{{#Wiki_filter:Surry 2014-301 "JPM a"  Page 1 of 8  U.S. Nuclear Regulatory Commission Surry Power Station   SR14301  Simulator Job Performance Measure APE001.AA2.05 (4.4/4.6) [Alternate Path]
{{#Wiki_filter:Surry 2014-301 "JPM a"  Page 1 of 8  U.S. Nuclear Regulatory Commission Surry Power Station SR14301  Simulator Job Performance Measure APE001.AA2.05 (4.4/4.6) [Alternate Path]
Applicant________________________________     Start Time___________________ Examiner_______________________________ Date ___________________________________   Stop Time___________________ Title  Respond to Continuous Rod Withdrawal K/A: Ability to determine and interpret the following as they apply to the Continuous Rod Withdrawal: Uncontrolled rod withdrawal, from available indications. Applicability     Estimated Time  Actual Time RO/SRO(I)/SRO(U)     3 Minutes    ___  Minutes                     Conditions   Task is to be PERFORMED in the simulator. Plant is at 100% power with all systems in AUTO. 1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low. 0-AP-53.00 actions have been completed with 1-MS-PT-1447, Channel IV Turbine First Stage Pressure selected. All components have been returned to Automatic with the exception of Rod Control. Standards   Trip the Reactor in accordance with AP-1.00. Initiating Cues   Continuous rod withdrawal motion indicated. Terminating Cues   Unit 1 manual reactor trip implemented. Procedures 0-AP-1.00, Rod Control System Malfunction, Rev. 26. 1-OP-ZZ-002, Maintenance of Plant Operations, Rev. 30. Tools and Equipment     Safety Considerations None      None Surry 2014-301 "JPM a"  Page 2 of 8  Simulator Setup   Reset to IC 271 OR Recall 100% IC. Load the following malfunctions: MS1401, 1st Stage PRSR TRNSMTR PT-446 FAILURE, -2 DEG, Trigger 1. RD0102, CONT ROD WITHDRAWL ALL MODES, Trigger 3. Load the following Switch Override: RD, ROD_MOD_SEL_MAN, ON, Trigger 1, 8 second delay. Place the Simulator in RUN. Place the Main Feed Reg Valves in MANUAL. Actuate Trigger 1. Select PT-447. Return the Main Feed Reg Valves to AUTO. Acknowledge all alarms, place Rod Control Mode Selector Switch in MANUAL, place a "Pink" Ring on the Rod. Switch, and allow conditions to stabilize. Place pink magnet on PT-1446. Freeze and store until ready to RUN. Initial Conditions   Plant is at 100% power with all systems in AUTO. 1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low. 0-AP-53.00 actions have been completed with 1-MS-PT-1447, Channel IV Turbine First Stage Pressure. selected. All components have been returned to Automatic with the exception of Rod Control. Initiating Cues   You are the Unit 1 Reactor Operator. Restore Control Bank "D" to 228 steps in three (3) step increments. When complete, return Rod Control to AUTO. When you have completed this task, please inform me. Notes  After the Candidate has completed the second 3-Step rod movement, Actuate Trigger 3.
 
Surry 2014-301 "JPM a"  Page 3 of 8  PERFORMANCE CHECKLIST   Notes to the Evaluator   Task critical elements are bolded and denoted by an asterisk (*). An additional instructor may be needed to silence and acknowledge alarms for the examinee. START TIME: ___________           STEP 1:  WITHDRAW CONTROL RODS IN THREE (3) STEP INCREMENTS. (Step 1)  STANDARD a) Checks ROD CONTROL MODE SEL switch in the MAN position. b) Check ROD SPEED indicator (S1-1-408) indicates approximately 48 steps per minute. c) WITHDRAW control rods in 3-step increments.
Applicant________________________________
* Move ROD MOTION IN/OUT/HOLD switch in the OUT direction. This is a critical step. Check ROD DIRECTION OUT light is LIT. Release switch when rods are at desired height (3 steps). Check rod motion has stopped. EVALUATOR NOTE: Operator may have to step in/out Rods 1/2 step to equalize group step counter indication. COMMENTS:
Start Time___________________
Examiner_______________________________
Date ___________________________________
Stop Time___________________
Title  Respond to Continuous Rod Withdrawal K/A: Ability to determine and interpret the following as they apply to the Continuous Rod Withdrawal: Uncontrolled rod withdrawal, from available indications.
Applicability Estimated Time  Actual Time RO/SRO(I)/SRO(U) 3 Minutes    ___  Minutes Conditions Task is to be PERFORMED in the simulator.
Plant is at 100% power with all systems in AUTO.
1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low
. 0-AP-53.00 actions have been completed with 1
-MS-PT-1447, Channel IV Turbine First Stage Pressure selected. All components have been returned to Automatic with the exception of Rod Control
. Standards Trip the Reactor in accordance with AP
-1.00. Initiating Cues Continuous rod withdrawal motion indicated.
Terminating Cues Unit 1 manual reactor trip implemented
. Procedures
 
0-AP-1.00, Rod Control System Malfunction, Rev. 26.
1-OP-ZZ-002, Maintenance of Plant Operations, Rev. 30.
Tools and Equipment Safety Considerations
 
None      None Surry 2014-301 "JPM a"  Page 2 of 8  Simulator Setup Reset to IC 271 OR Recall 100% IC
. Load the following malfunctions:
MS1401, 1st Stage PRSR TRNSMTR PT
-446 FAILURE,  
-2 DEG, Trigger 1
. RD0102, CONT ROD WITHDRAWL ALL MODES, Trigger 3
. Load the following Switch Override:
RD, ROD_MOD_SEL_MAN, ON, Trigger 1, 8 second delay
. Place the Simulator in RUN
. Place the Main Feed Reg Valves in MANUAL
. Actuate Trigger 1
. Select PT
-447. Return the Main Feed Reg Valves to AUTO
. Acknowledge all alarms, place Rod Control Mode Selector Switch in MANUAL, place a "Pink" Ring on the Rod
. Switch, and allow cond itions to stabilize.
Place pink magnet on PT
-1446. Freeze and store until ready to RUN
. Initial Conditions Plant is at 100% power with all systems in AUTO.
1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low
. 0-AP-53.00 actions have been completed with 1
-MS-PT-1447, Channel IV Turbine First Stage Pressure
. selected. All components have been returned to Automatic with the exception of Rod Control
. Initiating Cues You are the Unit 1 Reactor Operator. Restore Control Bank "D" to 228 steps in three (3) step increments.
When complete, return Rod Control to AUTO
. When you have completed this task, please inform me
. Notes  After the Candidate has completed the second 3-Step rod movement, Actuate Trigger 3.
 
Surry 2014-301 "JPM a"  Page 3 of 8  PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (
*). An additional instructor may be needed to silence and acknowledge alarms for the examinee.
START TIME: ___________
STEP 1:  WITHDRAW CONTROL RODS IN THREE (3) STEP INCREMENTS
. (Step 1)  STANDARD a) Checks ROD CONTROL MODE SEL switch in the MAN position.
b) Check ROD SPEED indicator (S1 408) indicates approximately 48 steps per minute. c) WITHDRAW control rods in 3
-step increments.
* Move ROD MOTION IN/OUT/HOLD switch in the OUT direction.
This is a critical step.
Check ROD DIRECTION OUT light is LIT.
Release switch when rods are at desired height (3 steps)
. Check rod motion has stopped. EVALUATOR NOTE:
Operator may have to step in/out Rods 1/2 step to equalize group step counter indication.
COMMENTS:
 
_______ SAT
 
_______ UNSAT STEP 2:  WITHDRAW CONTROL RODS IN THREE (3) STEP INCREMENTS. (Step 2)
STANDARD a) Checks ROD CONTROL MODE SEL switch in the MAN position.
b) Check ROD SPEED indicator (S1 408) indicates approximately 48 steps per minute. c) WITHDRAW control rods in 3
-step increments.
* Move ROD MOTION IN/OUT/HOLD switch in the OUT direction.
This is a critical step.
Check ROD DIRECTION OUT light is LIT.
Release switch when rods are at desired height (3 steps).
Check rod motion has stopped.
EVALUATOR NOTE:
After rods have moved in the OUT direction, the malfunction will be entered to cause continuous outward rod motion in all ROD Control Modes
. _______ SAT
 
_______ UNSAT
 
Surry 2014-301 "JPM a"  Page 4 of 8  COMMENTS:
STEP 3:  CHECKS FOR CONTINUOUS ROD INSERTION OR WITHDRAWAL (Step 3)  STANDARD:
a) Checks continuous outward rod motion by examining the following:
ROD DIRECTION OUT lamp lit, CERPIs and/or step counters indicate motion.
EVALUATOR'S NOTE:
COMMENTS:
_______ SAT
_______ UNSAT STEP 4:  ATTEMPTS TO STOP ROD MOTION BY SWITCHING RODS TO MANUAL
. (Step 2)  STANDARD:
a)
* Rotates ROD CONT MODE SEL Switch from AUTO to MANUAL.
This is a critical step.
b)  Determines that rod motion has not stopped by:
serving ROD DIRECTION OUT lamp lit, and/or observing rod step counters showing outward motion, and/or    step counters making an audible "clicking" noise EVALUATOR'S NOTE:
Placing ROD CONT MODE SEL Switch to MANUAL is only a critical step if switch is in AUTO.
ROD CONT MODE SEL switch may be placed in AUTO. This is acceptable by OP
-ZZ-002 if Tave is within 1 degree of Tref.
COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM a"  Page 5 of 8  STEP 5:  INITIATES UNIT REACTOR TRIP
. (Step 2-RNO)  STANDARD:
a) *Manually initiates reactor trip by depressing the Benchboard 1
-1 and/or Benchboard 1
-2 Reactor Trip pushbutton
. This is a critical step.
EVALUATOR'S NOTE:
COMMENTS:
_______ SAT
_______ SAT
_______ UNSAT   STEP 2:  WITHDRAW CONTROL RODS IN THREE (3) STEP INCREMENTS. (Step 2)
_______ UNSAT
STANDARD a) Checks ROD CONTROL MODE SEL switch in the MAN position. b) Check ROD SPEED indicator (S1-1-408) indicates approximately 48 steps per minute. c) WITHDRAW control rods in 3-step increments.
* Move ROD MOTION IN/OUT/HOLD switch in the OUT direction. This is a critical step. Check ROD DIRECTION OUT light is LIT. Release switch when rods are at desired height (3 steps). Check rod motion has stopped. EVALUATOR NOTE: After rods have moved in the OUT direction, the malfunction will be entered to cause continuous outward rod motion in all ROD Control Modes. _______ SAT
_______ UNSAT 


Surry 2014-301 "JPM a"  Page 4 of 8  COMMENTS:  STEP 3CHECKS FOR CONTINUOUS ROD INSERTION OR WITHDRAWAL (Step 3)  STANDARD:  a) Checks continuous outward rod motion by examining the following:  ROD DIRECTION OUT lamp lit,  CERPIs and/or step counters indicate motion. EVALUATOR'S NOTE:  COMMENTS:    _______ SAT  _______ UNSAT  STEP 4: ATTEMPTS TO STOP ROD MOTION BY SWITCHING RODS TO MANUAL. (Step 2)  STANDARD:   a)
STEP 6REPORTS TO SHIFT MANAGER (EVALUATOR.
* Rotates ROD CONT MODE SEL Switch from AUTO to MANUAL. This is a critical step. b)  Determines that rod motion has not stopped by:    serving ROD DIRECTION OUT lamp lit, and/or    observing rod step counters showing outward motion, and/or     step counters making an audible "clicking" noise  EVALUATOR'S NOTE:   Placing ROD CONT MODE SEL Switch to MANUAL is only a critical step if switch is in AUTO. ROD CONT MODE SEL switch may be placed in AUTO. This is acceptable by OP-ZZ-002 if Tave is within 1 degree of Tref. COMMENTS:   _______ SAT _______ UNSAT
  (Step 2-RNO)  STANDARD:
a) Performs immediate actions of 1
-E-0. Check Rx. Trip by verifying all rods on bottom, Reactor trip and bypass breakers open, and neutron flux decreasing.
Checks Turbine Trip by manually tripping the turbine, checking all turbine stop valves are closed, isolating reheaters by closing 1
-MS-SOV-104 and checking the generator output breakers are open.
Checks both AC Emergency busses energized.
Checks if SI is actuated or if it is required.
b) Verbal status report made that immediate actions completed (with tripping of reactor).
EVALUATOR'S NOTE:
If operator continues with actions of verifying reactor trip by performing E
-0 immediate operator actions, let the operator continue E
-0 immediate action steps until completion
. When the candidate completes this step then inform the candidate that the task is complete  COMMENTS:
  ** JPM COMPLETE
**  _______ SAT
_______ UNSAT STOP TIME:
 
____________________________________________________________________________________
____________________________________________________________________________________
 
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________


Surry 2014-301 "JPM a"  Page 5 of 8  STEP 5:  INITIATES UNIT REACTOR TRIP. (Step 2-RNO)  STANDARD:  a) *Manually initiates reactor trip by depressing the Benchboard 1-1 and/or Benchboard 1-2 Reactor Trip pushbutton. This is a critical step. EVALUATOR'S NOTE:  COMMENTS:  _______ SAT  _______ UNSAT STEP 6:  REPORTS TO SHIFT MANAGER (EVALUATOR. (Step 2-RNO)  STANDARD:  a) Performs immediate actions of 1-E-0. Check Rx. Trip by verifying all rods on bottom, Reactor trip and bypass breakers open, and neutron flux decreasing. Checks Turbine Trip by manually tripping the turbine, checking all turbine stop valves are closed, isolating reheaters by closing 1-MS-SOV-104 and checking the generator output breakers are open. Checks both AC Emergency busses energized. Checks if SI is actuated or if it is required. b) Verbal status report made that immediate actions completed (with tripping of reactor). EVALUATOR'S NOTE:  If operator continues with actions of verifying reactor trip by performing E-0 immediate operator actions, let the operator continue E-0 immediate action steps until completion. When the candidate completes this step then inform the candidate that the task is complete  COMMENTS:  ** JPM COMPLETE **  _______ SAT  _______ UNSAT  STOP TIME:
____________________________________________________________________________________  ____________________________________________________________________________________
____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Surry 2014-301 "JPM a"  Page 6 of 8  ____________________________________________________________________________________ Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER) Task  Task is to be performed in the simulator. Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task. Initial Conditions  Plant is at 100% power with all systems in AUTO. 1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low. 0-AP-53.00 actions have been completed with 1-MS-PT-1447, Channel IV Turbine First Stage Pressure selected. All components have been returned to Automatic with the exception of Rod Control. Initiating Cues   You are the Unit 1 Reactor Operator. Restore Control Bank "D" to 228 steps in three (3) step increments. When complete, return Rod Control to AUTO. When you have completed this task, please inform me.
 
Surry 2014-301 "JPM a"  Page 7 of 8  Reference for Evaluator Operator Directions Handout (TO BE GIVEN TO APPLICANT)   Initial Conditions   Plant is at 100% power with all systems in AUTO. 1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low. 0-AP-53.00 actions have been completed with 1-MS-PT-1447, Channel IV Turbine First Stage Pressure selected. All components have been returned to Automatic with the exception of Rod Control. Initiating Cues   You are the Unit 1 Reactor Operator. Restore Control Bank "D" to 228 steps in three (3) step increments.
Surry 2014-301 "JPM a"  Page 6 of 8  ____________________________________________________________________________________
When complete, return Rod Control to AUTO. When you have completed this task, please inform me.
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Surry 2014-301 "JPM b"              Page 1 of 13  U.S. Nuclear Regulatory Commission Surry Power Station   SR14301  Simulator Job Performance Measure [KA 004A4.07 3.9/3.7]    Applicant________________________________     Start Time___________________ Examiner_______________________________
Task  Task is to be performed in the simulator.
Date ___________________________________   Stop Time___________________ Title  Perform an Alternate Dilution of the RCS. K/A: Ability to manually operate and/or monitor in the control room: Boration/dilution 3.9 / 3.7 Applicability     Estimated Time  Actual Time RO/SRO(I)/SRO(U)     10 Minutes     ___  Minutes                     Conditions   Task is to be Performed in the simulator. A ramp increase in power is occurring which requires a dilution. Standards   1-OP-CH-021, Alternate Dilution Using Blender. Initiating Cues   Reactivity SRO Direction. A ramp increase in power requires a Dilution. Terminating Cues   Report to Shift Supervision, blender returned to automatic. Procedures 1-OP-CH-021, Alternate Dilution Using Blender, Rev 16   Tools and Equipment     Safety Considerations   None      None Surry 2014-301 "JPM b"              Page 2 of 13 Simulator Setup   Reset to IC 272 OR Call up 25% power IC and initialize. Place simulator in RUN. Ramp the Unit to 30% power and match Tave and Tref. Shift Station Service bus power from RSSTs to SSTs. Set PG Flow Control 1-CH-FC-1114A to 4.0 on the pot. Initial Conditions   Unit 1 is at 30% power. The 30% hold for a flux map on Unit 1 is complete. Power escalation to 100% in accordance with 1-GOP-1.5, Unit Startup, 2% to Reactor Power to Max Allowable Power, is about to recommence. Initiating Cues   You are to perform a 200 gallon Alternate Dilute only to the suction of the charging pump in accordance with 1-OP-CH-021. When you finish the actions necessary to accomplish this task, please inform me.
Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.
Surry 2014-301 "JPM b"              Page 3 of 13 PERFORMANCE CHECKLIST   Notes to the Evaluator   This JPM may be Pre-briefed as directed by the Chief Examiner. Task critical elements are bolded and denoted by an asterisk (*). An additional instructor may be needed to silence and acknowledge alarms for the examinee. START TIME_______:             STEP 1:  1-OP-CH-021, Initial Conditions. Check Primary Grade water is available to the Blender. STANDARD:   a) Candidate checks PG pressure normal on Boron Recovery Panel. EVALUATOR'S NOTE:   COMMENTS:   _______ SAT _______ UNSAT   STEP 2:  1-OP-CH-021, Precautions and Limitations.
Initial Conditions  Plant is at 100% power with all systems in AUTO.
Candidate reviews and initials Precautions and Limitations. STANDARD: a) Candidate Reviews and initials P&L 4.1 through 4.8. EVALUATOR'S NOTE:   None  COMMENTS:   _______ SAT _______ UNSAT Surry 2014-301 "JPM b"              Page 4 of 13 STEP 3:
1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low
1-OP-CH-021. (Step 5.1.1)  Candidate acknowledges two (2) NOTES prior to Step 5.1. Candidate Notifies Shift Supervision of Impending Dilution. STANDARD: a) Candidate acknowledges this subsection is used for the first dilution of the shift. Attachment 1 is used for subsequent dilutions. b) Candidate identifies excess letdown NOT in service, 1-OP-CH-007 not required. c) Candidate Notifies Shift Supervision/Evaluator of impending Alternate Dilution. EVALUATOR'S NOTE:
. 0-AP-53.00 actions have been completed with 1
When notified:  Acknowledge Candidate will be performing an Alternate Dilution. COMMENTS:    _______ SAT  _______ UNSAT  STEP 4:  1-OP-CH-021. (Step 5.1.2)  Notify STA of impending Alternate Dilution. STANDARD:  a) Candidate notifies STA/Evaluator of impending Alternate Dilute. EVALUATOR'S NOTE:
-MS-PT-1447, Channel IV Turbine First Stage Pressure selected. All components have been returned to Automatic with the exception of Rod Control
. Initiating Cues You are the Unit 1 Reactor Operator. Restore Control Bank "D" to 228 steps in three (3) step increments.
When complete, return Rod Control to AUTO.
When you have completed this task, please inform me
.
Surry 2014-301 "JPM a"  Page 7 of 8  Reference for Evaluator
 
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions Plant is at 100% power with all systems in AUTO.
1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low
. 0-AP-53.00 actions have been completed with 1
-MS-PT-1447, Channel IV Turbine First Stage Pressure selected. All components have been returned to Automatic with the exception of Rod Control
. Initiating Cues You are the Unit 1 Reactor Operator. Restore Control Bank "D" to 228 steps in three (3) step increments.
 
When complete, return Rod Control to AUTO.
When you have completed this task, please inform me
.
Surry 2014-301 "JPM b"              Page 1 of 13  U.S. Nuclear Regulatory Commission Surry Power Station SR14301  Simulator Job Performance Measure [KA 004A4.07 3.9/3.7
]    Applicant________________________________
Start Time___________________
Examiner_______________________________
 
Date ___________________________________
Stop Time___________________
Title  Perform an Alternate Dilution of the RCS.
K/A: Ability to manually operate and/or monitor in the control room: Boration/dilution 3.9 / 3.7 Applicability Estimated Time  Actual Time RO/SRO(I)/SRO(U) 10 Minutes
___  Minutes Conditions Task is to be Performed in the simulator.
A ramp increase in power is occurring which requires a dilution.
Standards 1-OP-CH-021, Alternate Dilution Using Blender
. Initiating Cues Reactivity SRO Direction
. A ramp increase in power requires a Dilution
. Terminating Cues Report to Shift Supervision, blender returned to automatic
. Procedures
 
1-OP-CH-021, Alternate Dilution Using Blender, Rev 16 Tools and Equipment Safety Considerations None      None Surry 2014-301 "JPM b"              Page 2 of 13 Simulator Setup Reset to IC 272 OR Call up 25% power IC and initialize. Place simulator in RUN.
Ramp the Unit to 30% power and match Tave and Tref.
Shift Station Service bus power from RSSTs to SSTs.
Set PG Flow Control 1
-CH-FC-1114A to 4.0 on the pot. Initial Conditions Unit 1 is at 30% power.
The 30% hold for a flux map on Unit 1 is complete.
Power escalation to 100% in accordance with 1
-GOP-1.5, Unit Startup, 2% to Reactor Power to Max Allowable Power, is about to recommence.
Initiating Cues You are to perform a 200 gallon Alternate Dilute only to the suction of the charging pump in accordance with 1
-OP-CH-021. When you finish the actions necessary to accomplish this task, please inform me.
 
Surry 2014-301 "JPM b"              Page 3 of 13 PERFORMANCE CHECKLIST Notes to the Evaluator This JPM may be Pre-briefed as directed by the Chief Examiner
. Task critical elements are bolded and denoted by an asterisk (
*). An additional instructor may be needed to silence and acknowledge alarms for the examinee.
START TIME_______:
STEP 1:  1-OP-CH-021, Initial Conditions.
Check Primary Grade water is available to the Blender.
STANDARD:
a) Candidate checks PG pressure normal on Boron Recovery Panel
. EVALUATOR'S NOTE:
COMMENTS:
_______ SAT
_______ UNSAT STEP 2:  1-OP-CH-021, Precautions and Limitations.
 
Candidate reviews and initials Precautions and Limitations.
STANDARD:
a) Candidate Reviews and initials P&L 4.1 through 4.8. EVALUATOR'S NOTE:
None  COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM b"              Page 4 of 13 STEP 3:
1-OP-CH-021. (Step 5.1.1)  Candidate acknowledges two (2) NOTES prior to Step 5.1.
Candidate Notifies Shift Supervision of Impending Dilution.
STANDARD:
a) Candidate acknowledges this subsection is used for the first dilution of the shift. Attachment 1 is used for subsequent dilutions.
b) Candidate identifies excess letdown NOT in service, 1
-OP-CH-007 not required.
c) Candidate Notifies Shift Supervision/Evaluator of impending Alternate Dilution.
EVALUATOR'S NOTE:
 
When notified:  Acknowledge Candidate will be performing an Alternate Dilution.
When notified:  Acknowledge Candidate will be performing an Alternate Dilution.
COMMENTS:
COMMENTS:
_______ SAT  _______ UNSAT Surry 2014-301 "JPM b"              Page 5 of 13 STEP 5:
_______ SAT
1-OP-CH-021. (Step 5.1.3)  Place the MAKE-UP MODE CNTRL switch in STOP STANDARD:   a) Candidate places Blender Mode Control switch in STOP position. b) Candidate Checks RED Light out and GREEN light illuminates. EVALUATOR'S NOTE:
_______ UNSAT STEP 4: 1-OP-CH-021. (Step 5.1.2)  Notify STA of impending Alternate Dilution.
STANDARD:
a) Candidate notifies STA/Evaluator of impending Alternate Dilute. EVALUATOR'S NOTE:
 
When notified:  Acknowledge Candidate will be performing an Alternate Dilution
.
COMMENTS:
 
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM b"              Page 5 of 13 STEP 5:
1-OP-CH-021. (Step 5.1.3)  Place the MAKE
-UP MODE CNTRL switch in STOP STANDARD:
a) Candidate p laces Blender Mode Control switch in STOP position
. b) Candidate Checks RED Light out and GREEN light illuminates.
EVALUATOR'S NOTE:
 
If asked: Acknowledge Candidates request for a peer check.
If asked: Acknowledge Candidates request for a peer check.
COMMENTS:    _______ SAT
 
_______ UNSAT  STEP 6:  1-OP-CH-021. (Step 5.1.4)    Adjust PG Flow Rate and Total gallons for the Dilution.
STANDARD:  a) Checks 1-CH-FC-1114A, PG Flow CNTRL set at 100 gpm (refers to Attachment 2, as necessary. b) Determines required integrator setpoint by filling in blank for desired dilution, subtracting anticipated additional flow using P&L 4.7 as required, and writing 196 in GPM blank. c) Enter value in 1-YS-1114 PRI WATER SUP BATCH INTEGRATOR.
EVALUATOR'S NOTE:  If asked concerning a) above: PG Flow Control not previously set. If asked concerning IV for Steps a) and b) above:  State that the Candidate may assume an IV has been performed, please continue with the Task.
COMMENTS:    _______ SAT  _______ UNSAT Surry 2014-301 "JPM b"              Page 6 of 13 STEP 7:
1-OP-CH-021. (Step 5.1.5)  Place the MAKE-UP MODE SEL switch in the ALT DIL position. STANDARD:  *a) Places the MAKE-UP MODE SEL switch in the ALT DIL position. This is a critical step.
EVALUATOR'S NOTE:              1-CH-FCV-1113A automatically CLOSES. COMMENTS:    _______ SAT  _______ UNSAT  STEP 8:  1-OP-CH-021. (Step 5.1.6)    Place 1-CH-FCV-1114B, BLENDER TO VCT, in the CLOSE position. STANDARD:  a) Candidate remembers from Directions that PG flow is to be aligned to the charging pump suction.  *b) Places 1-CH-FCV-1114B, BLENDER TO VCT, in the CLOSE position. This is a critical step. EVALUATOR'S NOTE:  If asked: PG flow is to be aligned to the charging pump suction.
COMMENTS:
COMMENTS:
_______ SAT  _______ UNSAT   
_______ SAT
 
_______ UNSAT STEP 6: 1-OP-CH-021. (Step 5.1.4)    Adjust PG Flow Rate and Total gallons for the Dilution.
 
STANDARD:
a) Checks 1-CH-FC-1114A, PG Flow CNTRL set at 100 gpm (refers to Attachment 2, as necessary
. b) Determines required integrator setpoint by filling in blank for desired dilution, subtracting anticipated additional flow using P&L 4.7 as required, and writing 196 in GPM blank
. c) Enter value in 1
-YS-1114 PRI WATER SUP BATCH INTEGRATOR.
 
EVALUATOR'S NOTE:
If asked concerning a) above: PG Flow Control not previously set.
If asked concerning IV for Steps a) and b) above
:  State that the Candidate may assume an IV has been performed, please continue with the Task.
 
COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM b"              Page 6 of 13 STEP 7:
1-OP-CH-021. (Step 5.1.5)  Place the MAKE-UP MODE SEL switch in the ALT DIL position
. STANDARD:
  *a) Places the MAKE
-UP MODE SEL switch in the ALT DIL position
. This is a critical step.
 
EVALUATOR'S NOTE:
 
1-CH-FCV-1113A automatically CLOSES.
COMMENTS:
_______ SAT
_______ UNSAT STEP 8: 1-OP-CH-021. (Step 5.1.6)    Place 1-CH-FCV-1114B, BLENDER TO VCT, in the CLOSE position.
STANDARD:
a) Candidate remembers from Directions that PG flow is to be aligned to the charging pump suction.
  *b) Places 1-CH-FCV-1114B, BLENDER TO VCT, in the CLOSE position.
This is a critical step.
EVALUATOR'S NOTE:
If asked: PG flow is to be aligned to the charging pump suction.
 
COMMENTS:
 
_______ SAT
_______ UNSAT


Surry 2014-301 "JPM b"              Page 7 of 13 STEP 9:
Surry 2014-301 "JPM b"              Page 7 of 13 STEP 9:
1-OP-CH-021. (Step 5.1.7 and 5.1.8)  Place the MAKE-UP MODE CNTRL switch in the START position. STANDARD:   *a) Places the MAKE-UP MODE CNTRL switch in the START position. This is a critical step b) Checks the following conditions:   a. 1-CH-FCV-1113A, BORIC ACID TO BLENDER, is closed. b. 1-CH-FCV-1113B, BLENDER TO CHG PUMP, is open. c. 1-CH-FCV-1114A, PGW TO BLENDER, is controlling in AUTO c) Checks flow indicated on 1-CH-FR-1113, PG Flow, equals desired flow rate. d) Checks Integrator counting to desired total gallons. EVALUATOR'S NOTE:  None. COMMENTS:
1-OP-CH-021. (Step 5.1.7 and 5.1.8
_______ SAT _______ UNSAT   STEP 10:  1-OP-CH-021. (Step 5.1.9 and 5.1.10)  Stopping dilution. STANDARD:   a) Candidate monitors Dilution and Stops the dilution by: Placing MAKE-UP MODE CNTRL switch in the STOP position, OR  Observing 1-CH-FCV-1113B closes and Integrator total gallons settles on 200 gallons (199-201). EVALUATOR'S NOTE:   Candidate may perform either bulleted item listed above.
)  Place the MAKE-UP MODE CNTRL switch in the START position.
* Ceasing of the Dilution is critical for this step. (Range of 199-201 due to blender overshoot or undershoot) COMMENTS:
STANDARD:
_______ SAT _______ UNSAT
  *a) Places the MAKE
-UP MODE CNTRL switch in the START position.
This is a critical step b) Checks the following conditions:
: a. 1-CH-FCV-1113A, BORIC ACID TO BLENDER, is closed.
: b. 1-CH-FCV-1113B, BLENDER TO CHG PUMP, is open.
: c. 1-CH-FCV-1114A, PGW TO BLENDER, is controlling in AUTO c) Checks flow indicated on 1
-CH-FR-1113, PG Flow, equals desired flow rate.
d) Checks Integrator counting to desired total gallons.
EVALUATOR'S NOTE:  None. COMMENTS:
 
_______ SAT
_______ UNSAT STEP 10:  1-OP-CH-021. (Step 5.1.9 and 5.1.10
)  Stopping dilution
. STANDARD:
a) Candidate monitors Dilution and Stops the dilution by:
Placing MAKE-UP MODE CNTRL switch in the STOP position, OR  Observing 1
-CH-FCV-1113B closes and Integrator total gallons settles on 200 gallons (199-201). EVALUATOR'S NOTE:
Candidate may perform either bulleted item listed above.
* Ceasing of the Dilution is critical for this step.
(Range of 199
-201 due to blender overshoot or undershoot)
COMMENTS:
 
_______ SAT
_______ UNSAT


Surry 2014-301 "JPM b"              Page 8 of 13 STEP 11:
Surry 2014-301 "JPM b"              Page 8 of 13 STEP 11:
1-OP-CH-021. (Step 5.1.11, 5.1.12, 5.1.13)  Return the Blender to Automatic. STANDARD:   a) Places the control switch for 1-CH-FCV-1114B to AUTO position. b) Places the MAKE-UP MODE SEL switch in the AUTO position. *c) Places the MAKE-UP MODE CNTRL to START. This is a critical step.
1-OP-CH-021. (Step 5.1.11, 5.1.12, 5.1.13
EVALUATOR'S NOTE:   None. COMMENTS:     _______ SAT
)  Return the Blender to Automatic
_______ UNSAT     Notify Shift Supervision/Evaluator of Blender status. END OF JPM. STOP TIME: _______________________________________
. STANDARD:
a) Places the control switch for 1
-CH-FCV-1114B to AUTO position
. b) Places the MAKE
-UP MODE SEL switch in the AUTO position.
  *c) Places the MAKE
-UP MODE CNTRL to START
. This is a critical step.
 
EVALUATOR'S NOTE:
None. COMMENTS:
_______ SAT
 
_______ UNSAT Notify Shift Supervision/Evaluator of Blender status
. END OF JPM.
STOP TIME:
_______________________________________
 
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
 
____________________________________________________________________________________


____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
__________________________________________________________________________________
__  ____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
 
____________________________________________________________________________________  ____________________________________________________________________________________
____________________________________________________________________________________  ____________________________________________________________________________________
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)   Initial Conditions   Unit 1 is at 30% power. The 30% hold for a flux map on Unit 1 is complete. Power escalation to 100% in accordance with 1-GOP-1.5, Unit Startup, 2% to Reactor Power to Max Allowable Power, is about to recommence. Initiating Cues   You are to perform a 200 gallon Alternate Dilute only to the suction of the charging pump in accordance with 1-OP-CH-021. When you finish the actions necessary to accomplish this task, please inform me.
 
Operator Directions Handout (TO BE GIVEN TO APPLICANT)  Initial Conditions   Unit 1 is at 30% power. The 30% hold for a flux map on Unit 1 is complete. Power escalation to 100% in accordance with 1-GOP-1.5, Unit Startup, 2% to Reactor Power to Max Allowable Power, is about to recommence. Initiating Cues  You are to perform a 200 gallon Alternate Dilute only to the suction of the charging pump in accordance with 1-OP-CH-021. When you finish the actions necessary to accomplish this task, please inform me.
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Surry 2014-301 "JPM c"                Page 1 of 12  U.S. Nuclear Regulatory Commission Surry Power Station   SR09301  Simulator Job Performance Measure WE14EA1.3 (3.3/3.8)
Initial Conditions Unit 1 is at 30% power.
Applicant________________________________     Start Time___________________
The 30% hold for a flux map on Unit 1 is complete.
Examiner_______________________________ Date ___________________________________   Stop Time___________________ Title  CONFIGURE SPRAY SYSTEMS IN ACCORDANCE WITH ECA-1.1 (LOSS OF EMERGENCY RECIRCULATION). K/A: WE14EA1.3 Ability to operate and / or monitor the following as they apply to the (High Containment Pressure). Desired operating results during abnormal and emergency situations. Applicability     Estimated Time  Actual Time RO/SRO(I)/SRO(U)     10 Minutes                         Conditions   Task is to be PERFORMED in the simulator. A LBLOCA has occurred and both LHSI pumps are inoperable. 1-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8. Standards   1-ECA-1.1, Loss of Emergency Coolant Recirculation, steps 8 and 9 are complete which result in 1-RS-P-2B in service to 1-RS-E-1D (with service water aligned) and 1-CS-P-1A and 1B in service. Initiating Cues   1-ECA-1.1 step 8. Shift Manager direction Terminating Cues 1-ECA-1.1 steps 8 and 9 complete. Procedures   1-ECA-1.1, Loss of Emergency Coolant Recirculation, Rev. 37.
Power escalation to 100% in accordance with 1
Surry 2014-301 "JPM c"                Page 2 of 12 Tools and Equipment     Safety Considerations None      None  Simulator Setup Call up 100% power IC and initialize (or IC-270). Enter the following malfunctions: o RS1001- TRN A HI HI CLS FAILS TO ACTIVATE- INSERT o RS1002- TRN B HI HI CLS FAILS TO ACTIVATE- INSERT o RC0102- RCS COLD LEG B PIPE RUPTURE- INSERT o RS0702- LOSS OF INSIDE RECIRC SPR PP 1B - Trigger 4 o SI0901- LHSI PUMP SI-P-1A OVERCURRENT TRIP- Trigger 1 o SI0902- LHSI PUMP SI-P-1B OVERCURRENT TRIP- Trigger 1 Setup the following event trigger- Event action- rsp1b_amp>0.1 - Event 4  Set up the following switch override- MOVSW104A_OPEN- OFF - INSERT  Set up the following MOV override - SWMOV105C_BKR - set to OPEN and INSERT. Place the simulator in RUN and perform 1-E-0 steps, then transition to 1-E-1 and perform steps 1 on step 18 insert trigger 1 and transition to 1-ECA-1.1. Do not worry about stopping unloaded EDGs in E-1. Start 1-CS-P-1A and open 1-CS-MOV-101A/B and 1-CS-MOV-102A. Open 1-CS-MOV-101C, and 1-CS-MOV-101D. Ensure containment sump level is >4'. On recall of JPM, activate/check activated Trigger 4. Initial Conditions   A LBLOCA has occurred with the failure of Hi-Hi CLS to function and failure of both LHSI pumps. 1-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8. Initiating Cues   You are the Unit 1 RO. Align Recirc Spray and Containment Spray in accordance with 1-ECA-1.1, steps 8 and 9. When you finish the actions necessary to accomplish this, please inform me. Notes Surry 2014-301 "JPM c"                Page 3 of 12 PERFORMANCE CHECKLIST   Notes to the Evaluator   Task critical elements are bolded and noted at the end of the step as CRITIAL STEP. An additional instructor may be needed to silence and acknowledge alarms for the examinee. START TIME:             STEP 1:  CAUTION AND NOTE PRIOR TO STEP 8   CAUTION: Operation of an OSRS pump without the associated CS pump could   cause cavitation as indicated by fluctuating amperage. NOTE:  If CLS can NOT be reset, local breaker operation will be required to   stop CS and ISRS pumps. STANDARD:   Acknowledges caution and note. COMMENTS:   _______ SAT _______ UNSAT   STEP 2:  Check for EITHER of the following (Step 8a):    - RUNNING OR REQUIRED     OR  - LESS THAN 20%
-GOP-1.5, Unit Startup, 2% to Reactor Power to Max Allowable Power, is about to recommence.
STANDARD:   Observes 1-CS-P-1A running and continues to substep b. EVALUATOR'S NOTE: N/A COMMENTS:   _______ SAT _______ UNSAT Surry 2014-301 "JPM c"                Page 4 of 12 STEP 3:  Check CTMT sump level - GREATER THAN 4.0 ft (Step 8b). STANDARD:   Verifies containment sump level >4'. EVALUATOR'S NOTE: N/A  COMMENTS:     _______ SAT
Initiating Cues You are to perform a 200 gallon Alternate Dilute only to the suction of the charging pump in accordance with 1
_______ UNSAT   STEP 4:  Check SW aligned to at least two RS HXs (Step 8c). STANDARD:   Observes that service water is not aligned to ANY RS HXs and goes to step 8c RNO. EVALUATOR'S NOTE: N/A COMMENTS:     _______ SAT _______ UNSAT Surry 2014-301 "JPM c"                Page 5 of 12 STEP 5:    Align SW to at least two RS HXs (Step 8c RNO). STANDARD:
-OP-CH-021. When you finish the actions necessary to accomplish this task, please inform me.
* Opens 1-SW-MOV-103A- either this valve or 103B must be opened- one valve must be open as a critical step.
 
* Opens 1-SW-MOV-103B- either this valve or 103A must be opened- one valve must be open as a critical step. Opens 1-SW-MOV-103C. Opens 1-SW-MOV-103D. Opens 1-SW-MOV-104A - Determines that valve will not open. Opens 1-SW-MOV-104B. Opens 1-SW-MOV-104C.
Operator Directions Handout (TO BE GIVEN TO APPLICANT)  Initial Conditions Unit 1 is at 30% power.
* Opens 1-SW-MOV-104D - This is a critical step. Opens 1-SW-MOV-105A. Opens 1-SW-MOV-105B. Opens 1-SW-MOV-105C - Determines that valve will not open.
The 30% hold for a flux map on Unit 1 is complete.
* Opens 1-SW-MOV-105D - This is a critical step. EVALUATOR'S NOTE:  N/A   BOOTH NOTE: If asked:  Trainee may dispatch operator to investigate supply breaker to 1-SW-MOV-104A. Report time compression has occurred and there are no abnormal indications on 1-SW-MOV-104A (1H1-2N-7B) supply breaker. If asked:  Trainee may dispatch operator to investigate supply breaker for 1-SW-MOV-105C. Report time compression has occurred and that the supply breaker (1H1-2N-8C) has tripped. COMMENTS:     _______ SAT _______ UNSAT Surry 2014-301 "JPM c"                Page 6 of 12 STEP 6:  Start RS pumps associated with aligned RS HXs (Step 8d) STANDARD:   Trainee starts 1-RS-P-1B ("B" RS HX) Trainee observes that 1-RS-P-1B tripped and continues.
Power escalation to 100% in accordance with 1
* Trainee starts 1-RS-P-2B ("D" RS HX) - This is a critical step. EVALUATOR'S NOTE: N/A BOOTH NOTE: If directed to investigate breaker for 1-RS-P-1B (14J4), report that breaker is tripped as indicated by a 'Bell Lockout'.
-GOP-1.5, Unit Startup, 2% to Reactor Power to Max Allowable Power, is about to recommence.
COMMENTS:   _______ SAT _______ UNSAT   STEP 7:  CAUTIONS PRIOR TO STEP 9   CAUTION:   CHG and LHSI pumps taking suction from the RWST must be stopped when level decreases to 6%. CS pumps taking suction from the RWST must be stopped when level decreases to 3%. STANDARD:   Acknowledges cautions       EVALUATOR'S NOTE: N/A COMMENTS:
Initiating Cues  You are to perform a 200 gallon Alternate Dilute only to the suction of the charging pump in accordance with 1
_______ SAT _______ UNSAT
-OP-CH-021. When you finish the actions necessary to accomplish this task, please inform me.
 
Surry 2014-301 "JPM c"                Page 1 of 12  U.S. Nuclear Regulatory Commission Surry Power Station SR09301  Simulator Job Performance Measure WE14EA1.3 (3.3/3.8)
Applicant________________________________
Start Time___________________
 
Examiner_______________________________
Date ___________________________________
Stop Time___________________
Title  CONFIGURE SPRAY SYSTEMS IN ACCORDANCE WITH ECA
-1.1 (LOSS OF EMERGENCY RECIRCULATION).
K/A: WE14EA1.3 Ability to operate and / or monitor the following as they apply to the (High Containment Pressure). Desired operating results during abnormal and emergency situations.
Applicability Estimated Time  Actual Time
 
RO/SRO(I)/SRO(U) 10 Minutes  
 
Conditions Task is to be PERFORMED in the simulator.
A LBLOCA has occurred and both LHSI pumps are inoperable. 1
-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.
Standards 1-ECA-1.1, Loss of Emergency Coolant Recirculation, steps 8 and 9 are complete which result in 1
-RS-P-2B in service to 1
-RS-E-1D (with service water aligned) and 1
-CS-P-1A and 1B in service
. Initiating Cues 1-ECA-1.1 step 8.
Shift Manager direction Terminating Cues 1-ECA-1.1 steps 8 and 9 complete.
Procedures 1-ECA-1.1, Loss of Emergency Coolant Recirculation, Rev. 37
.
Surry 2014-301 "JPM c"                Page 2 of 12 Tools and Equipment Safety Considerations None      None  Simulator Setup Call up 100% power IC and initialize (or IC
-270). Enter the following malfunctions:
o RS1001- TRN A HI HI CLS FAILS TO ACTIVATE
- INSERT o RS1002- TRN B HI HI CLS FAILS TO ACTIVATE
- INSERT o RC0102- RCS COLD LEG B PIPE RUPTURE
- INSERT o RS0702- LOSS OF INSIDE RECIRC SPR PP 1B  
- Trigger 4 o SI0901- LHSI PUMP SI
-P-1A OVERCURRENT TRIP- Trigger 1 o SI0902- LHSI PUMP SI
-P-1B OVERCURRENT TRIP
- Trigger 1 Setup the following event trigger
- Event action
- rsp1b_amp>0.1  
- Event 4  Set up the following switch override
- MOVSW104A_OPEN
- OFF - INSERT  Set up the following MOV override  
- SWMOV105C_
BKR - set to OPEN and INSERT.
Place the simulator in RUN and perform 1
-E-0 steps, then transition to 1
-E-1 and perform steps 1 on step 18 insert trigger 1 and transition to 1
-ECA-1.1. Do not worry about stopping unloaded EDGs in E
-1. Start 1-CS-P-1A and open 1
-CS-MOV-101A/B and 1
-CS-MOV-102A. Open 1-CS-MOV-101C, and 1
-CS-MOV-101D. Ensure containment sump level is >4'.
On recall of JPM, activate/check activated Trigger 4
. Initial Conditions A LBLOCA has occurred with the failure of Hi
-Hi CLS to function and failure of both LHSI pumps. 1
-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.
Initiating Cues You are the Unit 1 RO. Align Recirc Spray and Containment Spray in accordance with 1
-ECA-1.1, steps 8 and  
: 9. When you finish the actions necessary to accomplish this, please inform me.
Notes Surry 2014-301 "JPM c"                Page 3 of 12 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and noted at the end of the step as CRITIAL STEP.
An additional instructor may be needed to silence and acknowledge alarms for the examinee.
START TIME:
STEP 1:  CAUTION AND NOTE PRIOR TO STEP 8 CAUTION:
Operation of an OSRS pump without the associated CS pump could cause cavitation as indicated by fluctuating amperage.
NOTE:  If CLS can NOT be reset, local breaker operation will be required to stop CS and ISRS pumps.
STANDARD:
Acknowledges caution and note.
COMMENTS:
_______ SAT
_______ UNSAT STEP 2:  Check for EITHER of the following (Step 8a)
:    - RUNNING OR REQUIRED OR  - LESS THAN 20%
 
STANDARD:
Observes 1
-CS-P-1A running and continues to substep b.
EVALUATOR'S NOTE: N/A COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM c"                Page 4 of 12 STEP 3:  Check CTMT sump level  
- GREATER THAN 4.0 ft (Step 8b)
. STANDARD:
Verifies containment sump level >4'.
EVALUATOR'S NOTE: N/A  COMMENTS:
_______ SAT
 
_______ UNSAT STEP 4:  Check SW aligned to at least two RS HXs (Step 8c).
STANDARD:
Observes that service water is not aligned to ANY RS HXs and goes to step 8c RNO. EVALUATOR'S NOTE: N/A
 
COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM c"                Page 5 of 12 STEP 5:    Align SW to at least two RS HXs (Step 8c RNO)
. STANDARD:
* Opens 1-SW-MOV-103A- either this valve or 103B must be opened
- one valve must be open as a critical step.
* Opens 1-SW-MOV-103B- either this valve or 103A must be opened- one valve must be open as a critical step.
Opens 1-SW-MOV-103C. Opens 1-SW-MOV-103D. Opens 1-SW-MOV-104A - Determines that valve will not open
. Opens 1-SW-MOV-104B. Opens 1-SW-MOV-104C.
* Opens 1-SW-MOV-104D - This is a critical step.
Opens 1-SW-MOV-105A. Opens 1-SW-MOV-105B. Opens 1-SW-MOV-105C - Determines that valve will not open
.
* Opens 1-SW-MOV-105D - This is a critical step.
EVALUATOR'S NOTE:  N/A BOOTH NOTE:
If asked:  Trainee may dispatch operator to investigate supply breaker to 1-SW-MOV-104A. Report time compression has occurred and there are no abnormal indication s on 1-SW-MOV-104A (1H1
-2N-7B) supply breaker.
If asked:  Trainee may dispatch operator to investigate supply breaker for 1
-SW-MOV-105C. Report time compression has occurred and that the supply breaker (1H1
-2N-8C) has tripped.
COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM c"                Page 6 of 12 STEP 6:  Start RS pumps associated with aligned RS HXs (Step 8d)
STANDARD:
Trainee starts 1
-RS-P-1B ("B" RS HX)
Trainee observes that 1
-RS-P-1B tripped and continues.
* Trainee starts 1
-RS-P-2B ("D" RS HX)  
- This is a critical step.
EVALUATOR'S NOTE: N/A BOOTH NOTE:
If directed to investigate breaker for 1
-RS-P-1B (14J4), report that breaker is tripped as indicated by a 'Bell Lockout'.
 
COMMENTS:
_______ SAT
_______ UNSAT STEP 7:  CAUTIONS PRIOR TO STEP 9 CAUTION:
CHG and LHSI pumps taking suction from the RWST must be stopped when level decreases to 6%.
CS pumps taking suction from the RWST must be stopped when level decreases to 3%. STANDARD:
Acknowledges cautions EVALUATOR'S NOTE: N/A
 
COMMENTS:
 
_______ SAT
_______ UNSAT


Surry 2014-301 "JPM c"                Page 7 of 12 STEP 8:
Surry 2014-301 "JPM c"                Page 7 of 12 STEP 8:
Determine number of CS pumps required (Step 9a):    STANDARD:   Determines that containment pressure is between 14 psia and 60 psia, fewer than two RS pumps are running, and determines that 2 CS pumps are required. EVALUATOR'S CUE:  If asked, there are no abnormalities noted on either containment spray pump.
Determine number of CS pumps required (Step 9a)
COMMENTS:     _______ SAT _______ UNSAT   STEP 9:  CS pumps running - EQUAL TO NUMBER REQUIRED (Step 9b)     STANDARD:   Determines that 2 CS pumps are required, but only 1 currently in service. Goes to step 9 RNO.       EVALUATOR'S NOTE: N/A COMMENTS:   _______ SAT
:    STANDARD:
_______ UNSAT Surry 2014-301 "JPM c"                Page 8 of 12 STEP 10:
Determines that containment pressure is between 14 psia and 60 psia, fewer than two RS pumps are running, and determines that 2 CS pumps are required.
Do the following (Step 9b RNO):  1)  Manually operate CS pump(s).       2) Close associated CS pump discharge MOVs for stopped pump(s):   -CS-P-1A, 1-CS-MOV-101A and 1-CS-MOV-101B    -CS-P-1B, 1-CS-MOV-101C and 1-CS-MOV-101D    STANDARD:
EVALUATOR'S CUE:  If asked, there are no abnormalities noted on either containment spray pump.
* Trainee starts 1-CS-P-1B. This is a critical step.       EVALUATOR'S NOTE: N/A COMMENTS:   _______ SAT _______ UNSAT STEP 11:
 
REPORT TO SHIFT SUPERVISOR (EVALUATOR). STANDARD: Verbal status report that CS and RS have been aligned in accordance with ECA-1.1 steps 8 & 9.
COMMENTS:
EVALUATOR'S NOTE: N/A STOP TIME:             COMMENTS:   _______ SAT
_______ SAT
_______ UNSAT STOP TIME: ____________________________________________________________________________________  ____________________________________________________________________________________
_______ UNSAT STEP 9:  CS pumps running - EQUAL TO NUMBER REQUIRED (Step 9b)
____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
STANDARD:
Determines that 2 CS pumps are required, but only 1 currently in service.
Goes to step 9 RNO.
EVALUATOR'S NOTE: N/A
 
COMMENTS:
_______ SAT
 
_______ UNSAT
 
Surry 2014-301 "JPM c"                Page 8 of 12 STEP 10:
Do the following (Step 9b RNO)
:  1)  Manually operate CS pump(s).
: 2) Close associated CS pump discharge MOVs for stopped pump(s):
    -CS-P-1A, 1-CS-MOV-101A and 1
-CS-MOV-101B    -CS-P-1B, 1-CS-MOV-101C and 1
-CS-MOV-101D    STANDARD:
* Trainee starts 1
-CS-P-1B. This is a critical step.
EVALUATOR'S NOTE: N/A COMMENTS:
_______ SAT
_______ UNSAT STEP 11:
REPORT TO SHIFT SUPERVISOR (EVALUATOR).
STANDARD:
Verbal status report that CS and RS have been aligned in accordance with ECA
-1.1 steps 8 &  
: 9.
EVALUATOR'S NOTE: N/A STOP TIME:
COMMENTS:
_______ SAT
 
_______ UNSAT
 
STOP TIME:
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Operator Directions Handout  (TO BE READ TO APPLICANT BY EXAMINER)  Task  Task is to be performed in the simulator. Perform Steps 8 and 9 of 1-ECA-1.1, Loss of Emergency Coolant Recirculation, to align Recirc Spray and Containment Spray systems. Directions  The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task  Initial Conditions  A LBLOCA has occurred with the failure of Hi-Hi CLS to function and failure of both LHSI pumps. 1-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8. Initiating Cues  You are the Unit 1 RO. Align Recirc Spray and Containment Spray in accordance with 1-ECA-1.1, steps 8 and 9. When you finish the actions necessary to accomplish this, please inform me.
Operator Directions Handout  (TO BE GIVEN TO APPLICANT)  Initial Conditions  A LBLOCA has occurred with the failure of Hi-Hi CLS to function and failure of both LHSI pumps. 1-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8. Initiating Cues  You are the Unit 1 RO. Align Recirc Spray and Containment Spray in accordance with 1-ECA-1.1, steps 8 and 9. When you finish the actions necessary to accomplish this, please inform me.   


Surry 2014-301 "JPM d"              Page 1 of 20  U.S. Nuclear Regulatory Commission Surry Power Station   SR14301  Simulator Job Performance Measure EPEE02.EK3.3 (3.9/3.9) Alternate Path   Applicant________________________________     Start Time___________________ Examiner_______________________________
____________________________________________________________________________________
Date ___________________________________   Stop Time___________________ Title  Re-establish Normal Letdown Following SI K/A: EPEEE02.EK3.3 Knowledge of the reasons for the following responses as they apply to the (SI Termination): Manipulation of controls required to obtain desired operating results during abnormal, and emergency situations. 3.9 / 3/9 Applicability     Estimated Time  Actual Time RO/SRO(I)/     35 Minutes    ___  Minutes                     Conditions   Task is to be PERFORMED in the simulator. A spurious SI has occurred. E-0 has been performed, SI reduction criteria are satisfied, transition made to ES-1.1, and it has been performed through Step 14. Standards Excess letdown placed in service. Initiating Cues 1-ES-1.1, SI Termination, Step 15. Shift Manager direction. Terminating Cues   Report received that excess letdown is in service per 1-OP-CH-006. Procedures   1-ES-1.1, SI Termination, Rev. 48. 1-OP-CH-006, Shifting or Increasing/Decreasing Letdown Flow, Rev.20.
____________________________________________________________________________________
Surry 2014-301 "JPM d"              Page 2 of 20 Tools and Equipment     Safety Considerations   None      None Surry 2014-301 "JPM d"              Page 3 of 20 Simulator Setup   Call up 100% power IC and initialize (IC 268). Place simulator in RUN. Initiate SI. Perform E-0, reset SI, verify SI reduction criteria satisfied, transition to ES-1.1 and perform it through Step 14. Allow simulator until SR energize, place in freeze and snap until ready to run JPM. Close 1-CH-LCV-1460A & B. Initiate failure 1-CH-LCV-1460A shut; Switch O/R, CHLCV460A_CLOSE, ON, INSERT; CHLCV-460A_OPEN, OFF, INSERT. Open 1-CC0TV-109B. Press Green Pushbutton on 1-DG-TV-108A/B and pump down the PDTT. Set seal injection at 8 gpm. Verify PRZR Level Control Channel Select Switch is in the III/II position. Freeze simulator at these conditions for JPM performance. Initial Conditions   Plant was at 100% power with all systems operating normal and in automatic. The crew is currently recovering from a spurious SI initiation. 1-ES-1.1, SI Termination has been completed up to Step 15. SI has been reset. Initiating Cues   You are the Unit 1 RO. Re-establish letdown by performing step 15 of 1-ES-1.1. When you finish the actions necessary to accomplish this, please inform me. Notes Surry 2014-301 "JPM d"              Page 4 of 20 PERFORMANCE CHECKLIST   Notes to the Evaluator   Operator is given a copy of 1-ES-1.1, SI Termination, Step 15. When Operator determines the need to place excess letdown in service, give them a copy of 1-OP-CH-006, Shifting or Increasing/Decreasing Letdown Flow. Task critical elements are bolded and noted at the end of the step as CRITIAL STEP. START TIME:_______________:             STEP 1:  Adjust charging line flow to establish > 40 gpm. (Step 15a of ES-1.1)  STANDARD:   Checks that indicated CHG line flow is greater than 40 gpm by observing flow on 1-CH-FI-1122A. EVALUATOR'S NOTE:   COMMENTS:   _______ SAT
____________________________________________________________________________________
_______ UNSAT   STEP 2:  Open Letdown Line pressure control valve. (Step 15 b of ES-1.1)  1-CH-PCV-1145 STANDARD: *(a) Places 1-CH-PCV-1145 controller into MANUAL. This is a critical step. *(b) Adjusts demand increase button until 1-CH-PCV-1145 indicates open (zero demand indicated). This is a critical step.
 
EVALUATOR'S NOTE:     COMMENTS:   _______ SAT _______ UNSAT
____________________________________________________________________________________
 
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Task  Task is to be performed in the simulator.
Perform Steps 8 and 9 of 1-ECA-1.1, Loss of Emergency Coolant Recirculation, to align Recirc Spray and Containment Spray systems.
Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task Initial Conditions A LBLOCA has occurred with the failure of Hi
-Hi CLS to function and failure of both LHSI pumps. 1
-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.
Initiating Cues You are the Unit 1 RO. Align Recirc Spray and Containment Spray in accordance with 1
-ECA-1.1, steps 8 and
: 9. When you finish the actions necessary to accomplish this, please inform me.
 
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions A LBLOCA has occurred with the failure of Hi
-Hi CLS to function and failure of both LHSI pumps. 1
-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.
Initiating Cues You are the Unit 1 RO. Align Recirc Spray and Containment Spray in accordance with 1-ECA-1.1, steps 8 and
: 9. When you finish the actions necessary to accomplish this, please inform me.
 
Surry 2014-301 "JPM d"              Page 1 of 20  U.S. Nuclear Regulatory Commission Surry Power Station SR14301  Simulator Job Performance Measure EPEE02.EK3.3 (3.9/3.9)
Alternate Path Applicant________________________________
Start Time___________________
Examiner_______________________________
 
Date ___________________________________
Stop Time___________________
Title  Re-establish Normal Letdown Following SI K/A: EPEEE02.EK3.3 Knowledge of the reasons for the following responses as they apply to the (SI Termination):
Manipulation of controls required to obtain desired operating results during abnormal, and emergency situations.
3.9 / 3/9 Applicability Estimated Time  Actual Time RO/SRO(I)/
35 Minutes    ___  Minutes Conditions Task is to be PERFORMED in the simulator.
A spurious SI has occurred. E
-0 has been performed, SI reduction criteria are satisfied, transition made to ES
-1.1, and it has been performed through Step 14. Standards
 
Excess letdown placed in service.
Initiating Cues
 
1-ES-1.1, SI Termination, Step 15.
Shift Manager direction
. Terminating Cues Report received that excess letdown is in service per 1
-OP-CH-006. Procedures 1-ES-1.1, SI Termination, Rev. 48
. 1-OP-CH-006, Shifting or Increasing/Decreasing Letdown Flow, Rev.20.
Surry 2014-301 "JPM d"              Page 2 of 20 Tools and Equipment Safety Considerations None      None Surry 2014-301 "JPM d"              Page 3 of 20 Simulator Setup Call up 100% power IC and initialize (IC 268). Place simulator in RUN.
Initiate SI. Perform E
-0, reset SI, verify SI reduction criteria satisfied, transition to ES
-1.1 and perform it through Step 14. Allow simulator until SR energize, place in freeze and snap until ready to run JPM.
Close 1-CH-LCV-1460A & B. Initiate failure 1-CH-LCV-1460A shut
; Switch O/R, CHLCV460A_CLOSE, ON, INSERT; CHLCV
-460A_OPEN, OFF, INSERT
. Open 1-CC0TV-109B. Press Green Pushbutton on 1
-DG-TV-108A/B and pump down the PDTT.
Set seal injection at 8 gpm.
Verify PRZR Level Control Channel Select Switch is in the III/II position.
Freeze simulator at these conditions for JPM performance.
Initial Conditions Plant was at 100% power with all systems operating normal and in automatic
. The crew is currently recovering from a spurious SI initiation
. 1-ES-1.1, SI Termination has been completed up to Step 15.
SI has been reset.
Initiating Cues You are the Unit 1 RO
. Re-establish letdown by performing step 15 of 1
-ES-1.1. When you finish the actions necessary to accomplish this, please inform me
. Notes Surry 2014-301 "JPM d"              Page 4 of 20 PERFORMANCE CHECKLIST Notes to the Evaluator Operator is given a copy of 1
-ES-1.1, SI Termination, Step 15.
When Operator determines the need to place excess letdown in service, give them a copy of 1
-OP-CH-006, Shifting or Increasing/Decreasing Letdown Flow.
Task critical elements are bolded and noted at the end of the step as CRITIAL STEP.
START TIME:_______________
:
STEP 1:  Adjust charging line flow to establish > 40 gpm.
(Step 15a of ES-1.1)  STANDARD:
Checks that indicated C HG line flow is greater than 40 gpm by observing flow on 1
-CH-FI-1122A. EVALUATOR'S NOTE:
COMMENTS:
_______ SAT
 
_______ UNSAT STEP 2:  Open Letdown Line pressure control valve
. (Step 15 b of ES
-1.1)  1-CH-PCV-1145 STANDARD:
  *(a) Places 1-CH-PCV-1145 controller into MANUAL.
This is a critical step.
*(b) Adjusts demand increase button until 1
-CH-PCV-1145 indicates open (zero demand indicated)
. This is a critical step.
 
EVALUATOR'S NOTE:
COMMENTS:
_______ SAT
_______ UNSAT


Surry 2014-301 "JPM d"              Page 5 of 20 STEP 3:
Surry 2014-301 "JPM d"              Page 5 of 20 STEP 3:
Check closed or close letdown orifice isolation valves. (Step 15 c of ES-1.1)  1-CH-HCV-1200A  1-CH-HCV-1200B  1-CH-HCV-1200C  STANDARD:   a) Checks 1-CH-HCV-1200A closed. b) Checks 1-CH-HCV-1200B closed. c) Checks 1-CH-HCV-1200C closed. EVALUATOR'S NOTE:
Check closed or close letdown orifice isolation valves.
(Step 15 c of ES
-1.1)  1-CH-HCV-1200A  1-CH-HCV-1200B  1-CH-HCV-1200C  STANDARD:
a) Checks 1-CH-HCV-1200A closed
. b) Checks 1-CH-HCV-1200B closed.
c) Checks 1-CH-HCV-1200C closed.
EVALUATOR'S NOTE:
 
None.
None.
COMMENTS:   b  STEP 4:  Open letdown isolation valves. (Step 15 d of ES-1.1)  STANDARD:   *a) Opens 1-CH-TV-1204A. This is a critical step. *b) Opens 1-CH-TV-1204B. This is a critical step. *c) Attempts to open 1-CHLCV-1460A, Valve will not open. *d) Goes to Step 15 RNO, Establish excess letdown IAW 1-OP-CH-006, Shifting or Increasing/Decreasing letdown Flow. This is a critical step.
COMMENTS:
EVALUATOR'S NOTE:
b  STEP 4:  Open letdown isolation valves.
   [This step is the Fault] The Operator should determine the letdown isolation valve 1-CH-LCV-1460A has failed and apply the RNO for placing excess letdown in service. Operator may reduce charging at this point to minimize it to attempt to maintain PRZR level. When Operator determines the need to perform 1-OP-CH-006, hand him/her a copy of the  procedure.
(Step 15 d of ES
-1.1)  STANDARD:
  *a) Opens 1-CH-TV-1204A. This is a critical step.
  *b) Opens 1-CH-TV-1204B. This is a critical step.
  *c) Attempts to open 1
-CHLCV-1460A, Valve will not open.
  *d) Goes to Step 15 RNO, Establish excess letdown IAW 1
-OP-CH-006, Shifting or Increasing/Decreasing letdown Flow.
This is a critical step.
 
EVALUATOR'S NOTE:
 
   [This step is the Fault]
The Operator should determine the letdown isolation valve 1
-CH-LCV-1460A has failed and apply the RNO for placing excess letdown in service. Operator may reduce charging at this point to minimize it to attempt to maintain PRZR level. When Operator determines the need to perform 1
-OP-CH-006, hand him/her a copy of the  procedure.
 
COMMENTS:
 
_______ SAT
 
_______ UNSAT
 
Surry 2014-301 "JPM d"              Page 6 of 20 STEP 5:  1-OP-CH-006.
OBTAINS COPY OF 1
-OP-CH-006 FROM EVALUATOR STANDARD:
  (a) Reviews initial conditions, precautions and limitations.
  (b) Determines Section 5.1 is to be used.
COMMENTS:
_______ SAT
 
_______ UNSAT STEP 6:  1-OP-CH-006. (Steps 5.1.1 thru 5.1.4)
CHECK ALL LOOP DRAINS AND EXCESS LETDOWN ISOLATIONS ARE SHUT STANDARD:
  (a) Verifies all loop drains are shut (1
-RC-1557A, B, and C) using control board indicator lights.  (b) Verifies excess letdown HX isolation is shut (1
-CH-HCV-1201) using control board indicator lights.
  (c) Verifies excess letdown flow setpoint is at zero (1
-CH-HCV-1137).  (d) Verifies excess letdown divert valve (1
-CH-HCV-1389) is set to VCT.
 
EVALUATOR'S NOTE:
None. COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM d"              Page 7 of 20 STEP 7:  1-OP-CH-006. (Step 5.1.5 and 5.1.6
)  OPENS RCP SEAL RETURN
, 1-CH-MOV-1381. Check running at least one CCW pump. STANDARD:
  *(a) Opens RCP seal return isolation (1
-CH-MOV-1381) using control board controls.
This is a critical step.
  (b) Checks at least one CC pump running using control board indications.
EVALUATOR'S NOTE:
Step 5.1.7 is N/A.
 
COMMENTS:
_______ SAT
_______ UNSAT STEP 8:  1-OP-CH-006. (Step 5.1.
8 thru 5.1.12)
VERIFIES LETDOWN HX TEMPERATURE CONTROL AND EXCESS LETDOWN READY FOR SERVICE.
STANDARD:
    (a) Checks 1-CC-FI-109, LETDOWN HX OUTLET FLOW is ~ 1 60 gpm.  (b) Applies note concerning 1
-CC-HCV-108.  (c) Checks 1-CC-TI-108, LETDOWN HX OUTLET TEMP, is indicating ambient.
  (d) Checks 1-CH-PI-1138, EXCESS LETDOWN HX OUTLET PRESS, is approximately 50 psig.
  (e) Checks 1-CH-TI-1139, EXCESS LETDOWN HX OUTLET TEMP, is indicating ambient. COMMENTS:
 
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM d"              Page 8 of 20 STEP 9:  1-OP-CH-006. (Step 5.1.
13 thru 5.1.23)  ESTABLISH EXCESS LETDOWN FLOW PATH.
STANDARD:
  (a) Acknowledges note on first directing excess letdown to the PDTT.
  *(b) Places 1-CH-HCV-1389, EXCESS LETDOWN DIVERT, to the PDTT. Verifies position by board indications.
This is a critical step.
  (c) Verifies 1
-CH-PI-1138, EXCES LETDOWN HX OUTLET PRESS, indicates ~ 10 psig.
      *(d) Opens 1-CH-HCV-1201, EXCESS HX LETDOWN ISOLATION, and verifies position by board indications.
This is a critical step.
  (e) Records charging flow.
  (f) Acknowledges note on excess letdown effect on calorimetric.
  (g) N/A's step for calorimetric being performed.
  (h) Acknowledges cautions on opening loop drains.
      *(i) Opens one and only one loop drain (1
-RC-HCV-1557A, B, or C). Verifies position by board indications.
This is a critical step.
  (j) Acknowledges notes on excess letdown flow rate and use of Attachment 1.
  *(k) Slowly opens 1
-CH-HCV-1137, EXCESS LETDOWN FLOW, until 15 gpm to PDTT. This is a critical step.
  (l) Place 1-CH-FC-1122C, CHARGING FLOW CONTROL, in Manual and raise charging flow 15 gpm from initial value.
(m) Verifies excess letdown temperature 1
-CC-TI-108 is < 150
&deg;F and 1-CH-TI-1139 is < 195&deg;F.  (m) Records pot setting for 1
-CH-HCV-1137. EVALUATOR'S NOTE:
If asked:  A calorimetric is not being performed If asked:  As the Shift Manager, direct the Operator to use the "A" loop drain path.
 
COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM d"              Page 9 of 20 STEP 10:  1-OP-CH-006. (Step 5.1.
24 thru 5.1.26)  ESTABLISH EXCESS LETDOWN FLOW PATH THROTTLES EXCESS LETDOWN AND TRANSFERS TO VCT.
STANDARD:
  (a) Throttles 1
-CH-HCV-1137 to 5 gpm.
  (b) Acknowledges Notes.
  *(c) When PDTT increases 10% (1
-DG-LI-107) selects "VCT" on 1
-CH-HCV-1389. This is a critical step.
  (d) Increase 1
-CH-HCV-1137 to previous recorded setpoint.
EVALUATOR'S NOTE:
To expedite JPM, Evaluator may time compress and direct Operator PDTT level has increased by at least 10% from the original point
. COMMENTS:
_______ SAT
_______ UNSAT STEP 11:  1-OP-CH-006. (Step 5.1.
27 thru 5.1.31)
Checks Parameters
.
STANDARD:
  (a) Checks RCP seal leakoff is in normal band (approx. 2
-3 gpm).  (b) Checks 1-CH-PI-1138 ~ 65 psig.
(c) Acknowledges CAUTION concerning CH flow greater than expected, a leak on excess letdown flowpath is a possibility.
(d) Verifies charging flow stable at ~ 15 gpm greater than previously recorded value.
  (e) Verifies 1
-CC-TI-108 < 150F, and 1-CH-TI-1139 < 195F. EVALUATOR'S NOTE:
When Excess Letdown is in service, you can inform the Operator someone else will finish the procedure and terminate the JPM.
COMMENTS:
COMMENTS:
_______ SAT
_______ SAT
_______ UNSAT Surry 2014-301 "JPM d"              Page 6 of 20 STEP 5:  1-OP-CH-006.
_______ UNSAT
OBTAINS COPY OF 1-OP-CH-006 FROM EVALUATOR  STANDARD:  (a) Reviews initial conditions, precautions and limitations.  (b) Determines Section 5.1 is to be used. COMMENTS:    _______ SAT
 
_______ UNSAT  STEP 6:  1-OP-CH-006. (Steps 5.1.1 thru 5.1.4)  CHECK ALL LOOP DRAINS AND EXCESS LETDOWN ISOLATIONS ARE SHUT  STANDARD:  (a) Verifies all loop drains are shut (1-RC-1557A, B, and C) using control board indicator lights.  (b) Verifies excess letdown HX isolation is shut (1-CH-HCV-1201) using control board indicator lights.  (c) Verifies excess letdown flow setpoint is at zero (1-CH-HCV-1137).  (d) Verifies excess letdown divert valve (1-CH-HCV-1389) is set to VCT.
Surry 2014-301 "JPM d"              Page 10 of 20 Step 12  REPORTS TO SHIFT MANAGER (EVALUATOR).
EVALUATOR'S NOTE:  None. COMMENTS:    _______ SAT  _______ UNSAT Surry 2014-301 "JPM d"              Page 7 of 20 STEP 7:  1-OP-CH-006. (Step 5.1.5 and 5.1.6)  OPENS RCP SEAL RETURN, 1-CH-MOV-1381. Check running at least one CCW pump. STANDARD:  *(a) Opens RCP seal return isolation (1-CH-MOV-1381) using control board controls. This is a critical step.  (b) Checks at least one CC pump running using control board indications. EVALUATOR'S NOTE:  Step 5.1.7 is N/A.
Standards Verbal status report made that Step 15 completed and letdown has been re
COMMENTS:    _______ SAT  _______ UNSAT  STEP 8:  1-OP-CH-006. (Step 5.1.8 thru 5.1.12)
-established.
VERIFIES LETDOWN HX TEMPERATURE CONTROL AND EXCESS LETDOWN READY FOR SERVICE. STANDARD:    (a) Checks 1-CC-FI-109, LETDOWN HX OUTLET FLOW is ~ 160 gpm.  (b) Applies note concerning 1-CC-HCV-108.  (c) Checks 1-CC-TI-108, LETDOWN HX OUTLET TEMP, is indicating ambient.  (d) Checks 1-CH-PI-1138, EXCESS LETDOWN HX OUTLET PRESS, is approximately 50 psig.  (e) Checks 1-CH-TI-1139, EXCESS LETDOWN HX OUTLET TEMP, is indicating ambient. COMMENTS:
Evaluator's Comments STOP TIME:________________
_______ SAT  _______ UNSAT Surry 2014-301 "JPM d"              Page 8 of 20 STEP 9:  1-OP-CH-006. (Step 5.1.13 thru 5.1.23)  ESTABLISH EXCESS LETDOWN FLOW PATH. STANDARD:  (a) Acknowledges note on first directing excess letdown to the PDTT.  *(b) Places 1-CH-HCV-1389, EXCESS LETDOWN DIVERT, to the PDTT. Verifies position by board indications. This is a critical step.  (c) Verifies 1-CH-PI-1138, EXCES LETDOWN HX OUTLET PRESS, indicates ~ 10 psig.      *(d) Opens 1-CH-HCV-1201, EXCESS HX LETDOWN ISOLATION, and verifies position by board indications. This is a critical step.  (e) Records charging flow.  (f) Acknowledges note on excess letdown effect on calorimetric.  (g) N/A's step for calorimetric being performed.  (h) Acknowledges cautions on opening loop drains.      *(i) Opens one and only one loop drain (1-RC-HCV-1557A, B, or C). Verifies position by board indications. This is a critical step.  (j) Acknowledges notes on excess letdown flow rate and use of Attachment 1.  *(k) Slowly opens 1-CH-HCV-1137, EXCESS LETDOWN FLOW, until 15 gpm to PDTT. This is a critical step.  (l) Place 1-CH-FC-1122C, CHARGING FLOW CONTROL, in Manual and raise charging flow 15 gpm from initial value. (m) Verifies excess letdown temperature 1-CC-TI-108 is < 150&deg;F and 1-CH-TI-1139 is < 195&deg;F.  (m) Records pot setting for 1-CH-HCV-1137. EVALUATOR'S NOTE:  If asked:  A calorimetric is not being performed  If asked:  As the Shift Manager, direct the Operator to use the "A" loop drain path.
STOP TIME:
COMMENTS:    _______ SAT  _______ UNSAT Surry 2014-301 "JPM d"              Page 9 of 20 STEP 10:  1-OP-CH-006. (Step 5.1.24 thru 5.1.26)  ESTABLISH EXCESS LETDOWN FLOW PATH THROTTLES EXCESS LETDOWN AND TRANSFERS TO VCT. STANDARD:  (a) Throttles 1-CH-HCV-1137 to 5 gpm.  (b) Acknowledges Notes.  *(c) When PDTT increases 10% (1-DG-LI-107) selects "VCT" on 1-CH-HCV-1389. This is a critical step.  (d) Increase 1-CH-HCV-1137 to previous recorded setpoint. EVALUATOR'S NOTE:  To expedite JPM, Evaluator may time compress and direct Operator PDTT level has increased by at least 10% from the original point. COMMENTS:    _______ SAT  _______ UNSAT  STEP 11:  1-OP-CH-006. (Step 5.1.27 thru 5.1.31)
____________________________________________________________________________________
Checks Parameters.
____________________________________________________________________________________
STANDARD:  (a) Checks RCP seal leakoff is in normal band (approx. 2 -3 gpm).  (b) Checks 1-CH-PI-1138 ~ 65 psig. (c) Acknowledges CAUTION concerning CH flow greater than expected, a leak on excess letdown flowpath is a possibility. (d) Verifies charging flow stable at ~ 15 gpm greater than previously recorded value.  (e) Verifies 1-CC-TI-108 < 150F, and 1-CH-TI-1139 < 195F. EVALUATOR'S NOTE:  When Excess Letdown is in service, you can inform the Operator someone else will finish the procedure and terminate the JPM. COMMENTS:    _______ SAT  _______ UNSAT Surry 2014-301 "JPM d"              Page 10 of 20 Step 12  REPORTS TO SHIFT MANAGER (EVALUATOR). Standards   Verbal status report made that Step 15 completed and letdown has been re-established. Evaluator's Comments                                 STOP TIME:________________     STOP TIME:   ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Operator Directions Handout  (TO BE READ TO APPLICANT BY EXAMINER)  Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task. Initial Conditions  Plant was at 100% power with all systems operating normal and in automatic. The crew is currently recovering from a spurious SI initiation. 1-ES-1.1, SI Termination has been completed up to Step 15. SI has been reset. Initiating Cues    You are the Unit 1 RO. Re-establish letdown by performing step 15 of 1-ES-1.1. When you finish the actions necessary to accomplish this, please inform me. .   


Operator Directions Handout (TO BE GIVEN TO APPLICANT)   Initial Conditions  Plant was at 100% power with all systems operating normal and in automatic. The crew is currently recovering from a spurious SI initiation. 1-ES-1.1, SI Termination has been completed up to Step 15. SI has been reset. Initiating Cues You are the Unit 1 RO. Re-establish letdown by performing step 15 of 1-ES-1.1. When you finish the actions necessary to accomplish this, please inform me.
____________________________________________________________________________________
Surry 2014-301 "JPM e"   Surry    SR 2014 - 301      Page 1 of 8  U.S. Nuclear Regulatory Commission  Surry Power Station  SR14301  Simulator Job Performance Measure APE054.AA1.01 (4.5 / 4.4)
__________________________________________________________________________________
Applicant________________________________    Start Time___________________  Examiner_______________________________  Date ___________________________________  Stop Time___________________  Title Cross-Connect AFW from Unit 1 to Unit 2. K/A: APE054.AA.01: Ability to operate and / or monitor the following as they apply to the Loss of Main Feedwater (MFW) - AFW controls, including the use of alternate AFW sources (RO 4.5/SRO 4.4.) Applicability      Estimated Time  Actual Time  RO/SRO(I)      10 Minutes    ___  Minutes                    Conditions  Task is to be PERFORMED in the Simulator. Unit 1 is at 100% power with all systems normal and in AUTO. Unit 2 is experiencing a loss of all Feed Water. Standards  2-FR-H.1, Loss of Secondary Heat Sink, step 3d RNO, steps d3 through d5, Revision 34. Initiating Cues  Shift Manager Direction. 2-FR-H.1, Loss of Secondary Heat Sink, step 3d RNO, steps d3 through d5. Terminating Cues   2-FR-H.1, Loss of Secondary Heat Sink, step 3d RNO, step d5 complete. Confirmation of AFW to Unit 2 from Unit 2 Operator. Procedures 2-FR-H.1, Loss of Secondary Heat Sink, Revision 36  Tools and Equipment    Safety Considerations None      Standard Personal Safety Equipment Surry 2014-301 "JPM e"    Surry    SR 2014 - 301      Page 2 of 8 Simulator Setup  Reset to IC 269 OR Call up 100% power IC and initialize. Trip Unit 2, Remotes, Station Protection Unit 2, RXTRIP_UNIT2, and wait for swapover. Secure Unit 2 RCPs: Remotes, EL2, EL25A3_bkr / EL25B3_bkr / EL25C3_bkr, Open. Initial Conditions  Unit 1 is at 100% power with all systems normal and in AUTO. Unit 2 is experiencing a loss of all Feed Water. Unit 2 is currently experiencing a loss of all feedwater. They are in 2-FR-H.1 at step 3d RNO and need Aux Feed flow from both Unit 1 motor-driven AFW pumps. All Unit 2 RCPs have been secured. 1J bus will remain on its current (normal) power supply. Initiating Cues  You are to cross-connect Aux Feedwater from Unit 1 to Unit 2 in accordance with 2-FR-H.1 3d RNO. RNO steps d. 1) and d. 2) are complete. When you finish the actions necessary to accomplish this, please inform me. Evaluator Notes  Operator is provided with a copy of 2-FR-H.1, step 3 during directions. Task critical elements are bolded and denoted by an asterisk (*).
__  ____________________________________________________________________________________
Surry 2014-301 "JPM e"    Surry    SR 2014 - 301      Page 3 of 8 PERFORMANCE CHECKLIST    Notes to the Evaluator   Task critical elements are bolded and denoted by an asterisk (*). An additional instructor may be needed to silence and acknowledge alarms for the examinee, and respond as the Unit 2 Reactor Operator. START TIME:            STEP 1: (Step 3d RNO, d 3), 2-FR-H.1)
____________________________________________________________________________________
CLOSES THE UNIT 1 AFW MOVs    STANDARD:    Closes and verifies closed indication (green light on - red light off) the following AFW MOVs:  *(a) 1-MOV-FW-151A. This is a critical step.  *(b) 1-MOV-FW-151B. This is a critical step.  *(c) 1-MOV-FW-151C. This is a critical step.   *(d) 1-MOV-FW-151D. This is a critical step.   *(e) 1-MOV-FW-151E. This is a critical step.   *(f) 1-MOV-FW-151F. This is a critical step. EVALUATOR'S NOTE: 1) 2-handed operation is allowed. 2) Not sequence dependant. COMMENTS:    _______ SAT  _______ UNSAT  STEP 2:  (Step 3d RNO, d4, 2-FR-H.1)  OPENS THE AFW CROSS-CONNECT VALVES TO SUPPLY UNIT 2.
 
STANDARD:
____________________________________________________________________________________
  *(a) Places control switch for 2-MOV-FW-260A to the OPEN position.   *(b) Places control switch for 2-MOV-FW-260B to the OPEN position.    (c) Checks 2-MOV-FW-260A open indication received (red on & green off).   (d) Checks 2-MOV-FW-260B open indication received (red on & green off).    (e) Acknowledges annunciator D-D-4, AFW X-TIE MOVS NOT FULLY CLOSED. EVALUATOR'S NOTE:    COMMENTS:    _______ SAT  _______ UNSAT Surry 2014-301 "JPM e"    Surry     SR 2014 - 301      Page 4 of 8  STEP 3: (Step 3d RNO, d5, 2-FR-H.1)  STARTS THE UNIT 1 MOTOR DRIVEN AFW PUMPS. STANDARD:     (a) Announces AFW pump start over Gai-tronics system.   *(b) Starts 1-FW-P-3A by placing control switch to START.    (c) Verifies start indications (red light on & amps indicated),   *(d) Starts 1-FW-P-3B by placing control switch to START.   (e) Verifies start indications (red light on & amps indicated).     (f) Checks no Unit 1 AFW flow indicated on 1-FW-FI-100A, B & C. EVALUATOR'S NOTE:
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Unit 2: Following Start of 1-FW-P-3A and 1-FW-P-3B, report that AFW flow is indicated on Unit 2. COMMENTS:      _______ SAT  _______ UNSAT  STEP 5:  REPORTS TO SHIFT MANAGER (EVALUATOR). STANDARD:     Reports to the Shift Manager (Evaluator) TASK COMPLETE. . EVALUATOR'S NOTE:   Operator may throttle AFW to restore S/G level.Evaluator option to stop JPM at any time after AFW pumps are started. COMMENTS:   JPM COMPLETE _______ SAT _______ UNSAT Surry 2014-301 "JPM e"    Surry    SR 2014 - 301      Page 5 of 8  STOP TIME:
Directions
 
The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.
Initial Conditions Plant was at 100% power with all systems operating normal and in automatic.
The crew is currently recovering from a spurious SI initiation
. 1-ES-1.1, SI Termination has been completed up to Step 15.
SI has been reset.
Initiating Cues You are the Unit 1 RO. Re
-establish letdown by performing step 15 of 1
-ES-1.1. When you finish the actions necessary to accomplish this, please inform me
. .     
 
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions Plant was at 100% power with all systems operating normal and in automatic.
The crew is currently recovering from a spurious SI initiation
. 1-ES-1.1, SI Termination has been completed up to Step 15.
SI has been reset.
Initiating Cues
 
You are the Unit 1 RO. Re
-establish letdown by performing step 15 of 1
-ES-1.1. When you finish the actions necessary to accomplish this, please inform me
.
Surry 2014-301 "JPM e"    Surry    SR 2014 - 301      Page 1 of 8  U.S. Nuclear Regulatory Commission Surry Power Station SR14301  Simulator Job Performance Measure APE054.AA1.01 (4.5 / 4.4)
Applicant________________________________
Start Time___________________
Examiner_______________________________
Date ___________________________________
Stop Time___________________
Title Cross-Connect AFW from Unit 1 to Unit 2.
K/A: APE054.AA.01: Ability to operate and / or monitor the following as they apply to the Loss of Main Feedwater (MFW)
- AFW controls, including the use of alternate AFW sources (RO 4.5/SRO 4.4
.)  Applicability Estimated Time  Actual Time RO/SRO(I)      10 Minutes    ___   Minutes Conditions Task is to be PERFORMED in the Simulator
. Unit 1 is at 100% power with all systems normal and in AUTO.
Unit 2 is experiencing a loss of all Feed Water. Standards 2-FR-H.1, Loss of Secondary Heat Sink, step 3d RNO, steps d 3 through d 5, Revision 34
. Initiating Cues Shift Manager Direction
. 2-FR-H.1, Loss of Secondary Heat Sink, step 3d RNO, steps d 3 through d
: 5. Terminating Cues 2-FR-H.1, Loss of Secondary Heat Sink, step 3d RNO, step d5 complete
. Confirmation of AFW to Unit 2 from Unit 2 Operator.
Procedures
 
2-FR-H.1, Loss of Secondary Heat Sink
, Revision 36 Tools and Equipment Safety Considerations
 
None      Standard Personal Safety Equipment
 
Surry 2014-301 "JPM e"    Surry    SR 2014 - 301      Page 2 of 8 Simulator Setup Reset to IC 269 OR Call up 100% power IC and initialize.
Trip Unit 2, Remotes, Station Protection Unit 2, RXTRIP_UNIT2, and wait for swapover.
Secure Unit 2 RCPs: Remotes, EL2, EL25A3_bkr
/ EL25B3_bkr
/ EL25C3_bkr, Open.
Initial Conditions Unit 1 is at 100% power with all systems normal and in AUTO.
Unit 2 is experiencing a loss of all Feed Water. Unit 2 is currently experiencing a loss of all feedwater. They are in 2-FR-H.1 at step 3d RNO and need Aux Feed flow from both Unit 1 motor-driven AFW pumps.
All Unit 2 RCPs have been secured. 1J bus will remain on its current (normal) power supply.
Initiating Cues You are to cross
-connect Aux Feedwater from Unit 1 to Unit 2 in accordance with 2
-FR-H.1 3d RNO. RNO steps d. 1) and d. 2) are complete.
When you finish the actions necessary to accomplish this, please inform me
. Evaluator Notes   Operator is provided with a copy of 2
-FR-H.1, step 3 during directions.
Task critical elements are bolded and denoted by an asterisk (
*).
Surry 2014-301 "JPM e"    Surry    SR 2014 - 301      Page 3 of 8 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (*). An additional instructor may be needed to silence and acknowledge alarms for the examinee, and respond as the Unit 2 Reactor Operator.
START TIME:
STEP 1: (Step 3d RNO, d 3), 2
-FR-H.1)
CLOSES THE UNIT 1 AFW MOVs STANDARD:
Closes and verifies closed indication (green light on
- red light off) the following AFW MOVs:  *(a) 1-MOV-FW-151A. This is a critical step.
  *(b) 1-MOV-FW-151B. This is a critical step.
  *(c) 1-MOV-FW-151C. This is a critical step.
  *(d) 1-MOV-FW-151D. This is a critical step.
  *(e) 1-MOV-FW-151E. This is a critical step.
  *(f) 1-MOV-FW-151F. This is a critical step.
EVALUATOR'S NOTE:
: 1) 2-handed operation is allowed.
: 2) Not sequence dependant.
COMMENTS:
_______ SAT
_______ UNSAT STEP 2(Step 3d RNO, d4, 2
-FR-H.1)   OPENS THE AFW CROSS
-CONNECT VALVES TO SUPPLY UNIT 2.
 
STANDARD:
 
  *(a) Places control switch for 2
-MOV-FW-260A to the OPEN position.
   *(b) Places control switch for 2
-MOV-FW-260B to the OPEN position.
    (c) Checks 2-MOV-FW-260A open indication received (red on & green off).
     (d) Checks 2-MOV-FW-260B open indication received (red on & green off).
     (e) Acknowledges annunciator D
-D-4, AFW X-TIE MOVS NOT FULLY CLOSED
. EVALUATOR'S NOTE:
COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM e"    Surry    SR 2014 - 301      Page 4 of 8  STEP 3: (Step 3d RNO, d5, 2
-FR-H.1)  STARTS THE UNIT 1 MOTOR DRIVEN AFW PUMPS.
STANDARD:
    (a) Announces AFW pump start over Gai
-tronics system.
  *(b) Starts 1-FW-P-3A by placing control switch to START
.   (c) Verifies start indications (red light on & amps indicated),
  *(d) Starts 1-FW-P-3B by placing control switch to START
.    (e) Verifies start indications (red light on & amps indicated).
    (f) Checks no Unit 1 AFW flow indicated on 1
-FW-FI-100A, B & C.
EVALUATOR'S NOTE:
 
Unit 2: Following Start of 1
-FW-P-3A and 1-FW-P-3B, report that AFW flow is indicated on Unit 2.
COMMENTS:
_______ SAT
_______ UNSAT STEP 5:  REPORTS TO SHIFT MANAGER (EVALUATOR).
STANDARD:
Reports to the Shift Manager (Evaluator) TASK COMPLETE.
. EVALUATOR'S NOTE:
Operator may throttle AFW to restore S/G level.Evaluator option to stop JPM at any time after AFW pumps are started.
COMMENTS:
JPM COMPLETE
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM e"    Surry    SR 2014 - 301      Page 5 of 8  STOP TIME:
 
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________  ____________________________________________________________________________________________  ____________________________________________________________________________________________  ____________________________________________________________________________________________  ____________________________________________________________________________________________  ____________________________________________________________________________________________  ____________________________________________________________________________________________  ____________________________________________________________________________________________  ____________________________________________________________________________________________
Operator Directions Handout  (TO BE READ TO APPLICANT BY EXAMINER)  Task  Task is to be performed in the Simulator. Directions  The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task. Initial Conditions  Unit 1 is at 100% power with all systems normal and in AUTO. Unit 2 is experiencing a loss of all Feed Water. Unit 2 is currently experiencing a loss of all feedwater. They are in 2-FR-H.1 at step 3d RNO and need Aux Feed flow from both Unit 1 motor-driven AFW pumps. All Unit 2 RCPs have been secured. 1J bus will remain on its current (normal) power supply. Initiating Cues  You are to cross-connect Aux Feedwater from Unit 1 to Unit 2 in accordance with 2-FR-H.1 3d RNO. RNO steps d. 1) and d. 2) are complete. When you finish the actions necessary to accomplish this, please inform me. .   


Operator Directions Handout (TO BE GIVEN TO APPLICANT)   Initial Conditions   Unit 1 is at 100% power with all systems normal and in AUTO. Unit 2 is experiencing a loss of all Feed Water. Unit 2 is currently experiencing a loss of all feedwater. They are in 2-FR-H.1 at step 3d RNO and need Aux Feed flow from both Unit 1 motor-driven AFW pumps. All Unit 2 RCPs have been secured. 1J bus will remain on its current (normal) power supply. Initiating Cues   You are to cross-connect Aux Feedwater from Unit 1 to Unit 2 in accordance with 2-FR-H.1 3d RNO. RNO steps d. 1) and d. 2) are complete. When you finish the actions necessary to accomplish this, please inform me.
____________________________________________________________________________________________
Surry 2014-301 "JPM f"              Page 1 of 14  U.S. Nuclear Regulatory Commission Surry Power Station   SR14301  Simulator Job Performance Measure [KA 015A4.03 3.8 / 3.9]    Applicant________________________________     Start Time___________________ Examiner_______________________________
____________________________________________________________________________________________
Date ___________________________________   Stop Time___________________ Title  Remove Source Range NIs From Service During a Reactor Startup. K/A: 015A4.03 Ability to manually operate and/or monitor in the control room: Trip bypasses  3.8 / 3.9 Applicability     Estimated Time  Actual Time RO/SRO(I)     10 Minutes    ___  Minutes                     Conditions   Task is to be PERFORMED in the simulator. Reactor power is at approximately 1.2 x 10-10 amps during a startup, and the SR high voltage cannot be removed from either N-31 or N-32. Standards 1-AP-4.00, Nuclear Instrumentation Malfunction Initiating Cues Shift manager Direction. Terminating Cues   1-AP-4.00, Nuclear Instrumentation Malfunction, Step 38 complete. Procedures 1-AP-4.00, Nuclear Instrumentation Malfunction, Rev 30. Tools and Equipment     Safety Considerations   None      None Surry 2014-301 "JPM f"              Page 2 of 14 Simulator Setup   Call up IC-14, S1C26 10-8 Amps D-131 Steps MSTV Shut, and initialize. Place simulator in RUN. Perform the startup to obtain power at 1.2 x 10-10 amps (or slightly greater), then implement switch overrides (SRTRP_BLK_TRA_PB, and SRTRP_BLK_TRB_PB, override OFF, Insert), Flux Level Trip Cutout Pushbuttons. Freeze the simulator until ready for operator to perform JPM. Do not allow the SUR to be greater than +0.1 dpm. Initial Conditions   During a Reactor startup, when P-6 was reached the Operator pushed 1/N-33A TR A and 1/N-33B TR B to de-energize the Source Range NIs. Both N-31 and N-32 failed to de-energize. Initiating Cues   You are the RO. Respond to a failure of both Source Range NIs in accordance with 1-AP-4.00, NI Malfunction. When you finish the actions necessary to accomplish this, please inform me.
____________________________________________________________________________________________
Surry 2014-301 "JPM f"              Page 3 of 14 PERFORMANCE CHECKLIST   Notes to the Evaluator   Task critical elements are bolded and denoted by an asterisk (*). An additional instructor may be needed to silence and acknowledge alarms for the examinee. START TIME: _________________________.             STEP 1:  AP-4.00, (Step 1)  Check NI Malfunction - Power Range Failure. STANDARD:   (a) Enters 1-AP-4.00 at Step 1.  (b) Determines failure not in Power Range NI and goes to Step 10. EVALUATOR'S NOTE: NONE  COMMENTS:   _______ SAT _______ UNSAT   STEP 2:  AP-4.00, (Step 10)  Check NI Malfunction - Intermediate Range Failure. STANDARD:     (a) Determines failure not in Power Range NI and goes to Step 19. EVALUATOR'S NOTE: NONE COMMENTS:   _______ SAT _______ UNSAT   STEP 3:  AP-4.00, (Step 19)  Check NI Malfunction - Source Range Failure.
____________________________________________________________________________________________
STANDARD:     (a) Determines failure is in Source Range NIs and continues. EVALUATOR'S NOTE: NONE COMMENTS:   _______ SAT _______ UNSAT Surry 2014-301 "JPM f"              Page 4 of 14 STEP 4:  AP-4.00, Step 20 STABILIZE UNIT CONDITIONS. STANDARD:   (a) Verifies Unit conditions stable with a zero startup rate. (b) Maintains power with zero startup rate.
____________________________________________________________________________________________
EVALUATOR'S NOTE:   A manual Reactor trip is NOT an acceptable action.
____________________________________________________________________________________________
COMMENTS:   _______ SAT _______ UNSAT   STEP 5:  AP-4.00. (Step 21)  CHECK REACTOR POWER GREATER THAN P-6 (1X10-10). STANDARD: a) Checks Reactor power level greater than P-6 (1x 10-10 amps) by:  observing INT RNG FLUX meters NI-1-35B and NI-1-36B, Benchboard 1-2, ~ 1.2 x 10-10 amps  Meters on the IR CH 1 and CH2 Drawers ~ 1.2 x 10-10 amps. Permissive Status Light on Vertical Board 1-2, B-3, LIT. Trip Status Lights on Vertical Board 1-2, C-2 and D-2 LIT  Bistable Light, Power Above Permissive P6, on IR CH-1 and CH2 Drawer, LIT. EVALUATOR'S NOTE:   If asked: Indications and lights status is "as found". COMMENTS:     _______ SAT _______ UNSAT
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
 
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Task  Task is to be performed in the Simulator
. Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.
Initial Conditions Unit 1 is at 100% power with all systems normal and in AUTO.
Unit 2 is experiencing a loss of all Feed Water. Unit 2 is currently experiencing a loss of all feedwater. They are in 2-FR-H.1 at step 3d RNO and need Aux Feed flow from both Unit 1 motor-driven AFW pumps.
All Unit 2 RCPs have been secured. 1J bus will remain on its current (normal) power supply.
Initiating Cues You are to cross
-connect Aux Feedwater from Unit 1 to Unit 2 in accordance with 2-FR-H.1 3d RNO. RNO steps d. 1) and d. 2) are complete.
When you finish the actions necessary to accomplish this, please inform me
. .   
 
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions Unit 1 is at 100% power with all systems normal and in AUTO.
Unit 2 is experiencing a loss of all Feed Water. Unit 2 is currently experiencing a loss of all feedwater. They are in 2-FR-H.1 at step 3d RNO and need Aux Feed flow from both Unit 1 motor-driven AFW pumps.
All Unit 2 RCPs have been secured. 1J bus will remain on its current (normal) power supply.
Initiating Cues You are to cross
-connect Aux Feedwater from Unit 1 to Unit 2 in accordance with 2
-FR-H.1 3d RNO. RNO steps d. 1) and d. 2) are complete.
When you finish the actions necessary to accomplish this, please inform me
.
Surry 2014-301 "JPM f"              Page 1 of 14  U.S. Nuclear Regulatory Commission Surry Power Station SR14301  Simulator Job Performance Measure [KA 015A4.03 3.8 / 3.9
]    Applicant________________________________
Start Time___________________
Examiner_______________________________
 
Date ___________________________________
Stop Time___________________
Title  Remove Source Range NI s From Service During a Reactor Startup.
K/A: 015A4.03 Ability to manually operate and/or monitor in the control room: Trip bypasses  3.8 / 3.9 Applicability Estimated Time  Actual Time RO/SRO(I) 10 Minutes    ___  Minutes Conditions Task is to be PERFORMED in the simulator.
Reactor power is at approximately 1.
2 x 10-10 amps during a startup, and the SR high voltage cannot be removed from either N
-31 or N-32. Standards
 
1-AP-4.00, Nuclear Instrumentation Malfunction Initiating Cues
 
Shift manager Direction.
Terminating Cues 1-AP-4.00, Nuclear Instrumentation Malfunction, Step 38 complete
. Procedures
 
1-AP-4.00, Nuclear Instrumentation Malfunction, Rev 30. Tools and Equipment Safety Considerations None      None Surry 2014-301 "JPM f"              Page 2 of 14 Simulator Setup Call up IC
-14, S1C26 10
-8 Amps D-131 Steps MSTV Shut, and initialize. Place simulator in RUN.
Perform the startup to obtain power at 1.2 x 10-10 amps (or slightly greater), then implement switch overrides (SRTRP_BLK_TRA_PB
, and SRTRP_BLK_TRB_PB, override OFF, Insert), Flux Level Trip Cutout Pushbuttons. Freeze the simulator until ready for operator to perform JPM.
Do not allow the SUR to be greater than +0.1 dpm
. Initial Conditions During a Reactor startup, when P
-6 was reached the Operator pushed 1/N
-33A TR A and 1/N
-33B TR B to de
-energize the Source Range NIs.
Both N-31 and N-32 failed to de
-energize. Initiating Cues You are the RO
. Respond to a failure of both Source Range N Is in accordance with 1
-AP-4.00, NI Malfunction.
When you finish the actions necessary to accomplish this, please inform me.
 
Surry 2014-301 "JPM f"              Page 3 of 14 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (
*). An additional instructor may be needed to silence and acknowledge alarms for the examinee.
START TIME:
_________________________.
 
STEP 1:  AP-4.00, (Step 1)  Check NI Malfunction  
- Power Range Failure
. STANDARD:
    (a) Enters 1-AP-4.00 at Step 1.  (b) Determines failure not in Power Range NI and goes to Step 10.
EVALUATOR'S NOTE:
NONE  COMMENTS:
_______ SAT
_______ UNSAT STEP 2:  AP-4.00, (Step 10)  Check NI Malfunction  
- Intermediate Range Failure.
STANDARD:
    (a) Determines failure not in Power Range NI and goes to Step 19.
EVALUATOR'S NOTE: NONE COMMENTS:
_______ SAT
_______ UNSAT STEP 3:  AP-4.00, (Step 19)  Check NI Malfunction  
- Source Range Failure.
 
STANDARD:
    (a) Determines failure is in Source Range NIs and continues.
EVALUATOR'S NOTE: NONE COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM f"              Page 4 of 14 STEP 4:  AP-4.00, Step 20 STABILIZE UNIT CONDITIONS.
STANDARD:
  (a) Verifies Unit conditions stable with a zero startup rate.
  (b) Maintains power with zero startup rate.
EVALUATOR'S NOTE:
A manual Reactor trip is NOT an acceptable action
.
COMMENTS:
_______ SAT
_______ UNSAT STEP 5:  AP-4.00. (Step 21)  CHECK REACTOR POWER GREATER THAN P
-6 (1X10-10). STANDARD:
a) Checks Reactor power level greater than P
-6 (1x 10-10 amps) by:  observing INT RNG FLUX meters NI 35B and NI 36B, Benchboard 1
-2, ~ 1.2 x 10-10 amps  Meters on the IR CH 1 and CH2 Drawers ~ 1.2 x 10
-10 amps. Permissive Status Light on Vertical Board 1
-2, B-3, LIT. Trip Status Lights on Vertical Board 1-2, C-2 and D-2 LIT  Bistable Light, Power Above Permissive P6, on IR CH
-1 and CH2 Drawer, LIT.
EVALUATOR'S NOTE:
If asked: Indications and lights status is "as found".
COMMENTS:
_______ SAT
_______ UNSAT


Surry 2014-301 "JPM f"              Page 5 of 14 STEP 6:
Surry 2014-301 "JPM f"              Page 5 of 14 STEP 6:
AP-4.00. (Step 22)  CHECK BOTH SOURCE RANGE CHANNELS- HIGH VOLTAGE OFF STANDARD:   (a) Determine that both SRNI Channels are still energized. (b) Pushes "1/N 33A TR A" pushbutton and "1/N 33B TR B" pushbutton. (c) Notes that N-31 and N-32 still have high voltage applied to the detectors. *(d) Places LEVEL TRIP switch for N-31 in BYPASS. This is a critical step. *(e) Removes INSTRUMENT POWER fuses for N-31. This is a critical step. *(f) Places LEVEL TRIP switch for N-32 in BYPASS. This is a critical step. *(g) Removes INSTRUMENT POWER fuses for N-32. This is a critical step. (h) Notes requirement to refer to Tech Spec Table 3.7-1 Item 4. (i) Notes requirement to make entry in PSL and Shift Turnover to reinstall fuses.   (j) Goes to Step 38 of 1-AP-4.00.  (k) Informs the Shift Manager that I&C and the OMOC must be notified EVALUATOR'S NOTE:
AP-4.00. (Step 22)  CHECK BOTH SOURCE RANGE CHANNELS
When Notified: Acknowledge that Tech Spec Table 3.7-1, item 4 requires review. When Notified: Acknowledge that I&C and OM on Call must be notified. When the Instrument Power fuses are pulled on the first channel, annunciator 1G-A3, "NIS SOURCE RNG LOSS OF DET VOLT" is received. It is acceptable to place both SRNI in LEVEL TRIP BYPASS before removing the INSTRUMENT POWER fuses.   
- HIGH VOLTAGE OFF STANDARD:
  (a) Determine that both SRNI Channels are still energized.
  (b) Pushes "1/N 33A TR A" pushbutton and "1/N 33B TR B" pushbutton.
  (c) Notes that N
-31 and N-32 still have high voltage applied to the detectors.
  *(d) Places LEVEL TRIP switch for N
-31 in BYPASS.
This is a critical step.
  *(e) Removes INSTRUMENT POWER fuses for N
-31. This is a critical step.
  *(f) Places LEVEL TRIP switch for N
-32 in BYPASS.
This is a critical step.
  *(g) Removes INSTRUMENT POWER fuses for N
-32. This is a critical step.
(h) Notes requirement to refer to Tech Spec Table 3.7
-1 Item 4.
(i) Notes requirement to make entry in PSL and Shift Turnover to reinstall fuses.
  (j) Goes to Step 38 of 1-AP-4.00.  (k) Informs the Shift Manager that I&C and the OMOC must be notified
 
EVALUATOR'S NOTE:
 
When Notified: Acknowledge that Tech Spec Table 3.7
-1, item 4 requires review
. When Notified
: Acknowledge that I&C and OM on Call must be notified.
When the Instrument Power fuses are pulled on the first channel, annunciator 1G
-A3, "NIS SOURCE RNG LOSS OF DET VOLT" is received.
It is acceptable to place both SRNI in LEVEL TRIP BYPASS before removing the INSTRUMENT POWER fuses
.   


COMMENTS:
COMMENTS:
_______ SAT  _______ UNSAT  STEP 7  REPORT TO NUCLEAR SHIFT MANAGER (EVALUATOR). Standards    Verbal status report that N-31 and N-32 have been removed from service IAW AP-4.00. Evaluator's Comments              STOP TIME:                          _______ SAT
_______ UNSAT 


Surry 2014-301 "JPM f"              Page 6 of 14  COMMENTS:  ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________
_______ SAT
____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
_______ UNSAT STEP 7  REPORT TO NUCLEAR SHIFT MANAGER (EVALUATOR).
____________________________________________________________________________________  ____________________________________________________________________________________ ____________________________________________________________________________________
Standards Verbal status report that N
-31 and N-32 have been removed from service IAW AP-4.00. Evaluator's Comments STOP TIME:
 
_______ SAT
 
_______ UNSAT
 
Surry 2014-301 "JPM f"              Page 6 of 14  COMMENTS:  ____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
 
__________________________________________________________________________________
__ ____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Operator Directions Handout  (TO BE READ TO APPLICANT BY EXAMINER)  Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task. Initial Conditions  During a Reactor startup, when P-6 was reached the Operator pushed 1/N-33A TR A and 1/N-33B TR B to de-energize the Source Range NIs. Both N-31 and N-32 failed to de-energize. Initiating Cues  You are the RO. Respond to a failure of both Source Range NIs in accordance with 1-AP-4.00, NI Malfunction. When you finish the actions necessary to accomplish this, please inform me.
Operator Directions Handout  (TO BE GIVEN TO APPLICANT)  Initial Conditions  During a Reactor startup, when P-6 was reached the Operator pushed 1/N-33A TR A and 1/N-33B TR B to de-energize the Source Range NIs. Both N-31 and N-32 failed to de-energize. Initiating Cues  You are the RO. Respond to a failure of both Source Range NIs in accordance with 1-AP-4.00, NI Malfunction. When you finish the actions necessary to accomplish this, please inform me.     


Surry 2014-301 "JPM g"              Page 1 of 13  U.S. Nuclear Regulatory Commission Surry Power Station   SR14301  Simulator Job Performance Measure [KA 075A2.02 2.5 / 2.7]    Applicant________________________________     Start Time___________________ Examiner_______________________________
____________________________________________________________________________________  ____________________________________________________________________________________
Date ___________________________________   Stop Time___________________ Title  Respond to a Low Level Transient K/A: 075A2.02 2.5/2.7, Ability to (a) predict the impacts of the following malfunctions or operations on the circulating water system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of circulating water pumps Applicability     Estimated Time  Actual Time RO/SRO(I)/SRO(U)     14 Minutes    ___  Minutes                     Conditions   Task is to be PERFORMED in the simulator. Both units are at 100% power when a lightning strike trips 2G screenwell transformer. Standards   Circ Water Pumps restored in accordance with AP-12.01, Loss of Intake Canal Level "prior to automatic protective actions."  Initiating Cues   LLIS TROUBLE annunciator. 500 KV HSE TROUBLE annunciator. Unit Two Circ Water Pumps secured. Terminating Cues 0-AP-12.01, Loss of Intake Canal Level, completed. Procedures   0-AP-12.01, Loss of Intake Canal Level, completed. Rev 30. Tools and Equipment     Safety Considerations None      None Surry 2014-301 "JPM g"              Page 2 of 13 Simulator Setup   Call up 100% power IC and initialize. Place simulator in RUN. Implement EL0802, Loss of Screenwell Transformer 2, and place simulator in RUN. Acknowledge all annunciators and place simulator in FREEZE. Initial Conditions   Both units are at 100% power when a lightning strike trips 2G screenwell transformer. Alarm VSP L-7 "LLIS TROUBLE"  and VSP-K6 "500KV HSE TRBL" have alarmed eight (8) minutes ago. Security reports a lightning strike in the vicinity of the low level intake. All Unit 2 Circulating Water Pumps were initially running. Unit One and Unit Two Reactor Operators are currently throttling CW MOVs to conserve intake canal level. Initiating Cue You are the Unit 1 BOP. You are to respond to the loss of Circulating Water Pumps. When you finish the actions necessary to accomplish this, please inform me.
____________________________________________________________________________________
Surry 2014-301 "JPM g"              Page 3 of 13 PERFORMANCE CHECKLIST   Notes to the Evaluator   When candidate identifies AP-12.01 as the guiding procedure, then provide a copy to the candidate. Task critical elements are bolded and denoted by an asterisk (*). An additional instructor may be needed to silence and acknowledge alarms for the examinee. START TIME_______:             STEP 1:  0-AP-12.01 (Step 1)  NOTE: EPIPs may be applicable. CHECKS ENTRY INTO THIS PROCEDURE -FROM AN EOP OR AN AP TO RESTORE SW FLOW TO THE CCHXs. STANDARD:
 
a) Acknowledges Note prior to Step 1. b) Identifies entry into this procedure is not from EOP or AP to restore SW. c) Goes to Step 3. EVALUATOR'S NOTE: If Asked: Entry into this procedure not an attempt to restore SW. COMMENTS:   _______ SAT _______ UNSAT Surry 2014-301 "JPM g"              Page 4 of 13 STEP 2:
____________________________________________________________________________________
0-AP-12.01. (Step 3)  TRY TO MAINTAIN INTAKE CANAL LEVEL STANDARD: (a) Acknowledges CAUTIONs prior to step 3 regarding turbine stall flutter and reference to AP-14, if vacuum cannot be maintained. (b) Acknowledges NOTE prior to step 3 regarding potential need to trip one unit to reduce rate of intake canal drawdown. (c) Recalls that initial conditions revealed that Unit ROs were throttling waterboxes as required. EVALUATOR'S NOTE:   If asked:  Both units are currently throttling waterbox outlet MOVs as required due to loss of circ water pumps. If asked:  Unit SRO will direct unit ramping as required. COMMENTS:   _______ SAT _______ UNSAT   STEP 3:  0-AP-12.01. (Step 4)  CHECK INTAKE CANAL LEVEL- DECREASING. STANDARD:   a) Candidate identifies that 3 CW pumps are insufficient to supply two units CW requirement. (b) Candidate reads intake canal level indicator and determines downward trend. EVALUATOR'S NOTE:   COMMENTS:
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
_______ SAT  _______ UNSAT Surry 2014-301 "JPM g"              Page 5 of 13 STEP 4:
Directions
0-AP-12.01. (Step 5)  START CIRC WATER PUMPS AS REQUIRED FROM THE MCR IAW ATTACHMENT 3 STANDARD:   Candidate goes to Attachment 3.
 
EVALUATOR'S NOTE:  COMMENTS:
The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.
_______ SAT  _______ UNSAT  STEP 5:  0-AP-12.01, Attachment 3. (Step 1)  ATTACHMENT 3- REMOTE START OF CIRCULATING WATER PUMPS. STANDARD:  (a) Candidate acknowledges NOTE prior to step (a) that requires 5-minute coastdown of CW pumps prior to starting. (b) Candidate checks 1G-2G Bus Tie Bkr Closed using "LLIS Electrical" PCS screen. (c) Trainee verifies that CW pumps are not in local by noting no white box around Unit 2 CW pumps on CW Pump PCS screen. *(d) Candidate calls up soft control box pumps to start CW pump by clicking on CW pump ICON on PCS CW screen. This is a critical step. *(e) Candidate enables soft control box for pump to be started by clicking on mark number box and verifies red border. This is a critical step. *(f) Candidate clicks "Start" button for pump to control that is active. This is a critical step. (g) Candidate verifies proper amp indication for pump started. *(h) Candidate completes steps (c) through (e) of attachment 3 for remaining Unit 2 CW pumps to be started. This is a critical step. (i) Candidate directs outside operator to perform post-start checks IAW respective OP 48.1.1. EVALUATOR'S NOTE:    If asked:  Greater than 5 minutes have elapsed since loss of transformer. If asked:  2A, 2B, 2C and 2D circ water pumps were previously in service. When Directed: Acknowledge as Outside Operator to perform post start checks of CW pumps IAW op-48.1.1. COMMENTS:    _______ SAT  _______ UNSAT Surry 2014-301 "JPM g"              Page 6 of 13 STEP 6:
Initial Conditions During a Reactor startup, when P
0-AP-12.01. (Step 6)  SEND OPERATOR TO LOW LEVEL INTAKE TO PERFORM THE FOLLOWING PROCEDURES. STANDARD:  (a) Candidate acknowledges Note prior to step 6 regarding PIN number for ESW pump house and statement regarding CW pump restrictions when 1G-2G busses are cross-tied. (b) Sends an Operator to Low Levels to perform Attachment 2 and OP-48.1.1. EVALUATOR'S NOTE:  None.
-6 was reached the Operator pushed 1/N
Booth Operator:  When directed: Acknowledge Direction to perform 0-AP-12.01, Attachment 2, Low Level Intake Responses; 0-OP-SW-002, Emergency Service Water Pump Operation; and OP-48.1.1. Starting any CW Pump. COMMENTS:    _______ SAT
-33A TR A and 1/N
_______ UNSAT  STEP 7:  0-AP-12.01. (Step 7)  CHECK INTAKE CANAL LEVEL - GREATER THAN TRIP SETPOINT. STANDARD:  Candidate determines that Intake canal level is greater than 23.5 feet and annunciator 1F-G-1, INTK CANAL LO LVL TRIP not lit. EVALUATOR'S NOTE:              If asked:  2F-G1 not lit on Unit Two. 
-33B TR B to de
-energize the Source Range NIs. Both N
-31 and N-32 failed to de
-energize.
Initiating Cues You are the RO. Respond to a failure of both Source Range NIs in accordance with 1
-AP-4.00, NI Malfunction. When you finish the actions necessary to accomplish this, please inform me.
 
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions During a Reactor startup, when P
-6 was reached the Operator pushed 1/N
-33A TR A and 1/N-33B TR B to de
-energize the Source Range NIs. Both N
-31 and N-32 failed to de
-energize.
Initiating Cues You are the RO. Respond to a failure of both Source Range NIs in accordance with 1
-AP-4.00, NI Malfunction.
When you finish the actions necessary to accomplish this, please inform me.
 
Surry 2014-301 "JPM g"              Page 1 of 13  U.S. Nuclear Regulatory Commission Surry Power Station SR14301  Simulator Job Performance Measure [KA 075A2.02 2.5 / 2.7
]    Applicant________________________________
Start Time___________________
Examiner_______________________________
 
Date ___________________________________
Stop Time___________________
Title  Respond to a Low Level Transient K/A: 075A2.02 2.5/2.7, Ability to (a) predict the impacts of the following malfunctions or operations on the circulating water system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:
Loss of circulating water pumps Applicability Estimated Time  Actual Time RO/SRO(I)/SRO(U) 14 Minutes    ___  Minutes Conditions Task is to be PERFORMED in the simulator.
Both units are at 100% power when a lightning strike trips 2G screenwell transformer.
Standards Circ Water Pumps restored in accordance with AP
-12.01, Loss of Intake Canal Level "prior to automatic protective actions
."  Initiating Cues LLIS TROUBLE annunciator.
500 KV HSE TROUBLE annunciator.
Unit Two Circ Water Pumps secured.
Terminating Cues
 
0-AP-12.01, Loss of Intake Canal Level, completed.
Procedures 0-AP-12.01, Loss of Intake Canal Level, completed. Rev 30. Tools and Equipment Safety Considerations None      None Surry 2014-301 "JPM g"              Page 2 of 13 Simulator Setup Call up 100% power IC and initialize. Place simulator in RUN.
Implement EL0802, Loss of Screenwell Transformer 2, and place simulator in RUN.
Acknowledge all annunciators and place simulator in FREEZE.
Initial Conditions Both units are at 100% power when a lightning strike trips 2G screenwell transformer.
Alarm VSP L
-7 "LLIS TROUBLE"  and VSP
-K6 "500KV HSE TRBL" have alarmed eight (8) minutes ago.
Security reports a lightning strike in the vicinity of the low level intake.
All Unit 2 Circulating Water Pumps were initially running. Unit One and Unit Two Reactor Operators are currently throttling CW MOVs to conserve intake canal level.
Initiating Cue You are the Unit 1 BOP. You are to respond to the loss of Circulating Water Pumps
. When you finish the actions necessary to accomplish this, please inform me.
 
Surry 2014-301 "JPM g"              Page 3 of 13 PERFORMANCE CHECKLIST Notes to the Evaluator When candidate identifies AP
-12.01 as the guiding procedure, then provide a copy to the candidate.
Task critical elements are bolded and denoted by an asterisk (
*). An additional instructor may be needed to silence and acknowledge alarms for the examinee.
START TIME_______:
STEP 1:  0-AP-12.01 (Step 1)  NOTE: EPIPs may be applicable.
CHECKS ENTRY INTO THIS PROCEDURE  
-FROM AN EOP OR AN AP TO RESTORE SW FLOW TO THE CCHXs.
STANDARD:
 
a) Acknowledges Note prior to Step 1
. b) Identifies entry into this procedure is not from EOP or AP to restore SW.
c) Goes to Step 3.
EVALUATOR'S NOTE:
If Asked: Entry into this procedure not an attempt to restore SW.
COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM g"              Page 4 of 13 STEP 2:
0-AP-12.01. (Step 3)  TRY TO MAINTAIN INTAKE CANAL LEVEL STANDARD:
  (a) Acknowledges CAUTIONs prior to step 3 regarding turbine stall flutter and reference to AP-14, if vacuum cannot be maintained.
(b) Acknowledges NOTE prior to step 3 regarding potential need to trip one unit to reduce rate of intake canal drawdown.
(c) Recalls that initial conditions revealed that Unit ROs were throttling waterboxes as required.
EVALUATOR'S NOTE:
If asked:  Both units are currently throttling waterbox outlet MOVs as required due to loss of circ water pumps.
If asked:  Unit SRO will direct unit ramping as required.
COMMENTS:
_______ SAT
_______ UNSAT STEP 3:  0-AP-12.01. (Step 4)  CHECK INTAKE CANAL LEVEL
- DECREASING.
STANDARD:
a) Candidate identifies that 3 CW pumps are insufficient to supply two units CW requirement.
(b) Candidate reads intake canal level indicator and determines downward trend.
EVALUATOR'S NOTE:
COMMENTS:
 
_______ SAT  _______ UNSAT
 
Surry 2014-301 "JPM g"              Page 5 of 13 STEP 4:
0-AP-12.01. (Step 5)  START CIRC WATER PUMPS AS REQUIRED FROM THE MCR IAW ATTACHMENT 3 STANDARD:
Candidate goes to Attachment 3.


COMMENTS:    _______ SAT  _______ UNSAT Surry 2014-301 "JPM g"              Page 7 of 13 STEP 8:
EVALUATOR'S NOTE:
0-AP-12.01. (Step 8)  CHECK CW LOSS - SUSTAINED WITH NO EXPECTATION OF RECOVERY  STANDARD:  a) Candidate identifies Canal Level Stable or increasing  b) Candidate goes to Step 10  EVALUATOR'S NOTE:   None.
COMMENTS:
COMMENTS:
_______ SAT  _______ UNSAT  STEP 9:  0-AP-12.01. (Step 10)  CONTINUES TO REDUCE UNIT LOAD AS NECESSARY TO MAINTAIN VACUUM. STANDARD:   Candidate determines that no actions are required based on number of CW pumps running    EVALUATOR'S NOTE:   Both unit's Reactor Operators have stopped throttling CW MOVs. COMMENTS:     _______ SAT
 
_______ UNSAT
_______ SAT
_______ UNSAT STEP 5:  0-AP-12.01, Attachment 3
. (Step 1)  ATTACHMENT 3
- REMOTE START OF CIRCULATING WATER PUMPS.
STANDARD:
  (a) Candidate acknowledges NOTE prior to step (a) that requires 5
-minute coastdown of CW pumps prior to starting.
(b) Candidate checks 1G
-2G Bus Tie Bkr Closed using "LLIS Electrical" PCS screen.
(c) Trainee verifies that CW pumps are not in local by noting no white box around Unit 2 CW pumps on CW Pump PCS screen.
*(d) Candidate calls up soft control box pumps to start CW pump by clicking on CW pump ICON on PCS CW screen. This is a critical step.
*(e) Candidate enables soft control box for pump to be started by clicking on mark number box and verifies red border.
This is a critical step.
*(f) Candidate clicks "Start" button for pump to control that is active.
This is a critical step.
(g) Candidate verifies proper amp indication for pump started.
*(h) Candidate completes steps (c) through (e) of attachment 3 for remaining Unit 2 CW pumps to be started.
This is a critical step.
(i) Candidate directs outside operator to perform post
-start checks IAW respective OP 48.1.1. EVALUATOR'S NOTE:
If asked: Greater than 5 minutes have elapsed since loss of transformer.
If asked:  2A, 2B, 2C and 2D circ water pumps were previously in service.
When Directed: Acknowledge as Outside Operator to perform post start checks of CW pumps IAW op
-48.1.1. COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM g"              Page 6 of 13 STEP 6:
0-AP-12.01. (Step 6)  SEND OPERATOR TO LOW LEVEL INTAKE TO PERFORM THE FOLLOWING PROCEDURES.
STANDARD:
   (a) Candidate acknowledges Note prior to step 6 regarding PIN number for ESW pump house and statement regarding CW pump restrictions when 1G
-2G busses are cross
-tied. (b) Sends an Operator to Low Levels to perform Attachment 2 and OP
-48.1.1. EVALUATOR'S NOTE:
None.
Booth Operator:
When directed: Acknowledge Direction to perform 0
-AP-12.01, Attachment 2, Low Level Intake Responses; 0-OP-SW-002, Emergency Service Water Pump Operation; and OP
-48.1.1. Starting any CW Pump.
COMMENTS:
_______ SAT
 
_______ UNSAT STEP 7:  0-AP-12.01. (Step 7)  CHECK INTAKE CANAL LEVEL
- GREATER THAN TRIP SETPOINT.
STANDARD:
Candidate determines that Intake canal level is greater than 23.5 feet and annunciator 1F
-G-1, INTK CANAL LO LVL TRIP not lit.
EVALUATOR'S NOTE:
 
If asked:  2F-G1 not lit on Unit Two.
 
COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM g"              Page 7 of 13 STEP 8:
0-AP-12.01. (Step 8)  CHECK CW LOSS
- SUSTAINED WITH NO EXPECTATION OF RECOVERY STANDARD:
a) Candidate identifies Canal Level Stable or increasing b) Candidate goes to Step 10 EVALUATOR'S NOTE:
None.
COMMENTS:
 
_______ SAT
_______ UNSAT STEP 9:  0-AP-12.01. (Step 10)  CONTINUES TO REDUCE UNIT LOAD AS NECESSARY TO MAINTAIN VACUUM.
STANDARD:
Candidate determines that no actions are required based on number of CW pumps running    EVALUATOR'S NOTE:
Both unit's Reactor Operators have stopped throttling CW MOVs.
COMMENTS:
_______ SAT
 
_______ UNSAT


Surry 2014-301 "JPM g"              Page 8 of 13 STEP 10:
Surry 2014-301 "JPM g"              Page 8 of 13 STEP 10:
0-AP-12.01. (Step 11)  CHECK INTAKE CANAL LEVEL - STABLE OR INCREASING. STANDARD: (a) Trainee evaluates canal level indication and/or trend recorder to verify canal level increasing. (b) Trainee then goes to Step 27 EVALUATOR'S NOTE:  None. COMMENTS:
0-AP-12.01. (Step 11)  CHECK INTAKE CANAL LEVEL  
- STABLE OR INCREASING.
STANDARD:
  (a) Trainee evaluates canal level indication and/or trend recorder to verify canal level increasing.
  (b) Trainee then goes to Step 27
 
EVALUATOR'S NOTE:
None. COMMENTS:
 
_______ SAT
 
_______ UNSAT STEP 11:  0-AP-12.01. (Step 27)  NOTIFY THE FOLLOWING.
STANDARD:
   (a) Candidate notifies Evaluator that the OM on Call, Manager Nuclear Operations and STA need to be notified.
EVALUATOR'S NOTE:
Respond:  Notifications will be made.
 
COMMENTS:
_______ SAT
_______ SAT
_______ UNSAT   STEP 11:  0-AP-12.01. (Step 27)  NOTIFY THE FOLLOWING. STANDARD:  (a) Candidate notifies Evaluator that the OM on Call, Manager Nuclear Operations and STA need to be notified. EVALUATOR'S NOTE:  Respond:  Notifications will be made.
_______ UNSAT
COMMENTS:    _______ SAT  _______ UNSAT 


Surry 2014-301 "JPM g"              Page 9 of 13 STEP 12:
Surry 2014-301 "JPM g"              Page 9 of 13 STEP 12:
0-AP-12.01. (Step 28)  CHECK INTAKE CANAL LEVEL- INCREASING. STANDARD: (a) Candidate acknowledges NOTE concerning Intake Canal Level must be maintained >17.2 feet. (b) Candidate evaluates canal level indication and/or trend recorder to and identifies canal level >17.2 feet, and increasing.
0-AP-12.01. (Step 28)  CHECK INTAKE CANAL LEVEL
EVALUATOR'S NOTE:   None. COMMENTS:     _______ SAT _______ UNSAT   STEP 13:  0-AP-12.01. (Step 29)  CHECK INTAKE CANAL LEVEL - GREATER THAN 17.2 FT. STANDARD: (a) Candidate identifies canal level greater than 17.2 feet. EVALUATOR'S NOTE:   None.
- INCREASING.
COMMENTS:     _______ SAT _______ UNSAT Surry 2014-301 "JPM g"              Page 10 of 13 STEP 14:
STANDARD:
0-AP-12.01. (Step 30)  THROTTLE OPEN CC HX SW OUTLET VALVES AS NECESSARY TO LOWER CC TEMPERATURE. STANDARD:
  (a) Candidate acknowledges NOTE concerning Intake Canal Level must be maintained >17.2 feet.
  (a) Acknowledges NOTE regarding restoration of CCHX SW flow. (b) Candidate recognizes that no throttling of CCHW SW flow was performed, so no actions required on this step. EVALUATOR'S NOTE:   If asked: No actions were taken to reduce CCHX SW flow. COMMENTS:     _______ SAT _______ UNSAT   STEP 15:  0-AP-12.01. (Step 31)  CHECK CAUSE OF LEVEL DECREASE -CORRECTED. STANDARD:   (a) Candidate identifies that restoration of CW pumps corrects cause of level decrease.
(b) Candidate evaluates canal level indication and/or trend recorder to and identifies canal level >17.2 feet, and increasing.
EVALUATOR'S NOTE:   If asked: Control Ops group will be notified to initiate troubleshooting on 2G transformer.
 
COMMENTS:     _______ SAT
EVALUATOR'S NOTE:
_______ UNSAT Surry 2014-301 "JPM g"              Page 11 of 13 STEP 16:
None. COMMENTS:
0-AP-12.01. (Step 32)  RESTORE CW AND SW COMPONENTS (INCLUDING CW CHEMICAL INJECTION BY   OPENING 1-SA-285 AND 2-SA-274) TO SUPPORT PLANT CONDITIONS. STANDARD: (a) Candidate reports that CW MOVs may be returned to previous position. (b) Candidate recognizes that chemical injections systems require no action. EVALUATOR'S NOTE:   None. COMMENTS:     _______ SAT _______ UNSAT   STEP 17  Candidate Reports completion of Task to Shift Manager   END OF JPM   STOP TIME:  ____________________________________
_______ SAT
_______ UNSAT STEP 13:  0-AP-12.01. (Step 29)  CHECK INTAKE CANAL LEVEL  
- GREATER THAN 17.2 FT
. STANDARD:
  (a) Candidate identifies canal level greater than 17.2 feet
. EVALUATOR'S NOTE:
None.
COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM g"              Page 10 of 13 STEP 14:
0-AP-12.01. (Step 30)  THROTTLE OPEN CC HX SW OUTLET VALVES AS NECESSARY TO LOWER CC TEMPERATURE.
STANDARD:
 
  (a) Acknowledges NOTE regarding restoration of CCHX SW flow.
  (b) Candidate recognizes that no throttling of CCHW SW flow was performed, so no actions required on this step.
EVALUATOR'S NOTE:
If asked:
No actions were taken to reduce CCHX SW flow
. COMMENTS:
_______ SAT
_______ UNSAT STEP 15:  0-AP-12.01. (Step 31)  CHECK CAUSE OF LEVEL DECREASE  
-CORRECTED.
STANDARD:
  (a) Candidate identifies that restoration of CW pumps corrects cause of level decrease.
 
EVALUATOR'S NOTE:
If asked:
Control Ops group will be notified to initiate troubleshooting on 2G transformer
.
COMMENTS:
_______ SAT
 
_______ UNSAT
 
Surry 2014-301 "JPM g"              Page 11 of 13 STEP 16:
0-AP-12.01. (Step 32)  RESTORE CW AND SW COMPONENTS (INCLUDING CW CHEMICAL INJECTION BY OPENING 1
-SA-285 AND 2-SA-274) TO SUPPORT PLANT CONDITIONS.
STANDARD:
  (a) Candidate reports that CW MOVs may be returned to previous position.
  (b) Candidate recognizes that chemical injections systems require no action.
EVALUATOR'S NOTE:
None. COMMENTS:
_______ SAT
_______ UNSAT STEP 17  Candidate Reports completion of Task to Shift Manager END OF JPM STOP TIME:
____________________________________
 
____________________________________________________________________________________
____________________________________________________________________________________
 
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
__________________________________________________________________________________
__ ____________________________________________________________________________________
 
____________________________________________________________________________________
____________________________________________________________________________________  ____________________________________________________________________________________
____________________________________________________________________________________  ____________________________________________________________________________________
____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
 
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)   Initial Conditions   Both units are at 100% power when a lightning strike trips 2G screenwell transformer. Alarm VSP L-7 "LLIS TROUBLE"  and VSP-K6 "500KV HSE TRBL" have alarmed eight (8) minutes ago. Security reports a lightning strike in the vicinity of the low level intake. All Unit 2 Circulating Water Pumps were initially running. Unit One and Unit Two Reactor Operators are currently throttling CW MOVs to conserve intake canal level. Initiating Cue You are the Unit 1 BOP. You are to respond to the loss of Circulating Water Pumps. When you finish the actions necessary to accomplish this, please inform me.
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Operator Directions Handout (TO BE GIVEN TO APPLICANT)   Initial Conditions   Both units are at 100% power when a lightning strike trips 2G screenwell transformer. Alarm VSP L-7 "LLIS TROUBLE"  and VSP-K6 "500KV HSE TRBL" have alarmed eight (8) minutes ago. Security reports a lightning strike in the vicinity of the low level intake. All Unit 2 Circulating Water Pumps were initially running. Unit One and Unit Two Reactor Operators are currently throttling CW MOVs to conserve intake canal level. Initiating Cue You are the Unit 1 BOP. You are to respond to the loss of Circulating Water Pumps. When you finish the actions necessary to accomplish this, please inform me.
Initial Conditions Both units are at 100% power when a lightning strike trips 2G screenwell transformer.
Surry 2014-301 "JPM h"                Page 1 of 7  U.S. Nuclear Regulatory Commission Surry Power Station   SR14301  Simulator Job Performance Measure [KA 064.A4.06] [Alternate Path]   Applicant________________________________     Start Time___________________ Examiner_______________________________
Alarm VSP L
Date ___________________________________   Stop Time___________________ Title  Respond to a Failure of #3 EDG to Start and Load on 1J 4160V Bus. K/A: 064.A4.06; Manual start, loading, and stopping of the ED/G, RO 3.9 / SRO 3.9 Applicability     Estimated Time  Actual Time RO      20 Minutes     ___  Minutes                     Conditions   Task is to be PERFORMED in the simulator. A Loss of the "A" RSS Transformer has occurred.  #3 EDG has failed to start and load. Standards
-7 "LLIS TROUBLE"  and VSP
  #3 EDG started and loaded on the 1J Emergency Bus IAW 0-AP-17.05, EDG 3 - Emergency Operations. Initiating Cue Shift Manager Direction. Terminating Cues   Report of #3 EDG loaded on the 1J Emergency Bus. Procedures 0-AP-17.05, EDG 3 - Emergency Operations, Revision 22. Tools and Equipment     Safety Considerations   None      None Surry 2014-301 "JPM h"                Page 2 of 7 Simulator Setup   Call up 100% power IC and initialize (IC 280). Place simulator in RUN. Load the following Malfunctions/Overrides: EL0501, Loss of reserve Station Service XMFMR A, TRUE  ED0503, EDG3 Voltage Regulator Failure, -1  VSPC5 EMERG DIESEL 3 Auto Start Disabled, Trigger 15 Remotes, EDG3, AUTO_EXERCISE, EMERG GEN 3 AUTO EXERCISE, EXERCISE When #3 EDG placed in AUTO implement Trigger 15. When STOP buttons pushed delete VSPC5 malfunction. Acknowledge Alarms. Freeze and Snap IC until ready for evaluation. Initial Conditions Unit 1 operating at 100% power. The Loss of the "A" RSST has occurred and #3 EDG has failed to start and load on 1J 4160V Bus. Starting and loading #3 EDG on the 1J 4160V bus IAW 0-AP-17.05, EDG 3 - Emergency Operations is in progress and is complete through step 3 of Attachment 2. Initiating Cues   You are the Unit 2 BOP and are to continue with starting and loading of #3 EDG per 0-AP-17.05, starting with Attachment 2 step 4. When you finish the actions necessary to accomplish this, please inform me. Notes Surry 2014-301 "JPM h"                Page 3 of 7 PERFORMANCE CHECKLIST   Notes to the Evaluator   This JPM may be Pre-briefed as directed by the Chief Examiner. Task critical elements are bolded and denoted by an asterisk (*). An additional instructor may be needed to silence and acknowledge alarms for the examinee, and perform actions for Unit 2. START TIME _____:             STEP 1:  [Step 4, 5, and 6 of Attachment 2, AP-17.05]  Check Load Limit at maximum, Start EDG 3, Check #3 EDG Speed at 900 RPM, Place #3 EDG AUTO EXERCISE Switch in Auto. STANDARD:   *a) Candidate presses the EDG NO. 3 Engine Start pushbutton. This is a critical step. b) Candidate will check EDG started using RPM indication. *c) Candidate will place the AUTO-EXERCISE Switch for EDG #3 in AUTO position. This is a critical step. d) Candidate will note that #3 EDG has not energized the 1J Bus. e) Candidate returns to AP-17.05, Step 8. EVALUATOR'S NOTE:   COMMENTS:   STEP 2:  [Step 8, AP-17.05]
-K6 "500KV HSE TRBL" have alarmed eight (8) minutes ago.
CHECK BOTH J BUSES - ENERGIZED BY OFFSITE POWER   STANDARD:   a) Candidate Identifies 1J Bus is still de-energized. b) Candidate Goes To Step 10. EVALUATOR'S NOTE:   COMMENTS:   _______ SAT
Security reports a lightning strike in the vicinity of the low level intake.
_______ UNSAT Surry 2014-301 "JPM h"                Page 4 of 7 STEP 3:  [Notes prior to Step 10 of AP-17.05]  Acknowledges NOTES: If the B DC Bus is deenergized, the EDG output breaker and the J Bus load breakers must be closed manually. The following conditions must exist for the EDG output breaker to close automatically: EDG speed greater than 870 rpm EDG INCOMING voltage greater than 113 volts J8 breaker open Control switch for the J3 breaker in AUTO AFTER TRIP DC control power available to the J3 breaker STANDARD:   EVALUATOR'S NOTE:   COMMENTS:   _______ SAT _______ UNSAT   STEP 4:  [Step 10, AP-17.05]
All Unit 2 Circulating Water Pumps were initially running. Unit One and Unit Two Reactor Operators are currently throttling CW MOVs to conserve intake canal level. Initiating Cue You are the Unit 1 BOP.
CHECK EDG 3 - SUPPLYING J BUS STANDARD:   a) Candidate Identifies 15J3 -  NOT Closed. b) Candidate performs RNO. Identifies that loads are already stripped per Attachment 3. c) Candidate goes to step 15 EVALUATOR'S NOTE:   COMMENTS:   _______ SAT _______ UNSAT STEP 5:  [Step 15, AP-17.05]  CHECK EDG 3 INCOMING VOLTAGE GREATER THAN 113 VOLTS. STANDARD:   a) *Candidate turns SYNC-ACB-15J3 key switch to ON. This is a critical step. b) *Candidate identifies no generator voltage and momentarily depresses EMERG GEN NO 3 FIELD FLASS pushbutton. Identifies Voltage established. This is a critical step. c) *Candidate attempts to raise incoming voltage to 120 volts using the EMERG GEN NO 3 VOLT ADJ control switch. This is a critical step. d) Candidate determines there is no Voltage increase, and goes to 15.c RNO.
You are to respond to the loss of Circulating Water Pumps.
EVALUATOR'S NOTE:   _______ SAT _______ UNSAT Surry 2014-301 "JPM h"                Page 5 of 7  COMMENTS:   STEP 6:  [Step 15.c RNO, AP-17.05]  SECURES #3 EDG. STANDARD:   a) Candidate notifies Electrical Department. b) *Candidate secures #3 EDG by momentarily pressing the EMERG GEN NO.3 ENGINE STOP pushbuttons. This is a critical step. c) Candidate notifies Shift Manager. EVALUATOR'S NOTE: If asked to notify the Electrical department: Acknowledge request.  *Both ENGINE STOP pushbuttons must be depressed simultaneously. COMMENTS:   JPM ENDS  _______ SAT _______ UNSAT STOP TIME_______:
When you finish the actions necessary to accomplish this, please inform me.
____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________
 
Surry 2014-301 "JPM h"      Page 6 of 7  Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)   Initial Conditions   Unit 1 operating at 100% power. The Loss of the "A" RSST has occurred and #3 EDG has failed to start and load on 1J 4160V Bus. Starting and loading #3 EDG on the 1J 4160V bus IAW 0-AP-17.05, EDG 3 - Emergency Operations is in progress and is complete through step 3 of Attachment 2. Initiating Cues   You are the Unit 2 BOP and are to continue with starting and loading of #3 EDG per 0-AP-17.05, starting with Attachment 2 step 4. When you finish the actions necessary to accomplish this, please inform me.
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Operator Directions Handout  (TO BE GIVEN TO APPLICANT)   Initial Conditions   Unit 1 operating at 100% power. The Loss of the "A" RSST has occurred and #3 EDG has failed to start and load on 1J 4160V Bus. Starting and loading #3 EDG on the 1J 4160V bus IAW 0-AP-17.05, EDG 3 - Emergency Operations is in progress and is complete through step 3 of Attachment 2. Initiating Cues   You are the Unit 2 BOP and are to continue with starting and loading of #3 EDG per 0-AP-17.05, starting with Attachment 2 step 4. When you finish the actions necessary to accomplish this, please inform me.
Initial Conditions Both units are at 100% power when a lightning strike trips 2G screenwell transformer.
Surry 2014-301 "JPM i"              Page 1 of 13  U.S. Nuclear Regulatory Commission Surry Power Station   SR14301  Job Performance Measure [KA APE068.AA1.21 3.9/4.1]    Applicant________________________________     Start Time___________________ Examiner_______________________________
Alarm VSP L
Date ___________________________________   Stop Time___________________ Title  LOCALLY TRANSFER INDIVIDUAL COMPONENTS TO THE AUX SHUTDOWN PANEL K/A: APE068.AA1.21 Ability to operate and / or monitor the following as they apply to the Control Room Evacuation: Transfer of controls from control room to shutdown panel or local control 3.9 / 4.1 Applicability     Estimated Time  Actual Time RO/SRO(I)/SRO(U)     20 Minutes    ___  Minutes                     Conditions   Task is to be SIMULATED in the plant beginning at the Unit 1 Aux Shutdown Panel. A limiting MCR fire has occurred. The MCR has been evacuated and attempts are being made to transfer plant control to the ASD Panel. Neither the H-Group nor the J-Group Transfer Switch will actuate its components. The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel. The H and J Group Transfer Switches have failed to function. Standards   FCA-1.00, Attachment 2. Initiating Cues   FCA-1.00, Limiting MCR Fire, Step 16 RNO Shift Manager direction. Terminating Cues Report received that FCA-1.00, Attachment 2 completed for Unit 1 components. Procedures FCA-1.00, Limiting MCR Fire, Attachment 2, Rev 48. Tools and Equipment     Safety Considerations None      Standard Personal Safety Equipment Surry 2014-301 "JPM i"              Page 2 of 13 Initial Conditions   This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves. The MCR was evacuated due to a fire. The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel. The H and J Group Transfer Switches have failed to function. Initiating Cue   Locally transfer the individual Unit 1 components to the Unit 1 Aux Shutdown Panel in accordance with FCA-1.00, Attachment 2, Override Control to Auxiliary Shutdown Panel. When you finish the actions necessary to accomplish this, please inform me. Notes to the Evaluator:   Operator briefing should occur at the Unit 1 Aux Shutdown Panel. This task is to be SIMULATED. Do NOT allow the operator to manipulate controls, operate switches or reposition valves. Task critical elements are denoted by an asterisk (*). If substeps of a critical element also have an asterisk (*), then only those asterisked substeps are critical to performance of that task element. Critical step sequencing requirements: None Surry 2014-301 "JPM i"              Page 3 of 13 PERFORMANCE CHECKLIST   Notes to the Evaluator   Task critical elements are bolded and denoted by an asterisk (*). START TIME_______:             STEP 1:  0-FCA-1.00, Attachment 2 (Caution Prior to Step 1)  REVIEWS CAUTION PRIOR TO STEP 1. Standards   Notes that this Attachment should not be performed if transfer failure is due to the emergency bus being de-energized Cues    If asked: Both emergency buses are energized on Unit 1. Evaluator's Comments   _______ SAT
-7 "LLIS TROUBLE"  and VSP
_______ UNSAT STEP 2:  0-FCA-1.00, Attachment 2 (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel: Standards (a) Proceeds to H Bus 4160v breaker 15H4. *(b) Places 1-FW-P-3A's local control box Mode switch (1-EP-43-15H4) to OVERRIDE position. *(c) Rotates Transfer switch (1-EP-43X-15H4) to AUX P position. Evaluator's Note:    If Asked at the ASP:  Following Step b) and c) above, 1-FW-P-3A breaker indicating lights, RED light LIT, GREEN light OFF. Evaluator's Comments     _______ SAT
-K6 "500KV HSE TRBL" have alarmed eight (8) minutes ago.
_______ UNSAT Surry 2014-301 "JPM i"              Page 4 of 13 STEP 3:
Security reports a lightning strike in the vicinity of the low level intake.
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:   LOCALLY TRANSFERS 1-CH-P-1A. Standards   (a) Proceeds to H Bus 4160v breaker 15H5. *(b) Places 1-CH-P-1A's local control box Mode switch (1-EP-43A-15H5) to OVERRIDE position. *(c) Rotates Transfer switch (1-EP-43X-15H5) to AUX P position. Evaluator's Note:     If Asked at the ASP:  Following Step b) and c) above, 1-CH-P-1A breaker indicating lights, RED and GREEN OFF (control switch in PTL). Evaluator's Comments     _______ SAT _______ UNSAT   STEP 4:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:   LOCALLY TRANSFERS 1-CH-P-1C (NORM). Standards   (a) Proceeds to H Bus 4160v breaker 15H6. *(b) Places 1-CH-P-1C's local control box Mode switch (1-EP-43-15H6) to OVERRIDE position. *(c) Rotates Transfer switch (1-EP-43X-15H6) to AUX P position. Evaluator's Note:     If Asked at the ASP:  Following Step b) and c) above, 1-FCH-P-1C breaker indicating lights, RED light LIT, GREEN light OFF. Evaluator's Comments     _______ SAT _______ UNSAT Surry 2014-301 "JPM i"              Page 5 of 13 STEP 5:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel: LOCALLY TRANSFERS 1-CH-P-1C (ALT). Standards     (a) Proceeds to J Bus 4160v breaker 15J2.   *(b) Places 1-CH-P-1C's (ALT) local control box Mode switch (1-EP-43-15J2) to OVERRIDE position   *(c) Rotates Transfer switch (1-EP-43X-15J2) to AUX P position.
All Unit 2 Circulating Water Pumps were initially running. Unit One and Unit Two Reactor Operators are currently throttling CW MOVs to conserve intake canal level.
Evaluator's Note:     If Asked at the ASP:  Following Step b) and c) above, 1-CH-P-1C (ALT) breaker indicating lights, RED light and GREEN light OFF (switch in PTL). Evaluator's Comments     _______ SAT _______ UNSAT   STEP 6:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel: 6. LOCALLY TRANSFERS 1-FW-P-3B. Standards   (a) Proceeds to J Bus 4160v breaker 15J4. *(b) Places 1-FW-P-3B's local control box Mode switch (1-EP-43-15J4) to OVERRIDE position *(c) Rotates Transfer switch (1-EP-43X-15J4) to AUX P position. Evaluator's Note:
Initiating Cue You are the Unit 1 BOP.
If Asked at the ASP:  Following Step b) and c) above, 1-FW-P-3B breaker indicating lights, RED light LIT, GREEN light OFF. Evaluator's Comments
You are to respond to the loss of Circulating Water Pumps.
_______ SAT _______ UNSAT
When you finish the actions necessary to accomplish this, please inform me.
 
Surry 2014-301 "JPM h"                Page 1 of 7  U.S. Nuclear Regulatory Commission Surry Power Station SR14301  Simulator Job Performance Measure [KA 064.A4.06
] [Alternate Path]
Applicant________________________________
Start Time___________________
Examiner_______________________________
 
Date ___________________________________
Stop Time___________________
Title  Respond to a Failure of #3 EDG to Start and Load on 1J 4160V Bus.
K/A: 064.A4.06
; Manual start, loading, and stopping of the ED/G, RO 3.9 / SRO 3.9 Applicability Estimated Time  Actual Time RO      20 Minutes
___  Minutes Conditions Task is to be PERFORMED in the simulator.
A Loss of the "A" RSS Transformer has occurred
.  #3 EDG has failed to start and load.
Standards
 
  #3 EDG started and loaded on the 1J Emergency Bus IAW 0
-AP-17.05, EDG 3  
- Emergency Operations
. Initiating Cue
 
Shift Manager Direction
. Terminating Cues Report of #3 EDG loaded on the 1J Emergency Bus
. Procedures
 
0-AP-17.05, EDG 3  
- Emergency Operations, Revision 22.
Tools and Equipment Safety Considerations None      None Surry 2014-301 "JPM h"                Page 2 of 7 Simulator Setup Call up 100% power IC and initialize (IC 280). Place simulator in RUN.
Load the following Malfunctions/Overrides:
EL0501, Loss of reserve Station Service XMFMR A, TRUE  ED0503, EDG3 Voltage Regulator Failure,  
-1  VSPC5 EMERG DIESEL 3 Auto Start Disabled, Trigger 15 Remotes, EDG3, AUTO_EXERCISE, EMERG GEN 3 AUTO EXERCISE, EXERCISE When #3 EDG placed in AUTO implement Trigger 15
. When STOP buttons pushed delete VSPC5 malfunction
. Acknowledge Alarms.
Freeze and Snap IC until ready for evaluation.
Initial Conditions
 
Unit 1 operating at 100% power
. The Loss of the "A" RSST has occurred and #3 EDG has failed to start and load on 1J 4160V Bus
. Starting and loading #3 EDG on the 1J 4160V bus IAW 0
-AP-17.05, EDG 3  
- Emergency Operations is in progress and is complete through step 3 of Attachment 2
. Initiating Cues You are the Unit 2 BOP and are to continue with starting and loading of #3 EDG per 0
-AP-17.05, starting with Attachment 2 step 4
. When you finish the actions necessary to accomplish this, please inform me.
Notes Surry 2014-301 "JPM h"                Page 3 of 7 PERFORMANCE CHECKLIST Notes to the Evaluator This JPM may be Pre-briefed as directed by the Chief Examiner.
Task critical elements are bolded and denoted by an asterisk (
*). An additional instructor may be needed to silence and acknowledge alarms for the examinee, and perform actions for Unit 2
. START TIME
_____:
STEP 1:  [Step 4, 5, and 6 of Attachment 2, AP
-17.05]  Check Load Limit at maximum, Start EDG 3, Check #3 EDG Speed at 900 RPM, Place #3 EDG AUTO EXERCISE Switch in Auto.
STANDARD:
    *a) Candidate presses the EDG NO. 3 Engine Start pushbutton.
This is a critical step. b) Candidate will check EDG started using RPM indication.
*c) Candidate will place the AUTO
-EXERCISE Switch for EDG #3 in AUTO position.
This is a critical step.
d) Candidate will note that #3 EDG has not energized the 1J Bus.
e) Candidate returns to AP
-17.05, Step 8.
EVALUATOR'S NOTE:
COMMENTS:
STEP 2:  [Step 8, AP
-17.05]
CHECK BOTH J BUSES  
- ENERGIZED BY OFFSITE POWER STANDARD:
a) Candidate Identifies 1J Bus is still de
-energized.
b) Candidate Goes To Step 10
. EVALUATOR'S NOTE:
COMMENTS:
_______ SAT
 
_______ UNSAT
 
Surry 2014-301 "JPM h"                Page 4 of 7 STEP 3:  [Notes prior to Step 10 of AP
-17.05]  Acknowledges NOTES:
If the B DC Bus is deenergized, the EDG output breaker and the J Bus load breakers must be closed manually.
The following conditions must exist for the EDG output breaker to close automatically:
EDG speed greater than 870 rpm EDG INCOMING voltage greater than 113 volts J8 breaker open Control switch for the J3 breaker in AUTO AFTER TRIP DC control power available to the J3 breaker STANDARD:
EVALUATOR'S NOTE:
COMMENTS:
_______ SAT
_______ UNSAT STEP 4:  [Step 10, AP
-17.05]
CHECK EDG 3  
- SUPPLYING J BUS STANDARD:
a) Candidate Identifies 15J3 -  NOT Closed.
b) Candidate performs RNO. Identifies that loads are already stripped per Attachment 3.
c) Candidate goes to step 15 EVALUATOR'S NOTE:
COMMENTS:
_______ SAT
_______ UNSAT STEP 5:  [Step 15, AP-17.05]  CHECK EDG 3 INCOMING VOLTAGE GREATER THAN 113 VOLTS.
STANDARD:
a) *Candidate turns SYNC
-ACB-15J3 key switch to ON
. This is a critical step.
b) *Candidate identifies no generator voltage and momentarily depresses EMERG GEN NO 3 FIELD FLASS pushbutton
. Identifies Voltage established. This is a critical step.
c) *Candidate attempts to raise incoming voltage to 120 volts using the EMERG GEN NO 3 VOLT ADJ control switch. This is a critical step.
d) Candidate determines there is no Voltage increase, and goes to 15.c RNO.
 
EVALUATOR'S NOTE:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM h"                Page 5 of 7  COMMENTS:
STEP 6:  [Step 15.c RNO, AP
-17.05]  SECURES #3 EDG.
STANDARD:
a) Candidate notifies Electrical Department
. b) *Candidate secures #3 EDG by momentarily pressing the EMERG GEN NO.3 ENGINE STOP pushbutton
: s. This is a critical step.
c) Candidate notifies Shift Manager.
EVALUATOR'S NOTE:
If asked to notify the Electrical department: Acknowledge request.  
   *Both ENGINE STOP pushbuttons must be depressed simultaneously.
COMMENTS:
JPM ENDS  _______ SAT
_______ UNSAT
 
STOP TIME_______:
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
 
Surry 2014-301 "JPM h"      Page 6 of 7  Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Initial Conditions Unit 1 operating at 100% power.
The Loss of the "A" RSST has occurred and #3 EDG has failed to start and load on 1J 4160V Bus.
Starting and loading #3 EDG on the 1J 4160V bus IAW 0
-AP-17.05, EDG 3  
- Emergency Operations is in progress and is complete through step 3 of Attachment 2.
Initiating Cues You are the Unit 2 BOP and are to continue with starting and loading of #3 EDG per 0
-AP-17.05, starting with Attachment 2 step 4
. When you finish the actions necessary to accomplish this, please inform me.
 
Operator Directions Handout  (TO BE GIVEN TO APPLICANT)
Initial Conditions Unit 1 operating at 100% power.
The Loss of the "A" RSST has occurred and #3 EDG has failed to start and load on 1J 4160V Bus.
Starting and loading #3 EDG on the 1J 4160V bus IAW 0
-AP-17.05, EDG 3  
- Emergency Operations is in progress and is complete through step 3 of Attachment 2.
Initiating Cues You are the Unit 2 BOP and are to continue with starting and loading of #3 EDG per 0
-AP-17.05, starting with Attachment 2 step 4
. When you finish the actions necessary to accomplish this, please inform me.
 
Surry 2014-301 "JPM i"              Page 1 of 13  U.S. Nuclear Regulatory Commission Surry Power Station SR14301  Job Performance Measure [KA APE068.AA1.21 3.9/4.1
]    Applicant________________________________
Start Time___________________
Examiner_______________________________
 
Date ___________________________________
Stop Time___________________
Title  LOCALLY TRANSFER INDIVIDUAL COMPONENTS TO THE AUX SHUTDOWN PANEL K/A: APE068.AA1.21 Ability to operate and / or monitor the following as they apply to the Control Room Evacuation: Transfer of controls from control room to shutdown panel or local control 3.9 / 4.1 Applicability Estimated Time  Actual Time RO/SRO(I)/SRO(U) 20 Minutes    ___  Minutes Conditions Task is to be SIMULATED in the plant beginning at the Unit 1 Aux Shutdown Panel
. A limiting MCR fire has occurred. The MCR has been evacuated and attempts are being made to transfer plant control to the ASD Panel. Neither the H
-Group nor the J
-Group Transfer Switch will actuate its components.
The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel.
The H and J Group Transfer Switches have failed to function.
Standards FCA-1.00, Attachment  
: 2. Initiating Cues FCA-1.00, Limiting MCR Fire, Step 16 RNO Shift Manager direction.
Terminating Cues
 
Report received that FCA
-1.00, Attachment 2 completed for Unit 1 components.
Procedures
 
FCA-1.00, Limiting MCR Fire, Attachment 2, Rev 48.
Tools and Equipment Safety Considerations
 
None      Standard Personal Safety Equipment
 
Surry 2014-301 "JPM i"              Page 2 of 13 Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
The MCR was evacuated due to a fire.
The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel.
The H and J Group Transfer Switches have failed to function.
Initiating Cue Locally transfer the individual Unit 1 components to the Unit 1 Aux Shutdown Panel in accordance with FCA
-1.00, Attachment 2, Override Control to Auxiliary Shutdown Panel.
When you finish the actions necessary to accomplish this, please inform me.
Notes to the Evaluator:
Operator briefing should occur at the Unit 1 Aux Shutdown Panel.
This task is to be SIMULATED. Do NOT allow the operator to manipulate controls, operate switches or reposition valves.
Task critical elements are denoted by an asterisk (
*). If substeps of a critical element also have an asterisk (
*), then only those asterisked substeps are critical to performance of that task element.
Critical step sequencing requirements: None
 
Surry 2014-301 "JPM i"              Page 3 of 13 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (
*). START TIME_______:
STEP 1:  0-FCA-1.00, Attachment 2 (Caution Prior to Step
: 1)  REVIEWS CAUTION PRIOR TO STEP 1.
Standards Notes that this Attachment should not be performed if transfer failure is due to the emergency bus being de
-energized Cues    If asked: Both emergency buses are energized on Unit 1.
Evaluator's Comments
_______ SAT
 
_______ UNSAT
 
STEP 2:  0-FCA-1.00, Attachment 2 (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
Standards
 
  (a) Proceeds to H Bus 4160v breaker 15H4.
  *(b) Places 1-FW-P-3A's local control box Mode switch (1
-EP-43-15H4) to OVERRIDE position.
  *(c) Rotates Transfer switch (1
-EP-43X-15H4) to AUX P position
. Evaluator's Note:    If Asked at the ASP:  Following Step b) and c) above, 1
-FW-P-3A breaker indicating lights, RED light LIT, GREEN light OFF.
Evaluator's Comments
_______ SAT
 
_______ UNSAT
 
Surry 2014-301 "JPM i"              Page 4 of 13 STEP 3:
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1
-CH-P-1A. Standards (a) Proceeds to H Bus 4160v breaker 15H5.
  *(b) Places 1-CH-P-1A's local control box Mode switch (1
-EP-43A-15H5) to OVERRIDE position.
  *(c) Rotates Transfer switch (1-EP-43X-15H5) to AUX P position
. Evaluator's Note:
If Asked at the ASP:  Following Step b) and c) above, 1
-CH-P-1A breaker indicating lights, RED and GREEN OFF (control switch in PTL).
Evaluator's Comments
_______ SAT
_______ UNSAT STEP 4:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1
-CH-P-1C (NORM).
Standards (a) Proceeds to H Bus 4160v breaker 15H6.
  *(b) Places 1-CH-P-1C's local control box Mode switch (1
-EP-43-15H6) to OVERRIDE position.
  *(c) Rotates Transfer switch (1
-EP-43X-15H6) to AUX P position
. Evaluator's Note:
If Asked at the ASP:  Following Step b) and c) above, 1
-FCH-P-1C breaker indicating lights, RED light LIT, GREEN light OFF.
Evaluator's Comments
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM i"              Page 5 of 13 STEP 5:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1
-CH-P-1C (ALT).
Standards (a) Proceeds to J Bus 4160v breaker 15J2.
    *(b) Places 1-CH-P-1C's (ALT) local control box Mode switch (1
-EP-43-15J2) to OVERRIDE position
    *(c) Rotates Transfer switch (1
-EP-43X-15J2) to AUX P position.
 
Evaluator's Note:
If Asked at the ASP:  Following Step b) and c) above, 1
-CH-P-1C (ALT) breaker indicating lights, RED light and GREEN light OFF (switch in PTL).
Evaluator's Comments
_______ SAT
_______ UNSAT STEP 6:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
: 6. LOCALLY TRANSFERS 1
-FW-P-3B. Standards (a) Proceeds to J Bus 4160v breaker 15J4.
  *(b) Places 1-FW-P-3B's local control box Mode switch (1
-EP-43-15J4) to OVERRIDE position
  *(c) Rotates Transfer switch (1-EP-43X-15J4) to AUX P position.
Evaluator's Note:
 
If Asked at the ASP:  Following Step b) and c) above, 1
-FW-P-3B breaker indicating lights, RED light LIT, GREEN light OFF.
Evaluator's Comments
 
_______ SAT
_______ UNSAT


Surry 2014-301 "JPM i"              Page 6 of 13 STEP 7:
Surry 2014-301 "JPM i"              Page 6 of 13 STEP 7:
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1-CH-P-1B. Standards (a) Proceeds to J Bus 4160v breaker 15J5. *(b) Places 1-CH-P-1B's local control box Mode switch (1-EP-43A-15J5) to OVERRIDE position *(c) Rotates Transfer switch (1-EP-43X-15J5) to AUX P position. Evaluator's Note:     If Asked at the ASP:  Following Step b) and c) above, 1-CH-P-1B breaker indicating lights, RED light and GREEN light OFF (switch in PTL).
 
Evaluator's Comments     _______ SAT _______ UNSAT   STEP 8:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel: LOCALLY TRANSFERS 1-MS-SOV-102A. Standards   (a) Proceeds to Aux SD Panel, locates Transfer Relay Cabinet 5. *(b) Places 1-MS-SOV-102A's local control box Mode switch (1-MS-43B-SMS102A) to OVERRIDE position *(c) Rotates Transfer switch (1-MS-43X-SMS102A) to AUX PANEL position. Cues  If asked at ASP:  RED Light LIT, GREEN light OFF, switch in CLOSE position. Evaluator's Comments
LOCALLY TRANSFERS 1
_______ SAT _______ UNSAT Surry 2014-301 "JPM i"              Page 7 of 13 STEP 9:
-CH-P-1B. Standards
 
  (a) Proceeds to J Bus 4160v breaker 15J5.
  *(b) Places 1-CH-P-1B's local control box Mode switch (1
-EP-43A-15J5) to OVERRIDE position
  *(c) Rotates Transfer switch (1
-EP-43X-15J5) to AUX P position.
Evaluator's Note:
If Asked at the ASP:  Following Step b) and c) above, 1
-CH-P-1B breaker indicating lights, RED light and GREEN light OFF (switch in PTL).
 
Evaluator's Comments
_______ SAT
_______ UNSAT STEP 8:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1
-MS-SOV-102A. Standards (a) Proceeds to Aux SD Panel, locates Transfer Relay Cabinet 5.
  *(b) Places 1-MS-SOV-102A's local control box Mode switch (1
-MS-43B-SMS102A) to OVERRIDE position
  *(c) Rotates Transfer switch (1
-MS-43X-SMS102A) to AUX PANEL position.
Cues  If asked at ASP:  RED Light LIT, GREEN light OFF, switch in CLOSE position
. Evaluator's Comments
 
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM i"              Page 7 of 13 STEP 9:
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1-MS-SOV-102B. Standards (a) Locates Transfer Relay Cabinet #3 (left of Aux SD Panel). *(b) Places 1-MS-SOV-102B's local control box Mode switch (1-MS-43B-SMS102B) to OVERRIDE position *(c) Rotates Transfer switch (1-MS-43X-SMS102B) to AUX P position. Cues  If asked at ASP: RED light ON, GREEN light OFF, switch in CLOSE position. Evaluator's Comments
 
LOCALLY TRANSFERS 1
-MS-SOV-102B. Standards
 
  (a) Locates Transfer Relay Cabinet #3 (left of Aux SD Panel).
  *(b) Places 1-MS-SOV-102B's local control box Mode switch (1
-MS-43B-SMS102B) to OVERRIDE position
  *(c) Rotates Transfer switch (1
-MS-43X-SMS102B) to AUX P position
. Cues  If asked at ASP: RED light ON, GREEN light OFF, switch in CLOSE position
. Evaluator's Comments
 
_______ SAT
_______ SAT
_______ UNSAT   STEP 10:  0-FCA-1.00, Attachment 2, (Step 1, Page 2)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
 
LOCALLY TRANSFERS 1-FW-MOV-151A. Standards   (a) Proceeds to Unit 1 Cable Vault Transfer Relay Cabinet 1. *(b) Places 1-FW-MOV-151A's local control box Mode switch (1-FW-43B-FW151A) to OVERRIDE position *(c) Rotates Transfer switch (1-FW-43X-FW151A) to AUX P position. Evaluator's Note:
_______ UNSAT STEP 10:  0-FCA-1.00, Attachment 2, (Step 1, Page 2)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
If Asked at the ASP:  Following Step b) and c) above, 1-FW-MOV-151A indicating lights, RED light LIT, GREEN light OFF. Evaluator's Comments
 
_______ SAT _______ UNSAT
LOCALLY TRANSFERS 1
-FW-MOV-151A. Standards (a) Proceeds to Unit 1 Cable Vault Transfer Relay Cabinet 1.
  *(b) Places 1-FW-MOV-151A's local control box Mode switch (1
-FW-43B-FW151A) to OVERRIDE position
  *(c) Rotates Transfer switch (1
-FW-43X-FW151A) to AUX P position
. Evaluator's Note:
 
If Asked at the ASP:  Following Step b) and c) above, 1
-FW-MOV-151A indicating lights, RED light LIT, GREEN light OFF.
Evaluator's Comments
 
_______ SAT
_______ UNSAT


Surry 2014-301 "JPM i"              Page 8 of 13 STEP 11:
Surry 2014-301 "JPM i"              Page 8 of 13 STEP 11:
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1-FW-MOV-151C. Standards (a) Locates appropriate switch on Transfer Relay Cabinet 1. *(b) Places 1-FW-MOV-151C's local control box Mode switch (1-FW-43B-FW151C) to OVERRIDE position *(c) Rotates Transfer switch (1-FW-43X-FW151C) to AUX P position. Evaluator's Note:     If Asked at the ASP:  Following Step b) and c) above, 1-FW-MOV-151C indicating lights, RED light LIT, GREEN light OFF. Evaluator's Comments     _______ SAT _______ UNSAT   STEP 12:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel: LOCALLY TRANSFERS 1-FW-MOV-151E. Standards   (a) Locates appropriate switch on Transfer Relay Cabinet 1. *(b) Places 1-FW-MOV-151E's local control box Mode switch (1-FW-43B-FW151E) to OVERRIDE position *(c) Rotates Transfer switch (1-FW-43X-FW151E) to AUX P position. Evaluator's Note:
 
If Asked at the ASP:  Following Step b) and c) above, 1-FW-MOV-151EA indicating lights, RED light LIT, GREEN light OFF. Evaluator's Comments
LOCALLY TRANSFERS 1
_______ SAT _______ UNSAT
-FW-MOV-151C. Standards
 
  (a) Locates appropriate switch on Transfer Relay Cabinet 1.
  *(b) Places 1-FW-MOV-151C's local control box Mode switch (1
-FW-43B-FW151C) to OVERRIDE position
  *(c) Rotates Transfer switch (1
-FW-43X-FW151C) to AUX P position
. Evaluator's Note:
If Asked at the ASP:  Following Step b) and c) above, 1
-FW-MOV-151C indicating lights, RED light LIT, GREEN light OFF.
Evaluator's Comments
_______ SAT
_______ UNSAT STEP 12:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1
-FW-MOV-151E. Standards (a) Locates appropriate switch on Transfer Relay Cabinet 1.
  *(b) Places 1-FW-MOV-151E's local control box Mode switch (1
-FW-43B-FW151E) to OVERRIDE position
  *(c) Rotates Transfer switch (1
-FW-43X-FW151E) to AUX P position.
Evaluator's Note:
 
If Asked at the ASP:  Following Step b) and c) above, 1
-FW-MOV-151EA indicating lights, RED light LIT, GREEN light OFF.
Evaluator's Comments
 
_______ SAT
_______ UNSAT


Surry 2014-301 "JPM i"              Page 9 of 13 STEP 13:
Surry 2014-301 "JPM i"              Page 9 of 13 STEP 13:
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel: LOCALLY TRANSFERS 1-CH-P-2A. Standards (a) Locates appropriate switch on Transfer Relay Cabinet 1. *(b) Places 1-CH-P-2A's local control box Mode switch (1-CH-43B-CH2A) to OVERRIDE position *(c) Rotates Transfer switch (1-CH-43X-CH2A) to AUX P position. Evaluator's Note:     If Asked at the ASP:  Following Step b) and c) above, 1-CH-P-2A indicating lights, RED  SLOW light LIT, switch in "A". Evaluator's Comments
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1
-CH-P-2A. Standards
 
  (a) Locates appropriate switch on Transfer Relay Cabinet 1.
  *(b) Places 1-CH-P-2A's local control box Mode switch (1
-CH-43B-CH2A) to OVERRIDE position
  *(c) Rotates Transfer switch (1
-CH-43X-CH2A) to AUX P position
. Evaluator's Note:
If Asked at the ASP:  Following Step b) and c) above, 1
-CH-P-2A indicating lights, RED  SLOW light LIT, switch in "A". Evaluator's Comments
 
_______ SAT
 
_______ UNSAT STEP 14:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1
-FW-MOV-151B. Standards (a) Proceeds to Unit 1 Cable Vault Transfer Relay Cabinet #2.
  *(b) Places 1-FW-MOV-151B's local control box Mode switch (1
-FW-43B-FW151B) to OVERRIDE position
  *(c) Rotates Transfer switch (1
-FW-43X-FW151B) to AUX P position
. Evaluator's Note:
If Asked at the ASP:  Following Step b) and c) above, 1
-FW-MOV-151B indicating lights, RED light LIT, GREEN light OFF.
Evaluator's Comments
_______ SAT
_______ SAT
_______ UNSAT   STEP 14:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:  LOCALLY TRANSFERS 1-FW-MOV-151B. Standards    (a) Proceeds to Unit 1 Cable Vault Transfer Relay Cabinet #2.  *(b) Places 1-FW-MOV-151B's local control box Mode switch (1-FW-43B-FW151B) to OVERRIDE position  *(c) Rotates Transfer switch (1-FW-43X-FW151B) to AUX P position. Evaluator's Note:    If Asked at the ASP:  Following Step b) and c) above, 1-FW-MOV-151B indicating lights, RED light LIT, GREEN light OFF. Evaluator's Comments    _______ SAT  _______ UNSAT Surry 2014-301 "JPM i"              Page 10 of 13 STEP 15:
_______ UNSAT
 
Surry 2014-301 "JPM i"              Page 10 of 13 STEP 15:
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1-FW-MOV-151D. Standards (a) Locates appropriate switch on Transfer Relay Cabinet #2 *(b) Places 1-FW-MOV-151D's local control box Mode switch (1-FW-43B-FW151D) to OVERRIDE position. *(c) Rotates Transfer switch (1-FW-43X-FW151D) to AUX P position. Evaluator's Note:     If Asked at the ASP:  Following Step b) and c) above, 1-FW-MOV-151D indicating lights, RED light LIT, GREEN light OFF. Evaluator's Comments     _______ SAT
 
_______ UNSAT   STEP 16:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel: LOCALLY TRANSFERS 1-FW-MOV-151F. Standards   (a) Locates appropriate switch on Transfer Relay Cabinet #2 *(b) Places 1-FW-MOV-151F's local control box Mode switch (1-FW-43B-FW151F) to OVERRIDE position *(c) Rotates Transfer switch (1-FW-43X-FW151F) to AUX P position. Evaluator's Note:     If Asked at the ASP:  Following Step b) and c) above, 1-FW-MOV-151F indicating lights, RED light LIT, GREEN light OFF. Evaluator's Comments
LOCALLY TRANSFERS 1
_______ SAT _______ UNSAT Surry 2014-301 "JPM i"              Page 11 of 13 STEP 17:
-FW-MOV-151D. Standards
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel: LOCALLY TRANSFERS 1-CH-P-2B. Standards (a) Locates appropriate switch on Transfer Relay Cabinet #2 *(b) Places 1-CH-P-2B's local control box Mode switch (1-CH-43B-CH2B) to OVERRIDE position *(c) Rotates Transfer switch (1-CH-43X-CH2B) to AUX P position. Evaluator's Note:     If Asked at the ASP:  Following Step b) and c) above, 1-CH-P-2B indicating lights, RED  SLOW light LIT, GREEN light OFF, switch in "S".
 
Evaluator's Comments     _______ SAT
  (a) Locates appropriate switch on Transfer Relay Cabinet #2
_______ UNSAT   STEP 18:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel: LOCALLY TRANSFERS 1-CH-MOV-1350. Standards (a) Proceeds to Unit 1 Cable Vault Transfer Relay Cabinet 4. *(b) Places 1-CH-MOV-1350's local control box Mode switch (1-CH-43B-1350) to OVERRIDE position. *(c) Rotates Transfer switch (1-CH-43X-1350) to AUX P position. Evaluator's Note:     If Asked at the ASP:  Following Step b) and c) above, 1-CH-MOV-1350 indicating lights, GREEN light LIT, RED light OFF. IF Asked at the ASP:    All components indicate shifted to ASP Control. Evaluator's Comments     _______ SAT _______ UNSAT Surry 2014-301 "JPM i"              Page 12 of 13 REPORTS TO SHIFT MANAGER (EVALUATOR). Standards   Verbal status report made that all affected Unit 1 components locally transferred to Aux Shutdown Panel. STOP TIME: ______                   Evaluator's Comments                                 Evaluator's Note   If Asked: Components shown below indicate status.       1-FW-P-3A  1-MS-SOV-102A  1-MS-SOV-102B  1-FW-P-3B Red Lite LIT Red Lite LIT   Both Red Lites LIT Red Lite LIT 1-CH-P-1A  1-CH-P-1C  1-CH-P-1B  1-CH-P-1C (Alt) No Lites (PTL) Red Lite Lit  No Lites (PTL)   No Lites (PTL) 1-FW-MOV-151A 1-FW-MOV-151E  1-FW-MOV-151D  1-FW-MOV-151B Red Lite LIT Red Lite LIT  Red Lite LIT   Red Lite LIT 1-FW-MOV-151C        1-FW-MOV-151F Red Lite LIT         Red Lite LIT 1-CH-P-2A          1-CH-P-2B Red SLOW LIT         Red SLOW LIT Switch in "A"         Switch in "S" Surry 2014-301 "JPM i"              Page 13 of 13 STOP TIME:   ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________
  *(b) Places 1-FW-MOV-151D's local control box Mode switch (1
____________________________________________________________________________________  ____________________________________________________________________________________ ____________________________________________________________________________________
-FW-43B-FW151D) to OVERRIDE position.
____________________________________________________________________________________  ____________________________________________________________________________________ ____________________________________________________________________________________
  *(c) Rotates Transfer switch (1
-FW-43X-FW151D) to AUX P position
. Evaluator's Note:
If Asked at the ASP:  Following Step b) and c) above, 1
-FW-MOV-151D indicating lights, RED light LIT, GREEN light OFF.
Evaluator's Comments
_______ SAT
 
_______ UNSAT STEP 16:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1
-FW-MOV-151F. Standards (a) Locates appropriate switch on Transfer Relay Cabinet #2
  *(b) Places 1-FW-MOV-151F's local control box Mode switch (1
-FW-43B-FW151F) to OVERRIDE position
  *(c) Rotates Transfer switch (1
-FW-43X-FW151F) to AUX P position.
Evaluator's Note:
If Asked at the ASP:  Following Step b) and c) above, 1
-FW-MOV-151F indicating lights, RED light LIT, GREEN light OFF.
Evaluator's Comments
 
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM i"              Page 11 of 13 STEP 17:
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1
-CH-P-2B. Standards
 
  (a) Locates appropriate switch on Transfer Relay Cabinet #2
  *(b) Places 1-CH-P-2B's local control box Mode switch (1
-CH-43B-CH2B) to OVERRIDE position
  *(c) Rotates Transfer switch (1
-CH-43X-CH2B) to AUX P position
. Evaluator's Note:
If Asked at the ASP:  Following Step b) and c) above, 1
-CH-P-2B indicating lights, RED  SLOW light LIT, GREEN light OFF, switch in "S".
 
Evaluator's Comments
_______ SAT
 
_______ UNSAT STEP 18:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1
-CH-MOV-1350. Standards
 
  (a) Proceeds to Unit 1 Cable Vault Transfer Relay Cabinet 4.
  *(b) Places 1-CH-MOV-1350's local control box Mode switch (1
-CH-43B-1350) to OVERRIDE position.
  *(c) Rotates Transfer switch (1
-CH-43X-1350) to AUX P position
. Evaluator's Note:
If Asked at the ASP:  Following Step b) and c) above, 1
-CH-MOV-1350 indicating lights, GREEN light LIT, RED light OFF.
IF Asked at the ASP:    All components indicate shifted to ASP Control.
Evaluator's Comments
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM i"              Page 12 of 13 REPORTS TO SHIFT MANAGER (EVALUATOR).
Standards Verbal status report made that all affected Unit 1 components locally transferred to Aux Shutdown Panel.
STOP TIME: ______
Evaluator's Comments
 
Evaluator's Note If Asked: Components shown below indicate status.
1-FW-P-3A  1-MS-SOV-102A  1-MS-SOV-102B  1-FW-P-3B Red Lite LIT Red Lite LIT Both Red Lites LIT Red Lite LIT 1-CH-P-1A  1-CH-P-1C  1-CH-P-1B  1-CH-P-1C (Alt) No Lites (PTL)
Red Lite Lit  No Lites (PTL)
No Lites (PTL) 1-FW-MOV-151A 1-FW-MOV-151E  1-FW-MOV-151D  1-FW-MOV-151B Red Lite LIT Red Lite LIT  Red Lite LIT Red Lite LIT 1-FW-MOV-151C        1-FW-MOV-151F Red Lite LIT Red Lite LIT 1-CH-P-2A          1-CH-P-2B Red SLOW LIT Red SLOW LIT Switch in "A" Switch in "S"
 
Surry 2014-301 "JPM i"              Page 13 of 13 STOP TIME:
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
 
____________________________________________________________________________________
__________________________________________________________________________________
__ ____________________________________________________________________________________
 
____________________________________________________________________________________
____________________________________________________________________________________  ____________________________________________________________________________________
 
____________________________________________________________________________________
____________________________________________________________________________________
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER) Initial Conditions   This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves. The MCR was evacuated due to a fire. The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel   The H and J Group Transfer Switches have failed to function. Initiating Cue   Locally transfer the individual Unit 1 components to the Unit 1 Aux Shutdown Panel in accordance with FCA-1.00, Attachment 2, Override Control to Auxiliary Shutdown Panel. When you finish the actions necessary to accomplish this, please inform me.
 
Operator Directions Handout (TO BE GIVEN TO APPLICANT)   Initial Conditions   This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves. The MCR was evacuated due to a fire. The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel The H and J Group Transfer Switches have failed to function. Initiating Cue Locally transfer the individual Unit 1 components to the Unit 1 Aux Shutdown Panel in accordance with FCA-1.00, Attachment 2, Override Control to Auxiliary Shutdown Panel.
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
The MCR was evacuated due to a fire.
The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel The H and J Group Transfer Switches have failed to function.
Initiating Cue Locally transfer the individual Unit 1 components to the Unit 1 Aux Shutdown Panel in accordance with FCA
-1.00, Attachment 2, Override Control to Auxiliary Shutdown Panel.
When you finish the actions necessary to accomplish this, please inform me.
 
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
The MCR was evacuated due to a fire.
The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel
 
The H and J Group Transfer Switches have failed to function.
Initiating Cue Locally transfer the individual Unit 1 components to the Unit 1 Aux Shutdown Panel in accordance with FCA
-1.00, Attachment 2, Override Control to Auxiliary Shutdown Panel.
 
When you finish the actions necessary to accomplish this, please inform me.     
When you finish the actions necessary to accomplish this, please inform me.     


Surry 2014-301 "JPM j" Surry SR14301  1 of 10  U.S. Nuclear Regulatory Commission Surry Power Station   SR14301  Job Performance Measure 076A2.01 (3.5/3.7) [ALTERNATE PATH]   Applicant________________________________     Start Time___________________ Examiner_______________________________
Surry 2014-301 "JPM j" Surry SR14301  1 of 10  U.S. Nuclear Regulatory Commission Surry Power Station SR14301  Job Performance Measure 076A2.01 (3.5/3.7)
Date ___________________________________   Stop Time___________________ Title  ISOLATE SERVICE WATER TO #3 MER DURING FLOODING K/A: 076A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the SWS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations; Loss of SWS. (3.5/3.7)
[ALTERNATE PATH]
Applicability     Estimated Time  Actual Time RO/SRO(D)     15 Minutes   __________                       Conditions   Task is to be SIMULATED in the plant. Any plant mode/condition where a large SW leak in #3 MER has occurred. Standards   Flooding isolated to #3 MER as indicated by decreasing water level in accordance with 0-AP-13.00 steps 38 and 39. Initiating Cues   0-AP-13.00, Turbine Building or #3 MER Flooding, Step 38. Shift Manager direction. Terminating Cues   0-AP-13.00, Turbine Building or #3 MER Flooding, Step 39 completed. Procedures   0-AP-13.00, Turbine Building or #3 MER Flooding, Revision 28.   
Applicant________________________________
Start Time___________________
Examiner_______________________________
 
Date ___________________________________
Stop Time___________________
Title  ISOLATE SERVICE WATER TO #3 MER DURING FLOODING K/A: 076A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the SWS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations; Loss of SWS. (3.5/3.7)
 
Applicability Estimated Time  Actual Ti me RO/SRO(D) 15 Minutes
__________
Conditions Task is to be SIMULATED in the plant.
Any plant mode/condition where a large SW leak in #3 MER has occurred.
Standards Flooding isolated to #3 MER as indicated by decreasing water level in accordance with 0
-AP-13.00 steps 38 and 39. Initiating Cues 0-AP-13.00, Turbine Building or #3 MER Flooding, Step 3
: 8. Shift Manager direction.
Terminating Cues 0-AP-13.00, Turbine Building or #3 MER Flooding, Step 3 9 completed.
Procedures 0-AP-13.00, Turbine Building or #3 MER Flooding, Revision 28
 
Surry 2014-301 "JPM j" Surry SR14301  2 of 10 Tools and Equipment Safety Considerations None        Standard Personal Safety Equipment Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
There is a major Service Water leak in #3 MER.
1-SW-P-10B and 2
-SW-P-10B have been secured.
 
1-VS-E-4A, 4B, and 4C have been secured.
MER 3 Watertight Door has been checked closed.
Initiating Cues The team has reached step 37 of 0
-AP-13.00, Turbine Building or #3 MER Flooding.
You are to isolate Service Water to #3 MER in accordance with Steps 38 and 39 of 0
-AP-13.00, Turbine Building or #3 MER Flooding.
 
Notes to the Evaluator
. Task briefing should occur in the pre-determined location
.     
 
Surry 2014-301 "JPM j" Surry SR14301  3 of 10 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (*)
. START TIME:
STEP 1: 
  [Step 38a, AP
-13.00]  ISOLATE SW TO MER 3:
a)  Fail 1-SW-263 closed by opening Circuit 8 on Lighting Panel 2T3 (located north of 2
-FW-E-2A)  STANDARD:
Locates lighting panel 2T3 (located north of 2
-FW-E-2A). *b) Opens circuit 8 on lighting panel 2-EP-LP-2T3- this is a critical step.
 
EVALUATOR'S NOTE:
None  COMMENTS:
_______ SAT
 
_______ UNSAT
 
STEP 2:
STEP 38b-  Verify open or open 1
-SW-500, SW Header Crosstie (MER 4)
STANDARD:
  (a) Proceeds to #4 MER.
(b) Locates manual valve 1
-SW-500 (halfway across room under smoke detector).
(c) *Pulls pin from handwheel actuator.
This is a critical step.
(d) *Opens 1-SW-500 by rotating valve handwheel in the  clockwise direction
- This is a critical step.
Evaluator's Cues Tell operator:
Actual valve position in plant may be open or closed. Provide appropriate cue
. Point at "CLOSED" indicator
.
COMMENTS:
_______ SAT
 
_______ UNSAT
 
Surry 2014-301 "JPM j" Surry SR14301  4 of 10 STEP 3:  Step 38c- Close 2-SW-476, Water Box 2C Isol (MER 4)
STANDARD:
  (a) Locates 2
-SW-476 (in #4 MER 2/3 of the way across the room on the right hand side. (b) Attempts to close 2
-SW-476 by removing the locking pin and rotating the handwheel clockwise.
(c) Recognizes that 2
-SW-476 will not close and transitions to step 38c RNO column.
Evaluator's Cues Tell operator:
As operator attempts to close valve, the handwheel will not move.
COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM j" Surry SR14301  5 of 10 STEP 4:  Step 38c RNO-  Do the following:
: 1) Verify open or open 2
-SW-533. 2) Close 2
-SW-474, located in Unit 2 BC HX SW MOV pit. STANDARD:
  (a) *Opens 2-SW-533 (MER-5) - by rotating valve handwheel in the counter-clockwise direction.
This is a critical step.
(b) Proceeds to Unit 2 BC HX SW MOV pit.
(c) Locates manual valve 2
-SW-474. (d) *Closes 2-SW-474 by removing the locking pin and rotating valve handwheel in the clockwise direction
- this is a critical step.
Evaluator's Cues For 2-SW-533, provide appropriate cue based on actual initial valve position in plant. If asked: After trainee identifies 2
-SW-474, if expected mark number not verbalized, ask the trainee what they expect the label to read, then tell trainee the label reads 2
-SW-474. If wrong valve identified, tell trainee that what they expected is not what it reads.
If asked: Security has been notified for entry.
Evaluator's Note Safety concern: Trainee does not have to travel down into the valve pits. He can identify which label he is looking at, tell the evaluator what he expects the label to read, and if correct (at the BC HX SW MOV PIT
), the evaluator can then state the label reads 2
-SW-474. The trainee can describe actions to complete valve manipulation from above.
Security concern: Certain valve pits are now covered by grates. If the enclosure is to be opened, security should be contacted. It is acceptable for the trainee to describe the actions required to raise the grate(s)
- utilize hand crank to raise the grating access door
. COMMENTS:
 
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM j" Surry SR14301  6 of 10 STEP 5:  Step 38d-  Close 2-SW-478, SW Header Crosstie. (MER 4)
STANDARD:
  (a) Locates 2
-SW-478 (in #4 MER 2/3 of the way across the room on the right hand side). (b) Pulls pin from handwheel actuator.
(c) *Closes 2-SW-478 by rotating valve handwheel in the clockwise direction
- This is a critical step.
Evaluator's Cues Tell operator:
Provide appropriate cue for valve operation based on actual in plant valve position.
Safety concern: Trainee does not have to crawl across pipes to check the valve labels at the east end of the #4 MER. He can identify which valve label he is looking at, and the evaluator can state the label reads "2
-SW-478" if the correct label is identified. The trainee can then describe the required actions to complete valve manipulation from the west end of #4 MER.
. COMMENTS:
_______ SAT
_______ UNSAT STEP 6:  Step 38e-  SECURE CHEMICAL INJECTION TO MER 3 SW SUPPLY HEADER IAW 0
-OP-SW-006, MER 3 AND MER 4 SERVICE WATER CHEMICAL INJECTION OPERATION STANDARD:
    (a) Notifies Shift Manager (Evaluator) that Chemical Injection to MER 3 SW Supply Header needs to be secured IAW 0
-OP-SW-006. Evaluator's Cues Tell operator:
Unit 1 Turbine Building Operator will secure chemical injection.
 
COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM j" Surry SR14301  7 of 10 STEP 7:  Step 39-  CHECK WATER LEVEL IN MER 3 ON MER 4 GAUGE 2
-PL-LI-201 -  DECREASING STANDARD:
    (a) Locates MER 3 level gauge 2
-PL-LI-201 in MER 4.
  (b) Checks that level in MER 3 is decreasing.
 
Evaluator's Cues Tell operator:
After the operator locates MER 3 level gauge, tell him the level is 50" H2O and slowly decreasing.
COMMENTS:
_______ SAT
 
_______ UNSAT STEP 8:  REPORT TO SHIFT SUPERVISOR (EVALUATOR).
STANDARD:
Verbal status report that steps 3 8 and 39 of 1-AP-13.00 are complete.
EVALUATOR'S NOTE: N/A STOP TIME:
COMMENTS:
_______ SAT
_______ UNSAT STOP TIME:
______________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
 
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
 
Surry SR14301  8 of 10    Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
There is a major Service Water leak in #3 MER.
1-SW-P-10B and 2-SW-P-10B have been secured.
1-VS-E-4A, 4B, and 4C have been secured.
MER 3 Watertight Door has been checked closed.
Initiating Cues
 
The team has reached step 37 of 0
-AP-13.00, Turbine Building or #3 MER Flooding.
You are to isolate Service Water to #3 MER in accordance with Steps 38 and 39 of 0
-AP-13.00, Turbine Building or #3 MER Flooding.
 
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
There is a major Service Water leak in #3 MER.
1-SW-P-10B and 2
-SW-P-10B have been secured.
1-VS-E-4A, 4B, and 4C have been secured.
MER 3 Watertight Door has been checked closed.
Initiating Cues The team has reached step 37 of 0
-AP-13.00, Turbine Building or #3 MER Flooding.
You are to isolate Service Water to #3 MER in accordance with Steps 38 and 39 of 0
-AP-13.00, Turbine Building or #3 MER Flooding.
 
Surry 2014-301 "JPM k"              Page 1 of 16  U.S. Nuclear Regulatory Commission Surry Power Station SR14301  Simulator Job Performance Measure [KA 061K4.01 4.1/4.2
] [Alternate Path]
Applicant________________________________
Start Time___________________
Examiner_______________________________
 
Date ___________________________________
Stop Time___________________
Title  LOCALLY SWAP THE AFW PUMP SUPPLY TO THE FIRE WATER ALTERNATE SOURCE (Faulted)
K/A: Knowledge of AFW design feature(s) and/or interlock(s) which provide for the following: Water sources and priority of use
. 4.1/4.2. Applicability Estimated Time  Actual Time RO/SRO(I)/SRO(U) 25 Minutes    ___  Minutes Conditions Task is to be SIMULATED in the plant.
A simulated loss of secondary heat sink is in progress. Both the ECST and underground tank levels are below 20% and it is desired to swap AFW pump suction to the Fire Main.
Standards 2-FR-H.1, Attachment 1, part 4 Self-Checking (STAR) practices will be used throughout task performance.
Operations Department Standards shall be adhered to.
Terminating Cues
 
Report received that alternate source aligned to AFW pumps.
Any failure criteria listed under the Evaluation Criteria section above has been met.
Candidate states "Task is complete."
Procedures 2-FR-H.1, Attachment 1, part 4, Rev 36 Tools and Equipment Safety Considerations None      Standard PPE Required.
 
Surry 2014-301 "JPM k"              Page 2 of 16 Initial Conditions Unit 2 is currently experiencing a loss of secondary heat sink and the team is currently at step 3 of 2-FR-H.1, Response to Loss of Secondary Heat Sink.
AFW cross
-tie from Unit 1 is unavailable
. An operator has attempted to open 2-CN-150 and the valve is stuck CLOSED.
. Initiating Cues    Align an alternate suction source to the Aux Feedwater pumps using the most preferred source available in accordance with 2
-FR-H.1, Attachment 1.
Notes to the Evaluator
:  Brief of this JPM may be accomplished in the RP Briefing Room, outside of the RCA This task is to be SIMULATED. Do NOT allow the operator to manipulate controls, operate switches or reposition valves.
 
Surry 2014-301 "JPM k"              Page 3 of 16 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (
*). START TIME_______:
STEP 1:  2-FR-H.1, Attachment 1, Part 1 Select one of the following methods as an alternate source of Auxiliary Feedwater.
Makeup to 2
-CN-TK-1 from 2-CN-TK-2  Standards (a) Identifies this source is not available from initial conditions
.      Evaluator's Cues  When attempts are made to open the valve, the handwheel will not turn with the chain. The valve is jammed closed.
Evaluator's Notes 2-CN-150 is stuck closed
. Evaluator's Comments
_______ SAT
_______ UNSAT STEP 2:  2-FR-H.1, Attachment 1, Part 2 Alignment of AFW Booster Pump(s)
DETERMINES AFW BOOSTER PUMPS ARE NOT AVAILABLE Standards (a) Check 2-CN-TK-3  level > 20%
. Evaluator's Cues  Inform operator that 2
-CN-TK-3 level is < 10%
. Evaluator's Comments
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM k"              Page 4 of 16 STEP 3:  2-FR-H.1, Attachment 1, Part 3.
Cross-tie from Unit 1.
Standards Based on directions given to operator, determines AFW crosstie from Unit 1 unavailable.
Evaluator's Cues  As the Shift Manager, I need you to determine an alternate method based on the information given.
Evaluator's Comments
 
_______ SAT
 
_______ UNSAT STEP 4:  2-FR-H.1, Attachment 1, Part, (Step 4a)    Fire Water Alignment to AFW Pumps.
LOCALLY CLOSE THE FIRE MAIN ISOLATION VALVES TELL
-TALE DRAIN, 2
-FW-119  Standards (a) Proceeds to Unit 2 safeguards steam side.
(b) Closes 2-FW-119 by turning handwheel in the clockwise direction.
Evaluator's Cues  When the valve is operated properly, the valve stem inserts until the handwheel will not turn. Evaluator's Notes 2-FW-119 is located between the fire main isolation valves near the stairway to the upper levels and is normally open.
Evaluator's Comments
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM k"              Page 5 of 16 STEP 5:  2-FR-H.1, Attachment 1, Part 4, (Step b.)
Locally open fire main isolation valves:
Standards
  *(a) Opens 2-FW-120 by turning handwheel in the counter
-clockwise direction
.  *(b) Opens 2-FW-185 by turning handwheel in the counter
-clockwise direction
. Cues    Provide cues valve stems rise as FW
-120 & FW-185 are properly operated.
Tell Operator:
After both FW
-120 & FW-185 opened, provide cues flow noise is momentarily heard through the valves.
Tell Operator:
If FW-119 NOT closed before opening FW
-120 & FW-185, provide cues water is spraying out from 2
-FW-119. Evaluator's Notes 2-FW-120 & -185 are located on ground level near stairway.
Evaluator's Comments
_______ SAT
 
_______ UNSAT STEP 6:  2-FR-H.1, Attachment 1, Part 4, (Step 4 c.)
Locally start diesel driven fire pump.
STANDARD:
a) Asks Shift Manager/Evaluator status of diesel driven fire pump
. EVALUATOR'S NOTE:
 
When asked: Diesel driven fire pump has been started
. COMMENTS:
_______ SAT
 
_______ UNSAT
 
Surry 2014-301 "JPM k"              Page 6 of 16 STEP 7:  2-FR-H.1, Attachment 1, Part 4, (Step 4 d.)
Locally open fire water suction valves to available AFW pump(s):
STANDARD:
a) Acknowledges NOTE prior to Step d:  The following steps should be used as needed to align water to each AFW pump one at a time and the MCR informed after each pump alignment is complete.
  *b) Opens 2-FW-154, (for 2
-FW-P-2)  *c) Opens 2-FW-169, (for 2
-FW-P-3A)  *d) Opens 2-FW-184, (for 2
-FW-P-3B)    Evaluator's Cues  Provide cues valve stems rise as each valve is properly operated.
 
If Notified:
acknowledge opening 2
-FW-154 / 169 / 184 as MCR Operator.
If Asked:
Inform Candidate that Unit 2 AFW Pumps have been secured due to cavitation.
EVALUATOR'S NOTE:
Candidate inform s MCR (Evaluator) following manipulation of each individual valve or wait until all valves for each pump have been manipulated.
  (Steps 8, 9, and 10 describe valve operations).
 
COMMENTS:
_______ SAT
_______ UNSAT STEP 8:  2-FR-H.1, Attachment 1, Part 4, (Step 4 d.)
LOCALLY CHECK AFW PUMP SUCTION PRESSURE AVAILABLE Standards Checks each AFW pump suction pressure gauge to verify pressure available:
  (a) 2-FW-PI-256A (for 2
-FW-P-2),  (b) 2-FW-PI-256B (for 2
-FW-P-3A),  (c) 2-FW-PI-256C (for 2-FW-P-3B). Evaluator's Cues    Provide cues each gauge indicates full range (>
30 psig). Evaluator's Comments
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM k"              Page 7 of 16  STEP 9:  2-FR-H.1, Attachment 1, Part 4, (Step 4 f.)
LOCALLY CLOSE THE NORMAL AFW PUMP SUCTION VALVES Standards Closes/verifies closed the other AFW pump suction paths:
  *(a) Closes 2-FW-153 (ECST to 2
-FW-P-2) by turning handwheel in the clockwise direction (b) Verifies 2
-FW-283 closed (booster pps to 2
-FW-P-2).  *(c) Closes 2-FW-168 (ECST to 2-FW-P-3A) by turning handwheel in the clockwise direction (d) Verifies 2
-FW-284 closed (booster pps to 2
-FW-P-3A).  *(e) Closes 2-FW-183 (ECST to 2
-FW-P-3B) by turning handwheel in the clockwise direction (f) Verifies 2
-FW-285 closed (booster pps to 2-FW-P-3B). Evaluator's Cues    Provide cues valve stems go in as 2
-FW-153, -168 & -183 are properly operated.
Provide cues valve stems for 2
-FW-283, -284 & -285 are as indicated (~1/2 inch showing).
When notified:  As each AFW pump valve alignment is complete, acknowledge completion of alignment as MCR Operator.
Evaluator's Comments
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM k"              Page 8 of 16  STEP 10:  REPORTS TO SHIFT MANAGER (EVALUATOR)
Standards Verbal status report made that AFW pumps are on fire water suction per 2-FR-H.1, Attachment 1
. STOP TIME: ______________
Evaluator's Comments
_______ SAT
_______ UNSAT COMMENTS:
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
 
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Initial Conditions Unit 2 is currently experiencing a loss of secondary heat sink and the team is currently at step 3 of 2
-FR-H.1, Response to Loss of Secondary Heat Sink.
AFW cross
-tie from Unit 1 is unavailable.
An operator has attempted to open 2
-CN-150 and the valve is stuck CLOSED.
. Initiating Cues    Align an alternate suction source to the Aux Feedwater pumps using the most preferred source available in accordance with 2
-FR-H.1, Attachment 1.
 
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions Unit 2 is currently experiencing a loss of secondary heat sink and the team is currently at step 3 of 2
-FR-H.1, Response to Loss of Secondary Heat Sink.
AFW cross-tie from Unit 1 is unavailable.
An operator has attempted to open 2
-CN-150 and the valve is stuck CLOSED.
. Initiating Cues    Align an alternate suction source to the Aux Feedwater pumps using the most preferred source available in accordance with 2-FR-H.1, Attachment 1.
 
Surry 2014-301 "JPM a"  Page 1 of 8  U.S. Nuclear Regulatory Commission Surry Power Station SR14301  Simulator Job Performance Measure APE001.AA2.05 (4.4/4.6) [Alternate Path]
 
Applicant________________________________
Start Time___________________
Examiner_______________________________
Date ___________________________________
Stop Time___________________
Title  Respond to Continuous Rod Withdrawal K/A: Ability to determine and interpret the following as they apply to the Continuous Rod Withdrawal: Uncontrolled rod withdrawal, from available indications.
Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 3 Minutes    ___  Minutes Conditions Task is to be PERFORMED in the simulator.
Plant is at 100% power with all systems in AUTO.
1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low
. 0-AP-53.00 actions have been completed with 1
-MS-PT-1447, Channel IV Turbine First Stage Pressure selected. All components have been returned to Automatic with the exception of Rod Control
. Standards Trip the Reactor in accordance with AP
-1.00. Initiating Cues Continuous rod withdrawal motion indicated.
Terminating Cues Unit 1 manual reactor trip implemented
. Procedures


Surry 2014-301 "JPM j" Surry SR14301  2 of 10 Tools and Equipment    Safety Considerations  None        Standard Personal Safety Equipment  Initial Conditions  This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves. There is a major Service Water leak in #3 MER. 1-SW-P-10B and 2-SW-P-10B have been secured.
0-AP-1.00, Rod Control System Malfunction, Rev. 26.
1-VS-E-4A, 4B, and 4C have been secured. MER 3 Watertight Door has been checked closed. Initiating Cues    The team has reached step 37 of 0-AP-13.00, Turbine Building or #3 MER Flooding. You are to isolate Service Water to #3 MER in accordance with Steps 38 and 39 of 0-AP-13.00, Turbine Building or #3 MER Flooding.
1-OP-ZZ-002, Maintenance of Plant Operations, Rev. 30.
Notes to the Evaluator. Task briefing should occur in the pre-determined location.     
Tools and Equipment Safety Considerations


Surry 2014-301 "JPM j" Surry SR14301  3 of 10 PERFORMANCE CHECKLIST   Notes to the Evaluator  Task critical elements are bolded and denoted by an asterisk (*). START TIME:              STEP 1:    [Step 38a, AP-13.00]  ISOLATE SW TO MER 3:  a)  Fail 1-SW-263 closed by opening Circuit 8 on Lighting Panel 2T3 (located north of 2-FW-E-2A)  STANDARD:  Locates lighting panel 2T3 (located north of 2-FW-E-2A). *b) Opens circuit 8 on lighting panel 2-EP-LP-2T3- this is a critical step.
None      None Surry 2014-301 "JPM aPage 2 of 8  Simulator Setup Reset to IC 271 OR Recall 100% IC
EVALUATOR'S NOTE:  None COMMENTS:    _______ SAT
. Load the following malfunctions:
_______ UNSAT STEP 2:
MS1401, 1st Stage PRSR TRNSMTR PT
STEP 38b-  Verify open or open 1-SW-500, SW Header Crosstie (MER 4)  STANDARD:  (a) Proceeds to #4 MER. (b) Locates manual valve 1-SW-500 (halfway across room under smoke detector). (c) *Pulls pin from handwheel actuator. This is a critical step. (d) *Opens 1-SW-500 by rotating valve handwheel in the clockwise direction- This is a critical step. Evaluator's Cues Tell operator: Actual valve position in plant may be open or closed. Provide appropriate cue. Point at "CLOSED" indicator.
-446 FAILURE,
COMMENTS:    _______ SAT
-2 DEG, Trigger 1
_______ UNSAT Surry 2014-301 "JPM j" Surry SR14301  4 of 10 STEP 3:  Step 38c- Close 2-SW-476, Water Box 2C Isol (MER 4)  STANDARD:  (a) Locates 2-SW-476 (in #4 MER 2/3 of the way across the room on the right hand side. (b) Attempts to close 2-SW-476 by removing the locking pin and rotating the handwheel clockwise. (c) Recognizes that 2-SW-476 will not close and transitions to step 38c RNO column. Evaluator's Cues  Tell operator:  As operator attempts to close valve, the handwheel will not move. COMMENTS:    _______ SAT  _______ UNSAT Surry 2014-301 "JPM j" Surry SR14301  5 of 10 STEP 4:  Step 38c RNO-  Do the following:   1) Verify open or open 2-SW-533. 2) Close 2-SW-474, located in Unit 2 BC HX SW MOV pit. STANDARD:  (a) *Opens 2-SW-533 (MER-5) - by rotating valve handwheel in the counter-clockwise direction. This is a critical step. (b) Proceeds to Unit 2 BC HX SW MOV pit. (c) Locates manual valve 2-SW-474. (d) *Closes 2-SW-474 by removing the locking pin and rotating valve handwheel in the clockwise direction- this is a critical step. Evaluator's Cues    For 2-SW-533, provide appropriate cue based on actual initial valve position in plant. If asked: After trainee identifies 2-SW-474, if expected mark number not verbalized, ask the trainee what they expect the label to read, then tell trainee the label reads 2-SW-474. If wrong valve identified, tell trainee that what they expected is not what it reads. If asked: Security has been notified for entry.      Evaluator's Note  Safety concern: Trainee does not have to travel down into the valve pits. He can identify which label he is looking at, tell the evaluator what he expects the label to read, and if correct (at the BC HX SW MOV PIT), the evaluator can then state the label reads 2-SW-474. The trainee can describe actions to complete valve manipulation from above. Security concern: Certain valve pits are now covered by grates. If the enclosure is to be opened, security should be contacted. It is acceptable for the trainee to describe the actions required to raise the grate(s) - utilize hand crank to raise the grating access door. COMMENTS:
. RD0102, CONT ROD WITHDRAWL ALL MODES, Trigger 3
_______ SAT  _______ UNSAT Surry 2014-301 "JPM j" Surry SR14301  6 of 10 STEP 5:  Step 38d- Close 2-SW-478, SW Header Crosstie. (MER 4)  STANDARD:  (a) Locates 2-SW-478 (in #4 MER 2/3 of the way across the room on the right hand side). (b) Pulls pin from handwheel actuator. (c) *Closes 2-SW-478 by rotating valve handwheel in the clockwise direction- This is a critical step. Evaluator's Cues  Tell operator:  Provide appropriate cue for valve operation based on actual in plant valve position. Safety concern: Trainee does not have to crawl across pipes to check the valve labels at the east end of the #4 MER. He can identify which valve label he is looking at, and the evaluator can state the label reads "2-SW-478" if the correct label is identified. The trainee can then describe the required actions to complete valve manipulation from the west end of #4 MER. . COMMENTS:    _______ SAT  _______ UNSAT   STEP 6:  Step 38e-  SECURE CHEMICAL INJECTION TO MER 3 SW SUPPLY HEADER IAW 0-OP-SW-006, MER 3 AND MER 4 SERVICE WATER CHEMICAL INJECTION OPERATION  STANDARD:    (a) Notifies Shift Manager (Evaluator) that Chemical Injection to MER 3 SW Supply Header needs to be secured IAW 0-OP-SW-006. Evaluator's Cues  Tell operator:  Unit 1 Turbine Building Operator will secure chemical injection.
. Load the following Switch Override:
COMMENTS:    _______ SAT  _______ UNSAT 
RD, ROD_MOD_SEL_MAN, ON, Trigger 1, 8 second delay
. Place the Simulator in RUN
. Place the Main Feed Reg Valves in MANUAL
. Actuate Trigger 1
. Select PT
-447. Return the Main Feed Reg Valves to AUTO
. Acknowledge all alarms, place Rod Control Mode Selector Switch in MANUAL, place a "Pink" Ring on the Rod
. Switch, and allow cond itions to stabilize.
Place pink magnet on PT
-1446. Freeze and store until ready to RUN
. Initial Conditions Plant is at 100% power with all systems in AUTO.
1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low
. 0-AP-53.00 actions have been completed with 1
-MS-PT-1447, Channel IV Turbine First Stage Pressure
. selected. All components have been returned to Automatic with the exception of Rod Control
. Initiating Cues You are the Unit 1 Reactor Operator. Restore Control Bank "D" to 228 steps in three (3) step increments.
When complete, return Rod Control to AUTO
. When you have completed this task, please inform me
. Notes   After the Candidate has completed the second 3-Step rod movement, Actuate Trigger 3.


Surry 2014-301 "JPM j" Surry SR14301  7 of 10 STEP 7: Step 39-  CHECK WATER LEVEL IN MER 3 ON MER 4 GAUGE 2-PL-LI-201 -  DECREASING  STANDARD:    (a) Locates MER 3 level gauge 2-PL-LI-201 in MER 4.  (b) Checks that level in MER 3 is decreasing.
Surry 2014-301 "JPM a"   Page 3 of 8 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (
Evaluator's Cues  Tell operator:  After the operator locates MER 3 level gauge, tell him the level is 50" H2O and slowly decreasing. COMMENTS:     _______ SAT
*). An additional instructor may be needed to silence and acknowledge alarms for the examinee.
_______ UNSAT  STEP 8REPORT TO SHIFT SUPERVISOR (EVALUATOR). STANDARD:  Verbal status report that steps 38 and 39 of 1-AP-13.00 are complete. EVALUATOR'S NOTE: N/A  STOP TIME:            COMMENTS:    _______ SAT  _______ UNSAT    STOP TIME:  ______________________  ____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
START TIME: ___________
____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
STEP 1WITHDRAW CONTROL RODS IN THREE (3) STEP INCREMENTS
Surry SR14301  8 of 10    Operator Directions Handout  (TO BE READ TO APPLICANT BY EXAMINER) Initial Conditions  This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves. There is a major Service Water leak in #3 MER. 1-SW-P-10B and 2-SW-P-10B have been secured. 1-VS-E-4A, 4B, and 4C have been secured. MER 3 Watertight Door has been checked closed. Initiating Cues The team has reached step 37 of 0-AP-13.00, Turbine Building or #3 MER Flooding. You are to isolate Service Water to #3 MER in accordance with Steps 38 and 39 of 0-AP-13.00, Turbine Building or #3 MER Flooding.
. (Step 1)  STANDARD a) Checks ROD CONTROL MODE SEL switch in the MAN position.
Operator Directions Handout  (TO BE GIVEN TO APPLICANT)  Initial Conditions  This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves. There is a major Service Water leak in #3 MER. 1-SW-P-10B and 2-SW-P-10B have been secured. 1-VS-E-4A, 4B, and 4C have been secured. MER 3 Watertight Door has been checked closed. Initiating Cues    The team has reached step 37 of 0-AP-13.00, Turbine Building or #3 MER Flooding. You are to isolate Service Water to #3 MER in accordance with Steps 38 and 39 of 0-AP-13.00, Turbine Building or #3 MER Flooding.     
b) Check ROD SPEED indicator (S1 408) indicates approximately 48 steps per minute. c) WITHDRAW control rods in 3
-step increments.
* Move ROD MOTION IN/OUT/HOLD switch in the OUT direction.
This is a critical step.
Check ROD DIRECTION OUT light is LIT.
Release switch when rods are at desired height (3 steps)
. Check rod motion has stopped. EVALUATOR NOTE:
Operator may have to step in/out Rods 1/2 step to equalize group step counter indication.
COMMENTS:


Surry 2014-301 "JPM k"              Page 1 of 16  U.S. Nuclear Regulatory Commission  Surry Power Station  SR14301  Simulator Job Performance Measure [KA 061K4.01 4.1/4.2] [Alternate Path]  Applicant________________________________    Start Time___________________  Examiner_______________________________
Date ___________________________________  Stop Time___________________  Title  LOCALLY SWAP THE AFW PUMP SUPPLY TO THE FIRE WATER ALTERNATE SOURCE (Faulted)  K/A: Knowledge of AFW design feature(s) and/or interlock(s) which provide for the following: Water sources and priority of use. 4.1/4.2. Applicability      Estimated Time  Actual Time  RO/SRO(I)/SRO(U)    25 Minutes    ___  Minutes                    Conditions  Task is to be SIMULATED in the plant. A simulated loss of secondary heat sink is in progress. Both the ECST and underground tank levels are below 20% and it is desired to swap AFW pump suction to the Fire Main. Standards  2-FR-H.1, Attachment 1, part 4  Self-Checking (STAR) practices will be used throughout task performance. Operations Department Standards shall be adhered to. Terminating Cues Report received that alternate source aligned to AFW pumps. Any failure criteria listed under the Evaluation Criteria section above has been met. Candidate states "Task is complete."  Procedures  2-FR-H.1, Attachment 1, part 4, Rev 36  Tools and Equipment    Safety Considerations  None      Standard PPE Required.
Surry 2014-301 "JPM k"              Page 2 of 16 Initial Conditions  Unit 2 is currently experiencing a loss of secondary heat sink and the team is currently at step 3 of 2-FR-H.1, Response to Loss of Secondary Heat Sink. AFW cross-tie from Unit 1 is unavailable. An operator has attempted to open 2-CN-150 and the valve is stuck CLOSED. . Initiating Cues    Align an alternate suction source to the Aux Feedwater pumps using the most preferred source available in accordance with 2-FR-H.1, Attachment 1. Notes to the Evaluator:  Brief of this JPM may be accomplished in the RP Briefing Room, outside of the RCA  This task is to be SIMULATED. Do NOT allow the operator to manipulate controls, operate switches or reposition valves.
Surry 2014-301 "JPM k"              Page 3 of 16 PERFORMANCE CHECKLIST    Notes to the Evaluator  Task critical elements are bolded and denoted by an asterisk (*). START TIME_______:              STEP 1:  2-FR-H.1, Attachment 1, Part 1  Select one of the following methods as an alternate source of Auxiliary Feedwater. Makeup to 2-CN-TK-1 from 2-CN-TK-2  Standards    (a) Identifies this source is not available from initial conditions.      Evaluator's Cues  When attempts are made to open the valve, the handwheel will not turn with the chain. The valve is jammed closed. Evaluator's Notes    2-CN-150 is stuck closed. Evaluator's Comments    _______ SAT  _______ UNSAT  STEP 2:  2-FR-H.1, Attachment 1, Part 2  Alignment of AFW Booster Pump(s)  DETERMINES AFW BOOSTER PUMPS ARE NOT AVAILABLE  Standards  (a) Check 2-CN-TK-3  level > 20%. Evaluator's Cues  Inform operator that 2-CN-TK-3 level is < 10%. Evaluator's Comments    _______ SAT  _______ UNSAT Surry 2014-301 "JPM k"              Page 4 of 16 STEP 3:  2-FR-H.1, Attachment 1, Part 3. Cross-tie from Unit 1. Standards  Based on directions given to operator, determines AFW crosstie from Unit 1 unavailable. Evaluator's Cues  As the Shift Manager, I need you to determine an alternate method based on the information given. Evaluator's Comments
_______ SAT
_______ SAT
_______ UNSAT  STEP 4:  2-FR-H.1, Attachment 1, Part, (Step 4a)    Fire Water Alignment to AFW Pumps. LOCALLY CLOSE THE FIRE MAIN ISOLATION VALVES TELL-TALE DRAIN, 2-FW-119  Standards  (a) Proceeds to Unit 2 safeguards steam side. (b) Closes 2-FW-119 by turning handwheel in the clockwise direction. Evaluator's Cues  When the valve is operated properly, the valve stem inserts until the handwheel will not turn. Evaluator's Notes  2-FW-119 is located between the fire main isolation valves near the stairway to the upper levels and is normally open. Evaluator's Comments    _______ SAT  _______ UNSAT Surry 2014-301 "JPM k"              Page 5 of 16 STEP 5:  2-FR-H.1, Attachment 1, Part 4, (Step b.)  Locally open fire main isolation valves:  Standards  *(a) Opens 2-FW-120 by turning handwheel in the counter-clockwise direction.  *(b) Opens 2-FW-185 by turning handwheel in the counter-clockwise direction. Cues    Provide cues valve stems rise as FW-120 & FW-185 are properly operated. Tell Operator:  After both FW-120 & FW-185 opened, provide cues flow noise is momentarily heard through the valves. Tell Operator:  If FW-119 NOT closed before opening FW-120 & FW-185, provide cues water is spraying out from 2-FW-119. Evaluator's Notes  2-FW-120 & -185 are located on ground level near stairway. Evaluator's Comments    _______ SAT
_______ UNSAT  STEP 6:  2-FR-H.1, Attachment 1, Part 4, (Step 4 c.)    Locally start diesel driven fire pump. STANDARD:  a) Asks Shift Manager/Evaluator status of diesel driven fire pump. EVALUATOR'S NOTE:              When asked: Diesel driven fire pump has been started. COMMENTS:    _______ SAT
_______ UNSAT Surry 2014-301 "JPM k"              Page 6 of 16 STEP 7:  2-FR-H.1, Attachment 1, Part 4, (Step 4 d.)  Locally open fire water suction valves to available AFW pump(s):  STANDARD:  a) Acknowledges NOTE prior to Step d:  The following steps should be used as needed to align water to each AFW pump one at a time and the MCR informed after each pump alignment is complete.  *b) Opens 2-FW-154, (for 2-FW-P-2)  *c) Opens 2-FW-169, (for 2-FW-P-3A)  *d) Opens 2-FW-184, (for 2-FW-P-3B)    Evaluator's Cues  Provide cues valve stems rise as each valve is properly operated.
If Notified: acknowledge opening 2-FW-154 / 169 / 184 as MCR Operator. If Asked: Inform Candidate that Unit 2 AFW Pumps have been secured due to cavitation. EVALUATOR'S NOTE:  Candidate informs MCR (Evaluator) following manipulation of each individual valve or wait until all valves for each pump have been manipulated.  (Steps 8, 9, and 10 describe valve operations).
COMMENTS:    _______ SAT  _______ UNSAT  STEP 8:  2-FR-H.1, Attachment 1, Part 4, (Step 4 d.)  LOCALLY CHECK AFW PUMP SUCTION PRESSURE AVAILABLE  Standards  Checks each AFW pump suction pressure gauge to verify pressure available:  (a) 2-FW-PI-256A (for 2-FW-P-2),  (b) 2-FW-PI-256B (for 2-FW-P-3A),  (c) 2-FW-PI-256C (for 2-FW-P-3B). Evaluator's Cues    Provide cues each gauge indicates full range (> 30 psig). Evaluator's Comments    _______ SAT  _______ UNSAT Surry 2014-301 "JPM k"              Page 7 of 16  STEP 9:  2-FR-H.1, Attachment 1, Part 4, (Step 4 f.)  LOCALLY CLOSE THE NORMAL AFW PUMP SUCTION VALVES  Standards  Closes/verifies closed the other AFW pump suction paths:  *(a) Closes 2-FW-153 (ECST to 2-FW-P-2) by turning handwheel in the clockwise direction  (b) Verifies 2-FW-283 closed (booster pps to 2-FW-P-2).  *(c) Closes 2-FW-168 (ECST to 2-FW-P-3A) by turning handwheel in the clockwise direction  (d) Verifies 2-FW-284 closed (booster pps to 2-FW-P-3A).  *(e) Closes 2-FW-183 (ECST to 2-FW-P-3B) by turning handwheel in the clockwise direction  (f) Verifies 2-FW-285 closed (booster pps to 2-FW-P-3B). Evaluator's Cues    Provide cues valve stems go in as 2-FW-153, -168 & -183 are properly operated. Provide cues valve stems for 2-FW-283, -284 & -285 are as indicated (~1/2 inch showing). When notified:  As each AFW pump valve alignment is complete, acknowledge completion of alignment as MCR Operator. Evaluator's Comments    _______ SAT  _______ UNSAT 


Surry 2014-301 "JPM k"             Page 8 of 16 STEP 10REPORTS TO SHIFT MANAGER (EVALUATOR) Standards   Verbal status report made that AFW pumps are on fire water suction per 2-FR-H.1, Attachment 1. STOP TIME: ______________              Evaluator's Comments    _______ SAT _______ UNSAT   COMMENTS:
_______ UNSAT STEP 2:  WITHDRAW CONTROL RODS IN THREE (3) STEP INCREMENTS. (Step 2)
____________________________________________________________________________________ ____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
STANDARD a) Checks ROD CONTROL MODE SEL switch in the MAN position.
Operator Directions Handout  (TO BE READ TO APPLICANT BY EXAMINERInitial Conditions  Unit 2 is currently experiencing a loss of secondary heat sink and the team is currently at step 3 of 2-FR-H.1, Response to Loss of Secondary Heat Sink. AFW cross-tie from Unit 1 is unavailable. An operator has attempted to open 2-CN-150 and the valve is stuck CLOSED. . Initiating Cues     Align an alternate suction source to the Aux Feedwater pumps using the most preferred source available in accordance with 2-FR-H.1, Attachment 1.
b) Check ROD SPEED indicator (S1 408) indicates approximately 48 steps per minute. c) WITHDRAW control rods in 3
Operator Directions Handout  (TO BE GIVEN TO APPLICANT)  Initial Conditions  Unit 2 is currently experiencing a loss of secondary heat sink and the team is currently at step 3 of 2-FR-H.1, Response to Loss of Secondary Heat Sink. AFW cross-tie from Unit 1 is unavailable. An operator has attempted to open 2-CN-150 and the valve is stuck CLOSED. . Initiating Cues    Align an alternate suction source to the Aux Feedwater pumps using the most preferred source available in accordance with 2-FR-H.1, Attachment 1.  
-step increments.
* Move ROD MOTION IN/OUT/HOLD switch in the OUT direction.
This is a critical step.
Check ROD DIRECTION OUT light is LIT.
Release switch when rods are at desired height (3 steps).
Check rod motion has stopped.
EVALUATOR NOTE:
After rods have moved in the OUT direction, the malfunction will be entered to cause continuous outward rod motion in all ROD Control Modes
. _______ SAT
 
_______ UNSAT
 
Surry 2014-301 "JPM a"   Page 4 of COMMENTS:
STEP 3CHECKS FOR CONTINUOUS ROD INSERTION OR WITHDRAWAL (Step 3STANDARD:
a) Checks continuous outward rod motion by examining the following:
ROD DIRECTION OUT lamp lit, CERPIs and/or step counters indicate motion.
EVALUATOR'S NOTE:
COMMENTS:
_______ SAT
_______ UNSAT STEP 4ATTEMPTS TO STOP ROD MOTION BY SWITCHING RODS TO MANUAL
. (Step 2STANDARD:
a)
* Rotates ROD CONT MODE SEL Switch from AUTO to MANUAL.
This is a critical step.
b)  Determines that rod motion has not stopped by:
serving ROD DIRECTION OUT lamp lit, and/or observing rod step counters showing outward motion, and/or     step counters making an audible "clicking" noise EVALUATOR'S NOTE:
Placing ROD CONT MODE SEL Switch to MANUAL is only a critical step if switch is in AUTO.
ROD CONT MODE SEL switch may be placed in AUTO. This is acceptable by OP
-ZZ-002 if Tave is within 1 degree of Tref.
COMMENTS:
_______ SAT
_______ UNSAT


Surry 2014-301 "JPM a"  Page 1 of 8   U.S. Nuclear Regulatory Commission Surry Power Station  SR14301 Simulator Job Performance Measure APE001.AA2.05 (4.4/4.6) [Alternate Path]
Surry 2014-301 "JPM a"  Page 5 of 8  STEP 5: INITIATES UNIT REACTOR TRIP
Applicant________________________________    Start Time___________________ Examiner_______________________________  Date ___________________________________  Stop Time___________________  Title  Respond to Continuous Rod Withdrawal  K/A: Ability to determine and interpret the following as they apply to the Continuous Rod Withdrawal: Uncontrolled rod withdrawal, from available indications. Applicability      Estimated Time  Actual Time  RO/SRO(I)/SRO(U)    3 Minutes    ___  Minutes                    Conditions  Task is to be PERFORMED in the simulator. Plant is at 100% power with all systems in AUTO. 1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low. 0-AP-53.00 actions have been completed with 1-MS-PT-1447, Channel IV Turbine First Stage Pressure selected. All components have been returned to Automatic with the exception of Rod Control. Standards  Trip the Reactor in accordance with AP-1.00. Initiating Cues  Continuous rod withdrawal motion indicated. Terminating Cues  Unit 1 manual reactor trip implemented. Procedures 0-AP-1.00, Rod Control System Malfunction, Rev. 26. 1-OP-ZZ-002, Maintenance of Plant Operations, Rev. 30. Tools and Equipment    Safety Considerations None      None Surry 2014-301 "JPM a"  Page 2 of 8  Simulator Setup  Reset to IC 271 OR Recall 100% IC. Load the following malfunctions:  MS1401, 1st Stage PRSR TRNSMTR PT-446 FAILURE, -2 DEG, Trigger 1. RD0102, CONT ROD WITHDRAWL ALL MODES, Trigger 3. Load the following Switch Override:  RD, ROD_MOD_SEL_MAN, ON, Trigger 1, 8 second delay. Place the Simulator in RUN. Place the Main Feed Reg Valves in MANUAL. Actuate Trigger 1. Select PT-447. Return the Main Feed Reg Valves to AUTO. Acknowledge all alarms, place Rod Control Mode Selector Switch in MANUAL, place a "Pink" Ring on the Rod. Switch, and allow conditions to stabilize. Place pink magnet on PT-1446. Freeze and store until ready to RUN. Initial Conditions  Plant is at 100% power with all systems in AUTO. 1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low. 0-AP-53.00 actions have been completed with 1-MS-PT-1447, Channel IV Turbine First Stage Pressure. selected. All components have been returned to Automatic with the exception of Rod Control. Initiating Cues  You are the Unit 1 Reactor Operator. Restore Control Bank "D" to 228 steps in three (3) step increments. When complete, return Rod Control to AUTO. When you have completed this task, please inform me. Notes  After the Candidate has completed the second 3-Step rod movement, Actuate Trigger 3.
. (Step 2-RNOSTANDARD:
Surry 2014-301 "JPM a"  Page 3 of 8  PERFORMANCE CHECKLIST    Notes to the Evaluator  Task critical elements are bolded and denoted by an asterisk (*). An additional instructor may be needed to silence and acknowledge alarms for the examinee. START TIME: ___________            STEP 1:  WITHDRAW CONTROL RODS IN THREE (3) STEP INCREMENTS. (Step 1)  STANDARD a) Checks ROD CONTROL MODE SEL switch in the MAN position. b) Check ROD SPEED indicator (S1-1-408) indicates approximately 48 steps per minute. c) WITHDRAW control rods in 3-step increments.
a) *Manually initiates reactor trip by depressing the Benchboard 1
* Move ROD MOTION IN/OUT/HOLD switch in the OUT direction. This is a critical step. Check ROD DIRECTION OUT light is LIT. Release switch when rods are at desired height (3 steps). Check rod motion has stopped. EVALUATOR NOTE: Operator may have to step in/out Rods 1/2 step to equalize group step counter indication. COMMENTS:
-1 and/or Benchboard 1
-2 Reactor Trip pushbutton
. This is a critical step.
EVALUATOR'S NOTE:
COMMENTS:
_______ SAT
_______ SAT
_______ UNSAT   STEP 2:  WITHDRAW CONTROL RODS IN THREE (3) STEP INCREMENTS. (Step 2)
_______ UNSAT
STANDARD a) Checks ROD CONTROL MODE SEL switch in the MAN position. b) Check ROD SPEED indicator (S1-1-408) indicates approximately 48 steps per minute. c) WITHDRAW control rods in 3-step increments.
* Move ROD MOTION IN/OUT/HOLD switch in the OUT direction. This is a critical step. Check ROD DIRECTION OUT light is LIT. Release switch when rods are at desired height (3 steps). Check rod motion has stopped. EVALUATOR NOTE: After rods have moved in the OUT direction, the malfunction will be entered to cause continuous outward rod motion in all ROD Control Modes. _______ SAT
_______ UNSAT 


Surry 2014-301 "JPM a"  Page 4 of 8  COMMENTS:  STEP 3CHECKS FOR CONTINUOUS ROD INSERTION OR WITHDRAWAL (Step 3)  STANDARD:  a) Checks continuous outward rod motion by examining the following:  ROD DIRECTION OUT lamp lit,  CERPIs and/or step counters indicate motion. EVALUATOR'S NOTE:  COMMENTS:    _______ SAT  _______ UNSAT  STEP 4: ATTEMPTS TO STOP ROD MOTION BY SWITCHING RODS TO MANUAL. (Step 2)  STANDARD:   a)
STEP 6REPORTS TO SHIFT MANAGER (EVALUATOR.
* Rotates ROD CONT MODE SEL Switch from AUTO to MANUAL. This is a critical step. b)  Determines that rod motion has not stopped by:    serving ROD DIRECTION OUT lamp lit, and/or    observing rod step counters showing outward motion, and/or     step counters making an audible "clicking" noise  EVALUATOR'S NOTE:   Placing ROD CONT MODE SEL Switch to MANUAL is only a critical step if switch is in AUTO. ROD CONT MODE SEL switch may be placed in AUTO. This is acceptable by OP-ZZ-002 if Tave is within 1 degree of Tref. COMMENTS:   _______ SAT _______ UNSAT
  (Step 2-RNO)  STANDARD:
a) Performs immediate actions of 1
-E-0. Check Rx. Trip by verifying all rods on bottom, Reactor trip and bypass breakers open, and neutron flux decreasing.
Checks Turbine Trip by manually tripping the turbine, checking all turbine stop valves are closed, isolating reheaters by closing 1
-MS-SOV-104 and checking the generator output breakers are open.
Checks both AC Emergency busses energized.
Checks if SI is actuated or if it is required.
b) Verbal status report made that immediate actions completed (with tripping of reactor).
EVALUATOR'S NOTE:
If operator continues with actions of verifying reactor trip by performing E
-0 immediate operator actions, let the operator continue E
-0 immediate action steps until completion
. When the candidate completes this step then inform the candidate that the task is complete  COMMENTS:
  ** JPM COMPLETE
**  _______ SAT
_______ UNSAT STOP TIME:
 
____________________________________________________________________________________
____________________________________________________________________________________
 
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________


Surry 2014-301 "JPM a"  Page 5 of 8  STEP 5:  INITIATES UNIT REACTOR TRIP. (Step 2-RNO)  STANDARD:  a) *Manually initiates reactor trip by depressing the Benchboard 1-1 and/or Benchboard 1-2 Reactor Trip pushbutton. This is a critical step. EVALUATOR'S NOTE:  COMMENTS:  _______ SAT  _______ UNSAT STEP 6:  REPORTS TO SHIFT MANAGER (EVALUATOR. (Step 2-RNO)  STANDARD:  a) Performs immediate actions of 1-E-0. Check Rx. Trip by verifying all rods on bottom, Reactor trip and bypass breakers open, and neutron flux decreasing. Checks Turbine Trip by manually tripping the turbine, checking all turbine stop valves are closed, isolating reheaters by closing 1-MS-SOV-104 and checking the generator output breakers are open. Checks both AC Emergency busses energized. Checks if SI is actuated or if it is required. b) Verbal status report made that immediate actions completed (with tripping of reactor). EVALUATOR'S NOTE:  If operator continues with actions of verifying reactor trip by performing E-0 immediate operator actions, let the operator continue E-0 immediate action steps until completion. When the candidate completes this step then inform the candidate that the task is complete  COMMENTS:  ** JPM COMPLETE **  _______ SAT  _______ UNSAT  STOP TIME:
____________________________________________________________________________________  ____________________________________________________________________________________
____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Surry 2014-301 "JPM a"  Page 6 of 8  ____________________________________________________________________________________ Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER) Task  Task is to be performed in the simulator. Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task. Initial Conditions  Plant is at 100% power with all systems in AUTO. 1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low. 0-AP-53.00 actions have been completed with 1-MS-PT-1447, Channel IV Turbine First Stage Pressure selected. All components have been returned to Automatic with the exception of Rod Control. Initiating Cues   You are the Unit 1 Reactor Operator. Restore Control Bank "D" to 228 steps in three (3) step increments. When complete, return Rod Control to AUTO. When you have completed this task, please inform me.
 
Surry 2014-301 "JPM a"  Page 7 of 8  Reference for Evaluator Operator Directions Handout (TO BE GIVEN TO APPLICANT)   Initial Conditions   Plant is at 100% power with all systems in AUTO. 1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low. 0-AP-53.00 actions have been completed with 1-MS-PT-1447, Channel IV Turbine First Stage Pressure selected. All components have been returned to Automatic with the exception of Rod Control. Initiating Cues   You are the Unit 1 Reactor Operator. Restore Control Bank "D" to 228 steps in three (3) step increments.
Surry 2014-301 "JPM a"  Page 6 of 8  ____________________________________________________________________________________
When complete, return Rod Control to AUTO. When you have completed this task, please inform me.
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Surry 2014-301 "JPM b"              Page 1 of 13  U.S. Nuclear Regulatory Commission Surry Power Station   SR14301  Simulator Job Performance Measure [KA 004A4.07 3.9/3.7]    Applicant________________________________     Start Time___________________ Examiner_______________________________
Task  Task is to be performed in the simulator.
Date ___________________________________   Stop Time___________________ Title  Perform an Alternate Dilution of the RCS. K/A: Ability to manually operate and/or monitor in the control room: Boration/dilution 3.9 / 3.7 Applicability     Estimated Time  Actual Time RO/SRO(I)/SRO(U)     10 Minutes     ___  Minutes                     Conditions   Task is to be Performed in the simulator. A ramp increase in power is occurring which requires a dilution. Standards   1-OP-CH-021, Alternate Dilution Using Blender. Initiating Cues   Reactivity SRO Direction. A ramp increase in power requires a Dilution. Terminating Cues   Report to Shift Supervision, blender returned to automatic. Procedures 1-OP-CH-021, Alternate Dilution Using Blender, Rev 16   Tools and Equipment     Safety Considerations   None      None Surry 2014-301 "JPM b"              Page 2 of 13 Simulator Setup   Reset to IC 272 OR Call up 25% power IC and initialize. Place simulator in RUN. Ramp the Unit to 30% power and match Tave and Tref. Shift Station Service bus power from RSSTs to SSTs. Set PG Flow Control 1-CH-FC-1114A to 4.0 on the pot. Initial Conditions   Unit 1 is at 30% power. The 30% hold for a flux map on Unit 1 is complete. Power escalation to 100% in accordance with 1-GOP-1.5, Unit Startup, 2% to Reactor Power to Max Allowable Power, is about to recommence. Initiating Cues   You are to perform a 200 gallon Alternate Dilute only to the suction of the charging pump in accordance with 1-OP-CH-021. When you finish the actions necessary to accomplish this task, please inform me.
Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.
Surry 2014-301 "JPM b"              Page 3 of 13 PERFORMANCE CHECKLIST   Notes to the Evaluator   This JPM may be Pre-briefed as directed by the Chief Examiner. Task critical elements are bolded and denoted by an asterisk (*). An additional instructor may be needed to silence and acknowledge alarms for the examinee. START TIME_______:             STEP 1:  1-OP-CH-021, Initial Conditions. Check Primary Grade water is available to the Blender. STANDARD:   a) Candidate checks PG pressure normal on Boron Recovery Panel. EVALUATOR'S NOTE:   COMMENTS:   _______ SAT _______ UNSAT   STEP 2:  1-OP-CH-021, Precautions and Limitations.
Initial Conditions  Plant is at 100% power with all systems in AUTO.
Candidate reviews and initials Precautions and Limitations. STANDARD: a) Candidate Reviews and initials P&L 4.1 through 4.8. EVALUATOR'S NOTE:   None  COMMENTS:   _______ SAT _______ UNSAT Surry 2014-301 "JPM b"              Page 4 of 13 STEP 3:
1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low
1-OP-CH-021. (Step 5.1.1)  Candidate acknowledges two (2) NOTES prior to Step 5.1. Candidate Notifies Shift Supervision of Impending Dilution. STANDARD: a) Candidate acknowledges this subsection is used for the first dilution of the shift. Attachment 1 is used for subsequent dilutions. b) Candidate identifies excess letdown NOT in service, 1-OP-CH-007 not required. c) Candidate Notifies Shift Supervision/Evaluator of impending Alternate Dilution. EVALUATOR'S NOTE:
. 0-AP-53.00 actions have been completed with 1
When notified:  Acknowledge Candidate will be performing an Alternate Dilution. COMMENTS:    _______ SAT  _______ UNSAT  STEP 4:  1-OP-CH-021. (Step 5.1.2)  Notify STA of impending Alternate Dilution. STANDARD:  a) Candidate notifies STA/Evaluator of impending Alternate Dilute. EVALUATOR'S NOTE:
-MS-PT-1447, Channel IV Turbine First Stage Pressure selected. All components have been returned to Automatic with the exception of Rod Control
. Initiating Cues You are the Unit 1 Reactor Operator. Restore Control Bank "D" to 228 steps in three (3) step increments.
When complete, return Rod Control to AUTO.
When you have completed this task, please inform me
.
Surry 2014-301 "JPM a"  Page 7 of 8  Reference for Evaluator
 
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions Plant is at 100% power with all systems in AUTO.
1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low
. 0-AP-53.00 actions have been completed with 1
-MS-PT-1447, Channel IV Turbine First Stage Pressure selected. All components have been returned to Automatic with the exception of Rod Control
. Initiating Cues You are the Unit 1 Reactor Operator. Restore Control Bank "D" to 228 steps in three (3) step increments.
 
When complete, return Rod Control to AUTO.
When you have completed this task, please inform me
.
Surry 2014-301 "JPM b"              Page 1 of 13  U.S. Nuclear Regulatory Commission Surry Power Station SR14301  Simulator Job Performance Measure [KA 004A4.07 3.9/3.7
]    Applicant________________________________
Start Time___________________
Examiner_______________________________
 
Date ___________________________________
Stop Time___________________
Title  Perform an Alternate Dilution of the RCS.
K/A: Ability to manually operate and/or monitor in the control room: Boration/dilution 3.9 / 3.7 Applicability Estimated Time  Actual Time RO/SRO(I)/SRO(U) 10 Minutes
___  Minutes Conditions Task is to be Performed in the simulator.
A ramp increase in power is occurring which requires a dilution.
Standards 1-OP-CH-021, Alternate Dilution Using Blender
. Initiating Cues Reactivity SRO Direction
. A ramp increase in power requires a Dilution
. Terminating Cues Report to Shift Supervision, blender returned to automatic
. Procedures
 
1-OP-CH-021, Alternate Dilution Using Blender, Rev 16 Tools and Equipment Safety Considerations None      None Surry 2014-301 "JPM b"              Page 2 of 13 Simulator Setup Reset to IC 272 OR Call up 25% power IC and initialize. Place simulator in RUN.
Ramp the Unit to 30% power and match Tave and Tref.
Shift Station Service bus power from RSSTs to SSTs.
Set PG Flow Control 1
-CH-FC-1114A to 4.0 on the pot. Initial Conditions Unit 1 is at 30% power.
The 30% hold for a flux map on Unit 1 is complete.
Power escalation to 100% in accordance with 1
-GOP-1.5, Unit Startup, 2% to Reactor Power to Max Allowable Power, is about to recommence.
Initiating Cues You are to perform a 200 gallon Alternate Dilute only to the suction of the charging pump in accordance with 1
-OP-CH-021. When you finish the actions necessary to accomplish this task, please inform me.
 
Surry 2014-301 "JPM b"              Page 3 of 13 PERFORMANCE CHECKLIST Notes to the Evaluator This JPM may be Pre-briefed as directed by the Chief Examiner
. Task critical elements are bolded and denoted by an asterisk (
*). An additional instructor may be needed to silence and acknowledge alarms for the examinee.
START TIME_______:
STEP 1:  1-OP-CH-021, Initial Conditions.
Check Primary Grade water is available to the Blender.
STANDARD:
a) Candidate checks PG pressure normal on Boron Recovery Panel
. EVALUATOR'S NOTE:
COMMENTS:
_______ SAT
_______ UNSAT STEP 2:  1-OP-CH-021, Precautions and Limitations.
 
Candidate reviews and initials Precautions and Limitations.
STANDARD:
a) Candidate Reviews and initials P&L 4.1 through 4.8. EVALUATOR'S NOTE:
None  COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM b"              Page 4 of 13 STEP 3:
1-OP-CH-021. (Step 5.1.1)  Candidate acknowledges two (2) NOTES prior to Step 5.1.
Candidate Notifies Shift Supervision of Impending Dilution.
STANDARD:
a) Candidate acknowledges this subsection is used for the first dilution of the shift. Attachment 1 is used for subsequent dilutions.
b) Candidate identifies excess letdown NOT in service, 1
-OP-CH-007 not required.
c) Candidate Notifies Shift Supervision/Evaluator of impending Alternate Dilution.
EVALUATOR'S NOTE:
 
When notified:  Acknowledge Candidate will be performing an Alternate Dilution.
When notified:  Acknowledge Candidate will be performing an Alternate Dilution.
COMMENTS:
COMMENTS:
_______ SAT  _______ UNSAT Surry 2014-301 "JPM b"              Page 5 of 13 STEP 5:
_______ SAT
1-OP-CH-021. (Step 5.1.3)  Place the MAKE-UP MODE CNTRL switch in STOP STANDARD:   a) Candidate places Blender Mode Control switch in STOP position. b) Candidate Checks RED Light out and GREEN light illuminates. EVALUATOR'S NOTE:
_______ UNSAT STEP 4: 1-OP-CH-021. (Step 5.1.2)  Notify STA of impending Alternate Dilution.
STANDARD:
a) Candidate notifies STA/Evaluator of impending Alternate Dilute. EVALUATOR'S NOTE:
 
When notified:  Acknowledge Candidate will be performing an Alternate Dilution
.
COMMENTS:
 
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM b"              Page 5 of 13 STEP 5:
1-OP-CH-021. (Step 5.1.3)  Place the MAKE
-UP MODE CNTRL switch in STOP STANDARD:
a) Candidate p laces Blender Mode Control switch in STOP position
. b) Candidate Checks RED Light out and GREEN light illuminates.
EVALUATOR'S NOTE:
 
If asked: Acknowledge Candidates request for a peer check.
If asked: Acknowledge Candidates request for a peer check.
COMMENTS:    _______ SAT
 
_______ UNSAT  STEP 6:  1-OP-CH-021. (Step 5.1.4)    Adjust PG Flow Rate and Total gallons for the Dilution.
STANDARD:  a) Checks 1-CH-FC-1114A, PG Flow CNTRL set at 100 gpm (refers to Attachment 2, as necessary. b) Determines required integrator setpoint by filling in blank for desired dilution, subtracting anticipated additional flow using P&L 4.7 as required, and writing 196 in GPM blank. c) Enter value in 1-YS-1114 PRI WATER SUP BATCH INTEGRATOR.
EVALUATOR'S NOTE:  If asked concerning a) above: PG Flow Control not previously set. If asked concerning IV for Steps a) and b) above:  State that the Candidate may assume an IV has been performed, please continue with the Task.
COMMENTS:    _______ SAT  _______ UNSAT Surry 2014-301 "JPM b"              Page 6 of 13 STEP 7:
1-OP-CH-021. (Step 5.1.5)  Place the MAKE-UP MODE SEL switch in the ALT DIL position. STANDARD:  *a) Places the MAKE-UP MODE SEL switch in the ALT DIL position. This is a critical step.
EVALUATOR'S NOTE:              1-CH-FCV-1113A automatically CLOSES. COMMENTS:    _______ SAT  _______ UNSAT  STEP 8:  1-OP-CH-021. (Step 5.1.6)    Place 1-CH-FCV-1114B, BLENDER TO VCT, in the CLOSE position. STANDARD:  a) Candidate remembers from Directions that PG flow is to be aligned to the charging pump suction.  *b) Places 1-CH-FCV-1114B, BLENDER TO VCT, in the CLOSE position. This is a critical step. EVALUATOR'S NOTE:  If asked: PG flow is to be aligned to the charging pump suction.
COMMENTS:
COMMENTS:
_______ SAT  _______ UNSAT   
_______ SAT
 
_______ UNSAT STEP 6: 1-OP-CH-021. (Step 5.1.4)    Adjust PG Flow Rate and Total gallons for the Dilution.
 
STANDARD:
a) Checks 1-CH-FC-1114A, PG Flow CNTRL set at 100 gpm (refers to Attachment 2, as necessary
. b) Determines required integrator setpoint by filling in blank for desired dilution, subtracting anticipated additional flow using P&L 4.7 as required, and writing 196 in GPM blank
. c) Enter value in 1
-YS-1114 PRI WATER SUP BATCH INTEGRATOR.
 
EVALUATOR'S NOTE:
If asked concerning a) above: PG Flow Control not previously set.
If asked concerning IV for Steps a) and b) above
:  State that the Candidate may assume an IV has been performed, please continue with the Task.
 
COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM b"              Page 6 of 13 STEP 7:
1-OP-CH-021. (Step 5.1.5)  Place the MAKE-UP MODE SEL switch in the ALT DIL position
. STANDARD:
  *a) Places the MAKE
-UP MODE SEL switch in the ALT DIL position
. This is a critical step.
 
EVALUATOR'S NOTE:
 
1-CH-FCV-1113A automatically CLOSES.
COMMENTS:
_______ SAT
_______ UNSAT STEP 8: 1-OP-CH-021. (Step 5.1.6)    Place 1-CH-FCV-1114B, BLENDER TO VCT, in the CLOSE position.
STANDARD:
a) Candidate remembers from Directions that PG flow is to be aligned to the charging pump suction.
  *b) Places 1-CH-FCV-1114B, BLENDER TO VCT, in the CLOSE position.
This is a critical step.
EVALUATOR'S NOTE:
If asked: PG flow is to be aligned to the charging pump suction.
 
COMMENTS:
 
_______ SAT
_______ UNSAT


Surry 2014-301 "JPM b"              Page 7 of 13 STEP 9:
Surry 2014-301 "JPM b"              Page 7 of 13 STEP 9:
1-OP-CH-021. (Step 5.1.7 and 5.1.8)  Place the MAKE-UP MODE CNTRL switch in the START position. STANDARD:   *a) Places the MAKE-UP MODE CNTRL switch in the START position. This is a critical step b) Checks the following conditions:   a. 1-CH-FCV-1113A, BORIC ACID TO BLENDER, is closed. b. 1-CH-FCV-1113B, BLENDER TO CHG PUMP, is open. c. 1-CH-FCV-1114A, PGW TO BLENDER, is controlling in AUTO c) Checks flow indicated on 1-CH-FR-1113, PG Flow, equals desired flow rate. d) Checks Integrator counting to desired total gallons. EVALUATOR'S NOTE:  None. COMMENTS:
1-OP-CH-021. (Step 5.1.7 and 5.1.8
_______ SAT _______ UNSAT   STEP 10:  1-OP-CH-021. (Step 5.1.9 and 5.1.10)  Stopping dilution. STANDARD:   a) Candidate monitors Dilution and Stops the dilution by: Placing MAKE-UP MODE CNTRL switch in the STOP position, OR  Observing 1-CH-FCV-1113B closes and Integrator total gallons settles on 200 gallons (199-201). EVALUATOR'S NOTE:   Candidate may perform either bulleted item listed above.
)  Place the MAKE-UP MODE CNTRL switch in the START position.
* Ceasing of the Dilution is critical for this step. (Range of 199-201 due to blender overshoot or undershoot) COMMENTS:
STANDARD:
_______ SAT _______ UNSAT
  *a) Places the MAKE
-UP MODE CNTRL switch in the START position.
This is a critical step b) Checks the following conditions:
: a. 1-CH-FCV-1113A, BORIC ACID TO BLENDER, is closed.
: b. 1-CH-FCV-1113B, BLENDER TO CHG PUMP, is open.
: c. 1-CH-FCV-1114A, PGW TO BLENDER, is controlling in AUTO c) Checks flow indicated on 1
-CH-FR-1113, PG Flow, equals desired flow rate.
d) Checks Integrator counting to desired total gallons.
EVALUATOR'S NOTE:  None. COMMENTS:
 
_______ SAT
_______ UNSAT STEP 10:  1-OP-CH-021. (Step 5.1.9 and 5.1.10
)  Stopping dilution
. STANDARD:
a) Candidate monitors Dilution and Stops the dilution by:
Placing MAKE-UP MODE CNTRL switch in the STOP position, OR  Observing 1
-CH-FCV-1113B closes and Integrator total gallons settles on 200 gallons (199-201). EVALUATOR'S NOTE:
Candidate may perform either bulleted item listed above.
* Ceasing of the Dilution is critical for this step.
(Range of 199
-201 due to blender overshoot or undershoot)
COMMENTS:
 
_______ SAT
_______ UNSAT


Surry 2014-301 "JPM b"              Page 8 of 13 STEP 11:
Surry 2014-301 "JPM b"              Page 8 of 13 STEP 11:
1-OP-CH-021. (Step 5.1.11, 5.1.12, 5.1.13)  Return the Blender to Automatic. STANDARD:   a) Places the control switch for 1-CH-FCV-1114B to AUTO position. b) Places the MAKE-UP MODE SEL switch in the AUTO position. *c) Places the MAKE-UP MODE CNTRL to START. This is a critical step.
1-OP-CH-021. (Step 5.1.11, 5.1.12, 5.1.13
EVALUATOR'S NOTE:   None. COMMENTS:     _______ SAT
)  Return the Blender to Automatic
_______ UNSAT     Notify Shift Supervision/Evaluator of Blender status. END OF JPM. STOP TIME: _______________________________________
. STANDARD:
a) Places the control switch for 1
-CH-FCV-1114B to AUTO position
. b) Places the MAKE
-UP MODE SEL switch in the AUTO position.
  *c) Places the MAKE
-UP MODE CNTRL to START
. This is a critical step.
 
EVALUATOR'S NOTE:
None. COMMENTS:
_______ SAT
 
_______ UNSAT Notify Shift Supervision/Evaluator of Blender status
. END OF JPM.
STOP TIME:
_______________________________________
 
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
 
____________________________________________________________________________________


____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
__________________________________________________________________________________
__  ____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
 
____________________________________________________________________________________  ____________________________________________________________________________________
____________________________________________________________________________________  ____________________________________________________________________________________
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)   Initial Conditions   Unit 1 is at 30% power. The 30% hold for a flux map on Unit 1 is complete. Power escalation to 100% in accordance with 1-GOP-1.5, Unit Startup, 2% to Reactor Power to Max Allowable Power, is about to recommence. Initiating Cues   You are to perform a 200 gallon Alternate Dilute only to the suction of the charging pump in accordance with 1-OP-CH-021. When you finish the actions necessary to accomplish this task, please inform me.
 
Operator Directions Handout (TO BE GIVEN TO APPLICANT)  Initial Conditions   Unit 1 is at 30% power. The 30% hold for a flux map on Unit 1 is complete. Power escalation to 100% in accordance with 1-GOP-1.5, Unit Startup, 2% to Reactor Power to Max Allowable Power, is about to recommence. Initiating Cues  You are to perform a 200 gallon Alternate Dilute only to the suction of the charging pump in accordance with 1-OP-CH-021. When you finish the actions necessary to accomplish this task, please inform me.
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Surry 2014-301 "JPM c"                Page 1 of 12  U.S. Nuclear Regulatory Commission Surry Power Station   SR09301  Simulator Job Performance Measure WE14EA1.3 (3.3/3.8)
Initial Conditions Unit 1 is at 30% power.
Applicant________________________________     Start Time___________________
The 30% hold for a flux map on Unit 1 is complete.
Examiner_______________________________ Date ___________________________________   Stop Time___________________ Title  CONFIGURE SPRAY SYSTEMS IN ACCORDANCE WITH ECA-1.1 (LOSS OF EMERGENCY RECIRCULATION). K/A: WE14EA1.3 Ability to operate and / or monitor the following as they apply to the (High Containment Pressure). Desired operating results during abnormal and emergency situations. Applicability     Estimated Time  Actual Time RO/SRO(I)/SRO(U)     10 Minutes                         Conditions   Task is to be PERFORMED in the simulator. A LBLOCA has occurred and both LHSI pumps are inoperable. 1-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8. Standards   1-ECA-1.1, Loss of Emergency Coolant Recirculation, steps 8 and 9 are complete which result in 1-RS-P-2B in service to 1-RS-E-1D (with service water aligned) and 1-CS-P-1A and 1B in service. Initiating Cues   1-ECA-1.1 step 8. Shift Manager direction Terminating Cues 1-ECA-1.1 steps 8 and 9 complete. Procedures   1-ECA-1.1, Loss of Emergency Coolant Recirculation, Rev. 37.
Power escalation to 100% in accordance with 1
Surry 2014-301 "JPM c"                Page 2 of 12 Tools and Equipment     Safety Considerations None      None  Simulator Setup Call up 100% power IC and initialize (or IC-270). Enter the following malfunctions: o RS1001- TRN A HI HI CLS FAILS TO ACTIVATE- INSERT o RS1002- TRN B HI HI CLS FAILS TO ACTIVATE- INSERT o RC0102- RCS COLD LEG B PIPE RUPTURE- INSERT o RS0702- LOSS OF INSIDE RECIRC SPR PP 1B - Trigger 4 o SI0901- LHSI PUMP SI-P-1A OVERCURRENT TRIP- Trigger 1 o SI0902- LHSI PUMP SI-P-1B OVERCURRENT TRIP- Trigger 1 Setup the following event trigger- Event action- rsp1b_amp>0.1 - Event 4  Set up the following switch override- MOVSW104A_OPEN- OFF - INSERT  Set up the following MOV override - SWMOV105C_BKR - set to OPEN and INSERT. Place the simulator in RUN and perform 1-E-0 steps, then transition to 1-E-1 and perform steps 1 on step 18 insert trigger 1 and transition to 1-ECA-1.1. Do not worry about stopping unloaded EDGs in E-1. Start 1-CS-P-1A and open 1-CS-MOV-101A/B and 1-CS-MOV-102A. Open 1-CS-MOV-101C, and 1-CS-MOV-101D. Ensure containment sump level is >4'. On recall of JPM, activate/check activated Trigger 4. Initial Conditions   A LBLOCA has occurred with the failure of Hi-Hi CLS to function and failure of both LHSI pumps. 1-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8. Initiating Cues   You are the Unit 1 RO. Align Recirc Spray and Containment Spray in accordance with 1-ECA-1.1, steps 8 and 9. When you finish the actions necessary to accomplish this, please inform me. Notes Surry 2014-301 "JPM c"                Page 3 of 12 PERFORMANCE CHECKLIST   Notes to the Evaluator   Task critical elements are bolded and noted at the end of the step as CRITIAL STEP. An additional instructor may be needed to silence and acknowledge alarms for the examinee. START TIME:             STEP 1:  CAUTION AND NOTE PRIOR TO STEP 8   CAUTION: Operation of an OSRS pump without the associated CS pump could   cause cavitation as indicated by fluctuating amperage. NOTE:  If CLS can NOT be reset, local breaker operation will be required to   stop CS and ISRS pumps. STANDARD:   Acknowledges caution and note. COMMENTS:   _______ SAT _______ UNSAT   STEP 2:  Check for EITHER of the following (Step 8a):    - RUNNING OR REQUIRED     OR  - LESS THAN 20%
-GOP-1.5, Unit Startup, 2% to Reactor Power to Max Allowable Power, is about to recommence.
STANDARD:   Observes 1-CS-P-1A running and continues to substep b. EVALUATOR'S NOTE: N/A COMMENTS:   _______ SAT _______ UNSAT Surry 2014-301 "JPM c"                Page 4 of 12 STEP 3:  Check CTMT sump level - GREATER THAN 4.0 ft (Step 8b). STANDARD:   Verifies containment sump level >4'. EVALUATOR'S NOTE: N/A  COMMENTS:     _______ SAT
Initiating Cues You are to perform a 200 gallon Alternate Dilute only to the suction of the charging pump in accordance with 1
_______ UNSAT   STEP 4:  Check SW aligned to at least two RS HXs (Step 8c). STANDARD:   Observes that service water is not aligned to ANY RS HXs and goes to step 8c RNO. EVALUATOR'S NOTE: N/A COMMENTS:     _______ SAT _______ UNSAT Surry 2014-301 "JPM c"                Page 5 of 12 STEP 5:    Align SW to at least two RS HXs (Step 8c RNO). STANDARD:
-OP-CH-021. When you finish the actions necessary to accomplish this task, please inform me.
* Opens 1-SW-MOV-103A- either this valve or 103B must be opened- one valve must be open as a critical step.
 
* Opens 1-SW-MOV-103B- either this valve or 103A must be opened- one valve must be open as a critical step. Opens 1-SW-MOV-103C. Opens 1-SW-MOV-103D. Opens 1-SW-MOV-104A - Determines that valve will not open. Opens 1-SW-MOV-104B. Opens 1-SW-MOV-104C.
Operator Directions Handout (TO BE GIVEN TO APPLICANT)  Initial Conditions Unit 1 is at 30% power.
* Opens 1-SW-MOV-104D - This is a critical step. Opens 1-SW-MOV-105A. Opens 1-SW-MOV-105B. Opens 1-SW-MOV-105C - Determines that valve will not open.
The 30% hold for a flux map on Unit 1 is complete.
* Opens 1-SW-MOV-105D - This is a critical step. EVALUATOR'S NOTE:  N/A   BOOTH NOTE: If asked:  Trainee may dispatch operator to investigate supply breaker to 1-SW-MOV-104A. Report time compression has occurred and there are no abnormal indications on 1-SW-MOV-104A (1H1-2N-7B) supply breaker. If asked:  Trainee may dispatch operator to investigate supply breaker for 1-SW-MOV-105C. Report time compression has occurred and that the supply breaker (1H1-2N-8C) has tripped. COMMENTS:     _______ SAT _______ UNSAT Surry 2014-301 "JPM c"                Page 6 of 12 STEP 6:  Start RS pumps associated with aligned RS HXs (Step 8d) STANDARD:   Trainee starts 1-RS-P-1B ("B" RS HX) Trainee observes that 1-RS-P-1B tripped and continues.
Power escalation to 100% in accordance with 1
* Trainee starts 1-RS-P-2B ("D" RS HX) - This is a critical step. EVALUATOR'S NOTE: N/A BOOTH NOTE: If directed to investigate breaker for 1-RS-P-1B (14J4), report that breaker is tripped as indicated by a 'Bell Lockout'.
-GOP-1.5, Unit Startup, 2% to Reactor Power to Max Allowable Power, is about to recommence.
COMMENTS:   _______ SAT _______ UNSAT   STEP 7:  CAUTIONS PRIOR TO STEP 9   CAUTION:   CHG and LHSI pumps taking suction from the RWST must be stopped when level decreases to 6%. CS pumps taking suction from the RWST must be stopped when level decreases to 3%. STANDARD:   Acknowledges cautions       EVALUATOR'S NOTE: N/A COMMENTS:
Initiating Cues  You are to perform a 200 gallon Alternate Dilute only to the suction of the charging pump in accordance with 1
_______ SAT _______ UNSAT
-OP-CH-021. When you finish the actions necessary to accomplish this task, please inform me.
 
Surry 2014-301 "JPM c"                Page 1 of 12  U.S. Nuclear Regulatory Commission Surry Power Station SR09301  Simulator Job Performance Measure WE14EA1.3 (3.3/3.8)
Applicant________________________________
Start Time___________________
 
Examiner_______________________________
Date ___________________________________
Stop Time___________________
Title  CONFIGURE SPRAY SYSTEMS IN ACCORDANCE WITH ECA
-1.1 (LOSS OF EMERGENCY RECIRCULATION).
K/A: WE14EA1.3 Ability to operate and / or monitor the following as they apply to the (High Containment Pressure). Desired operating results during abnormal and emergency situations.
Applicability Estimated Time  Actual Time
 
RO/SRO(I)/SRO(U) 10 Minutes  
 
Conditions Task is to be PERFORMED in the simulator.
A LBLOCA has occurred and both LHSI pumps are inoperable. 1
-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.
Standards 1-ECA-1.1, Loss of Emergency Coolant Recirculation, steps 8 and 9 are complete which result in 1
-RS-P-2B in service to 1
-RS-E-1D (with service water aligned) and 1
-CS-P-1A and 1B in service
. Initiating Cues 1-ECA-1.1 step 8.
Shift Manager direction Terminating Cues 1-ECA-1.1 steps 8 and 9 complete.
Procedures 1-ECA-1.1, Loss of Emergency Coolant Recirculation, Rev. 37
.
Surry 2014-301 "JPM c"                Page 2 of 12 Tools and Equipment Safety Considerations None      None  Simulator Setup Call up 100% power IC and initialize (or IC
-270). Enter the following malfunctions:
o RS1001- TRN A HI HI CLS FAILS TO ACTIVATE
- INSERT o RS1002- TRN B HI HI CLS FAILS TO ACTIVATE
- INSERT o RC0102- RCS COLD LEG B PIPE RUPTURE
- INSERT o RS0702- LOSS OF INSIDE RECIRC SPR PP 1B  
- Trigger 4 o SI0901- LHSI PUMP SI
-P-1A OVERCURRENT TRIP- Trigger 1 o SI0902- LHSI PUMP SI
-P-1B OVERCURRENT TRIP
- Trigger 1 Setup the following event trigger
- Event action
- rsp1b_amp>0.1  
- Event 4  Set up the following switch override
- MOVSW104A_OPEN
- OFF - INSERT  Set up the following MOV override  
- SWMOV105C_
BKR - set to OPEN and INSERT.
Place the simulator in RUN and perform 1
-E-0 steps, then transition to 1
-E-1 and perform steps 1 on step 18 insert trigger 1 and transition to 1
-ECA-1.1. Do not worry about stopping unloaded EDGs in E
-1. Start 1-CS-P-1A and open 1
-CS-MOV-101A/B and 1
-CS-MOV-102A. Open 1-CS-MOV-101C, and 1
-CS-MOV-101D. Ensure containment sump level is >4'.
On recall of JPM, activate/check activated Trigger 4
. Initial Conditions A LBLOCA has occurred with the failure of Hi
-Hi CLS to function and failure of both LHSI pumps. 1
-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.
Initiating Cues You are the Unit 1 RO. Align Recirc Spray and Containment Spray in accordance with 1
-ECA-1.1, steps 8 and  
: 9. When you finish the actions necessary to accomplish this, please inform me.
Notes Surry 2014-301 "JPM c"                Page 3 of 12 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and noted at the end of the step as CRITIAL STEP.
An additional instructor may be needed to silence and acknowledge alarms for the examinee.
START TIME:
STEP 1:  CAUTION AND NOTE PRIOR TO STEP 8 CAUTION:
Operation of an OSRS pump without the associated CS pump could cause cavitation as indicated by fluctuating amperage.
NOTE:  If CLS can NOT be reset, local breaker operation will be required to stop CS and ISRS pumps.
STANDARD:
Acknowledges caution and note.
COMMENTS:
_______ SAT
_______ UNSAT STEP 2:  Check for EITHER of the following (Step 8a)
:    - RUNNING OR REQUIRED OR  - LESS THAN 20%
 
STANDARD:
Observes 1
-CS-P-1A running and continues to substep b.
EVALUATOR'S NOTE: N/A COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM c"                Page 4 of 12 STEP 3:  Check CTMT sump level  
- GREATER THAN 4.0 ft (Step 8b)
. STANDARD:
Verifies containment sump level >4'.
EVALUATOR'S NOTE: N/A  COMMENTS:
_______ SAT
 
_______ UNSAT STEP 4:  Check SW aligned to at least two RS HXs (Step 8c).
STANDARD:
Observes that service water is not aligned to ANY RS HXs and goes to step 8c RNO. EVALUATOR'S NOTE: N/A
 
COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM c"                Page 5 of 12 STEP 5:    Align SW to at least two RS HXs (Step 8c RNO)
. STANDARD:
* Opens 1-SW-MOV-103A- either this valve or 103B must be opened
- one valve must be open as a critical step.
* Opens 1-SW-MOV-103B- either this valve or 103A must be opened- one valve must be open as a critical step.
Opens 1-SW-MOV-103C. Opens 1-SW-MOV-103D. Opens 1-SW-MOV-104A - Determines that valve will not open
. Opens 1-SW-MOV-104B. Opens 1-SW-MOV-104C.
* Opens 1-SW-MOV-104D - This is a critical step.
Opens 1-SW-MOV-105A. Opens 1-SW-MOV-105B. Opens 1-SW-MOV-105C - Determines that valve will not open
.
* Opens 1-SW-MOV-105D - This is a critical step.
EVALUATOR'S NOTE:  N/A BOOTH NOTE:
If asked:  Trainee may dispatch operator to investigate supply breaker to 1-SW-MOV-104A. Report time compression has occurred and there are no abnormal indication s on 1-SW-MOV-104A (1H1
-2N-7B) supply breaker.
If asked:  Trainee may dispatch operator to investigate supply breaker for 1
-SW-MOV-105C. Report time compression has occurred and that the supply breaker (1H1
-2N-8C) has tripped.
COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM c"                Page 6 of 12 STEP 6:  Start RS pumps associated with aligned RS HXs (Step 8d)
STANDARD:
Trainee starts 1
-RS-P-1B ("B" RS HX)
Trainee observes that 1
-RS-P-1B tripped and continues.
* Trainee starts 1
-RS-P-2B ("D" RS HX)  
- This is a critical step.
EVALUATOR'S NOTE: N/A BOOTH NOTE:
If directed to investigate breaker for 1
-RS-P-1B (14J4), report that breaker is tripped as indicated by a 'Bell Lockout'.
 
COMMENTS:
_______ SAT
_______ UNSAT STEP 7:  CAUTIONS PRIOR TO STEP 9 CAUTION:
CHG and LHSI pumps taking suction from the RWST must be stopped when level decreases to 6%.
CS pumps taking suction from the RWST must be stopped when level decreases to 3%. STANDARD:
Acknowledges cautions EVALUATOR'S NOTE: N/A
 
COMMENTS:
 
_______ SAT
_______ UNSAT


Surry 2014-301 "JPM c"                Page 7 of 12 STEP 8:
Surry 2014-301 "JPM c"                Page 7 of 12 STEP 8:
Determine number of CS pumps required (Step 9a):    STANDARD:   Determines that containment pressure is between 14 psia and 60 psia, fewer than two RS pumps are running, and determines that 2 CS pumps are required. EVALUATOR'S CUE:  If asked, there are no abnormalities noted on either containment spray pump.
Determine number of CS pumps required (Step 9a)
COMMENTS:     _______ SAT _______ UNSAT   STEP 9:  CS pumps running - EQUAL TO NUMBER REQUIRED (Step 9b)     STANDARD:   Determines that 2 CS pumps are required, but only 1 currently in service. Goes to step 9 RNO.       EVALUATOR'S NOTE: N/A COMMENTS:   _______ SAT
:    STANDARD:
_______ UNSAT Surry 2014-301 "JPM c"                Page 8 of 12 STEP 10:
Determines that containment pressure is between 14 psia and 60 psia, fewer than two RS pumps are running, and determines that 2 CS pumps are required.
Do the following (Step 9b RNO):  1)  Manually operate CS pump(s).       2) Close associated CS pump discharge MOVs for stopped pump(s):   -CS-P-1A, 1-CS-MOV-101A and 1-CS-MOV-101B    -CS-P-1B, 1-CS-MOV-101C and 1-CS-MOV-101D    STANDARD:
EVALUATOR'S CUE:  If asked, there are no abnormalities noted on either containment spray pump.
* Trainee starts 1-CS-P-1B. This is a critical step.       EVALUATOR'S NOTE: N/A COMMENTS:   _______ SAT _______ UNSAT STEP 11:
 
REPORT TO SHIFT SUPERVISOR (EVALUATOR). STANDARD: Verbal status report that CS and RS have been aligned in accordance with ECA-1.1 steps 8 & 9.
COMMENTS:
EVALUATOR'S NOTE: N/A STOP TIME:             COMMENTS:   _______ SAT
_______ SAT
_______ UNSAT STOP TIME: ____________________________________________________________________________________  ____________________________________________________________________________________
_______ UNSAT STEP 9:  CS pumps running - EQUAL TO NUMBER REQUIRED (Step 9b)
____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
STANDARD:
Determines that 2 CS pumps are required, but only 1 currently in service.
Goes to step 9 RNO.
EVALUATOR'S NOTE: N/A
 
COMMENTS:
_______ SAT
 
_______ UNSAT
 
Surry 2014-301 "JPM c"                Page 8 of 12 STEP 10:
Do the following (Step 9b RNO)
:  1)  Manually operate CS pump(s).
: 2) Close associated CS pump discharge MOVs for stopped pump(s):
    -CS-P-1A, 1-CS-MOV-101A and 1
-CS-MOV-101B    -CS-P-1B, 1-CS-MOV-101C and 1
-CS-MOV-101D    STANDARD:
* Trainee starts 1
-CS-P-1B. This is a critical step.
EVALUATOR'S NOTE: N/A COMMENTS:
_______ SAT
_______ UNSAT STEP 11:
REPORT TO SHIFT SUPERVISOR (EVALUATOR).
STANDARD:
Verbal status report that CS and RS have been aligned in accordance with ECA
-1.1 steps 8 &  
: 9.
EVALUATOR'S NOTE: N/A STOP TIME:
COMMENTS:
_______ SAT
 
_______ UNSAT
 
STOP TIME:
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Operator Directions Handout  (TO BE READ TO APPLICANT BY EXAMINER)  Task  Task is to be performed in the simulator. Perform Steps 8 and 9 of 1-ECA-1.1, Loss of Emergency Coolant Recirculation, to align Recirc Spray and Containment Spray systems. Directions  The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task  Initial Conditions  A LBLOCA has occurred with the failure of Hi-Hi CLS to function and failure of both LHSI pumps. 1-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8. Initiating Cues  You are the Unit 1 RO. Align Recirc Spray and Containment Spray in accordance with 1-ECA-1.1, steps 8 and 9. When you finish the actions necessary to accomplish this, please inform me.
Operator Directions Handout  (TO BE GIVEN TO APPLICANT)  Initial Conditions  A LBLOCA has occurred with the failure of Hi-Hi CLS to function and failure of both LHSI pumps. 1-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8. Initiating Cues  You are the Unit 1 RO. Align Recirc Spray and Containment Spray in accordance with 1-ECA-1.1, steps 8 and 9. When you finish the actions necessary to accomplish this, please inform me.   


Surry 2014-301 "JPM d"              Page 1 of 20  U.S. Nuclear Regulatory Commission Surry Power Station   SR14301  Simulator Job Performance Measure EPEE02.EK3.3 (3.9/3.9) Alternate Path   Applicant________________________________     Start Time___________________ Examiner_______________________________
____________________________________________________________________________________
Date ___________________________________   Stop Time___________________ Title  Re-establish Normal Letdown Following SI K/A: EPEEE02.EK3.3 Knowledge of the reasons for the following responses as they apply to the (SI Termination): Manipulation of controls required to obtain desired operating results during abnormal, and emergency situations. 3.9 / 3/9 Applicability     Estimated Time  Actual Time RO/SRO(I)/     35 Minutes    ___  Minutes                     Conditions   Task is to be PERFORMED in the simulator. A spurious SI has occurred. E-0 has been performed, SI reduction criteria are satisfied, transition made to ES-1.1, and it has been performed through Step 14. Standards Excess letdown placed in service. Initiating Cues 1-ES-1.1, SI Termination, Step 15. Shift Manager direction. Terminating Cues   Report received that excess letdown is in service per 1-OP-CH-006. Procedures   1-ES-1.1, SI Termination, Rev. 48. 1-OP-CH-006, Shifting or Increasing/Decreasing Letdown Flow, Rev.20.
____________________________________________________________________________________
Surry 2014-301 "JPM d"              Page 2 of 20 Tools and Equipment     Safety Considerations   None      None Surry 2014-301 "JPM d"              Page 3 of 20 Simulator Setup   Call up 100% power IC and initialize (IC 268). Place simulator in RUN. Initiate SI. Perform E-0, reset SI, verify SI reduction criteria satisfied, transition to ES-1.1 and perform it through Step 14. Allow simulator until SR energize, place in freeze and snap until ready to run JPM. Close 1-CH-LCV-1460A & B. Initiate failure 1-CH-LCV-1460A shut; Switch O/R, CHLCV460A_CLOSE, ON, INSERT; CHLCV-460A_OPEN, OFF, INSERT. Open 1-CC0TV-109B. Press Green Pushbutton on 1-DG-TV-108A/B and pump down the PDTT. Set seal injection at 8 gpm. Verify PRZR Level Control Channel Select Switch is in the III/II position. Freeze simulator at these conditions for JPM performance. Initial Conditions   Plant was at 100% power with all systems operating normal and in automatic. The crew is currently recovering from a spurious SI initiation. 1-ES-1.1, SI Termination has been completed up to Step 15. SI has been reset. Initiating Cues   You are the Unit 1 RO. Re-establish letdown by performing step 15 of 1-ES-1.1. When you finish the actions necessary to accomplish this, please inform me. Notes Surry 2014-301 "JPM d"              Page 4 of 20 PERFORMANCE CHECKLIST   Notes to the Evaluator   Operator is given a copy of 1-ES-1.1, SI Termination, Step 15. When Operator determines the need to place excess letdown in service, give them a copy of 1-OP-CH-006, Shifting or Increasing/Decreasing Letdown Flow. Task critical elements are bolded and noted at the end of the step as CRITIAL STEP. START TIME:_______________:             STEP 1:  Adjust charging line flow to establish > 40 gpm. (Step 15a of ES-1.1)  STANDARD:   Checks that indicated CHG line flow is greater than 40 gpm by observing flow on 1-CH-FI-1122A. EVALUATOR'S NOTE:   COMMENTS:   _______ SAT
____________________________________________________________________________________
_______ UNSAT   STEP 2:  Open Letdown Line pressure control valve. (Step 15 b of ES-1.1)  1-CH-PCV-1145 STANDARD: *(a) Places 1-CH-PCV-1145 controller into MANUAL. This is a critical step. *(b) Adjusts demand increase button until 1-CH-PCV-1145 indicates open (zero demand indicated). This is a critical step.
 
EVALUATOR'S NOTE:     COMMENTS:   _______ SAT _______ UNSAT
____________________________________________________________________________________
 
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Task  Task is to be performed in the simulator.
Perform Steps 8 and 9 of 1-ECA-1.1, Loss of Emergency Coolant Recirculation, to align Recirc Spray and Containment Spray systems.
Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task Initial Conditions A LBLOCA has occurred with the failure of Hi
-Hi CLS to function and failure of both LHSI pumps. 1
-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.
Initiating Cues You are the Unit 1 RO. Align Recirc Spray and Containment Spray in accordance with 1
-ECA-1.1, steps 8 and
: 9. When you finish the actions necessary to accomplish this, please inform me.
 
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions A LBLOCA has occurred with the failure of Hi
-Hi CLS to function and failure of both LHSI pumps. 1
-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.
Initiating Cues You are the Unit 1 RO. Align Recirc Spray and Containment Spray in accordance with 1-ECA-1.1, steps 8 and
: 9. When you finish the actions necessary to accomplish this, please inform me.
 
Surry 2014-301 "JPM d"              Page 1 of 20  U.S. Nuclear Regulatory Commission Surry Power Station SR14301  Simulator Job Performance Measure EPEE02.EK3.3 (3.9/3.9)
Alternate Path Applicant________________________________
Start Time___________________
Examiner_______________________________
 
Date ___________________________________
Stop Time___________________
Title  Re-establish Normal Letdown Following SI K/A: EPEEE02.EK3.3 Knowledge of the reasons for the following responses as they apply to the (SI Termination):
Manipulation of controls required to obtain desired operating results during abnormal, and emergency situations.
3.9 / 3/9 Applicability Estimated Time  Actual Time RO/SRO(I)/
35 Minutes    ___  Minutes Conditions Task is to be PERFORMED in the simulator.
A spurious SI has occurred. E
-0 has been performed, SI reduction criteria are satisfied, transition made to ES
-1.1, and it has been performed through Step 14. Standards
 
Excess letdown placed in service.
Initiating Cues
 
1-ES-1.1, SI Termination, Step 15.
Shift Manager direction
. Terminating Cues Report received that excess letdown is in service per 1
-OP-CH-006. Procedures 1-ES-1.1, SI Termination, Rev. 48
. 1-OP-CH-006, Shifting or Increasing/Decreasing Letdown Flow, Rev.20.
Surry 2014-301 "JPM d"              Page 2 of 20 Tools and Equipment Safety Considerations None      None Surry 2014-301 "JPM d"              Page 3 of 20 Simulator Setup Call up 100% power IC and initialize (IC 268). Place simulator in RUN.
Initiate SI. Perform E
-0, reset SI, verify SI reduction criteria satisfied, transition to ES
-1.1 and perform it through Step 14. Allow simulator until SR energize, place in freeze and snap until ready to run JPM.
Close 1-CH-LCV-1460A & B. Initiate failure 1-CH-LCV-1460A shut
; Switch O/R, CHLCV460A_CLOSE, ON, INSERT; CHLCV
-460A_OPEN, OFF, INSERT
. Open 1-CC0TV-109B. Press Green Pushbutton on 1
-DG-TV-108A/B and pump down the PDTT.
Set seal injection at 8 gpm.
Verify PRZR Level Control Channel Select Switch is in the III/II position.
Freeze simulator at these conditions for JPM performance.
Initial Conditions Plant was at 100% power with all systems operating normal and in automatic
. The crew is currently recovering from a spurious SI initiation
. 1-ES-1.1, SI Termination has been completed up to Step 15.
SI has been reset.
Initiating Cues You are the Unit 1 RO
. Re-establish letdown by performing step 15 of 1
-ES-1.1. When you finish the actions necessary to accomplish this, please inform me
. Notes Surry 2014-301 "JPM d"              Page 4 of 20 PERFORMANCE CHECKLIST Notes to the Evaluator Operator is given a copy of 1
-ES-1.1, SI Termination, Step 15.
When Operator determines the need to place excess letdown in service, give them a copy of 1
-OP-CH-006, Shifting or Increasing/Decreasing Letdown Flow.
Task critical elements are bolded and noted at the end of the step as CRITIAL STEP.
START TIME:_______________
:
STEP 1:  Adjust charging line flow to establish > 40 gpm.
(Step 15a of ES-1.1)  STANDARD:
Checks that indicated C HG line flow is greater than 40 gpm by observing flow on 1
-CH-FI-1122A. EVALUATOR'S NOTE:
COMMENTS:
_______ SAT
 
_______ UNSAT STEP 2:  Open Letdown Line pressure control valve
. (Step 15 b of ES
-1.1)  1-CH-PCV-1145 STANDARD:
  *(a) Places 1-CH-PCV-1145 controller into MANUAL.
This is a critical step.
*(b) Adjusts demand increase button until 1
-CH-PCV-1145 indicates open (zero demand indicated)
. This is a critical step.
 
EVALUATOR'S NOTE:
COMMENTS:
_______ SAT
_______ UNSAT


Surry 2014-301 "JPM d"              Page 5 of 20 STEP 3:
Surry 2014-301 "JPM d"              Page 5 of 20 STEP 3:
Check closed or close letdown orifice isolation valves. (Step 15 c of ES-1.1)  1-CH-HCV-1200A  1-CH-HCV-1200B  1-CH-HCV-1200C  STANDARD:   a) Checks 1-CH-HCV-1200A closed. b) Checks 1-CH-HCV-1200B closed. c) Checks 1-CH-HCV-1200C closed. EVALUATOR'S NOTE:
Check closed or close letdown orifice isolation valves.
(Step 15 c of ES
-1.1)  1-CH-HCV-1200A  1-CH-HCV-1200B  1-CH-HCV-1200C  STANDARD:
a) Checks 1-CH-HCV-1200A closed
. b) Checks 1-CH-HCV-1200B closed.
c) Checks 1-CH-HCV-1200C closed.
EVALUATOR'S NOTE:
 
None.
None.
COMMENTS:   b  STEP 4:  Open letdown isolation valves. (Step 15 d of ES-1.1)  STANDARD:   *a) Opens 1-CH-TV-1204A. This is a critical step. *b) Opens 1-CH-TV-1204B. This is a critical step. *c) Attempts to open 1-CHLCV-1460A, Valve will not open. *d) Goes to Step 15 RNO, Establish excess letdown IAW 1-OP-CH-006, Shifting or Increasing/Decreasing letdown Flow. This is a critical step.
COMMENTS:
EVALUATOR'S NOTE:
b  STEP 4:  Open letdown isolation valves.
   [This step is the Fault] The Operator should determine the letdown isolation valve 1-CH-LCV-1460A has failed and apply the RNO for placing excess letdown in service. Operator may reduce charging at this point to minimize it to attempt to maintain PRZR level. When Operator determines the need to perform 1-OP-CH-006, hand him/her a copy of the  procedure.
(Step 15 d of ES
-1.1)  STANDARD:
  *a) Opens 1-CH-TV-1204A. This is a critical step.
  *b) Opens 1-CH-TV-1204B. This is a critical step.
  *c) Attempts to open 1
-CHLCV-1460A, Valve will not open.
  *d) Goes to Step 15 RNO, Establish excess letdown IAW 1
-OP-CH-006, Shifting or Increasing/Decreasing letdown Flow.
This is a critical step.
 
EVALUATOR'S NOTE:
 
   [This step is the Fault]
The Operator should determine the letdown isolation valve 1
-CH-LCV-1460A has failed and apply the RNO for placing excess letdown in service. Operator may reduce charging at this point to minimize it to attempt to maintain PRZR level. When Operator determines the need to perform 1
-OP-CH-006, hand him/her a copy of the  procedure.
 
COMMENTS:
 
_______ SAT
 
_______ UNSAT
 
Surry 2014-301 "JPM d"              Page 6 of 20 STEP 5:  1-OP-CH-006.
OBTAINS COPY OF 1
-OP-CH-006 FROM EVALUATOR STANDARD:
  (a) Reviews initial conditions, precautions and limitations.
  (b) Determines Section 5.1 is to be used.
COMMENTS:
_______ SAT
 
_______ UNSAT STEP 6:  1-OP-CH-006. (Steps 5.1.1 thru 5.1.4)
CHECK ALL LOOP DRAINS AND EXCESS LETDOWN ISOLATIONS ARE SHUT STANDARD:
  (a) Verifies all loop drains are shut (1
-RC-1557A, B, and C) using control board indicator lights.  (b) Verifies excess letdown HX isolation is shut (1
-CH-HCV-1201) using control board indicator lights.
  (c) Verifies excess letdown flow setpoint is at zero (1
-CH-HCV-1137).  (d) Verifies excess letdown divert valve (1
-CH-HCV-1389) is set to VCT.
 
EVALUATOR'S NOTE:
None. COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM d"              Page 7 of 20 STEP 7:  1-OP-CH-006. (Step 5.1.5 and 5.1.6
)  OPENS RCP SEAL RETURN
, 1-CH-MOV-1381. Check running at least one CCW pump. STANDARD:
  *(a) Opens RCP seal return isolation (1
-CH-MOV-1381) using control board controls.
This is a critical step.
  (b) Checks at least one CC pump running using control board indications.
EVALUATOR'S NOTE:
Step 5.1.7 is N/A.
 
COMMENTS:
_______ SAT
_______ UNSAT STEP 8:  1-OP-CH-006. (Step 5.1.
8 thru 5.1.12)
VERIFIES LETDOWN HX TEMPERATURE CONTROL AND EXCESS LETDOWN READY FOR SERVICE.
STANDARD:
    (a) Checks 1-CC-FI-109, LETDOWN HX OUTLET FLOW is ~ 1 60 gpm.  (b) Applies note concerning 1
-CC-HCV-108.  (c) Checks 1-CC-TI-108, LETDOWN HX OUTLET TEMP, is indicating ambient.
  (d) Checks 1-CH-PI-1138, EXCESS LETDOWN HX OUTLET PRESS, is approximately 50 psig.
  (e) Checks 1-CH-TI-1139, EXCESS LETDOWN HX OUTLET TEMP, is indicating ambient. COMMENTS:
 
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM d"              Page 8 of 20 STEP 9:  1-OP-CH-006. (Step 5.1.
13 thru 5.1.23)  ESTABLISH EXCESS LETDOWN FLOW PATH.
STANDARD:
  (a) Acknowledges note on first directing excess letdown to the PDTT.
  *(b) Places 1-CH-HCV-1389, EXCESS LETDOWN DIVERT, to the PDTT. Verifies position by board indications.
This is a critical step.
  (c) Verifies 1
-CH-PI-1138, EXCES LETDOWN HX OUTLET PRESS, indicates ~ 10 psig.
      *(d) Opens 1-CH-HCV-1201, EXCESS HX LETDOWN ISOLATION, and verifies position by board indications.
This is a critical step.
  (e) Records charging flow.
  (f) Acknowledges note on excess letdown effect on calorimetric.
  (g) N/A's step for calorimetric being performed.
  (h) Acknowledges cautions on opening loop drains.
      *(i) Opens one and only one loop drain (1
-RC-HCV-1557A, B, or C). Verifies position by board indications.
This is a critical step.
  (j) Acknowledges notes on excess letdown flow rate and use of Attachment 1.
  *(k) Slowly opens 1
-CH-HCV-1137, EXCESS LETDOWN FLOW, until 15 gpm to PDTT. This is a critical step.
  (l) Place 1-CH-FC-1122C, CHARGING FLOW CONTROL, in Manual and raise charging flow 15 gpm from initial value.
(m) Verifies excess letdown temperature 1
-CC-TI-108 is < 150
&deg;F and 1-CH-TI-1139 is < 195&deg;F.  (m) Records pot setting for 1
-CH-HCV-1137. EVALUATOR'S NOTE:
If asked:  A calorimetric is not being performed If asked:  As the Shift Manager, direct the Operator to use the "A" loop drain path.
 
COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM d"              Page 9 of 20 STEP 10:  1-OP-CH-006. (Step 5.1.
24 thru 5.1.26)  ESTABLISH EXCESS LETDOWN FLOW PATH THROTTLES EXCESS LETDOWN AND TRANSFERS TO VCT.
STANDARD:
  (a) Throttles 1
-CH-HCV-1137 to 5 gpm.
  (b) Acknowledges Notes.
  *(c) When PDTT increases 10% (1
-DG-LI-107) selects "VCT" on 1
-CH-HCV-1389. This is a critical step.
  (d) Increase 1
-CH-HCV-1137 to previous recorded setpoint.
EVALUATOR'S NOTE:
To expedite JPM, Evaluator may time compress and direct Operator PDTT level has increased by at least 10% from the original point
. COMMENTS:
_______ SAT
_______ UNSAT STEP 11:  1-OP-CH-006. (Step 5.1.
27 thru 5.1.31)
Checks Parameters
.
STANDARD:
  (a) Checks RCP seal leakoff is in normal band (approx. 2
-3 gpm).  (b) Checks 1-CH-PI-1138 ~ 65 psig.
(c) Acknowledges CAUTION concerning CH flow greater than expected, a leak on excess letdown flowpath is a possibility.
(d) Verifies charging flow stable at ~ 15 gpm greater than previously recorded value.
  (e) Verifies 1
-CC-TI-108 < 150F, and 1-CH-TI-1139 < 195F. EVALUATOR'S NOTE:
When Excess Letdown is in service, you can inform the Operator someone else will finish the procedure and terminate the JPM.
COMMENTS:
COMMENTS:
_______ SAT
_______ SAT
_______ UNSAT Surry 2014-301 "JPM d"              Page 6 of 20 STEP 5:  1-OP-CH-006.
_______ UNSAT
OBTAINS COPY OF 1-OP-CH-006 FROM EVALUATOR  STANDARD:  (a) Reviews initial conditions, precautions and limitations.  (b) Determines Section 5.1 is to be used. COMMENTS:    _______ SAT
 
_______ UNSAT  STEP 6:  1-OP-CH-006. (Steps 5.1.1 thru 5.1.4)  CHECK ALL LOOP DRAINS AND EXCESS LETDOWN ISOLATIONS ARE SHUT  STANDARD:  (a) Verifies all loop drains are shut (1-RC-1557A, B, and C) using control board indicator lights.  (b) Verifies excess letdown HX isolation is shut (1-CH-HCV-1201) using control board indicator lights.  (c) Verifies excess letdown flow setpoint is at zero (1-CH-HCV-1137).  (d) Verifies excess letdown divert valve (1-CH-HCV-1389) is set to VCT.
Surry 2014-301 "JPM d"              Page 10 of 20 Step 12  REPORTS TO SHIFT MANAGER (EVALUATOR).
EVALUATOR'S NOTE:  None. COMMENTS:    _______ SAT  _______ UNSAT Surry 2014-301 "JPM d"              Page 7 of 20 STEP 7:  1-OP-CH-006. (Step 5.1.5 and 5.1.6)  OPENS RCP SEAL RETURN, 1-CH-MOV-1381. Check running at least one CCW pump. STANDARD:  *(a) Opens RCP seal return isolation (1-CH-MOV-1381) using control board controls. This is a critical step.  (b) Checks at least one CC pump running using control board indications. EVALUATOR'S NOTE:  Step 5.1.7 is N/A.
Standards Verbal status report made that Step 15 completed and letdown has been re
COMMENTS:    _______ SAT  _______ UNSAT  STEP 8:  1-OP-CH-006. (Step 5.1.8 thru 5.1.12)
-established.
VERIFIES LETDOWN HX TEMPERATURE CONTROL AND EXCESS LETDOWN READY FOR SERVICE. STANDARD:    (a) Checks 1-CC-FI-109, LETDOWN HX OUTLET FLOW is ~ 160 gpm.  (b) Applies note concerning 1-CC-HCV-108.  (c) Checks 1-CC-TI-108, LETDOWN HX OUTLET TEMP, is indicating ambient.  (d) Checks 1-CH-PI-1138, EXCESS LETDOWN HX OUTLET PRESS, is approximately 50 psig.  (e) Checks 1-CH-TI-1139, EXCESS LETDOWN HX OUTLET TEMP, is indicating ambient. COMMENTS:
Evaluator's Comments STOP TIME:________________
_______ SAT  _______ UNSAT Surry 2014-301 "JPM d"              Page 8 of 20 STEP 9:  1-OP-CH-006. (Step 5.1.13 thru 5.1.23)  ESTABLISH EXCESS LETDOWN FLOW PATH. STANDARD:  (a) Acknowledges note on first directing excess letdown to the PDTT.  *(b) Places 1-CH-HCV-1389, EXCESS LETDOWN DIVERT, to the PDTT. Verifies position by board indications. This is a critical step.  (c) Verifies 1-CH-PI-1138, EXCES LETDOWN HX OUTLET PRESS, indicates ~ 10 psig.      *(d) Opens 1-CH-HCV-1201, EXCESS HX LETDOWN ISOLATION, and verifies position by board indications. This is a critical step.  (e) Records charging flow.  (f) Acknowledges note on excess letdown effect on calorimetric.  (g) N/A's step for calorimetric being performed.  (h) Acknowledges cautions on opening loop drains.      *(i) Opens one and only one loop drain (1-RC-HCV-1557A, B, or C). Verifies position by board indications. This is a critical step.  (j) Acknowledges notes on excess letdown flow rate and use of Attachment 1.  *(k) Slowly opens 1-CH-HCV-1137, EXCESS LETDOWN FLOW, until 15 gpm to PDTT. This is a critical step.  (l) Place 1-CH-FC-1122C, CHARGING FLOW CONTROL, in Manual and raise charging flow 15 gpm from initial value. (m) Verifies excess letdown temperature 1-CC-TI-108 is < 150&deg;F and 1-CH-TI-1139 is < 195&deg;F.  (m) Records pot setting for 1-CH-HCV-1137. EVALUATOR'S NOTE:  If asked:  A calorimetric is not being performed  If asked:  As the Shift Manager, direct the Operator to use the "A" loop drain path.
STOP TIME:
COMMENTS:    _______ SAT  _______ UNSAT Surry 2014-301 "JPM d"              Page 9 of 20 STEP 10:  1-OP-CH-006. (Step 5.1.24 thru 5.1.26)  ESTABLISH EXCESS LETDOWN FLOW PATH THROTTLES EXCESS LETDOWN AND TRANSFERS TO VCT. STANDARD:  (a) Throttles 1-CH-HCV-1137 to 5 gpm.  (b) Acknowledges Notes.  *(c) When PDTT increases 10% (1-DG-LI-107) selects "VCT" on 1-CH-HCV-1389. This is a critical step.  (d) Increase 1-CH-HCV-1137 to previous recorded setpoint. EVALUATOR'S NOTE:  To expedite JPM, Evaluator may time compress and direct Operator PDTT level has increased by at least 10% from the original point. COMMENTS:    _______ SAT  _______ UNSAT  STEP 11:  1-OP-CH-006. (Step 5.1.27 thru 5.1.31)
____________________________________________________________________________________
Checks Parameters.
____________________________________________________________________________________
STANDARD:  (a) Checks RCP seal leakoff is in normal band (approx. 2 -3 gpm).  (b) Checks 1-CH-PI-1138 ~ 65 psig. (c) Acknowledges CAUTION concerning CH flow greater than expected, a leak on excess letdown flowpath is a possibility. (d) Verifies charging flow stable at ~ 15 gpm greater than previously recorded value.  (e) Verifies 1-CC-TI-108 < 150F, and 1-CH-TI-1139 < 195F. EVALUATOR'S NOTE:  When Excess Letdown is in service, you can inform the Operator someone else will finish the procedure and terminate the JPM. COMMENTS:    _______ SAT  _______ UNSAT Surry 2014-301 "JPM d"              Page 10 of 20 Step 12  REPORTS TO SHIFT MANAGER (EVALUATOR). Standards   Verbal status report made that Step 15 completed and letdown has been re-established. Evaluator's Comments                                 STOP TIME:________________     STOP TIME:   ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Operator Directions Handout  (TO BE READ TO APPLICANT BY EXAMINER)  Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task. Initial Conditions  Plant was at 100% power with all systems operating normal and in automatic. The crew is currently recovering from a spurious SI initiation. 1-ES-1.1, SI Termination has been completed up to Step 15. SI has been reset. Initiating Cues    You are the Unit 1 RO. Re-establish letdown by performing step 15 of 1-ES-1.1. When you finish the actions necessary to accomplish this, please inform me. .   


Operator Directions Handout (TO BE GIVEN TO APPLICANT)   Initial Conditions  Plant was at 100% power with all systems operating normal and in automatic. The crew is currently recovering from a spurious SI initiation. 1-ES-1.1, SI Termination has been completed up to Step 15. SI has been reset. Initiating Cues You are the Unit 1 RO. Re-establish letdown by performing step 15 of 1-ES-1.1. When you finish the actions necessary to accomplish this, please inform me.
____________________________________________________________________________________
Surry 2014-301 "JPM e"   Surry    SR 2014 - 301      Page 1 of 8  U.S. Nuclear Regulatory Commission  Surry Power Station  SR14301  Simulator Job Performance Measure APE054.AA1.01 (4.5 / 4.4)
__________________________________________________________________________________
Applicant________________________________    Start Time___________________  Examiner_______________________________  Date ___________________________________  Stop Time___________________  Title Cross-Connect AFW from Unit 1 to Unit 2. K/A: APE054.AA.01: Ability to operate and / or monitor the following as they apply to the Loss of Main Feedwater (MFW) - AFW controls, including the use of alternate AFW sources (RO 4.5/SRO 4.4.) Applicability      Estimated Time  Actual Time  RO/SRO(I)      10 Minutes    ___  Minutes                    Conditions  Task is to be PERFORMED in the Simulator. Unit 1 is at 100% power with all systems normal and in AUTO. Unit 2 is experiencing a loss of all Feed Water. Standards  2-FR-H.1, Loss of Secondary Heat Sink, step 3d RNO, steps d3 through d5, Revision 34. Initiating Cues  Shift Manager Direction. 2-FR-H.1, Loss of Secondary Heat Sink, step 3d RNO, steps d3 through d5. Terminating Cues   2-FR-H.1, Loss of Secondary Heat Sink, step 3d RNO, step d5 complete. Confirmation of AFW to Unit 2 from Unit 2 Operator. Procedures 2-FR-H.1, Loss of Secondary Heat Sink, Revision 36  Tools and Equipment    Safety Considerations None      Standard Personal Safety Equipment Surry 2014-301 "JPM e"    Surry    SR 2014 - 301      Page 2 of 8 Simulator Setup  Reset to IC 269 OR Call up 100% power IC and initialize. Trip Unit 2, Remotes, Station Protection Unit 2, RXTRIP_UNIT2, and wait for swapover. Secure Unit 2 RCPs: Remotes, EL2, EL25A3_bkr / EL25B3_bkr / EL25C3_bkr, Open. Initial Conditions  Unit 1 is at 100% power with all systems normal and in AUTO. Unit 2 is experiencing a loss of all Feed Water. Unit 2 is currently experiencing a loss of all feedwater. They are in 2-FR-H.1 at step 3d RNO and need Aux Feed flow from both Unit 1 motor-driven AFW pumps. All Unit 2 RCPs have been secured. 1J bus will remain on its current (normal) power supply. Initiating Cues  You are to cross-connect Aux Feedwater from Unit 1 to Unit 2 in accordance with 2-FR-H.1 3d RNO. RNO steps d. 1) and d. 2) are complete. When you finish the actions necessary to accomplish this, please inform me. Evaluator Notes  Operator is provided with a copy of 2-FR-H.1, step 3 during directions. Task critical elements are bolded and denoted by an asterisk (*).
__  ____________________________________________________________________________________
Surry 2014-301 "JPM e"    Surry    SR 2014 - 301      Page 3 of 8 PERFORMANCE CHECKLIST    Notes to the Evaluator   Task critical elements are bolded and denoted by an asterisk (*). An additional instructor may be needed to silence and acknowledge alarms for the examinee, and respond as the Unit 2 Reactor Operator. START TIME:            STEP 1: (Step 3d RNO, d 3), 2-FR-H.1)
____________________________________________________________________________________
CLOSES THE UNIT 1 AFW MOVs    STANDARD:    Closes and verifies closed indication (green light on - red light off) the following AFW MOVs:  *(a) 1-MOV-FW-151A. This is a critical step.  *(b) 1-MOV-FW-151B. This is a critical step.  *(c) 1-MOV-FW-151C. This is a critical step.   *(d) 1-MOV-FW-151D. This is a critical step.   *(e) 1-MOV-FW-151E. This is a critical step.   *(f) 1-MOV-FW-151F. This is a critical step. EVALUATOR'S NOTE: 1) 2-handed operation is allowed. 2) Not sequence dependant. COMMENTS:    _______ SAT  _______ UNSAT  STEP 2:  (Step 3d RNO, d4, 2-FR-H.1)  OPENS THE AFW CROSS-CONNECT VALVES TO SUPPLY UNIT 2.
 
STANDARD:
____________________________________________________________________________________
  *(a) Places control switch for 2-MOV-FW-260A to the OPEN position.   *(b) Places control switch for 2-MOV-FW-260B to the OPEN position.    (c) Checks 2-MOV-FW-260A open indication received (red on & green off).   (d) Checks 2-MOV-FW-260B open indication received (red on & green off).    (e) Acknowledges annunciator D-D-4, AFW X-TIE MOVS NOT FULLY CLOSED. EVALUATOR'S NOTE:    COMMENTS:    _______ SAT  _______ UNSAT Surry 2014-301 "JPM e"    Surry     SR 2014 - 301      Page 4 of 8  STEP 3: (Step 3d RNO, d5, 2-FR-H.1)  STARTS THE UNIT 1 MOTOR DRIVEN AFW PUMPS. STANDARD:     (a) Announces AFW pump start over Gai-tronics system.   *(b) Starts 1-FW-P-3A by placing control switch to START.    (c) Verifies start indications (red light on & amps indicated),   *(d) Starts 1-FW-P-3B by placing control switch to START.   (e) Verifies start indications (red light on & amps indicated).     (f) Checks no Unit 1 AFW flow indicated on 1-FW-FI-100A, B & C. EVALUATOR'S NOTE:
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Unit 2: Following Start of 1-FW-P-3A and 1-FW-P-3B, report that AFW flow is indicated on Unit 2. COMMENTS:      _______ SAT  _______ UNSAT  STEP 5:  REPORTS TO SHIFT MANAGER (EVALUATOR). STANDARD:     Reports to the Shift Manager (Evaluator) TASK COMPLETE. . EVALUATOR'S NOTE:   Operator may throttle AFW to restore S/G level.Evaluator option to stop JPM at any time after AFW pumps are started. COMMENTS:   JPM COMPLETE _______ SAT _______ UNSAT Surry 2014-301 "JPM e"    Surry    SR 2014 - 301      Page 5 of 8  STOP TIME:
Directions
 
The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.
Initial Conditions Plant was at 100% power with all systems operating normal and in automatic.
The crew is currently recovering from a spurious SI initiation
. 1-ES-1.1, SI Termination has been completed up to Step 15.
SI has been reset.
Initiating Cues You are the Unit 1 RO. Re
-establish letdown by performing step 15 of 1
-ES-1.1. When you finish the actions necessary to accomplish this, please inform me
. .     
 
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions Plant was at 100% power with all systems operating normal and in automatic.
The crew is currently recovering from a spurious SI initiation
. 1-ES-1.1, SI Termination has been completed up to Step 15.
SI has been reset.
Initiating Cues
 
You are the Unit 1 RO. Re
-establish letdown by performing step 15 of 1
-ES-1.1. When you finish the actions necessary to accomplish this, please inform me
.
Surry 2014-301 "JPM e"    Surry    SR 2014 - 301      Page 1 of 8  U.S. Nuclear Regulatory Commission Surry Power Station SR14301  Simulator Job Performance Measure APE054.AA1.01 (4.5 / 4.4)
Applicant________________________________
Start Time___________________
Examiner_______________________________
Date ___________________________________
Stop Time___________________
Title Cross-Connect AFW from Unit 1 to Unit 2.
K/A: APE054.AA.01: Ability to operate and / or monitor the following as they apply to the Loss of Main Feedwater (MFW)
- AFW controls, including the use of alternate AFW sources (RO 4.5/SRO 4.4
.)  Applicability Estimated Time  Actual Time RO/SRO(I)      10 Minutes    ___   Minutes Conditions Task is to be PERFORMED in the Simulator
. Unit 1 is at 100% power with all systems normal and in AUTO.
Unit 2 is experiencing a loss of all Feed Water. Standards 2-FR-H.1, Loss of Secondary Heat Sink, step 3d RNO, steps d 3 through d 5, Revision 34
. Initiating Cues Shift Manager Direction
. 2-FR-H.1, Loss of Secondary Heat Sink, step 3d RNO, steps d 3 through d
: 5. Terminating Cues 2-FR-H.1, Loss of Secondary Heat Sink, step 3d RNO, step d5 complete
. Confirmation of AFW to Unit 2 from Unit 2 Operator.
Procedures
 
2-FR-H.1, Loss of Secondary Heat Sink
, Revision 36 Tools and Equipment Safety Considerations
 
None      Standard Personal Safety Equipment
 
Surry 2014-301 "JPM e"    Surry    SR 2014 - 301      Page 2 of 8 Simulator Setup Reset to IC 269 OR Call up 100% power IC and initialize.
Trip Unit 2, Remotes, Station Protection Unit 2, RXTRIP_UNIT2, and wait for swapover.
Secure Unit 2 RCPs: Remotes, EL2, EL25A3_bkr
/ EL25B3_bkr
/ EL25C3_bkr, Open.
Initial Conditions Unit 1 is at 100% power with all systems normal and in AUTO.
Unit 2 is experiencing a loss of all Feed Water. Unit 2 is currently experiencing a loss of all feedwater. They are in 2-FR-H.1 at step 3d RNO and need Aux Feed flow from both Unit 1 motor-driven AFW pumps.
All Unit 2 RCPs have been secured. 1J bus will remain on its current (normal) power supply.
Initiating Cues You are to cross
-connect Aux Feedwater from Unit 1 to Unit 2 in accordance with 2
-FR-H.1 3d RNO. RNO steps d. 1) and d. 2) are complete.
When you finish the actions necessary to accomplish this, please inform me
. Evaluator Notes   Operator is provided with a copy of 2
-FR-H.1, step 3 during directions.
Task critical elements are bolded and denoted by an asterisk (
*).
Surry 2014-301 "JPM e"    Surry    SR 2014 - 301      Page 3 of 8 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (*). An additional instructor may be needed to silence and acknowledge alarms for the examinee, and respond as the Unit 2 Reactor Operator.
START TIME:
STEP 1: (Step 3d RNO, d 3), 2
-FR-H.1)
CLOSES THE UNIT 1 AFW MOVs STANDARD:
Closes and verifies closed indication (green light on
- red light off) the following AFW MOVs:  *(a) 1-MOV-FW-151A. This is a critical step.
  *(b) 1-MOV-FW-151B. This is a critical step.
  *(c) 1-MOV-FW-151C. This is a critical step.
  *(d) 1-MOV-FW-151D. This is a critical step.
  *(e) 1-MOV-FW-151E. This is a critical step.
  *(f) 1-MOV-FW-151F. This is a critical step.
EVALUATOR'S NOTE:
: 1) 2-handed operation is allowed.
: 2) Not sequence dependant.
COMMENTS:
_______ SAT
_______ UNSAT STEP 2(Step 3d RNO, d4, 2
-FR-H.1)   OPENS THE AFW CROSS
-CONNECT VALVES TO SUPPLY UNIT 2.
 
STANDARD:
 
  *(a) Places control switch for 2
-MOV-FW-260A to the OPEN position.
   *(b) Places control switch for 2
-MOV-FW-260B to the OPEN position.
    (c) Checks 2-MOV-FW-260A open indication received (red on & green off).
     (d) Checks 2-MOV-FW-260B open indication received (red on & green off).
     (e) Acknowledges annunciator D
-D-4, AFW X-TIE MOVS NOT FULLY CLOSED
. EVALUATOR'S NOTE:
COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM e"    Surry    SR 2014 - 301      Page 4 of 8  STEP 3: (Step 3d RNO, d5, 2
-FR-H.1)  STARTS THE UNIT 1 MOTOR DRIVEN AFW PUMPS.
STANDARD:
    (a) Announces AFW pump start over Gai
-tronics system.
  *(b) Starts 1-FW-P-3A by placing control switch to START
.   (c) Verifies start indications (red light on & amps indicated),
  *(d) Starts 1-FW-P-3B by placing control switch to START
.    (e) Verifies start indications (red light on & amps indicated).
    (f) Checks no Unit 1 AFW flow indicated on 1
-FW-FI-100A, B & C.
EVALUATOR'S NOTE:
 
Unit 2: Following Start of 1
-FW-P-3A and 1-FW-P-3B, report that AFW flow is indicated on Unit 2.
COMMENTS:
_______ SAT
_______ UNSAT STEP 5:  REPORTS TO SHIFT MANAGER (EVALUATOR).
STANDARD:
Reports to the Shift Manager (Evaluator) TASK COMPLETE.
. EVALUATOR'S NOTE:
Operator may throttle AFW to restore S/G level.Evaluator option to stop JPM at any time after AFW pumps are started.
COMMENTS:
JPM COMPLETE
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM e"    Surry    SR 2014 - 301      Page 5 of 8  STOP TIME:
 
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________  ____________________________________________________________________________________________  ____________________________________________________________________________________________  ____________________________________________________________________________________________  ____________________________________________________________________________________________  ____________________________________________________________________________________________  ____________________________________________________________________________________________  ____________________________________________________________________________________________  ____________________________________________________________________________________________
Operator Directions Handout  (TO BE READ TO APPLICANT BY EXAMINER)  Task  Task is to be performed in the Simulator. Directions  The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task. Initial Conditions  Unit 1 is at 100% power with all systems normal and in AUTO. Unit 2 is experiencing a loss of all Feed Water. Unit 2 is currently experiencing a loss of all feedwater. They are in 2-FR-H.1 at step 3d RNO and need Aux Feed flow from both Unit 1 motor-driven AFW pumps. All Unit 2 RCPs have been secured. 1J bus will remain on its current (normal) power supply. Initiating Cues  You are to cross-connect Aux Feedwater from Unit 1 to Unit 2 in accordance with 2-FR-H.1 3d RNO. RNO steps d. 1) and d. 2) are complete. When you finish the actions necessary to accomplish this, please inform me. .   


Operator Directions Handout (TO BE GIVEN TO APPLICANT)   Initial Conditions   Unit 1 is at 100% power with all systems normal and in AUTO. Unit 2 is experiencing a loss of all Feed Water. Unit 2 is currently experiencing a loss of all feedwater. They are in 2-FR-H.1 at step 3d RNO and need Aux Feed flow from both Unit 1 motor-driven AFW pumps. All Unit 2 RCPs have been secured. 1J bus will remain on its current (normal) power supply. Initiating Cues   You are to cross-connect Aux Feedwater from Unit 1 to Unit 2 in accordance with 2-FR-H.1 3d RNO. RNO steps d. 1) and d. 2) are complete. When you finish the actions necessary to accomplish this, please inform me.
____________________________________________________________________________________________
Surry 2014-301 "JPM f"              Page 1 of 14  U.S. Nuclear Regulatory Commission Surry Power Station   SR14301  Simulator Job Performance Measure [KA 015A4.03 3.8 / 3.9]    Applicant________________________________     Start Time___________________ Examiner_______________________________
____________________________________________________________________________________________
Date ___________________________________   Stop Time___________________ Title  Remove Source Range NIs From Service During a Reactor Startup. K/A: 015A4.03 Ability to manually operate and/or monitor in the control room: Trip bypasses  3.8 / 3.9 Applicability     Estimated Time  Actual Time RO/SRO(I)     10 Minutes    ___  Minutes                     Conditions   Task is to be PERFORMED in the simulator. Reactor power is at approximately 1.2 x 10-10 amps during a startup, and the SR high voltage cannot be removed from either N-31 or N-32. Standards 1-AP-4.00, Nuclear Instrumentation Malfunction Initiating Cues Shift manager Direction. Terminating Cues   1-AP-4.00, Nuclear Instrumentation Malfunction, Step 38 complete. Procedures 1-AP-4.00, Nuclear Instrumentation Malfunction, Rev 30. Tools and Equipment     Safety Considerations   None      None Surry 2014-301 "JPM f"              Page 2 of 14 Simulator Setup   Call up IC-14, S1C26 10-8 Amps D-131 Steps MSTV Shut, and initialize. Place simulator in RUN. Perform the startup to obtain power at 1.2 x 10-10 amps (or slightly greater), then implement switch overrides (SRTRP_BLK_TRA_PB, and SRTRP_BLK_TRB_PB, override OFF, Insert), Flux Level Trip Cutout Pushbuttons. Freeze the simulator until ready for operator to perform JPM. Do not allow the SUR to be greater than +0.1 dpm. Initial Conditions   During a Reactor startup, when P-6 was reached the Operator pushed 1/N-33A TR A and 1/N-33B TR B to de-energize the Source Range NIs. Both N-31 and N-32 failed to de-energize. Initiating Cues   You are the RO. Respond to a failure of both Source Range NIs in accordance with 1-AP-4.00, NI Malfunction. When you finish the actions necessary to accomplish this, please inform me.
____________________________________________________________________________________________
Surry 2014-301 "JPM f"              Page 3 of 14 PERFORMANCE CHECKLIST   Notes to the Evaluator   Task critical elements are bolded and denoted by an asterisk (*). An additional instructor may be needed to silence and acknowledge alarms for the examinee. START TIME: _________________________.             STEP 1:  AP-4.00, (Step 1)  Check NI Malfunction - Power Range Failure. STANDARD:   (a) Enters 1-AP-4.00 at Step 1.  (b) Determines failure not in Power Range NI and goes to Step 10. EVALUATOR'S NOTE: NONE  COMMENTS:   _______ SAT _______ UNSAT   STEP 2:  AP-4.00, (Step 10)  Check NI Malfunction - Intermediate Range Failure. STANDARD:     (a) Determines failure not in Power Range NI and goes to Step 19. EVALUATOR'S NOTE: NONE COMMENTS:   _______ SAT _______ UNSAT   STEP 3:  AP-4.00, (Step 19)  Check NI Malfunction - Source Range Failure.
____________________________________________________________________________________________
STANDARD:     (a) Determines failure is in Source Range NIs and continues. EVALUATOR'S NOTE: NONE COMMENTS:   _______ SAT _______ UNSAT Surry 2014-301 "JPM f"              Page 4 of 14 STEP 4:  AP-4.00, Step 20 STABILIZE UNIT CONDITIONS. STANDARD:   (a) Verifies Unit conditions stable with a zero startup rate. (b) Maintains power with zero startup rate.
____________________________________________________________________________________________
EVALUATOR'S NOTE:   A manual Reactor trip is NOT an acceptable action.
____________________________________________________________________________________________
COMMENTS:   _______ SAT _______ UNSAT   STEP 5:  AP-4.00. (Step 21)  CHECK REACTOR POWER GREATER THAN P-6 (1X10-10). STANDARD: a) Checks Reactor power level greater than P-6 (1x 10-10 amps) by:  observing INT RNG FLUX meters NI-1-35B and NI-1-36B, Benchboard 1-2, ~ 1.2 x 10-10 amps  Meters on the IR CH 1 and CH2 Drawers ~ 1.2 x 10-10 amps. Permissive Status Light on Vertical Board 1-2, B-3, LIT. Trip Status Lights on Vertical Board 1-2, C-2 and D-2 LIT  Bistable Light, Power Above Permissive P6, on IR CH-1 and CH2 Drawer, LIT. EVALUATOR'S NOTE:   If asked: Indications and lights status is "as found". COMMENTS:     _______ SAT _______ UNSAT
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
 
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Task  Task is to be performed in the Simulator
. Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.
Initial Conditions Unit 1 is at 100% power with all systems normal and in AUTO.
Unit 2 is experiencing a loss of all Feed Water. Unit 2 is currently experiencing a loss of all feedwater. They are in 2-FR-H.1 at step 3d RNO and need Aux Feed flow from both Unit 1 motor-driven AFW pumps.
All Unit 2 RCPs have been secured. 1J bus will remain on its current (normal) power supply.
Initiating Cues You are to cross
-connect Aux Feedwater from Unit 1 to Unit 2 in accordance with 2-FR-H.1 3d RNO. RNO steps d. 1) and d. 2) are complete.
When you finish the actions necessary to accomplish this, please inform me
. .   
 
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions Unit 1 is at 100% power with all systems normal and in AUTO.
Unit 2 is experiencing a loss of all Feed Water. Unit 2 is currently experiencing a loss of all feedwater. They are in 2-FR-H.1 at step 3d RNO and need Aux Feed flow from both Unit 1 motor-driven AFW pumps.
All Unit 2 RCPs have been secured. 1J bus will remain on its current (normal) power supply.
Initiating Cues You are to cross
-connect Aux Feedwater from Unit 1 to Unit 2 in accordance with 2
-FR-H.1 3d RNO. RNO steps d. 1) and d. 2) are complete.
When you finish the actions necessary to accomplish this, please inform me
.
Surry 2014-301 "JPM f"              Page 1 of 14  U.S. Nuclear Regulatory Commission Surry Power Station SR14301  Simulator Job Performance Measure [KA 015A4.03 3.8 / 3.9
]    Applicant________________________________
Start Time___________________
Examiner_______________________________
 
Date ___________________________________
Stop Time___________________
Title  Remove Source Range NI s From Service During a Reactor Startup.
K/A: 015A4.03 Ability to manually operate and/or monitor in the control room: Trip bypasses  3.8 / 3.9 Applicability Estimated Time  Actual Time RO/SRO(I) 10 Minutes    ___  Minutes Conditions Task is to be PERFORMED in the simulator.
Reactor power is at approximately 1.
2 x 10-10 amps during a startup, and the SR high voltage cannot be removed from either N
-31 or N-32. Standards
 
1-AP-4.00, Nuclear Instrumentation Malfunction Initiating Cues
 
Shift manager Direction.
Terminating Cues 1-AP-4.00, Nuclear Instrumentation Malfunction, Step 38 complete
. Procedures
 
1-AP-4.00, Nuclear Instrumentation Malfunction, Rev 30. Tools and Equipment Safety Considerations None      None Surry 2014-301 "JPM f"              Page 2 of 14 Simulator Setup Call up IC
-14, S1C26 10
-8 Amps D-131 Steps MSTV Shut, and initialize. Place simulator in RUN.
Perform the startup to obtain power at 1.2 x 10-10 amps (or slightly greater), then implement switch overrides (SRTRP_BLK_TRA_PB
, and SRTRP_BLK_TRB_PB, override OFF, Insert), Flux Level Trip Cutout Pushbuttons. Freeze the simulator until ready for operator to perform JPM.
Do not allow the SUR to be greater than +0.1 dpm
. Initial Conditions During a Reactor startup, when P
-6 was reached the Operator pushed 1/N
-33A TR A and 1/N
-33B TR B to de
-energize the Source Range NIs.
Both N-31 and N-32 failed to de
-energize. Initiating Cues You are the RO
. Respond to a failure of both Source Range N Is in accordance with 1
-AP-4.00, NI Malfunction.
When you finish the actions necessary to accomplish this, please inform me.
 
Surry 2014-301 "JPM f"              Page 3 of 14 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (
*). An additional instructor may be needed to silence and acknowledge alarms for the examinee.
START TIME:
_________________________.
 
STEP 1:  AP-4.00, (Step 1)  Check NI Malfunction  
- Power Range Failure
. STANDARD:
    (a) Enters 1-AP-4.00 at Step 1.  (b) Determines failure not in Power Range NI and goes to Step 10.
EVALUATOR'S NOTE:
NONE  COMMENTS:
_______ SAT
_______ UNSAT STEP 2:  AP-4.00, (Step 10)  Check NI Malfunction  
- Intermediate Range Failure.
STANDARD:
    (a) Determines failure not in Power Range NI and goes to Step 19.
EVALUATOR'S NOTE: NONE COMMENTS:
_______ SAT
_______ UNSAT STEP 3:  AP-4.00, (Step 19)  Check NI Malfunction  
- Source Range Failure.
 
STANDARD:
    (a) Determines failure is in Source Range NIs and continues.
EVALUATOR'S NOTE: NONE COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM f"              Page 4 of 14 STEP 4:  AP-4.00, Step 20 STABILIZE UNIT CONDITIONS.
STANDARD:
  (a) Verifies Unit conditions stable with a zero startup rate.
  (b) Maintains power with zero startup rate.
EVALUATOR'S NOTE:
A manual Reactor trip is NOT an acceptable action
.
COMMENTS:
_______ SAT
_______ UNSAT STEP 5:  AP-4.00. (Step 21)  CHECK REACTOR POWER GREATER THAN P
-6 (1X10-10). STANDARD:
a) Checks Reactor power level greater than P
-6 (1x 10-10 amps) by:  observing INT RNG FLUX meters NI 35B and NI 36B, Benchboard 1
-2, ~ 1.2 x 10-10 amps  Meters on the IR CH 1 and CH2 Drawers ~ 1.2 x 10
-10 amps. Permissive Status Light on Vertical Board 1
-2, B-3, LIT. Trip Status Lights on Vertical Board 1-2, C-2 and D-2 LIT  Bistable Light, Power Above Permissive P6, on IR CH
-1 and CH2 Drawer, LIT.
EVALUATOR'S NOTE:
If asked: Indications and lights status is "as found".
COMMENTS:
_______ SAT
_______ UNSAT


Surry 2014-301 "JPM f"              Page 5 of 14 STEP 6:
Surry 2014-301 "JPM f"              Page 5 of 14 STEP 6:
AP-4.00. (Step 22)  CHECK BOTH SOURCE RANGE CHANNELS- HIGH VOLTAGE OFF STANDARD:   (a) Determine that both SRNI Channels are still energized. (b) Pushes "1/N 33A TR A" pushbutton and "1/N 33B TR B" pushbutton. (c) Notes that N-31 and N-32 still have high voltage applied to the detectors. *(d) Places LEVEL TRIP switch for N-31 in BYPASS. This is a critical step. *(e) Removes INSTRUMENT POWER fuses for N-31. This is a critical step. *(f) Places LEVEL TRIP switch for N-32 in BYPASS. This is a critical step. *(g) Removes INSTRUMENT POWER fuses for N-32. This is a critical step. (h) Notes requirement to refer to Tech Spec Table 3.7-1 Item 4. (i) Notes requirement to make entry in PSL and Shift Turnover to reinstall fuses.   (j) Goes to Step 38 of 1-AP-4.00.  (k) Informs the Shift Manager that I&C and the OMOC must be notified EVALUATOR'S NOTE:
AP-4.00. (Step 22)  CHECK BOTH SOURCE RANGE CHANNELS
When Notified: Acknowledge that Tech Spec Table 3.7-1, item 4 requires review. When Notified: Acknowledge that I&C and OM on Call must be notified. When the Instrument Power fuses are pulled on the first channel, annunciator 1G-A3, "NIS SOURCE RNG LOSS OF DET VOLT" is received. It is acceptable to place both SRNI in LEVEL TRIP BYPASS before removing the INSTRUMENT POWER fuses.   
- HIGH VOLTAGE OFF STANDARD:
  (a) Determine that both SRNI Channels are still energized.
  (b) Pushes "1/N 33A TR A" pushbutton and "1/N 33B TR B" pushbutton.
  (c) Notes that N
-31 and N-32 still have high voltage applied to the detectors.
  *(d) Places LEVEL TRIP switch for N
-31 in BYPASS.
This is a critical step.
  *(e) Removes INSTRUMENT POWER fuses for N
-31. This is a critical step.
  *(f) Places LEVEL TRIP switch for N
-32 in BYPASS.
This is a critical step.
  *(g) Removes INSTRUMENT POWER fuses for N
-32. This is a critical step.
(h) Notes requirement to refer to Tech Spec Table 3.7
-1 Item 4.
(i) Notes requirement to make entry in PSL and Shift Turnover to reinstall fuses.
  (j) Goes to Step 38 of 1-AP-4.00.  (k) Informs the Shift Manager that I&C and the OMOC must be notified
 
EVALUATOR'S NOTE:
 
When Notified: Acknowledge that Tech Spec Table 3.7
-1, item 4 requires review
. When Notified
: Acknowledge that I&C and OM on Call must be notified.
When the Instrument Power fuses are pulled on the first channel, annunciator 1G
-A3, "NIS SOURCE RNG LOSS OF DET VOLT" is received.
It is acceptable to place both SRNI in LEVEL TRIP BYPASS before removing the INSTRUMENT POWER fuses
.   


COMMENTS:
COMMENTS:
_______ SAT  _______ UNSAT  STEP 7  REPORT TO NUCLEAR SHIFT MANAGER (EVALUATOR). Standards    Verbal status report that N-31 and N-32 have been removed from service IAW AP-4.00. Evaluator's Comments              STOP TIME:                          _______ SAT
_______ UNSAT 


Surry 2014-301 "JPM f"              Page 6 of 14  COMMENTS:  ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________
_______ SAT
____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
_______ UNSAT STEP 7  REPORT TO NUCLEAR SHIFT MANAGER (EVALUATOR).
____________________________________________________________________________________  ____________________________________________________________________________________ ____________________________________________________________________________________
Standards Verbal status report that N
-31 and N-32 have been removed from service IAW AP-4.00. Evaluator's Comments STOP TIME:
 
_______ SAT
 
_______ UNSAT
 
Surry 2014-301 "JPM f"              Page 6 of 14  COMMENTS:  ____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
 
__________________________________________________________________________________
__ ____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Operator Directions Handout  (TO BE READ TO APPLICANT BY EXAMINER)  Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task. Initial Conditions  During a Reactor startup, when P-6 was reached the Operator pushed 1/N-33A TR A and 1/N-33B TR B to de-energize the Source Range NIs. Both N-31 and N-32 failed to de-energize. Initiating Cues  You are the RO. Respond to a failure of both Source Range NIs in accordance with 1-AP-4.00, NI Malfunction. When you finish the actions necessary to accomplish this, please inform me.
Operator Directions Handout  (TO BE GIVEN TO APPLICANT)  Initial Conditions  During a Reactor startup, when P-6 was reached the Operator pushed 1/N-33A TR A and 1/N-33B TR B to de-energize the Source Range NIs. Both N-31 and N-32 failed to de-energize. Initiating Cues  You are the RO. Respond to a failure of both Source Range NIs in accordance with 1-AP-4.00, NI Malfunction. When you finish the actions necessary to accomplish this, please inform me.     


Surry 2014-301 "JPM g"              Page 1 of 13  U.S. Nuclear Regulatory Commission Surry Power Station   SR14301  Simulator Job Performance Measure [KA 075A2.02 2.5 / 2.7]    Applicant________________________________     Start Time___________________ Examiner_______________________________
____________________________________________________________________________________  ____________________________________________________________________________________
Date ___________________________________   Stop Time___________________ Title  Respond to a Low Level Transient K/A: 075A2.02 2.5/2.7, Ability to (a) predict the impacts of the following malfunctions or operations on the circulating water system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of circulating water pumps Applicability     Estimated Time  Actual Time RO/SRO(I)/SRO(U)     14 Minutes    ___  Minutes                     Conditions   Task is to be PERFORMED in the simulator. Both units are at 100% power when a lightning strike trips 2G screenwell transformer. Standards   Circ Water Pumps restored in accordance with AP-12.01, Loss of Intake Canal Level "prior to automatic protective actions."  Initiating Cues   LLIS TROUBLE annunciator. 500 KV HSE TROUBLE annunciator. Unit Two Circ Water Pumps secured. Terminating Cues 0-AP-12.01, Loss of Intake Canal Level, completed. Procedures   0-AP-12.01, Loss of Intake Canal Level, completed. Rev 30. Tools and Equipment     Safety Considerations None      None Surry 2014-301 "JPM g"              Page 2 of 13 Simulator Setup   Call up 100% power IC and initialize. Place simulator in RUN. Implement EL0802, Loss of Screenwell Transformer 2, and place simulator in RUN. Acknowledge all annunciators and place simulator in FREEZE. Initial Conditions   Both units are at 100% power when a lightning strike trips 2G screenwell transformer. Alarm VSP L-7 "LLIS TROUBLE"  and VSP-K6 "500KV HSE TRBL" have alarmed eight (8) minutes ago. Security reports a lightning strike in the vicinity of the low level intake. All Unit 2 Circulating Water Pumps were initially running. Unit One and Unit Two Reactor Operators are currently throttling CW MOVs to conserve intake canal level. Initiating Cue You are the Unit 1 BOP. You are to respond to the loss of Circulating Water Pumps. When you finish the actions necessary to accomplish this, please inform me.
____________________________________________________________________________________
Surry 2014-301 "JPM g"              Page 3 of 13 PERFORMANCE CHECKLIST   Notes to the Evaluator   When candidate identifies AP-12.01 as the guiding procedure, then provide a copy to the candidate. Task critical elements are bolded and denoted by an asterisk (*). An additional instructor may be needed to silence and acknowledge alarms for the examinee. START TIME_______:             STEP 1:  0-AP-12.01 (Step 1)  NOTE: EPIPs may be applicable. CHECKS ENTRY INTO THIS PROCEDURE -FROM AN EOP OR AN AP TO RESTORE SW FLOW TO THE CCHXs. STANDARD:
 
a) Acknowledges Note prior to Step 1. b) Identifies entry into this procedure is not from EOP or AP to restore SW. c) Goes to Step 3. EVALUATOR'S NOTE: If Asked: Entry into this procedure not an attempt to restore SW. COMMENTS:   _______ SAT _______ UNSAT Surry 2014-301 "JPM g"              Page 4 of 13 STEP 2:
____________________________________________________________________________________
0-AP-12.01. (Step 3)  TRY TO MAINTAIN INTAKE CANAL LEVEL STANDARD: (a) Acknowledges CAUTIONs prior to step 3 regarding turbine stall flutter and reference to AP-14, if vacuum cannot be maintained. (b) Acknowledges NOTE prior to step 3 regarding potential need to trip one unit to reduce rate of intake canal drawdown. (c) Recalls that initial conditions revealed that Unit ROs were throttling waterboxes as required. EVALUATOR'S NOTE:   If asked:  Both units are currently throttling waterbox outlet MOVs as required due to loss of circ water pumps. If asked:  Unit SRO will direct unit ramping as required. COMMENTS:   _______ SAT _______ UNSAT   STEP 3:  0-AP-12.01. (Step 4)  CHECK INTAKE CANAL LEVEL- DECREASING. STANDARD:   a) Candidate identifies that 3 CW pumps are insufficient to supply two units CW requirement. (b) Candidate reads intake canal level indicator and determines downward trend. EVALUATOR'S NOTE:   COMMENTS:
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
_______ SAT  _______ UNSAT Surry 2014-301 "JPM g"              Page 5 of 13 STEP 4:
Directions
0-AP-12.01. (Step 5)  START CIRC WATER PUMPS AS REQUIRED FROM THE MCR IAW ATTACHMENT 3 STANDARD:   Candidate goes to Attachment 3.
 
EVALUATOR'S NOTE:  COMMENTS:
The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.
_______ SAT  _______ UNSAT  STEP 5:  0-AP-12.01, Attachment 3. (Step 1)  ATTACHMENT 3- REMOTE START OF CIRCULATING WATER PUMPS. STANDARD:  (a) Candidate acknowledges NOTE prior to step (a) that requires 5-minute coastdown of CW pumps prior to starting. (b) Candidate checks 1G-2G Bus Tie Bkr Closed using "LLIS Electrical" PCS screen. (c) Trainee verifies that CW pumps are not in local by noting no white box around Unit 2 CW pumps on CW Pump PCS screen. *(d) Candidate calls up soft control box pumps to start CW pump by clicking on CW pump ICON on PCS CW screen. This is a critical step. *(e) Candidate enables soft control box for pump to be started by clicking on mark number box and verifies red border. This is a critical step. *(f) Candidate clicks "Start" button for pump to control that is active. This is a critical step. (g) Candidate verifies proper amp indication for pump started. *(h) Candidate completes steps (c) through (e) of attachment 3 for remaining Unit 2 CW pumps to be started. This is a critical step. (i) Candidate directs outside operator to perform post-start checks IAW respective OP 48.1.1. EVALUATOR'S NOTE:    If asked:  Greater than 5 minutes have elapsed since loss of transformer. If asked:  2A, 2B, 2C and 2D circ water pumps were previously in service. When Directed: Acknowledge as Outside Operator to perform post start checks of CW pumps IAW op-48.1.1. COMMENTS:    _______ SAT  _______ UNSAT Surry 2014-301 "JPM g"              Page 6 of 13 STEP 6:
Initial Conditions During a Reactor startup, when P
0-AP-12.01. (Step 6)  SEND OPERATOR TO LOW LEVEL INTAKE TO PERFORM THE FOLLOWING PROCEDURES. STANDARD:  (a) Candidate acknowledges Note prior to step 6 regarding PIN number for ESW pump house and statement regarding CW pump restrictions when 1G-2G busses are cross-tied. (b) Sends an Operator to Low Levels to perform Attachment 2 and OP-48.1.1. EVALUATOR'S NOTE:  None.
-6 was reached the Operator pushed 1/N
Booth Operator:  When directed: Acknowledge Direction to perform 0-AP-12.01, Attachment 2, Low Level Intake Responses; 0-OP-SW-002, Emergency Service Water Pump Operation; and OP-48.1.1. Starting any CW Pump. COMMENTS:    _______ SAT
-33A TR A and 1/N
_______ UNSAT  STEP 7:  0-AP-12.01. (Step 7)  CHECK INTAKE CANAL LEVEL - GREATER THAN TRIP SETPOINT. STANDARD:  Candidate determines that Intake canal level is greater than 23.5 feet and annunciator 1F-G-1, INTK CANAL LO LVL TRIP not lit. EVALUATOR'S NOTE:              If asked:  2F-G1 not lit on Unit Two. 
-33B TR B to de
-energize the Source Range NIs. Both N
-31 and N-32 failed to de
-energize.
Initiating Cues You are the RO. Respond to a failure of both Source Range NIs in accordance with 1
-AP-4.00, NI Malfunction. When you finish the actions necessary to accomplish this, please inform me.
 
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions During a Reactor startup, when P
-6 was reached the Operator pushed 1/N
-33A TR A and 1/N-33B TR B to de
-energize the Source Range NIs. Both N
-31 and N-32 failed to de
-energize.
Initiating Cues You are the RO. Respond to a failure of both Source Range NIs in accordance with 1
-AP-4.00, NI Malfunction.
When you finish the actions necessary to accomplish this, please inform me.
 
Surry 2014-301 "JPM g"              Page 1 of 13  U.S. Nuclear Regulatory Commission Surry Power Station SR14301  Simulator Job Performance Measure [KA 075A2.02 2.5 / 2.7
]    Applicant________________________________
Start Time___________________
Examiner_______________________________
 
Date ___________________________________
Stop Time___________________
Title  Respond to a Low Level Transient K/A: 075A2.02 2.5/2.7, Ability to (a) predict the impacts of the following malfunctions or operations on the circulating water system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:
Loss of circulating water pumps Applicability Estimated Time  Actual Time RO/SRO(I)/SRO(U) 14 Minutes    ___  Minutes Conditions Task is to be PERFORMED in the simulator.
Both units are at 100% power when a lightning strike trips 2G screenwell transformer.
Standards Circ Water Pumps restored in accordance with AP
-12.01, Loss of Intake Canal Level "prior to automatic protective actions
."  Initiating Cues LLIS TROUBLE annunciator.
500 KV HSE TROUBLE annunciator.
Unit Two Circ Water Pumps secured.
Terminating Cues
 
0-AP-12.01, Loss of Intake Canal Level, completed.
Procedures 0-AP-12.01, Loss of Intake Canal Level, completed. Rev 30. Tools and Equipment Safety Considerations None      None Surry 2014-301 "JPM g"              Page 2 of 13 Simulator Setup Call up 100% power IC and initialize. Place simulator in RUN.
Implement EL0802, Loss of Screenwell Transformer 2, and place simulator in RUN.
Acknowledge all annunciators and place simulator in FREEZE.
Initial Conditions Both units are at 100% power when a lightning strike trips 2G screenwell transformer.
Alarm VSP L
-7 "LLIS TROUBLE"  and VSP
-K6 "500KV HSE TRBL" have alarmed eight (8) minutes ago.
Security reports a lightning strike in the vicinity of the low level intake.
All Unit 2 Circulating Water Pumps were initially running. Unit One and Unit Two Reactor Operators are currently throttling CW MOVs to conserve intake canal level.
Initiating Cue You are the Unit 1 BOP. You are to respond to the loss of Circulating Water Pumps
. When you finish the actions necessary to accomplish this, please inform me.
 
Surry 2014-301 "JPM g"              Page 3 of 13 PERFORMANCE CHECKLIST Notes to the Evaluator When candidate identifies AP
-12.01 as the guiding procedure, then provide a copy to the candidate.
Task critical elements are bolded and denoted by an asterisk (
*). An additional instructor may be needed to silence and acknowledge alarms for the examinee.
START TIME_______:
STEP 1:  0-AP-12.01 (Step 1)  NOTE: EPIPs may be applicable.
CHECKS ENTRY INTO THIS PROCEDURE  
-FROM AN EOP OR AN AP TO RESTORE SW FLOW TO THE CCHXs.
STANDARD:
 
a) Acknowledges Note prior to Step 1
. b) Identifies entry into this procedure is not from EOP or AP to restore SW.
c) Goes to Step 3.
EVALUATOR'S NOTE:
If Asked: Entry into this procedure not an attempt to restore SW.
COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM g"              Page 4 of 13 STEP 2:
0-AP-12.01. (Step 3)  TRY TO MAINTAIN INTAKE CANAL LEVEL STANDARD:
  (a) Acknowledges CAUTIONs prior to step 3 regarding turbine stall flutter and reference to AP-14, if vacuum cannot be maintained.
(b) Acknowledges NOTE prior to step 3 regarding potential need to trip one unit to reduce rate of intake canal drawdown.
(c) Recalls that initial conditions revealed that Unit ROs were throttling waterboxes as required.
EVALUATOR'S NOTE:
If asked:  Both units are currently throttling waterbox outlet MOVs as required due to loss of circ water pumps.
If asked:  Unit SRO will direct unit ramping as required.
COMMENTS:
_______ SAT
_______ UNSAT STEP 3:  0-AP-12.01. (Step 4)  CHECK INTAKE CANAL LEVEL
- DECREASING.
STANDARD:
a) Candidate identifies that 3 CW pumps are insufficient to supply two units CW requirement.
(b) Candidate reads intake canal level indicator and determines downward trend.
EVALUATOR'S NOTE:
COMMENTS:
 
_______ SAT  _______ UNSAT
 
Surry 2014-301 "JPM g"              Page 5 of 13 STEP 4:
0-AP-12.01. (Step 5)  START CIRC WATER PUMPS AS REQUIRED FROM THE MCR IAW ATTACHMENT 3 STANDARD:
Candidate goes to Attachment 3.


COMMENTS:    _______ SAT  _______ UNSAT Surry 2014-301 "JPM g"              Page 7 of 13 STEP 8:
EVALUATOR'S NOTE:
0-AP-12.01. (Step 8)  CHECK CW LOSS - SUSTAINED WITH NO EXPECTATION OF RECOVERY  STANDARD:  a) Candidate identifies Canal Level Stable or increasing  b) Candidate goes to Step 10  EVALUATOR'S NOTE:   None.
COMMENTS:
COMMENTS:
_______ SAT  _______ UNSAT  STEP 9:  0-AP-12.01. (Step 10)  CONTINUES TO REDUCE UNIT LOAD AS NECESSARY TO MAINTAIN VACUUM. STANDARD:   Candidate determines that no actions are required based on number of CW pumps running    EVALUATOR'S NOTE:   Both unit's Reactor Operators have stopped throttling CW MOVs. COMMENTS:     _______ SAT
 
_______ UNSAT
_______ SAT
_______ UNSAT STEP 5:  0-AP-12.01, Attachment 3
. (Step 1)  ATTACHMENT 3
- REMOTE START OF CIRCULATING WATER PUMPS.
STANDARD:
  (a) Candidate acknowledges NOTE prior to step (a) that requires 5
-minute coastdown of CW pumps prior to starting.
(b) Candidate checks 1G
-2G Bus Tie Bkr Closed using "LLIS Electrical" PCS screen.
(c) Trainee verifies that CW pumps are not in local by noting no white box around Unit 2 CW pumps on CW Pump PCS screen.
*(d) Candidate calls up soft control box pumps to start CW pump by clicking on CW pump ICON on PCS CW screen. This is a critical step.
*(e) Candidate enables soft control box for pump to be started by clicking on mark number box and verifies red border.
This is a critical step.
*(f) Candidate clicks "Start" button for pump to control that is active.
This is a critical step.
(g) Candidate verifies proper amp indication for pump started.
*(h) Candidate completes steps (c) through (e) of attachment 3 for remaining Unit 2 CW pumps to be started.
This is a critical step.
(i) Candidate directs outside operator to perform post
-start checks IAW respective OP 48.1.1. EVALUATOR'S NOTE:
If asked: Greater than 5 minutes have elapsed since loss of transformer.
If asked:  2A, 2B, 2C and 2D circ water pumps were previously in service.
When Directed: Acknowledge as Outside Operator to perform post start checks of CW pumps IAW op
-48.1.1. COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM g"              Page 6 of 13 STEP 6:
0-AP-12.01. (Step 6)  SEND OPERATOR TO LOW LEVEL INTAKE TO PERFORM THE FOLLOWING PROCEDURES.
STANDARD:
   (a) Candidate acknowledges Note prior to step 6 regarding PIN number for ESW pump house and statement regarding CW pump restrictions when 1G
-2G busses are cross
-tied. (b) Sends an Operator to Low Levels to perform Attachment 2 and OP
-48.1.1. EVALUATOR'S NOTE:
None.
Booth Operator:
When directed: Acknowledge Direction to perform 0
-AP-12.01, Attachment 2, Low Level Intake Responses; 0-OP-SW-002, Emergency Service Water Pump Operation; and OP
-48.1.1. Starting any CW Pump.
COMMENTS:
_______ SAT
 
_______ UNSAT STEP 7:  0-AP-12.01. (Step 7)  CHECK INTAKE CANAL LEVEL
- GREATER THAN TRIP SETPOINT.
STANDARD:
Candidate determines that Intake canal level is greater than 23.5 feet and annunciator 1F
-G-1, INTK CANAL LO LVL TRIP not lit.
EVALUATOR'S NOTE:
 
If asked:  2F-G1 not lit on Unit Two.
 
COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM g"              Page 7 of 13 STEP 8:
0-AP-12.01. (Step 8)  CHECK CW LOSS
- SUSTAINED WITH NO EXPECTATION OF RECOVERY STANDARD:
a) Candidate identifies Canal Level Stable or increasing b) Candidate goes to Step 10 EVALUATOR'S NOTE:
None.
COMMENTS:
 
_______ SAT
_______ UNSAT STEP 9:  0-AP-12.01. (Step 10)  CONTINUES TO REDUCE UNIT LOAD AS NECESSARY TO MAINTAIN VACUUM.
STANDARD:
Candidate determines that no actions are required based on number of CW pumps running    EVALUATOR'S NOTE:
Both unit's Reactor Operators have stopped throttling CW MOVs.
COMMENTS:
_______ SAT
 
_______ UNSAT


Surry 2014-301 "JPM g"              Page 8 of 13 STEP 10:
Surry 2014-301 "JPM g"              Page 8 of 13 STEP 10:
0-AP-12.01. (Step 11)  CHECK INTAKE CANAL LEVEL - STABLE OR INCREASING. STANDARD: (a) Trainee evaluates canal level indication and/or trend recorder to verify canal level increasing. (b) Trainee then goes to Step 27 EVALUATOR'S NOTE:  None. COMMENTS:
0-AP-12.01. (Step 11)  CHECK INTAKE CANAL LEVEL  
- STABLE OR INCREASING.
STANDARD:
  (a) Trainee evaluates canal level indication and/or trend recorder to verify canal level increasing.
  (b) Trainee then goes to Step 27
 
EVALUATOR'S NOTE:
None. COMMENTS:
 
_______ SAT
 
_______ UNSAT STEP 11:  0-AP-12.01. (Step 27)  NOTIFY THE FOLLOWING.
STANDARD:
   (a) Candidate notifies Evaluator that the OM on Call, Manager Nuclear Operations and STA need to be notified.
EVALUATOR'S NOTE:
Respond:  Notifications will be made.
 
COMMENTS:
_______ SAT
_______ SAT
_______ UNSAT   STEP 11:  0-AP-12.01. (Step 27)  NOTIFY THE FOLLOWING. STANDARD:  (a) Candidate notifies Evaluator that the OM on Call, Manager Nuclear Operations and STA need to be notified. EVALUATOR'S NOTE:  Respond:  Notifications will be made.
_______ UNSAT
COMMENTS:    _______ SAT  _______ UNSAT 


Surry 2014-301 "JPM g"              Page 9 of 13 STEP 12:
Surry 2014-301 "JPM g"              Page 9 of 13 STEP 12:
0-AP-12.01. (Step 28)  CHECK INTAKE CANAL LEVEL- INCREASING. STANDARD: (a) Candidate acknowledges NOTE concerning Intake Canal Level must be maintained >17.2 feet. (b) Candidate evaluates canal level indication and/or trend recorder to and identifies canal level >17.2 feet, and increasing.
0-AP-12.01. (Step 28)  CHECK INTAKE CANAL LEVEL
EVALUATOR'S NOTE:   None. COMMENTS:     _______ SAT _______ UNSAT   STEP 13:  0-AP-12.01. (Step 29)  CHECK INTAKE CANAL LEVEL - GREATER THAN 17.2 FT. STANDARD: (a) Candidate identifies canal level greater than 17.2 feet. EVALUATOR'S NOTE:   None.
- INCREASING.
COMMENTS:     _______ SAT _______ UNSAT Surry 2014-301 "JPM g"              Page 10 of 13 STEP 14:
STANDARD:
0-AP-12.01. (Step 30)  THROTTLE OPEN CC HX SW OUTLET VALVES AS NECESSARY TO LOWER CC TEMPERATURE. STANDARD:
  (a) Candidate acknowledges NOTE concerning Intake Canal Level must be maintained >17.2 feet.
  (a) Acknowledges NOTE regarding restoration of CCHX SW flow. (b) Candidate recognizes that no throttling of CCHW SW flow was performed, so no actions required on this step. EVALUATOR'S NOTE:   If asked: No actions were taken to reduce CCHX SW flow. COMMENTS:     _______ SAT _______ UNSAT   STEP 15:  0-AP-12.01. (Step 31)  CHECK CAUSE OF LEVEL DECREASE -CORRECTED. STANDARD:   (a) Candidate identifies that restoration of CW pumps corrects cause of level decrease.
(b) Candidate evaluates canal level indication and/or trend recorder to and identifies canal level >17.2 feet, and increasing.
EVALUATOR'S NOTE:   If asked: Control Ops group will be notified to initiate troubleshooting on 2G transformer.
 
COMMENTS:     _______ SAT
EVALUATOR'S NOTE:
_______ UNSAT Surry 2014-301 "JPM g"              Page 11 of 13 STEP 16:
None. COMMENTS:
0-AP-12.01. (Step 32)  RESTORE CW AND SW COMPONENTS (INCLUDING CW CHEMICAL INJECTION BY   OPENING 1-SA-285 AND 2-SA-274) TO SUPPORT PLANT CONDITIONS. STANDARD: (a) Candidate reports that CW MOVs may be returned to previous position. (b) Candidate recognizes that chemical injections systems require no action. EVALUATOR'S NOTE:   None. COMMENTS:     _______ SAT _______ UNSAT   STEP 17  Candidate Reports completion of Task to Shift Manager   END OF JPM   STOP TIME:  ____________________________________
_______ SAT
_______ UNSAT STEP 13:  0-AP-12.01. (Step 29)  CHECK INTAKE CANAL LEVEL  
- GREATER THAN 17.2 FT
. STANDARD:
  (a) Candidate identifies canal level greater than 17.2 feet
. EVALUATOR'S NOTE:
None.
COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM g"              Page 10 of 13 STEP 14:
0-AP-12.01. (Step 30)  THROTTLE OPEN CC HX SW OUTLET VALVES AS NECESSARY TO LOWER CC TEMPERATURE.
STANDARD:
 
  (a) Acknowledges NOTE regarding restoration of CCHX SW flow.
  (b) Candidate recognizes that no throttling of CCHW SW flow was performed, so no actions required on this step.
EVALUATOR'S NOTE:
If asked:
No actions were taken to reduce CCHX SW flow
. COMMENTS:
_______ SAT
_______ UNSAT STEP 15:  0-AP-12.01. (Step 31)  CHECK CAUSE OF LEVEL DECREASE  
-CORRECTED.
STANDARD:
  (a) Candidate identifies that restoration of CW pumps corrects cause of level decrease.
 
EVALUATOR'S NOTE:
If asked:
Control Ops group will be notified to initiate troubleshooting on 2G transformer
.
COMMENTS:
_______ SAT
 
_______ UNSAT
 
Surry 2014-301 "JPM g"              Page 11 of 13 STEP 16:
0-AP-12.01. (Step 32)  RESTORE CW AND SW COMPONENTS (INCLUDING CW CHEMICAL INJECTION BY OPENING 1
-SA-285 AND 2-SA-274) TO SUPPORT PLANT CONDITIONS.
STANDARD:
  (a) Candidate reports that CW MOVs may be returned to previous position.
  (b) Candidate recognizes that chemical injections systems require no action.
EVALUATOR'S NOTE:
None. COMMENTS:
_______ SAT
_______ UNSAT STEP 17  Candidate Reports completion of Task to Shift Manager END OF JPM STOP TIME:
____________________________________
 
____________________________________________________________________________________
____________________________________________________________________________________
 
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
__________________________________________________________________________________
__ ____________________________________________________________________________________
 
____________________________________________________________________________________
____________________________________________________________________________________  ____________________________________________________________________________________
____________________________________________________________________________________  ____________________________________________________________________________________
____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
 
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)   Initial Conditions   Both units are at 100% power when a lightning strike trips 2G screenwell transformer. Alarm VSP L-7 "LLIS TROUBLE"  and VSP-K6 "500KV HSE TRBL" have alarmed eight (8) minutes ago. Security reports a lightning strike in the vicinity of the low level intake. All Unit 2 Circulating Water Pumps were initially running. Unit One and Unit Two Reactor Operators are currently throttling CW MOVs to conserve intake canal level. Initiating Cue You are the Unit 1 BOP. You are to respond to the loss of Circulating Water Pumps. When you finish the actions necessary to accomplish this, please inform me.
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Operator Directions Handout (TO BE GIVEN TO APPLICANT)   Initial Conditions   Both units are at 100% power when a lightning strike trips 2G screenwell transformer. Alarm VSP L-7 "LLIS TROUBLE"  and VSP-K6 "500KV HSE TRBL" have alarmed eight (8) minutes ago. Security reports a lightning strike in the vicinity of the low level intake. All Unit 2 Circulating Water Pumps were initially running. Unit One and Unit Two Reactor Operators are currently throttling CW MOVs to conserve intake canal level. Initiating Cue You are the Unit 1 BOP. You are to respond to the loss of Circulating Water Pumps. When you finish the actions necessary to accomplish this, please inform me.
Initial Conditions Both units are at 100% power when a lightning strike trips 2G screenwell transformer.
Surry 2014-301 "JPM h"                Page 1 of 7  U.S. Nuclear Regulatory Commission Surry Power Station   SR14301  Simulator Job Performance Measure [KA 064.A4.06] [Alternate Path]   Applicant________________________________     Start Time___________________ Examiner_______________________________
Alarm VSP L
Date ___________________________________   Stop Time___________________ Title  Respond to a Failure of #3 EDG to Start and Load on 1J 4160V Bus. K/A: 064.A4.06; Manual start, loading, and stopping of the ED/G, RO 3.9 / SRO 3.9 Applicability     Estimated Time  Actual Time RO      20 Minutes     ___  Minutes                     Conditions   Task is to be PERFORMED in the simulator. A Loss of the "A" RSS Transformer has occurred.  #3 EDG has failed to start and load. Standards
-7 "LLIS TROUBLE"  and VSP
  #3 EDG started and loaded on the 1J Emergency Bus IAW 0-AP-17.05, EDG 3 - Emergency Operations. Initiating Cue Shift Manager Direction. Terminating Cues   Report of #3 EDG loaded on the 1J Emergency Bus. Procedures 0-AP-17.05, EDG 3 - Emergency Operations, Revision 22. Tools and Equipment     Safety Considerations   None      None Surry 2014-301 "JPM h"                Page 2 of 7 Simulator Setup   Call up 100% power IC and initialize (IC 280). Place simulator in RUN. Load the following Malfunctions/Overrides: EL0501, Loss of reserve Station Service XMFMR A, TRUE  ED0503, EDG3 Voltage Regulator Failure, -1  VSPC5 EMERG DIESEL 3 Auto Start Disabled, Trigger 15 Remotes, EDG3, AUTO_EXERCISE, EMERG GEN 3 AUTO EXERCISE, EXERCISE When #3 EDG placed in AUTO implement Trigger 15. When STOP buttons pushed delete VSPC5 malfunction. Acknowledge Alarms. Freeze and Snap IC until ready for evaluation. Initial Conditions Unit 1 operating at 100% power. The Loss of the "A" RSST has occurred and #3 EDG has failed to start and load on 1J 4160V Bus. Starting and loading #3 EDG on the 1J 4160V bus IAW 0-AP-17.05, EDG 3 - Emergency Operations is in progress and is complete through step 3 of Attachment 2. Initiating Cues   You are the Unit 2 BOP and are to continue with starting and loading of #3 EDG per 0-AP-17.05, starting with Attachment 2 step 4. When you finish the actions necessary to accomplish this, please inform me. Notes Surry 2014-301 "JPM h"                Page 3 of 7 PERFORMANCE CHECKLIST   Notes to the Evaluator   This JPM may be Pre-briefed as directed by the Chief Examiner. Task critical elements are bolded and denoted by an asterisk (*). An additional instructor may be needed to silence and acknowledge alarms for the examinee, and perform actions for Unit 2. START TIME _____:             STEP 1:  [Step 4, 5, and 6 of Attachment 2, AP-17.05]  Check Load Limit at maximum, Start EDG 3, Check #3 EDG Speed at 900 RPM, Place #3 EDG AUTO EXERCISE Switch in Auto. STANDARD:   *a) Candidate presses the EDG NO. 3 Engine Start pushbutton. This is a critical step. b) Candidate will check EDG started using RPM indication. *c) Candidate will place the AUTO-EXERCISE Switch for EDG #3 in AUTO position. This is a critical step. d) Candidate will note that #3 EDG has not energized the 1J Bus. e) Candidate returns to AP-17.05, Step 8. EVALUATOR'S NOTE:   COMMENTS:   STEP 2:  [Step 8, AP-17.05]
-K6 "500KV HSE TRBL" have alarmed eight (8) minutes ago.
CHECK BOTH J BUSES - ENERGIZED BY OFFSITE POWER   STANDARD:   a) Candidate Identifies 1J Bus is still de-energized. b) Candidate Goes To Step 10. EVALUATOR'S NOTE:   COMMENTS:   _______ SAT
Security reports a lightning strike in the vicinity of the low level intake.
_______ UNSAT Surry 2014-301 "JPM h"                Page 4 of 7 STEP 3:  [Notes prior to Step 10 of AP-17.05]  Acknowledges NOTES: If the B DC Bus is deenergized, the EDG output breaker and the J Bus load breakers must be closed manually. The following conditions must exist for the EDG output breaker to close automatically: EDG speed greater than 870 rpm EDG INCOMING voltage greater than 113 volts J8 breaker open Control switch for the J3 breaker in AUTO AFTER TRIP DC control power available to the J3 breaker STANDARD:   EVALUATOR'S NOTE:   COMMENTS:   _______ SAT _______ UNSAT   STEP 4:  [Step 10, AP-17.05]
All Unit 2 Circulating Water Pumps were initially running. Unit One and Unit Two Reactor Operators are currently throttling CW MOVs to conserve intake canal level. Initiating Cue You are the Unit 1 BOP.
CHECK EDG 3 - SUPPLYING J BUS STANDARD:   a) Candidate Identifies 15J3 -  NOT Closed. b) Candidate performs RNO. Identifies that loads are already stripped per Attachment 3. c) Candidate goes to step 15 EVALUATOR'S NOTE:   COMMENTS:   _______ SAT _______ UNSAT STEP 5:  [Step 15, AP-17.05]  CHECK EDG 3 INCOMING VOLTAGE GREATER THAN 113 VOLTS. STANDARD:   a) *Candidate turns SYNC-ACB-15J3 key switch to ON. This is a critical step. b) *Candidate identifies no generator voltage and momentarily depresses EMERG GEN NO 3 FIELD FLASS pushbutton. Identifies Voltage established. This is a critical step. c) *Candidate attempts to raise incoming voltage to 120 volts using the EMERG GEN NO 3 VOLT ADJ control switch. This is a critical step. d) Candidate determines there is no Voltage increase, and goes to 15.c RNO.
You are to respond to the loss of Circulating Water Pumps.
EVALUATOR'S NOTE:   _______ SAT _______ UNSAT Surry 2014-301 "JPM h"                Page 5 of 7  COMMENTS:   STEP 6:  [Step 15.c RNO, AP-17.05]  SECURES #3 EDG. STANDARD:   a) Candidate notifies Electrical Department. b) *Candidate secures #3 EDG by momentarily pressing the EMERG GEN NO.3 ENGINE STOP pushbuttons. This is a critical step. c) Candidate notifies Shift Manager. EVALUATOR'S NOTE: If asked to notify the Electrical department: Acknowledge request.  *Both ENGINE STOP pushbuttons must be depressed simultaneously. COMMENTS:   JPM ENDS  _______ SAT _______ UNSAT STOP TIME_______:
When you finish the actions necessary to accomplish this, please inform me.
____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________
 
Surry 2014-301 "JPM h"      Page 6 of 7  Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)   Initial Conditions   Unit 1 operating at 100% power. The Loss of the "A" RSST has occurred and #3 EDG has failed to start and load on 1J 4160V Bus. Starting and loading #3 EDG on the 1J 4160V bus IAW 0-AP-17.05, EDG 3 - Emergency Operations is in progress and is complete through step 3 of Attachment 2. Initiating Cues   You are the Unit 2 BOP and are to continue with starting and loading of #3 EDG per 0-AP-17.05, starting with Attachment 2 step 4. When you finish the actions necessary to accomplish this, please inform me.
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Operator Directions Handout  (TO BE GIVEN TO APPLICANT)   Initial Conditions   Unit 1 operating at 100% power. The Loss of the "A" RSST has occurred and #3 EDG has failed to start and load on 1J 4160V Bus. Starting and loading #3 EDG on the 1J 4160V bus IAW 0-AP-17.05, EDG 3 - Emergency Operations is in progress and is complete through step 3 of Attachment 2. Initiating Cues   You are the Unit 2 BOP and are to continue with starting and loading of #3 EDG per 0-AP-17.05, starting with Attachment 2 step 4. When you finish the actions necessary to accomplish this, please inform me.
Initial Conditions Both units are at 100% power when a lightning strike trips 2G screenwell transformer.
Surry 2014-301 "JPM i"              Page 1 of 13  U.S. Nuclear Regulatory Commission Surry Power Station   SR14301  Job Performance Measure [KA APE068.AA1.21 3.9/4.1]    Applicant________________________________     Start Time___________________ Examiner_______________________________
Alarm VSP L
Date ___________________________________   Stop Time___________________ Title  LOCALLY TRANSFER INDIVIDUAL COMPONENTS TO THE AUX SHUTDOWN PANEL K/A: APE068.AA1.21 Ability to operate and / or monitor the following as they apply to the Control Room Evacuation: Transfer of controls from control room to shutdown panel or local control 3.9 / 4.1 Applicability     Estimated Time  Actual Time RO/SRO(I)/SRO(U)     20 Minutes    ___  Minutes                     Conditions   Task is to be SIMULATED in the plant beginning at the Unit 1 Aux Shutdown Panel. A limiting MCR fire has occurred. The MCR has been evacuated and attempts are being made to transfer plant control to the ASD Panel. Neither the H-Group nor the J-Group Transfer Switch will actuate its components. The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel. The H and J Group Transfer Switches have failed to function. Standards   FCA-1.00, Attachment 2. Initiating Cues   FCA-1.00, Limiting MCR Fire, Step 16 RNO Shift Manager direction. Terminating Cues Report received that FCA-1.00, Attachment 2 completed for Unit 1 components. Procedures FCA-1.00, Limiting MCR Fire, Attachment 2, Rev 48. Tools and Equipment     Safety Considerations None      Standard Personal Safety Equipment Surry 2014-301 "JPM i"              Page 2 of 13 Initial Conditions   This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves. The MCR was evacuated due to a fire. The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel. The H and J Group Transfer Switches have failed to function. Initiating Cue   Locally transfer the individual Unit 1 components to the Unit 1 Aux Shutdown Panel in accordance with FCA-1.00, Attachment 2, Override Control to Auxiliary Shutdown Panel. When you finish the actions necessary to accomplish this, please inform me. Notes to the Evaluator:   Operator briefing should occur at the Unit 1 Aux Shutdown Panel. This task is to be SIMULATED. Do NOT allow the operator to manipulate controls, operate switches or reposition valves. Task critical elements are denoted by an asterisk (*). If substeps of a critical element also have an asterisk (*), then only those asterisked substeps are critical to performance of that task element. Critical step sequencing requirements: None Surry 2014-301 "JPM i"              Page 3 of 13 PERFORMANCE CHECKLIST   Notes to the Evaluator   Task critical elements are bolded and denoted by an asterisk (*). START TIME_______:             STEP 1:  0-FCA-1.00, Attachment 2 (Caution Prior to Step 1)  REVIEWS CAUTION PRIOR TO STEP 1. Standards   Notes that this Attachment should not be performed if transfer failure is due to the emergency bus being de-energized Cues    If asked: Both emergency buses are energized on Unit 1. Evaluator's Comments   _______ SAT
-7 "LLIS TROUBLE"  and VSP
_______ UNSAT STEP 2:  0-FCA-1.00, Attachment 2 (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel: Standards (a) Proceeds to H Bus 4160v breaker 15H4. *(b) Places 1-FW-P-3A's local control box Mode switch (1-EP-43-15H4) to OVERRIDE position. *(c) Rotates Transfer switch (1-EP-43X-15H4) to AUX P position. Evaluator's Note:    If Asked at the ASP:  Following Step b) and c) above, 1-FW-P-3A breaker indicating lights, RED light LIT, GREEN light OFF. Evaluator's Comments     _______ SAT
-K6 "500KV HSE TRBL" have alarmed eight (8) minutes ago.
_______ UNSAT Surry 2014-301 "JPM i"              Page 4 of 13 STEP 3:
Security reports a lightning strike in the vicinity of the low level intake.
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:   LOCALLY TRANSFERS 1-CH-P-1A. Standards   (a) Proceeds to H Bus 4160v breaker 15H5. *(b) Places 1-CH-P-1A's local control box Mode switch (1-EP-43A-15H5) to OVERRIDE position. *(c) Rotates Transfer switch (1-EP-43X-15H5) to AUX P position. Evaluator's Note:     If Asked at the ASP:  Following Step b) and c) above, 1-CH-P-1A breaker indicating lights, RED and GREEN OFF (control switch in PTL). Evaluator's Comments     _______ SAT _______ UNSAT   STEP 4:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:   LOCALLY TRANSFERS 1-CH-P-1C (NORM). Standards   (a) Proceeds to H Bus 4160v breaker 15H6. *(b) Places 1-CH-P-1C's local control box Mode switch (1-EP-43-15H6) to OVERRIDE position. *(c) Rotates Transfer switch (1-EP-43X-15H6) to AUX P position. Evaluator's Note:     If Asked at the ASP:  Following Step b) and c) above, 1-FCH-P-1C breaker indicating lights, RED light LIT, GREEN light OFF. Evaluator's Comments     _______ SAT _______ UNSAT Surry 2014-301 "JPM i"              Page 5 of 13 STEP 5:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel: LOCALLY TRANSFERS 1-CH-P-1C (ALT). Standards     (a) Proceeds to J Bus 4160v breaker 15J2.   *(b) Places 1-CH-P-1C's (ALT) local control box Mode switch (1-EP-43-15J2) to OVERRIDE position   *(c) Rotates Transfer switch (1-EP-43X-15J2) to AUX P position.
All Unit 2 Circulating Water Pumps were initially running. Unit One and Unit Two Reactor Operators are currently throttling CW MOVs to conserve intake canal level.
Evaluator's Note:     If Asked at the ASP:  Following Step b) and c) above, 1-CH-P-1C (ALT) breaker indicating lights, RED light and GREEN light OFF (switch in PTL). Evaluator's Comments     _______ SAT _______ UNSAT   STEP 6:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel: 6. LOCALLY TRANSFERS 1-FW-P-3B. Standards   (a) Proceeds to J Bus 4160v breaker 15J4. *(b) Places 1-FW-P-3B's local control box Mode switch (1-EP-43-15J4) to OVERRIDE position *(c) Rotates Transfer switch (1-EP-43X-15J4) to AUX P position. Evaluator's Note:
Initiating Cue You are the Unit 1 BOP.
If Asked at the ASP:  Following Step b) and c) above, 1-FW-P-3B breaker indicating lights, RED light LIT, GREEN light OFF. Evaluator's Comments
You are to respond to the loss of Circulating Water Pumps.
_______ SAT _______ UNSAT
When you finish the actions necessary to accomplish this, please inform me.
 
Surry 2014-301 "JPM h"                Page 1 of 7  U.S. Nuclear Regulatory Commission Surry Power Station SR14301  Simulator Job Performance Measure [KA 064.A4.06
] [Alternate Path]
Applicant________________________________
Start Time___________________
Examiner_______________________________
 
Date ___________________________________
Stop Time___________________
Title  Respond to a Failure of #3 EDG to Start and Load on 1J 4160V Bus.
K/A: 064.A4.06
; Manual start, loading, and stopping of the ED/G, RO 3.9 / SRO 3.9 Applicability Estimated Time  Actual Time RO      20 Minutes
___  Minutes Conditions Task is to be PERFORMED in the simulator.
A Loss of the "A" RSS Transformer has occurred
.  #3 EDG has failed to start and load.
Standards
 
  #3 EDG started and loaded on the 1J Emergency Bus IAW 0
-AP-17.05, EDG 3  
- Emergency Operations
. Initiating Cue
 
Shift Manager Direction
. Terminating Cues Report of #3 EDG loaded on the 1J Emergency Bus
. Procedures
 
0-AP-17.05, EDG 3  
- Emergency Operations, Revision 22.
Tools and Equipment Safety Considerations None      None Surry 2014-301 "JPM h"                Page 2 of 7 Simulator Setup Call up 100% power IC and initialize (IC 280). Place simulator in RUN.
Load the following Malfunctions/Overrides:
EL0501, Loss of reserve Station Service XMFMR A, TRUE  ED0503, EDG3 Voltage Regulator Failure,  
-1  VSPC5 EMERG DIESEL 3 Auto Start Disabled, Trigger 15 Remotes, EDG3, AUTO_EXERCISE, EMERG GEN 3 AUTO EXERCISE, EXERCISE When #3 EDG placed in AUTO implement Trigger 15
. When STOP buttons pushed delete VSPC5 malfunction
. Acknowledge Alarms.
Freeze and Snap IC until ready for evaluation.
Initial Conditions
 
Unit 1 operating at 100% power
. The Loss of the "A" RSST has occurred and #3 EDG has failed to start and load on 1J 4160V Bus
. Starting and loading #3 EDG on the 1J 4160V bus IAW 0
-AP-17.05, EDG 3  
- Emergency Operations is in progress and is complete through step 3 of Attachment 2
. Initiating Cues You are the Unit 2 BOP and are to continue with starting and loading of #3 EDG per 0
-AP-17.05, starting with Attachment 2 step 4
. When you finish the actions necessary to accomplish this, please inform me.
Notes Surry 2014-301 "JPM h"                Page 3 of 7 PERFORMANCE CHECKLIST Notes to the Evaluator This JPM may be Pre-briefed as directed by the Chief Examiner.
Task critical elements are bolded and denoted by an asterisk (
*). An additional instructor may be needed to silence and acknowledge alarms for the examinee, and perform actions for Unit 2
. START TIME
_____:
STEP 1:  [Step 4, 5, and 6 of Attachment 2, AP
-17.05]  Check Load Limit at maximum, Start EDG 3, Check #3 EDG Speed at 900 RPM, Place #3 EDG AUTO EXERCISE Switch in Auto.
STANDARD:
    *a) Candidate presses the EDG NO. 3 Engine Start pushbutton.
This is a critical step. b) Candidate will check EDG started using RPM indication.
*c) Candidate will place the AUTO
-EXERCISE Switch for EDG #3 in AUTO position.
This is a critical step.
d) Candidate will note that #3 EDG has not energized the 1J Bus.
e) Candidate returns to AP
-17.05, Step 8.
EVALUATOR'S NOTE:
COMMENTS:
STEP 2:  [Step 8, AP
-17.05]
CHECK BOTH J BUSES  
- ENERGIZED BY OFFSITE POWER STANDARD:
a) Candidate Identifies 1J Bus is still de
-energized.
b) Candidate Goes To Step 10
. EVALUATOR'S NOTE:
COMMENTS:
_______ SAT
 
_______ UNSAT
 
Surry 2014-301 "JPM h"                Page 4 of 7 STEP 3:  [Notes prior to Step 10 of AP
-17.05]  Acknowledges NOTES:
If the B DC Bus is deenergized, the EDG output breaker and the J Bus load breakers must be closed manually.
The following conditions must exist for the EDG output breaker to close automatically:
EDG speed greater than 870 rpm EDG INCOMING voltage greater than 113 volts J8 breaker open Control switch for the J3 breaker in AUTO AFTER TRIP DC control power available to the J3 breaker STANDARD:
EVALUATOR'S NOTE:
COMMENTS:
_______ SAT
_______ UNSAT STEP 4:  [Step 10, AP
-17.05]
CHECK EDG 3  
- SUPPLYING J BUS STANDARD:
a) Candidate Identifies 15J3 -  NOT Closed.
b) Candidate performs RNO. Identifies that loads are already stripped per Attachment 3.
c) Candidate goes to step 15 EVALUATOR'S NOTE:
COMMENTS:
_______ SAT
_______ UNSAT STEP 5:  [Step 15, AP-17.05]  CHECK EDG 3 INCOMING VOLTAGE GREATER THAN 113 VOLTS.
STANDARD:
a) *Candidate turns SYNC
-ACB-15J3 key switch to ON
. This is a critical step.
b) *Candidate identifies no generator voltage and momentarily depresses EMERG GEN NO 3 FIELD FLASS pushbutton
. Identifies Voltage established. This is a critical step.
c) *Candidate attempts to raise incoming voltage to 120 volts using the EMERG GEN NO 3 VOLT ADJ control switch. This is a critical step.
d) Candidate determines there is no Voltage increase, and goes to 15.c RNO.
 
EVALUATOR'S NOTE:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM h"                Page 5 of 7  COMMENTS:
STEP 6:  [Step 15.c RNO, AP
-17.05]  SECURES #3 EDG.
STANDARD:
a) Candidate notifies Electrical Department
. b) *Candidate secures #3 EDG by momentarily pressing the EMERG GEN NO.3 ENGINE STOP pushbutton
: s. This is a critical step.
c) Candidate notifies Shift Manager.
EVALUATOR'S NOTE:
If asked to notify the Electrical department: Acknowledge request.  
   *Both ENGINE STOP pushbuttons must be depressed simultaneously.
COMMENTS:
JPM ENDS  _______ SAT
_______ UNSAT
 
STOP TIME_______:
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
 
Surry 2014-301 "JPM h"      Page 6 of 7  Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Initial Conditions Unit 1 operating at 100% power.
The Loss of the "A" RSST has occurred and #3 EDG has failed to start and load on 1J 4160V Bus.
Starting and loading #3 EDG on the 1J 4160V bus IAW 0
-AP-17.05, EDG 3  
- Emergency Operations is in progress and is complete through step 3 of Attachment 2.
Initiating Cues You are the Unit 2 BOP and are to continue with starting and loading of #3 EDG per 0
-AP-17.05, starting with Attachment 2 step 4
. When you finish the actions necessary to accomplish this, please inform me.
 
Operator Directions Handout  (TO BE GIVEN TO APPLICANT)
Initial Conditions Unit 1 operating at 100% power.
The Loss of the "A" RSST has occurred and #3 EDG has failed to start and load on 1J 4160V Bus.
Starting and loading #3 EDG on the 1J 4160V bus IAW 0
-AP-17.05, EDG 3  
- Emergency Operations is in progress and is complete through step 3 of Attachment 2.
Initiating Cues You are the Unit 2 BOP and are to continue with starting and loading of #3 EDG per 0
-AP-17.05, starting with Attachment 2 step 4
. When you finish the actions necessary to accomplish this, please inform me.
 
Surry 2014-301 "JPM i"              Page 1 of 13  U.S. Nuclear Regulatory Commission Surry Power Station SR14301  Job Performance Measure [KA APE068.AA1.21 3.9/4.1
]    Applicant________________________________
Start Time___________________
Examiner_______________________________
 
Date ___________________________________
Stop Time___________________
Title  LOCALLY TRANSFER INDIVIDUAL COMPONENTS TO THE AUX SHUTDOWN PANEL K/A: APE068.AA1.21 Ability to operate and / or monitor the following as they apply to the Control Room Evacuation: Transfer of controls from control room to shutdown panel or local control 3.9 / 4.1 Applicability Estimated Time  Actual Time RO/SRO(I)/SRO(U) 20 Minutes    ___  Minutes Conditions Task is to be SIMULATED in the plant beginning at the Unit 1 Aux Shutdown Panel
. A limiting MCR fire has occurred. The MCR has been evacuated and attempts are being made to transfer plant control to the ASD Panel. Neither the H
-Group nor the J
-Group Transfer Switch will actuate its components.
The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel.
The H and J Group Transfer Switches have failed to function.
Standards FCA-1.00, Attachment  
: 2. Initiating Cues FCA-1.00, Limiting MCR Fire, Step 16 RNO Shift Manager direction.
Terminating Cues
 
Report received that FCA
-1.00, Attachment 2 completed for Unit 1 components.
Procedures
 
FCA-1.00, Limiting MCR Fire, Attachment 2, Rev 48.
Tools and Equipment Safety Considerations
 
None      Standard Personal Safety Equipment
 
Surry 2014-301 "JPM i"              Page 2 of 13 Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
The MCR was evacuated due to a fire.
The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel.
The H and J Group Transfer Switches have failed to function.
Initiating Cue Locally transfer the individual Unit 1 components to the Unit 1 Aux Shutdown Panel in accordance with FCA
-1.00, Attachment 2, Override Control to Auxiliary Shutdown Panel.
When you finish the actions necessary to accomplish this, please inform me.
Notes to the Evaluator:
Operator briefing should occur at the Unit 1 Aux Shutdown Panel.
This task is to be SIMULATED. Do NOT allow the operator to manipulate controls, operate switches or reposition valves.
Task critical elements are denoted by an asterisk (
*). If substeps of a critical element also have an asterisk (
*), then only those asterisked substeps are critical to performance of that task element.
Critical step sequencing requirements: None
 
Surry 2014-301 "JPM i"              Page 3 of 13 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (
*). START TIME_______:
STEP 1:  0-FCA-1.00, Attachment 2 (Caution Prior to Step
: 1)  REVIEWS CAUTION PRIOR TO STEP 1.
Standards Notes that this Attachment should not be performed if transfer failure is due to the emergency bus being de
-energized Cues    If asked: Both emergency buses are energized on Unit 1.
Evaluator's Comments
_______ SAT
 
_______ UNSAT
 
STEP 2:  0-FCA-1.00, Attachment 2 (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
Standards
 
  (a) Proceeds to H Bus 4160v breaker 15H4.
  *(b) Places 1-FW-P-3A's local control box Mode switch (1
-EP-43-15H4) to OVERRIDE position.
  *(c) Rotates Transfer switch (1
-EP-43X-15H4) to AUX P position
. Evaluator's Note:    If Asked at the ASP:  Following Step b) and c) above, 1
-FW-P-3A breaker indicating lights, RED light LIT, GREEN light OFF.
Evaluator's Comments
_______ SAT
 
_______ UNSAT
 
Surry 2014-301 "JPM i"              Page 4 of 13 STEP 3:
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1
-CH-P-1A. Standards (a) Proceeds to H Bus 4160v breaker 15H5.
  *(b) Places 1-CH-P-1A's local control box Mode switch (1
-EP-43A-15H5) to OVERRIDE position.
  *(c) Rotates Transfer switch (1-EP-43X-15H5) to AUX P position
. Evaluator's Note:
If Asked at the ASP:  Following Step b) and c) above, 1
-CH-P-1A breaker indicating lights, RED and GREEN OFF (control switch in PTL).
Evaluator's Comments
_______ SAT
_______ UNSAT STEP 4:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1
-CH-P-1C (NORM).
Standards (a) Proceeds to H Bus 4160v breaker 15H6.
  *(b) Places 1-CH-P-1C's local control box Mode switch (1
-EP-43-15H6) to OVERRIDE position.
  *(c) Rotates Transfer switch (1
-EP-43X-15H6) to AUX P position
. Evaluator's Note:
If Asked at the ASP:  Following Step b) and c) above, 1
-FCH-P-1C breaker indicating lights, RED light LIT, GREEN light OFF.
Evaluator's Comments
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM i"              Page 5 of 13 STEP 5:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1
-CH-P-1C (ALT).
Standards (a) Proceeds to J Bus 4160v breaker 15J2.
    *(b) Places 1-CH-P-1C's (ALT) local control box Mode switch (1
-EP-43-15J2) to OVERRIDE position
    *(c) Rotates Transfer switch (1
-EP-43X-15J2) to AUX P position.
 
Evaluator's Note:
If Asked at the ASP:  Following Step b) and c) above, 1
-CH-P-1C (ALT) breaker indicating lights, RED light and GREEN light OFF (switch in PTL).
Evaluator's Comments
_______ SAT
_______ UNSAT STEP 6:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
: 6. LOCALLY TRANSFERS 1
-FW-P-3B. Standards (a) Proceeds to J Bus 4160v breaker 15J4.
  *(b) Places 1-FW-P-3B's local control box Mode switch (1
-EP-43-15J4) to OVERRIDE position
  *(c) Rotates Transfer switch (1-EP-43X-15J4) to AUX P position.
Evaluator's Note:
 
If Asked at the ASP:  Following Step b) and c) above, 1
-FW-P-3B breaker indicating lights, RED light LIT, GREEN light OFF.
Evaluator's Comments
 
_______ SAT
_______ UNSAT


Surry 2014-301 "JPM i"              Page 6 of 13 STEP 7:
Surry 2014-301 "JPM i"              Page 6 of 13 STEP 7:
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1-CH-P-1B. Standards (a) Proceeds to J Bus 4160v breaker 15J5. *(b) Places 1-CH-P-1B's local control box Mode switch (1-EP-43A-15J5) to OVERRIDE position *(c) Rotates Transfer switch (1-EP-43X-15J5) to AUX P position. Evaluator's Note:     If Asked at the ASP:  Following Step b) and c) above, 1-CH-P-1B breaker indicating lights, RED light and GREEN light OFF (switch in PTL).
 
Evaluator's Comments     _______ SAT _______ UNSAT   STEP 8:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel: LOCALLY TRANSFERS 1-MS-SOV-102A. Standards   (a) Proceeds to Aux SD Panel, locates Transfer Relay Cabinet 5. *(b) Places 1-MS-SOV-102A's local control box Mode switch (1-MS-43B-SMS102A) to OVERRIDE position *(c) Rotates Transfer switch (1-MS-43X-SMS102A) to AUX PANEL position. Cues  If asked at ASP:  RED Light LIT, GREEN light OFF, switch in CLOSE position. Evaluator's Comments
LOCALLY TRANSFERS 1
_______ SAT _______ UNSAT Surry 2014-301 "JPM i"              Page 7 of 13 STEP 9:
-CH-P-1B. Standards
 
  (a) Proceeds to J Bus 4160v breaker 15J5.
  *(b) Places 1-CH-P-1B's local control box Mode switch (1
-EP-43A-15J5) to OVERRIDE position
  *(c) Rotates Transfer switch (1
-EP-43X-15J5) to AUX P position.
Evaluator's Note:
If Asked at the ASP:  Following Step b) and c) above, 1
-CH-P-1B breaker indicating lights, RED light and GREEN light OFF (switch in PTL).
 
Evaluator's Comments
_______ SAT
_______ UNSAT STEP 8:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1
-MS-SOV-102A. Standards (a) Proceeds to Aux SD Panel, locates Transfer Relay Cabinet 5.
  *(b) Places 1-MS-SOV-102A's local control box Mode switch (1
-MS-43B-SMS102A) to OVERRIDE position
  *(c) Rotates Transfer switch (1
-MS-43X-SMS102A) to AUX PANEL position.
Cues  If asked at ASP:  RED Light LIT, GREEN light OFF, switch in CLOSE position
. Evaluator's Comments
 
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM i"              Page 7 of 13 STEP 9:
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1-MS-SOV-102B. Standards (a) Locates Transfer Relay Cabinet #3 (left of Aux SD Panel). *(b) Places 1-MS-SOV-102B's local control box Mode switch (1-MS-43B-SMS102B) to OVERRIDE position *(c) Rotates Transfer switch (1-MS-43X-SMS102B) to AUX P position. Cues  If asked at ASP: RED light ON, GREEN light OFF, switch in CLOSE position. Evaluator's Comments
 
LOCALLY TRANSFERS 1
-MS-SOV-102B. Standards
 
  (a) Locates Transfer Relay Cabinet #3 (left of Aux SD Panel).
  *(b) Places 1-MS-SOV-102B's local control box Mode switch (1
-MS-43B-SMS102B) to OVERRIDE position
  *(c) Rotates Transfer switch (1
-MS-43X-SMS102B) to AUX P position
. Cues  If asked at ASP: RED light ON, GREEN light OFF, switch in CLOSE position
. Evaluator's Comments
 
_______ SAT
_______ SAT
_______ UNSAT   STEP 10:  0-FCA-1.00, Attachment 2, (Step 1, Page 2)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
 
LOCALLY TRANSFERS 1-FW-MOV-151A. Standards   (a) Proceeds to Unit 1 Cable Vault Transfer Relay Cabinet 1. *(b) Places 1-FW-MOV-151A's local control box Mode switch (1-FW-43B-FW151A) to OVERRIDE position *(c) Rotates Transfer switch (1-FW-43X-FW151A) to AUX P position. Evaluator's Note:
_______ UNSAT STEP 10:  0-FCA-1.00, Attachment 2, (Step 1, Page 2)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
If Asked at the ASP:  Following Step b) and c) above, 1-FW-MOV-151A indicating lights, RED light LIT, GREEN light OFF. Evaluator's Comments
 
_______ SAT _______ UNSAT
LOCALLY TRANSFERS 1
-FW-MOV-151A. Standards (a) Proceeds to Unit 1 Cable Vault Transfer Relay Cabinet 1.
  *(b) Places 1-FW-MOV-151A's local control box Mode switch (1
-FW-43B-FW151A) to OVERRIDE position
  *(c) Rotates Transfer switch (1
-FW-43X-FW151A) to AUX P position
. Evaluator's Note:
 
If Asked at the ASP:  Following Step b) and c) above, 1
-FW-MOV-151A indicating lights, RED light LIT, GREEN light OFF.
Evaluator's Comments
 
_______ SAT
_______ UNSAT


Surry 2014-301 "JPM i"              Page 8 of 13 STEP 11:
Surry 2014-301 "JPM i"              Page 8 of 13 STEP 11:
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1-FW-MOV-151C. Standards (a) Locates appropriate switch on Transfer Relay Cabinet 1. *(b) Places 1-FW-MOV-151C's local control box Mode switch (1-FW-43B-FW151C) to OVERRIDE position *(c) Rotates Transfer switch (1-FW-43X-FW151C) to AUX P position. Evaluator's Note:     If Asked at the ASP:  Following Step b) and c) above, 1-FW-MOV-151C indicating lights, RED light LIT, GREEN light OFF. Evaluator's Comments     _______ SAT _______ UNSAT   STEP 12:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel: LOCALLY TRANSFERS 1-FW-MOV-151E. Standards   (a) Locates appropriate switch on Transfer Relay Cabinet 1. *(b) Places 1-FW-MOV-151E's local control box Mode switch (1-FW-43B-FW151E) to OVERRIDE position *(c) Rotates Transfer switch (1-FW-43X-FW151E) to AUX P position. Evaluator's Note:
 
If Asked at the ASP:  Following Step b) and c) above, 1-FW-MOV-151EA indicating lights, RED light LIT, GREEN light OFF. Evaluator's Comments
LOCALLY TRANSFERS 1
_______ SAT _______ UNSAT
-FW-MOV-151C. Standards
 
  (a) Locates appropriate switch on Transfer Relay Cabinet 1.
  *(b) Places 1-FW-MOV-151C's local control box Mode switch (1
-FW-43B-FW151C) to OVERRIDE position
  *(c) Rotates Transfer switch (1
-FW-43X-FW151C) to AUX P position
. Evaluator's Note:
If Asked at the ASP:  Following Step b) and c) above, 1
-FW-MOV-151C indicating lights, RED light LIT, GREEN light OFF.
Evaluator's Comments
_______ SAT
_______ UNSAT STEP 12:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1
-FW-MOV-151E. Standards (a) Locates appropriate switch on Transfer Relay Cabinet 1.
  *(b) Places 1-FW-MOV-151E's local control box Mode switch (1
-FW-43B-FW151E) to OVERRIDE position
  *(c) Rotates Transfer switch (1
-FW-43X-FW151E) to AUX P position.
Evaluator's Note:
 
If Asked at the ASP:  Following Step b) and c) above, 1
-FW-MOV-151EA indicating lights, RED light LIT, GREEN light OFF.
Evaluator's Comments
 
_______ SAT
_______ UNSAT


Surry 2014-301 "JPM i"              Page 9 of 13 STEP 13:
Surry 2014-301 "JPM i"              Page 9 of 13 STEP 13:
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel: LOCALLY TRANSFERS 1-CH-P-2A. Standards (a) Locates appropriate switch on Transfer Relay Cabinet 1. *(b) Places 1-CH-P-2A's local control box Mode switch (1-CH-43B-CH2A) to OVERRIDE position *(c) Rotates Transfer switch (1-CH-43X-CH2A) to AUX P position. Evaluator's Note:     If Asked at the ASP:  Following Step b) and c) above, 1-CH-P-2A indicating lights, RED  SLOW light LIT, switch in "A". Evaluator's Comments
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1
-CH-P-2A. Standards
 
  (a) Locates appropriate switch on Transfer Relay Cabinet 1.
  *(b) Places 1-CH-P-2A's local control box Mode switch (1
-CH-43B-CH2A) to OVERRIDE position
  *(c) Rotates Transfer switch (1
-CH-43X-CH2A) to AUX P position
. Evaluator's Note:
If Asked at the ASP:  Following Step b) and c) above, 1
-CH-P-2A indicating lights, RED  SLOW light LIT, switch in "A". Evaluator's Comments
 
_______ SAT
 
_______ UNSAT STEP 14:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1
-FW-MOV-151B. Standards (a) Proceeds to Unit 1 Cable Vault Transfer Relay Cabinet #2.
  *(b) Places 1-FW-MOV-151B's local control box Mode switch (1
-FW-43B-FW151B) to OVERRIDE position
  *(c) Rotates Transfer switch (1
-FW-43X-FW151B) to AUX P position
. Evaluator's Note:
If Asked at the ASP:  Following Step b) and c) above, 1
-FW-MOV-151B indicating lights, RED light LIT, GREEN light OFF.
Evaluator's Comments
_______ SAT
_______ SAT
_______ UNSAT   STEP 14:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:  LOCALLY TRANSFERS 1-FW-MOV-151B. Standards    (a) Proceeds to Unit 1 Cable Vault Transfer Relay Cabinet #2.  *(b) Places 1-FW-MOV-151B's local control box Mode switch (1-FW-43B-FW151B) to OVERRIDE position  *(c) Rotates Transfer switch (1-FW-43X-FW151B) to AUX P position. Evaluator's Note:    If Asked at the ASP:  Following Step b) and c) above, 1-FW-MOV-151B indicating lights, RED light LIT, GREEN light OFF. Evaluator's Comments    _______ SAT  _______ UNSAT Surry 2014-301 "JPM i"              Page 10 of 13 STEP 15:
_______ UNSAT
 
Surry 2014-301 "JPM i"              Page 10 of 13 STEP 15:
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1-FW-MOV-151D. Standards (a) Locates appropriate switch on Transfer Relay Cabinet #2 *(b) Places 1-FW-MOV-151D's local control box Mode switch (1-FW-43B-FW151D) to OVERRIDE position. *(c) Rotates Transfer switch (1-FW-43X-FW151D) to AUX P position. Evaluator's Note:     If Asked at the ASP:  Following Step b) and c) above, 1-FW-MOV-151D indicating lights, RED light LIT, GREEN light OFF. Evaluator's Comments     _______ SAT
 
_______ UNSAT   STEP 16:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel: LOCALLY TRANSFERS 1-FW-MOV-151F. Standards   (a) Locates appropriate switch on Transfer Relay Cabinet #2 *(b) Places 1-FW-MOV-151F's local control box Mode switch (1-FW-43B-FW151F) to OVERRIDE position *(c) Rotates Transfer switch (1-FW-43X-FW151F) to AUX P position. Evaluator's Note:     If Asked at the ASP:  Following Step b) and c) above, 1-FW-MOV-151F indicating lights, RED light LIT, GREEN light OFF. Evaluator's Comments
LOCALLY TRANSFERS 1
_______ SAT _______ UNSAT Surry 2014-301 "JPM i"              Page 11 of 13 STEP 17:
-FW-MOV-151D. Standards
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel: LOCALLY TRANSFERS 1-CH-P-2B. Standards (a) Locates appropriate switch on Transfer Relay Cabinet #2 *(b) Places 1-CH-P-2B's local control box Mode switch (1-CH-43B-CH2B) to OVERRIDE position *(c) Rotates Transfer switch (1-CH-43X-CH2B) to AUX P position. Evaluator's Note:     If Asked at the ASP:  Following Step b) and c) above, 1-CH-P-2B indicating lights, RED  SLOW light LIT, GREEN light OFF, switch in "S".
 
Evaluator's Comments     _______ SAT
  (a) Locates appropriate switch on Transfer Relay Cabinet #2
_______ UNSAT   STEP 18:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel: LOCALLY TRANSFERS 1-CH-MOV-1350. Standards (a) Proceeds to Unit 1 Cable Vault Transfer Relay Cabinet 4. *(b) Places 1-CH-MOV-1350's local control box Mode switch (1-CH-43B-1350) to OVERRIDE position. *(c) Rotates Transfer switch (1-CH-43X-1350) to AUX P position. Evaluator's Note:     If Asked at the ASP:  Following Step b) and c) above, 1-CH-MOV-1350 indicating lights, GREEN light LIT, RED light OFF. IF Asked at the ASP:    All components indicate shifted to ASP Control. Evaluator's Comments     _______ SAT _______ UNSAT Surry 2014-301 "JPM i"              Page 12 of 13 REPORTS TO SHIFT MANAGER (EVALUATOR). Standards   Verbal status report made that all affected Unit 1 components locally transferred to Aux Shutdown Panel. STOP TIME: ______                   Evaluator's Comments                                 Evaluator's Note   If Asked: Components shown below indicate status.       1-FW-P-3A  1-MS-SOV-102A  1-MS-SOV-102B  1-FW-P-3B Red Lite LIT Red Lite LIT   Both Red Lites LIT Red Lite LIT 1-CH-P-1A  1-CH-P-1C  1-CH-P-1B  1-CH-P-1C (Alt) No Lites (PTL) Red Lite Lit  No Lites (PTL)   No Lites (PTL) 1-FW-MOV-151A 1-FW-MOV-151E  1-FW-MOV-151D  1-FW-MOV-151B Red Lite LIT Red Lite LIT  Red Lite LIT   Red Lite LIT 1-FW-MOV-151C        1-FW-MOV-151F Red Lite LIT         Red Lite LIT 1-CH-P-2A          1-CH-P-2B Red SLOW LIT         Red SLOW LIT Switch in "A"         Switch in "S" Surry 2014-301 "JPM i"              Page 13 of 13 STOP TIME:   ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________
  *(b) Places 1-FW-MOV-151D's local control box Mode switch (1
____________________________________________________________________________________  ____________________________________________________________________________________ ____________________________________________________________________________________
-FW-43B-FW151D) to OVERRIDE position.
____________________________________________________________________________________  ____________________________________________________________________________________ ____________________________________________________________________________________
  *(c) Rotates Transfer switch (1
-FW-43X-FW151D) to AUX P position
. Evaluator's Note:
If Asked at the ASP:  Following Step b) and c) above, 1
-FW-MOV-151D indicating lights, RED light LIT, GREEN light OFF.
Evaluator's Comments
_______ SAT
 
_______ UNSAT STEP 16:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1
-FW-MOV-151F. Standards (a) Locates appropriate switch on Transfer Relay Cabinet #2
  *(b) Places 1-FW-MOV-151F's local control box Mode switch (1
-FW-43B-FW151F) to OVERRIDE position
  *(c) Rotates Transfer switch (1
-FW-43X-FW151F) to AUX P position.
Evaluator's Note:
If Asked at the ASP:  Following Step b) and c) above, 1
-FW-MOV-151F indicating lights, RED light LIT, GREEN light OFF.
Evaluator's Comments
 
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM i"              Page 11 of 13 STEP 17:
0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1
-CH-P-2B. Standards
 
  (a) Locates appropriate switch on Transfer Relay Cabinet #2
  *(b) Places 1-CH-P-2B's local control box Mode switch (1
-CH-43B-CH2B) to OVERRIDE position
  *(c) Rotates Transfer switch (1
-CH-43X-CH2B) to AUX P position
. Evaluator's Note:
If Asked at the ASP:  Following Step b) and c) above, 1
-CH-P-2B indicating lights, RED  SLOW light LIT, GREEN light OFF, switch in "S".
 
Evaluator's Comments
_______ SAT
 
_______ UNSAT STEP 18:  0-FCA-1.00, Attachment 2, (Step 1)  Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:
LOCALLY TRANSFERS 1
-CH-MOV-1350. Standards
 
  (a) Proceeds to Unit 1 Cable Vault Transfer Relay Cabinet 4.
  *(b) Places 1-CH-MOV-1350's local control box Mode switch (1
-CH-43B-1350) to OVERRIDE position.
  *(c) Rotates Transfer switch (1
-CH-43X-1350) to AUX P position
. Evaluator's Note:
If Asked at the ASP:  Following Step b) and c) above, 1
-CH-MOV-1350 indicating lights, GREEN light LIT, RED light OFF.
IF Asked at the ASP:    All components indicate shifted to ASP Control.
Evaluator's Comments
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM i"              Page 12 of 13 REPORTS TO SHIFT MANAGER (EVALUATOR).
Standards Verbal status report made that all affected Unit 1 components locally transferred to Aux Shutdown Panel.
STOP TIME: ______
Evaluator's Comments
 
Evaluator's Note If Asked: Components shown below indicate status.
1-FW-P-3A  1-MS-SOV-102A  1-MS-SOV-102B  1-FW-P-3B Red Lite LIT Red Lite LIT Both Red Lites LIT Red Lite LIT 1-CH-P-1A  1-CH-P-1C  1-CH-P-1B  1-CH-P-1C (Alt) No Lites (PTL)
Red Lite Lit  No Lites (PTL)
No Lites (PTL) 1-FW-MOV-151A 1-FW-MOV-151E  1-FW-MOV-151D  1-FW-MOV-151B Red Lite LIT Red Lite LIT  Red Lite LIT Red Lite LIT 1-FW-MOV-151C        1-FW-MOV-151F Red Lite LIT Red Lite LIT 1-CH-P-2A          1-CH-P-2B Red SLOW LIT Red SLOW LIT Switch in "A" Switch in "S"
 
Surry 2014-301 "JPM i"              Page 13 of 13 STOP TIME:
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
 
____________________________________________________________________________________
__________________________________________________________________________________
__ ____________________________________________________________________________________
 
____________________________________________________________________________________
____________________________________________________________________________________  ____________________________________________________________________________________
 
____________________________________________________________________________________
____________________________________________________________________________________
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER) Initial Conditions   This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves. The MCR was evacuated due to a fire. The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel   The H and J Group Transfer Switches have failed to function. Initiating Cue   Locally transfer the individual Unit 1 components to the Unit 1 Aux Shutdown Panel in accordance with FCA-1.00, Attachment 2, Override Control to Auxiliary Shutdown Panel. When you finish the actions necessary to accomplish this, please inform me.
 
Operator Directions Handout (TO BE GIVEN TO APPLICANT)   Initial Conditions   This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves. The MCR was evacuated due to a fire. The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel The H and J Group Transfer Switches have failed to function. Initiating Cue Locally transfer the individual Unit 1 components to the Unit 1 Aux Shutdown Panel in accordance with FCA-1.00, Attachment 2, Override Control to Auxiliary Shutdown Panel.
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
The MCR was evacuated due to a fire.
The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel The H and J Group Transfer Switches have failed to function.
Initiating Cue Locally transfer the individual Unit 1 components to the Unit 1 Aux Shutdown Panel in accordance with FCA
-1.00, Attachment 2, Override Control to Auxiliary Shutdown Panel.
When you finish the actions necessary to accomplish this, please inform me.
 
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
The MCR was evacuated due to a fire.
The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel
 
The H and J Group Transfer Switches have failed to function.
Initiating Cue Locally transfer the individual Unit 1 components to the Unit 1 Aux Shutdown Panel in accordance with FCA
-1.00, Attachment 2, Override Control to Auxiliary Shutdown Panel.
 
When you finish the actions necessary to accomplish this, please inform me.     
When you finish the actions necessary to accomplish this, please inform me.     


Surry 2014-301 "JPM j" Surry SR14301  1 of 10  U.S. Nuclear Regulatory Commission Surry Power Station   SR14301  Job Performance Measure 076A2.01 (3.5/3.7) [ALTERNATE PATH]   Applicant________________________________     Start Time___________________ Examiner_______________________________
Surry 2014-301 "JPM j" Surry SR14301  1 of 10  U.S. Nuclear Regulatory Commission Surry Power Station SR14301  Job Performance Measure 076A2.01 (3.5/3.7)
Date ___________________________________   Stop Time___________________ Title  ISOLATE SERVICE WATER TO #3 MER DURING FLOODING K/A: 076A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the SWS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations; Loss of SWS. (3.5/3.7)
[ALTERNATE PATH]
Applicability     Estimated Time  Actual Time RO/SRO(D)     15 Minutes   __________                       Conditions   Task is to be SIMULATED in the plant. Any plant mode/condition where a large SW leak in #3 MER has occurred. Standards   Flooding isolated to #3 MER as indicated by decreasing water level in accordance with 0-AP-13.00 steps 38 and 39. Initiating Cues   0-AP-13.00, Turbine Building or #3 MER Flooding, Step 38. Shift Manager direction. Terminating Cues   0-AP-13.00, Turbine Building or #3 MER Flooding, Step 39 completed. Procedures   0-AP-13.00, Turbine Building or #3 MER Flooding, Revision 28.   
Applicant________________________________
Start Time___________________
Examiner_______________________________
 
Date ___________________________________
Stop Time___________________
Title  ISOLATE SERVICE WATER TO #3 MER DURING FLOODING K/A: 076A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the SWS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations; Loss of SWS. (3.5/3.7)
 
Applicability Estimated Time  Actual Ti me RO/SRO(D) 15 Minutes
__________
Conditions Task is to be SIMULATED in the plant.
Any plant mode/condition where a large SW leak in #3 MER has occurred.
Standards Flooding isolated to #3 MER as indicated by decreasing water level in accordance with 0
-AP-13.00 steps 38 and 39. Initiating Cues 0-AP-13.00, Turbine Building or #3 MER Flooding, Step 3
: 8. Shift Manager direction.
Terminating Cues 0-AP-13.00, Turbine Building or #3 MER Flooding, Step 3 9 completed.
Procedures 0-AP-13.00, Turbine Building or #3 MER Flooding, Revision 28
.   
 
Surry 2014-301 "JPM j" Surry SR14301  2 of 10 Tools and Equipment Safety Considerations None        Standard Personal Safety Equipment Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
There is a major Service Water leak in #3 MER.
1-SW-P-10B and 2
-SW-P-10B have been secured.


Surry 2014-301 "JPM j" Surry SR14301  2 of 10 Tools and Equipment    Safety Considerations  None        Standard Personal Safety Equipment  Initial Conditions  This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves. There is a major Service Water leak in #3 MER. 1-SW-P-10B and 2-SW-P-10B have been secured.
1-VS-E-4A, 4B, and 4C have been secured.
1-VS-E-4A, 4B, and 4C have been secured. MER 3 Watertight Door has been checked closed. Initiating Cues   The team has reached step 37 of 0-AP-13.00, Turbine Building or #3 MER Flooding. You are to isolate Service Water to #3 MER in accordance with Steps 38 and 39 of 0-AP-13.00, Turbine Building or #3 MER Flooding.
MER 3 Watertight Door has been checked closed.
Notes to the Evaluator. Task briefing should occur in the pre-determined location.     
Initiating Cues The team has reached step 37 of 0
-AP-13.00, Turbine Building or #3 MER Flooding.
You are to isolate Service Water to #3 MER in accordance with Steps 38 and 39 of 0
-AP-13.00, Turbine Building or #3 MER Flooding.


Surry 2014-301 "JPM j" Surry SR14301  3 of 10 PERFORMANCE CHECKLIST  Notes to the Evaluator   Task critical elements are bolded and denoted by an asterisk (*). START TIME:              STEP 1:    [Step 38a, AP-13.00]  ISOLATE SW TO MER 3:  a)  Fail 1-SW-263 closed by opening Circuit 8 on Lighting Panel 2T3 (located north of 2-FW-E-2A)  STANDARD:  Locates lighting panel 2T3 (located north of 2-FW-E-2A). *b) Opens circuit 8 on lighting panel 2-EP-LP-2T3- this is a critical step.
Notes to the Evaluator
EVALUATOR'S NOTE:  None  COMMENTS:    _______ SAT
. Task briefing should occur in the pre-determined location
_______ UNSAT STEP 2:
.       
STEP 38b-  Verify open or open 1-SW-500, SW Header Crosstie (MER 4)  STANDARD:  (a) Proceeds to #4 MER. (b) Locates manual valve 1-SW-500 (halfway across room under smoke detector). (c) *Pulls pin from handwheel actuator. This is a critical step. (d) *Opens 1-SW-500 by rotating valve handwheel in the clockwise direction- This is a critical step. Evaluator's Cues Tell operator:  Actual valve position in plant may be open or closed. Provide appropriate cue. Point at "CLOSED" indicator.
COMMENTS:    _______ SAT
_______ UNSAT Surry 2014-301 "JPM j" Surry SR14301  4 of 10 STEP 3:  Step 38c- Close 2-SW-476, Water Box 2C Isol (MER 4)  STANDARD:  (a) Locates 2-SW-476 (in #4 MER 2/3 of the way across the room on the right hand side. (b) Attempts to close 2-SW-476 by removing the locking pin and rotating the handwheel clockwise. (c) Recognizes that 2-SW-476 will not close and transitions to step 38c RNO column. Evaluator's Cues  Tell operator:  As operator attempts to close valve, the handwheel will not move. COMMENTS:    _______ SAT  _______ UNSAT Surry 2014-301 "JPM j" Surry SR14301  5 of 10 STEP 4:  Step 38c RNO-  Do the following:  1) Verify open or open 2-SW-533. 2) Close 2-SW-474, located in Unit 2 BC HX SW MOV pit. STANDARD:  (a) *Opens 2-SW-533 (MER-5) - by rotating valve handwheel in the counter-clockwise direction. This is a critical step. (b) Proceeds to Unit 2 BC HX SW MOV pit. (c) Locates manual valve 2-SW-474. (d) *Closes 2-SW-474 by removing the locking pin and rotating valve handwheel in the clockwise direction- this is a critical step. Evaluator's Cues    For 2-SW-533, provide appropriate cue based on actual initial valve position in plant. If asked: After trainee identifies 2-SW-474, if expected mark number not verbalized, ask the trainee what they expect the label to read, then tell trainee the label reads 2-SW-474. If wrong valve identified, tell trainee that what they expected is not what it reads. If asked: Security has been notified for entry.      Evaluator's Note  Safety concern: Trainee does not have to travel down into the valve pits. He can identify which label he is looking at, tell the evaluator what he expects the label to read, and if correct (at the BC HX SW MOV PIT), the evaluator can then state the label reads 2-SW-474. The trainee can describe actions to complete valve manipulation from above. Security concern: Certain valve pits are now covered by grates. If the enclosure is to be opened, security should be contacted. It is acceptable for the trainee to describe the actions required to raise the grate(s) - utilize hand crank to raise the grating access door. COMMENTS:
_______ SAT  _______ UNSAT Surry 2014-301 "JPM j" Surry SR14301  6 of 10 STEP 5:  Step 38d-  Close 2-SW-478, SW Header Crosstie. (MER 4)  STANDARD:  (a) Locates 2-SW-478 (in #4 MER 2/3 of the way across the room on the right hand side). (b) Pulls pin from handwheel actuator. (c) *Closes 2-SW-478 by rotating valve handwheel in the clockwise direction- This is a critical step. Evaluator's Cues  Tell operator:  Provide appropriate cue for valve operation based on actual in plant valve position. Safety concern: Trainee does not have to crawl across pipes to check the valve labels at the east end of the #4 MER. He can identify which valve label he is looking at, and the evaluator can state the label reads "2-SW-478" if the correct label is identified. The trainee can then describe the required actions to complete valve manipulation from the west end of #4 MER. . COMMENTS:    _______ SAT  _______ UNSAT  STEP 6:  Step 38e-  SECURE CHEMICAL INJECTION TO MER 3 SW SUPPLY HEADER IAW 0-OP-SW-006, MER 3 AND MER 4 SERVICE WATER CHEMICAL INJECTION OPERATION  STANDARD:    (a) Notifies Shift Manager (Evaluator) that Chemical Injection to MER 3 SW Supply Header needs to be secured IAW 0-OP-SW-006. Evaluator's Cues  Tell operator:  Unit 1 Turbine Building Operator will secure chemical injection.
COMMENTS:    _______ SAT  _______ UNSAT 


Surry 2014-301 "JPM j" Surry SR14301  7 of 10 STEP 7:  Step 39-  CHECK WATER LEVEL IN MER 3 ON MER 4 GAUGE 2-PL-LI-201 -  DECREASING  STANDARD:    (a) Locates MER 3 level gauge 2-PL-LI-201 in MER 4.  (b) Checks that level in MER 3 is decreasing.
Surry 2014-301 "JPM j" Surry SR14301  3 of 10 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (*)
Evaluator's Cues  Tell operator:  After the operator locates MER 3 level gauge, tell him the level is 50" H2O and slowly decreasing. COMMENTS:     _______ SAT
. START TIME:
_______ UNSAT  STEP 8REPORT TO SHIFT SUPERVISOR (EVALUATOR). STANDARD:  Verbal status report that steps 38 and 39 of 1-AP-13.00 are complete. EVALUATOR'S NOTE: N/A  STOP TIME:             COMMENTS:    _______ SAT  _______ UNSAT    STOP TIME:  ______________________  ____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
STEP 1:   
____________________________________________________________________________________  ____________________________________________________________________________________  ____________________________________________________________________________________
  [Step 38a, AP
Surry SR14301  8 of 10    Operator Directions Handout  (TO BE READ TO APPLICANT BY EXAMINERInitial Conditions  This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves. There is a major Service Water leak in #3 MER. 1-SW-P-10B and 2-SW-P-10B have been secured. 1-VS-E-4A, 4B, and 4C have been secured. MER 3 Watertight Door has been checked closed. Initiating Cues The team has reached step 37 of 0-AP-13.00, Turbine Building or #3 MER Flooding. You are to isolate Service Water to #3 MER in accordance with Steps 38 and 39 of 0-AP-13.00, Turbine Building or #3 MER Flooding.
-13.00]  ISOLATE SW TO MER 3:
Operator Directions Handout  (TO BE GIVEN TO APPLICANT)   Initial Conditions  This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves. There is a major Service Water leak in #3 MER. 1-SW-P-10B and 2-SW-P-10B have been secured. 1-VS-E-4A, 4B, and 4C have been secured. MER 3 Watertight Door has been checked closed. Initiating Cues    The team has reached step 37 of 0-AP-13.00, Turbine Building or #3 MER Flooding. You are to isolate Service Water to #3 MER in accordance with Steps 38 and 39 of 0-AP-13.00, Turbine Building or #3 MER Flooding.    
aFail 1-SW-263 closed by opening Circuit 8 on Lighting Panel 2T3 (located north of 2
-FW-E-2A)  STANDARD:
Locates lighting panel 2T3 (located north of 2
-FW-E-2A). *b) Opens circuit 8 on lighting panel 2-EP-LP-2T3- this is a critical step.


Surry 2014-301 "JPM k"              Page 1 of 16  U.S. Nuclear Regulatory Commission  Surry Power Station  SR14301  Simulator Job Performance Measure [KA 061K4.01 4.1/4.2] [Alternate Path]  Applicant________________________________    Start Time___________________  Examiner_______________________________
EVALUATOR'S NOTE:
Date ___________________________________  Stop Time___________________  Title  LOCALLY SWAP THE AFW PUMP SUPPLY TO THE FIRE WATER ALTERNATE SOURCE (Faulted)  K/A: Knowledge of AFW design feature(s) and/or interlock(s) which provide for the following: Water sources and priority of use. 4.1/4.2. Applicability      Estimated Time  Actual Time  RO/SRO(I)/SRO(U)    25 Minutes    ___  Minutes                    Conditions  Task is to be SIMULATED in the plant. A simulated loss of secondary heat sink is in progress. Both the ECST and underground tank levels are below 20% and it is desired to swap AFW pump suction to the Fire Main. Standards  2-FR-H.1, Attachment 1, part 4  Self-Checking (STAR) practices will be used throughout task performance. Operations Department Standards shall be adhered to. Terminating Cues Report received that alternate source aligned to AFW pumps. Any failure criteria listed under the Evaluation Criteria section above has been met. Candidate states "Task is complete."  Procedures  2-FR-H.1, Attachment 1, part 4, Rev 36  Tools and Equipment    Safety Considerations  None       Standard PPE Required.
None  COMMENTS:
Surry 2014-301 "JPM k"              Page 2 of 16 Initial Conditions  Unit 2 is currently experiencing a loss of secondary heat sink and the team is currently at step 3 of 2-FR-H.1, Response to Loss of Secondary Heat Sink. AFW cross-tie from Unit 1 is unavailable. An operator has attempted to open 2-CN-150 and the valve is stuck CLOSED. . Initiating Cues    Align an alternate suction source to the Aux Feedwater pumps using the most preferred source available in accordance with 2-FR-H.1, Attachment 1. Notes to the Evaluator:  Brief of this JPM may be accomplished in the RP Briefing Room, outside of the RCA  This task is to be SIMULATED. Do NOT allow the operator to manipulate controls, operate switches or reposition valves.
Surry 2014-301 "JPM k"              Page 3 of 16 PERFORMANCE CHECKLIST    Notes to the Evaluator  Task critical elements are bolded and denoted by an asterisk (*). START TIME_______:              STEP 1:  2-FR-H.1, Attachment 1, Part 1  Select one of the following methods as an alternate source of Auxiliary Feedwater. Makeup to 2-CN-TK-1 from 2-CN-TK-2  Standards    (a) Identifies this source is not available from initial conditions.      Evaluator's Cues  When attempts are made to open the valve, the handwheel will not turn with the chain. The valve is jammed closed. Evaluator's Notes    2-CN-150 is stuck closed. Evaluator's Comments    _______ SAT  _______ UNSAT  STEP 2:  2-FR-H.1, Attachment 1, Part 2  Alignment of AFW Booster Pump(s)  DETERMINES AFW BOOSTER PUMPS ARE NOT AVAILABLE  Standards  (a) Check 2-CN-TK-3  level > 20%. Evaluator's Cues  Inform operator that 2-CN-TK-3 level is < 10%. Evaluator's Comments    _______ SAT _______ UNSAT Surry 2014-301 "JPM k"              Page 4 of 16 STEP 3: 2-FR-H.1, Attachment 1, Part 3. Cross-tie from Unit 1. Standards  Based on directions given to operator, determines AFW crosstie from Unit 1 unavailable. Evaluator's Cues  As the Shift Manager, I need you to determine an alternate method based on the information given. Evaluator's Comments
_______ SAT
_______ SAT
_______ UNSAT  STEP 4:  2-FR-H.1, Attachment 1, Part, (Step 4a)    Fire Water Alignment to AFW Pumps. LOCALLY CLOSE THE FIRE MAIN ISOLATION VALVES TELL-TALE DRAIN, 2-FW-119  Standards  (a) Proceeds to Unit 2 safeguards steam side. (b) Closes 2-FW-119 by turning handwheel in the clockwise direction. Evaluator's Cues  When the valve is operated properly, the valve stem inserts until the handwheel will not turn. Evaluator's Notes  2-FW-119 is located between the fire main isolation valves near the stairway to the upper levels and is normally open. Evaluator's Comments    _______ SAT  _______ UNSAT Surry 2014-301 "JPM k"              Page 5 of 16 STEP 5:  2-FR-H.1, Attachment 1, Part 4, (Step b.)  Locally open fire main isolation valves:  Standards  *(a) Opens 2-FW-120 by turning handwheel in the counter-clockwise direction.  *(b) Opens 2-FW-185 by turning handwheel in the counter-clockwise direction. Cues    Provide cues valve stems rise as FW-120 & FW-185 are properly operated. Tell Operator:  After both FW-120 & FW-185 opened, provide cues flow noise is momentarily heard through the valves. Tell Operator:  If FW-119 NOT closed before opening FW-120 & FW-185, provide cues water is spraying out from 2-FW-119. Evaluator's Notes  2-FW-120 & -185 are located on ground level near stairway. Evaluator's Comments    _______ SAT
_______ UNSAT  STEP 6:  2-FR-H.1, Attachment 1, Part 4, (Step 4 c.)    Locally start diesel driven fire pump. STANDARD:  a) Asks Shift Manager/Evaluator status of diesel driven fire pump. EVALUATOR'S NOTE:              When asked: Diesel driven fire pump has been started. COMMENTS:    _______ SAT
_______ UNSAT Surry 2014-301 "JPM k"              Page 6 of 16 STEP 7:  2-FR-H.1, Attachment 1, Part 4, (Step 4 d.)  Locally open fire water suction valves to available AFW pump(s):  STANDARD:  a) Acknowledges NOTE prior to Step d:  The following steps should be used as needed to align water to each AFW pump one at a time and the MCR informed after each pump alignment is complete.  *b) Opens 2-FW-154, (for 2-FW-P-2)  *c) Opens 2-FW-169, (for 2-FW-P-3A)  *d) Opens 2-FW-184, (for 2-FW-P-3B)    Evaluator's Cues  Provide cues valve stems rise as each valve is properly operated.
If Notified: acknowledge opening 2-FW-154 / 169 / 184 as MCR Operator. If Asked: Inform Candidate that Unit 2 AFW Pumps have been secured due to cavitation. EVALUATOR'S NOTE:  Candidate informs MCR (Evaluator) following manipulation of each individual valve or wait until all valves for each pump have been manipulated.  (Steps 8, 9, and 10 describe valve operations).
COMMENTS:    _______ SAT  _______ UNSAT  STEP 8:  2-FR-H.1, Attachment 1, Part 4, (Step 4 d.)  LOCALLY CHECK AFW PUMP SUCTION PRESSURE AVAILABLE  Standards  Checks each AFW pump suction pressure gauge to verify pressure available:  (a) 2-FW-PI-256A (for 2-FW-P-2),  (b) 2-FW-PI-256B (for 2-FW-P-3A),  (c) 2-FW-PI-256C (for 2-FW-P-3B). Evaluator's Cues    Provide cues each gauge indicates full range (> 30 psig). Evaluator's Comments    _______ SAT  _______ UNSAT Surry 2014-301 "JPM k"              Page 7 of 16  STEP 9:  2-FR-H.1, Attachment 1, Part 4, (Step 4 f.)  LOCALLY CLOSE THE NORMAL AFW PUMP SUCTION VALVES  Standards  Closes/verifies closed the other AFW pump suction paths:  *(a) Closes 2-FW-153 (ECST to 2-FW-P-2) by turning handwheel in the clockwise direction  (b) Verifies 2-FW-283 closed (booster pps to 2-FW-P-2).  *(c) Closes 2-FW-168 (ECST to 2-FW-P-3A) by turning handwheel in the clockwise direction  (d) Verifies 2-FW-284 closed (booster pps to 2-FW-P-3A).  *(e) Closes 2-FW-183 (ECST to 2-FW-P-3B) by turning handwheel in the clockwise direction  (f) Verifies 2-FW-285 closed (booster pps to 2-FW-P-3B). Evaluator's Cues    Provide cues valve stems go in as 2-FW-153, -168 & -183 are properly operated. Provide cues valve stems for 2-FW-283, -284 & -285 are as indicated (~1/2 inch showing). When notified:  As each AFW pump valve alignment is complete, acknowledge completion of alignment as MCR Operator. Evaluator's Comments    _______ SAT  _______ UNSAT 


Surry 2014-301 "JPM k"              Page 8 of 16  STEP 10:  REPORTS TO SHIFT MANAGER (EVALUATOR) Standards   Verbal status report made that AFW pumps are on fire water suction per 2-FR-H.1, Attachment 1. STOP TIME: ______________               Evaluator's Comments     _______ SAT _______ UNSAT   COMMENTS:
_______ UNSAT
____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________
 
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER) Initial Conditions Unit 2 is currently experiencing a loss of secondary heat sink and the team is currently at step 3 of 2-FR-H.1, Response to Loss of Secondary Heat Sink. AFW cross-tie from Unit 1 is unavailable. An operator has attempted to open 2-CN-150 and the valve is stuck CLOSED. . Initiating Cues    Align an alternate suction source to the Aux Feedwater pumps using the most preferred source available in accordance with 2-FR-H.1, Attachment 1.
STEP 2:
Operator Directions Handout (TO BE GIVEN TO APPLICANT)   Initial Conditions Unit 2 is currently experiencing a loss of secondary heat sink and the team is currently at step 3 of 2-FR-H.1, Response to Loss of Secondary Heat Sink. AFW cross-tie from Unit 1 is unavailable. An operator has attempted to open 2-CN-150 and the valve is stuck CLOSED. . Initiating Cues    Align an alternate suction source to the Aux Feedwater pumps using the most preferred source available in accordance with 2-FR-H.1, Attachment 1.}}
STEP 38b-  Verify open or open 1
-SW-500, SW Header Crosstie (MER 4)
STANDARD:
  (a) Proceeds to #4 MER.
(b) Locates manual valve 1
-SW-500 (halfway across room under smoke detector).
(c) *Pulls pin from handwheel actuator.
This is a critical step.
(d) *Opens 1-SW-500 by rotating valve handwheel in the  clockwise direction
- This is a critical step.
Evaluator's Cues Tell operator:
Actual valve position in plant may be open or closed. Provide appropriate cue
. Point at "CLOSED" indicator
.
COMMENTS:
_______ SAT
 
_______ UNSAT
 
Surry 2014-301 "JPM j" Surry SR14301  4 of 10 STEP 3:  Step 38c- Close 2-SW-476, Water Box 2C Isol (MER 4)
STANDARD:
  (a) Locates 2
-SW-476 (in #4 MER 2/3 of the way across the room on the right hand side. (b) Attempts to close 2
-SW-476 by removing the locking pin and rotating the handwheel clockwise.
(c) Recognizes that 2
-SW-476 will not close and transitions to step 38c RNO column.
Evaluator's Cues Tell operator:
As operator attempts to close valve, the handwheel will not move.
COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM j" Surry SR14301  5 of 10 STEP 4:  Step 38c RNO-  Do the following:
: 1) Verify open or open 2
-SW-533. 2) Close 2
-SW-474, located in Unit 2 BC HX SW MOV pit. STANDARD:
  (a) *Opens 2-SW-533 (MER-5) - by rotating valve handwheel in the counter-clockwise direction.
This is a critical step.
(b) Proceeds to Unit 2 BC HX SW MOV pit.
(c) Locates manual valve 2
-SW-474. (d) *Closes 2-SW-474 by removing the locking pin and rotating valve handwheel in the clockwise direction
- this is a critical step.
Evaluator's Cues For 2-SW-533, provide appropriate cue based on actual initial valve position in plant. If asked: After trainee identifies 2
-SW-474, if expected mark number not verbalized, ask the trainee what they expect the label to read, then tell trainee the label reads 2
-SW-474. If wrong valve identified, tell trainee that what they expected is not what it reads.
If asked: Security has been notified for entry.
Evaluator's Note Safety concern: Trainee does not have to travel down into the valve pits. He can identify which label he is looking at, tell the evaluator what he expects the label to read, and if correct (at the BC HX SW MOV PIT
), the evaluator can then state the label reads 2
-SW-474. The trainee can describe actions to complete valve manipulation from above.
Security concern: Certain valve pits are now covered by grates. If the enclosure is to be opened, security should be contacted. It is acceptable for the trainee to describe the actions required to raise the grate(s)
- utilize hand crank to raise the grating access door
. COMMENTS:
 
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM j" Surry SR14301  6 of 10 STEP 5:  Step 38d-  Close 2-SW-478, SW Header Crosstie. (MER 4)
STANDARD:
  (a) Locates 2
-SW-478 (in #4 MER 2/3 of the way across the room on the right hand side). (b) Pulls pin from handwheel actuator.
(c) *Closes 2-SW-478 by rotating valve handwheel in the clockwise direction
- This is a critical step.
Evaluator's Cues Tell operator:
Provide appropriate cue for valve operation based on actual in plant valve position.
Safety concern: Trainee does not have to crawl across pipes to check the valve labels at the east end of the #4 MER. He can identify which valve label he is looking at, and the evaluator can state the label reads "2
-SW-478" if the correct label is identified. The trainee can then describe the required actions to complete valve manipulation from the west end of #4 MER.
. COMMENTS:
_______ SAT
_______ UNSAT STEP 6:  Step 38e-  SECURE CHEMICAL INJECTION TO MER 3 SW SUPPLY HEADER IAW 0
-OP-SW-006, MER 3 AND MER 4 SERVICE WATER CHEMICAL INJECTION OPERATION STANDARD:
    (a) Notifies Shift Manager (Evaluator) that Chemical Injection to MER 3 SW Supply Header needs to be secured IAW 0
-OP-SW-006. Evaluator's Cues Tell operator:
Unit 1 Turbine Building Operator will secure chemical injection.
 
COMMENTS:
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM j" Surry SR14301  7 of 10 STEP 7:  Step 39-  CHECK WATER LEVEL IN MER 3 ON MER 4 GAUGE 2
-PL-LI-201 -  DECREASING STANDARD:
    (a) Locates MER 3 level gauge 2
-PL-LI-201 in MER 4.
  (b) Checks that level in MER 3 is decreasing.
 
Evaluator's Cues Tell operator:
After the operator locates MER 3 level gauge, tell him the level is 50" H2O and slowly decreasing.
COMMENTS:
_______ SAT
 
_______ UNSAT STEP 8:  REPORT TO SHIFT SUPERVISOR (EVALUATOR).
STANDARD:
Verbal status report that steps 3 8 and 39 of 1-AP-13.00 are complete.
EVALUATOR'S NOTE: N/A STOP TIME:
COMMENTS:
_______ SAT
_______ UNSAT STOP TIME:
______________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
 
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
 
Surry SR14301  8 of 10    Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
There is a major Service Water leak in #3 MER.
1-SW-P-10B and 2-SW-P-10B have been secured.
1-VS-E-4A, 4B, and 4C have been secured.
MER 3 Watertight Door has been checked closed.
Initiating Cues
 
The team has reached step 37 of 0
-AP-13.00, Turbine Building or #3 MER Flooding.
You are to isolate Service Water to #3 MER in accordance with Steps 38 and 39 of 0
-AP-13.00, Turbine Building or #3 MER Flooding.
 
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.
There is a major Service Water leak in #3 MER.
1-SW-P-10B and 2
-SW-P-10B have been secured.
1-VS-E-4A, 4B, and 4C have been secured.
MER 3 Watertight Door has been checked closed.
Initiating Cues The team has reached step 37 of 0
-AP-13.00, Turbine Building or #3 MER Flooding.
You are to isolate Service Water to #3 MER in accordance with Steps 38 and 39 of 0
-AP-13.00, Turbine Building or #3 MER Flooding.
 
Surry 2014-301 "JPM k"              Page 1 of 16  U.S. Nuclear Regulatory Commission Surry Power Station SR14301  Simulator Job Performance Measure [KA 061K4.01 4.1/4.2
] [Alternate Path]
Applicant________________________________
Start Time___________________
Examiner_______________________________
 
Date ___________________________________
Stop Time___________________
Title  LOCALLY SWAP THE AFW PUMP SUPPLY TO THE FIRE WATER ALTERNATE SOURCE (Faulted)
K/A: Knowledge of AFW design feature(s) and/or interlock(s) which provide for the following: Water sources and priority of use
. 4.1/4.2. Applicability Estimated Time  Actual Time RO/SRO(I)/SRO(U) 25 Minutes    ___  Minutes Conditions Task is to be SIMULATED in the plant.
A simulated loss of secondary heat sink is in progress. Both the ECST and underground tank levels are below 20% and it is desired to swap AFW pump suction to the Fire Main.
Standards 2-FR-H.1, Attachment 1, part 4 Self-Checking (STAR) practices will be used throughout task performance.
Operations Department Standards shall be adhered to.
Terminating Cues
 
Report received that alternate source aligned to AFW pumps.
Any failure criteria listed under the Evaluation Criteria section above has been met.
Candidate states "Task is complete."
Procedures 2-FR-H.1, Attachment 1, part 4, Rev 36 Tools and Equipment Safety Considerations None      Standard PPE Required.
 
Surry 2014-301 "JPM k"              Page 2 of 16 Initial Conditions Unit 2 is currently experiencing a loss of secondary heat sink and the team is currently at step 3 of 2-FR-H.1, Response to Loss of Secondary Heat Sink.
AFW cross
-tie from Unit 1 is unavailable
. An operator has attempted to open 2-CN-150 and the valve is stuck CLOSED.
. Initiating Cues    Align an alternate suction source to the Aux Feedwater pumps using the most preferred source available in accordance with 2
-FR-H.1, Attachment 1.
Notes to the Evaluator
:  Brief of this JPM may be accomplished in the RP Briefing Room, outside of the RCA This task is to be SIMULATED. Do NOT allow the operator to manipulate controls, operate switches or reposition valves.
 
Surry 2014-301 "JPM k"              Page 3 of 16 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (
*). START TIME_______:
STEP 1:  2-FR-H.1, Attachment 1, Part 1 Select one of the following methods as an alternate source of Auxiliary Feedwater.
Makeup to 2
-CN-TK-1 from 2-CN-TK-2  Standards (a) Identifies this source is not available from initial conditions
.      Evaluator's Cues  When attempts are made to open the valve, the handwheel will not turn with the chain. The valve is jammed closed.
Evaluator's Notes 2-CN-150 is stuck closed
. Evaluator's Comments
_______ SAT
_______ UNSAT STEP 2:  2-FR-H.1, Attachment 1, Part 2 Alignment of AFW Booster Pump(s)
DETERMINES AFW BOOSTER PUMPS ARE NOT AVAILABLE Standards (a) Check 2-CN-TK-3  level > 20%
. Evaluator's Cues  Inform operator that 2
-CN-TK-3 level is < 10%
. Evaluator's Comments
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM k"              Page 4 of 16 STEP 3:  2-FR-H.1, Attachment 1, Part 3.
Cross-tie from Unit 1.
Standards Based on directions given to operator, determines AFW crosstie from Unit 1 unavailable.
Evaluator's Cues  As the Shift Manager, I need you to determine an alternate method based on the information given.
Evaluator's Comments
 
_______ SAT
 
_______ UNSAT STEP 4:  2-FR-H.1, Attachment 1, Part, (Step 4a)    Fire Water Alignment to AFW Pumps.
LOCALLY CLOSE THE FIRE MAIN ISOLATION VALVES TELL
-TALE DRAIN, 2
-FW-119  Standards (a) Proceeds to Unit 2 safeguards steam side.
(b) Closes 2-FW-119 by turning handwheel in the clockwise direction.
Evaluator's Cues  When the valve is operated properly, the valve stem inserts until the handwheel will not turn. Evaluator's Notes 2-FW-119 is located between the fire main isolation valves near the stairway to the upper levels and is normally open.
Evaluator's Comments
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM k"              Page 5 of 16 STEP 5:  2-FR-H.1, Attachment 1, Part 4, (Step b.)
Locally open fire main isolation valves:
Standards
  *(a) Opens 2-FW-120 by turning handwheel in the counter
-clockwise direction
.  *(b) Opens 2-FW-185 by turning handwheel in the counter
-clockwise direction
. Cues    Provide cues valve stems rise as FW
-120 & FW-185 are properly operated.
Tell Operator:
After both FW
-120 & FW-185 opened, provide cues flow noise is momentarily heard through the valves.
Tell Operator:
If FW-119 NOT closed before opening FW
-120 & FW-185, provide cues water is spraying out from 2
-FW-119. Evaluator's Notes 2-FW-120 & -185 are located on ground level near stairway.
Evaluator's Comments
_______ SAT
 
_______ UNSAT STEP 6:  2-FR-H.1, Attachment 1, Part 4, (Step 4 c.)
Locally start diesel driven fire pump.
STANDARD:
a) Asks Shift Manager/Evaluator status of diesel driven fire pump
. EVALUATOR'S NOTE:
 
When asked: Diesel driven fire pump has been started
. COMMENTS:
_______ SAT
 
_______ UNSAT
 
Surry 2014-301 "JPM k"              Page 6 of 16 STEP 7:  2-FR-H.1, Attachment 1, Part 4, (Step 4 d.)
Locally open fire water suction valves to available AFW pump(s):
STANDARD:
a) Acknowledges NOTE prior to Step d:  The following steps should be used as needed to align water to each AFW pump one at a time and the MCR informed after each pump alignment is complete.
  *b) Opens 2-FW-154, (for 2
-FW-P-2)  *c) Opens 2-FW-169, (for 2
-FW-P-3A)  *d) Opens 2-FW-184, (for 2
-FW-P-3B)    Evaluator's Cues  Provide cues valve stems rise as each valve is properly operated.
 
If Notified:
acknowledge opening 2
-FW-154 / 169 / 184 as MCR Operator.
If Asked:
Inform Candidate that Unit 2 AFW Pumps have been secured due to cavitation.
EVALUATOR'S NOTE:
Candidate inform s MCR (Evaluator) following manipulation of each individual valve or wait until all valves for each pump have been manipulated.
  (Steps 8, 9, and 10 describe valve operations).
 
COMMENTS:
_______ SAT
_______ UNSAT STEP 8:  2-FR-H.1, Attachment 1, Part 4, (Step 4 d.)
LOCALLY CHECK AFW PUMP SUCTION PRESSURE AVAILABLE Standards Checks each AFW pump suction pressure gauge to verify pressure available:
  (a) 2-FW-PI-256A (for 2
-FW-P-2),  (b) 2-FW-PI-256B (for 2
-FW-P-3A),  (c) 2-FW-PI-256C (for 2-FW-P-3B). Evaluator's Cues    Provide cues each gauge indicates full range (>
30 psig). Evaluator's Comments
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM k"              Page 7 of 16  STEP 9:  2-FR-H.1, Attachment 1, Part 4, (Step 4 f.)
LOCALLY CLOSE THE NORMAL AFW PUMP SUCTION VALVES Standards Closes/verifies closed the other AFW pump suction paths:
  *(a) Closes 2-FW-153 (ECST to 2
-FW-P-2) by turning handwheel in the clockwise direction (b) Verifies 2
-FW-283 closed (booster pps to 2
-FW-P-2).  *(c) Closes 2-FW-168 (ECST to 2-FW-P-3A) by turning handwheel in the clockwise direction (d) Verifies 2
-FW-284 closed (booster pps to 2
-FW-P-3A).  *(e) Closes 2-FW-183 (ECST to 2
-FW-P-3B) by turning handwheel in the clockwise direction (f) Verifies 2
-FW-285 closed (booster pps to 2-FW-P-3B). Evaluator's Cues    Provide cues valve stems go in as 2
-FW-153, -168 & -183 are properly operated.
Provide cues valve stems for 2
-FW-283, -284 & -285 are as indicated (~1/2 inch showing).
When notified:  As each AFW pump valve alignment is complete, acknowledge completion of alignment as MCR Operator.
Evaluator's Comments
_______ SAT
_______ UNSAT
 
Surry 2014-301 "JPM k"              Page 8 of 16  STEP 10:  REPORTS TO SHIFT MANAGER (EVALUATOR)
Standards Verbal status report made that AFW pumps are on fire water suction per 2-FR-H.1, Attachment 1
. STOP TIME: ______________
Evaluator's Comments
_______ SAT
_______ UNSAT COMMENTS:
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
 
Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)
Initial Conditions Unit 2 is currently experiencing a loss of secondary heat sink and the team is currently at step 3 of 2
-FR-H.1, Response to Loss of Secondary Heat Sink.
AFW cross
-tie from Unit 1 is unavailable.
An operator has attempted to open 2
-CN-150 and the valve is stuck CLOSED.
. Initiating Cues    Align an alternate suction source to the Aux Feedwater pumps using the most preferred source available in accordance with 2
-FR-H.1, Attachment 1.
 
Operator Directions Handout (TO BE GIVEN TO APPLICANT)
Initial Conditions Unit 2 is currently experiencing a loss of secondary heat sink and the team is currently at step 3 of 2
-FR-H.1, Response to Loss of Secondary Heat Sink.
AFW cross-tie from Unit 1 is unavailable.
An operator has attempted to open 2
-CN-150 and the valve is stuck CLOSED.
. Initiating Cues    Align an alternate suction source to the Aux Feedwater pumps using the most preferred source available in accordance with 2-FR-H.1, Attachment 1.}}

Revision as of 10:27, 30 June 2018

Surry, 2014-301 Section 11
ML16089A392
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/22/2016
From:
NRC/RGN-II
To:
Virginia Electric & Power Co (VEPCO)
References
Download: ML16089A392 (134)


Text

Surry 2014-301 "JPM a" Page 1 of 8 U.S. Nuclear Regulatory Commission Surry Power Station SR14301 Simulator Job Performance Measure APE001.AA2.05 (4.4/4.6) [Alternate Path]

Applicant________________________________

Start Time___________________

Examiner_______________________________

Date ___________________________________

Stop Time___________________

Title Respond to Continuous Rod Withdrawal K/A: Ability to determine and interpret the following as they apply to the Continuous Rod Withdrawal: Uncontrolled rod withdrawal, from available indications.

Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 3 Minutes ___ Minutes Conditions Task is to be PERFORMED in the simulator.

Plant is at 100% power with all systems in AUTO.

1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low

. 0-AP-53.00 actions have been completed with 1

-MS-PT-1447, Channel IV Turbine First Stage Pressure selected. All components have been returned to Automatic with the exception of Rod Control

. Standards Trip the Reactor in accordance with AP

-1.00. Initiating Cues Continuous rod withdrawal motion indicated.

Terminating Cues Unit 1 manual reactor trip implemented

. Procedures

0-AP-1.00, Rod Control System Malfunction, Rev. 26.

1-OP-ZZ-002, Maintenance of Plant Operations, Rev. 30.

Tools and Equipment Safety Considerations

None None Surry 2014-301 "JPM a" Page 2 of 8 Simulator Setup Reset to IC 271 OR Recall 100% IC

. Load the following malfunctions:

MS1401, 1st Stage PRSR TRNSMTR PT

-446 FAILURE,

-2 DEG, Trigger 1

. RD0102, CONT ROD WITHDRAWL ALL MODES, Trigger 3

. Load the following Switch Override:

RD, ROD_MOD_SEL_MAN, ON, Trigger 1, 8 second delay

. Place the Simulator in RUN

. Place the Main Feed Reg Valves in MANUAL

. Actuate Trigger 1

. Select PT

-447. Return the Main Feed Reg Valves to AUTO

. Acknowledge all alarms, place Rod Control Mode Selector Switch in MANUAL, place a "Pink" Ring on the Rod

. Switch, and allow cond itions to stabilize.

Place pink magnet on PT

-1446. Freeze and store until ready to RUN

. Initial Conditions Plant is at 100% power with all systems in AUTO.

1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low

. 0-AP-53.00 actions have been completed with 1

-MS-PT-1447, Channel IV Turbine First Stage Pressure

. selected. All components have been returned to Automatic with the exception of Rod Control

. Initiating Cues You are the Unit 1 Reactor Operator. Restore Control Bank "D" to 228 steps in three (3) step increments.

When complete, return Rod Control to AUTO

. When you have completed this task, please inform me

. Notes After the Candidate has completed the second 3-Step rod movement, Actuate Trigger 3.

Surry 2014-301 "JPM a" Page 3 of 8 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (

  • ). An additional instructor may be needed to silence and acknowledge alarms for the examinee.

START TIME: ___________

STEP 1: WITHDRAW CONTROL RODS IN THREE (3) STEP INCREMENTS

. (Step 1) STANDARD a) Checks ROD CONTROL MODE SEL switch in the MAN position.

b) Check ROD SPEED indicator (S1 408) indicates approximately 48 steps per minute. c) WITHDRAW control rods in 3

-step increments.

  • Move ROD MOTION IN/OUT/HOLD switch in the OUT direction.

This is a critical step.

Check ROD DIRECTION OUT light is LIT.

Release switch when rods are at desired height (3 steps)

. Check rod motion has stopped. EVALUATOR NOTE:

Operator may have to step in/out Rods 1/2 step to equalize group step counter indication.

COMMENTS:

_______ SAT

_______ UNSAT STEP 2: WITHDRAW CONTROL RODS IN THREE (3) STEP INCREMENTS. (Step 2)

STANDARD a) Checks ROD CONTROL MODE SEL switch in the MAN position.

b) Check ROD SPEED indicator (S1 408) indicates approximately 48 steps per minute. c) WITHDRAW control rods in 3

-step increments.

  • Move ROD MOTION IN/OUT/HOLD switch in the OUT direction.

This is a critical step.

Check ROD DIRECTION OUT light is LIT.

Release switch when rods are at desired height (3 steps).

Check rod motion has stopped.

EVALUATOR NOTE:

After rods have moved in the OUT direction, the malfunction will be entered to cause continuous outward rod motion in all ROD Control Modes

. _______ SAT

_______ UNSAT

Surry 2014-301 "JPM a" Page 4 of 8 COMMENTS:

STEP 3: CHECKS FOR CONTINUOUS ROD INSERTION OR WITHDRAWAL (Step 3) STANDARD:

a) Checks continuous outward rod motion by examining the following:

ROD DIRECTION OUT lamp lit, CERPIs and/or step counters indicate motion.

EVALUATOR'S NOTE:

COMMENTS:

_______ SAT

_______ UNSAT STEP 4: ATTEMPTS TO STOP ROD MOTION BY SWITCHING RODS TO MANUAL

. (Step 2) STANDARD:

a)

  • Rotates ROD CONT MODE SEL Switch from AUTO to MANUAL.

This is a critical step.

b) Determines that rod motion has not stopped by:

serving ROD DIRECTION OUT lamp lit, and/or observing rod step counters showing outward motion, and/or step counters making an audible "clicking" noise EVALUATOR'S NOTE:

Placing ROD CONT MODE SEL Switch to MANUAL is only a critical step if switch is in AUTO.

ROD CONT MODE SEL switch may be placed in AUTO. This is acceptable by OP

-ZZ-002 if Tave is within 1 degree of Tref.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM a" Page 5 of 8 STEP 5: INITIATES UNIT REACTOR TRIP

. (Step 2-RNO) STANDARD:

a) *Manually initiates reactor trip by depressing the Benchboard 1

-1 and/or Benchboard 1

-2 Reactor Trip pushbutton

. This is a critical step.

EVALUATOR'S NOTE:

COMMENTS:

_______ SAT

_______ UNSAT

STEP 6: REPORTS TO SHIFT MANAGER (EVALUATOR.

(Step 2-RNO) STANDARD:

a) Performs immediate actions of 1

-E-0. Check Rx. Trip by verifying all rods on bottom, Reactor trip and bypass breakers open, and neutron flux decreasing.

Checks Turbine Trip by manually tripping the turbine, checking all turbine stop valves are closed, isolating reheaters by closing 1

-MS-SOV-104 and checking the generator output breakers are open.

Checks both AC Emergency busses energized.

Checks if SI is actuated or if it is required.

b) Verbal status report made that immediate actions completed (with tripping of reactor).

EVALUATOR'S NOTE:

If operator continues with actions of verifying reactor trip by performing E

-0 immediate operator actions, let the operator continue E

-0 immediate action steps until completion

. When the candidate completes this step then inform the candidate that the task is complete COMMENTS:

_______ UNSAT STOP TIME:

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

Surry 2014-301 "JPM a" Page 6 of 8 ____________________________________________________________________________________

Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Task Task is to be performed in the simulator.

Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.

Initial Conditions Plant is at 100% power with all systems in AUTO.

1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low

. 0-AP-53.00 actions have been completed with 1

-MS-PT-1447, Channel IV Turbine First Stage Pressure selected. All components have been returned to Automatic with the exception of Rod Control

. Initiating Cues You are the Unit 1 Reactor Operator. Restore Control Bank "D" to 228 steps in three (3) step increments.

When complete, return Rod Control to AUTO.

When you have completed this task, please inform me

.

Surry 2014-301 "JPM a" Page 7 of 8 Reference for Evaluator

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions Plant is at 100% power with all systems in AUTO.

1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low

. 0-AP-53.00 actions have been completed with 1

-MS-PT-1447, Channel IV Turbine First Stage Pressure selected. All components have been returned to Automatic with the exception of Rod Control

. Initiating Cues You are the Unit 1 Reactor Operator. Restore Control Bank "D" to 228 steps in three (3) step increments.

When complete, return Rod Control to AUTO.

When you have completed this task, please inform me

.

Surry 2014-301 "JPM b" Page 1 of 13 U.S. Nuclear Regulatory Commission Surry Power Station SR14301 Simulator Job Performance Measure [KA 004A4.07 3.9/3.7

] Applicant________________________________

Start Time___________________

Examiner_______________________________

Date ___________________________________

Stop Time___________________

Title Perform an Alternate Dilution of the RCS.

K/A: Ability to manually operate and/or monitor in the control room: Boration/dilution 3.9 / 3.7 Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 10 Minutes

___ Minutes Conditions Task is to be Performed in the simulator.

A ramp increase in power is occurring which requires a dilution.

Standards 1-OP-CH-021, Alternate Dilution Using Blender

. Initiating Cues Reactivity SRO Direction

. A ramp increase in power requires a Dilution

. Terminating Cues Report to Shift Supervision, blender returned to automatic

. Procedures

1-OP-CH-021, Alternate Dilution Using Blender, Rev 16 Tools and Equipment Safety Considerations None None Surry 2014-301 "JPM b" Page 2 of 13 Simulator Setup Reset to IC 272 OR Call up 25% power IC and initialize. Place simulator in RUN.

Ramp the Unit to 30% power and match Tave and Tref.

Shift Station Service bus power from RSSTs to SSTs.

Set PG Flow Control 1

-CH-FC-1114A to 4.0 on the pot. Initial Conditions Unit 1 is at 30% power.

The 30% hold for a flux map on Unit 1 is complete.

Power escalation to 100% in accordance with 1

-GOP-1.5, Unit Startup, 2% to Reactor Power to Max Allowable Power, is about to recommence.

Initiating Cues You are to perform a 200 gallon Alternate Dilute only to the suction of the charging pump in accordance with 1

-OP-CH-021. When you finish the actions necessary to accomplish this task, please inform me.

Surry 2014-301 "JPM b" Page 3 of 13 PERFORMANCE CHECKLIST Notes to the Evaluator This JPM may be Pre-briefed as directed by the Chief Examiner

. Task critical elements are bolded and denoted by an asterisk (

  • ). An additional instructor may be needed to silence and acknowledge alarms for the examinee.

START TIME_______:

STEP 1: 1-OP-CH-021, Initial Conditions.

Check Primary Grade water is available to the Blender.

STANDARD:

a) Candidate checks PG pressure normal on Boron Recovery Panel

. EVALUATOR'S NOTE:

COMMENTS:

_______ SAT

_______ UNSAT STEP 2: 1-OP-CH-021, Precautions and Limitations.

Candidate reviews and initials Precautions and Limitations.

STANDARD:

a) Candidate Reviews and initials P&L 4.1 through 4.8. EVALUATOR'S NOTE:

None COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM b" Page 4 of 13 STEP 3:

1-OP-CH-021. (Step 5.1.1) Candidate acknowledges two (2) NOTES prior to Step 5.1.

Candidate Notifies Shift Supervision of Impending Dilution.

STANDARD:

a) Candidate acknowledges this subsection is used for the first dilution of the shift. Attachment 1 is used for subsequent dilutions.

b) Candidate identifies excess letdown NOT in service, 1

-OP-CH-007 not required.

c) Candidate Notifies Shift Supervision/Evaluator of impending Alternate Dilution.

EVALUATOR'S NOTE:

When notified: Acknowledge Candidate will be performing an Alternate Dilution.

COMMENTS:

_______ SAT

_______ UNSAT STEP 4: 1-OP-CH-021. (Step 5.1.2) Notify STA of impending Alternate Dilution.

STANDARD:

a) Candidate notifies STA/Evaluator of impending Alternate Dilute. EVALUATOR'S NOTE:

When notified: Acknowledge Candidate will be performing an Alternate Dilution

.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM b" Page 5 of 13 STEP 5:

1-OP-CH-021. (Step 5.1.3) Place the MAKE

-UP MODE CNTRL switch in STOP STANDARD:

a) Candidate p laces Blender Mode Control switch in STOP position

. b) Candidate Checks RED Light out and GREEN light illuminates.

EVALUATOR'S NOTE:

If asked: Acknowledge Candidates request for a peer check.

COMMENTS:

_______ SAT

_______ UNSAT STEP 6: 1-OP-CH-021. (Step 5.1.4) Adjust PG Flow Rate and Total gallons for the Dilution.

STANDARD:

a) Checks 1-CH-FC-1114A, PG Flow CNTRL set at 100 gpm (refers to Attachment 2, as necessary

. b) Determines required integrator setpoint by filling in blank for desired dilution, subtracting anticipated additional flow using P&L 4.7 as required, and writing 196 in GPM blank

. c) Enter value in 1

-YS-1114 PRI WATER SUP BATCH INTEGRATOR.

EVALUATOR'S NOTE:

If asked concerning a) above: PG Flow Control not previously set.

If asked concerning IV for Steps a) and b) above

State that the Candidate may assume an IV has been performed, please continue with the Task.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM b" Page 6 of 13 STEP 7:

1-OP-CH-021. (Step 5.1.5) Place the MAKE-UP MODE SEL switch in the ALT DIL position

. STANDARD:

  • a) Places the MAKE

-UP MODE SEL switch in the ALT DIL position

. This is a critical step.

EVALUATOR'S NOTE:

1-CH-FCV-1113A automatically CLOSES.

COMMENTS:

_______ SAT

_______ UNSAT STEP 8: 1-OP-CH-021. (Step 5.1.6) Place 1-CH-FCV-1114B, BLENDER TO VCT, in the CLOSE position.

STANDARD:

a) Candidate remembers from Directions that PG flow is to be aligned to the charging pump suction.

  • b) Places 1-CH-FCV-1114B, BLENDER TO VCT, in the CLOSE position.

This is a critical step.

EVALUATOR'S NOTE:

If asked: PG flow is to be aligned to the charging pump suction.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM b" Page 7 of 13 STEP 9:

1-OP-CH-021. (Step 5.1.7 and 5.1.8

) Place the MAKE-UP MODE CNTRL switch in the START position.

STANDARD:

  • a) Places the MAKE

-UP MODE CNTRL switch in the START position.

This is a critical step b) Checks the following conditions:

a. 1-CH-FCV-1113A, BORIC ACID TO BLENDER, is closed.
b. 1-CH-FCV-1113B, BLENDER TO CHG PUMP, is open.
c. 1-CH-FCV-1114A, PGW TO BLENDER, is controlling in AUTO c) Checks flow indicated on 1

-CH-FR-1113, PG Flow, equals desired flow rate.

d) Checks Integrator counting to desired total gallons.

EVALUATOR'S NOTE: None. COMMENTS:

_______ SAT

_______ UNSAT STEP 10: 1-OP-CH-021. (Step 5.1.9 and 5.1.10

) Stopping dilution

. STANDARD:

a) Candidate monitors Dilution and Stops the dilution by:

Placing MAKE-UP MODE CNTRL switch in the STOP position, OR Observing 1

-CH-FCV-1113B closes and Integrator total gallons settles on 200 gallons (199-201). EVALUATOR'S NOTE:

Candidate may perform either bulleted item listed above.

  • Ceasing of the Dilution is critical for this step.

(Range of 199

-201 due to blender overshoot or undershoot)

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM b" Page 8 of 13 STEP 11:

1-OP-CH-021. (Step 5.1.11, 5.1.12, 5.1.13

) Return the Blender to Automatic

. STANDARD:

a) Places the control switch for 1

-CH-FCV-1114B to AUTO position

. b) Places the MAKE

-UP MODE SEL switch in the AUTO position.

  • c) Places the MAKE

-UP MODE CNTRL to START

. This is a critical step.

EVALUATOR'S NOTE:

None. COMMENTS:

_______ SAT

_______ UNSAT Notify Shift Supervision/Evaluator of Blender status

. END OF JPM.

STOP TIME:

_______________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

__________________________________________________________________________________

__ ____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________ ____________________________________________________________________________________

Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Initial Conditions Unit 1 is at 30% power.

The 30% hold for a flux map on Unit 1 is complete.

Power escalation to 100% in accordance with 1

-GOP-1.5, Unit Startup, 2% to Reactor Power to Max Allowable Power, is about to recommence.

Initiating Cues You are to perform a 200 gallon Alternate Dilute only to the suction of the charging pump in accordance with 1

-OP-CH-021. When you finish the actions necessary to accomplish this task, please inform me.

Operator Directions Handout (TO BE GIVEN TO APPLICANT) Initial Conditions Unit 1 is at 30% power.

The 30% hold for a flux map on Unit 1 is complete.

Power escalation to 100% in accordance with 1

-GOP-1.5, Unit Startup, 2% to Reactor Power to Max Allowable Power, is about to recommence.

Initiating Cues You are to perform a 200 gallon Alternate Dilute only to the suction of the charging pump in accordance with 1

-OP-CH-021. When you finish the actions necessary to accomplish this task, please inform me.

Surry 2014-301 "JPM c" Page 1 of 12 U.S. Nuclear Regulatory Commission Surry Power Station SR09301 Simulator Job Performance Measure WE14EA1.3 (3.3/3.8)

Applicant________________________________

Start Time___________________

Examiner_______________________________

Date ___________________________________

Stop Time___________________

Title CONFIGURE SPRAY SYSTEMS IN ACCORDANCE WITH ECA

-1.1 (LOSS OF EMERGENCY RECIRCULATION).

K/A: WE14EA1.3 Ability to operate and / or monitor the following as they apply to the (High Containment Pressure). Desired operating results during abnormal and emergency situations.

Applicability Estimated Time Actual Time

RO/SRO(I)/SRO(U) 10 Minutes

Conditions Task is to be PERFORMED in the simulator.

A LBLOCA has occurred and both LHSI pumps are inoperable. 1

-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.

Standards 1-ECA-1.1, Loss of Emergency Coolant Recirculation, steps 8 and 9 are complete which result in 1

-RS-P-2B in service to 1

-RS-E-1D (with service water aligned) and 1

-CS-P-1A and 1B in service

. Initiating Cues 1-ECA-1.1 step 8.

Shift Manager direction Terminating Cues 1-ECA-1.1 steps 8 and 9 complete.

Procedures 1-ECA-1.1, Loss of Emergency Coolant Recirculation, Rev. 37

.

Surry 2014-301 "JPM c" Page 2 of 12 Tools and Equipment Safety Considerations None None Simulator Setup Call up 100% power IC and initialize (or IC

-270). Enter the following malfunctions:

o RS1001- TRN A HI HI CLS FAILS TO ACTIVATE

- INSERT o RS1002- TRN B HI HI CLS FAILS TO ACTIVATE

- INSERT o RC0102- RCS COLD LEG B PIPE RUPTURE

- INSERT o RS0702- LOSS OF INSIDE RECIRC SPR PP 1B

- Trigger 4 o SI0901- LHSI PUMP SI

-P-1A OVERCURRENT TRIP- Trigger 1 o SI0902- LHSI PUMP SI

-P-1B OVERCURRENT TRIP

- Trigger 1 Setup the following event trigger

- Event action

- rsp1b_amp>0.1

- Event 4 Set up the following switch override

- MOVSW104A_OPEN

- OFF - INSERT Set up the following MOV override

- SWMOV105C_

BKR - set to OPEN and INSERT.

Place the simulator in RUN and perform 1

-E-0 steps, then transition to 1

-E-1 and perform steps 1 on step 18 insert trigger 1 and transition to 1

-ECA-1.1. Do not worry about stopping unloaded EDGs in E

-1. Start 1-CS-P-1A and open 1

-CS-MOV-101A/B and 1

-CS-MOV-102A. Open 1-CS-MOV-101C, and 1

-CS-MOV-101D. Ensure containment sump level is >4'.

On recall of JPM, activate/check activated Trigger 4

. Initial Conditions A LBLOCA has occurred with the failure of Hi

-Hi CLS to function and failure of both LHSI pumps. 1

-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.

Initiating Cues You are the Unit 1 RO. Align Recirc Spray and Containment Spray in accordance with 1

-ECA-1.1, steps 8 and

9. When you finish the actions necessary to accomplish this, please inform me.

Notes Surry 2014-301 "JPM c" Page 3 of 12 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and noted at the end of the step as CRITIAL STEP.

An additional instructor may be needed to silence and acknowledge alarms for the examinee.

START TIME:

STEP 1: CAUTION AND NOTE PRIOR TO STEP 8 CAUTION:

Operation of an OSRS pump without the associated CS pump could cause cavitation as indicated by fluctuating amperage.

NOTE: If CLS can NOT be reset, local breaker operation will be required to stop CS and ISRS pumps.

STANDARD:

Acknowledges caution and note.

COMMENTS:

_______ SAT

_______ UNSAT STEP 2: Check for EITHER of the following (Step 8a)

- RUNNING OR REQUIRED OR - LESS THAN 20%

STANDARD:

Observes 1

-CS-P-1A running and continues to substep b.

EVALUATOR'S NOTE: N/A COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM c" Page 4 of 12 STEP 3: Check CTMT sump level

- GREATER THAN 4.0 ft (Step 8b)

. STANDARD:

Verifies containment sump level >4'.

EVALUATOR'S NOTE: N/A COMMENTS:

_______ SAT

_______ UNSAT STEP 4: Check SW aligned to at least two RS HXs (Step 8c).

STANDARD:

Observes that service water is not aligned to ANY RS HXs and goes to step 8c RNO. EVALUATOR'S NOTE: N/A

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM c" Page 5 of 12 STEP 5: Align SW to at least two RS HXs (Step 8c RNO)

. STANDARD:

  • Opens 1-SW-MOV-103A- either this valve or 103B must be opened

- one valve must be open as a critical step.

  • Opens 1-SW-MOV-103B- either this valve or 103A must be opened- one valve must be open as a critical step.

Opens 1-SW-MOV-103C. Opens 1-SW-MOV-103D. Opens 1-SW-MOV-104A - Determines that valve will not open

. Opens 1-SW-MOV-104B. Opens 1-SW-MOV-104C.

  • Opens 1-SW-MOV-104D - This is a critical step.

Opens 1-SW-MOV-105A. Opens 1-SW-MOV-105B. Opens 1-SW-MOV-105C - Determines that valve will not open

.

  • Opens 1-SW-MOV-105D - This is a critical step.

EVALUATOR'S NOTE: N/A BOOTH NOTE:

If asked: Trainee may dispatch operator to investigate supply breaker to 1-SW-MOV-104A. Report time compression has occurred and there are no abnormal indication s on 1-SW-MOV-104A (1H1

-2N-7B) supply breaker.

If asked: Trainee may dispatch operator to investigate supply breaker for 1

-SW-MOV-105C. Report time compression has occurred and that the supply breaker (1H1

-2N-8C) has tripped.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM c" Page 6 of 12 STEP 6: Start RS pumps associated with aligned RS HXs (Step 8d)

STANDARD:

Trainee starts 1

-RS-P-1B ("B" RS HX)

Trainee observes that 1

-RS-P-1B tripped and continues.

  • Trainee starts 1

-RS-P-2B ("D" RS HX)

- This is a critical step.

EVALUATOR'S NOTE: N/A BOOTH NOTE:

If directed to investigate breaker for 1

-RS-P-1B (14J4), report that breaker is tripped as indicated by a 'Bell Lockout'.

COMMENTS:

_______ SAT

_______ UNSAT STEP 7: CAUTIONS PRIOR TO STEP 9 CAUTION:

CHG and LHSI pumps taking suction from the RWST must be stopped when level decreases to 6%.

CS pumps taking suction from the RWST must be stopped when level decreases to 3%. STANDARD:

Acknowledges cautions EVALUATOR'S NOTE: N/A

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM c" Page 7 of 12 STEP 8:

Determine number of CS pumps required (Step 9a)

STANDARD:

Determines that containment pressure is between 14 psia and 60 psia, fewer than two RS pumps are running, and determines that 2 CS pumps are required.

EVALUATOR'S CUE: If asked, there are no abnormalities noted on either containment spray pump.

COMMENTS:

_______ SAT

_______ UNSAT STEP 9: CS pumps running - EQUAL TO NUMBER REQUIRED (Step 9b)

STANDARD:

Determines that 2 CS pumps are required, but only 1 currently in service.

Goes to step 9 RNO.

EVALUATOR'S NOTE: N/A

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM c" Page 8 of 12 STEP 10:

Do the following (Step 9b RNO)

1) Manually operate CS pump(s).
2) Close associated CS pump discharge MOVs for stopped pump(s):

-CS-P-1A, 1-CS-MOV-101A and 1

-CS-MOV-101B -CS-P-1B, 1-CS-MOV-101C and 1

-CS-MOV-101D STANDARD:

  • Trainee starts 1

-CS-P-1B. This is a critical step.

EVALUATOR'S NOTE: N/A COMMENTS:

_______ SAT

_______ UNSAT STEP 11:

REPORT TO SHIFT SUPERVISOR (EVALUATOR).

STANDARD:

Verbal status report that CS and RS have been aligned in accordance with ECA

-1.1 steps 8 &

9.

EVALUATOR'S NOTE: N/A STOP TIME:

COMMENTS:

_______ SAT

_______ UNSAT

STOP TIME:

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Task Task is to be performed in the simulator.

Perform Steps 8 and 9 of 1-ECA-1.1, Loss of Emergency Coolant Recirculation, to align Recirc Spray and Containment Spray systems.

Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task Initial Conditions A LBLOCA has occurred with the failure of Hi

-Hi CLS to function and failure of both LHSI pumps. 1

-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.

Initiating Cues You are the Unit 1 RO. Align Recirc Spray and Containment Spray in accordance with 1

-ECA-1.1, steps 8 and

9. When you finish the actions necessary to accomplish this, please inform me.

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions A LBLOCA has occurred with the failure of Hi

-Hi CLS to function and failure of both LHSI pumps. 1

-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.

Initiating Cues You are the Unit 1 RO. Align Recirc Spray and Containment Spray in accordance with 1-ECA-1.1, steps 8 and

9. When you finish the actions necessary to accomplish this, please inform me.

Surry 2014-301 "JPM d" Page 1 of 20 U.S. Nuclear Regulatory Commission Surry Power Station SR14301 Simulator Job Performance Measure EPEE02.EK3.3 (3.9/3.9)

Alternate Path Applicant________________________________

Start Time___________________

Examiner_______________________________

Date ___________________________________

Stop Time___________________

Title Re-establish Normal Letdown Following SI K/A: EPEEE02.EK3.3 Knowledge of the reasons for the following responses as they apply to the (SI Termination):

Manipulation of controls required to obtain desired operating results during abnormal, and emergency situations.

3.9 / 3/9 Applicability Estimated Time Actual Time RO/SRO(I)/

35 Minutes ___ Minutes Conditions Task is to be PERFORMED in the simulator.

A spurious SI has occurred. E

-0 has been performed, SI reduction criteria are satisfied, transition made to ES

-1.1, and it has been performed through Step 14. Standards

Excess letdown placed in service.

Initiating Cues

1-ES-1.1, SI Termination, Step 15.

Shift Manager direction

. Terminating Cues Report received that excess letdown is in service per 1

-OP-CH-006. Procedures 1-ES-1.1, SI Termination, Rev. 48

. 1-OP-CH-006, Shifting or Increasing/Decreasing Letdown Flow, Rev.20.

Surry 2014-301 "JPM d" Page 2 of 20 Tools and Equipment Safety Considerations None None Surry 2014-301 "JPM d" Page 3 of 20 Simulator Setup Call up 100% power IC and initialize (IC 268). Place simulator in RUN.

Initiate SI. Perform E

-0, reset SI, verify SI reduction criteria satisfied, transition to ES

-1.1 and perform it through Step 14. Allow simulator until SR energize, place in freeze and snap until ready to run JPM.

Close 1-CH-LCV-1460A & B. Initiate failure 1-CH-LCV-1460A shut

Switch O/R, CHLCV460A_CLOSE, ON, INSERT; CHLCV

-460A_OPEN, OFF, INSERT

. Open 1-CC0TV-109B. Press Green Pushbutton on 1

-DG-TV-108A/B and pump down the PDTT.

Set seal injection at 8 gpm.

Verify PRZR Level Control Channel Select Switch is in the III/II position.

Freeze simulator at these conditions for JPM performance.

Initial Conditions Plant was at 100% power with all systems operating normal and in automatic

. The crew is currently recovering from a spurious SI initiation

. 1-ES-1.1, SI Termination has been completed up to Step 15.

SI has been reset.

Initiating Cues You are the Unit 1 RO

. Re-establish letdown by performing step 15 of 1

-ES-1.1. When you finish the actions necessary to accomplish this, please inform me

. Notes Surry 2014-301 "JPM d" Page 4 of 20 PERFORMANCE CHECKLIST Notes to the Evaluator Operator is given a copy of 1

-ES-1.1, SI Termination, Step 15.

When Operator determines the need to place excess letdown in service, give them a copy of 1

-OP-CH-006, Shifting or Increasing/Decreasing Letdown Flow.

Task critical elements are bolded and noted at the end of the step as CRITIAL STEP.

START TIME:_______________

STEP 1: Adjust charging line flow to establish > 40 gpm.

(Step 15a of ES-1.1) STANDARD:

Checks that indicated C HG line flow is greater than 40 gpm by observing flow on 1

-CH-FI-1122A. EVALUATOR'S NOTE:

COMMENTS:

_______ SAT

_______ UNSAT STEP 2: Open Letdown Line pressure control valve

. (Step 15 b of ES

-1.1) 1-CH-PCV-1145 STANDARD:

  • (a) Places 1-CH-PCV-1145 controller into MANUAL.

This is a critical step.

  • (b) Adjusts demand increase button until 1

-CH-PCV-1145 indicates open (zero demand indicated)

. This is a critical step.

EVALUATOR'S NOTE:

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM d" Page 5 of 20 STEP 3:

Check closed or close letdown orifice isolation valves.

(Step 15 c of ES

-1.1) 1-CH-HCV-1200A 1-CH-HCV-1200B 1-CH-HCV-1200C STANDARD:

a) Checks 1-CH-HCV-1200A closed

. b) Checks 1-CH-HCV-1200B closed.

c) Checks 1-CH-HCV-1200C closed.

EVALUATOR'S NOTE:

None.

COMMENTS:

b STEP 4: Open letdown isolation valves.

(Step 15 d of ES

-1.1) STANDARD:

  • a) Opens 1-CH-TV-1204A. This is a critical step.
  • b) Opens 1-CH-TV-1204B. This is a critical step.
  • c) Attempts to open 1

-CHLCV-1460A, Valve will not open.

  • d) Goes to Step 15 RNO, Establish excess letdown IAW 1

-OP-CH-006, Shifting or Increasing/Decreasing letdown Flow.

This is a critical step.

EVALUATOR'S NOTE:

[This step is the Fault]

The Operator should determine the letdown isolation valve 1

-CH-LCV-1460A has failed and apply the RNO for placing excess letdown in service. Operator may reduce charging at this point to minimize it to attempt to maintain PRZR level. When Operator determines the need to perform 1

-OP-CH-006, hand him/her a copy of the procedure.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM d" Page 6 of 20 STEP 5: 1-OP-CH-006.

OBTAINS COPY OF 1

-OP-CH-006 FROM EVALUATOR STANDARD:

(a) Reviews initial conditions, precautions and limitations.

(b) Determines Section 5.1 is to be used.

COMMENTS:

_______ SAT

_______ UNSAT STEP 6: 1-OP-CH-006. (Steps 5.1.1 thru 5.1.4)

CHECK ALL LOOP DRAINS AND EXCESS LETDOWN ISOLATIONS ARE SHUT STANDARD:

(a) Verifies all loop drains are shut (1

-RC-1557A, B, and C) using control board indicator lights. (b) Verifies excess letdown HX isolation is shut (1

-CH-HCV-1201) using control board indicator lights.

(c) Verifies excess letdown flow setpoint is at zero (1

-CH-HCV-1137). (d) Verifies excess letdown divert valve (1

-CH-HCV-1389) is set to VCT.

EVALUATOR'S NOTE:

None. COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM d" Page 7 of 20 STEP 7: 1-OP-CH-006. (Step 5.1.5 and 5.1.6

) OPENS RCP SEAL RETURN

, 1-CH-MOV-1381. Check running at least one CCW pump. STANDARD:

  • (a) Opens RCP seal return isolation (1

-CH-MOV-1381) using control board controls.

This is a critical step.

(b) Checks at least one CC pump running using control board indications.

EVALUATOR'S NOTE:

Step 5.1.7 is N/A.

COMMENTS:

_______ SAT

_______ UNSAT STEP 8: 1-OP-CH-006. (Step 5.1.

8 thru 5.1.12)

VERIFIES LETDOWN HX TEMPERATURE CONTROL AND EXCESS LETDOWN READY FOR SERVICE.

STANDARD:

(a) Checks 1-CC-FI-109, LETDOWN HX OUTLET FLOW is ~ 1 60 gpm. (b) Applies note concerning 1

-CC-HCV-108. (c) Checks 1-CC-TI-108, LETDOWN HX OUTLET TEMP, is indicating ambient.

(d) Checks 1-CH-PI-1138, EXCESS LETDOWN HX OUTLET PRESS, is approximately 50 psig.

(e) Checks 1-CH-TI-1139, EXCESS LETDOWN HX OUTLET TEMP, is indicating ambient. COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM d" Page 8 of 20 STEP 9: 1-OP-CH-006. (Step 5.1.

13 thru 5.1.23) ESTABLISH EXCESS LETDOWN FLOW PATH.

STANDARD:

(a) Acknowledges note on first directing excess letdown to the PDTT.

  • (b) Places 1-CH-HCV-1389, EXCESS LETDOWN DIVERT, to the PDTT. Verifies position by board indications.

This is a critical step.

(c) Verifies 1

-CH-PI-1138, EXCES LETDOWN HX OUTLET PRESS, indicates ~ 10 psig.

  • (d) Opens 1-CH-HCV-1201, EXCESS HX LETDOWN ISOLATION, and verifies position by board indications.

This is a critical step.

(e) Records charging flow.

(f) Acknowledges note on excess letdown effect on calorimetric.

(g) N/A's step for calorimetric being performed.

(h) Acknowledges cautions on opening loop drains.

  • (i) Opens one and only one loop drain (1

-RC-HCV-1557A, B, or C). Verifies position by board indications.

This is a critical step.

(j) Acknowledges notes on excess letdown flow rate and use of Attachment 1.

  • (k) Slowly opens 1

-CH-HCV-1137, EXCESS LETDOWN FLOW, until 15 gpm to PDTT. This is a critical step.

(l) Place 1-CH-FC-1122C, CHARGING FLOW CONTROL, in Manual and raise charging flow 15 gpm from initial value.

(m) Verifies excess letdown temperature 1

-CC-TI-108 is < 150

°F and 1-CH-TI-1139 is < 195°F. (m) Records pot setting for 1

-CH-HCV-1137. EVALUATOR'S NOTE:

If asked: A calorimetric is not being performed If asked: As the Shift Manager, direct the Operator to use the "A" loop drain path.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM d" Page 9 of 20 STEP 10: 1-OP-CH-006. (Step 5.1.

24 thru 5.1.26) ESTABLISH EXCESS LETDOWN FLOW PATH THROTTLES EXCESS LETDOWN AND TRANSFERS TO VCT.

STANDARD:

(a) Throttles 1

-CH-HCV-1137 to 5 gpm.

(b) Acknowledges Notes.

  • (c) When PDTT increases 10% (1

-DG-LI-107) selects "VCT" on 1

-CH-HCV-1389. This is a critical step.

(d) Increase 1

-CH-HCV-1137 to previous recorded setpoint.

EVALUATOR'S NOTE:

To expedite JPM, Evaluator may time compress and direct Operator PDTT level has increased by at least 10% from the original point

. COMMENTS:

_______ SAT

_______ UNSAT STEP 11: 1-OP-CH-006. (Step 5.1.

27 thru 5.1.31)

Checks Parameters

.

STANDARD:

(a) Checks RCP seal leakoff is in normal band (approx. 2

-3 gpm). (b) Checks 1-CH-PI-1138 ~ 65 psig.

(c) Acknowledges CAUTION concerning CH flow greater than expected, a leak on excess letdown flowpath is a possibility.

(d) Verifies charging flow stable at ~ 15 gpm greater than previously recorded value.

(e) Verifies 1

-CC-TI-108 < 150F, and 1-CH-TI-1139 < 195F. EVALUATOR'S NOTE:

When Excess Letdown is in service, you can inform the Operator someone else will finish the procedure and terminate the JPM.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM d" Page 10 of 20 Step 12 REPORTS TO SHIFT MANAGER (EVALUATOR).

Standards Verbal status report made that Step 15 completed and letdown has been re

-established.

Evaluator's Comments STOP TIME:________________

STOP TIME:

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

__________________________________________________________________________________

__ ____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Directions

The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.

Initial Conditions Plant was at 100% power with all systems operating normal and in automatic.

The crew is currently recovering from a spurious SI initiation

. 1-ES-1.1, SI Termination has been completed up to Step 15.

SI has been reset.

Initiating Cues You are the Unit 1 RO. Re

-establish letdown by performing step 15 of 1

-ES-1.1. When you finish the actions necessary to accomplish this, please inform me

. .

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions Plant was at 100% power with all systems operating normal and in automatic.

The crew is currently recovering from a spurious SI initiation

. 1-ES-1.1, SI Termination has been completed up to Step 15.

SI has been reset.

Initiating Cues

You are the Unit 1 RO. Re

-establish letdown by performing step 15 of 1

-ES-1.1. When you finish the actions necessary to accomplish this, please inform me

.

Surry 2014-301 "JPM e" Surry SR 2014 - 301 Page 1 of 8 U.S. Nuclear Regulatory Commission Surry Power Station SR14301 Simulator Job Performance Measure APE054.AA1.01 (4.5 / 4.4)

Applicant________________________________

Start Time___________________

Examiner_______________________________

Date ___________________________________

Stop Time___________________

Title Cross-Connect AFW from Unit 1 to Unit 2.

K/A: APE054.AA.01: Ability to operate and / or monitor the following as they apply to the Loss of Main Feedwater (MFW)

- AFW controls, including the use of alternate AFW sources (RO 4.5/SRO 4.4

.) Applicability Estimated Time Actual Time RO/SRO(I) 10 Minutes ___ Minutes Conditions Task is to be PERFORMED in the Simulator

. Unit 1 is at 100% power with all systems normal and in AUTO.

Unit 2 is experiencing a loss of all Feed Water. Standards 2-FR-H.1, Loss of Secondary Heat Sink, step 3d RNO, steps d 3 through d 5, Revision 34

. Initiating Cues Shift Manager Direction

. 2-FR-H.1, Loss of Secondary Heat Sink, step 3d RNO, steps d 3 through d

5. Terminating Cues 2-FR-H.1, Loss of Secondary Heat Sink, step 3d RNO, step d5 complete

. Confirmation of AFW to Unit 2 from Unit 2 Operator.

Procedures

2-FR-H.1, Loss of Secondary Heat Sink

, Revision 36 Tools and Equipment Safety Considerations

None Standard Personal Safety Equipment

Surry 2014-301 "JPM e" Surry SR 2014 - 301 Page 2 of 8 Simulator Setup Reset to IC 269 OR Call up 100% power IC and initialize.

Trip Unit 2, Remotes, Station Protection Unit 2, RXTRIP_UNIT2, and wait for swapover.

Secure Unit 2 RCPs: Remotes, EL2, EL25A3_bkr

/ EL25B3_bkr

/ EL25C3_bkr, Open.

Initial Conditions Unit 1 is at 100% power with all systems normal and in AUTO.

Unit 2 is experiencing a loss of all Feed Water. Unit 2 is currently experiencing a loss of all feedwater. They are in 2-FR-H.1 at step 3d RNO and need Aux Feed flow from both Unit 1 motor-driven AFW pumps.

All Unit 2 RCPs have been secured. 1J bus will remain on its current (normal) power supply.

Initiating Cues You are to cross

-connect Aux Feedwater from Unit 1 to Unit 2 in accordance with 2

-FR-H.1 3d RNO. RNO steps d. 1) and d. 2) are complete.

When you finish the actions necessary to accomplish this, please inform me

. Evaluator Notes Operator is provided with a copy of 2

-FR-H.1, step 3 during directions.

Task critical elements are bolded and denoted by an asterisk (

  • ).

Surry 2014-301 "JPM e" Surry SR 2014 - 301 Page 3 of 8 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (*). An additional instructor may be needed to silence and acknowledge alarms for the examinee, and respond as the Unit 2 Reactor Operator.

START TIME:

STEP 1: (Step 3d RNO, d 3), 2

-FR-H.1)

CLOSES THE UNIT 1 AFW MOVs STANDARD:

Closes and verifies closed indication (green light on

- red light off) the following AFW MOVs: *(a) 1-MOV-FW-151A. This is a critical step.

  • (b) 1-MOV-FW-151B. This is a critical step.
  • (c) 1-MOV-FW-151C. This is a critical step.
  • (d) 1-MOV-FW-151D. This is a critical step.
  • (e) 1-MOV-FW-151E. This is a critical step.
  • (f) 1-MOV-FW-151F. This is a critical step.

EVALUATOR'S NOTE:

1) 2-handed operation is allowed.
2) Not sequence dependant.

COMMENTS:

_______ SAT

_______ UNSAT STEP 2: (Step 3d RNO, d4, 2

-FR-H.1) OPENS THE AFW CROSS

-CONNECT VALVES TO SUPPLY UNIT 2.

STANDARD:

  • (a) Places control switch for 2

-MOV-FW-260A to the OPEN position.

  • (b) Places control switch for 2

-MOV-FW-260B to the OPEN position.

(c) Checks 2-MOV-FW-260A open indication received (red on & green off).

(d) Checks 2-MOV-FW-260B open indication received (red on & green off).

(e) Acknowledges annunciator D

-D-4, AFW X-TIE MOVS NOT FULLY CLOSED

. EVALUATOR'S NOTE:

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM e" Surry SR 2014 - 301 Page 4 of 8 STEP 3: (Step 3d RNO, d5, 2

-FR-H.1) STARTS THE UNIT 1 MOTOR DRIVEN AFW PUMPS.

STANDARD:

(a) Announces AFW pump start over Gai

-tronics system.

  • (b) Starts 1-FW-P-3A by placing control switch to START

. (c) Verifies start indications (red light on & amps indicated),

  • (d) Starts 1-FW-P-3B by placing control switch to START

. (e) Verifies start indications (red light on & amps indicated).

(f) Checks no Unit 1 AFW flow indicated on 1

-FW-FI-100A, B & C.

EVALUATOR'S NOTE:

Unit 2: Following Start of 1

-FW-P-3A and 1-FW-P-3B, report that AFW flow is indicated on Unit 2.

COMMENTS:

_______ SAT

_______ UNSAT STEP 5: REPORTS TO SHIFT MANAGER (EVALUATOR).

STANDARD:

Reports to the Shift Manager (Evaluator) TASK COMPLETE.

. EVALUATOR'S NOTE:

Operator may throttle AFW to restore S/G level.Evaluator option to stop JPM at any time after AFW pumps are started.

COMMENTS:

JPM COMPLETE

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM e" Surry SR 2014 - 301 Page 5 of 8 STOP TIME:

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Task Task is to be performed in the Simulator

. Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.

Initial Conditions Unit 1 is at 100% power with all systems normal and in AUTO.

Unit 2 is experiencing a loss of all Feed Water. Unit 2 is currently experiencing a loss of all feedwater. They are in 2-FR-H.1 at step 3d RNO and need Aux Feed flow from both Unit 1 motor-driven AFW pumps.

All Unit 2 RCPs have been secured. 1J bus will remain on its current (normal) power supply.

Initiating Cues You are to cross

-connect Aux Feedwater from Unit 1 to Unit 2 in accordance with 2-FR-H.1 3d RNO. RNO steps d. 1) and d. 2) are complete.

When you finish the actions necessary to accomplish this, please inform me

. .

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions Unit 1 is at 100% power with all systems normal and in AUTO.

Unit 2 is experiencing a loss of all Feed Water. Unit 2 is currently experiencing a loss of all feedwater. They are in 2-FR-H.1 at step 3d RNO and need Aux Feed flow from both Unit 1 motor-driven AFW pumps.

All Unit 2 RCPs have been secured. 1J bus will remain on its current (normal) power supply.

Initiating Cues You are to cross

-connect Aux Feedwater from Unit 1 to Unit 2 in accordance with 2

-FR-H.1 3d RNO. RNO steps d. 1) and d. 2) are complete.

When you finish the actions necessary to accomplish this, please inform me

.

Surry 2014-301 "JPM f" Page 1 of 14 U.S. Nuclear Regulatory Commission Surry Power Station SR14301 Simulator Job Performance Measure [KA 015A4.03 3.8 / 3.9

] Applicant________________________________

Start Time___________________

Examiner_______________________________

Date ___________________________________

Stop Time___________________

Title Remove Source Range NI s From Service During a Reactor Startup.

K/A: 015A4.03 Ability to manually operate and/or monitor in the control room: Trip bypasses 3.8 / 3.9 Applicability Estimated Time Actual Time RO/SRO(I) 10 Minutes ___ Minutes Conditions Task is to be PERFORMED in the simulator.

Reactor power is at approximately 1.

2 x 10-10 amps during a startup, and the SR high voltage cannot be removed from either N

-31 or N-32. Standards

1-AP-4.00, Nuclear Instrumentation Malfunction Initiating Cues

Shift manager Direction.

Terminating Cues 1-AP-4.00, Nuclear Instrumentation Malfunction, Step 38 complete

. Procedures

1-AP-4.00, Nuclear Instrumentation Malfunction, Rev 30. Tools and Equipment Safety Considerations None None Surry 2014-301 "JPM f" Page 2 of 14 Simulator Setup Call up IC

-14, S1C26 10

-8 Amps D-131 Steps MSTV Shut, and initialize. Place simulator in RUN.

Perform the startup to obtain power at 1.2 x 10-10 amps (or slightly greater), then implement switch overrides (SRTRP_BLK_TRA_PB

, and SRTRP_BLK_TRB_PB, override OFF, Insert), Flux Level Trip Cutout Pushbuttons. Freeze the simulator until ready for operator to perform JPM.

Do not allow the SUR to be greater than +0.1 dpm

. Initial Conditions During a Reactor startup, when P

-6 was reached the Operator pushed 1/N

-33A TR A and 1/N

-33B TR B to de

-energize the Source Range NIs.

Both N-31 and N-32 failed to de

-energize. Initiating Cues You are the RO

. Respond to a failure of both Source Range N Is in accordance with 1

-AP-4.00, NI Malfunction.

When you finish the actions necessary to accomplish this, please inform me.

Surry 2014-301 "JPM f" Page 3 of 14 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (

  • ). An additional instructor may be needed to silence and acknowledge alarms for the examinee.

START TIME:

_________________________.

STEP 1: AP-4.00, (Step 1) Check NI Malfunction

- Power Range Failure

. STANDARD:

(a) Enters 1-AP-4.00 at Step 1. (b) Determines failure not in Power Range NI and goes to Step 10.

EVALUATOR'S NOTE:

NONE COMMENTS:

_______ SAT

_______ UNSAT STEP 2: AP-4.00, (Step 10) Check NI Malfunction

- Intermediate Range Failure.

STANDARD:

(a) Determines failure not in Power Range NI and goes to Step 19.

EVALUATOR'S NOTE: NONE COMMENTS:

_______ SAT

_______ UNSAT STEP 3: AP-4.00, (Step 19) Check NI Malfunction

- Source Range Failure.

STANDARD:

(a) Determines failure is in Source Range NIs and continues.

EVALUATOR'S NOTE: NONE COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM f" Page 4 of 14 STEP 4: AP-4.00, Step 20 STABILIZE UNIT CONDITIONS.

STANDARD:

(a) Verifies Unit conditions stable with a zero startup rate.

(b) Maintains power with zero startup rate.

EVALUATOR'S NOTE:

A manual Reactor trip is NOT an acceptable action

.

COMMENTS:

_______ SAT

_______ UNSAT STEP 5: AP-4.00. (Step 21) CHECK REACTOR POWER GREATER THAN P

-6 (1X10-10). STANDARD:

a) Checks Reactor power level greater than P

-6 (1x 10-10 amps) by: observing INT RNG FLUX meters NI 35B and NI 36B, Benchboard 1

-2, ~ 1.2 x 10-10 amps Meters on the IR CH 1 and CH2 Drawers ~ 1.2 x 10

-10 amps. Permissive Status Light on Vertical Board 1

-2, B-3, LIT. Trip Status Lights on Vertical Board 1-2, C-2 and D-2 LIT Bistable Light, Power Above Permissive P6, on IR CH

-1 and CH2 Drawer, LIT.

EVALUATOR'S NOTE:

If asked: Indications and lights status is "as found".

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM f" Page 5 of 14 STEP 6:

AP-4.00. (Step 22) CHECK BOTH SOURCE RANGE CHANNELS

- HIGH VOLTAGE OFF STANDARD:

(a) Determine that both SRNI Channels are still energized.

(b) Pushes "1/N 33A TR A" pushbutton and "1/N 33B TR B" pushbutton.

(c) Notes that N

-31 and N-32 still have high voltage applied to the detectors.

  • (d) Places LEVEL TRIP switch for N

-31 in BYPASS.

This is a critical step.

  • (e) Removes INSTRUMENT POWER fuses for N

-31. This is a critical step.

  • (f) Places LEVEL TRIP switch for N

-32 in BYPASS.

This is a critical step.

  • (g) Removes INSTRUMENT POWER fuses for N

-32. This is a critical step.

(h) Notes requirement to refer to Tech Spec Table 3.7

-1 Item 4.

(i) Notes requirement to make entry in PSL and Shift Turnover to reinstall fuses.

(j) Goes to Step 38 of 1-AP-4.00. (k) Informs the Shift Manager that I&C and the OMOC must be notified

EVALUATOR'S NOTE:

When Notified: Acknowledge that Tech Spec Table 3.7

-1, item 4 requires review

. When Notified

Acknowledge that I&C and OM on Call must be notified.

When the Instrument Power fuses are pulled on the first channel, annunciator 1G

-A3, "NIS SOURCE RNG LOSS OF DET VOLT" is received.

It is acceptable to place both SRNI in LEVEL TRIP BYPASS before removing the INSTRUMENT POWER fuses

.

COMMENTS:

_______ SAT

_______ UNSAT STEP 7 REPORT TO NUCLEAR SHIFT MANAGER (EVALUATOR).

Standards Verbal status report that N

-31 and N-32 have been removed from service IAW AP-4.00. Evaluator's Comments STOP TIME:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM f" Page 6 of 14 COMMENTS: ____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

__________________________________________________________________________________

__ ____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________ ____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Directions

The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.

Initial Conditions During a Reactor startup, when P

-6 was reached the Operator pushed 1/N

-33A TR A and 1/N

-33B TR B to de

-energize the Source Range NIs. Both N

-31 and N-32 failed to de

-energize.

Initiating Cues You are the RO. Respond to a failure of both Source Range NIs in accordance with 1

-AP-4.00, NI Malfunction. When you finish the actions necessary to accomplish this, please inform me.

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions During a Reactor startup, when P

-6 was reached the Operator pushed 1/N

-33A TR A and 1/N-33B TR B to de

-energize the Source Range NIs. Both N

-31 and N-32 failed to de

-energize.

Initiating Cues You are the RO. Respond to a failure of both Source Range NIs in accordance with 1

-AP-4.00, NI Malfunction.

When you finish the actions necessary to accomplish this, please inform me.

Surry 2014-301 "JPM g" Page 1 of 13 U.S. Nuclear Regulatory Commission Surry Power Station SR14301 Simulator Job Performance Measure [KA 075A2.02 2.5 / 2.7

] Applicant________________________________

Start Time___________________

Examiner_______________________________

Date ___________________________________

Stop Time___________________

Title Respond to a Low Level Transient K/A: 075A2.02 2.5/2.7, Ability to (a) predict the impacts of the following malfunctions or operations on the circulating water system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:

Loss of circulating water pumps Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 14 Minutes ___ Minutes Conditions Task is to be PERFORMED in the simulator.

Both units are at 100% power when a lightning strike trips 2G screenwell transformer.

Standards Circ Water Pumps restored in accordance with AP

-12.01, Loss of Intake Canal Level "prior to automatic protective actions

." Initiating Cues LLIS TROUBLE annunciator.

500 KV HSE TROUBLE annunciator.

Unit Two Circ Water Pumps secured.

Terminating Cues

0-AP-12.01, Loss of Intake Canal Level, completed.

Procedures 0-AP-12.01, Loss of Intake Canal Level, completed. Rev 30. Tools and Equipment Safety Considerations None None Surry 2014-301 "JPM g" Page 2 of 13 Simulator Setup Call up 100% power IC and initialize. Place simulator in RUN.

Implement EL0802, Loss of Screenwell Transformer 2, and place simulator in RUN.

Acknowledge all annunciators and place simulator in FREEZE.

Initial Conditions Both units are at 100% power when a lightning strike trips 2G screenwell transformer.

Alarm VSP L

-7 "LLIS TROUBLE" and VSP

-K6 "500KV HSE TRBL" have alarmed eight (8) minutes ago.

Security reports a lightning strike in the vicinity of the low level intake.

All Unit 2 Circulating Water Pumps were initially running. Unit One and Unit Two Reactor Operators are currently throttling CW MOVs to conserve intake canal level.

Initiating Cue You are the Unit 1 BOP. You are to respond to the loss of Circulating Water Pumps

. When you finish the actions necessary to accomplish this, please inform me.

Surry 2014-301 "JPM g" Page 3 of 13 PERFORMANCE CHECKLIST Notes to the Evaluator When candidate identifies AP

-12.01 as the guiding procedure, then provide a copy to the candidate.

Task critical elements are bolded and denoted by an asterisk (

  • ). An additional instructor may be needed to silence and acknowledge alarms for the examinee.

START TIME_______:

STEP 1: 0-AP-12.01 (Step 1) NOTE: EPIPs may be applicable.

CHECKS ENTRY INTO THIS PROCEDURE

-FROM AN EOP OR AN AP TO RESTORE SW FLOW TO THE CCHXs.

STANDARD:

a) Acknowledges Note prior to Step 1

. b) Identifies entry into this procedure is not from EOP or AP to restore SW.

c) Goes to Step 3.

EVALUATOR'S NOTE:

If Asked: Entry into this procedure not an attempt to restore SW.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM g" Page 4 of 13 STEP 2:

0-AP-12.01. (Step 3) TRY TO MAINTAIN INTAKE CANAL LEVEL STANDARD:

(a) Acknowledges CAUTIONs prior to step 3 regarding turbine stall flutter and reference to AP-14, if vacuum cannot be maintained.

(b) Acknowledges NOTE prior to step 3 regarding potential need to trip one unit to reduce rate of intake canal drawdown.

(c) Recalls that initial conditions revealed that Unit ROs were throttling waterboxes as required.

EVALUATOR'S NOTE:

If asked: Both units are currently throttling waterbox outlet MOVs as required due to loss of circ water pumps.

If asked: Unit SRO will direct unit ramping as required.

COMMENTS:

_______ SAT

_______ UNSAT STEP 3: 0-AP-12.01. (Step 4) CHECK INTAKE CANAL LEVEL

- DECREASING.

STANDARD:

a) Candidate identifies that 3 CW pumps are insufficient to supply two units CW requirement.

(b) Candidate reads intake canal level indicator and determines downward trend.

EVALUATOR'S NOTE:

COMMENTS:

_______ SAT _______ UNSAT

Surry 2014-301 "JPM g" Page 5 of 13 STEP 4:

0-AP-12.01. (Step 5) START CIRC WATER PUMPS AS REQUIRED FROM THE MCR IAW ATTACHMENT 3 STANDARD:

Candidate goes to Attachment 3.

EVALUATOR'S NOTE:

COMMENTS:

_______ SAT

_______ UNSAT STEP 5: 0-AP-12.01, Attachment 3

. (Step 1) ATTACHMENT 3

- REMOTE START OF CIRCULATING WATER PUMPS.

STANDARD:

(a) Candidate acknowledges NOTE prior to step (a) that requires 5

-minute coastdown of CW pumps prior to starting.

(b) Candidate checks 1G

-2G Bus Tie Bkr Closed using "LLIS Electrical" PCS screen.

(c) Trainee verifies that CW pumps are not in local by noting no white box around Unit 2 CW pumps on CW Pump PCS screen.

  • (d) Candidate calls up soft control box pumps to start CW pump by clicking on CW pump ICON on PCS CW screen. This is a critical step.
  • (e) Candidate enables soft control box for pump to be started by clicking on mark number box and verifies red border.

This is a critical step.

  • (f) Candidate clicks "Start" button for pump to control that is active.

This is a critical step.

(g) Candidate verifies proper amp indication for pump started.

  • (h) Candidate completes steps (c) through (e) of attachment 3 for remaining Unit 2 CW pumps to be started.

This is a critical step.

(i) Candidate directs outside operator to perform post

-start checks IAW respective OP 48.1.1. EVALUATOR'S NOTE:

If asked: Greater than 5 minutes have elapsed since loss of transformer.

If asked: 2A, 2B, 2C and 2D circ water pumps were previously in service.

When Directed: Acknowledge as Outside Operator to perform post start checks of CW pumps IAW op

-48.1.1. COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM g" Page 6 of 13 STEP 6:

0-AP-12.01. (Step 6) SEND OPERATOR TO LOW LEVEL INTAKE TO PERFORM THE FOLLOWING PROCEDURES.

STANDARD:

(a) Candidate acknowledges Note prior to step 6 regarding PIN number for ESW pump house and statement regarding CW pump restrictions when 1G

-2G busses are cross

-tied. (b) Sends an Operator to Low Levels to perform Attachment 2 and OP

-48.1.1. EVALUATOR'S NOTE:

None.

Booth Operator:

When directed: Acknowledge Direction to perform 0

-AP-12.01, Attachment 2, Low Level Intake Responses; 0-OP-SW-002, Emergency Service Water Pump Operation; and OP

-48.1.1. Starting any CW Pump.

COMMENTS:

_______ SAT

_______ UNSAT STEP 7: 0-AP-12.01. (Step 7) CHECK INTAKE CANAL LEVEL

- GREATER THAN TRIP SETPOINT.

STANDARD:

Candidate determines that Intake canal level is greater than 23.5 feet and annunciator 1F

-G-1, INTK CANAL LO LVL TRIP not lit.

EVALUATOR'S NOTE:

If asked: 2F-G1 not lit on Unit Two.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM g" Page 7 of 13 STEP 8:

0-AP-12.01. (Step 8) CHECK CW LOSS

- SUSTAINED WITH NO EXPECTATION OF RECOVERY STANDARD:

a) Candidate identifies Canal Level Stable or increasing b) Candidate goes to Step 10 EVALUATOR'S NOTE:

None.

COMMENTS:

_______ SAT

_______ UNSAT STEP 9: 0-AP-12.01. (Step 10) CONTINUES TO REDUCE UNIT LOAD AS NECESSARY TO MAINTAIN VACUUM.

STANDARD:

Candidate determines that no actions are required based on number of CW pumps running EVALUATOR'S NOTE:

Both unit's Reactor Operators have stopped throttling CW MOVs.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM g" Page 8 of 13 STEP 10:

0-AP-12.01. (Step 11) CHECK INTAKE CANAL LEVEL

- STABLE OR INCREASING.

STANDARD:

(a) Trainee evaluates canal level indication and/or trend recorder to verify canal level increasing.

(b) Trainee then goes to Step 27

EVALUATOR'S NOTE:

None. COMMENTS:

_______ SAT

_______ UNSAT STEP 11: 0-AP-12.01. (Step 27) NOTIFY THE FOLLOWING.

STANDARD:

(a) Candidate notifies Evaluator that the OM on Call, Manager Nuclear Operations and STA need to be notified.

EVALUATOR'S NOTE:

Respond: Notifications will be made.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM g" Page 9 of 13 STEP 12:

0-AP-12.01. (Step 28) CHECK INTAKE CANAL LEVEL

- INCREASING.

STANDARD:

(a) Candidate acknowledges NOTE concerning Intake Canal Level must be maintained >17.2 feet.

(b) Candidate evaluates canal level indication and/or trend recorder to and identifies canal level >17.2 feet, and increasing.

EVALUATOR'S NOTE:

None. COMMENTS:

_______ SAT

_______ UNSAT STEP 13: 0-AP-12.01. (Step 29) CHECK INTAKE CANAL LEVEL

- GREATER THAN 17.2 FT

. STANDARD:

(a) Candidate identifies canal level greater than 17.2 feet

. EVALUATOR'S NOTE:

None.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM g" Page 10 of 13 STEP 14:

0-AP-12.01. (Step 30) THROTTLE OPEN CC HX SW OUTLET VALVES AS NECESSARY TO LOWER CC TEMPERATURE.

STANDARD:

(a) Acknowledges NOTE regarding restoration of CCHX SW flow.

(b) Candidate recognizes that no throttling of CCHW SW flow was performed, so no actions required on this step.

EVALUATOR'S NOTE:

If asked:

No actions were taken to reduce CCHX SW flow

. COMMENTS:

_______ SAT

_______ UNSAT STEP 15: 0-AP-12.01. (Step 31) CHECK CAUSE OF LEVEL DECREASE

-CORRECTED.

STANDARD:

(a) Candidate identifies that restoration of CW pumps corrects cause of level decrease.

EVALUATOR'S NOTE:

If asked:

Control Ops group will be notified to initiate troubleshooting on 2G transformer

.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM g" Page 11 of 13 STEP 16:

0-AP-12.01. (Step 32) RESTORE CW AND SW COMPONENTS (INCLUDING CW CHEMICAL INJECTION BY OPENING 1

-SA-285 AND 2-SA-274) TO SUPPORT PLANT CONDITIONS.

STANDARD:

(a) Candidate reports that CW MOVs may be returned to previous position.

(b) Candidate recognizes that chemical injections systems require no action.

EVALUATOR'S NOTE:

None. COMMENTS:

_______ SAT

_______ UNSAT STEP 17 Candidate Reports completion of Task to Shift Manager END OF JPM STOP TIME:

____________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

__________________________________________________________________________________

__ ____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________ ____________________________________________________________________________________

____________________________________________________________________________________

Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Initial Conditions Both units are at 100% power when a lightning strike trips 2G screenwell transformer.

Alarm VSP L

-7 "LLIS TROUBLE" and VSP

-K6 "500KV HSE TRBL" have alarmed eight (8) minutes ago.

Security reports a lightning strike in the vicinity of the low level intake.

All Unit 2 Circulating Water Pumps were initially running. Unit One and Unit Two Reactor Operators are currently throttling CW MOVs to conserve intake canal level. Initiating Cue You are the Unit 1 BOP.

You are to respond to the loss of Circulating Water Pumps.

When you finish the actions necessary to accomplish this, please inform me.

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions Both units are at 100% power when a lightning strike trips 2G screenwell transformer.

Alarm VSP L

-7 "LLIS TROUBLE" and VSP

-K6 "500KV HSE TRBL" have alarmed eight (8) minutes ago.

Security reports a lightning strike in the vicinity of the low level intake.

All Unit 2 Circulating Water Pumps were initially running. Unit One and Unit Two Reactor Operators are currently throttling CW MOVs to conserve intake canal level.

Initiating Cue You are the Unit 1 BOP.

You are to respond to the loss of Circulating Water Pumps.

When you finish the actions necessary to accomplish this, please inform me.

Surry 2014-301 "JPM h" Page 1 of 7 U.S. Nuclear Regulatory Commission Surry Power Station SR14301 Simulator Job Performance Measure [KA 064.A4.06

] [Alternate Path]

Applicant________________________________

Start Time___________________

Examiner_______________________________

Date ___________________________________

Stop Time___________________

Title Respond to a Failure of #3 EDG to Start and Load on 1J 4160V Bus.

K/A: 064.A4.06

Manual start, loading, and stopping of the ED/G, RO 3.9 / SRO 3.9 Applicability Estimated Time Actual Time RO 20 Minutes

___ Minutes Conditions Task is to be PERFORMED in the simulator.

A Loss of the "A" RSS Transformer has occurred

. #3 EDG has failed to start and load.

Standards

  1. 3 EDG started and loaded on the 1J Emergency Bus IAW 0

-AP-17.05, EDG 3

- Emergency Operations

. Initiating Cue

Shift Manager Direction

. Terminating Cues Report of #3 EDG loaded on the 1J Emergency Bus

. Procedures

0-AP-17.05, EDG 3

- Emergency Operations, Revision 22.

Tools and Equipment Safety Considerations None None Surry 2014-301 "JPM h" Page 2 of 7 Simulator Setup Call up 100% power IC and initialize (IC 280). Place simulator in RUN.

Load the following Malfunctions/Overrides:

EL0501, Loss of reserve Station Service XMFMR A, TRUE ED0503, EDG3 Voltage Regulator Failure,

-1 VSPC5 EMERG DIESEL 3 Auto Start Disabled, Trigger 15 Remotes, EDG3, AUTO_EXERCISE, EMERG GEN 3 AUTO EXERCISE, EXERCISE When #3 EDG placed in AUTO implement Trigger 15

. When STOP buttons pushed delete VSPC5 malfunction

. Acknowledge Alarms.

Freeze and Snap IC until ready for evaluation.

Initial Conditions

Unit 1 operating at 100% power

. The Loss of the "A" RSST has occurred and #3 EDG has failed to start and load on 1J 4160V Bus

. Starting and loading #3 EDG on the 1J 4160V bus IAW 0

-AP-17.05, EDG 3

- Emergency Operations is in progress and is complete through step 3 of Attachment 2

. Initiating Cues You are the Unit 2 BOP and are to continue with starting and loading of #3 EDG per 0

-AP-17.05, starting with Attachment 2 step 4

. When you finish the actions necessary to accomplish this, please inform me.

Notes Surry 2014-301 "JPM h" Page 3 of 7 PERFORMANCE CHECKLIST Notes to the Evaluator This JPM may be Pre-briefed as directed by the Chief Examiner.

Task critical elements are bolded and denoted by an asterisk (

  • ). An additional instructor may be needed to silence and acknowledge alarms for the examinee, and perform actions for Unit 2

. START TIME

_____:

STEP 1: [Step 4, 5, and 6 of Attachment 2, AP

-17.05] Check Load Limit at maximum, Start EDG 3, Check #3 EDG Speed at 900 RPM, Place #3 EDG AUTO EXERCISE Switch in Auto.

STANDARD:

  • a) Candidate presses the EDG NO. 3 Engine Start pushbutton.

This is a critical step. b) Candidate will check EDG started using RPM indication.

  • c) Candidate will place the AUTO

-EXERCISE Switch for EDG #3 in AUTO position.

This is a critical step.

d) Candidate will note that #3 EDG has not energized the 1J Bus.

e) Candidate returns to AP

-17.05, Step 8.

EVALUATOR'S NOTE:

COMMENTS:

STEP 2: [Step 8, AP

-17.05]

CHECK BOTH J BUSES

- ENERGIZED BY OFFSITE POWER STANDARD:

a) Candidate Identifies 1J Bus is still de

-energized.

b) Candidate Goes To Step 10

. EVALUATOR'S NOTE:

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM h" Page 4 of 7 STEP 3: [Notes prior to Step 10 of AP

-17.05] Acknowledges NOTES:

If the B DC Bus is deenergized, the EDG output breaker and the J Bus load breakers must be closed manually.

The following conditions must exist for the EDG output breaker to close automatically:

EDG speed greater than 870 rpm EDG INCOMING voltage greater than 113 volts J8 breaker open Control switch for the J3 breaker in AUTO AFTER TRIP DC control power available to the J3 breaker STANDARD:

EVALUATOR'S NOTE:

COMMENTS:

_______ SAT

_______ UNSAT STEP 4: [Step 10, AP

-17.05]

CHECK EDG 3

- SUPPLYING J BUS STANDARD:

a) Candidate Identifies 15J3 - NOT Closed.

b) Candidate performs RNO. Identifies that loads are already stripped per Attachment 3.

c) Candidate goes to step 15 EVALUATOR'S NOTE:

COMMENTS:

_______ SAT

_______ UNSAT STEP 5: [Step 15, AP-17.05] CHECK EDG 3 INCOMING VOLTAGE GREATER THAN 113 VOLTS.

STANDARD:

a) *Candidate turns SYNC

-ACB-15J3 key switch to ON

. This is a critical step.

b) *Candidate identifies no generator voltage and momentarily depresses EMERG GEN NO 3 FIELD FLASS pushbutton

. Identifies Voltage established. This is a critical step.

c) *Candidate attempts to raise incoming voltage to 120 volts using the EMERG GEN NO 3 VOLT ADJ control switch. This is a critical step.

d) Candidate determines there is no Voltage increase, and goes to 15.c RNO.

EVALUATOR'S NOTE:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM h" Page 5 of 7 COMMENTS:

STEP 6: [Step 15.c RNO, AP

-17.05] SECURES #3 EDG.

STANDARD:

a) Candidate notifies Electrical Department

. b) *Candidate secures #3 EDG by momentarily pressing the EMERG GEN NO.3 ENGINE STOP pushbutton

s. This is a critical step.

c) Candidate notifies Shift Manager.

EVALUATOR'S NOTE:

If asked to notify the Electrical department: Acknowledge request.

  • Both ENGINE STOP pushbuttons must be depressed simultaneously.

COMMENTS:

JPM ENDS _______ SAT

_______ UNSAT

STOP TIME_______:

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

Surry 2014-301 "JPM h" Page 6 of 7 Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Initial Conditions Unit 1 operating at 100% power.

The Loss of the "A" RSST has occurred and #3 EDG has failed to start and load on 1J 4160V Bus.

Starting and loading #3 EDG on the 1J 4160V bus IAW 0

-AP-17.05, EDG 3

- Emergency Operations is in progress and is complete through step 3 of Attachment 2.

Initiating Cues You are the Unit 2 BOP and are to continue with starting and loading of #3 EDG per 0

-AP-17.05, starting with Attachment 2 step 4

. When you finish the actions necessary to accomplish this, please inform me.

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions Unit 1 operating at 100% power.

The Loss of the "A" RSST has occurred and #3 EDG has failed to start and load on 1J 4160V Bus.

Starting and loading #3 EDG on the 1J 4160V bus IAW 0

-AP-17.05, EDG 3

- Emergency Operations is in progress and is complete through step 3 of Attachment 2.

Initiating Cues You are the Unit 2 BOP and are to continue with starting and loading of #3 EDG per 0

-AP-17.05, starting with Attachment 2 step 4

. When you finish the actions necessary to accomplish this, please inform me.

Surry 2014-301 "JPM i" Page 1 of 13 U.S. Nuclear Regulatory Commission Surry Power Station SR14301 Job Performance Measure [KA APE068.AA1.21 3.9/4.1

] Applicant________________________________

Start Time___________________

Examiner_______________________________

Date ___________________________________

Stop Time___________________

Title LOCALLY TRANSFER INDIVIDUAL COMPONENTS TO THE AUX SHUTDOWN PANEL K/A: APE068.AA1.21 Ability to operate and / or monitor the following as they apply to the Control Room Evacuation: Transfer of controls from control room to shutdown panel or local control 3.9 / 4.1 Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 20 Minutes ___ Minutes Conditions Task is to be SIMULATED in the plant beginning at the Unit 1 Aux Shutdown Panel

. A limiting MCR fire has occurred. The MCR has been evacuated and attempts are being made to transfer plant control to the ASD Panel. Neither the H

-Group nor the J

-Group Transfer Switch will actuate its components.

The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel.

The H and J Group Transfer Switches have failed to function.

Standards FCA-1.00, Attachment

2. Initiating Cues FCA-1.00, Limiting MCR Fire, Step 16 RNO Shift Manager direction.

Terminating Cues

Report received that FCA

-1.00, Attachment 2 completed for Unit 1 components.

Procedures

FCA-1.00, Limiting MCR Fire, Attachment 2, Rev 48.

Tools and Equipment Safety Considerations

None Standard Personal Safety Equipment

Surry 2014-301 "JPM i" Page 2 of 13 Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.

The MCR was evacuated due to a fire.

The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel.

The H and J Group Transfer Switches have failed to function.

Initiating Cue Locally transfer the individual Unit 1 components to the Unit 1 Aux Shutdown Panel in accordance with FCA

-1.00, Attachment 2, Override Control to Auxiliary Shutdown Panel.

When you finish the actions necessary to accomplish this, please inform me.

Notes to the Evaluator:

Operator briefing should occur at the Unit 1 Aux Shutdown Panel.

This task is to be SIMULATED. Do NOT allow the operator to manipulate controls, operate switches or reposition valves.

Task critical elements are denoted by an asterisk (

  • ). If substeps of a critical element also have an asterisk (
  • ), then only those asterisked substeps are critical to performance of that task element.

Critical step sequencing requirements: None

Surry 2014-301 "JPM i" Page 3 of 13 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (

  • ). START TIME_______:

STEP 1: 0-FCA-1.00, Attachment 2 (Caution Prior to Step

1) REVIEWS CAUTION PRIOR TO STEP 1.

Standards Notes that this Attachment should not be performed if transfer failure is due to the emergency bus being de

-energized Cues If asked: Both emergency buses are energized on Unit 1.

Evaluator's Comments

_______ SAT

_______ UNSAT

STEP 2: 0-FCA-1.00, Attachment 2 (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

Standards

(a) Proceeds to H Bus 4160v breaker 15H4.

  • (b) Places 1-FW-P-3A's local control box Mode switch (1

-EP-43-15H4) to OVERRIDE position.

  • (c) Rotates Transfer switch (1

-EP-43X-15H4) to AUX P position

. Evaluator's Note: If Asked at the ASP: Following Step b) and c) above, 1

-FW-P-3A breaker indicating lights, RED light LIT, GREEN light OFF.

Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM i" Page 4 of 13 STEP 3:

0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-CH-P-1A. Standards (a) Proceeds to H Bus 4160v breaker 15H5.

  • (b) Places 1-CH-P-1A's local control box Mode switch (1

-EP-43A-15H5) to OVERRIDE position.

  • (c) Rotates Transfer switch (1-EP-43X-15H5) to AUX P position

. Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-CH-P-1A breaker indicating lights, RED and GREEN OFF (control switch in PTL).

Evaluator's Comments

_______ SAT

_______ UNSAT STEP 4: 0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-CH-P-1C (NORM).

Standards (a) Proceeds to H Bus 4160v breaker 15H6.

  • (b) Places 1-CH-P-1C's local control box Mode switch (1

-EP-43-15H6) to OVERRIDE position.

  • (c) Rotates Transfer switch (1

-EP-43X-15H6) to AUX P position

. Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-FCH-P-1C breaker indicating lights, RED light LIT, GREEN light OFF.

Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM i" Page 5 of 13 STEP 5: 0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-CH-P-1C (ALT).

Standards (a) Proceeds to J Bus 4160v breaker 15J2.

  • (b) Places 1-CH-P-1C's (ALT) local control box Mode switch (1

-EP-43-15J2) to OVERRIDE position

  • (c) Rotates Transfer switch (1

-EP-43X-15J2) to AUX P position.

Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-CH-P-1C (ALT) breaker indicating lights, RED light and GREEN light OFF (switch in PTL).

Evaluator's Comments

_______ SAT

_______ UNSAT STEP 6: 0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

6. LOCALLY TRANSFERS 1

-FW-P-3B. Standards (a) Proceeds to J Bus 4160v breaker 15J4.

  • (b) Places 1-FW-P-3B's local control box Mode switch (1

-EP-43-15J4) to OVERRIDE position

  • (c) Rotates Transfer switch (1-EP-43X-15J4) to AUX P position.

Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-FW-P-3B breaker indicating lights, RED light LIT, GREEN light OFF.

Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM i" Page 6 of 13 STEP 7:

0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-CH-P-1B. Standards

(a) Proceeds to J Bus 4160v breaker 15J5.

  • (b) Places 1-CH-P-1B's local control box Mode switch (1

-EP-43A-15J5) to OVERRIDE position

  • (c) Rotates Transfer switch (1

-EP-43X-15J5) to AUX P position.

Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-CH-P-1B breaker indicating lights, RED light and GREEN light OFF (switch in PTL).

Evaluator's Comments

_______ SAT

_______ UNSAT STEP 8: 0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-MS-SOV-102A. Standards (a) Proceeds to Aux SD Panel, locates Transfer Relay Cabinet 5.

  • (b) Places 1-MS-SOV-102A's local control box Mode switch (1

-MS-43B-SMS102A) to OVERRIDE position

  • (c) Rotates Transfer switch (1

-MS-43X-SMS102A) to AUX PANEL position.

Cues If asked at ASP: RED Light LIT, GREEN light OFF, switch in CLOSE position

. Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM i" Page 7 of 13 STEP 9:

0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-MS-SOV-102B. Standards

(a) Locates Transfer Relay Cabinet #3 (left of Aux SD Panel).

  • (b) Places 1-MS-SOV-102B's local control box Mode switch (1

-MS-43B-SMS102B) to OVERRIDE position

  • (c) Rotates Transfer switch (1

-MS-43X-SMS102B) to AUX P position

. Cues If asked at ASP: RED light ON, GREEN light OFF, switch in CLOSE position

. Evaluator's Comments

_______ SAT

_______ UNSAT STEP 10: 0-FCA-1.00, Attachment 2, (Step 1, Page 2) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-FW-MOV-151A. Standards (a) Proceeds to Unit 1 Cable Vault Transfer Relay Cabinet 1.

  • (b) Places 1-FW-MOV-151A's local control box Mode switch (1

-FW-43B-FW151A) to OVERRIDE position

  • (c) Rotates Transfer switch (1

-FW-43X-FW151A) to AUX P position

. Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-FW-MOV-151A indicating lights, RED light LIT, GREEN light OFF.

Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM i" Page 8 of 13 STEP 11:

0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-FW-MOV-151C. Standards

(a) Locates appropriate switch on Transfer Relay Cabinet 1.

  • (b) Places 1-FW-MOV-151C's local control box Mode switch (1

-FW-43B-FW151C) to OVERRIDE position

  • (c) Rotates Transfer switch (1

-FW-43X-FW151C) to AUX P position

. Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-FW-MOV-151C indicating lights, RED light LIT, GREEN light OFF.

Evaluator's Comments

_______ SAT

_______ UNSAT STEP 12: 0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-FW-MOV-151E. Standards (a) Locates appropriate switch on Transfer Relay Cabinet 1.

  • (b) Places 1-FW-MOV-151E's local control box Mode switch (1

-FW-43B-FW151E) to OVERRIDE position

  • (c) Rotates Transfer switch (1

-FW-43X-FW151E) to AUX P position.

Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-FW-MOV-151EA indicating lights, RED light LIT, GREEN light OFF.

Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM i" Page 9 of 13 STEP 13:

0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-CH-P-2A. Standards

(a) Locates appropriate switch on Transfer Relay Cabinet 1.

  • (b) Places 1-CH-P-2A's local control box Mode switch (1

-CH-43B-CH2A) to OVERRIDE position

  • (c) Rotates Transfer switch (1

-CH-43X-CH2A) to AUX P position

. Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-CH-P-2A indicating lights, RED SLOW light LIT, switch in "A". Evaluator's Comments

_______ SAT

_______ UNSAT STEP 14: 0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-FW-MOV-151B. Standards (a) Proceeds to Unit 1 Cable Vault Transfer Relay Cabinet #2.

  • (b) Places 1-FW-MOV-151B's local control box Mode switch (1

-FW-43B-FW151B) to OVERRIDE position

  • (c) Rotates Transfer switch (1

-FW-43X-FW151B) to AUX P position

. Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-FW-MOV-151B indicating lights, RED light LIT, GREEN light OFF.

Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM i" Page 10 of 13 STEP 15:

0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-FW-MOV-151D. Standards

(a) Locates appropriate switch on Transfer Relay Cabinet #2

  • (b) Places 1-FW-MOV-151D's local control box Mode switch (1

-FW-43B-FW151D) to OVERRIDE position.

  • (c) Rotates Transfer switch (1

-FW-43X-FW151D) to AUX P position

. Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-FW-MOV-151D indicating lights, RED light LIT, GREEN light OFF.

Evaluator's Comments

_______ SAT

_______ UNSAT STEP 16: 0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-FW-MOV-151F. Standards (a) Locates appropriate switch on Transfer Relay Cabinet #2

  • (b) Places 1-FW-MOV-151F's local control box Mode switch (1

-FW-43B-FW151F) to OVERRIDE position

  • (c) Rotates Transfer switch (1

-FW-43X-FW151F) to AUX P position.

Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-FW-MOV-151F indicating lights, RED light LIT, GREEN light OFF.

Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM i" Page 11 of 13 STEP 17:

0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-CH-P-2B. Standards

(a) Locates appropriate switch on Transfer Relay Cabinet #2

  • (b) Places 1-CH-P-2B's local control box Mode switch (1

-CH-43B-CH2B) to OVERRIDE position

  • (c) Rotates Transfer switch (1

-CH-43X-CH2B) to AUX P position

. Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-CH-P-2B indicating lights, RED SLOW light LIT, GREEN light OFF, switch in "S".

Evaluator's Comments

_______ SAT

_______ UNSAT STEP 18: 0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-CH-MOV-1350. Standards

(a) Proceeds to Unit 1 Cable Vault Transfer Relay Cabinet 4.

  • (b) Places 1-CH-MOV-1350's local control box Mode switch (1

-CH-43B-1350) to OVERRIDE position.

  • (c) Rotates Transfer switch (1

-CH-43X-1350) to AUX P position

. Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-CH-MOV-1350 indicating lights, GREEN light LIT, RED light OFF.

IF Asked at the ASP: All components indicate shifted to ASP Control.

Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM i" Page 12 of 13 REPORTS TO SHIFT MANAGER (EVALUATOR).

Standards Verbal status report made that all affected Unit 1 components locally transferred to Aux Shutdown Panel.

STOP TIME: ______

Evaluator's Comments

Evaluator's Note If Asked: Components shown below indicate status.

1-FW-P-3A 1-MS-SOV-102A 1-MS-SOV-102B 1-FW-P-3B Red Lite LIT Red Lite LIT Both Red Lites LIT Red Lite LIT 1-CH-P-1A 1-CH-P-1C 1-CH-P-1B 1-CH-P-1C (Alt) No Lites (PTL)

Red Lite Lit No Lites (PTL)

No Lites (PTL) 1-FW-MOV-151A 1-FW-MOV-151E 1-FW-MOV-151D 1-FW-MOV-151B Red Lite LIT Red Lite LIT Red Lite LIT Red Lite LIT 1-FW-MOV-151C 1-FW-MOV-151F Red Lite LIT Red Lite LIT 1-CH-P-2A 1-CH-P-2B Red SLOW LIT Red SLOW LIT Switch in "A" Switch in "S"

Surry 2014-301 "JPM i" Page 13 of 13 STOP TIME:

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

__________________________________________________________________________________

__ ____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________ ____________________________________________________________________________________

____________________________________________________________________________________

Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.

The MCR was evacuated due to a fire.

The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel The H and J Group Transfer Switches have failed to function.

Initiating Cue Locally transfer the individual Unit 1 components to the Unit 1 Aux Shutdown Panel in accordance with FCA

-1.00, Attachment 2, Override Control to Auxiliary Shutdown Panel.

When you finish the actions necessary to accomplish this, please inform me.

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.

The MCR was evacuated due to a fire.

The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel

The H and J Group Transfer Switches have failed to function.

Initiating Cue Locally transfer the individual Unit 1 components to the Unit 1 Aux Shutdown Panel in accordance with FCA

-1.00, Attachment 2, Override Control to Auxiliary Shutdown Panel.

When you finish the actions necessary to accomplish this, please inform me.

Surry 2014-301 "JPM j" Surry SR14301 1 of 10 U.S. Nuclear Regulatory Commission Surry Power Station SR14301 Job Performance Measure 076A2.01 (3.5/3.7)

[ALTERNATE PATH]

Applicant________________________________

Start Time___________________

Examiner_______________________________

Date ___________________________________

Stop Time___________________

Title ISOLATE SERVICE WATER TO #3 MER DURING FLOODING K/A: 076A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the SWS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations; Loss of SWS. (3.5/3.7)

Applicability Estimated Time Actual Ti me RO/SRO(D) 15 Minutes

__________

Conditions Task is to be SIMULATED in the plant.

Any plant mode/condition where a large SW leak in #3 MER has occurred.

Standards Flooding isolated to #3 MER as indicated by decreasing water level in accordance with 0

-AP-13.00 steps 38 and 39. Initiating Cues 0-AP-13.00, Turbine Building or #3 MER Flooding, Step 3

8. Shift Manager direction.

Terminating Cues 0-AP-13.00, Turbine Building or #3 MER Flooding, Step 3 9 completed.

Procedures 0-AP-13.00, Turbine Building or #3 MER Flooding, Revision 28

.

Surry 2014-301 "JPM j" Surry SR14301 2 of 10 Tools and Equipment Safety Considerations None Standard Personal Safety Equipment Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.

There is a major Service Water leak in #3 MER.

1-SW-P-10B and 2

-SW-P-10B have been secured.

1-VS-E-4A, 4B, and 4C have been secured.

MER 3 Watertight Door has been checked closed.

Initiating Cues The team has reached step 37 of 0

-AP-13.00, Turbine Building or #3 MER Flooding.

You are to isolate Service Water to #3 MER in accordance with Steps 38 and 39 of 0

-AP-13.00, Turbine Building or #3 MER Flooding.

Notes to the Evaluator

. Task briefing should occur in the pre-determined location

.

Surry 2014-301 "JPM j" Surry SR14301 3 of 10 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (*)

. START TIME:

STEP 1:

[Step 38a, AP

-13.00] ISOLATE SW TO MER 3:

a) Fail 1-SW-263 closed by opening Circuit 8 on Lighting Panel 2T3 (located north of 2

-FW-E-2A) STANDARD:

Locates lighting panel 2T3 (located north of 2

-FW-E-2A). *b) Opens circuit 8 on lighting panel 2-EP-LP-2T3- this is a critical step.

EVALUATOR'S NOTE:

None COMMENTS:

_______ SAT

_______ UNSAT

STEP 2:

STEP 38b- Verify open or open 1

-SW-500, SW Header Crosstie (MER 4)

STANDARD:

(a) Proceeds to #4 MER.

(b) Locates manual valve 1

-SW-500 (halfway across room under smoke detector).

(c) *Pulls pin from handwheel actuator.

This is a critical step.

(d) *Opens 1-SW-500 by rotating valve handwheel in the clockwise direction

- This is a critical step.

Evaluator's Cues Tell operator:

Actual valve position in plant may be open or closed. Provide appropriate cue

. Point at "CLOSED" indicator

.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM j" Surry SR14301 4 of 10 STEP 3: Step 38c- Close 2-SW-476, Water Box 2C Isol (MER 4)

STANDARD:

(a) Locates 2

-SW-476 (in #4 MER 2/3 of the way across the room on the right hand side. (b) Attempts to close 2

-SW-476 by removing the locking pin and rotating the handwheel clockwise.

(c) Recognizes that 2

-SW-476 will not close and transitions to step 38c RNO column.

Evaluator's Cues Tell operator:

As operator attempts to close valve, the handwheel will not move.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM j" Surry SR14301 5 of 10 STEP 4: Step 38c RNO- Do the following:

1) Verify open or open 2

-SW-533. 2) Close 2

-SW-474, located in Unit 2 BC HX SW MOV pit. STANDARD:

(a) *Opens 2-SW-533 (MER-5) - by rotating valve handwheel in the counter-clockwise direction.

This is a critical step.

(b) Proceeds to Unit 2 BC HX SW MOV pit.

(c) Locates manual valve 2

-SW-474. (d) *Closes 2-SW-474 by removing the locking pin and rotating valve handwheel in the clockwise direction

- this is a critical step.

Evaluator's Cues For 2-SW-533, provide appropriate cue based on actual initial valve position in plant. If asked: After trainee identifies 2

-SW-474, if expected mark number not verbalized, ask the trainee what they expect the label to read, then tell trainee the label reads 2

-SW-474. If wrong valve identified, tell trainee that what they expected is not what it reads.

If asked: Security has been notified for entry.

Evaluator's Note Safety concern: Trainee does not have to travel down into the valve pits. He can identify which label he is looking at, tell the evaluator what he expects the label to read, and if correct (at the BC HX SW MOV PIT

), the evaluator can then state the label reads 2

-SW-474. The trainee can describe actions to complete valve manipulation from above.

Security concern: Certain valve pits are now covered by grates. If the enclosure is to be opened, security should be contacted. It is acceptable for the trainee to describe the actions required to raise the grate(s)

- utilize hand crank to raise the grating access door

. COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM j" Surry SR14301 6 of 10 STEP 5: Step 38d- Close 2-SW-478, SW Header Crosstie. (MER 4)

STANDARD:

(a) Locates 2

-SW-478 (in #4 MER 2/3 of the way across the room on the right hand side). (b) Pulls pin from handwheel actuator.

(c) *Closes 2-SW-478 by rotating valve handwheel in the clockwise direction

- This is a critical step.

Evaluator's Cues Tell operator:

Provide appropriate cue for valve operation based on actual in plant valve position.

Safety concern: Trainee does not have to crawl across pipes to check the valve labels at the east end of the #4 MER. He can identify which valve label he is looking at, and the evaluator can state the label reads "2

-SW-478" if the correct label is identified. The trainee can then describe the required actions to complete valve manipulation from the west end of #4 MER.

. COMMENTS:

_______ SAT

_______ UNSAT STEP 6: Step 38e- SECURE CHEMICAL INJECTION TO MER 3 SW SUPPLY HEADER IAW 0

-OP-SW-006, MER 3 AND MER 4 SERVICE WATER CHEMICAL INJECTION OPERATION STANDARD:

(a) Notifies Shift Manager (Evaluator) that Chemical Injection to MER 3 SW Supply Header needs to be secured IAW 0

-OP-SW-006. Evaluator's Cues Tell operator:

Unit 1 Turbine Building Operator will secure chemical injection.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM j" Surry SR14301 7 of 10 STEP 7: Step 39- CHECK WATER LEVEL IN MER 3 ON MER 4 GAUGE 2

-PL-LI-201 - DECREASING STANDARD:

(a) Locates MER 3 level gauge 2

-PL-LI-201 in MER 4.

(b) Checks that level in MER 3 is decreasing.

Evaluator's Cues Tell operator:

After the operator locates MER 3 level gauge, tell him the level is 50" H2O and slowly decreasing.

COMMENTS:

_______ SAT

_______ UNSAT STEP 8: REPORT TO SHIFT SUPERVISOR (EVALUATOR).

STANDARD:

Verbal status report that steps 3 8 and 39 of 1-AP-13.00 are complete.

EVALUATOR'S NOTE: N/A STOP TIME:

COMMENTS:

_______ SAT

_______ UNSAT STOP TIME:

______________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

Surry SR14301 8 of 10 Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.

There is a major Service Water leak in #3 MER.

1-SW-P-10B and 2-SW-P-10B have been secured.

1-VS-E-4A, 4B, and 4C have been secured.

MER 3 Watertight Door has been checked closed.

Initiating Cues

The team has reached step 37 of 0

-AP-13.00, Turbine Building or #3 MER Flooding.

You are to isolate Service Water to #3 MER in accordance with Steps 38 and 39 of 0

-AP-13.00, Turbine Building or #3 MER Flooding.

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.

There is a major Service Water leak in #3 MER.

1-SW-P-10B and 2

-SW-P-10B have been secured.

1-VS-E-4A, 4B, and 4C have been secured.

MER 3 Watertight Door has been checked closed.

Initiating Cues The team has reached step 37 of 0

-AP-13.00, Turbine Building or #3 MER Flooding.

You are to isolate Service Water to #3 MER in accordance with Steps 38 and 39 of 0

-AP-13.00, Turbine Building or #3 MER Flooding.

Surry 2014-301 "JPM k" Page 1 of 16 U.S. Nuclear Regulatory Commission Surry Power Station SR14301 Simulator Job Performance Measure [KA 061K4.01 4.1/4.2

] [Alternate Path]

Applicant________________________________

Start Time___________________

Examiner_______________________________

Date ___________________________________

Stop Time___________________

Title LOCALLY SWAP THE AFW PUMP SUPPLY TO THE FIRE WATER ALTERNATE SOURCE (Faulted)

K/A: Knowledge of AFW design feature(s) and/or interlock(s) which provide for the following: Water sources and priority of use

. 4.1/4.2. Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 25 Minutes ___ Minutes Conditions Task is to be SIMULATED in the plant.

A simulated loss of secondary heat sink is in progress. Both the ECST and underground tank levels are below 20% and it is desired to swap AFW pump suction to the Fire Main.

Standards 2-FR-H.1, Attachment 1, part 4 Self-Checking (STAR) practices will be used throughout task performance.

Operations Department Standards shall be adhered to.

Terminating Cues

Report received that alternate source aligned to AFW pumps.

Any failure criteria listed under the Evaluation Criteria section above has been met.

Candidate states "Task is complete."

Procedures 2-FR-H.1, Attachment 1, part 4, Rev 36 Tools and Equipment Safety Considerations None Standard PPE Required.

Surry 2014-301 "JPM k" Page 2 of 16 Initial Conditions Unit 2 is currently experiencing a loss of secondary heat sink and the team is currently at step 3 of 2-FR-H.1, Response to Loss of Secondary Heat Sink.

AFW cross

-tie from Unit 1 is unavailable

. An operator has attempted to open 2-CN-150 and the valve is stuck CLOSED.

. Initiating Cues Align an alternate suction source to the Aux Feedwater pumps using the most preferred source available in accordance with 2

-FR-H.1, Attachment 1.

Notes to the Evaluator

Brief of this JPM may be accomplished in the RP Briefing Room, outside of the RCA This task is to be SIMULATED. Do NOT allow the operator to manipulate controls, operate switches or reposition valves.

Surry 2014-301 "JPM k" Page 3 of 16 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (

  • ). START TIME_______:

STEP 1: 2-FR-H.1, Attachment 1, Part 1 Select one of the following methods as an alternate source of Auxiliary Feedwater.

Makeup to 2

-CN-TK-1 from 2-CN-TK-2 Standards (a) Identifies this source is not available from initial conditions

. Evaluator's Cues When attempts are made to open the valve, the handwheel will not turn with the chain. The valve is jammed closed.

Evaluator's Notes 2-CN-150 is stuck closed

. Evaluator's Comments

_______ SAT

_______ UNSAT STEP 2: 2-FR-H.1, Attachment 1, Part 2 Alignment of AFW Booster Pump(s)

DETERMINES AFW BOOSTER PUMPS ARE NOT AVAILABLE Standards (a) Check 2-CN-TK-3 level > 20%

. Evaluator's Cues Inform operator that 2

-CN-TK-3 level is < 10%

. Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM k" Page 4 of 16 STEP 3: 2-FR-H.1, Attachment 1, Part 3.

Cross-tie from Unit 1.

Standards Based on directions given to operator, determines AFW crosstie from Unit 1 unavailable.

Evaluator's Cues As the Shift Manager, I need you to determine an alternate method based on the information given.

Evaluator's Comments

_______ SAT

_______ UNSAT STEP 4: 2-FR-H.1, Attachment 1, Part, (Step 4a) Fire Water Alignment to AFW Pumps.

LOCALLY CLOSE THE FIRE MAIN ISOLATION VALVES TELL

-TALE DRAIN, 2

-FW-119 Standards (a) Proceeds to Unit 2 safeguards steam side.

(b) Closes 2-FW-119 by turning handwheel in the clockwise direction.

Evaluator's Cues When the valve is operated properly, the valve stem inserts until the handwheel will not turn. Evaluator's Notes 2-FW-119 is located between the fire main isolation valves near the stairway to the upper levels and is normally open.

Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM k" Page 5 of 16 STEP 5: 2-FR-H.1, Attachment 1, Part 4, (Step b.)

Locally open fire main isolation valves:

Standards

  • (a) Opens 2-FW-120 by turning handwheel in the counter

-clockwise direction

. *(b) Opens 2-FW-185 by turning handwheel in the counter

-clockwise direction

. Cues Provide cues valve stems rise as FW

-120 & FW-185 are properly operated.

Tell Operator:

After both FW

-120 & FW-185 opened, provide cues flow noise is momentarily heard through the valves.

Tell Operator:

If FW-119 NOT closed before opening FW

-120 & FW-185, provide cues water is spraying out from 2

-FW-119. Evaluator's Notes 2-FW-120 & -185 are located on ground level near stairway.

Evaluator's Comments

_______ SAT

_______ UNSAT STEP 6: 2-FR-H.1, Attachment 1, Part 4, (Step 4 c.)

Locally start diesel driven fire pump.

STANDARD:

a) Asks Shift Manager/Evaluator status of diesel driven fire pump

. EVALUATOR'S NOTE:

When asked: Diesel driven fire pump has been started

. COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM k" Page 6 of 16 STEP 7: 2-FR-H.1, Attachment 1, Part 4, (Step 4 d.)

Locally open fire water suction valves to available AFW pump(s):

STANDARD:

a) Acknowledges NOTE prior to Step d: The following steps should be used as needed to align water to each AFW pump one at a time and the MCR informed after each pump alignment is complete.

  • b) Opens 2-FW-154, (for 2

-FW-P-2) *c) Opens 2-FW-169, (for 2

-FW-P-3A) *d) Opens 2-FW-184, (for 2

-FW-P-3B) Evaluator's Cues Provide cues valve stems rise as each valve is properly operated.

If Notified:

acknowledge opening 2

-FW-154 / 169 / 184 as MCR Operator.

If Asked:

Inform Candidate that Unit 2 AFW Pumps have been secured due to cavitation.

EVALUATOR'S NOTE:

Candidate inform s MCR (Evaluator) following manipulation of each individual valve or wait until all valves for each pump have been manipulated.

(Steps 8, 9, and 10 describe valve operations).

COMMENTS:

_______ SAT

_______ UNSAT STEP 8: 2-FR-H.1, Attachment 1, Part 4, (Step 4 d.)

LOCALLY CHECK AFW PUMP SUCTION PRESSURE AVAILABLE Standards Checks each AFW pump suction pressure gauge to verify pressure available:

(a) 2-FW-PI-256A (for 2

-FW-P-2), (b) 2-FW-PI-256B (for 2

-FW-P-3A), (c) 2-FW-PI-256C (for 2-FW-P-3B). Evaluator's Cues Provide cues each gauge indicates full range (>

30 psig). Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM k" Page 7 of 16 STEP 9: 2-FR-H.1, Attachment 1, Part 4, (Step 4 f.)

LOCALLY CLOSE THE NORMAL AFW PUMP SUCTION VALVES Standards Closes/verifies closed the other AFW pump suction paths:

  • (a) Closes 2-FW-153 (ECST to 2

-FW-P-2) by turning handwheel in the clockwise direction (b) Verifies 2

-FW-283 closed (booster pps to 2

-FW-P-2). *(c) Closes 2-FW-168 (ECST to 2-FW-P-3A) by turning handwheel in the clockwise direction (d) Verifies 2

-FW-284 closed (booster pps to 2

-FW-P-3A). *(e) Closes 2-FW-183 (ECST to 2

-FW-P-3B) by turning handwheel in the clockwise direction (f) Verifies 2

-FW-285 closed (booster pps to 2-FW-P-3B). Evaluator's Cues Provide cues valve stems go in as 2

-FW-153, -168 & -183 are properly operated.

Provide cues valve stems for 2

-FW-283, -284 & -285 are as indicated (~1/2 inch showing).

When notified: As each AFW pump valve alignment is complete, acknowledge completion of alignment as MCR Operator.

Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM k" Page 8 of 16 STEP 10: REPORTS TO SHIFT MANAGER (EVALUATOR)

Standards Verbal status report made that AFW pumps are on fire water suction per 2-FR-H.1, Attachment 1

. STOP TIME: ______________

Evaluator's Comments

_______ SAT

_______ UNSAT COMMENTS:

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Initial Conditions Unit 2 is currently experiencing a loss of secondary heat sink and the team is currently at step 3 of 2

-FR-H.1, Response to Loss of Secondary Heat Sink.

AFW cross

-tie from Unit 1 is unavailable.

An operator has attempted to open 2

-CN-150 and the valve is stuck CLOSED.

. Initiating Cues Align an alternate suction source to the Aux Feedwater pumps using the most preferred source available in accordance with 2

-FR-H.1, Attachment 1.

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions Unit 2 is currently experiencing a loss of secondary heat sink and the team is currently at step 3 of 2

-FR-H.1, Response to Loss of Secondary Heat Sink.

AFW cross-tie from Unit 1 is unavailable.

An operator has attempted to open 2

-CN-150 and the valve is stuck CLOSED.

. Initiating Cues Align an alternate suction source to the Aux Feedwater pumps using the most preferred source available in accordance with 2-FR-H.1, Attachment 1.

Surry 2014-301 "JPM a" Page 1 of 8 U.S. Nuclear Regulatory Commission Surry Power Station SR14301 Simulator Job Performance Measure APE001.AA2.05 (4.4/4.6) [Alternate Path]

Applicant________________________________

Start Time___________________

Examiner_______________________________

Date ___________________________________

Stop Time___________________

Title Respond to Continuous Rod Withdrawal K/A: Ability to determine and interpret the following as they apply to the Continuous Rod Withdrawal: Uncontrolled rod withdrawal, from available indications.

Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 3 Minutes ___ Minutes Conditions Task is to be PERFORMED in the simulator.

Plant is at 100% power with all systems in AUTO.

1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low

. 0-AP-53.00 actions have been completed with 1

-MS-PT-1447, Channel IV Turbine First Stage Pressure selected. All components have been returned to Automatic with the exception of Rod Control

. Standards Trip the Reactor in accordance with AP

-1.00. Initiating Cues Continuous rod withdrawal motion indicated.

Terminating Cues Unit 1 manual reactor trip implemented

. Procedures

0-AP-1.00, Rod Control System Malfunction, Rev. 26.

1-OP-ZZ-002, Maintenance of Plant Operations, Rev. 30.

Tools and Equipment Safety Considerations

None None Surry 2014-301 "JPM a" Page 2 of 8 Simulator Setup Reset to IC 271 OR Recall 100% IC

. Load the following malfunctions:

MS1401, 1st Stage PRSR TRNSMTR PT

-446 FAILURE,

-2 DEG, Trigger 1

. RD0102, CONT ROD WITHDRAWL ALL MODES, Trigger 3

. Load the following Switch Override:

RD, ROD_MOD_SEL_MAN, ON, Trigger 1, 8 second delay

. Place the Simulator in RUN

. Place the Main Feed Reg Valves in MANUAL

. Actuate Trigger 1

. Select PT

-447. Return the Main Feed Reg Valves to AUTO

. Acknowledge all alarms, place Rod Control Mode Selector Switch in MANUAL, place a "Pink" Ring on the Rod

. Switch, and allow cond itions to stabilize.

Place pink magnet on PT

-1446. Freeze and store until ready to RUN

. Initial Conditions Plant is at 100% power with all systems in AUTO.

1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low

. 0-AP-53.00 actions have been completed with 1

-MS-PT-1447, Channel IV Turbine First Stage Pressure

. selected. All components have been returned to Automatic with the exception of Rod Control

. Initiating Cues You are the Unit 1 Reactor Operator. Restore Control Bank "D" to 228 steps in three (3) step increments.

When complete, return Rod Control to AUTO

. When you have completed this task, please inform me

. Notes After the Candidate has completed the second 3-Step rod movement, Actuate Trigger 3.

Surry 2014-301 "JPM a" Page 3 of 8 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (

  • ). An additional instructor may be needed to silence and acknowledge alarms for the examinee.

START TIME: ___________

STEP 1: WITHDRAW CONTROL RODS IN THREE (3) STEP INCREMENTS

. (Step 1) STANDARD a) Checks ROD CONTROL MODE SEL switch in the MAN position.

b) Check ROD SPEED indicator (S1 408) indicates approximately 48 steps per minute. c) WITHDRAW control rods in 3

-step increments.

  • Move ROD MOTION IN/OUT/HOLD switch in the OUT direction.

This is a critical step.

Check ROD DIRECTION OUT light is LIT.

Release switch when rods are at desired height (3 steps)

. Check rod motion has stopped. EVALUATOR NOTE:

Operator may have to step in/out Rods 1/2 step to equalize group step counter indication.

COMMENTS:

_______ SAT

_______ UNSAT STEP 2: WITHDRAW CONTROL RODS IN THREE (3) STEP INCREMENTS. (Step 2)

STANDARD a) Checks ROD CONTROL MODE SEL switch in the MAN position.

b) Check ROD SPEED indicator (S1 408) indicates approximately 48 steps per minute. c) WITHDRAW control rods in 3

-step increments.

  • Move ROD MOTION IN/OUT/HOLD switch in the OUT direction.

This is a critical step.

Check ROD DIRECTION OUT light is LIT.

Release switch when rods are at desired height (3 steps).

Check rod motion has stopped.

EVALUATOR NOTE:

After rods have moved in the OUT direction, the malfunction will be entered to cause continuous outward rod motion in all ROD Control Modes

. _______ SAT

_______ UNSAT

Surry 2014-301 "JPM a" Page 4 of 8 COMMENTS:

STEP 3: CHECKS FOR CONTINUOUS ROD INSERTION OR WITHDRAWAL (Step 3) STANDARD:

a) Checks continuous outward rod motion by examining the following:

ROD DIRECTION OUT lamp lit, CERPIs and/or step counters indicate motion.

EVALUATOR'S NOTE:

COMMENTS:

_______ SAT

_______ UNSAT STEP 4: ATTEMPTS TO STOP ROD MOTION BY SWITCHING RODS TO MANUAL

. (Step 2) STANDARD:

a)

  • Rotates ROD CONT MODE SEL Switch from AUTO to MANUAL.

This is a critical step.

b) Determines that rod motion has not stopped by:

serving ROD DIRECTION OUT lamp lit, and/or observing rod step counters showing outward motion, and/or step counters making an audible "clicking" noise EVALUATOR'S NOTE:

Placing ROD CONT MODE SEL Switch to MANUAL is only a critical step if switch is in AUTO.

ROD CONT MODE SEL switch may be placed in AUTO. This is acceptable by OP

-ZZ-002 if Tave is within 1 degree of Tref.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM a" Page 5 of 8 STEP 5: INITIATES UNIT REACTOR TRIP

. (Step 2-RNO) STANDARD:

a) *Manually initiates reactor trip by depressing the Benchboard 1

-1 and/or Benchboard 1

-2 Reactor Trip pushbutton

. This is a critical step.

EVALUATOR'S NOTE:

COMMENTS:

_______ SAT

_______ UNSAT

STEP 6: REPORTS TO SHIFT MANAGER (EVALUATOR.

(Step 2-RNO) STANDARD:

a) Performs immediate actions of 1

-E-0. Check Rx. Trip by verifying all rods on bottom, Reactor trip and bypass breakers open, and neutron flux decreasing.

Checks Turbine Trip by manually tripping the turbine, checking all turbine stop valves are closed, isolating reheaters by closing 1

-MS-SOV-104 and checking the generator output breakers are open.

Checks both AC Emergency busses energized.

Checks if SI is actuated or if it is required.

b) Verbal status report made that immediate actions completed (with tripping of reactor).

EVALUATOR'S NOTE:

If operator continues with actions of verifying reactor trip by performing E

-0 immediate operator actions, let the operator continue E

-0 immediate action steps until completion

. When the candidate completes this step then inform the candidate that the task is complete COMMENTS:

_______ UNSAT STOP TIME:

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

Surry 2014-301 "JPM a" Page 6 of 8 ____________________________________________________________________________________

Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Task Task is to be performed in the simulator.

Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.

Initial Conditions Plant is at 100% power with all systems in AUTO.

1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low

. 0-AP-53.00 actions have been completed with 1

-MS-PT-1447, Channel IV Turbine First Stage Pressure selected. All components have been returned to Automatic with the exception of Rod Control

. Initiating Cues You are the Unit 1 Reactor Operator. Restore Control Bank "D" to 228 steps in three (3) step increments.

When complete, return Rod Control to AUTO.

When you have completed this task, please inform me

.

Surry 2014-301 "JPM a" Page 7 of 8 Reference for Evaluator

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions Plant is at 100% power with all systems in AUTO.

1-MS-PT-1446, Channel III Turbine First Stage Pressure has failed low

. 0-AP-53.00 actions have been completed with 1

-MS-PT-1447, Channel IV Turbine First Stage Pressure selected. All components have been returned to Automatic with the exception of Rod Control

. Initiating Cues You are the Unit 1 Reactor Operator. Restore Control Bank "D" to 228 steps in three (3) step increments.

When complete, return Rod Control to AUTO.

When you have completed this task, please inform me

.

Surry 2014-301 "JPM b" Page 1 of 13 U.S. Nuclear Regulatory Commission Surry Power Station SR14301 Simulator Job Performance Measure [KA 004A4.07 3.9/3.7

] Applicant________________________________

Start Time___________________

Examiner_______________________________

Date ___________________________________

Stop Time___________________

Title Perform an Alternate Dilution of the RCS.

K/A: Ability to manually operate and/or monitor in the control room: Boration/dilution 3.9 / 3.7 Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 10 Minutes

___ Minutes Conditions Task is to be Performed in the simulator.

A ramp increase in power is occurring which requires a dilution.

Standards 1-OP-CH-021, Alternate Dilution Using Blender

. Initiating Cues Reactivity SRO Direction

. A ramp increase in power requires a Dilution

. Terminating Cues Report to Shift Supervision, blender returned to automatic

. Procedures

1-OP-CH-021, Alternate Dilution Using Blender, Rev 16 Tools and Equipment Safety Considerations None None Surry 2014-301 "JPM b" Page 2 of 13 Simulator Setup Reset to IC 272 OR Call up 25% power IC and initialize. Place simulator in RUN.

Ramp the Unit to 30% power and match Tave and Tref.

Shift Station Service bus power from RSSTs to SSTs.

Set PG Flow Control 1

-CH-FC-1114A to 4.0 on the pot. Initial Conditions Unit 1 is at 30% power.

The 30% hold for a flux map on Unit 1 is complete.

Power escalation to 100% in accordance with 1

-GOP-1.5, Unit Startup, 2% to Reactor Power to Max Allowable Power, is about to recommence.

Initiating Cues You are to perform a 200 gallon Alternate Dilute only to the suction of the charging pump in accordance with 1

-OP-CH-021. When you finish the actions necessary to accomplish this task, please inform me.

Surry 2014-301 "JPM b" Page 3 of 13 PERFORMANCE CHECKLIST Notes to the Evaluator This JPM may be Pre-briefed as directed by the Chief Examiner

. Task critical elements are bolded and denoted by an asterisk (

  • ). An additional instructor may be needed to silence and acknowledge alarms for the examinee.

START TIME_______:

STEP 1: 1-OP-CH-021, Initial Conditions.

Check Primary Grade water is available to the Blender.

STANDARD:

a) Candidate checks PG pressure normal on Boron Recovery Panel

. EVALUATOR'S NOTE:

COMMENTS:

_______ SAT

_______ UNSAT STEP 2: 1-OP-CH-021, Precautions and Limitations.

Candidate reviews and initials Precautions and Limitations.

STANDARD:

a) Candidate Reviews and initials P&L 4.1 through 4.8. EVALUATOR'S NOTE:

None COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM b" Page 4 of 13 STEP 3:

1-OP-CH-021. (Step 5.1.1) Candidate acknowledges two (2) NOTES prior to Step 5.1.

Candidate Notifies Shift Supervision of Impending Dilution.

STANDARD:

a) Candidate acknowledges this subsection is used for the first dilution of the shift. Attachment 1 is used for subsequent dilutions.

b) Candidate identifies excess letdown NOT in service, 1

-OP-CH-007 not required.

c) Candidate Notifies Shift Supervision/Evaluator of impending Alternate Dilution.

EVALUATOR'S NOTE:

When notified: Acknowledge Candidate will be performing an Alternate Dilution.

COMMENTS:

_______ SAT

_______ UNSAT STEP 4: 1-OP-CH-021. (Step 5.1.2) Notify STA of impending Alternate Dilution.

STANDARD:

a) Candidate notifies STA/Evaluator of impending Alternate Dilute. EVALUATOR'S NOTE:

When notified: Acknowledge Candidate will be performing an Alternate Dilution

.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM b" Page 5 of 13 STEP 5:

1-OP-CH-021. (Step 5.1.3) Place the MAKE

-UP MODE CNTRL switch in STOP STANDARD:

a) Candidate p laces Blender Mode Control switch in STOP position

. b) Candidate Checks RED Light out and GREEN light illuminates.

EVALUATOR'S NOTE:

If asked: Acknowledge Candidates request for a peer check.

COMMENTS:

_______ SAT

_______ UNSAT STEP 6: 1-OP-CH-021. (Step 5.1.4) Adjust PG Flow Rate and Total gallons for the Dilution.

STANDARD:

a) Checks 1-CH-FC-1114A, PG Flow CNTRL set at 100 gpm (refers to Attachment 2, as necessary

. b) Determines required integrator setpoint by filling in blank for desired dilution, subtracting anticipated additional flow using P&L 4.7 as required, and writing 196 in GPM blank

. c) Enter value in 1

-YS-1114 PRI WATER SUP BATCH INTEGRATOR.

EVALUATOR'S NOTE:

If asked concerning a) above: PG Flow Control not previously set.

If asked concerning IV for Steps a) and b) above

State that the Candidate may assume an IV has been performed, please continue with the Task.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM b" Page 6 of 13 STEP 7:

1-OP-CH-021. (Step 5.1.5) Place the MAKE-UP MODE SEL switch in the ALT DIL position

. STANDARD:

  • a) Places the MAKE

-UP MODE SEL switch in the ALT DIL position

. This is a critical step.

EVALUATOR'S NOTE:

1-CH-FCV-1113A automatically CLOSES.

COMMENTS:

_______ SAT

_______ UNSAT STEP 8: 1-OP-CH-021. (Step 5.1.6) Place 1-CH-FCV-1114B, BLENDER TO VCT, in the CLOSE position.

STANDARD:

a) Candidate remembers from Directions that PG flow is to be aligned to the charging pump suction.

  • b) Places 1-CH-FCV-1114B, BLENDER TO VCT, in the CLOSE position.

This is a critical step.

EVALUATOR'S NOTE:

If asked: PG flow is to be aligned to the charging pump suction.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM b" Page 7 of 13 STEP 9:

1-OP-CH-021. (Step 5.1.7 and 5.1.8

) Place the MAKE-UP MODE CNTRL switch in the START position.

STANDARD:

  • a) Places the MAKE

-UP MODE CNTRL switch in the START position.

This is a critical step b) Checks the following conditions:

a. 1-CH-FCV-1113A, BORIC ACID TO BLENDER, is closed.
b. 1-CH-FCV-1113B, BLENDER TO CHG PUMP, is open.
c. 1-CH-FCV-1114A, PGW TO BLENDER, is controlling in AUTO c) Checks flow indicated on 1

-CH-FR-1113, PG Flow, equals desired flow rate.

d) Checks Integrator counting to desired total gallons.

EVALUATOR'S NOTE: None. COMMENTS:

_______ SAT

_______ UNSAT STEP 10: 1-OP-CH-021. (Step 5.1.9 and 5.1.10

) Stopping dilution

. STANDARD:

a) Candidate monitors Dilution and Stops the dilution by:

Placing MAKE-UP MODE CNTRL switch in the STOP position, OR Observing 1

-CH-FCV-1113B closes and Integrator total gallons settles on 200 gallons (199-201). EVALUATOR'S NOTE:

Candidate may perform either bulleted item listed above.

  • Ceasing of the Dilution is critical for this step.

(Range of 199

-201 due to blender overshoot or undershoot)

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM b" Page 8 of 13 STEP 11:

1-OP-CH-021. (Step 5.1.11, 5.1.12, 5.1.13

) Return the Blender to Automatic

. STANDARD:

a) Places the control switch for 1

-CH-FCV-1114B to AUTO position

. b) Places the MAKE

-UP MODE SEL switch in the AUTO position.

  • c) Places the MAKE

-UP MODE CNTRL to START

. This is a critical step.

EVALUATOR'S NOTE:

None. COMMENTS:

_______ SAT

_______ UNSAT Notify Shift Supervision/Evaluator of Blender status

. END OF JPM.

STOP TIME:

_______________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

__________________________________________________________________________________

__ ____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________ ____________________________________________________________________________________

Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Initial Conditions Unit 1 is at 30% power.

The 30% hold for a flux map on Unit 1 is complete.

Power escalation to 100% in accordance with 1

-GOP-1.5, Unit Startup, 2% to Reactor Power to Max Allowable Power, is about to recommence.

Initiating Cues You are to perform a 200 gallon Alternate Dilute only to the suction of the charging pump in accordance with 1

-OP-CH-021. When you finish the actions necessary to accomplish this task, please inform me.

Operator Directions Handout (TO BE GIVEN TO APPLICANT) Initial Conditions Unit 1 is at 30% power.

The 30% hold for a flux map on Unit 1 is complete.

Power escalation to 100% in accordance with 1

-GOP-1.5, Unit Startup, 2% to Reactor Power to Max Allowable Power, is about to recommence.

Initiating Cues You are to perform a 200 gallon Alternate Dilute only to the suction of the charging pump in accordance with 1

-OP-CH-021. When you finish the actions necessary to accomplish this task, please inform me.

Surry 2014-301 "JPM c" Page 1 of 12 U.S. Nuclear Regulatory Commission Surry Power Station SR09301 Simulator Job Performance Measure WE14EA1.3 (3.3/3.8)

Applicant________________________________

Start Time___________________

Examiner_______________________________

Date ___________________________________

Stop Time___________________

Title CONFIGURE SPRAY SYSTEMS IN ACCORDANCE WITH ECA

-1.1 (LOSS OF EMERGENCY RECIRCULATION).

K/A: WE14EA1.3 Ability to operate and / or monitor the following as they apply to the (High Containment Pressure). Desired operating results during abnormal and emergency situations.

Applicability Estimated Time Actual Time

RO/SRO(I)/SRO(U) 10 Minutes

Conditions Task is to be PERFORMED in the simulator.

A LBLOCA has occurred and both LHSI pumps are inoperable. 1

-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.

Standards 1-ECA-1.1, Loss of Emergency Coolant Recirculation, steps 8 and 9 are complete which result in 1

-RS-P-2B in service to 1

-RS-E-1D (with service water aligned) and 1

-CS-P-1A and 1B in service

. Initiating Cues 1-ECA-1.1 step 8.

Shift Manager direction Terminating Cues 1-ECA-1.1 steps 8 and 9 complete.

Procedures 1-ECA-1.1, Loss of Emergency Coolant Recirculation, Rev. 37

.

Surry 2014-301 "JPM c" Page 2 of 12 Tools and Equipment Safety Considerations None None Simulator Setup Call up 100% power IC and initialize (or IC

-270). Enter the following malfunctions:

o RS1001- TRN A HI HI CLS FAILS TO ACTIVATE

- INSERT o RS1002- TRN B HI HI CLS FAILS TO ACTIVATE

- INSERT o RC0102- RCS COLD LEG B PIPE RUPTURE

- INSERT o RS0702- LOSS OF INSIDE RECIRC SPR PP 1B

- Trigger 4 o SI0901- LHSI PUMP SI

-P-1A OVERCURRENT TRIP- Trigger 1 o SI0902- LHSI PUMP SI

-P-1B OVERCURRENT TRIP

- Trigger 1 Setup the following event trigger

- Event action

- rsp1b_amp>0.1

- Event 4 Set up the following switch override

- MOVSW104A_OPEN

- OFF - INSERT Set up the following MOV override

- SWMOV105C_

BKR - set to OPEN and INSERT.

Place the simulator in RUN and perform 1

-E-0 steps, then transition to 1

-E-1 and perform steps 1 on step 18 insert trigger 1 and transition to 1

-ECA-1.1. Do not worry about stopping unloaded EDGs in E

-1. Start 1-CS-P-1A and open 1

-CS-MOV-101A/B and 1

-CS-MOV-102A. Open 1-CS-MOV-101C, and 1

-CS-MOV-101D. Ensure containment sump level is >4'.

On recall of JPM, activate/check activated Trigger 4

. Initial Conditions A LBLOCA has occurred with the failure of Hi

-Hi CLS to function and failure of both LHSI pumps. 1

-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.

Initiating Cues You are the Unit 1 RO. Align Recirc Spray and Containment Spray in accordance with 1

-ECA-1.1, steps 8 and

9. When you finish the actions necessary to accomplish this, please inform me.

Notes Surry 2014-301 "JPM c" Page 3 of 12 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and noted at the end of the step as CRITIAL STEP.

An additional instructor may be needed to silence and acknowledge alarms for the examinee.

START TIME:

STEP 1: CAUTION AND NOTE PRIOR TO STEP 8 CAUTION:

Operation of an OSRS pump without the associated CS pump could cause cavitation as indicated by fluctuating amperage.

NOTE: If CLS can NOT be reset, local breaker operation will be required to stop CS and ISRS pumps.

STANDARD:

Acknowledges caution and note.

COMMENTS:

_______ SAT

_______ UNSAT STEP 2: Check for EITHER of the following (Step 8a)

- RUNNING OR REQUIRED OR - LESS THAN 20%

STANDARD:

Observes 1

-CS-P-1A running and continues to substep b.

EVALUATOR'S NOTE: N/A COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM c" Page 4 of 12 STEP 3: Check CTMT sump level

- GREATER THAN 4.0 ft (Step 8b)

. STANDARD:

Verifies containment sump level >4'.

EVALUATOR'S NOTE: N/A COMMENTS:

_______ SAT

_______ UNSAT STEP 4: Check SW aligned to at least two RS HXs (Step 8c).

STANDARD:

Observes that service water is not aligned to ANY RS HXs and goes to step 8c RNO. EVALUATOR'S NOTE: N/A

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM c" Page 5 of 12 STEP 5: Align SW to at least two RS HXs (Step 8c RNO)

. STANDARD:

  • Opens 1-SW-MOV-103A- either this valve or 103B must be opened

- one valve must be open as a critical step.

  • Opens 1-SW-MOV-103B- either this valve or 103A must be opened- one valve must be open as a critical step.

Opens 1-SW-MOV-103C. Opens 1-SW-MOV-103D. Opens 1-SW-MOV-104A - Determines that valve will not open

. Opens 1-SW-MOV-104B. Opens 1-SW-MOV-104C.

  • Opens 1-SW-MOV-104D - This is a critical step.

Opens 1-SW-MOV-105A. Opens 1-SW-MOV-105B. Opens 1-SW-MOV-105C - Determines that valve will not open

.

  • Opens 1-SW-MOV-105D - This is a critical step.

EVALUATOR'S NOTE: N/A BOOTH NOTE:

If asked: Trainee may dispatch operator to investigate supply breaker to 1-SW-MOV-104A. Report time compression has occurred and there are no abnormal indication s on 1-SW-MOV-104A (1H1

-2N-7B) supply breaker.

If asked: Trainee may dispatch operator to investigate supply breaker for 1

-SW-MOV-105C. Report time compression has occurred and that the supply breaker (1H1

-2N-8C) has tripped.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM c" Page 6 of 12 STEP 6: Start RS pumps associated with aligned RS HXs (Step 8d)

STANDARD:

Trainee starts 1

-RS-P-1B ("B" RS HX)

Trainee observes that 1

-RS-P-1B tripped and continues.

  • Trainee starts 1

-RS-P-2B ("D" RS HX)

- This is a critical step.

EVALUATOR'S NOTE: N/A BOOTH NOTE:

If directed to investigate breaker for 1

-RS-P-1B (14J4), report that breaker is tripped as indicated by a 'Bell Lockout'.

COMMENTS:

_______ SAT

_______ UNSAT STEP 7: CAUTIONS PRIOR TO STEP 9 CAUTION:

CHG and LHSI pumps taking suction from the RWST must be stopped when level decreases to 6%.

CS pumps taking suction from the RWST must be stopped when level decreases to 3%. STANDARD:

Acknowledges cautions EVALUATOR'S NOTE: N/A

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM c" Page 7 of 12 STEP 8:

Determine number of CS pumps required (Step 9a)

STANDARD:

Determines that containment pressure is between 14 psia and 60 psia, fewer than two RS pumps are running, and determines that 2 CS pumps are required.

EVALUATOR'S CUE: If asked, there are no abnormalities noted on either containment spray pump.

COMMENTS:

_______ SAT

_______ UNSAT STEP 9: CS pumps running - EQUAL TO NUMBER REQUIRED (Step 9b)

STANDARD:

Determines that 2 CS pumps are required, but only 1 currently in service.

Goes to step 9 RNO.

EVALUATOR'S NOTE: N/A

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM c" Page 8 of 12 STEP 10:

Do the following (Step 9b RNO)

1) Manually operate CS pump(s).
2) Close associated CS pump discharge MOVs for stopped pump(s):

-CS-P-1A, 1-CS-MOV-101A and 1

-CS-MOV-101B -CS-P-1B, 1-CS-MOV-101C and 1

-CS-MOV-101D STANDARD:

  • Trainee starts 1

-CS-P-1B. This is a critical step.

EVALUATOR'S NOTE: N/A COMMENTS:

_______ SAT

_______ UNSAT STEP 11:

REPORT TO SHIFT SUPERVISOR (EVALUATOR).

STANDARD:

Verbal status report that CS and RS have been aligned in accordance with ECA

-1.1 steps 8 &

9.

EVALUATOR'S NOTE: N/A STOP TIME:

COMMENTS:

_______ SAT

_______ UNSAT

STOP TIME:

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Task Task is to be performed in the simulator.

Perform Steps 8 and 9 of 1-ECA-1.1, Loss of Emergency Coolant Recirculation, to align Recirc Spray and Containment Spray systems.

Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task Initial Conditions A LBLOCA has occurred with the failure of Hi

-Hi CLS to function and failure of both LHSI pumps. 1

-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.

Initiating Cues You are the Unit 1 RO. Align Recirc Spray and Containment Spray in accordance with 1

-ECA-1.1, steps 8 and

9. When you finish the actions necessary to accomplish this, please inform me.

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions A LBLOCA has occurred with the failure of Hi

-Hi CLS to function and failure of both LHSI pumps. 1

-ECA-1.1, Loss of Emergency Coolant Recirculation, has been performed up to step 8.

Initiating Cues You are the Unit 1 RO. Align Recirc Spray and Containment Spray in accordance with 1-ECA-1.1, steps 8 and

9. When you finish the actions necessary to accomplish this, please inform me.

Surry 2014-301 "JPM d" Page 1 of 20 U.S. Nuclear Regulatory Commission Surry Power Station SR14301 Simulator Job Performance Measure EPEE02.EK3.3 (3.9/3.9)

Alternate Path Applicant________________________________

Start Time___________________

Examiner_______________________________

Date ___________________________________

Stop Time___________________

Title Re-establish Normal Letdown Following SI K/A: EPEEE02.EK3.3 Knowledge of the reasons for the following responses as they apply to the (SI Termination):

Manipulation of controls required to obtain desired operating results during abnormal, and emergency situations.

3.9 / 3/9 Applicability Estimated Time Actual Time RO/SRO(I)/

35 Minutes ___ Minutes Conditions Task is to be PERFORMED in the simulator.

A spurious SI has occurred. E

-0 has been performed, SI reduction criteria are satisfied, transition made to ES

-1.1, and it has been performed through Step 14. Standards

Excess letdown placed in service.

Initiating Cues

1-ES-1.1, SI Termination, Step 15.

Shift Manager direction

. Terminating Cues Report received that excess letdown is in service per 1

-OP-CH-006. Procedures 1-ES-1.1, SI Termination, Rev. 48

. 1-OP-CH-006, Shifting or Increasing/Decreasing Letdown Flow, Rev.20.

Surry 2014-301 "JPM d" Page 2 of 20 Tools and Equipment Safety Considerations None None Surry 2014-301 "JPM d" Page 3 of 20 Simulator Setup Call up 100% power IC and initialize (IC 268). Place simulator in RUN.

Initiate SI. Perform E

-0, reset SI, verify SI reduction criteria satisfied, transition to ES

-1.1 and perform it through Step 14. Allow simulator until SR energize, place in freeze and snap until ready to run JPM.

Close 1-CH-LCV-1460A & B. Initiate failure 1-CH-LCV-1460A shut

Switch O/R, CHLCV460A_CLOSE, ON, INSERT; CHLCV

-460A_OPEN, OFF, INSERT

. Open 1-CC0TV-109B. Press Green Pushbutton on 1

-DG-TV-108A/B and pump down the PDTT.

Set seal injection at 8 gpm.

Verify PRZR Level Control Channel Select Switch is in the III/II position.

Freeze simulator at these conditions for JPM performance.

Initial Conditions Plant was at 100% power with all systems operating normal and in automatic

. The crew is currently recovering from a spurious SI initiation

. 1-ES-1.1, SI Termination has been completed up to Step 15.

SI has been reset.

Initiating Cues You are the Unit 1 RO

. Re-establish letdown by performing step 15 of 1

-ES-1.1. When you finish the actions necessary to accomplish this, please inform me

. Notes Surry 2014-301 "JPM d" Page 4 of 20 PERFORMANCE CHECKLIST Notes to the Evaluator Operator is given a copy of 1

-ES-1.1, SI Termination, Step 15.

When Operator determines the need to place excess letdown in service, give them a copy of 1

-OP-CH-006, Shifting or Increasing/Decreasing Letdown Flow.

Task critical elements are bolded and noted at the end of the step as CRITIAL STEP.

START TIME:_______________

STEP 1: Adjust charging line flow to establish > 40 gpm.

(Step 15a of ES-1.1) STANDARD:

Checks that indicated C HG line flow is greater than 40 gpm by observing flow on 1

-CH-FI-1122A. EVALUATOR'S NOTE:

COMMENTS:

_______ SAT

_______ UNSAT STEP 2: Open Letdown Line pressure control valve

. (Step 15 b of ES

-1.1) 1-CH-PCV-1145 STANDARD:

  • (a) Places 1-CH-PCV-1145 controller into MANUAL.

This is a critical step.

  • (b) Adjusts demand increase button until 1

-CH-PCV-1145 indicates open (zero demand indicated)

. This is a critical step.

EVALUATOR'S NOTE:

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM d" Page 5 of 20 STEP 3:

Check closed or close letdown orifice isolation valves.

(Step 15 c of ES

-1.1) 1-CH-HCV-1200A 1-CH-HCV-1200B 1-CH-HCV-1200C STANDARD:

a) Checks 1-CH-HCV-1200A closed

. b) Checks 1-CH-HCV-1200B closed.

c) Checks 1-CH-HCV-1200C closed.

EVALUATOR'S NOTE:

None.

COMMENTS:

b STEP 4: Open letdown isolation valves.

(Step 15 d of ES

-1.1) STANDARD:

  • a) Opens 1-CH-TV-1204A. This is a critical step.
  • b) Opens 1-CH-TV-1204B. This is a critical step.
  • c) Attempts to open 1

-CHLCV-1460A, Valve will not open.

  • d) Goes to Step 15 RNO, Establish excess letdown IAW 1

-OP-CH-006, Shifting or Increasing/Decreasing letdown Flow.

This is a critical step.

EVALUATOR'S NOTE:

[This step is the Fault]

The Operator should determine the letdown isolation valve 1

-CH-LCV-1460A has failed and apply the RNO for placing excess letdown in service. Operator may reduce charging at this point to minimize it to attempt to maintain PRZR level. When Operator determines the need to perform 1

-OP-CH-006, hand him/her a copy of the procedure.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM d" Page 6 of 20 STEP 5: 1-OP-CH-006.

OBTAINS COPY OF 1

-OP-CH-006 FROM EVALUATOR STANDARD:

(a) Reviews initial conditions, precautions and limitations.

(b) Determines Section 5.1 is to be used.

COMMENTS:

_______ SAT

_______ UNSAT STEP 6: 1-OP-CH-006. (Steps 5.1.1 thru 5.1.4)

CHECK ALL LOOP DRAINS AND EXCESS LETDOWN ISOLATIONS ARE SHUT STANDARD:

(a) Verifies all loop drains are shut (1

-RC-1557A, B, and C) using control board indicator lights. (b) Verifies excess letdown HX isolation is shut (1

-CH-HCV-1201) using control board indicator lights.

(c) Verifies excess letdown flow setpoint is at zero (1

-CH-HCV-1137). (d) Verifies excess letdown divert valve (1

-CH-HCV-1389) is set to VCT.

EVALUATOR'S NOTE:

None. COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM d" Page 7 of 20 STEP 7: 1-OP-CH-006. (Step 5.1.5 and 5.1.6

) OPENS RCP SEAL RETURN

, 1-CH-MOV-1381. Check running at least one CCW pump. STANDARD:

  • (a) Opens RCP seal return isolation (1

-CH-MOV-1381) using control board controls.

This is a critical step.

(b) Checks at least one CC pump running using control board indications.

EVALUATOR'S NOTE:

Step 5.1.7 is N/A.

COMMENTS:

_______ SAT

_______ UNSAT STEP 8: 1-OP-CH-006. (Step 5.1.

8 thru 5.1.12)

VERIFIES LETDOWN HX TEMPERATURE CONTROL AND EXCESS LETDOWN READY FOR SERVICE.

STANDARD:

(a) Checks 1-CC-FI-109, LETDOWN HX OUTLET FLOW is ~ 1 60 gpm. (b) Applies note concerning 1

-CC-HCV-108. (c) Checks 1-CC-TI-108, LETDOWN HX OUTLET TEMP, is indicating ambient.

(d) Checks 1-CH-PI-1138, EXCESS LETDOWN HX OUTLET PRESS, is approximately 50 psig.

(e) Checks 1-CH-TI-1139, EXCESS LETDOWN HX OUTLET TEMP, is indicating ambient. COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM d" Page 8 of 20 STEP 9: 1-OP-CH-006. (Step 5.1.

13 thru 5.1.23) ESTABLISH EXCESS LETDOWN FLOW PATH.

STANDARD:

(a) Acknowledges note on first directing excess letdown to the PDTT.

  • (b) Places 1-CH-HCV-1389, EXCESS LETDOWN DIVERT, to the PDTT. Verifies position by board indications.

This is a critical step.

(c) Verifies 1

-CH-PI-1138, EXCES LETDOWN HX OUTLET PRESS, indicates ~ 10 psig.

  • (d) Opens 1-CH-HCV-1201, EXCESS HX LETDOWN ISOLATION, and verifies position by board indications.

This is a critical step.

(e) Records charging flow.

(f) Acknowledges note on excess letdown effect on calorimetric.

(g) N/A's step for calorimetric being performed.

(h) Acknowledges cautions on opening loop drains.

  • (i) Opens one and only one loop drain (1

-RC-HCV-1557A, B, or C). Verifies position by board indications.

This is a critical step.

(j) Acknowledges notes on excess letdown flow rate and use of Attachment 1.

  • (k) Slowly opens 1

-CH-HCV-1137, EXCESS LETDOWN FLOW, until 15 gpm to PDTT. This is a critical step.

(l) Place 1-CH-FC-1122C, CHARGING FLOW CONTROL, in Manual and raise charging flow 15 gpm from initial value.

(m) Verifies excess letdown temperature 1

-CC-TI-108 is < 150

°F and 1-CH-TI-1139 is < 195°F. (m) Records pot setting for 1

-CH-HCV-1137. EVALUATOR'S NOTE:

If asked: A calorimetric is not being performed If asked: As the Shift Manager, direct the Operator to use the "A" loop drain path.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM d" Page 9 of 20 STEP 10: 1-OP-CH-006. (Step 5.1.

24 thru 5.1.26) ESTABLISH EXCESS LETDOWN FLOW PATH THROTTLES EXCESS LETDOWN AND TRANSFERS TO VCT.

STANDARD:

(a) Throttles 1

-CH-HCV-1137 to 5 gpm.

(b) Acknowledges Notes.

  • (c) When PDTT increases 10% (1

-DG-LI-107) selects "VCT" on 1

-CH-HCV-1389. This is a critical step.

(d) Increase 1

-CH-HCV-1137 to previous recorded setpoint.

EVALUATOR'S NOTE:

To expedite JPM, Evaluator may time compress and direct Operator PDTT level has increased by at least 10% from the original point

. COMMENTS:

_______ SAT

_______ UNSAT STEP 11: 1-OP-CH-006. (Step 5.1.

27 thru 5.1.31)

Checks Parameters

.

STANDARD:

(a) Checks RCP seal leakoff is in normal band (approx. 2

-3 gpm). (b) Checks 1-CH-PI-1138 ~ 65 psig.

(c) Acknowledges CAUTION concerning CH flow greater than expected, a leak on excess letdown flowpath is a possibility.

(d) Verifies charging flow stable at ~ 15 gpm greater than previously recorded value.

(e) Verifies 1

-CC-TI-108 < 150F, and 1-CH-TI-1139 < 195F. EVALUATOR'S NOTE:

When Excess Letdown is in service, you can inform the Operator someone else will finish the procedure and terminate the JPM.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM d" Page 10 of 20 Step 12 REPORTS TO SHIFT MANAGER (EVALUATOR).

Standards Verbal status report made that Step 15 completed and letdown has been re

-established.

Evaluator's Comments STOP TIME:________________

STOP TIME:

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

__________________________________________________________________________________

__ ____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Directions

The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.

Initial Conditions Plant was at 100% power with all systems operating normal and in automatic.

The crew is currently recovering from a spurious SI initiation

. 1-ES-1.1, SI Termination has been completed up to Step 15.

SI has been reset.

Initiating Cues You are the Unit 1 RO. Re

-establish letdown by performing step 15 of 1

-ES-1.1. When you finish the actions necessary to accomplish this, please inform me

. .

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions Plant was at 100% power with all systems operating normal and in automatic.

The crew is currently recovering from a spurious SI initiation

. 1-ES-1.1, SI Termination has been completed up to Step 15.

SI has been reset.

Initiating Cues

You are the Unit 1 RO. Re

-establish letdown by performing step 15 of 1

-ES-1.1. When you finish the actions necessary to accomplish this, please inform me

.

Surry 2014-301 "JPM e" Surry SR 2014 - 301 Page 1 of 8 U.S. Nuclear Regulatory Commission Surry Power Station SR14301 Simulator Job Performance Measure APE054.AA1.01 (4.5 / 4.4)

Applicant________________________________

Start Time___________________

Examiner_______________________________

Date ___________________________________

Stop Time___________________

Title Cross-Connect AFW from Unit 1 to Unit 2.

K/A: APE054.AA.01: Ability to operate and / or monitor the following as they apply to the Loss of Main Feedwater (MFW)

- AFW controls, including the use of alternate AFW sources (RO 4.5/SRO 4.4

.) Applicability Estimated Time Actual Time RO/SRO(I) 10 Minutes ___ Minutes Conditions Task is to be PERFORMED in the Simulator

. Unit 1 is at 100% power with all systems normal and in AUTO.

Unit 2 is experiencing a loss of all Feed Water. Standards 2-FR-H.1, Loss of Secondary Heat Sink, step 3d RNO, steps d 3 through d 5, Revision 34

. Initiating Cues Shift Manager Direction

. 2-FR-H.1, Loss of Secondary Heat Sink, step 3d RNO, steps d 3 through d

5. Terminating Cues 2-FR-H.1, Loss of Secondary Heat Sink, step 3d RNO, step d5 complete

. Confirmation of AFW to Unit 2 from Unit 2 Operator.

Procedures

2-FR-H.1, Loss of Secondary Heat Sink

, Revision 36 Tools and Equipment Safety Considerations

None Standard Personal Safety Equipment

Surry 2014-301 "JPM e" Surry SR 2014 - 301 Page 2 of 8 Simulator Setup Reset to IC 269 OR Call up 100% power IC and initialize.

Trip Unit 2, Remotes, Station Protection Unit 2, RXTRIP_UNIT2, and wait for swapover.

Secure Unit 2 RCPs: Remotes, EL2, EL25A3_bkr

/ EL25B3_bkr

/ EL25C3_bkr, Open.

Initial Conditions Unit 1 is at 100% power with all systems normal and in AUTO.

Unit 2 is experiencing a loss of all Feed Water. Unit 2 is currently experiencing a loss of all feedwater. They are in 2-FR-H.1 at step 3d RNO and need Aux Feed flow from both Unit 1 motor-driven AFW pumps.

All Unit 2 RCPs have been secured. 1J bus will remain on its current (normal) power supply.

Initiating Cues You are to cross

-connect Aux Feedwater from Unit 1 to Unit 2 in accordance with 2

-FR-H.1 3d RNO. RNO steps d. 1) and d. 2) are complete.

When you finish the actions necessary to accomplish this, please inform me

. Evaluator Notes Operator is provided with a copy of 2

-FR-H.1, step 3 during directions.

Task critical elements are bolded and denoted by an asterisk (

  • ).

Surry 2014-301 "JPM e" Surry SR 2014 - 301 Page 3 of 8 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (*). An additional instructor may be needed to silence and acknowledge alarms for the examinee, and respond as the Unit 2 Reactor Operator.

START TIME:

STEP 1: (Step 3d RNO, d 3), 2

-FR-H.1)

CLOSES THE UNIT 1 AFW MOVs STANDARD:

Closes and verifies closed indication (green light on

- red light off) the following AFW MOVs: *(a) 1-MOV-FW-151A. This is a critical step.

  • (b) 1-MOV-FW-151B. This is a critical step.
  • (c) 1-MOV-FW-151C. This is a critical step.
  • (d) 1-MOV-FW-151D. This is a critical step.
  • (e) 1-MOV-FW-151E. This is a critical step.
  • (f) 1-MOV-FW-151F. This is a critical step.

EVALUATOR'S NOTE:

1) 2-handed operation is allowed.
2) Not sequence dependant.

COMMENTS:

_______ SAT

_______ UNSAT STEP 2: (Step 3d RNO, d4, 2

-FR-H.1) OPENS THE AFW CROSS

-CONNECT VALVES TO SUPPLY UNIT 2.

STANDARD:

  • (a) Places control switch for 2

-MOV-FW-260A to the OPEN position.

  • (b) Places control switch for 2

-MOV-FW-260B to the OPEN position.

(c) Checks 2-MOV-FW-260A open indication received (red on & green off).

(d) Checks 2-MOV-FW-260B open indication received (red on & green off).

(e) Acknowledges annunciator D

-D-4, AFW X-TIE MOVS NOT FULLY CLOSED

. EVALUATOR'S NOTE:

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM e" Surry SR 2014 - 301 Page 4 of 8 STEP 3: (Step 3d RNO, d5, 2

-FR-H.1) STARTS THE UNIT 1 MOTOR DRIVEN AFW PUMPS.

STANDARD:

(a) Announces AFW pump start over Gai

-tronics system.

  • (b) Starts 1-FW-P-3A by placing control switch to START

. (c) Verifies start indications (red light on & amps indicated),

  • (d) Starts 1-FW-P-3B by placing control switch to START

. (e) Verifies start indications (red light on & amps indicated).

(f) Checks no Unit 1 AFW flow indicated on 1

-FW-FI-100A, B & C.

EVALUATOR'S NOTE:

Unit 2: Following Start of 1

-FW-P-3A and 1-FW-P-3B, report that AFW flow is indicated on Unit 2.

COMMENTS:

_______ SAT

_______ UNSAT STEP 5: REPORTS TO SHIFT MANAGER (EVALUATOR).

STANDARD:

Reports to the Shift Manager (Evaluator) TASK COMPLETE.

. EVALUATOR'S NOTE:

Operator may throttle AFW to restore S/G level.Evaluator option to stop JPM at any time after AFW pumps are started.

COMMENTS:

JPM COMPLETE

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM e" Surry SR 2014 - 301 Page 5 of 8 STOP TIME:

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

____________________________________________________________________________________________

Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Task Task is to be performed in the Simulator

. Directions The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.

Initial Conditions Unit 1 is at 100% power with all systems normal and in AUTO.

Unit 2 is experiencing a loss of all Feed Water. Unit 2 is currently experiencing a loss of all feedwater. They are in 2-FR-H.1 at step 3d RNO and need Aux Feed flow from both Unit 1 motor-driven AFW pumps.

All Unit 2 RCPs have been secured. 1J bus will remain on its current (normal) power supply.

Initiating Cues You are to cross

-connect Aux Feedwater from Unit 1 to Unit 2 in accordance with 2-FR-H.1 3d RNO. RNO steps d. 1) and d. 2) are complete.

When you finish the actions necessary to accomplish this, please inform me

. .

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions Unit 1 is at 100% power with all systems normal and in AUTO.

Unit 2 is experiencing a loss of all Feed Water. Unit 2 is currently experiencing a loss of all feedwater. They are in 2-FR-H.1 at step 3d RNO and need Aux Feed flow from both Unit 1 motor-driven AFW pumps.

All Unit 2 RCPs have been secured. 1J bus will remain on its current (normal) power supply.

Initiating Cues You are to cross

-connect Aux Feedwater from Unit 1 to Unit 2 in accordance with 2

-FR-H.1 3d RNO. RNO steps d. 1) and d. 2) are complete.

When you finish the actions necessary to accomplish this, please inform me

.

Surry 2014-301 "JPM f" Page 1 of 14 U.S. Nuclear Regulatory Commission Surry Power Station SR14301 Simulator Job Performance Measure [KA 015A4.03 3.8 / 3.9

] Applicant________________________________

Start Time___________________

Examiner_______________________________

Date ___________________________________

Stop Time___________________

Title Remove Source Range NI s From Service During a Reactor Startup.

K/A: 015A4.03 Ability to manually operate and/or monitor in the control room: Trip bypasses 3.8 / 3.9 Applicability Estimated Time Actual Time RO/SRO(I) 10 Minutes ___ Minutes Conditions Task is to be PERFORMED in the simulator.

Reactor power is at approximately 1.

2 x 10-10 amps during a startup, and the SR high voltage cannot be removed from either N

-31 or N-32. Standards

1-AP-4.00, Nuclear Instrumentation Malfunction Initiating Cues

Shift manager Direction.

Terminating Cues 1-AP-4.00, Nuclear Instrumentation Malfunction, Step 38 complete

. Procedures

1-AP-4.00, Nuclear Instrumentation Malfunction, Rev 30. Tools and Equipment Safety Considerations None None Surry 2014-301 "JPM f" Page 2 of 14 Simulator Setup Call up IC

-14, S1C26 10

-8 Amps D-131 Steps MSTV Shut, and initialize. Place simulator in RUN.

Perform the startup to obtain power at 1.2 x 10-10 amps (or slightly greater), then implement switch overrides (SRTRP_BLK_TRA_PB

, and SRTRP_BLK_TRB_PB, override OFF, Insert), Flux Level Trip Cutout Pushbuttons. Freeze the simulator until ready for operator to perform JPM.

Do not allow the SUR to be greater than +0.1 dpm

. Initial Conditions During a Reactor startup, when P

-6 was reached the Operator pushed 1/N

-33A TR A and 1/N

-33B TR B to de

-energize the Source Range NIs.

Both N-31 and N-32 failed to de

-energize. Initiating Cues You are the RO

. Respond to a failure of both Source Range N Is in accordance with 1

-AP-4.00, NI Malfunction.

When you finish the actions necessary to accomplish this, please inform me.

Surry 2014-301 "JPM f" Page 3 of 14 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (

  • ). An additional instructor may be needed to silence and acknowledge alarms for the examinee.

START TIME:

_________________________.

STEP 1: AP-4.00, (Step 1) Check NI Malfunction

- Power Range Failure

. STANDARD:

(a) Enters 1-AP-4.00 at Step 1. (b) Determines failure not in Power Range NI and goes to Step 10.

EVALUATOR'S NOTE:

NONE COMMENTS:

_______ SAT

_______ UNSAT STEP 2: AP-4.00, (Step 10) Check NI Malfunction

- Intermediate Range Failure.

STANDARD:

(a) Determines failure not in Power Range NI and goes to Step 19.

EVALUATOR'S NOTE: NONE COMMENTS:

_______ SAT

_______ UNSAT STEP 3: AP-4.00, (Step 19) Check NI Malfunction

- Source Range Failure.

STANDARD:

(a) Determines failure is in Source Range NIs and continues.

EVALUATOR'S NOTE: NONE COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM f" Page 4 of 14 STEP 4: AP-4.00, Step 20 STABILIZE UNIT CONDITIONS.

STANDARD:

(a) Verifies Unit conditions stable with a zero startup rate.

(b) Maintains power with zero startup rate.

EVALUATOR'S NOTE:

A manual Reactor trip is NOT an acceptable action

.

COMMENTS:

_______ SAT

_______ UNSAT STEP 5: AP-4.00. (Step 21) CHECK REACTOR POWER GREATER THAN P

-6 (1X10-10). STANDARD:

a) Checks Reactor power level greater than P

-6 (1x 10-10 amps) by: observing INT RNG FLUX meters NI 35B and NI 36B, Benchboard 1

-2, ~ 1.2 x 10-10 amps Meters on the IR CH 1 and CH2 Drawers ~ 1.2 x 10

-10 amps. Permissive Status Light on Vertical Board 1

-2, B-3, LIT. Trip Status Lights on Vertical Board 1-2, C-2 and D-2 LIT Bistable Light, Power Above Permissive P6, on IR CH

-1 and CH2 Drawer, LIT.

EVALUATOR'S NOTE:

If asked: Indications and lights status is "as found".

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM f" Page 5 of 14 STEP 6:

AP-4.00. (Step 22) CHECK BOTH SOURCE RANGE CHANNELS

- HIGH VOLTAGE OFF STANDARD:

(a) Determine that both SRNI Channels are still energized.

(b) Pushes "1/N 33A TR A" pushbutton and "1/N 33B TR B" pushbutton.

(c) Notes that N

-31 and N-32 still have high voltage applied to the detectors.

  • (d) Places LEVEL TRIP switch for N

-31 in BYPASS.

This is a critical step.

  • (e) Removes INSTRUMENT POWER fuses for N

-31. This is a critical step.

  • (f) Places LEVEL TRIP switch for N

-32 in BYPASS.

This is a critical step.

  • (g) Removes INSTRUMENT POWER fuses for N

-32. This is a critical step.

(h) Notes requirement to refer to Tech Spec Table 3.7

-1 Item 4.

(i) Notes requirement to make entry in PSL and Shift Turnover to reinstall fuses.

(j) Goes to Step 38 of 1-AP-4.00. (k) Informs the Shift Manager that I&C and the OMOC must be notified

EVALUATOR'S NOTE:

When Notified: Acknowledge that Tech Spec Table 3.7

-1, item 4 requires review

. When Notified

Acknowledge that I&C and OM on Call must be notified.

When the Instrument Power fuses are pulled on the first channel, annunciator 1G

-A3, "NIS SOURCE RNG LOSS OF DET VOLT" is received.

It is acceptable to place both SRNI in LEVEL TRIP BYPASS before removing the INSTRUMENT POWER fuses

.

COMMENTS:

_______ SAT

_______ UNSAT STEP 7 REPORT TO NUCLEAR SHIFT MANAGER (EVALUATOR).

Standards Verbal status report that N

-31 and N-32 have been removed from service IAW AP-4.00. Evaluator's Comments STOP TIME:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM f" Page 6 of 14 COMMENTS: ____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

__________________________________________________________________________________

__ ____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________ ____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Directions

The evaluator will explain the initial conditions of the task to be performed and will provide the initiating cue. Ensure you indicate to the evaluator when you understand your assigned task.

Initial Conditions During a Reactor startup, when P

-6 was reached the Operator pushed 1/N

-33A TR A and 1/N

-33B TR B to de

-energize the Source Range NIs. Both N

-31 and N-32 failed to de

-energize.

Initiating Cues You are the RO. Respond to a failure of both Source Range NIs in accordance with 1

-AP-4.00, NI Malfunction. When you finish the actions necessary to accomplish this, please inform me.

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions During a Reactor startup, when P

-6 was reached the Operator pushed 1/N

-33A TR A and 1/N-33B TR B to de

-energize the Source Range NIs. Both N

-31 and N-32 failed to de

-energize.

Initiating Cues You are the RO. Respond to a failure of both Source Range NIs in accordance with 1

-AP-4.00, NI Malfunction.

When you finish the actions necessary to accomplish this, please inform me.

Surry 2014-301 "JPM g" Page 1 of 13 U.S. Nuclear Regulatory Commission Surry Power Station SR14301 Simulator Job Performance Measure [KA 075A2.02 2.5 / 2.7

] Applicant________________________________

Start Time___________________

Examiner_______________________________

Date ___________________________________

Stop Time___________________

Title Respond to a Low Level Transient K/A: 075A2.02 2.5/2.7, Ability to (a) predict the impacts of the following malfunctions or operations on the circulating water system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:

Loss of circulating water pumps Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 14 Minutes ___ Minutes Conditions Task is to be PERFORMED in the simulator.

Both units are at 100% power when a lightning strike trips 2G screenwell transformer.

Standards Circ Water Pumps restored in accordance with AP

-12.01, Loss of Intake Canal Level "prior to automatic protective actions

." Initiating Cues LLIS TROUBLE annunciator.

500 KV HSE TROUBLE annunciator.

Unit Two Circ Water Pumps secured.

Terminating Cues

0-AP-12.01, Loss of Intake Canal Level, completed.

Procedures 0-AP-12.01, Loss of Intake Canal Level, completed. Rev 30. Tools and Equipment Safety Considerations None None Surry 2014-301 "JPM g" Page 2 of 13 Simulator Setup Call up 100% power IC and initialize. Place simulator in RUN.

Implement EL0802, Loss of Screenwell Transformer 2, and place simulator in RUN.

Acknowledge all annunciators and place simulator in FREEZE.

Initial Conditions Both units are at 100% power when a lightning strike trips 2G screenwell transformer.

Alarm VSP L

-7 "LLIS TROUBLE" and VSP

-K6 "500KV HSE TRBL" have alarmed eight (8) minutes ago.

Security reports a lightning strike in the vicinity of the low level intake.

All Unit 2 Circulating Water Pumps were initially running. Unit One and Unit Two Reactor Operators are currently throttling CW MOVs to conserve intake canal level.

Initiating Cue You are the Unit 1 BOP. You are to respond to the loss of Circulating Water Pumps

. When you finish the actions necessary to accomplish this, please inform me.

Surry 2014-301 "JPM g" Page 3 of 13 PERFORMANCE CHECKLIST Notes to the Evaluator When candidate identifies AP

-12.01 as the guiding procedure, then provide a copy to the candidate.

Task critical elements are bolded and denoted by an asterisk (

  • ). An additional instructor may be needed to silence and acknowledge alarms for the examinee.

START TIME_______:

STEP 1: 0-AP-12.01 (Step 1) NOTE: EPIPs may be applicable.

CHECKS ENTRY INTO THIS PROCEDURE

-FROM AN EOP OR AN AP TO RESTORE SW FLOW TO THE CCHXs.

STANDARD:

a) Acknowledges Note prior to Step 1

. b) Identifies entry into this procedure is not from EOP or AP to restore SW.

c) Goes to Step 3.

EVALUATOR'S NOTE:

If Asked: Entry into this procedure not an attempt to restore SW.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM g" Page 4 of 13 STEP 2:

0-AP-12.01. (Step 3) TRY TO MAINTAIN INTAKE CANAL LEVEL STANDARD:

(a) Acknowledges CAUTIONs prior to step 3 regarding turbine stall flutter and reference to AP-14, if vacuum cannot be maintained.

(b) Acknowledges NOTE prior to step 3 regarding potential need to trip one unit to reduce rate of intake canal drawdown.

(c) Recalls that initial conditions revealed that Unit ROs were throttling waterboxes as required.

EVALUATOR'S NOTE:

If asked: Both units are currently throttling waterbox outlet MOVs as required due to loss of circ water pumps.

If asked: Unit SRO will direct unit ramping as required.

COMMENTS:

_______ SAT

_______ UNSAT STEP 3: 0-AP-12.01. (Step 4) CHECK INTAKE CANAL LEVEL

- DECREASING.

STANDARD:

a) Candidate identifies that 3 CW pumps are insufficient to supply two units CW requirement.

(b) Candidate reads intake canal level indicator and determines downward trend.

EVALUATOR'S NOTE:

COMMENTS:

_______ SAT _______ UNSAT

Surry 2014-301 "JPM g" Page 5 of 13 STEP 4:

0-AP-12.01. (Step 5) START CIRC WATER PUMPS AS REQUIRED FROM THE MCR IAW ATTACHMENT 3 STANDARD:

Candidate goes to Attachment 3.

EVALUATOR'S NOTE:

COMMENTS:

_______ SAT

_______ UNSAT STEP 5: 0-AP-12.01, Attachment 3

. (Step 1) ATTACHMENT 3

- REMOTE START OF CIRCULATING WATER PUMPS.

STANDARD:

(a) Candidate acknowledges NOTE prior to step (a) that requires 5

-minute coastdown of CW pumps prior to starting.

(b) Candidate checks 1G

-2G Bus Tie Bkr Closed using "LLIS Electrical" PCS screen.

(c) Trainee verifies that CW pumps are not in local by noting no white box around Unit 2 CW pumps on CW Pump PCS screen.

  • (d) Candidate calls up soft control box pumps to start CW pump by clicking on CW pump ICON on PCS CW screen. This is a critical step.
  • (e) Candidate enables soft control box for pump to be started by clicking on mark number box and verifies red border.

This is a critical step.

  • (f) Candidate clicks "Start" button for pump to control that is active.

This is a critical step.

(g) Candidate verifies proper amp indication for pump started.

  • (h) Candidate completes steps (c) through (e) of attachment 3 for remaining Unit 2 CW pumps to be started.

This is a critical step.

(i) Candidate directs outside operator to perform post

-start checks IAW respective OP 48.1.1. EVALUATOR'S NOTE:

If asked: Greater than 5 minutes have elapsed since loss of transformer.

If asked: 2A, 2B, 2C and 2D circ water pumps were previously in service.

When Directed: Acknowledge as Outside Operator to perform post start checks of CW pumps IAW op

-48.1.1. COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM g" Page 6 of 13 STEP 6:

0-AP-12.01. (Step 6) SEND OPERATOR TO LOW LEVEL INTAKE TO PERFORM THE FOLLOWING PROCEDURES.

STANDARD:

(a) Candidate acknowledges Note prior to step 6 regarding PIN number for ESW pump house and statement regarding CW pump restrictions when 1G

-2G busses are cross

-tied. (b) Sends an Operator to Low Levels to perform Attachment 2 and OP

-48.1.1. EVALUATOR'S NOTE:

None.

Booth Operator:

When directed: Acknowledge Direction to perform 0

-AP-12.01, Attachment 2, Low Level Intake Responses; 0-OP-SW-002, Emergency Service Water Pump Operation; and OP

-48.1.1. Starting any CW Pump.

COMMENTS:

_______ SAT

_______ UNSAT STEP 7: 0-AP-12.01. (Step 7) CHECK INTAKE CANAL LEVEL

- GREATER THAN TRIP SETPOINT.

STANDARD:

Candidate determines that Intake canal level is greater than 23.5 feet and annunciator 1F

-G-1, INTK CANAL LO LVL TRIP not lit.

EVALUATOR'S NOTE:

If asked: 2F-G1 not lit on Unit Two.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM g" Page 7 of 13 STEP 8:

0-AP-12.01. (Step 8) CHECK CW LOSS

- SUSTAINED WITH NO EXPECTATION OF RECOVERY STANDARD:

a) Candidate identifies Canal Level Stable or increasing b) Candidate goes to Step 10 EVALUATOR'S NOTE:

None.

COMMENTS:

_______ SAT

_______ UNSAT STEP 9: 0-AP-12.01. (Step 10) CONTINUES TO REDUCE UNIT LOAD AS NECESSARY TO MAINTAIN VACUUM.

STANDARD:

Candidate determines that no actions are required based on number of CW pumps running EVALUATOR'S NOTE:

Both unit's Reactor Operators have stopped throttling CW MOVs.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM g" Page 8 of 13 STEP 10:

0-AP-12.01. (Step 11) CHECK INTAKE CANAL LEVEL

- STABLE OR INCREASING.

STANDARD:

(a) Trainee evaluates canal level indication and/or trend recorder to verify canal level increasing.

(b) Trainee then goes to Step 27

EVALUATOR'S NOTE:

None. COMMENTS:

_______ SAT

_______ UNSAT STEP 11: 0-AP-12.01. (Step 27) NOTIFY THE FOLLOWING.

STANDARD:

(a) Candidate notifies Evaluator that the OM on Call, Manager Nuclear Operations and STA need to be notified.

EVALUATOR'S NOTE:

Respond: Notifications will be made.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM g" Page 9 of 13 STEP 12:

0-AP-12.01. (Step 28) CHECK INTAKE CANAL LEVEL

- INCREASING.

STANDARD:

(a) Candidate acknowledges NOTE concerning Intake Canal Level must be maintained >17.2 feet.

(b) Candidate evaluates canal level indication and/or trend recorder to and identifies canal level >17.2 feet, and increasing.

EVALUATOR'S NOTE:

None. COMMENTS:

_______ SAT

_______ UNSAT STEP 13: 0-AP-12.01. (Step 29) CHECK INTAKE CANAL LEVEL

- GREATER THAN 17.2 FT

. STANDARD:

(a) Candidate identifies canal level greater than 17.2 feet

. EVALUATOR'S NOTE:

None.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM g" Page 10 of 13 STEP 14:

0-AP-12.01. (Step 30) THROTTLE OPEN CC HX SW OUTLET VALVES AS NECESSARY TO LOWER CC TEMPERATURE.

STANDARD:

(a) Acknowledges NOTE regarding restoration of CCHX SW flow.

(b) Candidate recognizes that no throttling of CCHW SW flow was performed, so no actions required on this step.

EVALUATOR'S NOTE:

If asked:

No actions were taken to reduce CCHX SW flow

. COMMENTS:

_______ SAT

_______ UNSAT STEP 15: 0-AP-12.01. (Step 31) CHECK CAUSE OF LEVEL DECREASE

-CORRECTED.

STANDARD:

(a) Candidate identifies that restoration of CW pumps corrects cause of level decrease.

EVALUATOR'S NOTE:

If asked:

Control Ops group will be notified to initiate troubleshooting on 2G transformer

.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM g" Page 11 of 13 STEP 16:

0-AP-12.01. (Step 32) RESTORE CW AND SW COMPONENTS (INCLUDING CW CHEMICAL INJECTION BY OPENING 1

-SA-285 AND 2-SA-274) TO SUPPORT PLANT CONDITIONS.

STANDARD:

(a) Candidate reports that CW MOVs may be returned to previous position.

(b) Candidate recognizes that chemical injections systems require no action.

EVALUATOR'S NOTE:

None. COMMENTS:

_______ SAT

_______ UNSAT STEP 17 Candidate Reports completion of Task to Shift Manager END OF JPM STOP TIME:

____________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

__________________________________________________________________________________

__ ____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________ ____________________________________________________________________________________

____________________________________________________________________________________

Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Initial Conditions Both units are at 100% power when a lightning strike trips 2G screenwell transformer.

Alarm VSP L

-7 "LLIS TROUBLE" and VSP

-K6 "500KV HSE TRBL" have alarmed eight (8) minutes ago.

Security reports a lightning strike in the vicinity of the low level intake.

All Unit 2 Circulating Water Pumps were initially running. Unit One and Unit Two Reactor Operators are currently throttling CW MOVs to conserve intake canal level. Initiating Cue You are the Unit 1 BOP.

You are to respond to the loss of Circulating Water Pumps.

When you finish the actions necessary to accomplish this, please inform me.

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions Both units are at 100% power when a lightning strike trips 2G screenwell transformer.

Alarm VSP L

-7 "LLIS TROUBLE" and VSP

-K6 "500KV HSE TRBL" have alarmed eight (8) minutes ago.

Security reports a lightning strike in the vicinity of the low level intake.

All Unit 2 Circulating Water Pumps were initially running. Unit One and Unit Two Reactor Operators are currently throttling CW MOVs to conserve intake canal level.

Initiating Cue You are the Unit 1 BOP.

You are to respond to the loss of Circulating Water Pumps.

When you finish the actions necessary to accomplish this, please inform me.

Surry 2014-301 "JPM h" Page 1 of 7 U.S. Nuclear Regulatory Commission Surry Power Station SR14301 Simulator Job Performance Measure [KA 064.A4.06

] [Alternate Path]

Applicant________________________________

Start Time___________________

Examiner_______________________________

Date ___________________________________

Stop Time___________________

Title Respond to a Failure of #3 EDG to Start and Load on 1J 4160V Bus.

K/A: 064.A4.06

Manual start, loading, and stopping of the ED/G, RO 3.9 / SRO 3.9 Applicability Estimated Time Actual Time RO 20 Minutes

___ Minutes Conditions Task is to be PERFORMED in the simulator.

A Loss of the "A" RSS Transformer has occurred

. #3 EDG has failed to start and load.

Standards

  1. 3 EDG started and loaded on the 1J Emergency Bus IAW 0

-AP-17.05, EDG 3

- Emergency Operations

. Initiating Cue

Shift Manager Direction

. Terminating Cues Report of #3 EDG loaded on the 1J Emergency Bus

. Procedures

0-AP-17.05, EDG 3

- Emergency Operations, Revision 22.

Tools and Equipment Safety Considerations None None Surry 2014-301 "JPM h" Page 2 of 7 Simulator Setup Call up 100% power IC and initialize (IC 280). Place simulator in RUN.

Load the following Malfunctions/Overrides:

EL0501, Loss of reserve Station Service XMFMR A, TRUE ED0503, EDG3 Voltage Regulator Failure,

-1 VSPC5 EMERG DIESEL 3 Auto Start Disabled, Trigger 15 Remotes, EDG3, AUTO_EXERCISE, EMERG GEN 3 AUTO EXERCISE, EXERCISE When #3 EDG placed in AUTO implement Trigger 15

. When STOP buttons pushed delete VSPC5 malfunction

. Acknowledge Alarms.

Freeze and Snap IC until ready for evaluation.

Initial Conditions

Unit 1 operating at 100% power

. The Loss of the "A" RSST has occurred and #3 EDG has failed to start and load on 1J 4160V Bus

. Starting and loading #3 EDG on the 1J 4160V bus IAW 0

-AP-17.05, EDG 3

- Emergency Operations is in progress and is complete through step 3 of Attachment 2

. Initiating Cues You are the Unit 2 BOP and are to continue with starting and loading of #3 EDG per 0

-AP-17.05, starting with Attachment 2 step 4

. When you finish the actions necessary to accomplish this, please inform me.

Notes Surry 2014-301 "JPM h" Page 3 of 7 PERFORMANCE CHECKLIST Notes to the Evaluator This JPM may be Pre-briefed as directed by the Chief Examiner.

Task critical elements are bolded and denoted by an asterisk (

  • ). An additional instructor may be needed to silence and acknowledge alarms for the examinee, and perform actions for Unit 2

. START TIME

_____:

STEP 1: [Step 4, 5, and 6 of Attachment 2, AP

-17.05] Check Load Limit at maximum, Start EDG 3, Check #3 EDG Speed at 900 RPM, Place #3 EDG AUTO EXERCISE Switch in Auto.

STANDARD:

  • a) Candidate presses the EDG NO. 3 Engine Start pushbutton.

This is a critical step. b) Candidate will check EDG started using RPM indication.

  • c) Candidate will place the AUTO

-EXERCISE Switch for EDG #3 in AUTO position.

This is a critical step.

d) Candidate will note that #3 EDG has not energized the 1J Bus.

e) Candidate returns to AP

-17.05, Step 8.

EVALUATOR'S NOTE:

COMMENTS:

STEP 2: [Step 8, AP

-17.05]

CHECK BOTH J BUSES

- ENERGIZED BY OFFSITE POWER STANDARD:

a) Candidate Identifies 1J Bus is still de

-energized.

b) Candidate Goes To Step 10

. EVALUATOR'S NOTE:

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM h" Page 4 of 7 STEP 3: [Notes prior to Step 10 of AP

-17.05] Acknowledges NOTES:

If the B DC Bus is deenergized, the EDG output breaker and the J Bus load breakers must be closed manually.

The following conditions must exist for the EDG output breaker to close automatically:

EDG speed greater than 870 rpm EDG INCOMING voltage greater than 113 volts J8 breaker open Control switch for the J3 breaker in AUTO AFTER TRIP DC control power available to the J3 breaker STANDARD:

EVALUATOR'S NOTE:

COMMENTS:

_______ SAT

_______ UNSAT STEP 4: [Step 10, AP

-17.05]

CHECK EDG 3

- SUPPLYING J BUS STANDARD:

a) Candidate Identifies 15J3 - NOT Closed.

b) Candidate performs RNO. Identifies that loads are already stripped per Attachment 3.

c) Candidate goes to step 15 EVALUATOR'S NOTE:

COMMENTS:

_______ SAT

_______ UNSAT STEP 5: [Step 15, AP-17.05] CHECK EDG 3 INCOMING VOLTAGE GREATER THAN 113 VOLTS.

STANDARD:

a) *Candidate turns SYNC

-ACB-15J3 key switch to ON

. This is a critical step.

b) *Candidate identifies no generator voltage and momentarily depresses EMERG GEN NO 3 FIELD FLASS pushbutton

. Identifies Voltage established. This is a critical step.

c) *Candidate attempts to raise incoming voltage to 120 volts using the EMERG GEN NO 3 VOLT ADJ control switch. This is a critical step.

d) Candidate determines there is no Voltage increase, and goes to 15.c RNO.

EVALUATOR'S NOTE:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM h" Page 5 of 7 COMMENTS:

STEP 6: [Step 15.c RNO, AP

-17.05] SECURES #3 EDG.

STANDARD:

a) Candidate notifies Electrical Department

. b) *Candidate secures #3 EDG by momentarily pressing the EMERG GEN NO.3 ENGINE STOP pushbutton

s. This is a critical step.

c) Candidate notifies Shift Manager.

EVALUATOR'S NOTE:

If asked to notify the Electrical department: Acknowledge request.

  • Both ENGINE STOP pushbuttons must be depressed simultaneously.

COMMENTS:

JPM ENDS _______ SAT

_______ UNSAT

STOP TIME_______:

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

Surry 2014-301 "JPM h" Page 6 of 7 Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Initial Conditions Unit 1 operating at 100% power.

The Loss of the "A" RSST has occurred and #3 EDG has failed to start and load on 1J 4160V Bus.

Starting and loading #3 EDG on the 1J 4160V bus IAW 0

-AP-17.05, EDG 3

- Emergency Operations is in progress and is complete through step 3 of Attachment 2.

Initiating Cues You are the Unit 2 BOP and are to continue with starting and loading of #3 EDG per 0

-AP-17.05, starting with Attachment 2 step 4

. When you finish the actions necessary to accomplish this, please inform me.

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions Unit 1 operating at 100% power.

The Loss of the "A" RSST has occurred and #3 EDG has failed to start and load on 1J 4160V Bus.

Starting and loading #3 EDG on the 1J 4160V bus IAW 0

-AP-17.05, EDG 3

- Emergency Operations is in progress and is complete through step 3 of Attachment 2.

Initiating Cues You are the Unit 2 BOP and are to continue with starting and loading of #3 EDG per 0

-AP-17.05, starting with Attachment 2 step 4

. When you finish the actions necessary to accomplish this, please inform me.

Surry 2014-301 "JPM i" Page 1 of 13 U.S. Nuclear Regulatory Commission Surry Power Station SR14301 Job Performance Measure [KA APE068.AA1.21 3.9/4.1

] Applicant________________________________

Start Time___________________

Examiner_______________________________

Date ___________________________________

Stop Time___________________

Title LOCALLY TRANSFER INDIVIDUAL COMPONENTS TO THE AUX SHUTDOWN PANEL K/A: APE068.AA1.21 Ability to operate and / or monitor the following as they apply to the Control Room Evacuation: Transfer of controls from control room to shutdown panel or local control 3.9 / 4.1 Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 20 Minutes ___ Minutes Conditions Task is to be SIMULATED in the plant beginning at the Unit 1 Aux Shutdown Panel

. A limiting MCR fire has occurred. The MCR has been evacuated and attempts are being made to transfer plant control to the ASD Panel. Neither the H

-Group nor the J

-Group Transfer Switch will actuate its components.

The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel.

The H and J Group Transfer Switches have failed to function.

Standards FCA-1.00, Attachment

2. Initiating Cues FCA-1.00, Limiting MCR Fire, Step 16 RNO Shift Manager direction.

Terminating Cues

Report received that FCA

-1.00, Attachment 2 completed for Unit 1 components.

Procedures

FCA-1.00, Limiting MCR Fire, Attachment 2, Rev 48.

Tools and Equipment Safety Considerations

None Standard Personal Safety Equipment

Surry 2014-301 "JPM i" Page 2 of 13 Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.

The MCR was evacuated due to a fire.

The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel.

The H and J Group Transfer Switches have failed to function.

Initiating Cue Locally transfer the individual Unit 1 components to the Unit 1 Aux Shutdown Panel in accordance with FCA

-1.00, Attachment 2, Override Control to Auxiliary Shutdown Panel.

When you finish the actions necessary to accomplish this, please inform me.

Notes to the Evaluator:

Operator briefing should occur at the Unit 1 Aux Shutdown Panel.

This task is to be SIMULATED. Do NOT allow the operator to manipulate controls, operate switches or reposition valves.

Task critical elements are denoted by an asterisk (

  • ). If substeps of a critical element also have an asterisk (
  • ), then only those asterisked substeps are critical to performance of that task element.

Critical step sequencing requirements: None

Surry 2014-301 "JPM i" Page 3 of 13 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (

  • ). START TIME_______:

STEP 1: 0-FCA-1.00, Attachment 2 (Caution Prior to Step

1) REVIEWS CAUTION PRIOR TO STEP 1.

Standards Notes that this Attachment should not be performed if transfer failure is due to the emergency bus being de

-energized Cues If asked: Both emergency buses are energized on Unit 1.

Evaluator's Comments

_______ SAT

_______ UNSAT

STEP 2: 0-FCA-1.00, Attachment 2 (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

Standards

(a) Proceeds to H Bus 4160v breaker 15H4.

  • (b) Places 1-FW-P-3A's local control box Mode switch (1

-EP-43-15H4) to OVERRIDE position.

  • (c) Rotates Transfer switch (1

-EP-43X-15H4) to AUX P position

. Evaluator's Note: If Asked at the ASP: Following Step b) and c) above, 1

-FW-P-3A breaker indicating lights, RED light LIT, GREEN light OFF.

Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM i" Page 4 of 13 STEP 3:

0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-CH-P-1A. Standards (a) Proceeds to H Bus 4160v breaker 15H5.

  • (b) Places 1-CH-P-1A's local control box Mode switch (1

-EP-43A-15H5) to OVERRIDE position.

  • (c) Rotates Transfer switch (1-EP-43X-15H5) to AUX P position

. Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-CH-P-1A breaker indicating lights, RED and GREEN OFF (control switch in PTL).

Evaluator's Comments

_______ SAT

_______ UNSAT STEP 4: 0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-CH-P-1C (NORM).

Standards (a) Proceeds to H Bus 4160v breaker 15H6.

  • (b) Places 1-CH-P-1C's local control box Mode switch (1

-EP-43-15H6) to OVERRIDE position.

  • (c) Rotates Transfer switch (1

-EP-43X-15H6) to AUX P position

. Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-FCH-P-1C breaker indicating lights, RED light LIT, GREEN light OFF.

Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM i" Page 5 of 13 STEP 5: 0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-CH-P-1C (ALT).

Standards (a) Proceeds to J Bus 4160v breaker 15J2.

  • (b) Places 1-CH-P-1C's (ALT) local control box Mode switch (1

-EP-43-15J2) to OVERRIDE position

  • (c) Rotates Transfer switch (1

-EP-43X-15J2) to AUX P position.

Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-CH-P-1C (ALT) breaker indicating lights, RED light and GREEN light OFF (switch in PTL).

Evaluator's Comments

_______ SAT

_______ UNSAT STEP 6: 0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

6. LOCALLY TRANSFERS 1

-FW-P-3B. Standards (a) Proceeds to J Bus 4160v breaker 15J4.

  • (b) Places 1-FW-P-3B's local control box Mode switch (1

-EP-43-15J4) to OVERRIDE position

  • (c) Rotates Transfer switch (1-EP-43X-15J4) to AUX P position.

Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-FW-P-3B breaker indicating lights, RED light LIT, GREEN light OFF.

Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM i" Page 6 of 13 STEP 7:

0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-CH-P-1B. Standards

(a) Proceeds to J Bus 4160v breaker 15J5.

  • (b) Places 1-CH-P-1B's local control box Mode switch (1

-EP-43A-15J5) to OVERRIDE position

  • (c) Rotates Transfer switch (1

-EP-43X-15J5) to AUX P position.

Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-CH-P-1B breaker indicating lights, RED light and GREEN light OFF (switch in PTL).

Evaluator's Comments

_______ SAT

_______ UNSAT STEP 8: 0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-MS-SOV-102A. Standards (a) Proceeds to Aux SD Panel, locates Transfer Relay Cabinet 5.

  • (b) Places 1-MS-SOV-102A's local control box Mode switch (1

-MS-43B-SMS102A) to OVERRIDE position

  • (c) Rotates Transfer switch (1

-MS-43X-SMS102A) to AUX PANEL position.

Cues If asked at ASP: RED Light LIT, GREEN light OFF, switch in CLOSE position

. Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM i" Page 7 of 13 STEP 9:

0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-MS-SOV-102B. Standards

(a) Locates Transfer Relay Cabinet #3 (left of Aux SD Panel).

  • (b) Places 1-MS-SOV-102B's local control box Mode switch (1

-MS-43B-SMS102B) to OVERRIDE position

  • (c) Rotates Transfer switch (1

-MS-43X-SMS102B) to AUX P position

. Cues If asked at ASP: RED light ON, GREEN light OFF, switch in CLOSE position

. Evaluator's Comments

_______ SAT

_______ UNSAT STEP 10: 0-FCA-1.00, Attachment 2, (Step 1, Page 2) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-FW-MOV-151A. Standards (a) Proceeds to Unit 1 Cable Vault Transfer Relay Cabinet 1.

  • (b) Places 1-FW-MOV-151A's local control box Mode switch (1

-FW-43B-FW151A) to OVERRIDE position

  • (c) Rotates Transfer switch (1

-FW-43X-FW151A) to AUX P position

. Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-FW-MOV-151A indicating lights, RED light LIT, GREEN light OFF.

Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM i" Page 8 of 13 STEP 11:

0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-FW-MOV-151C. Standards

(a) Locates appropriate switch on Transfer Relay Cabinet 1.

  • (b) Places 1-FW-MOV-151C's local control box Mode switch (1

-FW-43B-FW151C) to OVERRIDE position

  • (c) Rotates Transfer switch (1

-FW-43X-FW151C) to AUX P position

. Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-FW-MOV-151C indicating lights, RED light LIT, GREEN light OFF.

Evaluator's Comments

_______ SAT

_______ UNSAT STEP 12: 0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-FW-MOV-151E. Standards (a) Locates appropriate switch on Transfer Relay Cabinet 1.

  • (b) Places 1-FW-MOV-151E's local control box Mode switch (1

-FW-43B-FW151E) to OVERRIDE position

  • (c) Rotates Transfer switch (1

-FW-43X-FW151E) to AUX P position.

Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-FW-MOV-151EA indicating lights, RED light LIT, GREEN light OFF.

Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM i" Page 9 of 13 STEP 13:

0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-CH-P-2A. Standards

(a) Locates appropriate switch on Transfer Relay Cabinet 1.

  • (b) Places 1-CH-P-2A's local control box Mode switch (1

-CH-43B-CH2A) to OVERRIDE position

  • (c) Rotates Transfer switch (1

-CH-43X-CH2A) to AUX P position

. Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-CH-P-2A indicating lights, RED SLOW light LIT, switch in "A". Evaluator's Comments

_______ SAT

_______ UNSAT STEP 14: 0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-FW-MOV-151B. Standards (a) Proceeds to Unit 1 Cable Vault Transfer Relay Cabinet #2.

  • (b) Places 1-FW-MOV-151B's local control box Mode switch (1

-FW-43B-FW151B) to OVERRIDE position

  • (c) Rotates Transfer switch (1

-FW-43X-FW151B) to AUX P position

. Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-FW-MOV-151B indicating lights, RED light LIT, GREEN light OFF.

Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM i" Page 10 of 13 STEP 15:

0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-FW-MOV-151D. Standards

(a) Locates appropriate switch on Transfer Relay Cabinet #2

  • (b) Places 1-FW-MOV-151D's local control box Mode switch (1

-FW-43B-FW151D) to OVERRIDE position.

  • (c) Rotates Transfer switch (1

-FW-43X-FW151D) to AUX P position

. Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-FW-MOV-151D indicating lights, RED light LIT, GREEN light OFF.

Evaluator's Comments

_______ SAT

_______ UNSAT STEP 16: 0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-FW-MOV-151F. Standards (a) Locates appropriate switch on Transfer Relay Cabinet #2

  • (b) Places 1-FW-MOV-151F's local control box Mode switch (1

-FW-43B-FW151F) to OVERRIDE position

  • (c) Rotates Transfer switch (1

-FW-43X-FW151F) to AUX P position.

Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-FW-MOV-151F indicating lights, RED light LIT, GREEN light OFF.

Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM i" Page 11 of 13 STEP 17:

0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-CH-P-2B. Standards

(a) Locates appropriate switch on Transfer Relay Cabinet #2

  • (b) Places 1-CH-P-2B's local control box Mode switch (1

-CH-43B-CH2B) to OVERRIDE position

  • (c) Rotates Transfer switch (1

-CH-43X-CH2B) to AUX P position

. Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-CH-P-2B indicating lights, RED SLOW light LIT, GREEN light OFF, switch in "S".

Evaluator's Comments

_______ SAT

_______ UNSAT STEP 18: 0-FCA-1.00, Attachment 2, (Step 1) Locally select OVERRIDE position on Mode switch and rotate Transfer switch to AUX P position for equipment failing to transfer control to the Auxiliary Shutdown Panel:

LOCALLY TRANSFERS 1

-CH-MOV-1350. Standards

(a) Proceeds to Unit 1 Cable Vault Transfer Relay Cabinet 4.

  • (b) Places 1-CH-MOV-1350's local control box Mode switch (1

-CH-43B-1350) to OVERRIDE position.

  • (c) Rotates Transfer switch (1

-CH-43X-1350) to AUX P position

. Evaluator's Note:

If Asked at the ASP: Following Step b) and c) above, 1

-CH-MOV-1350 indicating lights, GREEN light LIT, RED light OFF.

IF Asked at the ASP: All components indicate shifted to ASP Control.

Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM i" Page 12 of 13 REPORTS TO SHIFT MANAGER (EVALUATOR).

Standards Verbal status report made that all affected Unit 1 components locally transferred to Aux Shutdown Panel.

STOP TIME: ______

Evaluator's Comments

Evaluator's Note If Asked: Components shown below indicate status.

1-FW-P-3A 1-MS-SOV-102A 1-MS-SOV-102B 1-FW-P-3B Red Lite LIT Red Lite LIT Both Red Lites LIT Red Lite LIT 1-CH-P-1A 1-CH-P-1C 1-CH-P-1B 1-CH-P-1C (Alt) No Lites (PTL)

Red Lite Lit No Lites (PTL)

No Lites (PTL) 1-FW-MOV-151A 1-FW-MOV-151E 1-FW-MOV-151D 1-FW-MOV-151B Red Lite LIT Red Lite LIT Red Lite LIT Red Lite LIT 1-FW-MOV-151C 1-FW-MOV-151F Red Lite LIT Red Lite LIT 1-CH-P-2A 1-CH-P-2B Red SLOW LIT Red SLOW LIT Switch in "A" Switch in "S"

Surry 2014-301 "JPM i" Page 13 of 13 STOP TIME:

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

__________________________________________________________________________________

__ ____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________ ____________________________________________________________________________________

____________________________________________________________________________________

Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.

The MCR was evacuated due to a fire.

The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel The H and J Group Transfer Switches have failed to function.

Initiating Cue Locally transfer the individual Unit 1 components to the Unit 1 Aux Shutdown Panel in accordance with FCA

-1.00, Attachment 2, Override Control to Auxiliary Shutdown Panel.

When you finish the actions necessary to accomplish this, please inform me.

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.

The MCR was evacuated due to a fire.

The crew is attempting to establish control from the Unit 1 Aux Shutdown Panel

The H and J Group Transfer Switches have failed to function.

Initiating Cue Locally transfer the individual Unit 1 components to the Unit 1 Aux Shutdown Panel in accordance with FCA

-1.00, Attachment 2, Override Control to Auxiliary Shutdown Panel.

When you finish the actions necessary to accomplish this, please inform me.

Surry 2014-301 "JPM j" Surry SR14301 1 of 10 U.S. Nuclear Regulatory Commission Surry Power Station SR14301 Job Performance Measure 076A2.01 (3.5/3.7)

[ALTERNATE PATH]

Applicant________________________________

Start Time___________________

Examiner_______________________________

Date ___________________________________

Stop Time___________________

Title ISOLATE SERVICE WATER TO #3 MER DURING FLOODING K/A: 076A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the SWS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations; Loss of SWS. (3.5/3.7)

Applicability Estimated Time Actual Ti me RO/SRO(D) 15 Minutes

__________

Conditions Task is to be SIMULATED in the plant.

Any plant mode/condition where a large SW leak in #3 MER has occurred.

Standards Flooding isolated to #3 MER as indicated by decreasing water level in accordance with 0

-AP-13.00 steps 38 and 39. Initiating Cues 0-AP-13.00, Turbine Building or #3 MER Flooding, Step 3

8. Shift Manager direction.

Terminating Cues 0-AP-13.00, Turbine Building or #3 MER Flooding, Step 3 9 completed.

Procedures 0-AP-13.00, Turbine Building or #3 MER Flooding, Revision 28

.

Surry 2014-301 "JPM j" Surry SR14301 2 of 10 Tools and Equipment Safety Considerations None Standard Personal Safety Equipment Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.

There is a major Service Water leak in #3 MER.

1-SW-P-10B and 2

-SW-P-10B have been secured.

1-VS-E-4A, 4B, and 4C have been secured.

MER 3 Watertight Door has been checked closed.

Initiating Cues The team has reached step 37 of 0

-AP-13.00, Turbine Building or #3 MER Flooding.

You are to isolate Service Water to #3 MER in accordance with Steps 38 and 39 of 0

-AP-13.00, Turbine Building or #3 MER Flooding.

Notes to the Evaluator

. Task briefing should occur in the pre-determined location

.

Surry 2014-301 "JPM j" Surry SR14301 3 of 10 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (*)

. START TIME:

STEP 1:

[Step 38a, AP

-13.00] ISOLATE SW TO MER 3:

a) Fail 1-SW-263 closed by opening Circuit 8 on Lighting Panel 2T3 (located north of 2

-FW-E-2A) STANDARD:

Locates lighting panel 2T3 (located north of 2

-FW-E-2A). *b) Opens circuit 8 on lighting panel 2-EP-LP-2T3- this is a critical step.

EVALUATOR'S NOTE:

None COMMENTS:

_______ SAT

_______ UNSAT

STEP 2:

STEP 38b- Verify open or open 1

-SW-500, SW Header Crosstie (MER 4)

STANDARD:

(a) Proceeds to #4 MER.

(b) Locates manual valve 1

-SW-500 (halfway across room under smoke detector).

(c) *Pulls pin from handwheel actuator.

This is a critical step.

(d) *Opens 1-SW-500 by rotating valve handwheel in the clockwise direction

- This is a critical step.

Evaluator's Cues Tell operator:

Actual valve position in plant may be open or closed. Provide appropriate cue

. Point at "CLOSED" indicator

.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM j" Surry SR14301 4 of 10 STEP 3: Step 38c- Close 2-SW-476, Water Box 2C Isol (MER 4)

STANDARD:

(a) Locates 2

-SW-476 (in #4 MER 2/3 of the way across the room on the right hand side. (b) Attempts to close 2

-SW-476 by removing the locking pin and rotating the handwheel clockwise.

(c) Recognizes that 2

-SW-476 will not close and transitions to step 38c RNO column.

Evaluator's Cues Tell operator:

As operator attempts to close valve, the handwheel will not move.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM j" Surry SR14301 5 of 10 STEP 4: Step 38c RNO- Do the following:

1) Verify open or open 2

-SW-533. 2) Close 2

-SW-474, located in Unit 2 BC HX SW MOV pit. STANDARD:

(a) *Opens 2-SW-533 (MER-5) - by rotating valve handwheel in the counter-clockwise direction.

This is a critical step.

(b) Proceeds to Unit 2 BC HX SW MOV pit.

(c) Locates manual valve 2

-SW-474. (d) *Closes 2-SW-474 by removing the locking pin and rotating valve handwheel in the clockwise direction

- this is a critical step.

Evaluator's Cues For 2-SW-533, provide appropriate cue based on actual initial valve position in plant. If asked: After trainee identifies 2

-SW-474, if expected mark number not verbalized, ask the trainee what they expect the label to read, then tell trainee the label reads 2

-SW-474. If wrong valve identified, tell trainee that what they expected is not what it reads.

If asked: Security has been notified for entry.

Evaluator's Note Safety concern: Trainee does not have to travel down into the valve pits. He can identify which label he is looking at, tell the evaluator what he expects the label to read, and if correct (at the BC HX SW MOV PIT

), the evaluator can then state the label reads 2

-SW-474. The trainee can describe actions to complete valve manipulation from above.

Security concern: Certain valve pits are now covered by grates. If the enclosure is to be opened, security should be contacted. It is acceptable for the trainee to describe the actions required to raise the grate(s)

- utilize hand crank to raise the grating access door

. COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM j" Surry SR14301 6 of 10 STEP 5: Step 38d- Close 2-SW-478, SW Header Crosstie. (MER 4)

STANDARD:

(a) Locates 2

-SW-478 (in #4 MER 2/3 of the way across the room on the right hand side). (b) Pulls pin from handwheel actuator.

(c) *Closes 2-SW-478 by rotating valve handwheel in the clockwise direction

- This is a critical step.

Evaluator's Cues Tell operator:

Provide appropriate cue for valve operation based on actual in plant valve position.

Safety concern: Trainee does not have to crawl across pipes to check the valve labels at the east end of the #4 MER. He can identify which valve label he is looking at, and the evaluator can state the label reads "2

-SW-478" if the correct label is identified. The trainee can then describe the required actions to complete valve manipulation from the west end of #4 MER.

. COMMENTS:

_______ SAT

_______ UNSAT STEP 6: Step 38e- SECURE CHEMICAL INJECTION TO MER 3 SW SUPPLY HEADER IAW 0

-OP-SW-006, MER 3 AND MER 4 SERVICE WATER CHEMICAL INJECTION OPERATION STANDARD:

(a) Notifies Shift Manager (Evaluator) that Chemical Injection to MER 3 SW Supply Header needs to be secured IAW 0

-OP-SW-006. Evaluator's Cues Tell operator:

Unit 1 Turbine Building Operator will secure chemical injection.

COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM j" Surry SR14301 7 of 10 STEP 7: Step 39- CHECK WATER LEVEL IN MER 3 ON MER 4 GAUGE 2

-PL-LI-201 - DECREASING STANDARD:

(a) Locates MER 3 level gauge 2

-PL-LI-201 in MER 4.

(b) Checks that level in MER 3 is decreasing.

Evaluator's Cues Tell operator:

After the operator locates MER 3 level gauge, tell him the level is 50" H2O and slowly decreasing.

COMMENTS:

_______ SAT

_______ UNSAT STEP 8: REPORT TO SHIFT SUPERVISOR (EVALUATOR).

STANDARD:

Verbal status report that steps 3 8 and 39 of 1-AP-13.00 are complete.

EVALUATOR'S NOTE: N/A STOP TIME:

COMMENTS:

_______ SAT

_______ UNSAT STOP TIME:

______________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

Surry SR14301 8 of 10 Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.

There is a major Service Water leak in #3 MER.

1-SW-P-10B and 2-SW-P-10B have been secured.

1-VS-E-4A, 4B, and 4C have been secured.

MER 3 Watertight Door has been checked closed.

Initiating Cues

The team has reached step 37 of 0

-AP-13.00, Turbine Building or #3 MER Flooding.

You are to isolate Service Water to #3 MER in accordance with Steps 38 and 39 of 0

-AP-13.00, Turbine Building or #3 MER Flooding.

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions This task is to be SIMULATED. Do NOT turn switches, manipulate controls or reposition valves.

There is a major Service Water leak in #3 MER.

1-SW-P-10B and 2

-SW-P-10B have been secured.

1-VS-E-4A, 4B, and 4C have been secured.

MER 3 Watertight Door has been checked closed.

Initiating Cues The team has reached step 37 of 0

-AP-13.00, Turbine Building or #3 MER Flooding.

You are to isolate Service Water to #3 MER in accordance with Steps 38 and 39 of 0

-AP-13.00, Turbine Building or #3 MER Flooding.

Surry 2014-301 "JPM k" Page 1 of 16 U.S. Nuclear Regulatory Commission Surry Power Station SR14301 Simulator Job Performance Measure [KA 061K4.01 4.1/4.2

] [Alternate Path]

Applicant________________________________

Start Time___________________

Examiner_______________________________

Date ___________________________________

Stop Time___________________

Title LOCALLY SWAP THE AFW PUMP SUPPLY TO THE FIRE WATER ALTERNATE SOURCE (Faulted)

K/A: Knowledge of AFW design feature(s) and/or interlock(s) which provide for the following: Water sources and priority of use

. 4.1/4.2. Applicability Estimated Time Actual Time RO/SRO(I)/SRO(U) 25 Minutes ___ Minutes Conditions Task is to be SIMULATED in the plant.

A simulated loss of secondary heat sink is in progress. Both the ECST and underground tank levels are below 20% and it is desired to swap AFW pump suction to the Fire Main.

Standards 2-FR-H.1, Attachment 1, part 4 Self-Checking (STAR) practices will be used throughout task performance.

Operations Department Standards shall be adhered to.

Terminating Cues

Report received that alternate source aligned to AFW pumps.

Any failure criteria listed under the Evaluation Criteria section above has been met.

Candidate states "Task is complete."

Procedures 2-FR-H.1, Attachment 1, part 4, Rev 36 Tools and Equipment Safety Considerations None Standard PPE Required.

Surry 2014-301 "JPM k" Page 2 of 16 Initial Conditions Unit 2 is currently experiencing a loss of secondary heat sink and the team is currently at step 3 of 2-FR-H.1, Response to Loss of Secondary Heat Sink.

AFW cross

-tie from Unit 1 is unavailable

. An operator has attempted to open 2-CN-150 and the valve is stuck CLOSED.

. Initiating Cues Align an alternate suction source to the Aux Feedwater pumps using the most preferred source available in accordance with 2

-FR-H.1, Attachment 1.

Notes to the Evaluator

Brief of this JPM may be accomplished in the RP Briefing Room, outside of the RCA This task is to be SIMULATED. Do NOT allow the operator to manipulate controls, operate switches or reposition valves.

Surry 2014-301 "JPM k" Page 3 of 16 PERFORMANCE CHECKLIST Notes to the Evaluator Task critical elements are bolded and denoted by an asterisk (

  • ). START TIME_______:

STEP 1: 2-FR-H.1, Attachment 1, Part 1 Select one of the following methods as an alternate source of Auxiliary Feedwater.

Makeup to 2

-CN-TK-1 from 2-CN-TK-2 Standards (a) Identifies this source is not available from initial conditions

. Evaluator's Cues When attempts are made to open the valve, the handwheel will not turn with the chain. The valve is jammed closed.

Evaluator's Notes 2-CN-150 is stuck closed

. Evaluator's Comments

_______ SAT

_______ UNSAT STEP 2: 2-FR-H.1, Attachment 1, Part 2 Alignment of AFW Booster Pump(s)

DETERMINES AFW BOOSTER PUMPS ARE NOT AVAILABLE Standards (a) Check 2-CN-TK-3 level > 20%

. Evaluator's Cues Inform operator that 2

-CN-TK-3 level is < 10%

. Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM k" Page 4 of 16 STEP 3: 2-FR-H.1, Attachment 1, Part 3.

Cross-tie from Unit 1.

Standards Based on directions given to operator, determines AFW crosstie from Unit 1 unavailable.

Evaluator's Cues As the Shift Manager, I need you to determine an alternate method based on the information given.

Evaluator's Comments

_______ SAT

_______ UNSAT STEP 4: 2-FR-H.1, Attachment 1, Part, (Step 4a) Fire Water Alignment to AFW Pumps.

LOCALLY CLOSE THE FIRE MAIN ISOLATION VALVES TELL

-TALE DRAIN, 2

-FW-119 Standards (a) Proceeds to Unit 2 safeguards steam side.

(b) Closes 2-FW-119 by turning handwheel in the clockwise direction.

Evaluator's Cues When the valve is operated properly, the valve stem inserts until the handwheel will not turn. Evaluator's Notes 2-FW-119 is located between the fire main isolation valves near the stairway to the upper levels and is normally open.

Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM k" Page 5 of 16 STEP 5: 2-FR-H.1, Attachment 1, Part 4, (Step b.)

Locally open fire main isolation valves:

Standards

  • (a) Opens 2-FW-120 by turning handwheel in the counter

-clockwise direction

. *(b) Opens 2-FW-185 by turning handwheel in the counter

-clockwise direction

. Cues Provide cues valve stems rise as FW

-120 & FW-185 are properly operated.

Tell Operator:

After both FW

-120 & FW-185 opened, provide cues flow noise is momentarily heard through the valves.

Tell Operator:

If FW-119 NOT closed before opening FW

-120 & FW-185, provide cues water is spraying out from 2

-FW-119. Evaluator's Notes 2-FW-120 & -185 are located on ground level near stairway.

Evaluator's Comments

_______ SAT

_______ UNSAT STEP 6: 2-FR-H.1, Attachment 1, Part 4, (Step 4 c.)

Locally start diesel driven fire pump.

STANDARD:

a) Asks Shift Manager/Evaluator status of diesel driven fire pump

. EVALUATOR'S NOTE:

When asked: Diesel driven fire pump has been started

. COMMENTS:

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM k" Page 6 of 16 STEP 7: 2-FR-H.1, Attachment 1, Part 4, (Step 4 d.)

Locally open fire water suction valves to available AFW pump(s):

STANDARD:

a) Acknowledges NOTE prior to Step d: The following steps should be used as needed to align water to each AFW pump one at a time and the MCR informed after each pump alignment is complete.

  • b) Opens 2-FW-154, (for 2

-FW-P-2) *c) Opens 2-FW-169, (for 2

-FW-P-3A) *d) Opens 2-FW-184, (for 2

-FW-P-3B) Evaluator's Cues Provide cues valve stems rise as each valve is properly operated.

If Notified:

acknowledge opening 2

-FW-154 / 169 / 184 as MCR Operator.

If Asked:

Inform Candidate that Unit 2 AFW Pumps have been secured due to cavitation.

EVALUATOR'S NOTE:

Candidate inform s MCR (Evaluator) following manipulation of each individual valve or wait until all valves for each pump have been manipulated.

(Steps 8, 9, and 10 describe valve operations).

COMMENTS:

_______ SAT

_______ UNSAT STEP 8: 2-FR-H.1, Attachment 1, Part 4, (Step 4 d.)

LOCALLY CHECK AFW PUMP SUCTION PRESSURE AVAILABLE Standards Checks each AFW pump suction pressure gauge to verify pressure available:

(a) 2-FW-PI-256A (for 2

-FW-P-2), (b) 2-FW-PI-256B (for 2

-FW-P-3A), (c) 2-FW-PI-256C (for 2-FW-P-3B). Evaluator's Cues Provide cues each gauge indicates full range (>

30 psig). Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM k" Page 7 of 16 STEP 9: 2-FR-H.1, Attachment 1, Part 4, (Step 4 f.)

LOCALLY CLOSE THE NORMAL AFW PUMP SUCTION VALVES Standards Closes/verifies closed the other AFW pump suction paths:

  • (a) Closes 2-FW-153 (ECST to 2

-FW-P-2) by turning handwheel in the clockwise direction (b) Verifies 2

-FW-283 closed (booster pps to 2

-FW-P-2). *(c) Closes 2-FW-168 (ECST to 2-FW-P-3A) by turning handwheel in the clockwise direction (d) Verifies 2

-FW-284 closed (booster pps to 2

-FW-P-3A). *(e) Closes 2-FW-183 (ECST to 2

-FW-P-3B) by turning handwheel in the clockwise direction (f) Verifies 2

-FW-285 closed (booster pps to 2-FW-P-3B). Evaluator's Cues Provide cues valve stems go in as 2

-FW-153, -168 & -183 are properly operated.

Provide cues valve stems for 2

-FW-283, -284 & -285 are as indicated (~1/2 inch showing).

When notified: As each AFW pump valve alignment is complete, acknowledge completion of alignment as MCR Operator.

Evaluator's Comments

_______ SAT

_______ UNSAT

Surry 2014-301 "JPM k" Page 8 of 16 STEP 10: REPORTS TO SHIFT MANAGER (EVALUATOR)

Standards Verbal status report made that AFW pumps are on fire water suction per 2-FR-H.1, Attachment 1

. STOP TIME: ______________

Evaluator's Comments

_______ SAT

_______ UNSAT COMMENTS:

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

Operator Directions Handout (TO BE READ TO APPLICANT BY EXAMINER)

Initial Conditions Unit 2 is currently experiencing a loss of secondary heat sink and the team is currently at step 3 of 2

-FR-H.1, Response to Loss of Secondary Heat Sink.

AFW cross

-tie from Unit 1 is unavailable.

An operator has attempted to open 2

-CN-150 and the valve is stuck CLOSED.

. Initiating Cues Align an alternate suction source to the Aux Feedwater pumps using the most preferred source available in accordance with 2

-FR-H.1, Attachment 1.

Operator Directions Handout (TO BE GIVEN TO APPLICANT)

Initial Conditions Unit 2 is currently experiencing a loss of secondary heat sink and the team is currently at step 3 of 2

-FR-H.1, Response to Loss of Secondary Heat Sink.

AFW cross-tie from Unit 1 is unavailable.

An operator has attempted to open 2

-CN-150 and the valve is stuck CLOSED.

. Initiating Cues Align an alternate suction source to the Aux Feedwater pumps using the most preferred source available in accordance with 2-FR-H.1, Attachment 1.