ML15281A177: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001  
 
October 16, 2015  


Mr. Reid Nelson, Director Office of Federal Agency Programs Advisory Council on Historic Preservation 401 F Street NW, Suite 308 Washington, DC  20001-2637  
Mr. Reid Nelson, Director Office of Federal Agency Programs Advisory Council on Historic Preservation 401 F Street NW, Suite 308 Washington, DC  20001-2637  


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY  


==Dear Mr. Nelson:==
==Dear Mr. Nelson:==


The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, "Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report" (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS. In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.  
The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, "Environmental Impact Statement fo r the Construction Permit for the SHINE Radioisotope Production Facility, Final Report" (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.
In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.  
 
If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov
.
Sincerely,
 
  /RA/  David J. Wrona, Chief Environmental Review and
 
Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation


If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Docket No. 50-608  
Sincerely, 
  /RA/  David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608  


==Enclosure:==
==Enclosure:==
As stated cc w/encls: Distribution List  
As stated cc w/encls: Distribution List  


ML15281A235 (Package) ML15281A177 (Letter)  ML15288A046 (Final EIS) *concurred via email          
ML15281A235 (Package) ML15281A177 (Letter)  ML15288A046 (Final EIS)
  *concurred via email


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY DISTRIBUTION: E-MAIL: PUBLIC Public    DHowe  SLynch  JLynch  SHarwell RTR r/f    MAdams  CWeber  CFrazier  MConley RidsNrrDpr  MMoser DBarss  LLondon  JWeil RidsNrrDprPrta  AAdams  ASapountzis  MYoung  VHuckabay RidsNrrDprPrtb  LTran  DSeymour  TZaki  DWrona RidsOgcRp Resource        RHoffman RidsAcrsAcnw_MailCTR Resource HARD COPY: Laura Bub Environmental Analysis and Review  Specialist State of Wisconsin Department of Natural Resources 3911 Fish Hatchery Road Fitchburg, WI 53711 Jim Costedio Licensing Manager SHINE Medical Technologies, Inc. 2555 Industrial Drive Monona, WI 53713 Randy Howell National Nuclear Security Administration,  NA-212 U.S. Department of Energy  1000 Independence Ave SW  Washington, DC 20585  
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY  
 
DISTRIBUTION:
E-MAIL: PUBLIC Public    DHowe  SLynch  JLynch  SHarwell RTR r/f    MAdams  CWeber  CFrazier  MConley RidsNrrDpr  MMoser DBarss  LLondon  JWeil RidsNrrDprPrta  AAdams  ASapountzis  MYoung  VHuckabay RidsNrrDprPrtb  LTran  DSeymour  TZaki  DWrona RidsOgcRp Resource        RHoffman RidsAcrsAcnw_MailCTR Resource  
 
HARD COPY:
Laura Bub Environmental Analysis and Review  Specialist State of Wisconsin Department of Natural Resources 3911 Fish Hatchery Road Fitchburg, WI 53711 Jim Costedio Licensing Manager SHINE Medical Technologies, Inc. 2555 Industrial Drive Monona, WI 53713 Randy Howell National Nuclear Security Administration,  NA-212 U.S. Department of Energy  1000 Independence Ave SW  Washington, DC 20585  
 
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001


UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015  
October 16, 2015  


Mr. Reid Nelson, Director Office of Federal Agency Programs Advisory Council on Historic Preservation 401 F Street NW, Suite 308 Washington, DC  20001-2637  
Mr. Reid Nelson, Director Office of Federal Agency Programs Advisory Council on Historic Preservation 401 F Street NW, Suite 308 Washington, DC  20001-2637  


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY  


==Dear Mr. Nelson:==
==Dear Mr. Nelson:==


The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, "Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report" (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS. In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.  
The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, "Environmental Impact Statement fo r the Construction Permit for the SHINE Radioisotope Production Facility, Final Report" (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.
In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.  
 
If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov
.
Sincerely,
 
  /RA/  David J. Wrona, Chief Environmental Review and
 
Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation


If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Docket No. 50-608  
Sincerely, 
  /RA/  David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608  


==Enclosure:==
==Enclosure:==
As stated cc w/encls: Distribution List  
As stated cc w/encls: Distribution List  


ML15281A235 (Package) ML15281A177 (Letter)  ML15288A046 (Final EIS) *concurred via email          
ML15281A235 (Package) ML15281A177 (Letter)  ML15288A046 (Final EIS)
  *concurred via email


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY DISTRIBUTION: E-MAIL: PUBLIC Public    DHowe  SLynch  JLynch  SHarwell RTR r/f    MAdams  CWeber  CFrazier  MConley RidsNrrDpr  MMoser DBarss  LLondon  JWeil RidsNrrDprPrta  AAdams  ASapountzis  MYoung  VHuckabay RidsNrrDprPrtb  LTran  DSeymour  TZaki  DWrona RidsOgcRp Resource        RHoffman RidsAcrsAcnw_MailCTR Resource HARD COPY: Laura Bub Environmental Analysis and Review  Specialist State of Wisconsin Department of Natural Resources 3911 Fish Hatchery Road Fitchburg, WI 53711 Jim Costedio Licensing Manager SHINE Medical Technologies, Inc. 2555 Industrial Drive Monona, WI 53713 Randy Howell National Nuclear Security Administration,  NA-212 U.S. Department of Energy  1000 Independence Ave SW  Washington, DC 20585}}
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY  
 
DISTRIBUTION:
E-MAIL: PUBLIC Public    DHowe  SLynch  JLynch  SHarwell RTR r/f    MAdams  CWeber  CFrazier  MConley RidsNrrDpr  MMoser DBarss  LLondon  JWeil RidsNrrDprPrta  AAdams  ASapountzis  MYoung  VHuckabay RidsNrrDprPrtb  LTran  DSeymour  TZaki  DWrona RidsOgcRp Resource        RHoffman RidsAcrsAcnw_MailCTR Resource  
 
HARD COPY:
Laura Bub Environmental Analysis and Review  Specialist State of Wisconsin Department of Natural Resources 3911 Fish Hatchery Road Fitchburg, WI 53711 Jim Costedio Licensing Manager SHINE Medical Technologies, Inc. 2555 Industrial Drive Monona, WI 53713 Randy Howell National Nuclear Security Administration,  NA-212 U.S. Department of Energy  1000 Independence Ave SW  Washington, DC 20585}}

Revision as of 20:30, 30 June 2018

Notice of Availability of the Final Environmental Impact Statement for the Construction Permit for the Proposed Shine Medical Radioisotope Production Facility
ML15281A177
Person / Time
Site: SHINE Medical Technologies
Issue date: 10/16/2015
From: Wrona D J
Division of License Renewal
To: Nelson R
US Advisory Council On Historic Preservation
Hoffman R,NRR/DLR,415-1107
References
DLR-15-0464
Download: ML15281A177 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001

October 16, 2015

Mr. Reid Nelson, Director Office of Federal Agency Programs Advisory Council on Historic Preservation 401 F Street NW, Suite 308 Washington, DC 20001-2637

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Mr. Nelson:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, "Environmental Impact Statement fo r the Construction Permit for the SHINE Radioisotope Production Facility, Final Report" (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov

.

Sincerely,

/RA/ David J. Wrona, Chief Environmental Review and

Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation

Docket No. 50-608

Enclosure:

As stated cc w/encls: Distribution List

ML15281A235 (Package) ML15281A177 (Letter) ML15288A046 (Final EIS)

  • concurred via email

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

DISTRIBUTION:

E-MAIL: PUBLIC Public DHowe SLynch JLynch SHarwell RTR r/f MAdams CWeber CFrazier MConley RidsNrrDpr MMoser DBarss LLondon JWeil RidsNrrDprPrta AAdams ASapountzis MYoung VHuckabay RidsNrrDprPrtb LTran DSeymour TZaki DWrona RidsOgcRp Resource RHoffman RidsAcrsAcnw_MailCTR Resource

HARD COPY:

Laura Bub Environmental Analysis and Review Specialist State of Wisconsin Department of Natural Resources 3911 Fish Hatchery Road Fitchburg, WI 53711 Jim Costedio Licensing Manager SHINE Medical Technologies, Inc. 2555 Industrial Drive Monona, WI 53713 Randy Howell National Nuclear Security Administration, NA-212 U.S. Department of Energy 1000 Independence Ave SW Washington, DC 20585

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001

October 16, 2015

Mr. Reid Nelson, Director Office of Federal Agency Programs Advisory Council on Historic Preservation 401 F Street NW, Suite 308 Washington, DC 20001-2637

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Mr. Nelson:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, "Environmental Impact Statement fo r the Construction Permit for the SHINE Radioisotope Production Facility, Final Report" (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov

.

Sincerely,

/RA/ David J. Wrona, Chief Environmental Review and

Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation

Docket No. 50-608

Enclosure:

As stated cc w/encls: Distribution List

ML15281A235 (Package) ML15281A177 (Letter) ML15288A046 (Final EIS)

  • concurred via email

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

DISTRIBUTION:

E-MAIL: PUBLIC Public DHowe SLynch JLynch SHarwell RTR r/f MAdams CWeber CFrazier MConley RidsNrrDpr MMoser DBarss LLondon JWeil RidsNrrDprPrta AAdams ASapountzis MYoung VHuckabay RidsNrrDprPrtb LTran DSeymour TZaki DWrona RidsOgcRp Resource RHoffman RidsAcrsAcnw_MailCTR Resource

HARD COPY:

Laura Bub Environmental Analysis and Review Specialist State of Wisconsin Department of Natural Resources 3911 Fish Hatchery Road Fitchburg, WI 53711 Jim Costedio Licensing Manager SHINE Medical Technologies, Inc. 2555 Industrial Drive Monona, WI 53713 Randy Howell National Nuclear Security Administration, NA-212 U.S. Department of Energy 1000 Independence Ave SW Washington, DC 20585