ML14364A363

From kanterella
Jump to navigation Jump to search
2014 Braidwood Station Initial License Examination Form ES-301-2
ML14364A363
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/24/2014
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML14344A990 List:
References
ES-301-2 50-456/OL-14, 50-457/OL-14
Download: ML14364A363 (2)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Braidwood Station Date of Examination: 11/10/14 Exam Level: RO SRO-I SRO-U Operating Test Number: 2014301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

Type Safety System / JPM Title Code* Function D, S, P 1

a. SIM-102 Perform Movable Control Assembly Quarterly Surveillance A, N, S 2
b. SIM-205 Raise SI Accumulator level using 1B SI pump A, D, L, S 3
c. SIM-302 Transfer to Cold Leg Recirculation N, S 4S
d. SIM-416S CD/CB Pump Trip M, S 5
e. SIM-510 Start 1A CS pump for Surveillance
f. SIM-608A Synchronize 1A DG and respond to Gov Adj and overspeed trip A, D, S, L 6 failures
g. SIM-711 Place Channel Service Status from "Out of Service" to "In N, S 7 Service" A, D, P, S 8
h. SIM-801 Respond to a RCP Thermal Barrier Leak In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. IP-104 Local Reactor Trip A, D, E 1
j. IP-206 Local reset of Phase A D, E 2
k. IP-409S Locally start the 2B AF pump D, R 4S

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)

(R)CA >1 / >1 / >1 (S)imulator

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Braidwood Station Date of Examination: 11/10/14 Exam Level: RO SRO-I SRO-U Operating Test Number: 2014301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

Safety System / JPM Title Type Code*

Function

a. SIM-102 Perform Movable Control Assembly Quarterly Surveillance D, S, P 1
b. SIM-205 Raise SI Accumulator level using 1B SI pump A, N, S 2
c. SIM-302 Transfer to Cold Leg Recirculation A, D, L, S 3
d. SIM-416S CD/CB Pump Trip N, S 4S
e. n/a n/a n/a
f. SIM-608A Synchronize 1A DG and respond to Gov Adj and overspeed A, D, S, L 6 trip failures
g. SIM-711 Place Channel Service Status from "Out of Service" to "In N, S 7 Service"
h. SIM-801 Respond to a RCP Thermal Barrier Leak A, D, P, S 8 In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. IP-104 Local Reactor Trip A, D, E 1
j. IP-206 Local reset of Phase A D, E 2
k. IP-409S Locally start the 2B AF pump D, R 4S

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)

(R)CA >1 / >1 / >1 (S)imulator