ML19074A238: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 March 14, 2019 Mr. Bryan C. Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 March 14, 2019 Mr. Bryan C. Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555  


==SUBJECT:==
==SUBJECT:==
INITIAL OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL -
INITIAL OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL -
CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 AND 2
CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 AND 2  


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing written examinations at the Calvert Cliffs Nuclear Power Plant Units 1 and 2. Please note that operating test approval has been communicated under separate correspondence.
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing written examinations at the Calvert Cliffs Nuclear Power Plant Units 1 and 2. Please note that operating test approval has been communicated under separate correspondence.
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Michael Milbradt, Site Training Director. Note that any examination waivers have been addressed in separate correspondence.
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Michael Milbradt, Site Training Director. Note that any examination waivers have been addressed in separate correspondence.
The NRC has approved the subject written examinations in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11. Your staff will administer the written examinations during the week of March 25, 2019. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this written examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5306.
The NRC has approved the subject written examinations in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11. Your staff will administer the written examinations during the week of March 25, 2019. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this written examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5306.
Please contact your Chief Examiner, Mr. David Silk, at (610) 337-5372, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete written examination) specified for each applicant.
Please contact your Chief Examiner, Mr. David Silk, at (610) 337-5372, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete written examination) specified for each applicant.
Sincerely,
Sincerely,  
                                                /RA/
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69 cc: Distribution via ListServ
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket Nos.
50-317 and 50-318 License Nos. DPR-53 and DPR-69 cc: Distribution via ListServ


B. Hanson                                     2
B. Hanson 2  


==SUBJECT:==
==SUBJECT:==
INITIAL OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL -
INITIAL OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL -
CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 AND 2 DATED MARCH 14, 2019 Distribution w/encl: (via E-mail)
CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 AND 2 DATED MARCH 14, 2019 Distribution w/encl: (via E-mail)
DLew, RA               (R1ORAMAIL RESOURCE)
DLew, RA (R1ORAMAIL RESOURCE)
RLorson, DRA           (R1ORAMAIL RESOURCE)
RLorson, DRA (R1ORAMAIL RESOURCE)
DCollins, DRP           (R1DRPMAIL RESOURCE)
DCollins, DRP (R1DRPMAIL RESOURCE)
MShams, DRP             (R1DRPMAIL RESOURCE)
MShams, DRP (R1DRPMAIL RESOURCE)
JYerokun, DRS           (R1DRSMAIL RESOURCE)
JYerokun, DRS (R1DRSMAIL RESOURCE)
BWelling, DRS           (R1DRSMAIL RESOURCE)
BWelling, DRS (R1DRSMAIL RESOURCE)
DJackson, DRS ECarfang, DRP ARosebrook, DRP SObadina, DRP RClagg, DRP, SRI CRoettgen, DRP, RI CFragman, DRP, AA MMcCoppin, RI OEDO DJackson, DRS DSilk, DRS RidsNrrPMCalvertCliffs Resource RidsNrrDorlLpl1 Resource DOCUMENT NAME: G:\DRS\Operations Branch\SILK\Exam FY19-CalvertCliffs Retake Mar25\CC2019RetakeWrittenExamApproval-Ltr.docx ADAMS PACKAGE NO.: ML18296A408                   ADAMS ACCESSION NO.: ML19074A238 SUNSI Review Non-Sensitive                         Publicly Available Sensitive                              Non-Publicly Available OFFICE     RI/DRS             RI/DRS NAME       DSilk               DJackson DATE       3/8/19             3/14/19 OFFICIAL RECORD COPY}}
DJackson, DRS ECarfang, DRP ARosebrook, DRP SObadina, DRP RClagg, DRP, SRI CRoettgen, DRP, RI CFragman, DRP, AA MMcCoppin, RI OEDO DJackson, DRS DSilk, DRS RidsNrrPMCalvertCliffs Resource RidsNrrDorlLpl1 Resource DOCUMENT NAME: G:\\DRS\\Operations Branch\\SILK\\Exam FY19-CalvertCliffs Retake Mar25\\CC2019RetakeWrittenExamApproval-Ltr.docx ADAMS PACKAGE NO.: ML18296A408 ADAMS ACCESSION NO.: ML19074A238 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS NAME DSilk DJackson DATE 3/8/19 3/14/19 OFFICIAL RECORD COPY}}

Latest revision as of 04:15, 5 January 2025

Initial Operator Licensing Written Examination Approval: Calvert Cliffs Nuclear Power Plant Units 1 and 2
ML19074A238
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 03/14/2019
From: Diane Jackson
Operations Branch I
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Shared Package
ML18296A408 List:
References
Download: ML19074A238 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 March 14, 2019 Mr. Bryan C. Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

INITIAL OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL -

CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 AND 2

Dear Mr. Hanson:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing written examinations at the Calvert Cliffs Nuclear Power Plant Units 1 and 2. Please note that operating test approval has been communicated under separate correspondence.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. Michael Milbradt, Site Training Director. Note that any examination waivers have been addressed in separate correspondence.

The NRC has approved the subject written examinations in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11. Your staff will administer the written examinations during the week of March 25, 2019. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this written examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5306.

Please contact your Chief Examiner, Mr. David Silk, at (610) 337-5372, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete written examination) specified for each applicant.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket Nos.

50-317 and 50-318 License Nos. DPR-53 and DPR-69 cc: Distribution via ListServ

B. Hanson 2

SUBJECT:

INITIAL OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL -

CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 AND 2 DATED MARCH 14, 2019 Distribution w/encl: (via E-mail)

DLew, RA (R1ORAMAIL RESOURCE)

RLorson, DRA (R1ORAMAIL RESOURCE)

DCollins, DRP (R1DRPMAIL RESOURCE)

MShams, DRP (R1DRPMAIL RESOURCE)

JYerokun, DRS (R1DRSMAIL RESOURCE)

BWelling, DRS (R1DRSMAIL RESOURCE)

DJackson, DRS ECarfang, DRP ARosebrook, DRP SObadina, DRP RClagg, DRP, SRI CRoettgen, DRP, RI CFragman, DRP, AA MMcCoppin, RI OEDO DJackson, DRS DSilk, DRS RidsNrrPMCalvertCliffs Resource RidsNrrDorlLpl1 Resource DOCUMENT NAME: G:\\DRS\\Operations Branch\\SILK\\Exam FY19-CalvertCliffs Retake Mar25\\CC2019RetakeWrittenExamApproval-Ltr.docx ADAMS PACKAGE NO.: ML18296A408 ADAMS ACCESSION NO.: ML19074A238 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS NAME DSilk DJackson DATE 3/8/19 3/14/19 OFFICIAL RECORD COPY