{{#Wiki_filter:W. Charlton                                                                          November 12, 2019 Dr. William Charlton, Director Nuclear Engineering Teaching Laboratory The University of Texas at Austin Pickle Research Campus, Building 159 10100 Burnet Road Austin, TX 78758
{{#Wiki_filter:
November 12, 2019 Dr. William Charlton, Director Nuclear Engineering Teaching Laboratory The University of Texas at Austin Pickle Research Campus, Building 159 10100 Burnet Road Austin, TX 78758  


==SUBJECT:==
==SUBJECT:==
UNIVERSITY OF TEXAS AT AUSTIN - EXTENSION TO REVISED SCHEDULE FOR THE COMPLETION OF THE REACTOR ANALYSES RE: RENEWAL OF FACILITY OPERATING LICENSE NO. R-129 FOR THE UNIVERSITY OF TEXAS AT AUSTIN RESEARCH REACTOR (EPID NO. L-2017-RNW-0032)
UNIVERSITY OF TEXAS AT AUSTIN - EXTENSION TO REVISED SCHEDULE FOR THE COMPLETION OF THE REACTOR ANALYSES RE: RENEWAL OF FACILITY OPERATING LICENSE NO. R-129 FOR THE UNIVERSITY OF TEXAS AT AUSTIN RESEARCH REACTOR (EPID NO. L-2017-RNW-0032)  


==Dear Dr. Charlton:==
==Dear Dr. Charlton:==
The U.S. Nuclear Regulatory Commission (NRC) staff is continuing its review of the University of Texas at Austin (UTA) application for renewal of Facility Operating License No. R-129, for the Nuclear Engineering Teaching Laboratory nuclear research reactor, dated December 12, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12156A097), as supplemented by {{letter dated|date=February 21, 2012|text=letter dated February 21, 2012}} (ADAMS Accession No. ML12061A009). The NRC staff requested a schedule for completion of the reactor analyses, by {{letter dated|date=October 18, 2018|text=letter dated October 18, 2018}} (ADAMS Accession No. ML18262A182).
By {{letter dated|date=August 12, 2019|text=letter dated August 12, 2019}} (ADAMS Accession No. ML19234A110), the UTA staff indicated that additional design information was needed from the reactor manufacturer, General Atomics, TRIGA International, and the completion of the reactor analysis would need to be extended until November 30, 2019. The NRC staff acknowledges that the UTA staff has made progress toward the completion of the reactor analyses with the support of the Department of Energy and the November 30, 2019, date is acceptable. If you have any questions, contact me at (301) 415-0893 or by electronic mail at Geoffrey.Wertz@nrc.gov.
Sincerely,
/RA Greg Casto Acting For/
Geoffrey A. Wertz, Project Manager Non-Power Production and Utilization Facility Licensing Branch Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Docket No. 50-602 License No. R-129 cc: See next page


The U.S. Nuclear Regulatory Commission (NRC) staff is continuing its review of the University of Texas at Austin (UTA) application for renewal of Facility Operating License No. R-129, for the Nuclear Engineering Teaching Laboratory nuclear research reactor, dated December 12, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12156A097), as supplemented by letter dated February 21, 2012 (ADAMS Accession No. ML12061A009). The NRC staff requested a schedule for completion of the reactor analyses, by letter dated October 18, 2018 (ADAMS Accession No. ML18262A182).
University of Texas Docket No. 50-602 cc:
By letter dated August 12, 2019 (ADAMS Accession No. ML19234A110), the UTA staff indicated that additional design information was needed from the reactor manufacturer, General Atomics, TRIGA International, and the completion of the reactor analysis would need to be extended until November 30, 2019. The NRC staff acknowledges that the UTA staff has made progress toward the completion of the reactor analyses with the support of the Department of Energy and the November 30, 2019, date is acceptable. If you have any questions, contact me at (301) 415-0893 or by electronic mail at Geoffrey.Wertz@nrc.gov.
Bureau of Radiation Control State of Texas 1100 West 49th Street Austin, TX 78756 Dr. Gregory L. Fenves The University of Texas at Austin Office of the President 110 Inner Campus Drive, G3400 Austin, TX 78712-3400 Maurie McInnis Executive Vice President and Provost The University of Texas at Austin 1 University Station, G1000 Austin, TX 78712 DeAnn Walker, Director Office of the Governor Office of Budget and Policy P.O. Box 12428 Austin, TX 78711 Paul Whaley, Associate Director Nuclear Engineering Teaching Laboratory The University of Texas at Austin 10100 Burnet Road, Building 159 Austin, TX 78758 Larry Hall, Reactor Supervisor Nuclear Engineering Teaching Laboratory The University of Texas at Austin 10100 Burnet Road, Building 159 Austin, TX 78758 Test, Research and Training Reactor Newsletter Attention: Amber Johnson Dept of Materials Science and Engineering University of Maryland 4418 Stadium Drive College Park, MD 20742-2115 John G Ekerdt, PhD The University of Texas at Austin Chemical Engineering 200 E. Dean Keeton St, Stop C0400 Austin, TX 78712-1589 Dr. Richard Neptune, Dept. Chair Walker Department of Mechanical Engineering 204 E. Dean Keeton St., ETC 5.200 (C2200)
Sincerely,
Austin, TX 78712-1591 Dean Sharon Wood The Cockrell School of Engineering 301 E. Dean Keeton St., ECJ 10th Floor (C2100)
                                                  /RA Greg Casto Acting For/
Austin, TX 78712-2100  
Geoffrey A. Wertz, Project Manager Non-Power Production and Utilization Facility Licensing Branch Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Docket No. 50-602 License No. R-129 cc: See next page
 
University of Texas                                             Docket No. 50-602 cc:
Bureau of Radiation Control            Larry Hall, Reactor Supervisor State of Texas                          Nuclear Engineering Teaching Laboratory 1100 West 49th Street                  The University of Texas at Austin Austin, TX 78756                        10100 Burnet Road, Building 159 Austin, TX 78758 Dr. Gregory L. Fenves The University of Texas at Austin      Test, Research and Training Office of the President                  Reactor Newsletter 110 Inner Campus Drive, G3400          Attention: Amber Johnson Austin, TX 78712-3400                  Dept of Materials Science and Engineering University of Maryland Maurie McInnis                          4418 Stadium Drive Executive Vice President and Provost    College Park, MD 20742-2115 The University of Texas at Austin 1 University Station, G1000            John G Ekerdt, PhD Austin, TX 78712                        The University of Texas at Austin Chemical Engineering DeAnn Walker, Director                  200 E. Dean Keeton St, Stop C0400 Office of the Governor                  Austin, TX 78712-1589 Office of Budget and Policy P.O. Box 12428                          Dr. Richard Neptune, Dept. Chair Austin, TX 78711                        Walker Department of Mechanical Engineering Paul Whaley, Associate Director        204 E. Dean Keeton St., ETC 5.200 Nuclear Engineering Teaching Laboratory (C2200)
The University of Texas at Austin      Austin, TX 78712-1591 10100 Burnet Road, Building 159 Austin, TX 78758                        Dean Sharon Wood The Cockrell School of Engineering 301 E. Dean Keeton St., ECJ 10th Floor (C2100)
Austin, TX 78712-2100


ML19312C004
ML19312C004
* concurrence via email               NRR-106 OFFICE   NRR/DANU/UNPL/PM*     NRR/DANU/UNPL/LA*     NRR/DANU/UNPL/BC       NRR/DANU/UNPL/PM*
* concurrence via email NRR-106 OFFICE NRR/DANU/UNPL/PM*
NAME     GWertz               NParker               GCasto                 GWertz (GCasto for)
NRR/DANU/UNPL/LA*
DATE     11/12/19             11/8/19               11/12/19               11/11/19}}
NRR/DANU/UNPL/BC NRR/DANU/UNPL/PM*
NAME GWertz NParker GCasto GWertz (GCasto for)
DATE 11/12/19 11/8/19 11/12/19 11/11/19}}

Latest revision as of 01:32, 2 January 2025

University of Texas at Austin - Extension to Revised Schedule for the Completion of the Reactor Analyses Renewal of Facility Operating License No. R 129 for the University of Texas at Austin Research Reactor
ML19312C004
Person / Time
Site: University of Texas at Austin
Issue date: 11/12/2019
From: Geoffrey Wertz
NRC/NRR/DANU/UNPL
To: Charlton W
University of Texas at Austin
Wertz G, NRR/UNPL, 415-0893
References
EPID L-2017-RNW-0032
Download: ML19312C004 (3)


Text

November 12, 2019 Dr. William Charlton, Director Nuclear Engineering Teaching Laboratory The University of Texas at Austin Pickle Research Campus, Building 159 10100 Burnet Road Austin, TX 78758

SUBJECT:

UNIVERSITY OF TEXAS AT AUSTIN - EXTENSION TO REVISED SCHEDULE FOR THE COMPLETION OF THE REACTOR ANALYSES RE: RENEWAL OF FACILITY OPERATING LICENSE NO. R-129 FOR THE UNIVERSITY OF TEXAS AT AUSTIN RESEARCH REACTOR (EPID NO. L-2017-RNW-0032)

Dear Dr. Charlton:

The U.S. Nuclear Regulatory Commission (NRC) staff is continuing its review of the University of Texas at Austin (UTA) application for renewal of Facility Operating License No. R-129, for the Nuclear Engineering Teaching Laboratory nuclear research reactor, dated December 12, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12156A097), as supplemented by letter dated February 21, 2012 (ADAMS Accession No. ML12061A009). The NRC staff requested a schedule for completion of the reactor analyses, by letter dated October 18, 2018 (ADAMS Accession No. ML18262A182).

By letter dated August 12, 2019 (ADAMS Accession No. ML19234A110), the UTA staff indicated that additional design information was needed from the reactor manufacturer, General Atomics, TRIGA International, and the completion of the reactor analysis would need to be extended until November 30, 2019. The NRC staff acknowledges that the UTA staff has made progress toward the completion of the reactor analyses with the support of the Department of Energy and the November 30, 2019, date is acceptable. If you have any questions, contact me at (301) 415-0893 or by electronic mail at Geoffrey.Wertz@nrc.gov.

Sincerely,

/RA Greg Casto Acting For/

Geoffrey A. Wertz, Project Manager Non-Power Production and Utilization Facility Licensing Branch Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Docket No. 50-602 License No. R-129 cc: See next page

University of Texas Docket No. 50-602 cc:

Bureau of Radiation Control State of Texas 1100 West 49th Street Austin, TX 78756 Dr. Gregory L. Fenves The University of Texas at Austin Office of the President 110 Inner Campus Drive, G3400 Austin, TX 78712-3400 Maurie McInnis Executive Vice President and Provost The University of Texas at Austin 1 University Station, G1000 Austin, TX 78712 DeAnn Walker, Director Office of the Governor Office of Budget and Policy P.O. Box 12428 Austin, TX 78711 Paul Whaley, Associate Director Nuclear Engineering Teaching Laboratory The University of Texas at Austin 10100 Burnet Road, Building 159 Austin, TX 78758 Larry Hall, Reactor Supervisor Nuclear Engineering Teaching Laboratory The University of Texas at Austin 10100 Burnet Road, Building 159 Austin, TX 78758 Test, Research and Training Reactor Newsletter Attention: Amber Johnson Dept of Materials Science and Engineering University of Maryland 4418 Stadium Drive College Park, MD 20742-2115 John G Ekerdt, PhD The University of Texas at Austin Chemical Engineering 200 E. Dean Keeton St, Stop C0400 Austin, TX 78712-1589 Dr. Richard Neptune, Dept. Chair Walker Department of Mechanical Engineering 204 E. Dean Keeton St., ETC 5.200 (C2200)

Austin, TX 78712-1591 Dean Sharon Wood The Cockrell School of Engineering 301 E. Dean Keeton St., ECJ 10th Floor (C2100)

Austin, TX 78712-2100

ML19312C004

  • concurrence via email NRR-106 OFFICE NRR/DANU/UNPL/PM*

NRR/DANU/UNPL/LA*

NRR/DANU/UNPL/BC NRR/DANU/UNPL/PM*

NAME GWertz NParker GCasto GWertz (GCasto for)

DATE 11/12/19 11/8/19 11/12/19 11/11/19