{{#Wiki_filter: | {{#Wiki_filter:March 3, 2008 | ||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 28: | Line 28: | ||
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Related Information" will include the security cornerstone review and resultant inspection plan. | This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Related Information" will include the security cornerstone review and resultant inspection plan. | ||
Overall, Virgil C. Summer Nuclear Station operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC | Overall, Virgil C. Summer Nuclear Station operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting non-ROP inspections which include: TI 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies; and TI 2515/172, Reactor Coolant System Dissimilar Metal Butt Welds. | ||
=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting non-ROP inspections which include: TI 2515/171, | |||
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. | The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. | ||
| Line 35: | Line 34: | ||
The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review. | The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review. | ||
SCE&G | SCE&G | ||
=s | |||
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4662 with any questions you may have regarding this letter or the inspection plan. | If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4662 with any questions you may have regarding this letter or the inspection plan. | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Division of Reactor Projects | Eugene Guthrie, Chief Reactor Projects Branch 5 Division of Reactor Projects | ||
Docket No.: 50-395 License No.: NPF-12 | |||
Enclosure: | |||
Summer Inspection/Activity Plan (03/01/08 - 06/30/09) | |||
_________________________ OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE /RA/ /RA/ /RA/ /RA/ NAME JDodson DArnertt LGarner EGuthrie DATE 2/28/08 2/27/08 3/3/08 3/3/08 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO SCE&G | cc w/encl.: | ||
(See page 3) | |||
_________________________ | |||
OFFICE RII:DRP RII:DRP RII:DRP RII:DRP | |||
SIGNATURE | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
NAME JDodson DArnertt LGarner EGuthrie | |||
DATE 2/28/08 2/27/08 3/3/08 3/3/08 | |||
E-MAIL COPY? | |||
YES NO YES NO YES NO YES NO YES NO YES NO | |||
SCE&G | |||
cc w/encl.: | |||
Kathryn M. Sutton, Esq. | Kathryn M. Sutton, Esq. | ||
Morgan, Lewis & Bockius LLP Electronic Mail Distribution | Morgan, Lewis & Bockius LLP Electronic Mail Distribution | ||
Henry J. Porter Assistant Director | Henry J. Porter Assistant Director Division of Radioactive Waste Mgmt. | ||
Division of Radioactive Waste Mgmt. | |||
S.C. Department of Health and Environmental Control Electronic Mail Distribution | S.C. Department of Health and Environmental Control Electronic Mail Distribution | ||
Bruce L. Thompson | Bruce L. Thompson Manager Nuclear Licensing (Mail Code 830) | ||
South Carolina Electric & Gas Company Electronic Mail Distribution | |||
Manager Nuclear Licensing (Mail Code 830) South Carolina Electric & Gas Company Electronic Mail Distribution | |||
Thomas D. Gatlin General Manager Nuclear Plant Operations (Mail Code 303) | Thomas D. Gatlin General Manager Nuclear Plant Operations (Mail Code 303) | ||
South Carolina Electric & Gas Company Electronic Mail Distribution | South Carolina Electric & Gas Company Electronic Mail Distribution | ||
SCE&G | SCE&G | ||
C. Evans, RII EICS (Part 72 Only) | |||
Letter to Jeffrey from Eugene F. Guthrie dated March 3, 2008 | |||
SUBJECT: | |||
ANNUAL ASSESSMENT LETTER - VIRGIL C. SUMMER NUCLEAR STATION NRC INSPECTION REPORT 05000395/2008001 | |||
Distribution w/encl.: | |||
C. Evans, RII EICS (Part 72 Only) | |||
L. Slack, RII EICS OE Mail (email address if applicable) | |||
R. Martin, NRR RIDSNRRDIRS PUBLIC | |||
Summer Inspection / Activity Plan 03/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2008 08:12:34 Report 22 | |||
PI&R | |||
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections Identification and Resolution of Problems 03/10/2008 03/14/2008 | |||
71152B IP Baseline Inspections Identification and Resolution of Problems 03/24/2008 03/28/2008 | |||
71152B IP | |||
PSB1-RP | |||
- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections Access Control to Radiologically Significant Areas 03/24/2008 03/26/2008 | |||
7112101 IP | |||
PSB1-RP | |||
- RADIATION PROTECTION OCCUPATIONAL WK1 Baseline Inspections Access Control to Radiologically Significant Areas 04/28/2008 05/02/2008 | |||
7112101 IP Baseline Inspections ALARA Planning and Controls 04/28/2008 05/02/2008 | |||
7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 04/28/2008 05/02/2008 | |||
7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 04/28/2008 05/02/2008 | |||
71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 04/28/2008 05/02/2008 | |||
71151-PR01 IP | |||
EB3-ISI | |||
- SUMMER - ISI Baseline Inspections Inservice Inspection Activities - PWR 05/05/2008 05/09/2008 | |||
7111108P IP | |||
PSB1-RP | |||
- RADIATION PROTECTION OCCUPATIONAL WK2 Baseline Inspections Access Control to Radiologically Significant Areas 05/05/2008 05/09/2008 | |||
7112101 IP Baseline Inspections ALARA Planning and Controls 05/05/2008 05/09/2008 | |||
7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 05/05/2008 05/09/2008 | |||
7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 05/05/2008 05/09/2008 | |||
71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 05/05/2008 05/09/2008 | |||
71151-PR01 IP | |||
TI-171 | |||
- B.5.B PHASE 2&3 Generic Safety Inspection Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 06/23/2008 06/27/2008 | |||
2515/171 IP | |||
EB3TI172 | |||
- TI-172 Generic Safety Inspection Reactor Coolant System Dissimiliar Metal Butt Welds 07/07/2008 07/11/2008 | |||
2515/172 IP | |||
EB1-CDBI | |||
- COMPONENT DESIGN BASIS INSPECTION Baseline Inspections Component Design Bases Inspection 07/28/2008 08/01/2008 | |||
7111121 IP Baseline Inspections Component Design Bases Inspection 08/11/2008 08/15/2008 | |||
7111121 IP Baseline Inspections Component Design Bases Inspection 08/25/2008 08/29/2008 | |||
7111121 IP Baseline Inspections Component Design Bases Inspection 09/08/2008 09/12/2008 | |||
7111121 IP | |||
OL RQ | |||
- REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 08/11/2008 08/15/2008 | |||
7111111B IP | |||
PSB1-EP | |||
- EP INSP EP Baseline Inspection Alert and Notification System Testing 09/22/2008 09/26/2008 | |||
7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 09/22/2008 09/26/2008 | |||
7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 09/22/2008 09/26/2008 | |||
7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 09/22/2008 09/26/2008 | |||
7111405 IP This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Summer Inspection / Activity Plan 03/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2008 08:12:34 Report 22 | |||
PSB1-EP | |||
- EP INSP Baseline Inspections Drill/Exercise Performance 09/22/2008 09/26/2008 | |||
71151-EP01 IP Baseline Inspections ERO Drill Participation 09/22/2008 09/26/2008 | |||
71151-EP02 IP Baseline Inspections Alert & Notification System 09/22/2008 09/26/2008 | |||
71151-EP03 IP | |||
OL EXAM | |||
- INITIAL EXAM PREP Not Applicable SUMMER/JANUARY 2009 EXAM AT POWER FACILITIES 01/05/2009 01/09/2009 | |||
V23297 | |||
OL EXAM | |||
- INITIAL EXAM - WEEK 1 Not Applicable SUMMER/JANUARY 2009 EXAM AT POWER FACILITIES 02/02/2009 02/06/2009 | |||
V23297 | |||
OL EXAM | |||
- INITIAL EXAM - WEEK 2 Not Applicable SUMMER/JANUARY 2009 EXAM AT POWER FACILITIES 02/09/2009 02/13/2009 | |||
V23297 | |||
PSB1EP | |||
- EP EXERCISE EP Baseline Inspection Exercise Evaluation 03/30/2009 04/03/2009 | |||
7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 03/30/2009 04/03/2009 | |||
7111404 IP Baseline Inspections Drill/Exercise Performance 03/30/2009 04/03/2009 | |||
71151-EP01 IP Baseline Inspections ERO Drill Participation 03/30/2009 04/03/2009 | |||
71151-EP02 IP Baseline Inspections Alert & Notification System 03/30/2009 04/03/2009 | |||
71151-EP03 IP This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
}} | }} | ||
Latest revision as of 17:53, 14 January 2025
| ML080630301 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 03/03/2008 |
| From: | Eugene Guthrie NRC/RGN-II/DRP/RPB5 |
| To: | Archie J South Carolina Electric & Gas Co |
| References | |
| IR-08-001 | |
| Download: ML080630301 (7) | |
Text
March 3, 2008
SUBJECT:
ANNUAL ASSESSMENT LETTER - VIRGIL C. SUMMER NUCLEAR STATION (NRC INSPECTION REPORT 05000395/2008001)
Dear Mr. Archie:
On February 6, 2008, the NRC staff completed its performance review of the Virgil C. Summer Nuclear Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Related Information" will include the security cornerstone review and resultant inspection plan.
Overall, Virgil C. Summer Nuclear Station operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting non-ROP inspections which include: TI 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies; and TI 2515/172, Reactor Coolant System Dissimilar Metal Butt Welds.
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.
SCE&G
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4662 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Eugene Guthrie, Chief Reactor Projects Branch 5 Division of Reactor Projects
Docket No.: 50-395 License No.: NPF-12
Enclosure:
Summer Inspection/Activity Plan (03/01/08 - 06/30/09)
cc w/encl.:
(See page 3)
_________________________
OFFICE RII:DRP RII:DRP RII:DRP RII:DRP
SIGNATURE
/RA/
/RA/
/RA/
/RA/
NAME JDodson DArnertt LGarner EGuthrie
DATE 2/28/08 2/27/08 3/3/08 3/3/08
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO
SCE&G
cc w/encl.:
Kathryn M. Sutton, Esq.
Morgan, Lewis & Bockius LLP Electronic Mail Distribution
Henry J. Porter Assistant Director Division of Radioactive Waste Mgmt.
S.C. Department of Health and Environmental Control Electronic Mail Distribution
Bruce L. Thompson Manager Nuclear Licensing (Mail Code 830)
South Carolina Electric & Gas Company Electronic Mail Distribution
Thomas D. Gatlin General Manager Nuclear Plant Operations (Mail Code 303)
South Carolina Electric & Gas Company Electronic Mail Distribution
SCE&G
Letter to Jeffrey from Eugene F. Guthrie dated March 3, 2008
SUBJECT:
ANNUAL ASSESSMENT LETTER - VIRGIL C. SUMMER NUCLEAR STATION NRC INSPECTION REPORT 05000395/2008001
Distribution w/encl.:
C. Evans, RII EICS (Part 72 Only)
L. Slack, RII EICS OE Mail (email address if applicable)
R. Martin, NRR RIDSNRRDIRS PUBLIC
Summer Inspection / Activity Plan 03/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2008 08:12:34 Report 22
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections Identification and Resolution of Problems 03/10/2008 03/14/2008
71152B IP Baseline Inspections Identification and Resolution of Problems 03/24/2008 03/28/2008
71152B IP
PSB1-RP
- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections Access Control to Radiologically Significant Areas 03/24/2008 03/26/2008
7112101 IP
PSB1-RP
- RADIATION PROTECTION OCCUPATIONAL WK1 Baseline Inspections Access Control to Radiologically Significant Areas 04/28/2008 05/02/2008
7112101 IP Baseline Inspections ALARA Planning and Controls 04/28/2008 05/02/2008
7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 04/28/2008 05/02/2008
7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 04/28/2008 05/02/2008
71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 04/28/2008 05/02/2008
71151-PR01 IP
EB3-ISI
- SUMMER - ISI Baseline Inspections Inservice Inspection Activities - PWR 05/05/2008 05/09/2008
7111108P IP
PSB1-RP
- RADIATION PROTECTION OCCUPATIONAL WK2 Baseline Inspections Access Control to Radiologically Significant Areas 05/05/2008 05/09/2008
7112101 IP Baseline Inspections ALARA Planning and Controls 05/05/2008 05/09/2008
7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 05/05/2008 05/09/2008
7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 05/05/2008 05/09/2008
71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 05/05/2008 05/09/2008
71151-PR01 IP
TI-171
- B.5.B PHASE 2&3 Generic Safety Inspection Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 06/23/2008 06/27/2008
2515/171 IP
EB3TI172
- TI-172 Generic Safety Inspection Reactor Coolant System Dissimiliar Metal Butt Welds 07/07/2008 07/11/2008
2515/172 IP
EB1-CDBI
- COMPONENT DESIGN BASIS INSPECTION Baseline Inspections Component Design Bases Inspection 07/28/2008 08/01/2008
7111121 IP Baseline Inspections Component Design Bases Inspection 08/11/2008 08/15/2008
7111121 IP Baseline Inspections Component Design Bases Inspection 08/25/2008 08/29/2008
7111121 IP Baseline Inspections Component Design Bases Inspection 09/08/2008 09/12/2008
7111121 IP
- REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 08/11/2008 08/15/2008
7111111B IP
PSB1-EP
- EP INSP EP Baseline Inspection Alert and Notification System Testing 09/22/2008 09/26/2008
7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 09/22/2008 09/26/2008
7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 09/22/2008 09/26/2008
7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 09/22/2008 09/26/2008
7111405 IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Summer Inspection / Activity Plan 03/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2008 08:12:34 Report 22
PSB1-EP
- EP INSP Baseline Inspections Drill/Exercise Performance 09/22/2008 09/26/2008
71151-EP01 IP Baseline Inspections ERO Drill Participation 09/22/2008 09/26/2008
71151-EP02 IP Baseline Inspections Alert & Notification System 09/22/2008 09/26/2008
71151-EP03 IP
OL EXAM
- INITIAL EXAM PREP Not Applicable SUMMER/JANUARY 2009 EXAM AT POWER FACILITIES 01/05/2009 01/09/2009
V23297
OL EXAM
- INITIAL EXAM - WEEK 1 Not Applicable SUMMER/JANUARY 2009 EXAM AT POWER FACILITIES 02/02/2009 02/06/2009
V23297
OL EXAM
- INITIAL EXAM - WEEK 2 Not Applicable SUMMER/JANUARY 2009 EXAM AT POWER FACILITIES 02/09/2009 02/13/2009
V23297
PSB1EP
- EP EXERCISE EP Baseline Inspection Exercise Evaluation 03/30/2009 04/03/2009
7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 03/30/2009 04/03/2009
7111404 IP Baseline Inspections Drill/Exercise Performance 03/30/2009 04/03/2009
71151-EP01 IP Baseline Inspections ERO Drill Participation 03/30/2009 04/03/2009
71151-EP02 IP Baseline Inspections Alert & Notification System 03/30/2009 04/03/2009
71151-EP03 IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.