ML18106A040: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:LACROSSESOLUTIONS 10 CPR 20.2206(c) April 9, 2018 REIRS Project Manager Office of Nuclear Regulatory Research U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 La Crosse Boiling Water Reactor Facility Operating License No. DPR-45 NRC Docket Nos. 50-409 and 72-046
 
==Subject:==
Occupational Radiation Exposure Annual Report for 2017 LC-2018-0028 In accordance with 10 CFR 20.2206, "Reports of individual monitoring," paragraph (c), the Annual Dose Report covering the previous year shall be submitted on or before April 30th of each year. The Annual Dose Report for 2017 provides the results of individual radiation monitoring carried out by LaCrosseSolutions, LLC for each individual for whom radiation monitoring was provided during 2017. The report was generated on April 3rd, 2018 following the guidance provided in Regulatory Guide 8.7, "Instructions for Recording and Reporting Occupational Radiation Dose Data.'' The data file, "NRCS.dat," was submitted electronically via the Radiation Exposure and Information Reporting System (REIRS) internet web page on April 5th, 2018. There are no new regulatory commitments in this submittal. If you have any questions about this submittal please contact Mr. Joseph Jacobsen at (608) 689-4259. Respectfully, ~Ref-~ fol' Gerard van Noordennen Vice President Regulatory Affairs cc: Marlayna Vaaler, U.S. NRC Project Manager Service List S4601 State Highway 35, Genoa, WI 54632 La Crosse Boiling Water Reactor Service List cc: Ken Robuck Group President Disposal and Decommissioning Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 John Sauger Executive VP and Chief Nuclear Officer ReactorD&D Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Joseph Nowak General Manager LaCrosseSolutions S4601 State Highway 35 Genoa, WI 54632-8846 Gerard van Noordennen VP Regulatory Affairs Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Russ Workman General Counsel Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 Jerome Pedretti, Clerk Town of Genoa E860 Mundsack Road Genoa, WI 54632 Jeffery Kitsembel Division of Energy Regulation Wisconsin Public Service Commission P .0. Box 7854 Madison, WI 53707-7854 Regional Administrator U.S. NRC, Region III 2443 Warrenville Road Lisle, IL 60532-4352 Paul Schmidt, Manager Radiation Protection Section Bureau of Environmental and Occupational Health Division of Public Health Wisconsin Department of Health Services P.O. Box 2659 Madison, WI 53701-2659 Barbara Nick President and CEO Dairyland Power Cooperative 3200 East Avenue South La Crosse, WI 54602-081 7 Cheryl Olson, ISFSI Manager La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 P.O. Box 817 Genoa, WI54632-8846 Lane Peters La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 Genoa, WI54632-8846 Thomas Zaremba Wheeler, Van Sickle and Anderson, S.C. 44 East Mifflin Street, Suite 1000 Madison, WI 53703 John E. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania A venue, NW Washington, DC 20004 
}}

Revision as of 17:40, 17 April 2018

La Crosse Boiling Water Reactor, Submittal of Occupational Radiation Exposure Annual Report for 2017
ML18106A040
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 04/09/2018
From: VanNoordennen G
LaCrosseSolutions
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Regulatory Research
References
LC-2018-0028
Download: ML18106A040 (2)


Text

LACROSSESOLUTIONS 10 CPR 20.2206(c) April 9, 2018 REIRS Project Manager Office of Nuclear Regulatory Research U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 La Crosse Boiling Water Reactor Facility Operating License No. DPR-45 NRC Docket Nos. 50-409 and 72-046

Subject:

Occupational Radiation Exposure Annual Report for 2017 LC-2018-0028 In accordance with 10 CFR 20.2206, "Reports of individual monitoring," paragraph (c), the Annual Dose Report covering the previous year shall be submitted on or before April 30th of each year. The Annual Dose Report for 2017 provides the results of individual radiation monitoring carried out by LaCrosseSolutions, LLC for each individual for whom radiation monitoring was provided during 2017. The report was generated on April 3rd, 2018 following the guidance provided in Regulatory Guide 8.7, "Instructions for Recording and Reporting Occupational Radiation Dose Data. The data file, "NRCS.dat," was submitted electronically via the Radiation Exposure and Information Reporting System (REIRS) internet web page on April 5th, 2018. There are no new regulatory commitments in this submittal. If you have any questions about this submittal please contact Mr. Joseph Jacobsen at (608) 689-4259. Respectfully, ~Ref-~ fol' Gerard van Noordennen Vice President Regulatory Affairs cc: Marlayna Vaaler, U.S. NRC Project Manager Service List S4601 State Highway 35, Genoa, WI 54632 La Crosse Boiling Water Reactor Service List cc: Ken Robuck Group President Disposal and Decommissioning Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 John Sauger Executive VP and Chief Nuclear Officer ReactorD&D Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Joseph Nowak General Manager LaCrosseSolutions S4601 State Highway 35 Genoa, WI 54632-8846 Gerard van Noordennen VP Regulatory Affairs Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Russ Workman General Counsel Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 Jerome Pedretti, Clerk Town of Genoa E860 Mundsack Road Genoa, WI 54632 Jeffery Kitsembel Division of Energy Regulation Wisconsin Public Service Commission P .0. Box 7854 Madison, WI 53707-7854 Regional Administrator U.S. NRC, Region III 2443 Warrenville Road Lisle, IL 60532-4352 Paul Schmidt, Manager Radiation Protection Section Bureau of Environmental and Occupational Health Division of Public Health Wisconsin Department of Health Services P.O. Box 2659 Madison, WI 53701-2659 Barbara Nick President and CEO Dairyland Power Cooperative 3200 East Avenue South La Crosse, WI 54602-081 7 Cheryl Olson, ISFSI Manager La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 P.O. Box 817 Genoa, WI54632-8846 Lane Peters La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 Genoa, WI54632-8846 Thomas Zaremba Wheeler, Van Sickle and Anderson, S.C. 44 East Mifflin Street, Suite 1000 Madison, WI 53703 John E. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania A venue, NW Washington, DC 20004