ML20095A549: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
OPERATING DATA REPORT DOCKET NO. | OPERATING DATA REPORT DOCKET NO. | ||
: 1. UNIT NAME: | 50-289 DATE COMPLETED BY W G HEYSEK OPERATING STATUS TELEPHONE (717) 948-8191 | ||
: 3. REPORTING PERIOD: | : 1. UNIT NAME: | ||
: 3. LICENSED THERMAL POWER: | THREE MILE ISLAND UNIT 1 NOTES: | ||
: 4. NAMEPLATE RATING (CROSS MWe): | : 3. REPORTING PERIOD: | ||
: 5. DESIGN ELECTRICAL RATING (NET MWe): | DECEMBER 1991 | ||
: 3. LICENSED THERMAL POWER: | |||
2568 | |||
: 4. NAMEPLATE RATING (CROSS MWe): | |||
871 | |||
: 5. DESIGN ELECTRICAL RATING (NET MWe): | |||
819 | |||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): | : 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): | ||
* 834 | * 834 780 7 MAXIMUM DEPENDABLE CAPACITY (NET hWe): | ||
: 8. IF CHANGES OCCUR IN (ITEMS 3-7) SINCE LAST REPORT, GIVE REASONS: | : 8. IF CHANGES OCCUR IN (ITEMS 3-7) SINCE LAST REPORT, GIVE REASONS: | ||
* Retroactive to 11/15/91, the MDC values have been adjusted down by 22 MWe due to MW-Hour meter recalibration and unidentified looses. | * Retroactive to 11/15/91, the MDC values have been adjusted down by 22 MWe due to MW-Hour meter recalibration and unidentified looses. | ||
9. | |||
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): | |||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | : 10. REASONS FOR RESTRICTIONS, IF ANY: | ||
THIS MONTH YR-To-DATE CUMMULATIVE | THIS MONTH YR-To-DATE CUMMULATIVE | ||
: 11. HOUR 3 IN REPORTING PERIOD | : 11. HOUR 3 IN REPORTING PERIOD (HRS) 744.0 8760.0 151921.0 | ||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL | : 12. NUMBER OF HOURS REACTOR WAS CRITICAL (HRS) 744.0 7566.8 76731.0 | ||
-13. REACTOR RESERVE SHUTDOWN HOURS (HRS) 0.0 | |||
: 14. HOURS GENERATOR ON-LINE | -0.0 2245,6 | ||
: 15. UNIT RESERVE SHUTDOWN HOURS | : 14. HOURS GENERATOR ON-LINE (HRS) 744.0 7536.5 75656.2 | ||
: 16. GROSS THERMAL ENERGY GENERATED | : 15. UNIT RESERVE SHUTDOWN HOURS (HRS) 0.0 0.0 0.0 | ||
: 17. GROSS ELECTRICAL ENERGY GENERATED | : 16. GROSS THERMAL ENERGY GENERATED (MWH) 1852650 17398714 183869045 | ||
: 18. NET ELECTRICAL ENERGY GENERATED | : 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 624088 6033355 | ||
: 19. UNIT SERVICE FACTOR | -61994259 | ||
: 31. UNIT CAPACITY FACTOR | : 18. NET ELECTRICAL ENERGY GENERATED (MWH) 58aE17 5667789 58157220- | ||
: 32. UNIT CAPACITY FACTOR | : 19. UNIT SERVICE FACTOR | ||
: | (%) | ||
100.0 86.0 49.8 20 UNIT AVAILABILITY FACTOR | |||
(%) | |||
100.0 86.0 49.8 | |||
: 31. UNIT CAPACITY FACTOR (USING KDC NET) 100.7 80.5 48.7 | |||
: 32. UNIT CAPACITY FACTOR (USING DER NET) 96.6 79.0 46.7 j. | |||
: 23. UNIT FORCED OUTAGE RATE | |||
(%) | |||
0.0 0.7 44.5 UNIT FORCED OUTAGE HOURS (HRS) 0.0 51.9 60648.7 | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): | : 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): | ||
i r | i i | ||
r | |||
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | : 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | ||
l | l 4 | ||
I l | |||
9204170126 920413 i | |||
PDR ADOCK 05000289 l | |||
R PDR}} |
Latest revision as of 08:53, 13 December 2024
ML20095A549 | |
Person / Time | |
---|---|
Site: | Three Mile Island |
Issue date: | 12/31/1991 |
From: | Heysek W GENERAL PUBLIC UTILITIES CORP. |
To: | |
Shared Package | |
ML20095A522 | List: |
References | |
NUDOCS 9204170126 | |
Download: ML20095A549 (1) | |
Text
.
OPERATING DATA REPORT DOCKET NO.
50-289 DATE COMPLETED BY W G HEYSEK OPERATING STATUS TELEPHONE (717) 948-8191
- 1. UNIT NAME:
THREE MILE ISLAND UNIT 1 NOTES:
- 3. REPORTING PERIOD:
DECEMBER 1991
- 3. LICENSED THERMAL POWER:
2568
- 4. NAMEPLATE RATING (CROSS MWe):
871
- 5. DESIGN ELECTRICAL RATING (NET MWe):
819
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
- 834 780 7 MAXIMUM DEPENDABLE CAPACITY (NET hWe):
- 8. IF CHANGES OCCUR IN (ITEMS 3-7) SINCE LAST REPORT, GIVE REASONS:
- Retroactive to 11/15/91, the MDC values have been adjusted down by 22 MWe due to MW-Hour meter recalibration and unidentified looses.
9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS MONTH YR-To-DATE CUMMULATIVE
- 11. HOUR 3 IN REPORTING PERIOD (HRS) 744.0 8760.0 151921.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL (HRS) 744.0 7566.8 76731.0
-13. REACTOR RESERVE SHUTDOWN HOURS (HRS) 0.0
-0.0 2245,6
- 14. HOURS GENERATOR ON-LINE (HRS) 744.0 7536.5 75656.2
- 15. UNIT RESERVE SHUTDOWN HOURS (HRS) 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1852650 17398714 183869045
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 624088 6033355
-61994259
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 58aE17 5667789 58157220-
- 19. UNIT SERVICE FACTOR
(%)
100.0 86.0 49.8 20 UNIT AVAILABILITY FACTOR
(%)
100.0 86.0 49.8
- 31. UNIT CAPACITY FACTOR (USING KDC NET) 100.7 80.5 48.7
- 32. UNIT CAPACITY FACTOR (USING DER NET) 96.6 79.0 46.7 j.
- 23. UNIT FORCED OUTAGE RATE
(%)
0.0 0.7 44.5 UNIT FORCED OUTAGE HOURS (HRS) 0.0 51.9 60648.7
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
i i
r
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
l 4
I l
9204170126 920413 i
PDR ADOCK 05000289 l
R PDR