| | {{#Wiki_filter:SEntergyEntergy Nuclear Northeast IEntergy Nuclear operations,'nc.--t' NI,James A. ,P.O. Box 110Lycoming, NY 13093Tel 315-342-3840Chris M. AdnerRegulatory Assurance ManagerJAFP-15-0075June 16, 2015U. S. Nuclear Regulatory CommissionAttn: Document Control DeskWashington DC 20555-0001 |
| | |
| | ==Subject:== |
| | Flood Hazard Reevaluation Requested Files for James A. FitzPatrickJames A. FitzPatrick Nuclear Power PlantDocket No. 50-333License No. DPR-59 |
| | |
| | ==Dear Sir or Madam:== |
| | James A. FitzPatrick Nuclear Power Plant is submitting the files related to the Flood HazardReevaluation on hard drive. The list of files is contained in the Attachment. The files identified inthe first column (with its title listed in the second column) are in pdf format. The third columncontains the input/output files.File formats include spreadsheets in Excel format. The remaining file format is listed in the filename. As an example LIP FLO2D is in FLO2D and requires FLO2D program (COTS) to accessthe input/output files.There are no commitments contained in this letter.Should you have any questions, please contact Mr. Chris M. Adner, Regulatory AssuranceManager, at (315) 349-6766.Very truly yours,Chris M. AdnerRegulatory Assurance ManagerCA/mh |
| | |
| | ==Attachment:== |
| | |
| | ==Enclosure:== |
| | .List of FilesHard drivejY~ |
| | JAFP-1 5-0075AttachmentList of Files(1 Page) |
| | N.JAFP-15-0075AttachmentList of FilesFile Name Title Input/Output FilesLIP FLO2D Input/OutputJames A. FitzPatrick Flooding PMF FLO2D Input/Output32-9227045-000 LIP.pdf Hazard Re-Evaluation -Local HEC-HMS Input/OutputIntense Precipitation Supporting SpreadsheetsJames A. FitzPatrick Flooding BOSS HMR52 Output32-9227050-000.pdf Hazard Re-Evaluation -Probable HEC-HMS Input/OutputMaximum Flood on Streams Supporting SpreadsheetsJames A. FitzPatrick Flooding MATLAB Input/OutputHazard Re-Evaluation -Probable Supporting Spreadsheets32-9227053-000.pdf Maximum Wind Storm -LakeOntarioJames A. FitzPatrick Flooding SSPP Input/OutputHazard Re-Evaluation -Probable Supporting Spreadsheets32-9227056-000.pdf Maximum Storm Surge -Lake OntarioJames A. FitzPatrick Flooding MATLAB Input/Output32-9227059-000.pdf Hazard Re-Evaluation -Probable Supporting SpreadsheetsMaximum Seiche -Lake OntarioJames A. FitzPatrick Flooding SWAN Input/Output32-9227062-000.pdf Hazard Re-Evaluation -Ppon SpreadsheetCombined Events Supporting SpreadsheetsJames A. FitzPatrick Flooding No files associated with these reportsHazard Re-Evaluation 9226881-000.pdf Screening for Dam Failure,Tsunami, Ice-Induced Flooding,and Channel MigrationJames A. FitzPatrick Topographic AREVA JAF 2D Plan.dwg38-9227043-000.pdf Jamey Fiverables AREVAJAFContours RevAug2014.dwgSurvey Deliverables AREVA JAF DTM RevAug20l4.dwg JAFP-1 5-0075EnclosureHard Drive(WD Elements 500GB Hard Drive)}} |
Revision as of 22:28, 10 June 2018
|
---|
Category:Letter
MONTHYEARIR 05000333/20240032024-11-12012 November 2024 Integrated Inspection Report 05000333/2024003 ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums JAFP-24-0055, Response to Request for Additional Information for License Amendment Request to Add Temporary Change to TS 3.3.2.1, Condition C, Control Rod Block Instrumentation2024-10-29029 October 2024 Response to Request for Additional Information for License Amendment Request to Add Temporary Change to TS 3.3.2.1, Condition C, Control Rod Block Instrumentation IR 05000333/20240902024-10-29029 October 2024 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000333/2024090 IR 05000333/20244022024-10-28028 October 2024 Material Control and Accounting Program Inspection Report 05000333/2024402 (Cover Letter Only) ML24276A1332024-10-17017 October 2024 Issuance of Amendment No. 357 Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision-4, and Administrative Changes ML24282B0302024-10-11011 October 2024 Project Manager Assignment RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24207A0192024-10-0909 October 2024 SE Addendum Related to the License Amendment No. 338 for Implementation of the Alternative Source Term (DPO-2021-001) ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing JAFP-24-0051, Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-0882024-10-0303 October 2024 Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-088 ML24270A0742024-09-30030 September 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0134) - LTR ML24270A1452024-09-26026 September 2024 Notice of Enforcement Discretion for James A. Fitzpatrick Nuclear Power Plant JAFP-24-0046, Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation2024-09-25025 September 2024 Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation JAFP-24-0047, License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software2024-09-25025 September 2024 License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software JAFP-24-0045, Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2024-09-20020 September 2024 Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications IR 05000333/20240112024-09-19019 September 2024 Follow-up to Inspection Procedure 71153 Report 05000333/2024011 and Preliminary White Finding and Apparent Violation JAFP-24-0044, Core Operating Limits Report Cycle 272024-09-16016 September 2024 Core Operating Limits Report Cycle 27 JAFP-24-0043, Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues2024-09-12012 September 2024 Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues 05000333/LER-2024-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation2024-09-0404 September 2024 Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation ML24165A0382024-09-0404 September 2024 Issuance of Amendment No. 356 Update Fuel Handling Accident Analysis IR 05000333/20240052024-08-29029 August 2024 Updated Inspection Plan for James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2024005) 05000333/LER-2024-001-01, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-08-21021 August 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000333/20240022024-08-0707 August 2024 Integrated Inspection Report 05000333/2024002 JAFP-24-0034, 10 CFR 50.46 Annual Report2024-07-31031 July 2024 10 CFR 50.46 Annual Report ML24208A0492024-07-30030 July 2024 Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Proposed No Significant Hazards Consideration Determination (Letter) JAFP-24-0036, Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-07-29029 July 2024 Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-24-0033, Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test2024-07-23023 July 2024 Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test IR 05000333/20244032024-07-18018 July 2024 Biennial Problem Identification and Resolution Inspection Report 05000333/2024403 (Cover Letter Only) IR 05000333/20244012024-07-15015 July 2024 Security Baseline Inspection 05000333/2024401 RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24190A1932024-07-0909 July 2024 Correction Letter of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance IR 05000333/20240102024-07-0808 July 2024 Commercial Grade Dedication Inspection Report 05000333/2024010 ML24184A1662024-07-0303 July 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24136A1162024-06-26026 June 2024 Issuance of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance 05000333/LER-2024-001, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-06-24024 June 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket ML24176A2412024-06-24024 June 2024 Licensed Operator Positive Fitness-for-Duty Test JAFP-24-0027, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-06-24024 June 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations JAFP-24-0026, Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance2024-06-12012 June 2024 Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 JAFP-24-0023, 2023 Annual Radiological Environmental Operating Report2024-05-0909 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000333/20240012024-05-0909 May 2024 Integrated Inspection Report 05000333/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests JAFP-24-0020, 2023 Annual Radioactive Effluent Release Report2024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report JAFP-24-0019, 2023 REIRS Transmittal of NRC Form 52024-04-18018 April 2024 2023 REIRS Transmittal of NRC Form 5 ML24106A0152024-04-15015 April 2024 Request for Withholding Information from Public Disclosure Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24107A6972024-04-12012 April 2024 Engine Systems, Inc Part 21 Report Re EMD Cylinder Liner Water Leak 2024-09-04
[Table view] |
Text
SEntergyEntergy Nuclear Northeast IEntergy Nuclear operations,'nc.--t' NI,James A. ,P.O. Box 110Lycoming, NY 13093Tel 315-342-3840Chris M. AdnerRegulatory Assurance ManagerJAFP-15-0075June 16, 2015U. S. Nuclear Regulatory CommissionAttn: Document Control DeskWashington DC 20555-0001
Subject:
Flood Hazard Reevaluation Requested Files for James A. FitzPatrickJames A. FitzPatrick Nuclear Power PlantDocket No. 50-333License No. DPR-59
Dear Sir or Madam:
James A. FitzPatrick Nuclear Power Plant is submitting the files related to the Flood HazardReevaluation on hard drive. The list of files is contained in the Attachment. The files identified inthe first column (with its title listed in the second column) are in pdf format. The third columncontains the input/output files.File formats include spreadsheets in Excel format. The remaining file format is listed in the filename. As an example LIP FLO2D is in FLO2D and requires FLO2D program (COTS) to accessthe input/output files.There are no commitments contained in this letter.Should you have any questions, please contact Mr. Chris M. Adner, Regulatory AssuranceManager, at (315) 349-6766.Very truly yours,Chris M. AdnerRegulatory Assurance ManagerCA/mh
Attachment:
Enclosure:
.List of FilesHard drivejY~
JAFP-1 5-0075AttachmentList of Files(1 Page)
N.JAFP-15-0075AttachmentList of FilesFile Name Title Input/Output FilesLIP FLO2D Input/OutputJames A. FitzPatrick Flooding PMF FLO2D Input/Output32-9227045-000 LIP.pdf Hazard Re-Evaluation -Local HEC-HMS Input/OutputIntense Precipitation Supporting SpreadsheetsJames A. FitzPatrick Flooding BOSS HMR52 Output32-9227050-000.pdf Hazard Re-Evaluation -Probable HEC-HMS Input/OutputMaximum Flood on Streams Supporting SpreadsheetsJames A. FitzPatrick Flooding MATLAB Input/OutputHazard Re-Evaluation -Probable Supporting Spreadsheets32-9227053-000.pdf Maximum Wind Storm -LakeOntarioJames A. FitzPatrick Flooding SSPP Input/OutputHazard Re-Evaluation -Probable Supporting Spreadsheets32-9227056-000.pdf Maximum Storm Surge -Lake OntarioJames A. FitzPatrick Flooding MATLAB Input/Output32-9227059-000.pdf Hazard Re-Evaluation -Probable Supporting SpreadsheetsMaximum Seiche -Lake OntarioJames A. FitzPatrick Flooding SWAN Input/Output32-9227062-000.pdf Hazard Re-Evaluation -Ppon SpreadsheetCombined Events Supporting SpreadsheetsJames A. FitzPatrick Flooding No files associated with these reportsHazard Re-Evaluation 9226881-000.pdf Screening for Dam Failure,Tsunami, Ice-Induced Flooding,and Channel MigrationJames A. FitzPatrick Topographic AREVA JAF 2D Plan.dwg38-9227043-000.pdf Jamey Fiverables AREVAJAFContours RevAug2014.dwgSurvey Deliverables AREVA JAF DTM RevAug20l4.dwg JAFP-1 5-0075EnclosureHard Drive(WD Elements 500GB Hard Drive)