ML14364A363: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| page count = 2 | | page count = 2 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Braidwood Station Date of Examination: 11/10/14 Exam Level: RO SRO-I SRO-U Operating Test Number: 2014301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) System / JPM Title Type Code* Safety Function a. SIM-102 Perform Movable Control Assembly Quarterly Surveillance D, S, P 1 b. SIM-205 Raise SI Accumulator level using 1B SI pump A, N, S 2 c. SIM-302 Transfer to Cold Leg Recirculation A, D, L, S 3 d. SIM-416S CD/CB Pump Trip N, S 4S e. SIM-510 Start 1A CS pump for Surveillance M, S 5 f. SIM-608A Synchronize 1A DG and respond to Gov Adj and overspeed trip failures A, D, S, L 6 g. SIM-711 Place Channel Service Status from "Out of Service" to "In Service" N, S 7 h. SIM-801 Respond to a RCP Thermal Barrier Leak A, D, P, S 8 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i. IP-104 Local Reactor Trip A, D, E 1 j. IP-206 Local reset of Phase A D, E 2 k. IP-409S Locally start the 2B AF pump D, R 4S @ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. *Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) (P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 < 9 / < 8 / < 4 > 1 / > 1 / > 1 > 1 / > 1 / > 1 > 2 / > 2 / > 1 < 3 / < 3 / < 2 (randomly selected) > 1 / > 1 / > 1 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Braidwood Station Date of Examination: 11/10/14 Exam Level: RO SRO-I SRO-U Operating Test Number: 2014301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) System / JPM Title Type Code* Safety Function a. SIM-102 Perform Movable Control Assembly Quarterly Surveillance D, S, P 1 b. SIM-205 Raise SI Accumulator level using 1B SI pump A, N, S 2 c. SIM-302 Transfer to Cold Leg Recirculation A, D, L, S 3 d. SIM-416S CD/CB Pump Trip N, S 4S e. n/a n/a n/a f. SIM-608A Synchronize 1A DG and respond to Gov Adj and overspeed trip failures A, D, S, L 6 g. SIM-711 Place Channel Service Status from "Out of Service" to "In Service" N, S 7 h. SIM-801 Respond to a RCP Thermal Barrier Leak A, D, P, S 8 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i. IP-104 Local Reactor Trip A, D, E 1 j. IP-206 Local reset of Phase A D, E 2 k. IP-409S Locally start the 2B AF pump D, R 4S @ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. *Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) (P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 < 9 / < 8 / < 4 > 1 / > 1 / > 1 > 1 / > 1 / > 1 > 2 / > 2 / > 1 < 3 / < 3 / < 2 (randomly selected) > 1 / > 1 / > 1}} |
Revision as of 17:33, 15 June 2018
ML14364A363 | |
Person / Time | |
---|---|
Site: | Braidwood |
Issue date: | 11/24/2014 |
From: | McNeil D R NRC/RGN-III/DRS/OLB |
To: | Exelon Generation Co |
Shared Package | |
ML14344A990 | List: |
References | |
ES-301-2 50-456/OL-14, 50-457/OL-14 | |
Download: ML14364A363 (2) | |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Braidwood Station Date of Examination: 11/10/14 Exam Level: RO SRO-I SRO-U Operating Test Number: 2014301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) System / JPM Title Type Code* Safety Function a. SIM-102 Perform Movable Control Assembly Quarterly Surveillance D, S, P 1 b. SIM-205 Raise SI Accumulator level using 1B SI pump A, N, S 2 c. SIM-302 Transfer to Cold Leg Recirculation A, D, L, S 3 d. SIM-416S CD/CB Pump Trip N, S 4S e. SIM-510 Start 1A CS pump for Surveillance M, S 5 f. SIM-608A Synchronize 1A DG and respond to Gov Adj and overspeed trip failures A, D, S, L 6 g. SIM-711 Place Channel Service Status from "Out of Service" to "In Service" N, S 7 h. SIM-801 Respond to a RCP Thermal Barrier Leak A, D, P, S 8 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i. IP-104 Local Reactor Trip A, D, E 1 j. IP-206 Local reset of Phase A D, E 2 k. IP-409S Locally start the 2B AF pump D, R 4S @ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. *Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) (P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 < 9 / < 8 / < 4 > 1 / > 1 / > 1 > 1 / > 1 / > 1 > 2 / > 2 / > 1 < 3 / < 3 / < 2 (randomly selected) > 1 / > 1 / > 1 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Braidwood Station Date of Examination: 11/10/14 Exam Level: RO SRO-I SRO-U Operating Test Number: 2014301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) System / JPM Title Type Code* Safety Function a. SIM-102 Perform Movable Control Assembly Quarterly Surveillance D, S, P 1 b. SIM-205 Raise SI Accumulator level using 1B SI pump A, N, S 2 c. SIM-302 Transfer to Cold Leg Recirculation A, D, L, S 3 d. SIM-416S CD/CB Pump Trip N, S 4S e. n/a n/a n/a f. SIM-608A Synchronize 1A DG and respond to Gov Adj and overspeed trip failures A, D, S, L 6 g. SIM-711 Place Channel Service Status from "Out of Service" to "In Service" N, S 7 h. SIM-801 Respond to a RCP Thermal Barrier Leak A, D, P, S 8 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i. IP-104 Local Reactor Trip A, D, E 1 j. IP-206 Local reset of Phase A D, E 2 k. IP-409S Locally start the 2B AF pump D, R 4S @ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. *Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A) (P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 < 9 / < 8 / < 4 > 1 / > 1 / > 1 > 1 / > 1 / > 1 > 2 / > 2 / > 1 < 3 / < 3 / < 2 (randomly selected) > 1 / > 1 / > 1