In a telephone conversation on February 20, 2018, between Mr. B. Bergeon, Operations Engineer, the U. S. Nuclear Regulatory Commission (NRC) lead inspector for this inspection, and Mr. D. Siuda, Dresden Operations Training Instructor, final arrangements were made for the NRC to inspect the Licensed Operator Requalification Program at the Dresden Nuclear Power Station. The inspection is planned for the week of May 14, 2018. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. In accordance with Title 10 of the Code of Federal Regulations (CFR), Part 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations and annual operating tests as necessary to support the NRC's inspection program needs. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a request for documents needed for the inspection. Please furnish the items listed in the first group of the attached enclosure, needed to support our in-office inspection activities, to the NRC by May 1, 2018. Please have the items listed in the second group of the attached enclosure available for the inspectors during the onsite portion of the inspection activities. Mr. D. Siuda has been advised of this request. Thank you for your cooperation in this matter. If there are any questions regarding either the inspection, or the material requested in the enclosure, please contact me at 630-829-9851, or via e-mail at Bryan.Bergeon@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
In a telephone conversation on February 20, 2018, between Mr. B. Bergeon, Operations Engineer, the U. S. Nuclear Regulatory Commission (NRC) lead inspector for this inspection, and Mr. D. Siuda, Dresden Operations Training Instructor, final arrangements were made for the NRC to inspect the Licensed Operator Requalification Program at the Dresden Nuclear Power Station. The inspection is planned for the week of May 14, 2018. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. In accordance with Title 10 of the Code of Federal Regulations (CFR), Part 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations and annual operating tests as necessary to support the NRC's inspection program needs. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a request for documents needed for the inspection. Please furnish the items listed in the first group of the attached enclosure, needed to support our in-office inspection activities, to the NRC by May 1, 2018. Please have the items listed in the second group of the attached enclosure available for the inspectors during the onsite portion of the inspection activities. Mr. D. Siuda has been advised of this request. Thank you for your cooperation in this matter. If there are any questions regarding either the inspection, or the material requested in the enclosure, please contact me at 630-829-9851, or via e-mail at Bryan.Bergeon@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
B. Hanson This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR  Sincerely,  /RA Randal Baker Acting for/  Bryan A. Bergeon, Operations Engineer Operations Branch Division of Reactor Safety Docket Nos. 50237; 50249 License Nos. DPR19; DPR25  
This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR  Sincerely,  /RA Randal Baker Acting for/  Bryan A. Bergeon, Operations Engineer Operations Branch Division of Reactor Safety Docket Nos. 50237; 50249 License Nos. DPR19; DPR25  


==Enclosure:==
==Enclosure:==
Documents Request to Support Licensed Operator Requalification Program and Licensed Operator Performance Inspection cc:  Distribution via LISTSERV B. Hanson Letter to Bryan C. Hanson from Bryan A. Bergeon dated February 21, 2018  
Documents Request to Support Licensed Operator Requalification Program and Licensed Operator Performance Inspection cc:  Distribution via LISTSERV Letter to Bryan C. Hanson from Bryan A. Bergeon dated February 21, 2018  


==SUBJECT:==
==SUBJECT:==
DRESDEN NUCLEAR POWER STATIONNOTIFICATION OF AN NRC BIENNIAL LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION AND REQUEST FOR INFORMATION DISTRIBUTION: Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII Nancy Salgado Colleen Schmidt                          ADAMS Accession Number ML:  18053A109 OFFICE RIII  RIII  RIII  RIII  NAME BBergeon:cl    DATE 02/21/18    OFFICIAL RECORD COPY DOCUMENTS REQUEST TO SUPPORT LICENSED OPERATOR REQUALIFICATION PROGRAM AND LICENSED OPERATOR PERFORMANCE INSPECTION Enclosure Please provide the following information on a CD/DVD, or electronically if possible, by May 1, 2018. 1. One complete version of the biennial requalification written examination (RO and SRO exams) to be administered during the onsite portion of this inspection. 2. Ten (10) job performance measures (JPMs) and four (4) simulator scenarios associated with an annual requalification operating test required by 10 CFR 55.59(a)(2). The JPMs and scenarios to be reviewed should include those that will be observed during the onsite portion of this inspection, with any remaining JPMs and scenarios selected from other weeks within the same training cycle. 3. Complete versions of the reference materials used to develop the written examinations and operating tests provided for items 1 and 2 above.  (Refer to ES-201 Attachment 3, Reference Material Guidelines for Initial Licensing Examinations, for additional examples and clarification.) 4. A list (or lists) of licensee-identified issues associated with licensed operator errors or other licensed operator performance problems which have occurred in the actual plant/main control room since the last biennial requalification program, their associated corrective actions, and if these issues were incorporated into requalification training. (These issues are likely documented in condition/problem identification reports, licensee-conducted audits and assessments, and in industry operating experience reports, etc.) 5. Spreadsheets and/or test outlines which show the usage of written examination questions, JPMs, and simulator scenarios. 6. Facility licensee procedures for licensed operator requalification training and examination, including examination security procedures. 7. -site inspection week. Please have the following information available for NRC review on May 14, 2018. 1. Licensed operator pass/fail statistics for any NRC-required requalification examinations that has been completed (see Table 03.02-1, Examination Results). 2. biennial inspection (cycle weeks, training topics, etc.). 3. A list and descriptions of any examination security problems since the last biennial inspection (likely documented in training department condition/problem identification reports). 4. Records for licensed operator requalification training attendance, licensed operator performance in requalification, licensed operator remedial training, individual licensed operator medical records, and records for maintaining an active license and license re activation. 5. Simulator testing, maintenance, modification, and performance records. Simulator corrective action records, including lists of open/closed simulator deficiencies, and corrective actions taken.}}
DRESDEN NUCLEAR POWER STATIONNOTIFICATION OF AN NRC BIENNIAL LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION AND REQUEST FOR INFORMATION DISTRIBUTION: Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII Nancy Salgado Colleen Schmidt                          ADAMS Accession Number ML:  18053A109 OFFICE RIII  RIII  RIII  RIII  NAME BBergeon:cl    DATE 02/21/18    OFFICIAL RECORD COPY DOCUMENTS REQUEST TO SUPPORT LICENSED OPERATOR REQUALIFICATION PROGRAM AND LICENSED OPERATOR PERFORMANCE INSPECTION Enclosure Please provide the following information on a CD/DVD, or electronically if possible, by May 1, 2018. 1. One complete version of the biennial requalification written examination (RO and SRO exams) to be administered during the onsite portion of this inspection. 2. Ten (10) job performance measures (JPMs) and four (4) simulator scenarios associated with an annual requalification operating test required by 10 CFR 55.59(a)(2). The JPMs and scenarios to be reviewed should include those that will be observed during the onsite portion of this inspection, with any remaining JPMs and scenarios selected from other weeks within the same training cycle. 3. Complete versions of the reference materials used to develop the written examinations and operating tests provided for items 1 and 2 above.  (Refer to ES-201 Attachment 3, Reference Material Guidelines for Initial Licensing Examinations, for additional examples and clarification.) 4. A list (or lists) of licensee-identified issues associated with licensed operator errors or other licensed operator performance problems which have occurred in the actual plant/main control room since the last biennial requalification program, their associated corrective actions, and if these issues were incorporated into requalification training. (These issues are likely documented in condition/problem identification reports, licensee-conducted audits and assessments, and in industry operating experience reports, etc.) 5. Spreadsheets and/or test outlines which show the usage of written examination questions, JPMs, and simulator scenarios. 6. Facility licensee procedures for licensed operator requalification training and examination, including examination security procedures. 7. -site inspection week. Please have the following information available for NRC review on May 14, 2018. 1. Licensed operator pass/fail statistics for any NRC-required requalification examinations that has been completed (see Table 03.02-1, Examination Results). 2. biennial inspection (cycle weeks, training topics, etc.). 3. A list and descriptions of any examination security problems since the last biennial inspection (likely documented in training department condition/problem identification reports). 4. Records for licensed operator requalification training attendance, licensed operator performance in requalification, licensed operator remedial training, individual licensed operator medical records, and records for maintaining an active license and license re activation. 5. Simulator testing, maintenance, modification, and performance records. Simulator corrective action records, including lists of open/closed simulator deficiencies, and corrective actions taken.}}

Revision as of 23:22, 19 June 2018

Ltr 02/21/18 Dresden Nuclear Power Station - Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information (DRS-B.Bergeon)
ML18053A109
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 02/21/2018
From: Bergeon B A
Operations Branch III
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
Download: ML18053A109 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, ILLINOIS 60532-4352 February 21, 2018 Mr. Bryan C. Hanson Senior VP, Exelon Generation Co., LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

DRESDEN NUCLEAR POWER STATIONNOTIFICATION OF AN NRC BIENNIAL LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Hanson:

In a telephone conversation on February 20, 2018, between Mr. B. Bergeon, Operations Engineer, the U. S. Nuclear Regulatory Commission (NRC) lead inspector for this inspection, and Mr. D. Siuda, Dresden Operations Training Instructor, final arrangements were made for the NRC to inspect the Licensed Operator Requalification Program at the Dresden Nuclear Power Station. The inspection is planned for the week of May 14, 2018. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. In accordance with Title 10 of the Code of Federal Regulations (CFR), Part 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations and annual operating tests as necessary to support the NRC's inspection program needs. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a request for documents needed for the inspection. Please furnish the items listed in the first group of the attached enclosure, needed to support our in-office inspection activities, to the NRC by May 1, 2018. Please have the items listed in the second group of the attached enclosure available for the inspectors during the onsite portion of the inspection activities. Mr. D. Siuda has been advised of this request. Thank you for your cooperation in this matter. If there are any questions regarding either the inspection, or the material requested in the enclosure, please contact me at 630-829-9851, or via e-mail at Bryan.Bergeon@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR Sincerely, /RA Randal Baker Acting for/ Bryan A. Bergeon, Operations Engineer Operations Branch Division of Reactor Safety Docket Nos. 50237; 50249 License Nos. DPR19; DPR25

Enclosure:

Documents Request to Support Licensed Operator Requalification Program and Licensed Operator Performance Inspection cc: Distribution via LISTSERV Letter to Bryan C. Hanson from Bryan A. Bergeon dated February 21, 2018

SUBJECT:

DRESDEN NUCLEAR POWER STATIONNOTIFICATION OF AN NRC BIENNIAL LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION AND REQUEST FOR INFORMATION DISTRIBUTION: Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII Nancy Salgado Colleen Schmidt ADAMS Accession Number ML: 18053A109 OFFICE RIII RIII RIII RIII NAME BBergeon:cl DATE 02/21/18 OFFICIAL RECORD COPY DOCUMENTS REQUEST TO SUPPORT LICENSED OPERATOR REQUALIFICATION PROGRAM AND LICENSED OPERATOR PERFORMANCE INSPECTION Enclosure Please provide the following information on a CD/DVD, or electronically if possible, by May 1, 2018. 1. One complete version of the biennial requalification written examination (RO and SRO exams) to be administered during the onsite portion of this inspection. 2. Ten (10) job performance measures (JPMs) and four (4) simulator scenarios associated with an annual requalification operating test required by 10 CFR 55.59(a)(2). The JPMs and scenarios to be reviewed should include those that will be observed during the onsite portion of this inspection, with any remaining JPMs and scenarios selected from other weeks within the same training cycle. 3. Complete versions of the reference materials used to develop the written examinations and operating tests provided for items 1 and 2 above. (Refer to ES-201 Attachment 3, Reference Material Guidelines for Initial Licensing Examinations, for additional examples and clarification.) 4. A list (or lists) of licensee-identified issues associated with licensed operator errors or other licensed operator performance problems which have occurred in the actual plant/main control room since the last biennial requalification program, their associated corrective actions, and if these issues were incorporated into requalification training. (These issues are likely documented in condition/problem identification reports, licensee-conducted audits and assessments, and in industry operating experience reports, etc.) 5. Spreadsheets and/or test outlines which show the usage of written examination questions, JPMs, and simulator scenarios. 6. Facility licensee procedures for licensed operator requalification training and examination, including examination security procedures. 7. -site inspection week. Please have the following information available for NRC review on May 14, 2018. 1. Licensed operator pass/fail statistics for any NRC-required requalification examinations that has been completed (see Table 03.02-1, Examination Results). 2. biennial inspection (cycle weeks, training topics, etc.). 3. A list and descriptions of any examination security problems since the last biennial inspection (likely documented in training department condition/problem identification reports). 4. Records for licensed operator requalification training attendance, licensed operator performance in requalification, licensed operator remedial training, individual licensed operator medical records, and records for maintaining an active license and license re activation. 5. Simulator testing, maintenance, modification, and performance records. Simulator corrective action records, including lists of open/closed simulator deficiencies, and corrective actions taken.