICAL)  
: 1. Ion chamber survey meter minimum range 0-5 R/h 2. Frisker minimum range 0-5 k cpm 3. Dosimeters (0-99.99 Rem) 4. Air sampler 5. Silver zeolite cartridges for air sampler 6. Particulate filter papers for air sampler 7. Sample counting equipment 8. Field monitoring log forms 9. Area and road maps 10. Clipboard and writing materials  
: 1. Survey meters:  Ion chamber, minimum range 0-50 R/h; Frisker, minimum range 0-50 k cpm 2. Dosimeters (0-99.99 Rem) 3. OSLDs 4. Air sampler  
: 11. Radios  
: 12. Smears 13. Plastic bags 14. Soil scoop  
: 15. Knife 16. 1-liter bottles  
: 17. Tape 18. Cotton gloves and rubber gloves 19. Protective clothing 20. First aid kit  
: 21. Flashlight  
: 22. Calculator 23. Tape measure 24. Stop watch  
: 25. Respirators  
 
4-4 REV 60  07/13 TABLE 4-4 OSC EMERGENCY EQUIPMENT (TYPICAL)  
: 1. Survey meters:  Ion chamber, minimum range 0-50 R/h; Frisker, minimum range 0-50 k cpm 2. Dosimeters (0-99.99 Rem)  
: 3. OSLDs 4. Air sampler  
: 5. Silver zeolite cartridges for air sampler  
: 5. Silver zeolite cartridges for air sampler  
: 6. Particulate filter papers for air sampler  
: 6. Particulate filter papers for air sampler  
Line 214: Line 834:
: 27. Potassium iodide  
: 27. Potassium iodide  
: 28. Data forms  
: 28. Data forms  
: 29. Clipboards, writing materials, and secretarial supplies 4-5 REV 60  07/13 TABLE 4-5   MAIN CONTROL POINT OR HP ROOM EMERGENCY EQUIPMENT (TYPICAL) 1. Survey meters:  Ionization chamber, minimum range 0-50 R/h; Frisker, minimum range 0-50 k cpm 2. Dosimeters (0-99.99 Rem) 3. OSLDs 4. Air sampler  
: 29. Clipboards, writing materials, and secretarial supplies 4-5 REV 60  07/13 TABLE 4-5 MAIN CONTROL POINT OR HP ROOM EMERGENCY EQUIPMENT (TYPICAL)  
: 1. Survey meters:  Ionization chamber, minimum range 0-50 R/h; Frisker, minimum range 0-50 k cpm 2. Dosimeters (0-99.99 Rem)  
: 3. OSLDs 4. Air sampler  
: 5. Silver zeolite cartridges for air sampler  
: 5. Silver zeolite cartridges for air sampler  
: 6. Particulate filter papers for air sampler  
: 6. Particulate filter papers for air sampler  
Line 240: Line 862:
: 28. Clipboards, writing materials, and secretarial supplies  
: 28. Clipboards, writing materials, and secretarial supplies  


4-6 REV 60  07/13 TABLE 4-6 DECONTAMINATION EMERGENCY EQUIPMENT KIT (TYPICAL)  
4-6 REV 60  07/13 TABLE 4-6 DECONTAMINATION EMERGENCY EQUIPMENT KIT (TYPICAL)  
: 1. Ion chamber, minimum range 0-5 R/h 2. Frisker with probe, minimum range 0-50 k cpm  
: 1. Ion chamber, minimum range 0-5 R/h 2. Frisker with probe, minimum range 0-50 k cpm  
: 3. Smears  
: 3. Smears  
Line 266: Line 888:
: 26. Cotton swabs  
: 26. Cotton swabs  


4-7 REV 60  07/13 TABLE 4-7 OFFSITE AMBULANCE EMERGENCY EQUIPMENT  
4-7 REV 60  07/13 TABLE 4-7 OFFSITE AMBULANCE EMERGENCY EQUIPMENT  
: 1. Coveralls 2. Shoe covers  
: 1. Coveralls 2. Shoe covers  
: 3. Cotton gloves  
: 3. Cotton gloves  
Line 277: Line 899:
: 10. OSLDs(a) 11. Dosimeters (0-99.99 Rem)(a)  
: 10. OSLDs(a) 11. Dosimeters (0-99.99 Rem)(a)  
: 12. Radiation tape and tags  
: 12. Radiation tape and tags  
: a. Equipment supplied by personnel at Plant Entry and Security Building (PESB).
: a. Equipment supplied by personnel at Plant Entry and  
REV 0  11/30/84  
 
Security Building (PESB).
REV 0  11/30/84
 
APPENDIX 5 MEMORANDUM OF AGREEMENT WITH DEPARTMENT OF ENERGY - SAVANNAH RIVER 
 
REV 59    12/12
 
APPENDIX 6 EVACUATION TIME ESTIMATES FOR THE VOGTLE ELECTRIC GENERATING PLANT PLUME EXPOSURE PATHWAY EMERGENCY PLANNING ZONE


APPENDIX 5  MEMORANDUM OF AGREEMENT WITH DEPARTMENT OF ENERGY - SAVANNAH RIVER  
6-1 REV 64 3/15 Appendix 6 Evacuation Time Estimate In order to ensure the safety of the public living in the


REV 59    12/12 
vicinity of nuclear power plants in the nation, the U.S.


APPENDIX 6  EVACUATION TIME ESTIMATES FOR THE VOGTLE ELECTRIC GENERATING PLANT PLUME EXPOSURE PATHWAY EMERGENCY PLANNING ZONE 6-1 REV 64  3/15 Appendix 6 Evacuation Time Estimate  In order to ensure the safety of the public living in the vicinity of nuclear power plants in the nation, the U.S.
Nuclear Regulatory Commission (NRC) requires licensees to  
Nuclear Regulatory Commission (NRC) requires licensees to develop and update evacuation times estimates (ETEs) for areas within the emergency planning zone (EPZ). Updates are required following the availability of data from the decennial census (10 years) or when the sensitivity factor for changes in population within the EPZ has been exceeded.
This appendix contains information from the ETE update performed in 2012. ETE population reviews will be conducted annually. This update implements the requirements of the revised regulations relevant to ETE updates in accordance with the guidance provided in NUREG/CR-7002, Criteria for Development of Evacuation Time Estimate Studies and the requirements in 10 CFR 50, Appendix E, Sections IV.3 and IV.4.


Southern Nuclear Operating Company (SNC) contracted IEM to estimate evacuation times for the 2012 populations within the 10-mile plume exposure pathway emergency planning zone (EPZ) surrounding the Vogtle Electric Generating Plant (VEGP).
develop and update evacuation times estimates (ETEs) for
This appendix provides a summary of the final report describing the methods used to obtain population data and to estimate evacuation times and estimated population figures, evacuation road network information, and ETEs.


The report provides a breakdown of the population by geographic areas and protective action zones (PAZ).1  Four categories of population are identified in the report:
areas within the emergency planning zone (EPZ). Updates are
 
required following the availability of data from the
 
decennial census (10 years) or when the sensitivity factor
 
for changes in population within the EPZ has been exceeded. 
 
This appendix contains information from the ETE update
 
performed in 2012. ETE population reviews will be conducted annually. This update implements the requirements of the revised regulations relevant to ETE updates in accordance
 
with the guidance provided in NUREG/CR-7002, Criteria for
 
Development of Evacuation Time Estimate Studies and the requirements in 10 CFR 50, Appendix E, Sections IV.3 and
 
IV.4.
 
Southern Nuclear Operating Company (SNC) contracted IEM to
 
estimate evacuation times for the 2012 populations within the
 
10-mile plume exposure pathway emergency planning zone (EPZ)
 
surrounding the Vogtle Electric Generating Plant (VEGP). 
 
This appendix provides a summary of the final report
 
describing the methods used to obtain population data and to
 
estimate evacuation times and estimated population figures,
 
evacuation road network information, and ETEs.
 
The report provides a breakdown of the population by  
 
geographic areas and protective action zones (PAZ).
1  Four categories of population are identified in the report:
* Permanent residents.
* Permanent residents.
* Transient population.
* Transient population.
* Transit dependent permanent residents.
* Transit dependent permanent residents.
* Schools.
* Schools.  
The permanent resident population is made up of individuals residing in the 10-mile EPZ. The total year 2012 permanent resident populations within the 10-mile EPZ for VEGP are estimated to be 3,080. The transient population consists of workers employed within the area, recreational sportsmen, and visitors. The total peak transient population within the 10-mile EPZ is estimated to be 2,915. Only one school, Lord's House of Praise Christian School, was identified in the VEGP EPZ. IEM contacted the school to collect current enrollment, staff figures, and the evacuation plan. The total peak population for the school in the EPZ is estimated to be 70. Transit dependent permanent residents in the EPZ are estimated to be 29. This study also considered the voluntary evacuees, who are also known as shadow evacuees that reside within 10 to 15 miles from VEGP.                     1 NRC Criteria for Development of Evacuation Time Estimate Studies. NUREG/CR-7002. November 2011.
 
6-2 REV 61  06/14 IEM utilized a computer traffic simulation model, PTV Vision VISUM, to perform the ETE analyses. For the analyses, the 10-mile plume exposure pathway EPZ was divided into 19 unique geographic areas based on two-mile, five-mile, and ten-mile radius rings, the 16 22.5-degree PAZs, as well as keyhole and staged evacuation logic. In order to represent the most realistic emergency scenarios, evacuations for the 19 geographic evacuation areas were modeled individually for the midweek daytime, midweek - weekend evening, and weekend daytime scenarios. Each of these scenarios was then considered under both normal and adverse weather conditions using the 2012 population estimations. A total of 114 evacuation scenarios were considered as part of this study to represent different wind, temporal, seasonal and weather conditions.  
The permanent resident population is made up of individuals  
 
residing in the 10-mile EPZ. The total year 2012 permanent  
 
resident populations within the 10-mile EPZ for VEGP are  
 
estimated to be 3,080. The transient population consists of  
 
workers employed within the area, recreational sportsmen, and  
 
visitors. The total peak transient population within the  
 
10-mile EPZ is estimated to be 2,915. Only one school,  
 
Lord's House of Praise Christian School, was identified in  
 
the VEGP EPZ. IEM contacted the school to collect current  
 
enrollment, staff figures, and the evacuation plan. The  
 
total peak population for the school in the EPZ is estimated  
 
to be 70. Transit dependent permanent residents in the EPZ  
 
are estimated to be 29. This study also considered the  
 
voluntary evacuees, who are also known as shadow evacuees  
 
that reside within 10 to 15 miles from VEGP.  
 
1 NRC Criteria for Development of Evacuation Time Estimate Studies
. NUREG/CR-7002. November 2011.
6-2 REV 61  06/14 IEM utilized a computer traffic simulation model, PTV Vision VISUM, to perform the ETE analyses. For the analyses, the  
 
10-mile plume exposure pathway EPZ was divided into 19 unique geographic areas based on two-mile, five-mile, and ten-mile  
 
radius rings, the 16 22.5-degree PAZs, as well as keyhole and  
 
staged evacuation logic. In order to represent the most  
 
realistic emergency scenarios, evacuations for the 19 geographic evacuation areas were modeled individually for the  
 
midweek daytime, midweek - weekend evening, and weekend  
 
daytime scenarios. Each of these scenarios was then  
 
considered under both normal and adverse weather conditions  
 
using the 2012 population estimations. A total of 114 evacuation scenarios were considered as part of this study to  
 
represent different wind, temporal, seasonal and weather  
 
conditions.
 
Both 100% and 90% ETEs for each scenario were collected. The
 
100% ETEs for the evacuation areas ranged from 2 hours 10 minutes to 3 hours 25 minutes for the normal scenarios, and
 
from 2 hours 15 minutes to 3 hours 25 minutes for those occurring in adverse weather. The 90% ETEs for the
 
evacuation areas ranged from 1 hour 20 minutes to 2 hours 20
 
minutes for the normal scenarios, and from 1 hour 20 minutes
 
to 2 hours 25 minutes for those occurring in adverse weather.
 
The factors that contributed to the variations in EPEs
 
between scenarios include differences in the number of
 
evacuating vehicles, the capacity of the evacuation routes
 
used, or the distance from the origin zones to the EPZ
 
boundary.
 
Based on the data gathered and the results of the evacuation
 
simulations, the existing evacuation strategy was determined
 
to be functional for the 2012 conditions, given the lack of
 
severe congestion or very high ETEs. Recommendations were
 
provided for enhancements to improve the evacuation time
 
estimate.
 
Assumptions utilized in the ETE will be reviewed when
 
evaluating changes to roadways or evacuation networks to
 
ensure the results of the ETE remain valid. Changes in
 
population will be evaluated utilizing the sensitivity factor


Both 100% and 90% ETEs for each scenario were collected. The 100% ETEs for the evacuation areas ranged from 2 hours 10 minutes to 3 hours 25 minutes for the normal scenarios, and from 2 hours 15 minutes to 3 hours 25 minutes for those occurring in adverse weather. The 90% ETEs for the evacuation areas ranged from 1 hour 20 minutes to 2 hours 20 minutes for the normal scenarios, and from 1 hour 20 minutes to 2 hours 25 minutes for those occurring in adverse weather.  
developed during the ETE analysis.  


The factors that contributed to the variations in EPEs between scenarios include differences in the number of evacuating vehicles, the capacity of the evacuation routes used, or the distance from the origin zones to the EPZ boundary.
The full Evacuation Time Estimate was submitted for NRC


Based on the data gathered and the results of the evacuation simulations, the existing evacuation strategy was determined to be functional for the 2012 conditions, given the lack of severe congestion or very high ETEs. Recommendations were provided for enhancements to improve the evacuation time estimate.
review in accordance with NRC regulations Evacuation Time


Assumptions utilized in the ETE will be reviewed when evaluating changes to roadways or evacuation networks to ensure the results of the ETE remain valid. Changes in population will be evaluated utilizing the sensitivity factor developed during the ETE analysis.  
Estimate (ETE) Updates 10 CFR 50, Appendix E, Section IV.3.


The full Evacuation Time Estimate was submitted for NRC review in accordance with NRC regulations Evacuation Time Estimate (ETE) Updates 10 CFR 50, Appendix E, Section IV.3.
Following the NRC review, the results of the study and  
Following the NRC review, the results of the study and recommendations will be reviewed with applicable offsite agencies. The review will focus on the utilization of the results of the evacuation simulations provided in the ETE for comparison to existing protective action strategies.
 
Modifications, if any, will be incorporated as part of the ongoing emergency planning process. SNC will work with OROs and maintain a protective action strategy using the 6-3 REV 61  06/14 applicable portions of NUREG 0654 Supplement III.  (
recommendations will be reviewed with applicable offsite  
 
agencies. The review will focus on the utilization of the  
 
results of the evacuation simulations provided in the ETE for  
 
comparison to existing protective action strategies.
 
Modifications, if any, will be incorporated as part of the  
 
ongoing emergency planning process. SNC will work with OROs and maintain a protective action strategy using the 6-3 REV 61  06/14 applicable portions of NUREG 0654 Supplement III.   
(


==Reference:==
==Reference:==
Evacuation Time Estimates Update dated November 26, 2013 NL-13-2340; ETE Report ETE-VEGP-001; Annual ETE Review ETE-VEGP-002).
Evacuation Time Estimates Update dated November 26, 2013 NL-13-2340; ETE Report ETE-VEGP-001; Annual ETE Review ETE-VEGP-002).  
REV 38  05/05 APPENDIX 7 EMERGENCY OPERATIONS FACILITY 1 REV 38  05/05 A. INTRODUCTION A.1 PURPOSE The purpose of this appendix is to outline the function of the Emergency Operations Facility for the Southern Nuclear Operating Company (SNC). Additionally, this appendix delineates the actions to be taken by SNC Corporate Staff in the event of an emergency at any (SNC) site. A.2 SCOPE AND APPLICABILITY This appendix provides the framework for operations of the EOF for SNC. This appendix is an integral part of the site specific emergency plan(s). This appendix may be implemented to coordinate a SNC response to an emergency at any SNC facility or in response to a transportation accident involving radioactive material. Additionally, this appendix provides the mechanism for obtaining and providing additional emergency response support and resources to SNC site(s) in the event of an emergency. The SNC Corporate Staff will be responsible for offsite emergency response support and resources as requested. Overall management of the emergency will be accomplished at the specific site(s)[Vogtle Electric Generating Plant (VEGP), Hatch Nuclear Plant (HNP) and Farley Nuclear Plant (FNP)]. A.3 SUMMARY The site specific Emergency Plan, is activated by the Emergency Director (ED). Upon notification of an ALERT or higher classification or as directed by the ED, the EOF will be activated as described in emergency implementing procedures. When notified, the designated corporate emergency organization management report to the EOF to be briefed on current conditions and perform their assigned tasks. Each manager's support staff will operate from that group's office area. Offsite support personnel and equipment will be dispatched to the site Operations Support Center (OSC) or Technical Support Center (TSC) upon request from the specific site Emergency Director. The corporate emergency organization will provide offsite emergency response support and resources to SNC sites 24 hours per day until the emergency has been terminated.
 
2 REV 38  05/05 The EOF will be activated for an ALERT, a SITE AREA or GENERAL emergency classification. This facility will be operational within about an hour of the initial notification. SNC's goal is to begin notification of all required on-call Emergency Response Organization (ERO) personnel as soon as practicable, within 15 minutes, following the declaration of an Alert emergency or higher emergency classification at any SNC site. Minimum EOF staff for facility activation will include the EOF Manager, the Dose Assessment Supervisor, the Dose Analyst, the Field Team Coordinator, the ENN Communicator, and the Licensing Support Coordinator. Access control for the EOF is established through the use of electronic card readers. During the emergency, the emergency director will normally be located in either the TSC or Control Room at his/her option. The emergency director is responsible for the management of the emergency response. Specific duties and responsibilities are provided in the site specific Emergency Plan and Emergency Plan Implementing Procedures. SNC has taken precautions to ensure that the EOF can be quickly accessed and made operational within about an hour of the initial notification and is safe-guarded against unauthorized personnel. The common EOF is located in a secure building. The building itself has posted security guards and video surveillance cameras. Any outside doors that do not have security guards are accessible only by SNC ID badges. Additionally, the EOF facility door is accessible only to people with ID badges that have been pre-approved for access. If an event were to occur during off-normal hours, a guard will be posted at the main entrance to Building 40 to allow access to offsite agency or other responders without pre-designated ID access. B. EOF ORGANIZATION The EOF Organization consists of selected management and staff members located in the SNC Corporate Office. This organization is responsible for providing offsite emergency response support and resources, as needed. The EOF Organization is displayed in Figure 1 and typical duty assignments are shown on Table 1. This organization may be supplemented or reduced by the EOF Manager, as required, to respond to the specific emergency situation. but will not be reduced to below the minimum staff as specified in A.3 above. SNC normally maintains ERO positions in a duty rotation. Several positions have been designated as plant specific 3 REV 38  05/05 and, as such, have personnel designated for each of the 3 sites. Specifically each of the following EOF positions has site-specific personnel designated:
REV 38  05/05 APPENDIX 7 EMERGENCY OPERATIONS FACILITY  
 
1 REV 38  05/05 A. INTRODUCTION A.1 PURPOSE The purpose of this appendix is to outline the function of the Emergency Operations Facility for the Southern Nuclear Operating Company (SNC). Additionally, this appendix delineates the actions to be taken by SNC Corporate Staff in the event of an emergency at any (SNC) site.
A.2 SCOPE AND APPLICABILITY This appendix provides the framework for operations of the EOF for SNC. This appendix is an integral part of the site specific emergency plan(s).
This appendix may be implemented to coordinate a SNC response to an emergency at any SNC facility or in response to a transportation accident involving radioactive material.
Additionally, this appendix provides the mechanism for obtaining and providing additional emergency response support and resources to SNC site(s) in the event of an emergency.
The SNC Corporate Staff will be responsible for offsite emergency response support and resources as requested.
Overall management of the emergency will be accomplished at the specific site(s)[Vogtle Electric Generating Plant (VEGP), Hatch Nuclear Plant (HNP) and Farley Nuclear Plant (FNP)].
A.3 SUMMARY The site specific Emergency Plan, is activated by the Emergency Director (ED). Upon notification of an ALERT or higher classification or as directed by the ED, the EOF will be activated as described in emergency implementing procedures. When notified, the designated corporate emergency organization management report to the EOF to be briefed on current conditions and perform their assigned tasks. Each manager's support staff will operate from that group's office area. Offsite support personnel and equipment will be dispatched to the site Operations Support Center (OSC) or Technical Support Center (TSC) upon request from the specific site Emergency Director. The corporate emergency organization will provide offsite emergency response support and resources to SNC sites 24 hours per day until the emergency has been terminated.
2 REV 38  05/05 The EOF will be activated for an ALERT, a SITE AREA or GENERAL emergency classification. This facility will be operational within about an hour of the initial notification.
SNC's goal is to begin notification of all required on-call Emergency Response Organization (ERO) personnel as soon as practicable, within 15 minutes, following the declaration of an Alert emergency or higher emergency classification at any SNC site.
Minimum EOF staff for facility activation will include the EOF Manager, the Dose Assessment Supervisor, the Dose Analyst, the Field Team Coordinator, the ENN Communicator, and the Licensing Support Coordinator.
Access control for the EOF is established through the use of electronic card readers.
During the emergency, the emergency director will normally be located in either the TSC or Control Room at his/her option. The emergency director is responsible for the management of the emergency response. Specific duties and responsibilities are provided in the site specific Emergency Plan and Emergency Plan Implementing Procedures.
SNC has taken precautions to ensure that the EOF can be quickly accessed and made operational within about an hour of the initial notification and is safe-guarded against unauthorized personnel. The common EOF is located in a secure building. The building itself has posted security guards and video surveillance cameras.
Any outside doors that do not have security guards are accessible only by SNC ID badges. Additionally, the EOF facility door is accessible only to people with ID badges that have been pre-approved for access. If an event were to occur during off-normal hours, a guard will be posted at the main entrance to Building 40 to allow access to offsite agency or other responders without pre-designated ID access.
B. EOF ORGANIZATION The EOF Organization consists of selected management and staff members located in the SNC Corporate Office. This organization is responsible for providing offsite emergency response support and resources, as needed.
The EOF Organization is displayed in Figure 1 and typical duty assignments are shown on Table 1. This organization may be supplemented or reduced by the EOF Manager, as required, to respond to the specific emergency situation. but will not be reduced to below the minimum staff as specified in A.3 above.
SNC normally maintains ERO positions in a duty rotation.
Several positions have been designated as plant specific 3 REV 38  05/05 and, as such, have personnel designated for each of the 3 sites. Specifically each of the following EOF positions has site-specific personnel designated:
* EOF Manager
* EOF Manager
* EOF Technical Supervisor In order to augment additional staff that may be needed in the unlikely event of a multi-site accident, SNC will re-activate its ERO notification system. When the EOF is activated, all EOF staff pagers are activated, and all EOF personnel are expected to report to the EOF. Personnel that are not needed to augment positions are briefed and dismissed with a stand-by status. B.1 EOF MANAGER   The EOF Manager manages the following activities:
* EOF Technical Supervisor In order to augment additional staff that may be needed in the unlikely event of a multi-site accident, SNC will re-activate its ERO notification system. When the EOF is activated, all EOF staff pagers are activated, and all EOF personnel are expected to report to the EOF.
Personnel that are not needed to augment positions are briefed and dismissed with a stand-by status.
B.1 EOF MANAGER The EOF Manager manages the following activities:
* Overall direction and control of the offsite response for SNC.
* Overall direction and control of the offsite response for SNC.
* Communication of radiological information to State and local emergency response agencies as needed.
* Communication of radiological information to State and local emergency response agencies as needed.
* After consultation with the ED, provides support for initial activities associated with planning for recovery operations. The duties and responsibilities of the EOF Manager will be assumed by designated SNC corporate personnel. The designated individual will be assigned according to a predetermined rotation schedule and will typically have either previous plant specific SRO background or long-term supervisory/management experience.
* After consultation with the ED, provides support for initial activities associated with planning for recovery operations.
The duties and responsibilities of the EOF Manager will be assumed by designated SNC corporate personnel. The designated individual will be assigned according to a predetermined rotation schedule and will typically have either previous plant specific SRO background or long-term supervisory/management experience.  
 
4 REV 60  07/13 The duties and responsibilities of the EOF Manager are as follows:  
4 REV 60  07/13 The duties and responsibilities of the EOF Manager are as follows:  
: 1. Manage the EOF and direct the activities of the EOF organization. 2. Ensure activation of the EOF at ALERT or higher classification, or as directed by the ED. 3. Support site efforts for the following:
: 1. Manage the EOF and direct the activities of the EOF  
 
organization.  
: 2. Ensure activation of the EOF at ALERT or higher  
 
classification, or as directed by the ED.  
: 3. Support site efforts for the following:
* Determining the cause of the incident.
* Determining the cause of the incident.
* Assessing the overall damage, including personnel, equipment, systems, facilities and/or fuel.
* Assessing the overall damage, including personnel, equipment, systems, facilities and/or fuel.
* Developing recovery plans. 4. Keep corporate management informed regarding the emergency response and emergency classification upgrades. 5. Ensure that the joint owners, as applicable, are kept apprised of significant changes in the emergency status including upgrades, downgrades and terminations. 6. Keep the GPC/APCO public information director fully apprised regarding the status of the emergency. 7. Identify the available resources within and outside the company to assist in mitigation and recovery, as necessary. 8. Procure outside services and equipment, as necessary. 9. Obtain assistance from SNC Environmental Services regarding non-radiological and hazardous materials environmental considerations. 10. Request assistance from legal counsel as appropriate. 11. Coordinate NRC inquiries/activities requiring a response from the Corporate Office. Obtain licenses and/or amendments to licenses, if required, for repair of the affected unit and disposal of waste products. 12. Approve news releases issued from the Emergency Response Center (ERC) or the Emergency News Center (ENC)/Joint Information Center (JIC). 13. Communicate developed PARs to the ED once offsite communication responsibility is transferred to the EOF. The EOF Manager and ED will determine which facility will communicate the PARs to offsite agencies. Normally, initial PARs will be communicated to offsite agencies by the TSC while 5 REV 38  05/05 changes in PARs will be communicated to offsite agencies by the EOF. 14. Ensure that necessary support is provided to the SNC Newswriter, the SNC Spokesperson, and the Public Information Director to ensure timely and accurate information flow to the public. An unaffected EOF Manager will be available to assist the affected EOF Manager in Company Spokesperson interface activities.
* Developing recovery plans.  
6 REV 38  05/05 B.2 EOF TECHNICAL SUPERVISOR The duties and responsibilities of the EOF Technical Supervisor will be assumed by SNC corporate support personnel. The designated individual will be assigned according to a predetermined rotation schedule and will typically have plant specific long-term engineering/design experience. Reporting to the Technical Supervisor are the emergency communicators and the necessary engineering technical, and licensing personnel needed to support tasks assigned to the EOF. The duties and responsibilities of the Technical Supervisor are as follows: 1. Provide technical interface to vendors, utility groups, consultants and technical investigation groups. 2. Assist in establishing a list of plant equipment/system modifications required to bring the plant to cold shutdown, recovery and/or startup. 3. Develop an engineering support plan compatible with the plant mitigation and recovery plan. Provide engineering support developing site recovery procedures. This plan will include engineering personnel resources. 4. Coordinate the work performed by SNC engineering, Southern Company Services, the architect engineer, the nuclear steam supply system supplier, and other engineering consultants. Coordinate the transmittal of engineering modification/design documents (Design Change Packages (DCP), Request for Engineering Assistance (REA), etc) to the site staff, and site and SNC procurement groups. 5. Coordinate the receipt and assessment of technical information related to plant systems and facility operations, and submit recommendations to the TSC Manager through the EOF Manager. 6. Provide licensing support, as requested, through utilization of the licensing support. 7. Provides communications support for offsite notifications (Emergency Notification Network(ENN), as requested.
: 4. Keep corporate management informed regarding the  
7 REV 43  05/06 B.3 EOF SUPPORT COORDINATOR The duties and responsibilities of the EOF Support Coordinator will be assumed by SNC corporate support personnel. The individuals designated to assume the position will be indicated on a predetermined rotational schedule. Reporting to the EOF Support Coordinator are the non-technical personnel needed to support tasks assigned to the EOF. Additionally, the News writer is matrixed to the EOF Support Coordinator from the corporate communications organization. The duties and responsibilities of the EOF Support Coordinator are as follows: 1. Provide assistance to the TSC Support Coordinator in the Technical Support Center (TSC) for ordering equipment and materials needed. Establish a standby list of personnel to provide additional technical support, as required. 2. Obtain materials, supplies, and equipment that are needed in the EOF. 3. Process expense accounts, distribute checks from payroll, and conduct other financial aspects of the emergency organization. 4. Provide logistics arrangements for support personnel called in to assist in the emergency, including communications hardware, transportation, food, and lodging. 5. Obtain assistance from corporate financial staff to communicate, as necessary, with banks, financial institutions, investors, joint owners and insurers regarding the emergency situation. 6. During the initial phase of the emergency, provide the official log of actions and the course of the emergency from the EOF. 7. Provide administrative services for the Corporate Emergency Response Organization, such as clerical, typing, and duplication. 8. Provide administrative, logistic, financial, and procurement support as appropriate during the recovery phase.
 
8 REV 38  05/05 B.4 DOSE ASSESSMENT SUPERVISOR The duties and responsibilities of the Dose Assessment Supervisor will be assumed by SNC corporate support personnel. The individuals designated to assume the position will be indicated on a predetermined rotation schedule. Reporting to the Dose Assessment Supervisor are the Dose Analyst, Field Team Coordinator, Field Team Communicator, and Radiological Status Communicator. The TSC will initially be responsible for dose projection and field team control activities. When the EOF is activated and ready to assume functions of dose projection/assessment activities, then the EOF Dose Assessment Supervisor will coordinate transfer of dose assessment, field team control, and protective action determination from the TSC to the EOF. Coordination will include ED/EOF Manager mutual approval of the transfer with the intention of transferring dose assessment from the TSC to the EOF as rapidly as possible while ensuring a smoothly coordinated transfer of this critical function. The duties and responsibilities of the Dose Assessment Supervisor are as follows: 1. Support the plant dose assessment supervisor as necessary. Be prepared to assume offsite dose projection if requested. Keep the EOF Manager informed of any offsite dose assessments performed by the site or corporate staff. 2. Provide an as low as reasonably achievable (ALARA) exposure review of engineering modifications and tasks proposed by the emergency organization, including necessary documentation of those reviews. 3. Develop methods for treatment and/or disposal of radioactive wastes resulting from the emergency and recovery operations. 4. Compare calculations and measurements with State and Federal groups performing radiological assessments. 5. Coordinate distribution of dose assessment information with offsite authorities. 6. Coordinate assistance to the State for transportation incidents involving radioactive material, as requested. 7. Develop protective action recommendations (PARs) and communicate to the EOF Manager the need for PAR communication once control is transferred to the EOF.
emergency response and emergency classification  
9 REV 38  05/05 B.5  SECURITY COORDINATOR The duties and responsibilities of the Security Coordinator will be assumed by SNC corporate security personnel. The individuals designated to assume the position will be indicated on a predetermined rotation schedule. The duties and responsibilities of the Security Coordinator are as follows: 1. Support the plant security manager as necessary. Keep the EOF Manager informed of any security events/issues. 2. Provide assistance to the security supervisor at the site, as requested. 3. Establish and maintain access control for the EOF.
 
10 REV 38  05/05 B.6 OFFSITE RESPONSE COORDINATOR The duties and responsibilities of the Offsite Response Coordinator will be assumed by SNC Corporate Emergency Planning Coordinators and designated staff. The individuals designated to assume the position will be indicated on a predetermined rotation schedule. The duties and responsibilities of the Offsite Response Coordinator are as follows: 1. Coordinate activities concerning the dispatch and update of technical liaisons to State and Local authorities, as appropriate. 2. Monitor EOF functional areas to facilitate coordination between the licensee and State and Local agencies. B.7 ENGINEERING/TECHNICAL SUPPORT STAFF AND ADMINISTRATIVE SUPPORT STAFF 1. The Engineering/Technical Support staff and administrative support staff will report to the EOF, as directed. These job titles refer to a number of individuals performing a variety of designated tasks. Their numbers will depend on the type and duration of the emergency. 2. The Engineering/Technical Support staff are personnel designated by the management of the Corporate Emergency Organization. They provide management, technical, regulatory and licensing support during an emergency. This staff report through the EOF Technical Supervisor to the EOF Manager. 3. The administrative support staff are the non-technical members of the Corporate Emergency Response Organization. They perform duties designated by the EOF Support Coordinator or appropriate manager which include but are not limited to the following: a. Providing clerical and secretarial support to the Emergency Organization. b. Operation of word processors. c. Operation of telecopiers. d. Making entries to and retrieving data from Nuclear Network. e. Retrieval of file documents. f. Updating status boards using information provided from the sites.
upgrades.  
11  REV 60  07/13  C. NOTIFICATION AND ACTIVATION  Initial notifications or emergency response personnel will follow the guidelines specified in the site specific Emergency Plan and Emergency Plan Implementing Procedures. This appendix contains the emergency notification of Corporate Management and the appropriate offsite support groups not specified in the site specific Emergency Plan(s).
: 5. Ensure that the joint owners, as applicable, are  
C.1 NOTIFICATION OF CORPORATE MANAGEMENT  The Nuclear Duty Officer will be notified of all emergencies classified at any SNC site. The Nuclear Duty Officer will in turn notify the EOF Manager. The EOF Manager is responsible for activation of the EOF Staff and notifying the appropriate Corporate Management.
 
: 1. The EOF Manager is responsible for assuring that the Corporate Emergency Organization is notified 2. The EOF Manager will also be responsible for ensuring that the corporate emergency staff members report directly to the EOF. 3. Notification of personnel may be accomplished through the use of an automated or manual system.
kept apprised of significant changes in the  
C.2 NOTIFICATION OF OFFSITE SUPPORT AGENCIES  Offsite support agencies will be notified by the appropriate emergency organization member(s), as requested by VEGP, FNP, and HNP. 
 
emergency status including upgrades, downgrades and  
 
terminations.  
: 6. Keep the GPC/APCO public information director fully  
 
apprised regarding the status of the emergency.  
: 7. Identify the available resources within and outside  
 
the company to assist in mitigation and recovery, as  
 
necessary.  
: 8. Procure outside services and equipment, as  
 
necessary.  
: 9. Obtain assistance from SNC Environmental Services  
 
regarding non-radiological and hazardous materials  
 
environmental considerations.  
: 10. Request assistance from legal counsel as  
 
appropriate.  
: 11. Coordinate NRC inquiries/activities requiring a  
 
response from the Corporate Office. Obtain licenses  
 
and/or amendments to licenses, if required, for  
 
repair of the affected unit and disposal of waste  
 
products.  
: 12. Approve news releases issued from the Emergency  
 
Response Center (ERC) or the Emergency News Center  
 
(ENC)/Joint Information Center (JIC).  
: 13. Communicate developed PARs to the ED once offsite  
 
communication responsibility is transferred to the  
 
EOF. The EOF Manager and ED will determine which  
 
facility will communicate the PARs to offsite  
 
agencies. Normally, initial PARs will be  
 
communicated to offsite agencies by the TSC while 5 REV 38  05/05 changes in PARs will be communicated to offsite agencies by the EOF.  
: 14. Ensure that necessary support is provided to the SNC Newswriter, the SNC Spokesperson, and the Public Information Director to ensure timely and accurate information flow to the public. An unaffected EOF Manager will be available to assist the affected EOF Manager in Company Spokesperson interface activities.  
 
6 REV 38  05/05 B.2 EOF TECHNICAL SUPERVISOR The duties and responsibilities of the EOF Technical Supervisor will be assumed by SNC corporate support personnel. The designated individual will be assigned according to a predetermined rotation schedule and will typically have plant specific long-term engineering/design experience. Reporting to the Technical Supervisor are the emergency communicators and the necessary engineering technical, and licensing personnel needed to support tasks assigned to the EOF.
The duties and responsibilities of the Technical Supervisor are as follows:  
: 1. Provide technical interface to vendors, utility groups, consultants and technical investigation groups. 2. Assist in establishing a list of plant equipment/system modifications required to bring the plant to cold shutdown, recovery and/or startup.  
: 3. Develop an engineering support plan compatible with the plant mitigation and recovery plan. Provide engineering support developing site recovery procedures. This plan will include engineering personnel resources.  
: 4. Coordinate the work performed by SNC engineering, Southern Company Services, the architect engineer, the nuclear steam supply system supplier, and other engineering consultants. Coordinate the transmittal of engineering modification/design documents (Design Change Packages (DCP), Request for Engineering Assistance (REA), etc) to the site staff, and site and SNC procurement groups.  
: 5. Coordinate the receipt and assessment of technical information related to plant systems and facility operations, and submit recommendations to the TSC Manager through the EOF Manager.  
: 6. Provide licensing support, as requested, through utilization of the licensing support.  
: 7. Provides communications support for offsite notifications (Emergency Notification Network(ENN),
as requested.  
 
7 REV 43  05/06 B.3 EOF SUPPORT COORDINATOR The duties and responsibilities of the EOF Support Coordinator will be assumed by SNC corporate support  
 
personnel. The individuals designated to assume the  
 
position will be indicated on a predetermined  
 
rotational schedule. Reporting to the EOF Support  
 
Coordinator are the non-technical personnel needed to  
 
support tasks assigned to the EOF. Additionally, the  
 
News writer is matrixed to the EOF Support Coordinator  
 
from the corporate communications organization.
The duties and responsibilities of the EOF Support Coordinator are as follows:
: 1. Provide assistance to the TSC Support Coordinator in the Technical Support Center (TSC) for ordering equipment and materials needed. Establish a standby  
 
list of personnel to provide additional technical  
 
support, as required.
: 2. Obtain materials, supplies, and equipment that are  
 
needed in the EOF.  
: 3. Process expense accounts, distribute checks from  
 
payroll, and conduct other financial aspects of the  
 
emergency organization.  
: 4. Provide logistics arrangements for support personnel  
 
called in to assist in the emergency, including  
 
communications hardware, transportation, food, and  
 
lodging.
: 5. Obtain assistance from corporate financial staff to  
 
communicate, as necessary, with banks, financial  
 
institutions, investors, joint owners and insurers  
 
regarding the emergency situation.
: 6. During the initial phase of the emergency, provide  
 
the official log of actions and the course of the  
 
emergency from the EOF.  
: 7. Provide administrative services for the Corporate  
 
Emergency Response Organization, such as clerical,  
 
typing, and duplication.
: 8. Provide administrative, logistic, financial, and  
 
procurement support as appropriate during the  


12 REV 38  05/05 D. EMERGENCY FACILITIES AND EQUIPMENT Following the declaration of an emergency, response activity will be coordinated at a number of facilities. These emergency response facilities are described in the site specific emergency plans. The EOF is a common facility for all SNC sites and is described in this section. D.1 EOF DESCRIPTION The EOF is the central location for management of the offsite emergency response, coordination of radiological assessment, and management of initial recovery operations. The EOF is located in Birmingham, Alabama and serves as the EOF for all SNC sites (VEGP, FNP, and HNP). The EOF will be activated as prescribed in the site specific Emergency Plan implementing procedures. From the EOF, SNC corporate management personnel assist the states and other governmental bodies by communicating protective action recommendations approved by the Emergency Director to ensure public health and safety. Plant systems information, radiological data, and meteorological data are provided via the SNC integrated data display system to EOF personnel as needed to: assess environmental conditions, coordinate radiological monitoring activities, and recommend implementation of offsite emergency plans. Data displays provide periodic and timely conditions of the affected plant and periodic and timely assessment of radiological conditions in the plant environs. . The SNC integrated data display system utilizes data provided by the plant specific data links. These station data links are described in each site specific plan. These displays may be either manual or electronic. Data displays are located in the main caucus area of the EOF, dose assessment area, plant status area, and engineering area within the facility. Other displays may be located in the command center area. Data is also available to all state agencies responding to the EOF. Data is available both in the main caucus area and the area designated for the particular state agency. Similarly, this data is available to state and local authorities via a secure network dedicated to data distribution among the various offsite emergency response facilities. The data display system provides the user with a "master view" for the monitoring of multiple site events simultaneously. Data required to support EOF operations is provided by an extensive ring bus transport network. Data may also be obtained manually via telephone from the Control Room and the TSC to the EOF.
recovery phase.
13 REV 38  05/05 Contained within the facility will be the manpower and equipment necessary to provide dedicated direct communication links to the plant site(s). In addition, there are commercial and company wide phone systems to and from the site(s). A communication link will be established and maintained between the Emergency Operations Facility and the Technical Support Center (TSC) until the emergency director determines that the communication link is no longer needed. Other communications equipment accessible to the EOF includes Nuclear Network (an intra-industry computer-based information exchange network), telecopiers, and computer workstations designated for emergency use. Computer workstations are dedicated for performing dose projections for multiple sites. The EOF is the distribution center for all field data and sample analyses. This information will be available to county, State, and Federal representatives. The EOF is sized to accommodate 35 persons, including 25 pre-designated persons, 9 persons from the NRC, and 1 person from the Federal Emergency Management Agency (FEMA). It is anticipated that representatives from the state(s) of Georgia, South Carolina, Alabama, and Florida will be dispatched to the EOF for an event at specific SNC site(s). The EOF has been designed to accommodate these representatives. Agreements exist between the appropriate State agencies and SNC to ensure rapid response of state personnel dispatched to the EOF. Table 4 provides additional information concerning EOF communications capabilities. Upon activation of the EOF, Corporate personnel will provide staffing 24 hours per day until directed otherwise by the Emergency Director. The emergency director, located at the affected site(s), is responsible for the management of the emergency response. Specific duties and responsibilities are provided in the site specific Emergency. The EOF consists of several rooms, as shown, together with the location of key personnel, in Figure 2. The EOF is a dedicated facility. The designated emergency planning coordinator for each of the three sites maintains an office within the EOF to ensure readiness and daily operability. Based on the physical location of the EOF, specialized ventilation systems are not required. The EOF ventilation system is consistent in design with standard building codes. Similarly, EOF functions would not be interrupted by radiation releases from any SNC site.
8 REV 38  05/05 B.4 DOSE ASSESSMENT SUPERVISOR The duties and responsibilities of the Dose Assessment Supervisor will be assumed by SNC corporate support personnel. The individuals designated to assume the position will be indicated on a predetermined rotation schedule. Reporting to the Dose Assessment Supervisor are the Dose Analyst, Field Team Coordinator, Field Team Communicator, and Radiological Status Communicator.
14 REV 38  05/05 Normal power to the EOF is from a reliable offsite source. Emergency lighting is provided by battery operated lights. Back-up power for the EOF is supplied by onsite diesel generation. All essential equipment is backed up by the diesel generation system. The EOF is located adjacent to the document management section for SNC. The following records or information are available:
The TSC will initially be responsible for dose projection and field team control activities. When the EOF is activated and ready to assume functions of dose projection/assessment activities, then the EOF Dose Assessment Supervisor will coordinate transfer of dose assessment, field team control, and protective action determination from the TSC to the EOF. Coordination will include ED/EOF Manager mutual approval of the transfer with the intention of transferring dose assessment from the TSC to the EOF as rapidly as possible while ensuring a smoothly coordinated transfer of this critical function.
The duties and responsibilities of the Dose Assessment Supervisor are as follows:
: 1. Support the plant dose assessment supervisor as necessary. Be prepared to assume offsite dose projection if requested. Keep the EOF Manager informed of any offsite dose assessments performed by the site or corporate staff.
: 2. Provide an as low as reasonably achievable (ALARA) exposure review of engineering modifications and tasks proposed by the emergency organization, including necessary documentation of those reviews.
: 3. Develop methods for treatment and/or disposal of radioactive wastes resulting from the emergency and recovery operations.
: 4. Compare calculations and measurements with State and Federal groups performing radiological assessments.
: 5. Coordinate distribution of dose assessment information with offsite authorities.
: 6. Coordinate assistance to the State for transportation incidents involving radioactive material, as requested.
: 7. Develop protective action recommendations (PARs) and communicate to the EOF Manager the need for PAR communication once control is transferred to the EOF.
9 REV 38  05/05 B.5  SECURITY COORDINATOR The duties and responsibilities of the Security Coordinator will be assumed by SNC corporate security personnel. The individuals designated to assume the position will be indicated on a predetermined rotation schedule.
The duties and responsibilities of the Security Coordinator are as follows:
: 1. Support the plant security manager as necessary.
Keep the EOF Manager informed of any security events/issues.
: 2. Provide assistance to the security supervisor at the site, as requested.
: 3. Establish and maintain access control for the EOF.
10 REV 38  05/05 B.6 OFFSITE RESPONSE COORDINATOR The duties and responsibilities of the Offsite Response Coordinator will be assumed by SNC Corporate Emergency Planning Coordinators and designated staff. The individuals designated to assume the position will be indicated on a predetermined rotation schedule.
The duties and responsibilities of the Offsite Response Coordinator are as follows:
: 1. Coordinate activities concerning the dispatch and update of technical liaisons to State and Local authorities, as appropriate. 
: 2. Monitor EOF functional areas to facilitate coordination between the licensee and State and Local agencies.
B.7 ENGINEERING/TECHNICAL SUPPORT STAFF AND ADMINISTRATIVE SUPPORT STAFF
: 1. The Engineering/Technical Support staff and administrative support staff will report to the EOF, as directed. These job titles refer to a number of individuals performing a variety of designated tasks. Their numbers will depend on the type and duration of the emergency. 
: 2. The Engineering/Technical Support staff are personnel designated by the management of the Corporate Emergency Organization. They provide management, technical, regulatory and licensing support during an emergency. This staff report through the EOF Technical Supervisor to the EOF Manager.
: 3. The administrative support staff are the non-technical members of the Corporate Emergency Response Organization. They perform duties designated by the EOF Support Coordinator or appropriate manager which include but are not limited to the following:
: a. Providing clerical and secretarial support to the Emergency Organization.
: b. Operation of word processors.
: c. Operation of telecopiers. 
: d. Making entries to and retrieving data from Nuclear Network.
: e. Retrieval of file documents. 
: f. Updating status boards using information provided from the sites.
 
11  REV 60  07/13 C. NOTIFICATION AND ACTIVATION Initial notifications or emergency response personnel
 
will follow the guidelines specified in the site
 
specific Emergency Plan and Emergency Plan Implementing
 
Procedures. This appendix contains the emergency
 
notification of Corporate Management and the appropriate
 
offsite support groups not specified in the site
 
specific Emergency Plan(s).
 
C.1 NOTIFICATION OF CORPORATE MANAGEMENT The Nuclear Duty Officer will be notified of all emergencies classified at any SNC site. The Nuclear Duty Officer will in turn notify the EOF Manager. The EOF Manager is responsible for activation of the EOF
 
Staff and notifying the appropriate Corporate
 
Management.
: 1. The EOF Manager is responsible for assuring that the Corporate Emergency Organization is notified 2. The EOF Manager will also be responsible for ensuring that the corporate emergency staff members report directly to the EOF. 3. Notification of personnel may be accomplished through the use of an automated or manual system.
 
C.2 NOTIFICATION OF OFFSITE SUPPORT AGENCIES Offsite support agencies will be notified by the
 
appropriate emergency organization member(s), as
 
requested by VEGP, FNP, and HNP.
 
12 REV 38  05/05 D. EMERGENCY FACILITIES AND EQUIPMENT Following the declaration of an emergency, response activity will be coordinated at a number of facilities.
These emergency response facilities are described in the site specific emergency plans. The EOF is a common facility for all SNC sites and is described in this section.
D.1 EOF DESCRIPTION The EOF is the central location for management of the offsite emergency response, coordination of radiological assessment, and management of initial recovery operations. The EOF is located in Birmingham, Alabama and serves as the EOF for all SNC sites (VEGP, FNP, and HNP). The EOF will be activated as prescribed in the site specific Emergency Plan implementing procedures. From the EOF, SNC corporate management personnel assist the states and other governmental bodies by communicating protective action recommendations approved by the Emergency Director to ensure public health and safety. Plant systems information, radiological data, and meteorological data are provided via the SNC integrated data display system to EOF personnel as needed to: assess environmental conditions, coordinate radiological monitoring activities, and recommend implementation of offsite emergency plans. Data displays provide periodic and timely conditions of the affected plant and periodic and timely assessment of radiological conditions in the plant environs. .
The SNC integrated data display system utilizes data provided by the plant specific data links. These station data links are described in each site specific plan. These displays may be either manual or electronic. Data displays are located in the main caucus area of the EOF, dose assessment area, plant status area, and engineering area within the facility. Other displays may be located in the command center area. Data is also available to all state agencies responding to the EOF. Data is available both in the main caucus area and the area designated for the particular state agency. Similarly, this data is available to state and local authorities via a secure network dedicated to data distribution among the various offsite emergency response facilities. The data display system provides the user with a "master view" for the monitoring of multiple site events simultaneously. Data required to support EOF operations is provided by an extensive ring bus transport network. Data may also be obtained manually via telephone from the Control Room and the TSC to the EOF.
13 REV 38  05/05 Contained within the facility will be the manpower and equipment necessary to provide dedicated direct communication links to the plant site(s). In addition, there are commercial and company wide phone systems to and from the site(s). A communication link will be established and maintained between the Emergency Operations Facility and the Technical Support Center (TSC) until the emergency director determines that the communication link is no longer needed. Other communications equipment accessible to the EOF includes Nuclear Network (an intra-industry computer-based information exchange network), telecopiers, and computer workstations designated for emergency use. Computer workstations are dedicated for performing dose projections for multiple sites. The EOF is the distribution center for all field data and sample analyses. This information will be available to county, State, and Federal representatives. The EOF is sized to accommodate 35 persons, including 25 pre-designated persons, 9 persons from the NRC, and 1 person from the Federal Emergency Management Agency (FEMA). It is anticipated that representatives from the state(s) of Georgia, South Carolina, Alabama, and Florida will be dispatched to the EOF for an event at specific SNC site(s). The EOF has been designed to accommodate these representatives. Agreements exist between the appropriate State agencies and SNC to ensure rapid response of state personnel dispatched to the EOF. Table 4 provides additional information concerning EOF communications capabilities. Upon activation of the EOF, Corporate personnel will provide staffing 24 hours per day until directed otherwise by the Emergency Director.
The emergency director, located at the affected site(s),
is responsible for the management of the emergency response. Specific duties and responsibilities are provided in the site specific Emergency.
The EOF consists of several rooms, as shown, together with the location of key personnel, in Figure 2. The EOF is a dedicated facility. The designated emergency planning coordinator for each of the three sites maintains an office within the EOF to ensure readiness and daily operability.
Based on the physical location of the EOF, specialized ventilation systems are not required. The EOF ventilation system is consistent in design with standard building codes. Similarly, EOF functions would not be interrupted by radiation releases from any SNC site.
14 REV 38  05/05 Normal power to the EOF is from a reliable offsite source. Emergency lighting is provided by battery operated lights. Back-up power for the EOF is supplied by onsite diesel generation. All essential equipment is backed up by the diesel generation system.
The EOF is located adjacent to the document management section for SNC. The following records or information are available:
* Technical Specifications.
* Technical Specifications.
* Selected plant operating procedures.
* Selected plant operating procedures.
Line 344: Line 1,324:
* FSARs.
* FSARs.
* State and local emergency response plans.
* State and local emergency response plans.
* Savannah River Site Emergency Plan. The following records or information can be transmitted to the EOF manually, electronically or by facsimile:
* Savannah River Site Emergency Plan.
The following records or information can be transmitted to the EOF manually, electronically or by facsimile:
* Environs radiological monitoring records.
* Environs radiological monitoring records.
* SNC employee radiation exposure histories.
* SNC employee radiation exposure histories.
* System piping and instrumentation diagrams and HVAC flow diagrams.
* System piping and instrumentation diagrams and HVAC flow diagrams.
* Piping area diagrams.
* Piping area diagrams.
* Electrical one-line, elementary, and wiring diagrams. The above records or information are available in current form and updated as necessary to ensure currency and completeness. Operations at this facility are directed by the EOF manager.
* Electrical one-line, elementary, and wiring diagrams.
15 REV 43  05/06 D.2 CONTINGENCY PLANNING Optimum functionality and availability was considered in the decision to locate the EOF in Birmingham, Alabama. At this location, functionality of the EOF would be uninterrupted by radiation releases, natural phenomena, and security based events at any of the SNC sites. Support operations and coordination with Federal, State and local organizations would continue. If personnel were to be dispatched to the sites, then personal protection equipment would be available from the local emergency management agency or from one of the unaffected SNC plant sites. In the unlikely event that individuals should need to respond to the EOF from within the 10 mile EPZ of any SNC plant, they would be surveyed prior to release by local emergency authorities at the reception centers in accordance with State and Local emergency response plans. In the unlikely event that the EOF becomes uninhabitable, resources and personnel will be transferred to the Corporate Headquarters of Alabama Power Company, located in Birmingham, Alabama. These actions will be taken as part of the normal business continuity plan. E. COORDINATION WITH GOVERNMENTAL AGENCIES  The site specific Emergency Plan(s) delineate the governmental agencies to be notified and specifies the information to be initially conveyed. It is anticipated that representatives of various agencies will be dispatched to the EOF for an event at an SNC facility.
The above records or information are available in current form and updated as necessary to ensure currency and completeness.
Arrangements have been made between the appropriate State agencies and SNC to ensure rapid response of state personnel dispatched to the EOF.
Operations at this facility are directed by the EOF manager.
E.1 U.S. NUCLEAR REGULATORY COMMISSION  Coordination with the U.S. Nuclear Regulatory Commission (NRC) may be underway at several locations simultaneously. For details of the NRC response, see the NRC Incident Response Plan, NUREG-0728.
15 REV 43  05/06 D.2 CONTINGENCY PLANNING Optimum functionality and availability was considered in the decision to locate the EOF in Birmingham,  
Initial notification of the NRC will proceed as specified in the site specific Emergency Plan. The resident NRC inspector(s) and plant personnel have direct communications from the site control room to the NRC headquarters in Rockville, Maryland and to the regional headquarters in Atlanta, Georgia. 
 
Alabama. At this location, functionality of the EOF  


16 REV 38  05/05 The resident inspector(s) may be reinforced by additional NRC personnel shortly after notification of an emergency. The Emergency Director is responsible for coordinating NRC activities to reduce duplication of effort and reduce impact on the plant staff during the emergency situation. Provisions have been made to have direct NRC FTS lines in the TSC and the EOF during an emergency. This will allow personnel in the control room to continue responding to the emergency while personnel in the TSC or EOF respond to questions and input from the NRC. NRC activities requiring response from the licensee will be coordinated by the EOF Technical Coordinator through the EOF manager. E.2 STATE GOVERNMENTAL AGENCIES  The government notifications are outlined in the site specific Emergency Plan(s). Coordination of offsite responses to the emergency is the responsibility of State agencies as outlined in the State Radiological Emergency Response Plans. E.3 LOCAL GOVERNMENTAL AGENCIES  Notification of local government officials is outlined in the site specific Emergency Plan(s). Coordination with local government agencies will normally be through the responsible State agency. E.4 DEPARTMENT OF ENERGY  Notification of DOE officials is outlined in the site specific Emergency Plan.
would be uninterrupted by radiation releases, natural
17 REV 38  05/05 F. OFFSITE SUPPORT  Offsite resources that may be available to support an emergency response effort include, but are not limited to, the following:    1. Southern Nuclear Operating Company 2. Georgia Power Company 3. Alabama Power Company 4. Southern Company Services, Inc. 5. The architect engineers 6. NSSS supplier 7. Nuclear industry 8. Contract laboratories  F.1 SOUTHERN NUCLEAR OPERATING COMPANY (SNC)  1. SNC is divided into three projects:  the Farley Project, the Hatch Project, and the Vogtle Project. Each of the projects is further divided into a plant staff and a corporate staff. These represent a pool of positions of which approximately two-thirds would be additional assets that could be made available to support an individual site emergency organization, as required. a. Plant Staffs - The permanent plant staffs consist of personnel who possess expertise in at least one of the following areas: operations, maintenance, engineering, administration, or technical support. These personnel would be available to assist in an emergency or recovery situation at an SNC nuclear facility. b. Corporate Staffs - These staffs consist of personnel who provide management, technical, clerical, procurement, and regulatory support to the nuclear facilities.
18 REV 38  05/05 F.2 GEORGIA POWER COMPANY (GPC) 1. The GPC Fossil and Hydro Power Generation Department is responsible for the operations and maintenance of all GPC non-nuclear generating facilities including diesel and combustion turbine facilities. This represents a large source of technical expertise which could provide support to the emergency organization, if required. 2. The GPC Power Delivery Department manages the activities of the divisions and areas of the company which provide the electrical services to customers. This organization has a large resource of people and heavy equipment which may be of assistance following a nuclear emergency. 3. Other GPC assets, including maintenance and repair facilities, training facilities, engineering staffs, and headquarters personnel represent additional resources available for emergency support. 4. The GPC Central Laboratory has personnel and facilities available to provide offsite monitoring, sample analysis, and dosimetry processing for the affected site. F.3 ALABAMA POWER COMPANY (APCO) 1. The APCO Fossil and Hydro Power Generation Department is responsible for the operations and maintenance of all APCO non-nuclear generating facilities including diesel and combustion turbine facilities. This represents a large source of technical expertise which could provide support to the emergency organization, if required. 2. The APCO Power Delivery Department manages the activities of the divisions and areas of the company which provide the electrical services to customers. This organization has a large resource of people and heavy equipment which may be of assistance following a nuclear emergency. 3. Other APCO assets, including maintenance and repair facilities, training facilities, engineering staffs, and headquarters personnel represent additional resources available for emergency support.
19 REV 38  05/05 F.4 SOUTHERN COMPANY SERVICES, INC. (SCS) 1. SNC has the primary responsibility for engineering support of VEGP, FNP and HNP. SCS may be utilized in response to a plant emergency or for subsequent recovery operations as deemed necessary by SNC. F.5 ARCHITECT ENGINEERS  The architect engineers will provide support as requested through the engineering services manager. The architect engineers are SNC and Bechtel Power Corporation. 1. SNC serves as its own Architect/Engineer. SCS, an associate company to Southern Nuclear Operating Company, will be used to the extent appropriate in responding to nuclear emergencies. 2. Bechtel Power Corporation, headquartered in Gaithersburg, Maryland, also performs architect engineer services for SNC. Bechtel's technical staffs are engaged in all phases of public utility engineering, design, construction, purchasing, inspection, and expedition of materials, as well as consultation on utility operating matters. Bechtel has available a broad range of engineering, construction, and consulting experience. Bechtel's nuclear experience includes engineering studies, the evaluation of reactor systems, safety evaluations, detailed engineering design, construction, and startup and testing of nuclear power facilities. F.6 NUCLEAR STEAM SUPPLY SYSTEM VENDOR  The applicable NSSS vendor will provide support through the engineering services manager. Plant specific references to the appropriate vendor are specified in the plant specific base plans. The NSSS maintains a large staff of technically qualified people in all the engineering disciplines related to the design, construction, and operation of a nuclear power plant. These same skills would be necessary in the evaluation of, and recovery from, an emergency at any SNC site. Assistance would most likely be sought for large-scale core analysis, special tool design, and licensing.   


20 REV 38  05/05 F.7 NUCLEAR INDUSTRY  The nuclear industry provides a large reservoir of personnel with a wide range of technical expertise and knowledge. A nuclear industry national inventory of personnel who might be called upon to supplement Company personnel has been developed through the Institute of Nuclear Power Operations (INPO). In addition, a number of utilities have entered into an INPO coordinated Voluntary Assistance Agreement program. This provides a mechanism to draw upon industry resources during an emergency. Support may be called upon from neighboring utilities would include the following:    1. Manpower and equipment to assist in in-plant and emergency field monitoring. 2. Engineering, design, and technical expertise to assist in determining the cause of the accident and to support recovery. 3. Manpower and equipment to assist in maintenance and repairs to the facility. F.8 CONTRACT LABORATORIES  Teledyne Isotopes, Inc. for emergency analytical services. Framatome ANP for emergency analytical services 
phenomena, and security based events at any of the SNC


21 REV 38  05/05 G. MAINTAINING EMERGENCY PREPAREDNESS G.1 ORGANIZATIONAL PREPAREDNESS 1. Training  Corporate personnel identified in the Emergency Response Organization receive training. The training consists of familiarization with the Site Emergency Plans and applicable emergency implementing procedures required to carry out their specific functions. The corporate emergency planning coordinator(s) will ensure that personnel in the Corporate Emergency Response Organization are familiar with the Emergency Plans and able to respond promptly. A training matrix for corporate personnel assigned to the ERO is shown in Table 2, and training course summaries are presented in Table 3. Training will be documented in accordance with established practices. The corporate emergency planning coordinator(s) are responsible for assuring that training is conducted for corporate emergency response personnel each calendar year. 2. Drills/Exercises Drills/ exercises will be conducted each calendar year to test the performance of implementing procedures, personnel, and emergency equipment. These drills/exercises will be conducted with each SNC site. SNC's goal is to activate the EOF in support of all site activities that involve TSC activation. EOF activation is required at least 3 times annually (1 scenario per site per year) in accordance with the existing Emergency Plans. At least 1 activation every 5 years will require a concurrent EOF support response for more than one SNC site. Each drill/exercise will test, as a minimum, the communication links and notification procedures to assure the prompt notification of the corporate staff. Provisions are made for critique of all drills/exercises. Critique items will be forwarded to the site emergency preparedness coordinator for processing in the site specific corrective action program.
sites. Support operations and coordination with
22 REV 38  05/05  G.2 REVIEW AND UPDATE OF PLAN AND PROCEDURES  Reviews of the site Emergency Plan and Emergency Plan Implementing Procedures will be performed in accordance with site specific emergency plans. These reviews will be utilized to update the Plans and procedures and to improve emergency preparedness.
 
23 REV 38  05/05 TABLE 1  TYPICAL CORPORATE EMERGENCY ORGANIZATION ASSIGNMENTS  EMERGENCY POSITION ASSIGNMENT EOF Manager Supervision from corporate staff as designated in NMP-EP-001 EOF Technical Supervisor Corporate staff as designated in NMP-EP-001 EOF Support Coordinator  Corporate staff as designated in NMP-EP-001 EOF Dose Assessment Supervisor Corporate staff as designated in NMP-EP-001 Dose Analyst Corporate staff as designated in NMP-EP-001 Field Team Coordinator Corporate staff as designated in NMP-EP-001 Field Team Communicator Corporate staff as designated in NMP-EP-001 Radiological Status Communicator Corporate staff as designated in NMP-EP-001 Plant Status Loop Communicator Corporate staff as designated in NMP-EP-001 ENN Communicator  Corporate staff as designated in NMP-EP-001 ENS Communicator  Corporate staff as designated in NMP-EP-001 Licensing Support Coordinator Corporate staff as designated in NMP-EP-001 Security Coordinator  Corporate staff as designated in NMP-EP-001 Offsite Response Coordinator Corporate staff as designated in NMP-EP-001 Engineering/Technical Support Staff Corporate staff as designated in NMP-EP-001 Administrative Support Staff Corporate staff as designated in NMP-EP-001 Liaisons  Corporate staff as designated in NMP-EP-001 Public Information Director Corporate staff as designated in NMP-EP-001 Company Spokesperson Corporate staff as designated in NMP-EP-001 Newswriter Corporate staff as designated in NMP-EP-001 Other Public Information Emergency Communications Organization Staff Corporate staff as designated in NMP-EP-001 24 REV 38  05/05 TABLE 2  CORPORATE EMERGENCY ORGANIZATION TRAINING MATRIX    Subject Area Position Emergency Plan Overview Position Specific Items Offsite Dose Assessment EOF Manager X X  EOF Technical Supervisor X X  EOF Support Coordinator X X  EOF Dose Assessment Supervisor X X X Dose Analyst X X X Field Team Coordinator X X X Field Team Communicator X X  Radiological Status Communicator X X  Plant Status Loop Communicator X X  ENN Communicator X X  ENS Communicator X X  Licensing Support Coordinator X X  Security Coordinator X X  Offsite Response Coordinator X X  Engineering/Technical Support Staff X X  Administrative Support Staff X X  Liaisons X X  Public Information Director Company Spokesperson Newswriter Other Public Information Emergency Communications Organization Staff See Emergency Communications Plan (Appendix 8) 25 REV 38  05/05 TABLE 3  DESCRIPTION OF TRAINING SUBJECT AREAS   Subject Area Description Emergency Plan Overview An overview of the Emergency Plan with special attention to emergency planning zones (EPZs); emergency classification system; emergency response organizations; responsibilities of emergency response personnel; site accountability; and site dismissal. Offsite Dose Assessment Dose projection methodology including manual and computerized methods; methods for obtaining meteorological and radiological data; operation of the dose assessment computer; and interpretation of offsite dose calculation results. Position Specific Items An overview of this appendix with an emphasis on organization, interactions with other elements of the emergency organization, and position specific responsibilities as delineated in the emergency implementing procedures.  . This overview training may be conducted as part of classroom, table-top, drill or exercise.
Federal, State and local organizations would continue.
26 REV 38  05/05 TABLE 4  TYPICAL EOF COMMUNICATION CAPABILITY Communications Functions VEGP HNP FNP EOF Management with TSC Commercial Telephone lines TSC/EOF/OSC Conference Bridge Radio Commercial Telephone lines TSC/EOF/OSC Conference Bridge Radio Commercial Telephone lines TSC/EOF/OSC Conference Bridge Radio Resource  Management Commercial Telephone lines OPX Commercial Telephone lines OPX Ringdown Commercial Telephone lines OPX Radiological Monitoring Southern LINC Kenwood Radio System Southern LINC Kenwood Radio System Southern LINC Kenwood Radio System Off-site (PARs) ENN ENN ENN NRC Use ENS HPN RSCL PMCL MCL LAN Conference Phones (3) ENS HPN RSCL PMCL MCL LAN Conference Phones (3) ENS HPN RSCL PMCL MCL LAN Conference Phones (3) Notes:  1. The Offsite Premises Extension (OPX) lines to the three SNC plant sites will be available in the proposed common EOF. These lines bypass the local phone switch. These lines may be referenced as company tie lines. Intra-facility public address and intra-building public address systems are also available.
If personnel were to be dispatched to the sites, then personal protection equipment would be available from
 
the local emergency management agency or from one of  
 
the unaffected SNC plant sites.
In the unlikely event that individuals should need to respond to the EOF from within the 10 mile EPZ of any
 
SNC plant, they would be surveyed prior to release by
 
local emergency authorities at the reception centers in
 
accordance with State and Local emergency response
 
plans. In the unlikely event that the EOF becomes uninhabitable, resources and personnel will be  
 
transferred to the Corporate Headquarters of Alabama
 
Power Company, located in Birmingham, Alabama. These
 
actions will be taken as part of the normal business
 
continuity plan.
E. COORDINATION WITH GOVERNMENTAL AGENCIES The site specific Emergency Plan(s) delineate the
 
governmental agencies to be notified and specifies the
 
information to be initially conveyed. It is anticipated
 
that representatives of various agencies will be
 
dispatched to the EOF for an event at an SNC facility.   
 
Arrangements have been made between the appropriate
 
State agencies and SNC to ensure rapid response of state
 
personnel dispatched to the EOF.  
 
E.1 U.S. NUCLEAR REGULATORY COMMISSION Coordination with the U.S. Nuclear Regulatory Commission
 
(NRC) may be underway at several locations
 
simultaneously. For details of the NRC response, see
 
the NRC Incident Response Plan, NUREG-0728. 
 
Initial notification of the NRC will proceed as
 
specified in the site specific Emergency Plan. The
 
resident NRC inspector(s) and plant personnel have
 
direct communications from the site control room to the  
 
NRC headquarters in Rockville, Maryland and to the
 
regional headquarters in Atlanta, Georgia.  
 
16 REV 38  05/05 The resident inspector(s) may be reinforced by additional NRC personnel shortly after notification of an emergency. The Emergency Director is responsible for coordinating NRC activities to reduce duplication of effort and reduce impact on the plant staff during the emergency situation.
Provisions have been made to have direct NRC FTS lines in the TSC and the EOF during an emergency. This will allow personnel in the control room to continue responding to the emergency while personnel in the TSC or EOF respond to questions and input from the NRC.
NRC activities requiring response from the licensee will be coordinated by the EOF Technical Coordinator through the EOF manager.
E.2 STATE GOVERNMENTAL AGENCIES The government notifications are outlined in the site specific Emergency Plan(s). Coordination of offsite responses to the emergency is the responsibility of State agencies as outlined in the State Radiological Emergency Response Plans.
E.3 LOCAL GOVERNMENTAL AGENCIES Notification of local government officials is outlined in the site specific Emergency Plan(s). Coordination with local government agencies will normally be through the responsible State agency.
E.4 DEPARTMENT OF ENERGY Notification of DOE officials is outlined in the site specific Emergency Plan.
 
17 REV 38  05/05 F. OFFSITE SUPPORT Offsite resources that may be available to support an emergency response effort include, but are not limited to, the following: 
: 1. Southern Nuclear Operating Company
: 2. Georgia Power Company
: 3. Alabama Power Company
: 4. Southern Company Services, Inc.
: 5. The architect engineers
: 6. NSSS supplier
: 7. Nuclear industry
: 8. Contract laboratories F.1 SOUTHERN NUCLEAR OPERATING COMPANY (SNC)
: 1. SNC is divided into three projects:  the Farley Project, the Hatch Project, and the Vogtle Project.
Each of the projects is further divided into a plant staff and a corporate staff. These represent a pool of positions of which approximately two-thirds would be additional assets that could be made available to support an individual site emergency organization, as required.
: a. Plant Staffs - The permanent plant staffs consist of personnel who possess expertise in at least one of the following areas: operations, maintenance, engineering, administration, or technical support.
These personnel would be available to assist in an emergency or recovery situation at an SNC nuclear facility.
: b. Corporate Staffs - These staffs consist of personnel who provide management, technical, clerical, procurement, and regulatory support to the nuclear facilities.
 
18 REV 38  05/05 F.2 GEORGIA POWER COMPANY (GPC)
: 1. The GPC Fossil and Hydro Power Generation Department is responsible for the operations and maintenance of all GPC non-nuclear generating facilities including diesel and combustion turbine facilities. This represents a large source of technical expertise which could provide support to the emergency organization, if required. 
: 2. The GPC Power Delivery Department manages the activities of the divisions and areas of the company which provide the electrical services to customers.
This organization has a large resource of people and heavy equipment which may be of assistance following a nuclear emergency. 
: 3. Other GPC assets, including maintenance and repair facilities, training facilities, engineering staffs, and headquarters personnel represent additional resources available for emergency support. 
: 4. The GPC Central Laboratory has personnel and facilities available to provide offsite monitoring, sample analysis, and dosimetry processing for the affected site.
F.3 ALABAMA POWER COMPANY (APCO)
: 1. The APCO Fossil and Hydro Power Generation Department is responsible for the operations and maintenance of all APCO non-nuclear generating facilities including diesel and combustion turbine facilities. This represents a large source of technical expertise which could provide support to the emergency organization, if required.
: 2. The APCO Power Delivery Department manages the activities of the divisions and areas of the company which provide the electrical services to customers.
This organization has a large resource of people and heavy equipment which may be of assistance following a nuclear emergency.
: 3. Other APCO assets, including maintenance and repair facilities, training facilities, engineering staffs, and headquarters personnel represent additional resources available for emergency support. 
 
19 REV 38  05/05 F.4 SOUTHERN COMPANY SERVICES, INC. (SCS)
: 1. SNC has the primary responsibility for engineering support of VEGP, FNP and HNP. SCS may be utilized in response to a plant emergency or for subsequent recovery operations as deemed necessary by SNC.
F.5 ARCHITECT ENGINEERS The architect engineers will provide support as requested through the engineering services manager. The architect engineers are SNC and Bechtel Power Corporation.
: 1. SNC serves as its own Architect/Engineer. SCS, an associate company to Southern Nuclear Operating Company, will be used to the extent appropriate in responding to nuclear emergencies. 
: 2. Bechtel Power Corporation, headquartered in Gaithersburg, Maryland, also performs architect engineer services for SNC. Bechtel's technical staffs are engaged in all phases of public utility engineering, design, construction, purchasing, inspection, and expedition of materials, as well as consultation on utility operating matters. Bechtel has available a broad range of engineering, construction, and consulting experience. Bechtel's nuclear experience includes engineering studies, the evaluation of reactor systems, safety evaluations, detailed engineering design, construction, and startup and testing of nuclear power facilities.
F.6 NUCLEAR STEAM SUPPLY SYSTEM VENDOR The applicable NSSS vendor will provide support through the engineering services manager. Plant specific references to the appropriate vendor are specified in the plant specific base plans. The NSSS maintains a large staff of technically qualified people in all the engineering disciplines related to the design, construction, and operation of a nuclear power plant.
These same skills would be necessary in the evaluation of, and recovery from, an emergency at any SNC site.
Assistance would most likely be sought for large-scale core analysis, special tool design, and licensing. 
 
20 REV 38  05/05 F.7 NUCLEAR INDUSTRY The nuclear industry provides a large reservoir of personnel with a wide range of technical expertise and knowledge. A nuclear industry national inventory of personnel who might be called upon to supplement Company personnel has been developed through the Institute of Nuclear Power Operations (INPO).
In addition, a number of utilities have entered into an INPO coordinated Voluntary Assistance Agreement program.
This provides a mechanism to draw upon industry resources during an emergency.
Support may be called upon from neighboring utilities would include the following: 
: 1. Manpower and equipment to assist in in-plant and emergency field monitoring.
: 2. Engineering, design, and technical expertise to assist in determining the cause of the accident and to support recovery. 
: 3. Manpower and equipment to assist in maintenance and repairs to the facility.
F.8 CONTRACT LABORATORIES Teledyne Isotopes, Inc. for emergency analytical services.
Framatome ANP for emergency analytical services
 
21 REV 38  05/05 G. MAINTAINING EMERGENCY PREPAREDNESS G.1 ORGANIZATIONAL PREPAREDNESS
: 1. Training Corporate personnel identified in the Emergency Response Organization receive training. The training consists of familiarization with the Site Emergency Plans and applicable emergency implementing procedures required to carry out their specific functions.
The corporate emergency planning coordinator(s) will ensure that personnel in the Corporate Emergency Response Organization are familiar with the Emergency Plans and able to respond promptly. A training matrix for corporate personnel assigned to the ERO is shown in Table 2, and training course summaries are presented in Table 3. Training will be documented in accordance with established practices.
The corporate emergency planning coordinator(s) are responsible for assuring that training is conducted for corporate emergency response personnel each calendar year. 2. Drills/Exercises Drills/ exercises will be conducted each calendar year to test the performance of implementing procedures, personnel, and emergency equipment. These drills/exercises will be conducted with each SNC site.
SNC's goal is to activate the EOF in support of all site activities that involve TSC activation. EOF activation is required at least 3 times annually (1 scenario per site per year) in accordance with the existing Emergency Plans. At least 1 activation every 5 years will require a concurrent EOF support response for more than one SNC site.
Each drill/exercise will test, as a minimum, the communication links and notification procedures to assure the prompt notification of the corporate staff.
Provisions are made for critique of all drills/exercises. Critique items will be forwarded to the site emergency preparedness coordinator for processing in the site specific corrective action program.
 
22 REV 38  05/05 G.2 REVIEW AND UPDATE OF PLAN AND PROCEDURES Reviews of the site Emergency Plan and Emergency Plan Implementing Procedures will be performed in accordance with site specific emergency plans. These reviews will be utilized to update the Plans and procedures and to improve emergency preparedness.
 
23 REV 38  05/05 TABLE 1  TYPICAL CORPORATE EMERGENCY ORGANIZATION ASSIGNMENTS EMERGENCY POSITION ASSIGNMENT EOF Manager Supervision from corporate staff as designated in NMP-EP-001 EOF Technical
 
Supervisor Corporate staff as designated in NMP-EP-001 EOF Support
 
Coordinator Corporate staff as designated in NMP-EP-001 EOF Dose Assessment Supervisor Corporate staff as designated in NMP-EP-001 Dose Analyst Corporate staff as designated in NMP-EP-001 Field Team
 
Coordinator Corporate staff as designated in NMP-EP-001 Field Team Communicator Corporate staff as designated in NMP-EP-001 Radiological Status
 
Communicator Corporate staff as designated in NMP-EP-001 Plant Status Loop Communicator Corporate staff as designated in NMP-EP-001 ENN Communicator Corporate staff as designated in NMP-EP-001 ENS Communicator Corporate staff as designated in NMP-EP-001 Licensing Support Coordinator Corporate staff as designated in NMP-EP-001 Security Coordinator Corporate staff as designated in NMP-EP-001 Offsite Response Coordinator Corporate staff as designated in NMP-EP-001 Engineering/Technica l Support Staff Corporate staff as designated in NMP-EP-001 Administrative
 
Support Staff Corporate staff as designated in NMP-EP-001 Liaisons Corporate staff as designated in NMP-EP-001 Public Information Director Corporate staff as designated in NMP-EP-001 Company Spokesperson Corporate staff as designated in NMP-EP-001 Newswriter Corporate staff as designated in NMP-EP-001 Other Public Information Emergency Communications
 
Organization Staff Corporate staff as designated in NMP-EP-001  
 
24 REV 38 05/05 TABLE 2 CORPORATE EMERGENCY ORGANIZATION TRAINING MATRIX Subject Area Position Emergency Plan Overview Position Specific Items Offsite Dose Assessment EOF Manager X X  EOF Technical Supervisor X X  EOF Support Coordinator X X  EOF Dose Assessment Supervisor X X X Dose Analyst X X X Field Team Coordinator X X X Field Team Communicator X X  Radiological Status Communicator X X  Plant Status Loop Communicator X X  ENN Communicator X X  ENS Communicator X X  Licensing Support Coordinator X X  Security Coordinator X X  Offsite Response Coordinator X X  Engineering/Technical Support Staff X X  Administrative Support Staff X X  Liaisons X X  Public Information Director Company Spokesperson Newswriter Other Public Information Emergency Communications Organization Staff See Emergency Communications Plan (Appendix 8)  
 
25 REV 38  05/05 TABLE 3  DESCRIPTION OF TRAINING SUBJECT AREAS Subject Area Description Emergency Plan Overview An overview of the Emergency Plan with special attention to emergency planning zones (EPZs);
emergency classification system; emergency response organizations; responsibilities of emergency response personnel; site accountability; and site dismissal.
Offsite Dose Assessment Dose projection methodology including manual and computerized methods; methods for obtaining meteorological and radiological data; operation of the dose assessment computer; and interpretation of offsite dose calculation results.
Position Specific Items An overview of this appendix with an emphasis on organization, interactions with other elements of the emergency organization, and position specific responsibilities as delineated in the emergency implementing procedures.  . This overview training may be conducted as part of classroom, table-top, drill or exercise.  
 
26 REV 38  05/05 TABLE 4  TYPICAL EOF COMMUNICATION CAPABILITY Communications Functions VEGP HNP FNP EOF Management with TSC Commercial Telephone lines TSC/EOF/OSC Conference Bridge Radio Commercial Telephone lines TSC/EOF/OSC Conference Bridge Radio Commercial Telephone lines TSC/EOF/OSC Conference Bridge Radio Resource  Management Commercial Telephone lines OPX Commercial Telephone lines OPX Ringdown Commercial Telephone lines OPX Radiological Monitoring Southern LINC Kenwood Radio System Southern LINC Kenwood Radio System Southern LINC Kenwood Radio System Off-site (PARs)
ENN ENN ENN NRC Use ENS HPN RSCL PMCL MCL LAN Conference Phones (3)
ENS HPN RSCL PMCL MCL LAN Conference Phones (3)
ENS HPN RSCL PMCL MCL LAN Conference Phones (3)
Notes:  1. The Offsite Premises Extension (OPX) lines to the three SNC plant sites will be available in the proposed common EOF. These lines bypass the local phone switch. These lines may be referenced as company tie lines.
Intra-facility public address and intra-building public address systems are also available.
27 REV 49  08/08
27 REV 49  08/08
* Position used to meet augmentation requirements for EOF Direction and notification/communication FIGURE 1 28 REV 49    08/08   FIGURE 2 REV 57  06/12 APPENDIX 8 EMERGENCY COMMUNICATIONS PLAN SOUTHERN NUCLEAR OPERATING COMPANY i REV 57  06/12 APPENDIX 8 EMERGENCY COMMUNICATIONS PLAN TABLE OF CONTENTS     Page 1.0 Purpose 1 2.0 Policy 2 3.0 Relationship with Other Agencies 4 4.0 Flow of Emergency Public Information 4 5.0 Emergency Communications Facility Locations and Functions 6 6.0 Emergency Communications Plan Activation 9 7.0 Emergency Communications Staff Functions 11 8.0 News Releases 17 9.0 Press Briefings 17 10.0 Public Response 17 11.0 Telecommunications 18 12.0 Transportation 18 13.0 Security 18 14.0 Print and Audiovisual Aids 18 15.0 Special Requests 18 16.0 Public Information Plan for Recovery 19 17.0 Training 19 18.0 Public Information and Education Program 21 19.0 Procedures 24 ii REV 57  06/12 LIST OF FIGURES   Page  A. Flow of Public Information During an Emergency 26 B. Initial/Early Stage Flow of Emergency Public Information at CMC (Prior to JIC Activation)  27 C. Emergency Communications Information Flow following JIC Activation 28 D. Public Response Flow Chart 29 E. Emergency Communications Reporting Structure 30 iii REV 57  06/12 LIST OF TABLES   Page  Table 1 Emergency Communications Training Matrix  25 1 REV 57  06/12 1.0 PURPOSE The Southern Nuclear Company (SNC) Emergency Communications Plan (ECP) is a portion of the Vogtle Electric Generating Plant (VEGP) Unit 1 and Unit 2 Emergency Plans submitted to the Nuclear Regulatory Commission (NRC).
* Position used to meet augmentation requirements for EOF Direction and notification/communication FIGURE 1  
The Vice President and General Counsel, SNC Corporate Council and Compliance, is responsible for coordination and administration of the Southern Nuclear Emergency Communications Plan (ECP or the Plan). The ECP is reviewed and updated once per calendar year in conjunction with a review and update of the site Emergency Plans. The ECP is designed to:
 
A. Coordinate the public communications effort through the issuance of timely, accurate information during an emergency. B. Describe the means to activate and staff emergency communications positions in the Alabama Power/Georgia Power (APC/GPC) Corporate Media Center (CMC) in Birmingham/Atlanta, the Joint Information Centers (JIC), and the SNC Emergency Operations Facility (EOF). C. Describe the process of information dissemination through news releases and press briefings. D. Describe the training and testing of personnel in their functions and testing of the response to be made pursuant to the ECP. E. Maintain an orderly flow of information during the recovery period.
28 REV 49    08/08 FIGURE 2 REV 57  06/12 APPENDIX 8 EMERGENCY COMMUNICATIONS PLAN SOUTHERN NUCLEAR OPERATING COMPANY  
2 REV 57  06/12 F. Describe the Public Education and Information Program for the periodic dissemination of emergency planning instructional materials to residents and transients in the plume exposure pathway Emergency Planning Zone. G. Provide for 24-hour/day Emergency Communications Organization (ECO) staff coverage in the event of an emergency. H. Assign responsibilities to and duty locations for the Emergency Communications response team. 2.0 POLICY The public information policy described below will provide guidance during an emergency at a SNC nuclear plant (the Plant): A. The Southern Company has a policy of full disclosure and will maintain honest and open communications with public officials, the public (especially in the immediate vicinity of the plant), and its employees at all times. This attitude stems from resolve to operate all our facilities safely and prudently and to communicate clearly and completely any significant breach of safety.
 
3 REV 57  06/12 B. The Company (Southern Company) will provide the public with prompt and accurate information through established news and information channels. C. The Company will make every effort to meet the information needs of the public and employees while communicating promptly with appropriate local, state, and federal officials during the period of the emergency. D. Statements to the news media, the public and employees concerning the plant, its operation, and any emergencies are to be made only with the knowledge and guidance of the appropriate GPC/APC Public Relations/Corporate Communication Departments and appropriate Southern Nuclear management.
i REV 57  06/12 APPENDIX 8 EMERGENCY COMMUNICATIONS PLAN TABLE OF CONTENTS Page 1.0 Purpose 1 2.0 Policy 2 3.0 Relationship with Other Agencies 4 4.0 Flow of Emergency Public Information 4 5.0 Emergency Communications Facility Locations and Functions 6 6.0 Emergency Communications Plan Activation 9 7.0 Emergency Communications Staff Functions 11 8.0 News Releases 17 9.0 Press Briefings 17 10.0 Public Response 17 11.0 Telecommunications 18 12.0 Transportation 18 13.0 Security 18 14.0 Print and Audiovisual Aids 18 15.0 Special Requests 18 16.0 Public Information Plan for Recovery 19 17.0 Training 19 18.0 Public Information and Education Program 21 19.0 Procedures 24  
4 REV 57  06/12 3.0 RELATIONSHIP WITH OTHER AGENCIES A. The Emergency Communications Organization (ECO) is responsible for the coordination and issuance of all news announcements related to emergency conditions at the Plant. Federal, State and County emergency management agencies and the Department of Energy -Savannah River Site (DOE-SRS) are responsible for the issuance of public announcements relating to offsite conditions, including recommended protective actions.
 
B. A Joint Information Center (JIC) will be operated providing the Utility, the state(s),  the federal agencies (including the SRS as appropriate), and counties the opportunity  to coordinate information, issue news releases, make announcements, and may participate jointly in news briefings. Public response activities will be conducted and coordinated jointly with State and County agencies as appropriate.
ii REV 57  06/12 LIST OF FIGURES Page  A. Flow of Public Information During an Emergency 26 B. Initial/Early Stage Flow of Emergency Public Information at CMC (Prior to JIC Activation)  27
C. Work areas for the public information officers of the federal, state, and county emergency response agencies are available at the JIC. Telecommunications facilities are also available to these agencies.
 
D. Utility news announcements will be provided to representatives of government agencies prior to their distribution to the news media.
C. Emergency Communications Information Flow following JIC Activation 28
E. The county and state emergency management agencies should advise ERC/JIC staff of announcements for the news media or the Emergency Alerting Stations (EAS) prior to their distribution to the news media.
 
F. Public response may include state and county agency representatives and utility employees coordinated by the CMC/JIC Public Response Coordinator. Rumors related to offsite matters will be referred to the appropriate federal, state, or county agency representatives for proper responses. Rumors related to onsite matters that agencies are aware of will be relayed to the CMC/JIC Public Response Coordinator for the necessary actions. 
D. Public Response Flow Chart 29 E. Emergency Communications Reporting Structure 30
 
iii REV 57  06/12 LIST OF TABLES Page  Table 1 Emergency Communications Training Matrix  25  
 
1 REV 57  06/12
 
==1.0 PURPOSE==
The Southern Nuclear Company (SNC) Emergency Communications Plan (ECP) is a portion of the Vogtle Electric Generating Plant (VEGP) Unit 1 and Unit 2 Emergency Plans submitted to the Nuclear Regulatory Commission (NRC).  
 
The Vice President and General Counsel, SNC Corporate Council and Compliance, is responsible for coordination and administration of the Southern Nuclear Emergency Communications Plan (ECP or the Plan). The ECP is reviewed and updated once per calendar year in conjunction with a review and update of the site Emergency Plans.
The ECP is designed to:  
 
A. Coordinate the public communications effort through the issuance of timely, accurate information during  
 
an emergency. B. Describe the means to activate and staff emergency communications positions in the Alabama Power/Georgia Power (APC/GPC) Corporate Media Center  
 
(CMC) in Birmingham/Atlanta, the Joint Information Centers (JIC), and the SNC Emergency Operations Facility (EOF). C. Describe the process of information dissemination through news releases and press briefings. D. Describe the training and testing of personnel in their functions and testing of the response to be made pursuant to the ECP. E. Maintain an orderly flow of information during the recovery period.
2 REV 57  06/12 F. Describe the Public Education and Information Program for the periodic dissemination of emergency planning instructional materials to residents and transients in the plume exposure pathway Emergency Planning Zone. G. Provide for 24-hour/day Emergency Communications Organization (ECO) staff coverage in the event of an emergency. H. Assign responsibilities to and duty locations for the Emergency Communications response team.  
 
==2.0 POLICY==
The public information policy described below will provide guidance during an emergency at a SNC nuclear  
 
plant (the Plant):
A. The Southern Company has a policy of full disclosure and will maintain honest and open communications  
 
with public officials, the public (especially in the  
 
immediate vicinity of the plant), and its employees  
 
at all times. This attitude stems from resolve to  
 
operate all our facilities safely and prudently and  
 
to communicate clearly and completely any  
 
significant breach of safety.  
 
3 REV 57  06/12 B. The Company (Southern Company) will provide the public with prompt and accurate information through established news and information channels.
C. The Company will make every effort to meet the information needs of the public and employees while  
 
communicating promptly with appropriate local,  
 
state, and federal officials during the period of  
 
the emergency.
D. Statements to the news media, the public and employees concerning the plant, its operation, and  
 
any emergencies are to be made only with the  
 
knowledge and guidance of the appropriate GPC/APC  
 
Public Relations/Corporate Communication Departments  
 
and appropriate Southern Nuclear management.  
 
4 REV 57  06/12 3.0 RELATIONSHIP WITH OTHER AGENCIES A. The Emergency Communications Organization (ECO) is responsible for the coordination and issuance of all news announcements related to emergency conditions at the  
 
Plant. Federal, State and County emergency management  
 
agencies and the Department of Energy -Savannah River  
 
Site (DOE-SRS) are responsible for the issuance of public  
 
announcements relating to offsite conditions, including  
 
recommended protective actions.  
 
B. A Joint Information Center (JIC) will be operated providing the Utility, the state(s),  the federal agencies (including the SRS as appropriate), and counties  
 
the opportunity  to coordinate information, issue news releases, make announcements, and may participate jointly  
 
in news briefings. Public response activities will be  
 
conducted and coordinated jointly with State and County  
 
agencies as appropriate.  
 
C. Work areas for the public information officers of the federal, state, and county emergency response agencies  
 
are available at the JIC. Telecommunications facilities are also available to these agencies.  
 
D. Utility news announcements will be provided to representatives of government agencies prior to their  
 
distribution to the news media.  
 
E. The county and state emergency management agencies should advise ERC/JIC staff of announcements for the news media or the Emergency Alerting Stations (EAS) prior to their  
 
distribution to the news media.  


4.0 FLOW OF EMERGENCY PUBLIC INFORMATION  Information release for a Notification of Unusual Event is managed by the SNC Corporate Communication Manager in coordination with Southern Nuclear management and APC/GPC Corporate Communication. At an Alert classification or higher, approval of news releases, other than the Initial News Release (INR), is required from both the EOF Manager and the Public Information Director (PID) or their designee(s).
F. Public response may include state and county agency representatives and utility employees coordinated by the  
5 REV 57  06/12 The following figures are designed to show the flow of information for emergencies classified as Alert or higher.


A. Flow of Public Information During an Emergency B. Initial/Early Flow of Emergency Public Information at Corporate Media Center (prior to JIC activation) C. Emergency Communications Information Flow (after JIC activation) D. Public Response Flow Chart E. Emergency Communications Reporting Structure 6 REV 57  06/12 5.0 EMERGENCY COMMUNICATIONS STAFF LOCATIONS AND FUNCTIONS  The PI Director is responsible for all emergency communications response activities and staff.  
CMC/JIC Public Response Coordinator. Rumors related to offsite matters will be referred to the appropriate


At an alert classification or higher, the Emergency Communications public response will be handled initially from the CMC by the PI Director. The PI Director and the Nuclear Spokesperson will contact the EOF Manager for briefing on the emergency. The EOF will issue an Initial News Release (INR).
federal, state, or county agency representatives for  


If the decision is made to activate the JIC, the PI Director and the Nuclear Spokesperson move to that facility. Upon activation of the JIC, primary utility Emergency Communications response will be conducted from the JIC. The CMC staff will maintain communications with the JIC and EOF, keep APC/GPC/SNC personnel notified of plant conditions, and support JIC activities.
proper responses. Rumors related to onsite matters that
A. Corporate Media Center - Atlanta/Birmingham
 
: 1. The Corporate Media Center, located at the Atlanta/Birmingham corporate headquarters building of Georgia Power Company/Alabama Power Company, as appropriate, is the official location for coordination and issuance of news announcements and responses to news media inquiries until the JIC has been activated. The CMC may function as a Joint Public Information Center (JPIC) and may conduct these activities as long as appropriate and necessary.
agencies are aware of will be relayed to the CMC/JIC Public Response Coordinator for the necessary actions.
: 2. Prior to activation of the JIC at an Alert or higher classification, corporate staff assigned to the JIC will assemble at the CMC. They will proceed to the JIC when directed by the Public Information Director.
 
4.0 FLOW OF EMERGENCY PUBLIC INFORMATION Information release for a Notification of Unusual Event
 
is managed by the SNC Corporate Communication Manager in
 
coordination with Southern Nuclear management and APC/GPC
 
Corporate Communication.
At an Alert classification or higher, approval of news
 
releases, other than the Initial News Release (INR), is
 
required from both the EOF Manager and the Public
 
Information Director (PID) or their designee(s).
5 REV 57  06/12 The following figures are designed to show the flow of information for emergencies classified as Alert or
 
higher.
 
A. Flow of Public Information During an Emergency B. Initial/Early Flow of Emergency Public Information at Corporate Media Center (prior to JIC activation) C. Emergency Communications Information Flow (after JIC activation) D. Public Response Flow Chart E. Emergency Communications Reporting Structure 6 REV 57  06/12 5.0 EMERGENCY COMMUNICATIONS STAFF LOCATIONS AND FUNCTIONS The PI Director is responsible for all emergency
 
communications response activities and staff.
 
At an alert classification or higher, the Emergency
 
Communications public response will be handled initially from
 
the CMC by the PI Director. The PI Director and the Nuclear
 
Spokesperson will contact the EOF Manager for briefing on the
 
emergency. The EOF will issue an Initial News Release (INR).
 
If the decision is made to activate the JIC, the PI Director and the Nuclear Spokesperson move to that facility. Upon  
 
activation of the JIC, primary utility Emergency Communications response will be conducted from the JIC. The CMC staff will maintain communications with the JIC and EOF, keep APC/GPC/SNC personnel notified of plant conditions, and  
 
support JIC activities.  
 
A. Corporate Media Center - Atlanta/Birmingham
: 1. The Corporate Media Center, located at the Atlanta/Birmingham corporate headquarters  
 
building of Georgia Power Company/Alabama Power  
 
Company, as appropriate, is the official location  
 
for coordination and issuance of news  
 
announcements and responses to news media  
 
inquiries until the JIC has been activated. The CMC may function as a Joint Public Information  
 
Center (JPIC) and may conduct these activities as  
 
long as appropriate and necessary.  
: 2. Prior to activation of the JIC at an Alert or higher classification, corporate staff assigned  
 
to the JIC will assemble at the CMC. They will proceed to the JIC when directed by the Public Information Director.  
: 3. The following staff is assigned to the Corporate Media Center
: 3. The following staff is assigned to the Corporate Media Center
* PI Director (until JIC activation)
* PI Director (until JIC activation)
Line 402: Line 1,671:
* Internet Coordinator
* Internet Coordinator
* CMC Assistant
* CMC Assistant
* CMC Support Staff 7 REV 57  06/12   4. Following activation of the JIC, the CMC staff responsibilities will continue. Responsibilities will include the following: a. Support of the JIC in all functions common to the two facilities such as telephone response, media monitoring, media response, news release preparation and distribution, etc. b. Functions specific to the CMC, including, but not limited to:
* CMC Support Staff  
 
7 REV 57  06/12
: 4. Following activation of the JIC, the CMC staff responsibilities will continue. Responsibilities will include the following:  
: a. Support of the JIC in all functions common to the two facilities such as telephone  
 
response, media monitoring, media response,  
 
news release preparation and distribution,  
 
etc. b. Functions specific to the CMC, including, but not limited to:
* employee communications
* employee communications
* financial response
* financial response
Line 408: Line 1,687:
* coordination with senior management
* coordination with senior management
* Internet activities
* Internet activities
* providing additional trained staff to support the ECO effort B. Emergency Operations Facility (EOF)
* providing additional trained staff to  
: 1. The EOF will serve as the source of information about an incident to staff in the CMC and JIC.
 
support the ECO effort  
 
B. Emergency Operations Facility (EOF)
: 1. The EOF will serve as the source of information about an incident to staff in the CMC and JIC.  
: 2. Emergency Communications staff will:
: 2. Emergency Communications staff will:
* serve as the source of information for the Nuclear Spokesperson and PID
* serve as the source of information for the  
 
Nuclear Spokesperson and PID
* develop and issue the INR
* develop and issue the INR
* develop and obtain SNC approval for subsequent news releases
* develop and obtain SNC approval for subsequent  
 
news releases
* confirm or correct rumors identified
* confirm or correct rumors identified
* perform other communications responsibilities as needed 8 REV 57  06/12 C. Joint Information Center 1. After the initial notification of an emergency at the Alert classification or higher, the PI Director decides whether to activate the JIC. Once the JIC is activated, it becomes the "single source" for media information. 2. Upon activation of the JIC, the PI Director transfers to that facility, maintaining overall responsibility for emergency communications response. The PI Director will manage the emergency communications response and is responsible for all functions of the JIC. These functions include:
* perform other communications responsibilities  
 
as needed 8 REV 57  06/12 C. Joint Information Center
: 1. After the initial notification of an emergency at the Alert classification or higher, the PI  
 
Director decides whether to activate the JIC.
Once the JIC is activated, it becomes the "single source" for media information.  
: 2. Upon activation of the JIC, the PI Director transfers to that facility, maintaining overall  
 
responsibility for emergency communications  
 
response. The PI Director will manage the  
 
emergency communications response and is  
 
responsible for all functions of the JIC. These functions include:
* final approval and distribution of press statements
* final approval and distribution of press statements
* coordination of press briefings and joint news announcements with
* coordination of press briefings and joint news announcements with
Line 421: Line 1,723:
* requests for interviews and photos
* requests for interviews and photos
* recorded information line updates
* recorded information line updates
* public response It is the PI Director's responsibility to assure all information is fully coordinated with and among the appropriate state and federal government public information officers (PIOs).   
* public response  
: 3. Upon activation, the JIC will obtain information from the EOF. 4. News briefings will be held at regular intervals during the emergency. The PI Director will preside over the press briefings. The Nuclear Spokesperson will explain emergency conditions and actions the Utility has taken at the plant. Off-site issues will be handled by off-site agency representatives. 5. If radiological conditions permit, an area near the plant may be designated as a site for television and news photographs. The Media Relations Representative, in consultation with the PI Director and the ED or his designee, and AEMA/GEMA management, as appropriate, will arrange for escorted visits to photographic locations.
 
9 REV 57  06/12   6. The following positions will be assigned to the Joint Information Center:
It is the PI Director's responsibility to assure all  
 
information is fully coordinated with and among the  
 
appropriate state and federal government public information  
 
officers (PIOs).   
: 3. Upon activation, the JIC will obtain information from the EOF.  
: 4. News briefings will be held at regular intervals  
 
during the emergency. The PI Director will  
 
preside over the press briefings. The Nuclear  
 
Spokesperson will explain emergency conditions and  
 
actions the Utility has taken at the plant. Off-
 
site issues will be handled by off-site agency  
 
representatives.  
: 5. If radiological conditions permit, an area near  
 
the plant may be designated as a site for  
 
television and news photographs. The Media  
 
Relations Representative, in consultation with the  
 
PI Director and the ED or his designee, and  
 
AEMA/GEMA management, as appropriate, will arrange  
 
for escorted visits to photographic locations.
9 REV 57  06/12
: 6. The following positions will be assigned to the Joint Information Center:
* PI Director
* PI Director
* JIC Manager
* JIC Manager
Line 436: Line 1,773:
* Technical Assistants
* Technical Assistants
* Security Officers
* Security Officers
* AV Support Staff
* AV Support Staff  
 
6.0 EMERGENCY COMMUNICATIONS PLAN ACTIVATION


6.0 EMERGENCY COMMUNICATIONS PLAN ACTIVATION A. Notification of Unusual Event  
A. Notification of Unusual Event  


The SNC Corporate Communication Manager will be notified of an NUE and will in turn notify APC Public Relations/GPC Corporate Communication management, as appropriate. The notification will include the status of the emergency and a brief description of the event. The SNC Corporate Communication Manager will confer with appropriate SNC management and affected owner-company management to determine the need for:  
The SNC Corporate Communication Manager will be notified of  
 
an NUE and will in turn notify APC Public Relations/GPC  
 
Corporate Communication management, as appropriate. The  
 
notification will include the status of the emergency and a  
 
brief description of the event. The SNC Corporate  
 
Communication Manager will confer with appropriate SNC  
 
management and affected owner-company management to determine  
 
the need for:  
: 1. Additional notifications  
: 1. Additional notifications  
: 2. Issuance of a news release 10 REV 57  06/12 B. Alert and Higher Classifications   The SNC On-Call Media Rep will be advised of an event classified as Alert level or higher. The SNC rep will notify the APC/GPC On-Call Media Rep, as appropriate, with a description of the situation. The APC/GPC on-call media rep will notify the PID who will:  
: 2. Issuance of a news release  
 
10 REV 57  06/12 B. Alert and Higher Classifications The SNC On-Call Media Rep will be advised of an event  
 
classified as Alert level or higher. The SNC rep will notify  
 
the APC/GPC On-Call Media Rep, as appropriate, with a  
 
description of the situation. The APC/GPC on-call media rep  
 
will notify the PID who will:  
: 1. Formally activate the Emergency Communications Plan.   
: 1. Formally activate the Emergency Communications Plan.   
: 2. Notify emergency communications staff per Nuclear Management Procedure-Emergency Planning (NMP-EP-002).   
: 2. Notify emergency communications staff per Nuclear Management Procedure-Emergency Planning (NMP-EP-
: 3. Establish contact with the Emergency Operation Facility.
 
: 4. Establish contact with appropriate local, state and federal agencies.
002).   
: 3. Establish contact with the Emergency Operation Facility.  
: 4. Establish contact with appropriate local, state and federal agencies.  
: 5. Issue news release(s).  
: 5. Issue news release(s).  


In addition, the PI Director will evaluate the following actions:  
In addition, the PI Director will evaluate the  
: 1. Activating the JIC and dispatch staff accordingly.  
 
: 2. Conducting news briefings at the CMC or the JIC, which will include to the maximum extent possible, a panel composed of the Nuclear Spokesperson and representatives of government agencies.
following actions:  
11 REV 57  06/12 7.0 EMERGENCY COMMUNICATIONS STAFF FUNCTIONS The following is a description of responsibilities of principal Emergency Communications staff.
: 1. Activating the JIC and dispatch staff accordingly.  
A. Public Information Director (PID): The Public Information Director (PID) is responsible for directing all emergency communications personnel assignments. The PID, or a designee, is responsible for coordinating approvals and dissemination of all utility public information regarding the emergency. Upon activation of the CMC/JIC, the PID will be responsible for overall facility direction. Those duties may include coordinating approval and dissemination of utility news releases, facilitating news briefings, overseeing public response, meeting special media requests, and coordination among company and non-utility representatives in the facility and liaison with the media. The PID will be responsible for coordinating emergency communications response and coordinating with the SNC Corporate Duty Manager in evaluating the emergency's severity in terms of public interest and safety.
: 2. Conducting news briefings at the CMC or the JIC, which will include to the maximum extent  
B. Nuclear Spokesperson The Nuclear Spokesperson speaks on behalf of the company, providing plant status updates during news briefings. The Spokesperson also may do one-on-one media interviews. The position works with the Technical Assistant in keeping abreast of the event status and keeps the PID posted on that status. The position may first report to the EOF and then proceed to the CMC/JIC. C. Technical Assistant (TA)  
 
possible, a panel composed of the Nuclear  
 
Spokesperson and representatives of government  
 
agencies.  
 
11 REV 57  06/12 7.0 EMERGENCY COMMUNICATIONS STAFF FUNCTIONS The following is a description of responsibilities of principal Emergency Communications staff.  
 
A. Public Information Director (PID):
The Public Information Director (PID) is responsible for  
 
directing all emergency communications personnel  
 
assignments. The PID, or a designee, is responsible for  
 
coordinating approvals and dissemination of all utility  
 
public information regarding the emergency. Upon  
 
activation of the CMC/JIC, the PID will be responsible for overall facility direction. Those duties may  
 
include coordinating approval and dissemination of  
 
utility news releases, facilitating news briefings,  
 
overseeing public response, meeting special media  
 
requests, and coordination among company and non-utility  
 
representatives in the facility and liaison with the  
 
media. The PID will be responsible for coordinating  
 
emergency communications response and coordinating with  
 
the SNC Corporate Duty Manager in evaluating the  
 
emergency's severity in terms of public interest and  
 
safety.
B. Nuclear Spokesperson  
 
The Nuclear Spokesperson speaks on behalf of the  
 
company, providing plant status updates during news  
 
briefings. The Spokesperson also may do one-on-one  
 
media interviews. The position works with the Technical  
 
Assistant in keeping abreast of the event status and  
 
keeps the PID posted on that status. The position may  
 
first report to the EOF and then proceed to the CMC/JIC.
C. Technical Assistant (TA)  
 
The Technical Assistant (TA) supports the Nuclear
 
Spokesperson by gathering accurate and timely
 
information about the event and the plant's status. 
 
Information is gathered via WebEOC, the plant status
 
loop, and via direct contact with the EOC Manager -
 
which the TA should maintain throughout an event. TA's
 
may do media interviews at the discretion and direction
 
of the PID.
12 REV 60  07/13 D. CMC Manager The CMC Manager will report to the CMC where he/she will coordinate activities. The CMC Manager may assume the
 
PID role while a PID is en-route to the JIC. After JIC
 
activation, the CMC Manager will assume full
 
responsibility for CMC activities and maintain contact
 
with the PID. The CMC Manager has responsibility for
 
ensuring that the actions of the CMC positions are
 
carried out. 
 
E. CMC/JIC/CCC Public Response Coordinator
 
The CMC/JIC Public Response Coordinator will direct facility public response activities, keeping staff
 
advised of current information and obtaining responses
 
for questions they cannot answer. This includes
 
referring specific inquiries to the proper person. The
 
Coordinator is responsible for tracking rumors and
 
ensuring that the Public Response team members have
 
updated information on the rumor responses. 


The Technical Assistant (TA) supports the Nuclear Spokesperson by gathering accurate and timely information about the event and the plant's status.
Information is gathered via WebEOC, the plant status loop, and via direct contact with the EOC Manager -
which the TA should maintain throughout an event. TA's may do media interviews at the discretion and direction of the PID.
12 REV 60  07/13 D. CMC Manager  The CMC Manager will report to the CMC where he/she will coordinate activities. The CMC Manager may assume the PID role while a PID is en-route to the JIC. After JIC activation, the CMC Manager will assume full responsibility for CMC activities and maintain contact with the PID. The CMC Manager has responsibility for ensuring that the actions of the CMC positions are carried out.
E. CMC/JIC/CCC Public Response Coordinator The CMC/JIC Public Response Coordinator will direct facility public response activities, keeping staff advised of current information and obtaining responses for questions they cannot answer. This includes referring specific inquiries to the proper person. The Coordinator is responsible for tracking rumors and ensuring that the Public Response team members have updated information on the rumor responses.
F. CMC Financial Response Liaison  
F. CMC Financial Response Liaison  


The CMC Financial Response Liaison responds to financial inquiries from financial analysts, the public, media and stockholders regarding the effects a nuclear incident might have on Southern Company's financial position.
The CMC Financial Response Liaison responds to financial  
This role identifies and establishes contact with key financial leaders and provides them updated information.
 
The position maintains contact with the CMC Public Response Coordinator.
inquiries from financial analysts, the public, media and  
 
stockholders regarding the effects a nuclear incident  
 
might have on Southern Company's financial position.
 
This role identifies and establishes contact with key  
 
financial leaders and provides them updated information.
 
The position maintains contact with the CMC Public  
 
Response Coordinator.
 
G. Government Relations Liaison  
G. Government Relations Liaison  


The Government Relations Liaison responds to inquiries from governmental sources. The role identifies and establishes contact with key government officials and provides them with updated information. The position maintains contact with the CMC Public Response Coordinator.
The Government Relations Liaison responds to inquiries  
H. SNC News Writer The SNC News Writer gathers information and prepares all news releases for the duration of an event. The News Writer coordinates technical approval with the SNC EOF Manager. This position works in the SNC EOF.
 
13 REV 60  07/13 I. JIC Manager The JIC Manager is responsible for coordinating operations of the facility and has responsibility for ensuring that the actions of the JIC positions represented on Attachment 1 are carried out. The position may assume Emergency Communications approval authority at the direction of the PID.
from governmental sources. The role identifies and  
J. CMC/JIC Media Relations Representative(s) The CMC/JIC Media Relations Representative(s) report to the CMC/JIC Manager and are responsible for implementing utility media response.
 
establishes contact with key government officials and  
 
provides them with updated information. The position  
 
maintains contact with the CMC Public Response  
 
Coordinator.
 
H. SNC News Writer  
 
The SNC News Writer gathers information and prepares all  
 
news releases for the duration of an event. The News  
 
Writer coordinates technical approval with the SNC EOF  
 
Manager. This position works in the SNC EOF.
13 REV 60  07/13 I. JIC Manager  
 
The JIC Manager is responsible for coordinating  
 
operations of the facility and has responsibility for  
 
ensuring that the actions of the JIC positions  
 
represented on Attachment 1 are carried out. The  
 
position may assume Emergency Communications approval  
 
authority at the direction of the PID.
 
J. CMC/JIC Media Relations Representative(s)
The CMC/JIC Media Relations Representative(s) report to  
 
the CMC/JIC Manager and are responsible for implementing  
 
utility media response.
 
K. CMC/JIC Facility Coordinator  
K. CMC/JIC Facility Coordinator  


The CMC/JIC Facility Coordinator is responsible for setting up the facility and ensuring ongoing operability. The position supports the CMC/JIC Manager.
The CMC/JIC Facility Coordinator is responsible for  
 
setting up the facility and ensuring ongoing  
 
operability. The position supports the CMC/JIC Manager.  
 
L. Community Relations Coordinator  
L. Community Relations Coordinator  


The Community Relations Coordinator identifies and initiates contacts with local public officials and leaders who need to be aware of the latest information about events. The position should advise the Public Response Coordinator and Governmental Relations Liaison of activities and contacts as appropriate.
The Community Relations Coordinator identifies and  
 
initiates contacts with local public officials and  
 
leaders who need to be aware of the latest information  
 
about events. The position should advise the Public  
 
Response Coordinator and Governmental Relations Liaison  
 
of activities and contacts as appropriate.  
 
M. CMC/JIC Assistant  
M. CMC/JIC Assistant  


The CMC/JIC Assistant supports the PID and staff, coordinates approval and distribution of news releases, directs activities of the support staff and maintains an accurate record of JIC activities. N. CMC/JIC Support Staff The CMC/JIC Support Staff provides administrative support for the facility.
The CMC/JIC Assistant supports the PID and staff, coordinates approval and distribution of news releases,  
 
directs activities of the support staff and maintains an  
 
accurate record of JIC activities.
N. CMC/JIC Support Staff The CMC/JIC Support Staff provides administrative  
 
support for the facility.
 
O. Employee Communications Coordinator  
O. Employee Communications Coordinator  


The Employee Communications Coordinator disseminates plant status updates to Southern Company employees and customer service centers through a variety of means.
The Employee Communications Coordinator disseminates  
14 REV 60  07/13 P. Internet Coordinator The Internet Coordinator is responsible for updating and maintaining the company's external emergency page and monitoring the web for external coverage of the event.
 
Q. CSO/CMC/JIC Public Response Team The CMC/JIC Public Response Team is responsible for responding to public inquiries. The team may include Telephone Responders, Media Monitor, Internet Coordinator, Employee Communications Coordinator, Financial Response Liaison and Governmental Relations Liaison.
plant status updates to Southern Company employees and  
R. Social Media Coordinator The Social Media Coordinator will proactively disseminate notice of county news releases, announcements, etc., as needed. The position will monitor social media site to access the tone and volume of interest and to identify the spread of misinformation.
 
15 REV 57  06/12 8.0 NEWS RELEASES The Utility will issue news releases concerning events, conditions and actions at the Plant. News releases are designed to be a written confirmation of events and public information which has been issued. The SNC News Writer will write news releases in the EOF and obtain SNC approval from the EOF Manager, then forward them to the CMC or JIC as appropriate. The Facility Manager at that location will obtain communications approval and direct distribution of the release. 9.0 PRESS BRIEFINGS   In the event of an incident at a nuclear plant media attention would be quick and overwhelming. Press briefings will be conducted to keep the media informed of events and activities relating to the emergency. Briefings will provide the most current, up-to-date information about events and response to the incident. They are also a primary means of addressing rumors or inaccurate information identified in our publics. Public Information Officers (PIOs) from all offsite agencies responding to the emergency will be encouraged to participate in the briefings to discuss their particular activities. The emphasis of the briefings will be on public safety. 10.0 PUBLIC RESPONSE Upon announcement of an emergency situation, misinformation and rumors can be expected to evolve. The following Public Response policies shall be instituted and followed upon the activation of the ECP. Rumors will be addressed through a policy of open and candid communications with the news media and general public. A. All appropriate information will be released as clearly, concisely and quickly as possible. Public announcements will be made on a frequent and regular basis. B. An official Utility spokesperson will be designated as the source of new or updated official information about the incident.
customer service centers through a variety of means.
14 REV 60  07/13 P. Internet Coordinator  
 
The Internet Coordinator is responsible for updating and  
 
maintaining the company's external emergency page and  
 
monitoring the web for external coverage of the event.
 
Q. CSO/CMC/JIC Public Response Team  
 
The CMC/JIC Public Response Team is responsible for responding to public inquiries. The team may include  
 
Telephone Responders, Media Monitor, Internet  
 
Coordinator, Employee Communications Coordinator,  
 
Financial Response Liaison and Governmental Relations  
 
Liaison.
 
R. Social Media Coordinator The Social Media Coordinator will proactively disseminate notice of county news releases, announcements, etc., as needed. The position will monitor social media site to access the tone and volume of interest and to identify the spread of misinformation.  
 
15 REV 57  06/12 8.0 NEWS RELEASES The Utility will issue news releases concerning events, conditions and actions at the Plant. News releases are designed to be a written confirmation of events and public information which has been issued.
The SNC News Writer will write news releases in the EOF and  
 
obtain SNC approval from the EOF Manager, then forward them to the CMC or JIC as appropriate. The Facility Manager at that location will obtain communications approval and  
 
direct distribution of the release.
9.0 PRESS BRIEFINGS In the event of an incident at a nuclear plant media  
 
attention would be quick and overwhelming. Press briefings  
 
will be conducted to keep the media informed of events and activities relating to the emergency. Briefings will provide the most current, up-to-date information about events and response to the incident. They are also a primary means of addressing rumors or inaccurate information identified in our publics.
Public Information Officers (PIOs) from all offsite  
 
agencies responding to the emergency will be encouraged to participate in the briefings to discuss their particular activities.
The emphasis of the briefings will be on public safety.
10.0 PUBLIC RESPONSE Upon announcement of an emergency situation, misinformation and rumors can be expected to evolve. The following Public Response policies shall be instituted and followed upon the  
 
activation of the ECP.
Rumors will be addressed through a policy of open and candid communications with the news media and general public.
A. All appropriate information will be released as clearly, concisely and quickly as possible. Public announcements will be made on a frequent and regular basis.
B. An official Utility spokesperson will be designated as the source of new or updated official information about  
 
the incident.
16 REV 60  07/13 C. Public response will encompass a number of activities to ensure accurate information is disseminated. These may include:
16 REV 60  07/13 C. Public response will encompass a number of activities to ensure accurate information is disseminated. These may include:
* recorded messages containing the most current information,
* recorded messages containing the most current information,
* interaction with callers,
* interaction with callers,
* proactively providing information to the media and responding to their needs,
* proactively providing information to the media and  
 
responding to their needs,
* monitoring media broadcasts/outlets
* monitoring media broadcasts/outlets
* employee communications
* employee communications
* identifying, notifying and constantly updating specific publics, (i.e. financial centers, governmental officials, etc.)
* identifying, notifying and constantly updating  
 
specific publics, (i.e. financial centers, governmental officials, etc.)
* Internet coordination
* Internet coordination
* Social Media. Public response activities will be coordinated with state agencies. The Prompt Notification System (PNS) will be activated by state or local EMA officials. PNS will direct area residents to local news broadcasts and/or the Emergency Alert System (EAS), which will serve as the primary source of official information for the public. 11.0 TELECOMMUNICATIONS A. The CMC/JIC Facility Coordinator will be responsible for resolving special problems and obtaining additional equipment for the JIC. B. Telephone and telecopier lines connect the JIC and EOF to the appropriate CMC.
* Social Media.
C. Telephone lines and equipment discussed above will be tested quarterly.
Public response activities will be coordinated with state  
12.0 TRANSPORTATION A. If directed, The CMC Assistant will arrange for ground transportation services for Emergency Communications organization relocating to the JIC. B. Special transportation arrangements, such as company or commercial air service between Birmingham, Atlanta, the affected plant and the JIC, may be made available in an emergency.
 
17 REV 60  07/13  13.0 SECURITY A. GPC/APC Corporate Security will coordinate 24-hour security support at the CMC during an emergency.
agencies. The Prompt Notification System (PNS) will be  
B. Security will be provided to the JIC upon activation of this facility. JIC Security will be coordinated through GPC Corporate Security.
 
C. Company personnel, news personnel, industry representatives, government officials, and visitors will be asked to present identification and will be given an identification badge for admittance to the CMC/JIC.   
activated by state or local EMA officials. PNS will direct area residents to local news broadcasts and/or the Emergency Alert System (EAS), which will serve as the primary source of official information for the public.
11.0 TELECOMMUNICATIONS  
 
A. The CMC/JIC Facility Coordinator will be responsible for resolving special problems and obtaining additional  
 
equipment for the JIC.
B. Telephone and telecopier lines connect the JIC and EOF to the appropriate CMC.  
 
C. Telephone lines and equipment discussed above will be tested quarterly.  


18 REV 57  06/12 14.0 PRINT AND AUDIOVISUAL AIDS  A. Press kits are stored at the JIC and CMC. These kits will be updated regularly and will be available to all news media.
12.0 TRANSPORTATION
B. An emergency web page will be activated and will replace the normal web page on the operating company's Internet site in the event of an incident. The emergency page includes plant schematics, background information and directions to the JIC. News releases about the event will also be available here.
C. Maps, photographs, and diagrams of the plant and its operations are stored and maintained at the CMC and JIC for use during news briefings.
D. Electronic media (i.e. videotape, DVD, etc.) of plant exterior and interior views will be maintained and made available for distribution, upon request, to television stations.
15.0 SPECIAL REQUESTS A. The Media Relations Coordinator will respond to requests for special interviews, films, photos, videotapes, etc.
B. Special requests may be refused for either safety or security reasons. In such cases, the reason for refusal will be made clear.
C. Utility personnel will accommodate photographers at the plant site as conditions warrant. Media escorts will be coordinated with GEMA.
D. Industry experts from appropriate agencies (i.e., NEI, INPO) may be called upon to provide general background information to reporters but will not comment on the plant's status. With knowledge of the PI Director, interviews with these individuals will be arranged by the Media Relations Representative.
E. The Media Relations Coordinator or his designee will be present at all special interviews.
19 REV 57  06/12 16.0 PUBLIC INFORMATION PLAN FOR RECOVERY  A. The lead emergency communications representative in the Recovery Organization will be the Public Information Director. This person or his designee will maintain close contact with the Recovery Manager. Emergency communications response will follow the guidelines and procedures described for accident response.
B. As conditions and public interest warrant, additional Public Information personnel will be assigned to support the flow of information concerning recovery operations.
C. Information for possible release will be cleared with the Recovery Manager and the Public Information Director and given to the media through established procedures.
D. All information will be released through established channels of communication to federal and state authorities, the utility industry, the public, and employees.
E. Advance notice will be given to the public through the media of any Company action that will or may affect the health and safety of the plume exposure pathway EPZ residents. Information of this type will be followed up with a news release as soon as the results of any such action are known. 


17.0 TRAINING A. Staff Training  The GPC/APC Corporate Communication Department will coordinate annual emergency training for applicable emergency communications personnel once per calendar year. Training will provide an overview of the Emergency Communications Plan and specific staff position responsibilities (see Table 1). 
A. If directed, The CMC Assistant will arrange for ground transportation services for Emergency Communications  


Individual's assigned key positions on the Emergency Communications staff will participate in training.
organization relocating to the JIC.
(GPC/APC responders with responsibilities directly related to their daily jobs may be exempted. Training will be documented and records of examinations will be held at GPC Corporate Headquarters by the Corporate Communication EC Coordinator.
B. Special transportation arrangements, such as company or commercial air service between Birmingham, Atlanta, the  


Individual and team performance evaluation during exercises will be utilized to measure training program effectiveness and to adjust course content.
affected plant and the JIC, may be made available in an
20 REV 57  06/12  B. News Media Training    A program will be offered each calendar year to acquaint the news media with the methodology for obtaining information during an emergency and with overall emergency preparedness at APC/GPC nuclear plants, as appropriate. The training will include information about the plant, radiation, and the role of the JIC.
Media participation as observers or "Reporter players" during Vogtle exercises can effectively enhance training.
Therefore, media will be invited to participate in VEGP annual exercises. 


21 REV 57  06/12 18.0 PUBLIC INFORMATION AND EDUCATION PROGRAM   The goal of the public information program is to acquaint the general public with the emergency plans for the operation of APC/GPC nuclear plants, as appropriate, and actions they should take if a radiological emergency occurs. Such a program is essential to the overall welfare of citizens in the area. Any incident involving a nuclear plant or nuclear materials can easily become a "crisis" in the minds of those living in the area; unless they understand the plans and programs to be placed into effect should an emergency occur.
emergency.
Only by keeping the public well informed will the Plants be able to operate for the maximum benefit of all concerned. The Public Information and Education Program will seek to:
 
* Explain to the public how they will be notified should an emergency occur at the plant. This will include instructions in the use of the Tone Alert Radio notification system and information on the siren notification system as appropriate.
17 REV 60  07/13 13.0 SECURITY
 
A. GPC/APC Corporate Security will coordinate 24-hour security support at the CMC during an emergency.
 
B. Security will be provided to the JIC upon activation of this facility. JIC Security will be coordinated through
 
GPC Corporate Security.
 
C. Company personnel, news personnel, industry representatives, government officials, and visitors will
 
be asked to present identification and will be given an
 
identification badge for admittance to the CMC/JIC. 
 
18 REV 57  06/12 14.0 PRINT AND AUDIOVISUAL AIDS A. Press kits are stored at the JIC and CMC. These kits will be updated regularly and will be available to all
 
news media.
 
B. An emergency web page will be activated and will replace the normal web page on the operating company's Internet
 
site in the event of an incident. The emergency page
 
includes plant schematics, background information and
 
directions to the JIC. News releases about the event will also be available here.
 
C. Maps, photographs, and diagrams of the plant and its operations are stored and maintained at the CMC and JIC for use during news briefings.
 
D. Electronic media (i.e. videotape, DVD, etc.) of plant exterior and interior views will be maintained and made
 
available for distribution, upon request, to television
 
stations.
 
15.0 SPECIAL REQUESTS
 
A. The Media Relations Coordinator will respond to requests for special interviews, films, photos, videotapes, etc.
 
B. Special requests may be refused for either safety or security reasons. In such cases, the reason for refusal
 
will be made clear.
 
C. Utility personnel will accommodate photographers at the plant site as conditions warrant. Media escorts will be
 
coordinated with GEMA.
 
D. Industry experts from appropriate agencies (i.e., NEI, INPO) may be called upon to provide general background
 
information to reporters but will not comment on the
 
plant's status. With knowledge of the PI Director,
 
interviews with these individuals will be arranged by the
 
Media Relations Representative.
 
E. The Media Relations Coordinator or his designee will be present at all special interviews.
 
19 REV 57  06/12 16.0 PUBLIC INFORMATION PLAN FOR RECOVERY A. The lead emergency communications representative in the
 
Recovery Organization will be the Public Information
 
Director. This person or his designee will maintain
 
close contact with the Recovery Manager.
Emergency
 
communications response will follow the guidelines and
 
procedures described for accident response.
 
B. As conditions and public interest warrant, additional Public Information personnel will be assigned to support
 
the flow of information concerning recovery operations.
 
C. Information for possible release will be cleared with the Recovery Manager and the Public Information Director and
 
given to the media through established procedures.
 
D. All information will be released through established channels of communication to federal and state
 
authorities, the utility industry, the public, and
 
employees.
 
E. Advance notice will be given to the public through the media of any Company action that will or may affect the
 
health and safety of the plume exposure pathway EPZ
 
residents. Information of this type will be followed up
 
with a news release as soon as the results of any such
 
action are known.
 
17.0 TRAINING
 
A. Staff Training The GPC/APC Corporate Communication Department will
 
coordinate annual emergency training for applicable
 
emergency communications personnel once per calendar
 
year. Training will provide an overview of the Emergency
 
Communications Plan and specific staff position
 
responsibilities (see Table 1). 
 
Individual's assigned key positions on the Emergency
 
Communications staff will participate in training. 
 
(GPC/APC responders with responsibilities directly
 
related to their daily jobs may be exempted. Training
 
will be documented and records of examinations will be
 
held at GPC Corporate Headquarters by the Corporate
 
Communication EC Coordinator.
 
Individual and team performance evaluation during
 
exercises will be utilized to measure training program
 
effectiveness and to adjust course content.
20 REV 57  06/12 B. News Media Training A program will be offered each calendar year to acquaint the news media with the methodology for obtaining
 
information during an emergency and with overall
 
emergency preparedness at APC/GPC nuclear plants, as
 
appropriate. The training will include information about
 
the plant, radiation, and the role of the JIC.
 
Media participation as observers or "Reporter players"
 
during Vogtle exercises can effectively enhance training. 
 
Therefore, media will be invited to participate in VEGP
 
annual exercises. 
 
21 REV 57  06/12 18.0 PUBLIC INFORMATION AND EDUCATION PROGRAM The goal of the public information program is to acquaint the general public with the emergency plans for the operation of APC/GPC nuclear plants, as appropriate,  
 
and actions they should take if a radiological emergency  
 
occurs. Such a program is essential to the overall  
 
welfare of citizens in the area. Any incident involving  
 
a nuclear plant or nuclear materials can easily become a  
 
"crisis" in the minds of those living in the area;  
 
unless they understand the plans and programs to be  
 
placed into effect should an emergency occur.  
 
Only by keeping the public well informed will the Plants be able to operate for the maximum benefit of all  
 
concerned. The Public Information and Education Program  
 
will seek to:
* Explain to the public how they will be notified should an emergency occur at the plant. This will include  
 
instructions in the use of the Tone Alert Radio notification system and information on the siren notification system as appropriate.
* Educate the public about radiation and contamination.
* Educate the public about radiation and contamination.
* Help the public understand what their initial actions should be in an emergency.
* Help the public understand what their initial actions  
* Familiarize the public with protective actions, e.g. evacuation routes and relocation centers, and sheltering which may be required and rationale behind recommendations for these actions.
 
should be in an emergency.
* Familiarize the public with protective actions, e.g.
evacuation routes and relocation centers, and sheltering which may be required and rationale behind recommendations for these actions.
* Provide information concerning methods for receiving additional information
* Provide information concerning methods for receiving additional information
* Ensure that special needs of the handicapped are understood 22 REV 57  06/12 A. In order to help assure proper public reaction to an emergency notification, Alabama Power, Georgia Power and Southern Nuclear will keep state and local officials continuously informed of all details related to any emergency.
* Ensure that special needs of the handicapped are  
B. Several communications methods may be used to acquaint the public with plans for their protection during a Plant emergency. Means for accomplishing these methods will include one or more of the following activities as listed below. Effort will be concentrated upon providing information to the public by written material that is likely to be available in the residence and in locations frequented by transients. The information will also provide instructions as to what local media (radio and television stations) will be providing additional information in the event of an emergency. 1. Placement of an advertisement in local telephone directories.
 
23 REV 57  06/12   2. Information in utility bills,     3. Signs displayed in public areas within the plume exposure EPZ. (e.g., commercial establishments, areas used by sportsmen, motels, gasoline stations, phone booths, etc.) Sign content and location distribution will be revised and redistributed as needed.
understood  
: 4. Distribution of emergency information publications/leaflets,   5. Television or Radio,   6. Emergency Calendars,
 
: 7. Direct Mail-Newsletters,   8. Visitor Center availability to the public (when not restricted for Security reasons),     9. Information exchange meetings with government agencies and local officials as needed.
22 REV 57  06/12 A. In order to help assure proper public reaction to an emergency notification, Alabama Power, Georgia Power and Southern Nuclear will keep state and local officials continuously informed of all details related to any emergency.  
24 REV 57  06/12 19.0 PROCEDURES Implementing procedures (listed below) exist which will provide guidance and direction for carrying out the activities and responsibilities listed in this plan. These procedures cover, but are not limited to, emergency communications, facilities, development and issue of news releases, conduct of news briefings/media response, rumor control response and public education/information dissemination.
 
B. Several communications methods may be used to acquaint the public with plans for their protection during a Plant emergency. Means for accomplishing these methods will include one or more of the following activities as listed below.
Effort will be concentrated upon providing information to the public by written material that is likely to be available in the residence and in locations frequented by transients. The information will also provide instructions as to what local media (radio and television stations) will be providing additional information in the event of an emergency.  
: 1. Placement of an advertisement in local telephone directories.
23 REV 57  06/12
: 2. Information in utility bills,
: 3. Signs displayed in public areas within the plume exposure EPZ. (e.g., commercial establishments, areas used by  
 
sportsmen, motels, gasoline stations, phone booths, etc.)
Sign content and location distribution will be revised  
 
and redistributed as needed.  
: 4. Distribution of emergency information publications/leaflets,  
: 5. Television or Radio,  
: 6. Emergency Calendars,  
: 7. Direct Mail-Newsletters,  
: 8. Visitor Center availability to the public (when not restricted for Security reasons),
: 9. Information exchange meetings with government agencies and local officials as needed.  
 
24 REV 57  06/12 19.0 PROCEDURES Implementing procedures (listed below) exist which will provide guidance and direction for carrying out the  
 
activities and responsibilities listed in this plan. These  
 
procedures cover, but are not limited to, emergency  
 
communications, facilities, development and issue of news  
 
releases, conduct of news briefings/media response, rumor  
 
control response and public education/information  
 
dissemination.
* NMP-EP-201 Corporate Emergency Communications Administration
* NMP-EP-201 Corporate Emergency Communications Administration
* NMP-EP-202 Emergency Communications Notification and Activation
* NMP-EP-202 Emergency Communications Notification and Activation
Line 546: Line 2,326:
* NMP-EP-204 Emergency News Center/Joint Information Center Operation
* NMP-EP-204 Emergency News Center/Joint Information Center Operation
* NMP-EP-205 Emergency Response News Releases
* NMP-EP-205 Emergency Response News Releases
* NMP-EP-206 Corporate Communications News Briefings 25 REV 57  06/12 TABLE 1 EMERGENCY COMMUNICATIONS ORGANIZAZTION TRAINING MATRIX Emergency Response Organization PositionTraining Subject Areas EmergencyMediaTraining Position SpokespersonPublic Information Director   x  x  CMC Manager x  x  JIC Manager x  x  Nuclear Spokesperson x  x x CMC/JIC Media RelationsRepresentative x  x  SNC News Writer x  x  Employee Communications Coordinator   x  x  Public Response Teams x  x  CMC/JIC Public ResponseCoordinator x  x  Community Relations Coordinator   x  x  CMC/JIC Assistant x  x  CMC/JIC Support Staff x  x  CMC/JIC Facility Coordinator   x  x  Internet Coordinator x  x  News Media   x FIGURE A 26 REV 60  07/13 FLOW OF EMERGENCY PUBLIC INFORMATION DURING AN EMERGENCY     
* NMP-EP-206 Corporate Communications News Briefings  
 
25 REV 57  06/12 TABLE 1 EMERGENCY COMMUNICATIONS ORGANIZAZTION TRAINING MATRIX Emergency Response Organization Position Training Subject Areas Emergency MediaTraining Position Spokesperson Public Information Director x  x  CMC Manager x  x  JIC Manager x  x  Nuclear Spokesperson x  x x CMC/JIC Media Relations Representative
 
x  x  SNC News Writer x  x  Employee Communications
 
Coordinator x  x  Public Response Teams x  x  CMC/JIC Public Response Coordinator
 
x  x  Community Relations  
 
Coordinator x  x  CMC/JIC Assistant x  x  CMC/JIC Support Staff x  x  CMC/JIC Facility Coordinator x  x  Internet Coordinator x  x  News Media x
FIGURE A 26 REV 60  07/13 FLOW OF EMERGENCY PUBLIC INFORMATION DURING AN EMERGENCY  
 
TSCOFF SITEAGENCIESEOFCONTROLROOMJICMEDIAPUBLICCORPORATEMEDIACENTEREMPLOYEESPUBLIC CALLSMEDIA CALLSINDUSTRY CALLSOWNERSGOVT. OFFICIALS STOCKHOLDERS PSCINTERNET
 
28 REV 57  06/12 MEDIA / PUBLICCMCMANAGERCMCMEDIA RELATIONS REPCMC PUBLICRESPONSESTAFF*EMPLOYEESINTERNETGOV'T OFFICALSEMERGENCY COMMUNICATIONS INFORMATION FLOWAFTER JIC ACTIVATIONEOF MANAGERNUCLEARSPOKESPERSONPI DIRECTORGOV'TPIO'sCMC MEDIA RELATIONS REP JICPUBLICRESPONSESTAFFEOFJOINT INFORMATION CENTERCORPORATE MEDIA CENTERVRU*Includes Rumor Response Teams, Community RelationsCoordinator, State Response TeamsFIGURE CJICMANAGER
 
REV 57  06/12 APPENDIX 9 INDEX OF VEGP ADMINISTRATIVE, NUCLEAR MANAGEMENT AND EMERGENCY PLAN IMPLEMENTING PROCEDURES CROSS REFERENCED TO SECTIONS OF THE VEGP EMERGENCY PLAN 9-1 REV 57  06/12 INDEX OF VEGP ADMINISTRATIVE, NUCLEAR MANAGEMENT AND EMERGENCY PLAN IMPLEMENTING PROCEDURES CROSS REFERENCED TO SECTIONS OF THE VEGP EMERGENCY PLAN (SHEET 1 OF 3)
Procedure No. Title  Section of the Plan Implemented Administrative Procedures NMP-AP-001 Development and Control of Southern Nuclear Procedures P 00910-C VEGP ALARA Program K    00930-C Radiation and Contamination Control K 00940-C Bioassay Program L 00950-C Personnel Dosimetry Program K 00960-C Control of Radioactive Materials L 00970-C Respiratory Protection Program K Emergency Plan Implementing Procedures 91101-C Emergency Response Organization B NMP-EP-110 Emergency Classification and Determination B 91103-C  Duties of the TSC Manager B 91104-C  Duties of the OSC Manager B 91106-C Duties of the TSC Support Coordinator B 91107-C Duties of the Engineering Supervisor (TSC)
B 91108-C Duties of the Maintenance Supervisor (TSC)
B 91109-C Duties of the Operations Supervisor (TSC)
B 91110-C  Duties of the Health Physics Supervisor (TSC) B 91111-C Duties of the Chemistry Supervisor (TSC)
B 91201-C Activation and Operation of the TSC H 91202-C Activation and Operation of the OSC H 91204-C Emergency Response Communications A,F 91301-C Emergency Exposure Guidelines K
9-2 REV 64  3/15 INDEX OF VEGP ADMINISTRATIVE, NUCLEAR MANAGEMENT AND EMERGENCY PLAN IMPLEMENTING PROCEDURES CROSS REFERENCED TO SECTIONS OF THE VEGP EMERGENCY PLAN (SHEET 2 OF 3)
Procedure No. Title Section of the Plan Implemented91302-C In Plant Sampling and Surveys I 91303-C Field Sampling and Surveys I    91306-C Contamination Monitoring and Decontamination K 91401-C Assembly and Accountability J 91403-C Site Dismissal J 91501-C Recovery M 91502-C Core Damage Assessment I 91503-C Control Room Instrumentation Output for Assessment of Core Damage I 91601-C Emergency Preparedness Training O   91701-C Preparation and Control of Emergency Preparedness Documents P 91702-C Emergency Equipment and Supplies H 91704-C Actions for Security During a Radiological Emergency E, J 91705-C Inventory and Testing of Emergency Preparedness Materials/Equipment which are
 
not Part of the Emergency Kits H 91706-C Alert Notification System E 91801-C  Coordination of Emergency Responses and Planning Between Southern Nuclear Operating 
 
Company - Vogtle Electric Generating Plant
 
and U.S. Department of Energy Savannah River
 
Site A,C,I Safety and Health Implementing Procedures 70302-C Reporting and Documenting Occupational Injuries Or Illnesses L
9-3 REV 64  3/15 INDEX OF VEGP ADMINISTRATIVE,NUCLEAR MANAGEMENT AND EMERGENCY PLAN IMPLEMENTING PROCEDURES CROSS REFERENCED TO SECTIONS OF THE VEGP EMERGENCY PLAN (SHEET 3 OF 3)
 
Procedure No. Title Section of the Plan Implemented Nuclear Management Procedures NMP-AD-009 Licensing Document Change Requests P NMP-EP-101 EOF Activation App. 7 NMP-EP-102  EOF Manager App. 7 NMP-EP-103  Licensing Support App. 7 NMP-EP-104  Dose Assessment App. 7 NMP-EP-105  EOF Technical Supervisor App. 7 NMP-EP-106  EOF Support Coordinator App. 7 NMP-EP-107  Security Coordinator App. 7 NMP-EP-108  Offsite Response Coordinator App. 7 NMP-EP-110 Emergency Classification Determination and Initial Action A, D NMP-EP-111 Emergency Notifications A, E NMP-EP-112 Protective Action Recommendations A, J NMP-EP-135 Alternative Facility Setup and Operation H    NMP-HP-001 Radiation Protection Standard Practices K 
 
REV 1 05/85
 
APPENDIX 10 FSAR-POSTULATED TRANSIENTS
 
REV 21 10/94 FSAR-POSTULATED TRANSIENTS (SHEET 1 OF 2)
TRANSIENT EMERGENCY CLASS(A) Feedwater temperature reduction No emergency declared Excessive feedwater flow No emergency declared Excessive steam flow No emergency declared Inadvertent secondary side depressurization NUE Steam system piping failure NUE, Alert Turbine trip No emergency declared Loss of external load No emergency declared Inadvertent closure of an MSIV No emergency declared Loss of condenser vacuum No emergency declared
 
Loss of nonemergency ac power No emergency declared Loss of normal feedwater No emergency declared


TSCOFF SITEAGENCIESEOFCONTROLROOMJICMEDIAPUBLICCORPORATEMEDIACENTEREMPLOYEESPUBLIC CALLSMEDIA CALLSINDUSTRY CALLSOWNERSGOVT. OFFICIALSSTOCKHOLDERSPSCINTERNET
Feedwater system pipe break No emergency declared Partial loss of forced reactor coolant (RC) flow No emergency declared Complete loss of forced RC flow No emergency declared Reactor coolant pump (RCP)


28 REV 57  06/12 MEDIA / PUBLICCMCMANAGERCMCMEDIA RELATIONSREPCMC PUBLICRESPONSESTAFF*EMPLOYEESINTERNETGOV'T OFFICALSEMERGENCY COMMUNICATIONS INFORMATION FLOWAFTER JIC ACTIVATIONEOF MANAGERNUCLEARSPOKESPERSONPI DIRECTORGOV'TPIO'sCMC MEDIA RELATIONS REPJICPUBLICRESPONSESTAFFEOFJOINT INFORMATION CENTERCORPORATE MEDIA CENTERVRU*Includes Rumor Response Teams, Community RelationsCoordinator, State Response TeamsFIGURE CJICMANAGER
locked rotor No emergency declared RCP shaft break No emergency declared Rod cluster control assembly (RCCA)


REV 57  06/12 APPENDIX 9  INDEX OF VEGP ADMINISTRATIVE, NUCLEAR MANAGEMENT  AND EMERGENCY PLAN IMPLEMENTING PROCEDURES CROSS REFERENCED TO SECTIONS OF THE VEGP EMERGENCY PLAN 9-1 REV 57  06/12 INDEX OF VEGP ADMINISTRATIVE, NUCLEAR MANAGEMENT  AND EMERGENCY PLAN IMPLEMENTING PROCEDURES CROSS REFERENCED TO SECTIONS OF THE VEGP EMERGENCY PLAN (SHEET 1 OF 3)  Procedure No. Title  Section of the Plan ImplementedAdministrative Procedures NMP-AP-001 Development and Control of Southern Nuclear Procedures P 00910-C VEGP ALARA Program K    00930-C Radiation and Contamination Control K 00940-C Bioassay Program L 00950-C Personnel Dosimetry Program K 00960-C Control of Radioactive Materials L 00970-C Respiratory Protection Program K Emergency Plan Implementing Procedures      91101-C Emergency Response Organization B NMP-EP-110  Emergency Classification and Determination B 91103-C  Duties of the TSC Manager B 91104-C  Duties of the OSC Manager B 91106-C Duties of the TSC Support Coordinator B 91107-C Duties of the Engineering Supervisor (TSC) B 91108-C Duties of the Maintenance Supervisor (TSC) B 91109-C Duties of the Operations Supervisor (TSC) B 91110-C  Duties of the Health Physics Supervisor (TSC) B 91111-C Duties of the Chemistry Supervisor (TSC) B 91201-C Activation and Operation of the TSC H 91202-C Activation and Operation of the OSC H 91204-C Emergency Response Communications A,F 91301-C Emergency Exposure Guidelines K 9-2 REV 64  3/15 INDEX OF VEGP ADMINISTRATIVE, NUCLEAR MANAGEMENT AND EMERGENCY PLAN IMPLEMENTING PROCEDURES CROSS REFERENCED TO SECTIONS OF THE VEGP EMERGENCY PLAN (SHEET 2 OF 3)    Procedure No. Title Section of the Plan Implemented91302-C In Plant Sampling and Surveys I 91303-C Field Sampling and Surveys I    91306-C Contamination Monitoring and Decontamination K 91401-C Assembly and Accountability J 91403-C Site Dismissal J 91501-C Recovery M 91502-C Core Damage Assessment I 91503-C Control Room Instrumentation Output for Assessment of Core Damage I 91601-C Emergency Preparedness Training O    91701-C Preparation and Control of Emergency Preparedness Documents P 91702-C Emergency Equipment and Supplies H 91704-C Actions for Security During a Radiological Emergency E, J 91705-C Inventory and Testing of Emergency Preparedness Materials/Equipment which are not Part of the Emergency Kits H 91706-C Alert Notification System  E 91801-C  Coordination of Emergency Responses and Planning Between Southern Nuclear Operating Company - Vogtle Electric Generating Plant and U.S. Department of Energy Savannah River Site A,C,I Safety and Health Implementing Procedures 70302-C Reporting and Documenting Occupational Injuries Or Illnesses L 9-3 REV 64  3/15 INDEX OF VEGP ADMINISTRATIVE,NUCLEAR MANAGEMENT AND EMERGENCY PLAN IMPLEMENTING PROCEDURES CROSS REFERENCED TO SECTIONS OF THE VEGP EMERGENCY PLAN (SHEET 3 OF 3)
bank withdrawal from subcritical No emergency declared RCCA bank withdrawal at power No emergency declared RCCA misalignment No emergency declared
Procedure No. Title Section of the Plan ImplementedNuclear Management Procedures NMP-AD-009 Licensing Document Change Requests P NMP-EP-101 EOF Activation App. 7 NMP-EP-102  EOF Manager App. 7 NMP-EP-103  Licensing Support  App. 7 NMP-EP-104  Dose Assessment  App. 7 NMP-EP-105  EOF Technical Supervisor App. 7 NMP-EP-106  EOF Support Coordinator  App. 7 NMP-EP-107  Security Coordinator App. 7 NMP-EP-108  Offsite Response Coordinator App. 7 NMP-EP-110 Emergency Classification Determination and Initial Action A, D NMP-EP-111 Emergency Notifications A, E NMP-EP-112 Protective Action Recommendations A, J NMP-EP-135 Alternative Facility Setup and Operation H    NMP-HP-001 Radiation Protection Standard Practices K 


REV 1 05/85 
REV 21 10/94 FSAR-POSTULATED TRANSIENTS (SHEET 2 OF 2)
TRANSIENT EMERGENCY CLASS(A) Inactive RCP startup No emergency declared Uncontrolled boron dilution No emergency declared Improper fuel loading No emergency declared RCCA ejection Emergency Alert, Site Area Inadvertent emergency control cooling system (ECCS) operation at power No emergency declared Increase in RCS inventory No emergency declared Inadvertent opening of pressurizer safety or relief valve NUE, Alert Failure of small lines carrying NUE, Alert, Site Area primary coolant outside containment Emergency Steam generator tube failure Emergency NUE, Alert, Site Area Spectrum of loss-of-coolant NUE, Alert, Site Area accidents (LOCAs) Emergency Emergency, General Radioactive waste gas decay tank failure NUE, Alert Radiation release due to liquid tank


APPENDIX 10  FSAR-POSTULATED TRANSIENTS REV 21 10/94 FSAR-POSTULATED TRANSIENTS (SHEET 1 OF 2)  TRANSIENT EMERGENCY CLASS(A) Feedwater temperature reduction No emergency declared Excessive feedwater flow No emergency declared Excessive steam flow No emergency declared Inadvertent secondary side depressurization NUE Steam system piping failure NUE, Alert Turbine trip No emergency declared Loss of external load No emergency declared Inadvertent closure of an MSIV No emergency declared Loss of condenser vacuum No emergency declared Loss of nonemergency ac power No emergency declared Loss of normal feedwater No emergency declared Feedwater system pipe break No emergency declared Partial loss of forced reactor coolant (RC) flow No emergency declared Complete loss of forced RC flow No emergency declared Reactor coolant pump (RCP) locked rotor No emergency declared RCP shaft break No emergency declared Rod cluster control assembly (RCCA) bank withdrawal from subcritical No emergency declared RCCA bank withdrawal at power No emergency declared RCCA misalignment No emergency declared REV 21 10/94 FSAR-POSTULATED TRANSIENTS (SHEET 2 OF 2)  TRANSIENT EMERGENCY CLASS(A) Inactive RCP startup No emergency declared Uncontrolled boron dilution No emergency declared Improper fuel loading No emergency declared RCCA ejection Emergency Alert, Site Area Inadvertent emergency control cooling system (ECCS) operation at power No emergency declared Increase in RCS inventory No emergency declared Inadvertent opening of pressurizer safety or relief valve NUE, Alert Failure of small lines carrying NUE, Alert, Site Area primary coolant outside containment Emergency Steam generator tube failure Emergency NUE, Alert, Site Area Spectrum of loss-of-coolant NUE, Alert, Site Area accidents (LOCAs) Emergency Emergency, General Radioactive waste gas decay tank failure NUE, Alert Radiation release due to liquid tank failure NUE, Alert Fuel handling accidents NUE, Alert
failure NUE, Alert Fuel handling accidents NUE, Alert  
: a. Classification will depend on the severity of the accident.
: a. Classification will depend on the severity of the accident.
REV 6  7/86  
REV 6  7/86


APPENDIX 11 LETTER FROM THE STATE OF GEORGIA}}
APPENDIX 11 LETTER FROM THE STATE OF GEORGIA}}

Revision as of 20:56, 30 June 2018

Vogtle Electric Generating Plant Units 1 & 2, Revision 65 to Emergency Plan. Appendices
ML15233A289
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/17/2015
From:
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML15233A287 List:
References
NL-15-1569
Download: ML15233A289 (111)


Text

REV 0 11/30/84

APPENDIX 1 GLOSSARY

1-1 REV 39 12/04 GLOSSARY Term Definition AIM analog input module ALARA As Low as Reasonably Achievable

CRT cathode ray tube CSC Customer Service Center CSF critical safety function CSFST critical safety function status tree CVCS chemical and volume control system DEFACS Department of Family and Children Services DHEC Department of Health and Environmental Control of South Carolina DMA direct memory access DNR Department of Natural Resources DOD Department of Defense DOE Department of Energy DOE SR Department of Energy - Savannah River Operations Office DOE SRS Department of Energy - Savannah River Site DPM data processing module EAS Emergency Alerting System ED emergency director EMA Emergency Management Agency ENC Emergency News Center ENN Emergency Notification Network ENS Emergency Notification System EOC emergency operations center EOF emergency operations facility

1-2 REV 39 12/04 GLOSSARY (Continued)

Term Definition EOP emergency operating procedure EPA Environmental Protection Agency EPC emergency preparedness coordinator EPD Environmental Protection Division of Georgia EMD Emergency Management Division of South Carolina EPO Emergency Plan Overview EPZ emergency planning zone ERF emergency response facilities FEMA Federal Emergency Management Agency FEOC forward emergency operations center FRERP Federal Radiological Emergency Response Plan FSAR Final Safety Analysis Report FT fire training GEMA Georgia Emergency Management Agency GET general employee training GPC Georgia Power Company HP health physics HPN Health Physics Network HVAC heating, ventilation, and air conditioning I&C instrumentation and control INPO Institute of Nuclear Power Operations IPC Integrated Plant Computer MSIV main steam isolation valve MSL mean sea level

1-3 REV 49 08/08 GLOSSARY (Continued)

Term Definition MSRE medical support of radiological emergencies NACOM National Communication NAWAS National Warning System NCHPD Nuclear Chemistry and Health Physics Department NEI Nuclear Energy Institute NDOP Natural Disaster Operations Plan NOAA National Oceanic and Atmospheric Administration NRC Nuclear Regulatory Commission NSCW nuclear service cooling water NSSS nuclear steam supply system NWS National Weather Service NUE Notification of Unusual Event ODA offsite dose assessment OPS operational protection system OS operations supervisor OSC operations support center PA public address PAG Protective Action Guideline PAR Protective Action Recommendation PBX private branch exchange PEO plant equipment operator PERMS process and effluent radiation monitoring system PO plant operator PRA peak recording accelerograph R&CA repair and corrective action

1-4 REV 56 09/10 GLOSSARY (Continued)

Term Definition RCP reactor coolant pump RCS reactor coolant system REC radiation emergency coordinator RERP Radiological Emergency Response Plan RET radiological emergency team RET/E radiological emergency team/environmental RET/I radiological emergency team/in plant

RO reactor operator RPU remote processing unit RTD resistance temperature detector RVLIS reactor vessel level instrumentation system RWP radiation work permit

SAT satisfied SC South Carolina SCORERP South Carolina Operational Radiological Emergency Response Plan SEC security SG steam generator SLED State Law Enforcement Division of South Carolina SMA strong motion accelerometer SNC Southern Nuclear Operating Company SOE sequence of events SPDS safety parameter display system SRO senior reactor operator SRS Savannah River Site

1-5 REV 22 5/95 GLOSSARY (Continued)

Term Definition STA shift technical advisor SUR startup rate

TC thermocouple TLD thermoluminescent dosimeter TMI Three Mile Island TSC technical support center UFM universal field multiplexer

USDA United States Department of Agriculture VEGP Vogtle Electric Generating Plant WOG Westinghouse Owners Group

REV 46 07/07

APPENDIX 2 LETTERS OF AGREEMENT AND MEMORANDUMS OF UNDERSTANDING

2-1 REV 62 10/14 LETTERS OF AGREEMENT AND MEMORANDUMS OF UNDERSTANDING On File The following letters of agreement and memorandums of

understanding are maintained on file with the Site Emergency

Preparedness Supervisor.

  • Burke County Emergency Management Agency
  • WJBF-TV Channel 6
  • WRDW-TV Channel 12
  • WAGT-TV Channel 26
  • Doctors Hospital
  • Joseph M. Still Burn Center
  • Burke Medical Center
  • Medical Specialists, Inc.
  • Westinghouse
  • Bechtel Power Corporation
  • iHeart Media (WBBQ-FM, WPRW-FM, WKSP-FM, WSCG, WYNF and WNRR)
  • National Weather Service (NWS)
  • WDOG Radio Station
  • WKXC/KICKS 99 Radio Station (Beasley Broadcasting)
  • Burke County Sheriff's Department
  • B. Lamar Murray, M.D.
  • WFXG - TV Channel 54

2-2 REV 46 07/07

  • Georgia Emergency Management Agency
  • Department of Energy - Savannah River REV 0 11/30/84 APPENDIX 3 MEANS FOR PROVIDING PROMPT ALERTING AND NOTIFICATION OF THE PUBLIC MEANS FOR PROVIDING PROMPT ALERTING AND NOTIFICATION OF THE PUBLIC 3-1 REV 61 06/14 A. INTRODUCTION Prompt alerting and notification of the public within the plume exposure pathway EPZ is the obligation of State and

local government or other responsible authority. The

responsibility that means exist for this purpose rests with

Southern Nuclear Operating Company. An overview of these

means excluding the Savannah River Site is given in this

Appendix.

Initial notification of the public will occur in a manner

consistent with assuring the public health and safety. The

design objective for the system is to meet the acceptance

criteria which are provided in a subsequent section of this

Appendix. The design objective does not constitute a

guarantee that prompt notification can be provided for

everyone with 100% assurance, or that the system when tested

under actual field conditions will meet the design objective

in all cases.

In the event of an emergency the Emergency Director at VEGP

is responsible for notifying appropriate State and local

response organizations, plant emergency personnel, and DOE's

Savannah River Site. The initiating conditions for each

emergency class are delineated in Section D in the main body

of this emergency plan. The capability for 24-hour-per-day

alerting and notification of offsite response organizations

and plant emergency personnel is described in Section E.

Prompt alerting and notification of the public within the

plume exposure pathway EPZ will be accomplished by a

combination of several means. Initial alerting will be made

primarily by both tone-alert radios and a system of fixed

sirens. Those who are not alerted by the primary means will

be alerted by vehicles or boats equipped with sirens, and/or

loudspeakers, or by door to door contact. Having been

alerted, the public will turn on their radio or television to

receive additional instructions from the Emergency Alert

System (EAS). A full Alert and Notification System (ANS) description is provided in the FEMA approved Alert and Notification System Design Report (ANS-VEGP-001) located in the SNC document management system.

B. CONCEPT OF OPERATIONS In the event of a serious emergency at VEGP, the primary

means for alerting and providing initial instructions to the

public will be by a combination of tone-alert radios and a

system of fixed sirens. The specific tone-alert radio system

to be employed is the National Oceanic and Atmospheric

Administration's (NOAA) Alert System. The National Weather

Service (NWS) has agreed to activate the NOAA tone alert

radio system in the plant vicinity when required by

appropriate governmental officials. This means of

notification is available 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day.

3-2 REV 19 1/94 The tone-alert radios will broadcast an acoustic alerting signal immediately followed by a vocal emergency message.

The initial message will state that an emergency condition

exists at VEGP and will also advise of any appropriate

instructions for protective actions. NOAA will periodically

broadcast short, updated messages as warranted.

The siren system consists of a network of 47 rotating

electronic sirens mounted on poles strategically located

throughout the populated area of the plume exposure EPZ.

Based upon Appendix 3 of NUREG-0654 and FEMA REP-10, the

system is designed to provide a minimum of 60 dBC coverage to

all residences within the plume exposure EPZ, plus adequate

coverage for people outdoors in all other areas of the plume exposure EPZ open to the public.

The locations and design coverage contours of the sirens are

shown on the attached map labeled "Figure 3-1, 60 and 50 dBC

Siren Design Coverage Contours."

Anyone not notified by the primary means will be notified by

using State and local resources on an as needed and/or as

available basis. These resources consist of the following:

1. Vehicles ready for immediate dispatch are equipped with sirens and/or loudspeakers. In Georgia these vehicles

will be dispatched upon request of the Burke County EMA

Director (initially) or upon request of the senior GEMA

representative when he arrives at the FEOC. The EMA

Director, having either made the decision himself or

having been requested by GEMA, will direct the Burke

County Central Dispatcher (in the Burke County EOC) to

dispatch the desired vehicles. This is a 24-hour

capability. These vehicles will be supplied by the

Burke County Sheriff's Department and/or the County

Emergency Management Agency, both located in Waynesboro,

Georgia. The central dispatcher has direct radio

contact with the Burke County EMA vehicles, and will

contact Sheriff's vehicles by radio either directly or

through the Sheriff's dispatcher. Additional vehicles

will be provided by the Georgia State Patrol barracks

located in Sylvania, Georgia (Post 21) which can also be

contacted by radio from the Central Dispatcher in the

Burke County EOC.

3-3 REV 5 2/86 In South Carolina, vehicles will be dispatched upon request of the senior official in charge of the respective county's emergency operation center; or if the SEOC or FEOC is operational, when requested by the senior state official. Dispatch of the vehicles is a 24-hour capability and will be made through the sheriff's dispatcher of the respective county. Because any people located in the Barnwell County portion of the plume exposure pathway EPZ are accessible only through Allendale County, Allendale County warning teams will have primary responsibility to warn the Barnwell populace.

Barnwell County will provide backup warning teams if necessary. Vehicles will be supplied by the respective county sheriff's department.

2. Boats equipped with a voice or sound device will notify sportsmen or recreationers on the Savannah River. These boats will be supplied locally by the

Georgia Department of Natural Resources-Law

Enforcement Section and the Burke County Emergency

Management Agency and are stationed in Waynesboro.

They will be dispatched by the Burke County Central

Dispatcher, at the direction of the EMA Director.

This is a 24-hour capability. For the DNR boat, the

dispatcher will radio or telephone the Resident

Ranger in Waynesboro. The dispatcher has direct

radio contact with County EMA personnel to access

the EMA boat. The boats will usually be launched

from the Georgia Power Company boat ramp at Plant

Vogtle. From this point, the boats will be sent up

and downstream, depending upon the plume pathway, to

the boundaries of the plume EPZ. The boats will be

prepositioned at the boat ramp at an Alert or higher

classification to await orders to launch.

Notification of persons on the river will be

coordinated with the South Carolina Department of

Wildlife.

3. Door-to-door contact may be conducted in acute areas. This will be done as deemed necessary by

offsite authorities. It might be carried out after

completion of a portion of Item No. 1 above in

conjunction with confirmation of evacuation.

3-4 REV 56 09/10 Detailed information and instructions will be provided on local EAS radio and television stations. Seven commercial

radio stations and three commercial television stations whose

broadcasts are received in the plume exposure pathway EPZ

have agreed to broadcast emergency instructions and

information in cooperation with offsite officials. Each of

these stations is a member of the EAS. Not all of these

stations broadcast 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day. In the event of an

emergency, the stations have agreed to come on the air; their FCC licenses permit off hour broadcasts in case of an

emergency. Most stations expect to be ready for broadcasting

in approximately one-half hour following notification.

These continuing instructions will provide more specific or

detailed information of any protective actions advised for

affected areas. Information on the nature of the accident,

on any releases, and on the progress in ameliorating or

terminating the emergency event will also be provided

periodically on the commercial stations, along with a

prognosis for escalation or termination of the event.

C. CRITERIA FOR ACCEPTANCE

1. Within the plume exposure pathway EPZ, the prompt alerting and notification system will provide an alerting signal and notification by NOAA radio and

an alerting signal by fixed sirens; further

notification will also be provided by local

commercial radio and television stations which will

be activated via EAS.

2. The minimum acceptable design objectives for coverage by the system are:

a) Capability for both an alerting signal and an informational or instructional message to the

population on an area-wide basis throughout the

plume exposure pathway EPZ, within 15 minutes.

b) The initial notification system will assure direct coverage of essentially 100% of the

population within five miles of the site.

c) Special arrangements will be made to assure 100%

coverage, within 45 minutes, of the population

who may not have received the initial

notification within the entire plume exposure

pathway EPZ. People in remote areas, such as those engaged in hunting and fishing, will be reached by the fixed

siren system.

3-5 REV 52 12/08 Assurance of continued notification capability will be verified on a statistical basis similar to engineering calculation DOEJ-HX2008100234-M001.

Periodically, perhaps in conjunction with an exercise at VEGP, the public alert and notification

system will be activated; Southern Nuclear Operating

Company, and/or the State and local governments will

survey a sample of the residents in the plume

exposure pathway EPZ. The survey results shall be used to assess the public's ability to hear the

alerting signal and their awareness of the meaning

of the prompt notification message, as well as the

availability of information on what to do in an

emergency. In response to the findings of these

surveys, appropriate corrective measures will be

taken to provide reasonable assurance that the

required coverage is maintained.

3. Local and State agencies have the capability to provide information promptly over local commercial

radio and television at the time of the activation

of the alerting signal. An agreement has been made

with NOAA; arrangements have been made with local

commercial radio and television stations. Authority

for activation of the EAS, whereby designated

governmental officials are permitted to issue

emergency information and instruction in threatened

or actual emergencies, is given by 47CFR part 11,

EAS Rules.

D. PHYSICAL IMPLEMENTATION In the event of an emergency, Vogtle Electric Generating Plant (VEGP) has developed and will maintain plans, systems,

procedures and relationships that are effective in notifying

appropriate governmental and other responsible authorities.

These authorities will have available to them the means for

alerting and notifying the general public, and for advising

of appropriate responses by the public.

The communications system between the plant and the

responsible authorities (Federal, State and local) features

the following capabilities:

a) Twenty-four hour coverage at VEGP and at the primary points to receive and act upon notification.

b) Section D of the main body of this emergency plan describes the conditions for assured dissemination

of alerting and warning information by VEGP to

appropriate State and local warning points, Section

E describes the methods and procedures for notifying

these warning points. Communications equipment is

described in Section F.

3-6 REV 31 12/00 c) VEGP assumes primary responsibility for net control since effectively all of the emergency information originates at VEGP.

Notification of VEGP response personnel is described in

Section E of the main body of this emergency plan.

Notification of the response personnel of the State and local

response organization is described in their respective

emergency plans.

Southern Nuclear Operating Company in conjunction with

Georgia Power Company provides NOAA radio receivers for all

known establishments (residence, businesses, schools, etc.)

within the plume exposure pathway EPZ who choose to accept

them. The radios are distributed by the SNC Emergency Communications staff. During the distribution to those

accepting the radios, a brochure is handed out.

The brochure distributed with the radios is entitled

"Questions and Answers About Your Plant Vogtle NOAA Weather

Radio." That brochure will be redistributed on an annual

basis to NOAA recipients. This brochure includes the

following information:

  • Why NOAA radios are provided.
  • Information they will receive on the NOAA radio.
  • When the alert system will be activated.
  • Who makes NOAA broadcasts.
  • Where to place the radio.
  • Backup battery power for power failures.
  • What to do if the NOAA radio doesn't work.
  • How to replace radio batteries.

A public information calendar entitled "The Plant Vogtle

Emergency Information Calendar" will be distributed on an

annual basis to the NOAA radio recipients.

Both the brochure and the calendar advise residents to

contact VEGP or their local EMA if their radio is defective.

The telephone number and address of both offices are provided

in each brochure. SNC will replace any defective radios upon request or discovery that the radios are defective. SNC will also annually distribute replacement batteries to all

recipients of tone alert radios.

SNC will maintain a register of all radio recipients.

3-7 REV 31 12/00 The electric service to all Burke County recipients within the plume EPZ is provided by either Georgia Power Company or

the Planters Electric Membership Corporation (EMC). Planters

EMC has agreed to provide information monthly to the Emergency Communications staff concerning any persons requesting new electric service or disconnection of existing

electric service.

The Emergency Communications staff uses that information,

together with its knowledge of its own electrical hookups or

disconnections in the Georgia plume EPZ, to identify new

residents. The Emergency Communications staff distributes

tone alert radios to any new residents and updates the

register of radio recipients periodically.

The Emergency Communications staff also determines whether

there are any permanent Burke County plume EPZ residents

without electricity. A list of these residents is

maintained. A survey of the Burke County portion of the

plume EPZ will be made annually by the Emergency

Communications staff to assure that the list of any such

residents is current. This updated list is provided to the

Burke County EMA director. The primary means of notification

for these residents will be the siren system.

The recipients of tone-alert radios in the South Carolina

portion of the plume EPZ are so few that similar indirect

methods for checking the distribution of radios are not

necessary. Rather, annual surveys of the entire South

Carolina portion of the plume EPZ will be made directly by

the Emergency Communications Staff.

The tone alert radios are routinely tested by the National

Weather Service every Wednesday around noon unless severe

weather is threatening. The effectiveness of the tone alert

radios will be tested and evaluated at least once a year per

procedure 91706-C, Alert Notification System.

The testing and maintenance of the public alerting sirens in

the VEGP EPZ are the responsibility of VEGP. The maintenance

program will consist of both periodic routine checks and, as

required, corrective maintenance. The actual performance of

these maintenance actions will be conducted by Southern

Company Services maintenance personnel or contract personnel.

In either case, this program will be under the direction of

the VEGP emergency preparedness coordinator.

The periodic routine maintenance program will be based on the

manufacturers' recommendations and experience gained with the

installation. It will consist of quarterly inspections to

verify the proper physical condition of each siren location

and checks to verify the proper operation of each location

utilizing the built-in test and monitoring features of this

system.

3-8 REV 38 05/05 The periodic test program will consist of a weekly silent test, from the county activation points, and an annual full

scale activation of the system.

The weekly silent test will consist of activation of the

siren from the County EOC. Each siren location is activated

and responds in the normal manner, with the exception that

the radiated noise of the siren is above the normal audible

range and is therefore silent. Proper activation of each

siren is confirmed utilizing a monitoring system. This monitoring system verifies the proper activation of the major

components of the siren.

Once each year the system will be activated from the

associated county EOC in the normal mode. Advance notice of

the test will be provided to the public. Activation of each

siren will be verified by the WSMRFC. Reports of siren

failures or inadequate coverage will be investigated by VEGP.

Unsatisfactory conditions detected by any means will be

promptly repaired by Southern Company Services maintenance or

contract personnel under the direction of the VEGP emergency

preparedness coordinator.

GEMA and SC EMD procedures detail the process for activating the prompt notification system for VEGP and will contain

messages for first alert, shelter notice, evacuation notice,

and all clear.

Following initial notification of an emergency at VEGP by

plant officials, GEMA and SCEPD will coordinate any decision

to activate the prompt notification system. When a decision

to activate the NOAA tone alert radios has been made, GEMA

will request activation.

Authorization to activate the NOAA alert system for an

emergency situation at VEGP rests with the GEMA director,

executive director, and chief of operations. One of these

individuals will instruct a GEMA staff officer (predesignated

staff officers are listed by position and name in the GEMA's

procedure) to initiate activation of the alert system. The

GEMA staff officer will instruct the GEMA radio operator to

call National Weather Service - of Columbia, (NWS-Columbia)

for activation of the NOAA alert system and provide the radio

operator with his phone number (EOC, FEOC, home). The radio

operator will call the meteorologist-on-duty at NWS-Columbia

using the National Warning System (NAWAS) circuit and request

an emergency call to GEMA.

3-9 REV 38 05/05 (If NAWAS malfunctions, GEMA will call the NWS on either a commercial phone number or their FTS phone number.) The

meteorologist-on-duty will call the GEMA radio operator on

one of three numbers with patch call capability that are

identified in GEMA's procedure. The GEMA radio operator will

patch the Weather Service call through to the GEMA staff

officer's phone number.

The GEMA staff officer will identify himself, and the NOAA

operator will verify his name against the predesignated list

in the GEMA procedure.

The GEMA staff officer will request activation of the NOAA

alert system and specify the desired message to be broadcast

by the tone-alert radios from the prescripted messages

contained in the GEMA procedure which include pertinent

information for South Carolina portions of the plume EPZ. He

will also fill in any blanks in the prescripted message and

specify the length of time the message is to automatically

repeat. The entire activation process is estimated by GEMA

to take 5 to 10 min starting at the time the decision to

activate the prompt notification system is made.

Additional follow up messages which are not prescripted will

be similarly activated.

Each position identified in these activation steps is either

staffed or on-call 24 hr. a day.

The Burke County EMA director may request NOAA activation

through GEMA. He also has the authority to request

activation of the EAS. The Burke County EMA Director, or his

designee, may activate the EAS by telephoning (commercial

lines) either the EAS Control Station for the area, (WBBQ-FM

Augusta) or any local radio or television station which is an

EAS member. Each member station can notify the other member

stations. Certain member stations operate 24 h per day,

enabling activation regardless of the hour. The Burke County

EOC communication facility will also have the ability to

activate the EAS directly through a local radio station

(WBRO); however this station does not operate 24 h per day.

GEMA may also activate EAS by calling the same stations

described above, or through WSB in Atlanta.

Each of the three South Carolina counties within the plume

EPZ may also activate the EAS system in the event of an

immediate declaration of a Site Area Emergency or a General

Emergency by VEGP and if the South Carolina SEOC is not yet operational. This activation can be made by telephoning

(commercial lines) any EAS Control Station for the area

(WAKN-FM, Aiken Common Program Control Station (CPCS-1);

WTCB, Orangeburg Common Program Control Station (CPCS-1) or

any local radio or television station which is an EAS member.

3-10 REV 38 05/05 Fixed sirens are radio controlled by the county in which they are located. Forty-six of the sirens are controlled from the

Burke County EOC. The remaining siren is controlled from the

Barnwell County 911 Center. When a coordinated decision for

activation of the prompt notification system has been made

between GEMA and SCEMD, the respective state will instruct each affected county to activate its siren(s) at a

predesignated time synchronized with NOAA radio and EAS

activation. Each county may also activate its siren(s) when

deemed necessary for protection of its populace if the

states' EOC/FEOC are not yet activated. This siren activation

would be synchronized with activation of the EAS directly by

the county.

REV 7

FIGURE 3-1 60 and 50 dBC Siren Design Coverage Contours This figure is available in hard copy only.

See Christopher E. Boone, Emergency Planning Coordinator, (205) 992-6635.

REV 0 11/30/84 APPENDIX 4 EMERGENCY EQUIPMENT LISTS 4-1 REV 60 07/13 TABLE 4-1 CONTROL ROOM/TSC EMERGENCY EQUIPMENT (TYPICAL)

1. Survey meters: Ion chamber, minimum range 0-50 R/h; Frisker, minimum range 0-50 k cpm 2. Dosimeters (0-99.99 Rem)
3. OSLDs 4. Air sampler
5. Silver zeolite cartridges for air sampler
6. Particulate filter papers for air sampler
7. Survey logs
8. Smears
9. Plastic bags
10. Radiological signs
11. Barrier ropes or ribbon
12. Tape
13. Plastic sheeting
14. Absorbent material
15. Coveralls
16. Shoe covers
17. Rubber gloves
18. Cotton gloves
19. Hoods
20. Respirators
21. Respirator filters
22. SCBAs
23. First aid kit
24. Portable lanterns
25. Flashlights
26. Potassium iodide
27. Clipboards, writing materials, and secretarial supplies
28. Area maps
29. Check sources

4-2 REV 49 08/08 TABLE 4-2 EOF EMERGENCY EQUIPMENT (TYPICAL)

EOF Supplies

1. First aid kit
2. Flashlights 3. Clipboards, writing materials, and secretarial supplies
4. Area maps

4-3 REV 25 4/97 TABLE 4-3 EMERGENCY FIELD MONITORING KITS (3) (TYPICAL)

1. Ion chamber survey meter minimum range 0-5 R/h 2. Frisker minimum range 0-5 k cpm 3. Dosimeters (0-99.99 Rem) 4. Air sampler 5. Silver zeolite cartridges for air sampler 6. Particulate filter papers for air sampler 7. Sample counting equipment 8. Field monitoring log forms 9. Area and road maps 10. Clipboard and writing materials
11. Radios
12. Smears 13. Plastic bags 14. Soil scoop
15. Knife 16. 1-liter bottles
17. Tape 18. Cotton gloves and rubber gloves 19. Protective clothing 20. First aid kit
21. Flashlight
22. Calculator 23. Tape measure 24. Stop watch
25. Respirators

4-4 REV 60 07/13 TABLE 4-4 OSC EMERGENCY EQUIPMENT (TYPICAL)

1. Survey meters: Ion chamber, minimum range 0-50 R/h; Frisker, minimum range 0-50 k cpm 2. Dosimeters (0-99.99 Rem)
3. OSLDs 4. Air sampler
5. Silver zeolite cartridges for air sampler
6. Particulate filter papers for air sampler
7. Survey logs
8. Smears
9. Plastic bags
10. Radiological signs
11. Barrier ropes or ribbons
12. Tape
13. Plastic sheeting
14. Absorbent material
15. Coveralls
16. Shoe covers
17. Rubber gloves
18. Cotton gloves
19. Hoods
20. Respirators
21. Respirator filters
22. SCBAs
23. First Aid kit
24. Flashlights
25. Batteries
26. Check source
27. Potassium iodide
28. Data forms
29. Clipboards, writing materials, and secretarial supplies 4-5 REV 60 07/13 TABLE 4-5 MAIN CONTROL POINT OR HP ROOM EMERGENCY EQUIPMENT (TYPICAL)
1. Survey meters: Ionization chamber, minimum range 0-50 R/h; Frisker, minimum range 0-50 k cpm 2. Dosimeters (0-99.99 Rem)
3. OSLDs 4. Air sampler
5. Silver zeolite cartridges for air sampler
6. Particulate filter papers for air sampler
7. Survey logs
8. Smears
9. Plastic bags
10. Radiological signs
11. Barrier ropes or ribbons
12. Tape
13. Plastic sheeting
14. Absorbent material
15. Coveralls
16. Shoe covers
17. Rubber gloves
18. Cotton gloves
19. Hoods
20. Respirators
21. Respirator filters
22. SCBAs
23. First Aid kit
24. Flashlights
25. Batteries
26. Radiation protection and monitoring procedures
27. Potassium iodide
28. Clipboards, writing materials, and secretarial supplies

4-6 REV 60 07/13 TABLE 4-6 DECONTAMINATION EMERGENCY EQUIPMENT KIT (TYPICAL)

1. Ion chamber, minimum range 0-5 R/h 2. Frisker with probe, minimum range 0-50 k cpm
3. Smears
4. Plastic bags
5. Radiological signs
6. Barrier ropes or ribbons
7. Tape
8. Plastic sheeting
9. Absorbent material
10. Coveralls
11. Shoe covers
12. Rubber gloves
13. Cotton gloves
14. Hoods
15. Soap
16. Shampoo
17. Towels
18. Razors
19. Shaving cream
20. Dosimeters (0-99 rem)
21. Hand brushes
22. Body maps
23. Potassium iodide
24. OSLDs 25. Respirators with/filter cartridges
26. Cotton swabs

4-7 REV 60 07/13 TABLE 4-7 OFFSITE AMBULANCE EMERGENCY EQUIPMENT

1. Coveralls 2. Shoe covers
3. Cotton gloves
4. Plastic bags
5. Tape
6. Plastic sheeting
7. Absorbent material
8. Rubber gloves
9. Frisker with/probe, minimum range 0-50 k cpm
10. OSLDs(a) 11. Dosimeters (0-99.99 Rem)(a)
12. Radiation tape and tags
a. Equipment supplied by personnel at Plant Entry and

Security Building (PESB).

REV 0 11/30/84

APPENDIX 5 MEMORANDUM OF AGREEMENT WITH DEPARTMENT OF ENERGY - SAVANNAH RIVER

REV 59 12/12

APPENDIX 6 EVACUATION TIME ESTIMATES FOR THE VOGTLE ELECTRIC GENERATING PLANT PLUME EXPOSURE PATHWAY EMERGENCY PLANNING ZONE

6-1 REV 64 3/15 Appendix 6 Evacuation Time Estimate In order to ensure the safety of the public living in the

vicinity of nuclear power plants in the nation, the U.S.

Nuclear Regulatory Commission (NRC) requires licensees to

develop and update evacuation times estimates (ETEs) for

areas within the emergency planning zone (EPZ). Updates are

required following the availability of data from the

decennial census (10 years) or when the sensitivity factor

for changes in population within the EPZ has been exceeded.

This appendix contains information from the ETE update

performed in 2012. ETE population reviews will be conducted annually. This update implements the requirements of the revised regulations relevant to ETE updates in accordance

with the guidance provided in NUREG/CR-7002, Criteria for

Development of Evacuation Time Estimate Studies and the requirements in 10 CFR 50, Appendix E, Sections IV.3 and

IV.4.

Southern Nuclear Operating Company (SNC) contracted IEM to

estimate evacuation times for the 2012 populations within the

10-mile plume exposure pathway emergency planning zone (EPZ)

surrounding the Vogtle Electric Generating Plant (VEGP).

This appendix provides a summary of the final report

describing the methods used to obtain population data and to

estimate evacuation times and estimated population figures,

evacuation road network information, and ETEs.

The report provides a breakdown of the population by

geographic areas and protective action zones (PAZ).

1 Four categories of population are identified in the report:

  • Permanent residents.
  • Transit dependent permanent residents.
  • Schools.

The permanent resident population is made up of individuals

residing in the 10-mile EPZ. The total year 2012 permanent

resident populations within the 10-mile EPZ for VEGP are

estimated to be 3,080. The transient population consists of

workers employed within the area, recreational sportsmen, and

visitors. The total peak transient population within the

10-mile EPZ is estimated to be 2,915. Only one school,

Lord's House of Praise Christian School, was identified in

the VEGP EPZ. IEM contacted the school to collect current

enrollment, staff figures, and the evacuation plan. The

total peak population for the school in the EPZ is estimated

to be 70. Transit dependent permanent residents in the EPZ

are estimated to be 29. This study also considered the

voluntary evacuees, who are also known as shadow evacuees

that reside within 10 to 15 miles from VEGP.

1 NRC Criteria for Development of Evacuation Time Estimate Studies

. NUREG/CR-7002. November 2011.

6-2 REV 61 06/14 IEM utilized a computer traffic simulation model, PTV Vision VISUM, to perform the ETE analyses. For the analyses, the

10-mile plume exposure pathway EPZ was divided into 19 unique geographic areas based on two-mile, five-mile, and ten-mile

radius rings, the 16 22.5-degree PAZs, as well as keyhole and

staged evacuation logic. In order to represent the most

realistic emergency scenarios, evacuations for the 19 geographic evacuation areas were modeled individually for the

midweek daytime, midweek - weekend evening, and weekend

daytime scenarios. Each of these scenarios was then

considered under both normal and adverse weather conditions

using the 2012 population estimations. A total of 114 evacuation scenarios were considered as part of this study to

represent different wind, temporal, seasonal and weather

conditions.

Both 100% and 90% ETEs for each scenario were collected. The

100% ETEs for the evacuation areas ranged from 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 10 minutes to 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 25 minutes for the normal scenarios, and

from 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 15 minutes to 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 25 minutes for those occurring in adverse weather. The 90% ETEs for the

evacuation areas ranged from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 20 minutes to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 20

minutes for the normal scenarios, and from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 20 minutes

to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 25 minutes for those occurring in adverse weather.

The factors that contributed to the variations in EPEs

between scenarios include differences in the number of

evacuating vehicles, the capacity of the evacuation routes

used, or the distance from the origin zones to the EPZ

boundary.

Based on the data gathered and the results of the evacuation

simulations, the existing evacuation strategy was determined

to be functional for the 2012 conditions, given the lack of

severe congestion or very high ETEs. Recommendations were

provided for enhancements to improve the evacuation time

estimate.

Assumptions utilized in the ETE will be reviewed when

evaluating changes to roadways or evacuation networks to

ensure the results of the ETE remain valid. Changes in

population will be evaluated utilizing the sensitivity factor

developed during the ETE analysis.

The full Evacuation Time Estimate was submitted for NRC

review in accordance with NRC regulations Evacuation Time

Estimate (ETE) Updates 10 CFR 50, Appendix E, Section IV.3.

Following the NRC review, the results of the study and

recommendations will be reviewed with applicable offsite

agencies. The review will focus on the utilization of the

results of the evacuation simulations provided in the ETE for

comparison to existing protective action strategies.

Modifications, if any, will be incorporated as part of the

ongoing emergency planning process. SNC will work with OROs and maintain a protective action strategy using the 6-3 REV 61 06/14 applicable portions of NUREG 0654 Supplement III.

(

Reference:

Evacuation Time Estimates Update dated November 26, 2013 NL-13-2340; ETE Report ETE-VEGP-001; Annual ETE Review ETE-VEGP-002).

REV 38 05/05 APPENDIX 7 EMERGENCY OPERATIONS FACILITY

1 REV 38 05/05 A. INTRODUCTION A.1 PURPOSE The purpose of this appendix is to outline the function of the Emergency Operations Facility for the Southern Nuclear Operating Company (SNC). Additionally, this appendix delineates the actions to be taken by SNC Corporate Staff in the event of an emergency at any (SNC) site.

A.2 SCOPE AND APPLICABILITY This appendix provides the framework for operations of the EOF for SNC. This appendix is an integral part of the site specific emergency plan(s).

This appendix may be implemented to coordinate a SNC response to an emergency at any SNC facility or in response to a transportation accident involving radioactive material.

Additionally, this appendix provides the mechanism for obtaining and providing additional emergency response support and resources to SNC site(s) in the event of an emergency.

The SNC Corporate Staff will be responsible for offsite emergency response support and resources as requested.

Overall management of the emergency will be accomplished at the specific site(s)[Vogtle Electric Generating Plant (VEGP), Hatch Nuclear Plant (HNP) and Farley Nuclear Plant (FNP)].

A.3 SUMMARY The site specific Emergency Plan, is activated by the Emergency Director (ED). Upon notification of an ALERT or higher classification or as directed by the ED, the EOF will be activated as described in emergency implementing procedures. When notified, the designated corporate emergency organization management report to the EOF to be briefed on current conditions and perform their assigned tasks. Each manager's support staff will operate from that group's office area. Offsite support personnel and equipment will be dispatched to the site Operations Support Center (OSC) or Technical Support Center (TSC) upon request from the specific site Emergency Director. The corporate emergency organization will provide offsite emergency response support and resources to SNC sites 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day until the emergency has been terminated.

2 REV 38 05/05 The EOF will be activated for an ALERT, a SITE AREA or GENERAL emergency classification. This facility will be operational within about an hour of the initial notification.

SNC's goal is to begin notification of all required on-call Emergency Response Organization (ERO) personnel as soon as practicable, within 15 minutes, following the declaration of an Alert emergency or higher emergency classification at any SNC site.

Minimum EOF staff for facility activation will include the EOF Manager, the Dose Assessment Supervisor, the Dose Analyst, the Field Team Coordinator, the ENN Communicator, and the Licensing Support Coordinator.

Access control for the EOF is established through the use of electronic card readers.

During the emergency, the emergency director will normally be located in either the TSC or Control Room at his/her option. The emergency director is responsible for the management of the emergency response. Specific duties and responsibilities are provided in the site specific Emergency Plan and Emergency Plan Implementing Procedures.

SNC has taken precautions to ensure that the EOF can be quickly accessed and made operational within about an hour of the initial notification and is safe-guarded against unauthorized personnel. The common EOF is located in a secure building. The building itself has posted security guards and video surveillance cameras.

Any outside doors that do not have security guards are accessible only by SNC ID badges. Additionally, the EOF facility door is accessible only to people with ID badges that have been pre-approved for access. If an event were to occur during off-normal hours, a guard will be posted at the main entrance to Building 40 to allow access to offsite agency or other responders without pre-designated ID access.

B. EOF ORGANIZATION The EOF Organization consists of selected management and staff members located in the SNC Corporate Office. This organization is responsible for providing offsite emergency response support and resources, as needed.

The EOF Organization is displayed in Figure 1 and typical duty assignments are shown on Table 1. This organization may be supplemented or reduced by the EOF Manager, as required, to respond to the specific emergency situation. but will not be reduced to below the minimum staff as specified in A.3 above.

SNC normally maintains ERO positions in a duty rotation.

Several positions have been designated as plant specific 3 REV 38 05/05 and, as such, have personnel designated for each of the 3 sites. Specifically each of the following EOF positions has site-specific personnel designated:

  • EOF Technical Supervisor In order to augment additional staff that may be needed in the unlikely event of a multi-site accident, SNC will re-activate its ERO notification system. When the EOF is activated, all EOF staff pagers are activated, and all EOF personnel are expected to report to the EOF.

Personnel that are not needed to augment positions are briefed and dismissed with a stand-by status.

B.1 EOF MANAGER The EOF Manager manages the following activities:

  • Overall direction and control of the offsite response for SNC.
  • Communication of radiological information to State and local emergency response agencies as needed.
  • After consultation with the ED, provides support for initial activities associated with planning for recovery operations.

The duties and responsibilities of the EOF Manager will be assumed by designated SNC corporate personnel. The designated individual will be assigned according to a predetermined rotation schedule and will typically have either previous plant specific SRO background or long-term supervisory/management experience.

4 REV 60 07/13 The duties and responsibilities of the EOF Manager are as follows:

1. Manage the EOF and direct the activities of the EOF

organization.

2. Ensure activation of the EOF at ALERT or higher

classification, or as directed by the ED.

3. Support site efforts for the following:
  • Determining the cause of the incident.
  • Assessing the overall damage, including personnel, equipment, systems, facilities and/or fuel.
  • Developing recovery plans.
4. Keep corporate management informed regarding the

emergency response and emergency classification

upgrades.

5. Ensure that the joint owners, as applicable, are

kept apprised of significant changes in the

emergency status including upgrades, downgrades and

terminations.

6. Keep the GPC/APCO public information director fully

apprised regarding the status of the emergency.

7. Identify the available resources within and outside

the company to assist in mitigation and recovery, as

necessary.

8. Procure outside services and equipment, as

necessary.

9. Obtain assistance from SNC Environmental Services

regarding non-radiological and hazardous materials

environmental considerations.

10. Request assistance from legal counsel as

appropriate.

11. Coordinate NRC inquiries/activities requiring a

response from the Corporate Office. Obtain licenses

and/or amendments to licenses, if required, for

repair of the affected unit and disposal of waste

products.

12. Approve news releases issued from the Emergency

Response Center (ERC) or the Emergency News Center

(ENC)/Joint Information Center (JIC).

13. Communicate developed PARs to the ED once offsite

communication responsibility is transferred to the

EOF. The EOF Manager and ED will determine which

facility will communicate the PARs to offsite

agencies. Normally, initial PARs will be

communicated to offsite agencies by the TSC while 5 REV 38 05/05 changes in PARs will be communicated to offsite agencies by the EOF.

14. Ensure that necessary support is provided to the SNC Newswriter, the SNC Spokesperson, and the Public Information Director to ensure timely and accurate information flow to the public. An unaffected EOF Manager will be available to assist the affected EOF Manager in Company Spokesperson interface activities.

6 REV 38 05/05 B.2 EOF TECHNICAL SUPERVISOR The duties and responsibilities of the EOF Technical Supervisor will be assumed by SNC corporate support personnel. The designated individual will be assigned according to a predetermined rotation schedule and will typically have plant specific long-term engineering/design experience. Reporting to the Technical Supervisor are the emergency communicators and the necessary engineering technical, and licensing personnel needed to support tasks assigned to the EOF.

The duties and responsibilities of the Technical Supervisor are as follows:

1. Provide technical interface to vendors, utility groups, consultants and technical investigation groups. 2. Assist in establishing a list of plant equipment/system modifications required to bring the plant to cold shutdown, recovery and/or startup.
3. Develop an engineering support plan compatible with the plant mitigation and recovery plan. Provide engineering support developing site recovery procedures. This plan will include engineering personnel resources.
4. Coordinate the work performed by SNC engineering, Southern Company Services, the architect engineer, the nuclear steam supply system supplier, and other engineering consultants. Coordinate the transmittal of engineering modification/design documents (Design Change Packages (DCP), Request for Engineering Assistance (REA), etc) to the site staff, and site and SNC procurement groups.
5. Coordinate the receipt and assessment of technical information related to plant systems and facility operations, and submit recommendations to the TSC Manager through the EOF Manager.
6. Provide licensing support, as requested, through utilization of the licensing support.
7. Provides communications support for offsite notifications (Emergency Notification Network(ENN),

as requested.

7 REV 43 05/06 B.3 EOF SUPPORT COORDINATOR The duties and responsibilities of the EOF Support Coordinator will be assumed by SNC corporate support

personnel. The individuals designated to assume the

position will be indicated on a predetermined

rotational schedule. Reporting to the EOF Support

Coordinator are the non-technical personnel needed to

support tasks assigned to the EOF. Additionally, the

News writer is matrixed to the EOF Support Coordinator

from the corporate communications organization.

The duties and responsibilities of the EOF Support Coordinator are as follows:

1. Provide assistance to the TSC Support Coordinator in the Technical Support Center (TSC) for ordering equipment and materials needed. Establish a standby

list of personnel to provide additional technical

support, as required.

2. Obtain materials, supplies, and equipment that are

needed in the EOF.

3. Process expense accounts, distribute checks from

payroll, and conduct other financial aspects of the

emergency organization.

4. Provide logistics arrangements for support personnel

called in to assist in the emergency, including

communications hardware, transportation, food, and

lodging.

5. Obtain assistance from corporate financial staff to

communicate, as necessary, with banks, financial

institutions, investors, joint owners and insurers

regarding the emergency situation.

6. During the initial phase of the emergency, provide

the official log of actions and the course of the

emergency from the EOF.

7. Provide administrative services for the Corporate

Emergency Response Organization, such as clerical,

typing, and duplication.

8. Provide administrative, logistic, financial, and

procurement support as appropriate during the

recovery phase.

8 REV 38 05/05 B.4 DOSE ASSESSMENT SUPERVISOR The duties and responsibilities of the Dose Assessment Supervisor will be assumed by SNC corporate support personnel. The individuals designated to assume the position will be indicated on a predetermined rotation schedule. Reporting to the Dose Assessment Supervisor are the Dose Analyst, Field Team Coordinator, Field Team Communicator, and Radiological Status Communicator.

The TSC will initially be responsible for dose projection and field team control activities. When the EOF is activated and ready to assume functions of dose projection/assessment activities, then the EOF Dose Assessment Supervisor will coordinate transfer of dose assessment, field team control, and protective action determination from the TSC to the EOF. Coordination will include ED/EOF Manager mutual approval of the transfer with the intention of transferring dose assessment from the TSC to the EOF as rapidly as possible while ensuring a smoothly coordinated transfer of this critical function.

The duties and responsibilities of the Dose Assessment Supervisor are as follows:

1. Support the plant dose assessment supervisor as necessary. Be prepared to assume offsite dose projection if requested. Keep the EOF Manager informed of any offsite dose assessments performed by the site or corporate staff.
2. Provide an as low as reasonably achievable (ALARA) exposure review of engineering modifications and tasks proposed by the emergency organization, including necessary documentation of those reviews.
3. Develop methods for treatment and/or disposal of radioactive wastes resulting from the emergency and recovery operations.
4. Compare calculations and measurements with State and Federal groups performing radiological assessments.
5. Coordinate distribution of dose assessment information with offsite authorities.
6. Coordinate assistance to the State for transportation incidents involving radioactive material, as requested.
7. Develop protective action recommendations (PARs) and communicate to the EOF Manager the need for PAR communication once control is transferred to the EOF.

9 REV 38 05/05 B.5 SECURITY COORDINATOR The duties and responsibilities of the Security Coordinator will be assumed by SNC corporate security personnel. The individuals designated to assume the position will be indicated on a predetermined rotation schedule.

The duties and responsibilities of the Security Coordinator are as follows:

1. Support the plant security manager as necessary.

Keep the EOF Manager informed of any security events/issues.

2. Provide assistance to the security supervisor at the site, as requested.
3. Establish and maintain access control for the EOF.

10 REV 38 05/05 B.6 OFFSITE RESPONSE COORDINATOR The duties and responsibilities of the Offsite Response Coordinator will be assumed by SNC Corporate Emergency Planning Coordinators and designated staff. The individuals designated to assume the position will be indicated on a predetermined rotation schedule.

The duties and responsibilities of the Offsite Response Coordinator are as follows:

1. Coordinate activities concerning the dispatch and update of technical liaisons to State and Local authorities, as appropriate.
2. Monitor EOF functional areas to facilitate coordination between the licensee and State and Local agencies.

B.7 ENGINEERING/TECHNICAL SUPPORT STAFF AND ADMINISTRATIVE SUPPORT STAFF

1. The Engineering/Technical Support staff and administrative support staff will report to the EOF, as directed. These job titles refer to a number of individuals performing a variety of designated tasks. Their numbers will depend on the type and duration of the emergency.
2. The Engineering/Technical Support staff are personnel designated by the management of the Corporate Emergency Organization. They provide management, technical, regulatory and licensing support during an emergency. This staff report through the EOF Technical Supervisor to the EOF Manager.
3. The administrative support staff are the non-technical members of the Corporate Emergency Response Organization. They perform duties designated by the EOF Support Coordinator or appropriate manager which include but are not limited to the following:
a. Providing clerical and secretarial support to the Emergency Organization.
b. Operation of word processors.
c. Operation of telecopiers.
d. Making entries to and retrieving data from Nuclear Network.
e. Retrieval of file documents.
f. Updating status boards using information provided from the sites.

11 REV 60 07/13 C. NOTIFICATION AND ACTIVATION Initial notifications or emergency response personnel

will follow the guidelines specified in the site

specific Emergency Plan and Emergency Plan Implementing

Procedures. This appendix contains the emergency

notification of Corporate Management and the appropriate

offsite support groups not specified in the site

specific Emergency Plan(s).

C.1 NOTIFICATION OF CORPORATE MANAGEMENT The Nuclear Duty Officer will be notified of all emergencies classified at any SNC site. The Nuclear Duty Officer will in turn notify the EOF Manager. The EOF Manager is responsible for activation of the EOF

Staff and notifying the appropriate Corporate

Management.

1. The EOF Manager is responsible for assuring that the Corporate Emergency Organization is notified 2. The EOF Manager will also be responsible for ensuring that the corporate emergency staff members report directly to the EOF. 3. Notification of personnel may be accomplished through the use of an automated or manual system.

C.2 NOTIFICATION OF OFFSITE SUPPORT AGENCIES Offsite support agencies will be notified by the

appropriate emergency organization member(s), as

requested by VEGP, FNP, and HNP.

12 REV 38 05/05 D. EMERGENCY FACILITIES AND EQUIPMENT Following the declaration of an emergency, response activity will be coordinated at a number of facilities.

These emergency response facilities are described in the site specific emergency plans. The EOF is a common facility for all SNC sites and is described in this section.

D.1 EOF DESCRIPTION The EOF is the central location for management of the offsite emergency response, coordination of radiological assessment, and management of initial recovery operations. The EOF is located in Birmingham, Alabama and serves as the EOF for all SNC sites (VEGP, FNP, and HNP). The EOF will be activated as prescribed in the site specific Emergency Plan implementing procedures. From the EOF, SNC corporate management personnel assist the states and other governmental bodies by communicating protective action recommendations approved by the Emergency Director to ensure public health and safety. Plant systems information, radiological data, and meteorological data are provided via the SNC integrated data display system to EOF personnel as needed to: assess environmental conditions, coordinate radiological monitoring activities, and recommend implementation of offsite emergency plans. Data displays provide periodic and timely conditions of the affected plant and periodic and timely assessment of radiological conditions in the plant environs. .

The SNC integrated data display system utilizes data provided by the plant specific data links. These station data links are described in each site specific plan. These displays may be either manual or electronic. Data displays are located in the main caucus area of the EOF, dose assessment area, plant status area, and engineering area within the facility. Other displays may be located in the command center area. Data is also available to all state agencies responding to the EOF. Data is available both in the main caucus area and the area designated for the particular state agency. Similarly, this data is available to state and local authorities via a secure network dedicated to data distribution among the various offsite emergency response facilities. The data display system provides the user with a "master view" for the monitoring of multiple site events simultaneously. Data required to support EOF operations is provided by an extensive ring bus transport network. Data may also be obtained manually via telephone from the Control Room and the TSC to the EOF.

13 REV 38 05/05 Contained within the facility will be the manpower and equipment necessary to provide dedicated direct communication links to the plant site(s). In addition, there are commercial and company wide phone systems to and from the site(s). A communication link will be established and maintained between the Emergency Operations Facility and the Technical Support Center (TSC) until the emergency director determines that the communication link is no longer needed. Other communications equipment accessible to the EOF includes Nuclear Network (an intra-industry computer-based information exchange network), telecopiers, and computer workstations designated for emergency use. Computer workstations are dedicated for performing dose projections for multiple sites. The EOF is the distribution center for all field data and sample analyses. This information will be available to county, State, and Federal representatives. The EOF is sized to accommodate 35 persons, including 25 pre-designated persons, 9 persons from the NRC, and 1 person from the Federal Emergency Management Agency (FEMA). It is anticipated that representatives from the state(s) of Georgia, South Carolina, Alabama, and Florida will be dispatched to the EOF for an event at specific SNC site(s). The EOF has been designed to accommodate these representatives. Agreements exist between the appropriate State agencies and SNC to ensure rapid response of state personnel dispatched to the EOF. Table 4 provides additional information concerning EOF communications capabilities. Upon activation of the EOF, Corporate personnel will provide staffing 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day until directed otherwise by the Emergency Director.

The emergency director, located at the affected site(s),

is responsible for the management of the emergency response. Specific duties and responsibilities are provided in the site specific Emergency.

The EOF consists of several rooms, as shown, together with the location of key personnel, in Figure 2. The EOF is a dedicated facility. The designated emergency planning coordinator for each of the three sites maintains an office within the EOF to ensure readiness and daily operability.

Based on the physical location of the EOF, specialized ventilation systems are not required. The EOF ventilation system is consistent in design with standard building codes. Similarly, EOF functions would not be interrupted by radiation releases from any SNC site.

14 REV 38 05/05 Normal power to the EOF is from a reliable offsite source. Emergency lighting is provided by battery operated lights. Back-up power for the EOF is supplied by onsite diesel generation. All essential equipment is backed up by the diesel generation system.

The EOF is located adjacent to the document management section for SNC. The following records or information are available:

  • Technical Specifications.
  • Selected plant operating procedures.
  • State and local emergency response plans.

The following records or information can be transmitted to the EOF manually, electronically or by facsimile:

  • Environs radiological monitoring records.
  • SNC employee radiation exposure histories.
  • System piping and instrumentation diagrams and HVAC flow diagrams.
  • Piping area diagrams.
  • Electrical one-line, elementary, and wiring diagrams.

The above records or information are available in current form and updated as necessary to ensure currency and completeness.

Operations at this facility are directed by the EOF manager.

15 REV 43 05/06 D.2 CONTINGENCY PLANNING Optimum functionality and availability was considered in the decision to locate the EOF in Birmingham,

Alabama. At this location, functionality of the EOF

would be uninterrupted by radiation releases, natural

phenomena, and security based events at any of the SNC

sites. Support operations and coordination with

Federal, State and local organizations would continue.

If personnel were to be dispatched to the sites, then personal protection equipment would be available from

the local emergency management agency or from one of

the unaffected SNC plant sites.

In the unlikely event that individuals should need to respond to the EOF from within the 10 mile EPZ of any

SNC plant, they would be surveyed prior to release by

local emergency authorities at the reception centers in

accordance with State and Local emergency response

plans. In the unlikely event that the EOF becomes uninhabitable, resources and personnel will be

transferred to the Corporate Headquarters of Alabama

Power Company, located in Birmingham, Alabama. These

actions will be taken as part of the normal business

continuity plan.

E. COORDINATION WITH GOVERNMENTAL AGENCIES The site specific Emergency Plan(s) delineate the

governmental agencies to be notified and specifies the

information to be initially conveyed. It is anticipated

that representatives of various agencies will be

dispatched to the EOF for an event at an SNC facility.

Arrangements have been made between the appropriate

State agencies and SNC to ensure rapid response of state

personnel dispatched to the EOF.

E.1 U.S. NUCLEAR REGULATORY COMMISSION Coordination with the U.S. Nuclear Regulatory Commission

(NRC) may be underway at several locations

simultaneously. For details of the NRC response, see

the NRC Incident Response Plan, NUREG-0728.

Initial notification of the NRC will proceed as

specified in the site specific Emergency Plan. The

resident NRC inspector(s) and plant personnel have

direct communications from the site control room to the

NRC headquarters in Rockville, Maryland and to the

regional headquarters in Atlanta, Georgia.

16 REV 38 05/05 The resident inspector(s) may be reinforced by additional NRC personnel shortly after notification of an emergency. The Emergency Director is responsible for coordinating NRC activities to reduce duplication of effort and reduce impact on the plant staff during the emergency situation.

Provisions have been made to have direct NRC FTS lines in the TSC and the EOF during an emergency. This will allow personnel in the control room to continue responding to the emergency while personnel in the TSC or EOF respond to questions and input from the NRC.

NRC activities requiring response from the licensee will be coordinated by the EOF Technical Coordinator through the EOF manager.

E.2 STATE GOVERNMENTAL AGENCIES The government notifications are outlined in the site specific Emergency Plan(s). Coordination of offsite responses to the emergency is the responsibility of State agencies as outlined in the State Radiological Emergency Response Plans.

E.3 LOCAL GOVERNMENTAL AGENCIES Notification of local government officials is outlined in the site specific Emergency Plan(s). Coordination with local government agencies will normally be through the responsible State agency.

E.4 DEPARTMENT OF ENERGY Notification of DOE officials is outlined in the site specific Emergency Plan.

17 REV 38 05/05 F. OFFSITE SUPPORT Offsite resources that may be available to support an emergency response effort include, but are not limited to, the following:

1. Southern Nuclear Operating Company
2. Georgia Power Company
3. Alabama Power Company
4. Southern Company Services, Inc.
5. The architect engineers
6. NSSS supplier
7. Nuclear industry
8. Contract laboratories F.1 SOUTHERN NUCLEAR OPERATING COMPANY (SNC)
1. SNC is divided into three projects: the Farley Project, the Hatch Project, and the Vogtle Project.

Each of the projects is further divided into a plant staff and a corporate staff. These represent a pool of positions of which approximately two-thirds would be additional assets that could be made available to support an individual site emergency organization, as required.

a. Plant Staffs - The permanent plant staffs consist of personnel who possess expertise in at least one of the following areas: operations, maintenance, engineering, administration, or technical support.

These personnel would be available to assist in an emergency or recovery situation at an SNC nuclear facility.

b. Corporate Staffs - These staffs consist of personnel who provide management, technical, clerical, procurement, and regulatory support to the nuclear facilities.

18 REV 38 05/05 F.2 GEORGIA POWER COMPANY (GPC)

1. The GPC Fossil and Hydro Power Generation Department is responsible for the operations and maintenance of all GPC non-nuclear generating facilities including diesel and combustion turbine facilities. This represents a large source of technical expertise which could provide support to the emergency organization, if required.
2. The GPC Power Delivery Department manages the activities of the divisions and areas of the company which provide the electrical services to customers.

This organization has a large resource of people and heavy equipment which may be of assistance following a nuclear emergency.

3. Other GPC assets, including maintenance and repair facilities, training facilities, engineering staffs, and headquarters personnel represent additional resources available for emergency support.
4. The GPC Central Laboratory has personnel and facilities available to provide offsite monitoring, sample analysis, and dosimetry processing for the affected site.

F.3 ALABAMA POWER COMPANY (APCO)

1. The APCO Fossil and Hydro Power Generation Department is responsible for the operations and maintenance of all APCO non-nuclear generating facilities including diesel and combustion turbine facilities. This represents a large source of technical expertise which could provide support to the emergency organization, if required.
2. The APCO Power Delivery Department manages the activities of the divisions and areas of the company which provide the electrical services to customers.

This organization has a large resource of people and heavy equipment which may be of assistance following a nuclear emergency.

3. Other APCO assets, including maintenance and repair facilities, training facilities, engineering staffs, and headquarters personnel represent additional resources available for emergency support.

19 REV 38 05/05 F.4 SOUTHERN COMPANY SERVICES, INC. (SCS)

1. SNC has the primary responsibility for engineering support of VEGP, FNP and HNP. SCS may be utilized in response to a plant emergency or for subsequent recovery operations as deemed necessary by SNC.

F.5 ARCHITECT ENGINEERS The architect engineers will provide support as requested through the engineering services manager. The architect engineers are SNC and Bechtel Power Corporation.

1. SNC serves as its own Architect/Engineer. SCS, an associate company to Southern Nuclear Operating Company, will be used to the extent appropriate in responding to nuclear emergencies.
2. Bechtel Power Corporation, headquartered in Gaithersburg, Maryland, also performs architect engineer services for SNC. Bechtel's technical staffs are engaged in all phases of public utility engineering, design, construction, purchasing, inspection, and expedition of materials, as well as consultation on utility operating matters. Bechtel has available a broad range of engineering, construction, and consulting experience. Bechtel's nuclear experience includes engineering studies, the evaluation of reactor systems, safety evaluations, detailed engineering design, construction, and startup and testing of nuclear power facilities.

F.6 NUCLEAR STEAM SUPPLY SYSTEM VENDOR The applicable NSSS vendor will provide support through the engineering services manager. Plant specific references to the appropriate vendor are specified in the plant specific base plans. The NSSS maintains a large staff of technically qualified people in all the engineering disciplines related to the design, construction, and operation of a nuclear power plant.

These same skills would be necessary in the evaluation of, and recovery from, an emergency at any SNC site.

Assistance would most likely be sought for large-scale core analysis, special tool design, and licensing.

20 REV 38 05/05 F.7 NUCLEAR INDUSTRY The nuclear industry provides a large reservoir of personnel with a wide range of technical expertise and knowledge. A nuclear industry national inventory of personnel who might be called upon to supplement Company personnel has been developed through the Institute of Nuclear Power Operations (INPO).

In addition, a number of utilities have entered into an INPO coordinated Voluntary Assistance Agreement program.

This provides a mechanism to draw upon industry resources during an emergency.

Support may be called upon from neighboring utilities would include the following:

1. Manpower and equipment to assist in in-plant and emergency field monitoring.
2. Engineering, design, and technical expertise to assist in determining the cause of the accident and to support recovery.
3. Manpower and equipment to assist in maintenance and repairs to the facility.

F.8 CONTRACT LABORATORIES Teledyne Isotopes, Inc. for emergency analytical services.

Framatome ANP for emergency analytical services

21 REV 38 05/05 G. MAINTAINING EMERGENCY PREPAREDNESS G.1 ORGANIZATIONAL PREPAREDNESS

1. Training Corporate personnel identified in the Emergency Response Organization receive training. The training consists of familiarization with the Site Emergency Plans and applicable emergency implementing procedures required to carry out their specific functions.

The corporate emergency planning coordinator(s) will ensure that personnel in the Corporate Emergency Response Organization are familiar with the Emergency Plans and able to respond promptly. A training matrix for corporate personnel assigned to the ERO is shown in Table 2, and training course summaries are presented in Table 3. Training will be documented in accordance with established practices.

The corporate emergency planning coordinator(s) are responsible for assuring that training is conducted for corporate emergency response personnel each calendar year. 2. Drills/Exercises Drills/ exercises will be conducted each calendar year to test the performance of implementing procedures, personnel, and emergency equipment. These drills/exercises will be conducted with each SNC site.

SNC's goal is to activate the EOF in support of all site activities that involve TSC activation. EOF activation is required at least 3 times annually (1 scenario per site per year) in accordance with the existing Emergency Plans. At least 1 activation every 5 years will require a concurrent EOF support response for more than one SNC site.

Each drill/exercise will test, as a minimum, the communication links and notification procedures to assure the prompt notification of the corporate staff.

Provisions are made for critique of all drills/exercises. Critique items will be forwarded to the site emergency preparedness coordinator for processing in the site specific corrective action program.

22 REV 38 05/05 G.2 REVIEW AND UPDATE OF PLAN AND PROCEDURES Reviews of the site Emergency Plan and Emergency Plan Implementing Procedures will be performed in accordance with site specific emergency plans. These reviews will be utilized to update the Plans and procedures and to improve emergency preparedness.

23 REV 38 05/05 TABLE 1 TYPICAL CORPORATE EMERGENCY ORGANIZATION ASSIGNMENTS EMERGENCY POSITION ASSIGNMENT EOF Manager Supervision from corporate staff as designated in NMP-EP-001 EOF Technical

Supervisor Corporate staff as designated in NMP-EP-001 EOF Support

Coordinator Corporate staff as designated in NMP-EP-001 EOF Dose Assessment Supervisor Corporate staff as designated in NMP-EP-001 Dose Analyst Corporate staff as designated in NMP-EP-001 Field Team

Coordinator Corporate staff as designated in NMP-EP-001 Field Team Communicator Corporate staff as designated in NMP-EP-001 Radiological Status

Communicator Corporate staff as designated in NMP-EP-001 Plant Status Loop Communicator Corporate staff as designated in NMP-EP-001 ENN Communicator Corporate staff as designated in NMP-EP-001 ENS Communicator Corporate staff as designated in NMP-EP-001 Licensing Support Coordinator Corporate staff as designated in NMP-EP-001 Security Coordinator Corporate staff as designated in NMP-EP-001 Offsite Response Coordinator Corporate staff as designated in NMP-EP-001 Engineering/Technica l Support Staff Corporate staff as designated in NMP-EP-001 Administrative

Support Staff Corporate staff as designated in NMP-EP-001 Liaisons Corporate staff as designated in NMP-EP-001 Public Information Director Corporate staff as designated in NMP-EP-001 Company Spokesperson Corporate staff as designated in NMP-EP-001 Newswriter Corporate staff as designated in NMP-EP-001 Other Public Information Emergency Communications

Organization Staff Corporate staff as designated in NMP-EP-001

24 REV 38 05/05 TABLE 2 CORPORATE EMERGENCY ORGANIZATION TRAINING MATRIX Subject Area Position Emergency Plan Overview Position Specific Items Offsite Dose Assessment EOF Manager X X EOF Technical Supervisor X X EOF Support Coordinator X X EOF Dose Assessment Supervisor X X X Dose Analyst X X X Field Team Coordinator X X X Field Team Communicator X X Radiological Status Communicator X X Plant Status Loop Communicator X X ENN Communicator X X ENS Communicator X X Licensing Support Coordinator X X Security Coordinator X X Offsite Response Coordinator X X Engineering/Technical Support Staff X X Administrative Support Staff X X Liaisons X X Public Information Director Company Spokesperson Newswriter Other Public Information Emergency Communications Organization Staff See Emergency Communications Plan (Appendix 8)

25 REV 38 05/05 TABLE 3 DESCRIPTION OF TRAINING SUBJECT AREAS Subject Area Description Emergency Plan Overview An overview of the Emergency Plan with special attention to emergency planning zones (EPZs);

emergency classification system; emergency response organizations; responsibilities of emergency response personnel; site accountability; and site dismissal.

Offsite Dose Assessment Dose projection methodology including manual and computerized methods; methods for obtaining meteorological and radiological data; operation of the dose assessment computer; and interpretation of offsite dose calculation results.

Position Specific Items An overview of this appendix with an emphasis on organization, interactions with other elements of the emergency organization, and position specific responsibilities as delineated in the emergency implementing procedures. . This overview training may be conducted as part of classroom, table-top, drill or exercise.

26 REV 38 05/05 TABLE 4 TYPICAL EOF COMMUNICATION CAPABILITY Communications Functions VEGP HNP FNP EOF Management with TSC Commercial Telephone lines TSC/EOF/OSC Conference Bridge Radio Commercial Telephone lines TSC/EOF/OSC Conference Bridge Radio Commercial Telephone lines TSC/EOF/OSC Conference Bridge Radio Resource Management Commercial Telephone lines OPX Commercial Telephone lines OPX Ringdown Commercial Telephone lines OPX Radiological Monitoring Southern LINC Kenwood Radio System Southern LINC Kenwood Radio System Southern LINC Kenwood Radio System Off-site (PARs)

ENN ENN ENN NRC Use ENS HPN RSCL PMCL MCL LAN Conference Phones (3)

ENS HPN RSCL PMCL MCL LAN Conference Phones (3)

ENS HPN RSCL PMCL MCL LAN Conference Phones (3)

Notes: 1. The Offsite Premises Extension (OPX) lines to the three SNC plant sites will be available in the proposed common EOF. These lines bypass the local phone switch. These lines may be referenced as company tie lines.

Intra-facility public address and intra-building public address systems are also available.

27 REV 49 08/08

  • Position used to meet augmentation requirements for EOF Direction and notification/communication FIGURE 1

28 REV 49 08/08 FIGURE 2 REV 57 06/12 APPENDIX 8 EMERGENCY COMMUNICATIONS PLAN SOUTHERN NUCLEAR OPERATING COMPANY

i REV 57 06/12 APPENDIX 8 EMERGENCY COMMUNICATIONS PLAN TABLE OF CONTENTS Page 1.0 Purpose 1 2.0 Policy 2 3.0 Relationship with Other Agencies 4 4.0 Flow of Emergency Public Information 4 5.0 Emergency Communications Facility Locations and Functions 6 6.0 Emergency Communications Plan Activation 9 7.0 Emergency Communications Staff Functions 11 8.0 News Releases 17 9.0 Press Briefings 17 10.0 Public Response 17 11.0 Telecommunications 18 12.0 Transportation 18 13.0 Security 18 14.0 Print and Audiovisual Aids 18 15.0 Special Requests 18 16.0 Public Information Plan for Recovery 19 17.0 Training 19 18.0 Public Information and Education Program 21 19.0 Procedures 24

ii REV 57 06/12 LIST OF FIGURES Page A. Flow of Public Information During an Emergency 26 B. Initial/Early Stage Flow of Emergency Public Information at CMC (Prior to JIC Activation) 27

C. Emergency Communications Information Flow following JIC Activation 28

D. Public Response Flow Chart 29 E. Emergency Communications Reporting Structure 30

iii REV 57 06/12 LIST OF TABLES Page Table 1 Emergency Communications Training Matrix 25

1 REV 57 06/12

1.0 PURPOSE

The Southern Nuclear Company (SNC) Emergency Communications Plan (ECP) is a portion of the Vogtle Electric Generating Plant (VEGP) Unit 1 and Unit 2 Emergency Plans submitted to the Nuclear Regulatory Commission (NRC).

The Vice President and General Counsel, SNC Corporate Council and Compliance, is responsible for coordination and administration of the Southern Nuclear Emergency Communications Plan (ECP or the Plan). The ECP is reviewed and updated once per calendar year in conjunction with a review and update of the site Emergency Plans.

The ECP is designed to:

A. Coordinate the public communications effort through the issuance of timely, accurate information during

an emergency. B. Describe the means to activate and staff emergency communications positions in the Alabama Power/Georgia Power (APC/GPC) Corporate Media Center

(CMC) in Birmingham/Atlanta, the Joint Information Centers (JIC), and the SNC Emergency Operations Facility (EOF). C. Describe the process of information dissemination through news releases and press briefings. D. Describe the training and testing of personnel in their functions and testing of the response to be made pursuant to the ECP. E. Maintain an orderly flow of information during the recovery period.

2 REV 57 06/12 F. Describe the Public Education and Information Program for the periodic dissemination of emergency planning instructional materials to residents and transients in the plume exposure pathway Emergency Planning Zone. G. Provide for 24-hour/day Emergency Communications Organization (ECO) staff coverage in the event of an emergency. H. Assign responsibilities to and duty locations for the Emergency Communications response team.

2.0 POLICY

The public information policy described below will provide guidance during an emergency at a SNC nuclear

plant (the Plant):

A. The Southern Company has a policy of full disclosure and will maintain honest and open communications

with public officials, the public (especially in the

immediate vicinity of the plant), and its employees

at all times. This attitude stems from resolve to

operate all our facilities safely and prudently and

to communicate clearly and completely any

significant breach of safety.

3 REV 57 06/12 B. The Company (Southern Company) will provide the public with prompt and accurate information through established news and information channels.

C. The Company will make every effort to meet the information needs of the public and employees while

communicating promptly with appropriate local,

state, and federal officials during the period of

the emergency.

D. Statements to the news media, the public and employees concerning the plant, its operation, and

any emergencies are to be made only with the

knowledge and guidance of the appropriate GPC/APC

Public Relations/Corporate Communication Departments

and appropriate Southern Nuclear management.

4 REV 57 06/12 3.0 RELATIONSHIP WITH OTHER AGENCIES A. The Emergency Communications Organization (ECO) is responsible for the coordination and issuance of all news announcements related to emergency conditions at the

Plant. Federal, State and County emergency management

agencies and the Department of Energy -Savannah River

Site (DOE-SRS) are responsible for the issuance of public

announcements relating to offsite conditions, including

recommended protective actions.

B. A Joint Information Center (JIC) will be operated providing the Utility, the state(s), the federal agencies (including the SRS as appropriate), and counties

the opportunity to coordinate information, issue news releases, make announcements, and may participate jointly

in news briefings. Public response activities will be

conducted and coordinated jointly with State and County

agencies as appropriate.

C. Work areas for the public information officers of the federal, state, and county emergency response agencies

are available at the JIC. Telecommunications facilities are also available to these agencies.

D. Utility news announcements will be provided to representatives of government agencies prior to their

distribution to the news media.

E. The county and state emergency management agencies should advise ERC/JIC staff of announcements for the news media or the Emergency Alerting Stations (EAS) prior to their

distribution to the news media.

F. Public response may include state and county agency representatives and utility employees coordinated by the

CMC/JIC Public Response Coordinator. Rumors related to offsite matters will be referred to the appropriate

federal, state, or county agency representatives for

proper responses. Rumors related to onsite matters that

agencies are aware of will be relayed to the CMC/JIC Public Response Coordinator for the necessary actions.

4.0 FLOW OF EMERGENCY PUBLIC INFORMATION Information release for a Notification of Unusual Event

is managed by the SNC Corporate Communication Manager in

coordination with Southern Nuclear management and APC/GPC

Corporate Communication.

At an Alert classification or higher, approval of news

releases, other than the Initial News Release (INR), is

required from both the EOF Manager and the Public

Information Director (PID) or their designee(s).

5 REV 57 06/12 The following figures are designed to show the flow of information for emergencies classified as Alert or

higher.

A. Flow of Public Information During an Emergency B. Initial/Early Flow of Emergency Public Information at Corporate Media Center (prior to JIC activation) C. Emergency Communications Information Flow (after JIC activation) D. Public Response Flow Chart E. Emergency Communications Reporting Structure 6 REV 57 06/12 5.0 EMERGENCY COMMUNICATIONS STAFF LOCATIONS AND FUNCTIONS The PI Director is responsible for all emergency

communications response activities and staff.

At an alert classification or higher, the Emergency

Communications public response will be handled initially from

the CMC by the PI Director. The PI Director and the Nuclear

Spokesperson will contact the EOF Manager for briefing on the

emergency. The EOF will issue an Initial News Release (INR).

If the decision is made to activate the JIC, the PI Director and the Nuclear Spokesperson move to that facility. Upon

activation of the JIC, primary utility Emergency Communications response will be conducted from the JIC. The CMC staff will maintain communications with the JIC and EOF, keep APC/GPC/SNC personnel notified of plant conditions, and

support JIC activities.

A. Corporate Media Center - Atlanta/Birmingham

1. The Corporate Media Center, located at the Atlanta/Birmingham corporate headquarters

building of Georgia Power Company/Alabama Power

Company, as appropriate, is the official location

for coordination and issuance of news

announcements and responses to news media

inquiries until the JIC has been activated. The CMC may function as a Joint Public Information

Center (JPIC) and may conduct these activities as

long as appropriate and necessary.

2. Prior to activation of the JIC at an Alert or higher classification, corporate staff assigned

to the JIC will assemble at the CMC. They will proceed to the JIC when directed by the Public Information Director.

3. The following staff is assigned to the Corporate Media Center
  • PI Director (until JIC activation)
  • CMC Manager
  • CMC Media Relations Representative
  • CMC Facility Coordinator
  • CMC Public Response Coordinator
  • CNC Public Response Team
  • Government Relations Liaison
  • Financial Response Liaison
  • Employee Communications Coordinator
  • Internet Coordinator
  • CMC Assistant
  • CMC Support Staff

7 REV 57 06/12

4. Following activation of the JIC, the CMC staff responsibilities will continue. Responsibilities will include the following:
a. Support of the JIC in all functions common to the two facilities such as telephone

response, media monitoring, media response,

news release preparation and distribution,

etc. b. Functions specific to the CMC, including, but not limited to:

  • employee communications
  • financial response
  • governmental response
  • coordination with senior management
  • Internet activities
  • providing additional trained staff to

support the ECO effort

B. Emergency Operations Facility (EOF)

1. The EOF will serve as the source of information about an incident to staff in the CMC and JIC.
2. Emergency Communications staff will:
  • serve as the source of information for the

Nuclear Spokesperson and PID

  • develop and issue the INR
  • develop and obtain SNC approval for subsequent

news releases

  • confirm or correct rumors identified
  • perform other communications responsibilities

as needed 8 REV 57 06/12 C. Joint Information Center

1. After the initial notification of an emergency at the Alert classification or higher, the PI

Director decides whether to activate the JIC.

Once the JIC is activated, it becomes the "single source" for media information.

2. Upon activation of the JIC, the PI Director transfers to that facility, maintaining overall

responsibility for emergency communications

response. The PI Director will manage the

emergency communications response and is

responsible for all functions of the JIC. These functions include:

  • final approval and distribution of press statements
  • coordination of press briefings and joint news announcements with
  • interface with the media and local officials
  • requests for interviews and photos
  • recorded information line updates
  • public response

It is the PI Director's responsibility to assure all

information is fully coordinated with and among the

appropriate state and federal government public information

officers (PIOs).

3. Upon activation, the JIC will obtain information from the EOF.
4. News briefings will be held at regular intervals

during the emergency. The PI Director will

preside over the press briefings. The Nuclear

Spokesperson will explain emergency conditions and

actions the Utility has taken at the plant. Off-

site issues will be handled by off-site agency

representatives.

5. If radiological conditions permit, an area near

the plant may be designated as a site for

television and news photographs. The Media

Relations Representative, in consultation with the

PI Director and the ED or his designee, and

AEMA/GEMA management, as appropriate, will arrange

for escorted visits to photographic locations.

9 REV 57 06/12

6. The following positions will be assigned to the Joint Information Center:
  • PI Director
  • Nuclear Spokesperson
  • JIC Media Relations Representative
  • JIC Public Response Coordinator
  • JIC Public Response Team
  • JIC Facility Coordinator
  • Community Relations Coordinator
  • Admin Staff
  • Technical Assistants
  • Security Officers
  • AV Support Staff

6.0 EMERGENCY COMMUNICATIONS PLAN ACTIVATION

A. Notification of Unusual Event

The SNC Corporate Communication Manager will be notified of

an NUE and will in turn notify APC Public Relations/GPC

Corporate Communication management, as appropriate. The

notification will include the status of the emergency and a

brief description of the event. The SNC Corporate

Communication Manager will confer with appropriate SNC

management and affected owner-company management to determine

the need for:

1. Additional notifications
2. Issuance of a news release

10 REV 57 06/12 B. Alert and Higher Classifications The SNC On-Call Media Rep will be advised of an event

classified as Alert level or higher. The SNC rep will notify

the APC/GPC On-Call Media Rep, as appropriate, with a

description of the situation. The APC/GPC on-call media rep

will notify the PID who will:

1. Formally activate the Emergency Communications Plan.
2. Notify emergency communications staff per Nuclear Management Procedure-Emergency Planning (NMP-EP-

002).

3. Establish contact with the Emergency Operation Facility.
4. Establish contact with appropriate local, state and federal agencies.
5. Issue news release(s).

In addition, the PI Director will evaluate the

following actions:

1. Activating the JIC and dispatch staff accordingly.
2. Conducting news briefings at the CMC or the JIC, which will include to the maximum extent

possible, a panel composed of the Nuclear

Spokesperson and representatives of government

agencies.

11 REV 57 06/12 7.0 EMERGENCY COMMUNICATIONS STAFF FUNCTIONS The following is a description of responsibilities of principal Emergency Communications staff.

A. Public Information Director (PID):

The Public Information Director (PID) is responsible for

directing all emergency communications personnel

assignments. The PID, or a designee, is responsible for

coordinating approvals and dissemination of all utility

public information regarding the emergency. Upon

activation of the CMC/JIC, the PID will be responsible for overall facility direction. Those duties may

include coordinating approval and dissemination of

utility news releases, facilitating news briefings,

overseeing public response, meeting special media

requests, and coordination among company and non-utility

representatives in the facility and liaison with the

media. The PID will be responsible for coordinating

emergency communications response and coordinating with

the SNC Corporate Duty Manager in evaluating the

emergency's severity in terms of public interest and

safety.

B. Nuclear Spokesperson

The Nuclear Spokesperson speaks on behalf of the

company, providing plant status updates during news

briefings. The Spokesperson also may do one-on-one

media interviews. The position works with the Technical

Assistant in keeping abreast of the event status and

keeps the PID posted on that status. The position may

first report to the EOF and then proceed to the CMC/JIC.

C. Technical Assistant (TA)

The Technical Assistant (TA) supports the Nuclear

Spokesperson by gathering accurate and timely

information about the event and the plant's status.

Information is gathered via WebEOC, the plant status

loop, and via direct contact with the EOC Manager -

which the TA should maintain throughout an event. TA's

may do media interviews at the discretion and direction

of the PID.

12 REV 60 07/13 D. CMC Manager The CMC Manager will report to the CMC where he/she will coordinate activities. The CMC Manager may assume the

PID role while a PID is en-route to the JIC. After JIC

activation, the CMC Manager will assume full

responsibility for CMC activities and maintain contact

with the PID. The CMC Manager has responsibility for

ensuring that the actions of the CMC positions are

carried out.

E. CMC/JIC/CCC Public Response Coordinator

The CMC/JIC Public Response Coordinator will direct facility public response activities, keeping staff

advised of current information and obtaining responses

for questions they cannot answer. This includes

referring specific inquiries to the proper person. The

Coordinator is responsible for tracking rumors and

ensuring that the Public Response team members have

updated information on the rumor responses.

F. CMC Financial Response Liaison

The CMC Financial Response Liaison responds to financial

inquiries from financial analysts, the public, media and

stockholders regarding the effects a nuclear incident

might have on Southern Company's financial position.

This role identifies and establishes contact with key

financial leaders and provides them updated information.

The position maintains contact with the CMC Public

Response Coordinator.

G. Government Relations Liaison

The Government Relations Liaison responds to inquiries

from governmental sources. The role identifies and

establishes contact with key government officials and

provides them with updated information. The position

maintains contact with the CMC Public Response

Coordinator.

H. SNC News Writer

The SNC News Writer gathers information and prepares all

news releases for the duration of an event. The News

Writer coordinates technical approval with the SNC EOF

Manager. This position works in the SNC EOF.

13 REV 60 07/13 I. JIC Manager

The JIC Manager is responsible for coordinating

operations of the facility and has responsibility for

ensuring that the actions of the JIC positions

represented on Attachment 1 are carried out. The

position may assume Emergency Communications approval

authority at the direction of the PID.

J. CMC/JIC Media Relations Representative(s)

The CMC/JIC Media Relations Representative(s) report to

the CMC/JIC Manager and are responsible for implementing

utility media response.

K. CMC/JIC Facility Coordinator

The CMC/JIC Facility Coordinator is responsible for

setting up the facility and ensuring ongoing

operability. The position supports the CMC/JIC Manager.

L. Community Relations Coordinator

The Community Relations Coordinator identifies and

initiates contacts with local public officials and

leaders who need to be aware of the latest information

about events. The position should advise the Public

Response Coordinator and Governmental Relations Liaison

of activities and contacts as appropriate.

M. CMC/JIC Assistant

The CMC/JIC Assistant supports the PID and staff, coordinates approval and distribution of news releases,

directs activities of the support staff and maintains an

accurate record of JIC activities.

N. CMC/JIC Support Staff The CMC/JIC Support Staff provides administrative

support for the facility.

O. Employee Communications Coordinator

The Employee Communications Coordinator disseminates

plant status updates to Southern Company employees and

customer service centers through a variety of means.

14 REV 60 07/13 P. Internet Coordinator

The Internet Coordinator is responsible for updating and

maintaining the company's external emergency page and

monitoring the web for external coverage of the event.

Q. CSO/CMC/JIC Public Response Team

The CMC/JIC Public Response Team is responsible for responding to public inquiries. The team may include

Telephone Responders, Media Monitor, Internet

Coordinator, Employee Communications Coordinator,

Financial Response Liaison and Governmental Relations

Liaison.

R. Social Media Coordinator The Social Media Coordinator will proactively disseminate notice of county news releases, announcements, etc., as needed. The position will monitor social media site to access the tone and volume of interest and to identify the spread of misinformation.

15 REV 57 06/12 8.0 NEWS RELEASES The Utility will issue news releases concerning events, conditions and actions at the Plant. News releases are designed to be a written confirmation of events and public information which has been issued.

The SNC News Writer will write news releases in the EOF and

obtain SNC approval from the EOF Manager, then forward them to the CMC or JIC as appropriate. The Facility Manager at that location will obtain communications approval and

direct distribution of the release.

9.0 PRESS BRIEFINGS In the event of an incident at a nuclear plant media

attention would be quick and overwhelming. Press briefings

will be conducted to keep the media informed of events and activities relating to the emergency. Briefings will provide the most current, up-to-date information about events and response to the incident. They are also a primary means of addressing rumors or inaccurate information identified in our publics.

Public Information Officers (PIOs) from all offsite

agencies responding to the emergency will be encouraged to participate in the briefings to discuss their particular activities.

The emphasis of the briefings will be on public safety.

10.0 PUBLIC RESPONSE Upon announcement of an emergency situation, misinformation and rumors can be expected to evolve. The following Public Response policies shall be instituted and followed upon the

activation of the ECP.

Rumors will be addressed through a policy of open and candid communications with the news media and general public.

A. All appropriate information will be released as clearly, concisely and quickly as possible. Public announcements will be made on a frequent and regular basis.

B. An official Utility spokesperson will be designated as the source of new or updated official information about

the incident.

16 REV 60 07/13 C. Public response will encompass a number of activities to ensure accurate information is disseminated. These may include:

  • recorded messages containing the most current information,
  • interaction with callers,
  • proactively providing information to the media and

responding to their needs,

  • monitoring media broadcasts/outlets
  • employee communications
  • identifying, notifying and constantly updating

specific publics, (i.e. financial centers, governmental officials, etc.)

  • Internet coordination
  • Social Media.

Public response activities will be coordinated with state

agencies. The Prompt Notification System (PNS) will be

activated by state or local EMA officials. PNS will direct area residents to local news broadcasts and/or the Emergency Alert System (EAS), which will serve as the primary source of official information for the public.

11.0 TELECOMMUNICATIONS

A. The CMC/JIC Facility Coordinator will be responsible for resolving special problems and obtaining additional

equipment for the JIC.

B. Telephone and telecopier lines connect the JIC and EOF to the appropriate CMC.

C. Telephone lines and equipment discussed above will be tested quarterly.

12.0 TRANSPORTATION

A. If directed, The CMC Assistant will arrange for ground transportation services for Emergency Communications

organization relocating to the JIC.

B. Special transportation arrangements, such as company or commercial air service between Birmingham, Atlanta, the

affected plant and the JIC, may be made available in an

emergency.

17 REV 60 07/13 13.0 SECURITY

A. GPC/APC Corporate Security will coordinate 24-hour security support at the CMC during an emergency.

B. Security will be provided to the JIC upon activation of this facility. JIC Security will be coordinated through

GPC Corporate Security.

C. Company personnel, news personnel, industry representatives, government officials, and visitors will

be asked to present identification and will be given an

identification badge for admittance to the CMC/JIC.

18 REV 57 06/12 14.0 PRINT AND AUDIOVISUAL AIDS A. Press kits are stored at the JIC and CMC. These kits will be updated regularly and will be available to all

news media.

B. An emergency web page will be activated and will replace the normal web page on the operating company's Internet

site in the event of an incident. The emergency page

includes plant schematics, background information and

directions to the JIC. News releases about the event will also be available here.

C. Maps, photographs, and diagrams of the plant and its operations are stored and maintained at the CMC and JIC for use during news briefings.

D. Electronic media (i.e. videotape, DVD, etc.) of plant exterior and interior views will be maintained and made

available for distribution, upon request, to television

stations.

15.0 SPECIAL REQUESTS

A. The Media Relations Coordinator will respond to requests for special interviews, films, photos, videotapes, etc.

B. Special requests may be refused for either safety or security reasons. In such cases, the reason for refusal

will be made clear.

C. Utility personnel will accommodate photographers at the plant site as conditions warrant. Media escorts will be

coordinated with GEMA.

D. Industry experts from appropriate agencies (i.e., NEI, INPO) may be called upon to provide general background

information to reporters but will not comment on the

plant's status. With knowledge of the PI Director,

interviews with these individuals will be arranged by the

Media Relations Representative.

E. The Media Relations Coordinator or his designee will be present at all special interviews.

19 REV 57 06/12 16.0 PUBLIC INFORMATION PLAN FOR RECOVERY A. The lead emergency communications representative in the

Recovery Organization will be the Public Information

Director. This person or his designee will maintain

close contact with the Recovery Manager.

Emergency

communications response will follow the guidelines and

procedures described for accident response.

B. As conditions and public interest warrant, additional Public Information personnel will be assigned to support

the flow of information concerning recovery operations.

C. Information for possible release will be cleared with the Recovery Manager and the Public Information Director and

given to the media through established procedures.

D. All information will be released through established channels of communication to federal and state

authorities, the utility industry, the public, and

employees.

E. Advance notice will be given to the public through the media of any Company action that will or may affect the

health and safety of the plume exposure pathway EPZ

residents. Information of this type will be followed up

with a news release as soon as the results of any such

action are known.

17.0 TRAINING

A. Staff Training The GPC/APC Corporate Communication Department will

coordinate annual emergency training for applicable

emergency communications personnel once per calendar

year. Training will provide an overview of the Emergency

Communications Plan and specific staff position

responsibilities (see Table 1).

Individual's assigned key positions on the Emergency

Communications staff will participate in training.

(GPC/APC responders with responsibilities directly

related to their daily jobs may be exempted. Training

will be documented and records of examinations will be

held at GPC Corporate Headquarters by the Corporate

Communication EC Coordinator.

Individual and team performance evaluation during

exercises will be utilized to measure training program

effectiveness and to adjust course content.

20 REV 57 06/12 B. News Media Training A program will be offered each calendar year to acquaint the news media with the methodology for obtaining

information during an emergency and with overall

emergency preparedness at APC/GPC nuclear plants, as

appropriate. The training will include information about

the plant, radiation, and the role of the JIC.

Media participation as observers or "Reporter players"

during Vogtle exercises can effectively enhance training.

Therefore, media will be invited to participate in VEGP

annual exercises.

21 REV 57 06/12 18.0 PUBLIC INFORMATION AND EDUCATION PROGRAM The goal of the public information program is to acquaint the general public with the emergency plans for the operation of APC/GPC nuclear plants, as appropriate,

and actions they should take if a radiological emergency

occurs. Such a program is essential to the overall

welfare of citizens in the area. Any incident involving

a nuclear plant or nuclear materials can easily become a

"crisis" in the minds of those living in the area;

unless they understand the plans and programs to be

placed into effect should an emergency occur.

Only by keeping the public well informed will the Plants be able to operate for the maximum benefit of all

concerned. The Public Information and Education Program

will seek to:

  • Explain to the public how they will be notified should an emergency occur at the plant. This will include

instructions in the use of the Tone Alert Radio notification system and information on the siren notification system as appropriate.

  • Educate the public about radiation and contamination.
  • Help the public understand what their initial actions

should be in an emergency.

  • Familiarize the public with protective actions, e.g.

evacuation routes and relocation centers, and sheltering which may be required and rationale behind recommendations for these actions.

  • Provide information concerning methods for receiving additional information
  • Ensure that special needs of the handicapped are

understood

22 REV 57 06/12 A. In order to help assure proper public reaction to an emergency notification, Alabama Power, Georgia Power and Southern Nuclear will keep state and local officials continuously informed of all details related to any emergency.

B. Several communications methods may be used to acquaint the public with plans for their protection during a Plant emergency. Means for accomplishing these methods will include one or more of the following activities as listed below.

Effort will be concentrated upon providing information to the public by written material that is likely to be available in the residence and in locations frequented by transients. The information will also provide instructions as to what local media (radio and television stations) will be providing additional information in the event of an emergency.

1. Placement of an advertisement in local telephone directories.

23 REV 57 06/12

2. Information in utility bills,
3. Signs displayed in public areas within the plume exposure EPZ. (e.g., commercial establishments, areas used by

sportsmen, motels, gasoline stations, phone booths, etc.)

Sign content and location distribution will be revised

and redistributed as needed.

4. Distribution of emergency information publications/leaflets,
5. Television or Radio,
6. Emergency Calendars,
7. Direct Mail-Newsletters,
8. Visitor Center availability to the public (when not restricted for Security reasons),
9. Information exchange meetings with government agencies and local officials as needed.

24 REV 57 06/12 19.0 PROCEDURES Implementing procedures (listed below) exist which will provide guidance and direction for carrying out the

activities and responsibilities listed in this plan. These

procedures cover, but are not limited to, emergency

communications, facilities, development and issue of news

releases, conduct of news briefings/media response, rumor

control response and public education/information

dissemination.

  • NMP-EP-201 Corporate Emergency Communications Administration
  • NMP-EP-202 Emergency Communications Notification and Activation
  • NMP-EP-203 Corporate Media Center Operation
  • NMP-EP-204 Emergency News Center/Joint Information Center Operation
  • NMP-EP-205 Emergency Response News Releases
  • NMP-EP-206 Corporate Communications News Briefings

25 REV 57 06/12 TABLE 1 EMERGENCY COMMUNICATIONS ORGANIZAZTION TRAINING MATRIX Emergency Response Organization Position Training Subject Areas Emergency MediaTraining Position Spokesperson Public Information Director x x CMC Manager x x JIC Manager x x Nuclear Spokesperson x x x CMC/JIC Media Relations Representative

x x SNC News Writer x x Employee Communications

Coordinator x x Public Response Teams x x CMC/JIC Public Response Coordinator

x x Community Relations

Coordinator x x CMC/JIC Assistant x x CMC/JIC Support Staff x x CMC/JIC Facility Coordinator x x Internet Coordinator x x News Media x

FIGURE A 26 REV 60 07/13 FLOW OF EMERGENCY PUBLIC INFORMATION DURING AN EMERGENCY

TSCOFF SITEAGENCIESEOFCONTROLROOMJICMEDIAPUBLICCORPORATEMEDIACENTEREMPLOYEESPUBLIC CALLSMEDIA CALLSINDUSTRY CALLSOWNERSGOVT. OFFICIALS STOCKHOLDERS PSCINTERNET

28 REV 57 06/12 MEDIA / PUBLICCMCMANAGERCMCMEDIA RELATIONS REPCMC PUBLICRESPONSESTAFF*EMPLOYEESINTERNETGOV'T OFFICALSEMERGENCY COMMUNICATIONS INFORMATION FLOWAFTER JIC ACTIVATIONEOF MANAGERNUCLEARSPOKESPERSONPI DIRECTORGOV'TPIO'sCMC MEDIA RELATIONS REP JICPUBLICRESPONSESTAFFEOFJOINT INFORMATION CENTERCORPORATE MEDIA CENTERVRU*Includes Rumor Response Teams, Community RelationsCoordinator, State Response TeamsFIGURE CJICMANAGER

REV 57 06/12 APPENDIX 9 INDEX OF VEGP ADMINISTRATIVE, NUCLEAR MANAGEMENT AND EMERGENCY PLAN IMPLEMENTING PROCEDURES CROSS REFERENCED TO SECTIONS OF THE VEGP EMERGENCY PLAN 9-1 REV 57 06/12 INDEX OF VEGP ADMINISTRATIVE, NUCLEAR MANAGEMENT AND EMERGENCY PLAN IMPLEMENTING PROCEDURES CROSS REFERENCED TO SECTIONS OF THE VEGP EMERGENCY PLAN (SHEET 1 OF 3)

Procedure No. Title Section of the Plan Implemented Administrative Procedures NMP-AP-001 Development and Control of Southern Nuclear Procedures P 00910-C VEGP ALARA Program K 00930-C Radiation and Contamination Control K 00940-C Bioassay Program L 00950-C Personnel Dosimetry Program K 00960-C Control of Radioactive Materials L 00970-C Respiratory Protection Program K Emergency Plan Implementing Procedures 91101-C Emergency Response Organization B NMP-EP-110 Emergency Classification and Determination B 91103-C Duties of the TSC Manager B 91104-C Duties of the OSC Manager B 91106-C Duties of the TSC Support Coordinator B 91107-C Duties of the Engineering Supervisor (TSC)

B 91108-C Duties of the Maintenance Supervisor (TSC)

B 91109-C Duties of the Operations Supervisor (TSC)

B 91110-C Duties of the Health Physics Supervisor (TSC) B 91111-C Duties of the Chemistry Supervisor (TSC)

B 91201-C Activation and Operation of the TSC H 91202-C Activation and Operation of the OSC H 91204-C Emergency Response Communications A,F 91301-C Emergency Exposure Guidelines K

9-2 REV 64 3/15 INDEX OF VEGP ADMINISTRATIVE, NUCLEAR MANAGEMENT AND EMERGENCY PLAN IMPLEMENTING PROCEDURES CROSS REFERENCED TO SECTIONS OF THE VEGP EMERGENCY PLAN (SHEET 2 OF 3)

Procedure No. Title Section of the Plan Implemented91302-C In Plant Sampling and Surveys I 91303-C Field Sampling and Surveys I 91306-C Contamination Monitoring and Decontamination K 91401-C Assembly and Accountability J 91403-C Site Dismissal J 91501-C Recovery M 91502-C Core Damage Assessment I 91503-C Control Room Instrumentation Output for Assessment of Core Damage I 91601-C Emergency Preparedness Training O 91701-C Preparation and Control of Emergency Preparedness Documents P 91702-C Emergency Equipment and Supplies H 91704-C Actions for Security During a Radiological Emergency E, J 91705-C Inventory and Testing of Emergency Preparedness Materials/Equipment which are

not Part of the Emergency Kits H 91706-C Alert Notification System E 91801-C Coordination of Emergency Responses and Planning Between Southern Nuclear Operating

Company - Vogtle Electric Generating Plant

and U.S. Department of Energy Savannah River

Site A,C,I Safety and Health Implementing Procedures 70302-C Reporting and Documenting Occupational Injuries Or Illnesses L

9-3 REV 64 3/15 INDEX OF VEGP ADMINISTRATIVE,NUCLEAR MANAGEMENT AND EMERGENCY PLAN IMPLEMENTING PROCEDURES CROSS REFERENCED TO SECTIONS OF THE VEGP EMERGENCY PLAN (SHEET 3 OF 3)

Procedure No. Title Section of the Plan Implemented Nuclear Management Procedures NMP-AD-009 Licensing Document Change Requests P NMP-EP-101 EOF Activation App. 7 NMP-EP-102 EOF Manager App. 7 NMP-EP-103 Licensing Support App. 7 NMP-EP-104 Dose Assessment App. 7 NMP-EP-105 EOF Technical Supervisor App. 7 NMP-EP-106 EOF Support Coordinator App. 7 NMP-EP-107 Security Coordinator App. 7 NMP-EP-108 Offsite Response Coordinator App. 7 NMP-EP-110 Emergency Classification Determination and Initial Action A, D NMP-EP-111 Emergency Notifications A, E NMP-EP-112 Protective Action Recommendations A, J NMP-EP-135 Alternative Facility Setup and Operation H NMP-HP-001 Radiation Protection Standard Practices K

REV 1 05/85

APPENDIX 10 FSAR-POSTULATED TRANSIENTS

REV 21 10/94 FSAR-POSTULATED TRANSIENTS (SHEET 1 OF 2)

TRANSIENT EMERGENCY CLASS(A) Feedwater temperature reduction No emergency declared Excessive feedwater flow No emergency declared Excessive steam flow No emergency declared Inadvertent secondary side depressurization NUE Steam system piping failure NUE, Alert Turbine trip No emergency declared Loss of external load No emergency declared Inadvertent closure of an MSIV No emergency declared Loss of condenser vacuum No emergency declared

Loss of nonemergency ac power No emergency declared Loss of normal feedwater No emergency declared

Feedwater system pipe break No emergency declared Partial loss of forced reactor coolant (RC) flow No emergency declared Complete loss of forced RC flow No emergency declared Reactor coolant pump (RCP)

locked rotor No emergency declared RCP shaft break No emergency declared Rod cluster control assembly (RCCA)

bank withdrawal from subcritical No emergency declared RCCA bank withdrawal at power No emergency declared RCCA misalignment No emergency declared

REV 21 10/94 FSAR-POSTULATED TRANSIENTS (SHEET 2 OF 2)

TRANSIENT EMERGENCY CLASS(A) Inactive RCP startup No emergency declared Uncontrolled boron dilution No emergency declared Improper fuel loading No emergency declared RCCA ejection Emergency Alert, Site Area Inadvertent emergency control cooling system (ECCS) operation at power No emergency declared Increase in RCS inventory No emergency declared Inadvertent opening of pressurizer safety or relief valve NUE, Alert Failure of small lines carrying NUE, Alert, Site Area primary coolant outside containment Emergency Steam generator tube failure Emergency NUE, Alert, Site Area Spectrum of loss-of-coolant NUE, Alert, Site Area accidents (LOCAs) Emergency Emergency, General Radioactive waste gas decay tank failure NUE, Alert Radiation release due to liquid tank

failure NUE, Alert Fuel handling accidents NUE, Alert

a. Classification will depend on the severity of the accident.

REV 6 7/86

APPENDIX 11 LETTER FROM THE STATE OF GEORGIA