ML20202G822: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20202G822
| number = ML20202G822
| issue date = 01/31/1999
| issue date = 01/31/1999
| title = Forwards Second Simulator Certification Quadrenniel Rept,For Use of LGS plant-reference Simulator for Licensed Operator Exams,Per 10CFR55.45(b)(5)(ii).Rept Tabulates Testing Performed on Simulator Since Last Submittal Dtd 950131
| title = Forwards Second Simulator Certification Quadrenniel Rept,For Use of LGS plant-reference Simulator for Licensed Operator Exams,Per 10CFR55.45(b)(5)(ii).Rept Tabulates Testing Performed on Simulator Since Last Submittal
| author name = Von Suskil J
| author name = Von Suskil J
| author affiliation = PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
| author affiliation = PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 9902050299
| document report number = NUDOCS 9902050299
| title reference date = 01-31-1995
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 150
| page count = 150
Line 17: Line 18:
=Text=
=Text=
{{#Wiki_filter:_
{{#Wiki_filter:_
                                                                                        - .o. m .o Vce President Umerck Gener: tog Station PECO NUCLEAR                                                           Peco see,o, com,an,
-.o. m.o Vce President Umerck Gener: tog Station PECO NUCLEAR Peco see,o, com,an, A Unit o. PECO Energy
                                                                                              '2300 A Unit o. PECO Energy
$s"ii
                                                                                      $s"ii Sanatoga. PA 19464 o920 610 718 3000 / Fax aio 718 3008 Pager 1800 672 2285 ao271
'2300 Sanatoga. PA 19464 o920 610 718 3000 / Fax aio 718 3008 Pager 1800 672 2285 ao271
                                                                                      .itemet address: jvonsuskrepeco energycom January 31,1999 10CFR55.45(b)(5)(ii)
.itemet address: jvonsuskrepeco energycom January 31,1999 10CFR55.45(b)(5)(ii)
Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 Mr. Samuel J. Collins, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555
Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 Mr. Samuel J. Collins, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555


Line 27: Line 28:


==Dear Mr. Collins:==
==Dear Mr. Collins:==
This report is submitted in accordance with the requirements set forth in 100FR 55.45(b)(5)(ii), for the use of the Limerick Generating Station (LGS), Units 1 ard 2 plant-referenced simulator for Licensed Operator examinations.
This report is submitted in accordance with the requirements set forth in 100FR 55.45(b)(5)(ii), for the use of the Limerick Generating Station (LGS), Units 1 ard 2 plant-referenced simulator for Licensed Operator examinations.
This repor1 tabulates the testing performed on the simulator since the last quadrennial report, which was submitted on January 31,1995. With the exception of changes noted on the attached Form 474 and
This repor1 tabulates the testing performed on the simulator since the last quadrennial report, which was submitted on January 31,1995. With the exception of changes noted on the attached Form 474 and
* Simulator Tests Deleted" attachment, all testing was completed in accordance with the test schedule submitted with the previous quadrennial report. Since minor changes were made in the test program since the last submittal, a Form 474 is attached, along with any necessary Exception Reports and justification for the test plan change.
* Simulator Tests Deleted" attachment, all testing was completed in accordance with the test schedule submitted with the previous quadrennial report. Since minor changes were made in the test program since the last submittal, a Form 474 is attached, along with any necessary Exception Reports and justification for the test plan change.
During the 1997-1998 period the following simulator models were replaced or added, leading to additional testing for the 1997-1998 test period-e    Radiation Transport
During the 1997-1998 period the following simulator models were replaced or added, leading to additional testing for the 1997-1998 test period-Radiation Transport e
    . Process Radiation Monitoring e    Area Radiation Monitoring
Process Radiation Monitoring Area Radiation Monitoring e
    . Reactor Enclosure and HVAC System
Reactor Enclosure and HVAC System Refuel Floor and HVAC System Primary Containment Purge and inerting System e
    . Refuel Floor and HVAC System e    Primary Containment Purge and inerting System e   Turbine Enclosure and HVAC System e   Main Condenser e   Main Condenser Air Removal i   . Emergency Service Water e    RHR Service Water e   Steam Leak Detection                                                                                               g 9902050299 DR 99013 ADOCK 05000352 PDR l
Turbine Enclosure and HVAC System e
Main Condenser e
Main Condenser Air Removal e
i Emergency Service Water RHR Service Water e
Steam Leak Detection e
g 9902050299 99013 DR ADOCK 05000352 PDR l


January 31,1999 Page 2
January 31,1999 Page 2 Spent Fuel Pool and Fuel Pool Cooling Reactor and Turt>ine Enclosure Fire Detection System Reactor and Turbine Enclosure Fire Protection System e
  . Spent Fuel Pool and Fuel Pool Cooling
The attached report tabulations include the Test Number, Test Title, the Test Results (S for SAT and U for UNSAT), and the Date on which the test was performed. Please note that there were no uncorrected test failures. An additional tabulation lists the planned testing of the simulator over the next four years.
  . Reactor and Turt>ine Enclosure Fire Detection System                                                     ;
e    Reactor and Turbine Enclosure Fire Protection System The attached report tabulations include the Test Number, Test Title, the Test Results (S for SAT and U for UNSAT), and the Date on which the test was performed. Please note that there were no uncorrected test failures. An additional tabulation lists the planned testing of the simulator over the next four years.
The tests are divided into the following sections for configuration control purposes:
The tests are divided into the following sections for configuration control purposes:
Section 1,                 Miscellaneous tests, including performance tests.
Section 1, Miscellaneous tests, including performance tests.
Section 2,                 System tests, used for verifying implementation of plant mods and other simulator changes.
Section 2, System tests, used for verifying implementation of plant mods and other simulator changes.
Section 3                   Malfunction tests, used for verifying functionality of simulator failure modes, as well as logic and negative checks. These tests are performed at the rate of 25%
Section 3 Malfunction tests, used for verifying functionality of simulator failure modes, as well as logic and negative checks. These tests are performed at the rate of 25%
per year, such that over a four year period, all rnalfunctions ''e tested at least once. These tests are also used for complying with Section J.1.2 of ANSI /ANS 3.5-1985, Nuclear Power Plant Simulators for Use in Operator Training.
per year, such that over a four year period, all rnalfunctions ''e tested at least once. These tests are also used for complying with Section J.1.2 of ANSI /ANS 3.5-1985, Nuclear Power Plant Simulators for Use in Operator Training.
Section 4,                   E'octrical Bus Load Tables, used for verifying individual, specific loads fed from each simulated power supply. These bus tables are used in conjunction with Section 3 Malfunction tests.
Section 4, E'octrical Bus Load Tables, used for verifying individual, specific loads fed from each simulated power supply. These bus tables are used in conjunction with Section 3 Malfunction tests.
Section 5,                   Malfunction Performance Tests, used for complying with Section 3.1.2 of ANSl/ANS 3.5-1985, Nuclear Power Plant Simulators for Use in Operator Training.
Section 5, Malfunction Performance Tests, used for complying with Section 3.1.2 of ANSl/ANS 3.5-1985, Nuclear Power Plant Simulators for Use in Operator Training.
Section 6,                   Steady state performance Tests, used for complying with Appendix B1.1 of ANSI /ANS 3.5-1985, Nuclear Power Plant Simulators for Use in Operator Training.
Section 6, Steady state performance Tests, used for complying with Appendix B1.1 of ANSI /ANS 3.5-1985, Nuclear Power Plant Simulators for Use in Operator Training.
Section 7                   Transient Performance Tests, used for complying with Appendix B1.2 of ANSI /ANS 3.5-1985, Nuclear Powe.' Plant Simulators for Use in Operator i raining.
Section 7 Transient Performance Tests, used for complying with Appendix B1.2 of ANSI /ANS 3.5-1985, Nuclear Powe.' Plant Simulators for Use in Operator i raining.
Section 8                   Remote Function tests, used for verifying functionality of operator actions performed "outside the simulated control room".
Section 8 Remote Function tests, used for verifying functionality of operator actions performed "outside the simulated control room".
If you have any questions, or require additional information, please do not hesitate to contact Dr. John Stankiewicz, Director of Training, Limerick Generating Station at (610) 718-4000.
If you have any questions, or require additional information, please do not hesitate to contact Dr. John Stankiewicz, Director of Training, Limerick Generating Station at (610) 718-4000.
Siry:erely,,    ,
Siry:erely,,
: t.       (
t.
    & Te )k%u-r J. D, von Suskil attachment cc:       Mr. H.J. Miller, Administrator, Region 1. USNRC Mr. A.L. Burritt, USNRC Resident inspector, LGS Document Control Desk, USNRC, Washington, DC
(
& Te )k%u-r J. D, von Suskil attachment cc:
Mr. H.J. Miller, Administrator, Region 1. USNRC Mr. A.L. Burritt, USNRC Resident inspector, LGS Document Control Desk, USNRC, Washington, DC


  --                  -            -- --                    -      -      - - - . -                      - _ - -                      . _      . - . .. ~.                      .- .          -_ ..
. -... ~.
NRC FORM 474                                   U.S. NUCLEAR REGULATORY COMMISSION                             APPROVED 0Y oms NO. atsoone                                       EXPIRES. carmom l
NRC FORM 474 U.S. NUCLEAR REGULATORY COMMISSION APPROVED 0Y oms NO. atsoone EXPIRES. carmom l Esbreet.d.u,
      -                                                                                                              Esbreet.d .u,   - res- - w me enandam m ,me-request 120 hours The snformacon a used to certify e annuterion facinty Forware comments regeriling bureen ashmate to the Records Ma       ment Branch (T4 F33) U S SIMULATION FACILITY CERTIFICATION                                                               %%"*#"*'"b'" sow"OE~. 3"a"Ja'ee Bu                                   g""J'h.3"E 20503 een               cohecmon sees not derav e currentiv venio OMB contros number the NRC may not conduct or sponsor, and e person a not requared to fespond to, the meermance conectica INSTRUCTIONS
- res- - w me enandam m,me-request 120 hours The snformacon a used to certify e annuterion facinty Forware comments regeriling bureen ashmate to the Records Ma ment Branch (T4 F33) U S SIMULATION FACILITY CERTIFICATION
      ,m- P.~de ~ r .Th*s       sw., form   a to be
%%"*#"*'"b'" sow"OE~. 3"a"Ja'ee Bu g""J'h.3"E 20503 een cohecmon sees not derav e currentiv venio OMB contros number the NRC may not conduct or sponsor, and e person a not requared to fespond to, the meermance conectica INSTRUCTIONS.Th*s form a to be fnod for mibol certsfcanon, racertitcanon (it requered). and for any change to a simuishon fecelty peftaimonce teshng pian made e8ter mebal sub
                                          ,re-e.      fnod e%s    for mibol certsfcanon, u .meonnie    ime to .wwe racertitcanon   (it requered). and for any change to a simuishon fecelty peftaimonce teshng pian made e8ter mebal sub rees-,, suhmme, F ACALITy                                                                                                                                                         DOCKET NUMBER Limerick Generating Station Unit 1                                                                                                                 "~352                         l LICENSEE                                                                                                                                                           DATE PECO Nuclear Corporation                                                                                                                           01/31/99 Thes is to Eartriy that 1 The anove named tecihty bcensee a vs.no a simuiacon tecnny cormonng some         r or o piantverenced semuistor tn a t mese the e ounemens or 10 CFR 55 45                                   '
,m-P.~de ~ r sw.,,re-e.
i 2 Documentation m evenatne for NRC revow m eccoreente with 10 CFR 65 45(b) 3 The semutshon facMy meets the guidance conteined m ANSuANS 3 41985 or ANSVANS 3 51903. es enoorsed by NRC Regulatory Onese 1149 W there are any EXCEPTIONS to the certifcabon of the stem CHECM HERE h j and Gesenbe fully on addenonal pages as necessary NAME (or other adentercate) AND LOCATION OF SMULATION F ACILITY Limerick Generating Station                                                                                                                                                       i 341 Longview Road Linfield, PA 19468 sMutAflON F ACILITY PERFORM ANCE TEST ABSTR ACTS ATTACHED (Fcr perfbrmance ,esta conducted m she penod andmg we the dem of be s'fifcehon)
e%s u.meonnie ime to.wwe rees-,, suhmme, F ACALITy DOCKET NUMBER Limerick Generating Station Unit 1
DESCRIPTION OF PE RFORMANCE TE STING COMPLETED (Alfech oddrhonelpeges es neceswy and usenefy the som osecrpton bomp orwefnued J Exhibit 3, attached, summarizes the performance testing of the LGS simulttor since the submittal of the previous Quadrennial Report on 01/31/95. Those                                                                                                         j tables document the simulator facility performance in accordance with                                                                                                             (
"~352 l
ANSI /ANS 3.5 - 1985.                                                                                                                                                             l L
LICENSEE DATE PECO Nuclear Corporation 01/31/99 Thes is to Eartriy that 1 The anove named tecihty bcensee a vs.no a simuiacon tecnny cormonng some or o piantverenced semuistor tn t mese the e ounemens or 10 CFR 55 45 r
SMULATION F ACILITY PERFORMANCE TESTING SCHEDULE ATTACHED (Fe me conduct orepprornnaarsy 25 percent of psr*rmance anals per yosr Ar me fourp period E         commencmq w* the dere of mes certifscata)
a i
2 Documentation m evenatne for NRC revow m eccoreente with 10 CFR 65 45(b) 3 The semutshon facMy meets the guidance conteined m ANSuANS 3 41985 or ANSVANS 3 51903. es enoorsed by NRC Regulatory Onese 1149 W there are any EXCEPTIONS to the certifcabon of the stem CHECM HERE h j and Gesenbe fully on addenonal pages as necessary NAME (or other adentercate) AND LOCATION OF SMULATION F ACILITY Limerick Generating Station i
341 Longview Road Linfield, PA 19468 sMutAflON F ACILITY PERFORM ANCE TEST ABSTR ACTS ATTACHED (Fcr perfbrmance,esta conducted m she penod andmg we the dem of be s'fifcehon)
DESCRIPTION OF PE RFORMANCE TE STING COMPLETED (Alfech oddrhonelpeges es neceswy and usenefy the som osecrpton bomp orwefnued J Exhibit 3, attached, summarizes the performance testing of the LGS simulttor since the submittal of the previous Quadrennial Report on 01/31/95. Those j
tables document the simulator facility performance in accordance with
(
ANSI /ANS 3.5 - 1985.
l L
SMULATION F ACILITY PERFORMANCE TESTING SCHEDULE ATTACHED (Fe me conduct orepprornnaarsy 25 percent of psr*rmance anals per yosr Ar me fourp period E
commencmq w* the dere of mes certifscata)
DESCR?PTION OF VL RFORMANCE TESTING TO BE CONDUCTED (Attach addornonet pages es neceenery and mentury me nom desoraphon bemp conbnued)
DESCR?PTION OF VL RFORMANCE TESTING TO BE CONDUCTED (Attach addornonet pages es neceenery and mentury me nom desoraphon bemp conbnued)
Exhibit 4 attached, summarizes the performance testing scheduled to be performed on the LGS Unit I simulator over the next feur year period, ending 01/31/2003.                         The scheduled testing is in accordance with the requirements of ANSI /ANS 3.5 - 1985.
Exhibit 4 attached, summarizes the performance testing scheduled to be performed on the LGS Unit I simulator over the next feur year period, ending 01/31/2003.
The scheduled testing is in accordance with the requirements of ANSI /ANS 3.5 - 1985.
l l
l l
1 PE RFORM ANCE TESTING PL AN CHANGE (Acr any modafcehw km a performance sesbng pasa subnwreed on a previous cwtifcebonJ DESCRIPTION OF PE RFORMANCE TESTING PL AN CHANGE getroch addrhonet pages as necesse"y and edenpfy me dem doEWphon bemp con >nued)
1 PE RFORM ANCE TESTING PL AN CHANGE (Acr any modafcehw km a performance sesbng pasa subnwreed on a previous cwtifcebonJ DESCRIPTION OF PE RFORMANCE TESTING PL AN CHANGE getroch addrhonet pages as necesse"y and edenpfy me dem doEWphon bemp con >nued)
Exhibit 2, attached, documents performance tests deleted and/or other changes to the performance test plan, submitted with the previous Quadrennial Report.
Exhibit 2, attached, documents performance tests deleted and/or other changes to the performance test plan, submitted with the previous Quadrennial Report.
I t
I t
,                RECFRTIFICATION ([macnbe correchve echans sonen e#ech resu4s of composed pertamence fashng m occareence we 70 CFR 55 dS(b#S#v)
RECFRTIFICATION ([macnbe correchve echans sonen e#ech resu4s of composed pertamence fashng m occareence we 70 CFR 55 dS(b#S#v)
(Anoch end@onalpages es necessary and asenpfy the nem neecnphon beeng conbnuedi j     Any false statement or omesson en the accument, mcauemg ettechments may be subject to cani and cnmmel sanchons I certify under penalty at perjury that the mformeDon m the gocument and
(Anoch end@onalpages es necessary and asenpfy the nem neecnphon beeng conbnuedi j
;    .n.c.i ene m eu. and eor.eet 4
Any false statement or omesson en the accument, mcauemg ettechments may be subject to cani and cnmmel sanchons I certify under penalty at perjury that the mformeDon m the gocument and
      $8GNATURE AUTHOR ED                         SENTAtivE                   TTTLE                                                                                     DATE Vice President, t
.n.c.i ene m eu. and eor.eet 4
;                                                                                        Limerick Generating Station                                                     01/31/99 8
$8GNATURE AUTHOR ED SENTAtivE TTTLE DATE Vice President, 01/31/99 t
In socoreence wem 10 CFM SS 6 Communicausns thes form shell be subm#tted to the NRC es foNows BY Mall ADDRESSED TO               DHtECTOR. OFFICE OF NUCLEAR REACTOR REOULATION                       BY DELIVERY IN PERSON             ONE WHITE FLINT NORTH U S. NUCLEAR REGULATORY cot #Mi&5 ION                                 TO THE NRC OFFICE At               11665 ROCKYlLLE PIKE W ASHINGTON. DC 206664001                                                                               ROCsfVILLE. t#D NNC FORM 474 (EL1998)                                                                                                                                             PRINTED ON RECYCLED PAPER
Limerick Generating Station 8
In socoreence wem 10 CFM SS 6 Communicausns thes form shell be subm#tted to the NRC es foNows BY Mall ADDRESSED TO DHtECTOR. OFFICE OF NUCLEAR REACTOR REOULATION BY DELIVERY IN PERSON ONE WHITE FLINT NORTH U S. NUCLEAR REGULATORY cot #Mi&5 ION TO THE NRC OFFICE At 11665 ROCKYlLLE PIKE W ASHINGTON. DC 206664001 ROCsfVILLE. t#D NNC FORM 474 (EL1998)
PRINTED ON RECYCLED PAPER


  -.              - -;-----.                                            -. _ - . - - - . .                              - _ -              -~_. -                     -              - ~ _         -
-~_. -
- ~ _
4 8
4 8
1 NRC FORM 474                                   U.S. NUCLEAR REGULATORY COMMISSION                         APPR'lUED BY OeAS. NO.31964130                                 EXPIRES. Der 31/2001 (8 'M                                                                                                     Eshmated buiten per respone to campsy enm the mandatuy mtormanon cohecbon seauest 120 eours Tka odormanon a used a ceMy a semuistio                     Forward   i
1 NRC FORM 474 U.S. NUCLEAR REGULATORY COMMISSION APPR'lUED BY OeAS. NO.31964130 EXPIRES. Der 31/2001 (8 'M Eshmated buiten per respone to campsy enm the mandatuy mtormanon cohecbon seauest 120 eours Tka odormanon a used a ceMy a semuistio Forward i
!                                                                                                                  commenes regeisms bureen esomem to one Recoros                               uanagment nch (T 4 F33)   U$   sr n i
commenes regeisms bureen esomem to one Recoros uanagment sr nch (T 4 F33) U $
i                   SIMULATION FACILITY CERTIFICATION                                                             %L*""*#"#cWo"W"OlL"7C"r3n'eTend                                       44 *aW 20503 If an mformanon conecton soes not sopiar a currency ve6sa OMB controi nummer, d
i SIMULATION FACILITY CERTIFICATION
the NRC may not conduct or sponsor and a person a not requuod to respone g the ordtpatoa coliertoa
%L*""*#"#cWo"W"OlL"7C"r3n'eTend 44 *aW i
'        INSTRUCTION 4: The form a t be f4ed for msbal certificahon, recerghcaton (# requned) enti for any change to a samulaban facdst/ performance tesbng plan made sRet insbol submsitol of such a snen %moe the fr46 9wma ordarmahoa and ched the soproonate bor to moeste reasoa be tut >matal                                                                                                       f DOCKET NUMBER                        !
20503 If an mformanon conecton soes not sopiar a currency ve6sa OMB controi nummer, the NRC may not conduct or sponsor and a person a not requuod to respone g the d
1       F ACILffY Limerick Generaing Station Unit 2                                                                                                             so-353 LCENSEE                                                                                                                                                       DATE
ordtpatoa coliertoa INSTRUCTION 4: The form a t be f4ed for msbal certificahon, recerghcaton (# requned) enti for any change to a samulaban facdst/ performance tesbng plan made sRet insbol submsitol of such a
;                          PECO Nuclear Corporation                                                                                                                   01/31/99                               ,
%moe the fr46 wma ordarmahoa and ched the soproonate bor to moeste reasoa be tut >matal f
The e to ceably that i           1 The above named tecdsty Isensee es ussag a semutabon facenty consetng soiety of a piern-referenced semunalcr that most the reeuwements of to CFR 55 45 2 P- - _                 is swunlebee for NRC review m accordance enth 10 CFR SS AS(b)                                                                                                           L 3 The semuiscon tecd4 meets the guedence contained in ANSI /ANS 3 $1985 'ar ANSlIANS 3 51gg3. es endorsed by NRC Reguietary Guide 1149 li there are any EXCEPTIONS to the certificahon of this nom. CHECK M8 RE DQ and essentie fully on addDonal pages as n~===ry NAME (e other spentdcehon) AND LOCATION OF &lMULATION F AC3LffY Limerick Generating Station 341 Longview Road Linfield, PA 19468                                                                                                                                                                 ,
snen 9
SIMULAT10N F ACILffY PERFORMANCE TEST ABS'RACTS ATTACHED (Ferperftrmence feels pondueled e me persolf ondag with mo doss elmas certrfcohon) 7 SCRIPTION OF PE NF ORMANCE TESTING COMPLETED (Attaca eddshonalpages es necessary and identrfy me seem sesenpean bemg con 6nued)
1 F ACILffY DOCKET NUMBER so-353 Limerick Generaing Station Unit 2 LCENSEE DATE PECO Nuclear Corporation 01/31/99 The e to ceably that i
The LCS Unit I simulator is used for training and examination of LGS Unit 2 personnel.               Exhibit 3, attached, summarizes the performance testing of the LGS Unit I simulator since the submittal of the previous Quadrennial Report on 01/31/95. These tables document the simulator facility performance in accordance with ANSI /ANS 3.5 - 1985.
1 The above named tecdsty Isensee es ussag a semutabon facenty consetng soiety of a piern-referenced semunalcr that most the reeuwements of to CFR 55 45 2
S6MUL ATION F ACILftY PERFORMANCE TESTING SCHEDULE ATT ACHED (Fer me conduer of appromenelet 25 pecent of patrmance aests per year kr me fbw year permd E     commencong watn me dase of mas certifcahon)
P- - _
is swunlebee for NRC review m accordance enth 10 CFR SS AS(b)
L 3 The semuiscon tecd4 meets the guedence contained in ANSI /ANS 3 $1985 'ar ANSlIANS 3 51gg3. es endorsed by NRC Reguietary Guide 1149 li there are any EXCEPTIONS to the certificahon of this nom. CHECK M8 RE DQ and essentie fully on addDonal pages as n~===ry NAME (e other spentdcehon) AND LOCATION OF &lMULATION F AC3LffY Limerick Generating Station 341 Longview Road Linfield, PA 19468 SIMULAT10N F ACILffY PERFORMANCE TEST ABS'RACTS ATTACHED (Ferperftrmence feels pondueled e me persolf ondag with mo doss elmas certrfcohon) 7 SCRIPTION OF PE NF ORMANCE TESTING COMPLETED (Attaca eddshonalpages es necessary and identrfy me seem sesenpean bemg con 6nued)
The LCS Unit I simulator is used for training and examination of LGS Unit 2 personnel.
Exhibit 3, attached, summarizes the performance testing of the LGS Unit I simulator since the submittal of the previous Quadrennial Report on 01/31/95. These tables document the simulator facility performance in accordance with ANSI /ANS 3.5 - 1985.
S6MUL ATION F ACILftY PERFORMANCE TESTING SCHEDULE ATT ACHED (Fer me conduer of appromenelet 25 pecent of patrmance aests per year kr me fbw year permd E
commencong watn me dase of mas certifcahon)
DESCRIPTION OF PERFORMANCE IESTING TO BE CONDUCTED (Afteen odd bonel pages as necessary and idenfrfy the seern seemipbon beeng conhnverf)
DESCRIPTION OF PERFORMANCE IESTING TO BE CONDUCTED (Afteen odd bonel pages as necessary and idenfrfy the seern seemipbon beeng conhnverf)
Exhibit 4, attached, summarizes the performance testing scheduled to be performed on the LGS Unit I simulator over the next four year period, ending 01/31/2003. The scheduled testing is in accordance with the requirements of ANSI /ANS 3.5 - 1985.
Exhibit 4, attached, summarizes the performance testing scheduled to be performed on the LGS Unit I simulator over the next four year period, ending 01/31/2003.
g     PERFORMANCE TESTING PLAN CHANGC (Fa eny modAcahon 80 e paiemence seskng psen subm.ned on a preveous certothcekon)
The scheduled testing is in accordance with the requirements of ANSI /ANS 3.5 - 1985.
g PERFORMANCE TESTING PLAN CHANGC (Fa eny modAcahon 80 e paiemence seskng psen subm.ned on a preveous certothcekon)
DESCRIPTION OF PERFORMANCE TESTING PL AN CHANGE (Afraca nodrhonalpopes as necessay and asen6ry fne rium descnphon borng con 6nued)
DESCRIPTION OF PERFORMANCE TESTING PL AN CHANGE (Afraca nodrhonalpopes as necessay and asen6ry fne rium descnphon borng con 6nued)
Exhibit 2, attached, documents performance tests deleted and/or other changes to the performance test plan, submitted with the previous Quadrennial Report.
Exhibit 2, attached, documents performance tests deleted and/or other changes to the performance test plan, submitted with the previous Quadrennial Report.
RECE RTIFICATION (Descrabe semw>ve echons unen errech results of composed petamence seshng an occareence wrth 10 CFR SS dS(kKSXv)
RECE RTIFICATION (Descrabe semw>ve echons unen errech results of composed petamence seshng an occareence wrth 10 CFR SS dS(kKSXv)
(Afteca addskonelpages es necessery and noentify me nem descnchon borng conhnued)
(Afteca addskonelpages es necessery and noentify me nem descnchon borng conhnued)
Any esse stemment or omission m the encument. meluemo anschments may e e suefect to cani and enmmai sanctions I certify unow penatry of pequry that         mformetson m the document sad en.cr. ment . m .n. correct SIGNAYURE             - AUTHORIZED RE RESEMTATIVE                           TITLE                                                                             DATE Vice President.                                                             01/31/99 D                                                               Limerick Generating Station in .ecohete .nn so CFR ss s. Communceuona ihm eorm sh.li n. suomiei.d io ih. NRC a. miio s BY MAIL ADDRESSEDTO                 DIRECTOR, OFFICE OF NUCLE #t REACTOR REOULATION                   BY DELIVERY IN PERSON               ONE WHITE FLINT NORTH U.S NUCLEAR REOULATORY COeset&&&fDN                               TO THE NRC OFFICE AT               11666 ROCKVILLE PtKE WASH 4NOTON UC 309964001                                                                             ROCetVILLE, htD NNC f ONM 474 (ik1eW8)                                                                                                                                       PRINTED ON RECYCLLD PAPER
Any esse stemment or omission m the encument. meluemo anschments may e e suefect to cani and enmmai sanctions I certify unow penatry of pequry that mformetson m the document sad en.cr. ment. m
.n. correct SIGNAYURE
- AUTHORIZED RE RESEMTATIVE TITLE DATE Vice President.
01/31/99 D
Limerick Generating Station in.ecohete.nn so CFR ss s. Communceuona ihm eorm sh.li n. suomiei.d io ih. NRC a. miio s BY MAIL ADDRESSEDTO DIRECTOR, OFFICE OF NUCLE #t REACTOR REOULATION BY DELIVERY IN PERSON ONE WHITE FLINT NORTH U.S NUCLEAR REOULATORY COeset&&&fDN TO THE NRC OFFICE AT 11666 ROCKVILLE PtKE WASH 4NOTON UC 309964001 ROCetVILLE, htD NNC f ONM 474 (ik1eW8)
PRINTED ON RECYCLLD PAPER


PCCO NUCLEAR CORPORATION LIMERIC1'. GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT Table of Contents Exhibit 1:     Exceptions to ANSI /ANS 3.5-1985 Test Requirements Exhibit 2:     Simulator Tests Deleted (Test Plan Changes)
PCCO NUCLEAR CORPORATION LIMERIC1'. GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT Table of Contents Exhibit 1:
Exhibit 3:     Simulator Test Reports (Simulator Testing Completed                               ;
Exceptions to ANSI /ANS 3.5-1985 Test Requirements Exhibit 2:
in 1995 through 1998)
Simulator Tests Deleted (Test Plan Changes)
Exhibit 3:
Simulator Test Reports (Simulator Testing Completed in 1995 through 1998)
{
{
Exhibit 4:     Simulator Test Commitments (Simulator Testing to be Performed in 1999 through 2003) l
Exhibit 4:
                                          \
Simulator Test Commitments (Simulator Testing to be Performed in 1999 through 2003) l
                                                                                                                  -L
\\
-L


PECO NUCLEAR CORPORATION LIMERICK GEhTRATING STATION TRAINING SIMULATOR SIMITLATOR QUADRENNIAL REPORT l
PECO NUCLEAR CORPORATION LIMERICK GEhTRATING STATION TRAINING SIMULATOR SIMITLATOR QUADRENNIAL REPORT l
EXHIBIT 1 EXCEPTIONS TO ANSI / ANS 3.5-1985                 !
EXHIBIT 1 EXCEPTIONS TO ANSI / ANS 3.5-1985 TESTING REQUIREMENTS e
TESTING REQUIREMENTS e
i i
i i
                                                  ?
?


                                                                      \
\\
PCCO ENERGY CORPORATION LIMERICK GENERATING STATION TRAINING SINULATOR SIMULATOR QUADRENNIAL REPORT ANSI REQUIREMENT EXCEPTION RECGRD ANSI Requirement:     ANSI 3. 5-1985, Section 3.1.1 (9)
PCCO ENERGY CORPORATION LIMERICK GENERATING STATION TRAINING SINULATOR SIMULATOR QUADRENNIAL REPORT ANSI REQUIREMENT EXCEPTION RECGRD ANSI Requirement:
ANSI 3. 5-1985, Section 3.1.1 (9)
F
F


==Title:==
==Title:==
Core   performance   testing:     Reactivity coefficient measurements EXCEPTION:                                                         ,
Core performance testing:
Reactivity coefficient measurements EXCEPTION:
PECO Energy Corporation takes exception to this requirement.
PECO Energy Corporation takes exception to this requirement.
There is no performance test for this requirement which is performed as part of the Limerick Simulator Certification process.
There is no performance test for this requirement which is performed as part of the Limerick Simulator Certification process.
JUSTIFICATION:
JUSTIFICATION:
Determination of reactivity coefficients is not an operator function at the Limerick Generating Station. The LGS Simulator is not used to train operators in the determination of reactivity coefficients.
Determination of reactivity coefficients is not an operator function at the Limerick Generating Station.
l 1
The LGS Simulator is not used to train operators in the determination of reactivity coefficients.
l L
l l
1 L
w v
-,----..n,e


PECO ENER8Y CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT                                                   ;
PECO ENER8Y CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT ANSI REQUIREMENT EXCEPTION RECORD ANSI Requirement:
ANSI REQUIREMENT EXCEPTION RECORD ANSI Requirement:           ANSI 3.5-1985, Section 3.1.1 (9)                                               l
ANSI 3.5-1985, Section 3.1.1 (9)


==Title:==
==Title:==
Core performance testing:                 Control rod worth using                               l permanently installed instrumentation.                                                         I
Core performance testing:
                                                                                                                ,s EXCEPTION:                                                                                               ;
Control rod worth using I
permanently installed instrumentation.
,s EXCEPTION:
t PECO Energy Corporation takes exception to this requirement.
t PECO Energy Corporation takes exception to this requirement.
There is no performance test for this requirement which is                                               !
There is no performance test for this requirement which is performed as part of the Limerick Simulator Certification process.
performed as part of the Limerick Simulator Certification process.
i t
i t
1 I
1 I
Line 140: Line 178:
l.
l.
6 JUSTIFICATION:
6 JUSTIFICATION:
i                         Determination of control rod worth is not an operator j                   function at the Limerick Generating Station. The LGS Simulator is
i Determination of control rod worth is not an operator j
,                  not used to train operators in the determination of control rod worth.
function at the Limerick Generating Station.
I                                                                       -                                        ._ __. . f
The LGS Simulator is not used to train operators in the determination of control rod worth.
I f


  , . . . . . _ . . _ _ . ..      _ _ _ _ _ _ . _ . _ _ . _ _ . _ .          . _  _ . ._ __._ _ . _ . . . . . . . _ _ . _ _ . . . . _ . _ _      _.m _ _ _ . . _ .
_.m i
i PECO ENERGY CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMUI ATOR QUADRENNIAL REPORT                                                                   i ANSI REQUIREMENT EXCEPTION RECORD                                                                 f ANSI Requirement:                           ANSI 3.5-1985, Section 3.1.2 (1) (a)
PECO ENERGY CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMUI ATOR QUADRENNIAL REPORT i
ANSI REQUIREMENT EXCEPTION RECORD f
ANSI Requirement:
ANSI 3.5-1985, Section 3.1.2 (1) (a)


==Title:==
==Title:==
Loss of coolant, Significant PWR steam separator leaks.
Loss of coolant, Significant PWR steam separator leaks.
i EXCEPTION:
i EXCEPTION:
1 PECO Energy Corporation takes exception to this requirement.                                                                       !
1 PECO Energy Corporation takes exception to this requirement.
There is no perforr.4ance test for this requirement which is performed as part of the Limerick Simulator certiification p.:ocess.
There is no perforr.4ance test for this requirement which is performed as part of the Limerick Simulator certiification p.:ocess.
1 i
1 i
I 4
I 4
l d
d i
i l
JUSTIFICATION:
l JUSTIFICATION:                                                                                                                             l The Limerick Generating Station is a General Electric Boiling Water Reactor (BWR).                           This requirement is not applicable to the LGS Simulator.
The Limerick Generating Station is a General Electric Boiling Water Reactor (BWR).
This requirement is not applicable to the LGS Simulator.
y
,.,.1e.


PECO ENERGY CORPORATION                                 l LIMERICK GENERATING STATION TRAINING SIMULATOR                       !
PECO ENERGY CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT l
SIMULATOR QUADRENNIAL REPORT l
ANSI REQUIREMENT EXCEPTION RECORD ANSI Requirement:
ANSI REQUIREMENT EXCEPTION RECORD ANSI Requirement:               ANSI 3.5-1985, Section 3.1 2 (18)
ANSI 3.5-1985, Section 3.1 2 (18)


==Title:==
==Title:==
Line 168: Line 213:
There is no performance test for this requirement which is performed as part of the Limerick Simulator Certification process.
There is no performance test for this requirement which is performed as part of the Limerick Simulator Certification process.
JUSTIFICATION:
JUSTIFICATION:
The Limerick Generating Station is a General Electric Boiling Water Reactor (BWR). This requirement is not applicable to the LGS Simulator.
The Limerick Generating Station is a General Electric Boiling Water Reactor (BWR).
This requirement is not applicable to the LGS Simulator.


1 PECO ENERGY CORPORATION LIMERICK GENERATIN3 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT ANSI REQUIREMENT EXCEPTION RECORD i
1 PECO ENERGY CORPORATION LIMERICK GENERATIN3 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT ANSI REQUIREMENT EXCEPTION RECORD i
l ANSI Requirement:           ANSI 3.5-1985, Appendix Bl.2 (7)               j i                                                                             I
ANSI Requirement:
ANSI 3.5-1985, Appendix Bl.2 (7) j i
]
]
^


==Title:==
==Title:==
Transient Performance: Maximum rate power ramp (master     l recirculation flow controller)in " manual" down to       )'
Transient Performance:
Maximum rate power ramp (master
^
recirculation flow controller)in
" manual" down to
)
approximately 75% and back up to 100%.
approximately 75% and back up to 100%.
i EXCEPTION:                                                                 '
i EXCEPTION:
PECO Energy Corporation takes exception to this requirement.
PECO Energy Corporation takes exception to this requirement.
The performance test to satisfy this requirement has been deleted from the LGS Simulator Certification testing program.
The performance test to satisfy this requirement has been deleted from the LGS Simulator Certification testing program.
k i                                                                             ,
k i
i i
i i
s 4
s 4
Line 187: Line 238:
JUSTIFICATION:
JUSTIFICATION:
This test was deleted since it is not possible to perform.
This test was deleted since it is not possible to perform.
) To run this test and satisfy this requirement requires that the
)
Recirc M/A stations both be operated in AUTO and manipulations be done to the Recirc Master Flow Controller.           LGS is not permitted I
To run this test and satisfy this requirement requires that the Recirc M/A stations both be operated in AUTO and manipulations be done to the Recirc Master Flow Controller.
LGS is not permitted I
to operate in this configuration, and the Recirc Master Flow Controller has been removed from the Control Room Panels.
to operate in this configuration, and the Recirc Master Flow Controller has been removed from the Control Room Panels.
Therefore there is no benefit of performing simulator testing in           !
Therefore there is no benefit of performing simulator testing in this mode.
this mode.


PECO ENERGY CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT ANSI REQUIREMENT EXCEPTION RECORD ANSI Requirement:     ANSI 3. 5-1985, Appendix Bl.2 (10)
PECO ENERGY CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT ANSI REQUIREMENT EXCEPTION RECORD ANSI Requirement:
ANSI 3. 5-1985, Appendix Bl.2 (10)


==Title:==
==Title:==
Line 202: Line 254:
The performance test to satisfy this requirement has been d2leted from the LGS Simulator Certification testing program.
The performance test to satisfy this requirement has been d2leted from the LGS Simulator Certification testing program.
JUSTIFICATION:
JUSTIFICATION:
This test was dr leted since other Malfunction Performance and Transient Performar..:e tests on the Limerick Simulator serve to exercise the simulation models in similar or more extensive fashion. In particular, Malfunction Performance Test 5.18, Loss   ;
This test was dr leted since other Malfunction Performance and Transient Performar..:e tests on the Limerick Simulator serve to exercise the simulation models in similar or more extensive fashion.
of All Feedwater Resulting in ADS Blowdown, is similar, but provides for more dramatic changes in simulated p.lant parameters, thus exercising the simulator models to a greater degree.
In particular, Malfunction Performance Test 5.18, Loss of All Feedwater Resulting in ADS Blowdown, is similar, but provides for more dramatic changes in simulated p.lant parameters, thus exercising the simulator models to a greater degree.
l l
l
l


Line 210: Line 261:
(
(


PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR l
PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 SIMULATOR TESTS DELETED (With Justification)
SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 SIMULATOR TESTS DELETED (With Justification)
Malfunction Performance Test 5.01, Loss of Coolant Outside Primary Containment.
Malfunction Performance Test           5.01,     Loss of Coolant Outside Primary Containment.
This test was originally developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (1) (b), " Loss of Coolant:
This test was originally developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (1) (b), " Loss of Coolant:                       outside primary containment."
outside primary containment."
This requirement was           initially satisfied by                         a             Malfunction Performance Test, utilizing automated data collection.                               This proved to             ,
This requirement was initially satisfied by a
be unnecessary due to only minor parameter changes.                                 This requirement is now satisfied by the performance of the following test, which does                                           '
Malfunction Performance Test, utilizing automated data collection.
not utilize automated data collection, z.at does verify simulator                                               ,
This proved to be unnecessary due to only minor parameter changes.
functionality.                                                                                                   '
This requirement is now satisfied by the performance of the following test, which does not utilize automated data collection, z.at does verify simulator functionality.
3.441     Reactor Water Cleanup Leak Outside Primary Containment Malfunction Performance Test 5.04A, SRV Fails Open Electrically.                                                 ,
3.441 Reactor Water Cleanup Leak Outside Primary Containment Malfunction Performance Test 5.04A, SRV Fails Open Electrically.
This test was originally developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (1) (d), " failure of safety and relief valves."
This test was originally developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (1) (d), " failure of safety and relief valves."
,        This requirement was           initially satisfied by a Malfunction
This requirement was initially satisfied by a
; Performance Test, utilizing automated data collection. This proved to                                           i be unnecessary due to only minor parameter changes. Simulator response                                           t to this failure is now verified by the performance of the following                                             :
Malfunction Performance Test, utilizing automated data collection.
; tests, which do not utilize automated data collection but do verify
This proved to i
; simulator functionality.             The ANSI Requirement continues to be                                       l l satisfied by these and other tests:                                                                             i I
be unnecessary due to only minor parameter changes.
J 3.137C-150C     SRV 1F013 (A-S) Fails Open Electrically Page: 1
Simulator response t
to this failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality.
The ANSI Requirement continues to be l
l satisfied by these and other tests:
i I
J 3.137C-150C SRV 1F013 (A-S) Fails Open Electrically Page: 1


PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING dINULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 L
PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING dINULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 L
Simulator Tests Deleted (Continued)
Simulator Tests Deleted (Continued)
Malfunction Performance Test 5.04C, SRV Leaks.                          .
Malfunction Performance Test 5.04C, SRV Leaks.
This test was originally developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (1) (d), " failure of safety and relief valves."
This test was originally developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (1) (d), " failure of safety and relief valves."
This   requirement was initially satisfied by a Malfunction Performance Test, utilizing automated data collection. This proved to be unnecessary due to only minor parameter changes. Simulator response to this failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
This requirement was initially satisfied by a
3.137A-150A     SRV 1F013(A-S) Leaks Malfunction Performance Test 5.06A, Loss of Offsite Power at Startuo     l Test Conditions.                                                         l l
Malfunction Performance Test, utilizing automated data collection.
This proved to be unnecessary due to only minor parameter changes.
Simulator response to this failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
3.137A-150A SRV 1F013(A-S) Leaks Malfunction Performance Test 5.06A, Loss of Offsite Power at Startuo l
Test Conditions.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (3), " Loss or degraded electrical power to the station, including loss of offsite power."
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (3), " Loss or degraded electrical power to the station, including loss of offsite power."
This test was deleted due to the fact that it is no longer practical or useful to compare simulator response to reference plant response during Startup Test Conditions.       Many plant configuration changes, including retuning of the feedwater control system, feedwater heater and Main Condenser retubing, power rerate and retrofit of the Main Turbine, have made comparison of simulator response to reference plant startup test response meaningless.
This test was deleted due to the fact that it is no longer practical or useful to compare simulator response to reference plant response during Startup Test Conditions.
Many plant configuration changes, including retuning of the feedwater control system, feedwater heater and Main Condenser retubing, power rerate and retrofit of the Main Turbine, have made comparison of simulator response to reference plant startup test response meaningless.
Malfunction Performance Test 5.06B, Loss of Offsite Power at 100%
Malfunction Performance Test 5.06B, Loss of Offsite Power at 100%
Power, still serves to satisfy this ANSI requirement.
Power, still serves to satisfy this ANSI requirement.
i i
i i
Page: 2 l
Page: 2 l
I l
l i
i


PECO NUCLEAR CORPORATION LIMERICK GENERATING CTATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2                               .
PECO NUCLEAR CORPORATION LIMERICK GENERATING CTATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued) t e
Simulator Tests Deleted (Continued) t e
Malfunction Performance Test 5.08. Loss of Emeroency Power.
Malfunction Performance Test 5.08. Loss of Emeroency Power.
This test was originally developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2     (3),     " Loss or degraded electrical power, loss of emergency generators."
This test was originally developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (3),
This requirement was             initially satisfied by a Malfunction Performance Test, utilizing automated data collection. This proved to be unnecessary.       This ANSI requirement is now satisfied by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality:
" Loss or degraded electrical
3.418A             Diesel     Generator   D11   Trip 3.418B             Diesel     Generator   D12   Trip 3.418C             Diesel     Generator   D13   Trip 3.418D             Diesel     Generator   D14   Trip 3.419A             Diesel     Generator   D11   Fails   to Start 3.419B             Diesel     Generator   D12   Fails   to Start 3.419C             Diesel     Generator   D13   Fails   to Start 3.419D             Diesel     Generator   D14   Fails   to Start Malfunction Performance Test 5.12A. Recire Pumo Seizure.                                 l This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (4), " Loss of forced coolant flow due to single or multiple pump failure."
: power, loss of emergency generators."
This requirement was             initially satisfied by a Malfunction Performance Test, utilizing automated data collection.                   This proved to be unnecessary. Simulator response to this failure is now verified                   j using the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
This requirement was initially satisfied by a
3.430A, Recirc Pump A Seizure 3.430B, Recirc Pump B Seizure Page: 3                                       l
Malfunction Performance Test, utilizing automated data collection.
                                                                                              )
This proved to be unnecessary.
This ANSI requirement is now satisfied by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality:
3.418A Diesel Generator D11 Trip 3.418B Diesel Generator D12 Trip 3.418C Diesel Generator D13 Trip 3.418D Diesel Generator D14 Trip 3.419A Diesel Generator D11 Fails to Start 3.419B Diesel Generator D12 Fails to Start 3.419C Diesel Generator D13 Fails to Start 3.419D Diesel Generator D14 Fails to Start Malfunction Performance Test 5.12A. Recire Pumo Seizure.
l This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (4), " Loss of forced coolant flow due to single or multiple pump failure."
This requirement was initially satisfied by a
Malfunction Performance Test, utilizing automated data collection.
This proved to be unnecessary.
Simulator response to this failure is now verified j
using the following
: tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
3.430A, Recirc Pump A Seizure 3.430B, Recirc Pump B Seizure Page: 3
)


    -  -_    . _ . . . . -        - =_.       .  .  .-      -  . _ . -        ~ .  - .- _-
- =_.
~
PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued) l Malfunction Performance Test 5.12B. Calibrated Jet Pump Failure.
PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued) l Malfunction Performance Test 5.12B. Calibrated Jet Pump Failure.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (4), " Loss of forced coolant flow due to single or multiple pump failure."
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (4), " Loss of forced coolant flow due to single or multiple pump failure."
i This requirement was                 initially satisfied by a Malfunction Performance Test, utilizing automated data collection. This proved to be unnecessary.       Simulator response to this failure is now verified using the following tests,                 which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
i This requirement was initially satisfied by a
i 3.500A             Jet Pump No. 1 Fails - Displaced Jet Pump Mixer 3.500B             Jet Pump No. 16 Fails - Displaced Jet Pump Mixer i         3.501A             Jet Pump No. 7/8 Fails - Plugged Jet Pump Riser i         3.501B             Jet Pump No. 19/20 Fails - Plugged Jet Pump Riser 3.502A             Jet Pump No.               13 Failure       -
Malfunction Performance Test, utilizing automated data collection.
Broken Jet Pump i                             Instrument Line                                                 i
This proved to be unnecessary.
;          3.502B             Jet       Pump   No. 5 Failure     -
Simulator response to this failure is now verified using the following
Broken Jet Jump
: tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
!                              Instrument Line l         3.503A             Jet Pump No. 17/18 Failure - Break in Riser
i 3.500A Jet Pump No. 1 Fails - Displaced Jet Pump Mixer 3.500B Jet Pump No. 16 Fails - Displaced Jet Pump Mixer i
)         3.503B             Jet Pump No. 9/10 Failure - Break in Riser I
3.501A Jet Pump No. 7/8 Fails - Plugged Jet Pump Riser i
3.501B Jet Pump No. 19/20 Fails - Plugged Jet Pump Riser 3.502A Jet Pump No.
13 Failure Broken Jet Pump i
Instrument Line i
3.502B Jet Pump No.
5 Failure Broken Jet Jump Instrument Line l
3.503A Jet Pump No. 17/18 Failure - Break in Riser
)
3.503B Jet Pump No. 9/10 Failure - Break in Riser I
i d
i d
Page: 4
Page: 4
Line 268: Line 347:
MS.lfunction Performance Test 5.12C. Recire Pumo Field Breaker Trio.
MS.lfunction Performance Test 5.12C. Recire Pumo Field Breaker Trio.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (4), " Loss of forced coolant flow due to single or multiple pump failure."
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (4), " Loss of forced coolant flow due to single or multiple pump failure."
This requirement was       initially satisfied by a Malfunction Performance Test, utilizing automated data collection. This proved to be redundant.     The integrated plant effects of a Recirc Pump Field Breaker are identical to the effects of a Recirc Pump M-G Set Drive Motor Breaker trip, since a drive motor breaker trip also results in a field breaker trip. The primary effects of a recire pump field breaker trip are still verified using the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
This requirement was initially satisfied by a
3.436A, Recirc Pump A Field Breaker Trip 3.436B, Recirc Pump B Field Breaker Trip Malfunction   Performance Test   5.13B,   Main   Condenser Hotwell     Level Control.
Malfunction Performance Test, utilizing automated data collection.
This proved to be redundant.
The integrated plant effects of a Recirc Pump Field Breaker are identical to the effects of a Recirc Pump M-G Set Drive Motor Breaker trip, since a drive motor breaker trip also results in a field breaker trip.
The primary effects of a recire pump field breaker trip are still verified using the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
3.436A, Recirc Pump A Field Breaker Trip 3.436B, Recirc Pump B Field Breaker Trip Malfunction Performance Test 5.13B, Main Condenser Hotwell Level Control.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (5), " Loss of condenser vacuum including loss of condenser level control."
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (5), " Loss of condenser vacuum including loss of condenser level control."
This requirement was       initially satisfied by a Malfunction Performance Test, utilizing automated data collection. This proved to be unnecessary. The primary effects of main condenser hotwell level control failure are still verified using the following tests, which do not   utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
This requirement was initially satisfied by a
3.077A           Hotwell Level Control Fails High 3.077B           Hotwell Level Control Fails Low Page: 5
Malfunction Performance Test, utilizing automated data collection.
This proved to be unnecessary.
The primary effects of main condenser hotwell level control failure are still verified using the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
3.077A Hotwell Level Control Fails High 3.077B Hotwell Level Control Fails Low Page: 5


                              .  -~     --    .      - - -    -.  ._ - - -.
-~
PECO NUCLEAR CORPORATION LIMERICK GENERATIN3 STATION TRAINING SIMULATOR                 l SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 l
PECO NUCLEAR CORPORATION LIMERICK GENERATIN3 STATION TRAINING SIMULATOR l
l Simulator Tests Deleted (Continued)                   i l
SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued) i Malfunction Performance Test 5.15, Loss of Shutdown Coolino.
Malfunction Performance Test 5.15, Loss of Shutdown Coolino.                 !
This test was originally developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (7), " Loss of shutdown cooling."
This test was originally developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (7), " Loss of shutdown cooling."
l       .nis requirement was     initially satisfied by a Malfunction     ,
l
Performance Test, utilizing automated data collection. This proved to i be unnecessary. This requirement is now satisfied by the performance   i
.nis requirement was initially satisfied by a
)   of the following tests, which do not utilize automated data collection
Malfunction i
but do verify simulator functionality:                                     i 3.171A-D   RHR Pump (A-D) Trip                                       !
Performance Test, utilizing automated data collection.
]       3.173     RHR Shutdown Cooling Suction Line Break
This proved to i
  !      3.175A-D   RHR Pump Suction Valve (F004A-D) Fails
be unnecessary.
.        3.176A-B   RHR Loap Shutdown Cooling Valve (F006A-B) Fails As Is     i 3.176C-D   RHR Shutdown Cooling Suction Valve (F008, F009) Fails     !
This requirement is now satisfied by the performance i
}                   As Is l       3.176E-F   RHR Shutdown Cooling Injection Valve (F015A-B) Fails As Is                                                         ;
)
l 1        3.177A-D   RHR Hx (A-B) Bypass Controller Fails High/Lo 3.571A     RHR Shutdown Cooling Valve HV51-1F008 Trip of Thermal Overload 3.571B     RHR Shutdown Cooling Valve HV51-1F008 Trip of Magnetic Overload 3.572A     RHR Shutdown Cooling Valve HV51-1F009 Trip of Thermal     i
of the following tests, which do not utilize automated data collection but do verify simulator functionality:
:                  Overload J
i 3.171A-D RHR Pump (A-D) Trip
3.572B   RHR Shutdown Cooling Valve HV51-1F009 Trip of Magnetic Overload l
]
3.173 RHR Shutdown Cooling Suction Line Break 3.175A-D RHR Pump Suction Valve (F004A-D) Fails 3.176A-B RHR Loap Shutdown Cooling Valve (F006A-B) Fails As Is i
3.176C-D RHR Shutdown Cooling Suction Valve (F008, F009) Fails
}
As Is l
3.176E-F RHR Shutdown Cooling Injection Valve (F015A-B) Fails As l
Is 1
3.177A-D RHR Hx (A-B) Bypass Controller Fails High/Lo 3.571A RHR Shutdown Cooling Valve HV51-1F008 Trip of Thermal Overload 3.571B RHR Shutdown Cooling Valve HV51-1F008 Trip of Magnetic Overload 3.572A RHR Shutdown Cooling Valve HV51-1F009 Trip of Thermal i
Overload J
3.572B RHR Shutdown Cooling Valve HV51-1F009 Trip of Magnetic Overload l
i h
i h
i Page: 6 i
i Page: 6 i
l                       .
l


PECO NUCLEAR CORPORATION LIMERICK CENERATIN3 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EEHIBIT 2 I
PECO NUCLEAR CORPORATION LIMERICK CENERATIN3 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EEHIBIT 2 I
                      . Simulator Tests Deleted (Continued)
. Simulator Tests Deleted (Continued)
                                                                                                    )
)
Malfunction Performance Test       5.17C. Loss       of     Feedwater Heatino at Startuo Test Conditions.
Malfunction Performance Test 5.17C.
l This test originally helped to satisfy ANSI /ANS 3.5-1985 Section                         ;
Loss of Feedwater Heatino at Startuo Test Conditions.
3.1.2   (9), " Loss of normal feedwater or normal feedwater system                             l failure."
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (9),
This test was deleted due to the fact that it is no longer practical or useful to compare simulator response to reference plant response during Startup Test Conditions.                 Many plant configuration               !
" Loss of normal feedwater or normal feedwater system l
changes, including retuning of the feedwater control system, feedwater heater and Main Condenser retubing, power rerate and main turbine retrofit, have made comparison of simulator response to reference plant startup test response meaningless.
failure."
Malfunction Performance Test 5.17H, Loss of Feedwater Heating at
This test was deleted due to the fact that it is no longer practical or useful to compare simulator response to reference plant response during Startup Test Conditions.
. Full Power, still serves to verify simulator response to this scenario.
Many plant configuration changes, including retuning of the feedwater control system, feedwater heater and Main Condenser retubing, power rerate and main turbine retrofit, have made comparison of simulator response to reference plant startup test response meaningless.
Malfunction Performance Test 5.17H, Loss of Feedwater Heating at Full Power, still serves to verify simulator response to this scenario.
The ANSI Requirement continues to be satisfied by this and other tests.
The ANSI Requirement continues to be satisfied by this and other tests.
l l
l l
1                                                                                                   i l
1 i
1, I
l 1,
r
I r
!                                                                                                  i l
i l
f l
f l
                                                                                                    )
)
I Page: 7
Page: 7


J PECO NUCLEAR CORPORATION LINERICK GENERATIN3 STATION TRAINING SINULATOR SINULATOR QUADRENNIAL REPORT EXHIBIT 2                                 ,
J PECO NUCLEAR CORPORATION LINERICK GENERATIN3 STATION TRAINING SINULATOR SINULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)
Simulator Tests Deleted (Continued)                                 ,
J Malfunction Performance Test 5.19A, RPS Channel Trios; and 5.19B, RPS t
J Malfunction Performance Test 5.19A, RPS Channel Trios; and 5.19B, RPS                         t Channel Fails to Scram.
Channel Fails to Scram.
4 These tests originally helped to satisfy ANSI /ANS 3.5-1985 Section
4 These tests originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (11), " Loss of a protective system channel. "
3.1.2 (11), " Loss of a protective system channel. "                                           ;
This requirement was initially satisfied by 2
This         requirement was           initially satisfied by 2 Malfunction Performance Tests, utilizing automated data collection. This proved to be unnecessary.         This requirement is now satisfied by the performance
Malfunction Performance Tests, utilizing automated data collection.
of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement c.atinues
This proved to be unnecessary.
to be satisfied by these and other tests:
This requirement is now satisfied by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement c.atinues to be satisfied by these and other tests:
I       3.027A                   Loss of Normal Power to RPS Channel A i
I 3.027A Loss of Normal Power to RPS Channel A i
3.027B                   Loss of Normal Power to RPS Channel B
3.027B Loss of Normal Power to RPS Channel B 3.028A Full Reactor Scram l
;      3.028A                   Full Reactor Scram l       3.028B                   Reactor Scram Bank         1 i       3.028C                   Reactor Scram Bank         2 3.028D                   Reactor Scram Bank         3                                     l s       3.028E                   Reactor Scram Bank         4 3.029A                   RPS Fails to Scram (AUTO only) 3.029B                   RPS Fails to Scram (Complete) 3.029C                   RPS Fails to Scram Channel A 3.029D                   RPS Fails to Scram Channel B l
3.028B Reactor Scram Bank 1 i
4 P g e: 8                                       l 4
3.028C Reactor Scram Bank 2 3.028D Reactor Scram Bank 3 s
i
3.028E Reactor Scram Bank 4 3.029A RPS Fails to Scram (AUTO only) 3.029B RPS Fails to Scram (Complete) 3.029C RPS Fails to Scram Channel A 3.029D RPS Fails to Scram Channel B l
4 P g e: 8 i
4


          .-    . _-        . _ - - ~ . - -. -           ..  - -    -  . - _
- ~. - -. -
PECO NUCLEAR CORPORATION LIMERICK CENERATIN3 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 I
PECO NUCLEAR CORPORATION LIMERICK CENERATIN3 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)
Simulator Tests Deleted (Continued)                                   :
Malfunction Performance Test 5.20A, Stuck Control Rod.
Malfunction Performance Test 5.20A, Stuck Control Rod.                                     !
This test previously helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (12), " Control rod failure including stuck rods, uncoupled rods, j
This test previously helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (12), " Control rod failure including stuck rods, uncoupled rods,                   j drifting rods, rod drops and misaligned rods."
drifting rods, rod drops and misaligned rods."
This requirement was initially satisfied by a Malfunction                           +
+
Performance Test, utilizing automated data collection. This proved to be unnecessary.         Simulator response to a stuck control rod is now verified by the performance of the following tests, which do not utilize   automated       data   collection         but   do   verify       simulator <
This requirement was initially satisfied by a
functionality. The ANSI Requirement continues to be satisfied by these and other tests:
Malfunction Performance Test, utilizing automated data collection.
3.016D             Control Rod (XX-YY) Stuck 3.017D             Control Rod (XX-YY) Stuck 3.018D             Control Rod (XX-YY) Stuck 3.019D             Control Rod (XX-YY) Stuck Malfunction Performance Test 5.20B, Uncoupled Control Rods.
This proved to be unnecessary.
Simulator response to a stuck control rod is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
3.016D Control Rod (XX-YY) Stuck 3.017D Control Rod (XX-YY) Stuck 3.018D Control Rod (XX-YY) Stuck 3.019D Control Rod (XX-YY) Stuck Malfunction Performance Test 5.20B, Uncoupled Control Rods.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (12), " Control rod failure including stuck rods, uncoupled rods, drifting rods, rod drops and misaligned rods."
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (12), " Control rod failure including stuck rods, uncoupled rods, drifting rods, rod drops and misaligned rods."
This requirement was           initially satisfied by a Malfunction                 i Performance Test, utilizing automated data collection. This proved to                       ,
This requirement was initially satisfied by a
be unnecessary.       Simulator response to uncoupled control rods is now verified by the performance of the following tests, which do not utilize   automated       data     collection         but   do   verify       simulator l functionality. The ANSI Requirement continues to be satir,fied by these and other tests:
Malfunction i
:      3.016E             Control Rod (XX-YY) Uncoupled l       3.017E             Control Rod (XX-YY) Uncoupled l       3.018E             Control Rod (XX-YY) Uncoupled                                   ;
Performance Test, utilizing automated data collection.
i 3.019E             Control Rod (XX-YY) Uncoupled i
This proved to be unnecessary.
Simulator response to uncoupled control rods is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator l
functionality. The ANSI Requirement continues to be satir,fied by these and other tests:
3.016E Control Rod (XX-YY) Uncoupled l
3.017E Control Rod (XX-YY) Uncoupled l
3.018E Control Rod (XX-YY) Uncoupled i
3.019E Control Rod (XX-YY) Uncoupled i
Page: 9 i
Page: 9 i
i
i


PECO NUCLEAR CORPORATION LIMERICK GENERATIND STATION TRAININD SINULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)                                 j r
PECO NUCLEAR CORPORATION LIMERICK GENERATIND STATION TRAININD SINULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued) j r
Malfunt :fon Performance Test 5.20C. Control Rod Drifts Out.
Malfunt :fon Performance Test 5.20C. Control Rod Drifts Out.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (12), " Control rod failure including stuck rods, uncoupled rods,                 j drifting rods, rod drops and misaligned rods."
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (12), " Control rod failure including stuck rods, uncoupled rods, j
This requirement was       initially satisfied by a Malfunction                   1 Performance Test, utilizing automated data collection. This proved to be unnecessary. Simulator response to a control rod drifting out is now verified the performance of the following tests, which do not utilize   automated   data   collection     but         do     verify simulator functionality. The ANSI Requirement continues to be satisfied by these                   ;
drifting rods, rod drops and misaligned rods."
and other tests:                                                                         ;
This requirement was initially satisfied by a
3.016B           Control Rod (XX-YY) Drifts Out                                     i 3.017B           Control Rod (XX-YY) Drifts Out                                     :
Malfunction 1
3.018B           Control Rod (XX-YY) Drifts Out 3.019B           Control Rod (XX-YY) Drifts Out                                     i l
Performance Test, utilizing automated data collection.
Malfunction Performance Test 5.20D. Control Rod Drifts In.
This proved to be unnecessary.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (12), " Control rod failure including stuck rods, uncoupled rods, drifting rods, rod drops and misaligned rods."                                           !
Simulator response to a control rod drifting out is now verified the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
t This requirement was       initially satisfied by a Malfunction                   !
3.016B Control Rod (XX-YY) Drifts Out i
Performance Test, utilizing automated data collection. This proved to be unnecessary. Simulator response to a control rod drifting in, is                   ;
3.017B Control Rod (XX-YY) Drifts Out 3.018B Control Rod (XX-YY) Drifts Out 3.019B Control Rod (XX-YY) Drifts Out i
now verified by the performance of the following tests, which do not utilize   automated   data   collection     but         do     verify simulator     '
l Malfunction Performance Test 5.20D. Control Rod Drifts In.
functionality. The ANSI Requirement continues to be satisfied by these                   ;
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (12), " Control rod failure including stuck rods, uncoupled rods, drifting rods, rod drops and misaligned rods."
and other tests:
t This requirement was initially satisfied by a
3.016A           Control Rod (XX-YY) Drifts In
Malfunction Performance Test, utilizing automated data collection.
This proved to be unnecessary.
Simulator response to a control rod drifting in, is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
3.016A Control Rod (XX-YY) Drifts In 3.017A Control Rod (XX-YY) Drifts In
+
+
3.017A          Control Rod (XX-YY) Drifts In 3.018A           Control Rod (XX-YY) Drifts In                                     i 3.019A           Control Rod (XX-YY) Drifts In' Page: 10
3.018A Control Rod (XX-YY) Drifts In i
3.019A Control Rod (XX-YY) Drifts In' Page: 10


_.-  _    _  _ _    _ _ _ _        _ _ . _ _ . _ . _ .            _ _    _. ..        - ~ __     - - - - - -
- ~ __
2 PECO NUCLEAR CORPORATION                                                   I LIMERICK @ENERATING STATIC'J TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued) l t
PECO NUCLEAR CORPORATION I
2 LIMERICK @ENERATING STATIC'J TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued) l t
4 a
4 a
Malfunction Performance Test 5.20G. Individual Control Rod Scram.                                               1 i                                                                                                                     .
Malfunction Performance Test 5.20G. Individual Control Rod Scram.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section
1 i
,      3.1.2 (12), " Control rod failure including stuck rods, uncoupled rods,                                         i drifting rods, rod drops and misaligned rods."
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (12), " Control rod failure including stuck rods, uncoupled rods, i
t                                                                                                                     ;
drifting rods, rod drops and misaligned rods."
This     requirement was initially satisfied by a Malfunction 4
t This requirement was initially satisfied by a
Performance Test, utilizing automated data collection.                                 This proved to be unnecessary. Simulator response to an individual control rod scram
Malfunction Performance Test, utilizing automated data collection.
;    is now verified by the performance of the following tests, which do not                                         ,
This proved to 4
                                                                                                                      ~
be unnecessary.
utilize   automated             data                 collection     but       do verify     simulator functionality. The ANSI Requirement continues to be satisfied by these                                         i and other tests-t 3.016F                   Control Rod (XX-YY) Scrammed j           3.017F                   Control Rod (XX-YY) Scrammed 3.018F                   Control Rod (XX-YY) Scrammed Control Rod (XX-YY) Scrammed 3.019F 1
Simulator response to an individual control rod scram is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator
~
functionality. The ANSI Requirement continues to be satisfied by these i
and other tests-t 3.016F Control Rod (XX-YY) Scrammed j
3.017F Control Rod (XX-YY) Scrammed 3.018F Control Rod (XX-YY) Scrammed 3.019F Control Rod (XX-YY) Scrammed 1
Malfunction Performance Test 5.21A. Control Rod Drive Pumo Trio.
Malfunction Performance Test 5.21A. Control Rod Drive Pumo Trio.
t                                                                                                                     i This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (13), " Inability to drive control rods."
t i
i This requirement was                             initially satisfied by a Malfunction Performance Test, utilizing automated data collection.                                 This proved to be unnecessary.           Simulator response to this failure is now verified by                               )
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (13), " Inability to drive control rods."
i This requirement was initially satisfied by a
Malfunction Performance Test, utilizing automated data collection.
This proved to be unnecessary.
Simulator response to this failure is now verified by
)
the performance of the following tests, which do not utilize automated
the performance of the following tests, which do not utilize automated
                                                                                                                        ]
]
data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
data collection but do verify simulator functionality.
3.412A                   CRD Pump A Trips                                                                   l l          3.412B                   CRD Pump B Trips 3.412C                   Both CRD Pumps Trip Page: 11 I
The ANSI Requirement continues to be satisfied by these and other tests:
3.412A CRD Pump A Trips l
3.412B CRD Pump B Trips 3.412C Both CRD Pumps Trip Page: 11 I


PECO NUCLEAR CORPORATION T IMERICK CENERATING STATION TRAININ3 SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)_
PECO NUCLEAR CORPORATION T IMERICK CENERATING STATION TRAININ3 SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)_
Malfunction Performance Test                       5.21B,   CRD Flow Control         Valve     Fails Closed.
Malfunction Performance Test 5.21B, CRD Flow Control Valve Fails Closed.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section                                         :
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (13), " Inability to drive control rods."
3.1.2 (13), " Inability to drive control rods."
This requirement was initially satisfied by a
This requirement was                       initially satisfied by a Malfunction Performance Test, utilizing automated data collection. This proved to be unnecessary. Simulator response to this failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
Malfunction Performance Test, utilizing automated data collection.
3.411A                   CRD Flow Control Valve A Fails Closed 3.411B                     CRD Flow Control Valve B Fails Closed 3.411C                     Both CRD Flow Control Valves Fails Closed 1
This proved to be unnecessary.
Simulator response to this failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality.
The ANSI Requirement continues to be satisfied by these and other tests:
3.411A CRD Flow Control Valve A Fails Closed 3.411B CRD Flow Control Valve B Fails Closed 3.411C Both CRD Flow Control Valves Fails Closed 1
Malfunction Performance Test 5.22A and 5.22B, Fuel Claddino Failure (at low and hiah severities).
Malfunction Performance Test 5.22A and 5.22B, Fuel Claddino Failure (at low and hiah severities).
These tests originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (14), " Fuel cladding failure resulting in high activity in                                               i reactor coolant or off gas and the associated high radiation alarms."                                           l l
These tests originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (14),
This requirement was initially satisfied by a Malfunction                                                   ,
" Fuel cladding failure resulting in high activity in i
Performance Test, utilizing automated data collection.                         This proved to be unnecessary.             This requirement is now satisfied by the performance                               I of the following test, which does not utilize automated data collection                                         j but does verify simulator functionality i
reactor coolant or off gas and the associated high radiation alarms."
3-MRT001                   Fuel Cladding Failure (0-100%)
This requirement was initially satisfied by a
Malfunction Performance Test, utilizing automated data collection.
This proved to be unnecessary.
This requirement is now satisfied by the performance of the following test, which does not utilize automated data collection j
but does verify simulator functionality i
3-MRT001 Fuel Cladding Failure (0-100%)
d
d
,                                                      Page: 12                                                     )
)
1
Page: 12 1
                                                                                                            .__.__ j
.__.__ j


  - _ - . -    -_        - =       .
- =
e PECO NUCLEAR CORPORATION                   3 LIMERICK GENERATIN3 STATION TRAINING SIMULATOR             !
e PECO NUCLEAR CORPORATION 3
SIMULATOR QUADRENNIAL REPORT EXHIBIT 2               l Simulator Tests Deleted (Continued) 1 Malfunction Performance Test 5.24, Main Generator Trio.                     f This test was previously developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (16), " Generator Trip. "
LIMERICK GENERATIN3 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 l
This test was deleted due to the fact that integrated plant response to a generator trip is identical to integrated plant response to a main turbine trip, and therefore the test was redundant.                .
Simulator Tests Deleted (Continued) 1 Malfunction Performance Test 5.24, Main Generator Trio.
f This test was previously developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (16), " Generator Trip. "
This test was deleted due to the fact that integrated plant response to a generator trip is identical to integrated plant response to a main turbine trip, and therefore the test was redundant.
This requirement is now satisfied by the following tests:
This requirement is now satisfied by the following tests:
3.110     Turbine-Generator Trip 5.23       Turbine-Generator Trip at Rated Power Malfunction Performance Test 5.26, Reactor Trio.
3.110 Turbine-Generator Trip 5.23 Turbine-Generator Trip at Rated Power Malfunction Performance Test 5.26, Reactor Trio.
This test was originally developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (19), " Reactor Trip."                                         ,
This test was originally developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (19), " Reactor Trip."
This test was deleted due to the fact that this requirement is redundant with ANSI 3.5-1985, Appendix Bl.2) (1), Manual Scram.
This test was deleted due to the fact that this requirement is redundant with ANSI 3.5-1985, Appendix Bl.2) (1), Manual Scram.
I i
I i
l           This requirement is satisfied by the following tests:
l This requirement is satisfied by the following tests:
4
4 3.028A Full Reactor Scram 7.01 Manual Reactor Scram 1
;          3.028A     Full Reactor Scram
I J
,          7.01       Manual Reactor Scram l
Page: 13 I
l 1
l I
l l
J Page: 13 I


PECO NUCLEAR CORPORATION LIMERICK GENERATIN3 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)                               ;
PECO NUCLEAR CORPORATION LIMERICK GENERATIN3 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)
Malfunction           Performance Test           5.27,       Main       Steam   Line   Break Incide Containment.
Malfunction Performance Test 5.27, Main Steam Line Break Incide Containment.
This test was originally developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (20), " Main steam line break inside containment."
This test was originally developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (20), " Main steam line break inside containment."
This test was deleted due to the fact that this requirement is redundant with ANSI 3.5-1985, Appendix Bl.2) (1), ANSI 3.5-1985,                                     ,.
This test was deleted due to the fact that this requirement is redundant with ANSI 3.5-1985, Appendix Bl.2)
Appendix Bl.2) (9), " Maximum Size Unisolable Main Steam Line Rupture."
(1),
ANSI 3.5-1985, Appendix Bl.2) (9), " Maximum Size Unisolable Main Steam Line Rupture."
(In order for a Steam Line Rupture to be Unisolable, it must be located inside the drywell upstream of the MSIVs.)
(In order for a Steam Line Rupture to be Unisolable, it must be located inside the drywell upstream of the MSIVs.)
This requirement is satisfied by the following test:
This requirement is satisfied by the following test:
7.09             Maximum Size Unisolable Main Steam Line Rupture Malfunction Performance Test 5.31A, APRM UDscale Failure.
7.09 Maximum Size Unisolable Main Steam Line Rupture Malfunction Performance Test 5.31A, APRM UDscale Failure.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "
This requirement was               initially satisfied by a Malfunction Performance Test, utilizing automated data collection. This proved to be unnecessary.                 Simulator response to an APRM Upscale failure is now verified by the performance of the following tests, which do not utilize         automated           data   collection       but         do verify   simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
This requirement was initially satisfied by a
3.020A                   APRM Channel     A   Fails to Selected     Value 3.020B                   APRM Channel     B   Fails to Selected     Value 3.020C                   APRM Channel     C   Fails to Selected     Value 3.020D                   APRM Channel     D   Fails to Selected     Value 3.020E                   APRM Channel E Fails to Selected Value 3.020F                   APRM Channel F Fails to Selected Value Page: 14
Malfunction Performance Test, utilizing automated data collection.
This proved to be unnecessary.
Simulator response to an APRM Upscale failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
3.020A APRM Channel A Fails to Selected Value 3.020B APRM Channel B Fails to Selected Value 3.020C APRM Channel C Fails to Selected Value 3.020D APRM Channel D Fails to Selected Value 3.020E APRM Channel E Fails to Selected Value 3.020F APRM Channel F Fails to Selected Value Page: 14


            -      .  ~ . - .      ._ ._    - .-    __.  -            . .
~. -.
PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING DIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2                                 ;
PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING DIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)
Simulator Tests Deleted (Continued)
Malfunction Performance Jest 5.31B, APRM Downscale Failure.
Malfunction Performance Jest 5.31B, APRM Downscale Failure.
This test originuliy helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "
This test originuliy helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "
This requirement was                 initially satisfied by a Malfunction Performance Test, utilizing automated data collection. This proved to be unnecessary. Simulator response to an APRM Downscale Failure is now verified by the performance of the following tests,                         which do not utilize     automated         data     collection       but   do   verify     simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
This requirement was initially satisfied by a
3.020A                 APRM Channel     A Fails   to Selected Value 3.020B                 APRM Channel     B Fails   to Selected Value 3.020C                 APRM Channel     C Fails   to Selected Value 3.020D                 APRM Channel     D Fails   to Selected Value 3.020E                 APRM Channel     E Fails   to Selected Value 3.020F                 APRM Channel     F Fails   to Selected Value 4
Malfunction Performance Test, utilizing automated data collection.
This proved to be unnecessary.
Simulator response to an APRM Downscale Failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
3.020A APRM Channel A Fails to Selected Value 3.020B APRM Channel B Fails to Selected Value 3.020C APRM Channel C Fails to Selected Value 3.020D APRM Channel D Fails to Selected Value 3.020E APRM Channel E Fails to Selected Value 3.020F APRM Channel F Fails to Selected Value 4
T Page: 15 1
T Page: 15 1


                .-                  J
J
                                                                                                        /
/
PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)
PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)
Malfunction Performance Test 5.31C, APRM Inonerative Failure.
Malfunction Performance Test 5.31C, APRM Inonerative Failure.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "
This requirement was       initially satisfied by a Malfunction Performance Test, utilizing automated data collection.                                       This proved to be unnecessary.     Simulator response to an APRM Inop Failure is now verified by the performance of the following tests, which do not utilize   automated     data   collection     but                                   do verify   simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
This requirement was initially satisfied by a
3.004B           APRM Channel A Fails   Inop 3.005B           APRM Channel B Fails   Inop 3.006B           APRM Channel C Fails   Inop 3.007B           APRM Channel D Fails   Inop 3.008B           APRM Channel E Fails   Inop 3.009B           APRM Channel   F Fails   Inop Malfunction Performance Test 5.31D, RBM Uoscale Failure.
Malfunction Performance Test, utilizing automated data collection.
This proved to be unnecessary.
Simulator response to an APRM Inop Failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
3.004B APRM Channel A Fails Inop 3.005B APRM Channel B Fails Inop 3.006B APRM Channel C Fails Inop 3.007B APRM Channel D Fails Inop 3.008B APRM Channel E Fails Inop 3.009B APRM Channel F Fails Inop Malfunction Performance Test 5.31D, RBM Uoscale Failure.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "
This requirement was       initially satisfied by a Malfunction Performance Test, utilizing automated data collection. This proved to be unnecessary. Simulator response to an RBM Upscale Failure is now verified by the performance of the following tests, which do not                                             ,
This requirement was initially satisfied by a
utilize   automated     data   collection     but                                   do verify   simulator j functionality. The ANSI Requirement continues to be satisfied by these and other tests:
Malfunction Performance Test, utilizing automated data collection.
3.217A           RBM Channel A Fails to Selected Value 3.217B           RBM Channel B Fails to Selected Value i
This proved to be unnecessary.
Simulator response to an RBM Upscale Failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator j
functionality.
The ANSI Requirement continues to be satisfied by these and other tests:
3.217A RBM Channel A Fails to Selected Value 3.217B RBM Channel B Fails to Selected Value i
l Page: 16
l Page: 16
_ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _                      (
(


l l
l l
PECO NUCLEAR CORPORATION t               LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)
PECO NUCLEAR CORPORATION t
LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)
Malfunction Performance Test 5.31E. RBM Downscale Failure.
Malfunction Performance Test 5.31E. RBM Downscale Failure.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "
This requirement was initially satisfied by a Malfunction i
This requirement was initially satisfied by a
Performance Test, utilizing automated data collection.                                                                                 This proved to be unnecessary. Simulator response to an RBM Downscale railure is now verified by the performance of the following tests, which do not utilize   automated   data   collection                                                               but                 do verify   simulator functionality. The ANSI Requirement continues to be satisfied by these a.nd other tests:
Malfunction i
3.217A         RBM Channel A Fails to Selected Value 3.217B         RBM Channel B Fails to Selected Value Malfunction Performance Test 5.31F. IRM Uoscale Failure.
Performance Test, utilizing automated data collection.
This test originally helpet t. o satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "
This proved to railure is now be unnecessary.
This requirement was       initially satisfied by a Malfunction Performance Test, utilizing automated data collection. This proved to be unnecessary. Simulator response to an IRM Upscale Failure is now verified by the performance of the following tests,                                                                                     which do not utilize   automated   data   collection                                                               but                   do verify   simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
Simulator response to an RBM Downscale verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these a.nd other tests:
3.214A         IRM Channel A Fails                                         to                                 Selected   Value 3.214B         IRM Channel B Fails                                         to                                 Selected   Value 3.214C         IRM Channel C Fails                                         to                                 Selected   Value 3.214D         IRM Channel D Fails                                         to                                 Selected   Value 3.214E         IRM Channel E Fails                                         to                                 Selected   Value 3.214F         IRM Channel F Fails                                         to                                 Selected   Value 3.214G           IRM Channel G Fails                                         to                                 Selected   Value 3.214H           IRM Channel H Fails                                         to                                 Selected   Value Page: 17
3.217A RBM Channel A Fails to Selected Value 3.217B RBM Channel B Fails to Selected Value Malfunction Performance Test 5.31F. IRM Uoscale Failure.
                                          - - - - - - - . - . - - - - - - - - - - - - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                          (
This test originally helpet
: t. o satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "
This requirement was initially satisfied by a
Malfunction Performance Test, utilizing automated data collection.
This proved to be unnecessary.
Simulator response to an IRM Upscale Failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality.
The ANSI Requirement continues to be satisfied by these and other tests:
3.214A IRM Channel A Fails to Selected Value 3.214B IRM Channel B Fails to Selected Value 3.214C IRM Channel C Fails to Selected Value 3.214D IRM Channel D Fails to Selected Value 3.214E IRM Channel E Fails to Selected Value 3.214F IRM Channel F Fails to Selected Value 3.214G IRM Channel G Fails to Selected Value 3.214H IRM Channel H Fails to Selected Value Page: 17
(


PECO NUCLEAR CORPORATION LIMERICK GENERATINJ STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EZHIBIT 2 Simulator Tests Deleted (Continued)
PECO NUCLEAR CORPORATION LIMERICK GENERATINJ STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EZHIBIT 2 Simulator Tests Deleted (Continued)
Malfunction Performance Test 5.31G, IRM InoDerative Failure.
Malfunction Performance Test 5.31G, IRM InoDerative Failure.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "
l This requirement was initially satisfied by a Malfunction Performance Test, utilizing automated data collection. This proved to be unnecessary. Simulator response to an IRM Inoperative Failure is now verified by the performance of the following tests, which do not utilize   automated   data   collection                                                                                           but do   verify             siraulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:                                                                                                                                                           ,
l This requirement was initially satisfied by a
3.205B         IRM Channel A           Fails                                                                   Inop 3.206B         IRM Channel B           Fails                                                                   Inop 3.207B         IRM Channel C           Fails                                                                   Inop 3.208B         IRM Channel D           Fails                                                                   Inop 3.209B         IRM Channel E           Fails                                                                 Inop 3.210B         IRM Channel F           Fails                                                                 Inop 3.211B         IRM Channel G           Fails                                                                 Inop 3.212B         IRM Channel a           Fails                                                                 Inop
Malfunction Performance Test, utilizing automated data collection.
                                                                                                                                                                                          -I l
This proved to be unnecessary.
Simulator response to an IRM Inoperative Failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify siraulator functionality.
The ANSI Requirement continues to be satisfied by these and other tests:
3.205B IRM Channel A Fails Inop 3.206B IRM Channel B Fails Inop 3.207B IRM Channel C Fails Inop 3.208B IRM Channel D Fails Inop 3.209B IRM Channel E Fails Inop 3.210B IRM Channel F Fails Inop 3.211B IRM Channel G Fails Inop 3.212B IRM Channel a Fails Inop
-I l
l l
l l
Page: 18                                                                                                                                 l
Page: 18 l


  - .        .        =.               -_-    .          .                                      _    .-      - .  - _ _ . - --
=.
PECO NUCLEAR CORPORATION LIMERICK QENERATING STATION TRAINING SIMUIJLTOR
PECO NUCLEAR CORPORATION LIMERICK QENERATING STATION TRAINING SIMUIJLTOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 l
* SIMULATOR QUADRENNIAL REPORT EXHIBIT 2                                                             l Simulator Tests Deleted (Continued)                                                             i 4
Simulator Tests Deleted (Continued) i 4
l i
l i
j Malfunction Performance Test 5.31H, SRM Uoscale Failure.
j Malfunction Performance Test 5.31H, SRM Uoscale Failure.
l This test originally helped to satisfy ANSI /ANS 3.5-1985 Section                                                 !
l This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 1
1      3.1.2 (21), " Nuclear Instrumentation Failures. "                                                                           I o                                                                                                                                 ;
3.1.2 (21), " Nuclear Instrumentation Failures. "
I o
l i
l i
This requirement was initially satisfied by a Malfunction i
This requirement was initially satisfied by a
Performance Test, utilizing automated data collection. This proved to
Malfunction Performance Test, utilizing automated data collection.
,      be unnecessary.           Simulator response to an SRM. Upscale Failure is now                                             ,
This proved to i
verified by the performance of the following tests, which do not utilize           automated   data     collection                           but             do     verify   simulator     ;
be unnecessary.
functionality. The ANSI Requirement continues to be satisfied by these and other tests:                                                                                                             !
Simulator response to an SRM. Upscale Failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
;              3.213A             SRM   Channel A Fails             to                   Selected       Value                   ;
3.213A SRM Channel A Fails to Selected Value 3.213B SRM Channel B Fails to Selected Value j
3.213B             SRM   Channel B Fails             to                   Selected       Value                   j 3.213C             SRM   Channel C Fails             to                   Selected       Value                   '
3.213C SRM Channel C Fails to Selected Value 3.213D SRM Channel D Fails to Selected Value I
3.213D             SRM   Channel D Fails             to                   Selected       Value I
Malfunction Performance Test 5.31I. SRM Downscale Failure.
Malfunction Performance Test 5.31I. SRM Downscale Failure.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "
:      3.1.2 (21), " Nuclear Instrumentation Failures. "                                                                           !
j This requirement was initially satisfied by a
j This     requirement was initially satisfied by a Malfunction l     Performance Test, utilizing automated data collection.                                                   This proved to       1 be unnecessary. Simulator response to an SRM Downscale Failure is now verified by the performance of the following tests, which do not j     utilize         automated     data     collection                         but             do       verify   simulator functionality. The           ANSI Requirement continues to be satisfied by these                                             l and other tests:
Malfunction l
3.213A             SRM Channel A Fails to Selected Value                                                           !
Performance Test, utilizing automated data collection.
3.213B             SRM Channel B Fails to Selected Value 3.213C             SRM Channel C Fails to Selected Value 3.213D             SRM Channel D Fails to Selected Value Page: 19
This proved to 1
be unnecessary.
Simulator response to an SRM Downscale Failure is now verified by the performance of the following tests, which do not j
utilize automated data collection but do verify simulator functionality.
The ANSI Requirement continues to be satisfied by these and other tests:
3.213A SRM Channel A Fails to Selected Value 3.213B SRM Channel B Fails to Selected Value 3.213C SRM Channel C Fails to Selected Value 3.213D SRM Channel D Fails to Selected Value Page: 19


PECO NUCLEAR CORPORATION LIMERICK GENERATIN3 STATION TRAINING SIMULATOR                 )
PECO NUCLEAR CORPORATION LIMERICK GENERATIN3 STATION TRAINING SIMULATOR
SIMULATOR QUADRENNIAL P.EPORT EXHIBIT 2                   F Simulator Tests Deleted (Cc,ntinued)                   !
)
i Malfunction Performance Test 5.31J. SRM Inoperative Failure.
SIMULATOR QUADRENNIAL P.EPORT EXHIBIT 2 F
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section       l 3.1.2 (21), " Nuclear Instrumentation Failures. "
Simulator Tests Deleted (Cc,ntinued) i Malfunction Performance Test 5.31J. SRM Inoperative Failure.
This   requirement was     initially satisfied by a Malfunction Performance Test, utilizing automated data collection. This proved to         ,
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section l
be unnecessary.     Simulator response to an SRM Inoperative Failure is     ;
3.1.2 (21), " Nuclear Instrumentation Failures. "
now verified by the performance of the following tests, which do not utilize     automated     data   collection     but do verify   simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
This requirement was initially satisfied by a
3.201B           SRM Channel A Fails   Inop 3.202B           SRM Channel B Fails   Inop                         4 3.203B           SRM Channel C Fails   Inop                         ,
Malfunction Performance Test, utilizing automated data collection.
3.204B           SRM Channel D Fails   Inop Malfunction Performance Test 5.32A, Rx Instrument Line Break Downstream of Check Valve F04 5A.
This proved to be unnecessary.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2   (22),   " Process   instrumentation, alarms and control system failures."
Simulator response to an SRM Inoperative Failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality.
1       This requirement was         initially satisfied by a Malfunction Performance Test, utilizing automated data collection.         This proved to i
The ANSI Requirement continues to be satisfied by these and other tests:
be unnecessary. Simulator response to this failure is now verified by the performance of the following test, which does not utilize automated data collection, but does verify simulator functionality. The ANSI           ;
3.201B SRM Channel A Fails Inop 3.202B SRM Channel B Fails Inop 4
Requirement continues to be satisfied by this and other tests:               ,
3.203B SRM Channel C Fails Inop 3.204B SRM Channel D Fails Inop Malfunction Performance Test 5.32A, Rx Instrument Line Break Downstream of Check Valve F04 5A.
l 3.231A     Instrument Line Break Downstream of XV42-1F045A s
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (22),
i
" Process instrumentation, alarms and control system failures."
.                                      Page: 20 l
1 This requirement was initially satisfied by a
I
Malfunction Performance Test, utilizing automated data collection.
This proved to i
be unnecessary.
Simulator response to this failure is now verified by the performance of the following test, which does not utilize automated data collection, but does verify simulator functionality. The ANSI Requirement continues to be satisfied by this and other tests:
l 3.231A Instrument Line Break Downstream of XV42-1F045A s
i Page: 20 I


PECO NUCLEAR CORPORATION LIMERICK GENERATIN3 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)
PECO NUCLEAR CORPORATION LIMERICK GENERATIN3 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)
Malfunction Performance Test 5.32B, Rx Instrument Line Break Downstream of Check Valve F047A.
Malfunction Performance Test 5.32B, Rx Instrument Line Break Downstream of Check Valve F047A.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2   (22),   " Process   instrumentation, alarms and control system failures."
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (22),
This requirement was         initially satisfied by a Malfunction Performance' Test, utilizing automated data collection. This proved to be unnecessary. Simulator response to this failure is now verified by the performance of the following test, which does not utilize automated data collection but does verify simulator functionality. The ANSI Requirement continues to be satisfied by this and other tests:
" Process instrumentation, alarms and control system failures."
3.228A     Instrument Line Break Downstream of XV42-1F047A Malfunction Performance Test 5.32C, Rx Instrument Line Break Downstream of Check Valve F065A.
This requirement was initially satisfied by a
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2   (22),   " Process   instrumentation, alarms and control system failures."
Malfunction Performance' Test, utilizing automated data collection.
This requirement was         initially satisfied by a Malfunction Performance Test, utilizing automated data collection.     This proved to be unnecessary. Simulator response to this failure is now verified by the performance of the following test, which does not utilize automated data collection but does verify simulator functionality. The ANSI         ,
This proved to be unnecessary.
Requirement continues to be satisfied by thin and other tests:
Simulator response to this failure is now verified by the performance of the following test, which does not utilize automated data collection but does verify simulator functionality. The ANSI Requirement continues to be satisfied by this and other tests:
3.230A     Instrument Line Break Downstream of XV42-1F065A Page: 21 -
3.228A Instrument Line Break Downstream of XV42-1F047A Malfunction Performance Test 5.32C, Rx Instrument Line Break Downstream of Check Valve F065A.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (22),
" Process instrumentation, alarms and control system failures."
This requirement was initially satisfied by a
Malfunction Performance Test, utilizing automated data collection.
This proved to be unnecessary.
Simulator response to this failure is now verified by the performance of the following test, which does not utilize automated data collection but does verify simulator functionality. The ANSI Requirement continues to be satisfied by thin and other tests:
3.230A Instrument Line Break Downstream of XV42-1F065A Page: 21 -


PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued) i V
PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued) i V
Malfunction Performance Test 5.32C, R:: Instrument Line Break Downstream                               :
Malfunction Performance Test 5.32C, R:: Instrument Line Break Downstream of Check Valve F045D.
of Check Valve F045D.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (22),
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2     (22),   " Process       instrumentation, alai.ns and control system failures."
" Process instrumentation, alai.ns and control system failures."
This     requirement was initially satisfied by a Malfunction                                   ;
This requirement was initially satisfied by a
Performance Test, utilizing automated data collection. This proved to                                 ,
Malfunction Performance Test, utilizing automated data collection.
be unnecessary. Simulator response to this failure is now verified by the performance of the following test, which does not utilize automated data collection but does verify simulator functionality.                                     The ANSI Requirement continues to be satisfied by this and other tests:
This proved to be unnecessary.
3.231D       Instrument Line Break Downstream of XV42-1F045D i
Simulator response to this failure is now verified by the performance of the following test, which does not utilize automated data collection but does verify simulator functionality.
Malfunction Performance Test 5.33A. RHR Pumo B Fails to Auto Start.                                     l l
The ANSI Requirement continues to be satisfied by this and other tests:
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section                                !
3.231D Instrument Line Break Downstream of XV42-1F045D i
3.1.2 (23), " Passive malfunctions in systems, such as engineered safety                                j features, emergency feedwater system."                                                                  !
Malfunction Performance Test 5.33A. RHR Pumo B Fails to Auto Start.
l This    requirement was          initially satisfied by a Malfunction                            !
Performance Test, utilizing automated data collection.                                This proved to  ,
be unnecessary. Simulator response to this failure is now verified by the performance of the following tests, which do not utilize automated                                  i data collection but do verify simulator functionality. The ANSI l
Requirement continues to be satisfied by these and other testE :
l 3.172A-D    RHR Pump (A-D) Fails to Auto Start                                                  j l
l 1
l l
l l
l Page: 22
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (23), " Passive malfunctions in systems, such as engineered safety j
features, emergency feedwater system."
l This requirement was initially satisfied by a
Malfunction Performance Test, utilizing automated data collection.
This proved to be unnecessary.
Simulator response to this failure is now verified by the performance of the following tests, which do not utilize automated i
data collection but do verify simulator functionality.
The ANSI Requirement continues to be satisfied by these and other testE :
3.172A-D RHR Pump (A-D) Fails to Auto Start j
1 l
Page: 22


PECO NUCLEAR CORPORATION LIMERICK GENERATIN8 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)
PECO NUCLEAR CORPORATION LIMERICK GENERATIN8 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)
Malfunction Performance Test 5.33B. Core Sorav Iniection Valve 1F005 Fails As Is.
Malfunction Performance Test 5.33B. Core Sorav Iniection Valve 1F005 Fails As Is.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (23), " Passive malfunctions in systems, such as engineered safety features, emergency feedwater system. "
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (23), " Passive malfunctions in systems, such as engineered safety features, emergency feedwater system. "
This requirement was initially satisfied by a Malfunction Performance Test, utilizing automated data collection. This proved to be unnecessary. Simulator response to this failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
This requirement was initially satisfied by a
3.184A-B     Core Spray Injection Valves Fail to Auto Open Malfunction Performance Test 5.33C. HPCI and RCIC fail to Auto Start.
Malfunction Performance Test, utilizing automated data collection.
This proved to be unnecessary.
Simulator response to this failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality.
The ANSI Requirement continues to be satisfied by these and other tests:
3.184A-B Core Spray Injection Valves Fail to Auto Open Malfunction Performance Test 5.33C. HPCI and RCIC fail to Auto Start.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (23), " Passive malfunctions in systems, such as engineered safety features, emergency feedwater system. "
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (23), " Passive malfunctions in systems, such as engineered safety features, emergency feedwater system. "
This test was deleted since it was redundant with tests used to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (10), Loss of All Feedwater (normal and emergency).
This test was deleted since it was redundant with tests used to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (10), Loss of All Feedwater 4
(normal and emergency).
Malfunction Performance Test 5.18, Loss of All Feedwater Resulting in ADS Blowdown, satisfies these requirements.
Malfunction Performance Test 5.18, Loss of All Feedwater Resulting in ADS Blowdown, satisfies these requirements.
4 i
4 i
Line 558: Line 737:
Malfunction Performance Test 5.35B, EHC Pressure Reculator Fails Low.
Malfunction Performance Test 5.35B, EHC Pressure Reculator Fails Low.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (25), " Reactor pressure control system failure including turbine bypass failure."
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (25), " Reactor pressure control system failure including turbine bypass failure."
This requirement was             initially satisfied by   a Malfunction Performance Test, utilizing automated data collection.           This proved to be unnecessary, due to only minor changes in parameters. Simulator response to this failure is now verified by the performar.ce of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
This requirement was initially satisfied by a
3.105B           EHC Pressure A Regulator Fails Low 3.106B           EHC Pressure B Regulator Fails Low I
Malfunction Performance Test, utilizing automated data collection.
This proved to be unnecessary, due to only minor changes in parameters. Simulator response to this failure is now verified by the performar.ce of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:
3.105B EHC Pressure A Regulator Fails Low 3.106B EHC Pressure B Regulator Fails Low I
i l
i l
Page: 24
Page: 24
{
{


PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMUL 3LTOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued) i Malfunction Performance Test     5.35C. All Turbine Bvoass Valves Fail ODen.
PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMUL 3LTOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued) i Malfunction Performance Test 5.35C.
All Turbine Bvoass Valves Fail ODen.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (25), " Reactor pressure control system failure including turbine bypass failure."
This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (25), " Reactor pressure control system failure including turbine bypass failure."
This test was deleted because the initiating malfunction, 108, was modified at the request of the simulator Instructors to limit Bypass Valve position instead of causing the valves to open to a specified position. This ANSI requirement continues to be satisfied by the I
This test was deleted because the initiating malfunction, 108, was modified at the request of the simulator Instructors to limit Bypass Valve position instead of causing the valves to open to a specified position.
performance of the following tests; 3.105A           EHC Pressure A Regulator   Fails High 3.105B           EHC Pressure A Regulator   Fails Low 3.105C           EHC Pressure A Regulator   Fails Oscillates 3.106A           EHC Pressure B Regulator   Fails High 3.106B           EHC Pressure B Regulator   Fails Low                     i 3.106C           EHC Pressure B Regulator   Fails Oscillates             i 3.107A-H         Selected Bypass Valve Sticks Open 3.108     Turbine Bypass Valves Limited to Selected Value                 i 5.35A     EHC Pressurc Regulator Fails High                               ;
This ANSI requirement continues to be satisfied by the I
5.35D     Turbine Trip with Bypass Valves Fail to Open Page: 25
performance of the following tests; 3.105A EHC Pressure A Regulator Fails High 3.105B EHC Pressure A Regulator Fails Low 3.105C EHC Pressure A Regulator Fails Oscillates 3.106A EHC Pressure B Regulator Fails High 3.106B EHC Pressure B Regulator Fails Low i
                                                                          -f
3.106C EHC Pressure B Regulator Fails Oscillates i
3.107A-H Selected Bypass Valve Sticks Open 3.108 Turbine Bypass Valves Limited to Selected Value i
5.35A EHC Pressurc Regulator Fails High 5.35D Turbine Trip with Bypass Valves Fail to Open Page: 25
-f


PECO NUCLEAR CORPORATION LIMERICK GENERATIN8 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)
PECO NUCLEAR CORPORATION LIMERICK GENERATIN8 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)
Transient Test 7.03B, Closure of All MSIVs at Startuo Test Conditions.
Transient Test 7.03B, Closure of All MSIVs at Startuo Test Conditions.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Appendix Bl.2 (3) :   " Closure of All Main Steam Isolation Valves."
This test originally helped to satisfy ANSI /ANS 3.5-1985 Appendix Bl.2 (3) :
This test was deleted due to the fact that it is no longer practical or useful to compare simulator response to reference plant response during Startup Test Conditions.           Many plant configuration changes, including retuning of the feedwater control system, feedwater heater and Main Condenser retubing, power rerate and retrofit of the Main Turbine, have made comparison of simulator response to reference plant startup test response meaningless.
" Closure of All Main Steam Isolation Valves."
This test was deleted due to the fact that it is no longer practical or useful to compare simulator response to reference plant response during Startup Test Conditions.
Many plant configuration changes, including retuning of the feedwater control system, feedwater heater and Main Condenser retubing, power rerate and retrofit of the Main Turbine, have made comparison of simulator response to reference plant startup test response meaningless.
This requirement is satisfied by the following test:
This requirement is satisfied by the following test:
7.03       Closure of All MSIVs at Rated Power Transient Test 7.04B. Simultaneous Trio of all Recirculation Dumos at Startun Test Conditions.
7.03 Closure of All MSIVs at Rated Power Transient Test 7.04B. Simultaneous Trio of all Recirculation Dumos at Startun Test Conditions.
This test originally helped to satisfy ANSI /ANS 3.5-1985 Appendix Bl.2 (4) :   " Simultaneous Trip of all recirculation pumps. "
This test originally helped to satisfy ANSI /ANS 3.5-1985 Appendix Bl.2 (4) :
This test was deleted due to the fact that it is no longer practical or useful to compare simulator response to reference plant response during Startup Test Conditions.           Many plant configuration changes, including retuning of the feedwater control system, feedwater heater and Main Condenser retubing, power rerate and retrofit of the Main Turbine, have made comparison of simulator response to reference plant startup test response meaningless.
" Simultaneous Trip of all recirculation pumps. "
This test was deleted due to the fact that it is no longer practical or useful to compare simulator response to reference plant response during Startup Test Conditions.
Many plant configuration changes, including retuning of the feedwater control system, feedwater heater and Main Condenser retubing, power rerate and retrofit of the Main Turbine, have made comparison of simulator response to reference plant startup test response meaningless.
This requirement is satisfied by the following test:
This requirement is satisfied by the following test:
7.04       Dual Recirc Pump Trip at Rated Power Page: 26
7.04 Dual Recirc Pump Trip at Rated Power Page: 26


.                  .    .      = _ _ _ - .
= _ _ _ -.
l PECO NUCLEAR CORPORATION LIMERICK GENERATIN3 STATION TRAINING SIMULATOR SIMDLATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)
PECO NUCLEAR CORPORATION LIMERICK GENERATIN3 STATION TRAINING SIMULATOR SIMDLATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)
Transient Test 7.07. Maximum Rate Power Ramo.
Transient Test 7.07. Maximum Rate Power Ramo.
This test was originally developed to satisfy ANSI /ANS 3.5-1985                   l Appendix 31.2 (7):     " Maximum rate power ramp (master recirculation flow           i controller in " manual") down to approximately 75% and back up to 100%. "               l This test was deleted since it serves no useful purpose.                   To run this test and satisfy this requirement requires that the Recirc M/A stations both be operated in AUTO and manipulations be done to the Recirc Master Flow Controller. LGS is not permitted to operate in this configuration, and the Recirc Master Flow Controller has been removed from the   Control Room panels.                   Therefore there   is no benefit in i performing simulator testing in this mode.
This test was originally developed to satisfy ANSI /ANS 3.5-1985 l
i Appendix 31.2 (7):
" Maximum rate power ramp (master recirculation flow controller in " manual") down to approximately 75% and back up to 100%. "
l This test was deleted since it serves no useful purpose.
To run this test and satisfy this requirement requires that the Recirc M/A stations both be operated in AUTO and manipulations be done to the Recirc Master Flow Controller.
LGS is not permitted to operate in this configuration, and the Recirc Master Flow Controller has been removed from the Control Room panels.
Therefore there is no benefit in i
performing simulator testing in this mode.
Simulator Model exercising, in an equivalent mode, is accomplished by the performance of the following tests:
Simulator Model exercising, in an equivalent mode, is accomplished by the performance of the following tests:
3.431A     Recirc   Pump     A       M/A Station   Fails High 3.431B     Recirc   Pump     A       M/A Station   Fails Low                     ,
3.431A Recirc Pump A M/A Station Fails High 3.431B Recirc Pump A M/A Station Fails Low 3.431C Recirc Pump B M/A Station Fails High 3.431D Recirc Pump B M/A Station Fails Low 5.25A Recirc Pump M/A Station Fails High 5.25B Recirc Pump M/A Station Fails Low PECO Nuclear takes exception to the ANSI Requirement to perform this test (Exception Record attached.)
3.431C     Recirc   Pump     B       M/A Station Fails High 3.431D     Recirc   Pump     B       M/A Station   Fails Low 5.25A       Recirc Pump M/A Station Fails High 5.25B       Recirc Pump M/A Station Fails Low PECO Nuclear takes exception to the ANSI Requirement to perform this test (Exception Record attached.)
t i
t i
f Page: 27 l
f Page: 27 l


        .      .    - -        -    .--  -    ._.  ._ _  ~ = _ _ _ _ _ .. ~   -    -.
~ = _ _ _ _ _.. ~
PECO NUCLEAR CORPORATION LIMERICK UENERATING STATION TRAINING SIMULATOR                         i SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 4
PECO NUCLEAR CORPORATION LIMERICK UENERATING STATION TRAINING SIMULATOR i
SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 4
Simulator Tests Deleted (Continued) 1 j
Simulator Tests Deleted (Continued) 1 j
1 Transient Test 7.10. BWR TMI Scenario.
1 Transient Test 7.10. BWR TMI Scenario.
!        This test was originally developed to satisfy ANSI /ANS 3.5-1985 Appendix Bl.2 (10):       " Simultaneous closure of all Main Steam Isolation Valves combined with single stuck open safety / relief valve.             (Inhibit activation of high pressure Emergency Core Cooling Systems."
This test was originally developed to satisfy ANSI /ANS 3.5-1985 Appendix Bl.2 (10):
This test was deleted since it serves no useful purpose. Other Malfunction Performance and Transient Performance tests on the Limerick l Simulator serve to exercise the simulation models in equivalent or more extensive fashion.       In particular, Malfunction Performance Test 5.18,
" Simultaneous closure of all Main Steam Isolation Valves combined with single stuck open safety / relief valve.
. Loss of All Feedwater Resulting in ADS Blowdown, is similar, but provides for more dramatic changes in simulated plant parameters, thus exercising the simulator models to a greater degree.
(Inhibit activation of high pressure Emergency Core Cooling Systems."
This test was deleted since it serves no useful purpose.
Other Malfunction Performance and Transient Performance tests on the Limerick l
Simulator serve to exercise the simulation models in equivalent or more extensive fashion.
In particular, Malfunction Performance Test 5.18, Loss of All Feedwater Resulting in ADS Blowdown, is similar, but provides for more dramatic changes in simulated plant parameters, thus exercising the simulator models to a greater degree.
i PECO Nuclear takes exception to the ANSI Requirement to perform this test (Exception Record attached.)
i PECO Nuclear takes exception to the ANSI Requirement to perform this test (Exception Record attached.)
l                                                                                        <
l l
l l
l l
l l
l
\\
                                                                                          \
Page: 28
l l
Page: 28                                     !


      -  .-    -    --      - _    .  =         ..            .      .      ..
=
PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR I
PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR I
,                      SIMULATOR QUADRENNIAL REPORT EXHIBIT 2                     j i
SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 j
l Simulator Tests Deleted (Continued)                       l l
i l
l l                                                                                  l Miscellaneous Tests Deleted (with no specific ANSI Reauirement)-
Simulator Tests Deleted (Continued) l l
Miscellaneous Tests Deleted (with no specific ANSI Reauirement)-
4 s
4 s
Moisture Separator Level Control Fails Low (Malfunction Test 3.070)
Moisture Separator Level Control Fails Low (Malfunction Test 3.070)
This test was replaced by individual malfunctions that fail can fail each Moisture Separator Drain and Dump valves open or closed.
This test was replaced by individual malfunctions that fail can fail each Moisture Separator Drain and Dump valves open or closed.
Trio of Stator Coolant Pumo A or Pumo B (Malfunction Tests 3.099A 4 3.099B i
Trio of Stator Coolant Pumo A or Pumo B (Malfunction Tests 3.099A 4 3.099B i
These malfunctions were deleted and combined into or.e l   malfunction, with the corresponding Malfunction Test, 3.099, Trip of Both Stator Coolant Pumps                                                     ;
These malfunctions were deleted and combined into or.e l
Drawer Inoo. RHRSW Heat Exchancer outlet Rad Monitor (Malfunction i   Tests 3.115RC: 3.115RD; 3.115RE: 3.115RF) i These malfunctions were deleted, as the Rad Monitors were deleted       ,
malfunction, with the corresponding Malfunction Test, 3.099, Trip of Both Stator Coolant Pumps Drawer Inoo. RHRSW Heat Exchancer outlet Rad Monitor (Malfunction i
in both the Reference Unit and the simulator.
Tests 3.115RC: 3.115RD; 3.115RE: 3.115RF) i These malfunctions were deleted, as the Rad Monitors were deleted in both the Reference Unit and the simulator.
E_ailure of the Process Computer (Malfunction Test 3.463) 4 This malfunction was deleted due to a plant and simulator               l modification replacing the Plant Process Computer with a Monitoring           ;
E_ailure of the Process Computer (Malfunction Test 3.463) 4 This malfunction was deleted due to a plant and simulator l
System not susceptible to the original failure mode.
modification replacing the Plant Process Computer with a Monitoring System not susceptible to the original failure mode.
5.36A. Closure of One MSIV.
5.36A. Closure of One MSIV.
This test was deleted due to the fact that it is no longer practical or useful to compare simulator response to reference plant response during Startup Test Conditions.           Many plant configuration changes, including retuning of the feedwater control system, feedwater heater and Main Condenser retubing, power rerate and retrofit of the Main Turbine, have made comparison of simulator response to reference plant startup test response meaningless.                                       -
This test was deleted due to the fact that it is no longer practical or useful to compare simulator response to reference plant response during Startup Test Conditions.
Many plant configuration changes, including retuning of the feedwater control system, feedwater heater and Main Condenser retubing, power rerate and retrofit of the Main Turbine, have made comparison of simulator response to reference plant startup test response meaningless.
This test was not required by the Simulator Standard.
This test was not required by the Simulator Standard.
t 1                                                                               i Page: 29
t 1
i Page: 29


PECO NUCLRAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 3 SIMULATOR TEST REPORTS (TESTING COMPLETED 1995 - 1998)
PECO NUCLRAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 3 SIMULATOR TEST REPORTS (TESTING COMPLETED 1995 - 1998)
P i
P i


PECO NUCLEAR CORPORATION 4
PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR 4
LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT r
SIMULATOR QUADRENNIAL REPORT r
1 i
1 i
)                             LGS SIMULATOR TESTING
)
:                                PERFORMED IN 1995 i
LGS SIMULATOR TESTING PERFORMED IN 1995 i
l
i
.,                                                                  i 1


LGS Simulator Testing Completedin 1995                                               l Test No     Title                                   Test Date Result 1.01       COMPUTER REAL TIME TEST                     11/6/95     S 3.003A                                               10/12/95      S CORE POWER OSCILLA~CNS (IN-PHASE) 3.004A     APRM CHAN A RECORDER FAILS AS-IS             2/1/95     S 3.004B     APRM CHAN A FAILS INOP                       2/1/95     S 3.009A     APRM CHAN F RECORDER FAILS AS-IS             22/95     S 3.011 A     RBM CHAN B RECORDER FAILS AS-IS             2/6/95     S 3.012A     LPRM 56-17B UPSCALE FAILURE                 3/3/95     S 3.012E     LPRM 40-33B UPSCALE FAILURE               8/31/95     S 3.013A     LPRM 24-33D DOWNSCALE FAILURE               9/9/95     S I
LGS Simulator Testing Completedin 1995 Test No Title Test Date Result 1.01 COMPUTER REAL TIME TEST 11/6/95 S
3.013E     LPRM 48-49D DOWNSCALE FAILURE             10/11/95     S 3.015A     LPRM 16-41B DRIFT (-25 TO +25)             11/6/95     S 3.016A                                                 2/10/95      S CONTROL ROD XX-W FAILURE (DRIFT IN) 3.016B                                                2/10/95     S CONTROL ROD XX-W FAILURE (DRIFT OUT) i 3.016C                                                2/10/95     S CONTROL ROD XX W FAILURE (ACCUM TRBL)                                     ,
3.003A CORE POWER OSCILLA~CNS (IN-PHASE) 10/12/95 S
3.016D                                                2/10/95     S t
3.004A APRM CHAN A RECORDER FAILS AS-IS 2/1/95 S
CONTROL ROD XX-W FAILURE (STUCK)
3.004B APRM CHAN A FAILS INOP 2/1/95 S
! 3.016E                                                2/10/95     S CONTROL ROD XX-W FAILURE (UNCOUPLED) 3.016F     CONTROL ROD XX-YY FAILURE (SCRAMMED)       2/10/95     S 3.016G     CONTROL ROD XX-XX FAILS TO SCRAM           2/10/95     S 3.020A     APRM CHANNEL A FAILS 0-125%                 9/10/95     S 3.020E     APRM CHANNEL E FAILS 0-125%               10/27/95     S 3.027A     LOSS OF NORMAL POWER TO RPS CHANNEL A       2/9/95     S 3.028A     REACTOR SCRAM (FULL)                       2/17/95     S 3.0288     REACTOR SCRAM (BANK 1)                     10/11/95     S 3.029C     RPS FAILS TO SCRAM (CHAN A)                 2/10/95     S 3.044A     FW PUMP A CONTROLLER OUTPUT FAILS HIGH       2/6/95     S 3.045B     FW PUMP B CONTROLLER OUTPUT FAILS LOW       2/6/95     S                 i 3.046A     STEAM FLOW XMITTER 1N003A FAILS 0-100%     2/17/95     S 3.047C     FW FLOW XMITTER 1N002C FAILS 0-100%         8/13/95     S Friday, December 04,1998                                               Page 1 of12
3.009A APRM CHAN F RECORDER FAILS AS-IS 22/95 S
3.011 A RBM CHAN B RECORDER FAILS AS-IS 2/6/95 S
3.012A LPRM 56-17B UPSCALE FAILURE 3/3/95 S
3.012E LPRM 40-33B UPSCALE FAILURE 8/31/95 S
3.013A LPRM 24-33D DOWNSCALE FAILURE 9/9/95 S
I 3.013E LPRM 48-49D DOWNSCALE FAILURE 10/11/95 S
3.015A LPRM 16-41B DRIFT (-25 TO +25) 11/6/95 S
3.016A CONTROL ROD XX-W FAILURE (DRIFT IN) 2/10/95 S
3.016B CONTROL ROD XX-W FAILURE (DRIFT OUT) 2/10/95 S
i 3.016C CONTROL ROD XX W FAILURE (ACCUM TRBL) 2/10/95 S
3.016D CONTROL ROD XX-W FAILURE (STUCK) 2/10/95 S
t 3.016E CONTROL ROD XX-W FAILURE (UNCOUPLED) 2/10/95 S
3.016F CONTROL ROD XX-YY FAILURE (SCRAMMED) 2/10/95 S
3.016G CONTROL ROD XX-XX FAILS TO SCRAM 2/10/95 S
3.020A APRM CHANNEL A FAILS 0-125%
9/10/95 S
3.020E APRM CHANNEL E FAILS 0-125%
10/27/95 S
3.027A LOSS OF NORMAL POWER TO RPS CHANNEL A 2/9/95 S
3.028A REACTOR SCRAM (FULL) 2/17/95 S
3.0288 REACTOR SCRAM (BANK 1) 10/11/95 S
3.029C RPS FAILS TO SCRAM (CHAN A) 2/10/95 S
3.044A FW PUMP A CONTROLLER OUTPUT FAILS HIGH 2/6/95 S
3.045B FW PUMP B CONTROLLER OUTPUT FAILS LOW 2/6/95 S
i 3.046A STEAM FLOW XMITTER 1N003A FAILS 0-100%
2/17/95 S
3.047C FW FLOW XMITTER 1N002C FAILS 0-100%
8/13/95 S
Friday, December 04,1998 Page 1 of12


Test No   Title                                         Test Date Result 3.061A     MSIV HV41-1F022A FAILS OPEN                       2/6/95   S 3.062A     MSIV HV41-1FO28A FAILS OPEN                       2/6/95   S 3.063A     MSIV HV41-1FO22A FAILS CLOSED                     11/6/95   S 3.064A     MSIV HV41 1F028A FAILS CLOSED                     11/6/95   S i   3.069       STM SEAL EVAP STM OUTLET FAILS CLOSED             2/6/95   S 3.072A     SJAE STM SUPPLY PCV07-101 A FAILS CLOSED           2/8/95   S 3.073                                                       10/27/95    S FW CONDUCTIVITY INCREASE (1-100%)
Test No Title Test Date Result 3.061A MSIV HV41-1F022A FAILS OPEN 2/6/95 S
3.077B     HOTWELL LEVEL CONTROLLER FAILS LOW                 2/8/95   S 3.079A     COND FILTER /DEMIN A HI DIFF PRESSURE           8/13/95   S 3.079E     COND FILTER /DEMIN E Hi DIFF PRESSURE           10/19/95   S 3.080A     CONDENSATE RECIRC VALVE FAILS OPEN                 2/9/95   S 3.086A     CIRCULATING WATER PUMP A TRIP                   1/20/95   S 3.096       GEN HYDROGEN COOLING SYSTEM LEAK               10/20/95     S                     3 3.099       TRIP OF BOTH STATOR COOLANT PUMPS               2/17/95   S 3.100       MAIN TURBINE BRG #5 & #6 HIGH VIBRATION           9/9/95   S 3.102       MAIN TURBINE LOW BRG OIL PRESSURE                 9/G/95   S                     !
3.062A MSIV HV41-1FO28A FAILS OPEN 2/6/95 S
3.103       TURBINE BEARING HIGH TEMPERATURE                   9/9/95   S                     ,
3.063A MSIV HV41-1FO22A FAILS CLOSED 11/6/95 S
3.104A     TURBINE CONTROL SYSTEM FAILS HIGH               8/12/95   S 3.105C     EHC PRESSURE REGULATOR A OSCILLATES             8/12/95   S 3.107A     BYPASS VALVE NO.1 STICKS OPEN                   8/12/95   S 3.107E     BYPASS VALVE NO. 5 STICKS OPEN                   8/12/95   S 3.108       BYPASS VALVES Fall TO SELECTED VALUE             8/12/95   S i     3.111 B     EHC LOAD SELECTOR FAILS TO REMOTE               8/13/95   S f     3.113       HIGH RAD LEVEL IN SE'RVICE WTR                   8/31/95   S 3.115AA     DRAWER INOP RX ENCLOSURE VENT EXH CHAN A         2/6/95   S                     l 3.115AE     DRAWER INOP REFUEL FLOOR VENT EXH CHAN A         2/6/95   S 3.115AJ     CMWER INOP POST LOCA MONITOR CHAN A               2/8/95   S 3.115D     DRAWER INOP WIDE RANGE ACCIDENT MONITOR           2/8/95   S 3.115H     DRAWER INOP RADWASTE ENCLOSURE RAD MON           2/9/95   S 3.115M     DRWR INOP UNIT 1 CONTAINMENT LEAK DETECT       10/17/95     S
3.064A MSIV HV41 1F028A FAILS CLOSED 11/6/95 S
                                            ~
i 3.069 STM SEAL EVAP STM OUTLET FAILS CLOSED 2/6/95 S
Friday, December 04,1998                                                 Page 2 of 12
3.072A SJAE STM SUPPLY PCV07-101 A FAILS CLOSED 2/8/95 S
3.073 FW CONDUCTIVITY INCREASE (1-100%)
10/27/95 S
3.077B HOTWELL LEVEL CONTROLLER FAILS LOW 2/8/95 S
3.079A COND FILTER /DEMIN A HI DIFF PRESSURE 8/13/95 S
3.079E COND FILTER /DEMIN E Hi DIFF PRESSURE 10/19/95 S
3.080A CONDENSATE RECIRC VALVE FAILS OPEN 2/9/95 S
3.086A CIRCULATING WATER PUMP A TRIP 1/20/95 S
3.096 GEN HYDROGEN COOLING SYSTEM LEAK 10/20/95 S
3 3.099 TRIP OF BOTH STATOR COOLANT PUMPS 2/17/95 S
3.100 MAIN TURBINE BRG #5 & #6 HIGH VIBRATION 9/9/95 S
3.102 MAIN TURBINE LOW BRG OIL PRESSURE 9/G/95 S
3.103 TURBINE BEARING HIGH TEMPERATURE 9/9/95 S
3.104A TURBINE CONTROL SYSTEM FAILS HIGH 8/12/95 S
3.105C EHC PRESSURE REGULATOR A OSCILLATES 8/12/95 S
3.107A BYPASS VALVE NO.1 STICKS OPEN 8/12/95 S
3.107E BYPASS VALVE NO. 5 STICKS OPEN 8/12/95 S
3.108 BYPASS VALVES Fall TO SELECTED VALUE 8/12/95 S
i 3.111 B EHC LOAD SELECTOR FAILS TO REMOTE 8/13/95 S
f 3.113 HIGH RAD LEVEL IN SE'RVICE WTR 8/31/95 S
3.115AA DRAWER INOP RX ENCLOSURE VENT EXH CHAN A 2/6/95 S
l 3.115AE DRAWER INOP REFUEL FLOOR VENT EXH CHAN A 2/6/95 S
3.115AJ CMWER INOP POST LOCA MONITOR CHAN A 2/8/95 S
3.115D DRAWER INOP WIDE RANGE ACCIDENT MONITOR 2/8/95 S
3.115H DRAWER INOP RADWASTE ENCLOSURE RAD MON 2/9/95 S
3.115M DRWR INOP UNIT 1 CONTAINMENT LEAK DETECT 10/17/95 S
~
Friday, December 04,1998 Page 2 of 12


Test No   Title                                 Test Date Result 3.115R   DRAWER INOP AIR EJECTOR /OFFGAS CHAN B   2,16/95 S 3.115RC   DRAWER INOP RHRSW HX 1 A OUTLET           8/13/95 S 3.115T   DRAWER INOP MAIN STEAM LINE CHAN A       8/31/95 S 3.113     FUEL CLADDING FAILURE                   10/17/95   S 3.137A     ADS /SRV 1FO13A FAILS - LEAKS             2/15/95 S 3.1378     ADS /SRV 1FO13A FA!LS - STUCK             1/30/95 S 3.137C     ADS /SRV 1FO13A FAILS - OPEN ELECT       1/30/95 S 3.137D     ADS /SRV 1F013A FAILS - CLOSED             2/1/95 S 3.137E     ADS /SRV 1FO13A FAILS - OPEN MECH         2/1/95 S 3.141 A   ADS /SRV 1FO13E FAILS - LEAKS           2/15/95 S 3.141B     ADS /SRV 1FO13E FAILS - STUCK             2/6/95 S 3.141C     ADS /SRV 1FO13E FAILS - OPEN ELECT         2/8/95 S 3.141 D   ADS /SRV 1FO13E FAILS - CLOSED             2/8/95 S 3.141E   ADS /SRV 1FO13E FAILS - OPEN MECH           2/9/95 S 3.145A   ADS /SRV 1FO13J FAILS - LEAKS             2/16/95 S 3.145B   ADS /SRV 1FO13J FAILS - STUCK             2/16/95 S 3.145C   ADS /SRV 1FO13J FAILS - OPEN ELECT       2/16/95 S 3.145D   ADS /SRV 1FO13J FAILS - CLOSED           8/13/95 S 3.145E   ADS /SRV 1FO13J FAILS - OPEN MECH         8/13/95 S
Test No Title Test Date Result 3.115R DRAWER INOP AIR EJECTOR /OFFGAS CHAN B 2,16/95 S
                                                                                  ]
3.115RC DRAWER INOP RHRSW HX 1 A OUTLET 8/13/95 S
3.149C   ADS /SRV 1FO13N FAILS - OPEN ELECT       8/31/95 S 3.150B   ADS /SRV 1FO13S FAILS - STUCK             8/31/95 S 3.151 A   SRV 1F013K DOWNCOMER LEAK 0-100%         8/13/95 S 3.156A   NSSSS GROUP 1 A INADVERTENT ISOLATION     1/20/95 S 3.156E   NSSSS GROUP 1E INADVERTENT ISOLATION     1/20/95 S 1
3.115T DRAWER INOP MAIN STEAM LINE CHAN A 8/31/95 S
3.157A   NSSSS GROUP 2A INADVERTENT ISOLATION     9/10/95 S               ;
3.113 FUEL CLADDING FAILURE 10/17/95 S
3.157E   NSSSS GROUP 2E INADVERTENT ISOLATION     9/10/95 S 3.159A   NSSSS GROUP 6A INADVERTENT ISOLATION     1/20/95 S 3.159E   NSSSS GROUP 6E INADVERTENT ISOLATION       2/8/95 S               l l
3.137A ADS /SRV 1FO13A FAILS - LEAKS 2/15/95 S
3.160C     NSSSS GROUP 7C INADVERTENT ISOLATION       2/8/95 S 3.162A     SEC CON & PCIG A INADVERTENT ISOL         2/1/95 S I
3.1378 ADS /SRV 1FO13A FA!LS - STUCK 1/30/95 S
Friday, December 04,1998                                         Page 3 of 12 l I
3.137C ADS /SRV 1FO13A FAILS - OPEN ELECT 1/30/95 S
3.137D ADS /SRV 1F013A FAILS - CLOSED 2/1/95 S
3.137E ADS /SRV 1FO13A FAILS - OPEN MECH 2/1/95 S
3.141 A ADS /SRV 1FO13E FAILS - LEAKS 2/15/95 S
3.141B ADS /SRV 1FO13E FAILS - STUCK 2/6/95 S
3.141C ADS /SRV 1FO13E FAILS - OPEN ELECT 2/8/95 S
3.141 D ADS /SRV 1FO13E FAILS - CLOSED 2/8/95 S
3.141E ADS /SRV 1FO13E FAILS - OPEN MECH 2/9/95 S
3.145A ADS /SRV 1FO13J FAILS - LEAKS 2/16/95 S
3.145B ADS /SRV 1FO13J FAILS - STUCK 2/16/95 S
3.145C ADS /SRV 1FO13J FAILS - OPEN ELECT 2/16/95 S
3.145D ADS /SRV 1FO13J FAILS - CLOSED 8/13/95 S
3.145E ADS /SRV 1FO13J FAILS - OPEN MECH 8/13/95 S
]
3.149C ADS /SRV 1FO13N FAILS - OPEN ELECT 8/31/95 S
3.150B ADS /SRV 1FO13S FAILS - STUCK 8/31/95 S
3.151 A SRV 1F013K DOWNCOMER LEAK 0-100%
8/13/95 S
3.156A NSSSS GROUP 1 A INADVERTENT ISOLATION 1/20/95 S
3.156E NSSSS GROUP 1E INADVERTENT ISOLATION 1/20/95 S
1 3.157A NSSSS GROUP 2A INADVERTENT ISOLATION 9/10/95 S
3.157E NSSSS GROUP 2E INADVERTENT ISOLATION 9/10/95 S
3.159A NSSSS GROUP 6A INADVERTENT ISOLATION 1/20/95 S
3.159E NSSSS GROUP 6E INADVERTENT ISOLATION 2/8/95 S
3.160C NSSSS GROUP 7C INADVERTENT ISOLATION 2/8/95 S
3.162A SEC CON & PCIG A INADVERTENT ISOL 2/1/95 S
Friday, December 04,1998 Page 3 of 12


l l
Test No Title Test Date Result 3.162F SEC CON & PClG F INADVERTENTISOL 2/6/95 S
Test No     Title                                     Test Date Result 3.162F       SEC CON & PClG F INADVERTENTISOL               2/6/95       S               !
3.166B OFFGAS AFTERCOND LEVEL XMTR FAILS LOW 2/8/95 S
3.166B       OFFGAS AFTERCOND LEVEL XMTR FAILS LOW           2/8/95       S               I 3.168C                                                     2/16/95        S OFFGAS CHILLER GLYCOL PUMP TRIP (BOTH) 3.171A       RHR PUMP A TRIP                               1/30/95       S i
3.168C OFFGAS CHILLER GLYCOL PUMP TRIP (BOTH) 2/16/95 S
3.172A       RHR PUMP 1 A FAILo TO AUTO START               2/6/95       S 3.174A       RHR INJECTION VALVE 1F017A FAILS AS IS       8/12/95       S 3.174E       RHR SUPP POOL HV51-1F024A FAILS AS-IS         9/9/95       S 3.174F       RHR SUPP POOL HV51-1F024B FAILS AS-IS         9/9/95       S 3.175A       RHR PUMP SUCTION VALVE F004A FAILS AS IS       2/6/95       S               i 3.176C       RHR SDC SUCTION VALVE 1FOO8 FAILS AS IS     10/27/95         S               [
3.171A RHR PUMP A TRIP 1/30/95 S
3.177A       RHR HX A BYPASS CONTROLLER FAILS HIGH       10/27/95       S 3.182A       CORE SPRAY PUMP A TRIPS                       2/6/95       S 3.183A       CORE SPRAY PUMP A FAILS TO AUTO START         2/8/95       S               ,
i 3.172A RHR PUMP 1 A FAILo TO AUTO START 2/6/95 S
3.184A       CORE SPRAY INBD VALVE 1FOO5 FAILS AS IS       2/8/95       S 3.189C     REACTOR WATER CLEANUP PUMP C TRIPS             2/6/95       S               ,
3.174A RHR INJECTION VALVE 1F017A FAILS AS IS 8/12/95 S
3.192       REACTOR VESSEL CONDUCTIVITY INCREASES       10/27/95       S 3.1958     RWCU ISOL VALVE HV44-1F004 FAILS AS IS         2/6/95       S 3.1988     SLC PUMP B LOSS OF CONTROL POWER               2/6/95       S 3.201A     SRM CHANNEL A RECORDER FAILS AS-IS             2/9/95       S 3.201B       SRM CHANNEL A FAILS INOPERATIVE               9/10/95       S 3.201C       SRM CHANNEL A DETECTOR STUCK                 2/15/95       S 3.205A       IRM CHANNEL A RECORDER FAILS AS-IS           2/15/95       S 3.205B     IRM CHANNEL A FAILS INOPERATIVE               2/15/95       S 3 205C     IRM CHANNEL A DETECTOR STUCK                   2/15/95       S               ,
3.174E RHR SUPP POOL HV51-1F024A FAILS AS-IS 9/9/95 S
3.209A     IRM CHANNEL E RECORDER FAILS AS-IS             9/10/95       S               -
3.174F RHR SUPP POOL HV51-1F024B FAILS AS-IS 9/9/95 S
3.2098     IRM CHANNEL E FAILS INOPERATIVE               9/10/95       S 3.209C     IRM CHANNEL E DETECTOR STUCK                   9/10/95       S 3.213A     SRM CHANNEL A FAILS TO SELECTED VALUE         9/10/95       S 3.214A     IRM CHANNEL A FAILS TO SELECTED VALUE         9/10/95       S 3.214E     IRM CHANNEL E FAILS TO SELECTED VALUE         9/10/95       S
3.175A RHR PUMP SUCTION VALVE F004A FAILS AS IS 2/6/95 S
                ~~                    ~~
i 3.176C RHR SDC SUCTION VALVE 1FOO8 FAILS AS IS 10/27/95 S
      ' Friday, Decem5r~04,1958                                                   Page 4 of 12   >
[
3.177A RHR HX A BYPASS CONTROLLER FAILS HIGH 10/27/95 S
3.182A CORE SPRAY PUMP A TRIPS 2/6/95 S
3.183A CORE SPRAY PUMP A FAILS TO AUTO START 2/8/95 S
3.184A CORE SPRAY INBD VALVE 1FOO5 FAILS AS IS 2/8/95 S
3.189C REACTOR WATER CLEANUP PUMP C TRIPS 2/6/95 S
3.192 REACTOR VESSEL CONDUCTIVITY INCREASES 10/27/95 S
3.1958 RWCU ISOL VALVE HV44-1F004 FAILS AS IS 2/6/95 S
3.1988 SLC PUMP B LOSS OF CONTROL POWER 2/6/95 S
3.201A SRM CHANNEL A RECORDER FAILS AS-IS 2/9/95 S
3.201B SRM CHANNEL A FAILS INOPERATIVE 9/10/95 S
3.201C SRM CHANNEL A DETECTOR STUCK 2/15/95 S
3.205A IRM CHANNEL A RECORDER FAILS AS-IS 2/15/95 S
3.205B IRM CHANNEL A FAILS INOPERATIVE 2/15/95 S
3 205C IRM CHANNEL A DETECTOR STUCK 2/15/95 S
3.209A IRM CHANNEL E RECORDER FAILS AS-IS 9/10/95 S
3.2098 IRM CHANNEL E FAILS INOPERATIVE 9/10/95 S
3.209C IRM CHANNEL E DETECTOR STUCK 9/10/95 S
3.213A SRM CHANNEL A FAILS TO SELECTED VALUE 9/10/95 S
3.214A IRM CHANNEL A FAILS TO SELECTED VALUE 9/10/95 S
3.214E IRM CHANNEL E FAILS TO SELECTED VALUE 9/10/95 S
' Friday, Decem5r~04,1958 Page 4 of 12
~~
~~


Test No     Title                                   Test Date Result           -
Test No Title Test Date Result 3.217A RBM CHANNEL A FAILS TO SELECTED VALUE 10/12/95 S
3.217A     RBM CHANNEL A FAILS TO SELECTED VALUE     10/12/95   S 3.227B     RX INSTRUMENT LINE BREAK AFTER 42-F043B     2/8/95 S 3.229B     RX INSTRUMENT LINE BREAK AFTER 42-F049B   2/15/95   S 3.2310     RX INSTRUMENT LINE BREAK AFTER 42-F045B 10/27/95   S 3.232A     RX LEVEL XMITTER LT42-N080A FAILS HIGH   10/27/95   S 3.2328     RX LEVEL XMITTER LT42-N080A FAILS LOW   10/27/95   S 3.233A     RX LEVEL XMITTER DPT42-N004A FAILS HIGH 10/27/95   S
3.227B RX INSTRUMENT LINE BREAK AFTER 42-F043B 2/8/95 S
'                                                                S 3.233B     RX LEVEL XMITTER DPT42-N004A FAILS LOW   10/27/95 l
3.229B RX INSTRUMENT LINE BREAK AFTER 42-F049B 2/15/95 S
3.234A     RX PRESS XMITTER PT42-N078A FAILS HIGH   10/27/95   S 3.234B     RX PRESS XMITTER PT42-N078A FAILS LOW   10/27/95   S 3.235B     RX LEVEL / PRESS RECORDER R609 FAILS     10/20/95   S 3.236A     REFERENCE LEG 1D004A FLASHES             11/12/95   S 3.237A     REFERENCE LEG 1D004A LEVEL DEFECT       11/12/95   S
3.2310 RX INSTRUMENT LINE BREAK AFTER 42-F045B 10/27/95 S
' 3.237F     All. REFERENCE LEGS LEVEL DEFECT         11/12/95   S 3.242A     FEEDWATER HEATER 15A TUBE LEAK           10/20/95   S 3.2448     FEEDWATER PUMP A MECHANICAL FAILURE       11/6/95 S 3.245C     REACTOR FEEDPUMP B HIGH VIBRATION         11/7/95 S 3.247A     FW LOW FLOW CONTROL VALVE FAILS OPEN       9/10/95 S 3.249A     RX FEEDPUMP B RECIRC VALVE FAILS OPEN       2/6/95 S                 t 3.251A     FW S/U LEVEL CONTROL VALVE FAILS OPEN       9/10/95 S 3.252A     FW LINE A RUPTURE INSIDE DRYWELL         10/17/95   S 3.260A     NETWORK LOAD TRANSIENT INCREASE             11/7/95 S 3.262B     13.2KV 12 UNIT AUX BUS FAULT               11/6/95 S 3.263A     4KV SAFEGUARD BUS D11 FAULT               10/18/95   S                 i l 3.265A     STARTUP BUS BKR 10 TRIPS                   11/6/95 S 3.270A     114A GEN AREA 440V LOAD CENTER FAULT       8/13/95   S 3.270B     124A GEN AREA 440V LOAD CENTER FAULT     10/17/95   S 3.275A     D114 SAFEGUARD 440V LOAD CENTER FAULT     10/18/95   S 3.277A     120 VAC PANEL 10Y101 FAULT                 2/16/95   S 3.278A     120 VAC PANEL 10Y105 FAULT               10/17/95   S Friday, December 04,1998                                           Page 5 of 12 P
3.232A RX LEVEL XMITTER LT42-N080A FAILS HIGH 10/27/95 S
3.2328 RX LEVEL XMITTER LT42-N080A FAILS LOW 10/27/95 S
3.233A RX LEVEL XMITTER DPT42-N004A FAILS HIGH 10/27/95 S
3.233B RX LEVEL XMITTER DPT42-N004A FAILS LOW 10/27/95 S
3.234A RX PRESS XMITTER PT42-N078A FAILS HIGH 10/27/95 S
l 3.234B RX PRESS XMITTER PT42-N078A FAILS LOW 10/27/95 S
3.235B RX LEVEL / PRESS RECORDER R609 FAILS 10/20/95 S
3.236A REFERENCE LEG 1D004A FLASHES 11/12/95 S
3.237A REFERENCE LEG 1D004A LEVEL DEFECT 11/12/95 S
3.237F All. REFERENCE LEGS LEVEL DEFECT 11/12/95 S
3.242A FEEDWATER HEATER 15A TUBE LEAK 10/20/95 S
3.2448 FEEDWATER PUMP A MECHANICAL FAILURE 11/6/95 S
3.245C REACTOR FEEDPUMP B HIGH VIBRATION 11/7/95 S
3.247A FW LOW FLOW CONTROL VALVE FAILS OPEN 9/10/95 S
3.249A RX FEEDPUMP B RECIRC VALVE FAILS OPEN 2/6/95 S
t 3.251A FW S/U LEVEL CONTROL VALVE FAILS OPEN 9/10/95 S
3.252A FW LINE A RUPTURE INSIDE DRYWELL 10/17/95 S
3.260A NETWORK LOAD TRANSIENT INCREASE 11/7/95 S
3.262B 13.2KV 12 UNIT AUX BUS FAULT 11/6/95 S
3.263A 4KV SAFEGUARD BUS D11 FAULT 10/18/95 S
i l
3.265A STARTUP BUS BKR 10 TRIPS 11/6/95 S
3.270A 114A GEN AREA 440V LOAD CENTER FAULT 8/13/95 S
3.270B 124A GEN AREA 440V LOAD CENTER FAULT 10/17/95 S
3.275A D114 SAFEGUARD 440V LOAD CENTER FAULT 10/18/95 S
3.277A 120 VAC PANEL 10Y101 FAULT 2/16/95 S
3.278A 120 VAC PANEL 10Y105 FAULT 10/17/95 S
Friday, December 04,1998 Page 5 of 12 P


h Test No Title                                   Test Date Result 3.278C   120 VAC PANEL 10Y109 FAULT                 2/15/95 S 3.282A   1FA 125/250 VDC 1 AD105 FAULT             10/19/95 S 3.283     125/250 VDC 10D114 FAULT                 10/27/95 S 3.284A   LOSS OF DC TO SELECTED ANNUNCIATOR PNLS   2/15/95 S 3.284E   LOSS OF DC TO SELECTED ANNUNCIATOR PNLS   10/20/95 S 3.285A   125/250 VDC BUS 1 AD108 FAULT             5/15/95 S 3.285B   125/250 VDC BUS 1BD108 FAULT               5/15/95 S 3.285C   125/250 VDC BUS 1CD108 FAULT               5/15/95 S 3.285D   125/250 VDC BUS 1DD108 FAULT               5/15/95 S 3.285E   125/250 VDC BUS 10D125 FAULT               5/15/95 S 3.286A   1 A APRM UPS BUS 1 AY185 FAULT             5/15/95 S 3.286B   1B APRM UPS BUS 18Y185 FAULT               5/15/95 S 3.301A   RX ENCLOSURE ISOLATION CHANNEL A         10/17/95 S 3.304A   SGTS FROM REFUEL FLR HV76-019 FAILS OPEN     2/8/95 S
h Test No Title Test Date Result 3.278C 120 VAC PANEL 10Y109 FAULT 2/15/95 S
.      3.306   REFUEL FLOOR FAILS TO ISOLATE             10/12/95 S 3.406A   RRCS DIVISION I LOSS OF DC POWER         10/11/95 S 3.406C   RRCS LOSS OF DC POWER TO BOTH DIVISIONS   10/20/95 S 3.409A   CONTAINMENT INST GAS COMPRESSOR A LEAKS   10/12/95 S 3 410C   CIG ISOL VLVS 129A/B BOTH Fall CLOSED     2/13/95 S 3.412A   CONTROL ROD DRIVE PUMP A TRIPS               2/6/95 S 3.414A   DISCH VOLUME SV4t1F180 FAILS CLOSED       10/20/95 S 3.418A   DIESEL GENERATOR 11 TRIP                   2/15/95 S 3 419A   DIESEL GENERATOR 11 FAILS TO START       10/11/95 S 3.424A   INSTRUMENT AIR COMPRESSOR 1AK101 TRIP       2/6/95 S 3.4308   RECIRC PUMP B SElZURE                     8/31/95 S 3.431A   RECIRC PUMP A M/A STATION FAILS HIGH       8/31/95 S 3 433A   RECIRC PUMP A SEAL #1 FAILURE             10/19/95 S 3.435A   RECIRC PUMP A DRIVE MOTOR BREAKER TRIP       2/6/95 S 3.440B   RECIRC LOOP B RUPTURE (0100%)             10/17/95 S 3.442A   RECIRC PUMP 1 A RPT BREAKER CB3A TRIP     1/30/95 S Y5 day, D5b504,1995~~                                           Page 6 of12
3.282A 1FA 125/250 VDC 1 AD105 FAULT 10/19/95 S
3.283 125/250 VDC 10D114 FAULT 10/27/95 S
3.284A LOSS OF DC TO SELECTED ANNUNCIATOR PNLS 2/15/95 S
3.284E LOSS OF DC TO SELECTED ANNUNCIATOR PNLS 10/20/95 S
3.285A 125/250 VDC BUS 1 AD108 FAULT 5/15/95 S
3.285B 125/250 VDC BUS 1BD108 FAULT 5/15/95 S
3.285C 125/250 VDC BUS 1CD108 FAULT 5/15/95 S
3.285D 125/250 VDC BUS 1DD108 FAULT 5/15/95 S
3.285E 125/250 VDC BUS 10D125 FAULT 5/15/95 S
3.286A 1 A APRM UPS BUS 1 AY185 FAULT 5/15/95 S
3.286B 1B APRM UPS BUS 18Y185 FAULT 5/15/95 S
3.301A RX ENCLOSURE ISOLATION CHANNEL A 10/17/95 S
3.304A SGTS FROM REFUEL FLR HV76-019 FAILS OPEN 2/8/95 S
3.306 REFUEL FLOOR FAILS TO ISOLATE 10/12/95 S
3.406A RRCS DIVISION I LOSS OF DC POWER 10/11/95 S
3.406C RRCS LOSS OF DC POWER TO BOTH DIVISIONS 10/20/95 S
3.409A CONTAINMENT INST GAS COMPRESSOR A LEAKS 10/12/95 S
3 410C CIG ISOL VLVS 129A/B BOTH Fall CLOSED 2/13/95 S
3.412A CONTROL ROD DRIVE PUMP A TRIPS 2/6/95 S
3.414A DISCH VOLUME SV4t1F180 FAILS CLOSED 10/20/95 S
3.418A DIESEL GENERATOR 11 TRIP 2/15/95 S
3 419A DIESEL GENERATOR 11 FAILS TO START 10/11/95 S
3.424A INSTRUMENT AIR COMPRESSOR 1AK101 TRIP 2/6/95 S
3.4308 RECIRC PUMP B SElZURE 8/31/95 S
3.431A RECIRC PUMP A M/A STATION FAILS HIGH 8/31/95 S
3 433A RECIRC PUMP A SEAL #1 FAILURE 10/19/95 S
3.435A RECIRC PUMP A DRIVE MOTOR BREAKER TRIP 2/6/95 S
3.440B RECIRC LOOP B RUPTURE (0100%)
10/17/95 S
3.442A RECIRC PUMP 1 A RPT BREAKER CB3A TRIP 1/30/95 S
Y5 day, D5b504,1995~~
Page 6 of12


i Test No     Title                                     Test Date Result 3.445       HPCI STEAM LINE BREAK IN PUMP RM 1-100%       11/6/95   S             l 3.447A     HPCI AUX OIL PUMP FAILS TO AUTO START         2/13/95   S 3.449       HPCI TURBINE TRIP                               3/3/95 S 3.452       HPCI PUMP DISCH VALVE 1F006 FAILS AS IS       2/16/95   S 3.456       RCIC FAILS TO AUTO START                       1/30/95 S               ;
i Test No Title Test Date Result 3.445 HPCI STEAM LINE BREAK IN PUMP RM 1-100%
3.459A     RCIC STEAM SUPPLY HV49-1F008 ISOLATES         1/30/95 S 3.462       RCIC COOLING WATER VLV 1F046 FAILS AS IS       1/30/95 S               t 3.464C     RCIC ISOL VLV HV49-1F076 FAILS AS-IS         2/16/95   S 3.471A     DRYWELL AREA UNIT COOLER FAN 1 A1 TRIP         2/8/95 S 3.471E     DRYWELL AREA UNIT COOLER FAN 1E1 TRIP         2/15/95   S               l 3.472A     DRYWELL AREA UNIT COOLER FAN 1 A2 TRIP       2/16/95   S l
11/6/95 S
3.472E     DRYWELL AREA UNIT COOLER FAN 1E2 TRIP       10/12/95   S 3.474       SUPP POOL AIR LEAK TO REACTOR ENCLOSURE       8/31/95   S 3.483A     RECW PUMP TRIP (A)                           1/30/95   S 3.483C     RECW PUMP TRIP -(BOTH)                         2/8/95 S 3.487       LOSS OF SW TO MAIN TURB LUBE OIL COOLERS       9/9/95 S 3.488B     SERVICE WATER PUMP B TRIPS                   2/15/95   S                l S
l 3.447A HPCI AUX OIL PUMP FAILS TO AUTO START 2/13/95 S
3.489A     ESW PUMP A TRIPS                               2/8/95                   )
3.449 HPCI TURBINE TRIP 3/3/95 S
3.490A     ESW VLV HV11-121 Fall TO AUTO SWAP             2/8/95 S 3.490E     ESW VLV HV11-055A FAILS TO AUTO SWAP         2/15/95   S 3 492A     RHR SERVICE WATER PUMP A TRIPS               8/31/95   S 3.493B     FAILURE OF RHRSW HX B INLET VALVE             2/16/95   S
3.452 HPCI PUMP DISCH VALVE 1F006 FAILS AS IS 2/16/95 S
  ' 3.500A     JET PUMP NO.1 DISPLACED MIXER                 2/16/95   S 3.502A     JET PUMP NO.13 BROKEN INSTRUMENT LINE         8/31/95   S 3.505A     RECIRC PUMP A HIGH RUNBACK                   1/30/95   S 3.511       PRIMARY CONTAINMENT HYDROGEN INCREASES       10/20/95   S 3.515C     FW HEATER 14A DRAIN VALVE FAILS OPEN         3/17/95   S 3.5168     FW HEATER 13A DRAIN VALVE FAILS CLOSED         3/3/95 S 3.517A     FW HEATER 12B DRAIN VALVE FAILS OPEN           3/3/95 S 3.517E     FW HEATER 16B DRAIN VALVE FAILS OPEN         8/13/95   S               l i
3.456 RCIC FAILS TO AUTO START 1/30/95 S
      '    ~~
3.459A RCIC STEAM SUPPLY HV49-1F008 ISOLATES 1/30/95 S
Eidly',~Oece[nbeiO4,1996                                               Page 7 of 12 l
3.462 RCIC COOLING WATER VLV 1F046 FAILS AS IS 1/30/95 S
t 3.464C RCIC ISOL VLV HV49-1F076 FAILS AS-IS 2/16/95 S
3.471A DRYWELL AREA UNIT COOLER FAN 1 A1 TRIP 2/8/95 S
3.471E DRYWELL AREA UNIT COOLER FAN 1E1 TRIP 2/15/95 S
l 3.472A DRYWELL AREA UNIT COOLER FAN 1 A2 TRIP 2/16/95 S
3.472E DRYWELL AREA UNIT COOLER FAN 1E2 TRIP 10/12/95 S
3.474 SUPP POOL AIR LEAK TO REACTOR ENCLOSURE 8/31/95 S
3.483A RECW PUMP TRIP (A) 1/30/95 S
3.483C RECW PUMP TRIP -(BOTH) 2/8/95 S
3.487 LOSS OF SW TO MAIN TURB LUBE OIL COOLERS 9/9/95 S
3.488B SERVICE WATER PUMP B TRIPS 2/15/95 S
)
3.489A ESW PUMP A TRIPS 2/8/95 S
3.490A ESW VLV HV11-121 Fall TO AUTO SWAP 2/8/95 S
3.490E ESW VLV HV11-055A FAILS TO AUTO SWAP 2/15/95 S
3 492A RHR SERVICE WATER PUMP A TRIPS 8/31/95 S
3.493B FAILURE OF RHRSW HX B INLET VALVE 2/16/95 S
' 3.500A JET PUMP NO.1 DISPLACED MIXER 2/16/95 S
3.502A JET PUMP NO.13 BROKEN INSTRUMENT LINE 8/31/95 S
3.505A RECIRC PUMP A HIGH RUNBACK 1/30/95 S
3.511 PRIMARY CONTAINMENT HYDROGEN INCREASES 10/20/95 S
3.515C FW HEATER 14A DRAIN VALVE FAILS OPEN 3/17/95 S
3.5168 FW HEATER 13A DRAIN VALVE FAILS CLOSED 3/3/95 S
3.517A FW HEATER 12B DRAIN VALVE FAILS OPEN 3/3/95 S
3.517E FW HEATER 16B DRAIN VALVE FAILS OPEN 8/13/95 S
Eidly',~Oece[nbeiO4,1996 Page 7 of 12
~~


E Test No   Title                                   Test Date Result 3.518D   FW HEATER 15B DRAIN VALVE FAILS CLOSED       8/13/95 S               l 3.519C   FW HEATER 14C DRAIN VALVE FAILS OPEN         8/13/95 S               i 3.520A   FW HEATER 12C DRAIN VALVE FAILS CLOSED       8/31/95 S               t 3.5208   FW HEATER 13C DRAIN VALVE FAILS CLOSED       8/31/95 S 3.521A   FW HEATER 12A DUMP VALVE FAILS OPEN           9/9/95 S 3.521E   FW HEATER 16A DUMP VALVE FAILS OPEN           9/9/95 S 3.522D   FW HEATER 15A DUMP VALVE FAILS CLOSED     10/11/95 S 3.523C   FW HEATER 14B DUMP VALVE FAILS OPEN       10/11/95 S 3.524B   FW HEATER 13B DUMP VALVE FAILS CLOSED     10/19/95 S 3,525A   FW HEATER 12C DUMP VALVE FAILS OPEN       10/12/95 S 3.525E   FW HEATER 16C DUMP VALVE FAILS OPEN       10/20/95 S 3.526D   FW HEATER 15C DUMP VALVE FAILS CLOSED     10/19/95 S 3.527A   STEAM LEAK DET NUMAC TIS 25-101 A FAILS       2/8/95 S                 h 3.528A   RHR CNTMNT SPRAY VALVE F016A FAILS AS-IS   2/15/95 S 3.529A   RX PRESS XMITTER PT42-103A FAILS HIGH         4/5/95 S 3.5298   RX PRESS XMITTER PT42-103A FAILS LOW         4/5/95 S 3.529C   RX PRESS XMITTER PT42-103B FAILS HIGH         4/5/95 S S
E Test No Title Test Date Result 3.518D FW HEATER 15B DRAIN VALVE FAILS CLOSED 8/13/95 S
3.529D   RX PRESS XMITTER PT42-103B FAILS LOW         4/5/95                   f 3.530     MAIN TURBINE FAILS TO TRIP                 2/17/95 S                 :
l 3.519C FW HEATER 14C DRAIN VALVE FAILS OPEN 8/13/95 S
3.534     TURBINE TURNING GEAR MOTOR TRIPS           11/12/95 S 3.535A   1 A1 MOIST SEP DR TK DRN VLV FAILS CLOSED 11/12/95 S 3.535E   1C1 MOIST SEP DR TK DRN VLV FAILS CLOSED   11/12/95 S 3.536A   1 A1 MOIST SEP DR TK DRN VLV FAILS OPEN   11/12/95 S f
i 3.520A FW HEATER 12C DRAIN VALVE FAILS CLOSED 8/31/95 S
3.537A   1 A1 MOIST SEP DR TK DMP VLV FAILS CLOSED 11/12/95 S I
t 3.5208 FW HEATER 13C DRAIN VALVE FAILS CLOSED 8/31/95 S
3.537E   1C1 MOIST SEP DR TK DMP VLV FAILS CLOSED   11/12/95 S 3.538A   1 A1 MOIST SEP DRN TK DMP VLV FAILS OPEN   11/12/95 S                 -
3.521A FW HEATER 12A DUMP VALVE FAILS OPEN 9/9/95 S
3.538B   1 A2 MOIST SEP DRN TK DMP VLV FAILS OPEN   2/17/95 S 3.538C   181 MOIST SEP DRN TK DMP VLV FAILS OPEN     2/17/95 S 3.538D   182 MOIST SEP DRN TK DMP VLV FAILS OPEN     2/17/95 S 3.538E   1C1 MOIST SEP DRN TK DMP VLV FAILS OPEN     2/17/95 8 YridaylDecerbi5irr~0T4 55~                                       Page8of5
3.521E FW HEATER 16A DUMP VALVE FAILS OPEN 9/9/95 S
3.522D FW HEATER 15A DUMP VALVE FAILS CLOSED 10/11/95 S
3.523C FW HEATER 14B DUMP VALVE FAILS OPEN 10/11/95 S
3.524B FW HEATER 13B DUMP VALVE FAILS CLOSED 10/19/95 S
3,525A FW HEATER 12C DUMP VALVE FAILS OPEN 10/12/95 S
3.525E FW HEATER 16C DUMP VALVE FAILS OPEN 10/20/95 S
3.526D FW HEATER 15C DUMP VALVE FAILS CLOSED 10/19/95 S
3.527A STEAM LEAK DET NUMAC TIS 25-101 A FAILS 2/8/95 S
h 3.528A RHR CNTMNT SPRAY VALVE F016A FAILS AS-IS 2/15/95 S
3.529A RX PRESS XMITTER PT42-103A FAILS HIGH 4/5/95 S
3.5298 RX PRESS XMITTER PT42-103A FAILS LOW 4/5/95 S
3.529C RX PRESS XMITTER PT42-103B FAILS HIGH 4/5/95 S
f 3.529D RX PRESS XMITTER PT42-103B FAILS LOW 4/5/95 S
3.530 MAIN TURBINE FAILS TO TRIP 2/17/95 S
3.534 TURBINE TURNING GEAR MOTOR TRIPS 11/12/95 S
3.535A 1 A1 MOIST SEP DR TK DRN VLV FAILS CLOSED 11/12/95 S
3.535E 1C1 MOIST SEP DR TK DRN VLV FAILS CLOSED 11/12/95 S
f 3.536A 1 A1 MOIST SEP DR TK DRN VLV FAILS OPEN 11/12/95 S
3.537A 1 A1 MOIST SEP DR TK DMP VLV FAILS CLOSED 11/12/95 S
I 3.537E 1C1 MOIST SEP DR TK DMP VLV FAILS CLOSED 11/12/95 S
3.538A 1 A1 MOIST SEP DRN TK DMP VLV FAILS OPEN 11/12/95 S
3.538B 1 A2 MOIST SEP DRN TK DMP VLV FAILS OPEN 2/17/95 S
3.538C 181 MOIST SEP DRN TK DMP VLV FAILS OPEN 2/17/95 S
3.538D 182 MOIST SEP DRN TK DMP VLV FAILS OPEN 2/17/95 S
3.538E 1C1 MOIST SEP DRN TK DMP VLV FAILS OPEN 2/17/95 8
YridaylDecerbi5irr~0T4 55~
Page8of5


i l
i Test No Title Test Date Result 3.538F 1C2 MOIST SEP DRN TK DMP VLV FAILS OPEN 2/17/95 S
Test No     Title                                         Test Date Result 3.538F       1C2 MOIST SEP DRN TK DMP VLV FAILS OPEN             2/17/95   S 3.539       GEN ALTERREX TEMPERATURE CV FAILS CLOSED         11/12/95     S 3.542       GEN AUTO VOLTAGE REGULATOR FAILS HIGH               2/17/95   S 3.543       GEN AUTO VOLTAGE REGULATOR FAILS LOW                 2/17/95 S 3.544       REACTOR CAVITY SEALS NO. 3/4 LEAKAGE             10/11/95   S 3.545       STATOR COOLING WATER FLOW SWITCH FAILS           10/10/95   S 3.547       CRD PUMP TRIPS ON CLOGGED SUCTION FILTER             5/19/95 S 3.548       MAIN CONDENSER HOTWELL LEAK                       10/10/95   S                       ;
3.539 GEN ALTERREX TEMPERATURE CV FAILS CLOSED 11/12/95 S
3.549       COARSE HOTWELL REJECT VALVE FAILS OPEN               5/19/95 S 3.550       MS SUPPLY VLV HV01-109 FAILS AS-IS                   8/13/95 S 3.551       ADS FAILS TO INITIATE                               2/15/95 S 3.552A     RFP DISCH CHK VLV HV06105A FAILS OPEN               8/12/95 S 3.552B     RFP DISCH CHK VLV HV06-1058 FAILS OPEN               8/12/95 S                       :
3.542 GEN AUTO VOLTAGE REGULATOR FAILS HIGH 2/17/95 S
3.552C       RFP DISCH CHK VLV HV06-105C FAILS OPEN               8/12/95 S 3.553A     TURBINE CONTROL VALVE NO.1 FAILS OPEN               8/13/95   S                       l 3.553B       TURBINE CONTROL VALVE NO. 2 FAILS OPEN             8/13/95   S                       )
3.543 GEN AUTO VOLTAGE REGULATOR FAILS LOW 2/17/95 S
3.553C       TURBINE CONTROL VALVE NO. 3 FAILS OPEN             8/13/95   S 3.553D       TURBINE CONTROL VALVE NO. 4 FAILS OPEN             8/13/95   S 3.554       MAIN TURBINE PMG FAILS                             8/13/95   S 3.555       CONTROL RODS Fall TO SCRAM (0-120)                 9/10/95   S 3.556A       RFP A M/A STATION SWAPS TO MANUAL               10/19/95     S 3.556B       RFP B M/A STATION SWAPS TO MANUAL               10/10/95     S 3.556C       RFP C M/A STATION SWAPS TO MANUAL               10/10/95   S 3.556D       RFP A. B & C M/A STATIONS SWAP TO MANUAL         10/19/95   S 3.556E       FWC MASTER CONTROLLER SWAPS TO MANUAL           10/19/95   S 4.002       BUS TABLE: 12 UNIT AUXILIARY BUS                   11/6/95   S 4.005       BUS TABLE: 4 KV SAFEGUARD BUS D11               10/18/95   S 4.009       BUS TABLE: 4 KV SAFEGUARD BUS D114               10/18/95   S 4.015       BUS TABLE: GEN AREA LOAD CENTER 114A             8/13/95   S 4.019       BUS TABLE: GENERATOR AREA LC 124A               10/17/95   -S Friday, December 04,1998                                                       Page 9 of 12
3.544 REACTOR CAVITY SEALS NO. 3/4 LEAKAGE 10/11/95 S
3.545 STATOR COOLING WATER FLOW SWITCH FAILS 10/10/95 S
3.547 CRD PUMP TRIPS ON CLOGGED SUCTION FILTER 5/19/95 S
3.548 MAIN CONDENSER HOTWELL LEAK 10/10/95 S
3.549 COARSE HOTWELL REJECT VALVE FAILS OPEN 5/19/95 S
3.550 MS SUPPLY VLV HV01-109 FAILS AS-IS 8/13/95 S
3.551 ADS FAILS TO INITIATE 2/15/95 S
3.552A RFP DISCH CHK VLV HV06105A FAILS OPEN 8/12/95 S
3.552B RFP DISCH CHK VLV HV06-1058 FAILS OPEN 8/12/95 S
3.552C RFP DISCH CHK VLV HV06-105C FAILS OPEN 8/12/95 S
3.553A TURBINE CONTROL VALVE NO.1 FAILS OPEN 8/13/95 S
3.553B TURBINE CONTROL VALVE NO. 2 FAILS OPEN 8/13/95 S
)
3.553C TURBINE CONTROL VALVE NO. 3 FAILS OPEN 8/13/95 S
3.553D TURBINE CONTROL VALVE NO. 4 FAILS OPEN 8/13/95 S
3.554 MAIN TURBINE PMG FAILS 8/13/95 S
3.555 CONTROL RODS Fall TO SCRAM (0-120) 9/10/95 S
3.556A RFP A M/A STATION SWAPS TO MANUAL 10/19/95 S
3.556B RFP B M/A STATION SWAPS TO MANUAL 10/10/95 S
3.556C RFP C M/A STATION SWAPS TO MANUAL 10/10/95 S
3.556D RFP A. B & C M/A STATIONS SWAP TO MANUAL 10/19/95 S
3.556E FWC MASTER CONTROLLER SWAPS TO MANUAL 10/19/95 S
4.002 BUS TABLE: 12 UNIT AUXILIARY BUS 11/6/95 S
4.005 BUS TABLE: 4 KV SAFEGUARD BUS D11 10/18/95 S
4.009 BUS TABLE: 4 KV SAFEGUARD BUS D114 10/18/95 S
4.015 BUS TABLE: GEN AREA LOAD CENTER 114A 8/13/95 S
4.019 BUS TABLE: GENERATOR AREA LC 124A 10/17/95
-S Friday, December 04,1998 Page 9 of 12


Test No   Title                                 Test Date Result 4.029   BUS TABLE: 120 VAC PANEL 10Y101           2/16/95 S 4.033   BUS TABLE: 120 VAC PANEL 10Y105           10/17/95 S 4.035   BUS TABLE: 120 VAC PANEL 10Y109           2/15/95 S 4.041   BUS TABLE: 125/250 VDC BUS 1 AD105       10/19/95 S 4.045   BUS TABLE: 125/250 VDC BUS 10D114       10/27/95 S 4.046   BUS TABLE: DC BUS 1AD108                   5/15/95 S 4.047   BUS TABLE: DC BUS 1BD108                   5/15/95 S 4.048   BUS TABLE: DC BUS 1CD108                   5/15/95 S 4.049   BUS TABLE: DC BUS 1DD108                   5/15/95 S 4.053   BUS TABLE: APRM UPS BUS 1 AY185           5/15/95 S 4.054     BUS TABLE: APRM UPS BUS 1BY185             5/15/95 S 5.02A   REClRC LOOP A RUPTURE PERFORMANCE TEST     5/4/95 S 5.05     TOTAL LOSS OF INSTRUMENT AIR               5/12/95 S 5.07A                                               5/3/95 S LOSS OF SAFEGUARD BUS D11 (EMERG POWER) 5.09A   LOSS OF NON-SAFEGUARD LOAD CENTER 114A     5/3/95 S 5.09E   LOSS OF NON-SAFEGUARD LOAD CENTER 124A     5/3/95 S 5.10A     LOSS OF 120 VAC INSTRUMENT BUS 10Y101       5/3/95 S 5.10E     LOSS OF 120 VAC INSTRUMENT BUS 10Y105       5/3/95 S 5.10G     LOSS OF 120 VAC INSTRUMENT BUS 10Y109   11/26/95 S 5.11 A   LOSS OF 125/250 VDC BUS 1 AD105             5/4/95 S 5.11 E   LOSS OF 125/250 VDC BUS 10D114             5/3/95 6 5.16A     COMPLETE LOSS OF RX ENCL COOLING WATER   10/18/95 S 5.17G     TRIP OF TWO CONDENSATE PUMPS               5/4/95 S 5.25C     HPCI INADVERTANT INITIATION                 5/4/95 S
Test No Title Test Date Result 4.029 BUS TABLE: 120 VAC PANEL 10Y101 2/16/95 S
!                                        5.29A     MAIN FEED LINE A BREAK INSIDE DRYWELL   11/26/95 S j                                         5.34A     RPS AND ARI Fall TO SCRAM REACTOR         5/12/95 S 6.10                                               10/16/95  S STEADY STATE PERF @ 25% PWR FOR 1 HR.
4.033 BUS TABLE: 120 VAC PANEL 10Y105 10/17/95 S
6.11                                              10/16/95 S STEADY STATE PERF @ 75% PWR FOR 1 HR.
4.035 BUS TABLE: 120 VAC PANEL 10Y109 2/15/95 S
6.12     STEADY STATE PERF @ 100% PWR FOR 1 HR. 10/16/95 S 7.01     MANUAL SCRAM                             4/10/95 S
4.041 BUS TABLE: 125/250 VDC BUS 1 AD105 10/19/95 S
                                          $15th~I5cember 04,1598                                       Page 10 of12
4.045 BUS TABLE: 125/250 VDC BUS 10D114 10/27/95 S
4.046 BUS TABLE: DC BUS 1AD108 5/15/95 S
4.047 BUS TABLE: DC BUS 1BD108 5/15/95 S
4.048 BUS TABLE: DC BUS 1CD108 5/15/95 S
4.049 BUS TABLE: DC BUS 1DD108 5/15/95 S
4.053 BUS TABLE: APRM UPS BUS 1 AY185 5/15/95 S
4.054 BUS TABLE: APRM UPS BUS 1BY185 5/15/95 S
5.02A REClRC LOOP A RUPTURE PERFORMANCE TEST 5/4/95 S
5.05 TOTAL LOSS OF INSTRUMENT AIR 5/12/95 S
5.07A LOSS OF SAFEGUARD BUS D11 (EMERG POWER) 5/3/95 S
5.09A LOSS OF NON-SAFEGUARD LOAD CENTER 114A 5/3/95 S
5.09E LOSS OF NON-SAFEGUARD LOAD CENTER 124A 5/3/95 S
5.10A LOSS OF 120 VAC INSTRUMENT BUS 10Y101 5/3/95 S
5.10E LOSS OF 120 VAC INSTRUMENT BUS 10Y105 5/3/95 S
5.10G LOSS OF 120 VAC INSTRUMENT BUS 10Y109 11/26/95 S
5.11 A LOSS OF 125/250 VDC BUS 1 AD105 5/4/95 S
5.11 E LOSS OF 125/250 VDC BUS 10D114 5/3/95 6
5.16A COMPLETE LOSS OF RX ENCL COOLING WATER 10/18/95 S
5.17G TRIP OF TWO CONDENSATE PUMPS 5/4/95 S
5.25C HPCI INADVERTANT INITIATION 5/4/95 S
5.29A MAIN FEED LINE A BREAK INSIDE DRYWELL 11/26/95 S
j 5.34A RPS AND ARI Fall TO SCRAM REACTOR 5/12/95 S
6.10 STEADY STATE PERF @ 25% PWR FOR 1 HR.
10/16/95 S
6.11 STEADY STATE PERF @ 75% PWR FOR 1 HR.
10/16/95 S
6.12 STEADY STATE PERF @ 100% PWR FOR 1 HR.
10/16/95 S
7.01 MANUAL SCRAM 4/10/95 S
$15th~I5cember 04,1598 Page 10 of12


Test No     Title                                           Test Date Result 7.02       SIMULTANEOUS TRIP OF ALL FEEDWATER PUMPS         4/12/95 S 7.03                                                         4/12/95  S CLOSURE OF ALL MSIVS @ 100% POWER 7.04       TRIP OF BOTH RECIRC PUMPS AT RATED POWER           4/10/95 S 7.05       SINGLE RECIRC PUMP TRIP                           4/10/95 S 7.06       TURBINE TRIP WITHIN BYPASS CAPABILIT(             10/16/95 S 7.08       RECIRC LOOP RUPTURE W/ LOSS OFFSITE PWR           4/12/95 S 7.09       MAX SIZE UNISOLABLE MSL RUPTURE                   4/12/95 S 8.278       RHR PUMP A BREAKER RACKED OUT                     5/19/95 S d
Test No Title Test Date Result 7.02 SIMULTANEOUS TRIP OF ALL FEEDWATER PUMPS 4/12/95 S
8.279       RHR PUMP B BREAKER RACKED OUT                     5/19/95 S 8.280       RHR PUMP C BREAKER RACKED OUT                     5/19/95 S 8.281       RHR PUMP D BREAKER RACKED OUT                     5/19/95 S 8.299     MANUAL HOTWELL MAKEUP ISOLATION VALVES             9/10/95 S 8.300       RE Manual Test Switch HSXX-198A-5                 4/6/95 S 8.301       RE Manual Test Switch HSXX-1988-5                 4/6/95 S 8.302       REAC ENCL SUPPLY & EXH FANS RESTART               9/10/95 S 8.303     T-217 ARI RESET WITH TRIP SIGNAL                 10/10/95 S I
7.03 CLOSURE OF ALL MSIVS @ 100% POWER 4/12/95 S
8.304     MAIN STEAM BARRIER BLOCK VALVE HV41-142           9/10/95 S             l 8.305     MAIN STEAM BARRIER BLOCK VALVE HV41-143           9/10/95 S 8.306     RECW B/UP SUPPLY TO DWCW FDR BREAKER               7/14/95 S 8.309     T-251 HPCI CS VLV 1F006 FEEDER BREAKER           10/12/95 S 8.310     T-251 HPCI FWVLV 1F105 FEEDER BREAKER             10/12/95 S 8.323     SINGLE LOOP NEUT MONITORING OPERATIONS           10/10/95 6 8.324     COND TRANSFER PUMPS LOW LVL SELECTOR SW           10/9/95 S 8.325     RWST FILL FROM RADWASTE SAMPLE TANK               10/9/95 S 8.326     CST FILL FROM RADWASTE SAMPLE TANK                 10/9/95 S 8.327     CONDENSATE TRANSFER PUMPS SUCTION SELECT           10/9/95 S 8.328     CAVITY FILL FROM CST WITH HOSES                   10/10/95 S 8.329     CAVITY FILL FROM REFUEL WATER PUMPS               10/10/95 S 8.330     CAVITY FILL FROM CST W/ REFUEL WTR PUMPS         10/10/95 S 8.331     CST FILL FROM RWST W/ REFUEL WTR PUMPS             10/9/95 S I
7.04 TRIP OF BOTH RECIRC PUMPS AT RATED POWER 4/10/95 S
Friday, December 04,1998                                               Page 11 of 12
7.05 SINGLE RECIRC PUMP TRIP 4/10/95 S
7.06 TURBINE TRIP WITHIN BYPASS CAPABILIT(
10/16/95 S
7.08 RECIRC LOOP RUPTURE W/ LOSS OFFSITE PWR 4/12/95 S
7.09 MAX SIZE UNISOLABLE MSL RUPTURE 4/12/95 S
8.278 RHR PUMP A BREAKER RACKED OUT 5/19/95 S
8.279 RHR PUMP B BREAKER RACKED OUT 5/19/95 S
d 8.280 RHR PUMP C BREAKER RACKED OUT 5/19/95 S
8.281 RHR PUMP D BREAKER RACKED OUT 5/19/95 S
8.299 MANUAL HOTWELL MAKEUP ISOLATION VALVES 9/10/95 S
8.300 RE Manual Test Switch HSXX-198A-5 4/6/95 S
8.301 RE Manual Test Switch HSXX-1988-5 4/6/95 S
8.302 REAC ENCL SUPPLY & EXH FANS RESTART 9/10/95 S
8.303 T-217 ARI RESET WITH TRIP SIGNAL 10/10/95 S
I 8.304 MAIN STEAM BARRIER BLOCK VALVE HV41-142 9/10/95 S
8.305 MAIN STEAM BARRIER BLOCK VALVE HV41-143 9/10/95 S
8.306 RECW B/UP SUPPLY TO DWCW FDR BREAKER 7/14/95 S
8.309 T-251 HPCI CS VLV 1F006 FEEDER BREAKER 10/12/95 S
8.310 T-251 HPCI FWVLV 1F105 FEEDER BREAKER 10/12/95 S
8.323 SINGLE LOOP NEUT MONITORING OPERATIONS 10/10/95 6
8.324 COND TRANSFER PUMPS LOW LVL SELECTOR SW 10/9/95 S
8.325 RWST FILL FROM RADWASTE SAMPLE TANK 10/9/95 S
8.326 CST FILL FROM RADWASTE SAMPLE TANK 10/9/95 S
8.327 CONDENSATE TRANSFER PUMPS SUCTION SELECT 10/9/95 S
8.328 CAVITY FILL FROM CST WITH HOSES 10/10/95 S
8.329 CAVITY FILL FROM REFUEL WATER PUMPS 10/10/95 S
8.330 CAVITY FILL FROM CST W/ REFUEL WTR PUMPS 10/10/95 S
8.331 CST FILL FROM RWST W/ REFUEL WTR PUMPS 10/9/95 S
Friday, December 04,1998 Page 11 of 12


, Test No     Title                                   Test Date Result 8.332       DIESEL GEN D11 FIRE ALARM DEFEAT         10/19/95                   S 8.333       DIESEL GEN D12 FIRE ALARM DEFEAT         10/19/95                   S 8.334       DIESEL GEN D13 FIRE ALARM DEFEAT         10/19/95                   S 8.335       DIESLL GEN D14 FIRE ALARM DEFEAT         10/19/95                   S 8.336       HS76-151 A RX ENCUREFUEL ISOL INTERLOCK 10/19/95                   S 8.337       HS76-151B RX ENCUREFUEL ISOL INTERLOCK   10/12/95                   S 8.338       HS76-152A RX ENCUREFUEL ISOL INTERLOCK   10/13/95                   S 8.339       HS76-152B RX ENCUREFUEL ISOL INTERLOCK   10/19/95                   S 8.344       COND TRANSFER ISOL VLVS TO RHR LOOP A     10/8/95                   S 8.345       COND TRANSFER ISOL VLVS TO RHR LOOP B     10/8/95                   S e
Test No Title Test Date Result 8.332 DIESEL GEN D11 FIRE ALARM DEFEAT 10/19/95 S
1 i
8.333 DIESEL GEN D12 FIRE ALARM DEFEAT 10/19/95 S
          ^ ~                        ~'
8.334 DIESEL GEN D13 FIRE ALARM DEFEAT 10/19/95 S
Elda[D'ecember535i~                                                               Page 12 of 12 l
8.335 DIESLL GEN D14 FIRE ALARM DEFEAT 10/19/95 S
8.336 HS76-151 A RX ENCUREFUEL ISOL INTERLOCK 10/19/95 S
8.337 HS76-151B RX ENCUREFUEL ISOL INTERLOCK 10/12/95 S
8.338 HS76-152A RX ENCUREFUEL ISOL INTERLOCK 10/13/95 S
8.339 HS76-152B RX ENCUREFUEL ISOL INTERLOCK 10/19/95 S
8.344 COND TRANSFER ISOL VLVS TO RHR LOOP A 10/8/95 S
8.345 COND TRANSFER ISOL VLVS TO RHR LOOP B 10/8/95 S
e 1
Elda[D'ecember535i~
Page 12 of 12
^ ~
~'
l
l


PCCO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT LGS SIMULATOR TESTING PERFORMED IN 1996
PCCO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT LGS SIMULATOR TESTING PERFORMED IN 1996
      - - - _ - - - - - - - - - - - - - - - - - - - - _ - _ - - - _ - - _ - - - - - _ - - - - - - - - _ _ _ - (
(


LGS Simulator Testing Completedin 1996 Test No                           Title                                           Test Date Results 1.01                             COMPUTER REAL TIME TEST                           11/10/96     S 1.11                             SIMULATOR CORE RELOAD VERIFICATION                     6/30/96 S 1.12                             SIM/REF PLANT CRIT PAR COMPARISON                     8/11/96 S 2.25.Ill                           DEAD BUS AUTO START OF DIESEL GENERATORS             4/15/96   S 2.26.l.F                           D11-D14 SAFEGUARD BUS BREAKER LOGIC                 4/24/96   S                   1 2 . 2 6 .111                       SAFEGUARD BUS SUPPLY BREAKER LOGIC                   4/24/96   S 3.003B                             CORE POWER OSCILLATIONS (OUT-OF-PHASE)           11/11/96     S 3.005A                             APRM CHAN B RECORDER FAILS AS-IS                       5/1/96 S 3.005B                             APRM CHAN B FAILS INOP                             2/12/96     S 3.009B                             APRM CHAN F FAILS INOP                             3/26/96   S 3.011B                             RBM CHAN B FAILS INOP                             2/13/96     S                     ;
LGS Simulator Testing Completedin 1996 Test No Title Test Date Results 1.01 COMPUTER REAL TIME TEST 11/10/96 S
3.012B                             LPRM 40-57B UPSCALE FAILURE                             1/5/96 S 3.012F                             LPRM 32-49C UPSCALE FAILURE                             2/7/96 S 3.013B                             LPRM 16-49A DOWNSCALE FAILURE                     2/12/96     S 3.013F                             LPRM 48-33C DOWNSCALE FAILURE                     2/13/96     S                     l 3.0158                             LF'RM 40-25A DRIFT (-25 TO +25)                   3/26/96     S                   l 3.017A                             CONTROL ROD XX-W FAILURE (DRIFT IN)               4/23/96     S 3.017B                             CONTROL ROD XX-W Fait.URE (DRIFT OUT)             4/23/96     S 3.017C                             CONTROL ROD XX-W FAILURE (ACCUM TRBL)             4/23/96     S 3.017D                             CONTROL ROD XX-W FAILURE (STUCK)                 4/23/96     S 3.017E                             CONTROL ROD XX-W FAILURE (UNCOUPLED)             4/23/96     S                   I 3.017F                             CONTROL ROD XX-W FAILURE (SCRAMMED)               4/23/96     S 3.017G                             CONTROL ROD XX-XX FAILS TO SCRAM                 4/23/96     S 3.020B                             APRM CHANNEL B FAILS 0-125%                       4/23/96     S 3.020F                             APRM CHANNEL F FAILS 0-125%                       9/16/96     S 3.027B                             LOSS OF NORMAL POWER TO RPS CHANNEL B             3/26/96     S 3.028C                             REACTOR SCRAM (BANK 2)                           11/12/96     S 3.029D                             RPS FAILS TO SCRAM (CHAN B)                       7/28/96     S
1.11 SIMULATOR CORE RELOAD VERIFICATION 6/30/96 S
                                                                                          ~ ~ ~ ~
1.12 SIM/REF PLANT CRIT PAR COMPARISON 8/11/96 S
5 day, De$e~mber 04,1998                                                                           Page 1 of12
2.25.Ill DEAD BUS AUTO START OF DIESEL GENERATORS 4/15/96 S
                                                                                                                                  .              ..r ..
2.26.l.F D11-D14 SAFEGUARD BUS BREAKER LOGIC 4/24/96 S
1 2. 2 6.111 SAFEGUARD BUS SUPPLY BREAKER LOGIC 4/24/96 S
3.003B CORE POWER OSCILLATIONS (OUT-OF-PHASE) 11/11/96 S
3.005A APRM CHAN B RECORDER FAILS AS-IS 5/1/96 S
3.005B APRM CHAN B FAILS INOP 2/12/96 S
3.009B APRM CHAN F FAILS INOP 3/26/96 S
3.011B RBM CHAN B FAILS INOP 2/13/96 S
3.012B LPRM 40-57B UPSCALE FAILURE 1/5/96 S
3.012F LPRM 32-49C UPSCALE FAILURE 2/7/96 S
3.013B LPRM 16-49A DOWNSCALE FAILURE 2/12/96 S
3.013F LPRM 48-33C DOWNSCALE FAILURE 2/13/96 S
l 3.0158 LF'RM 40-25A DRIFT (-25 TO +25) 3/26/96 S
l 3.017A CONTROL ROD XX-W FAILURE (DRIFT IN) 4/23/96 S
3.017B CONTROL ROD XX-W Fait.URE (DRIFT OUT) 4/23/96 S
3.017C CONTROL ROD XX-W FAILURE (ACCUM TRBL) 4/23/96 S
3.017D CONTROL ROD XX-W FAILURE (STUCK) 4/23/96 S
3.017E CONTROL ROD XX-W FAILURE (UNCOUPLED) 4/23/96 S
I 3.017F CONTROL ROD XX-W FAILURE (SCRAMMED) 4/23/96 S
3.017G CONTROL ROD XX-XX FAILS TO SCRAM 4/23/96 S
3.020B APRM CHANNEL B FAILS 0-125%
4/23/96 S
3.020F APRM CHANNEL F FAILS 0-125%
9/16/96 S
3.027B LOSS OF NORMAL POWER TO RPS CHANNEL B 3/26/96 S
3.028C REACTOR SCRAM (BANK 2) 11/12/96 S
3.029D RPS FAILS TO SCRAM (CHAN B) 7/28/96 S
5 day, De$e~mber 04,1998 Page 1 of12
~ ~ ~ ~
..r


i Test No                                                                 Title                                 Test Date Results 3.044B                                                                   FW PUMP B CONTROLLER OUTPUT FAILS HIGH     5/8/96 S 3.045C                                                                   FW PUMP C CONTROLLER OUTPUT FAILS LOW     5/8/96 S 3.046B                                                                   STEAM FLOW XMITTER 1N003B FAILS 0-100% 4/29/96   S 3.061B                                                                   MSIV HV41-1FO22B FAILS OPEN             2/13/96   S 3.0628                                                                   MSIV HV41-1FO28B FAILS OPEN             3/26/96   S 3.063B                                                                   MSIV HV41-1FO22B FAILS CLOSED           9/16/96 S 3.064B                                                                 MSIV HV41-1F028B FAILS CLOSED           9/16/96   S 3.065                                                                   STM LEAK OUTSIDE PRIMARY CONTAINMENT     9/24/96   S 3.071A                                                                 LOSS OF EXTRACTION STEAM TO FW HTR 16A   2/12/96   S           j 3.072B                                                                 SJAE STM SUPPLY PCV07-101B FAILS CLOSED 7/28/96   S 3.074                                                                   MAIN CONDENSER AIR INLEAKAGE             11/4/96 S 3.078A                                                                   CONDENSATE PUMP ATRIP                     1/5/96 S 3.079B                                                                   COND FILTER /DEMIN B HI DIFF PRESSURE   4/16/96   S 3.079F                                                                   COND FILTER /DEMIN F HI DIFF PRESSURE     5/7/96 S 3.080B                                                                   CONDENSATE RECIRC VALVE FAILS CLOSED     9/25/96   S 3.086B                                                                   CIRCULATING WATER PUMP B TRIP           2/12/96   S 3.098                                                                   MAIN TRANSFORMER LOSS OF COOLING       10/24/96   S           l 3.100                                                                   MAIN TURBINE BRG #5 & #6 HIGH VIBRATION 9/16/96   S 3.104B                                                                 TURBINE CONTROL SYSTEM FAILS LOW         10/22/96   S 3.106A                                                                   EHC PRESSURE REGULATOR B FAILS HIGH     10/6/96   S 3.107B                                                                 BYPASS VALVE NO. 2 STICKS OPEN           2/12/96   S 3.107F                                                                 BYPASS VALVE NO. 6 STICKS OPEN           2/13/96   S 3.109                                                                   TURBINE ACCELERATION CONTROL FAILURE     11/12/96   S 3.112A                                                                 EHC PUMP A TRIPS                           2/7/96 S 3.115A                                                                 DRAWER INOP MCR FRESH AIR CHAN A & C       1/5/96 S 3.115AB                                                                 DRAWER INOP RX ENCLOSURE VENT EXH CHAN B 2/13/96   S 3.115AF                                                                 DRAWER INOP REFUEL FLOOR VENT EXH CHAN B 2/15/96   S 3.115AK                                                                 DRAWER INOP POST LOCA MONITOR CHAN B       2/7/96   S 3.115E                                                                   DRAWER INOP NORTH STACK RAD MONITOR       5/8/96   S 3.115J                                                                   DRAWER INOP RECOMBINER & H2 ANALYZER RMS   2/7/96   S
i Test No Title Test Date Results 3.044B FW PUMP B CONTROLLER OUTPUT FAILS HIGH 5/8/96 S
                                                                                                                                                                                  ~ ~ ~ ~ ~
3.045C FW PUMP C CONTROLLER OUTPUT FAILS LOW 5/8/96 S
FridayE5ber 04,1998
3.046B STEAM FLOW XMITTER 1N003B FAILS 0-100%
                                                                                                                                                                                ~
4/29/96 S
Page 2 of12
3.061B MSIV HV41-1FO22B FAILS OPEN 2/13/96 S
3.0628 MSIV HV41-1FO28B FAILS OPEN 3/26/96 S
3.063B MSIV HV41-1FO22B FAILS CLOSED 9/16/96 S
3.064B MSIV HV41-1F028B FAILS CLOSED 9/16/96 S
3.065 STM LEAK OUTSIDE PRIMARY CONTAINMENT 9/24/96 S
3.071A LOSS OF EXTRACTION STEAM TO FW HTR 16A 2/12/96 S
j 3.072B SJAE STM SUPPLY PCV07-101B FAILS CLOSED 7/28/96 S
3.074 MAIN CONDENSER AIR INLEAKAGE 11/4/96 S
3.078A CONDENSATE PUMP ATRIP 1/5/96 S
3.079B COND FILTER /DEMIN B HI DIFF PRESSURE 4/16/96 S
3.079F COND FILTER /DEMIN F HI DIFF PRESSURE 5/7/96 S
3.080B CONDENSATE RECIRC VALVE FAILS CLOSED 9/25/96 S
3.086B CIRCULATING WATER PUMP B TRIP 2/12/96 S
3.098 MAIN TRANSFORMER LOSS OF COOLING 10/24/96 S
l 3.100 MAIN TURBINE BRG #5 & #6 HIGH VIBRATION 9/16/96 S
3.104B TURBINE CONTROL SYSTEM FAILS LOW 10/22/96 S
3.106A EHC PRESSURE REGULATOR B FAILS HIGH 10/6/96 S
3.107B BYPASS VALVE NO. 2 STICKS OPEN 2/12/96 S
3.107F BYPASS VALVE NO. 6 STICKS OPEN 2/13/96 S
3.109 TURBINE ACCELERATION CONTROL FAILURE 11/12/96 S
3.112A EHC PUMP A TRIPS 2/7/96 S
3.115A DRAWER INOP MCR FRESH AIR CHAN A & C 1/5/96 S
3.115AB DRAWER INOP RX ENCLOSURE VENT EXH CHAN B 2/13/96 S
3.115AF DRAWER INOP REFUEL FLOOR VENT EXH CHAN B 2/15/96 S
3.115AK DRAWER INOP POST LOCA MONITOR CHAN B 2/7/96 S
3.115E DRAWER INOP NORTH STACK RAD MONITOR 5/8/96 S
3.115J DRAWER INOP RECOMBINER & H2 ANALYZER RMS 2/7/96 S
FridayE5ber 04,1998 Page 2 of12
~
~ ~ ~ ~ ~


Test No Title                                       Test Date Results 3.115N   DRAWER INOP RX ENCLOSURE COOLING WATER       7/28/96   S 3.115RA DRWR INOP RHRSW UNIT 1 HX RETURN HEADER       2/12/96   S 3.115RD DRAWER INOP RHRSW HX 18 OUTLET               9/16/96   S 3.115V   DRAWER INOP MAIN STEAM LINE CHAN B           7/28/96   S 3.136   STEAM LEAK OUTSIDE PRI CONT (1-100%)         9/24/96   S 3.138A   ADS /SRV 1FO13B FAILS - LEAKS                 1/14/96   S         l 3.1388   ADS /SRV 1FO13B FAILS - STUCK                 1/5/96   S 3.138C   ADS /SRV 1FO13B FAILS - OPEN ELECT             1/5/96 S 3.138D   ADS /SRV 1FO13B FAILS CLOSED                   1/5/96 S 3.138E   ADS /SRV 1FO13B FAILS OPEti MECH               1/5/96 S 3.142A   ADS /SRV 1FO13F FAILF. - LEAKS               1/14/96 S 3.142B   ADS /SRV 1FO13F FA LS - STUCK               1/14/96   S 3.142C   ADS /SRV 1FO13F FAILS - OPEN ELECT           2/12/96   S 3.142D   ADS /SRV 1FO13F FAILS - CLOSED               2/13/96   S 3.142E   ADS /SRV 1FO13F FAILS - OPEN MECH           2/15/96   S 3.146A   ADS /SRV 1FO13K FAILS - LEAKS               3/25/96   S 3.146B   ADS /SRV 1FO13K FAILS - STUCK               10/22/96   S 3.146C   ADS /SRV 1FO13K FAILS - OPEN ELECT           10/8/96   S 3.146D   ADS /SRV 1FO13K FAILS - CLOSED               9.25/96   S 3.146E   ADS /SRV 1FO13K FAILS - OPEN MECH           9/25/96   S 3.149B   ADS /SRV 1F013N FAILS - STUCK               10/23/96   S 3.149D   ADS /SRV 1FO13N FAILS - CLOSED             10/23/96   S 3.150C   ADS /SRV 1FO13S FAILS - OPEN ELECT         10/23/96   S 3.1518   SRV 1F013M DOWNCOMER LEAK 0-100%             2/13/96   S 3.156B   NSSSS GROUP 1B INADVERTENT ISOLATION         1/14/96   S 3.156F   NSSSS GROUP 1F INADVERTENT ISOLATION         2/7/96   S 3.1578   NSSSS GROUP 2B INADVERTENT ISOLATION         3/28/96   S 3.157F   NSSSS GROUP 2F INADVERTENT ISOLATION         7/28/96   S 3.159B   NSSSS GROUP 6B INADVERTENT ISOLATION         2/7/96   S           j 3.159F   NSSSS GROUP 6F INADVERTENT ISOLATION         2/7/96   S
Test No Title Test Date Results 3.115N DRAWER INOP RX ENCLOSURE COOLING WATER 7/28/96 S
                                                                                  ~            '
3.115RA DRWR INOP RHRSW UNIT 1 HX RETURN HEADER 2/12/96 S
Irl5a555Inber 04,1998                                             Page 3 of5
3.115RD DRAWER INOP RHRSW HX 18 OUTLET 9/16/96 S
3.115V DRAWER INOP MAIN STEAM LINE CHAN B 7/28/96 S
3.136 STEAM LEAK OUTSIDE PRI CONT (1-100%)
9/24/96 S
3.138A ADS /SRV 1FO13B FAILS - LEAKS 1/14/96 S
l 3.1388 ADS /SRV 1FO13B FAILS - STUCK 1/5/96 S
3.138C ADS /SRV 1FO13B FAILS - OPEN ELECT 1/5/96 S
3.138D ADS /SRV 1FO13B FAILS CLOSED 1/5/96 S
3.138E ADS /SRV 1FO13B FAILS OPEti MECH 1/5/96 S
3.142A ADS /SRV 1FO13F FAILF. - LEAKS 1/14/96 S
3.142B ADS /SRV 1FO13F FA LS - STUCK 1/14/96 S
3.142C ADS /SRV 1FO13F FAILS - OPEN ELECT 2/12/96 S
3.142D ADS /SRV 1FO13F FAILS - CLOSED 2/13/96 S
3.142E ADS /SRV 1FO13F FAILS - OPEN MECH 2/15/96 S
3.146A ADS /SRV 1FO13K FAILS - LEAKS 3/25/96 S
3.146B ADS /SRV 1FO13K FAILS - STUCK 10/22/96 S
3.146C ADS /SRV 1FO13K FAILS - OPEN ELECT 10/8/96 S
3.146D ADS /SRV 1FO13K FAILS - CLOSED 9.25/96 S
3.146E ADS /SRV 1FO13K FAILS - OPEN MECH 9/25/96 S
3.149B ADS /SRV 1F013N FAILS - STUCK 10/23/96 S
3.149D ADS /SRV 1FO13N FAILS - CLOSED 10/23/96 S
3.150C ADS /SRV 1FO13S FAILS - OPEN ELECT 10/23/96 S
3.1518 SRV 1F013M DOWNCOMER LEAK 0-100%
2/13/96 S
3.156B NSSSS GROUP 1B INADVERTENT ISOLATION 1/14/96 S
3.156F NSSSS GROUP 1F INADVERTENT ISOLATION 2/7/96 S
3.1578 NSSSS GROUP 2B INADVERTENT ISOLATION 3/28/96 S
3.157F NSSSS GROUP 2F INADVERTENT ISOLATION 7/28/96 S
3.159B NSSSS GROUP 6B INADVERTENT ISOLATION 2/7/96 S
j 3.159F NSSSS GROUP 6F INADVERTENT ISOLATION 2/7/96 S
Irl5a555Inber 04,1998 Page 3 of5
~


Test No   Title                                   Test Date Results 3.161A     NSSSS GROUP 8A INADVERTENT ISOLATION         9/9/96 S 3.161B     NSSSS GROUP BB INADVERTENT ISOLATION         9/9/96 S 3.162B     SEC CON & PClG B INADVERTENT ISOL           7/28/96 S 3.164     LOSS OF STEAM TO RECOMBINER PREHEATER     10/24/96   S 3.167     OFFGAS HEPA FILTER BLOCKAGE (1-100%)       2/13/96   S 3.171A     RHR PUMP A TRIP                           4/17/96   S 3.171B     RHR PUMP B TRIP                           4/17/96   S 3.171C     RHR PUMP C TRIP                           4/17/96   S 3.171D     RHR PUMP D TRIP                           4/17/96   S 3.172B     RHR PUMP 18 FAILS TO AUTO START           9/16/96   S 3.173       RHR SHUTDOWN COOLING SUCTION LINE LEAK   10/26/96 S 3.174B     RHR INJECTION VALVE 1F017B FAILS AS IS     9/17/96 S 3.175B     RHR PUMP SUCTION VALVE F004B FAILS AS IS   7/28/96 S 3.176D     RHR SDC SUCTION VALVE 1FOO9 FAILS AS IS   3/28/96 S 3.177B     RHR HX A BYPASS CONTROLLER FAILS LOW       9/16/96 S 3.182A     CORE SPRAY PUMP A TRIPS                     4/17/96 S 3.182B     CORE SPRAY PUMP B TRIPS                     4/17/96 S 3.182C     CORE SPRAY PUMP C TRIPS                     4/17/96 S 3.182D     CORE SPRAY PUMP D TRIPS                     4/17/96 S 3.183B     CORE SPRAY PUMP B FAILS TO AUTO STA.RT     9/17/96 S 3 1848     CORE SPRAY INBD VALVE 1FO37 FAILS AS IS     9/17/96 S 3.190A     RWCU DRAIN FLOW CONTROLLER FAILS OPEN       3/28/96 S 3.193     RWCU NONREGEN HX LEAK TO RECW(1-100%)     10/23/96   S 3.194     RWCU SUCTION LINE COOL LEAKAGE (1-100%)     9/24/96 S 3.195C     RWCU ISOL VALVE HV44-1F040 FAILS AS IS     1/14/96 S 3.197     SLC SOUlB VALVES Fall TO FIRE               3/26/96 S 3.198A     SLC PUMP A LOSS OF CONTROL POWER           3/26/96 S 3.1988     SLC PUMP B LOSS OF CONTROL POWER           3/26/96 S 3.198C     SLC PUMP C LOSS OF CONTROL POWER           3/26/96 S 3.202A     SRM CHANNEL B RECORDER FAILS AS-IS         3/10/96 S Eiiday, Dece5ber 04,1998                                         Page 4 of 12
Test No Title Test Date Results 3.161A NSSSS GROUP 8A INADVERTENT ISOLATION 9/9/96 S
3.161B NSSSS GROUP BB INADVERTENT ISOLATION 9/9/96 S
3.162B SEC CON & PClG B INADVERTENT ISOL 7/28/96 S
3.164 LOSS OF STEAM TO RECOMBINER PREHEATER 10/24/96 S
3.167 OFFGAS HEPA FILTER BLOCKAGE (1-100%)
2/13/96 S
3.171A RHR PUMP A TRIP 4/17/96 S
3.171B RHR PUMP B TRIP 4/17/96 S
3.171C RHR PUMP C TRIP 4/17/96 S
3.171D RHR PUMP D TRIP 4/17/96 S
3.172B RHR PUMP 18 FAILS TO AUTO START 9/16/96 S
3.173 RHR SHUTDOWN COOLING SUCTION LINE LEAK 10/26/96 S
3.174B RHR INJECTION VALVE 1F017B FAILS AS IS 9/17/96 S
3.175B RHR PUMP SUCTION VALVE F004B FAILS AS IS 7/28/96 S
3.176D RHR SDC SUCTION VALVE 1FOO9 FAILS AS IS 3/28/96 S
3.177B RHR HX A BYPASS CONTROLLER FAILS LOW 9/16/96 S
3.182A CORE SPRAY PUMP A TRIPS 4/17/96 S
3.182B CORE SPRAY PUMP B TRIPS 4/17/96 S
3.182C CORE SPRAY PUMP C TRIPS 4/17/96 S
3.182D CORE SPRAY PUMP D TRIPS 4/17/96 S
3.183B CORE SPRAY PUMP B FAILS TO AUTO STA.RT 9/17/96 S
3 1848 CORE SPRAY INBD VALVE 1FO37 FAILS AS IS 9/17/96 S
3.190A RWCU DRAIN FLOW CONTROLLER FAILS OPEN 3/28/96 S
3.193 RWCU NONREGEN HX LEAK TO RECW(1-100%)
10/23/96 S
3.194 RWCU SUCTION LINE COOL LEAKAGE (1-100%)
9/24/96 S
3.195C RWCU ISOL VALVE HV44-1F040 FAILS AS IS 1/14/96 S
3.197 SLC SOUlB VALVES Fall TO FIRE 3/26/96 S
3.198A SLC PUMP A LOSS OF CONTROL POWER 3/26/96 S
3.1988 SLC PUMP B LOSS OF CONTROL POWER 3/26/96 S
3.198C SLC PUMP C LOSS OF CONTROL POWER 3/26/96 S
3.202A SRM CHANNEL B RECORDER FAILS AS-IS 3/10/96 S
Eiiday, Dece5ber 04,1998 Page 4 of 12


Test No   Title                                       Test Date Results 3.202B   SRM CHANNEL B FAILS INOPERATIVE                 3/10/96 S 3.202C   SRM CHANNEL E DETECTOR STUCK                   3/10/96 S           ;
Test No Title Test Date Results 3.202B SRM CHANNEL B FAILS INOPERATIVE 3/10/96 S
3.206A   IRM CHANNEL B RECORDER FAILS AS-IS             3/10/96 S
3.202C SRM CHANNEL E DETECTOR STUCK 3/10/96 S
3.206B   IRM CHANNEL B FAILS INOPERATIVE                 3/10/96 S 3.206C   IRM CHANNEL B DETECTOR STUCK                   3/10/96   S           l 3.210A   1RM CHANNEL F RECORDER FAILS AS-IS             3/10/96   S 3.210B   IRM CHANNEL F FAILS INOPERATIVE               3/10/96   S 3.210C   IRM CHANNEL F DETECTOR STUCK                   3/10/96   S 3.213B   SRM CHANNEL B FAILS TO SELECTED VALUE         10/22/96 S 3.214B   IRM CHANNEL B FAILS TO SELECTED VALUE         3/10/96 S           ,
3.206A IRM CHANNEL B RECORDER FAILS AS-IS 3/10/96 S
3.214F   IRM CHANNEL F FAILS TO SELECTED VALUE         2/10/96 S 3.217B   RBM CHANNEL B FAILS TO SELECTED VALUE         1/14/96 S 3.228A   RX INSTRUMENT LINE BREAK AFTER 42-F047A       4/29/96 S
3.206B IRM CHANNEL B FAILS INOPERATIVE 3/10/96 S
.; 3.230A   RX INSTRUMENT LINE BREAK AFTER 42-F065A         5n/96 S 3.231C   RX INSTRUMENT LINE BREAK AFTER 42-F045C         5/7/96 S 3.232C   RX LEVEL XMITTER LT42-N060B FAILS HIGH         3/28/96 S 3.232D   RX LEVEL XMITTER LT42-N0E08 FAILS LOW         3/28/96 S 3.233C   RX LEVEL XMITTER DPT42-N0048 FAILS LOW         3/28/96 S 3.233D   RX LEVEL XMITTER DPT42-N004B FAILS LOW         3/28/96 S 3.234C   RX PRESS XMITTER PT42-N078B FAILS HIGH         3/28/96 S
3.206C IRM CHANNEL B DETECTOR STUCK 3/10/96 S
3 234D   RX PRESS XMITTER PT42-N0788 FAILS LOW         3/28/96 S
3.210A 1RM CHANNEL F RECORDER FAILS AS-IS 3/10/96 S
3.210B IRM CHANNEL F FAILS INOPERATIVE 3/10/96 S
3.210C IRM CHANNEL F DETECTOR STUCK 3/10/96 S
3.213B SRM CHANNEL B FAILS TO SELECTED VALUE 10/22/96 S
3.214B IRM CHANNEL B FAILS TO SELECTED VALUE 3/10/96 S
3.214F IRM CHANNEL F FAILS TO SELECTED VALUE 2/10/96 S
3.217B RBM CHANNEL B FAILS TO SELECTED VALUE 1/14/96 S
3.228A RX INSTRUMENT LINE BREAK AFTER 42-F047A 4/29/96 S
3.230A RX INSTRUMENT LINE BREAK AFTER 42-F065A 5n/96 S
3.231C RX INSTRUMENT LINE BREAK AFTER 42-F045C 5/7/96 S
3.232C RX LEVEL XMITTER LT42-N060B FAILS HIGH 3/28/96 S
3.232D RX LEVEL XMITTER LT42-N0E08 FAILS LOW 3/28/96 S
3.233C RX LEVEL XMITTER DPT42-N0048 FAILS LOW 3/28/96 S
3.233D RX LEVEL XMITTER DPT42-N004B FAILS LOW 3/28/96 S
3.234C RX PRESS XMITTER PT42-N078B FAILS HIGH 3/28/96 S
3 234D RX PRESS XMITTER PT42-N0788 FAILS LOW 3/28/96 S
~
~
3.2368   REFERENCE LEG 1D004B FLASHES                   9/16/06 S 3.236E   REFERENCE LEG 1D002 FLASHES                 10/14/96 3.237B    REFERENCE LEG 1D004B LEVEL DEFECT            9/17/96  S
3.2368 REFERENCE LEG 1D004B FLASHES 9/16/06 S
3.236E REFERENCE LEG 1D002 FLASHES 10/14/96
]
]
i 3.241A   FEEDWATER HEATER 12A TUBE LEAK                 11/4/96 S 3.2428   FEEDWATER HEATER 15B TUBE LEAK                 5/8/96 S 3.244C   REACTOR FEEDPUMP A HIGH VIBRATION           11/12/96   S 324A     REACTOR FEEDWATER PUMP C TRIPS                 1/5/96 S           r 3.247B   FW LOW FLOW CONTROL VALVE FAILS CLOSED       9/25/96   S 3.249B   RX FEEDPUMP B RECIRC VALVE MILS CLOSED       7/28/96   S f
3.237B REFERENCE LEG 1D004B LEVEL DEFECT 9/17/96 S
i 3.241A FEEDWATER HEATER 12A TUBE LEAK 11/4/96 S
3.2428 FEEDWATER HEATER 15B TUBE LEAK 5/8/96 S
3.244C REACTOR FEEDPUMP A HIGH VIBRATION 11/12/96 S
324A REACTOR FEEDWATER PUMP C TRIPS 1/5/96 S
r 3.247B FW LOW FLOW CONTROL VALVE FAILS CLOSED 9/25/96 S
3.249B RX FEEDPUMP B RECIRC VALVE MILS CLOSED 7/28/96 S
f
[
[
Er~I5a55 ember 04,1998                                             Page 5 of12
Er~I5a55 ember 04,1998 Page 5 of12


  .- .-      -        .-        -  - - . _ _ - _ . ~ . - . = - .. -               .  .  -- .
~. -. = -.. -
1 i
1 i
Test No Title                                                 Test Date Results 3.251B   FW S/U LEVEL CONTROL VALVE FAILS CLOSED                 3/10/96 S             '
Test No Title Test Date Results 3.251B FW S/U LEVEL CONTROL VALVE FAILS CLOSED 3/10/96 S
3.2528   FW LINE B RUPTURE INSIDE DRYWELL                       11/18/96   S 1
3.2528 FW LINE B RUPTURE INSIDE DRYWELL 11/18/96 S
3.2608   NETWORK LOAD TRANSIENT DECREASE                       11/11/96   S 3.263B   4KV SAFEGUARD BUS D12 FAULT                           10/23/96   S
1 3.2608 NETWORK LOAD TRANSIENT DECREASE 11/11/96 S
,        3.264A   MAIN GEN OUTPUT BKR 252-10113 TRIPS                     9/24/96   S 3.265B   STARTUP BUS BKR 20 TRIPS                                 11/5/96 S 3.266A   13.2KV SAFEGUARD XFMR BKR 101 TRIPS                     4/24/96   S             ,
3.263B 4KV SAFEGUARD BUS D12 FAULT 10/23/96 S
3.266B   13.2KV SAFEGUARD XFMR BKR 201 TRIPS                     4/30/96   S 3.267B   PLANT SERVICES LOAD CENTER 222 FAULT                   3/26/96   S 3.271A   114B RX AREA 440V LOAD CENTER FAULT                     3/25/96   S 3.271B   124B RX AREA 440V LOAD CENTER FAULT                   10/22/96   S 3.2738   214D PLANT SERVICES LOAD CENTER FAULT                 10/22/96   S
3.264A MAIN GEN OUTPUT BKR 252-10113 TRIPS 9/24/96 S
]       3.275B   D124 SAFEGUARD 440V LOAD CENTER FAULT                     5/8/96 S 3.277B   120 VAC PANEL 10Y102 FAULT                             10/7/96   S 2
3.265B STARTUP BUS BKR 20 TRIPS 11/5/96 S
3.2788   120 VAC PANEL 10Y106 FAULT                             3/25/96   S 3.278D   120 VAC PANEL 10Y110 FAULT                             10/6/96 S
3.266A 13.2KV SAFEGUARD XFMR BKR 101 TRIPS 4/24/96 S
.        3.282B   1FB 125/250 VDC 1BD105 FAULT                             5/8/96 S             !
3.266B 13.2KV SAFEGUARD XFMR BKR 201 TRIPS 4/30/96 S
1 l       32848   LOSS OF DC TO SELECTED ANNUNCIATOR PNLS                 10/8/96 S i       3 284F   LOSS OF DC TO SELECTED ANNUNCIATOR PNLS               10/23/96   S 3.299A   CONTROL STRUCTURE CHILLER OAK 112 TRIP                 7/28/96 S 3.3018   RX ENCLOSURE ISOLATION CHANNEL B                       10/7/96 S 3.304B   SGTS FROM REFUEL FLR HV76-020 FAILS OPEN               9/24/96 S 3.307   RX ENCLOSURE FAILS TO ISOLATE                           2/13/96 S 3.406B   RRCS DIVISION 11 LOSS OF DC POWER                     10/26/96   S 3 407C   RRCS ARI BOTH DIVS FAILS TO INITIATE                   7/28/96 S 3.4098   CONTAINMENT INST GAS COMPRESSOR B LEAKS               10/22/96   S 3.411 A CRD FLOW CNTRL VALVE A FAILS CLOSED                     3/28/96 S 3.412B   CONTROL ROD DRIVE PUMP B TRIPS                         3/25/96 S 3.414B   DISCH VOLUME SV47-1F010 FAILS CLOSED                     5/8/96 S 3.418B   DIESEL GENERATOR 12 TRIP                               4/29/96   S 555a55ecember5l1998                                                       - pay,goggg     l l
3.267B PLANT SERVICES LOAD CENTER 222 FAULT 3/26/96 S
3.271A 114B RX AREA 440V LOAD CENTER FAULT 3/25/96 S
3.271B 124B RX AREA 440V LOAD CENTER FAULT 10/22/96 S
3.2738 214D PLANT SERVICES LOAD CENTER FAULT 10/22/96 S
]
3.275B D124 SAFEGUARD 440V LOAD CENTER FAULT 5/8/96 S
3.277B 120 VAC PANEL 10Y102 FAULT 10/7/96 S
2 3.2788 120 VAC PANEL 10Y106 FAULT 3/25/96 S
3.278D 120 VAC PANEL 10Y110 FAULT 10/6/96 S
3.282B 1FB 125/250 VDC 1BD105 FAULT 5/8/96 S
1 l
32848 LOSS OF DC TO SELECTED ANNUNCIATOR PNLS 10/8/96 S
i 3 284F LOSS OF DC TO SELECTED ANNUNCIATOR PNLS 10/23/96 S
3.299A CONTROL STRUCTURE CHILLER OAK 112 TRIP 7/28/96 S
3.3018 RX ENCLOSURE ISOLATION CHANNEL B 10/7/96 S
3.304B SGTS FROM REFUEL FLR HV76-020 FAILS OPEN 9/24/96 S
3.307 RX ENCLOSURE FAILS TO ISOLATE 2/13/96 S
3.406B RRCS DIVISION 11 LOSS OF DC POWER 10/26/96 S
3 407C RRCS ARI BOTH DIVS FAILS TO INITIATE 7/28/96 S
3.4098 CONTAINMENT INST GAS COMPRESSOR B LEAKS 10/22/96 S
3.411 A CRD FLOW CNTRL VALVE A FAILS CLOSED 3/28/96 S
3.412B CONTROL ROD DRIVE PUMP B TRIPS 3/25/96 S
3.414B DISCH VOLUME SV47-1F010 FAILS CLOSED 5/8/96 S
3.418B DIESEL GENERATOR 12 TRIP 4/29/96 S
555a55ecember5l1998
- pay,goggg
(
(


Test No     Title                                     Test Date Results 3.419B     DIESEL GENERATOR 12 FAILS TO START           9/17/96   S 3.424B     INSTRUMENT AIR COMPRESSOR 1BK101 TRIP         2/13/96   S 3.4318     RECIRC PUMP A M/A STATION FAILS LOW           10/6/96   S 3.432A     RECIRC PUMP A INCOMPLETE START SEQ           7/28/96   S 3.433B     RECIRC PUMP B SEAL #1 FAILURE                 10/7/96   S 3.435A    RECIRC PUMP A DRIVE MOTOR BREAKER TRIP      4/15/96    S
Test No Title Test Date Results 3.419B DIESEL GENERATOR 12 FAILS TO START 9/17/96 S
3.424B INSTRUMENT AIR COMPRESSOR 1BK101 TRIP 2/13/96 S
3.4318 RECIRC PUMP A M/A STATION FAILS LOW 10/6/96 S
3.432A RECIRC PUMP A INCOMPLETE START SEQ 7/28/96 S
3.433B RECIRC PUMP B SEAL #1 FAILURE 10/7/96 S
]
]
3.435B     RECIRC PUMP B DRIVE MOTOR BREAKER TRIP       4/15/96     S 3.440B     RECIRC LOOP B RUPTURE (0-100%)                 5/1/96   S 3.441     COOLANT LEAKAGE IN DRYWELL (1-300 GPM)     10/22/96     S
3.435A RECIRC PUMP A DRIVE MOTOR BREAKER TRIP 4/15/96 S
* j     3.4428     RECIRC PUMP 1 A RPT BREAKER CB4A TRIP         1/5/96   S                 !
3.435B RECIRC PUMP B DRIVE MOTOR BREAKER TRIP 4/15/96 S
3.446A     HPCI STM ISOL VALVE HV55-1F002 FAILS         2/13/96   S
3.440B RECIRC LOOP B RUPTURE (0-100%)
'                                                                                          l 3.447B     HPCI AUX OIL PUMP FAILS -TRIPS               7/13/96   S 3.450     HPCI INADVERTENT START                       2/13/96   S                 !
5/1/96 S
3.453     HPCI PUMP DISCH VALVE 1F105 FAILS AS IS     3/25/96   S i
3.441 COOLANT LEAKAGE IN DRYWELL (1-300 GPM) 10/22/96 S
3.457A     RCIC SPEED CONT FAILS HIGH                   9/17/96   S
j 3.4428 RECIRC PUMP 1 A RPT BREAKER CB4A TRIP 1/5/96 S
!    3.4598     RCIC STEAM SUPFLY HV49-1F007 ISOLATES       2/13/96   S
3.446A HPCI STM ISOL VALVE HV55-1F002 FAILS 2/13/96 S
:    3.465       RCIC ETEAM LINE BREAK IN PUMP RM 1-100%   11/19/96     S 3.471B     DRYWELL AREA UNIT COOLER FAN 181 TRIP       2/13/96   S 3.471F     DRYWELL AREA UNIT COOLER FAN 1F1 TRIP       4/29/96     S 3.4728     DRYWELL AREA UNIT COOLER FAN 1B2 TRIP         5/1/96   S 3.472F     DRYWELL AREA UNIT COOLER FAN 1F2 TRIP         5/1/96   S 2    3.475       PRIMARY CONTAINMENT HYDROGEN DETONATION   10/23/96     S                 i l     3.482B     DW CHILLER 1BK111 TRIP                     4/15/96     S
l 3.447B HPCI AUX OIL PUMP FAILS -TRIPS 7/13/96 S
-    3.483B     RECW PUMP TRIP (B)                         2/12/96     S j     3.484C     TECW PUMPS TRIP (BOTH)                       10/8/96   S 3.48BC     SERVICE WATER PUMP C TRIPS                   1/14/96   S 3.489B     ESW PUMP B TRIPS                             1/14/96   S 3.490B     ESW VLV HV11-054A FAILS TO AUTO SWAP       1/14/96     S 3.490F     ESW VLV HV11-079 FAILS TO AUTO SWAP         1/14/96     S 3.492B     RHR SERVICE WATER PUMP B TRIPS             1/14/96     S
3.450 HPCI INADVERTENT START 2/13/96 S
                                      ~~
3.453 HPCI PUMP DISCH VALVE 1F105 FAILS AS IS 3/25/96 S
5Ide~yTDecembelbe,1998                                               Page 7 of12     .
i 3.457A RCIC SPEED CONT FAILS HIGH 9/17/96 S
3.4598 RCIC STEAM SUPFLY HV49-1F007 ISOLATES 2/13/96 S
3.465 RCIC ETEAM LINE BREAK IN PUMP RM 1-100%
11/19/96 S
3.471B DRYWELL AREA UNIT COOLER FAN 181 TRIP 2/13/96 S
3.471F DRYWELL AREA UNIT COOLER FAN 1F1 TRIP 4/29/96 S
3.4728 DRYWELL AREA UNIT COOLER FAN 1B2 TRIP 5/1/96 S
3.472F DRYWELL AREA UNIT COOLER FAN 1F2 TRIP 5/1/96 S
3.475 PRIMARY CONTAINMENT HYDROGEN DETONATION 10/23/96 S
i 2
l 3.482B DW CHILLER 1BK111 TRIP 4/15/96 S
3.483B RECW PUMP TRIP (B) 2/12/96 S
j 3.484C TECW PUMPS TRIP (BOTH) 10/8/96 S
3.48BC SERVICE WATER PUMP C TRIPS 1/14/96 S
3.489B ESW PUMP B TRIPS 1/14/96 S
3.490B ESW VLV HV11-054A FAILS TO AUTO SWAP 1/14/96 S
3.490F ESW VLV HV11-079 FAILS TO AUTO SWAP 1/14/96 S
3.492B RHR SERVICE WATER PUMP B TRIPS 1/14/96 S
5Ide~yTDecembelbe,1998 Page 7 of12
~~
I
I


_  .- -                  - - . _ -      -  - -  _ - _ _ - -                    -    . _ = . - . _ _
. _ =.
1 t
1 t
,                                                                                                                  t Test No     Title                                                 Test Date Results 3.5008       JET PUMP NO.16 DISPLACED MIXER                         2/13/96   S 3.502B       JET PUMP NO. 5 BROKEN INSTRUMENT LINE                   10/8/96 S 3.504A       RECIRC PUMP 1 A SHAFT FAILURE                           2/13/96   S 3.505B       RECIRC PUMP A LOW RUNBACK                               2/12/96   S 3.514       RHR Service Water High Radiation                       10/22/96   S 3.515D       FW HEATER 15A DRAIN VALVE FAILS OPEN                     1/5/96 S 3.516C       FW HEATER 14A DRAIN VALVE FAILS CLOSED                 2/12/96 S 3.5178       FW HEATER 13B DRAIN VALVE FAILS OPEN                   2/12/9S S 3.518A       FW HEATER 12B DRAIN VALVE FAILS CLOSED                 2/13/96 S 3.518E       FW HEATER 16B DRAIN VALVE FAILS CLOSED                 2/13/96 S 3.519D       FW HEATER 15C DRAIN VALVE FAILS OPEN                   3/26/96 S 3.520C       FW HEATER 14C DRAIN VALVE FAILS CLOSED                 3/26/96 S 3.521B       FW HEATER 13A DUMP VALVE FAILS OPEN                     4/29/96 S 3.522A       FW HEATER 12A DUMP VALVE FAILS CLOSED                   2/12/96 S                             ,
t Test No Title Test Date Results 3.5008 JET PUMP NO.16 DISPLACED MIXER 2/13/96 S
3.522E       FW HEATER 16A DUMP VALVE FAILS CLOSED                     5/1/96 S 3.523D       FW HEATER 15B DUMP VALVE FAILS OPEN                     4/29/96 S 3.524C       FW HEATER 14B DUMP VALVE FAILS CLOSED                     5/1/96 S 3.525B       FW HEATER 13C DUMP VALVE FAILS OPEN                     9/16/96 S 3.526A       FW HEATER 12C DUMP VALVE FAILS CLOSED                 10/22/96   S l
3.502B JET PUMP NO. 5 BROKEN INSTRUMENT LINE 10/8/96 S
3.526E       FW HEATER 16C DUMP VALVE FAILS CLOSED                 10/22/96   S                             I i
3.504A RECIRC PUMP 1 A SHAFT FAILURE 2/13/96 S
3.527B       STEAM LEAK DET NUMAC TIS 25-101B FAILS                 2/12/96 S 3.5288       RHR CNTMNT SPRAY VALVE F016B FAILS AS-IS               9/16/96 S l
3.505B RECIRC PUMP A LOW RUNBACK 2/12/96 S
3.529B       RX PRESS XMITTER PT42-103A FAILS LOW                   9/25/96 S 3.531         TURBINE MOTOR SUCTION PUMP TRIPS                       11/5/96 S 3.535B       1 A2 MOIST SEP DR TK DRN VLV FAILS CLOSED               9/25/96 S 3.535F       1C2 MOIST SEP DR TK DRN VLV FAILS CLOSED               9/25/96 S 3.536B       1 A2 MOIST SEP DR TK DRN VLV FAILS OPEN                 11/4/96 S 3.5378       1 A2 MOIST SEP DR TK DMP VLV FAILS CLOSED             10/22/96   S                             !
3.514 RHR Service Water High Radiation 10/22/96 S
l 3.537F         1C2 MOIST SEP DR TK DMP VLV FAILS CLOSED             10/22/96   S l
3.515D FW HEATER 15A DRAIN VALVE FAILS OPEN 1/5/96 S
3.5388         1 A2 MOIST SEP DRN TK DMP VLV FAILS OPEN             10/22/96   S                             I
3.516C FW HEATER 14A DRAIN VALVE FAILS CLOSED 2/12/96 S
      ~               ~         ~ ~ ~ '                                                   ~
3.5178 FW HEATER 13B DRAIN VALVE FAILS OPEN 2/12/9S S
Friday, Dece'm5e~r"5,1558                                                       Page 8 of 12
3.518A FW HEATER 12B DRAIN VALVE FAILS CLOSED 2/13/96 S
3.518E FW HEATER 16B DRAIN VALVE FAILS CLOSED 2/13/96 S
3.519D FW HEATER 15C DRAIN VALVE FAILS OPEN 3/26/96 S
3.520C FW HEATER 14C DRAIN VALVE FAILS CLOSED 3/26/96 S
3.521B FW HEATER 13A DUMP VALVE FAILS OPEN 4/29/96 S
3.522A FW HEATER 12A DUMP VALVE FAILS CLOSED 2/12/96 S
3.522E FW HEATER 16A DUMP VALVE FAILS CLOSED 5/1/96 S
3.523D FW HEATER 15B DUMP VALVE FAILS OPEN 4/29/96 S
3.524C FW HEATER 14B DUMP VALVE FAILS CLOSED 5/1/96 S
3.525B FW HEATER 13C DUMP VALVE FAILS OPEN 9/16/96 S
3.526A FW HEATER 12C DUMP VALVE FAILS CLOSED 10/22/96 S
3.526E FW HEATER 16C DUMP VALVE FAILS CLOSED 10/22/96 S
I i
3.527B STEAM LEAK DET NUMAC TIS 25-101B FAILS 2/12/96 S
3.5288 RHR CNTMNT SPRAY VALVE F016B FAILS AS-IS 9/16/96 S
3.529B RX PRESS XMITTER PT42-103A FAILS LOW 9/25/96 S
3.531 TURBINE MOTOR SUCTION PUMP TRIPS 11/5/96 S
3.535B 1 A2 MOIST SEP DR TK DRN VLV FAILS CLOSED 9/25/96 S
3.535F 1C2 MOIST SEP DR TK DRN VLV FAILS CLOSED 9/25/96 S
3.536B 1 A2 MOIST SEP DR TK DRN VLV FAILS OPEN 11/4/96 S
3.5378 1 A2 MOIST SEP DR TK DMP VLV FAILS CLOSED 10/22/96 S
3.537F 1C2 MOIST SEP DR TK DMP VLV FAILS CLOSED 10/22/96 S
3.5388 1 A2 MOIST SEP DRN TK DMP VLV FAILS OPEN 10/22/96 S
~
~
~ ~ ~ '
~
Friday, Dece'm5e~r"5,1558 Page 8 of 12


Test No   Title                                   Test Date Results 3.540     STATOR COOLING WATER TCV FAILS CLOSED   11/11/96   S 3.544     REACTOR CAVITY SEALS NO. 3/4 LEAKAGE     11/12/96   S 3.546A     Safeguard MCC D114-G-D Fault             10/23/96   S 3.546B     Safeguard MCC D124-G-D Fault             10/22/96   S 3.552A     RFP DISCH CHK VLV HV06-105A FAILS OPEN   11/20/96   S 3.553A     TURBINE CONTROL VALVE NO.1 FAILS OPEN       8/9/96 S 3.553B     TURBINE CONTROL VALVE NO. 2 FAILS OPEN   10/22/96   S 3.553C     TURBINE CONTROL VALVE NO. 3 FAILS OPEN     8/9/96 S
Test No Title Test Date Results 3.540 STATOR COOLING WATER TCV FAILS CLOSED 11/11/96 S
3.553D     TURBINE CONTROL VALVE NO. 4 FAILS OPEN     8/9/96 S 1
3.544 REACTOR CAVITY SEALS NO. 3/4 LEAKAGE 11/12/96 S
3.556A     RFP A M/A STATION SWAPS TO MANUAL         11/5/96 S 3.557A     FWC UPS INVERTER E/S-XX-118 FAILS         2/22/96 S 3.557B     FWC UPS INVERTER E/S-XX-119 FAILS         2/22/96 S 3.557C     FWC UPS INVERTER E/S-XX-120 FAILS         2/22/96 S 3.557D     ALL FWC UPS INVERTERS Fall               2/22/96 S 3.558A     HV51-1F017A CLOSE TORQUE SWITCH TRIPS     2/29/96 S           (
3.546A Safeguard MCC D114-G-D Fault 10/23/96 S
3.558B     HV51-1F017B CLOSE TOROUE SWITCH TRIPS     2/29/96 S           ,
3.546B Safeguard MCC D124-G-D Fault 10/22/96 S
3.558C     HV51-1F017C CLOSE TORQUE SWITCH TRIPS     2/29/96 S
3.552A RFP DISCH CHK VLV HV06-105A FAILS OPEN 11/20/96 S
, 3.558D     HV51-1F017D CLOSE TORQUE SWITCH TRIPS     2/29/96 S 3.559       SLC INJECTION LINE BREAK IN DRYWELL       3/26/96 S           i 3 560A     RHR PUMP A SUCTION STRAINER CLOGS SMALL   5/7/96 S 3.560B     RHR PUMP A SUCTION STRAINER CLOGS LARGE   5/7/96 S 3.561A     CORE SPRAY PUMP A SUCTION STRAINER CLOGS   5/7/96 S 3.561B     CORE SPRAY PUMP B SUCTION STRAINER CLOGS   5/7/96 S 3.561C     CORE SPRAY PUMP C SUCTION STRAINER CLOGS   5/7/96 S 3.561D     CORE SPRAY PUMP D SUCTION STRAINER CLOGS   5/7/96 S 3.562A     RHR PUMP B SUCTION STRAINER CLOGS SMALL     5/8/96 S 3.562B     RHR PUMP B SUCTION STRAINER CLOGS LARGE     5/8/96 3 4.006     Load Table: 4 KV Safeguard Bus D12       10/23/96   S 4.010     Load Table: 4 KV Safeguard MCC D114-G-D 10/22/96   S l 4.011     Load Table: 4 KV SAFEGUARD BUS D124         5/2/96 S r
3.553A TURBINE CONTROL VALVE NO.1 FAILS OPEN 8/9/96 S
Friday, December 04,1998                                       Page 9 of12 l
3.553B TURBINE CONTROL VALVE NO. 2 FAILS OPEN 10/22/96 S
3.553C TURBINE CONTROL VALVE NO. 3 FAILS OPEN 8/9/96 S
3.553D TURBINE CONTROL VALVE NO. 4 FAILS OPEN 8/9/96 S
3.556A RFP A M/A STATION SWAPS TO MANUAL 11/5/96 S
3.557A FWC UPS INVERTER E/S-XX-118 FAILS 2/22/96 S
3.557B FWC UPS INVERTER E/S-XX-119 FAILS 2/22/96 S
3.557C FWC UPS INVERTER E/S-XX-120 FAILS 2/22/96 S
3.557D ALL FWC UPS INVERTERS Fall 2/22/96 S
3.558A HV51-1F017A CLOSE TORQUE SWITCH TRIPS 2/29/96 S
3.558B HV51-1F017B CLOSE TOROUE SWITCH TRIPS 2/29/96 S
3.558C HV51-1F017C CLOSE TORQUE SWITCH TRIPS 2/29/96 S
3.558D HV51-1F017D CLOSE TORQUE SWITCH TRIPS 2/29/96 S
3.559 SLC INJECTION LINE BREAK IN DRYWELL 3/26/96 S
i 3 560A RHR PUMP A SUCTION STRAINER CLOGS SMALL 5/7/96 S
3.560B RHR PUMP A SUCTION STRAINER CLOGS LARGE 5/7/96 S
3.561A CORE SPRAY PUMP A SUCTION STRAINER CLOGS 5/7/96 S
3.561B CORE SPRAY PUMP B SUCTION STRAINER CLOGS 5/7/96 S
3.561C CORE SPRAY PUMP C SUCTION STRAINER CLOGS 5/7/96 S
3.561D CORE SPRAY PUMP D SUCTION STRAINER CLOGS 5/7/96 S
3.562A RHR PUMP B SUCTION STRAINER CLOGS SMALL 5/8/96 S
3.562B RHR PUMP B SUCTION STRAINER CLOGS LARGE 5/8/96 3
4.006 Load Table: 4 KV Safeguard Bus D12 10/23/96 S
4.010 Load Table: 4 KV Safeguard MCC D114-G-D 10/22/96 S
l 4.011 Load Table: 4 KV SAFEGUARD BUS D124 5/2/96 S
r Friday, December 04,1998 Page 9 of12 l


1 l
1 l
Test No     Title                                           Test Date Resu/:s 4.012       Load Table: 4 KV Safeguard MCC D124-G-D           10/22/96   S 4.016       Load Table: RX AREA LOAD CENTER 114B               3/25/96   G 4.020       Load lable: Reactor Area Load Center 1248         10/22/96   S 4.024       Load Table: Plant Se vices LC 214D               10/22/96   S 4.028       Load Table: Plant Services Bus 222                 3/26/96   S
Test No Title Test Date Resu/:s 4.012 Load Table: 4 KV Safeguard MCC D124-G-D 10/22/96 S
:    4.030       Load Table: 120 VAC PANEL 10Y102                   10/6/96   S 4.034       Load Table: 120 VAC PANEL 10Y106                   3/25/96   S 4.035       Load Table: 120 VAC PANEL 10Y109                   2/21/96   S 4.036       Load Tabie: 120 VAC Panel 10Y110                   10/6/96   S 4.037       Load Table: 120 VAC Panet 10Y201                   2/22/96   S 4.042       Load Table: 125/250 VDC BUS 1BD105                   5/8/96   S 4.055       Load Table: FWC UPS Inverter E/S-XX-118             2/22/96   S 4.056       Load Table: FWC UPS Inverter E/S-XX-119             10/6/96   S 4.057       Load Table: FWC UPS Inverter E/S-XX-120             2/22/96   S 4.058       Load Table: FWC 24 VDC Power Supply C32-K611       2/23/96   S
4.016 Load Table: RX AREA LOAD CENTER 114B 3/25/96 G
!    4.059       Load Table : FWC 24 VDC Power Supply C32-K612       2/23/96   S 4.060       Load Table: FWC 24 VDC Power Supply C32-K613       2/23/96   S 5.028       RECIRC LOOP B RUPTURE PERFORMANCE TEST             9/17/96   S 5.07A       LOSS OF SAFEGUARD BUS D11 (EMERG POWER)           2/23/96   S                 :
4.020 Load lable: Reactor Area Load Center 1248 10/22/96 S
5.07B       LOSS OF SAFEGUARD BUS D12 (EMERG POWER)           2/23/96   S 5.07C       LOSS OF SAFEGUARD BUS D13 (EMERG POWER)           2/23/96   S l
4.024 Load Table: Plant Se vices LC 214D 10/22/96 S
1 5.09B       LOSS OF NON-SAFEGUARD LOAD CENTER 114B             4/24/96   S                 i 5.09F       LOSS OF NON-SAFEGUARD LOAD CENTER 124B             4/23/96   S                 l 5.10B       LOSS OF 120 VAC INSTRUMENT BUS 10Y102             4/23/96   S 5.10E       LOSS OF 120 VAC INSTRUMENT BUS 10Y105             2/26/96   S I
4.028 Load Table: Plant Services Bus 222 3/26/96 S
5.10F       LOSS OF 120 VAC INSTRUMENT BUS 10Y106             2/21/96   S 5.10G       LOSS OF 120 VAC INSTRUMENT BUS 10Y109             2/21/96   S 5.10H       LOSS OF 120 VAC INSTRUMENT BUS 10Y110             2/21/96   S 5.10J       LOSS OF 120 VAC INSTRUMENT BUS 10Y201             2/21/96   S 5.11B       LOSS OF 125/250 VDC BUS 1BD105                     9/17/96   S Friday, December 04,1998                                                 Page 10 of12 l
4.030 Load Table: 120 VAC PANEL 10Y102 10/6/96 S
l
4.034 Load Table: 120 VAC PANEL 10Y106 3/25/96 S
4.035 Load Table: 120 VAC PANEL 10Y109 2/21/96 S
4.036 Load Tabie: 120 VAC Panel 10Y110 10/6/96 S
4.037 Load Table: 120 VAC Panet 10Y201 2/22/96 S
4.042 Load Table: 125/250 VDC BUS 1BD105 5/8/96 S
4.055 Load Table: FWC UPS Inverter E/S-XX-118 2/22/96 S
4.056 Load Table: FWC UPS Inverter E/S-XX-119 10/6/96 S
4.057 Load Table: FWC UPS Inverter E/S-XX-120 2/22/96 S
4.058 Load Table: FWC 24 VDC Power Supply C32-K611 2/23/96 S
4.059 Load Table : FWC 24 VDC Power Supply C32-K612 2/23/96 S
4.060 Load Table: FWC 24 VDC Power Supply C32-K613 2/23/96 S
5.028 RECIRC LOOP B RUPTURE PERFORMANCE TEST 9/17/96 S
5.07A LOSS OF SAFEGUARD BUS D11 (EMERG POWER) 2/23/96 S
5.07B LOSS OF SAFEGUARD BUS D12 (EMERG POWER) 2/23/96 S
5.07C LOSS OF SAFEGUARD BUS D13 (EMERG POWER) 2/23/96 S
5.09B LOSS OF NON-SAFEGUARD LOAD CENTER 114B 4/24/96 S
1 i
5.09F LOSS OF NON-SAFEGUARD LOAD CENTER 124B 4/23/96 S
5.10B LOSS OF 120 VAC INSTRUMENT BUS 10Y102 4/23/96 S
5.10E LOSS OF 120 VAC INSTRUMENT BUS 10Y105 2/26/96 S
I 5.10F LOSS OF 120 VAC INSTRUMENT BUS 10Y106 2/21/96 S
5.10G LOSS OF 120 VAC INSTRUMENT BUS 10Y109 2/21/96 S
5.10H LOSS OF 120 VAC INSTRUMENT BUS 10Y110 2/21/96 S
5.10J LOSS OF 120 VAC INSTRUMENT BUS 10Y201 2/21/96 S
5.11B LOSS OF 125/250 VDC BUS 1BD105 9/17/96 S
Friday, December 04,1998 Page 10 of12 l


I
I
                                                                                    )
)
l Test No   Title -                                           Test Date Results 5.13A     MAIN CONDENSER AIR LEAK AT LOW SEVERITY             11/4/96 S 5.16B     COMPLETE LOSS OF TURB ENCL COOLING WATER           11/19/96   S 5.17D     FW MASTER LVL CONTROLLER FAILS HIGH                 11/4/96 S I
Test No Title -
5.17H     LOSS OF FEEDWATER HEATING AT FULL POWER             9/17/96 S           l 5.23     MAIN TURBINE - GENERATOR TRIP .                     9/17/96 S l
Test Date Results 5.13A MAIN CONDENSER AIR LEAK AT LOW SEVERITY 11/4/96 S
5.28     MAIN STEAM LINE BREAK OUTSIDE DRYWELL               9/25/96 S           !
5.16B COMPLETE LOSS OF TURB ENCL COOLING WATER 11/19/96 S
I 5.29B     MAIN FEED LINE B BREAK INSIDE DRYWELL               9/25/96 S 5.34B     TURBINE TRIP WITH ATWS (BROWN'S FERRY)               11/4/96 S           ,
5.17D FW MASTER LVL CONTROLLER FAILS HIGH 11/4/96 S
6.01     NORMOPS: PLANT S/U TO HOT STANDBY                   6/11/96   S 6.02     NORMOPS: TURB/ GEN S/U AND GEN SYNCH               6/17/96   S 6.03     NORMOPS: HOT S/U FROM HOT STBY TO RATED             6/17/96   S 6.06       NORMOPS: PLT S/D FROM RATED TO HOT STBY               6/9/96 S 6.09       NORMOPS: TRIP /tND RESTART TO RATED               12/19/96   S 6.10       Steady State Performance at 25% Power             11/18/96   S C.11       Steady State Performance at 75% Power             11/18/96   S 6.12       Steady State Performance at 100% Power for 1 Hour   6/25/96   S 7.01       MANUAL SCRAM                                       9/17/96   S 7.02       SIMULTANEOUS TRIP OF ALL FEEDWATER PUMPS           10/8/96 S 7.03     CLOSURE OF ALL MSIVS @ 100% POWER                   11/4/96 S 7.04     TRIP OF BOTH RECIRC PUMPS AT RATED POWER             10/8/96 S 7.05     SINGLE RECIRC PUMP TRIP                             10/8/96 S l
5.17H LOSS OF FEEDWATER HEATING AT FULL POWER 9/17/96 S
7.06     TURBINE TRIP WITHIN BYPASS CAPABILITY             11/18/96   S             i 7.08     RECIRC LOOP RUPTURE W/ LOSS OFFSITE PWR           10/21/96   S             j 7.09     MAX SIZE UNISOLABLE MSL RUPTURE                     10/8/96 S 8.052     HV-48-1F016 PP TEST THROTTLE VALVE                   3/26/96 S             l 8.053     HV-48-1F036 SLC MAIN ISOLATION VALVE                 3/26/96 S 8.054     SLC PUMP A LOCAL TEST START SWITCH                   3/26/96 S           j 8.055     SLC PUMP B LOCAL TEST START SWITCH                   3/26/96 S 8.056     SLC PUMP C LOCAL TEST START SWITCH                   3/26/96 S 8.187     ALT OFFSITE PWR SUPPLY TO SAFEGUARD BUS             4/24/96 S
5.23 MAIN TURBINE - GENERATOR TRIP.
                              '      ~
9/17/96 S
Eriday?D5Elmber 04,1998                                                 Page 11 of1E :
5.28 MAIN STEAM LINE BREAK OUTSIDE DRYWELL 9/25/96 S
I 5.29B MAIN FEED LINE B BREAK INSIDE DRYWELL 9/25/96 S
5.34B TURBINE TRIP WITH ATWS (BROWN'S FERRY) 11/4/96 S
6.01 NORMOPS: PLANT S/U TO HOT STANDBY 6/11/96 S
6.02 NORMOPS: TURB/ GEN S/U AND GEN SYNCH 6/17/96 S
6.03 NORMOPS: HOT S/U FROM HOT STBY TO RATED 6/17/96 S
6.06 NORMOPS: PLT S/D FROM RATED TO HOT STBY 6/9/96 S
6.09 NORMOPS: TRIP /tND RESTART TO RATED 12/19/96 S
6.10 Steady State Performance at 25% Power 11/18/96 S
C.11 Steady State Performance at 75% Power 11/18/96 S
6.12 Steady State Performance at 100% Power for 1 Hour 6/25/96 S
7.01 MANUAL SCRAM 9/17/96 S
7.02 SIMULTANEOUS TRIP OF ALL FEEDWATER PUMPS 10/8/96 S
7.03 CLOSURE OF ALL MSIVS @ 100% POWER 11/4/96 S
7.04 TRIP OF BOTH RECIRC PUMPS AT RATED POWER 10/8/96 S
7.05 SINGLE RECIRC PUMP TRIP 10/8/96 S
7.06 TURBINE TRIP WITHIN BYPASS CAPABILITY 11/18/96 S
i 7.08 RECIRC LOOP RUPTURE W/ LOSS OFFSITE PWR 10/21/96 S
j 7.09 MAX SIZE UNISOLABLE MSL RUPTURE 10/8/96 S
8.052 HV-48-1F016 PP TEST THROTTLE VALVE 3/26/96 S
8.053 HV-48-1F036 SLC MAIN ISOLATION VALVE 3/26/96 S
8.054 SLC PUMP A LOCAL TEST START SWITCH 3/26/96 S
j 8.055 SLC PUMP B LOCAL TEST START SWITCH 3/26/96 S
8.056 SLC PUMP C LOCAL TEST START SWITCH 3/26/96 S
8.187 ALT OFFSITE PWR SUPPLY TO SAFEGUARD BUS 4/24/96 S
Eriday?D5Elmber 04,1998 Page 11 of1E
~
l I
l I


Test No                                     Title                                 Test Date Results 8.188                                     ALT OFFSITE PWR SUPPLY TO SAFEGUARD BUS   4/30/96             S 8.194                                       101 SAFEGUARD BUS UNDERVOLTAGE RELAY     5/8/96           S 8.195                                       201 SAFEGUARD BUS UNDERVOLTAGE RELAY     5/8/96           S 8.278                                       RHR PUMP A BREAKER RACKED OUT           4/17/96           S 8.279                                       RHR PUMP B BREAKER RACKED OUT           4/17/96             S 8.280                                       RHR PUMP C BREAKER RACKED OUT           4/17/96             S 8.281                                       RHR PUMP D BREAKER RACKED OUT           4/17/96             S 8.282                                     CORE SPRAY PUMP A BREAKER RACK IN/OUT   4/23/96             S 8.283                                     CORE SPRAY PUMP B BREAKER RACK IN/OUT   4/23/96             S 8.284                                     CORE SPRAY PUMP C BREAKER RACK IN/OUT   4/23/96             S 8.285                                     CORE SPRAY PUMP D BREAKER RACK IN/OUT   4/23/96             S 8.353                                     RECIRC MG SET A LO COOLER OUTLET VALVE   4/15/96             S 8.354                                     RECIRC MG SET B LO COOLER OUTLET VALVE   4/15/96             S 8.355                                     RHR PUMP A LOCAL MANUAL CONTROL         4/16/96             S 8.357                                     RHR PUMP B LOCAL MANUAL CONTROL         4/16/96             S 8.359                                     RHR PUMP C LOCAL MANUAL CONTROL         4/16/96             S 8.361                                     RHR PUMP D LOCAL MANUAL CONTROL         4/16/96             S 8.363                                     CORE SPRAY PUMP A LOCAL MANUAL CONTROL   4/16/96             S 8.365                                     CORE SPRAY PUMP B LOCAL MANUAL CONTROL   4/16/96             S 8.367                                     CORE SPRAY PUMP C LOCAL MANUAL CONTROL   4/16/96           S 8.369                                     CORE SPRAY PUMP D LOCAL MANUAL CONTROL   4/16/96           S l
Test No Title Test Date Results 8.188 ALT OFFSITE PWR SUPPLY TO SAFEGUARD BUS 4/30/96 S
Friday, December 04,1998                                                                               Page 12 of 12
8.194 101 SAFEGUARD BUS UNDERVOLTAGE RELAY 5/8/96 S
8.195 201 SAFEGUARD BUS UNDERVOLTAGE RELAY 5/8/96 S
8.278 RHR PUMP A BREAKER RACKED OUT 4/17/96 S
8.279 RHR PUMP B BREAKER RACKED OUT 4/17/96 S
8.280 RHR PUMP C BREAKER RACKED OUT 4/17/96 S
8.281 RHR PUMP D BREAKER RACKED OUT 4/17/96 S
8.282 CORE SPRAY PUMP A BREAKER RACK IN/OUT 4/23/96 S
8.283 CORE SPRAY PUMP B BREAKER RACK IN/OUT 4/23/96 S
8.284 CORE SPRAY PUMP C BREAKER RACK IN/OUT 4/23/96 S
8.285 CORE SPRAY PUMP D BREAKER RACK IN/OUT 4/23/96 S
8.353 RECIRC MG SET A LO COOLER OUTLET VALVE 4/15/96 S
8.354 RECIRC MG SET B LO COOLER OUTLET VALVE 4/15/96 S
8.355 RHR PUMP A LOCAL MANUAL CONTROL 4/16/96 S
8.357 RHR PUMP B LOCAL MANUAL CONTROL 4/16/96 S
8.359 RHR PUMP C LOCAL MANUAL CONTROL 4/16/96 S
8.361 RHR PUMP D LOCAL MANUAL CONTROL 4/16/96 S
8.363 CORE SPRAY PUMP A LOCAL MANUAL CONTROL 4/16/96 S
8.365 CORE SPRAY PUMP B LOCAL MANUAL CONTROL 4/16/96 S
8.367 CORE SPRAY PUMP C LOCAL MANUAL CONTROL 4/16/96 S
8.369 CORE SPRAY PUMP D LOCAL MANUAL CONTROL 4/16/96 S
l Friday, December 04,1998 Page 12 of 12


i PECO NUCLEAR CORPORATION
i PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT s
* LIMERICK GENERATING STATION TRAINING SIMULATOR ,
SIMULATOR QUADRENNIAL REPORT s
LGS SIMULATOR TESTING PERFORMED IN 1997 l
LGS SIMULATOR TESTING PERFORMED IN 1997 l
l 1
1 I
I l
i
l i


I LGS Simulator Testing Completedin 1997                                       l Test No Title                                             Test Date Results ,
I LGS Simulator Testing Completedin 1997 Test No Title Test Date Results 1.01 COMPUTER REAL TIME TEST 12/7/97 S
1.01     COMPUTER REAL TIME TEST                             12/7/97   S 3.006A   APRM CHAN C RECORDER FAILS AS-IS                     2/25/97 S     j 3.006B   APRM CHAN C FAILS INOP                                             !
3.006A APRM CHAN C RECORDER FAILS AS-IS 2/25/97 S
2/25/97 S 3.008A   APRM CHAN E RECORDER FAILS AS-IS                     2/26/97 S 3.010A   RBM CHAN A RECORDER FAILS AS-IS                     4/24/97 S 3.012C   LPRM 16-09C UPSCALE FAILURE                           316/9 7 S     !
j 3.006B APRM CHAN C FAILS INOP 2/25/97 S
        '' ')12G LPRM 56-41D UPSCALE FAILURE                           6/7/97 S 3.013C LPRM 08-33B DOWNSCALE FAILURE                         4/7/97 S 3 013G   LPRM 32-09A DOWNSCALE FAILURE                       6/22/97   S     ,
3.008A APRM CHAN E RECORDER FAILS AS-IS 2/26/97 S
3.014     TIP CHAMBER STUCK IN-CORE                           10/26/97   S 3.015C   LPRM 16-25A DRIFT ( 25 TO +25)                       6/14/97   S     !
3.010A RBM CHAN A RECORDER FAILS AS-IS 4/24/97 S
3.016H   Control Rod (XX-YY) Fails: Double Notch on Wthdraw 10/27/97   S     I 3.017H   Control Rod (XX-YY) Fails: Double Notch on Wthdraw 10/27/97   S 3.018A   CONTROL ROD XX-YY FAILURE (DRIFT IN)                 3/17/97   S l
3.012C LPRM 16-09C UPSCALE FAILURE 316/9 7 S
3.018B   CONTROL ROD XX-YY FAILURE (DRIFT OUT)               6/22/97   S 3.018C   CONTROL ROD XX-YY FAILURE (ACCUM TRBL)             10/18/97   S 3.018D   CONTROL ROD XX-YY FAILURE (STUCK)                   11/9/97   S 3.018E   CONTROL ROD XX-YY FAILURE (UNCOUPLED)               11/9/97   S 3.018F   CONTROL ROD XX-YY FAILURE (SCRAMMED)                 4/24/97   S 3.018G   CONTROL ROD XX-XX FAILS TO SCRAM                     6/14/97   S l     3.018H   Control Rod (XX YY) Fails: Double Notch on Wthdraw 10/27/97   S f
'' ')12G LPRM 56-41D UPSCALE FAILURE 6/7/97 S
3.019H   Control Rod (XX-YY) Fails: Double Notch on Wthdraw 10/27/97   S 3.020C   APRM CHANNEL C FAILS 0-125%                         1/26/97   S     i 3.023     RPIS FAILURE 4 ROD DISPLAY                           2/11/97   S     !
3.013C LPRM 08-33B DOWNSCALE FAILURE 4/7/97 S
3.024     RDCS FAILURE (ANALYZER CARD)                         11/9/97   S 3.028D   REACTOR SCRAM (BANK 3)                             10/26/97   S 3.029A     RPS FAILS TO SCRAM (AUTO ONLY)                       2/11/97   S 3.043A     FWC MASTER LEVEL CONTROLLER FAILS HIGH               2/15/97   S
3 013G LPRM 32-09A DOWNSCALE FAILURE 6/22/97 S
                            .               _ . . . ~
3.014 TIP CHAMBER STUCK IN-CORE 10/26/97 S
      .g.
3.015C LPRM 16-25A DRIFT ( 25 TO +25) 6/14/97 S
3.016H Control Rod (XX-YY) Fails: Double Notch on Wthdraw 10/27/97 S
I 3.017H Control Rod (XX-YY) Fails: Double Notch on Wthdraw 10/27/97 S
3.018A CONTROL ROD XX-YY FAILURE (DRIFT IN) 3/17/97 S
l 3.018B CONTROL ROD XX-YY FAILURE (DRIFT OUT) 6/22/97 S
3.018C CONTROL ROD XX-YY FAILURE (ACCUM TRBL) 10/18/97 S
3.018D CONTROL ROD XX-YY FAILURE (STUCK) 11/9/97 S
3.018E CONTROL ROD XX-YY FAILURE (UNCOUPLED) 11/9/97 S
3.018F CONTROL ROD XX-YY FAILURE (SCRAMMED) 4/24/97 S
3.018G CONTROL ROD XX-XX FAILS TO SCRAM 6/14/97 S
l 3.018H Control Rod (XX YY) Fails: Double Notch on Wthdraw 10/27/97 S
f 3.019H Control Rod (XX-YY) Fails: Double Notch on Wthdraw 10/27/97 S
3.020C APRM CHANNEL C FAILS 0-125%
1/26/97 S
i 3.023 RPIS FAILURE 4 ROD DISPLAY 2/11/97 S
3.024 RDCS FAILURE (ANALYZER CARD) 11/9/97 S
3.028D REACTOR SCRAM (BANK 3) 10/26/97 S
3.029A RPS FAILS TO SCRAM (AUTO ONLY) 2/11/97 S
3.043A FWC MASTER LEVEL CONTROLLER FAILS HIGH 2/15/97 S
.g.
_... ~
l
l


Test No   Title                                   Test Date Results 3.044C   FW PUMP C CONTROLLER OUTPUT FAILS HIGH     2/25/97   S 3.046C   STEAM FLOWXMITTER 1N003C FAILS 0-100%       5/12/97   S           :
Test No Title Test Date Results 3.044C FW PUMP C CONTROLLER OUTPUT FAILS HIGH 2/25/97 S
3.047A   FW FLOWXMITTER 1N002A FAILS 0-100%           5/7/97 S 3.061C   MSIV HV41-1FO22C FAILS OPEN                 2/26/97 S 3.062C   MSIV HV41-1FO28C FAILS OPEN                 4/24/97 S 3.063C   MSIV HV41-1FO22C FAILS CLOSED               4/7/97 S 3.064C   MSIV HV41 1FO28C FAILS CLOSED               5/13/97 S 3.066   STM LINE RUPTURE INSIDE DRYWELL           10/18/97   S 3.071B   LOSS OF EXTRACTION STEAM TO FW HTR 16B     4/24/97   S 3.072C   SJAE STM SUPPLY PCV07-101 A FAILS OPEN     12/7/97 S             ;
3.046C STEAM FLOWXMITTER 1N003C FAILS 0-100%
3.075   EXHAUST HOOD SPRAY VALVE FAILS CLOSED       12/7/97 S 3.078B   CONDENSATE PUMP B TRIP                     2/15/97   S 3.079C   COND FILTER /DEMIN C HI DIFF PRESSURE     4/24/97   S 3.079G   COND FILTER /DEMIN G HI DIFF PRESSURE     6/14/97   S 3.085     CIRCULATING WATER EXPANSION JOINT LEAK   11/15/97   S               I 3.086C   CIRCULATING WATER PUMP C TRIP             2/25/97   S 3.099     TRIP OF BOTH STATOR COOLANT PUMPS         5/20/97   S 3.102     MAIN TURBINE LOW BRG OlL PRESSURE         11/15/97   S 3.105A   EHC PRESSURE REGULATOR A FAILS HIGH       6/22/97   S 3.106B   EHC PRESSURE REGULATOR B FAILS LOW       10/18/97   S 3.107C   BYPASS VALVE NO. 3 STICKS OPEN             2/25/97   S 3.107G   BYPASS VALVE NO. 7 STICKS OPEN               6/7/97 S 3.110     MAIN TURBINE - GENERATOR TRIP             5/12/97   S 3.112B   EHC PUMP B TRIPS                           2/25/97   S 3.115AC   DRAWER INOP RX ENCLOSURE VENT EXH CHAN C   2/15/97   S 3.115AG   DRAWER INOP REFUEL FLOOR VENT EXH CHAN C   3/17/97   S             ,
5/12/97 S
1 3.115AL   DRAWER INOP POST LOCA MONITOR CHAN C       3/17/97   S 3.115B   DRAWER INOP MCR FRESH AIR CHAN B & D       2/25/97   S 3.115F   DRAWER INOP SOUTH STACK RAD MONITOR         2/25/97   S 3.115K   DRWR INOP STM PACK EXH & VAC PMP RAD MON   3/14/97   S SIday, Dic5EeT5I998                                             Page 2 of 11 i
3.047A FW FLOWXMITTER 1N002A FAILS 0-100%
5/7/97 S
3.061C MSIV HV41-1FO22C FAILS OPEN 2/26/97 S
3.062C MSIV HV41-1FO28C FAILS OPEN 4/24/97 S
3.063C MSIV HV41-1FO22C FAILS CLOSED 4/7/97 S
3.064C MSIV HV41 1FO28C FAILS CLOSED 5/13/97 S
3.066 STM LINE RUPTURE INSIDE DRYWELL 10/18/97 S
3.071B LOSS OF EXTRACTION STEAM TO FW HTR 16B 4/24/97 S
3.072C SJAE STM SUPPLY PCV07-101 A FAILS OPEN 12/7/97 S
3.075 EXHAUST HOOD SPRAY VALVE FAILS CLOSED 12/7/97 S
3.078B CONDENSATE PUMP B TRIP 2/15/97 S
3.079C COND FILTER /DEMIN C HI DIFF PRESSURE 4/24/97 S
3.079G COND FILTER /DEMIN G HI DIFF PRESSURE 6/14/97 S
3.085 CIRCULATING WATER EXPANSION JOINT LEAK 11/15/97 S
3.086C CIRCULATING WATER PUMP C TRIP 2/25/97 S
3.099 TRIP OF BOTH STATOR COOLANT PUMPS 5/20/97 S
3.102 MAIN TURBINE LOW BRG OlL PRESSURE 11/15/97 S
3.105A EHC PRESSURE REGULATOR A FAILS HIGH 6/22/97 S
3.106B EHC PRESSURE REGULATOR B FAILS LOW 10/18/97 S
3.107C BYPASS VALVE NO. 3 STICKS OPEN 2/25/97 S
3.107G BYPASS VALVE NO. 7 STICKS OPEN 6/7/97 S
3.110 MAIN TURBINE - GENERATOR TRIP 5/12/97 S
3.112B EHC PUMP B TRIPS 2/25/97 S
3.115AC DRAWER INOP RX ENCLOSURE VENT EXH CHAN C 2/15/97 S
3.115AG DRAWER INOP REFUEL FLOOR VENT EXH CHAN C 3/17/97 S
3.115AL DRAWER INOP POST LOCA MONITOR CHAN C 3/17/97 S
3.115B DRAWER INOP MCR FRESH AIR CHAN B & D 2/25/97 S
3.115F DRAWER INOP SOUTH STACK RAD MONITOR 2/25/97 S
3.115K DRWR INOP STM PACK EXH & VAC PMP RAD MON 3/14/97 S
SIday, Dic5EeT5I998 Page 2 of 11 i
m m


Test No   Title                                   Test Date Results 3.115P     DRAWER INOP SERVICE WATER COOLING WATER   2/26/97 S 3.115RB     DRWR INOP RHRSW UNIT 2 HX RETURN HEADER   6/22/97 S 3.115RE     DRAWER INOP RHRSW HX 2A OUTLET           10/26/97   S 3.115W     DRAWER INOP MAIN STEAM LINE CHAN C         2/25/97 S 3.139A     ADS /SRV 1FO13C FAILS - LEAKS             6/14/97 S           i 3.139B     ADS /SRV 1FO13C FAILS - STUCK             2/11/97 S           ,
Test No Title Test Date Results 3.115P DRAWER INOP SERVICE WATER COOLING WATER 2/26/97 S
3.139C     ADS /SRV 1FO13C FAILS - OPEN ELECT         2/11/97 S           ;
3.115RB DRWR INOP RHRSW UNIT 2 HX RETURN HEADER 6/22/97 S
3.139D     ADS /SRV 1FO13C FAILS - CLOSED             2/11/97 S 3.139E     ADS /SRV 1FO13C FAILS - OPEN MECH         2/15/97 S 3.143A     ADS /SRV 1FO13G FAILS - LEAKS             6/14/97 S 3.1438     ADS /SRV 1FO13G FAILS - STUCK             3/18/97 S 3.143C     ADS /SRV 1FO13G FAILS - OPEN ELECT       5/12/97 S 3.143D     ADS /SRV 1FO13G FAILS - CLOSED           5/12/97 S 3.143E     ADS /SRV 1F013G FAILS - OPEN MECH         5/12/97 S 3.147A     ADS /SRV 1FO13L FAILS - LEAKS             6/14/97 S 3.147B     ADS /SRV 1FO13L FAILS - STUCK             2/25/97 S 3.147C     ADS /SRV 1FO13L FAILS - OPEN ELECT         9/21/97 S 3.147D     ADS /SRV 1FO13L FAILS - CLOSED             6/14/97 S 3.147E     ADS /SRV 1FO13L FAILS - OPEN MECH         6/22/97 S 3.149A     ADS /SRV 1FO13N FAILS LEAKS               6/22/97 S           '
3.115RE DRAWER INOP RHRSW HX 2A OUTLET 10/26/97 S
3.149E     ADS /SRV 1FO13N FAILS - OPEN MECH         9/21/97 S 3.150D     ADS /SRV 1FO13S FAILS - CLOSED             9/21/97 S 3.151C     SRV 1F013H DOWNCOMER LEAK 0-100%           6/14/97 S 3.151E     SRV 1F013S DOWNCOMER LEAK 0-100%           12/7/97 S 3.156C     NSSSS GROUP 1C INADVERTENT ISOLATION       2/25/97 S 3.156G     NSSSS GROUP 1G INADVERTENT ISOL ATION     3/18/97 S 3.157C     NSSSS GROUP 2C INADVERTENT ISOLATION       2325/97 S 3.158A     NSSSS GROUP 3A INADVERTENi ISOLATION       2/25/97 S 3.159C     NSSSS GROUP 6C INADVERTENT ISOLATION       6/22/97 S 3.160A     NSSSS GROUP 7A INADVERTENT ISOLATION       6/22/97 S Friday, December 04,1998                                       Page 3 of11
3.115W DRAWER INOP MAIN STEAM LINE CHAN C 2/25/97 S
3.139A ADS /SRV 1FO13C FAILS - LEAKS 6/14/97 S
i 3.139B ADS /SRV 1FO13C FAILS - STUCK 2/11/97 S
3.139C ADS /SRV 1FO13C FAILS - OPEN ELECT 2/11/97 S
3.139D ADS /SRV 1FO13C FAILS - CLOSED 2/11/97 S
3.139E ADS /SRV 1FO13C FAILS - OPEN MECH 2/15/97 S
3.143A ADS /SRV 1FO13G FAILS - LEAKS 6/14/97 S
3.1438 ADS /SRV 1FO13G FAILS - STUCK 3/18/97 S
3.143C ADS /SRV 1FO13G FAILS - OPEN ELECT 5/12/97 S
3.143D ADS /SRV 1FO13G FAILS - CLOSED 5/12/97 S
3.143E ADS /SRV 1F013G FAILS - OPEN MECH 5/12/97 S
3.147A ADS /SRV 1FO13L FAILS - LEAKS 6/14/97 S
3.147B ADS /SRV 1FO13L FAILS - STUCK 2/25/97 S
3.147C ADS /SRV 1FO13L FAILS - OPEN ELECT 9/21/97 S
3.147D ADS /SRV 1FO13L FAILS - CLOSED 6/14/97 S
3.147E ADS /SRV 1FO13L FAILS - OPEN MECH 6/22/97 S
3.149A ADS /SRV 1FO13N FAILS LEAKS 6/22/97 S
3.149E ADS /SRV 1FO13N FAILS - OPEN MECH 9/21/97 S
3.150D ADS /SRV 1FO13S FAILS - CLOSED 9/21/97 S
3.151C SRV 1F013H DOWNCOMER LEAK 0-100%
6/14/97 S
3.151E SRV 1F013S DOWNCOMER LEAK 0-100%
12/7/97 S
3.156C NSSSS GROUP 1C INADVERTENT ISOLATION 2/25/97 S
3.156G NSSSS GROUP 1G INADVERTENT ISOL ATION 3/18/97 S
3.157C NSSSS GROUP 2C INADVERTENT ISOLATION 2325/97 S
3.158A NSSSS GROUP 3A INADVERTENi ISOLATION 2/25/97 S
3.159C NSSSS GROUP 6C INADVERTENT ISOLATION 6/22/97 S
3.160A NSSSS GROUP 7A INADVERTENT ISOLATION 6/22/97 S
Friday, December 04,1998 Page 3 of11


i P
i P
Test No   Title                                   Test Date Results 3.1618     NSSSS GROUP 8B INADVERTENT ISOLATION       10/18/97   S 3.162C     SEC CON & PCIG C INADVERTENT ISOL           5/12/97   S           !
Test No Title Test Date Results 3.1618 NSSSS GROUP 8B INADVERTENT ISOLATION 10/18/97 S
3.165     STEAM JET AIR EJECT DISCHARGE EXPLOSION   11/15/97   S f
3.162C SEC CON & PCIG C INADVERTENT ISOL 5/12/97 S
3.168A     OFFGAS CHILLER GLYCOL PUMP A TRIP           3/17/97   S           l l
f 3.165 STEAM JET AIR EJECT DISCHARGE EXPLOSION 11/15/97 S
3.171C     RHR PUMP C TRIP                             2/25/97   S           !
3.168A OFFGAS CHILLER GLYCOL PUMP A TRIP 3/17/97 S
3.172C     RHR PUMP 1C FAILS TO AUTO START           10/12/97   S           ,
l l
3.174C     RHR INJECTION VALVE 1F017C FAILS AS IS     10/12/97 S 3.175C     RHR PUMP SUCTION VALVE F004C FAILS AS IS   6/22/97 S 3.176A     RHR LOOP SDC VALVE 1FOO6A FAILS AS IS       4/8/97 S             ;
3.171C RHR PUMP C TRIP 2/25/97 S
3.176E     RHR SDC INJECT VALVE 1FO15A FAILS AS IS   10/12/97   S 3.177C     RHR HX B BYPASS CONTROLLER FAILS HIGH     10/12/97   S 3.182C   CORE SPRAY PUMP C TRIPS                     5/13/97 S 3.183C   CORE SPRAY PUMP C FAILS TO AUTO START       9/21/97 S 3.189A     REACTOR WATER CLEANUP PUMP A TRIPS           2/15/97 S 3.1900     RWCU DRAIN FLOW CONTROLLER FAILS CLOSED       3/4/97. S
3.172C RHR PUMP 1C FAILS TO AUTO START 10/12/97 S
                                                                                )
3.174C RHR INJECTION VALVE 1F017C FAILS AS IS 10/12/97 S
3.194     RWCU SUCTION LINE COOL LEAKAGE (1-100%)   10/26/97   S 3.197     SLC SQUlB VALVES FAIL TO FIRE               3/12/97 S 3.203A     SRM CHANNEL C RECORDER FAILS AS-IS           3/4/97 S 3 203B     SRM CHANNEL C FAILS INOPERATIVE               3/4/97 S 3.203C     SRM CHANNEL C DETECTOR STUCK                 3/4/97 S 3.207A     IRM CHANNEL C RECORDER FAILS AS-IS           3/4/97 S             ,
3.175C RHR PUMP SUCTION VALVE F004C FAILS AS IS 6/22/97 S
l 3.207B   IRM CHANNEL C FAILS INOPERATIVE               3/4/97 S
3.176A RHR LOOP SDC VALVE 1FOO6A FAILS AS IS 4/8/97 S
, 3.207C   IRM CHANNEL C DETECTOR STUCK                   3/4/97 S 3.211 A   IRM CHANNEL G RECORDER FAILS AS-IS         10/18/97   S 3.211B   IRM CHANNEL G FAILS INOPERATIVE             10/18/97   S             I i 3.211C   IRM CHANNEL G DETECTOR STUCK               10/18/97   S             I 3.213C   SRM CHANNEL C FAILS TO SELECTED VALUE         6/7/97 S 3.214C   IRM CHANNEL C FAILS TO SELECTED VALUE         6/7/97 S             l 3.214G   IRM CHANNEL G FAILS TO SELECTED VALUE         6/7/97 S 3.215     IRM OVERLAP FAILURE                         12/20/97   S
3.176E RHR SDC INJECT VALVE 1FO15A FAILS AS IS 10/12/97 S
                        ~
3.177C RHR HX B BYPASS CONTROLLER FAILS HIGH 10/12/97 S
YrI5a~y5 ember 04,1998                                           Page 4 of 11 l
3.182C CORE SPRAY PUMP C TRIPS 5/13/97 S
3.183C CORE SPRAY PUMP C FAILS TO AUTO START 9/21/97 S
3.189A REACTOR WATER CLEANUP PUMP A TRIPS 2/15/97 S
3.1900 RWCU DRAIN FLOW CONTROLLER FAILS CLOSED 3/4/97.
S
)
3.194 RWCU SUCTION LINE COOL LEAKAGE (1-100%)
10/26/97 S
3.197 SLC SQUlB VALVES FAIL TO FIRE 3/12/97 S
3.203A SRM CHANNEL C RECORDER FAILS AS-IS 3/4/97 S
3 203B SRM CHANNEL C FAILS INOPERATIVE 3/4/97 S
3.203C SRM CHANNEL C DETECTOR STUCK 3/4/97 S
3.207A IRM CHANNEL C RECORDER FAILS AS-IS 3/4/97 S
l 3.207B IRM CHANNEL C FAILS INOPERATIVE 3/4/97 S
3.207C IRM CHANNEL C DETECTOR STUCK 3/4/97 S
3.211 A IRM CHANNEL G RECORDER FAILS AS-IS 10/18/97 S
3.211B IRM CHANNEL G FAILS INOPERATIVE 10/18/97 S
i 3.211C IRM CHANNEL G DETECTOR STUCK 10/18/97 S
3.213C SRM CHANNEL C FAILS TO SELECTED VALUE 6/7/97 S
3.214C IRM CHANNEL C FAILS TO SELECTED VALUE 6/7/97 S
3.214G IRM CHANNEL G FAILS TO SELECTED VALUE 6/7/97 S
3.215 IRM OVERLAP FAILURE 12/20/97 S
YrI5a~y5 ember 04,1998 Page 4 of 11
~
l
l


t Test No   Title                                     Test Date Results 3.226     RX INSTRUMENT LINE BREAK AFTER 42-F041       3/18/97   S 3.228B     RX INSTRUMENT LINE BREAK AFTER 42-F0478     6/22/97   S f
t Test No Title Test Date Results 3.226 RX INSTRUMENT LINE BREAK AFTER 42-F041 3/18/97 S
3.230B     RX INSTRUMENT LINE BREAK AFTER 42-F065B     6/22/97   S           !
f 3.228B RX INSTRUMENT LINE BREAK AFTER 42-F0478 6/22/97 S
3.231D     RX INSTRUMENT LINE BREAK AFTER 42-F045D     12/7/97   S           !
3.230B RX INSTRUMENT LINE BREAK AFTER 42-F065B 6/22/97 S
3.232E     RX LEVEL XMITTER LT42-N080C FAILS HIGH         3/4/97 S 3.232F     RX LEVEL XMITTER LT42-N080C FAILS LOW         3/4/97 S           ;
3.231D RX INSTRUMENT LINE BREAK AFTER 42-F045D 12/7/97 S
t 3.233E     RX LEVEL XMITTER DPT42-N004C FAILS HIGH     2/25/97 S           !
3.232E RX LEVEL XMITTER LT42-N080C FAILS HIGH 3/4/97 S
3.233F     RX LEVEL XMITTER DPT42-N004C FAILS LOW       2/25/97 S 3.234E     RX PRESS XMITTER PT42-N078C FAILS HIGH       4/8/97 S 3.234F     RX PRESS XMITTER PT42-N078C FAILS LOW       12/7/97 S 3 236C   REFERENCE LEG 1D004C FLASHES                 12/7/97 S           ;
3.232F RX LEVEL XMITTER LT42-N080C FAILS LOW 3/4/97 S
3.236F   ALL REFERENCE LEGS FLASH                     12/7/97 S           ,
t 3.233E RX LEVEL XMITTER DPT42-N004C FAILS HIGH 2/25/97 S
3.237C   REFERENCE LEG 1D004C LEVEL DEFECT           6/22/97   S           ,
3.233F RX LEVEL XMITTER DPT42-N004C FAILS LOW 2/25/97 S
3.2418   FEEDWATER HEATER 128 TUBE LEAK               12/7/97   S 3.242C   FEEDWATER HEATER 15C TUBE LEAK               11/9/97   S           i 3.245A   REACTOR FEEDWATER PUMP B TRIPS               2/15/97   S 3.246B     FEEDWATER PUMP C MECHANICAL FAILURE         12/7/97   S 3.248A     RX FEEDPUMP A RECIRC VALVE FAILS OPEN       3/18/97   S           j 3.250A     RX FEEDPUMP C RECIRC VALVE FAILS OPEN       11/15/97   S 3.253A     FW LINE A RUPTURE OUTSIDE DRYWELL           12/7/97   S           j 3.256     CAC N2 PURGE FLOW CONTROLLER FAILS HIGH     12/7/97   S             l 3.261     LOSS OF OFFSITE POWER (BLACKOUT)             8/23/97   S 3.263C     4KV SAFEGUARD BUS D13 FAULT                 6/22/97   S 3.264B     MAIN GEN OUTPUT BKR 252-10213 TRIPS         11/15/97   S 3,266A     13.2KV SAFEGUARD XFMR BKR 101 TRIPS         11/9/97   S l
3.234E RX PRESS XMITTER PT42-N078C FAILS HIGH 4/8/97 S
3.272A     114C TURB AREA 440V LOAD CENTER FAULT         4/8/97 S 3.2728     124C TURB AREA 440V LOAD CENTER FAULT         4/8/97 S 3.275C     D134 SAFEGUARD 440V LOAD CENTER FAULT       6/14/97   S 3.277C     120 VAC PANEL 10Y103 FAULT                     3/5/97 S 3.279A     120 VAC PANEL 10Y201 FAULT                   3/18/97   S i Fr5In[Dic0m~ber 04,1998                                           Page 5 of11 l
3.234F RX PRESS XMITTER PT42-N078C FAILS LOW 12/7/97 S
3 236C REFERENCE LEG 1D004C FLASHES 12/7/97 S
3.236F ALL REFERENCE LEGS FLASH 12/7/97 S
3.237C REFERENCE LEG 1D004C LEVEL DEFECT 6/22/97 S
3.2418 FEEDWATER HEATER 128 TUBE LEAK 12/7/97 S
3.242C FEEDWATER HEATER 15C TUBE LEAK 11/9/97 S
i 3.245A REACTOR FEEDWATER PUMP B TRIPS 2/15/97 S
3.246B FEEDWATER PUMP C MECHANICAL FAILURE 12/7/97 S
3.248A RX FEEDPUMP A RECIRC VALVE FAILS OPEN 3/18/97 S
j 3.250A RX FEEDPUMP C RECIRC VALVE FAILS OPEN 11/15/97 S
3.253A FW LINE A RUPTURE OUTSIDE DRYWELL 12/7/97 S
j 3.256 CAC N2 PURGE FLOW CONTROLLER FAILS HIGH 12/7/97 S
3.261 LOSS OF OFFSITE POWER (BLACKOUT) 8/23/97 S
3.263C 4KV SAFEGUARD BUS D13 FAULT 6/22/97 S
3.264B MAIN GEN OUTPUT BKR 252-10213 TRIPS 11/15/97 S
3,266A 13.2KV SAFEGUARD XFMR BKR 101 TRIPS 11/9/97 S
3.272A 114C TURB AREA 440V LOAD CENTER FAULT 4/8/97 S
3.2728 124C TURB AREA 440V LOAD CENTER FAULT 4/8/97 S
3.275C D134 SAFEGUARD 440V LOAD CENTER FAULT 6/14/97 S
3.277C 120 VAC PANEL 10Y103 FAULT 3/5/97 S
3.279A 120 VAC PANEL 10Y201 FAULT 3/18/97 S
Fr5In[Dic0m~ber 04,1998 Page 5 of11 i
l i
l i
i
i


1 l   Test No     Title                                       Test Date Results 3.280A       120 VAC RPS & UPS BUS 1 AY160 FAULT             5/13/97   S 4                                                           .
1 l
3.282C       1FC 125/250 VDC 1CD105 FAULT                   9/28/97 S
Test No Title Test Date Results 3.280A 120 VAC RPS & UPS BUS 1 AY160 FAULT 5/13/97 S
3.284C       LOSS OF DC TO SELECTED ANNUNCIATOR PNLS     10/26/97   S
4 3.282C 1FC 125/250 VDC 1CD105 FAULT 9/28/97 S
3.284G       LOSS OF DC TO SELECTED ANNUNCIATOR PNLS         12/7/97 S 3.299B       CONTROL STRUCTURE CHILLER OBK112 TRIP       10/12/97   S 3.302A       Refuel Floor isolation Channel A                 6/7/97 S 1
3.284C LOSS OF DC TO SELECTED ANNUNCIATOR PNLS 10/26/97 S
3.305A       SGTS FROM RX ENCLOS HV76-196 FAILS OPEN           4/8/97 S l 3.310       CONTROL STRUCTURE Hi CL2 CONCENTRATION         6/14/97   S 3.407A       RRCS ARI DIVISION I FAILS TO INITIATE       10/26/97   S 3.408A       LEAK IN INSTRUMENT AIR HEADER A             10/12/97   S
3.284G LOSS OF DC TO SELECTED ANNUNCIATOR PNLS 12/7/97 S
} 3.410A       CIG ISOL TO DW HV59-129A FAILS CLOSED             4/8/97 S 3.411B       CRD FLOW CNTRL VALVE B FAILS CLOSED         10/17/97   S 3.412C       BOTH CONTROL ROD DRIVE PUMPS TRIP             2/25/97   S 3.414C       DISCH VOLUME SV47-1F181 FAILS CLOSED         11/15/97   S
3.299B CONTROL STRUCTURE CHILLER OBK112 TRIP 10/12/97 S
] 3.418C       DIESEL GENERATOR 13 TRIP                         3/5/97 S i 3.419C       DIESEL GENERATOR 13 FAILS TO START               6/7/97 S             j 3 424C       BOTH INSTRUMENT AIR COMPRESSORS TRIP             6/7/97 S l 3 431C       RECIRC PUMP B M/A STATION FAILS HIGH           12/7/97   S             l 3.432B       RECIRC PUMP B INCOMPLETE START SEO               6/7/97 S 3.434A       RECIRC PUMP A SEAL #2 FAILURE                 12/7/97   S
3.302A Refuel Floor isolation Channel A 6/7/97 S
                                                                                        ]
1 3.305A SGTS FROM RX ENCLOS HV76-196 FAILS OPEN 4/8/97 S
3.436A       RECIRC PUMP A GEN FIELD BREAKER TRIP           2/25/97   S 3.442C       RECIRC PUMP 1 A RPT BRKR CB3A & CB4A TRIP     3/18/97   S 3 443A REC 1RC PUMP 1B RPT BREAKER CB3B TRIP         2/25/97   S 3 446B       HPCI STM ISOL VALVE HV55-1F003 FAILS           5/13/97   S 3 448A       HPCI SPEED CONT FAILS HIGH                     9/21/97   S l 3.451A       HPCI STEAM SUPPLY HV55-1F003 ISOLATES         5/13/97   S 3.454       HPCI SUCTION VALVES FAIL TO AUTO SWAP         6/14/97   S 3.4578       RCIC SPEED CONT FAILS LOW                     6/22/97   S 3.460       RCIC DISCHARGE VALVE 1F013 FAILS AS IS       6/22/97   S 3.464A       RCIC ISOL VLV HV491F007 FAILS AS-IS               3/5/97 S Friday, December 04,1998                                               Page 6 of11
l 3.310 CONTROL STRUCTURE Hi CL2 CONCENTRATION 6/14/97 S
3.407A RRCS ARI DIVISION I FAILS TO INITIATE 10/26/97 S
3.408A LEAK IN INSTRUMENT AIR HEADER A 10/12/97 S
}
3.410A CIG ISOL TO DW HV59-129A FAILS CLOSED 4/8/97 S
3.411B CRD FLOW CNTRL VALVE B FAILS CLOSED 10/17/97 S
3.412C BOTH CONTROL ROD DRIVE PUMPS TRIP 2/25/97 S
3.414C DISCH VOLUME SV47-1F181 FAILS CLOSED 11/15/97 S
]
3.418C DIESEL GENERATOR 13 TRIP 3/5/97 S
i 3.419C DIESEL GENERATOR 13 FAILS TO START 6/7/97 S
j 3 424C BOTH INSTRUMENT AIR COMPRESSORS TRIP 6/7/97 S
l 3 431C RECIRC PUMP B M/A STATION FAILS HIGH 12/7/97 S
3.432B RECIRC PUMP B INCOMPLETE START SEO 6/7/97 S
3.434A RECIRC PUMP A SEAL #2 FAILURE 12/7/97 S
]
3.436A RECIRC PUMP A GEN FIELD BREAKER TRIP 2/25/97 S
3.442C RECIRC PUMP 1 A RPT BRKR CB3A & CB4A TRIP 3/18/97 S
3 443A REC 1RC PUMP 1B RPT BREAKER CB3B TRIP 2/25/97 S
3 446B HPCI STM ISOL VALVE HV55-1F003 FAILS 5/13/97 S
3 448A HPCI SPEED CONT FAILS HIGH 9/21/97 S
l 3.451A HPCI STEAM SUPPLY HV55-1F003 ISOLATES 5/13/97 S
3.454 HPCI SUCTION VALVES FAIL TO AUTO SWAP 6/14/97 S
3.4578 RCIC SPEED CONT FAILS LOW 6/22/97 S
3.460 RCIC DISCHARGE VALVE 1F013 FAILS AS IS 6/22/97 S
3.464A RCIC ISOL VLV HV491F007 FAILS AS-IS 3/5/97 S
Friday, December 04,1998 Page 6 of11


Test No   Title                                   Test Date Results 3.466       TRIP OF RCIC OVRSPEED MECHANISM             4/7/97 S 3.471C     DRYWELL AREA UNIT COOLER FAN 1C1 TRIP       4/7/97 S 3.471G     DRYWELL AREA UNIT COOLER FAN 1G1 TRIP       5/13/97 S 3.472C     DRYWELL AREA UNIT COOLER FAN 1C2 TRIP       6/14/97 S 3.472G     DRYWELL AREA UNIT COOLER FAN 1G2 TRIP       6/22/97 S 3.482A     DW CHILLER 1 AK111 TRIP                     11/9/97 S 3.484A     TECW PUMP A TRIP                           2/25/97   S 3.487       LOSS OF SW TO MAIN TURB LUBE OIL COOLERS     9/7/97 S 3.489C     ESW PUMP C TRIPS                           2/26/97   S 3.490C     ES$N VLV HV11225 FAILS TO AUTO SWAP       2/26/97 S 3.490G     ESW VLV HV11-126 FAILS TO AUTO SWAP         3/3/97 S 3.491       ESW SYSTEM LEAK                           7/26/97 S 3.492C     RHR SERVICE WATER PUMP C TRIPS             6/14/97 S 3.501A     JET PUMP NO. 7/8 PLUGGED RISER             6/14/97 S 3.503A     JET PUMP NO.17/18 RISER BREAK               12/7/97 S 3.504B     RECIRC PUMP 1B SHAFT FAILURE               12/7/97 S 3.506A     RECIRC PUMP B HIGH RUNBACK                 2/25/97 S 3.515A     FW HEATER 12A DRAIN VALVE FAILS OPEN       2/11/97 S 3.515E     FW HEATER 16A DRAIN VALVE FAILS OPEN         3/3/97 S 3.516D     FW HEATER 15A DRAIN VALVE FAILS CLOSED     3/18/97 S 3.517C     FW HEATER 1 IB DRAIN VALVE FAILS OPEN       3/18/97 S 3.518B     FW HEATER 14B DRAIN VALVE FAILS CLOSED     5/20/97 S 3.519A     FW HEATER 12C DRAIN VALVE FAILS OPEN         6/7/97 S 3.519E     FW HEATER 16C DRAIN VALVE FAILS OPEN       5/20/97 S
Test No Title Test Date Results 3.466 TRIP OF RCIC OVRSPEED MECHANISM 4/7/97 S
.                                3.520D     FW HEATER 15C DRAIN VALVE FAILS CLOSED     5/20/97 S 3.521C     FW HEATER 14A DUMP VALVE FAILS OPEN         5/20/97 S 3.5228     FW HEATER 13A DUMP VALVE FAILS CLOSED       5/20/97 S 3.523A     FW HEATER 12B DUMP VALVE FAILS OPEN         5/20/97 S 3.523E     FW HEATER 16B DUMP VALVE FAILS OPEN       6/22/97   S 3.524D     FW HEATER 15B DUMP VALVE FAILS CLOSED     5/20/97   S Friday, Deceri55er 04,1998                                       Page 7 of11
3.471C DRYWELL AREA UNIT COOLER FAN 1C1 TRIP 4/7/97 S
3.471G DRYWELL AREA UNIT COOLER FAN 1G1 TRIP 5/13/97 S
3.472C DRYWELL AREA UNIT COOLER FAN 1C2 TRIP 6/14/97 S
3.472G DRYWELL AREA UNIT COOLER FAN 1G2 TRIP 6/22/97 S
3.482A DW CHILLER 1 AK111 TRIP 11/9/97 S
3.484A TECW PUMP A TRIP 2/25/97 S
3.487 LOSS OF SW TO MAIN TURB LUBE OIL COOLERS 9/7/97 S
3.489C ESW PUMP C TRIPS 2/26/97 S
3.490C ES$N VLV HV11225 FAILS TO AUTO SWAP 2/26/97 S
3.490G ESW VLV HV11-126 FAILS TO AUTO SWAP 3/3/97 S
3.491 ESW SYSTEM LEAK 7/26/97 S
3.492C RHR SERVICE WATER PUMP C TRIPS 6/14/97 S
3.501A JET PUMP NO. 7/8 PLUGGED RISER 6/14/97 S
3.503A JET PUMP NO.17/18 RISER BREAK 12/7/97 S
3.504B RECIRC PUMP 1B SHAFT FAILURE 12/7/97 S
3.506A RECIRC PUMP B HIGH RUNBACK 2/25/97 S
3.515A FW HEATER 12A DRAIN VALVE FAILS OPEN 2/11/97 S
3.515E FW HEATER 16A DRAIN VALVE FAILS OPEN 3/3/97 S
3.516D FW HEATER 15A DRAIN VALVE FAILS CLOSED 3/18/97 S
3.517C FW HEATER 1 IB DRAIN VALVE FAILS OPEN 3/18/97 S
3.518B FW HEATER 14B DRAIN VALVE FAILS CLOSED 5/20/97 S
3.519A FW HEATER 12C DRAIN VALVE FAILS OPEN 6/7/97 S
3.519E FW HEATER 16C DRAIN VALVE FAILS OPEN 5/20/97 S
3.520D FW HEATER 15C DRAIN VALVE FAILS CLOSED 5/20/97 S
3.521C FW HEATER 14A DUMP VALVE FAILS OPEN 5/20/97 S
3.5228 FW HEATER 13A DUMP VALVE FAILS CLOSED 5/20/97 S
3.523A FW HEATER 12B DUMP VALVE FAILS OPEN 5/20/97 S
3.523E FW HEATER 16B DUMP VALVE FAILS OPEN 6/22/97 S
3.524D FW HEATER 15B DUMP VALVE FAILS CLOSED 5/20/97 S
Friday, Deceri55er 04,1998 Page 7 of11


a f
a f
Test No       Title                                                 Test Dhte Results i
Test No Title Test Dhte Results i
3.525C         FW HEATER 14C DUMP VALVE FAILS OPEN                     6/22/97     S 3.526B         FW HEATER 13C DUMP VALVE FAILS CLOSED                     6/7/97     S 3.527C         STEAM LEAK DET NUMAC TIS 25-101C FAILS                   6/7/97     S l
3.525C FW HEATER 14C DUMP VALVE FAILS OPEN 6/22/97 S
3.528C         RHR CNTMNT SPRAY VALVE FO21 A FAILS AS-IS                 4/8/97     S 3.529C         RX PRESS XMITTER PT42-103B FAILS HIGH                   6/14/97     S 3.532         TURBlNE EMERGENCY BEARING OIL PUMP TRIPS                 6/14/97     S 3.535C         181 MOIST SEP DR TK DRN VLV FAILS CLOSED                 6/14/97     S 3.536C         1B1 MOIST SEP DR TK DRN VLV FAILS OPEN                   12/7/97     S 3.536E         1C1 MOIST SEP DR TK DRN VLV FAILS OPEN                   12/7/97     S 3.537C         1B1 MOIST SEP DR TK DMP VLV FAILS CLOSED                 6/14/97     S 3.538C       181 MOIST SEP DRN TK DMP VLV FAILS OPEN                   12/5/97     S 3.538E         1C1 MOIST SEP DRN TK DMP VLV FAILS OPEN                   12/5/97     S 3.541         GEN HYDROGEN COOLERS TCV FAILS CLOSED                     12/7/97     S 1
3.526B FW HEATER 13C DUMP VALVE FAILS CLOSED 6/7/97 S
3.545         STATOR COOLING WATER FLOW SWITCH FAILS                   12/7/97     S 3.549         COARSE HOTWELL REJECT VALVE FAILS OPEN                   6/14/97     S 3.552A         RFP DISCH CHK VLV HV06-105A FAILS OPEN                   1/11/97     S 3.552B         RFP DISCH CHK VLV HV06-105B FAILS OPEN                   1/11/97     S 3.553C         TURBINE CONTROL VALVE NO. 3 FAILS OPEN                   6/22/97     S                             ,
3.527C STEAM LEAK DET NUMAC TIS 25-101C FAILS 6/7/97 S
3.554         MAIN TURBINE PMG FAILS                                   6/22/97     S l   3.556B         RFP B M/A STATION SWAPS TO MANUAL                       6/14/97     S                             j 3.556D         RFP A, B & C M/A STATIONS SWAP TO MANUAL                 6/14/97     S i
l 3.528C RHR CNTMNT SPRAY VALVE FO21 A FAILS AS-IS 4/8/97 S
3.563A         Fw Heater 1 A Level Sensing Line Fails Hi               4/24/97     S                             !
3.529C RX PRESS XMITTER PT42-103B FAILS HIGH 6/14/97 S
3.563B         Fw Heater 1B Level Sensing Line Fails Hi                 4/24/97     S                               .
3.532 TURBlNE EMERGENCY BEARING OIL PUMP TRIPS 6/14/97 S
3.563C         Fw Heater 1C Level Sensing Line Fails Hi                 4/24/97     S 3.564A         Fw Heater 2A Level Sensing Line Fails Hi                 4/24/97     S 3.564B       Fw Heater 28 Level Sensing Line Fails Hi                 4/24/97     S 3.564C       Fw Heater 2C Level Sensing Line Fails Hi                 4/24/97     S 3.565A       Fw Heater 3A Level Sensing Line Fails Hi                 4/24/97     S 3.565B       Fw Heater 3B Level Sensing Line Fails Hi                 4/24/97     S 3.565C       Fw Heater 3C Level Sensing Line Fails Hi                 4/24/97     S hy     e                                                                         h             h 2
3.535C 181 MOIST SEP DR TK DRN VLV FAILS CLOSED 6/14/97 S
3.536C 1B1 MOIST SEP DR TK DRN VLV FAILS OPEN 12/7/97 S
3.536E 1C1 MOIST SEP DR TK DRN VLV FAILS OPEN 12/7/97 S
3.537C 1B1 MOIST SEP DR TK DMP VLV FAILS CLOSED 6/14/97 S
3.538C 181 MOIST SEP DRN TK DMP VLV FAILS OPEN 12/5/97 S
3.538E 1C1 MOIST SEP DRN TK DMP VLV FAILS OPEN 12/5/97 S
3.541 GEN HYDROGEN COOLERS TCV FAILS CLOSED 12/7/97 S
1 3.545 STATOR COOLING WATER FLOW SWITCH FAILS 12/7/97 S
3.549 COARSE HOTWELL REJECT VALVE FAILS OPEN 6/14/97 S
3.552A RFP DISCH CHK VLV HV06-105A FAILS OPEN 1/11/97 S
3.552B RFP DISCH CHK VLV HV06-105B FAILS OPEN 1/11/97 S
3.553C TURBINE CONTROL VALVE NO. 3 FAILS OPEN 6/22/97 S
3.554 MAIN TURBINE PMG FAILS 6/22/97 S
l 3.556B RFP B M/A STATION SWAPS TO MANUAL 6/14/97 S
j i
3.556D RFP A, B & C M/A STATIONS SWAP TO MANUAL 6/14/97 S
3.563A Fw Heater 1 A Level Sensing Line Fails Hi 4/24/97 S
3.563B Fw Heater 1B Level Sensing Line Fails Hi 4/24/97 S
3.563C Fw Heater 1C Level Sensing Line Fails Hi 4/24/97 S
3.564A Fw Heater 2A Level Sensing Line Fails Hi 4/24/97 S
3.564B Fw Heater 28 Level Sensing Line Fails Hi 4/24/97 S
3.564C Fw Heater 2C Level Sensing Line Fails Hi 4/24/97 S
3.565A Fw Heater 3A Level Sensing Line Fails Hi 4/24/97 S
3.565B Fw Heater 3B Level Sensing Line Fails Hi 4/24/97 S
3.565C Fw Heater 3C Level Sensing Line Fails Hi 4/24/97 S
hy e
h h
2


Test No     Title                                       Test Date Results 3.566A     Fw Heater 4A Level Sensing Line Fails Hi       4/24/97           S 3.566B     Fw Heater 4B Level Sensing Line Fails Hi       4/24/97           S 3.566C     Fw Heater 4C Level Sensing Line Fails Hi       4/24/97           S 3.567A     Fw Heater SA Level Sensing Line Fails Hi         4/24/97           S 4
Test No Title Test Date Results 3.566A Fw Heater 4A Level Sensing Line Fails Hi 4/24/97 S
3.5678     Fw Heater 5B Level Sensing Line Fails Hi         4/24/97           S 3.567C     Fw Heater SC Level Sensing Line Fails Hi       4/24/97           S
3.566B Fw Heater 4B Level Sensing Line Fails Hi 4/24/97 S
;          3.568A     Fw Heater 6A Level Sensing Line Fails Hi       4/24/97           S 3.568B     Fw Heater 6B Level Sensing Line Fails Hi       4/24/97           S 3.568C     Fw Heater 6C Level Sens,ing Line Fails Hi       4/24/97           S 4.007       Load Table: 4 KV SAFEGUARD BUS D13             6/22/97           S 4.013       Load Table: 4 KV Safeguard Bus D134             6/14/97           S 4.017       Load Table: Turbine Area Load Ctr 114C           4/8/97           S 4.021       Load Table: Turbine Area Load Ctr 124C           4/8/97           S 4.031       Load Table: 120 VAC Panel 10Y103                 3/5/97           S 4.037       Load Table: 120 VAC Panel 10Y201               3/18/97           S 4.039       Load Table: 1 A RPS/UPS Bus 1 AY160             5/13/97           S 4.043       Load Table: 125/250 VDC Bus 1CD105             9/28/97           S 4.057       Load Table: FWC UPS Inverter E/S-XX-120         3/18/97           S 5.03A       10 gpm Reactor Coolant Leak In Drywell         9/28/97         S                   l 5.03B       100 gpm Reactor Coolant Leak in Drywell       10/12/97         S 5.068       LOSS O/S POWER AT RATED POWER CONDITIONS         6/8/97         S 507C       Loss of Safeguard Bus D13 (Emergency Power)       6/8/97         S 5.09C       LOSS OF NON-SAFEGUARD LOAD CENTER 114C           6/8/97         S 5.09G       LOSS OF NON-SAFEGUARD LOAD CENTER 124C           6/8/97         S                   i l
3.566C Fw Heater 4C Level Sensing Line Fails Hi 4/24/97 S
5.10C     LOSS OF 120 VAC INSTRUMENT BUS 10Y103             6/8/97         S                   j 5.10)     LOSS OF 120 VAC INSTRUMENT BUS 10Y201             6/8/97         S                   l 5.10L     LOSS OF 120 VAC RPS/UPS BUS 1 AY160               6/8/97         S 5.11C     LOSS OF 125/250 VDC BUS 1CD105                   6/8/97         S 5.13B     Main Condenser Air Leak at High Severity         9/21/97         S 5.17A     TRIP OF ONE REACTOR FEEDWATER PUMP               8/23/97         S Friday, December 04,1998                                                       Page 9 of11
3.567A Fw Heater SA Level Sensing Line Fails Hi 4/24/97 S
4 3.5678 Fw Heater 5B Level Sensing Line Fails Hi 4/24/97 S
3.567C Fw Heater SC Level Sensing Line Fails Hi 4/24/97 S
3.568A Fw Heater 6A Level Sensing Line Fails Hi 4/24/97 S
3.568B Fw Heater 6B Level Sensing Line Fails Hi 4/24/97 S
3.568C Fw Heater 6C Level Sens,ing Line Fails Hi 4/24/97 S
4.007 Load Table: 4 KV SAFEGUARD BUS D13 6/22/97 S
4.013 Load Table: 4 KV Safeguard Bus D134 6/14/97 S
4.017 Load Table: Turbine Area Load Ctr 114C 4/8/97 S
4.021 Load Table: Turbine Area Load Ctr 124C 4/8/97 S
4.031 Load Table: 120 VAC Panel 10Y103 3/5/97 S
4.037 Load Table: 120 VAC Panel 10Y201 3/18/97 S
4.039 Load Table: 1 A RPS/UPS Bus 1 AY160 5/13/97 S
4.043 Load Table: 125/250 VDC Bus 1CD105 9/28/97 S
4.057 Load Table: FWC UPS Inverter E/S-XX-120 3/18/97 S
5.03A 10 gpm Reactor Coolant Leak In Drywell 9/28/97 S
5.03B 100 gpm Reactor Coolant Leak in Drywell 10/12/97 S
5.068 LOSS O/S POWER AT RATED POWER CONDITIONS 6/8/97 S
507C Loss of Safeguard Bus D13 (Emergency Power) 6/8/97 S
5.09C LOSS OF NON-SAFEGUARD LOAD CENTER 114C 6/8/97 S
5.09G LOSS OF NON-SAFEGUARD LOAD CENTER 124C 6/8/97 S
i 5.10C LOSS OF 120 VAC INSTRUMENT BUS 10Y103 6/8/97 S
j 5.10)
LOSS OF 120 VAC INSTRUMENT BUS 10Y201 6/8/97 S
5.10L LOSS OF 120 VAC RPS/UPS BUS 1 AY160 6/8/97 S
5.11C LOSS OF 125/250 VDC BUS 1CD105 6/8/97 S
5.13B Main Condenser Air Leak at High Severity 9/21/97 S
5.17A TRIP OF ONE REACTOR FEEDWATER PUMP 8/23/97 S
Friday, December 04,1998 Page 9 of11


l Test No     Title                                           Test Date Results 5.17E     Feedwater Master Controller Fails Low               6/15/97   S 5.18       Loss of All Feedwater Resulting in ADS Blowdown     9/14/97   S 5.25A     Recire Pump M/A Station Fails High                   9/21/97 S 5.30A     Main Feedwater Line A Break Outside Drywell         8/31/97 S             i 5.34C     MSIV Closure with ATWS (Brown's Ferry)               9/14/97 S 5.35D     Turbine Trip with Bypass Valves Fail Closed         9/21/97 S 6.10       Steady State Performance at 25% Power               9/14/97 S 6.11       Steady State Performance at 75% Power               9/14/97 S 6.12       Steady State Performance at 100% Power for 1 Hour   9/14/97 S 7.01       MANUAL SCRAM                                       6/15/97   S 7.02       SIMULTANEOUS TRIP OF ALL FEEDWATER PUMPS           6/15/97   S 7.03       CLOSURE OF ALL MSIVS @ 100% POWER                   8/23/97   S 7.04       TRIP OF BOTH RECIRC PUMPS AT RATED POWER           6/15/97   S 7.05       SINGLE RECIRC PUMP TRIP                             6/15/97   S 7.06       TURBlNE TRIP WITHIN BYPASS CAPAB!LITY               9/21/97   S 7.08       RECIRC LOOP RUPTURE W/ LOSS OFFSITE PWR             6/15/97   S 7.09       MAX SIZE UNISOLABLE MSL RUPTURE                     6/22/97   S           ;
Test No Title Test Date Results 5.17E Feedwater Master Controller Fails Low 6/15/97 S
8.101       T-212 Byp Squib Vivs with Hi Press Hose             9/28/97   S           '
5.18 Loss of All Feedwater Resulting in ADS Blowdown 9/14/97 S
8.371       Local Fire Monitors Reset                           1/28/97   S 8.372       Spray Pond Tempersture                             7/26/97   S           [
5.25A Recire Pump M/A Station Fails High 9/21/97 S
8.373       11-0094A, ESW Loop A Unitization Jumper             7/27/97   S 8.374       11-0094B, ESW Loop B Unitization Jumper             7/27/97   S           ,
5.30A Main Feedwater Line A Break Outside Drywell 8/31/97 S
8.375       11-0095A., ESW Loop A isolation Valve               7/27/97 S           ,
i 5.34C MSIV Closure with ATWS (Brown's Ferry) 9/14/97 S
8.376       11-00958, ESW Loop B isolation Valve               7/27/97 S 8.377       11-0123A, ESW Loop A Return Hdr Iso Viv             7/27/97 S 8.378       11-01238, ESW Loop B Return Hdr Iso Viv             7/27/97 S 8.379     ESW Loop A Header Isolation                         7/29/97 S 8.380     ESW Loop B Header Isolation                         7/27/97 S 8.381     RHRSW Loop A Header Isolation                       7/26/97 S           l 8.382     RHRSW Loop B Header Isolation                       7/20/97 S Friday, December 04,1998                                                 Page 10 of11 i
5.35D Turbine Trip with Bypass Valves Fail Closed 9/21/97 S
6.10 Steady State Performance at 25% Power 9/14/97 S
6.11 Steady State Performance at 75% Power 9/14/97 S
6.12 Steady State Performance at 100% Power for 1 Hour 9/14/97 S
7.01 MANUAL SCRAM 6/15/97 S
7.02 SIMULTANEOUS TRIP OF ALL FEEDWATER PUMPS 6/15/97 S
7.03 CLOSURE OF ALL MSIVS @ 100% POWER 8/23/97 S
7.04 TRIP OF BOTH RECIRC PUMPS AT RATED POWER 6/15/97 S
7.05 SINGLE RECIRC PUMP TRIP 6/15/97 S
7.06 TURBlNE TRIP WITHIN BYPASS CAPAB!LITY 9/21/97 S
7.08 RECIRC LOOP RUPTURE W/ LOSS OFFSITE PWR 6/15/97 S
7.09 MAX SIZE UNISOLABLE MSL RUPTURE 6/22/97 S
8.101 T-212 Byp Squib Vivs with Hi Press Hose 9/28/97 S
8.371 Local Fire Monitors Reset 1/28/97 S
8.372 Spray Pond Tempersture 7/26/97 S
[
8.373 11-0094A, ESW Loop A Unitization Jumper 7/27/97 S
8.374 11-0094B, ESW Loop B Unitization Jumper 7/27/97 S
8.375 11-0095A., ESW Loop A isolation Valve 7/27/97 S
8.376 11-00958, ESW Loop B isolation Valve 7/27/97 S
8.377 11-0123A, ESW Loop A Return Hdr Iso Viv 7/27/97 S
8.378 11-01238, ESW Loop B Return Hdr Iso Viv 7/27/97 S
8.379 ESW Loop A Header Isolation 7/29/97 S
8.380 ESW Loop B Header Isolation 7/27/97 S
8.381 RHRSW Loop A Header Isolation 7/26/97 S
l 8.382 RHRSW Loop B Header Isolation 7/20/97 S
Friday, December 04,1998 Page 10 of11 i
l
l


f Test No     Title                                         Test Date Results 8.383       ESW/ RHRSW Loop A Crosstie Valves               7/27/97   S 8.384       ESW/ RHRSW Loop B Crosstie Valves               7/27/97   S 8.385       12-120A, RHRSW Loop A Hdr Iso Valve             5/29/97   S 4
f Test No Title Test Date Results 8.383 ESW/ RHRSW Loop A Crosstie Valves 7/27/97 S
8.386       12-1208, RHRSW Loop B Hdr Iso Valve             7/26/97   S 8.387       12-0121/0122, RHRSW Loop Crosstie Valves         7/26/97   S
8.384 ESW/ RHRSW Loop B Crosstie Valves 7/27/97 S
8.388       Feeder Breaker for HV12-034B                       8/3/97 S 8.389       Feeder Breaker for HV12-211                       8/3/97 S 8.390       Feeder Breaker for HV11-011 A                     8/3/97 S 8.391       Feeder Breaker for HV11-011B                     7/19/97   S 8.392       Feeder Breaker for HV11-015A                     8/3/97   S 8.393       Feeder Breaker for HV11-015B                     7/19/97   S 8.394       TECW Heat Exchanger Cooling Water Source         7/19/97   S 8.395       RECW Heat Exchanger Cooling Water Source         7/27/97   S 8.396       ESW Loop A Service Water Isolated?               7/27/97 S 8.397       ESW Loop B Service Water Isolated?               7/27/97 S 8.398       HV41-1F032A, FW Stop "Leakby"                   9/28/97 S 8.399       HV41-1F0328, FW Stop "Leakby"                   9/28/97 S 8.400       RWCU Filter / Demin A Flow Controller Setpoint 10/26/97 S i 8.401       RWCU Filter / Demin B Flow Controller Setpoint 10/26/97 S 1
8.385 12-120A, RHRSW Loop A Hdr Iso Valve 5/29/97 S
4 Friday, December 04,1998                                             Page 11 of 11
8.386 12-1208, RHRSW Loop B Hdr Iso Valve 7/26/97 S
4 8.387 12-0121/0122, RHRSW Loop Crosstie Valves 7/26/97 S
8.388 Feeder Breaker for HV12-034B 8/3/97 S
8.389 Feeder Breaker for HV12-211 8/3/97 S
8.390 Feeder Breaker for HV11-011 A 8/3/97 S
8.391 Feeder Breaker for HV11-011B 7/19/97 S
8.392 Feeder Breaker for HV11-015A 8/3/97 S
8.393 Feeder Breaker for HV11-015B 7/19/97 S
8.394 TECW Heat Exchanger Cooling Water Source 7/19/97 S
8.395 RECW Heat Exchanger Cooling Water Source 7/27/97 S
8.396 ESW Loop A Service Water Isolated?
7/27/97 S
8.397 ESW Loop B Service Water Isolated?
7/27/97 S
8.398 HV41-1F032A, FW Stop "Leakby" 9/28/97 S
8.399 HV41-1F0328, FW Stop "Leakby" 9/28/97 S
8.400 RWCU Filter / Demin A Flow Controller Setpoint 10/26/97 S
i 8.401 RWCU Filter / Demin B Flow Controller Setpoint 10/26/97 S
1 4
Friday, December 04,1998 Page 11 of 11


PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT LGS SIMULATOR TESTING PERFORMED IN 1998                       ;
PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT LGS SIMULATOR TESTING PERFORMED IN 1998 i
l l
l i


LGS Simulator Testing Completedin 1998 Test No       Title                                                     Test Date Results 1.01           Computer Real Time Test                                       9/9/98 S 1.04A         Performance Test: Loss of 11 Unit Auxiliary Bus             6/21/98   S     i 2.02-IX.B     HPCI HV55-1F011 Thermal Overload Trip on High DP             8/2/98 S 2.06-1.A       ADS System Test: Division i Manualinitiation               10/31/98 S       -
LGS Simulator Testing Completedin 1998 Test No Title Test Date Results 1.01 Computer Real Time Test 9/9/98 S
2.064 B       ADS System Test: Division 11 ManualInitiation             10/31/98   S 2 . 0 6 -11   ADS Sys Test: Auto ADS Init on Low Level & High DW Pressu 10/31/98 S 2.06-IV       ADS System Test: Automatic ADS Initiation inhibit           11598     S     '
1.04A Performance Test: Loss of 11 Unit Auxiliary Bus 6/21/98 S
2.06-VI       ADS System Test: Overpressure Operation of SRVs           10/31/98   S 2.06-Vil       SRV 1F013A, C & N Instrument Gas Accumulatcrs               9/9/98 S 2 . 0 9 -11     RPS Sys Test: Manual Scrams                               10/14/98 S 2.09-ill.B     RPS Sys Test: RPS Trip on MSIV Position                   12/23/98 S 2.09-ill.C     RPS Sys Test: RPS Trip on Low Rx Water Level               10/14/98   S     i l
i 2.02-IX.B HPCI HV55-1F011 Thermal Overload Trip on High DP 8/2/98 S 2.06-1.A ADS System Test: Division i Manualinitiation 10/31/98 S 2.064 B ADS System Test: Division 11 ManualInitiation 10/31/98 S
2.09-Ill.D     RPS Sys Test: RPS Trip on High Rx Pressure                 10/14/98   S     l 2.09-ill.H     RPS Sys Teat: RPS Trips on Turbine Stop Valve Closure     12/19/98   S 2 . 0 9 -111.1 RPS Sys Test: RPS Trip on Control Valve Fast Closure       10/14/98   S 2.09-IV         RPS Sys Test: Miscellaneous RPS Logic                     12/13/98   S 2.10-IV         RRCS Sys Test: Response To Instrument Line Breaks         10/22/98   S 2.15-1.H       RRS Sys Test: Recire Seal Water Supply Valve Logic         11/8/98   S
2. 0 6 -11 ADS Sys Test: Auto ADS Init on Low Level & High DW Pressu 10/31/98 S 2.06-IV ADS System Test: Automatic ADS Initiation inhibit 11598 S
;      2.15.l-C       RRS Sys Test: Verification of Scoop Tube Locks               8/1/98   S l     2.18-l B       Cire Water Sys Test: Circ Water Pump Trips                 12/12/98   S 2.21 B.lll     ESW Sys Test: Auto Valve Operation on ESW Pump Start       12/19/98   S 2.218.lX       ESW Sys Test: RHR Pumps A & C Compartment Cooling           1/2/98   S 2.21 B.VI       ESW Sys Test: HPCI Compartment Cooling                       1/2/98   S 2.21 B.Vil     ESW Sys Test: RCIC Compartment Cooling                       1/2198   S 2.218.X         ESW Sys Test: RHR Pumps B & D Compartment Coollng           1/2/98   S 2.218.XI       ESW Sys Test: Core Spray Pumps A & C Compartment Cing       1/2/98   S 2.218.XII       ESW Sys Test: Core Spray Pumps B & D Compartment Cing       1/2/98 S 2.21C.11       RHRSW Sys Test: Valve Control Logic Verification           12/19/98   S
2.06-VI ADS System Test: Overpressure Operation of SRVs 10/31/98 S
                                    ~~
2.06-Vil SRV 1F013A, C & N Instrument Gas Accumulatcrs 9/9/98 S 2. 0 9 -11 RPS Sys Test: Manual Scrams 10/14/98 S 2.09-ill.B RPS Sys Test: RPS Trip on MSIV Position 12/23/98 S 2.09-ill.C RPS Sys Test: RPS Trip on Low Rx Water Level 10/14/98 S
Saturday, January 02,1999                                                     Page 1 of 29 1
l 2.09-Ill.D RPS Sys Test: RPS Trip on High Rx Pressure 10/14/98 S
2.09-ill.H RPS Sys Teat: RPS Trips on Turbine Stop Valve Closure 12/19/98 S
2. 0 9 -111.1 RPS Sys Test: RPS Trip on Control Valve Fast Closure 10/14/98 S
2.09-IV RPS Sys Test: Miscellaneous RPS Logic 12/13/98 S
2.10-IV RRCS Sys Test: Response To Instrument Line Breaks 10/22/98 S
2.15-1.H RRS Sys Test: Recire Seal Water Supply Valve Logic 11/8/98 S
2.15.l-C RRS Sys Test: Verification of Scoop Tube Locks 8/1/98 S
l 2.18-l B Cire Water Sys Test: Circ Water Pump Trips 12/12/98 S
2.21 B.lll ESW Sys Test: Auto Valve Operation on ESW Pump Start 12/19/98 S
2.218.lX ESW Sys Test: RHR Pumps A & C Compartment Cooling 1/2/98 S
2.21 B.VI ESW Sys Test: HPCI Compartment Cooling 1/2/98 S
2.21 B.Vil ESW Sys Test: RCIC Compartment Cooling 1/2198 S
2.218.X ESW Sys Test: RHR Pumps B & D Compartment Coollng 1/2/98 S
2.218.XI ESW Sys Test: Core Spray Pumps A & C Compartment Cing 1/2/98 S
2.218.XII ESW Sys Test: Core Spray Pumps B & D Compartment Cing 1/2/98 S 2.21C.11 RHRSW Sys Test: Valve Control Logic Verification 12/19/98 S
~~
Saturday, January 02,1999 Page 1 of 29 1


Test No     Title                                                       Test Date Results 2.23-Ill.A   Main Turbine Sys Test: Chest & Shell Warming                 4/16/98 S 2.23-ill.B   Main Turbine Sys Test Speed & Acceleration Control           4/14/98 S
Test No Title Test Date Results 2.23-Ill.A Main Turbine Sys Test: Chest & Shell Warming 4/16/98 S 2.23-ill.B Main Turbine Sys Test Speed & Acceleration Control 4/14/98 S
                                                                                                ]
]
2.23-Ill.F   Main Turbine Sys Test: OverSpeed Trip Testing                 7/18/98 S 9
2.23-Ill.F Main Turbine Sys Test: OverSpeed Trip Testing 7/18/98 S 9
2.23-Vill     Main Turbine Sys Test: LP Turbine Backpressure Mon             5/8/98 S 2.31-1       Pri Contain Sys Test Drywell Purge Fan A Verification           2/8/98 S 2 . 3 1 -11   Pri Contain Sys Test: Drywell Purge Fan B Verification         2/8/98 S 2.31-Vil.A   Pri Contain Sys Test: Drywell De-Inerting and Purge           4/16/98 S 2.31-Vil.B   Pri Contain Sys Test: Suppr Chamber De-Inerting and Purge     4/16/98 S 2.31.lX       Pri Contain Sys Test: SP Gas Analyzer 206 Flowpath           4/16/98 S 2.31. Vill   Pri Contain Sys Test: DW Gas Analyzer 205 Flowpath           4/16/98 S 2.328-X       Ext Steam & HVD Sys Test: 1st Stg Press Isolation Logic         4/2/98 S 2.37-VI       Rem S/D Panel Sys Test: Reactor Recirculation Operations     12/13/98 S 2.38C-l       Rx Enci & Refuel Floor HVAC Sys Test: Sys Logic Testing       1/31/98 S 2.38C-Ill     Rx Enci & Refuel Floor HVAC Sys Test: Rx Enci Ch Logic Trip   1/31/98 S 2.38C-IV     Rx Enci & refuel Floor HVAC Sys Test: Refuel Floor Ch Logic   1/31/98 S 2.38D-IV     TE HVAC Logic and Interlocks                                 7/22/98 S 2.39A-Ill. A Control Enci Chiller A Low Cooling Water Flow Trips           8/2/98 S 2.39A-lll.B   Control Enci Chiller B Low Caoling Water Flow Trips           8/6/98 S 2.46-1       Steam Leak Det Sys Test: Outbd MSIV Room / Feedwater Pip     1/24/98 S 2 . 4 6 -111 Steam Leak Det Sys Test: Rx Core Isolation Coollng             2/3/98   S 2.46-IV       Steam Leak Det Sys Test: High Pressure Coolant injection       2/3/98 S 2.46-VI       Steam Leak Det Sys Test. Residual Heat Removal Sys             2/3/98 S 3-MAD 137E SRV 1F013A Fails Open Mechanically                             12/19/98 S i 3-MAD 138A SRV 1F013B Leaks                                                 11/7/98 S 3-MAD 138B SRV 1F013B Sticks Open                                           11/7/98 S 3-MAD 138C SRV 1F013B Fails Open Electrically                             11/11/98 S 3-MAD 138D SRV 1F013B Fails Closed                                         11/7/98   S 3-MAD 138E SRV 1F013B Fails Open Mechanically                             12/23/98 S 3-MAD 139A SRV 1F013C Leaks                                               11/11/98 S 3-MAD 139B SRV 1F013C Sticks Open                                         11/11/98   S
2.23-Vill Main Turbine Sys Test: LP Turbine Backpressure Mon 5/8/98 S 2.31-1 Pri Contain Sys Test Drywell Purge Fan A Verification 2/8/98 S 2. 3 1 -11 Pri Contain Sys Test: Drywell Purge Fan B Verification 2/8/98 S 2.31-Vil.A Pri Contain Sys Test: Drywell De-Inerting and Purge 4/16/98 S 2.31-Vil.B Pri Contain Sys Test: Suppr Chamber De-Inerting and Purge 4/16/98 S 2.31.lX Pri Contain Sys Test: SP Gas Analyzer 206 Flowpath 4/16/98 S 2.31. Vill Pri Contain Sys Test: DW Gas Analyzer 205 Flowpath 4/16/98 S 2.328-X Ext Steam & HVD Sys Test: 1st Stg Press Isolation Logic 4/2/98 S 2.37-VI Rem S/D Panel Sys Test: Reactor Recirculation Operations 12/13/98 S 2.38C-l Rx Enci & Refuel Floor HVAC Sys Test: Sys Logic Testing 1/31/98 S 2.38C-Ill Rx Enci & Refuel Floor HVAC Sys Test: Rx Enci Ch Logic Trip 1/31/98 S 2.38C-IV Rx Enci & refuel Floor HVAC Sys Test: Refuel Floor Ch Logic 1/31/98 S 2.38D-IV TE HVAC Logic and Interlocks 7/22/98 S 2.39A-Ill. A Control Enci Chiller A Low Cooling Water Flow Trips 8/2/98 S 2.39A-lll.B Control Enci Chiller B Low Caoling Water Flow Trips 8/6/98 S 2.46-1 Steam Leak Det Sys Test: Outbd MSIV Room / Feedwater Pip 1/24/98 S 2. 4 6 -111 Steam Leak Det Sys Test: Rx Core Isolation Coollng 2/3/98 S
                                    ~
2.46-IV Steam Leak Det Sys Test: High Pressure Coolant injection 2/3/98 S 2.46-VI Steam Leak Det Sys Test. Residual Heat Removal Sys 2/3/98 S 3-MAD 137E SRV 1F013A Fails Open Mechanically 12/19/98 S i
Saturday, JaTuary 02,1999                                                     Page 2 of 29
3-MAD 138A SRV 1F013B Leaks 11/7/98 S 3-MAD 138B SRV 1F013B Sticks Open 11/7/98 S 3-MAD 138C SRV 1F013B Fails Open Electrically 11/11/98 S 3-MAD 138D SRV 1F013B Fails Closed 11/7/98 S
3-MAD 138E SRV 1F013B Fails Open Mechanically 12/23/98 S 3-MAD 139A SRV 1F013C Leaks 11/11/98 S 3-MAD 139B SRV 1F013C Sticks Open 11/11/98 S
Saturday, JaTuary 02,1999 Page 2 of 29
~


i I
i I
Test No                 Title                     Test Date Results 3-MAD 139C SRV 1F013C Fails Open Electrically       11/11/98 S 3-MAD 139D SRV 1F013C Fails Closed                   11/11/98 S 3-MAD 139E SRV 1F013C Fails Open Mechanically       12/23/98 S 3-MAD 140A SRV 1F013D Leaks                         11/11/98 S           l 3-MAD 140B SRV 1F013D Sticks Open                   11/11/98 S 3-MAD 140C SRV 1F013D Fails Open Electrically       11/11/98 S 3-MAD 140D SRV 1F013D Fails Closed                 11/11/98 S 3-MAD 140E SRV 1F013D Fails Open Mechanically       12/23/98 S 3-MAD 142B SRV 1F013F Sticks Open                   12/23/98 S           ,
Test No Title Test Date Results 3-MAD 139C SRV 1F013C Fails Open Electrically 11/11/98 S 3-MAD 139D SRV 1F013C Fails Closed 11/11/98 S 3-MAD 139E SRV 1F013C Fails Open Mechanically 12/23/98 S 3-MAD 140A SRV 1F013D Leaks 11/11/98 S l
3-MAD 142C SRV 1F013F Fails Open Electrically       12/23/98 S           l 3-MAD 142D SRV 1F013F Fails Closed                 12/23/98 S 3-MAD 142E SRV 1F013F Fails Open Mechanically       12/19/98 S           l 3-MAD 1438 SRV 1F013G Sticks Open                   12/23/98 S 3-MAD 143C SRV 1F013G Fails Open Electrically       12/23/98 S 3-MAD 143D SRV 1F013G Fails Closed                 12/23/98 S 3-MAD 143E SRV 1F013G Fails Open Mechanically       12/19/98 S 3-MAD 144B SRV 1F013H Sticks Open                   12/19/98 S         .
3-MAD 140B SRV 1F013D Sticks Open 11/11/98 S 3-MAD 140C SRV 1F013D Fails Open Electrically 11/11/98 S 3-MAD 140D SRV 1F013D Fails Closed 11/11/98 S
l 3-MAD 144C SRV 1F013H Fails Open Electrically       12/23/98 S 3-MAD 144D SRV 1F013H Fails Closed                 12/23/98 S 3-MAD 144E SRV 1F013H Fails Open Electrically       12/19/98 S 3-MAD 146B SRV 1F013K Sticks Open                   12/22/98 S 3-MAD 146C SRV 1F013K Fails Open Electrically       12/22/96 S 3-MAD 146D SRV 1F013K Fails Closed                 12/22/98 S 3-MAD 146E SRV 1F013K Fails Open Mechanically       12/22/98 S 3-MAD 147B SRV 1F013L Sticks Open                 12/22/98   S 3-MAD 147C SRV 1F013L Fails Open Electrically     12/22/98 S 3-MAD 147D SRV 1F013L Fails Closed                 12/22/98 S 3 MAD 147E SRV 1F013L Fails Open Mechanically     12/12/98   S I
3-MAD 140E SRV 1F013D Fails Open Mechanically 12/23/98 S 3-MAD 142B SRV 1F013F Sticks Open 12/23/98 S l
3-MAD 148B SRV 1F013M Sticks Open                 12/22/98 S         =
3-MAD 142C SRV 1F013F Fails Open Electrically 12/23/98 S 3-MAD 142D SRV 1F013F Fails Closed 12/23/98 S 3-MAD 142E SRV 1F013F Fails Open Mechanically 12/19/98 S l
3-MAD 148C SRV 1F013M Fails Open Electrically     12/22/98 S
3-MAD 1438 SRV 1F013G Sticks Open 12/23/98 S 3-MAD 143C SRV 1F013G Fails Open Electrically 12/23/98 S 3-MAD 143D SRV 1F013G Fails Closed 12/23/98 S 3-MAD 143E SRV 1F013G Fails Open Mechanically 12/19/98 S
      ~
3-MAD 144B SRV 1F013H Sticks Open 12/19/98 S
Saturday, January 02,1999                             Page 3 of 29
l 3-MAD 144C SRV 1F013H Fails Open Electrically 12/23/98 S 3-MAD 144D SRV 1F013H Fails Closed 12/23/98 S 3-MAD 144E SRV 1F013H Fails Open Electrically 12/19/98 S 3-MAD 146B SRV 1F013K Sticks Open 12/22/98 S
3-MAD 146C SRV 1F013K Fails Open Electrically 12/22/96 S 3-MAD 146D SRV 1F013K Fails Closed 12/22/98 S 3-MAD 146E SRV 1F013K Fails Open Mechanically 12/22/98 S 3-MAD 147B SRV 1F013L Sticks Open 12/22/98 S
3-MAD 147C SRV 1F013L Fails Open Electrically 12/22/98 S 3-MAD 147D SRV 1F013L Fails Closed 12/22/98 S 3 MAD 147E SRV 1F013L Fails Open Mechanically 12/12/98 S
I 3-MAD 148B SRV 1F013M Sticks Open 12/22/98 S
=
3-MAD 148C SRV 1F013M Fails Open Electrically 12/22/98 S
~
Saturday, January 02,1999 Page 3 of 29


I l                                                                                       i Test No     Title                                                 Test Date Results l
I l
3-MAD 148D SRV 1F013M Fails Closed                                 12/22/98 S 3-MAD 148E SRV 1F013M Fails Open Mechanically                       12/23/98 S 3-MAD 149B SRV 1F013N Sticks Open                                   12/23/98 S 3-MAD 149D SRV 1F013N Fails Closed                                 12/23/98 S 3-MAD 149E SRV 1F013N Fails Open Mechanically                       12/23/98 S 3-MAD 150C SRV 1F013S Fails Open Electrically                       12/23/98 S 3-MAD 150D SRV 1F013S Fails Closed                                 12/23/98 S       .i 3-MAD 150E SRV 1F013S Fails Open Mechanically                       12/23/98 S         l 3-MCU575     RWCU Pipe Leak in Regen Heat Exchanger Room S03         7/18/98 S 3-MCWO86A 1A Circulating Water Pump Trips                           12/19/98 S 3-MCWOB6B 1B Circulating Water Pump Trips                           12/19/98 S         j 3-MCWO86C 1C Circulating Water Pump Trips                           12/19/98 S i
i Test No Title Test Date Results l
3-MCWO86D 1D Circulating Water Pump Trips                           12/19/98 S         ;
3-MAD 148D SRV 1F013M Fails Closed 12/22/98 S 3-MAD 148E SRV 1F013M Fails Open Mechanically 12/23/98 S 3-MAD 149B SRV 1F013N Sticks Open 12/23/98 S 3-MAD 149D SRV 1F013N Fails Closed 12/23/98 S 3-MAD 149E SRV 1F013N Fails Open Mechanically 12/23/98 S 3-MAD 150C SRV 1F013S Fails Open Electrically 12/23/98 S 3-MAD 150D SRV 1F013S Fails Closed 12/23/98 S
3-MCW483A RECW Pump 1 A Trips                                       12/22/98 S 3-MCW483B RECW Pump 1B Trips                                       12/22/98 S 3-MCW483C Both RECW Pumps 1 A and 1B Trip                           12/22/98 S 3-MHP445     HPCI Steam Line Break                                   7/19/98 S 3-MHP578A HV55-1F011 Fails: ThermalOverload                           8/2/98 S 3-MHP578B HV55-1F011 Fails: Magnetic Overload                         8/2/98 S 3-MHP578C HV55-1F011 Fails As-Is                                     8/2/98 S         ]
.i 3-MAD 150E SRV 1F013S Fails Open Mechanically 12/23/98 S l
3-MMC 073   Feedwater Conductivity increase (Condenser Tube Leak)   6/4/98 S 3-MMC 074   HP Condenser Air inLeakage                             10/25/98 S 3-MMS 068   Main Steam Line Rupture at Main Turbine                 7/19/98 ~ S 3-MNS156A NS4 Group I Inadvertent isolation                         10/24/98 S 3-MNS156B NS4 Group I Inadvertent isolation                         10/24/98 S 3-MNS156C NS4 Group i inadvertent isolation                         12/23/98 S 3-MNS156D NS4 Group i Inadvertent Isolation                         12/23/98 S 3-MNS156E NS4 Group i inadvertent isolation                         10/24/98 S 3-MNS156F NS4 Group i Inadvertent isolation                         12/13/98 S         )
3-MCU575 RWCU Pipe Leak in Regen Heat Exchanger Room S03 7/18/98 S 3-MCWO86A 1A Circulating Water Pump Trips 12/19/98 S 3-MCWOB6B 1B Circulating Water Pump Trips 12/19/98 S j
3-MNS156G NS4 GroupIInadvertentisolation                           12/13/98 S         l 5t'urday, January 02,1999                                             Page 4 of 29
3-MCWO86C 1C Circulating Water Pump Trips 12/19/98 S i
3-MCWO86D 1D Circulating Water Pump Trips 12/19/98 S 3-MCW483A RECW Pump 1 A Trips 12/22/98 S 3-MCW483B RECW Pump 1B Trips 12/22/98 S 3-MCW483C Both RECW Pumps 1 A and 1B Trip 12/22/98 S 3-MHP445 HPCI Steam Line Break 7/19/98 S 3-MHP578A HV55-1F011 Fails: ThermalOverload 8/2/98 S 3-MHP578B HV55-1F011 Fails: Magnetic Overload 8/2/98 S 3-MHP578C HV55-1F011 Fails As-Is 8/2/98 S
]
3-MMC 073 Feedwater Conductivity increase (Condenser Tube Leak) 6/4/98 S 3-MMC 074 HP Condenser Air inLeakage 10/25/98 S 3-MMS 068 Main Steam Line Rupture at Main Turbine 7/19/98 ~ S 3-MNS156A NS4 Group I Inadvertent isolation 10/24/98 S 3-MNS156B NS4 Group I Inadvertent isolation 10/24/98 S 3-MNS156C NS4 Group i inadvertent isolation 12/23/98 S 3-MNS156D NS4 Group i Inadvertent Isolation 12/23/98 S 3-MNS156E NS4 Group i inadvertent isolation 10/24/98 S 3-MNS156F NS4 Group i Inadvertent isolation 12/13/98 S
)
3-MNS156G NS4 GroupIInadvertentisolation 12/13/98 S l
5t'urday, January 02,1999 Page 4 of 29


r-                                                                                                                                     1 Test No     Title                                                                                                 Test Date Results 3-MNS156H NS4 Group 1Inadvertentisolation                                                                           12/13/98 S 3-MNS157A NS4 Group 11 Inadvertent isolation                                                                       12/13/98 S       l 3-MNS1578 NS4 Group 11 Inadvertent isolation                                                                       12/13/98 S       l 3-MNS157C NS4 Group ll Inadvertent isolation                                                                       10/24/98 S       l 3-MNS157D NS4 Group 11 Inadvertent isolation                                                                         11/8/98 S     l 3-MNS157E NS4 Group 11 Inadvertent isolation                                                                       12/13/98 S 3-MNS157F NS4 Croup 11 Inadvertent isolation                                                                         11/8/98 S 3-MNS158A NS4 Group 111 Inadvertent isolation                                                                       10/24/98 S 3-MNS158B NS4 Group lll Inadvertent isolation                                                                       10/24/98 S       I l
r-1 Test No Title Test Date Results 3-MNS156H NS4 Group 1Inadvertentisolation 12/13/98 S 3-MNS157A NS4 Group 11 Inadvertent isolation 12/13/98 S l
3-MNS159A NS4 Group VI Inadvertent isolation                                                                       10/24/98 S       l 3-MNS159B NS4 Group VI Inadvertent isolation                                                                       10/24/98 S 3-MNS159C NS4 Group VI Inadvertent isolation                                                                       12/13/98 S       l 3-MNS159D NS4 Group VI inadvertent isolation                                                                       12/13/98 S 3-MNS159E NS4 Group VI inadvertent Isolation                                                                       12/13/98 S 3-MNS159F NS4 Group VI Inadvertent isolation                                                                       12/23/98 S 3-MNS160A NS4 Group Vil inadvertent isolation                                                                       10/24/98 S 3-MNS1608 NS4 Group Vil Inadvertent isoletion                                                                       10/24/98 S       j 3-MNS160C NS4 Group Vil Inadvertent Isolation                                                                       10/24/98 S       l 3-MNS161 A NS4 Group Villa Inadvertent isolation                                                                   10/24/98 S 3-MNS161B NS4 Group Villa Inadvertent isolation                                                                     10/24/98 S 3-MNS162A Secondary Containment and PClG Inadvertent Isolation                                                     10/24/98 S 3-MNS162B Secondary Containment and PClG Inadvertent isolation                                                     10/24/98 S 3-MNS162C Secondary Containment and PClG Inadvertent isolation                                                     10/31/98 S 3-MNS162D Secondary Containment and PCIG Inadvertent isolation                                                     10/31/98 S 3-MNS162E Secondary Containment and PClG Inadvertent isolation                                                     10/31/98 S 3-MNS162F Secondary Containment and PCIG inadvertent isolation                                                     10/31/98 S 3-MPC482A Drywell Chiller 1 A Tnps                                                                                 12/22/98 S 3-MPC482B Drywell Chiller 1B Trips                                                                                 12/22/98 S 3-MRC465     RCIC Steam Line Break                                                                                   7/15/98 S 3-MRE100     Duct Rupture: T-200 Suppression Pool 18 Inch Vent Line                                                   4/7/98 S Saturday, January 02,1999                                                                                             Page 5 of 29
l 3-MNS1578 NS4 Group 11 Inadvertent isolation 12/13/98 S 3-MNS157C NS4 Group ll Inadvertent isolation 10/24/98 S l
l 3-MNS157D NS4 Group 11 Inadvertent isolation 11/8/98 S 3-MNS157E NS4 Group 11 Inadvertent isolation 12/13/98 S 3-MNS157F NS4 Croup 11 Inadvertent isolation 11/8/98 S 3-MNS158A NS4 Group 111 Inadvertent isolation 10/24/98 S 3-MNS158B NS4 Group lll Inadvertent isolation 10/24/98 S I
l 3-MNS159A NS4 Group VI Inadvertent isolation 10/24/98 S l
3-MNS159B NS4 Group VI Inadvertent isolation 10/24/98 S 3-MNS159C NS4 Group VI Inadvertent isolation 12/13/98 S l
3-MNS159D NS4 Group VI inadvertent isolation 12/13/98 S 3-MNS159E NS4 Group VI inadvertent Isolation 12/13/98 S 3-MNS159F NS4 Group VI Inadvertent isolation 12/23/98 S 3-MNS160A NS4 Group Vil inadvertent isolation 10/24/98 S 3-MNS1608 NS4 Group Vil Inadvertent isoletion 10/24/98 S j
3-MNS160C NS4 Group Vil Inadvertent Isolation 10/24/98 S l
3-MNS161 A NS4 Group Villa Inadvertent isolation 10/24/98 S 3-MNS161B NS4 Group Villa Inadvertent isolation 10/24/98 S 3-MNS162A Secondary Containment and PClG Inadvertent Isolation 10/24/98 S 3-MNS162B Secondary Containment and PClG Inadvertent isolation 10/24/98 S 3-MNS162C Secondary Containment and PClG Inadvertent isolation 10/31/98 S 3-MNS162D Secondary Containment and PCIG Inadvertent isolation 10/31/98 S 3-MNS162E Secondary Containment and PClG Inadvertent isolation 10/31/98 S 3-MNS162F Secondary Containment and PCIG inadvertent isolation 10/31/98 S 3-MPC482A Drywell Chiller 1 A Tnps 12/22/98 S 3-MPC482B Drywell Chiller 1B Trips 12/22/98 S 3-MRC465 RCIC Steam Line Break 7/15/98 S 3-MRE100 Duct Rupture: T-200 Suppression Pool 18 Inch Vent Line 4/7/98 S Saturday, January 02,1999 Page 5 of 29


Test No   Title                                                         Test Date Results j 3-MRE102   Duct Rupture: T-200 Drywell 24 inch Vent Line                     4/7/98 S 3-MRE301 A Inadvertent Rx Enclosure Isolation Chan A                       2/11/98 S
Test No Title Test Date Results j
3-MRE302A Refuel Floor inadvertent isolation Channel A                       1/24/98 S             ,
3-MRE102 Duct Rupture: T-200 Drywell 24 inch Vent Line 4/7/98 S
3-MRE302B Refuel Floor inadvertent isolation Channel B                     1/24/98 S
3-MRE301 A Inadvertent Rx Enclosure Isolation Chan A 2/11/98 S 3-MRE302A Refuel Floor inadvertent isolation Channel A 1/24/98 S 3-MRE302B Refuel Floor inadvertent isolation Channel B 1/24/98 S 3-MRE303 Air Leak in Rx Enclosure 4/8/98 S l
3-MRE303   Air Leak in Rx Enclosure                                         4/8/98 S l
3-MRE304A SGTS Inlet Valve From Refuel Floor HV76-019 Fails Open 1/24/98 S i
3-MRE304A SGTS Inlet Valve From Refuel Floor HV76-019 Fails Open           1/24/98 S i 3-MRE304B SGTS Inlet from Refuel Floor HV76-020 Fails Open                   3/7/98 S
3-MRE304B SGTS Inlet from Refuel Floor HV76-020 Fails Open 3/7/98 S 3-MRE305A SGTS From Reactor Enclosure HV76-196 Fails Open 1/23/98 S
3-MRE305A SGTS From Reactor Enclosure HV76-196 Fails Open                   1/23/98   S 3-MRE305B SGTS From Reactor Enclosure HV76-197 Fails Open                   1/23/98   S 3-MRE306   Refuel Floor Fails To isolate                                     4/8/98 S 3-MRE307   Reactor Enclosure Fails Toisolate                                 4/8/98 S 3-MRE30BA Trip of 1 A REECE Fan                                               2/8/98 S 3-MRE3088 Trip of 18 REECE Fan                                               2/8/98 S 3-MRE309A Trip of 1 A Rx Enclosure HVAC Supply Fan                           1/2/98 S 3-MRE309B Trip of 1B Rx Enclosure HVAC Supply Fan                             1/3/98 S 3-MRE309C Trip of 1C Rx Enclosure HVAC Supply Fan                                     C
3-MRE305B SGTS From Reactor Enclosure HV76-197 Fails Open 1/23/98 S
,                                                                                1/3/98 3-MRE310A Trip of 1A Rx Enclosure HVAC Exhaust Fan                           its/wB S 3-MRE3108 Tnp of 1B Rx Enclosure HVAC Exhaust Fan                             1/3/98 S 3-MRE310C Trip of 1C Rx Enclosure HVAC Exhaust Fan                           1/3/98 S 3-MRE311 A Tnp of 1 A Refuel Floor HVAC Air Supply Fan                       1/3/98 S 3-MRE3113 Trip of 18 Refuel Floor HVAC Air Supply Fan                         1/3/98 S 3-MRE311C Trip of 1C Refuel Floor HVAC Air Supply Fan                         1/3/98 S
3-MRE306 Refuel Floor Fails To isolate 4/8/98 S
: 3-MRE312A Trip of 1 A Refuel Floor HVAC Air Exhaust Fan                       1/3/98 S 3-MRE312B Trip of 1B Refuel Floor HVAC Air Exhaust Fan                       1/3/98 S 3-MRE312C Trip of 1C Refuel Floor HVAC Air Exhaust Fan                       1/3/98 S 3-MRM001 A Control Room Fresh Air Rad Mon Chan A Fails To Sel Value         4/14/98   S 4
3-MRE307 Reactor Enclosure Fails Toisolate 4/8/98 S
3-MRM001B Control Room Fresh Air Rad Mon Chan B Fails To Sel Value         4/14/98   S 3-MRM001C Control Room Fresh Air Rad Mon Chan C Fails To Sel Value         4/14/98   S 3-MRM001D Control Room Fresh Air Rad Mon Chan D Fails To Sel Value         4/14/98   S 3-MRM002A Control Room Emerg Air Rad Mon Chan C Fails To Sel Value         4/14/98   S Saturds[ January 02,1999                                                       Page 6 of 29
3-MRE30BA Trip of 1 A REECE Fan 2/8/98 S
3-MRE3088 Trip of 18 REECE Fan 2/8/98 S
3-MRE309A Trip of 1 A Rx Enclosure HVAC Supply Fan 1/2/98 S
3-MRE309B Trip of 1B Rx Enclosure HVAC Supply Fan 1/3/98 S
3-MRE309C Trip of 1C Rx Enclosure HVAC Supply Fan 1/3/98 C
3-MRE310A Trip of 1A Rx Enclosure HVAC Exhaust Fan its/wB S 3-MRE3108 Tnp of 1B Rx Enclosure HVAC Exhaust Fan 1/3/98 S 3-MRE310C Trip of 1C Rx Enclosure HVAC Exhaust Fan 1/3/98 S
3-MRE311 A Tnp of 1 A Refuel Floor HVAC Air Supply Fan 1/3/98 S
3-MRE3113 Trip of 18 Refuel Floor HVAC Air Supply Fan 1/3/98 S
3-MRE311C Trip of 1C Refuel Floor HVAC Air Supply Fan 1/3/98 S
3-MRE312A Trip of 1 A Refuel Floor HVAC Air Exhaust Fan 1/3/98 S
3-MRE312B Trip of 1B Refuel Floor HVAC Air Exhaust Fan 1/3/98 S
3-MRE312C Trip of 1C Refuel Floor HVAC Air Exhaust Fan 1/3/98 S
3-MRM001 A Control Room Fresh Air Rad Mon Chan A Fails To Sel Value 4/14/98 S
3-MRM001B Control Room Fresh Air Rad Mon Chan B Fails To Sel Value 4/14/98 S
4 3-MRM001C Control Room Fresh Air Rad Mon Chan C Fails To Sel Value 4/14/98 S
3-MRM001D Control Room Fresh Air Rad Mon Chan D Fails To Sel Value 4/14/98 S
3-MRM002A Control Room Emerg Air Rad Mon Chan C Fails To Sel Value 4/14/98 S
Saturds[ January 02,1999 Page 6 of 29 e


4 i
4 i
l Test No     Title                                                     Test Date Results 3-MRM0028 Control Room Emerg Air Rad Mon Chan D Fails To Sel Value       4/14/98 S 3-MRM003A N Stack WRAM Low Range Chan Fails To SeiValue                   4/9/98 S 3-MRM003B N Stack WRAM Mid Range Chan Fails To Sel Value                   4/9/98 S f
l Test No Title Test Date Results 3-MRM0028 Control Room Emerg Air Rad Mon Chan D Fails To Sel Value 4/14/98 S 3-MRM003A N Stack WRAM Low Range Chan Fails To SeiValue 4/9/98 S 3-MRM003B N Stack WRAM Mid Range Chan Fails To Sel Value 4/9/98 S f
3-MRM003C N Stack WRAM High Range Chan Fails To Set Value                 4/9/98 S 3-MRM004A N Stack Rad Mon A Particulate Chan Fails To Sei Value           4/6/98 S I         3-MRM0048 N Stack Rad Mon A lodine Chan (2lE075) Fails To Sel Value       4/6/98 S 3-MRM004C N Stack Rad Mon A Gaseous Chan (3GE075) Fails To Sel Val         4/6/98 S 3-MRM004D N Stack Rad Mon B Part Chan (4PE075) Fails To Sel Value         4/6/98   S         l 3-MRM004E N Stack Rad Mon B lodine Chan (SIE075) Fails To Sel Value       4/6/98 S 3-MRM004F N Stack Rad Mon B Gaseous Chan (6GE075) Fails To Sei Val         4/6/98   S 3-MRM005A U-1 S Stack Rad Mon A Part Chan (1PE185) Fails To Sel Valu     4/8/98   S 3-MRM005B U-1 S Stack Rad Mor. b lodine Chan (21E185) Fails To Sel Val   4/8/98   S 3-MRM005C U-1 S Stack Rad Mon A Gaseous Chan (3GE185) Fails To Set       4/8/98 S 3-MRM005D U-1 S Stack Rad Mon B Part Chan (4PE185) Fails To Sel Valu     4/8/98 S
3-MRM003C N Stack WRAM High Range Chan Fails To Set Value 4/9/98 S 3-MRM004A N Stack Rad Mon A Particulate Chan Fails To Sei Value 4/6/98 S I
:        3-MRM005E U-1 S Stack Rad Mon B lodine Chan (51E185) Fails To Set Val     4/8/98 S 1                                                                                                       <
3-MRM0048 N Stack Rad Mon A lodine Chan (2lE075) Fails To Sel Value 4/6/98 S 3-MRM004C N Stack Rad Mon A Gaseous Chan (3GE075) Fails To Sel Val 4/6/98 S 3-MRM004D N Stack Rad Mon B Part Chan (4PE075) Fails To Sel Value 4/6/98 S
3-MRM005F U-1 S Stack Rad Mon B Gaseous Chan (6GE185) Fails To Set       4/8/98 S             ;
l 3-MRM004E N Stack Rad Mon B lodine Chan (SIE075) Fails To Sel Value 4/6/98 S 3-MRM004F N Stack Rad Mon B Gaseous Chan (6GE075) Fails To Sei Val 4/6/98 S
]         3-MRM006     RW Equip Room Vent Exh Rad Mon Fails To Sel Value           2/5/98 S 3-MRM007     Radwaste Enci Exh Rad Mon Fails To Sel Value                 2/5/98 S 3-MRM008     Recombiner Rooms & H2 Analyzer Comp Rad Mon Fails To S     2/21/98   S q        3-MRM009 SPE Discharge & Vacuum Pump Exh Rad Mon Fails To Sel Va         2/5/98   S 3-MRM010     Offgas Charcoal Treatment Rad Mon Fails To Sel Value       2/11/98   S         i 3-MRM011     Unit 1 Containment Leak Det Rad Mon Fails To Sel Value       2/5/98   S 3-MRM012     Rx Enci Cooling Water Rad Mon Fails To Sel Value             2/5/98 S 3-MRM013 Semce Water Rad Mon Fails To Sel Value                           2/5/98   S         !
3-MRM005A U-1 S Stack Rad Mon A Part Chan (1PE185) Fails To Sel Valu 4/8/98 S
3-MRM014A Offgas Steam Jet Air Ejector Chan A Rad Mon Fails To Sel Val   2/19/98 S 3-MRM014B Offgas Steam Jet Air Ejector Chan B Rad Mon Fails To Set Val   2/19/98   S 3-MRM014C Offgas Steam Jet Air Ejector Linear Rad Mon Fails To SeiValu   4/14/98   S         ,
3-MRM005B U-1 S Stack Rad Mor. b lodine Chan (21E185) Fails To Sel Val 4/8/98 S
3-MRM015A Main Steam Line Rad Mon Chan A Fails To Sel Value             2/11/98 S 3-MRM015B Main Steam Line Rad Mon Chan B Fails To Sel Value             2/19/98   S 3-MRM015C Main Steam Line Rad Mon Chan C Fails To SeiValue               2/19/98 S 4
3-MRM005C U-1 S Stack Rad Mon A Gaseous Chan (3GE185) Fails To Set 4/8/98 S 3-MRM005D U-1 S Stack Rad Mon B Part Chan (4PE185) Fails To Sel Valu 4/8/98 S 3-MRM005E U-1 S Stack Rad Mon B lodine Chan (51E185) Fails To Set Val 4/8/98 S 1
A
3-MRM005F U-1 S Stack Rad Mon B Gaseous Chan (6GE185) Fails To Set 4/8/98 S
                                                    ~
]
                                                                                            ~
3-MRM006 RW Equip Room Vent Exh Rad Mon Fails To Sel Value 2/5/98 S 3-MRM007 Radwaste Enci Exh Rad Mon Fails To Sel Value 2/5/98 S 3-MRM008 Recombiner Rooms & H2 Analyzer Comp Rad Mon Fails To S 2/21/98 S
Saturday, January 02,1999                                                   Page 7 of 29 i
3-MRM009 SPE Discharge & Vacuum Pump Exh Rad Mon Fails To Sel Va 2/5/98 S
q 3-MRM010 Offgas Charcoal Treatment Rad Mon Fails To Sel Value 2/11/98 S
i 3-MRM011 Unit 1 Containment Leak Det Rad Mon Fails To Sel Value 2/5/98 S
3-MRM012 Rx Enci Cooling Water Rad Mon Fails To Sel Value 2/5/98 S 3-MRM013 Semce Water Rad Mon Fails To Sel Value 2/5/98 S
3-MRM014A Offgas Steam Jet Air Ejector Chan A Rad Mon Fails To Sel Val 2/19/98 S 3-MRM014B Offgas Steam Jet Air Ejector Chan B Rad Mon Fails To Set Val 2/19/98 S
3-MRM014C Offgas Steam Jet Air Ejector Linear Rad Mon Fails To SeiValu 4/14/98 S
3-MRM015A Main Steam Line Rad Mon Chan A Fails To Sel Value 2/11/98 S 3-MRM015B Main Steam Line Rad Mon Chan B Fails To Sel Value 2/19/98 S
3-MRM015C Main Steam Line Rad Mon Chan C Fails To SeiValue 2/19/98 S 4
A Saturday, January 02,1999
~
~
Page 7 of 29 i


i Test No     Title                                                                                                                             Test Date Results r
i Test No Title Test Date Results r
3-MRM015D Main Steam Line Rad Mon Chan D Fails To Sel Value                                                                                           2/19/98 S     ,
3-MRM015D Main Steam Line Rad Mon Chan D Fails To Sel Value 2/19/98 S 3-MRM016A Rx Enci Vent Exh Rad Mon A Fails To Sel Value 2/19/98 S 3-MRM016B Rx Enc! Vent Exh Rad Mon B Fails To Sel Value 2/19/98 S 3-MRM016C Rx Enci Vent Exh Rad Mon C Fails To Sel Value 2/19/98 S 3-MRM016D Rx Enci Vent Exh Rad Mon D Fails To Sel Value 2/19/98 S 3-MRM017A Refuel Floor Vent Exh Rad Mon Chan A Fails To Set Value 2/19/98 S 3-MRM017B Refuel Floor Vent Exh Rad Mon Chan B Fails To Sel Value 2/19/98 S 3-MRM017C Refuel Floor Vent Exh Rad Mon Chan C Fails To Sel Value 3/18/98 S
3-MRM016A Rx Enci Vent Exh Rad Mon A Fails To Sel Value                                                                                               2/19/98 S 3-MRM016B Rx Enc! Vent Exh Rad Mon B Fails To Sel Value                                                                                               2/19/98 S 3-MRM016C Rx Enci Vent Exh Rad Mon C Fails To Sel Value                                                                                               2/19/98 S     >
j 3-MRM017D Refuel Floor Vent Exh Rad Mon Chan D Fails To Set Value 3/18/98 S
3-MRM016D Rx Enci Vent Exh Rad Mon D Fails To Sel Value                                                                                               2/19/98 S 3-MRM017A Refuel Floor Vent Exh Rad Mon Chan A Fails To Set Value                                                                                       2/19/98 S 3-MRM017B Refuel Floor Vent Exh Rad Mon Chan B Fails To Sel Value                                                                                       2/19/98 S 3-MRM017C Refuel Floor Vent Exh Rad Mon Chan C Fails To Sel Value                                                                                       3/18/98 S j
3-MRM018A Drywell Post Loca Rad Mon Chan A Fails To Sel Value 4/9/98 S 3-MRM018B Drywell Post LOCA Rad Mon Chan B Fails To Sel Value 4/9/98 S 3-MRM018C Diywell Post LOCA Rad Mon Chan C Fails To Sel Va!ue 4/9/98 S j
3-MRM017D Refuel Floor Vent Exh Rad Mon Chan D Fails To Set Value                                                                                       3/18/98 S 3-MRM018A Drywell Post Loca Rad Mon Chan A Fails To Sel Value                                                                                           4/9/98 S 3-MRM018B Drywell Post LOCA Rad Mon Chan B Fails To Sel Value                                                                                           4/9/98 S 3-MRM018C Diywell Post LOCA Rad Mon Chan C Fails To Sel Va!ue                                                                                           4/9/98 S j     3-MRM018D Drywell Post LOCA Rad Mon Chan D Fails To Set Value                                                                                           4/9/98 S 3-MRM019A U-1 RHRSW Hx Return Header Rad Mon Fails To SeiValue                                                                                         4/16/98 S j     3-MRM019B U-2 RHRSW Hx Return Header Rad Mon Fails To SelValue                                                                                         4/16/98 S 3-MRM020 RCIC Pump Room Area Rad Mon Fails To Sel Value                                                                                                 2/4/98 S
3-MRM018D Drywell Post LOCA Rad Mon Chan D Fails To Set Value 4/9/98 S
)     3 MRM021     HPCI Pump Room Area Rad Mon Fails To Sel Value                                                                                             2/4/98 S     >
3-MRM019A U-1 RHRSW Hx Return Header Rad Mon Fails To SeiValue 4/16/98 S j
,                                                                                                                                                                            i.
3-MRM019B U-2 RHRSW Hx Return Header Rad Mon Fails To SelValue 4/16/98 S
3-MRM022     Rx Encl Sumps Area Rad Mon Fails To Sel Value                                                                                             2/19/98 S 3-MRM023 CRD Pump Room Area Rad Mon Fails To Sel Value                                                                                                   2/4/98 S 3-MRM024     Turbine Aux Hallway Area Rad Mon Fails To Sel Value                                                                                       2/4/98 S 3-MRM025 Isolation Valve Compartment Area Rad Mon Fails To Sel Value                                                                                     2/4/98 S 3-MRM026 Condensate Pump Rxm Area Rad Mon Fails To Sel Value                                                                                             2/4/98 S
3-MRM020 RCIC Pump Room Area Rad Mon Fails To Sel Value 2/4/98 S
    '3-MRM027     RHR Division i Room Area Rad Mon Fails To Sel Value                                                                                       2/4/98 S 3-MRM028     RHR Division 11 Room Area Rad Mon Fails To Sel Value                                                                                       2/4/98 S 3-MRM029 Steam Vent Area Stairwell Area Rad Mon Fails To Sel Value                                                                                       2/4/98 S 3-MRM030 Rx Enct Rr Access Airlock Area Rad Mon Fails To Sel Val                                                                                         2/4/98 S 3-MRM031     Hallway Cond Filters Area Rad Mon Fails To Sel Value                                                                                       2/4/98 S 3-MRM032 Turbine Enci Condenser Area Rad Mon Fails To Sei Value                                                                                         2/4/98 S 3-MRM033     Rx Drywell Area Rad Mon Fails To Sel Value                                                                                             2/11/98 S       t 3-MRM034 Rx Enci East Area Rad Mon Fails To Sel Value                                                                                                   2/4/98 S     ,
)
    ' Saturday, January 02,1999                                                                                                                               Page 8 of 29 i
3 MRM021 HPCI Pump Room Area Rad Mon Fails To Sel Value 2/4/98 S i.
3-MRM022 Rx Encl Sumps Area Rad Mon Fails To Sel Value 2/19/98 S 3-MRM023 CRD Pump Room Area Rad Mon Fails To Sel Value 2/4/98 S 3-MRM024 Turbine Aux Hallway Area Rad Mon Fails To Sel Value 2/4/98 S 3-MRM025 Isolation Valve Compartment Area Rad Mon Fails To Sel Value 2/4/98 S 3-MRM026 Condensate Pump Rxm Area Rad Mon Fails To Sel Value 2/4/98 S
'3-MRM027 RHR Division i Room Area Rad Mon Fails To Sel Value 2/4/98 S
3-MRM028 RHR Division 11 Room Area Rad Mon Fails To Sel Value 2/4/98 S
3-MRM029 Steam Vent Area Stairwell Area Rad Mon Fails To Sel Value 2/4/98 S
3-MRM030 Rx Enct Rr Access Airlock Area Rad Mon Fails To Sel Val 2/4/98 S
3-MRM031 Hallway Cond Filters Area Rad Mon Fails To Sel Value 2/4/98 S
3-MRM032 Turbine Enci Condenser Area Rad Mon Fails To Sei Value 2/4/98 S
3-MRM033 Rx Drywell Area Rad Mon Fails To Sel Value 2/11/98 S t
3-MRM034 Rx Enci East Area Rad Mon Fails To Sel Value 2/4/98 S
' Saturday, January 02,1999 Page 8 of 29 i


l Test No   Title                                                       Test Date Results 3-MRM035   Rx Encl West Area Rad Mon Fails To Sel Value                   2/4/98 S 3-MRM036   Neutron Mon Sys Area Rad Mon Fails To Sel Value               2/12/98 S 3-MRM037   Neutron Mon Drive Mech Area Rad Mon Fails To Sel Value       2/12/98 S 3-MRM038   Turbine Aux Hallway East Area Rad Mon Fails To Sel Value     2/12/98 S 3-MRM039 Turbine Aux Hallway West Area Rad Mon Fails To SelValue         2/12/98 S 3-MRM040   RWCU Heat Exchanger Area Rad Mon Fails To SelValue           2/19/98 S 3-MRM041   RWCU Pump Area Rad Mon Fails To Sel Value                     2/19/98 S 3-MRM042   SLC Sys Area Rad Mon Fails To Sel Value                       2/12/98 S 3-MRM043   RWCU instrument Rack Area Rad Mon Fails To Set Value         2/12/98 S 3-MRM044   Turbine Aux Bay Area Rad Mon Fails To Set Value               2/12/98 S 3-MRM045   Gas Radwaste Rec Hallway Area Rad Mon Fails To Sel Valu       2/19/98 S 3-MRM045   Turbine Enct Washdown Area Rad Mon Fails To Sel Value         2/12/98 S 3-MRM046   RWCl> Filter Area Rad Mon Fails To Sel Value                 2/12/98 S 3-MRM047 TEECE Filter Area Rao Mon Fails To Sel Value                   2/12/98 S 3-MRM048   Drywell Head Laydown Area Rad Mon Fails To Sel Value         2/19/98 S 3-MRM049   Steam Separator Area Rad Mon Fails To Sel Value               2/12/98 S 3-MRM050   Spent Fuel Pool Area Rad Mon Fails To Sel Value               2/12/98 S 3-MRM051   New Fuel Storage Vault Area Rad Mon Fails To Sel Value       2/12/98 S 3-MRM052   Pool Plug Laydown Area Rad Mon Fails To Sel Value             2/12/98 S 3-MRM053   H2O2 Analyzers Area Rad Mon Fails To Set Value               2/12/98 S 3-MRM055 Support Ctr / Turb Encl Area Rad Mon Fails To Sel Value         2/19/98 S 3-MRM056   Sludge Disch Mixing Pump Area Rad Mon Fails To Sel Value     2/19/98 S 3-MRM057   Radwaste Building Hallway Area Rad Mon Fails To Sel Value     2/19/98 S 3-MRM058   Cond Storage Disch Pump Area Rad Mon Fails To Sei Value       2/19/98 S 3-MRM059 Laundry Drain Process Room Area Rad Mon Fails To Set Valu       2/19/98 S 3-MRM060   Floor Drain Filter Hold Pmp Area Rad Mon Fails To Sel Value   2/i9/98 S 3-MRM061   Fuel Pool Filter Hold Pump Area Rad Mon Fails To Sel Value   2/19/98 S 3-MRM062   Precoat Tank and Pmp Room Area Rad Mon Fails To Sel Valu     2/19/98   S 3-MRM003   Remote SD Control Room Area Rad Mon Fails To Sel Value       2/19/98 S 3-MRM064   Radwaste Cask Loading Area Rad Mon Fails To Sel Value         3/3/98   S Sa5Ty, January 011999                                                       Page 9 of 29 i
l Test No Title Test Date Results 3-MRM035 Rx Encl West Area Rad Mon Fails To Sel Value 2/4/98 S 3-MRM036 Neutron Mon Sys Area Rad Mon Fails To Sel Value 2/12/98 S 3-MRM037 Neutron Mon Drive Mech Area Rad Mon Fails To Sel Value 2/12/98 S 3-MRM038 Turbine Aux Hallway East Area Rad Mon Fails To Sel Value 2/12/98 S 3-MRM039 Turbine Aux Hallway West Area Rad Mon Fails To SelValue 2/12/98 S 3-MRM040 RWCU Heat Exchanger Area Rad Mon Fails To SelValue 2/19/98 S 3-MRM041 RWCU Pump Area Rad Mon Fails To Sel Value 2/19/98 S 3-MRM042 SLC Sys Area Rad Mon Fails To Sel Value 2/12/98 S 3-MRM043 RWCU instrument Rack Area Rad Mon Fails To Set Value 2/12/98 S 3-MRM044 Turbine Aux Bay Area Rad Mon Fails To Set Value 2/12/98 S 3-MRM045 Gas Radwaste Rec Hallway Area Rad Mon Fails To Sel Valu 2/19/98 S 3-MRM045 Turbine Enct Washdown Area Rad Mon Fails To Sel Value 2/12/98 S 3-MRM046 RWCl> Filter Area Rad Mon Fails To Sel Value 2/12/98 S 3-MRM047 TEECE Filter Area Rao Mon Fails To Sel Value 2/12/98 S 3-MRM048 Drywell Head Laydown Area Rad Mon Fails To Sel Value 2/19/98 S 3-MRM049 Steam Separator Area Rad Mon Fails To Sel Value 2/12/98 S 3-MRM050 Spent Fuel Pool Area Rad Mon Fails To Sel Value 2/12/98 S 3-MRM051 New Fuel Storage Vault Area Rad Mon Fails To Sel Value 2/12/98 S 3-MRM052 Pool Plug Laydown Area Rad Mon Fails To Sel Value 2/12/98 S 3-MRM053 H2O2 Analyzers Area Rad Mon Fails To Set Value 2/12/98 S 3-MRM055 Support Ctr / Turb Encl Area Rad Mon Fails To Sel Value 2/19/98 S 3-MRM056 Sludge Disch Mixing Pump Area Rad Mon Fails To Sel Value 2/19/98 S 3-MRM057 Radwaste Building Hallway Area Rad Mon Fails To Sel Value 2/19/98 S 3-MRM058 Cond Storage Disch Pump Area Rad Mon Fails To Sei Value 2/19/98 S 3-MRM059 Laundry Drain Process Room Area Rad Mon Fails To Set Valu 2/19/98 S 3-MRM060 Floor Drain Filter Hold Pmp Area Rad Mon Fails To Sel Value 2/i9/98 S 3-MRM061 Fuel Pool Filter Hold Pump Area Rad Mon Fails To Sel Value 2/19/98 S 3-MRM062 Precoat Tank and Pmp Room Area Rad Mon Fails To Sel Valu 2/19/98 S
3-MRM003 Remote SD Control Room Area Rad Mon Fails To Sel Value 2/19/98 S 3-MRM064 Radwaste Cask Loading Area Rad Mon Fails To Sel Value 3/3/98 S
Sa5Ty, January 011999 Page 9 of 29 i


_ _ _ _    _ _ . , _ .                - _ _ -    . . - . = -           - - . - _ - - - - .        . -    _ _ - . - - - .
.. -. = -
i Test No                 Title                                                           Test Date Results I
i Test No Title Test Date Results I
3-M.VA065 Railroad Car Airlock Room Area Rad Mon Fails To Sel Value                           2/19/98 S 3-MRM066 Radwaste Enc! Hallway Area Rad Mon Fails To SelValue                                 2/19/98 S 3-MRM067                 Hot Maint Shop Area Rad Mon Fails To Sel Value                       2/19/98 S                     l 3-MRM068 Turb Encl RR Entrance Area Rad Mon Fails To Sei Va!ue                                 2/19/98 S                     :
3-M.VA065 Railroad Car Airlock Room Area Rad Mon Fails To Sel Value 2/19/98 S 3-MRM066 Radwaste Enc! Hallway Area Rad Mon Fails To SelValue 2/19/98 S 3-MRM067 Hot Maint Shop Area Rad Mon Fails To Sel Value 2/19/98 S l
l 3-MRM069 Radwaste Building Area Rad Mon Fails To Sel Value                                     2/19/98 S                     I Man ontro R           Area Rad Mon Fails To Sel Value                   /
3-MRM068 Turb Encl RR Entrance Area Rad Mon Fails To Sei Va!ue 2/19/98 S l
3-MRM072 Turbine Operating Area Rad Mon Fails To Set Value                                     2/19/98 S 3-MRM073                 SGTS Filter Area Rad Mon Fails To Sel Value                         2/19/98 S 3-MRM074                 N Stack Instrument Room Area Rad Mon Fails To Sel Value             2/19/98     S                 ;
3-MRM069 Radwaste Building Area Rad Mon Fails To Sel Value 2/19/98 S I
3-MRP027A Loss of Normal Power to RPS Bus A                                                 12/19/98     S 3-MRP027B Loss of Normal Power to RPS Bus B                                                 12/22/98     S f
Man ontro R Area Rad Mon Fails To Sel Value
j 3-MRP029A RPS Fails to Scram (Auto Only)                                                     12/13/98 S 3-MRP0298 RPS Fails to Scram (Complete)                                                     12/13/98     S 3-MRP029C RPS Channel A Fails to Scram                                                       12/13/98     S 3-MRP029D RPS Channel B Fails to Scram                                                       12/13/98     S 3-MRP406A RRCS Division I Loss of DC Power                                                   10/21/98 S 3-MRP407A RRCS Div i ARI Fails To initiate                                                   10/18/98     S
/
3-MRP4078 RRCS Div ll ARI Fails To initiate                                                 10/18/98     S                 ,
3-MRM072 Turbine Operating Area Rad Mon Fails To Set Value 2/19/98 S 3-MRM073 SGTS Filter Area Rad Mon Fails To Sel Value 2/19/98 S 3-MRM074 N Stack Instrument Room Area Rad Mon Fails To Sel Value 2/19/98 S
t                                                                                                                               t j 3-MRP407C RRCS Both Divisions of ARI Fail To initiate                                       10/18/98     S l 3-MRR430A Reactor Recire Pump 1 A Seizure                                                   12/11/98     S 3-MRR430B Reactor Recire Pump 1B Seizure                                                     12/11/98 S
3-MRP027A Loss of Normal Power to RPS Bus A 12/19/98 S
3-MRR431 A Recirc Pump 1 A M/A Station Fails High                                           12/11/98 S 3-MRR431B Recirc Pump 1 A M/A Station Fails Low                                             12/11/98 S 3-MRR431C Recirc Pump 1B M/A Station Fails High                                             12/11/98 S                       j 3-MRR431D Recirc Pump 18 M/A Station Fails Low                                               12/11/98 S                       f 3-MRR435A Recire Pump 1 A Drive Motor Breaker Trips                                         12/20/98 S I
f 3-MRP027B Loss of Normal Power to RPS Bus B 12/22/98 S
3-MRR435B Recirc Pump 1B Drive Motor Breaker Trips                                           12/20/98     S 3-MRR442A Recirc Pump 1 A RPT Breaker CB3A Trips                                             12/11/98     S 3-MRR4428 Recire Pump 1 A RPT Breaker CB4A Trips                                           12/11/98       S
j 3-MRP029A RPS Fails to Scram (Auto Only) 12/13/98 S 3-MRP0298 RPS Fails to Scram (Complete) 12/13/98 S
                        ~ ~ ~
3-MRP029C RPS Channel A Fails to Scram 12/13/98 S
3-MRP029D RPS Channel B Fails to Scram 12/13/98 S
3-MRP406A RRCS Division I Loss of DC Power 10/21/98 S 3-MRP407A RRCS Div i ARI Fails To initiate 10/18/98 S
3-MRP4078 RRCS Div ll ARI Fails To initiate 10/18/98 S
t t
j 3-MRP407C RRCS Both Divisions of ARI Fail To initiate 10/18/98 S
l 3-MRR430A Reactor Recire Pump 1 A Seizure 12/11/98 S
3-MRR430B Reactor Recire Pump 1B Seizure 12/11/98 S 3-MRR431 A Recirc Pump 1 A M/A Station Fails High 12/11/98 S 3-MRR431B Recirc Pump 1 A M/A Station Fails Low 12/11/98 S 3-MRR431C Recirc Pump 1B M/A Station Fails High 12/11/98 S j
f 3-MRR431D Recirc Pump 18 M/A Station Fails Low 12/11/98 S 3-MRR435A Recire Pump 1 A Drive Motor Breaker Trips 12/20/98 S I
3-MRR435B Recirc Pump 1B Drive Motor Breaker Trips 12/20/98 S
3-MRR442A Recirc Pump 1 A RPT Breaker CB3A Trips 12/11/98 S
3-MRR4428 Recire Pump 1 A RPT Breaker CB4A Trips 12/11/98 S
Saturday, january 02,1999 Page 10 of 29
~ ~ ~
+
+
Saturday, january 02,1999                                                                      Page 10 of 29 5
5 l
l l
.=
I
            - .=                                                           .


  . __ __                    -                        _-        -        - ~
~
l Test No     Title                                                 Test Date Results l 3-MRR442C Recirc Pump 1 A RPT Breakers CB3A and CB4A Trip           12/11/98 S       i 3-MRR443A Recirc Pump 1B RPT Breaker CB3B Tnps                       12/11/98 S 3-MRR443B Recirc Pump 1B RPT Breaker CB4B Trips                     12/11/98 S 3-MRR443C Reecirc Pump 1B RPT Breakers CB3B and CB4B Trip           12/11/98 S       ,
l Test No Title Test Date Results 3-MRR442C Recirc Pump 1 A RPT Breakers CB3A and CB4A Trip 12/11/98 S i
3-MRR505A Recirc Pump 1A inadvertent High Runback                   12/10/98 S       ;
3-MRR443A Recirc Pump 1B RPT Breaker CB3B Tnps 12/11/98 S 3-MRR443B Recirc Pump 1B RPT Breaker CB4B Trips 12/11/98 S 3-MRR443C Reecirc Pump 1B RPT Breakers CB3B and CB4B Trip 12/11/98 S 3-MRR505A Recirc Pump 1A inadvertent High Runback 12/10/98 S 3-MRR505B Recirc Pump 1 A inadvertent Lo Runback 12/10/98 S 3-MRR506A Recirc Pump 1B inadvertent High Runback 12/10/98 S 3-MRR506B Recirc Pump 1B Inadvertent Lo Runback 12/10/98 S 3-MRT001B Fuel Cladding Failure,0-52411 Fuel Pins 10/22/98 S 3-MRT002 RWCU F/D Resin Intrusion inTo Rx Vessel 7/26/98 S 3-MRTC04 Fuel Failure of Bundle in Rx Cavity 6/21/98 S 3-MRT005A Inadvertent Activity Release on Elevation 313 Rx Enci 6/11/98 S 3-MRT005B Inadvertent Activity Release on Elevation 253 Rx Enci 6/11/98 S
3-MRR505B Recirc Pump 1 A inadvertent Lo Runback                     12/10/98 S 3-MRR506A Recirc Pump 1B inadvertent High Runback                   12/10/98 S 3-MRR506B Recirc Pump 1B Inadvertent Lo Runback                     12/10/98 S 3-MRT001B Fuel Cladding Failure,0-52411 Fuel Pins                   10/22/98 S 3-MRT002     RWCU F/D Resin Intrusion inTo Rx Vessel                 7/26/98 S       '
3-MRT005C Inadvertent Activity Release on Elevation 177 Rx Enci 6/11/98 S 3-MRi O10 Offgas Sys Charcoal Adsorber Trains Degraded 6/11/98 S 3-MRT011 Offgas Sys Charcoal Adsorber Guard Bed Degraded 6/11/98 S 3-MRT012 Offgas Sys HEPA Filter Degraded 6/11/98 S 3-MSD001 A Steam Flooding Damper BPD-201-21 A Fails To Trip 3/11/98 S
3-MRTC04     Fuel Failure of Bundle in Rx Cavity                     6/21/98 S 3-MRT005A Inadvertent Activity Release on Elevation 313 Rx Enci       6/11/98 S 3-MRT005B Inadvertent Activity Release on Elevation 253 Rx Enci       6/11/98 S 3-MRT005C Inadvertent Activity Release on Elevation 177 Rx Enci       6/11/98 S 3-MRi O10     Offgas Sys Charcoal Adsorber Trains Degraded           6/11/98 S 3-MRT011     Offgas Sys Charcoal Adsorber Guard Bed Degraded         6/11/98 S 3-MRT012     Offgas Sys HEPA Filter Degraded                         6/11/98 S 3-MSD001 A Steam Flooding Damper BPD-201-21 A Fails To Trip           3/11/98 S 3-MSD001B Steam Flooding Damper BPD-201-21B Fails To Trip             3/11/98 S 3-MSD002A Steam Flooding Damper BPD-201-22A Fails To Trip             2/28/98 S 3-MSD002B Steam Flooding Damper BPD-201-22B Fails To Trip             2/28/98 S       (
3-MSD001B Steam Flooding Damper BPD-201-21B Fails To Trip 3/11/98 S
3-MSD003A Steam, Flooding Damper BPD-201-23A Fails To Trip           2/28/98 S 3-MSD003B Steam Flooding Damper BPD-201-23B Fails To Trip             2/28/98 S 3-MSD004A Steam Flooding Damper BPD-202-118A Fails To Trip           3/11/08 S 3-MSD004B Steam Flooding Damper BPD-202-118B Fails To Trip           3/11/98 S       ;
3-MSD002A Steam Flooding Damper BPD-201-22A Fails To Trip 2/28/98 S 3-MSD002B Steam Flooding Damper BPD-201-22B Fails To Trip 2/28/98 S
3-MSD005A Steam Flooding Damper BPD-202-67A Fails To Trip             2/28/98 S 3-MSD005B Steam Flooding Damper BPD-202-673 Fails To Trip             2/28/98 S 3-MSD006A Steam Flooding Damper BPD-202-104A Fails To Trip           2/28/98 S 3-MSD006B Steam Flooding Damper BPD-202-104B Fails To Trip           2/28/98 S       "
(
3-MSD007A Steam Flooding Damper BPD-203-1 A Fails To Trip             2/28/98 S
3-MSD003A Steam, Flooding Damper BPD-201-23A Fails To Trip 2/28/98 S
                                                  ~
3-MSD003B Steam Flooding Damper BPD-201-23B Fails To Trip 2/28/98 S 3-MSD004A Steam Flooding Damper BPD-202-118A Fails To Trip 3/11/08 S
Saturday, .fa~nuary 02,1999                                           Page 11 of 29
3-MSD004B Steam Flooding Damper BPD-202-118B Fails To Trip 3/11/98 S 3-MSD005A Steam Flooding Damper BPD-202-67A Fails To Trip 2/28/98 S 3-MSD005B Steam Flooding Damper BPD-202-673 Fails To Trip 2/28/98 S 3-MSD006A Steam Flooding Damper BPD-202-104A Fails To Trip 2/28/98 S 3-MSD006B Steam Flooding Damper BPD-202-104B Fails To Trip 2/28/98 S 3-MSD007A Steam Flooding Damper BPD-203-1 A Fails To Trip 2/28/98 S
Saturday,.fa~nuary 02,1999 Page 11 of 29
~


d Test No     Title                                               Test Date Results 3-MSD007B Steam Flooding Damper BPD-203-1B Fails To Trip           2/28/98 S 3-MSD008A Steam Flooding Damper BPD-203-4A Fails To Trip           2/28/98 S 3-MSD008B Steam Flooding Damper BPD-203-4B Fails To Trip           2/28/98 S 3-MSD009A Steam Flooding Damper BPD-203-14A Fails To Trip           2/28/98 S 3-MSD009B Steam Flooding Damper BPD-203-14B Fails To Trip           2128/98 S 3-MSD010A Steam Flooding Damper BPD-203-16A Fails To Trip           2/28/98     S   i 3-MSD010B Steam Flooding Damper BPD-203-168 Fails To Trip           2/2&'98 S 3-MSD011 A Steam Flooding Damper BPD-203-20A Fails To Trip         2/28/98 S 3-MSD011B Steam Flooding Damper BPD-203-20B Fails To Trip           2/28/98     S 3-MSD012A Steam Flooding Damper BPD-203-3A Fails To Trip           2/28/98     S 3-MSD012A Steam Flooding Damper BPD-203-24A Fails To Trip           2/28/90 S 3-MSD012B Steam Flooding Damper BPD-203-38 Fails To Trip           2/28/98     S 3-MSD012B Steam Flooding Damper BPD-203-24B Fails To Trip           2/28/98 S 3-MSD013A Steam Flooding Damper BPD-203-37A Fails To Trip           2/28/98 S 3-MSD013B Steam Flooding Damper BPD-203-37B Fails To Trip           2/28/98 S
d Test No Title Test Date Results 3-MSD007B Steam Flooding Damper BPD-203-1B Fails To Trip 2/28/98 S 3-MSD008A Steam Flooding Damper BPD-203-4A Fails To Trip 2/28/98 S 3-MSD008B Steam Flooding Damper BPD-203-4B Fails To Trip 2/28/98 S 3-MSD009A Steam Flooding Damper BPD-203-14A Fails To Trip 2/28/98 S 3-MSD009B Steam Flooding Damper BPD-203-14B Fails To Trip 2128/98 S 3-MSD010A Steam Flooding Damper BPD-203-16A Fails To Trip 2/28/98 S
-                3-MSD014A Steam Flooding Damper BPD-203-38A Fails To Trip           2/28/98 S 3-MSD014B Steam Flooding Damper BPD-203-388 Fails To Trip           2/28/98 S
i 3-MSD010B Steam Flooding Damper BPD-203-168 Fails To Trip 2/2&'98 S 3-MSD011 A Steam Flooding Damper BPD-203-20A Fails To Trip 2/28/98 S 3-MSD011B Steam Flooding Damper BPD-203-20B Fails To Trip 2/28/98 S
3-MSD012A Steam Flooding Damper BPD-203-3A Fails To Trip 2/28/98 S
3-MSD012A Steam Flooding Damper BPD-203-24A Fails To Trip 2/28/90 S 3-MSD012B Steam Flooding Damper BPD-203-38 Fails To Trip 2/28/98 S
3-MSD012B Steam Flooding Damper BPD-203-24B Fails To Trip 2/28/98 S 3-MSD013A Steam Flooding Damper BPD-203-37A Fails To Trip 2/28/98 S 3-MSD013B Steam Flooding Damper BPD-203-37B Fails To Trip 2/28/98 S 3-MSD014A Steam Flooding Damper BPD-203-38A Fails To Trip 2/28/98 S 3-MSD014B Steam Flooding Damper BPD-203-388 Fails To Trip 2/28/98 S
~
3-MSD015A Steam Flooding Damper BPD-203-39A Fails To Trip 2/28/98 S
' 3-MSD015B Steam Flooding Damper BPD-203-398 Fails To Trip 2/28/98 S l
3-MSD016A Steam Flooding Damper BPD-201-39A Fails To Trip 3/11/98 S
3-MSD016B Steam Flooding Damper BPD-201-398 Fails To Trip 3/11/98 S 3-MSD0i7A Steam Flooding Damper BPD-202-20A Fails To Trip 3/11/98 S 3-MSD017B Steam Flooding Damper BPD-202-20B Fails To Trip 3/11/98 S
3-MSD018A Steam Flooding Damper BPD-202-33A Fails To Trip 3/11/98 S 3-MSD018B Steam Flooding Damper BPD-202-33B Fails To Trip 3/11/98 S 3-MSD019A Steam Flooding Damper BPD-202-40A Fails To Trip 3/11/98 S
3-MSD019B Steam Flooding Damper BPD-20240B Fails To Trip 3/11/98 S
3-MSD020A Steam Flooding Damper BPD-202-41 A Fails To Trip 3/11/98 S
3-MSD020B Steam Flooding Damper BPD-202-41B Fails To Trip 3/11/98 S
3-MSD022A Steam Flooding Damper BPD-203-9A Fails To Trip 3/11/98 S
55tu'rday, Jan'uary 023999 Page 12 of 29
~
~
3-MSD015A Steam Flooding Damper BPD-203-39A Fails To Trip          2/28/98 S
J
              ' 3-MSD015B Steam Flooding Damper BPD-203-398 Fails To Trip          2/28/98 S l                3-MSD016A Steam Flooding Damper BPD-201-39A Fails To Trip          3/11/98      S 3-MSD016B Steam Flooding Damper BPD-201-398 Fails To Trip          3/11/98 S 3-MSD0i7A Steam Flooding Damper BPD-202-20A Fails To Trip          3/11/98 S 3-MSD017B Steam Flooding Damper BPD-202-20B Fails To Trip          3/11/98    S 3-MSD018A Steam Flooding Damper BPD-202-33A Fails To Trip          3/11/98 S 3-MSD018B Steam Flooding Damper BPD-202-33B Fails To Trip          3/11/98 S 3-MSD019A Steam Flooding Damper BPD-202-40A Fails To Trip          3/11/98    S 3-MSD019B Steam Flooding Damper BPD-20240B Fails To Trip            3/11/98    S 3-MSD020A Steam Flooding Damper BPD-202-41 A Fails To Trip          3/11/98    S 3-MSD020B Steam Flooding Damper BPD-202-41B Fails To Trip          3/11/98    S 3-MSD022A Steam Flooding Damper BPD-203-9A Fails To Trip            3/11/98    S
                                                    ~
55tu'rday, Jan'uary 023999                                            Page 12 of 29 J


Test No   Title                                           Test Date Results 3-MSD022B Steam Flooding Damper BPD-203-9B Fails To Trip     3/11/98 S 3-MSD023A Steam Flooding Damper BPD-203-10A Fails To Trip   3/11/98 S 3-MSD023B Steam Flooding Damper BPD-203-10B Fails To Trip   3/11/98 S 3-MSD024A Steam Flooding Damper BPD-203-17A Fails To Trip   2/28/98 S 3-MSD024B Steam Flooding Damper BPD-203-17B Fails To Trip   2/28/98 S 3-MSD025A Steam Flooding Damper BPD-203-22A Fails To Trip   3/11/98 S 3-MSD025B Steam Flooding Damper BPD-203-22B Fails To Trip   3/11/98 S 3-MSD026A Steam Flooding Damper BPD-203-23A Fails To Trip   3/12/98 S 3-MSD026B Steam Flooding Damper BPD-203-23B Fails To Trip   3/12/98 S       -
Test No Title Test Date Results 3-MSD022B Steam Flooding Damper BPD-203-9B Fails To Trip 3/11/98 S 3-MSD023A Steam Flooding Damper BPD-203-10A Fails To Trip 3/11/98 S 3-MSD023B Steam Flooding Damper BPD-203-10B Fails To Trip 3/11/98 S 3-MSD024A Steam Flooding Damper BPD-203-17A Fails To Trip 2/28/98 S 3-MSD024B Steam Flooding Damper BPD-203-17B Fails To Trip 2/28/98 S 3-MSD025A Steam Flooding Damper BPD-203-22A Fails To Trip 3/11/98 S 3-MSD025B Steam Flooding Damper BPD-203-22B Fails To Trip 3/11/98 S 3-MSD026A Steam Flooding Damper BPD-203-23A Fails To Trip 3/12/98 S 3-MSD026B Steam Flooding Damper BPD-203-23B Fails To Trip 3/12/98 S 3-MSD027A Steam Flooding Damper BPD-203-25A Fails To Trip 3/12/98 S 3-MSD0278 Steam Flooding Damper BPD-203-25B Fails To Trip 3/12/98 S 3-MSD028A Steam Flooding Damper BPD-203-26A Fails To Trip 3/12/98 S 3-MSD028B Steam Flooding Damper BPD-203-26B Fails To Trip 3/12/98 S 3-MSD029A Steam Flooding Damper BPD-203-27A Fails To Trip 3/12/98 S
3-MSD027A Steam Flooding Damper BPD-203-25A Fails To Trip   3/12/98 S 3-MSD0278 Steam Flooding Damper BPD-203-25B Fails To Trip   3/12/98 S 3-MSD028A Steam Flooding Damper BPD-203-26A Fails To Trip   3/12/98 S 3-MSD028B Steam Flooding Damper BPD-203-26B Fails To Trip   3/12/98 S       -
3-MSD029B Steam Flooding Damper BPD-203-27B Fails To Trip 3/12/98 S 3-MSD030A Steam Flooding Damper BPD-203-28A Fails To Trip 3/12/98 S 3-MSD030B Steam Flooding Damper BPD-203-28B Fails To Trip 3/12/98 S 3-MSD031 A Steam Flooding Damper BPD-203-29A Fails To Trip 3/11/98 S 3-MSD031B Steam Flooding Damper BPD-203-29B Fails To Trip 3/11/98 S 3-MSD032A Steam Flooding Damper BPD-203-30A Fails To Trip 3/12/98 S 3-MSD032B Steam Flooding Damper BPD-203-30B Fails To Trip 3/12/98 S 3-MSD033A Steam Flooding Damper BPD-203-31 A Fails To Trip 3/12/98 S 3-MSD033B Steam Flooding Damper BPD-203-31B Fails To Trip 3/12/98 S
3-MSD029A Steam Flooding Damper BPD-203-27A Fails To Trip   3/12/98 S       ,
3-MSD034A Steam Flooding Damper BPD-203-42A Fails To Trip 3/12/98 S 3-MSD034B Steam Flooding Damper BPD-203-42B Fails To Trip 3/12/98 S 3-MSD035A Steam Flooding Damper BPD-203-43A Fails To Trip 3/12/98 S 3-MSD035B Steam Flooding Damper BPD-203-43B Fails To Trip 3/12/98 S 3-MSD036A Steam Flooding Damper BPD-203-44A Fails To Trip 3/12/98 S l
3-MSD029B Steam Flooding Damper BPD-203-27B Fails To Trip   3/12/98 S 3-MSD030A Steam Flooding Damper BPD-203-28A Fails To Trip   3/12/98 S 3-MSD030B Steam Flooding Damper BPD-203-28B Fails To Trip   3/12/98 S 3-MSD031 A Steam Flooding Damper BPD-203-29A Fails To Trip   3/11/98 S         l 3-MSD031B Steam Flooding Damper BPD-203-29B Fails To Trip   3/11/98 S 3-MSD032A Steam Flooding Damper BPD-203-30A Fails To Trip   3/12/98 S 3-MSD032B Steam Flooding Damper BPD-203-30B Fails To Trip   3/12/98 S 3-MSD033A Steam Flooding Damper BPD-203-31 A Fails To Trip   3/12/98 S 3-MSD033B Steam Flooding Damper BPD-203-31B Fails To Trip   3/12/98 S 3-MSD034A Steam Flooding Damper BPD-203-42A Fails To Trip   3/12/98 S 3-MSD034B Steam Flooding Damper BPD-203-42B Fails To Trip   3/12/98 S 3-MSD035A Steam Flooding Damper BPD-203-43A Fails To Trip   3/12/98 S 3-MSD035B Steam Flooding Damper BPD-203-43B Fails To Trip   3/12/98 S         ,
3-MSD036B Steam Flooding Damper BPD-203-44B Fails To Trip 3/12/98 S 3-MS$ i98A SLC Pump 1 A Loss of Control Power 10/18/98 S i5sturT15y,ianuary 02, dI9 Page 13 of 29
3-MSD036A Steam Flooding Damper BPD-203-44A Fails To Trip   3/12/98 S       l 3-MSD036B Steam Flooding Damper BPD-203-44B Fails To Trip   3/12/98 S         l 3-MS$ i98A SLC Pump 1 A Loss of Control Power               10/18/98 S
~
                                    ~
i5sturT15y,ianuary 02, dI9                                     Page 13 of 29
                                                                                -l


Test No   Title                                                       Test Date Results 3-MSL1988 SLC Pump 1B Loss of Control Power                             10/18/98 S 3-MSL198C SLC Pump 1C Loss of Control Power                             10/18/98 S 4
Test No Title Test Date Results 3-MSL1988 SLC Pump 1B Loss of Control Power 10/18/98 S 3-MSL198C SLC Pump 1C Loss of Control Power 10/18/98 S 3-MSW488A Trip of 1 A Service Water Pump 12/13/98 S 4
3-MSW488A Trip of 1 A Service Water Pump                               12/13/98 S 12/13/98 S 3-MSW488B Trip of 1B Service Water Pump 3-MSW488C Trip of 1C Service Water Pump                                 12/13/98 S
3-MSW488B Trip of 1B Service Water Pump 12/13/98 S 3-MSW488C Trip of 1C Service Water Pump 12/13/98 S 3-MSW489A ESW Pump 1 A Trips 12/12/98 S 3-MSW489B ESW Pump 1B Trips 12/12/98 S 3-MSW489C ESW Pump 1C Trips 12/12/98 S 3-MSW489D ESW Pump 1D Trips 12/12/98 S 3-MSW490A ESWValve HV11-121 Fails to Auto Swap 12/13/98 S 3-MSW490C ESWValve HV11-225 Fails to Auto Swap 12/13/98 S 3-MSW490D ESWValve HV11-047 Fails to Auto Swap 12/13/98 S 3-MSW490E ESW Valve HV11-055A Fails to Auto Swap 12/13/98 S 3-MSW490F ESW Valve HV11-079 Fails to Auto Swap 12/13/98 S 3-MSW490G ESW Valve HV11-126 Fails to duto Swap 12/13/98 S 3-MSW490H ESWValve HV11-074 Fails to Auto Swap 12/13/98 S 3-MSW514 RHR Heat Exchanger A Tube Leak 4/8/98 S 3-MSW515B RHR Hx B Service Water Outlet Pipe Rupture in RHR Room 7/26/98 S 3-MTE001A Trip of 1 A Turbine Enclosure Suppy Fan 1/18/98 S
;    3-MSW489A ESW Pump 1 A Trips                                           12/12/98 S 3-MSW489B ESW Pump 1B Trips                                             12/12/98 S 3-MSW489C ESW Pump 1C Trips                                             12/12/98 S 3-MSW489D ESW Pump 1D Trips                                             12/12/98 S 3-MSW490A ESWValve HV11-121 Fails to Auto Swap                         12/13/98 S 3-MSW490C ESWValve HV11-225 Fails to Auto Swap                         12/13/98 S 3-MSW490D ESWValve HV11-047 Fails to Auto Swap                         12/13/98 S 3-MSW490E ESW Valve HV11-055A Fails to Auto Swap                       12/13/98 S       ,
3-WITE0018 Trip of 1B Turbine Enclosure Supply Fan 1/18/98 S 3 MTE001C Trip of 1C Turbine Enclosure Supply Fan 1/18/98 S 7
3-MSW490F ESW Valve HV11-079 Fails to Auto Swap                         12/13/98 S 3-MSW490G ESW Valve HV11-126 Fails to duto Swap                         12/13/98 S 3-MSW490H ESWValve HV11-074 Fails to Auto Swap                         12/13/98 S
3-MTE002A Trip of 1 A Turbine Enclosure Exhaust Fan 1/18/98 S
3-MSW514   RHR Heat Exchanger A Tube Leak                                 4/8/98 S 3-MSW515B RHR Hx B Service Water Outlet Pipe Rupture in RHR Room         7/26/98 S 3-MTE001A Trip of 1 A Turbine Enclosure Suppy Fan                       1/18/98   S 3-WITE0018 Trip of 1B Turbine Enclosure Supply Fan                       1/18/98 S 37 MTE001C Trip of 1C Turbine Enclosure Supply Fan                       1/18/98 S
' 3-MTE002B Trip of 18 Turbine Enclosure Exhaust Fan 1/18/98 S I
3-MTE002A Trip of 1 A Turbine Enclosure Exhaust Fan                     1/18/98   S
3-MTE002C Trip of 1C Turbine Enclosure Exhaust Fan 1/18/98 S 3-MTE003A Trip of 1 A Turbine Equipment Compt Exhaust Fan 1/18/98 S 3-MTR003B Trip of 1B Turbine Equipment Compt Exhaust Fan 1/18/98 S
  ' 3-MTE002B Trip of 18 Turbine Enclosure Exhaust Fan                       1/18/98 S I
3.007A APRM Channel D Recorder Fails As-Is 5/1/98 S j
3-MTE002C Trip of 1C Turbine Enclosure Exhaust Fan                       1/18/98 S 3-MTE003A Trip of 1 A Turbine Equipment Compt Exhaust Fan               1/18/98 S 3-MTR003B Trip of 1B Turbine Equipment Compt Exhaust Fan                 1/18/98   S 3.007A     APRM Channel D Recorder Fails As-Is                             5/1/98 S     j 3.007B     APRM Channel D Fails Inop                                       5/1/98 S 3.008B     APRM Channel E Fails inop                                       5/4/98 S 3.010B     RBM Channel A Fails inop                                       5/4/98 S J
3.007B APRM Channel D Fails Inop 5/1/98 S 3.008B APRM Channel E Fails inop 5/4/98 S
        ~                      ~
3.010B RBM Channel A Fails inop 5/4/98 S
* Saturdai5ttuary 02,1999                                                     Page 14 of 29 l
J Saturdai5ttuary 02,1999 Page 14 of 29
~
~


Test No     Title                                             Test Date Results 3.012D       LPRM 24-178 Upscale Failure                         5/4/98 S 3.012H       LPRM 08-17D Upscale Failure                         5/4/98 S 3.013D       LPRM 24-57B Downscale Failure                       5/4/98 S 3.013H       LPRM 40-17D Downscale Failure                       5/4/98 S 3.015D       LPRM 40-41B Drift (-25 To +25)                       5/4/98 S 3.019A       Contro: Rod XX-W Failure (Dnft in)                 7/15/98 S 3.019B       Control Rod XX-W Failure (Drift Out)               8/20/98 S 3.019C       Control Rod XX-W Fai;ure (Accumulator Trouble)     8/13/98 S 3.019D       Control Rod XX-W Failure (Stuck)                   8/23/98 S "s.019E     Control Rod XX-W Failure (Uncoupled)               8/23/98 S i 3.019F       Control Rod XX-W Failure (Scrammed)                 8/6/98 S 3.019G       Control Rod XX-W Fails To Scram                     8/6/98 S 3.020D       APRM Channel D Fails 0-125%                         6!6/98 S 3.022       Reactor Manual Control Failure To insert           5/1/98 S 3.024       RDCS Failure (Analyzer Card)                       5/1/98 S 3.028E       Reactor Scram (Bank 4)                             5/1/98 S 3.0298       RPS Fails To Scram (Complete)                       5/1/98 S 3 0438       Feedwater Master Level Controller Fails Low       7/23/98 S 3.045A       Feedwater Pump A Controller Output Fails Low       7/23/98 S 3.046D       Steam Flow Transmitter 1N003D Fails 0-100%         7/15/98 S 3.0478       Feedwater Flow Transmitter 1N002B Fails 0-100%     6/7/98 S 3.061D       MSIV HV41-1F022D Fails Open                         6/7/98 S 3.062D       MSIV HV41-1F028D Fails Open                       6/11/98 S i
Test No Title Test Date Results 3.012D LPRM 24-178 Upscale Failure 5/4/98 S 3.012H LPRM 08-17D Upscale Failure 5/4/98 S 3.013D LPRM 24-57B Downscale Failure 5/4/98 S 3.013H LPRM 40-17D Downscale Failure 5/4/98 S 3.015D LPRM 40-41B Drift (-25 To +25) 5/4/98 S 3.019A Contro: Rod XX-W Failure (Dnft in) 7/15/98 S 3.019B Control Rod XX-W Failure (Drift Out) 8/20/98 S 3.019C Control Rod XX-W Fai;ure (Accumulator Trouble) 8/13/98 S 3.019D Control Rod XX-W Failure (Stuck) 8/23/98 S "s.019E Control Rod XX-W Failure (Uncoupled) 8/23/98 S i
3.063D       MSIV HV41-1F022D Fails Closed                     9/27/98 S 3.064D       MSIV HV41-1F028D Fails Closed                     9/27/98 S 3.067       Steam Leak in Drywell(0-5000 gpm)                 10/25/98 S 3.071C       Loss of Extraction Steam To Feedwater Heater 16C   5/1/98 S 3.072D       SJAE Steam Supply PCV07-1018 Fails Open             8/6/98 S 3.073       Feedwater Conductivity increase                     6/4/98 S 3.074       Main Condenser Air inleakage                     10/25/98 S Saturday, January 02,1999                                       Page 15 of d
3.019F Control Rod XX-W Failure (Scrammed) 8/6/98 S 3.019G Control Rod XX-W Fails To Scram 8/6/98 S 3.020D APRM Channel D Fails 0-125%
6!6/98 S 3.022 Reactor Manual Control Failure To insert 5/1/98 S 3.024 RDCS Failure (Analyzer Card) 5/1/98 S 3.028E Reactor Scram (Bank 4) 5/1/98 S 3.0298 RPS Fails To Scram (Complete) 5/1/98 S 3 0438 Feedwater Master Level Controller Fails Low 7/23/98 S 3.045A Feedwater Pump A Controller Output Fails Low 7/23/98 S 3.046D Steam Flow Transmitter 1N003D Fails 0-100%
7/15/98 S 3.0478 Feedwater Flow Transmitter 1N002B Fails 0-100%
6/7/98 S 3.061D MSIV HV41-1F022D Fails Open 6/7/98 S
3.062D MSIV HV41-1F028D Fails Open 6/11/98 S i
3.063D MSIV HV41-1F022D Fails Closed 9/27/98 S 3.064D MSIV HV41-1F028D Fails Closed 9/27/98 S 3.067 Steam Leak in Drywell(0-5000 gpm) 10/25/98 S 3.071C Loss of Extraction Steam To Feedwater Heater 16C 5/1/98 S 3.072D SJAE Steam Supply PCV07-1018 Fails Open 8/6/98 S 3.073 Feedwater Conductivity increase 6/4/98 S 3.074 Main Condenser Air inleakage 10/25/98 S
Saturday, January 02,1999 Page 15 of d


      .-    - .            -                              . -        - . -.        . -..        =- _
=-
1 Test No       Title                                                         Test Date Results 3.077A         Hotwell Level Controller Fails High                           10/22/98 S 3.078C         Condensate Pump C Trip                                           6/7/98 S 3.079D         Condensate Powdex Demin D High Differential Pressure             7/26/98 S 3.079H         Condensate Powdex Demin H High Differential Pressure           6/21/98 S 4/13/98 S
1 Test No Title Test Date Results 3.077A Hotwell Level Controller Fails High 10/22/98 S 3.078C Condensate Pump C Trip 6/7/98 S 3.079D Condensate Powdex Demin D High Differential Pressure 7/26/98 S 3.079H Condensate Powdex Demin H High Differential Pressure 6/21/98 S 3.086A Circulating Water Pump A Trip 4/13/98 S
                              ~
~
3.086A          Circulating Water Pump A Trip 3.086B         Circulating Water Pump B Trip                                   4/13/98 S 3.086C         Circulating Water Pump C Trip                                   4/13/98 S             '
3.086B Circulating Water Pump B Trip 4/13/98 S 3.086C Circulating Water Pump C Trip 4/13/98 S 3.086D Circulating Water Pump D Trip 4/13/98 S 3.095 Automatic Voltage Regulator Failure 7/26/98 S 3.099 Trip of Both Stator Coolant Pumps 10/12/98 S
3.086D         Circulating Water Pump D Trip                                   4/13/98 S 3.095           Automatic Voltage Regulator Failure                             7/26/98 S 3.099           Trip of Both Stator Coolant Pumps                             10/12/98 S 3.100           Main Turbine Bearings 5 and 6 High Vibration                   6/14/98 S 3.103           Turbine Bearing High Temperature                               9/27/98 S 3.105A         EHC Pressure Regulator A Fails High                             6/21/98 S i 3.105B         EHC Pressure Regulator A Fails Low                             6/11/98 S
3.100 Main Turbine Bearings 5 and 6 High Vibration 6/14/98 S 3.103 Turbine Bearing High Temperature 9/27/98 S
: 3.106A         EHC Pressure Regulator B Fails High                             6/17/98 S 3.106C         EHC Pressure Regulator B Oscillates                             7/23/98 S I
3.105A EHC Pressure Regulator A Fails High 6/21/98 S i
3,107D         Bypass Valve No. 4 Sticks Open                                 6/11/98 S 3.107H         Bypass Valve No. 8 Sticks Open                                 7/23/98 S 3.111 A         EHC Load Selector Fails To Local                               8/20/98 S 3.112C         Both EHC Pumps Trip                                             6/11/98 S 3.115AD         DRAWER InOP RX Enci VENT EXH CHAN D                             2/19/98 S 3.115AG         DRAWER InOP Refuel Floor VENT EXH CHAN C                       3/18/98 S i
3.105B EHC Pressure Regulator A Fails Low 6/11/98 S
3.115AH         DRAWER inOP Refuel Floor VENT EXH CHAN D                       3/18/98 S 3.115AM         DRAWER InOP POST LOCA Mon CHAN D                                 4/9/98 S 3.115C         DRAWER InOP Control Room EMERG Air CH C                         4/14/98 S 3.115G         DRAWER inOP RADWASTE EQUIP Room Exh                             2/5/98 S 3.115L         DRAWER inOP CHARCOAL TREATMENT Sys                             2/11/98 S 3.1150         DRAWER InOP Air EJECTOR /OFFGAS CHAN A                         2/19/98 S 3.115S         DRAWER inOP Air EJECTOR /OFFGAS Linear                         4/14/98 S 3.115X         DRAWER InOP Main Steam Line CHAN D                             2/19/98 S
3.106A EHC Pressure Regulator B Fails High 6/17/98 S
                                                                              ~
3.106C EHC Pressure Regulator B Oscillates 7/23/98 S
Saturday, January 023999                                                         Page 16 of 29
I 3,107D Bypass Valve No. 4 Sticks Open 6/11/98 S
3.107H Bypass Valve No. 8 Sticks Open 7/23/98 S 3.111 A EHC Load Selector Fails To Local 8/20/98 S 3.112C Both EHC Pumps Trip 6/11/98 S
3.115AD DRAWER InOP RX Enci VENT EXH CHAN D 2/19/98 S
3.115AG DRAWER InOP Refuel Floor VENT EXH CHAN C 3/18/98 S
i 3.115AH DRAWER inOP Refuel Floor VENT EXH CHAN D 3/18/98 S 3.115AM DRAWER InOP POST LOCA Mon CHAN D 4/9/98 S 3.115C DRAWER InOP Control Room EMERG Air CH C 4/14/98 S 3.115G DRAWER inOP RADWASTE EQUIP Room Exh 2/5/98 S
3.115L DRAWER inOP CHARCOAL TREATMENT Sys 2/11/98 S
3.1150 DRAWER InOP Air EJECTOR /OFFGAS CHAN A 2/19/98 S
3.115S DRAWER inOP Air EJECTOR /OFFGAS Linear 4/14/98 S
3.115X DRAWER InOP Main Steam Line CHAN D 2/19/98 S Saturday, January 023999 Page 16 of 29
~


                                                    ~ _ . ..        -_    .    -
~ _.
Test No   Title                                           Test Date Results 3.140A       SRV 1FO13D Fails - Leaks                           5/4/98 S 3.140B       SRV iFO13D Fails - Stuck                           5/4/98 S 3.140C       SRV 1FO13D Fails - Open Electrically               5/4/98 S 3.1400       SRV 1FO13D Fails - Closed                         5/4/98 S 3.140E       SRV 1FO13D Fails- Open Mechanically               5/4/98 S 3.144A       SRV 1FO13H Fails - Leaks                           5/4/98 S 3.144B       SRV 1FO13H Fails - Stuck                           5/4/98 S 3.144C       SRV 1FO13H Fails - Open Electrically               5/4/98 S 3.144D       SRV 1FO13H Fails - Closed                         5/4/98 S 3.144E       SRV 1FO13H Fails - Open Mechanically             5/4/98 S 3.148A       SRV 1FO13M Fails - Leaks                         5/4/98 S       ,
Test No Title Test Date Results 3.140A SRV 1FO13D Fails - Leaks 5/4/98 S 3.140B SRV iFO13D Fails - Stuck 5/4/98 S 3.140C SRV 1FO13D Fails - Open Electrically 5/4/98 S 3.1400 SRV 1FO13D Fails - Closed 5/4/98 S 3.140E SRV 1FO13D Fails-Open Mechanically 5/4/98 S 3.144A SRV 1FO13H Fails - Leaks 5/4/98 S 3.144B SRV 1FO13H Fails - Stuck 5/4/98 S 3.144C SRV 1FO13H Fails - Open Electrically 5/4/98 S 3.144D SRV 1FO13H Fails - Closed 5/4/98 S 3.144E SRV 1FO13H Fails - Open Mechanically 5/4/98 S
3.148B       SRV 1FO13M Fails - Stuck                         5/4/98 S 3.148C       SRV 1FO13M Fails - Open Electrically             5/4/98 S 3.148D       SRV 1FO13M Fails - Closed                         5/4/98 S 3.148E       SRV 1FO13M Fails - Open Mechanically             5/4/98 S 3.149B       SRV 1FO13N Fails - Stuck                         8/6/98 S 3,150A       SRV 1FO13S Fails - Leaks                         7/26/98 S         ;
3.148A SRV 1FO13M Fails - Leaks 5/4/98 S
3.150E       SRV 1FO13S Fails - Open Mechanically             7/23/98 S 3.151 D     SRV 1F013E Downcomer Leak 0-100%                 6/11/98 S 3.151F       SRV 1F013N Downcomer Leak 0-100%                 7/15/98 S 3.156A       NSSSS Group 1 A Inadvertent isolation           10/24/98 S 3.1568       NSSSS Group 1B Inadvertent Isolation             2/3/98 S 3.156C       NSSSS Group 1C Inadvertent isolation             2/3/98 S 3.156D       NSSSS Group 1D inadvertent isolation             1/18/98 S 3.156E       NSSSS Group 1E 'nadvertent isolation           10/24/98 S 3.156F       NSSSS Group 1F Inadvertent isolation             2/3/98 S 3.156G       NSSSS Group 1G Inadvertent Isolation             4/8/98 S 3.156H       NSSSS Group 1H Inadvertent isolation             1/24/98 S         l 3.157A       NSSSS Group 2A inadvertent isolation             4/8/98 S         l 3.1578       NSSSS Group 2B inadvertent isolation             4/8/98 S Saturday, January 02,1999                                     Page 17 of 29 l
3.148B SRV 1FO13M Fails - Stuck 5/4/98 S 3.148C SRV 1FO13M Fails - Open Electrically 5/4/98 S
3.148D SRV 1FO13M Fails - Closed 5/4/98 S
3.148E SRV 1FO13M Fails - Open Mechanically 5/4/98 S
3.149B SRV 1FO13N Fails - Stuck 8/6/98 S
3,150A SRV 1FO13S Fails - Leaks 7/26/98 S
3.150E SRV 1FO13S Fails - Open Mechanically 7/23/98 S 3.151 D SRV 1F013E Downcomer Leak 0-100%
6/11/98 S
3.151F SRV 1F013N Downcomer Leak 0-100%
7/15/98 S
3.156A NSSSS Group 1 A Inadvertent isolation 10/24/98 S
3.1568 NSSSS Group 1B Inadvertent Isolation 2/3/98 S
3.156C NSSSS Group 1C Inadvertent isolation 2/3/98 S 3.156D NSSSS Group 1D inadvertent isolation 1/18/98 S
3.156E NSSSS Group 1E 'nadvertent isolation 10/24/98 S 3.156F NSSSS Group 1F Inadvertent isolation 2/3/98 S
3.156G NSSSS Group 1G Inadvertent Isolation 4/8/98 S
3.156H NSSSS Group 1H Inadvertent isolation 1/24/98 S
l 3.157A NSSSS Group 2A inadvertent isolation 4/8/98 S
l 3.1578 NSSSS Group 2B inadvertent isolation 4/8/98 S
Saturday, January 02,1999 Page 17 of 29 l


4 Test No     Title                                                 Test Date Results 3.157C       NSSSS Group 2C Inadvertent isolation                   4/8/98 S 3.157D       NSSSS Group 2D inadvertent Isolation                   4/8/98 S 3.157E       NSSSS Group 2E inadvertent isolation                   2/5/98 S 3.157F       NSSSS Group 2F Inadvertent isolation                   11/8/98 S 1               3.158A       NSSSS Group 3A inadvertent isolation                   2/5/98 S       f 3.158B       NSSSS Group 3B inadvertent isolation                   2/5/98 S j               3.159A       NSSSS Group 6A Inadvertent isolation                   3/8/98 S 3.159B       NSSSS Group 6B Inadvertent isolation                   3/8/98 S a               3.159C       NSSSS Group 6C InaJvertent isolation                   4/8/98 S 3.159D       NSSSS Group 6D Inadvertent Isolation                   3/8/98 S 3.159E       NSSSS Group 6E Inadvertent Isolation                   3/8/98 S 3.159F       NSSSS Group 6F Inadvertent isolation                   3/8/98 S 3.160A       NSSSS Group 7A inadvertent Isolation                   4/8/98 S 3.160B       NSSSS Group 78 Inadvertent isolation                   3/8/98 S 3.160C       NSSSS Group 7C Inadvertent isolation                   3/8/98 S 3.161 A     NSSSS Group 8A inadvertent Isolation                   3/8/98 S 3.161 B     NSSSS Group 8B inadvertent isolation                   3/8/98 S 3.162A       Secondary Containment & PCIG A Inadvertent Isolation   1/11/98 S 3.162B       Secondary Containment & PClG B Inadvertent Isolation   1/15/98 S 3.162C       Secondary Containment & PCIG C Inadvertent isolation   1/22/98 S I
4 Test No Title Test Date Results 3.157C NSSSS Group 2C Inadvertent isolation 4/8/98 S 3.157D NSSSS Group 2D inadvertent Isolation 4/8/98 S 3.157E NSSSS Group 2E inadvertent isolation 2/5/98 S 3.157F NSSSS Group 2F Inadvertent isolation 11/8/98 S 1
3.162D       Secondary Containment & PCIG D inadvertent isolation   1/22/98 S 3.162E       Secondary Containment & PCIG E Inadvertent isolation   2/3/98 S 3.162F       Secondary Containment & PCIG F Inadvertent Isolation   2/3/98 S 3.166A       Offgas AfterCondenser Level Transmitter Fails High     8/20/98 S 3.1688       Offgas Chiller Glycol Pump B Top                       7/26/98 S       ,
3.158A NSSSS Group 3A inadvertent isolation 2/5/98 S f
3.171 D     RHR Pump D Trip                                       6/21/98 S       j 3.172D       RHR Pump 1D Fails To Auto Start                       7/26/98 S       l 3.174D       RHR Injection Valve 1F017D Fails As-Is                 8/6/98 S       l 3.175D       RHR Pump Suction Valve F004D Fails As-Is               6/11/98 S 3.176B       RHR Shutdown Cooling Valve 1FOO6B Fails As-Is         8/13/98 S Saturday, January 02,1999                                           Page 18 of 29 i
3.158B NSSSS Group 3B inadvertent isolation 2/5/98 S j
1
3.159A NSSSS Group 6A Inadvertent isolation 3/8/98 S 3.159B NSSSS Group 6B Inadvertent isolation 3/8/98 S a
3.159C NSSSS Group 6C InaJvertent isolation 4/8/98 S 3.159D NSSSS Group 6D Inadvertent Isolation 3/8/98 S 3.159E NSSSS Group 6E Inadvertent Isolation 3/8/98 S 3.159F NSSSS Group 6F Inadvertent isolation 3/8/98 S 3.160A NSSSS Group 7A inadvertent Isolation 4/8/98 S 3.160B NSSSS Group 78 Inadvertent isolation 3/8/98 S 3.160C NSSSS Group 7C Inadvertent isolation 3/8/98 S 3.161 A NSSSS Group 8A inadvertent Isolation 3/8/98 S 3.161 B NSSSS Group 8B inadvertent isolation 3/8/98 S 3.162A Secondary Containment & PCIG A Inadvertent Isolation 1/11/98 S 3.162B Secondary Containment & PClG B Inadvertent Isolation 1/15/98 S
3.162C Secondary Containment & PCIG C Inadvertent isolation 1/22/98 S
I 3.162D Secondary Containment & PCIG D inadvertent isolation 1/22/98 S
3.162E Secondary Containment & PCIG E Inadvertent isolation 2/3/98 S 3.162F Secondary Containment & PCIG F Inadvertent Isolation 2/3/98 S 3.166A Offgas AfterCondenser Level Transmitter Fails High 8/20/98 S
3.1688 Offgas Chiller Glycol Pump B Top 7/26/98 S
3.171 D RHR Pump D Trip 6/21/98 S
j 3.172D RHR Pump 1D Fails To Auto Start 7/26/98 S 3.174D RHR Injection Valve 1F017D Fails As-Is 8/6/98 S 3.175D RHR Pump Suction Valve F004D Fails As-Is 6/11/98 S 3.176B RHR Shutdown Cooling Valve 1FOO6B Fails As-Is 8/13/98 S
Saturday, January 02,1999 Page 18 of 29 i


                                                            -_. _ _ _ ~             -    .
_ _ ~
Test No     Title                                                     Test Date Results   '
Test No Title Test Date Results 3.176F RHR SDC Injection Valve 1FO15B Fails As-Is 8/13/98 S 3.177D RHR HX B Bypass Controller Fails Low 9/9/98 S 3.182D Core Spray Pump D Trip 9/9/98 S 3.183D Core Spray Pump D Fails To Auto Start 7/26/98 S 3.189B Reactor Water Cleanup Pump B Trip 6/11/98 S a
3.176F       RHR SDC Injection Valve 1FO15B Fails As-Is                 8/13/98 S 3.177D       RHR HX B Bypass Controller Fails Low                         9/9/98 S 3.182D       Core Spray Pump D Trip                                       9/9/98 S 3.183D       Core Spray Pump D Fails To Auto Start                     7/26/98 S 3.189B       Reactor Water Cleanup Pump B Trip                         6/11/98 S a 3.191       RWCU Filter / Demin Resin Depletion                         9/9/98 S 3.195A       RWCU isolation Valve HV44-1F001 Fails As-is               6/11/98 S 3.198A       SLC Pump A Loss of Control Power                         10/18/98 S 3.204A       SRM Channel D Recorder Fails As-Is                           5/1/98 S 3.2048       SRM Channel D Fails inoperative                             5/1/98 S 3.204C       SRM Channel D Detector Stuck                               5/1/98 S 3.208A       1RM Channel D Recorder Fails As-Is                         5/1/98 S         i
3.191 RWCU Filter / Demin Resin Depletion 9/9/98 S 3.195A RWCU isolation Valve HV44-1F001 Fails As-is 6/11/98 S 3.198A SLC Pump A Loss of Control Power 10/18/98 S 3.204A SRM Channel D Recorder Fails As-Is 5/1/98 S 3.2048 SRM Channel D Fails inoperative 5/1/98 S 3.204C SRM Channel D Detector Stuck 5/1/98 S 3.208A 1RM Channel D Recorder Fails As-Is 5/1/98 S i
3.208B       IRM Channel D Fails inoperative                             5/1/98 S         ;
3.208B IRM Channel D Fails inoperative 5/1/98 S 3.208C IRM Channel D Detector Stuck 5/1/98 S 3.211C IRM Channel G Detector Stuck 5/1/98 S 3.212A IRM Channel H Recorder Fails As-Is 5/1/98 S 3.212B IRM Channel H Fails inoperative 5/1/98 S 3.212C IRM Channel H Detector Stuck 5/1/98 S 3.213D SRM Channel D Fails To Selecteo Value 8/13/98 S 3.214D IRM Channel D Fails To Selected Value 8/13/98 S l
3.208C       IRM Channel D Detector Stuck                               5/1/98 S 3.211C       IRM Channel G Detector Stuck                               5/1/98 S 3.212A       IRM Channel H Recorder Fails As-Is                         5/1/98 S         !
3.214H IRM Channel H Fails To Selected Valu3 8/26/98 S 3 216 APRM Overlap Failure 8/23/98 S
3.212B       IRM Channel H Fails inoperative                             5/1/98 S
3.227A Reactor Instrument Line Break After 42-F043A 7/26/98 S 3.229A Reactor Instrument Line Break After 42-F049A 8/6/98 S 3.231A Reactor Instrument Line Break After 42-F045A 8/23/98 S 3.232G Reactor Level Transmitter LT42-N080D Fails High 8/13/98 S 3 232H Reactor Level Transmitter LT42-N080D Fails Low 8/13/98 S 3.233A Reactor Level Transmitter DPT42-N004A Fails High 4/16/98 S r
3.212C       IRM Channel H Detector Stuck                               5/1/98 S 3.213D       SRM Channel D Fails To Selecteo Value                     8/13/98 S 3.214D       IRM Channel D Fails To Selected Value                     8/13/98 S         >
3.233G Reactor Level Transmitter DPT42-N004D Fails High 4/16/98 S 3.233H Reactor Level Transmitter DPT42-N004D Fails Low 4/16/98 S Saturday, January 02,1999 Page 19 of 29
3.214H       IRM Channel H Fails To Selected Valu3                     8/26/98 S 3 216       APRM Overlap Failure                                       8/23/98 S 3.227A       Reactor Instrument Line Break After 42-F043A               7/26/98 S 3.229A       Reactor Instrument Line Break After 42-F049A               8/6/98 S 3.231A       Reactor Instrument Line Break After 42-F045A               8/23/98 S 3.232G       Reactor Level Transmitter LT42-N080D Fails High           8/13/98 S
, 3 232H       Reactor Level Transmitter LT42-N080D Fails Low             8/13/98 S 3.233A       Reactor Level Transmitter DPT42-N004A Fails High           4/16/98 S       r 3.233G       Reactor Level Transmitter DPT42-N004D Fails High           4/16/98 S 3.233H       Reactor Level Transmitter DPT42-N004D Fails Low           4/16/98 S Saturday, January 02,1999                                               Page 19 of 29


Test No   Title                                               Test Date Results 3.234G       Reactor Pressure Transmitter PT42-N078D Fails High   8/13/98 S 3.234H       Reactor Pressure Transmitter PT42-N078D Fails Low     8/6/98 S 3.235A       Reactor Level / Pressure Recorder R608 Fails         8/23/98 S 3.236D       Refarence Leg 1D004D Flashes                         8/23/98 S 3.237D       Referenco Leg 1D004D Level Defect                   7/15/98 S 3.237E       Reference Leg 1D002 Level Defect                     7/15/98 S 3.241C       Feedwater Heater 12C Tube Leak                       11/4/98 S 3.244A       Rx Feedwater Pump A Trips                           10/12/98 S 3.244C       Reactor FeedPump A High Vibration                   6/14/98 S 3.245B       Feedwater Pump A Mechanical Failure                 10/22/98 S 3.245C       Reactor FeedPump B High Vibration                   6/14/98 S 3.246C       Reactor FeedPump C High Vibration                   6/14/98 IJ 3.248B       Reactor FeedPump A Recirc Valve Fails Closed         8/6/98 S 3.250B       Reactor FeedPump C Recire Valve Fails Closed       10/12/98 S 3.253B       FW Line B Rupture Outside Drywell                   10/25/98 S 3.257       Suppression Pool Leak (0-100,000 GPM)               4/17/98 S 3.262A       13.2KV 11 Unit Auxiliary Bus Fau't                   6/21/98 S 3.263D       4KV Safeguard Bus D14 Fault                           8/6/98 S       l 3.264C       Main Generator Output Breaker Trips (Both)           9/27/98 S 3.266B       13.2KV Safeguard Transformer Breaker 201 Trips       8/26/98 S
Test No Title Test Date Results 3.234G Reactor Pressure Transmitter PT42-N078D Fails High 8/13/98 S 3.234H Reactor Pressure Transmitter PT42-N078D Fails Low 8/6/98 S 3.235A Reactor Level / Pressure Recorder R608 Fails 8/23/98 S
: 3.267A       Plant Services Load Center 122 Fault                 4/21/98 S 3.273A       114D Plant Services Load Center Fault                 7/5/98 S
3.236D Refarence Leg 1D004D Flashes 8/23/98 S
; 3.274A       124D Plant Services Load Center Fault               4/17/98 S 3.2748       224D Plant Services Load Center Fault               4/17/98 S     1 t
3.237D Referenco Leg 1D004D Level Defect 7/15/98 S 3.237E Reference Leg 1D002 Level Defect 7/15/98 S
i 3.275D       D144 Safeguard 440V Load Center Fault               9/12/98 S 3.277D       120 VAC Panel 10Y104 Fault                           4/16/98 S     ;
3.241C Feedwater Heater 12C Tube Leak 11/4/98 S
1 3.279B       120 VAC Panel 10Y202 Fault                           5/30/98 S       j 3.2808       120 VAC RPS & UPS Bus 1BY160 Fault                   7/26/98 S 3.282D       1FD 125/250 VDC 1DD105 Fault                         5/31/98 S     '
3.244A Rx Feedwater Pump A Trips 10/12/98 S 3.244C Reactor FeedPump A High Vibration 6/14/98 S
3.284D       Loss of DC To Selected Annunciator Panels           8/23/98 S Esturday,'.lanuary 02,199I                                         Page 20 of 29
3.245B Feedwater Pump A Mechanical Failure 10/22/98 S
3.245C Reactor FeedPump B High Vibration 6/14/98 S
3.246C Reactor FeedPump C High Vibration 6/14/98 IJ 3.248B Reactor FeedPump A Recirc Valve Fails Closed 8/6/98 S 3.250B Reactor FeedPump C Recire Valve Fails Closed 10/12/98 S
3.253B FW Line B Rupture Outside Drywell 10/25/98 S
3.257 Suppression Pool Leak (0-100,000 GPM) 4/17/98 S
3.262A 13.2KV 11 Unit Auxiliary Bus Fau't 6/21/98 S
3.263D 4KV Safeguard Bus D14 Fault 8/6/98 S
3.264C Main Generator Output Breaker Trips (Both) 9/27/98 S
3.266B 13.2KV Safeguard Transformer Breaker 201 Trips 8/26/98 S
3.267A Plant Services Load Center 122 Fault 4/21/98 S
3.273A 114D Plant Services Load Center Fault 7/5/98 S
3.274A 124D Plant Services Load Center Fault 4/17/98 S
3.2748 224D Plant Services Load Center Fault 4/17/98 S
1 t
i 3.275D D144 Safeguard 440V Load Center Fault 9/12/98 S
3.277D 120 VAC Panel 10Y104 Fault 4/16/98 S
3.279B 120 VAC Panel 10Y202 Fault 5/30/98 S
j 3.2808 120 VAC RPS & UPS Bus 1BY160 Fault 7/26/98 S
3.282D 1FD 125/250 VDC 1DD105 Fault 5/31/98 S
3.284D Loss of DC To Selected Annunciator Panels 8/23/98 S
Esturday,'.lanuary 02,199I Page 20 of 29


(
(
Test No     Title                                               Test Date Results 3.284H       Loss of DC To Selected Annunciator Panels             9/12/98 S 3.302B       Refuel Floor Isolation Chan B                         1/24/98 S 3.303       Air Leak in Reactor Enclosure                         4/14/98 S 3.305B       SGTS From Resctor Enclosure HV76-197 Fails Open       1/23/98 S       j 3.405       Service Air Compressor Trip                           6/7/98 S 3.407B       RRCS ARI Division 11 Fails To initiate               10/18/98 S 3.408B       Leak in Instrument Air Header B                       8/20/98 S q           3.410B       CIG isolation To Drywell HV59-129B Fails Closed       8/13/98 S 3.411C       Both CRD Flow Control Valves Fall Closed             8/13/98 S       i 3.413       Control Rods Fail To Scram-Brown's Ferry             8/27/98 S     ,
Test No Title Test Date Results 3.284H Loss of DC To Selected Annunciator Panels 9/12/98 S 3.302B Refuel Floor Isolation Chan B 1/24/98 S 3.303 Air Leak in Reactor Enclosure 4/14/98 S 3.305B SGTS From Resctor Enclosure HV76-197 Fails Open 1/23/98 S j
3.414D       SDV Valve SV47-1F011 Fails Closed                     6/7/98 S 3.418D       Diesel Generator 14 Trip                             8/20/98 S 3.419D       Diesel Generator 14 Fails To Start                   8/26/98 S 3.430A       Recirc Pump A Seizure                                 8/30/98 S 3.431D       Recirc Pump B M/A Station Fails Low                   9/9/98 S 3.434B       Recire Pump B Seal #2 Failure                         8/13/98 S 3.436B       Recire Pump B Generator Field Breaker Trip           7/23/98 S 3.440A       Recire Loop A Rupture (0-100%)                       8/27/98 S 3.4438       Recirc Pump 1B RPT Breaker CB4B Trip                   6/7/98 S 3.443C       Recirc Pump 1B RPT Breaker Both Trip                   6/7/98 S       j 3.445       HPCI Steam Line Break in Pump Room 1-100%             7/19/98 S 3.446C       HPCI Steam Isolation Valve HV55-1F100 Fails           6/11/98 S       !
3.405 Service Air Compressor Trip 6/7/98 S 3.407B RRCS ARI Division 11 Fails To initiate 10/18/98 S 3.408B Leak in Instrument Air Header B 8/20/98 S q
3.448B       HPCI Speed Control Fails Low                         8/30/98 S       j i
3.410B CIG isolation To Drywell HV59-129B Fails Closed 8/13/98 S 3.411C Both CRD Flow Control Valves Fall Closed 8/13/98 S i
3.451B       HPCI Steam Supply HV55-1F002 Isolates                 7/26/98 S       '
3.413 Control Rods Fail To Scram-Brown's Ferry 8/27/98 S
3.455       HPCI Cooling Water Valve 1F059 Fails As-Is           8/23/98 S 3.458       RCIC Turbine Trip                                     8/6/98 S 3.461       RCIC Pump Suction Valves Fail To Auto Start           9/9/98 S 3.464B       RCIC isolation Valve HV49-1F008 Fails As-is           8/20/98 S 3.465       RCIC Steam Line Break in Pump Room 1-100%             7/15/98 S 3.471D       Drywell Area Unit Cooler Fan 1D1 Trip                 7/15/98 S l
3.414D SDV Valve SV47-1F011 Fails Closed 6/7/98 S 3.418D Diesel Generator 14 Trip 8/20/98 S 3.419D Diesel Generator 14 Fails To Start 8/26/98 S 3.430A Recirc Pump A Seizure 8/30/98 S 3.431D Recirc Pump B M/A Station Fails Low 9/9/98 S
Saturday, January 02,1999                                           Page 21 of 29
3.434B Recire Pump B Seal #2 Failure 8/13/98 S
3.436B Recire Pump B Generator Field Breaker Trip 7/23/98 S 3.440A Recire Loop A Rupture (0-100%)
8/27/98 S 3.4438 Recirc Pump 1B RPT Breaker CB4B Trip 6/7/98 S
3.443C Recirc Pump 1B RPT Breaker Both Trip 6/7/98 S
j 3.445 HPCI Steam Line Break in Pump Room 1-100%
7/19/98 S
3.446C HPCI Steam Isolation Valve HV55-1F100 Fails 6/11/98 S 3.448B HPCI Speed Control Fails Low 8/30/98 S j
i 3.451B HPCI Steam Supply HV55-1F002 Isolates 7/26/98 S 3.455 HPCI Cooling Water Valve 1F059 Fails As-Is 8/23/98 S 3.458 RCIC Turbine Trip 8/6/98 S 3.461 RCIC Pump Suction Valves Fail To Auto Start 9/9/98 S 3.464B RCIC isolation Valve HV49-1F008 Fails As-is 8/20/98 S 3.465 RCIC Steam Line Break in Pump Room 1-100%
7/15/98 S 3.471D Drywell Area Unit Cooler Fan 1D1 Trip 7/15/98 S
l Saturday, January 02,1999 Page 21 of 29


Test No         Title                                             Test Date Results 3.471H             Drywell Area Unit Cooler Fan 1H1 Trip               7/23/98 S 3.472D             Drywell Area Unit Cooler Fan 1D2 Trip               8/6/98 S 3.472H             Drywell Area Unit Cooler Fan 1H2 Trip             8/20/98 S 3.473             Drywell Air Leak To Reactor Enclosure             7/26/98 S 3.474             Suppression Chamber Air Leak To Reactor Enclosure   7/26/98 S 3.4828             DW Chiller 1BK111 Tnp                               6/21/98 S 3.484B             TECW Pump B Trip                                   6/11/98 S 3.488A             Service Water Pump A Trips                         7/23/98 S 3.489D             ESW Pump D Trips                                     8/6/9C S 3.490D             ES'W Valve HV11-047 Fails To Auto Swap             8/20/98 S 3.490H             ESW Valve HV11-074 Fails To Auto Swap               8/23/98 S 3.492D             RHR Service Water Pump D Trips                     9/27/98 S 3.493A             Failure OF RHRSW HX A Inlet Valve                   6/11/98 S 3.501A             Jet Pump No. 7/8 Plugged Riser                       7/5/98 S 3.501B             Jet Pump No.19/20 Plugged Riser                       7/5/98 S 3.503B             Jet Pump No. 9/10 Riser Break                       7/15/98 S 3.506B             Recirc Pump B Low Runback                           7/23/98 S 3 510             Primary Containment Oxygen increases               9/27/98 S 3.514             High Rad LevelIri RHRSW(1-100%)                     4/8/98 S 3.515B             Feedwater Heater 13A Drain Valve Fails Open         8/27/98 S 3.516A             Feedwater Heater 12A Drain Valve Fails Closed       9/8/98 S 3.51SE             Feedwater Heater 16A Drain Valve Fails Closed       8/27/98 S 3.517D             Feedwater Heater 158 Drain Valve Fails Open         8/30/98 S 3.518C             Feedwater Heater 14B Drain Valve Fails Closed       9/8/98 S 3.519B             Feedwater Heater 13C Drain Valve Fails Open         9/8/98 S 3.520A             Feedwater Heater 12C Drain Valve Fails Clos 3d       9/8/98 S 3.520E             Feedwater Heater 16C Drain Valve Fails Closed       9/8/98 S 3.521D             Feedwater Heater 15A Dump Valve Fails Open         8/23/98 S 3.522C             Feedwater Heater 14A Dump Valve Fails Closed       7/23/98 S 3.5238             Feedwater Heater 138 Dump Valve Fails Open           9/8/98 S
Test No Title Test Date Results 3.471H Drywell Area Unit Cooler Fan 1H1 Trip 7/23/98 S 3.472D Drywell Area Unit Cooler Fan 1D2 Trip 8/6/98 S 3.472H Drywell Area Unit Cooler Fan 1H2 Trip 8/20/98 S 3.473 Drywell Air Leak To Reactor Enclosure 7/26/98 S 3.474 Suppression Chamber Air Leak To Reactor Enclosure 7/26/98 S 3.4828 DW Chiller 1BK111 Tnp 6/21/98 S 3.484B TECW Pump B Trip 6/11/98 S 3.488A Service Water Pump A Trips 7/23/98 S 3.489D ESW Pump D Trips 8/6/9C S 3.490D ES'W Valve HV11-047 Fails To Auto Swap 8/20/98 S 3.490H ESW Valve HV11-074 Fails To Auto Swap 8/23/98 S
    ~
3.492D RHR Service Water Pump D Trips 9/27/98 S
StuEIy,ianuary 02,199Y~                                                 Page 22 of 29 1
3.493A Failure OF RHRSW HX A Inlet Valve 6/11/98 S 3.501A Jet Pump No. 7/8 Plugged Riser 7/5/98 S 3.501B Jet Pump No.19/20 Plugged Riser 7/5/98 S 3.503B Jet Pump No. 9/10 Riser Break 7/15/98 S
3.506B Recirc Pump B Low Runback 7/23/98 S
3 510 Primary Containment Oxygen increases 9/27/98 S
3.514 High Rad LevelIri RHRSW(1-100%)
4/8/98 S
3.515B Feedwater Heater 13A Drain Valve Fails Open 8/27/98 S 3.516A Feedwater Heater 12A Drain Valve Fails Closed 9/8/98 S
3.51SE Feedwater Heater 16A Drain Valve Fails Closed 8/27/98 S
3.517D Feedwater Heater 158 Drain Valve Fails Open 8/30/98 S
3.518C Feedwater Heater 14B Drain Valve Fails Closed 9/8/98 S
3.519B Feedwater Heater 13C Drain Valve Fails Open 9/8/98 S
3.520A Feedwater Heater 12C Drain Valve Fails Clos 3d 9/8/98 S
3.520E Feedwater Heater 16C Drain Valve Fails Closed 9/8/98 S
3.521D Feedwater Heater 15A Dump Valve Fails Open 8/23/98 S
3.522C Feedwater Heater 14A Dump Valve Fails Closed 7/23/98 S
3.5238 Feedwater Heater 138 Dump Valve Fails Open 9/8/98 S
StuEIy,ianuary 02,199Y~
Page 22 of 29
~
1


Test No   Title                                                       Test Date Results I 3.524A     Feedwater Heater 12B Dump Valve Fails Closed                 7/26/98 S 3.524E     Feedwater Heater 16B Dump Valve Fails Closed                   8/6/98 S 3.525D     Feedwater Heater 15C Dump Valve Fails Open                   8/30/98 S 3.526C     Feedwater Heater 16? Dump Valve Fails Closed                 8/20/98 S 3.527A     Steam Leak Detection NUMAC TIS 25-101 A Fails                 1/15/98 S 3.5278     Steam Leak Detection NUMAC TIS 25-101B Fails                 1/15/98 S 3.527C     Steam Leak Detection NUMAC TIS 25-101C Fails                 1/15/98 S 3.527D     Steam Leak Detection NUMAC TIS 25-101D Fails                 1/15/98 S 3.528D     RHR Containment Spray Valve FO21B Fails As-Is               7/15/98 S 3.529D       Reactor Pressure Transmitter PT42-103B Fails Low             9/27/98 S 3.533       Turbine Turning Gear Oil Pump Trips                         8/20/98 S 3.535D       182 Moisture Separator Drain Tank Drain Valve Fails Closed   8/13/98 S 3.536D       1B2 Moisture Separator Drain Tank Drain Valve Fails Open       9/9/98 S 3.536F       1C2 Moisture Separator Drain Tank Drain Valve Fails Open     8/20/98 S 3.537D       1B2 Moisture Separator Drain Tank Dump Valve Fails Closed   8/13/98 S 3.538D       1B2 Moisture Separa*or Drain Tank Dump Valve Fails Open     8/20/98 S 3.538F       1C2 Moisture Separator Drain Tank Dump Valve Fails Open     8/20/98 S 3.542       Generator Auto Voltage Regulator Fails High                 9/12/98 S 3.547       CRD Pump Trips On Clogged Suction Filter                     8/27/98 0 3.550       MS Supply Valve HV01-109 Fails As-Is                         8/27/98 S 3.552C       RFP Discharge Check Valve HV06-105C Fails Open               8/27/98 S 3.553D       Turbine Control Valve No. 4 Fails Open                       8/27/98 S 3.555       Control Rods Fail To Scram (0-120)                           9/27/98 S 3.556C       RFP C M/A Station Swaps To Manual                           8/13/98 S 3.556E       FWC Master Controller Swaps To Manual                       8/13/98 S 3.571A       RHR SDC Valve HV51-1F008 Trip of Thermal Overload           5/26/98 S 3.5718       RHR SDC Vaive HV51-1F008 Tnp of Magnetic Overload           5/26/98 S 3.572A       RHR SDC Valve HV51-1F009 Tnp of Thermal Overload             S/26/98 S 3.572B       RHR SDC Valve HV51-1F009 Tnp of Magnetic Overload           5/27/98 S 3.573A       RHR Valve HV51-1F024A Trip of Thermal Overload               5/26/98 S Saturday, January 02,1999                                                 Page 23 of 29 i
I Test No Title Test Date Results 3.524A Feedwater Heater 12B Dump Valve Fails Closed 7/26/98 S 3.524E Feedwater Heater 16B Dump Valve Fails Closed 8/6/98 S 3.525D Feedwater Heater 15C Dump Valve Fails Open 8/30/98 S 3.526C Feedwater Heater 16? Dump Valve Fails Closed 8/20/98 S 3.527A Steam Leak Detection NUMAC TIS 25-101 A Fails 1/15/98 S 3.5278 Steam Leak Detection NUMAC TIS 25-101B Fails 1/15/98 S 3.527C Steam Leak Detection NUMAC TIS 25-101C Fails 1/15/98 S 3.527D Steam Leak Detection NUMAC TIS 25-101D Fails 1/15/98 S 3.528D RHR Containment Spray Valve FO21B Fails As-Is 7/15/98 S
3.529D Reactor Pressure Transmitter PT42-103B Fails Low 9/27/98 S
3.533 Turbine Turning Gear Oil Pump Trips 8/20/98 S 3.535D 182 Moisture Separator Drain Tank Drain Valve Fails Closed 8/13/98 S 3.536D 1B2 Moisture Separator Drain Tank Drain Valve Fails Open 9/9/98 S 3.536F 1C2 Moisture Separator Drain Tank Drain Valve Fails Open 8/20/98 S 3.537D 1B2 Moisture Separator Drain Tank Dump Valve Fails Closed 8/13/98 S 3.538D 1B2 Moisture Separa*or Drain Tank Dump Valve Fails Open 8/20/98 S
3.538F 1C2 Moisture Separator Drain Tank Dump Valve Fails Open 8/20/98 S
3.542 Generator Auto Voltage Regulator Fails High 9/12/98 S
3.547 CRD Pump Trips On Clogged Suction Filter 8/27/98 0 3.550 MS Supply Valve HV01-109 Fails As-Is 8/27/98 S 3.552C RFP Discharge Check Valve HV06-105C Fails Open 8/27/98 S 3.553D Turbine Control Valve No. 4 Fails Open 8/27/98 S
3.555 Control Rods Fail To Scram (0-120) 9/27/98 S
3.556C RFP C M/A Station Swaps To Manual 8/13/98 S
3.556E FWC Master Controller Swaps To Manual 8/13/98 S
3.571A RHR SDC Valve HV51-1F008 Trip of Thermal Overload 5/26/98 S
3.5718 RHR SDC Vaive HV51-1F008 Tnp of Magnetic Overload 5/26/98 S
3.572A RHR SDC Valve HV51-1F009 Tnp of Thermal Overload S/26/98 S
3.572B RHR SDC Valve HV51-1F009 Tnp of Magnetic Overload 5/27/98 S
3.573A RHR Valve HV51-1F024A Trip of Thermal Overload 5/26/98 S
Saturday, January 02,1999 Page 23 of 29 i


  -                                          =_   _.        ..
=_
Test No   Title                                                     Test Date Results l
Test No Title Test Date Results
                                                                                              )
)
3.573B       RHR Valve HV51-1F024A Trip of Magnetic Overload             5/27/98 S       I 1
3.573B RHR Valve HV51-1F024A Trip of Magnetic Overload 5/27/98 S 3.574A RHR Valve HV51-1F024B Trip of Thermal Overload 5/26/98 S 3.574B RHR Valve HV51-1F024B Trip of Magnetic Overload 5/27/98 S 3.579 SJAE Air Valves Close -Inadvertent Trip of tcw Steam Flow 8/20/98 S 4.014 Load Table: 4 KV Safeguard Bus D144 8/6/98 S 4.018 Load Table: Plant Services Area Load Center 114D 7/5/98 S 4.025 Load Table: Plant Servicer. Load Center 224D 4/17/98 S 4.026 Load Table: Admin Builoing Load Center 234D 5/30/98 S 4.027 Load Table: Plant Seuices Bus 122 4/21/98 S 4.032 Load Table: 120 VAC Panel 10Y104 4/16/98 S 4.038 Load Table: 120 VAC Panel 10Y202 5/30/98 S 4.040 Load Table: 1B RPS & UPS Bus 18Y160 4/21/98 S 5.04 B SRV Opens at Rated Power 8/2/98 S 5.05 Tota! Loss of instrument Air 6/4/98 S 5.06B Loss of Offsite Power at Rated Power Conditions 6/4/98 S 5.07D Loss of Safeguard Bus D14 (Emergency Power) 5/27/98 S
3.574A     RHR Valve HV51-1F024B Trip of Thermal Overload             5/26/98 S       !
5.09D Loss of Non-Safeguard Load Center 114D 5/27/98 S
3.574B       RHR Valve HV51-1F024B Trip of Magnetic Overload           5/27/98 S 3.579       SJAE Air Valves Close -Inadvertent Trip of tcw Steam Flow   8/20/98 S 4.014       Load Table: 4 KV Safeguard Bus D144                           8/6/98 S 4.018       Load Table: Plant Services Area Load Center 114D             7/5/98 S 4.025       Load Table: Plant Servicer. Load Center 224D               4/17/98 S 4.026       Load Table: Admin Builoing Load Center 234D                 5/30/98 S 4.027       Load Table: Plant Seuices Bus 122                           4/21/98 S 4.032       Load Table: 120 VAC Panel 10Y104                           4/16/98 S 4.038       Load Table: 120 VAC Panel 10Y202                           5/30/98 S 4.040       Load Table: 1B RPS & UPS Bus 18Y160                         4/21/98 S 5.04 B       SRV Opens at Rated Power                                     8/2/98 S 5.05         Tota! Loss of instrument Air                                 6/4/98 S 5.06B       Loss of Offsite Power at Rated Power Conditions               6/4/98 S 5.07D       Loss of Safeguard Bus D14 (Emergency Power)                 5/27/98 S 5.09D       Loss of Non-Safeguard Load Center 114D                     5/27/98 S 5.09H       Loss of Non-Safeguard Load Center 124D                     5/27/98 S 5 09J       Loss of Non-Safeguard Load Center 122                       5/27/98 S       :
5.09H Loss of Non-Safeguard Load Center 124D 5/27/98 S 5 09J Loss of Non-Safeguard Load Center 122 5/27/98 S 5.10D Loss of 120 VAC Instrument Bus 10Y104 5/27/98 S 5.10K Loss of 120 VAC instrument Bus 10Y202 5/27/98 S
5.10D       Loss of 120 VAC Instrument Bus 10Y104                       5/27/98 S 5.10K       Loss of 120 VAC instrument Bus 10Y202                       5/27/98 S 5.10M       Loss of 120 VAC RPS/UPS Bus 18Y160                         5/27/98 S 5.11 D       Loss of 125/250 VDC Bus 1DD015                             5/27/98 S 5.14         Total Loss of Service Water                               10/25/98 S 5.17B       Trip of Two Reactor Feedwater Pumps                         8/2/98 S 5.17F       Trip of One Condensate Pump                                 6/4/98 S 5.25B       Recirc Pump M/A Station Fails Low                           6/4/98 S 5.30B       Main Feedwater Line B Rupture Outside Drywell               6/3/98 S 5.35A       EHC Pressure Regulator Fails High                           8/2/98 S 5.36A       Closure of One MStV                                       10/25/98 S Saturday, January 02,1999                                                 Page 24 of 29
5.10M Loss of 120 VAC RPS/UPS Bus 18Y160 5/27/98 S
5.11 D Loss of 125/250 VDC Bus 1DD015 5/27/98 S
5.14 Total Loss of Service Water 10/25/98 S
5.17B Trip of Two Reactor Feedwater Pumps 8/2/98 S 5.17F Trip of One Condensate Pump 6/4/98 S 5.25B Recirc Pump M/A Station Fails Low 6/4/98 S 5.30B Main Feedwater Line B Rupture Outside Drywell 6/3/98 S 5.35A EHC Pressure Regulator Fails High 8/2/98 S 5.36A Closure of One MStV 10/25/98 S
Saturday, January 02,1999 Page 24 of 29


Test No     Title                                                       Test Date Results l   6.10         Steady State Performance at 25% Power                       9/20/98 S 6.11         Steady State Performance at 75% Power                       9/20/98 S 6.12         Steady State Performance at 100% Power for 1 Hour           9/26/98 S 7.01         Reactor (Manual) Scram                                       5/26/98 S 7.02         Simultaneous Trip of All Reactor Feedwater Pumps             5/25/98 S 7.03         Closure of All MSIVs at Rated Power                         5/25/98 S 7.04         Trip of Both Reactor Recirc Pumps at Rated Power             5/26/98 S 7.05         Single Reactor Recirc Pump Trip                             5/25/98 S 7.06         Turbine Trip within Bypass Capability                       5/26/98 S 7.08         Recirc Loop Rupture with Loss of Offsite Power               5/25/98 S
Test No Title Test Date Results l
  ,  7.09         Maximum Size Unisolable Main Steam Line Rupture             5/26/98 S I
6.10 Steady State Performance at 25% Power 9/20/98 S 6.11 Steady State Performance at 75% Power 9/20/98 S 6.12 Steady State Performance at 100% Power for 1 Hour 9/26/98 S 7.01 Reactor (Manual) Scram 5/26/98 S 7.02 Simultaneous Trip of All Reactor Feedwater Pumps 5/25/98 S 7.03 Closure of All MSIVs at Rated Power 5/25/98 S 7.04 Trip of Both Reactor Recirc Pumps at Rated Power 5/26/98 S 7.05 Single Reactor Recirc Pump Trip 5/25/98 S 7.06 Turbine Trip within Bypass Capability 5/26/98 S 7.08 Recirc Loop Rupture with Loss of Offsite Power 5/25/98 S
8-RAD 204     SRV 1F013A Fuse                                             12/19/98 S 8-RAD 205     SRV 1F0138 Fuse                                             12/19/98 S       l 8-RAD 206     SRV 1F013C Fuse                                             12/19/98 S 8-RAD 207     SRV 1F013D Fuse                                             12/20/98 S       !
7.09 Maximum Size Unisolable Main Steam Line Rupture 5/26/98 S
8-RAD 208     SRV 1F013E Fuse                                             12/20/98 S l   8-RAD 209     SRV 1F013F Fuse                                             12/22/98 S 8-RAD 210     SRV 1F013G Fuse                                             12/23/98 S 8-RCE405     CE Chiller Hi Condenser Pressure Trip Reset                   8/1/98 S i
I 8-RAD 204 SRV 1F013A Fuse 12/19/98 S 8-RAD 205 SRV 1F0138 Fuse 12/19/98 S
8-RFC003     Spent Fuel Pool Heat Source                                   6/6/98 S 8-RFC007A 10-1136A, Fuel Pool Cooling Hx A Service Water inlet Valve       6/6/98 S 8-RFC007B 10-1136B, Fuel Pool Cooling Hx B Service Water inlet Valve       6/6/98 S 8-RFC007C 10-1136C, Fuel Pool Cooling Hx C Service Water Inlet Valve       6/6/98 S 8-RPC406     HV57-121 Air Supply Valve                                     8/8/98 S 8-RRE001     Rx Enct Door 20. HPCI Room To Corridor 111                   2/15/98 S 8-RRE002     Rx Enci Door 19, HPCI To RCIC Room                           2/15/98 S 8-RRE003     Rx Enci Door 18. RCIC Room To Airlock 106                   2/15/98 S 8-RRE005     Rx Enci Door No.14, RHR Pump A/C Room To RHR Pump B/         2/15/98 S 8-RRE006     Rx Encl Door No.12 RHR Pump 3/D Room To Passageway 1         3/3/98 S 8-RRE007     Rx Encl Door No. 21. Core Spray Room 110 To Corridor 111     3/3/98 S
l 8-RAD 206 SRV 1F013C Fuse 12/19/98 S 8-RAD 207 SRV 1F013D Fuse 12/20/98 S 8-RAD 208 SRV 1F013E Fuse 12/20/98 S l
        ~                               ~
8-RAD 209 SRV 1F013F Fuse 12/22/98 S 8-RAD 210 SRV 1F013G Fuse 12/23/98 S
    ~S 's~ turd 5snuary 02,1999                                                 Page 25 of 29 I
8-RCE405 CE Chiller Hi Condenser Pressure Trip Reset 8/1/98 S
i a
i 8-RFC003 Spent Fuel Pool Heat Source 6/6/98 S
8-RFC007A 10-1136A, Fuel Pool Cooling Hx A Service Water inlet Valve 6/6/98 S
8-RFC007B 10-1136B, Fuel Pool Cooling Hx B Service Water inlet Valve 6/6/98 S
8-RFC007C 10-1136C, Fuel Pool Cooling Hx C Service Water Inlet Valve 6/6/98 S 8-RPC406 HV57-121 Air Supply Valve 8/8/98 S
8-RRE001 Rx Enct Door 20. HPCI Room To Corridor 111 2/15/98 S
8-RRE002 Rx Enci Door 19, HPCI To RCIC Room 2/15/98 S
8-RRE003 Rx Enci Door 18. RCIC Room To Airlock 106 2/15/98 S 8-RRE005 Rx Enci Door No.14, RHR Pump A/C Room To RHR Pump B/
2/15/98 S 8-RRE006 Rx Encl Door No.12 RHR Pump 3/D Room To Passageway 1 3/3/98 S 8-RRE007 Rx Encl Door No. 21. Core Spray Room 110 To Corridor 111 3/3/98 S
~ 's~ turd 5snuary 02,1999 Page 25 of 29
~
~
S i
a


Test No   Title                                                           Test Date Results 8-RRE008   Rx Enct Door No. 23, Core Spray Room 113 To Corridor 111           3/3/98 S 8-RRE009   Rx Enci Door No. 24, Core Spray Room 114 To Passageway 1           3/3/98 S 8-RRE010   Rx Enct Door No.11, Core Spray Room 117 To Passageway 1           3/3/98 S 8-RRE011   Rx Enci Door No 424, RWCU isolation Valve Compt To RWCU           3/3/98 S       ,
Test No Title Test Date Results 8-RRE008 Rx Enct Door No. 23, Core Spray Room 113 To Corridor 111 3/3/98 S 8-RRE009 Rx Enci Door No. 24, Core Spray Room 114 To Passageway 1 3/3/98 S 8-RRE010 Rx Enct Door No.11, Core Spray Room 117 To Passageway 1 3/3/98 S 8-RRE011 Rx Enci Door No 424, RWCU isolation Valve Compt To RWCU 3/3/98 S 8-RRE012 Rx Enc! Door No. 425, RWCU Pump Room 509 To Corridor 50 3/3/98 S 8-RRE013 Rx Encl Door No. 423, Steam Chase 518 To Corridor 506W 3/3/98 S
8-RRE012   Rx Enc! Door No. 425, RWCU Pump Room 509 To Corridor 50           3/3/98 S
l 8-RRE014 Rx Enci Door No. 314. Steam Chase 407 To Corridor 402A 3/3/98 S
:    8-RRE013   Rx Encl Door No. 423, Steam Chase 518 To Corridor 506W             3/3/98   S     l 8-RRE014   Rx Enci Door No. 314. Steam Chase 407 To Corridor 402A             3/3/98   S 8-RRE140   SGTS Filter A Slide Gate Dampers                                   4/2/98 S       ,
8-RRE140 SGTS Filter A Slide Gate Dampers 4/2/98 S 8-RRE141 SGTS Filter B Slide Gate Dampers 4/2/98 S 4
4 8-RRE141   SGTS Filter B Slide Gate Dampers                                   4/2/98 S 8-RRE142   SGTS Fan A Purge in RONAN Mode                                     4/2/98   S 8-RRE143   SGTS Fan B Purge in RONAN Mode                                     4/2/98 S
8-RRE142 SGTS Fan A Purge in RONAN Mode 4/2/98 S
,    8-RRR029   Recirc Pump A Scoop Tube Positioner Power Switch               12/23/98 S 8-RRR030   Recirc Pump B Scoop Tube Positioner Power Switch               12/23/98 S 8-RRR241   Normal Reactor Coolant Leakage                                 12/11/98 S 8-RRT001   Rx Water Cleanup Filter / Demin Backwash Event                   6/13/98 S 8-RRT002   Feedwater Hydrogen injection                                     6/17/98 S 8-RSD001A Manual Operation of Steam Flooding Damper BPD-201-21 A           2/12/98 S         ,
8-RRE143 SGTS Fan B Purge in RONAN Mode 4/2/98 S 8-RRR029 Recirc Pump A Scoop Tube Positioner Power Switch 12/23/98 S 8-RRR030 Recirc Pump B Scoop Tube Positioner Power Switch 12/23/98 S 8-RRR241 Normal Reactor Coolant Leakage 12/11/98 S 8-RRT001 Rx Water Cleanup Filter / Demin Backwash Event 6/13/98 S 8-RRT002 Feedwater Hydrogen injection 6/17/98 S 8-RSD001A Manual Operation of Steam Flooding Damper BPD-201-21 A 2/12/98 S 8-RSD001B Manual Operation of Steam Flooding Damper BPD-201-21B 2/12/98 S 8-RSD002A Manual Operation of Steam Flooding Damper BPD-201-22A 2/8/98 S
8-RSD001B Manual Operation of Steam Flooding Damper BPD-201-21B             2/12/98 S 8-RSD002A Manual Operation of Steam Flooding Damper BPD-201-22A             2/8/98 S 8-RSD002B Manual Operation of Steam Flooding Damper BPD-201-22B             2/8/98 S 8-RSD003A Manual Operation of Steam Flooding Damper BPD-201-23A             2/8/98 S         i 4
8-RSD002B Manual Operation of Steam Flooding Damper BPD-201-22B 2/8/98 S
8-RSD003B Manual Operation of Steam Flooding Damper BPD-201-23B             2/8/98 S 8-RSD004A Manual Operation of Steam Flooding Damper BPD-202-118A           2/11/98 S 8-RSD004B Manual Operation of Steam Flooding Damper BPD-202-118B           2/11/98 S 8-RSD005A Manual Operation of Steam Flooding Damper BPD-202-67A             2/8/98 S 8-RSD005B Manual Operation of Steam Flooding Damper BPD-202-67B             2/8/98 S 8-RSD006A Manual Operation of Steam Flooding Damper BPD-202-104A             2/8/98 S 8-RSD006B Manual Operation of Steam Flooding Damper BPD-202-104B             2/8/98 S 8-RSD007A Manual Operation of Steam Flooding Damper BPD-203-1 A             2/12/98 S 8-RSD007B Manual Operation of Steam Flooding Damper BPD-203-1B             2/12/98 S of 29
8-RSD003A Manual Operation of Steam Flooding Damper BPD-201-23A 2/8/98 S
i 4
8-RSD003B Manual Operation of Steam Flooding Damper BPD-201-23B 2/8/98 S 8-RSD004A Manual Operation of Steam Flooding Damper BPD-202-118A 2/11/98 S
8-RSD004B Manual Operation of Steam Flooding Damper BPD-202-118B 2/11/98 S
8-RSD005A Manual Operation of Steam Flooding Damper BPD-202-67A 2/8/98 S 8-RSD005B Manual Operation of Steam Flooding Damper BPD-202-67B 2/8/98 S
8-RSD006A Manual Operation of Steam Flooding Damper BPD-202-104A 2/8/98 S 8-RSD006B Manual Operation of Steam Flooding Damper BPD-202-104B 2/8/98 S
8-RSD007A Manual Operation of Steam Flooding Damper BPD-203-1 A 2/12/98 S
8-RSD007B Manual Operation of Steam Flooding Damper BPD-203-1B 2/12/98 S of 29


l Test No   Title                                                 Test Date Results l l
Test No Title Test Date Results 8-RSD008A Manual Operation of Steam Flooding Damper BPD-203-4A 2/8/98 S 8-RSD008B Manual Operation of Steam Flooding Damper BPD-203-4B 2/8/98 S 8-RSD009A Manual Operation of Steam Flooding Damper BPD-203-14A 2/12/98 S 8-RSD009B Manual Operation of Steam Flooding Damper BPD-203-14B 2/12/98 S 8-RSD010B Manual Operation of Steam Flooding Damper BPD-203-16B 2/8/98 S
8-RSD008A Manual Operation of Steam Flooding Damper BPD-203-4A       2/8/98 S     l 8-RSD008B Manual Operation of Steam Flooding Damper BPD-203-4B       2/8/98 S     :
8-RSD011 A Manual Operation of Steam Flooding Damper BPD-203-20A 2/12/98 S 8-RSD0118 Manual Operation of Steam Flooding Damper BPD-203-20B 2/12/98 S
8-RSD009A Manual Operation of Steam Flooding Damper BPD-203-14A   2/12/98 S 8-RSD009B Manual Operation of Steam Flooding Damper BPD-203-14B   2/12/98 S 8-RSD010B Manual Operation of Steam Flooding Damper BPD-203-16B     2/8/98 S 8-RSD011 A Manual Operation of Steam Flooding Damper BPD-203-20A   2/12/98 S 8-RSD0118 Manual Operation of Steam Flooding Damper BPD-203-20B   2/12/98   S 8-RSD012A Manual Operation of Steam Flooding Damper BPD-203-24A   2/12/98   S 8-RSD012B Manual Operation of Steam Flooding Damper BPD-203-24B   2/12/98   S 8-RSD013A Manual Operation of Steam Flooding Damper BPD-203-37A   2/12/98   S 8-RSD013B Manual Operation of Steam Flooding Damper BPD-203-37B   2/12/98 S 8-RSD014A Manual Operation of Steam Flooding Damper BPD-203-38A   2/12/98 S B-RSD014B Manual Operation of Steam Flooding Damper BPD-203-38B   2/12/98 S 8-RSD015A Manual Operation of Steam Flooding Damper BPD-203-39A     2/12/98 S 8-RSD015B Manual Operation of Steam Flooding Damper BPD-203-39B   2/12/98 S 8-RSD016A Manual Operation of Steam Flooding Damper BPD-201-39A   2/11/98   S 8-RSD016B Manual Operation of Steam Flooding Damper BPD-201-39B   2/11/98   S 8-RSD017A Manual Operation of Steam Flooding Damper BPD-202-20A   2/11/98   S 8-RSD017B Manual Operation of Steam Flooding Damper BPD-202-208   2/11/98   S 8-RSD018A Manual Operation of Steam Flooding Damper BPD-202-33A   2/13/98   S 8-RSD018B Manual Operation of Steam Flooding Damper BPD-202-33B   2/13/98   S 8-RSD019A Manual Operation of Steam Flooding Damper BPD-202-40A   2/13/98   S 8-RSD019B Manual Operation of Steam Flooding Damper BPD-202-40B   2/13/98   S 8-RSD020A Manual Operation of Steam Flooding Damper BPD-202-41 A   2/13/98   S 8-RSD020B Manual Operation of Steam Flooding Damper BPD-202 41B   2/13/98   S 8-RSD021A Manual Operation of Steam Flooding Damper BPD-203-3B       2/8/98 S 8-RSD021A Manual Operation of Steam Flooding Damper BPD-203-3A       2/8/98 S 8-RSD022A Manual Operation of Steam Flooding Damper BPD-203-9A     2/13/98   S 8-RSD022B Manual Operation of Steam Flooding Damper BPD-203-98     2/13/98   S j 8-RSD023A Manual Operation of Steam Flooding Damper BPD-203-10A   2/13/98   S Saturday, January 02, i999                                           Page 27 of 29
8-RSD012A Manual Operation of Steam Flooding Damper BPD-203-24A 2/12/98 S
8-RSD012B Manual Operation of Steam Flooding Damper BPD-203-24B 2/12/98 S
8-RSD013A Manual Operation of Steam Flooding Damper BPD-203-37A 2/12/98 S
8-RSD013B Manual Operation of Steam Flooding Damper BPD-203-37B 2/12/98 S
8-RSD014A Manual Operation of Steam Flooding Damper BPD-203-38A 2/12/98 S
B-RSD014B Manual Operation of Steam Flooding Damper BPD-203-38B 2/12/98 S
8-RSD015A Manual Operation of Steam Flooding Damper BPD-203-39A 2/12/98 S
8-RSD015B Manual Operation of Steam Flooding Damper BPD-203-39B 2/12/98 S 8-RSD016A Manual Operation of Steam Flooding Damper BPD-201-39A 2/11/98 S
8-RSD016B Manual Operation of Steam Flooding Damper BPD-201-39B 2/11/98 S
8-RSD017A Manual Operation of Steam Flooding Damper BPD-202-20A 2/11/98 S
8-RSD017B Manual Operation of Steam Flooding Damper BPD-202-208 2/11/98 S
8-RSD018A Manual Operation of Steam Flooding Damper BPD-202-33A 2/13/98 S
8-RSD018B Manual Operation of Steam Flooding Damper BPD-202-33B 2/13/98 S
8-RSD019A Manual Operation of Steam Flooding Damper BPD-202-40A 2/13/98 S
8-RSD019B Manual Operation of Steam Flooding Damper BPD-202-40B 2/13/98 S
8-RSD020A Manual Operation of Steam Flooding Damper BPD-202-41 A 2/13/98 S
8-RSD020B Manual Operation of Steam Flooding Damper BPD-202 41B 2/13/98 S
8-RSD021A Manual Operation of Steam Flooding Damper BPD-203-3B 2/8/98 S
8-RSD021A Manual Operation of Steam Flooding Damper BPD-203-3A 2/8/98 S
8-RSD022A Manual Operation of Steam Flooding Damper BPD-203-9A 2/13/98 S
8-RSD022B Manual Operation of Steam Flooding Damper BPD-203-98 2/13/98 S
j 8-RSD023A Manual Operation of Steam Flooding Damper BPD-203-10A 2/13/98 S
Saturday, January 02, i999 Page 27 of 29


Test No     Title                                               Test Date Results 8-RSD023B Manual Operation of Steam Flooding Damper BPD-203-10B   2/13/98 S 8-RSD024A Manual Operation of Steam Flooding Damper BPD-203-17A     2/8/98 S 8-RSD024B Manual Operation of Steam Flooding Damper BPD-203-17B     2/8/98 S 8-RSD025A Manual Operation of Steam Flooding Damper BPD-203-22A   2/13/98 S       s 8-RSD0258 Manual Operation of Steam Flooding Damper BPD-203-22B   2/13/98 S 8-RSD026A Manual Operation of Steam Flooding Damper BPD-203-23A   2/13/98 S
Test No Title Test Date Results 8-RSD023B Manual Operation of Steam Flooding Damper BPD-203-10B 2/13/98 S 8-RSD024A Manual Operation of Steam Flooding Damper BPD-203-17A 2/8/98 S 8-RSD024B Manual Operation of Steam Flooding Damper BPD-203-17B 2/8/98 S 8-RSD025A Manual Operation of Steam Flooding Damper BPD-203-22A 2/13/98 S s
8-RSD026B Manual Operation of Steam Flooding Damper BPD-203-23B   2/13/98 S 8-RSD027A Manual Operation of Steam Flooding Damper BPD-203-25A   2/11/98 S 8-RSD027B Manual Operation of Steam Flooding Damper BPD-203-25B   2/11/98 S 8-RSD028A Manual Operation of Steam Flooding Damper BPD-203-26A   2/13/98 S 8-RSD028B Manual Operation of Steam Flooding Damper BPD-203-26B   2/13i38 S 8-RSD029A Manual Operation of Steam Flooding Damper BPD-203-27A   2/13/98 S 8-RSD029B Manual Operation of Steam Flooding Damper BPD-203-27B   2/13/98 S i 8-RSD030A Manual Operation of Steam Flooding Damper BPD-203-28A   2/13/98 S 8-RSD030B Manual Operation of Steam Flooding Damper BPD-203-28B   2/13/98 S 8-RSD031A Manual Operation of Steam Flooding Damper BPD-203-29A   2/13/98 S
8-RSD0258 Manual Operation of Steam Flooding Damper BPD-203-22B 2/13/98 S 8-RSD026A Manual Operation of Steam Flooding Damper BPD-203-23A 2/13/98 S 8-RSD026B Manual Operation of Steam Flooding Damper BPD-203-23B 2/13/98 S 8-RSD027A Manual Operation of Steam Flooding Damper BPD-203-25A 2/11/98 S 8-RSD027B Manual Operation of Steam Flooding Damper BPD-203-25B 2/11/98 S 8-RSD028A Manual Operation of Steam Flooding Damper BPD-203-26A 2/13/98 S 8-RSD028B Manual Operation of Steam Flooding Damper BPD-203-26B 2/13i38 S 8-RSD029A Manual Operation of Steam Flooding Damper BPD-203-27A 2/13/98 S 8-RSD029B Manual Operation of Steam Flooding Damper BPD-203-27B 2/13/98 S i
8-RSD031B Manual Operation of Steam Flooding Damper BPD-203-29B   2/13/98 S 8-RSD032A Manual Operation of Steam Flooding Damper BPD-203-30A   2/11/98 S 8-RSD032B Manual Operation of Steam Flooding Damper BPD-203-30B   2/11/98 S 8-RSD033A Manual Operation of Steam Flooding Damper BPD-203-31 A   2/11/98 S 8-RSD033B Manual Operation of Steam Flooding Damper BPD-203-31B   2/11/98 S 8-RSD034A Manual Operation of Steam Flooding Damper BPD-203-42A   2/11/98 S
8-RSD030A Manual Operation of Steam Flooding Damper BPD-203-28A 2/13/98 S 8-RSD030B Manual Operation of Steam Flooding Damper BPD-203-28B 2/13/98 S 8-RSD031A Manual Operation of Steam Flooding Damper BPD-203-29A 2/13/98 S 8-RSD031B Manual Operation of Steam Flooding Damper BPD-203-29B 2/13/98 S 8-RSD032A Manual Operation of Steam Flooding Damper BPD-203-30A 2/11/98 S 8-RSD032B Manual Operation of Steam Flooding Damper BPD-203-30B 2/11/98 S 8-RSD033A Manual Operation of Steam Flooding Damper BPD-203-31 A 2/11/98 S 8-RSD033B Manual Operation of Steam Flooding Damper BPD-203-31B 2/11/98 S 8-RSD034A Manual Operation of Steam Flooding Damper BPD-203-42A 2/11/98 S
8-RSD034B Manual Operation of Steam Flooding Damper BPD-203-42B   2/11/98 S
8-RSD034B Manual Operation of Steam Flooding Damper BPD-203-42B 2/11/98 S
) 8-RSD035A Manual Operation of Steam Flooding Damper BPD-203-43A   2/13/98 S 8-RSD035B Manual Operation of Steam Flooding Damper BPD-203-43B   2/13/98 S 8-RSD036A Manual Operation of Steam Flooding Damper SPD-203-44A   2/13/98 S B-RSD036B Manual Operation of Steam Flooding Damper BPD-203-44B   2/13/98 S 8-RSLD52     48-1F016, SLC Pump Test Return Throttle Valve         11/7/98 S 8-RSLO54     SLC Pump A Start from Test Station                   11/7/98 S 8-RSLO55     SLC Pump B Start from Test Station                   11/7/98 S Saturday, January 02,1999                                           Page 28 of 29   l l
)
l l
8-RSD035A Manual Operation of Steam Flooding Damper BPD-203-43A 2/13/98 S 8-RSD035B Manual Operation of Steam Flooding Damper BPD-203-43B 2/13/98 S 8-RSD036A Manual Operation of Steam Flooding Damper SPD-203-44A 2/13/98 S B-RSD036B Manual Operation of Steam Flooding Damper BPD-203-44B 2/13/98 S 8-RSLD52 48-1F016, SLC Pump Test Return Throttle Valve 11/7/98 S 8-RSLO54 SLC Pump A Start from Test Station 11/7/98 S 8-RSLO55 SLC Pump B Start from Test Station 11/7/98 S Saturday, January 02,1999 Page 28 of 29 l


i i
i i
Test No     Title                                                       Test Date Results 8-RSW154     ESW Pump B Transfer Switch                                 12/10/98 S 8-RSW155     ESW Pump B Local Control                                   12/10/98 S 8-RSW170     MCC Feeder Breaker for HV12-034A                           12/10/98 S 8-RTE 010A 1 A TEECE Fan Lockout Relay 1o6-11510 Reset                     4/8/98 S 8-RTE 010B 1B TEECE Fan Lockout Relay 186-11610 Reset                       4/8/98 S 8-RTR010     T-214 RRCS ARI Div i Manual Initiation                     10/17/98 S i
Test No Title Test Date Results 8-RSW154 ESW Pump B Transfer Switch 12/10/98 S 8-RSW155 ESW Pump B Local Control 12/10/98 S 8-RSW170 MCC Feeder Breaker for HV12-034A 12/10/98 S 8-RTE 010A 1 A TEECE Fan Lockout Relay 1o6-11510 Reset 4/8/98 S 8-RTE 010B 1B TEECE Fan Lockout Relay 186-11610 Reset 4/8/98 S 8-RTR010 T-214 RRCS ARI Div i Manual Initiation 10/17/98 S i
8-RTR011     T-214, RRCS ARI Div 11 Manual Initiation                   10/17/98 S 8-RTR181     T-217, RPS Reset with Trip Signal Present                   10/14/98   S 8-RTR303     T-217 ARI Reset with Trip Signal Present                   10/21/98 S 8-RTR311     T-228 Nitrogen Purge Supply Pressure                         4/8/98 S 8.148       RX Enclosure To SGTS isolation Damper SGD76-206-3           1/24/98 S 8.180       HS76-196 Test Switch                                         4/8/98 S 8.243       T-200 Suppression Pool 18 Inch Purge Vent                   2/20/98 S
8-RTR011 T-214, RRCS ARI Div 11 Manual Initiation 10/17/98 S 8-RTR181 T-217, RPS Reset with Trip Signal Present 10/14/98 S
8.244       T-200 Suppression Pool Purge Supply                         2/20/98 S 8.246       T-200 Drywell 24 inch Purge Exh                             2/20/98 S 8.247       T-200 Drywell Purge Supply                                   2/20/98 S 8.248       T-200 Drywell 6 Inch ILRT Line                               2/20/98 S 8.300       Reactor Enclosure Manual Test Switch HSXX-198A-5             2/3/98 S 8.301       Reactor Enclosure Manual Test Switch HSXX-198B-5             2/3/98 S         .
8-RTR303 T-217 ARI Reset with Trip Signal Present 10/21/98 S 8-RTR311 T-228 Nitrogen Purge Supply Pressure 4/8/98 S 8.148 RX Enclosure To SGTS isolation Damper SGD76-206-3 1/24/98 S 8.180 HS76-196 Test Switch 4/8/98 S 8.243 T-200 Suppression Pool 18 Inch Purge Vent 2/20/98 S 8.244 T-200 Suppression Pool Purge Supply 2/20/98 S 8.246 T-200 Drywell 24 inch Purge Exh 2/20/98 S 8.247 T-200 Drywell Purge Supply 2/20/98 S
8 336       HS76-151 A RX Enclosure / Refuel Floor Isolation Interlock   1/23/98 S 8.337       HS76-151B RX Enclosure / Refue! Floor Isolation Interlock     4/6/98 S 8.338       HS76-152A RX Enclosure / Refuel Floor Isolation Interlock   1/23/98 S
8.248 T-200 Drywell 6 Inch ILRT Line 2/20/98 S
; 8.339       HS76-152B RX Enclosure / Refuel Floor isolation Interlock     4/8/98 S 8.403       MCR Overhead Lighting Shunt Trip Reset                       6/3/98 S 8.407       Defeat RHR Shutdown Cooling Auto isolations                 8/30/98 S 1
8.300 Reactor Enclosure Manual Test Switch HSXX-198A-5 2/3/98 S
                                      '~
8.301 Reactor Enclosure Manual Test Switch HSXX-198B-5 2/3/98 S
  ~5atTrday, January 52,1999                                                 Page 29 of 29 i
8 336 HS76-151 A RX Enclosure / Refuel Floor Isolation Interlock 1/23/98 S
8.337 HS76-151B RX Enclosure / Refue! Floor Isolation Interlock 4/6/98 S
8.338 HS76-152A RX Enclosure / Refuel Floor Isolation Interlock 1/23/98 S
8.339 HS76-152B RX Enclosure / Refuel Floor isolation Interlock 4/8/98 S
8.403 MCR Overhead Lighting Shunt Trip Reset 6/3/98 S
8.407 Defeat RHR Shutdown Cooling Auto isolations 8/30/98 S 1
~5atTrday, January 52,1999 Page 29 of 29
'~
i
=-


e         J                   w PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 4 SIMULATOR TEST COMMITMENTS                 ,
e J
(TESTING TO BE COMPLETED 1999 - 2003) 1 1
w PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 4 SIMULATOR TEST COMMITMENTS (TESTING TO BE COMPLETED 1999 - 2003) 1 1
2 i
2 i
a i
a i
1 1
1 l
I I
l l
l 1
l 1
a
a
Line 1,171: Line 2,518:
LGS SIMULATOR TESTING TO BE PERFORMED IN 1999
LGS SIMULATOR TESTING TO BE PERFORMED IN 1999


LGS Simulator Testing Committmentsfor 1999 Test No           Title                                                             Te.it Date Committment 1.01             Computer Real Teme Test                                                           12/31/99 3-MRE100         Duct Rupture: T-200 Suppression Pool 18 inch Vent Line                           1201/99 3-MRE301A         inadvertent Rx Enclosure Isolation Chan A                                       12/31/99 i
LGS Simulator Testing Committmentsfor 1999 Test No Title Te.it Date Committment 1.01 Computer Real Teme Test 12/31/99 3-MRE100 Duct Rupture: T-200 Suppression Pool 18 inch Vent Line 1201/99 3-MRE301A inadvertent Rx Enclosure Isolation Chan A 12/31/99 i
3-MRE304A       SGTS Inlet Valve From Refuel Floor HV76-019 Fails Open                           12/31/99           l 3-MRE306         Refuel Floor Fails To isolate                                                     12/31/99 3-MRE308A       Tnp of 1A REECE Fan                                                               12/31/99 3-MRE310A         Tnp of 1 A Rx Enclosure HVAC Exhaust Fan                                         12/31/99 3-MRE312A         Tnp of 1A Refuel Floor HVAC Air Exhaust Fan                                       12/31/99 3-MRM001A         Control Room Fresh Air Rad Mon Chan A Fails To Sel Value                         12/31/99 3-MRM003A         fd Stack WRAM Low Range Chan Fails To Set Value                                 12/31/99 3-MRM0048         N Stack Rad Mon A todine Chan (21E075) Fails To Set Value                       12/31/99 3-MRM00e'F       N Stack Rad Mon B Gaseous Chan (6GE075) Fails To Sel Value                       12/31/99             J l
3-MRE304A SGTS Inlet Valve From Refuel Floor HV76-019 Fails Open 12/31/99 l
3-MRM00$D         U-1 S Stack Rad Mon B Part Chan (4PE185) Fails To Sei Value                     12/31/99 3 MRM007         Radwaste Enci Exh Rad Mon Fails To Set Value                                     12/31/99 3-MRM011         Unit i Containment Leak Det Rad Mon Fails To Sel Value                           12/31/99 3-MRM013         Service Water Rad Mon Fails To Sei value                                         12/31/99 3-MRM0148       Offgas Steam Jet Air Ejector Chan B Rad Mon Fails To Sel Value                   12/31/99 3-MRM015A       Main Steam Lsne Rad Mon Chan A Fails To Sei Value                                 12/31/99 3-MRM016A       Rx Enc! Vent Exh Rad Mon A Fails To Sel Value                                     12/31/99 3-MRM017A       Refuel Floor Vent Exh Rad Mon Chan A Fai!s To Sei Value                           12/31/99 3-MRM018A       Drywell Post Loca Rad Mon Chan A Fails To Sei Value                               12/31/99 3-MRM020         RCIC Pump Room Area Rad Mon Fails To Sei Value                                   12/31/99 3-MRM024         Turbine Aux Hallway Area Rad Mon Fails To Set Value                             12/31/99 3-MRM028         RHR Division il Room Area Rad Mon Fails To Sei Value                             12/31/99 3-MRM032         Turbine Enci Condenser Area Rad Mon Fads To Sei Value                           12/31/99 3-MRV 036       Neutron Mon Sys Area Rad Mon Fails To Sel Value                                 12/31/99 3 MRMMO         RWCU Heat Exchanger Area Rad Mon Fails To Sel Value                             12/31/99 3-MRM044         Turbine Aux Bay Area Rad Mon Fails To SeiValue                                   12/31/99 Friday DecemberN,1998                                                                                       Page i of11
3-MRE306 Refuel Floor Fails To isolate 12/31/99 3-MRE308A Tnp of 1A REECE Fan 12/31/99 3-MRE310A Tnp of 1 A Rx Enclosure HVAC Exhaust Fan 12/31/99 3-MRE312A Tnp of 1A Refuel Floor HVAC Air Exhaust Fan 12/31/99 3-MRM001A Control Room Fresh Air Rad Mon Chan A Fails To Sel Value 12/31/99 3-MRM003A fd Stack WRAM Low Range Chan Fails To Set Value 12/31/99 3-MRM0048 N Stack Rad Mon A todine Chan (21E075) Fails To Set Value 12/31/99 3-MRM00e'F N Stack Rad Mon B Gaseous Chan (6GE075) Fails To Sel Value 12/31/99 J
l 3-MRM00$D U-1 S Stack Rad Mon B Part Chan (4PE185) Fails To Sei Value 12/31/99 3 MRM007 Radwaste Enci Exh Rad Mon Fails To Set Value 12/31/99 3-MRM011 Unit i Containment Leak Det Rad Mon Fails To Sel Value 12/31/99 3-MRM013 Service Water Rad Mon Fails To Sei value 12/31/99 3-MRM0148 Offgas Steam Jet Air Ejector Chan B Rad Mon Fails To Sel Value 12/31/99 3-MRM015A Main Steam Lsne Rad Mon Chan A Fails To Sei Value 12/31/99 3-MRM016A Rx Enc! Vent Exh Rad Mon A Fails To Sel Value 12/31/99 3-MRM017A Refuel Floor Vent Exh Rad Mon Chan A Fai!s To Sei Value 12/31/99 3-MRM018A Drywell Post Loca Rad Mon Chan A Fails To Sei Value 12/31/99 3-MRM020 RCIC Pump Room Area Rad Mon Fails To Sei Value 12/31/99 3-MRM024 Turbine Aux Hallway Area Rad Mon Fails To Set Value 12/31/99 3-MRM028 RHR Division il Room Area Rad Mon Fails To Sei Value 12/31/99 3-MRM032 Turbine Enci Condenser Area Rad Mon Fads To Sei Value 12/31/99 3-MRV 036 Neutron Mon Sys Area Rad Mon Fails To Sel Value 12/31/99 3 MRMMO RWCU Heat Exchanger Area Rad Mon Fails To Sel Value 12/31/99 3-MRM044 Turbine Aux Bay Area Rad Mon Fails To SeiValue 12/31/99 Friday DecemberN,1998 Page i of11


E l
E l
1 Test No       Title                                                     Test Date Committment 3-MRM047     TEECE Fdter Area Rad Mon Fails To Sel Value                             12/31/99 3-MRM051     New Fuel 3torage Vauft Area Rad Mon Fails To Sol Value                   12/31/99 3-MRM056     Studge Disch Mixing Pump Area Rad Mon Fails To Sel Value                 12/31/99         ,
1 Test No Title Test Date Committment 3-MRM047 TEECE Fdter Area Rad Mon Fails To Sel Value 12/31/99 3-MRM051 New Fuel 3torage Vauft Area Rad Mon Fails To Sol Value 12/31/99 3-MRM056 Studge Disch Mixing Pump Area Rad Mon Fails To Sel Value 12/31/99 3-MRM060 Floor Drain Filter Hold Pmp Area Rad Mon Fails To Sel Value 12/31/99 l
3-MRM060     Floor Drain Filter Hold Pmp Area Rad Mon Fails To Sel Value             12/31/99         l 3-MRM064     Pidwaste Cask Loading Area Rad Mon Fads To Sol Value                     12/31/99 4   >
3-MRM064 Pidwaste Cask Loading Area Rad Mon Fads To Sol Value 12/31/99 4
3-MRM068     Turb Encl RR Entrance Area Rad Mon Fails To Set Value                   12/31/99 3-MRM072     Turbine Operating Area Rad Mon Fans To Sel Value                         12/31/99 3-MRT001B     Fuel Cladding Failure. 0-52411 Fuel Pins                                 12/31/99         i 3-MRT005B     inadvertent Activity Release on Elevation 253 Rx Encl                   12/31/99 3-MRT012     Offgas Sys HEPA Fdter Degraded                                         12/31/99 l
3-MRM068 Turb Encl RR Entrance Area Rad Mon Fails To Set Value 12/31/99 3-MRM072 Turbine Operating Area Rad Mon Fans To Sel Value 12/31/99 3-MRT001B Fuel Cladding Failure. 0-52411 Fuel Pins 12/31/99 i
3-MSD002B     Staam Flooding Damper BPD-201-22B Fails To Tnp                         12/31/99           l l
3-MRT005B inadvertent Activity Release on Elevation 253 Rx Encl 12/31/99 3-MRT012 Offgas Sys HEPA Fdter Degraded 12/31/99 l
3-MSD004B     Steam Flooding Damper BPD-202-118B Fails To Trip                       12/31/99
3-MSD002B Staam Flooding Damper BPD-201-22B Fails To Tnp 12/31/99 l
[                                                                                                                                                                              l 3-MSD006B     Steam Flooding Damper BPD-202104B Fans To Tnp                           12/31/99           l l
l
3 MSD008B     Steam Flooding Damper BPD-203-4B Fads To Tnp                           12/31/99           j 3-MSD010B     Steam Flooding Damper BPD 203-168 Fads To inp                           12/31/99 3-MSD012A     Steam Flooding Damper BPD-203-24A Fans To Trip                         12/31/99 3-MSD0138     Steam Flooding Damper BPD-203-37B Fads To Tnp                           12/31/99 3-MSD015B     Steam Flooding Damper BPD-203-398 Fails To Tnp                         12/31/99 3-MSD0170     Steam Flooding Damper BPD 202-20B Fans To Tnp                           12/31/99           ,
[
1 3-MSD0190     Steam Flooding Damper BPD-202-408 Fails To Trt,                         12/31/99 3-MSD022B     Steam Flooding Damper BPD-203-98 Fads To Tnp                           12/31/99 3-MSD02;B     Stearn Flooding Damper BPD-203-17B Fads To Tnp                         12/31/99 3-MSD026B     Steam Flooding Damper SPD-203 23B Fails To Tnp                         12/31/99 3-MSD028B     Steam Flooding Damper BPD-203-268 Fads To Tnp                         12/31/99 3-MSD030B     Steam Flooding Damper BPD-203-28B Fads To Tnp                         12/31/99 3-MSD0328     Steam Flooding Damper BPD-203-30B Fans To Tnp                         12/31/99 3-MSD034B     Steam Flooding Damper BPD-203-42B Fails To Tnp                         12/31/99 3-MSD036B   Steam Flooding Damper BPD-203-448 Fans To Tnp                           12/31/99 3-MTE001B   Tno of 1B Turbine Enclosure Supply Fan                                 12/31/99 3-MTE002C   Tnp of 1C Turbme Enclosure Exhaust Fan                                 12/31/99 555ry?Ii$ 5 5555~                        ~~~
3-MSD004B Steam Flooding Damper BPD-202-118B Fails To Trip 12/31/99 l
3-MSD006B Steam Flooding Damper BPD-202104B Fans To Tnp 12/31/99 l
l 3 MSD008B Steam Flooding Damper BPD-203-4B Fads To Tnp 12/31/99 j
3-MSD010B Steam Flooding Damper BPD 203-168 Fads To inp 12/31/99 3-MSD012A Steam Flooding Damper BPD-203-24A Fans To Trip 12/31/99 3-MSD0138 Steam Flooding Damper BPD-203-37B Fads To Tnp 12/31/99 3-MSD015B Steam Flooding Damper BPD-203-398 Fails To Tnp 12/31/99 3-MSD0170 Steam Flooding Damper BPD 202-20B Fans To Tnp 12/31/99 1
3-MSD0190 Steam Flooding Damper BPD-202-408 Fails To Trt, 12/31/99 3-MSD022B Steam Flooding Damper BPD-203-98 Fads To Tnp 12/31/99 3-MSD02;B Stearn Flooding Damper BPD-203-17B Fads To Tnp 12/31/99 3-MSD026B Steam Flooding Damper SPD-203 23B Fails To Tnp 12/31/99 3-MSD028B Steam Flooding Damper BPD-203-268 Fads To Tnp 12/31/99 3-MSD030B Steam Flooding Damper BPD-203-28B Fads To Tnp 12/31/99 3-MSD0328 Steam Flooding Damper BPD-203-30B Fans To Tnp 12/31/99 3-MSD034B Steam Flooding Damper BPD-203-42B Fails To Tnp 12/31/99 3-MSD036B Steam Flooding Damper BPD-203-448 Fans To Tnp 12/31/99 3-MTE001B Tno of 1B Turbine Enclosure Supply Fan 12/31/99 3-MTE002C Tnp of 1C Turbme Enclosure Exhaust Fan 12/31/99 555ry?Ii$ 5 5555~
page2 off
page2 off
~~~


4 Test No           Title                                                     Test Date Committment                     i 3.003A
4 Test No Title Test Date Committment i
                                                                                                                        )
)
;                    Core Power Oscaltations (In-Phase)                                       12/31/93                 i l 3 004A           APRM Channel A Recorder Fails As-Is                                       12/31/99                 3 1
3.003A Core Power Oscaltations (In-Phase) 12/31/93 i
3 004B           APRM Channel A Fans inop                                                   12/31/99 3 009A           APRM Channel F Recorder Fails As-Is                                       12/31/93 3 011A           RBM Channel B Recorder Fails As-is                                       12/31/99 3 012A           LPRM 56-17B Upscale Failure                                               12/31/99 3 012E           LPRM 40-338 Upscale Failure                                               12/31/99 3 013A           LPRM 24-33D Downscale Failure                                             12/31/99 3 013E           LPRM 48-49D Downscale Far -                                               12/31/99 3 015A           LPRM 16-41B Drrft ( 25 To +25)                                             12/31/99 3 016A           Control Rod XX-YY Failure (Drrft in)                                       12/31/99                   ,
l 3 004A APRM Channel A Recorder Fails As-Is 12/31/99 3
l 3 016B           Control Rod XX YY Failure (Drrft Out)                                     12/31/99                   l l
1 3 004B APRM Channel A Fans inop 12/31/99 3 009A APRM Channel F Recorder Fails As-Is 12/31/93 3 011A RBM Channel B Recorder Fails As-is 12/31/99 3 012A LPRM 56-17B Upscale Failure 12/31/99 3 012E LPRM 40-338 Upscale Failure 12/31/99 3 013A LPRM 24-33D Downscale Failure 12/31/99 3 013E LPRM 48-49D Downscale Far -
3 016C           Control Rod XX YY Failure (Accumulator Trouble)                           12/31/99 3 016D           Control Rod XX-YY Failure (Stuck)                                         12/31/99 3 016E           Control Rod XX YY Fadure (Uncoupled)                                     12/31/99                   j 3 016F           Control Rod XX YY Failure (Scrammed)                                     12/31/99
12/31/99 3 015A LPRM 16-41B Drrft ( 25 To +25) 12/31/99 3 016A Control Rod XX-YY Failure (Drrft in) 12/31/99 3 016B Control Rod XX YY Failure (Drrft Out) 12/31/99 l
                                                                                                                        ]
l 3 016C Control Rod XX YY Failure (Accumulator Trouble) 12/31/99 3 016D Control Rod XX-YY Failure (Stuck) 12/31/99 3 016E Control Rod XX YY Fadure (Uncoupled) 12/31/99 j
3 016G           Control Rod XX-YY Fails To Scram                                         12/31/99                   l l
3 016F Control Rod XX YY Failure (Scrammed) 12/31/99
3 016H           Control Rod (XX YY) Falls: Double Notch on Withdraw                       12/31/99
]
                                                                                                                        ]
3 016G Control Rod XX-YY Fails To Scram 12/31/99 3 016H Control Rod (XX YY) Falls: Double Notch on Withdraw 12/31/99
3 020A           APRM Channel A Fails 0125%                                               12/31/99                   !
]
l 3 020E           APRM Channel E Fails 0-125%                                               12/31/99 3 025             Control Rod XX-YY Reed Switch Failure                                     12/31/99 3 027A           Loss of Normal Power To RPS Channel A                                     12/31/99 l
3 020A APRM Channel A Fails 0125%
                                                                                                                      ~
12/31/99 3 020E APRM Channel E Fails 0-125%
3 028A           Reactor Scram (Full)                                                     12/31/99 3 028B           Reactor Scram (Bank 1)                                                   12/31/99 J029C             RPS Fails To Scram (Channel A)                                           12/31/99 3 044A           Feedwater Pump A Controller Output Fails High                             12/31/99 3 045B           Feedwater Pump B Controller Output Fails Low                             12/31/99                   ,
12/31/99 3 025 Control Rod XX-YY Reed Switch Failure 12/31/99 3 027A Loss of Normal Power To RPS Channel A 12/31/99 l
t 3 046A           Steam Flow Transmitter 1N003A Fails 0-100%                               12/31/99 3 04'TC           Feedwater Flow Transmitter 1N002C Fails 0-100%                           12/31/99 3 061 A           MSlV HV41-1F022A Fails Open                                               12/31/99 l
3 028A Reactor Scram (Full) 12/31/99
IWday. December N,1998                                                                               Page 3 of1I f
~
3 028B Reactor Scram (Bank 1) 12/31/99 J029C RPS Fails To Scram (Channel A) 12/31/99 3 044A Feedwater Pump A Controller Output Fails High 12/31/99 3 045B Feedwater Pump B Controller Output Fails Low 12/31/99 t
3 046A Steam Flow Transmitter 1N003A Fails 0-100%
12/31/99 3 04'TC Feedwater Flow Transmitter 1N002C Fails 0-100%
12/31/99 3 061 A MSlV HV41-1F022A Fails Open 12/31/99 l
IWday. December N,1998 Page 3 of1I f


I Test No           Title                                             Test Date Committment 3.062A           MSIV HV41 1F028A Fails Open                                     12/31/99 3 063A           MSIV HV41-1F022A Fails Closed                                   12/31/99 3.064A           MSfV HV41 1F028A Fails Closed                                   12/31/99 3 069             Steam Seal Evaporator Outlet Valve Fails Closed                 12/31/99
I Test No Title Test Date Committment 3.062A MSIV HV41 1F028A Fails Open 12/31/99 3 063A MSIV HV41-1F022A Fails Closed 12/31/99 3.064A MSfV HV41 1F028A Fails Closed 12/31/99 3 069 Steam Seal Evaporator Outlet Valve Fails Closed 12/31/99 3.072A SJAE Steam Supply PCV07101 A Fails Closed 12/31/99 3 073 Feedwater Conductrvity increase 12/31/99 3 077B Hotwell Level Controher Fails Low 12/31/99 3.079A Condensate Powdex Demm A Hgh Differential Pressure 12/31/99 3 079E Condensate Powdex Domin E Hgh Differential Pressu'e 12/31/99 3 080A Condensato Recire Valve Fails Open 12/31/99 3 086A Circulating Water Pump A Tnp 12/31/99 3 096 Generator Hydrogen Cooling System Leakage 12/31/99 3 099 Tnp of Both Stator Coolant Pumps 12/31/99 3104A Main Turtune Control System Fails Hgh 12/31/99 3.105C EHC Pressure Regulator A Osci!!ates 12/31/99 3107A Bypass Vatve No.1 Sticks Open 12/31/99 3.107E Bypass Valve No. 5 Sticks Open 12/31/99 3 108 Bypass Valves Limited To Selected Value 12/31/99 3111B EHC Lead Selector Fails To Remote 12/31/99 4
. 3.072A           SJAE Steam Supply PCV07101 A Fails Closed                       12/31/99 3 073             Feedwater Conductrvity increase                                 12/31/99 3 077B           Hotwell Level Controher Fails Low                               12/31/99 3.079A           Condensate Powdex Demm A Hgh Differential Pressure             12/31/99 3 079E           Condensate Powdex Domin E Hgh Differential Pressu'e             12/31/99 3 080A           Condensato Recire Valve Fails Open                             12/31/99 3 086A           Circulating Water Pump A Tnp                                   12/31/99 3 096             Generator Hydrogen Cooling System Leakage                       12/31/99 3 099             Tnp of Both Stator Coolant Pumps                               12/31/99 3104A             Main Turtune Control System Fails Hgh                           12/31/99 3.105C           EHC Pressure Regulator A Osci!!ates                             12/31/99 3107A             Bypass Vatve No.1 Sticks Open                                   12/31/99 3.107E           Bypass Valve No. 5 Sticks Open                                 12/31/99 3 108             Bypass Valves Limited To Selected Value                         12/31/99 4
3137A SRV 1FO13A Fails Leaks 12/31/99 3137B SRV 1FO13A Fails Stuck 12/31/99 3137C SRV 1FO13A Fails Open Electncally 12/31/99 3137D SRV 1FO13A Fails Closed 12/31/99 3137E SRV 1F013A Fails Open Mechanically 12/31/99 3141 A SRV 1F013E Fails Leaks 12/31/99 3.141B SRV 1FO13E Fails Stuck 12/31/99 3141C SRV 1FO13E Fails Open Electncally 12/31/99 31410 SRV 1FO13E Falls Closed 12/31/99 3.141E SRV 1F013E Fails Open Mechanically 12/31/99 3145A SRV 1F013J Fails - Leaks e
3111B             EHC Lead Selector Fails To Remote                               12/31/99 3137A             SRV 1FO13A Fails Leaks                                         12/31/99 3137B             SRV 1FO13A Fails Stuck                                         12/31/99 3137C             SRV 1FO13A Fails Open Electncally                               12/31/99 3137D             SRV 1FO13A Fails Closed                                         12/31/99 3137E             SRV 1F013A Fails Open Mechanically                             12/31/99 3141 A             SRV 1F013E Fails Leaks                                         12/31/99
12/31/99 feiday, December N,1998 Page 4 ofIi
3.141B             SRV 1FO13E Fails Stuck                                         12/31/99 3141C             SRV 1FO13E Fails Open Electncally                             12/31/99 31410             SRV 1FO13E Falls Closed                                       12/31/99 3.141E             SRV 1F013E Fails Open Mechanically                             12/31/99 3145A             SRV 1F013J Fails - Leaks                               e     12/31/99 feiday, December N,1998                                                                     Page 4 ofIi


Test No             Title                                                     Test Date Committment
Test No Title Test Date Committment 3145B SRV 1F013J Fails Stuck 12/31/99 3.145C SRV 1FO13J Fails Open Electncally 12/31/99 I
,        3145B               SRV 1F013J Fails Stuck                                                   12/31/99 3.145C             SRV 1FO13J Fails Open Electncally                                       12/31/99 I
3.145D SRV 1FO13J Fails - Closed 12/31/99 I
3.145D             SRV 1FO13J Fails - Closed                                               12/31/99 I
3.145E SRV 1F013J Fails Open Mechanically 12/31/99 3.149C SRV 1FO13N Fails Open Electncally 12/31/99 3150B SRV 1FO13S Fails - Stuck 12/31/99 f
3.145E             SRV 1F013J Fails Open Mechanically                                       12/31/99 3.149C             SRV 1FO13N Fails Open Electncally                                       12/31/99 3150B               SRV 1FO13S Fails - Stuck                                                 12/31/99 3151A               SRV 1F013K Downcomer Leak 0-100%                                         12/31/99               f 3.156A             NSSSS Group 1 A inadvertent isolation                                   12/31/99 3156E               NSSSS Group 1E inadvertent isolaton                                     12/31/99               !
3151A SRV 1F013K Downcomer Leak 0-100%
3.157A             NSSSS Group 2A inadvertent isolaton                                     12/31/99 3157E               NSSSS Group 2E inadvertent isolaton                                     12/31/99
12/31/99 3.156A NSSSS Group 1 A inadvertent isolation 12/31/99 3156E NSSSS Group 1E inadvertent isolaton 12/31/99 3.157A NSSSS Group 2A inadvertent isolaton 12/31/99 3157E NSSSS Group 2E inadvertent isolaton 12/31/99 3159A NSSSS Group 6A inadvertent isolaton 12/31/99 3159E NSSSS Group 6E inadvertent isolation 12/31/99 3.160C NSSSS Group 7C Inadvertent isolation 12/31/99 4
.        3159A               NSSSS Group 6A inadvertent isolaton                                     12/31/99 3159E               NSSSS Group 6E inadvertent isolation                                   12/31/99 4        3.160C             NSSSS Group 7C Inadvertent isolation                                   12/31/99 3162A               Secondary Containment & PCIG A inadvertent isolaton                     12/31/99
3162A Secondary Containment & PCIG A inadvertent isolaton 12/31/99 3.162F Secondary Containment & PCIG F Inadvertent isolation 12/31/99 3.166B Offgas AfterCondenser Level Transmmer Fails Low 12/31/99 3.168C Offgas Chiller Glycol Pump Tnp (Both) 12/31/99 3171 A RHR Pump A Tnp 12/31/99 3172A RHR Pump 1 A Fails To Auto Start 12/31/99 4
;        3.162F             Secondary Containment & PCIG F Inadvertent isolation                   12/31/99
3.174A RHR Injection Valve 1F017A Fails As-Is 12/31/99 3175A RHR Pump Sucten Valve F004A Fails As-is 12/31/99 3176C RHR SDC Suction Valve 1FOO8 Fails As-Is 12/31/99 3177A RHR HX A Bypass Controiner Fails High 12/31/99 3182A Core Spray Pump A Tnp 12/31/99 3183A Cove Spray Pump A Fails To Auto Start 12/31/99 3184A Core Soray inboard Vaive 1FOO5 Fails As-is 12/31/99 3.189C Reactor Water Cleanup Pump C Tnp 12/31/99 3195B RWCU isolation Valve HV441F004 Fails As-is 12/31/99 3198B SLC Pump B Loss of Control Power 12/31/99 L
;        3.166B             Offgas AfterCondenser Level Transmmer Fails Low                         12/31/99 3.168C             Offgas Chiller Glycol Pump Tnp (Both)                                   12/31/99 3171 A             RHR Pump A Tnp                                                         12/31/99 3172A               RHR Pump 1 A Fails To Auto Start                                       12/31/99 4
l'riday, December M, IV98 Page5ofIi 1
3.174A               RHR Injection Valve 1F017A Fails As-Is                                 12/31/99 3175A               RHR Pump Sucten Valve F004A Fails As-is                                 12/31/99 3176C               RHR SDC Suction Valve 1FOO8 Fails As-Is                                 12/31/99 3177A               RHR HX A Bypass Controiner Fails High                                   12/31/99 3182A               Core Spray Pump A Tnp                                                   12/31/99 3183A               Cove Spray Pump A Fails To Auto Start                                   12/31/99 3184A               Core Soray inboard Vaive 1FOO5 Fails As-is                             12/31/99 3.189C             Reactor Water Cleanup Pump C Tnp                                       12/31/99 3195B               RWCU isolation Valve HV441F004 Fails As-is                             12/31/99 3198B               SLC Pump B Loss of Control Power                                       12/31/99                 ;
L l'riday, December M, IV98                                                                             Page5ofIi 1


i l
i l
Test No                                                                                         Title                                                                     Test Date Committment 3.201 A                                                                                         SRM Chan A Recorder Fails As-ts                                                                         12/31/99 3.201B                                                                                         SRM Channel A Fails inoperative                                                                         12/31/99                 ,
Test No Title Test Date Committment 3.201 A SRM Chan A Recorder Fails As-ts 12/31/99 3.201B SRM Channel A Fails inoperative 12/31/99 l
l 3.201C                                                                                         SRM Channel A Detector Stuck                                                                             12/31/99 3 205A                                                                                         BRM Channel A Recorder Fails As-Is                                                                       12/~MJ9                 ,
3.201C SRM Channel A Detector Stuck 12/31/99 3 205A BRM Channel A Recorder Fails As-Is 12/~MJ9 l
l 3 205B                                                                                         IRM Channel A Fails :noperative                                                                         12/31/99                 i 3 205C                                                                                         IRM Channel A Detector Stuck                                                                             12/31/99 3 209A                                                                                           1RM Channet E Recorcer Fails As-Is                                                                       12/31/99 l
3 205B IRM Channel A Fails :noperative 12/31/99 i
3.209B                                                                                           1RM Channel E Fails inoperative                                                                         12/31/99                 !
3 205C IRM Channel A Detector Stuck 12/31/99 3 209A 1RM Channet E Recorcer Fails As-Is 12/31/99 l
3 209C                                                                                           IRM Channel E Detector Stuck                                                                             12/31/99 3 213A                                                                                           SRM Channel A Fails To Selected Value                                                                   12/31/99 3 214A                                                                                         1RM Channel A Fails To Se6ected Value                                                                     12/31/99 3 214E                                                                                         IRM Channel E Fails To Selected Value                                                                     12/31/99 3 217A                                                                                         RBM Channel A Fails To Selected Value                                                                     12/31/99 3 2278                                                                                         Reactor Instrument Line Break After 42-F043B                                                             12/31/99 3 229B                                                                                           Reactor instrument Line Break After 42 F049B                                                             12/31/99 t
3.209B 1RM Channel E Fails inoperative 12/31/99 3 209C IRM Channel E Detector Stuck 12/31/99 3 213A SRM Channel A Fails To Selected Value 12/31/99 3 214A 1RM Channel A Fails To Se6ected Value 12/31/99 3 214E IRM Channel E Fails To Selected Value 12/31/99 3 217A RBM Channel A Fails To Selected Value 12/31/99 3 2278 Reactor Instrument Line Break After 42-F043B 12/31/99 3 229B Reactor instrument Line Break After 42 F049B 12/31/99 t
3 231B                                                                                           Reactor instrument Line Break After 42-F045B                                                             12/31/99 3 232A                                                                                         Reactor Level Transmmer LT42-N060A Fails High                                                           12/31/99 3 232B                                                                                           Reactor i evel Transmmer LT42-N080A Fails Low                                                           12/31/99 3 233A                                                                                           Reac.or Level Transmitter DPT42-N004A Fails Hgh                                                         12/31/99 3 2330                                                                                           Reactor Level Transmitter DPT42-N004A Fails Lcrw                                                         12/31/99 3 234A                                                                                           Reactor Prestw Transmitter PT42-N078A Fails High                                                         12/31/99 32348                                                                                             Reactor Pressure Transmitter PT42-N078A Fails Low                                                       12/31/99 3 235B                                                                                           Reactor Level / Pressure Recorder R609 Fails                                                             12/31/99 3 236A                                                                                           Reference Leg 1D004A Flashes                                                                             12/31/99 3 237A                                                                                           Referente Leg 1D004A Lwel Defect                                                                         12/31/99 3 237F                                                                                             ALL Reference Legs Level Defect                                                                         12/31/99 3 242A                                                                                           Feedwster Heater 15A Tube Leak                                                                           12/31/99 3 244B                                                                                             Feedwater Pump A Mechanical Failure                                                                     12/31/99 3 245C                                                                                             Reactor FeedPump B Hgh Vibration                                                                       12/31/99 3 247A                                                                                             FW Low Flow Control Valve Fails Open                                                                   12/31/99
3 231B Reactor instrument Line Break After 42-F045B 12/31/99 3 232A Reactor Level Transmmer LT42-N060A Fails High 12/31/99 3 232B Reactor i evel Transmmer LT42-N080A Fails Low 12/31/99 3 233A Reac.or Level Transmitter DPT42-N004A Fails Hgh 12/31/99 3 2330 Reactor Level Transmitter DPT42-N004A Fails Lcrw 12/31/99 3 234A Reactor Prestw Transmitter PT42-N078A Fails High 12/31/99 32348 Reactor Pressure Transmitter PT42-N078A Fails Low 12/31/99 3 235B Reactor Level / Pressure Recorder R609 Fails 12/31/99 3 236A Reference Leg 1D004A Flashes 12/31/99 3 237A Referente Leg 1D004A Lwel Defect 12/31/99 3 237F ALL Reference Legs Level Defect 12/31/99 3 242A Feedwster Heater 15A Tube Leak 12/31/99 3 244B Feedwater Pump A Mechanical Failure 12/31/99 3 245C Reactor FeedPump B Hgh Vibration 12/31/99 3 247A FW Low Flow Control Valve Fails Open 12/31/99
                                                                                      ~55dh,5~505V5~                                                                                                                                                                                                         Page 6 ofIi l
~55dh,5~505V5~
Page 6 ofIi l


-__    ~ -                             . .        .-              -    - ~     .      - .      - -,-    .
~ -
~
1 k
1 k
I i
I i
Test No             Title                                             Test Date Committment 3 249A             Reactor FeedPurnp B Reorc Valve Fails Open                       12/31/99 3 251A             FW S/U Level Control Valve Fails Open                           12/31/99             s 3.252A             FW Line A Rupture inside Drywell                                 12/31/99 f
Test No Title Test Date Committment 3 249A Reactor FeedPurnp B Reorc Valve Fails Open 12/31/99 3 251A FW S/U Level Control Valve Fails Open 12/31/99 s
1 3.260A             Network Load Transent increase                                   12/31/99 3 262B               13.2KV 12 Unit Auxihary Bus Fault                               12/31/99 3 263A             4KV Safeguard Bus D11 Fault                                     12/31/99 3 265A             Startup Bus Breaker 10 Tnps                                     12/31/99 3 270A             114A Generator Area 440V Load Center Fault                     12/31/99 i
f 3.252A FW Line A Rupture inside Drywell 12/31/99 1
3 270B               124A Generator Area 440V Load Center Fault                     12/31/99 3 275A             D114 Safeguard 440V Load Center Fau!t                           12/31/99 3 277A             120 VAC Panet 10Y101 Fauft                                     12/31/99 3.278A             120 VAC Panel 10Y105 Fault                                     12/31/99 3 278C             120 VAC Panet 10Y109 Fault                                     12/31/99 3.282A             1FA 125/250 VDC 1 AD105 Fault                                   12/31/99 3.283               125/250 VDC 100114 Fault                                       12/31/99 1
3.260A Network Load Transent increase 12/31/99 3 262B 13.2KV 12 Unit Auxihary Bus Fault 12/31/99 3 263A 4KV Safeguard Bus D11 Fault 12/31/99 3 265A Startup Bus Breaker 10 Tnps 12/31/99 3 270A 114A Generator Area 440V Load Center Fault 12/31/99 i
3 274A             Loss of DC To Selected Annunciator Panels                       12/31/99               I 3.284E             Loss of DC To Selected Annunciator Panels                       12/31/99 3 285A             125/250 VDC Bus 1 AD108 Fault                                   12/31/99 3 285E             125/250 VDC Bus 10D125 Fault                                   12/31/99 3 406A             RRCS Division i Loss of DC Power                               12/31/99 3 406C             RRCS Loss of DC Power To Both Divisions                         12/31/99 3 409A             Containtnent instrument Gas Compressor A Leaks                 12/31/99
3 270B 124A Generator Area 440V Load Center Fault 12/31/99 3 275A D114 Safeguard 440V Load Center Fau!t 12/31/99 3 277A 120 VAC Panet 10Y101 Fauft 12/31/99 3.278A 120 VAC Panel 10Y105 Fault 12/31/99 3 278C 120 VAC Panet 10Y109 Fault 12/31/99 3.282A 1FA 125/250 VDC 1 AD105 Fault 12/31/99 3.283 125/250 VDC 100114 Fault 12/31/99 1
3 274A Loss of DC To Selected Annunciator Panels 12/31/99 3.284E Loss of DC To Selected Annunciator Panels 12/31/99 3 285A 125/250 VDC Bus 1 AD108 Fault 12/31/99 3 285E 125/250 VDC Bus 10D125 Fault 12/31/99 3 406A RRCS Division i Loss of DC Power 12/31/99 3 406C RRCS Loss of DC Power To Both Divisions 12/31/99 3 409A Containtnent instrument Gas Compressor A Leaks 12/31/99
{
{
3 410C             Both ClO Isolation Valves HV59-12"4A/B Fad Closed               12/31/99 3 412A             Control Rod Dnve Pump A Trips                                 12/31/99 3 414A             SDV Valve SV471F180 Fads Closed                               12/31/99 3 418A             Desel Generator 11 Tnp                                         12/31/99 3 419A             Desel Generator 11 Fails To Start                               12/31/99 3 424A             instrument Air Compressor 1 AK101 Tnp                           12/31/99 3 4300             Recarc Pump B Secure                                           12/31/99 3 431A             Recirc Pump A M/A Station Fads High                             12/31M Triday, December N, !99R                                                                     Page 7ofII
3 410C Both ClO Isolation Valves HV59-12"4A/B Fad Closed 12/31/99 3 412A Control Rod Dnve Pump A Trips 12/31/99 3 414A SDV Valve SV471F180 Fads Closed 12/31/99 3 418A Desel Generator 11 Tnp 12/31/99 3 419A Desel Generator 11 Fails To Start 12/31/99 3 424A instrument Air Compressor 1 AK101 Tnp 12/31/99 3 4300 Recarc Pump B Secure 12/31/99 3 431A Recirc Pump A M/A Station Fads High 12/31M Triday, December N, !99R Page 7ofII


P i
P i
s Test No           Title                                           Test Date Committment
s Test No Title Test Date Committment
                                                                                                      ~
~
3 433A           Recirc Pump A Seal #1 Failure                                 12/31/99 4
3 433A Recirc Pump A Seal #1 Failure 12/31/99 4
3 435A           Recirc Pump A Dnve Motor Breaker Tnp                           12/31/99 3 4400           Recirc Loop B Rupture (0-100%)                                 12/31/99 3 442A           Recirc Pump 1 A RPT Breaker CB3A Tnp                           12/31/99 3 445           HPCI Steam Line Break in Pump Room 1 100%                     12/31/99 e
3 435A Recirc Pump A Dnve Motor Breaker Tnp 12/31/99 3 4400 Recirc Loop B Rupture (0-100%)
3.447A           HPCI Aux Oil Pump Fails To Auto Start                         12/31/99
12/31/99 3 442A Recirc Pump 1 A RPT Breaker CB3A Tnp 12/31/99 3 445 HPCI Steam Line Break in Pump Room 1 100%
12/31/99 e
3.447A HPCI Aux Oil Pump Fails To Auto Start 12/31/99
[
[
3.449           HPCI Turbine Tnp                                             12/31/99 3 452           HPCI Pump Dischar9e Valve 1F006 Fails As-is                   12/31/99 3 456           RCIC Fails To Auto Start                                     12/31/99 I
3.449 HPCI Turbine Tnp 12/31/99 3 452 HPCI Pump Dischar9e Valve 1F006 Fails As-is 12/31/99 3 456 RCIC Fails To Auto Start 12/31/99 I
3 459A           RCIC Steam Supply HV49-1F008 isolates                         12/31/99 3 462           RCIC Cooling Water Valve HV49-1F046 Fails As-is               12/31/99             i 3 464C           RCIC isolation Valve HV49-1F076 Fails As-is                   12/31/99             l 3 47jA           Drywell Ares Unit Cooler Fan 1 A1 Tnp                         12/31E               !
3 459A RCIC Steam Supply HV49-1F008 isolates 12/31/99 3 462 RCIC Cooling Water Valve HV49-1F046 Fails As-is 12/31/99 i
3 471E           Drywell Area Unit Cookt Fan 1E1 Tnp                           12/31/99 3 472A           Drywell Ares Unit Cooler Fan 1 A2 Tnp                         12/31/99 3 472E           Drywell Area Unit Cooler Fan IE2 Tnp                         12/31/99 3 483A           RECW Pump Tnp (A)                                             12/31/99 3 483C           RECW Pump Tnp (Both)                                         12/31/99 3 488B           Service Water Pump B Tnps                                     12/31/99               j 3 489A           ESW Pump A Tnps                                               12/31/99 3 490A           ESW Valve HV11 121 Fails To Auto Swap                         12/31/99 3 490E           ESW Valve HV11-055A Fails To Auto Swap                       12/31/99 3 492A           RHR Service Water Pump A Tnps                                 12/31/99 3 4938           Failure OF RHRSW HX B Inlet Valve                             12/31/99 3 500A           Jet Pump No 1 Displaced Mixer                                 12/31/99 3 502A           Jet Pump No.13 Broken instrument Line                         12/31/99 3 505A           Recarc Pump A High Runback                                   12/31/99 3 511           Pnmary Containment Hydrogen increases                         12/31/99 3 515C           Feedwater Hester 14A Drain Valve Faits Open                   12/31/99 3.516B           Feedwater Hestet 13A Drain Valve Fails Closed                 12/31/99 In5ul)(ScAnher 04,I998                                                                   Page 8 ofIi
3 464C RCIC isolation Valve HV49-1F076 Fails As-is 12/31/99 l
3 47jA Drywell Ares Unit Cooler Fan 1 A1 Tnp 12/31E 3 471E Drywell Area Unit Cookt Fan 1E1 Tnp 12/31/99 3 472A Drywell Ares Unit Cooler Fan 1 A2 Tnp 12/31/99 3 472E Drywell Area Unit Cooler Fan IE2 Tnp 12/31/99 3 483A RECW Pump Tnp (A) 12/31/99 3 483C RECW Pump Tnp (Both) 12/31/99 3 488B Service Water Pump B Tnps 12/31/99 j
3 489A ESW Pump A Tnps 12/31/99 3 490A ESW Valve HV11 121 Fails To Auto Swap 12/31/99 3 490E ESW Valve HV11-055A Fails To Auto Swap 12/31/99 3 492A RHR Service Water Pump A Tnps 12/31/99 3 4938 Failure OF RHRSW HX B Inlet Valve 12/31/99 3 500A Jet Pump No 1 Displaced Mixer 12/31/99 3 502A Jet Pump No.13 Broken instrument Line 12/31/99 3 505A Recarc Pump A High Runback 12/31/99 3 511 Pnmary Containment Hydrogen increases 12/31/99 3 515C Feedwater Hester 14A Drain Valve Faits Open 12/31/99 3.516B Feedwater Hestet 13A Drain Valve Fails Closed 12/31/99 In5ul)(ScAnher 04,I998 Page 8 ofIi


Test No             Title                                                     Test Date Committment               '
Test No Title Test Date Committment 3 517A Feedwater Hester 12B Drain Valve Fails Open 12/31/99 3 517E Feedwater Heater 16B Drain Valve Fails Open 12/31/99 3.518D Feedwater Heater 15B Drain Valve Fails Closed 12/31/99 3 519C Feedwater Heater 14C Drain Valve Fails Open 12/31/99 3 520B Feedwater Heater 13C Drain Valve Fails Closed 12/31/99 3 521A Feedwater Heater 12A Dump Valve Fails Open 12/31/99 3 521E Feedwater Heater 16A Dump Valve Fails Open 12/31/99 3 522D Feedwater Hester 15A Dump Valve Fails Closed 12/31/99 3 523C Feedwater Hester 14B Dump Vane Fails Open 12/31/99 3 524B Feedwater Heater 13B Dump Valve Fails Closed 12/31/99 3 525A Feedwater Heater 12C Dump Vane Fails Open 12/31/99 3 525E Feedwater Heater 16C Dump Valve Fails Open 12/31/99 3 526D Feedwater Heater 15C Dump Valve Fails Closed 12/31/99 3 527A Steam Leak Detection NUMAC TIS 25-101A Fails 12/31/99 3 528A RHR Containment Spray Vane F016A Fails As-is 12/31/99 3 529A Reactor Pressure Transmitter PT42103A Fails High 12/31/99 I
3 517A             Feedwater Hester 12B Drain Valve Fails Open                               12/31/99 3 517E             Feedwater Heater 16B Drain Valve Fails Open                               12/31/99             ,
3 530 Main Turbine Fails To Tnp 12/31/99 3 534 Turbine Tuming Gear Motor Tnps 12/31/99 3 SLSD 182 Moisture Separator Drain Tank Drain Valve Fails Closed 12/31/99 3 536B 1 A2 Moisture Separator Drain Tank Drain Valve Fails Open 12/31/99 3 536F 1C2 Motsture Separator Drain Tank Drain Valve Fails Open 12/31/99 3 537D 182 Moisture Separator Drain Tank Dump Valve Fails Closed 12/31/99
3.518D             Feedwater Heater 15B Drain Valve Fails Closed                             12/31/99 3 519C             Feedwater Heater 14C Drain Valve Fails Open                               12/31/99 3 520B             Feedwater Heater 13C Drain Valve Fails Closed                             12/31/99 3 521A             Feedwater Heater 12A Dump Valve Fails Open                           -
+ 3 5388 1 A2 Moisture Separator Drain Tank Dump Valve Fails Open 12/31/99 3 538F 1C2 Mo!sture Separator Drain Tank Dump Valve Fails Open 12/31/99 3 542 Generator Auto Voltage Regulator Fails High 12/31/99 3 546A Safeguard MCC D-114-G-D Fault 12/31/99 3 549 Coarse Hotwell Reject Valve Fails Open 12/31/99 3 551 ADS Fails To initiate 12/31/99 3 552C RFP Dischar9e Check Valve HV06-105C Fails Open 12/31/99 3 553A Turbine Control Vane No 1 Fails Open 12/31/99 Friday, December 04, i998 Page 9 ofII
12/31/99 3 521E             Feedwater Heater 16A Dump Valve Fails Open                               12/31/99 3 522D             Feedwater Hester 15A Dump Valve Fails Closed                             12/31/99 3 523C             Feedwater Hester 14B Dump Vane Fails Open                                 12/31/99 3 524B             Feedwater Heater 13B Dump Valve Fails Closed                             12/31/99 3 525A             Feedwater Heater 12C Dump Vane Fails Open                               12/31/99 3 525E             Feedwater Heater 16C Dump Valve Fails Open                               12/31/99 3 526D             Feedwater Heater 15C Dump Valve Fails Closed                             12/31/99 3 527A             Steam Leak Detection NUMAC TIS 25-101A Fails                             12/31/99 3 528A             RHR Containment Spray Vane F016A Fails As-is                             12/31/99 3 529A             Reactor Pressure Transmitter PT42103A Fails High                         12/31/99 I
3 530               Main Turbine Fails To Tnp                                               12/31/99 3 534               Turbine Tuming Gear Motor Tnps                                           12/31/99 3 SLSD             182 Moisture Separator Drain Tank Drain Valve Fails Closed                                     I 12/31/99 3 536B             1 A2 Moisture Separator Drain Tank Drain Valve Fails Open               12/31/99 3 536F             1C2 Motsture Separator Drain Tank Drain Valve Fails Open                 12/31/99 3 537D             182 Moisture Separator Drain Tank Dump Valve Fails Closed               12/31/99
  + 3 5388             1 A2 Moisture Separator Drain Tank Dump Valve Fails Open                 12/31/99 3 538F             1C2 Mo!sture Separator Drain Tank Dump Valve Fails Open                 12/31/99 3 542               Generator Auto Voltage Regulator Fails High                             12/31/99 3 546A             Safeguard MCC D-114-G-D Fault                                           12/31/99 3 549               Coarse Hotwell Reject Valve Fails Open                                   12/31/99 3 551               ADS Fails To initiate                                                   12/31/99 3 552C             RFP Dischar9e Check Valve HV06-105C Fails Open                           12/31/99 3 553A             Turbine Control Vane No 1 Fails Open                                     12/31/99 Friday, December 04, i998                                                                             Page 9 ofII


Test No             Title                                             Test Date Committment 3 554               Main Turbine PMG Falls                                         12/31/99 3 556C               RFP C M/A Station Swaps To Manual                             12/31/99 3 5578               FWC UPS in%rter E/S-XX 119 Fails                               12/31/99           ,
Test No Title Test Date Committment 3 554 Main Turbine PMG Falls 12/31/99 3 556C RFP C M/A Station Swaps To Manual 12/31/99 3 5578 FWC UPS in%rter E/S-XX 119 Fails 12/31/99 3 558A HV51-1F017A Close Torque Switch Tnps 12/31/99 3 560A RHR Pump A Suction Strainer Clogs-Small 12/31/99 3.561 A Core Spray Pump A Suction Strainer Clogs 12/31/99 3 563A Feedwater Heater 1A Level Sensing Line Fails Hi 12/31/99 3 5648 Feedwater Heater 2B Levei Sensing Line Fails Hi 12/31/99 3 565C Feedwater Hester 3C Level Sensing Line Fails Hi 12/31/99 3 567A Feedwater Heater 5A Level Sensing Line Fails Hi 12/31/99 f
3 558A             HV51-1F017A Close Torque Switch Tnps                           12/31/99 3 560A             RHR Pump A Suction Strainer Clogs-Small                         12/31/99 3.561 A             Core Spray Pump A Suction Strainer Clogs                       12/31/99 3 563A             Feedwater Heater 1A Level Sensing Line Fails Hi               12/31/99 3 5648             Feedwater Heater 2B Levei Sensing Line Fails Hi               12/31/99 3 565C             Feedwater Hester 3C Level Sensing Line Fails Hi               12/31/99 3 567A             Feedwater Heater 5A Level Sensing Line Fails Hi               12/31/99             f 3 568B             Feedwater Heater 6B Level Sensing Line Fails Hi               12/31/99 3 571 A             RHR SDC Valve HV51-1F008 Tnp of Thermal Overload               12/31/99 3 573A             RHR Valve HV51-1F024A Tnp of Thermal Overload                 12/31/99             ,
3 568B Feedwater Heater 6B Level Sensing Line Fails Hi 12/31/99 3 571 A RHR SDC Valve HV51-1F008 Tnp of Thermal Overload 12/31/99 3 573A RHR Valve HV51-1F024A Tnp of Thermal Overload 12/31/99 5 02A Recarc Loop A Rupture Performance Test 12/31/99 5 05 Total Loss of instrument Air 12/31/99 507A Loss of Safeguard Bus D11 (Emergency Power) 12/31/99 5 09A Loss of Non-Safeguard Load Center 114A 12/31/99 5 09E Loss of Non-Safeguard Load Center 124A 12/31/99 5.10A Loss of 120 VAC Instrument Bus 10Y101 12/31/99 510E Loss of 120 VAC Instrument Bus 10Y105 12/31/99 510G Loss of 120 VAC instrument Bus 10Y109 12/31/99 511 A Loss of 125/250 VOC Bus 1AD105 12/31/99 I
5 02A               Recarc Loop A Rupture Performance Test                         12/31/99 5 05               Total Loss of instrument Air                                   12/31/99             ,
511E Loss of 125/250 VDC Bus 100114 12/31/99 516A Complete Loss of Reactor Enclosure Cooling Water 12/31/99 517G Tnp of Two Condensate Pumps 12/31/99 l
507A               Loss of Safeguard Bus D11 (Emergency Power)                   12/31/99 5 09A               Loss of Non-Safeguard Load Center 114A                         12/31/99 5 09E             Loss of Non-Safeguard Load Center 124A                         12/31/99 5.10A               Loss of 120 VAC Instrument Bus 10Y101                           12/31/99 510E               Loss of 120 VAC Instrument Bus 10Y105                           12/31/99 510G               Loss of 120 VAC instrument Bus 10Y109                           12/31/99 511 A               Loss of 125/250 VOC Bus 1AD105                                 12/31/99             I 511E               Loss of 125/250 VDC Bus 100114                                 12/31/99 516A               Complete Loss of Reactor Enclosure Cooling Water               12/31/99 517G               Tnp of Two Condensate Pumps                                   12/31/99 l
5 25C HPCI Inadvertent initiattor$
5 25C               HPCI Inadvertent initiattor$                                   12/31/99 5 29A               Main Feedwater Line A Rupture Insde Drywell                   12/31/99               l 2
12/31/99 5 29A Main Feedwater Line A Rupture Insde Drywell 12/31/99 l
5 34A               RPS and ARI Fail To insert Control Rods                       12/31/99 4
2 5 34A RPS and ARI Fail To insert Control Rods 12/31/99 4
6.10                 Steady State Performance at 25% Power                         12/31/99 6 11                 Steady State Performance at 75% Power                         12/31/99 l
6.10 Steady State Performance at 25% Power 12/31/99 6 11 Steady State Performance at 75% Power 12/31/99 l'riday, December 04, i998 Page 10 ofIi 1
l'riday, December 04, i998                                                                   Page 10 ofIi 1


I 1
I Test No Title Test Date Committment 6.12 Steady State Per"ormance at 100% Power for 1 Hour 12/31/99 7.01 Reactor (Manual) Scram 12/31/99 7.02 Simultaneous Trp of AH Reactor Feedwater Pumps 12/31/99 7.03 Closure of AH MSIVs at Rated Power 12/31/99 7.04 Tnp of Both Reactor Reorc Pumps at Rated Power 12/31/99 7.05 Single Reactor Rearc Pump Trp 12/31/99 7.06 Turbine Tnp within Bypass Capabihty 12/31/99 7.08 Recirc Loop Rupture with Loss of Offsite Power 12/31/99 7,09 Maximum Size Unisolable Main Steam Line Rupture 12/31/99 6
Test No                     Title                                                     Test Date Committment           ,
6.12                         Steady State Per"ormance at 100% Power for 1 Hour                     12/31/99 7.01                         Reactor (Manual) Scram                                                 12/31/99 7.02                         Simultaneous Trp of AH Reactor Feedwater Pumps                         12/31/99 7.03                         Closure of AH MSIVs at Rated Power                                     12/31/99 7.04                         Tnp of Both Reactor Reorc Pumps at Rated Power                         12/31/99           ;
7.05                         Single Reactor Rearc Pump Trp                                         12/31/99 7.06                         Turbine Tnp within Bypass Capabihty                                   12/31/99 7.08                         Recirc Loop Rupture with Loss of Offsite Power                         12/31/99 7,09                         Maximum Size Unisolable Main Steam Line Rupture                       12/31/99 6
1 r
1 r
l
l "Fr5[$~ '{ bece n er 05598 y,ge j;,y)J
                                                        ~ ~ ~ ~                                                              '
~ ~ ~ ~
      "Fr5[$~
r r
r          '{ bece n er 05598                                                                         y,ge j; ,y)J r


__ a         - - .        ,u,__ _ ~ , 4. +.. a,a . 4 A sa -
a
PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT t
,u,__
4 LGS SIMULATOR TESTING l             TO BE PERFORMED IN 2000 3
_ ~,
4.
+..
a,a 4
A sa PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT t
LGS SIMULATOR TESTING 4
l TO BE PERFORMED IN 2000 3
3 4
3 4
l 1
l
I


LGS Simulator Testing Committmentsfor 2000 Test No             Title                                                       Test Date Committment 1.01               Computer Real Time Test                                                 12/31/2000 3-MHP578A           HV551F011 Fails: Thermal Overload                                       12/31/2000 3-MMC 074           HP Condenser Air inteakage                                             12/31/2000 3-MRE301B           inadvertent Rx Enclosure isolata>n Chan B                               12/31/2000 3-MRE3048           SGTS Inlet from Refuel Floor HV76-020 Fails Open                       12/31/2000 3-MRE307           Reactor Enclosure Fails To laolate                                     12/31/2000 3-MRE308B           Tnp of 1B REECE Fan                                                     12/31/2000 3-MRE309A           Tnp of 1 A Rx Enclosure HVAC Supply Fan                                 12/31/2000 3-MRE310B           Tnp of 1B Rx Enclosure HVAC Exhaust Fan                                 12/31/2000 3-MRE311 A           Tnp of 1 A Refuel Floor HVAC Air Supply Fan                             12/31/2000 3-MRE312B           Tnp of 1B Refuel Floor HVAC Air Exhaust Fan                             12/31/2000 3-MRM001B           Control Room Fresh Air Rad Mon Chan B Fails To SeiValue                 12/31/2000 3-MRM003B           N Stack WRAM Mid Range Chan Fails To Sel Value                         12/31/2000 3-MRM004C           N Stack Rad Mon A Gaseous Chan (3GE075) Fails To Sel Value             12/31/2000 3-MRM005A           U-1 S Stack Rad Mon A Part Chan (1PE185) Fails To Sel Value             12/31/2000 3-MRM005E           U-1 S Stack Rad Mon B lodine Chan (SIE185) Fails To Sei Value           12/31/2000 3-MRM008           Recombiner Rooms & H2 Analyzer Comp Rad Mon Fails To Sel Valu           12/31/2000 3-MRM012           Rx Enci Cooling Water Rad Mon Fails To Sel Value                         12/31/2000 3-MRM015B           Main Steam Line Rad Mon Chan B Fails To Sei Value                       12/31/2000 3-MRM016B           Rx Enci Vent Exh Rad Mon B Fails To Sel Value                           12/31/2000 3-MRM0178           Refuel Floor Vent Exh Rad Mon Chan B Fails To Sel Value                 12/31/2000 3-MRM018B           Drywell Post LOCA Rad Mon Chan B Fails To Sel Value                     12/31/2000 3-MRM019A           U-1 RHRSW Hx Retum Header Rad Mon Fails To Set Value                     12/31/2000 3-MRM021           HPCI Pump Room Area Rad Mon Fails To Sel Value                         12/31/2000 3-MRM025           Isolation Valve Compartment Area Rad Mon Fails To Sei Value             12/31/2000 3-MRM329           Steam Vent Area Stairwell Area Rad Mon Fails To Sel Value               12/31/2000 3-MRM033           Rx Drywell Area Rad Mon Falls To SelValue                               12/31/2000 3-MRM037           Neutron Mon Dnve Mech Area Rad Mon Fails To Sei Value                   12/31/2000 Friday.1)ecember 04. I998                                                                               Page i ofI1 l
LGS Simulator Testing Committmentsfor 2000 Test No Title Test Date Committment 1.01 Computer Real Time Test 12/31/2000 3-MHP578A HV551F011 Fails: Thermal Overload 12/31/2000 3-MMC 074 HP Condenser Air inteakage 12/31/2000 3-MRE301B inadvertent Rx Enclosure isolata>n Chan B 12/31/2000 3-MRE3048 SGTS Inlet from Refuel Floor HV76-020 Fails Open 12/31/2000 3-MRE307 Reactor Enclosure Fails To laolate 12/31/2000 3-MRE308B Tnp of 1B REECE Fan 12/31/2000 3-MRE309A Tnp of 1 A Rx Enclosure HVAC Supply Fan 12/31/2000 3-MRE310B Tnp of 1B Rx Enclosure HVAC Exhaust Fan 12/31/2000 3-MRE311 A Tnp of 1 A Refuel Floor HVAC Air Supply Fan 12/31/2000 3-MRE312B Tnp of 1B Refuel Floor HVAC Air Exhaust Fan 12/31/2000 3-MRM001B Control Room Fresh Air Rad Mon Chan B Fails To SeiValue 12/31/2000 3-MRM003B N Stack WRAM Mid Range Chan Fails To Sel Value 12/31/2000 3-MRM004C N Stack Rad Mon A Gaseous Chan (3GE075) Fails To Sel Value 12/31/2000 3-MRM005A U-1 S Stack Rad Mon A Part Chan (1PE185) Fails To Sel Value 12/31/2000 3-MRM005E U-1 S Stack Rad Mon B lodine Chan (SIE185) Fails To Sei Value 12/31/2000 3-MRM008 Recombiner Rooms & H2 Analyzer Comp Rad Mon Fails To Sel Valu 12/31/2000 3-MRM012 Rx Enci Cooling Water Rad Mon Fails To Sel Value 12/31/2000 3-MRM015B Main Steam Line Rad Mon Chan B Fails To Sei Value 12/31/2000 3-MRM016B Rx Enci Vent Exh Rad Mon B Fails To Sel Value 12/31/2000 3-MRM0178 Refuel Floor Vent Exh Rad Mon Chan B Fails To Sel Value 12/31/2000 3-MRM018B Drywell Post LOCA Rad Mon Chan B Fails To Sel Value 12/31/2000 3-MRM019A U-1 RHRSW Hx Retum Header Rad Mon Fails To Set Value 12/31/2000 3-MRM021 HPCI Pump Room Area Rad Mon Fails To Sel Value 12/31/2000 3-MRM025 Isolation Valve Compartment Area Rad Mon Fails To Sei Value 12/31/2000 3-MRM329 Steam Vent Area Stairwell Area Rad Mon Fails To Sel Value 12/31/2000 3-MRM033 Rx Drywell Area Rad Mon Falls To SelValue 12/31/2000 3-MRM037 Neutron Mon Dnve Mech Area Rad Mon Fails To Sei Value 12/31/2000 Friday.1)ecember 04. I998 Page i ofI1


Test No           Title                                                     Test Date Committment 3-MRM041         RWCU Pump Area Rad Mon Fails To Sei Value                           12/31/2000 3-MRM045         Turbine EnciWashdown Area Red Mon Fails To SeiValue                 12/31/2000 3-MRM048         Drywell Head Laydown Area Rad Mon Fails To Sel Value                 12/31/2000 SMRM052           Pool Plug Laydown Area Rad Mon Fails To Sel Value                   12/31/2000 3-MRM057         Radweste Building HalNvay Area Rad Mon Fails To Sel Value           12/31/2000 3-MRM061         Fuel Pool Filter Hold Pump Area Rad Mon Fails To Sei Value           12/31/2000 3-MRM065           Railroad Car Airlock Room Area Rad Mon Fails To Sel Value           12/31/2000 3-MRM069           Radweste Building Area Rad Mon Falls To Sel Value                   12/31/2000 3-MRM073           SGTS Filter Area Rad Mon Fails To Sei Value                         12/31/2000 SMRT002           RWCU F/D Resin intrusion InTo Rx Vessel                             12/31/2000 3-MRT005C         Inadvertent Activity Release on Elevation 177 Rx Encl               12/31/2000 3-MSD001A         Steam Flooding Damper BPD-201-21 A Fails To Tnp                     12/31/2000 3-MSD003A         Steam Flooding Damper BPD-20123A Fails To Tnp                       12/31/2000 3-MSD005A         Steam Flooding Damper BPD-202 67A Fails To Trip                     12/31/2000 3-MSD007A         Steam Flooding Damper BPD-203-1 A Fails To Tnp                     12/31/2000 3-MSD009A         Steam Flooding Damper BPD-203-14A Fads To Tnp                       12/31/2000 3-MSD011 A         Steam Flooding Damper BPD 203-20A Fails To inp                     12/31/2000 3-MSD0128         Steam Flooding Damper BPD-203-38 Fails To Trip                     12/31/2000 3-MSD014A         Steam Flooding Camper BPD 203-38A Fails To Tnp                     12/31/2000 3-MSD016A         Steam Flooding Damper BPD-201-39A Fails To Tnp                     12/31/2000
Test No Title Test Date Committment 3-MRM041 RWCU Pump Area Rad Mon Fails To Sei Value 12/31/2000 3-MRM045 Turbine EnciWashdown Area Red Mon Fails To SeiValue 12/31/2000 3-MRM048 Drywell Head Laydown Area Rad Mon Fails To Sel Value 12/31/2000 SMRM052 Pool Plug Laydown Area Rad Mon Fails To Sel Value 12/31/2000 3-MRM057 Radweste Building HalNvay Area Rad Mon Fails To Sel Value 12/31/2000 3-MRM061 Fuel Pool Filter Hold Pump Area Rad Mon Fails To Sei Value 12/31/2000 3-MRM065 Railroad Car Airlock Room Area Rad Mon Fails To Sel Value 12/31/2000 3-MRM069 Radweste Building Area Rad Mon Falls To Sel Value 12/31/2000 3-MRM073 SGTS Filter Area Rad Mon Fails To Sei Value 12/31/2000 SMRT002 RWCU F/D Resin intrusion InTo Rx Vessel 12/31/2000 3-MRT005C Inadvertent Activity Release on Elevation 177 Rx Encl 12/31/2000 3-MSD001A Steam Flooding Damper BPD-201-21 A Fails To Tnp 12/31/2000 3-MSD003A Steam Flooding Damper BPD-20123A Fails To Tnp 12/31/2000 3-MSD005A Steam Flooding Damper BPD-202 67A Fails To Trip 12/31/2000 3-MSD007A Steam Flooding Damper BPD-203-1 A Fails To Tnp 12/31/2000 3-MSD009A Steam Flooding Damper BPD-203-14A Fads To Tnp 12/31/2000 3-MSD011 A Steam Flooding Damper BPD 203-20A Fails To inp 12/31/2000 3-MSD0128 Steam Flooding Damper BPD-203-38 Fails To Trip 12/31/2000 3-MSD014A Steam Flooding Camper BPD 203-38A Fails To Tnp 12/31/2000 3-MSD016A Steam Flooding Damper BPD-201-39A Fails To Tnp 12/31/2000
                                                                                                                )
)
3-MSD018A         Steam Flooding Damper BPD-202-33A Fails To Tnp                     12/31/2000 3-MSD020A         Steam Flooding Damper BPD-202-41 A Fails To Tnp                     12/31/2000               l 3-MSD023A         Steam Flooding Damper BPD-20310A Fads To Tnp                       12/31/2000               l 3-MSD025A         Steam Flooding Damper BPD-203-22A Fails To Tnp                     12/31/2000 3-MSD027A         Steam Flooding Damper BPD-203-25A Fails To Tnp                     12/31/2000               ,
3-MSD018A Steam Flooding Damper BPD-202-33A Fails To Tnp 12/31/2000 3-MSD020A Steam Flooding Damper BPD-202-41 A Fails To Tnp 12/31/2000 3-MSD023A Steam Flooding Damper BPD-20310A Fads To Tnp 12/31/2000 l
l 3-MSD029A         Steam Flooding Damper BPD 203-27A Fails To Tnp                     12/31/2000 3-MSD031A         Steam Flooding Damper BPD-203-29A Fails To Tnp                     12/31/2000 3-MSD033A         Steam Flooding Damper BPD-203-31 A Fails To Tno                     12/31/2000 3-MSD035A         Steam Flooding Damper BPD-203-43A Fails To Tnp                     12/31/2000 3-MSW514           RHR Heat Exchanger A Tube Leak                                     12/31/2000 t
3-MSD025A Steam Flooding Damper BPD-203-22A Fails To Tnp 12/31/2000 3-MSD027A Steam Flooding Damper BPD-203-25A Fails To Tnp 12/31/2000 l
Friday, December N,1998                                                                           Page 2 ofi1
3-MSD029A Steam Flooding Damper BPD 203-27A Fails To Tnp 12/31/2000 3-MSD031A Steam Flooding Damper BPD-203-29A Fails To Tnp 12/31/2000 3-MSD033A Steam Flooding Damper BPD-203-31 A Fails To Tno 12/31/2000 3-MSD035A Steam Flooding Damper BPD-203-43A Fails To Tnp 12/31/2000 3-MSW514 RHR Heat Exchanger A Tube Leak 12/31/2000 t
Friday, December N,1998 Page 2 ofi1


1 Test No             Title                                             Test Date Committment 3-MTE001C           Tnp of 1C Turbine Enclosure Supply Fan                       12/31/2000 3-MTE003A           Tnp of 1A Turbine Equipment Compt Exhaust Fan               12/31/2000 3.003B             Core Power Oscillations (Out-of-Phase)                       12/31/2000 3 005A             APRM Channel B Recorder Fails As-Is                         12/31/2000 3 005B             APRM Channel B Fails inop                                   12/31/2000               I 3 009B             APRM Channel F Fails inop                                   12/31/2000 3 0118             RBM Channel B Falls Inop                                   12/31/2000 3 0128             LPRM 40-578 Upscale Failure                                 12/31/2000 3 012F             LPRM 32 49C Upscale Failure                                 12/31/2000 3 013B             LPRM 16-49A Downscale Failure                               12/31/2000 3 013F             LPRM 48-33C Downscale Failure                               12/31/2000 3 0158             LPRM 40-25A Dnft (-25 To +25)                               12/31/2000 3 017A             Control Rod XX YY Failure (Onft in)                         12/31/2000 3 0170             Control Rod XX-YY Failure (Dnft Out)                         12/31/2000 3 017C             Control Rod XX YY Failure (Accumulator Trouble)             12/31/2000 3 017D             Control Rod XX-YY Failure (Stuck)                           12/31/2000 3 017E             Control Rod XX YY Failure (Uncoupled)                       12/31/2000 3 017F             Control Rod XX YY Failure (Scrammed)                       12/31/2000 3 017G             Control Rod XX-YY Fails To Scram                             12/31/2000 3 017H             Control Rod (XX YY) Fails: Double Notch on Withdraw         12/31/2000               l 3 020B             APRM Channel B Faits 0-125%                                 12/31/2000 4
1 Test No Title Test Date Committment 3-MTE001C Tnp of 1C Turbine Enclosure Supply Fan 12/31/2000 3-MTE003A Tnp of 1A Turbine Equipment Compt Exhaust Fan 12/31/2000 3.003B Core Power Oscillations (Out-of-Phase) 12/31/2000 3 005A APRM Channel B Recorder Fails As-Is 12/31/2000 3 005B APRM Channel B Fails inop 12/31/2000 3 009B APRM Channel F Fails inop 12/31/2000 3 0118 RBM Channel B Falls Inop 12/31/2000 3 0128 LPRM 40-578 Upscale Failure 12/31/2000 3 012F LPRM 32 49C Upscale Failure 12/31/2000 3 013B LPRM 16-49A Downscale Failure 12/31/2000 3 013F LPRM 48-33C Downscale Failure 12/31/2000 3 0158 LPRM 40-25A Dnft (-25 To +25) 12/31/2000 3 017A Control Rod XX YY Failure (Onft in) 12/31/2000 3 0170 Control Rod XX-YY Failure (Dnft Out) 12/31/2000 3 017C Control Rod XX YY Failure (Accumulator Trouble) 12/31/2000 3 017D Control Rod XX-YY Failure (Stuck) 12/31/2000 3 017E Control Rod XX YY Failure (Uncoupled) 12/31/2000 3 017F Control Rod XX YY Failure (Scrammed) 12/31/2000 3 017G Control Rod XX-YY Fails To Scram 12/31/2000 3 017H Control Rod (XX YY) Fails: Double Notch on Withdraw 12/31/2000 3 020B APRM Channel B Faits 0-125%
3 020F             APRM Channel F Fails 0-125%                                 12/31/2000 3 027B             Loss of Nortmal Power To RPS Channel B                       12/31/2000 3 028C             Reactor Scram (Bank 2)                                       12/31/2000               i 3 029D             RPS Fails To Scram (Channel B)                               12/31/2000 l
12/31/2000 4
, 3 044B             Feedwater Pump B Controller Output Fails Hgh                 12/31/2000 3 045C             Feedwater Pump C Controller Output Fails Low                 12/31/2000               i 3 046B             Steam Flow Transmitter 1N0038 Fails 0-100%                   12/31/2000               ,
3 020F APRM Channel F Fails 0-125%
3 061B             MSIV HV41 1F022B Fails Open                                 12/31/2000 3 062B             MSIV HV41 1F028B Fails Open                                 12/31/2000 Friday, LOcember 04, !998                                                                     Page 3 ofIi
12/31/2000 3 027B Loss of Nortmal Power To RPS Channel B 12/31/2000 3 028C Reactor Scram (Bank 2) 12/31/2000 i
3 029D RPS Fails To Scram (Channel B) 12/31/2000 3 044B Feedwater Pump B Controller Output Fails Hgh 12/31/2000 3 045C Feedwater Pump C Controller Output Fails Low 12/31/2000 i
3 046B Steam Flow Transmitter 1N0038 Fails 0-100%
12/31/2000 3 061B MSIV HV41 1F022B Fails Open 12/31/2000 3 062B MSIV HV41 1F028B Fails Open 12/31/2000 Friday, LOcember 04, !998 Page 3 ofIi


_ _                _ _                          _ _ _.        ._      .~   _                _ __-            .
.~
Test No           Title                                             Test Date Committment                   i 3.063B           MSIV HV41 1F022B Fails Closed                                 12/31/2000 3.0648           MSfV HV41-1F028B Fails Closed                                 12/31/2000 3 065             Steam Leak Outside Pnmary Containment                         12/31/2000                   i 3 071 A         Loss of Extraction Steam To Feedwater Heater 16A               12/31/2000 3 072B           SJAE Steam Supply PCV07101B Fails Closed                       12/31/2000 3 078A         Condensate Pump A Tnp                                           12/31/2000 3 079B         Condensate Powdex Demin B Hgh Differential Pressure             12/31/2000 3 079F           Condensate Powdex Domin F Hgh Differental Pressure             12/31/2000 3.080B           Condensate Recarc Valve Fails Closed                           12/31/2000 3 08SB         Circulating Waier Pump B Trip                                   12/31/2000 j
Test No Title Test Date Committment i
3 096           Main Transformer Loss of Cooling                                 12/31/2000 3.100           Main Turbine Beanngs 5 and 6 Hgh Vibration                       12/31/2000 3104B         Main Turbine Control System Fails Low                             12/31/2000 3.106A         EHC Pressure Regulator B Fails Hgh                               12/31/2000                   i 3.107B         Bypass Valve No. 2 Sticks Open                                   12/31/2000 3.107F       Bypass Valve No 6 Sticks Open                                     12/31/2000 3 109         Turbine Acceleration Control Failure                             12/31/2000 3.112A       EHC Pump A Tnps                                                   12/31/2000 3 136         Steam Leak Outside Pnmary Containment (0-100%)                   12/31/2000 3138A         SRV 1FO13B Fails - Leaks                                         12/31/2000 3138B         SRV 1F013B Fails Stuck                                           12/31/2000 3138C         SRV 1F0136 Fails Open Electncally                                 12/31/2000 3138D         SRV 1FO138 Fails Closed                                           12/31/2000 3138E         SRV 1FO13B Fails - Open Mechanically                             12/31/2000 3142A         SRV 1FO13F Fails - Leaks                                         12/31/2000 3142B         SRV 1FO13F Fails Stuck                                           12/31/2000 3142C         SRV 1F013F Fails Open Electncally                                 12/31/2000 3142D         SRV 1F013F Fails - Closed                                         12/31/2000 3.142E         SRV 1FO13F Fails Open Mechanically                               12/31/2000 3146A         SRV 1F013K Fails Leaks                                           12/31/2000
3.063B MSIV HV41 1F022B Fails Closed 12/31/2000 3.0648 MSfV HV41-1F028B Fails Closed 12/31/2000 3 065 Steam Leak Outside Pnmary Containment 12/31/2000 i
                                      '      ~~
3 071 A Loss of Extraction Steam To Feedwater Heater 16A 12/31/2000 3 072B SJAE Steam Supply PCV07101B Fails Closed 12/31/2000 3 078A Condensate Pump A Tnp 12/31/2000 3 079B Condensate Powdex Demin B Hgh Differential Pressure 12/31/2000 3 079F Condensate Powdex Domin F Hgh Differental Pressure 12/31/2000 3.080B Condensate Recarc Valve Fails Closed 12/31/2000 3 08SB Circulating Waier Pump B Trip 12/31/2000 j
55555ecembTe 55,!58                                                                             rage 4 ofIi l
3 096 Main Transformer Loss of Cooling 12/31/2000 3.100 Main Turbine Beanngs 5 and 6 Hgh Vibration 12/31/2000 3104B Main Turbine Control System Fails Low 12/31/2000 3.106A EHC Pressure Regulator B Fails Hgh 12/31/2000 i
t
3.107B Bypass Valve No. 2 Sticks Open 12/31/2000 3.107F Bypass Valve No 6 Sticks Open 12/31/2000 3 109 Turbine Acceleration Control Failure 12/31/2000 3.112A EHC Pump A Tnps 12/31/2000 3 136 Steam Leak Outside Pnmary Containment (0-100%)
12/31/2000 3138A SRV 1FO13B Fails - Leaks 12/31/2000 3138B SRV 1F013B Fails Stuck 12/31/2000 3138C SRV 1F0136 Fails Open Electncally 12/31/2000 3138D SRV 1FO138 Fails Closed 12/31/2000 3138E SRV 1FO13B Fails - Open Mechanically 12/31/2000 3142A SRV 1FO13F Fails - Leaks 12/31/2000 3142B SRV 1FO13F Fails Stuck 12/31/2000 3142C SRV 1F013F Fails Open Electncally 12/31/2000 3142D SRV 1F013F Fails - Closed 12/31/2000 3.142E SRV 1FO13F Fails Open Mechanically 12/31/2000 3146A SRV 1F013K Fails Leaks 12/31/2000 55555ecembTe 55,!58 rage 4 ofIi
~~
l t


_. - _ . . . _            __        _      ._.      __    _    _m               . _ ..__ _ _ . _          - _ _ ._ _        . _ - . . _. __
_m f
f j
j l
l l
I Test No Title Test Date Committment 3146B SRV 1FO13K Fails. Stuck 12/31/2000 3.146C SRV 1FO13K Fails Open Electncally 12/31/2000 3.146D SRV 1FO13K Fails. Closed 12/31/2000 3.146E Sr!V 1FO13K Fails Open Mechanscally 12/31/2000 3.149D SRV 1F013N Fails Closed 12/31/2000 3150C SRV 1F013S Fails Open Electncally 12/31/2000 3 1518 SRV 1F013M Downcomer Leak 0100%
I Test No           Title                                                           Test Date Committment 3146B             SRV 1FO13K Fails . Stuck                                                     12/31/2000 3.146C           SRV 1FO13K Fails Open Electncally                                           12/31/2000 3.146D           SRV 1FO13K Fails . Closed                                                   12/31/2000 3.146E             Sr!V 1FO13K Fails Open Mechanscally                                         12/31/2000 3.149D             SRV 1F013N Fails Closed                                                     12/31/2000 3150C             SRV 1F013S Fails Open Electncally                                           12/31/2000 3 1518             SRV 1F013M Downcomer Leak 0100%                                             12/31/2000                         ,
12/31/2000 3.156B NSSSS Group 1B Inadvertent isolation 12/31/2000 3.156F NSSSS Group 1F inadvertent isolation 12/31/2000 3157B NSSSS Group 2B inadvertent isolation 12/31/2000
3.156B             NSSSS Group 1B Inadvertent isolation                                         12/31/2000 3.156F             NSSSS Group 1F inadvertent isolation                                         12/31/2000 3157B             NSSSS Group 2B inadvertent isolation                                         12/31/2000
,1 3.157F NSSSS Group 2F Inadvertent isolation 12/31/2000 i
,1 3.157F             NSSSS Group 2F Inadvertent isolation                                         12/31/2000 i                                                                                                                                                   '
J 3 1580 NSSSS Group 6B inadvertent isolation 12/31/2000 3.159F NSSSS Group 6F Inadvertent isolation 12/31/2000 3161 A NSSSS Group BA inadvertent isolation 12/S1/2000 i
J                 3 1580             NSSSS Group 6B inadvertent isolation                                         12/31/2000 3.159F             NSSSS Group 6F Inadvertent isolation                                       12/31/2000 3161 A             NSSSS Group BA inadvertent isolation                                       12/S1/2000 i
i 3162E Secondary Containment & PCIG B Inadvertent isolation 12/31/2000 a
i 3162E             Secondary Containment & PCIG B Inadvertent isolation                       12/31/2000 a                   3 167             Offgas HEPA Filter Blockage (0-100%)                                         12/31/2000 3171B             RHR Pump B Tnp                                                               12/31/2000 i
3 167 Offgas HEPA Filter Blockage (0-100%)
3 1728           RHR Pump 1B Fails To Auto Start                                             12/31/2000 3.173             RHR Shutdown Cooling Suction Leak                                           12/31/2000 31748             RHR Injection Valve 1F0178 Fails As-is                                       12/31/2000 3175B             RHR Pump Suction Valve F0048 Fails As-Is                                     12/31/2000
12/31/2000 3171B RHR Pump B Tnp 12/31/2000 i
!                31760             RHR SDC Suction Valve 1FOO9 Fails As-Is                                     12/31/2000 3177B             RHR HX A Bypass Controner Fails Low                                         12/31/2000 3182B             Core Spray Pump B Tnp                                                       12/31/2000 3183B             Core Spray Pump B Fails To Auto Start                                       12/31/2000 3.184B             Core Spray Outboard Valve 1FO37 Fails As-is                                 12/31/2000 3190A             RWCU Drain Flow Controller Fails Open                                       12/31/2000 3 193             RWCU NonRegen Hx Leak To RECW (0-100%)                                     12/31/2000                           ;
3 1728 RHR Pump 1B Fails To Auto Start 12/31/2000 3.173 RHR Shutdown Cooling Suction Leak 12/31/2000 31748 RHR Injection Valve 1F0178 Fails As-is 12/31/2000 3175B RHR Pump Suction Valve F0048 Fails As-Is 12/31/2000 31760 RHR SDC Suction Valve 1FOO9 Fails As-Is 12/31/2000 3177B RHR HX A Bypass Controner Fails Low 12/31/2000 3182B Core Spray Pump B Tnp 12/31/2000 3183B Core Spray Pump B Fails To Auto Start 12/31/2000 3.184B Core Spray Outboard Valve 1FO37 Fails As-is 12/31/2000 3190A RWCU Drain Flow Controller Fails Open 12/31/2000 3 193 RWCU NonRegen Hx Leak To RECW (0-100%)
3195C             RWCU isolation Valve HV441F040 Fails As-Is                                 12/31/2000                           ,
12/31/2000 3195C RWCU isolation Valve HV441F040 Fails As-Is 12/31/2000 3.198C SLC Pump C Loss of Control Power 12/31/2000 Friday, December N,1998
3.198C             SLC Pump C Loss of Control Power                                           12/31/2000
~
                                                                    ~
Page5of1)
Friday, December N,1998                                                                                     Page5of1)
~
                                                        -                                                                    ~


l 1
l Test No Title Test Date Committment 3 202A SRM Channel B Recorder Fails As-is 12/31/2000 3.202B SRM Channel B Fails inoperstwo 12/31/2000 1
Test No             Title                                         Test Date Committment 3 202A               SRM Channel B Recorder Fails As-is                       12/31/2000             l l
3.202C SRM Channel B Detector Stuck 12/31/2000 i
3.202B               SRM Channel B Fails inoperstwo                           12/31/2000             1 3.202C               SRM Channel B Detector Stuck                             12/31/2000             i 3 206A               IRM Channel B Recorder Fails As-Is                       12/31/2000 3.206B               IRM Channel B Faik inoperatwe                             12/31/2000 3 206C               IRM Channel B Detector Stuck                             12/31/2000 3 210A               IRM Channel F Recorder Fails As-Is                       12/31/2000             i 3 210B               IRM Channel F Fails inoperstwe                           12/31/2000             3 3 210C               1RM Channel F Detector Stuck                             12/31/2000             i 3 213B               SRM Channel B Fails To Selected Value                     12/31/2000 3 214B               IRM Channel B Fails To Seiected Value                     12/31/2000 3 214F               1RM Channel F Fails To Selected Value                     12/31/2000
3 206A IRM Channel B Recorder Fails As-Is 12/31/2000 3.206B IRM Channel B Faik inoperatwe 12/31/2000 3 206C IRM Channel B Detector Stuck 12/31/2000 3 210A IRM Channel F Recorder Fails As-Is 12/31/2000 i
3 210B IRM Channel F Fails inoperstwe 12/31/2000 3
3 210C 1RM Channel F Detector Stuck 12/31/2000 i
3 213B SRM Channel B Fails To Selected Value 12/31/2000 3 214B IRM Channel B Fails To Seiected Value 12/31/2000 3 214F 1RM Channel F Fails To Selected Value 12/31/2000
{
{
3 217B               RBM Channel B Fails To Selected Value                     12/31/2000             !
3 217B RBM Channel B Fails To Selected Value 12/31/2000 3 228A Reactor instrument Line Break After 42-F047A 12/31/2000 3 230A Reactor instrument Line Break After 42-F065A 12/31/2000 3 231C Reactor instrument Line Break After 42-F045C 12/31/2000 3 232C Reactor Level Transmmer LT42-N0808 Fails High 12/31/2000 i
3 228A               Reactor instrument Line Break After 42-F047A             12/31/2000 3 230A               Reactor instrument Line Break After 42-F065A             12/31/2000 3 231C               Reactor instrument Line Break After 42-F045C             12/31/2000 3 232C               Reactor Level Transmmer LT42-N0808 Fails High             12/31/2000             i 3 2320               Reactor Level Transmmer LT42-N080B Fails Low             12/31/2000
3 2320 Reactor Level Transmmer LT42-N080B Fails Low 12/31/2000
  'a 133C             Reactor LevelTransmmer DPT42-N004P rails Low             12/31/2000 3 2330               Reactor Level Transmitter DPT42-N004B Fails Low           12/31/2000             i 3 234C               Reactor Pressure Transmeer PT42-N078B Fails High         12/31/2000 3.2340               Reactor Pressure Transmeer PT42-N078B Fails Low           12/31/2000 3 236B               Reference Leg 1D004B Flashes                             12/31/2000 3 236E               Reference Leg 1D002 Fl.sshes                             12/31/2000 3 2370               Reference Leg 1D004B Level Defect                         12/31/2000 3 241 A             Feedwater Hester 12A Tube Leak                           12/31/2000 l 3 242B               Feedwater Heater ISB Tube Leak                           12/31/2000 5
'a 133C Reactor LevelTransmmer DPT42-N004P r ils Low 12/31/2000 a
3 244C               Reactor FeedPump A High Veration                         12/31/2000 3.246A               Rx Feedwater Pump C Tnps                                 12/31/2000 l 3 247B             FW Low Flow Control Vatve Fails Closed                     12/31/2000 I
3 2330 Reactor Level Transmitter DPT42-N004B Fails Low 12/31/2000 i
1 Fridtry, December 04, I998                                                                 Page 6 of1J \
3 234C Reactor Pressure Transmeer PT42-N078B Fails High 12/31/2000 3.2340 Reactor Pressure Transmeer PT42-N078B Fails Low 12/31/2000 3 236B Reference Leg 1D004B Flashes 12/31/2000 3 236E Reference Leg 1D002 Fl.sshes 12/31/2000 3 2370 Reference Leg 1D004B Level Defect 12/31/2000 3 241 A Feedwater Hester 12A Tube Leak 12/31/2000 l
3 242B Feedwater Heater ISB Tube Leak 12/31/2000 5
3 244C Reactor FeedPump A High Veration 12/31/2000 3.246A Rx Feedwater Pump C Tnps 12/31/2000 l
3 247B FW Low Flow Control Vatve Fails Closed 12/31/2000 I
1 Fridtry, December 04, I998 Page 6 of1J
\\
I
I


f Test No           Title                                         Test Date Committment 3 2498           Reactor FeedPump B Recire Valve Fails Closed               12/31/2000 3 251B           FW S/U Level Control Valve Fails Closed                   12/31/2000 3.252B           FW Line B Rupture inside Drywell                           12/31/2000 3.260B           Network Load Transient Decrease                           12/31/2000 3 263B           4KV Safeguard Bus 012 Fault                               12/31/2000 3 264A           Main Generator Output Breaker 252-10113 Tnps             12/31/2000 3.265B           Startup Bus Breaker 20 Tnps                               12/31/2000 3 267B           Plant Services Load Center 222 Fault                     12/31/2000 3 271 A           114B Reactor Area 440V Load Center Fault                 12/31/2000 3 271B           1248 Reactor Area 440V Load Center Fault                 12/31/2000 3.273B             214D Plant Services Load Center Fault                     12/31/2000 3 2758           D124 Safeguard 440V Load Center Fault                     12/31/2000 3 277B           120 VAC Panet 10Y102 Fault                               12/31/2000 3 278B             120 VAC Panel 10Y106 Fault                               12/31/2000 3 278D             1D VAC Panel 10Y110 Fault                                 12/31/2000 3 2828             1FB 125/250 VDC 180105 Fault                             12/31/2000 3 284B           Loss of DC To Selected Annunciator Panels                 12/31/2000 3 284F           Loss of DC To Selected Annunciator Panels                 12/31/2000 3 2858           125/250 VDC Bus 1BD108 Fault                             12/31/2000 3 286A           1A APRM UPS Bus 1AY185 Fault                             12/31/2000 3 299A           Control Enclosure Chiller OAK 112 Tnp                     12/31/2000 3 406B           RRCS Division il Loss of DC Power                         12/31/2000 3 407C           RRCS Both ARI Divisions Fail To initiate                 12/31/2000 3 409B           Containment instrument Gas Compressor B Leaks             12/31/2000 3 411 A         CRD Flow Control Valve A Fails Closed                     12/31/2000 3 412B           Control Rod Dnve Pump B Tnps                               12/31/2000 34148           SDV Valve SV47-1F010 Fails Closed                         12/31/2000 3 418B           Desel Generator 12 Tnp                                     12/31/2000 3 419B           Desel Generator 12 Fails To Start                         12/31/2000 3 4248           Instrument Air Compressor 1BK101 Tnp                       12/31/2000
f Test No Title Test Date Committment 3 2498 Reactor FeedPump B Recire Valve Fails Closed 12/31/2000 3 251B FW S/U Level Control Valve Fails Closed 12/31/2000 3.252B FW Line B Rupture inside Drywell 12/31/2000 3.260B Network Load Transient Decrease 12/31/2000 3 263B 4KV Safeguard Bus 012 Fault 12/31/2000 3 264A Main Generator Output Breaker 252-10113 Tnps 12/31/2000 3.265B Startup Bus Breaker 20 Tnps 12/31/2000 3 267B Plant Services Load Center 222 Fault 12/31/2000 3 271 A 114B Reactor Area 440V Load Center Fault 12/31/2000 3 271B 1248 Reactor Area 440V Load Center Fault 12/31/2000 3.273B 214D Plant Services Load Center Fault 12/31/2000 3 2758 D124 Safeguard 440V Load Center Fault 12/31/2000 3 277B 120 VAC Panet 10Y102 Fault 12/31/2000 3 278B 120 VAC Panel 10Y106 Fault 12/31/2000 3 278D 1D VAC Panel 10Y110 Fault 12/31/2000 3 2828 1FB 125/250 VDC 180105 Fault 12/31/2000 3 284B Loss of DC To Selected Annunciator Panels 12/31/2000 3 284F Loss of DC To Selected Annunciator Panels 12/31/2000 3 2858 125/250 VDC Bus 1BD108 Fault 12/31/2000 3 286A 1A APRM UPS Bus 1AY185 Fault 12/31/2000 3 299A Control Enclosure Chiller OAK 112 Tnp 12/31/2000 3 406B RRCS Division il Loss of DC Power 12/31/2000 3 407C RRCS Both ARI Divisions Fail To initiate 12/31/2000 3 409B Containment instrument Gas Compressor B Leaks 12/31/2000 3 411 A CRD Flow Control Valve A Fails Closed 12/31/2000 3 412B Control Rod Dnve Pump B Tnps 12/31/2000 34148 SDV Valve SV47-1F010 Fails Closed 12/31/2000 3 418B Desel Generator 12 Tnp 12/31/2000 3 419B Desel Generator 12 Fails To Start 12/31/2000 3 4248 Instrument Air Compressor 1BK101 Tnp 12/31/2000 ErlIn)5[55r"5558
                                                                              ~
~
ErlIn)5[55r"5558                                                                       Page 7ofi1
Page 7ofi1


i Test No         Title                                             Test Date Committment 3 431B           Recire Pump A M/A Station Fails Low                         12/31/2000 3 432A           Recare Pump A incomplete Startup Sequence                   12/31/2000 3 433B           Recarc Pump B Sea! #1 Failure                               12/31/2000 3 435B           Recarc Pump B Drive Motor Breaker Tnp                       12/31/2000             !
i Test No Title Test Date Committment 3 431B Recire Pump A M/A Station Fails Low 12/31/2000 3 432A Recare Pump A incomplete Startup Sequence 12/31/2000 3 433B Recarc Pump B Sea! #1 Failure 12/31/2000 3 435B Recarc Pump B Drive Motor Breaker Tnp 12/31/2000 3 441 Coolant Leakage in Drywell (0-300 gpm) 12/31/??)0 3 442B Recarc Pump 1 A RPT Breaker CB4A Trip 12/31/2000 3 446A HPCI Steam isolaton Valve HV55-1F002 Fails 12/31/2000 3 447B HPCI Aux Oil Pump Fails Tnps 12/31/2000 3 450 HPCI Inadvertent Start 12/31/2000 3 453 HPCI Pump Discharge Valve 1F105 Fails As-Is 12/31/2000 3 457A RCIC Speed Control Fails Hegh 12/31/2000 3 4598 RCIC Steam Suppy HV49-1F007 isolates 12/31/2000 3 465 RCIC Steam Line Break in Pump Room 1-1uo%
3 441           Coolant Leakage in Drywell (0-300 gpm)                       12/31/??)0             !
12/31/2000 l
3 442B           Recarc Pump 1 A RPT Breaker CB4A Trip                       12/31/2000 3 446A           HPCI Steam isolaton Valve HV55-1F002 Fails                   12/31/2000 3 447B           HPCI Aux Oil Pump Fails Tnps                                 12/31/2000             ,
3 471B Drywell Area Unit Cooler Fan 1B1 Tnp 12/31/2000 3 471F DryweB Area Unit Cocier Fan 1F1 Tnp 12/31/2000 3 472B Drywell Area Unit Cooler Fan 182 Tnp 12/31/2000 3 472F Drywell Area Unit Cooler Fan 1F2 Tnp 12/31/2000 3 475 Pnmary Containment Hydrogen Detonation 12/31/2000 j
3 450           HPCI Inadvertent Start                                       12/31/2000 3 453           HPCI Pump Discharge Valve 1F105 Fails As-Is                   12/31/2000 3 457A           RCIC Speed Control Fails Hegh                                 12/31/2000 3 4598           RCIC Steam Suppy HV49-1F007 isolates                         12/31/2000 3 465             RCIC Steam Line Break in Pump Room 1-1uo%                     12/31/2000             l 3 471B           Drywell Area Unit Cooler Fan 1B1 Tnp                         12/31/2000 3 471F           DryweB Area Unit Cocier Fan 1F1 Tnp                         12/31/2000 3 472B                                                                                                 '
3 483B RECW Pump Trip (B) 12/31/2000 3 484C TECW Pumps Tnp (Both) 12/31/2000 3 488C Service Water Pump C Tnps 12/31/2000 3 4898 ESW Pump B Tnps 12/31/2000 3 490B ESW Valve HV11-054A Fails To Auto Swap 12/31/2000 3 490F ESW Valve HV11-079 Faits To Auto Swap 12/31/2000 3 4928 RHR Service Water Pump B Tnps 12/31/2000 I
Drywell Area Unit Cooler Fan 182 Tnp                         12/31/2000 3 472F           Drywell Area Unit Cooler Fan 1F2 Tnp                         12/31/2000 3 475             Pnmary Containment Hydrogen Detonation                       12/31/2000             j 3 483B           RECW Pump Trip (B)                                           12/31/2000 3 484C           TECW Pumps Tnp (Both)                                         12/31/2000 3 488C           Service Water Pump C Tnps                                   12/31/2000 3 4898           ESW Pump B Tnps                                               12/31/2000 3 490B           ESW Valve HV11-054A Fails To Auto Swap                       12/31/2000 3 490F           ESW Valve HV11-079 Faits To Auto Swap                         12/31/2000 3 4928           RHR Service Water Pump B Tnps                                 12/31/2000 I
3 5006 Jet Pump No.16 Displaced Mixer 12/31/2000 3 502B Jet Pump No 5 Broken instrument Line 12/31/2000 3 504A Recarc Pump 1 A Shait Failuia 12/31/2000
3 5006           Jet Pump No.16 Displaced Mixer                               12/31/2000 3 502B           Jet Pump No 5 Broken instrument Line                         12/31/2000 3 504A           Recarc Pump 1 A Shait Failuia                                 12/31/2000
.35058 Recirc Pump A Low Runback 12/31/2000 3 515D Feedwater Heater 15A Dram Vatve Fails Open 12/31/2000 YN5t[5iec^e'N5erN,1998 Page 8 ofIl
    .35058           Recirc Pump A Low Runback                                     12/31/2000 3 515D           Feedwater Heater 15A Dram Vatve Fails Open                   12/31/2000 YN5t[5iec^e'N5erN,1998                                                                     Page 8 ofIl


Test No             Title                                                     Test Date Committment 3 516C             Feedwater Heater 14A Drain Valve Falls Closed                         12/31/2000 3 517B             Feedwater Heater 13B Drain Valve Fails Open                           12/31/2000 3 518A             Feedwater Heater 12B Drain Valve Fails Closed                         12/31/2000 3 518E             Feedwater Heater 168 Drain Valve Fails Closed                         12/31/2000 3 5190             Feedwater Heater 15C Drain Valve Fails Open                           12/31/2000                     i 3 520C             Feedwater Hester 14C Drain Valve Fails Closed                         12/31/2000 3 521B             Feedwater Heater 13A Dump Valve Fails Open                           12/31/2000 3 522A             Feedwater Hea'er 12A Dump Valve Fails Closed                         12/31/2000 3.522E             Feedwater Heater 16A Dump Valve Faits Closed                         12/31/2000 3 523D             Feedwater Heater 15B Dump Valve Fails Open                           12/31/2000 3 524C             Feedwater Heater 14B Dump Valve Fails Closed                         12/31/2000 3 525B             Feedwater Heater 13C Dump Valve Fails Open                           12/31/2000 3 526A             Feedwater Hester 12C Dump Valve Fails Closed                         12/31/2000 3 526E             Feedwater Hester 16C Dump Valve Fails Closed                         12/31/2000 3 527B             Steam Leak Detection NUMAC TIS 25101B Fails                           12/31/2000 3 528B             RHR Containment Spray Valve F016B Fails As-is                       12/31/2000                       '
Test No Title Test Date Committment 3 516C Feedwater Heater 14A Drain Valve Falls Closed 12/31/2000 3 517B Feedwater Heater 13B Drain Valve Fails Open 12/31/2000 3 518A Feedwater Heater 12B Drain Valve Fails Closed 12/31/2000 3 518E Feedwater Heater 168 Drain Valve Fails Closed 12/31/2000 3 5190 Feedwater Heater 15C Drain Valve Fails Open 12/31/2000 i
l 3 5298             Reactor Pressure Transmiter PT42-103A Fails Low                     12/31/2000 1
3 520C Feedwater Hester 14C Drain Valve Fails Closed 12/31/2000 3 521B Feedwater Heater 13A Dump Valve Fails Open 12/31/2000 3 522A Feedwater Hea'er 12A Dump Valve Fails Closed 12/31/2000 3.522E Feedwater Heater 16A Dump Valve Faits Closed 12/31/2000 3 523D Feedwater Heater 15B Dump Valve Fails Open 12/31/2000 3 524C Feedwater Heater 14B Dump Valve Fails Closed 12/31/2000 3 525B Feedwater Heater 13C Dump Valve Fails Open 12/31/2000 3 526A Feedwater Hester 12C Dump Valve Fails Closed 12/31/2000 3 526E Feedwater Hester 16C Dump Valve Fails Closed 12/31/2000 3 527B Steam Leak Detection NUMAC TIS 25101B Fails 12/31/2000 3 528B RHR Containment Spray Valve F016B Fails As-is 12/31/2000 3 5298 Reactor Pressure Transmiter PT42-103A Fails Low 12/31/2000 1
3 531             Turbine Motor Suction Pump Tnps                                     12/31/2000                       <
3 531 Turbine Motor Suction Pump Tnps 12/31/2000 3 535A 1 A1 Moisture Separator Drain Tank Drain Valve Fails Closed 12/31/2000 3 535E 1C1 Moisture Separator Drain Tank Drain Valve Fails Closed 12/31/2000 l
3 535A             1 A1 Moisture Separator Drain Tank Drain Valve Fails Closed         12/31/2000 3 535E             1C1 Moisture Separator Drain Tank Drain Valve Fails Closed           12/31/2000                       l l
3 536C 181 Moisture Separator Drain Tank Drain Valve Fails Open 12/31/2000 3 537A 1 A1 Moisture Separator Drain Tank Dump Valve Fails Closed 12/31/2000 3 537E 1C1 Moisture Separator Drain Tank Dump Valve Fails Closed 12/31/2000 3 538C 1B1 Moisture Separator Drain Tank Dump Valve Fails Open 12/31/2000 3 539 Generator Afterrex Temperature Control Valve Fails Closed 12/31/2000 3 543 Generator Auto Voltage Regulator Fails Low 12/31/2000 3 5468 Safeguard MCC D-124-G-D Fauft 12/31/2000 3 550 MS Supply Valve HV01 109 Fails As-is 12/31/2000 l
3 536C             181 Moisture Separator Drain Tank Drain Valve Fails Open             12/31/2000 3 537A             1 A1 Moisture Separator Drain Tank Dump Valve Fails Closed           12/31/2000 3 537E             1C1 Moisture Separator Drain Tank Dump Valve Fails Closed           12/31/2000 3 538C             1B1 Moisture Separator Drain Tank Dump Valve Fails Open             12/31/2000 I
3 553B Turbine Control Valve No. 2 Fails Open 12/31/2000 3 555 Control Rods Fail To Scram (0-120) 12/31/2000 Iuday, specember N, IV98 Page 9 ofi1 l
3 539             Generator Afterrex Temperature Control Valve Fails Closed             12/31/2000 3 543             Generator Auto Voltage Regulator Fails Low                           12/31/2000 l
1
3 5468             Safeguard MCC D-124-G-D Fauft                                         12/31/2000                       l l
)
3 550             MS Supply Valve HV01 109 Fails As-is                                 12/31/2000                       l l
w A
3 553B             Turbine Control Valve No. 2 Fails Open                               12/31/2000 3 555             Control Rods Fail To Scram (0-120)                                   12/31/2000 Iuday, specember N, IV98                                                                             Page 9 ofi1 l
+
l 1
                                                                                                                          )
__    w____ ---- A +


Test No             Title                                           Test Date Committment 3.556D             RFP A, B & C M/A Stations Swap To Manual                   12/31/2000 3.557C             FWC UPS inverter E/S-XX-120 Fails                           12/31/2000 3 558B               HV51-1F017B Close Torque Switch Tnps                       12/31/2000 3 5608               RHR Pump A Suction Strainer Clogs-Large                     12/31/2000 3 561B               Core Spray Pump B Suction Strainer Clogs                   12/31/2000 3 563B               Feedwater Heater 1B L.evel Sensing Line Fails Hi           12/31/2000 3 564C               Feedwater Hester 2C Level Sensing Line Fails Hi             12/31/2000 3 566A               Feedwater Heater 4A Level Sensing Line Fails Hi             12/31/2000 3 567B               Feedwater Hester 5B Level Sensing Line Fails Hi             12/31/2000 3 568C               Feedwater Heater 6C Level Sensing Line Faits Hi             12/31/2000 3 5718               RHR SDC Valve HV51 1F000 Tnp of Magnetic Overload           12/31/2000 3 5738               RHR Valve HV51-1F024A Tnp of Magnetic Overload             12/31/2000 5 02B               Recirc Loop B Rupture Performance Test                     12/31/2000 5 07B               Loss of Safeguard Bus D12 (Emergency Power)               12/31/2000 5 09B               Loss of Non-Safeguard Load Center 114B                     12/31/2000 5 09F               Loss of Non-Safeguard Load Center 124B                     12/31/2000 510B               Loss of 120 VAC instrument Bus 10Y102                       12/31/2000 1
Test No Title Test Date Committment 3.556D RFP A, B & C M/A Stations Swap To Manual 12/31/2000 3.557C FWC UPS inverter E/S-XX-120 Fails 12/31/2000 3 558B HV51-1F017B Close Torque Switch Tnps 12/31/2000 3 5608 RHR Pump A Suction Strainer Clogs-Large 12/31/2000 3 561B Core Spray Pump B Suction Strainer Clogs 12/31/2000 3 563B Feedwater Heater 1B L.evel Sensing Line Fails Hi 12/31/2000 3 564C Feedwater Hester 2C Level Sensing Line Fails Hi 12/31/2000 3 566A Feedwater Heater 4A Level Sensing Line Fails Hi 12/31/2000 3 567B Feedwater Hester 5B Level Sensing Line Fails Hi 12/31/2000 3 568C Feedwater Heater 6C Level Sensing Line Faits Hi 12/31/2000 3 5718 RHR SDC Valve HV51 1F000 Tnp of Magnetic Overload 12/31/2000 3 5738 RHR Valve HV51-1F024A Tnp of Magnetic Overload 12/31/2000 5 02B Recirc Loop B Rupture Performance Test 12/31/2000 5 07B Loss of Safeguard Bus D12 (Emergency Power) 12/31/2000 5 09B Loss of Non-Safeguard Load Center 114B 12/31/2000 5 09F Loss of Non-Safeguard Load Center 124B 12/31/2000 510B Loss of 120 VAC instrument Bus 10Y102 12/31/2000 1
510F                 Loss of 120 VAC Instrument Bus 10Y106                       12/31/2000           ,
510F Loss of 120 VAC Instrument Bus 10Y106 12/31/2000 510H Loss of 120 VAC Instrument Bus 10Y110 12/31/2000 511B Loss of 125/250 VDC Bus 18D105 12/31/2000 I
510H                 Loss of 120 VAC Instrument Bus 10Y110                       12/31/2000           l 511B                 Loss of 125/250 VDC Bus 18D105                             12/31/2000           I l
513A Main Condenser Air Leak at Low Seventy 12/31/2000 516B Complete Loss of Turtune Enclosure Cooling Water 12/31/2000 517D Feedwater Master Level Controller Fails High 12/31/2000 517H Loss of Feedwater Heating at Rated Power 12/31/2000 5 23 Main Turtune-Generator Tnp 12/31/2000 l
513A                 Main Condenser Air Leak at Low Seventy                     12/31/2000 516B                 Complete Loss of Turtune Enclosure Cooling Water           12/31/2000 517D                 Feedwater Master Level Controller Fails High               12/31/2000 517H                 Loss of Feedwater Heating at Rated Power                   12/31/2000 5 23                 Main Turtune-Generator Tnp                                 12/31/2000 l
5 28 Main Steam Line Break Outside Drywell 12/31/2000 j
5 28                 Main Steam Line Break Outside Drywell                       12/31/2000           j 5 29B               Main Feedwater Lsne B Rupture inside Drywell               12/31/2000           !
5 29B Main Feedwater Lsne B Rupture inside Drywell 12/31/2000 5 34B Turbine Trip with Brown's Ferry ATWS 12/31/2000 6 10 Steady State Performance at 25% Power 12/31/2000
5 34B               Turbine Trip with Brown's Ferry ATWS                         12/31/2000           !
)
6 10                 Steady State Performance at 25% Power                       12/31/2000           )
6 11 Steady State Performance at 75% Power 12/31/2000
6 11                 Steady State Performance at 75% Power                       12/31/2000
~ ~ ~ ~
                                  ~ ~ ~ ~                 ^               ~
^
l'rlday, lhecember N, IV98                                                                   Page 15f]
~
l'rlday, lhecember N, IV98 Page 15f]
I I
I I
I
I


Test No Title Test Date Committment i
6.12 Steady State Performance at 100% Power for 1 Hour 12/31/2000 i
7.01 Reactor (Manual) Scram 12/31/2000 7.02 Sanuttaneous Tnp of All Reactor Feedwater Pumps 12/31/2000 l
7.03 Closure of All MSIVs at Rated Power 12/31/2000
)
7.04 Tnp of Both Reactor Recirc Pumps at Rated Power 12/31/2000 7.05 Single Reactor Reorc Pump Tnp 12/31/2000 i
7.06 Turbine Tnp within Bypass Capabiltty 12/31/2000 7.08 Recirc Loop Rupture with Loss of C$ rte Power 12/31/2000 7.09 Maximum Size Unisolable Main Steam Line Rupture 12/31/2000 i
i lhday, December N, I998 Page Ii ofII h
PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR i
SIMULATOR QUADRENNIAL REPORT 1
i 1
LGS SIMULATOR TESTING TO BE PERFORMED IN 2001 i
l l
l l
l l
Test No          Title                                            Test Date Committment          ;
i 6.12              Steady State Performance at 100% Power for 1 Hour          12/31/2000 i
7.01              Reactor (Manual) Scram                                      12/31/2000 l
7.02              Sanuttaneous Tnp of All Reactor Feedwater Pumps            12/31/2000 l
7.03              Closure of All MSIVs at Rated Power                        12/31/2000 7.04
                                                                                                          )
Tnp of Both Reactor Recirc Pumps at Rated Power            12/31/2000              ;
7.05              Single Reactor Reorc Pump Tnp                              12/31/2000            ,
i 7.06              Turbine Tnp within Bypass Capabiltty                        12/31/2000 7.08              Recirc Loop Rupture with Loss of C$ rte Power              12/31/2000            '
7.09              Maximum Size Unisolable Main Steam Line Rupture            12/31/2000 i
i                                                                                                      ,
lhday, December N, I998                                                                  Page Ii ofII h
PECO NUCLEAR CORPORATION                            ,
LIMERICK GENERATING STATION TRAINING SIMULATOR                    i SIMULATOR QUADRENNIAL REPORT 1i l
1 LGS SIMULATOR TESTING TO BE PERFORMED IN 2001 i
l l                                                                                    l l
l l
l l
l
l
-x-


LGS Simulator Testing Committmentsfor 2001                                                                             ,
LGS Simulator Testing Committmentsfor 2001 Test No Title Test Date Committment 1.01 Computer Real Time Test 12/31/2001 3-MHP5788 HV551F011 Fails: Magnetic Overtokd 12/31/2001 3-MMS 068 Main Steam Line Rupture at Main Turt one 12/31/2001 3-MRE302A Refuel Floor inadvertent Isolation Chrnnel A 12/31/2001 3-MRE305A SGTS From Reactor Enclosure HV76196 Fails Open 12/31/2001 3-MRE309B Tnp of 1B Rx Enclosure HVAC Supply Fan 12/31/2001 3-MRE311B Trip of 1B Refuel Floor HVAC Air Supply Fan 12/31/2001 3-MRE312C Tnp of 1C Refuel Floor HVAC Air Exhaust Fan 12/31/2001 l
Test No               Title                                                       Test Date Committment 1.01                 Computer Real Time Test                                                   12/31/2001 3-MHP5788           HV551F011 Fails: Magnetic Overtokd                                         12/31/2001             >
3-MRM001C Control Room Fresh Air Rad Mon Chan C Fails To Sel Value 12/31/2001 3-MRM001D Control Room Fresh Air Rad Mon Chan D Fails To Sel Value 12/31/2001 3-MRM003C N Stack WRAM High Range Chan Fails To Sel Value 12/31/2001 3-MRM004D N Stack Rad Mon B Part Chan (4PE075) Fails To Sel Value 12/31/2001 3
3-MMS 068           Main Steam Line Rupture at Main Turt one                                   12/31/2001 3-MRE302A           Refuel Floor inadvertent Isolation Chrnnel A                               12/31/2001
3-MRM005B U 1 S Stack Rad Mon B lodine Chan (2iE185) Fails To Sel Value 12/31/2001 3-MRM005F U-1 S Stack Rad Mon B Gaseous Chan (6GE185) Fails To Sei Value 12/31/2001 3-MRM009 SPE Discharge & Vacuum Pump Exh Rad Mon Fads To Sel Value 12/31/2001 3-MRM015C Main Steam Line Rad Mon Chan C Fails To Sei Value 12/31/2001 3-MRM016C Rx Enct Vent Exh Rad Mon C Fails To Sel Value 12/31/2001 3-MRM017C Refuel Floor Vent Exh Rad Mon Chan C Fails To Sel Value 12/31/2001 3-MRM018C Drywell Post LOCA Rad Mon Chan C Fails To Set Value 12/31/2001 3-MRM019B U-2 RHRSW Hx Return Header Rad Mon Fa:Is To Sel Value 12/31/2001 3-MRM022 Rx Enci Sumps Area Rad Mon Fads To Sei Value 12/31/2001
,        3-MRE305A           SGTS From Reactor Enclosure HV76196 Fails Open                             12/31/2001 3-MRE309B           Tnp of 1B Rx Enclosure HVAC Supply Fan                                   12/31/2001 3-MRE311B           Trip of 1B Refuel Floor HVAC Air Supply Fan                               12/31/2001 3-MRE312C           Tnp of 1C Refuel Floor HVAC Air Exhaust Fan                               12/31/2001             ,
'3-MRM026 Condensate Pump Room Area Rad Mon Fads To Sei Value 12/31/2001 3-MRM030 Rx Enct Rr Access Airlock Area Rad Mon Fails To Set Val 12/31/2001 3-MRM034 Rx Enct East Area Rad Mon Fails To Sei Value 12/31/2001 3-MRM038 Turbine Aux Hallway East Area Rad Mon Fails To SeiValue 12/31/2001 3-MRM042 SLC Sys Area Rad Mon Fads To SeiValue 12/31/2001 3-MRM045 Gas Radwaste Rec Hallway Area Rad Mon Fails To Set Valu 12/31/2001 3-MRM049 Steam Separator Area Rad Mon F&ils To Sei Value 12/31/2001 3-MRM053 H202 Analyzers Area Rad Mon Fads To Sel Value 12/31/2001 3-MRM058 Cond Storage Disch Pump Area Rad Mon Fails To Set Value 12/31/2001 Friday. December 04,1998 Page i of10
l        3-MRM001C           Control Room Fresh Air Rad Mon Chan C Fails To Sel Value                   12/31/2001 3-MRM001D           Control Room Fresh Air Rad Mon Chan D Fails To Sel Value                   12/31/2001 3-MRM003C           N Stack WRAM High Range Chan Fails To Sel Value                           12/31/2001 3
3-MRM004D           N Stack Rad Mon B Part Chan (4PE075) Fails To Sel Value                   12/31/2001 3-MRM005B           U 1 S Stack Rad Mon B lodine Chan (2iE185) Fails To Sel Value             12/31/2001 3-MRM005F           U-1 S Stack Rad Mon B Gaseous Chan (6GE185) Fails To Sei Value             12/31/2001 3-MRM009             SPE Discharge & Vacuum Pump Exh Rad Mon Fads To Sel Value                 12/31/2001 3-MRM015C           Main Steam Line Rad Mon Chan C Fails To Sei Value                         12/31/2001 3-MRM016C           Rx Enct Vent Exh Rad Mon C Fails To Sel Value                             12/31/2001 3-MRM017C           Refuel Floor Vent Exh Rad Mon Chan C Fails To Sel Value                     12/31/2001 3-MRM018C           Drywell Post LOCA Rad Mon Chan C Fails To Set Value                         12/31/2001 3-MRM019B           U-2 RHRSW Hx Return Header Rad Mon Fa:Is To Sel Value                       12/31/2001 3-MRM022           Rx Enci Sumps Area Rad Mon Fads To Sei Value                               12/31/2001
        '3-MRM026           Condensate Pump Room Area Rad Mon Fads To Sei Value                         12/31/2001 3-MRM030           Rx Enct Rr Access Airlock Area Rad Mon Fails To Set Val                   12/31/2001 3-MRM034           Rx Enct East Area Rad Mon Fails To Sei Value                               12/31/2001 3-MRM038           Turbine Aux Hallway East Area Rad Mon Fails To SeiValue                   12/31/2001 3-MRM042           SLC Sys Area Rad Mon Fads To SeiValue                                     12/31/2001 3-MRM045           Gas Radwaste Rec Hallway Area Rad Mon Fails To Set Valu                   12/31/2001 3-MRM049           Steam Separator Area Rad Mon F&ils To Sei Value                           12/31/2001 3-MRM053           H202 Analyzers Area Rad Mon Fads To Sel Value                             12/31/2001 3-MRM058           Cond Storage Disch Pump Area Rad Mon Fails To Set Value                   12/31/2001 Friday. December 04,1998                                                                                   Page i of10


i Test No                   Title                                                     Test Date Committment                   t e
i Test No Title Test Date Committment t
3-MRM062                   Procost Tank and Pmp Room Area Rad Mon Fails To Sel Value           12/31/2001 3-MRM066                   Radweste Enct Hallway Area Rad Mon Falls To Sol Value '             12/31/2001
e 3-MRM062 Procost Tank and Pmp Room Area Rad Mon Fails To Sel Value 12/31/2001 3-MRM066 Radweste Enct Hallway Area Rad Mon Falls To Sol Value '
* 3-MRM070                   Radweste Exh Fan Area Rad Mon Fails To Sei Value                     12/31/2001                   !
12/31/2001 3-MRM070 Radweste Exh Fan Area Rad Mon Fails To Sei Value 12/31/2001 3-MRM074 N Stack Instrument Room Area Rad Mon Fails To Sol Value 12/31/2001 L
3-MRM074                   N Stack Instrument Room Area Rad Mon Fails To Sol Value             12/31/2001                   L 3-MRT004                   Fuel Failure of Bund 6e in Rx Cavity                                 12/31/2001 3-MRT010                   Offges Sys Charcoal Adsorber Trains Degraded                         12/31/2001 3-MSD001B                 Steam Flooding Damper BPD-20121B Fails To Tnp                       12/31/2001 3-MSD003B                 Steam Flooding Damper BPD 201-238 Fails To Tnp                       12/31/2001                   !
3-MRT004 Fuel Failure of Bund 6e in Rx Cavity 12/31/2001 3-MRT010 Offges Sys Charcoal Adsorber Trains Degraded 12/31/2001 3-MSD001B Steam Flooding Damper BPD-20121B Fails To Tnp 12/31/2001 3-MSD003B Steam Flooding Damper BPD 201-238 Fails To Tnp 12/31/2001 3-MSD005B Steam Flooding Damper BPD-202-67B Fails To Trip 12/31/2001 I
3-MSD005B                 Steam Flooding Damper BPD-202-67B Fails To Trip                     12/31/2001                   I i
i 3-MSD007B Steam Flooding Damper BPD-203-1B Fails To Tnp 12/31/2001
3-MSD007B                 Steam Flooding Damper BPD-203-1B Fails To Tnp                       12/31/2001
{
{
3-MSD009B                   Steam Flooding Damper BPD-203-148 Fails To Trip                     12/31/2001 3-MSD0118                   Steam Flooding Damper BPD-203-208 Fails To Tnp                     12/31/2001                   I 3-MSD012B                 Steam Flooding Damper BPD-203-24B Fails To Trip                     12/31/2001                   f 3-MSD014B                 Steam Flooding Damper BPD-203-38B Fails To Trip                     12/31/2001 3-MSD016B                 Steam Flooding Damper BPD-201398 Fails To Trip                       12/31/2001 3-MSD018B                 Steam Flooding Damper BPD-202 338 Fails To Trip                       12/31/2001
3-MSD009B Steam Flooding Damper BPD-203-148 Fails To Trip 12/31/2001 3-MSD0118 Steam Flooding Damper BPD-203-208 Fails To Tnp 12/31/2001 I
                                                                                                                                        '1 3-MSD020B                 Steam Flooding Damper BPD-202-418 Fails To Trip                       12/31/2001                   ,
3-MSD012B Steam Flooding Damper BPD-203-24B Fails To Trip 12/31/2001 f
3-MSD023B                 Steam Flooding Damper BPD-203-10B Fails To Trip                       12/31/2001                   !
3-MSD014B Steam Flooding Damper BPD-203-38B Fails To Trip 12/31/2001 3-MSD016B Steam Flooding Damper BPD-201398 Fails To Trip 12/31/2001 3-MSD018B Steam Flooding Damper BPD-202 338 Fails To Trip 12/31/2001 3-MSD020B Steam Flooding Damper BPD-202-418 Fails To Trip 12/31/2001 3-MSD023B Steam Flooding Damper BPD-203-10B Fails To Trip 12/31/2001 I
I 3-MSD025B                 Steam Flooding Damper BPD-203-22B Fails To Tnp                       12/31/2001                   j 3-MSD027B                 Steam Flooding Damper BPD-203-25B Fails To Tnp                       12/31/2001                     l 3-MSD0298                 Steam Flooding Damper BPD-203-27B Fails To Tnp                       12/31/2001                     e 3-MSD0318                 Steam Flooding Damper BPD-203-29B Fails To Tnp                       12/31/2001 l
3-MSD025B Steam Flooding Damper BPD-203-22B Fails To Tnp 12/31/2001 j
.        3-MSD033B                 Steam Flooding Damper BPD-203-31B Fails To Tnp                       12/31/2001 f
3-MSD027B Steam Flooding Damper BPD-203-25B Fails To Tnp 12/31/2001 l
l 3-MSD0350                 Steam Flooding Damper BPD 203-438 Fails To Trip                       12/31/2001                     I 3-MSW515B                 RHR Hx B Service Water Outlet Pipe Rupture in RHR Room               12/31/2001 3-MTE002A                 Tnp of 1 A Turbine Enclosure Exhaust Fan                             12/31/2001                     i d
3-MSD0298 Steam Flooding Damper BPD-203-27B Fails To Tnp 12/31/2001 e
3-MTR0038                 Tnp of 1B Turbine Equipment Compt Exhaust Fan                         12/31/2001 3 006A                   APRM Channel C Recorder Fails As-is                                   12/31/2001 j         3.0068                   APRM Channel C Fails inop                                             12/31/2001                     l 3 008A                   APRM Channel E Recorder Fails As-is                                   12/31/2001 3 010A                   RBM Channel A Recorder Fails As-is                                   12/31/2001 3 012C                   LPRM 16-09C Upscale Failure                                           12/31/2001
3-MSD0318 Steam Flooding Damper BPD-203-29B Fails To Tnp 12/31/2001 l
3-MSD033B Steam Flooding Damper BPD-203-31B Fails To Tnp 12/31/2001 l
f 3-MSD0350 Steam Flooding Damper BPD 203-438 Fails To Trip 12/31/2001 I
3-MSW515B RHR Hx B Service Water Outlet Pipe Rupture in RHR Room 12/31/2001 3-MTE002A Tnp of 1 A Turbine Enclosure Exhaust Fan 12/31/2001 i
d 3-MTR0038 Tnp of 1B Turbine Equipment Compt Exhaust Fan 12/31/2001 3 006A APRM Channel C Recorder Fails As-is 12/31/2001 j
3.0068 APRM Channel C Fails inop 12/31/2001 l
3 008A APRM Channel E Recorder Fails As-is 12/31/2001 3 010A RBM Channel A Recorder Fails As-is 12/31/2001 3 012C LPRM 16-09C Upscale Failure 12/31/2001 3 012G LPRM 56-41D Upscale Failure 12/31/2001
=
=
3 012G                    LPRM 56-41D Upscale Failure                                          12/31/2001 i
i Yr[5y.' lien 5eberN,15I
                                                                  ~
~
Yr[5y.' lien 5eberN,15I                                                                                           Pqe20fl0 I
Pqe20fl0 I


Test No           Title                                                                                     Test Date Committment 3.013C             LPRM 06 338 Downscale Failure                                                                       1201/2001 3 013G             LPRM 32 09A Downscale Failure                                                                       12/31/2001 3 014             TIP Chamber Stuck in Core                                                                           12 41/2001 3 015C             LPRM 16-25A Dnft (-25 To +25)                                                                       12/31/2001 l                                                             3 018A             Control Rod XX-YY Failure (Drrft in)                                                                 12/31/2001 3.018B             Control Rod XX-YY Failure (Dnft Out)                                                                 12/31/2001 3 018C             Control Rod XX YY Failure (Accumulator Trouble)                                                     12/31/2001 3.0180             Control Rod XX-YY Failure (Stuck)                                                                   12/31/2001 3.018E             Control Rod XX YY Failure (Uncoupled)                                                               12/31/2001 3018F             Control Rod XX YY Failure (Scrammed)                                                               12/31/2001 3.018G             Control Rod XX-YY Fails To Scram                                                                   12/31/2001 3.018H             Control Rod (XX YY) Fails: Double Notch on Withdraw                                                 12/31/2001 3.020C             APRM Channel C Fails 0-125%                                                                         12/31/2001 3 023             RPIS Failure 4 Rod Display                                                                           12/31/2001 3 028D             Reactor Scram (Bank 3)                                                                               12/31/2001 3.029A             RPS Fails To Scram (Auto Only)                                                                       12/31/2001 3.043A             Feedwater Master Level Controher Fails Hgh                                                           12/31/2001 3 044C             Feedwater Pump C Controller Output Fails Hgh                                                         12/31/2001               j 3 046C             Steam Flow Transmitter 1N003C Falls 0-100%                                                           12/31/2001 3 047A             Feedwater Flow Transmitter 1N002A Fails 0-100%                                                       12/31/2001               '
Test No Title Test Date Committment 3.013C LPRM 06 338 Downscale Failure 1201/2001 3 013G LPRM 32 09A Downscale Failure 12/31/2001 3 014 TIP Chamber Stuck in Core 12 41/2001 3 015C LPRM 16-25A Dnft (-25 To +25) 12/31/2001 l
3 061C             MSIV HV41 1F022C Fails Open                                                                         12/31/2001 3 062C             MSIV HV41 1F028C Fails Open                                                                         12/31/2001                 I 1
3 018A Control Rod XX-YY Failure (Drrft in) 12/31/2001 3.018B Control Rod XX-YY Failure (Dnft Out) 12/31/2001 3 018C Control Rod XX YY Failure (Accumulator Trouble) 12/31/2001 3.0180 Control Rod XX-YY Failure (Stuck) 12/31/2001 3.018E Control Rod XX YY Failure (Uncoupled) 12/31/2001 3018F Control Rod XX YY Failure (Scrammed) 12/31/2001 3.018G Control Rod XX-YY Fails To Scram 12/31/2001 3.018H Control Rod (XX YY) Fails: Double Notch on Withdraw 12/31/2001 3.020C APRM Channel C Fails 0-125%
3 063C             MSfV HV41 1F022C Fails Closed                                                                       12/31/2001 3.064C             MSIV HV41-1F028C Fails Closed                                                                       12/31/2001 l                                                                                                                                                                                                              j 3 066             Steam Line Rupture inside Drywell                                                                   12/31/2001 3 071B             Loss of Extracton Steam To Feedwater Heater 16B                                                     12/31/2001 3 072C             SJAE Steam Supply PCV07101 A Fails Open                                                             12/31/2001 3 075             Turbine Exhaust Hood Spray Valve Fails Closed                                                       12/31/2001 3 078B             Condensate Pump B Tnp                                                                               12/31/2001 3 079C             Condensate Powdex Demsn C Hgh Differential Pressure                                                 12/31/2001 3.079G             Condensate Powdex Domin G Hgh Different:al Pressure                                                 12/31/2001 3 085             Circulating Water Expansen Joint Leak                                                               12.'31/2001 3 086C             Circulating Water Pump C Tnp                                                                       12/31/2001 Friday. Detmber N, IV96                                                                                                             l' age 3 ofI0
12/31/2001 3 023 RPIS Failure 4 Rod Display 12/31/2001 3 028D Reactor Scram (Bank 3) 12/31/2001 3.029A RPS Fails To Scram (Auto Only) 12/31/2001 3.043A Feedwater Master Level Controher Fails Hgh 12/31/2001 3 044C Feedwater Pump C Controller Output Fails Hgh 12/31/2001 j
3 046C Steam Flow Transmitter 1N003C Falls 0-100%
12/31/2001 3 047A Feedwater Flow Transmitter 1N002A Fails 0-100%
12/31/2001 3 061C MSIV HV41 1F022C Fails Open 12/31/2001 3 062C MSIV HV41 1F028C Fails Open 12/31/2001 I
1 3 063C MSfV HV41 1F022C Fails Closed 12/31/2001 l
3.064C MSIV HV41-1F028C Fails Closed 12/31/2001 j
3 066 Steam Line Rupture inside Drywell 12/31/2001 3 071B Loss of Extracton Steam To Feedwater Heater 16B 12/31/2001 3 072C SJAE Steam Supply PCV07101 A Fails Open 12/31/2001 3 075 Turbine Exhaust Hood Spray Valve Fails Closed 12/31/2001 3 078B Condensate Pump B Tnp 12/31/2001 3 079C Condensate Powdex Demsn C Hgh Differential Pressure 12/31/2001 3.079G Condensate Powdex Domin G Hgh Different:al Pressure 12/31/2001 3 085 Circulating Water Expansen Joint Leak 12.'31/2001 3 086C Circulating Water Pump C Tnp 12/31/2001 Friday. Detmber N, IV96 l' age 3 ofI0


Test No     Title                               Test Date Committment 3 102       Main TurtMne Low Beanng Oil Pressure           12/31/2001 3135A       EHC Pressure Regulator A Fails High             12/31/2001 3.106B       EHC Pressure Regulator B Fails Low             12/31/2001 3.107C       Bypass Valve No. 3 Sticks Open                 12/31/2001 3.107G       Bypass Valve No. 7 Sticks Open                 12/31/2001 3.110       Main Turbine-Generator Tnp                     12/31/2001 3.1120       EHC Purno B Tnps                               12/31/2001 3139A       SRV 1F013C Fails Leaks                         12/31/2001 3.139B       SRV 1F013C Fails Stuck                         12/31/2001 3.139C       SRV 1FO13C Fails - Open Electncally           12/31/2001 3.1390       SRV 1FO13C Fails - Closed                     12/31/2001 3.139E       SRV 1F0120 Fails Open Mechanically             12/31/2001 3143A       SRV 1F013G Fails Leaks                         12/31/2001 3.143B       SRV 1F013G Fails Stuck                         12/31/2001 3143C         SRV 1F013G Fails Open Electrically             12/31/2001             ,
Test No Title Test Date Committment 3 102 Main TurtMne Low Beanng Oil Pressure 12/31/2001 3135A EHC Pressure Regulator A Fails High 12/31/2001 3.106B EHC Pressure Regulator B Fails Low 12/31/2001 3.107C Bypass Valve No. 3 Sticks Open 12/31/2001 3.107G Bypass Valve No. 7 Sticks Open 12/31/2001 3.110 Main Turbine-Generator Tnp 12/31/2001 3.1120 EHC Purno B Tnps 12/31/2001 3139A SRV 1F013C Fails Leaks 12/31/2001 3.139B SRV 1F013C Fails Stuck 12/31/2001 3.139C SRV 1FO13C Fails - Open Electncally 12/31/2001 3.1390 SRV 1FO13C Fails - Closed 12/31/2001 3.139E SRV 1F0120 Fails Open Mechanically 12/31/2001 3143A SRV 1F013G Fails Leaks 12/31/2001 3.143B SRV 1F013G Fails Stuck 12/31/2001 3143C SRV 1F013G Fails Open Electrically 12/31/2001 3143D SRV 1FO13G Fails - Closed 12/31/2001 3.143E SRV 1FO13G Fails - Open Mechanically 12/31/2001 3.147A SRV 1FO13L Fails - Leaks 12/31/2001 j
3143D         SRV 1FO13G Fails - Closed                     12/31/2001 3.143E       SRV 1FO13G Fails - Open Mechanically           12/31/2001 3.147A       SRV 1FO13L Fails - Leaks                       12/31/2001             j l
l
: 3. I47B       SRV 1F013L Fails - Stuck                     12/31/2001 3147C       SRV 1F013L Fails - Open Electncally           12/31/2001 3147D       SRV 1F013L Fails - Closed                     12/31/2001 1
: 3. I47B SRV 1F013L Fails - Stuck 12/31/2001 3147C SRV 1F013L Fails - Open Electncally 12/31/2001 3147D SRV 1F013L Fails - Closed 12/31/2001 1
3147E       SRV 1FO13L Fails - Open Mechanically           12/31/2001               l 3.149A       SRV 1F013N Fails - Leaks                       12/31/2001 3.149E       SRV 1F013N Fsb Open Mechanically               12/31/2001 3 1500       SRV 1FO133 F.v.s - Closed                     12/31/2001 3.151C       SRV 1F013H Downcorner Leak 0-100%             12/31/2001 3.151E       SRV 1F013S Downcomer Leak 0100%               12/31/2001 3256C       NSSSS Group 1C Inadvertent Isoiston           12/31/2001 3156G       NSSSS Group 1G inadvertent isolaton           12/31/2001 3157C       NSSSS Group 2C Inadvertent isolaten           12/31/2001 3158A       NSSSS Group 3A inadvertent isolaton           12/31/2001 3.159C       NSSSS Group 6C Inadvertent isolaton           12/31/2001 3.160A       NSSSS Group 7A inadvertent isolaten           12/31/2001 YrId'lDece55II98 a                                                                  Page 4 of16
3147E SRV 1FO13L Fails - Open Mechanically 12/31/2001 l
3.149A SRV 1F013N Fails - Leaks 12/31/2001 3.149E SRV 1F013N Fsb Open Mechanically 12/31/2001 3 1500 SRV 1FO133 F.v.s - Closed 12/31/2001 3.151C SRV 1F013H Downcorner Leak 0-100%
12/31/2001 3.151E SRV 1F013S Downcomer Leak 0100%
12/31/2001 3256C NSSSS Group 1C Inadvertent Isoiston 12/31/2001 3156G NSSSS Group 1G inadvertent isolaton 12/31/2001 3157C NSSSS Group 2C Inadvertent isolaten 12/31/2001 3158A NSSSS Group 3A inadvertent isolaton 12/31/2001 3.159C NSSSS Group 6C Inadvertent isolaton 12/31/2001 3.160A NSSSS Group 7A inadvertent isolaten 12/31/2001 YrId'lDece55II98 Page 4 of16 a


l l
l l
l i
i Test No Title Test Date Committment i
Test No           Title                                                 Test Date Committment           i 1
1 3.161B NSSSS Group 88 Inadvertent isolation 12/31/2001 3.162C Secondary Containment & PCIG C ins wrtent isolation 12/31/2001 l
3.161B             NSSSS Group 88 Inadvertent isolation                           12/31/2001 3.162C             Secondary Containment & PCIG C ins wrtent isolation             12/31/2001             I l
3.165 Steam Jet Air Ejector Discharge Explosion 12/31/2001 3.168A Offgas Chiller Glycol Pump A Tnp 12/31/2001 3.171C RHR Pump C Tnp 12/31/2001 3.172C RHR Pump 1C Fails To Auto Start 12/31/2001 3174C RHR ingetion Valve 1F017C Fails As-is 12/31/2001 3.174E RHR Full Flow Test Valve HV51-1F024A Fails As-Is 12/31/2001
3.165               Steam Jet Air Ejector Discharge Explosion                       12/31/2001             ;
]
3.168A             Offgas Chiller Glycol Pump A Tnp                               12/31/2001 3.171C             RHR Pump C Tnp                                                 12/31/2001 3.172C             RHR Pump 1C Fails To Auto Start                                 12/31/2001 3174C               RHR ingetion Valve 1F017C Fails As-is                           12/31/2001 3.174E             RHR Full Flow Test Valve HV51-1F024A Fails As-Is               12/31/2001           ]
3.175C RHR Pump Suction Vmive F004C Fads As-is 12/31/2001 3.176A RHR Shutdown Cooling Valve 1FOO6A Fads As-Is 12/31/2001 3.176E RHR SDC injection Valve 1FO15A Fails As-Is 12/31/2001 3.177C RHR HX B Bypass Controller Fails ingh 12/31/2001 3.182C Core Spray Pump C Tnp 12/31/2001 3183C Core Spray Pump C Fads To Auto Start 12/31/2001 3.189A Reae or Water Cleanup Pump A Tnp 12/31/2001 3.1908 RWCU Drain Flow Controller Fads Closed 12/31/2001 3.104 RWCU Suction Line Coolant Leakage (1 100%)
3.175C             RHR Pump Suction Vmive F004C Fads As-is                         12/31/2001           ;
12/31/2001 3 197 SLC Squib Valves Fail To Fire 12/31/2001 3.203A SRM Channel C Recorder Fails As-Is 12/31/2001 j
3.176A             RHR Shutdown Cooling Valve 1FOO6A Fads As-Is                   12/31/2001 3.176E             RHR SDC injection Valve 1FO15A Fails As-Is                     12/31/2001 3.177C             RHR HX B Bypass Controller Fails ingh                           12/31/2001 3.182C             Core Spray Pump C Tnp                                           12/31/2001 3183C               Core Spray Pump C Fads To Auto Start                           12/31/2001 3.189A             Reae or Water Cleanup Pump A Tnp                               12/31/2001             '
, 3 203B SRM Channel C Fads inoperative 12/31/2001 3 203C SRM Channel C Detector Stuck 12/31/2001 3 207A 1RM Channel C Recorder Fads As-Is 12/31/2001 3 2078 IRM Channel C Fads inoperative 12/31/2001 3 207C 1RM Channel C Detector Stuck 12/31/2001 3 211 A IRM Channel G Recorder Fads As-is 12/31/2bO1 3.211B IRM Channel G Fads inoperative 12/31/2001 3.211C 1RM Channel G Detector Stuck 12/31/2001 3 213C SRM Channel C Fods To Selected Value 12/31/2001 3 214C IRM Channel C Fads To Selected Value 12/31/2001 3 214G IRM Channel G Fads To Selected Value 12/31/2001 3.215 IRM Overlap Fadure 12/31/2001 3.226 Reactor instrument Line Break After 42-F041 12/31/2001 f
3.1908             RWCU Drain Flow Controller Fads Closed                         12/31/2001 3.104             RWCU Suction Line Coolant Leakage (1 100%)                     12/31/2001 3 197             SLC Squib Valves Fail To Fire                                   12/31/2001 3.203A             SRM Channel C Recorder Fails As-Is                             12/31/2001 j
3.2288 Reactor instrument Line Break After 42 F0478 12/31/2001 f
, 3 203B             SRM Channel C Fads inoperative                                 12/31/2001 3 203C             SRM Channel C Detector Stuck                                   12/31/2001 3 207A             1RM Channel C Recorder Fads As-Is                               12/31/2001 3 2078             IRM Channel C Fads inoperative                                 12/31/2001 3 207C             1RM Channel C Detector Stuck                                   12/31/2001 3 211 A           IRM Channel G Recorder Fads As-is                               12/31/2bO1 3.211B             IRM Channel G Fads inoperative                                   12/31/2001 3.211C             1RM Channel G Detector Stuck                                     12/31/2001 3 213C             SRM Channel C Fods To Selected Value                             12/31/2001 3 214C             IRM Channel C Fads To Selected Value                             12/31/2001 3 214G             IRM Channel G Fads To Selected Value                             12/31/2001 3.215             IRM Overlap Fadure                                               12/31/2001 3.226             Reactor instrument Line Break After 42-F041                     12/31/2001 f
Friday, December 04,1998 Page$ of10
3.2288             Reactor instrument Line Break After 42 F0478                     12/31/2001 f
Friday, December 04,1998                                                                         Page$ of10


Test No         Title                                           Test Date Committment 3.2308         Reactor irrstrument Line Break After 42-F0658             12/31/2001 3.231D         Reactor instrument Line Break After 42-F045D               12/31/2001 3 232E         Reactor Level Transmdter LT42-N080C Fails High             12/31/2001 3.232F         Reactor Level Transmitter LT42-N080C Fails Low             12/31/2001 3.233E         Reactor Level Transmitter DPT42-N004C Fails Hgh           12/31/2001 3 233F         Reactor Level Transmrtter DPT42-N004C Fails Low           12/31/2001 3.234E         Reactor Pressure Transmater PT42-N078C Fails Hgh           12/31/2001 3.234F         Reactor Pressure Transmdter PT42-N078C Fails Low           12/31/2001 3.236C         Reference Leg 1D004C Flashes                               12/31/2001 3.236F         ALL Reference Legs Flash                                   12/31/2001 3.237C         Reference Leg 1D004C Level Defect                         12/31/2001 3 241B         Feedwater Hester 12B Tube Leak                             12/31/2001 3.242C         Feedwater Hester 15C Tube Leak                             12/31/2001 3 245A         Rx Feedwater Pump B Tnos                                   12/31/2001 3 246B         Feedwater Pump C Mechanical Failure                       12/31/2001 3 248A         Reactor FeedPump A Recire Valve Fails Open                 12/31/2001 3 250A         Reactor FeedPump C Recirc Valve Fails Open                 12/31/2001 3 253A         FW Lme A Rupture Outside Drywell                           12/31/2001 3.256           CAC N2 Purge Flow Controller Fails Hgh                     12/31/2001 3 261           Lcss of Offsde Power (Station Blackout)                   12/31/2001 3 263C         4KV Safeguard Bus 013 Fault                               12/31/2001 3 264B         Main Generator Output Breaker 252-10213 Tnps               12/31/2001 3 266A         13 2KV Safeguard Transformer Breaker 101 Tnps             12/31/2001 3 272A         114C Turbine Area 440V Load Center Fault                 12/31/2001 3 272B         124C Turbine Area 440V Load Center Fault                 12/31/2001 3 275C         D134 Safeguard 440V Load Center Fauft                     12/31/2001 3 277C         120 VAC Panel 10Y103 Fault                               12/31/2001 3.279A         120 VAC Panel 10Y201 Fault                               12/31/2001 3 280A         120 VAC RPS & UPS Bus 1 AY160 Fault                       12/31/2001 3.282C         1FC 125/250 VDC 1CD105 Fault                             12/31/2001 3 284C         Loss of DC To Soleded Annunciator Panels                 12/31/2001 3.284G         Loss of DC To Selected Annunciator Panels                 12/31/2001 3.285C         125/250 VDC Bus 1CD108 Fault                             12/31/2001 ErYi ) S 5 r N,1998                                                                   Page 6 of10
Test No Title Test Date Committment 3.2308 Reactor irrstrument Line Break After 42-F0658 12/31/2001 3.231D Reactor instrument Line Break After 42-F045D 12/31/2001 3 232E Reactor Level Transmdter LT42-N080C Fails High 12/31/2001 3.232F Reactor Level Transmitter LT42-N080C Fails Low 12/31/2001 3.233E Reactor Level Transmitter DPT42-N004C Fails Hgh 12/31/2001 3 233F Reactor Level Transmrtter DPT42-N004C Fails Low 12/31/2001 3.234E Reactor Pressure Transmater PT42-N078C Fails Hgh 12/31/2001 3.234F Reactor Pressure Transmdter PT42-N078C Fails Low 12/31/2001 3.236C Reference Leg 1D004C Flashes 12/31/2001 3.236F ALL Reference Legs Flash 12/31/2001 3.237C Reference Leg 1D004C Level Defect 12/31/2001 3 241B Feedwater Hester 12B Tube Leak 12/31/2001 3.242C Feedwater Hester 15C Tube Leak 12/31/2001 3 245A Rx Feedwater Pump B Tnos 12/31/2001 3 246B Feedwater Pump C Mechanical Failure 12/31/2001 3 248A Reactor FeedPump A Recire Valve Fails Open 12/31/2001 3 250A Reactor FeedPump C Recirc Valve Fails Open 12/31/2001 3 253A FW Lme A Rupture Outside Drywell 12/31/2001 3.256 CAC N2 Purge Flow Controller Fails Hgh 12/31/2001 3 261 Lcss of Offsde Power (Station Blackout) 12/31/2001 3 263C 4KV Safeguard Bus 013 Fault 12/31/2001 3 264B Main Generator Output Breaker 252-10213 Tnps 12/31/2001 3 266A 13 2KV Safeguard Transformer Breaker 101 Tnps 12/31/2001 3 272A 114C Turbine Area 440V Load Center Fault 12/31/2001 3 272B 124C Turbine Area 440V Load Center Fault 12/31/2001 3 275C D134 Safeguard 440V Load Center Fauft 12/31/2001 3 277C 120 VAC Panel 10Y103 Fault 12/31/2001 3.279A 120 VAC Panel 10Y201 Fault 12/31/2001 3 280A 120 VAC RPS & UPS Bus 1 AY160 Fault 12/31/2001 3.282C 1FC 125/250 VDC 1CD105 Fault 12/31/2001 3 284C Loss of DC To Soleded Annunciator Panels 12/31/2001 3.284G Loss of DC To Selected Annunciator Panels 12/31/2001 3.285C 125/250 VDC Bus 1CD108 Fault 12/31/2001 ErYi ) S 5 r N,1998 Page 6 of10


r l
r l
i i
i i
l Test No         Title i
l Test No Title
                                                                                                                    . Test Date Committment                     I
. Test Date Committment I
                                                                                                                                                                ?
i
3.2868           18 APRM UPS Bus 18Y185 Fault                                             12/31/2001                     f I'                                   3.2998           Control Enclosure Chiller OSK112 Trip                                     12/31/2001                     ;
?
i 3.310           Control Enclosure Hi Chlonne Concentraten                                       31/2001 3 407A           RRCS ARI Division i Fails To Inniste                                     12/31/2001                     k l
3.2868 18 APRM UPS Bus 18Y185 Fault 12/31/2001 f
;                                    3.406A           Loait in instrument Air Header A                                         12/31/2001                     i 4
I' 3.2998 Control Enclosure Chiller OSK112 Trip 12/31/2001 i
i 3.410A          CIG isolaten To Drywell HV59129A Fails Closed                            12/31/2001
3.310 Control Enclosure Hi Chlonne Concentraten 31/2001 3 407A RRCS ARI Division i Fails To Inniste 12/31/2001 k
l 3.406A Loait in instrument Air Header A 12/31/2001 i
4 i
]
]
:                                    3 411B           CP9 Flow Control Valve B Fails Closed                                     12/31/2001                     ,
3.410A CIG isolaten To Drywell HV59129A Fails Closed 12/31/2001 3 411B CP9 Flow Control Valve B Fails Closed 12/31/2001 t
t 4                                    3 412C           Both Control Rod Dnve Pumps Tnp                                           12/31/2001 i
3 412C Both Control Rod Dnve Pumps Tnp 12/31/2001 4
j                                    3 414C          SDV Valve SV47-1F181 Fails Closed                                        12/31/2001
                                                                                                                                                              -l j                                    3 41tC          Desel Generator 13 Tnp                                                    12/31/2001                      i 3.419C          Desel Generator 13 Fails To Start                                        12/31/2001 3.424C          Both Instrument Air Compressors Tnp                                      12/31/2001 i
j                                    3 431C          Recuc Pump B M/A Staten Fails High                                      12/31/2001                      )
i 34328            Recirc Pump B incomplete Startup Sequence                                12/31/2001 l
3 434A          Recirc Pump A Seal #2 Failure                                            12/31/2001                      l 1
3 436A          Recac Pump A Generator Feld Breaker Tnp                                  12/31/2001 3 442C          Recue Pump 1 A RPT Breaker CB3A & CB4A Tnp                              12/31/2001 3 443A          Recirc Pump 1B RPT Breaker CB3B Tnp                                      12/31/2001 3 446B          HPCl Steam isolaten Valve HV55-1F003 Fails                              12/31/2001 3 448A            HPCI Speed Control Fails High                                            12/31/2001 3 451 A          HPCI Steam Supply HV55-1F003 isolates                                    12/31/2001 3454              HPCI Suction Valves Fail To Auto Swap                                    12/31/2001 3 4578            RCIC Speed Control Fails Low                                            12/31/2001 3 460            RCIC Descharge Vahe 1F013 Fails As-is                                    12/31/2001 3 464A            RCIC isolaten Valve HV49-1F007 Fails As-Is                              12/31/2001 3 466            Tnp of RCIC Overspeed Tnp Mechanism                                      12/31/2001 3 471C            Drywell Area Und Cooier Fan 1C1 Tnp                                      12/31/2001 3 471G            Drywell Area Una Cooier Fan 1G1 Tnp                                      12/31/2001 3 472C            Drywell Area Unit Cooier Fan 1C2 Tnp                                    12/31/2001 3 472G            Drywell Ares Una Cooler Fan 1G2 Tnp                                      12/31/2001 3 482A            DW Chiller 1AK111 Tnp                                                    12/31/2001 3484              TECW Pump A Tnp                                                          12/31/2001 3 487            Loss of Serves Water To Main Turbine Lube Oil Coolers                    12/31/2001 YrId]nSc'eAher 04,1998                                                                                    Page 7of10 I
1 I
l 1
i
i
                                                                                                                                                            .-l
-l j
3 414C SDV Valve SV47-1F181 Fails Closed 12/31/2001 j
3 41tC Desel Generator 13 Tnp 12/31/2001 i
3.419C Desel Generator 13 Fails To Start 12/31/2001 3.424C Both Instrument Air Compressors Tnp 12/31/2001 i
j 3 431C Recuc Pump B M/A Staten Fails High 12/31/2001
)
i 34328 Recirc Pump B incomplete Startup Sequence 12/31/2001 l
3 434A Recirc Pump A Seal #2 Failure 12/31/2001 l
1 3 436A Recac Pump A Generator Feld Breaker Tnp 12/31/2001 3 442C Recue Pump 1 A RPT Breaker CB3A & CB4A Tnp 12/31/2001 3 443A Recirc Pump 1B RPT Breaker CB3B Tnp 12/31/2001 3 446B HPCl Steam isolaten Valve HV55-1F003 Fails 12/31/2001 3 448A HPCI Speed Control Fails High 12/31/2001 3 451 A HPCI Steam Supply HV55-1F003 isolates 12/31/2001 3454 HPCI Suction Valves Fail To Auto Swap 12/31/2001 3 4578 RCIC Speed Control Fails Low 12/31/2001 3 460 RCIC Descharge Vahe 1F013 Fails As-is 12/31/2001 3 464A RCIC isolaten Valve HV49-1F007 Fails As-Is 12/31/2001 3 466 Tnp of RCIC Overspeed Tnp Mechanism 12/31/2001 3 471C Drywell Area Und Cooier Fan 1C1 Tnp 12/31/2001 3 471G Drywell Area Una Cooier Fan 1G1 Tnp 12/31/2001 3 472C Drywell Area Unit Cooier Fan 1C2 Tnp 12/31/2001 3 472G Drywell Ares Una Cooler Fan 1G2 Tnp 12/31/2001 3 482A DW Chiller 1AK111 Tnp 12/31/2001 3484 TECW Pump A Tnp 12/31/2001 3 487 Loss of Serves Water To Main Turbine Lube Oil Coolers 12/31/2001 YrId]nSc'eAher 04,1998 Page 7of10 I
1 i
.-l


l, i
i l
l Test No               Title                                                   Test Date Committment                       i 3 489C                 ESW Pump C Tnps                                                       12/31/2001                     l d
Test No Title Test Date Committment i
l 3 490C               ESW VaNo HV11225 Fails To Auto Swap                                   12/31/2001                     l
3 489C ESW Pump C Tnps 12/31/2001 l
d l
3 490C ESW VaNo HV11225 Fails To Auto Swap 12/31/2001 l
?
?
!      3 490G               ESW Valve HV11-126 Fails To Auto Swap                                 12/31/2001 3 491                 ESW System Leak                                                       12/31/2001                     ;
3 490G ESW Valve HV11-126 Fails To Auto Swap 12/31/2001 3 491 ESW System Leak 12/31/2001 3 492C RHR Service Water Pump C Trips 12/31/2001 l
3 492C               RHR Service Water Pump C Trips                                       12/31/2001 4
3.501A Jet Pump No. 7/8 Pluggod Roer 12/31/2001 4
3.501A                 Jet Pump No. 7/8 Pluggod Roer                                       12/31/2001                     l 3                                                                                                                                   !
3 3.503A Jet Pump No.17/18 Reser Break 12131/2001 3.504B Recare Pump 1B Shaft Failure 12/31/2001 3 506A Recirc Pump B High Runback 12/31/2001 4
3.503A                 Jet Pump No.17/18 Reser Break                                       12131/2001                     ,
3.515A Feedwater Hester 12A Drain Valve Fails Open 12/31/2001 3.515E Feedwater Heater 16A Dran Valve Fails Open 12/31/2001 I
3.504B               Recare Pump 1B Shaft Failure                                         12/31/2001 3 506A                 Recirc Pump B High Runback                                           12/31/2001 4
i 3.516D Feedwater Heater 15A Dram Valve Feels Closed 12/31/2001 3.517C Foodwater Hester 14B Drain Valve Fails Open 12/31/2001 3.518B Feedwater Hester 13B Drain Valve Fails Closed 12/31/2001 j
3.515A                 Feedwater Hester 12A Drain Valve Fails Open                         12/31/2001
l 3 519A Feedwater Heater 12C Drain Valve Fails Open 12/31/2001 l
!      3.515E                 Feedwater Heater 16A Dran Valve Fails Open                           12/31/2001                     '
3.519E Feedwater Heater 16C Drain Vane Fails Open 12/31/2001 3 5200 Feedwater Hester 15C Drain Valve Fails Closed 12/31/2001 3 521C Feedwater Heater 14A Dump Valve Fails Open 12/31/2001 3.5228 Feedwater Hester 13A Dump Valve Fails Closed 12/31/2001
I i
3.516D                 Feedwater Heater 15A Dram Valve Feels Closed                       12/31/2001
* 3.517C                 Foodwater Hester 14B Drain Valve Fails Open                         12/31/2001                       :
3.518B                 Feedwater Hester 13B Drain Valve Fails Closed                       12/31/2001                       j l
3 519A               Feedwater Heater 12C Drain Valve Fails Open                         12/31/2001                       l 3.519E               Feedwater Heater 16C Drain Vane Fails Open                           12/31/2001 3 5200               Feedwater Hester 15C Drain Valve Fails Closed                       12/31/2001 3 521C               Feedwater Heater 14A Dump Valve Fails Open                           12/31/2001                       ;
3.5228               Feedwater Hester 13A Dump Valve Fails Closed                         12/31/2001
{
{
3.523A               Feedwater Hester 12B Dump Valve Fails Open                           12/31/2001                       i 3 523E               Feedwater Heater 16B Dump Valve Fails Open                           12/31/2001 3 524D               Feedwata Heater 158 Dump Valve Fails Closed                         12/31/20C1 3.525C               Fcedwater Heater 14C Dump Vane Fails Open                           12/31/2001 3 526B               Feedwater Hester 13C Dump Valve Fails Closed                         12/31/2001 3 527C                                                                                                                     !
3.523A Feedwater Hester 12B Dump Valve Fails Open 12/31/2001 i
Steam Leak Detection NUMAC TIS 25-101C Fails                         12/31/2001                       t 3 528C               RHR Containment Spray Valve F021 A Fails As ls                       12/31/2001 3 529C               Reactor Pressure Transmitter PT42-103B Fails High                   12/31/2001 3 532               Turbine Emergency Beanng Oil Pump Tnps                               12/31/2001                       !
3 523E Feedwater Heater 16B Dump Valve Fails Open 12/31/2001 3 524D Feedwata Heater 158 Dump Valve Fails Closed 12/31/20C1 3.525C Fcedwater Heater 14C Dump Vane Fails Open 12/31/2001 3 526B Feedwater Hester 13C Dump Valve Fails Closed 12/31/2001 3 527C Steam Leak Detection NUMAC TIS 25-101C Fails 12/31/2001 t
l     3.535B               1 A2 Moisture Separator Dram Tank Dram Valve Fails Closed           12/31/2001                       l 3 535F                                                                                                                     l 1C2 Mosture Separator Dram Tank Drain Valve Fails Cicaed             12/31/2001                       i 3.5360               1B2 Mooture Separator Drain Tank Drain Valv i Fails Open             12/31/2001                       !
3 528C RHR Containment Spray Valve F021 A Fails As ls 12/31/2001 3 529C Reactor Pressure Transmitter PT42-103B Fails High 12/31/2001 3 532 Turbine Emergency Beanng Oil Pump Tnps 12/31/2001 l
3.5378               1A2 Mosture Separator Dram Tank Dump V )Ne Fails Closed             12/31/2001 3 537F               "C2 Mosture Separator Drain Tank Dump Valve Fails Closed             12/31/2001 YrI5)(lieTc m$eTN 598                                                                                   Page 8 of1il i
l 3.535B 1 A2 Moisture Separator Dram Tank Dram Valve Fails Closed 12/31/2001 l
3 535F 1C2 Mosture Separator Dram Tank Drain Valve Fails Cicaed 12/31/2001 i
3.5360 1B2 Mooture Separator Drain Tank Drain Valv i Fails Open 12/31/2001 3.5378 1A2 Mosture Separator Dram Tank Dump V )Ne Fails Closed 12/31/2001 3 537F "C2 Mosture Separator Drain Tank Dump Valve Fails Closed 12/31/2001 YrI5)(lieTc m$eTN 598 Page 8 of1il i


Test No         Title                                                         Test Date Commi/tment 3.5380         182 Moisture Separator Drain Tank Dump Vatve Fails Open                 12/31/2001 3 540           Stator Cooling Water Temperature Control Valve Fails Closed,.           12/31/2001 3 544           Reactor Cavity Seals No. 3/4 Leakage                                   1?/31/2001 3547           CRD Pump Tnps On Clogged Sucten Filter                                 12/31/2001 3 552A         RFP Discharge Check Valve HV06-105A Fails Open                         12/31/2001 3 553C         Turtune Control Valve No. 3 Fails Open                                   12/31/2001 3 556A         RFP A M/A Staten Swaps To Manual                                       12/31/2001 3 556E         FWC Master Controller Swaps To Manual                                   12/31/2001 3.557D         ALL FWC UPS Inverters Fall                                               12/31/2001 3 558C         HV51 1F017C Close Torque Switch Tnps                                     12/31/2001 3 561C         Core Spray Pump C Suctm Strainer Clogs                                   12/31/2001 3562A         RHR Pump B Suction Strainer Clogs-Small                                 12/31/2001 3 563C         Feedwater Heater 1C Level Sensing Line Fails Hi                         12/31/2001 3.565A         Feedwater Hester 3A Level Sensing Line Fails Hi                         12/31/2001 3 566B         Feedwater Heater 4B Levet Sensing Line Fails Hi                         12/31/2001 i
Test No Title Test Date Commi/tment 3.5380 182 Moisture Separator Drain Tank Dump Vatve Fails Open 12/31/2001 3 540 Stator Cooling Water Temperature Control Valve Fails Closed,.
3 567C         Feedwater Heater SC Level Sensing Line Fails Hi                         12/31/2001
12/31/2001 3 544 Reactor Cavity Seals No. 3/4 Leakage 1?/31/2001 3547 CRD Pump Tnps On Clogged Sucten Filter 12/31/2001 3 552A RFP Discharge Check Valve HV06-105A Fails Open 12/31/2001 3 553C Turtune Control Valve No. 3 Fails Open 12/31/2001 3 556A RFP A M/A Staten Swaps To Manual 12/31/2001 3 556E FWC Master Controller Swaps To Manual 12/31/2001 3.557D ALL FWC UPS Inverters Fall 12/31/2001 3 558C HV51 1F017C Close Torque Switch Tnps 12/31/2001 3 561C Core Spray Pump C Suctm Strainer Clogs 12/31/2001 3562A RHR Pump B Suction Strainer Clogs-Small 12/31/2001 3 563C Feedwater Heater 1C Level Sensing Line Fails Hi 12/31/2001 3.565A Feedwater Hester 3A Level Sensing Line Fails Hi 12/31/2001 3 566B Feedwater Heater 4B Levet Sensing Line Fails Hi 12/31/2001 i
                                                                                                                  )
3 567C Feedwater Heater SC Level Sensing Line Fails Hi 12/31/2001
3.572A         RHR SDC Valve HV51 1F009 Tnp of Thermal Overload                         12/31/2001 l
)
3 574A         RHR Valve HV51-1F024B Tnp of Thermal Overload                           12/31/2001 5 03A           4 gpm Rx Coolant Leak in Drywell                                         12/31/2001 l
3.572A RHR SDC Valve HV51 1F009 Tnp of Thermal Overload 12/31/2001 3 574A RHR Valve HV51-1F024B Tnp of Thermal Overload 12/31/2001 5 03A 4 gpm Rx Coolant Leak in Drywell 12/31/2001 5 068 Loss of Offsite Power at Rated Power Conditions 12/31/2001 5 07C Loss of Sa'eguard Bus D13 (Emergency Power) 12/31/2001 509C Loss of Non-Safeguard Load Center 114C 12/31/2001 5 09G Loss of Non-Safeguard Load Center 124C 12/31/2001 510C Loss of 120 VAC Instrument Bus 10Y103 12/31/2001 5 10)
5 068           Loss of Offsite Power at Rated Power Conditions                         12/31/2001 5 07C           Loss of Sa'eguard Bus D13 (Emergency Power)                             12/31/2001 509C           Loss of Non-Safeguard Load Center 114C                                 12/31/2001 5 09G           Loss of Non-Safeguard Load Center 124C                                 12/31/2001 510C           Loss of 120 VAC Instrument Bus 10Y103                                   12/31/2001 5 10)           Loss of 120 VAC instrument Bus 10Y201                                   12/31/2001 510L           Loss of 120 VAC RPS/UPS Bus 1 AY160                                     12/31/2001 5.11C           Loss of 125/250 VDC Bus 1CD105                                         12/31/2001 513B           Main Condenser Air Leak at Hgh Seventy                                 12/31/2001 5.17A           Tnp of One Reactor Feedwater Pump                                       12/31/2001 5.17E           Feedwater Master Level Controller Fails Low                             12/31/2001             ,
Loss of 120 VAC instrument Bus 10Y201 12/31/2001 510L Loss of 120 VAC RPS/UPS Bus 1 AY160 12/31/2001 5.11C Loss of 125/250 VDC Bus 1CD105 12/31/2001 513B Main Condenser Air Leak at Hgh Seventy 12/31/2001 5.17A Tnp of One Reactor Feedwater Pump 12/31/2001 5.17E Feedwater Master Level Controller Fails Low 12/31/2001 1
1 5 18           Loss of All Feedwater Resulting in ADS Blowdown                         12/31/2001 525A           Recarc Pump MiA Station Fails Hgh                                       12/31/2001 5 30A           Main Feedwater Line A Rupture Outside Drywell                           12/31/2001
5 18 Loss of All Feedwater Resulting in ADS Blowdown 12/31/2001 525A Recarc Pump MiA Station Fails Hgh 12/31/2001 5 30A Main Feedwater Line A Rupture Outside Drywell 12/31/2001 Ibba].i55Ec 5 5(558
                                    ~ ~ ~ ~
~ ~ ~ ~
Ibba].i55Ec 5 5(558                                                                                 Page 9 ofi0 l-
Page 9 ofi0


Test No           Title                                                 Test Date Committment 5.34C             MSIV Closure wth Brown's Ferry ATWS                             12/31/2001 5.35D             Turbine Tnp with Bypass Valves Fail Closed                       12/31/2001 6.10               Str. ty State Performance at 25% Power                           12/31/2001 6.11               diesdy State Performance at 75% Power                           12/31/2001 6.12               Steady State Performance at 100% Power for 1 Hour               12/31/2001 7.01               Reactor (Manual) Scram                                           12/31/2001 7.02               Swnultaneous Tnp of All Reactor Feedwater Pumps                 12/31/2001 7.03               Closure of All MSlVs at Rated Power                             12/31/2001 7.04               Tnp of Both Reactor Reorc Pumps at Rated Power                   12/31/2001 7.05               Single Reactor Recarc Pump Tnp                                   12/31/2001 f     7.06               Turbine Trip within Bypass Capabihty                             12/31/2001 7.08               Rocerc Loop Rupture with Loss of Offsite Power                   12/31/2001 7.09               Maxrnum Size Unisolable Main Steam Line Rupture                 12/31/2001 i1 l
Test No Title Test Date Committment 5.34C MSIV Closure wth Brown's Ferry ATWS 12/31/2001 5.35D Turbine Tnp with Bypass Valves Fail Closed 12/31/2001 6.10 Str. ty State Performance at 25% Power 12/31/2001 6.11 diesdy State Performance at 75% Power 12/31/2001 6.12 Steady State Performance at 100% Power for 1 Hour 12/31/2001 7.01 Reactor (Manual) Scram 12/31/2001 7.02 Swnultaneous Tnp of All Reactor Feedwater Pumps 12/31/2001 7.03 Closure of All MSlVs at Rated Power 12/31/2001 7.04 Tnp of Both Reactor Reorc Pumps at Rated Power 12/31/2001 7.05 Single Reactor Recarc Pump Tnp 12/31/2001 f
7.06 Turbine Trip within Bypass Capabihty 12/31/2001 7.08 Rocerc Loop Rupture with Loss of Offsite Power 12/31/2001 7.09 Maxrnum Size Unisolable Main Steam Line Rupture 12/31/2001 i
1 l
4 i
4 i
a i
a i
a N
a N
1
1
                                          ~         ^
~
Friday, December N,1998                                                                       Page lo ofl0 i
^
Friday, December N,1998 Page lo ofl0 i


I PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT t
I PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT t
Line 1,507: Line 2,889:
i
i


LGS Simulator Testing Committmentsfor 2002 Test No           Title                                                       Test Date Committment 1.01               Computer Real Time Test 12/31/2002 3-MCUf75           RWCU Pepe Leak in Regen Hea: Exchanger Room 503                         12/31/2002 3.MHP578C           HV55-1F011 Fails As-Is                                                 12/31/2002 3-MRE102           Duct Rupture: T-200 Drywell 24 inch Vent Line                           12/31/2002 3-MRE302B         Refuel Floor inadvertent isolation Channel 8                             12/31/2002 3-MRE303           Air Leak in Rx Enclosure                                                 12/31/2002 3-MRE305B         SGTS From Reactor Enclosure HV76197 Fails Open 12/31/2002 3-MRE309C         Tnp of 1C Rx Enclosure HVAC Supply Fan                                   12/31/2002 3-MRE310C         Tnp of 1C Rx Enclosure HVAC Exhaust Fan 12/31/2002 3-MRE311C         Trip of 1C Refuel Floor HVAC Air Supply Fan                             12/31/2002 3-MRM002A         Control Room Emerg Air Rad Mon Chan C Fails To Sel Value 12/31/2002 3-MRM002B         Control Room Emerg Air Rad Mon Chan D Fails To Sei Value 12/31/2002 3-MRM004A         N Stack Rad Mon A Particulate Chan Fails To SelValue                     12/31/2002 3-MRM004E         N Stack Rad Mon B lodine Chan (5tE075) Fails To Sei Value               12/31/2002 3-MRM005C         U-1 S Stack Rad Mon A Gaseous Chan (3GE185) Fails To Sel Value         12/31/2002 3-MRM006           RW Equip Room Vent Exh Rad Mon Fails To Sel Value 12/31/2002 3-MRM010           Offgas Charcoat Treatment Rad Mon Fails To Sei Value 12/31/2002 3-MRM014A         Offgas Steam Jet Air Ejector Chan A Rad Mon Fails To Sel Value 12/31/2002 3-MRM014C         Offgas Steam Jet Air Elector Linear Rad Mon Fails To Sei Value 12/31/2002 3-MRM015D         Main Steam Line Rad Mon Chan D Fails To Sel Value                       12/31/2002 3-MRM016D         Rx Enci Vent Exh Rad Mon D Fails To Sel Value                           12/31/2002 3-MRM017D         Refuel Floor Vent Exh Rad Mon Chan D Fails To Set Value                 12/31/2002             ;
LGS Simulator Testing Committmentsfor 2002 Test No Title Test Date Committment 1.01 Computer Real Time Test 12/31/2002 3-MCUf75 RWCU Pepe Leak in Regen Hea: Exchanger Room 503 12/31/2002 3.MHP578C HV55-1F011 Fails As-Is 12/31/2002 3-MRE102 Duct Rupture: T-200 Drywell 24 inch Vent Line 12/31/2002 3-MRE302B Refuel Floor inadvertent isolation Channel 8 12/31/2002 3-MRE303 Air Leak in Rx Enclosure 12/31/2002 3-MRE305B SGTS From Reactor Enclosure HV76197 Fails Open 12/31/2002 3-MRE309C Tnp of 1C Rx Enclosure HVAC Supply Fan 12/31/2002 3-MRE310C Tnp of 1C Rx Enclosure HVAC Exhaust Fan 12/31/2002 3-MRE311C Trip of 1C Refuel Floor HVAC Air Supply Fan 12/31/2002 3-MRM002A Control Room Emerg Air Rad Mon Chan C Fails To Sel Value 12/31/2002 3-MRM002B Control Room Emerg Air Rad Mon Chan D Fails To Sei Value 12/31/2002 3-MRM004A N Stack Rad Mon A Particulate Chan Fails To SelValue 12/31/2002 3-MRM004E N Stack Rad Mon B lodine Chan (5tE075) Fails To Sei Value 12/31/2002 3-MRM005C U-1 S Stack Rad Mon A Gaseous Chan (3GE185) Fails To Sel Value 12/31/2002 3-MRM006 RW Equip Room Vent Exh Rad Mon Fails To Sel Value 12/31/2002 3-MRM010 Offgas Charcoat Treatment Rad Mon Fails To Sei Value 12/31/2002 3-MRM014A Offgas Steam Jet Air Ejector Chan A Rad Mon Fails To Sel Value 12/31/2002 3-MRM014C Offgas Steam Jet Air Elector Linear Rad Mon Fails To Sei Value 12/31/2002 3-MRM015D Main Steam Line Rad Mon Chan D Fails To Sel Value 12/31/2002 3-MRM016D Rx Enci Vent Exh Rad Mon D Fails To Sel Value 12/31/2002 3-MRM017D Refuel Floor Vent Exh Rad Mon Chan D Fails To Set Value 12/31/2002 3-MRM0180 Drywell Post LOCA Rad Mon Chan D Fails To Set Value 12/31/2002 3-MRM023 CRD Pump Room Area Rad Mon Fails To Sel Value 12/31/2002 3-MRM027 RHR Division 1 Room Area Rad Mon Fails To Set Value 12/31/2002 3-MRM031 Hallway Cond Fdters Area Rad Mon Fails To S68 Value 12/31/2002 3-MRM035 Rx Enct West Area Rad Mon Fails To Sel Value 12/31/2002 3-MRM039 Turbine Aux Hallway West Area Rad Mon Fails To Sei Value 12/31/2002 Friday, December N. I998 Page i ofII
3-MRM0180         Drywell Post LOCA Rad Mon Chan D Fails To Set Value 12/31/2002 3-MRM023           CRD Pump Room Area Rad Mon Fails To Sel Value 12/31/2002 3-MRM027           RHR Division 1 Room Area Rad Mon Fails To Set Value 12/31/2002 3-MRM031           Hallway Cond Fdters Area Rad Mon Fails To S68 Value 12/31/2002 3-MRM035           Rx Enct West Area Rad Mon Fails To Sel Value 12/31/2002 3-MRM039           Turbine Aux Hallway West Area Rad Mon Fails To Sei Value 12/31/2002 Friday, December N. I998                                                                               Page i ofII


l i
l i
i Test No             Title                                                     Test Date Committment                       *
i Test No Title Test Date Committment 3-MRM043 RWCU Instrument Rack Area Rad Mon Fails To Sel Value 12/31/2002 3-MRM046 RWCU Fitter Area Rad Mon Fails To Sel Value 12/31/2002 3-MRM050 Spent Fuel Pool Area Rad Mon Fails To Sei Value 12/31/2002 3-MRM055 Support Ctr / Turb Enct Area Rad Mon Fails To Sel Value 12/31/2002 4
, 3-MRM043           RWCU Instrument Rack Area Rad Mon Fails To Sel Value                       12/31/2002             ,
3-MRM05g Laundry Drain Process Room Area Rad Mon Fails To Sel Value 12/31/2002 3-MRM063 Remote SD Control Room Area Rad Mon Fails To Sel Value 12/31/2002 3-MRM067 Hot Maint Shop Area Rad Mon Fails To Sel Value 12/31/2002 3-MRM071 Main Control Room Area Rad Mon Fails To Set Value 12/31/2002 3-MRT001A Fuel Cladding Failure, Failure of 0100% of One Pin 12/31/2002 3-MRT005A inadvertent Actrvity Release on Elevation 313 Rx Encl 12/31/2002 3-MRT011 Offgas Sys Charcoal Adsorber Guard Bed Degraded 12/31/2002 3-MSD002A Steam Flooding Damper BPD-20122A Fails To Trip 12/31/2002 3-MSD004A Steam Flooding Damper BPD-202118A Fails To TnP 12/31/2002 3-MSD006A Steam Flooding Damper BPD-202104A Fails To Tnp 12/31/2002 3-MSD008A Steam Flooding Damper BPD-203-4A Fails To Tnp 12/31/2002 i
3-MRM046           RWCU Fitter Area Rad Mon Fails To Sel Value                               12/31/2002 3-MRM050           Spent Fuel Pool Area Rad Mon Fails To Sei Value 12/31/2002 4 3-MRM055           Support Ctr / Turb Enct Area Rad Mon Fails To Sel Value 12/31/2002
3-MSD010A Steam Flooding Damper BPD-203-16A Fails To Tnp 12/31G002 3-MSD012A Steam Flooding Damper BPD-203-3A Fails To Trip 12/31/2002 3 MSD013A Steam Flooding Damper BPD-203-37A Fails To Tnp 12/31/2002 3-MSD015A Steam Flooding Damper BPD-203-39A Fails To Tnp 12/31/2002 l
; 3-MRM05g           Laundry Drain Process Room Area Rad Mon Fails To Sel Value                 12/31/2002 3-MRM063           Remote SD Control Room Area Rad Mon Fails To Sel Value                     12/31/2002 3-MRM067           Hot Maint Shop Area Rad Mon Fails To Sel Value                             12/31/2002 3-MRM071           Main Control Room Area Rad Mon Fails To Set Value                         12/31/2002 3-MRT001A           Fuel Cladding Failure, Failure of 0100% of One Pin                       12/31/2002 3-MRT005A           inadvertent Actrvity Release on Elevation 313 Rx Encl                     12/31/2002 3-MRT011           Offgas Sys Charcoal Adsorber Guard Bed Degraded                           12/31/2002 3-MSD002A           Steam Flooding Damper BPD-20122A Fails To Trip 12/31/2002                   ;
3-MSD017A Steam Flooding Damper BPD-202-20A Fails To Trip 12/31/2002 l
3-MSD004A           Steam Flooding Damper BPD-202118A Fails To TnP                           12/31/2002 3-MSD006A           Steam Flooding Damper BPD-202104A Fails To Tnp                           12/31/2002 3-MSD008A           Steam Flooding Damper BPD-203-4A Fails To Tnp 12/31/2002 i
3-MSD019A Steam Flooding Damper BPD-202-40A Fails To Tno 12/31/2002 3-MSD022A Steam Flooding Damper BPD-203-9A Fails To Tnp 12/31/2002 3-MSD024A Steam Flooding Damper BPD-203-17A Fails To Tnp 12/31/2002 3-MSD026A Steam Flooding Damper BPD 203-23A Fails To Tnp 12/31/2002 i
3-MSD010A           Steam Flooding Damper BPD-203-16A Fails To Tnp                                                         '
3-MSD028A Steam Flooding Damper BPD-203-26A Fails To Trip 12/31/2002 3-MSD030A Steam Flooriang Damper BPD-203-28A Fails To Tnp 12/31/2002 1
12/31G002 3-MSD012A           Steam Flooding Damper BPD-203-3A Fails To Trip 12/31/2002 3 MSD013A           Steam Flooding Damper BPD-203-37A Fails To Tnp 12/31/2002 3-MSD015A           Steam Flooding Damper BPD-203-39A Fails To Tnp 12/31/2002                   l 3-MSD017A           Steam Flooding Damper BPD-202-20A Fails To Trip 12/31/2002                   l 3-MSD019A           Steam Flooding Damper BPD-202-40A Fails To Tno 12/31/2002 3-MSD022A           Steam Flooding Damper BPD-203-9A Fails To Tnp                                                         !
3-MSD032A Steam Flooding Damper BPD-203-30A Fails To Trip 12/31G002 3-MSD034A Steam Flooding Damper BPD-203-42A Fails To Trip 12/31G002 3-MSD0XA Steam Flooding Damper BPD-203-44A Fails To Trip 12/31Q002 3-MTE001A Tnp of 1 A Turbine Enclosure Suppy Fan 12/31G002 I
12/31/2002 3-MSD024A           Steam Flooding Damper BPD-203-17A Fails To Tnp 12/31/2002 3-MSD026A           Steam Flooding Damper BPD 203-23A Fails To Tnp 12/31/2002 i
Friday. December 04, i998 Page 2 of11 l
3-MSD028A           Steam Flooding Damper BPD-203-26A Fails To Trip 12/31/2002 3-MSD030A           Steam Flooriang Damper BPD-203-28A Fails To Tnp 12/31/2002 1
l l
3-MSD032A           Steam Flooding Damper BPD-203-30A Fails To Trip 12/31G002 3-MSD034A           Steam Flooding Damper BPD-203-42A Fails To Trip 12/31G002 3-MSD0XA           Steam Flooding Damper BPD-203-44A Fails To Trip 12/31Q002 3-MTE001A         Tnp of 1 A Turbine Enclosure Suppy Fan 12/31G002                   !
i
I Friday. December 04, i998                                                                                 Page 2 of11     l l
l i


Test No             Title                                             Test Date Committment t
Test No Title Test Date Committment t
3-MTE0028           Tnp of 1B Turt>ine Enclosure Exhaust Fan                     12/31/2002 3 007A             APRM Channel D Recorder Fails As-Is                           12/31/2002 3 0078             APRM Channel D Fails Inop                                     12/31/2002 3 008B             APRM Channel E Fails inop                                     12/31/2002           i 3.010B             RBM Channel A Fails inop                                     12/31/2002 3 012D             LPRM 2417B Upscale Failure                                   12/31/2002 3.012H             LPRM 061*D Upscale Failure                                   12/31/2002             i t
3-MTE0028 Tnp of 1B Turt>ine Enclosure Exhaust Fan 12/31/2002 3 007A APRM Channel D Recorder Fails As-Is 12/31/2002 3 0078 APRM Channel D Fails Inop 12/31/2002 3 008B APRM Channel E Fails inop 12/31/2002 i
3 013D             LPRM 24-578 Downscale Failure                               12/31/2002 3 013H             LPRM 40-17D Downscale Failure                               12/31/2002 3 0150             LPRM 40-41B Drrft ( 25 To +25)                               12/31/2002 3 019A             Control Rod XX YY Failure (Dnft in)                         12/31/2002 f
3.010B RBM Channel A Fails inop 12/31/2002 3 012D LPRM 2417B Upscale Failure 12/31/2002 3.012H LPRM 061*D Upscale Failure 12/31/2002 i
3 019B             Control Rod XX-YY Failure (Dnft Out)                         12/31/2002 3 010C             Control Rod XX YY Failure (Accumulator Trouble)             12/31/2002 3 019D             Control Rod XX-YY Failure (Stuck)                           12/31/2002             }
t 3 013D LPRM 24-578 Downscale Failure 12/31/2002 3 013H LPRM 40-17D Downscale Failure 12/31/2002 3 0150 LPRM 40-41B Drrft ( 25 To +25) 12/31/2002 f
3 019E             Control Rod XX YY Failure (Uncoupied)                       12/31/2002 3 019F             Control Rod XX-YY Failure (Scrammed)                         12/31/2002 3 019G             Control Rod XX YY Fails To Scram                             12/31/2002 3 019H             Control Rod (XX YY) Fails Double Notch on Withdraw           12f33/2002 3 020D             APRM Channel D Fails 0125%                                   12/31/2002 3 022               Reactof Manual Control Failure To insert                     12/31/2002 3 024               RDCS Failure (Analyzer Card) 12/31/2002 3 028E             Reactor Scram (Bank 4)                                       12/31/2002 3 029B             RPS Fails To Scram (Complete) 12/31/2002 i
3 019A Control Rod XX YY Failure (Dnft in) 12/31/2002 3 019B Control Rod XX-YY Failure (Dnft Out) 12/31/2002 3 010C Control Rod XX YY Failure (Accumulator Trouble) 12/31/2002 3 019D Control Rod XX-YY Failure (Stuck) 12/31/2002
3 043D             Feedwater Master Level Controller Fails Low                 12/31/2002             $
}
3 045A             Feedwater Pump A Controller Output Fails Low 12/31/2002 3 0460             Steam Flow Transmitter 1N003D Fails 0-100%                   12/31/2002             l 3 0478             Feedwater Flow Transmitter 1N002B Fails 0-100%                                     -
3 019E Control Rod XX YY Failure (Uncoupied) 12/31/2002 3 019F Control Rod XX-YY Failure (Scrammed) 12/31/2002 3 019G Control Rod XX YY Fails To Scram 12/31/2002 3 019H Control Rod (XX YY) Fails Double Notch on Withdraw 12f33/2002 3 020D APRM Channel D Fails 0125%
12/31/2002             i 3 061D             MStV HV41 1F0220 Fails Open                                                           l 12/31/2002 3 062D             MSIV HV41 1F0280 Fails Open 12/31/2002 3 063D             MSIV HV41-1F022D Fails Closed 12/31/2002 i
12/31/2002 3 022 Reactof Manual Control Failure To insert 12/31/2002 3 024 RDCS Failure (Analyzer Card) 12/31/2002 3 028E Reactor Scram (Bank 4) 12/31/2002 3 029B RPS Fails To Scram (Complete) 12/31/2002 i
Friday. December 04, I998                                                                   Page3 ofII
3 043D Feedwater Master Level Controller Fails Low 12/31/2002 3 045A Feedwater Pump A Controller Output Fails Low 12/31/2002 3 0460 Steam Flow Transmitter 1N003D Fails 0-100%
12/31/2002 l
3 0478 Feedwater Flow Transmitter 1N002B Fails 0-100%
12/31/2002 i
3 061D MStV HV41 1F0220 Fails Open l
12/31/2002 3 062D MSIV HV41 1F0280 Fails Open 12/31/2002 3 063D MSIV HV41-1F022D Fails Closed 12/31/2002 i
Friday. December 04, I998 Page3 ofII


Test No             Title                                               Test Date Committment 3 064D             MSIV HV41 1F028D Fans Closed                                   12/31/2002 3 067               Steam Leak in Drywell(0-5000 gpm)                               12/31/2002 3 071C             Loss of Extraction Steam To Feedwater Hester 16C               12/31/2002 3 072D             SJAE Sto:n Supply PCV07-101B Fails Open                         12/31/2002 3 077A             Hotwell Level Controller Fails High                             12/31/2002 3 07BC             Condensate Pump C Tnp 12/31/2002 3.079D             Condensate Powdex Demin D Hgh Differential Pressure             12/31/2002 3 079H             Condensate Powdex Domin H High Driferential Pressure           12/31/2002 3 086D             Circulating Water Pump D Tnp 12/31/2002 3 095               Automatic Voltage Regulator Failure                             12/31/2002 3 103               Turtune Beanng Hgh Temperature 12/31/2002 3.105B             EHC Pressure Regulator A Fails Low                             12/31/2002 3.106C             EHC Pressure Regulator B Oscillates                           12/31/2002 3.107D             Bypass Valve No. 4 Sticks Open 12/31/2002 3107H               Bypass Valve No. 8 Sticks Open                                 12/31/2002 3.111 A             EHC Load Selector Fails To Local                               12/31/2002 3.112C             Both EHC Pumps Tnp 12/31/2002 3.140A             SRV 1F013D Fails Leaks                                         12/31/2002 3140B               SRV 1FO13D Fails - Stuck                                       12/31/2002 3140C               SRV 1F0130 Fails - Open Electncally 12/31/2002 3140D               SRV 1F013D Fails - Closed                                     12/31/2002 3140E               SRV 1FO13D Fa:Is - Open Mechanically 12/31/2002 3144A               SRV 1FO13H Fails - Leaks                                       12/31/2002 31440               SRV 1FO13H Fads - Stuck 12/31/2002 3.144C             SRV 1F013H Fails Open Electncally                               12/31/2002 31440               SRV 1F013H Fads Closed                                         12/31/2002 3144E               SRV 1FO13H Fails Open Mechancally                               12/31/2002 3148A               SRV 1F013M Fails Leaks                                         12/31/2002 3.148B             SRV 1F013M Fails Stuck                                         12/31/2002 3.148C             SRV 1F013M Fails Open Electncally                               12/31/2002
Test No Title Test Date Committment 3 064D MSIV HV41 1F028D Fans Closed 12/31/2002 3 067 Steam Leak in Drywell(0-5000 gpm) 12/31/2002 3 071C Loss of Extraction Steam To Feedwater Hester 16C 12/31/2002 3 072D SJAE Sto:n Supply PCV07-101B Fails Open 12/31/2002 3 077A Hotwell Level Controller Fails High 12/31/2002 3 07BC Condensate Pump C Tnp 12/31/2002 3.079D Condensate Powdex Demin D Hgh Differential Pressure 12/31/2002 3 079H Condensate Powdex Domin H High Driferential Pressure 12/31/2002 3 086D Circulating Water Pump D Tnp 12/31/2002 3 095 Automatic Voltage Regulator Failure 12/31/2002 3 103 Turtune Beanng Hgh Temperature 12/31/2002 3.105B EHC Pressure Regulator A Fails Low 12/31/2002 3.106C EHC Pressure Regulator B Oscillates 12/31/2002 3.107D Bypass Valve No. 4 Sticks Open 12/31/2002 3107H Bypass Valve No. 8 Sticks Open 12/31/2002 3.111 A EHC Load Selector Fails To Local 12/31/2002 3.112C Both EHC Pumps Tnp 12/31/2002 3.140A SRV 1F013D Fails Leaks 12/31/2002 3140B SRV 1FO13D Fails - Stuck 12/31/2002 3140C SRV 1F0130 Fails - Open Electncally 12/31/2002 3140D SRV 1F013D Fails - Closed 12/31/2002 3140E SRV 1FO13D Fa:Is - Open Mechanically 12/31/2002 3144A SRV 1FO13H Fails - Leaks 12/31/2002 31440 SRV 1FO13H Fads - Stuck 12/31/2002 3.144C SRV 1F013H Fails Open Electncally 12/31/2002 31440 SRV 1F013H Fads Closed 12/31/2002 3144E SRV 1FO13H Fails Open Mechancally 12/31/2002 3148A SRV 1F013M Fails Leaks 12/31/2002 3.148B SRV 1F013M Fails Stuck 12/31/2002 3.148C SRV 1F013M Fails Open Electncally 12/31/2002 Triday,1)ecemIAr~0T4 IT9'8 F*Re 4 of11
                                    ~            ~                ~
~
Triday,1)ecemIAr~0T4 IT9'8 F*Re 4 of11
~
~


Test No             Title                                                         Test Date Committment 3.140D               SRV 1F013M Fails - Closed 4
Test No Title Test Date Committment 3.140D SRV 1F013M Fails - Closed 1201/2002 4
1201/2002 3.148E               SRV 1FO13M Fails - Open Mechanically                                             12/31/2002
3.148E SRV 1FO13M Fails - Open Mechanically 12/31/2002 3.1498 SRV 1FO13N Fails - Stuck 1201/2002 l
. 3.1498               SRV 1FO13N Fails - Stuck                                                         1201/2002 l 3.150A             SRV 1FO13S Fails Leaks                                                           12/31/2002 3.150E             SRV 1F013S Fails - Open MechanicalV 12/31/2002 3151D               SRV 1F013E Downcomer Leak 0-100%                                                 12/31/2002
3.150A SRV 1FO13S Fails Leaks 12/31/2002 3.150E SRV 1F013S Fails - Open MechanicalV 12/31/2002 3151D SRV 1F013E Downcomer Leak 0-100%
. 3.151 F             SRV 1F013N Downcomer Leak 0-100%                                                 12/31/2002 3.156D             NSSSS Group 1D inadvertent iso ation 12/31/2002 3.156H             NSSSS Group 1H inadvertent isolation 12 0 1/2002 3.157D             NSSSS Group 2D Inadvertent isolation 12/31/2002 4
12/31/2002 3.151 F SRV 1F013N Downcomer Leak 0-100%
3158B               NSSSS Group 3B inadvertent isolation 12/31/2002 3.159D               NSSSS Group 6D inadvertent isolation 12/31/2002 3 1608               NSSSS Group 7B inadvertent isolation 12G1/2002 4
12/31/2002 3.156D NSSSS Group 1D inadvertent iso ation 12/31/2002 3.156H NSSSS Group 1H inadvertent isolation 12 0 1/2002 3.157D NSSSS Group 2D Inadvertent isolation 12/31/2002 4
3.162D               Secondary Containment & PClG D inadvertent isolation 12/31/2002 3162E               Secondary Containment & PCIG E Inadvertent isolation 12/31/2002 3166A               Offgas AfterCondenser Level Transmitter Fails High 4                                                                                                      12/3tr2002 31680               Offgas Chiller Glycol Pump B Tnp 12/31/2002 3.171D               RHR Pump D Tnp 12/31/2002 31720               RHR Pump 1D Fails To Auto Start 12/31/2002 3174D               RHR injection Valve 1F017D Fails As-is 12/31/2002 3174F               RHR Full Flow Test Valve HV51 1F024B Fails As-Is                                 12/31/2002 3.175D               RHR Pump Suction Valve F004D Fails As-Is 12/31/2002
3158B NSSSS Group 3B inadvertent isolation 12/31/2002 3.159D NSSSS Group 6D inadvertent isolation 12/31/2002 3 1608 NSSSS Group 7B inadvertent isolation 12G1/2002 4
, 3.176B               RHR Shutdown Cooling Valve 1FOO68 Fails As-is 12/31/2002 3.176F               RHR SDC injection Valve 1FO15B Fails As-Is 12/31t2002 3177D               RHR HX B Bypass Controller Fails Low 12/31/2002 3.182D               Core Spray Pump D Trip 12/31/2002 3183D               Core Spray Pump D Fails To Auto Start
3.162D Secondary Containment & PClG D inadvertent isolation 12/31/2002 3162E Secondary Containment & PCIG E Inadvertent isolation 12/31/2002 3166A Offgas AfterCondenser Level Transmitter Fails High 12/3tr2002 4
                                                                                                      ' 3 1/2002 3 1898               Reactor Water Cleanup Pump B Tnp 12/31/2002 3.191               RWCU Filter i Domin Resen Depletion 12/31/2002 3195A               RWCU isolation Valve HV441F001 Fails As-is 12/31/2002 Friday, December N,1998                                                                                           Page 5 ofII
31680 Offgas Chiller Glycol Pump B Tnp 12/31/2002 3.171D RHR Pump D Tnp 12/31/2002 31720 RHR Pump 1D Fails To Auto Start 12/31/2002 3174D RHR injection Valve 1F017D Fails As-is 12/31/2002 3174F RHR Full Flow Test Valve HV51 1F024B Fails As-Is 12/31/2002 3.175D RHR Pump Suction Valve F004D Fails As-Is 12/31/2002 3.176B RHR Shutdown Cooling Valve 1FOO68 Fails As-is 12/31/2002 3.176F RHR SDC injection Valve 1FO15B Fails As-Is 12/31t2002 3177D RHR HX B Bypass Controller Fails Low 12/31/2002 3.182D Core Spray Pump D Trip 12/31/2002 3183D Core Spray Pump D Fails To Auto Start
                                                                                    .                                            ~
' 3 1/2002 3 1898 Reactor Water Cleanup Pump B Tnp 12/31/2002 3.191 RWCU Filter i Domin Resen Depletion 12/31/2002 3195A RWCU isolation Valve HV441F001 Fails As-is 12/31/2002 Friday, December N,1998 Page 5 ofII
~


Test No   Title                                                   Test Date Committment 3.198A   SLC Pump A Loss of Control Power 12/31/2002 3.204A   SRM Channel D Recorder Fails As-Is                                   12/31/2002 1
Test No Title Test Date Committment 3.198A SLC Pump A Loss of Control Power 12/31/2002 3.204A SRM Channel D Recorder Fails As-Is 12/31/2002 1
3.204B   SRM Channel D Fails inoperative 12/31/2002 3.204C   SRM Channel D Detector Stuck                                         12/31/2002 3 208A   1RM Channel D Recorder Fails As-Is                                   12/31/2002 3.208B   IRM Channel D Fails inoperative 12/31/2002 3.208C   1RM Channel D Detector Stuck                                         12/31/2002 3 212A   IRM Channel H Recorder Fails As-Is                                   12/31/2002 3 212B   IRM Channel H Fails inoperatrve                                     12/31/2002 4
3.204B SRM Channel D Fails inoperative 12/31/2002 3.204C SRM Channel D Detector Stuck 12/31/2002 3 208A 1RM Channel D Recorder Fails As-Is 12/31/2002 3.208B IRM Channel D Fails inoperative 12/31/2002 3.208C 1RM Channel D Detector Stuck 12/31/2002 3 212A IRM Channel H Recorder Fails As-Is 12/31/2002 3 212B IRM Channel H Fails inoperatrve 12/31/2002 3 212C 1RM Channel H Detector Stuck 4
3 212C   1RM Channel H Detector Stuck                                         12/31/2002                           '
12/31/2002 3 213D SRM Channel D Fails To Selected Value 12/31/2002 3 214D IRM Channel D Fails To Selected Value 12/31/2002 1
3 213D   SRM Channel D Fails To Selected Value                               12/31/2002 3 214D   IRM Channel D Fails To Selected Value 1
3 214H IRM Channel H Fails To Selected Value 12/31/2002 3 216 APRM Overlap Failure 12/31/2002 A
12/31/2002 3 214H   IRM Channel H Fails To Selected Value                               12/31/2002 3 216     APRM Overlap Failure A                                                                                                                                                                              12/31/2002 3.227A   Reactor instrument Line Break After 42-F043A                       12/31/2002 3 229A     Reactor instrument Line Break After 42-F049A                       12/31/2002                             '
3.227A Reactor instrument Line Break After 42-F043A 12/31/2002 3 229A Reactor instrument Line Break After 42-F049A 12/31/2002 4
4 3 231A     Reactor instrument Line Break After 42-F045A 1                                                                                                                                                                             12/31/2002                           .
3 231A Reactor instrument Line Break After 42-F045A 1
3 232G     Reactor Level Transmitter LT42-N080D Fails High                     12/31/2002                           '
12/31/2002 3 232G Reactor Level Transmitter LT42-N080D Fails High 12/31/2002 3 232H Reactor Level Transmitter LT42-N0800 Fails Low 12/31/2002 1
3 232H     Reactor Level Transmitter LT42-N0800 Fails Low                     12/31/2002                             1 3.233G     Reactor Level Transmater DPT42-N004D Fails Hgh 12/31/2002                           i l                                                                                               3 233H     Reactor Level Transmitter DPT42-N004D Fails Low 4
3.233G Reactor Level Transmater DPT42-N004D Fails Hgh 12/31/2002 i
12/31/2002 3 234G     Reactor Pressure Transmitter PT42-N0780 Fails Hgh                   12/31/2002 3 234H     Reactor Pressure Transmitter PT42-N078D Fails Low                   12/31/2002 3 235A     Reactor Level / Pressure Recorder R608 Fails 12/31/2002 3 236D   Reference Leg 1D004D Flashes 12/31/2002                           !
l 3 233H Reactor Level Transmitter DPT42-N004D Fails Low 12/31/2002 4
3 237D   Reference Leg 1D004D Level Defect 12/31/2002 3 237E   Reference Leg 1D002 Level Defect 12/31/2002 3 241C   Feedwater Hester 12C Tube Leak 12/31/2002                           5 3 244A   Rx Feedwater Pump A Tnps 12/31/2002 3.245B   Feedwater Pump A Mechanical Failure 12/31/2002
3 234G Reactor Pressure Transmitter PT42-N0780 Fails Hgh 12/31/2002 3 234H Reactor Pressure Transmitter PT42-N078D Fails Low 12/31/2002 3 235A Reactor Level / Pressure Recorder R608 Fails 12/31/2002 3 236D Reference Leg 1D004D Flashes 12/31/2002 3 237D Reference Leg 1D004D Level Defect 12/31/2002 3 237E Reference Leg 1D002 Level Defect 12/31/2002 3 241C Feedwater Hester 12C Tube Leak 12/31/2002 5
                                                                                                            ~
3 244A Rx Feedwater Pump A Tnps 12/31/2002 3.245B Feedwater Pump A Mechanical Failure 12/31/2002 "Fl1Id&55555997~
                                                                                                "Fl1Id&55555997~                                                                               Page 6 of11
~
    . . _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ - _ _ _ _                          _                                          w t-                                 - - + , '
Page 6 of11 w
t-
- - +, '


Test No                           Title                                                 Test Date Committment
Test No Title Test Date Committment
                                                                                                        ..=
..=
3.246C                             Reactor FeedPump C High Vibration 12/31/2002 3 248B                             Reactor FeedPump A Recirc Valve Fails Closed 12/31/2002 3.250B                             Reactor FeedPump C Recirc Valve Fails Closed 12/31/2002 3.253B                           FW Line B Rupture Outside Drywell                                 12/31/2002 3 257                             Suppression Pool Leak (0-100,000 GPM)                             12/31/2002 3 262A                             13.2KV 11 Unit Auxiliary Bus Fault                               12/31/2002           :
3.246C Reactor FeedPump C High Vibration 12/31/2002 3 248B Reactor FeedPump A Recirc Valve Fails Closed 12/31/2002 3.250B Reactor FeedPump C Recirc Valve Fails Closed 12/31/2002 3.253B FW Line B Rupture Outside Drywell 12/31/2002 3 257 Suppression Pool Leak (0-100,000 GPM) 12/31/2002 3 262A 13.2KV 11 Unit Auxiliary Bus Fault 12/31/2002 3.263D 4KV Safeguard Bus D14 Fault 12/31/2002 3 264C Main Generator Output Breaker Tnps (Both) 12/31/2002 3.266B 13.2KV Safeguard Transfo:mer Breaker 201 Trips 12/31/2002 3 267A Plant Services Load Center 122 Fault 12/31/2002 3 273A 114D Plant Services Load Center Fault 12/31/2002 3 274A 1240 Plant Services Load Center Fault 12/31/2002 3 274B 224D Plant Services Load Center Fault 12/31/2002 1
3.263D                           4KV Safeguard Bus D14 Fault                                       12/31/2002 3 264C                           Main Generator Output Breaker Tnps (Both)                         12/31/2002 3.266B                             13.2KV Safeguard Transfo:mer Breaker 201 Trips                   12/31/2002 3 267A                           Plant Services Load Center 122 Fault                             12/31/2002 3 273A                           114D Plant Services Load Center Fault                           12/31/2002 3 274A                           1240 Plant Services Load Center Fault                           12/31/2002 3 274B                           224D Plant Services Load Center Fault                           12/31/2002 1
3 275D D144 Safeguard 440V Load Center Fault 12/31/2002 3 2770 120 VAC Panel 10Y104 Fault 12/31/2002 3 2798 120 VAC Panel 10Y202 Fault 12/31/2002 3.280B 120 VAC RPS & UPS Bus 18Y160 Fault 12/31/2002 3 282D 1FD 125/250 VDC 1DD105 Fault 12/31/2002 32840 Loss of DC To Selected Annunciator Panels 12/31/2002 3 284H Loss of DC To Selected Annunciator Panels 12/31/2002 3 2850 125/250 VDC Bus 1DD108 Fault 12/31/2002 3 405 Service Air Compressor Trip 12/31/2002
3 275D                           D144 Safeguard 440V Load Center Fault 12/31/2002 3 2770                           120 VAC Panel 10Y104 Fault                                       12/31/2002 3 2798                           120 VAC Panel 10Y202 Fault                                       12/31/2002 3.280B                           120 VAC RPS & UPS Bus 18Y160 Fault                               12/31/2002 3 282D                           1FD 125/250 VDC 1DD105 Fault                                     12/31/2002             ;
'3 407B RRCS ARI Division 11 Fails To initiate 12/31/2002 3 406B Leak in instrument Air Header B 12/31/2002 i
32840                             Loss of DC To Selected Annunciator Panels                       12/31/2002 3 284H                           Loss of DC To Selected Annunciator Panels                       12/31/2002 3 2850                           125/250 VDC Bus 1DD108 Fault                                     12/31/2002 3 405                             Service Air Compressor Trip 12/31/2002
3 410B ClG isolation To Drywell HV59-129B Fails Closed 12/31/2002 3 411C Both CRD Flow Control Valves Fall Closed 12/31/2002 3 413 Control Rods Fail To Scram-Brown's Ferry 12/31/2002 k
                '3 407B                             RRCS ARI Division 11 Fails To initiate 12/31/2002 3 406B                             Leak in instrument Air Header B                                 12/31/2002 i
3 414D SDV Valve SV471F011 Fails Closed 12/31/2002 3 418D Desel Generator 14 Tnp 12/31/2002 3 419D Desel Generator 14 Fails To Start 12/31/2002 IMday, December 04, I998 hrte 7of1i i
3 410B                             ClG isolation To Drywell HV59-129B Fails Closed 12/31/2002 3 411C                             Both CRD Flow Control Valves Fall Closed                         12/31/2002             !
e m
3 413                             Control Rods Fail To Scram-Brown's Ferry 12/31/2002             k 3 414D                             SDV Valve SV471F011 Fails Closed                                 12/31/2002 3 418D                             Desel Generator 14 Tnp 12/31/2002 3 419D                             Desel Generator 14 Fails To Start                               12/31/2002 IMday, December 04, I998                                                                                                   '
hrte 7of1i i
e m_______________          _ _ _ _ _ _ _ _ _ _ _ _ _


1 TestNo               Title                                             Test Date Committment               l 3 430A             Recire Pump A Seizure 12/31/2002               :
1 TestNo Title Test Date Committment l
1 3.431D             Recire Pump B M/A Station Fails Low                             12/31/2002 34348               Recirc Pump B Seal #2 Failure                                   12/31/2002               <
3 430A Recire Pump A Seizure 12/31/2002 1
3 4368             Recirc Pump B Generator Field Breaker Tnp                       12/31/2002 i
3.431D Recire Pump B M/A Station Fails Low 12/31/2002 34348 Recirc Pump B Seal #2 Failure 12/31/2002 3 4368 Recirc Pump B Generator Field Breaker Tnp 12/31/2002 i
3 440A             Recirc Looo A Rupture (0100%)                                   12/31/2002 3 4438             Recire Pump 1B RPT Breaker CB4B Tnp                             12/31/2002 3 443C             Recirc Pump 1B RPT Breaker Both Tnp                             12/31/2002 3 446C             HPCI Steam isolation Valve HV551F100 Fails                     12/31/2002 3 448B             HPCI Speed Control Fails Low 12/31/2002 3 4518               HPCI Steam Supply HV55-1F002 Isolates                         12/31/2002 i
3 440A Recirc Looo A Rupture (0100%)
3 455               HPCI Cooling Water Valve 1F059 Fails As-Is                     12/31/2002 3 458               RCIC Turbine Trip                                             12/31/2002               ;
12/31/2002 3 4438 Recire Pump 1B RPT Breaker CB4B Tnp 12/31/2002 3 443C Recirc Pump 1B RPT Breaker Both Tnp 12/31/2002 3 446C HPCI Steam isolation Valve HV551F100 Fails 12/31/2002 3 448B HPCI Speed Control Fails Low 12/31/2002 3 4518 HPCI Steam Supply HV55-1F002 Isolates 12/31/2002 i
3 461               RCIC Pump Suction Valves Fail To Auto Start                   12/31/2002 34648               RCIC isolation Valve HV49-1F008 Fails As-is                   12/31/2002 3 471D               Drywell Area Unit Cooler Fan 1D1 Tnp                         12/31/2002 3 471H               Drywell Area Unit Cooler Fan 1H1 Tnp                         12/31/2002 3 472D               Drywell Area Unit Cooler Fan 1D2 Tnp                         12/31/2002 3 472H               Drywell Ares Unit Cooler Fan 1H2 Tnp                         12/31/2002 3 473               Drywell Air Leak To Reactor Enclosure                         12/31/2002 3 474               Suppression Chamber Air Leak To Reactor Enclosure 12/31/2002 3 4828             DW Chiller 1BK111 Tnp 12/31/2002 34848               TECW Pump B Tnp 12/31/2002                 ;
3 455 HPCI Cooling Water Valve 1F059 Fails As-Is 12/31/2002 3 458 RCIC Turbine Trip 12/31/2002 3 461 RCIC Pump Suction Valves Fail To Auto Start 12/31/2002 34648 RCIC isolation Valve HV49-1F008 Fails As-is 12/31/2002 3 471D Drywell Area Unit Cooler Fan 1D1 Tnp 12/31/2002 3 471H Drywell Area Unit Cooler Fan 1H1 Tnp 12/31/2002 3 472D Drywell Area Unit Cooler Fan 1D2 Tnp 12/31/2002 3 472H Drywell Ares Unit Cooler Fan 1H2 Tnp 12/31/2002 3 473 Drywell Air Leak To Reactor Enclosure 12/31/2002 3 474 Suppression Chamber Air Leak To Reactor Enclosure 12/31/2002 3 4828 DW Chiller 1BK111 Tnp 12/31/2002 34848 TECW Pump B Tnp 12/31/2002 3 488A Service Water Pump A Tnps 12/31/2002 3 4890 ESW Pump D Tnps 12/31/2002 3 490D ESW Valve HV11047 Fails To Auto Swap 12/31/2002 3 490H ESW Valve HV11-074 Fails To Auto Swap 12/31/2002 34920 RHR Service Water Pump D Tnps 12/31/2002 3 493A Failure OF RHRSW HX A Inlet Vane 12/31/2002 3 501B Jet Pump No.19/20 Plugged Reser 12/31/2002 f
3 488A             Service Water Pump A Tnps 12/31/2002 3 4890             ESW Pump D Tnps 12/31/2002 3 490D             ESW Valve HV11047 Fails To Auto Swap 12/31/2002 3 490H               ESW Valve HV11-074 Fails To Auto Swap 12/31/2002 34920               RHR Service Water Pump D Tnps 12/31/2002 3 493A               Failure OF RHRSW HX A Inlet Vane                               12/31/2002 3 501B               Jet Pump No.19/20 Plugged Reser
3 5038 Jet Pump No. 9/10 Reser Break 12/31/2002
,                                                                                          12/31/2002 f       3 5038               Jet Pump No. 9/10 Reser Break 12/31/2002
^
^
friday. December 04, !998                                                                       Page 8 ofii i
friday. December 04, !998 Page 8 ofii i


Test No         Title                                                     Test Date Committment 3?n>6B           Recirc Pump B Low Runback 12/31/2002 l
Test No Title Test Date Committment 3?n>6B Recirc Pump B Low Runback 12/31/2002 l
3.510           Pnmary Containment Oxygen increases 12/31/2002 3 5158           Feedwater Heater 13A Drain Valve Fails Open                         1201/2002 3.516A           Feedwater Heater 12A Drain Valve Fails Closed                       12/31/2002 3 516E           Feedwater Hester 16A Drain Valve Fails Closed                       12/31/2002 3.517D           Feedwater Heater ISB Drain Valve Fails Open                         12/31/2002 3 518C           Feedwater Hester 148 Drain Valve Fails Closed                       12/31/2002 3.519B           Fesdwater Heater 13C Drain Valve Fails Open                         12/31/2002 3 520A           Feedwater Heater 12C Drain Valve Fails Closed                                               '
3.510 Pnmary Containment Oxygen increases 12/31/2002 3 5158 Feedwater Heater 13A Drain Valve Fails Open 1201/2002 3.516A Feedwater Heater 12A Drain Valve Fails Closed 12/31/2002 3 516E Feedwater Hester 16A Drain Valve Fails Closed 12/31/2002 3.517D Feedwater Heater ISB Drain Valve Fails Open 12/31/2002 3 518C Feedwater Hester 148 Drain Valve Fails Closed 12/31/2002 3.519B Fesdwater Heater 13C Drain Valve Fails Open 12/31/2002 3 520A Feedwater Heater 12C Drain Valve Fails Closed 12/31/2002 3 520E Feedwater Heater 16C Drain Valve Fails Closed 12/31/2002 3.5210 Feedwater Hester 15A Dump Valve Fails Open 12/31/2002 3 522C Feedwater Heater 14A Dump Valve fails Closed 12r31f2002 3 523B Feedwater Heater 13B Dump Valve Fails Open 12/31/2002 3.524A Feedwater Heater 12B Dump Valve Fails Closed 12/31/2002 3 524E Feedwater Heater 16B Dump Valve Fails Closed 12/31/2002 3 525D Feedwater Heater 15C Dump Valve Fails Open 12/31/2002 3.526C Feedwater Heater 14C Dump Valve Fails Closed 12/31/2002 3 527D Steam Leak Detection NUMAC TIS 25-101D Fails 1201/2002 3 528D RHR Containment Spray Valve FO218 Fails As-Is 12/31/2002 3 529D Reactor Pressure Transmitter PT42-103B Fails Low 12/31/2002 3 533 Turtune Tuming Gear Oil Pump Tnps 1201/2002 3 535C 1B1 Moisture Separator Drain Tank Drain Valve Fails Closed 12/31/2002 3.536A 1 A1 Moisture Separator Drain Tank Drain Valve Fails Open 12/31/2002 3 536E 1C1 Monsture Separator Drain Tank Drain Valve Fails Open 12/31/2002 3 537C 181 Moisture Separator Drain Tank Dump Valve Fails Closed 12/31/2002 3 538A 1A1 Moisture Separator Drain Tank Dump Valve Fails Open 12/31/2002 3.538E 1C1 Moisture Separator Drain Tank Dump Valve Fails Open 12/31/2002 3 541 Generator H2 Coolers Temperature Control Vdve Fails Closed 12/31/2002 3 545 Stator Cooling Water Flow Switch Fails 12f31f2002 3 548 Main Condenser Hotwell Leak 12/31/2002 1
12/31/2002 3 520E         Feedwater Heater 16C Drain Valve Fails Closed                         12/31/2002 3.5210         Feedwater Hester 15A Dump Valve Fails Open 12/31/2002 3 522C         Feedwater Heater 14A Dump Valve fails Closed 12r31f2002 3 523B         Feedwater Heater 13B Dump Valve Fails Open 12/31/2002 3.524A         Feedwater Heater 12B Dump Valve Fails Closed 12/31/2002 3 524E         Feedwater Heater 16B Dump Valve Fails Closed 12/31/2002 3 525D         Feedwater Heater 15C Dump Valve Fails Open 12/31/2002 3.526C         Feedwater Heater 14C Dump Valve Fails Closed 12/31/2002 3 527D           Steam Leak Detection NUMAC TIS 25-101D Fails                         1201/2002 3 528D           RHR Containment Spray Valve FO218 Fails As-Is 12/31/2002 3 529D           Reactor Pressure Transmitter PT42-103B Fails Low                     12/31/2002 3 533           Turtune Tuming Gear Oil Pump Tnps 1201/2002 3 535C           1B1 Moisture Separator Drain Tank Drain Valve Fails Closed 12/31/2002 3.536A           1 A1 Moisture Separator Drain Tank Drain Valve Fails Open 12/31/2002 3 536E           1C1 Monsture Separator Drain Tank Drain Valve Fails Open 12/31/2002 3 537C           181 Moisture Separator Drain Tank Dump Valve Fails Closed 12/31/2002 3 538A           1A1 Moisture Separator Drain Tank Dump Valve Fails Open 12/31/2002 3.538E         1C1 Moisture Separator Drain Tank Dump Valve Fails Open
Triday DermberM,!998 Page 9 of11
'                                                                                      12/31/2002 l
3 541           Generator H2 Coolers Temperature Control Vdve Fails Closed 12/31/2002 3 545           Stator Cooling Water Flow Switch Fails 12f31f2002               ,
3 548           Main Condenser Hotwell Leak 12/31/2002 1
Triday DermberM,!998                                                                             Page 9 of11 I


Test No             Title                                                           Test Date Committment 3.552B             RFP Descharge Check Valve HV06-105B Fails Open 12/31/2002 3.553D             Turbine Control Valve No. 4 Fails Open 12/31/2002 3.556B             RFP B M/A Staten Swaps To Manual                                           12/31/2002 i
Test No Title Test Date Committment 3.552B RFP Descharge Check Valve HV06-105B Fails Open 12/31/2002 3.553D Turbine Control Valve No. 4 Fails Open 12/31/2002 3.556B RFP B M/A Staten Swaps To Manual 12/31/2002 i
3.557A               FWC UPS inverter E/S-XX 118 Fails                                                                 '
3.557A FWC UPS inverter E/S-XX 118 Fails 12/31/2002 3.5580 HV51 1F017D Close Torque Switch Trips 1?/31/2002 3 559 SLC injecten Line Rupture in Drywell 12/31/2002 3.561D Core Spray Pump D Suction Strainer Clogs 12/31/2002 3.562B RHR Pump B Suction Strainer Clogs-Large 12/31/2002 3.564A Feedwater Heater 2A Level Sensing Line Fails Hi 12/31/2002 3 565B Feedwater Hester 3B Level Sensing Line Fails Hi 12/31/2002 3.566C Feedwater Heater 4C Level Sensing Line Fails Hi 12/31/2002 3.568A Feedwater Heater 6A Level Sensing Line Fails Hi 12/31/2002 3 5728 RHR SDC Valve HV51 1F009 Tnp of Magnetic Overload 12/31/2002 3.574B RHR Valve HV51-1F024B Tnp of Magnetic Overload 12/31/2002 5 03B 100 gpm Rx Coolant Leak in Drywell 12/31/2002 5 048 SRV Opens at Rated Power 12/31/2002 507D Loss of Safeguard Bus D14 (Emergency Power) 12/3jf2002 5 09D Loss of Non-Safeguard Load Center 1140 12/31/2002 5 09H Loss of Non-Safeguard Load Center 124D 12/31/2002 5 09J Loss of Non-Safeguard Load Center 122 12/31/2002 5100 Loss of 120 VAC Instrument Bus 10Y104 12/31/2002 5.10K Loss of 120 VAC instrument Bus 10Y202 12/31/2002 5.10M Loss of 120 VAC RPS/UPS Bus 1BY160 12/31/2002 i
12/31/2002 3.5580               HV51 1F017D Close Torque Switch Trips                                       1?/31/2002 3 559               SLC injecten Line Rupture in Drywell                                       12/31/2002 3.561D               Core Spray Pump D Suction Strainer Clogs                                   12/31/2002             .
5.11D Loss of 125/250 VDC Bus 10D015 12/31/2002 l
3.562B               RHR Pump B Suction Strainer Clogs-Large                                     12/31/2002 3.564A               Feedwater Heater 2A Level Sensing Line Fails Hi                             12/31/2002 3 565B               Feedwater Hester 3B Level Sensing Line Fails Hi                             12/31/2002 3.566C               Feedwater Heater 4C Level Sensing Line Fails Hi                             12/31/2002 3.568A               Feedwater Heater 6A Level Sensing Line Fails Hi                             12/31/2002 3 5728               RHR SDC Valve HV51 1F009 Tnp of Magnetic Overload                         12/31/2002 3.574B               RHR Valve HV51-1F024B Tnp of Magnetic Overload                             12/31/2002 5 03B               100 gpm Rx Coolant Leak in Drywell                                         12/31/2002 5 048               SRV Opens at Rated Power 12/31/2002 507D               Loss of Safeguard Bus D14 (Emergency Power)                                 12/3jf2002 5 09D               Loss of Non-Safeguard Load Center 1140                                     12/31/2002 5 09H               Loss of Non-Safeguard Load Center 124D                                     12/31/2002 5 09J               Loss of Non-Safeguard Load Center 122                                       12/31/2002 5100               Loss of 120 VAC Instrument Bus 10Y104                                       12/31/2002
5.14 Total Loss of Service Water 12/31/2002 1
* 5.10K               Loss of 120 VAC instrument Bus 10Y202                                       12/31/2002 5.10M               Loss of 120 VAC RPS/UPS Bus 1BY160                                         12/31/2002             i 5.11D               Loss of 125/250 VDC Bus 10D015                                             12/31/2002             l 5.14               Total Loss of Service Water                                                 12/31/2002 1
5.178 Tnp of Two Reactor Feedwater Pumps 12/31/2002 5.17F Tnp of One Condensate Pump 12/31/2002 5 25B Recirc Pump M/A Station Fails Low 12/31/2002 5.30B Main Feedwater Line B Rupture Outside D'ywell 12/31/2002 5.35A EHC Pressure Regulator Fans High 12/31/2002
5.178               Tnp of Two Reactor Feedwater Pumps 12/31/2002 5.17F               Tnp of One Condensate Pump
$'rlday, December N, I998 Page 10 of1!
* 12/31/2002 5 25B               Recirc Pump M/A Station Fails Low 12/31/2002 5.30B               Main Feedwater Line B Rupture Outside D'ywell                               12/31/2002 5.35A               EHC Pressure Regulator Fans High                                           12/31/2002
~~
                                              ~~                        ~
~
  $'rlday, December N, I998                                                                                 Page 10 of1!


Test No                     Title                                                                           Test Date Committment 6.10                         Steady State Performance at 25% Power 12/31/2002 6.11                         Steady State Performance at 75% Power 12/31/2002 6.12                         Steady State Performance at 100% Power for 1 Hour 12f31/2002 7.01                         Reactos (Mayal) Scram 12/31/2002 7.02                         Simultaneous Tnp of All Reactor Feedwater Pumps 12/31/2002 7.03                           Closure of All MSIVs at Rated Power                                                       12/31/2002 7.04                           Tnp of Both Reactor Recarc Pumps at Rated Power 12/31/2002 7.05                           Single Reactor Reorc Pump Tnp 12/31/2002 7.06                           Turbine Tnp within Bypass Capabihty 12/31/2002 7.08                           Recrc Loop Rupture with Loss of Offsite Power 12/31/2002 7.09                           Maximum See Unisolable Main Steam Line Rupture 12/31/2002 l
Test No Title Test Date Committment 6.10 Steady State Performance at 25% Power 12/31/2002 6.11 Steady State Performance at 75% Power 12/31/2002 6.12 Steady State Performance at 100% Power for 1 Hour 12f31/2002 7.01 Reactos (Mayal) Scram 12/31/2002 7.02 Simultaneous Tnp of All Reactor Feedwater Pumps 12/31/2002 7.03 Closure of All MSIVs at Rated Power 12/31/2002 7.04 Tnp of Both Reactor Recarc Pumps at Rated Power 12/31/2002 7.05 Single Reactor Reorc Pump Tnp 12/31/2002 7.06 Turbine Tnp within Bypass Capabihty 12/31/2002 7.08 Recrc Loop Rupture with Loss of Offsite Power 12/31/2002 7.09 Maximum See Unisolable Main Steam Line Rupture 12/31/2002 l
l Friday, December N,1998                                                                                                                 Page 11 of11
l Friday, December N,1998 Page 11 of11
_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ - - _ _ _ _ - _ _ _ _ _ _ _ - _ - _ _                                              -________ - - ___ - _ - __ - .. ..                                ..}}
..}}

Latest revision as of 02:31, 8 December 2024

Forwards Second Simulator Certification Quadrenniel Rept,For Use of LGS plant-reference Simulator for Licensed Operator Exams,Per 10CFR55.45(b)(5)(ii).Rept Tabulates Testing Performed on Simulator Since Last Submittal
ML20202G822
Person / Time
Site: Limerick  
Issue date: 01/31/1999
From: Von Suskil J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Collins S
NRC (Affiliation Not Assigned)
References
NUDOCS 9902050299
Download: ML20202G822 (150)


Text

_

-.o. m.o Vce President Umerck Gener: tog Station PECO NUCLEAR Peco see,o, com,an, A Unit o. PECO Energy

$s"ii

'2300 Sanatoga. PA 19464 o920 610 718 3000 / Fax aio 718 3008 Pager 1800 672 2285 ao271

.itemet address: jvonsuskrepeco energycom January 31,1999 10CFR55.45(b)(5)(ii)

Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 Mr. Samuel J. Collins, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555

Subject:

Limerick Generating Station, Units 1 and 2 Submittal of Second Simulator Certification Quadrennial Report

Dear Mr. Collins:

This report is submitted in accordance with the requirements set forth in 100FR 55.45(b)(5)(ii), for the use of the Limerick Generating Station (LGS), Units 1 ard 2 plant-referenced simulator for Licensed Operator examinations.

This repor1 tabulates the testing performed on the simulator since the last quadrennial report, which was submitted on January 31,1995. With the exception of changes noted on the attached Form 474 and

  • Simulator Tests Deleted" attachment, all testing was completed in accordance with the test schedule submitted with the previous quadrennial report. Since minor changes were made in the test program since the last submittal, a Form 474 is attached, along with any necessary Exception Reports and justification for the test plan change.

During the 1997-1998 period the following simulator models were replaced or added, leading to additional testing for the 1997-1998 test period-Radiation Transport e

Process Radiation Monitoring Area Radiation Monitoring e

Reactor Enclosure and HVAC System Refuel Floor and HVAC System Primary Containment Purge and inerting System e

Turbine Enclosure and HVAC System e

Main Condenser e

Main Condenser Air Removal e

i Emergency Service Water RHR Service Water e

Steam Leak Detection e

g 9902050299 99013 DR ADOCK 05000352 PDR l

January 31,1999 Page 2 Spent Fuel Pool and Fuel Pool Cooling Reactor and Turt>ine Enclosure Fire Detection System Reactor and Turbine Enclosure Fire Protection System e

The attached report tabulations include the Test Number, Test Title, the Test Results (S for SAT and U for UNSAT), and the Date on which the test was performed. Please note that there were no uncorrected test failures. An additional tabulation lists the planned testing of the simulator over the next four years.

The tests are divided into the following sections for configuration control purposes:

Section 1, Miscellaneous tests, including performance tests.

Section 2, System tests, used for verifying implementation of plant mods and other simulator changes.

Section 3 Malfunction tests, used for verifying functionality of simulator failure modes, as well as logic and negative checks. These tests are performed at the rate of 25%

per year, such that over a four year period, all rnalfunctions e tested at least once. These tests are also used for complying with Section J.1.2 of ANSI /ANS 3.5-1985, Nuclear Power Plant Simulators for Use in Operator Training.

Section 4, E'octrical Bus Load Tables, used for verifying individual, specific loads fed from each simulated power supply. These bus tables are used in conjunction with Section 3 Malfunction tests.

Section 5, Malfunction Performance Tests, used for complying with Section 3.1.2 of ANSl/ANS 3.5-1985, Nuclear Power Plant Simulators for Use in Operator Training.

Section 6, Steady state performance Tests, used for complying with Appendix B1.1 of ANSI /ANS 3.5-1985, Nuclear Power Plant Simulators for Use in Operator Training.

Section 7 Transient Performance Tests, used for complying with Appendix B1.2 of ANSI /ANS 3.5-1985, Nuclear Powe.' Plant Simulators for Use in Operator i raining.

Section 8 Remote Function tests, used for verifying functionality of operator actions performed "outside the simulated control room".

If you have any questions, or require additional information, please do not hesitate to contact Dr. John Stankiewicz, Director of Training, Limerick Generating Station at (610) 718-4000.

Siry:erely,,

t.

(

& Te )k%u-r J. D, von Suskil attachment cc:

Mr. H.J. Miller, Administrator, Region 1. USNRC Mr. A.L. Burritt, USNRC Resident inspector, LGS Document Control Desk, USNRC, Washington, DC

. -... ~.

NRC FORM 474 U.S. NUCLEAR REGULATORY COMMISSION APPROVED 0Y oms NO. atsoone EXPIRES. carmom l Esbreet.d.u,

- res- - w me enandam m,me-request 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> The snformacon a used to certify e annuterion facinty Forware comments regeriling bureen ashmate to the Records Ma ment Branch (T4 F33) U S SIMULATION FACILITY CERTIFICATION

%%"*#"*'"b'" sow"OE~. 3"a"Ja'ee Bu g""J'h.3"E 20503 een cohecmon sees not derav e currentiv venio OMB contros number the NRC may not conduct or sponsor, and e person a not requared to fespond to, the meermance conectica INSTRUCTIONS.Th*s form a to be fnod for mibol certsfcanon, racertitcanon (it requered). and for any change to a simuishon fecelty peftaimonce teshng pian made e8ter mebal sub

,m-P.~de ~ r sw.,,re-e.

e%s u.meonnie ime to.wwe rees-,, suhmme, F ACALITy DOCKET NUMBER Limerick Generating Station Unit 1

"~352 l

LICENSEE DATE PECO Nuclear Corporation 01/31/99 Thes is to Eartriy that 1 The anove named tecihty bcensee a vs.no a simuiacon tecnny cormonng some or o piantverenced semuistor tn t mese the e ounemens or 10 CFR 55 45 r

a i

2 Documentation m evenatne for NRC revow m eccoreente with 10 CFR 65 45(b) 3 The semutshon facMy meets the guidance conteined m ANSuANS 3 41985 or ANSVANS 3 51903. es enoorsed by NRC Regulatory Onese 1149 W there are any EXCEPTIONS to the certifcabon of the stem CHECM HERE h j and Gesenbe fully on addenonal pages as necessary NAME (or other adentercate) AND LOCATION OF SMULATION F ACILITY Limerick Generating Station i

341 Longview Road Linfield, PA 19468 sMutAflON F ACILITY PERFORM ANCE TEST ABSTR ACTS ATTACHED (Fcr perfbrmance,esta conducted m she penod andmg we the dem of be s'fifcehon)

DESCRIPTION OF PE RFORMANCE TE STING COMPLETED (Alfech oddrhonelpeges es neceswy and usenefy the som osecrpton bomp orwefnued J Exhibit 3, attached, summarizes the performance testing of the LGS simulttor since the submittal of the previous Quadrennial Report on 01/31/95. Those j

tables document the simulator facility performance in accordance with

(

ANSI /ANS 3.5 - 1985.

l L

SMULATION F ACILITY PERFORMANCE TESTING SCHEDULE ATTACHED (Fe me conduct orepprornnaarsy 25 percent of psr*rmance anals per yosr Ar me fourp period E

commencmq w* the dere of mes certifscata)

DESCR?PTION OF VL RFORMANCE TESTING TO BE CONDUCTED (Attach addornonet pages es neceenery and mentury me nom desoraphon bemp conbnued)

Exhibit 4 attached, summarizes the performance testing scheduled to be performed on the LGS Unit I simulator over the next feur year period, ending 01/31/2003.

The scheduled testing is in accordance with the requirements of ANSI /ANS 3.5 - 1985.

l l

1 PE RFORM ANCE TESTING PL AN CHANGE (Acr any modafcehw km a performance sesbng pasa subnwreed on a previous cwtifcebonJ DESCRIPTION OF PE RFORMANCE TESTING PL AN CHANGE getroch addrhonet pages as necesse"y and edenpfy me dem doEWphon bemp con >nued)

Exhibit 2, attached, documents performance tests deleted and/or other changes to the performance test plan, submitted with the previous Quadrennial Report.

I t

RECFRTIFICATION ([macnbe correchve echans sonen e#ech resu4s of composed pertamence fashng m occareence we 70 CFR 55 dS(b#S#v)

(Anoch end@onalpages es necessary and asenpfy the nem neecnphon beeng conbnuedi j

Any false statement or omesson en the accument, mcauemg ettechments may be subject to cani and cnmmel sanchons I certify under penalty at perjury that the mformeDon m the gocument and

.n.c.i ene m eu. and eor.eet 4

$8GNATURE AUTHOR ED SENTAtivE TTTLE DATE Vice President, 01/31/99 t

Limerick Generating Station 8

In socoreence wem 10 CFM SS 6 Communicausns thes form shell be subm#tted to the NRC es foNows BY Mall ADDRESSED TO DHtECTOR. OFFICE OF NUCLEAR REACTOR REOULATION BY DELIVERY IN PERSON ONE WHITE FLINT NORTH U S. NUCLEAR REGULATORY cot #Mi&5 ION TO THE NRC OFFICE At 11665 ROCKYlLLE PIKE W ASHINGTON. DC 206664001 ROCsfVILLE. t#D NNC FORM 474 (EL1998)

PRINTED ON RECYCLED PAPER

-~_. -

- ~ _

4 8

1 NRC FORM 474 U.S. NUCLEAR REGULATORY COMMISSION APPR'lUED BY OeAS. NO.31964130 EXPIRES. Der 31/2001 (8 'M Eshmated buiten per respone to campsy enm the mandatuy mtormanon cohecbon seauest 120 eours Tka odormanon a used a ceMy a semuistio Forward i

commenes regeisms bureen esomem to one Recoros uanagment sr nch (T 4 F33) U $

i SIMULATION FACILITY CERTIFICATION

%L*""*#"#cWo"W"OlL"7C"r3n'eTend 44 *aW i

20503 If an mformanon conecton soes not sopiar a currency ve6sa OMB controi nummer, the NRC may not conduct or sponsor and a person a not requuod to respone g the d

ordtpatoa coliertoa INSTRUCTION 4: The form a t be f4ed for msbal certificahon, recerghcaton (# requned) enti for any change to a samulaban facdst/ performance tesbng plan made sRet insbol submsitol of such a

%moe the fr46 wma ordarmahoa and ched the soproonate bor to moeste reasoa be tut >matal f

snen 9

1 F ACILffY DOCKET NUMBER so-353 Limerick Generaing Station Unit 2 LCENSEE DATE PECO Nuclear Corporation 01/31/99 The e to ceably that i

1 The above named tecdsty Isensee es ussag a semutabon facenty consetng soiety of a piern-referenced semunalcr that most the reeuwements of to CFR 55 45 2

P- - _

is swunlebee for NRC review m accordance enth 10 CFR SS AS(b)

L 3 The semuiscon tecd4 meets the guedence contained in ANSI /ANS 3 $1985 'ar ANSlIANS 3 51gg3. es endorsed by NRC Reguietary Guide 1149 li there are any EXCEPTIONS to the certificahon of this nom. CHECK M8 RE DQ and essentie fully on addDonal pages as n~===ry NAME (e other spentdcehon) AND LOCATION OF &lMULATION F AC3LffY Limerick Generating Station 341 Longview Road Linfield, PA 19468 SIMULAT10N F ACILffY PERFORMANCE TEST ABS'RACTS ATTACHED (Ferperftrmence feels pondueled e me persolf ondag with mo doss elmas certrfcohon) 7 SCRIPTION OF PE NF ORMANCE TESTING COMPLETED (Attaca eddshonalpages es necessary and identrfy me seem sesenpean bemg con 6nued)

The LCS Unit I simulator is used for training and examination of LGS Unit 2 personnel.

Exhibit 3, attached, summarizes the performance testing of the LGS Unit I simulator since the submittal of the previous Quadrennial Report on 01/31/95. These tables document the simulator facility performance in accordance with ANSI /ANS 3.5 - 1985.

S6MUL ATION F ACILftY PERFORMANCE TESTING SCHEDULE ATT ACHED (Fer me conduer of appromenelet 25 pecent of patrmance aests per year kr me fbw year permd E

commencong watn me dase of mas certifcahon)

DESCRIPTION OF PERFORMANCE IESTING TO BE CONDUCTED (Afteen odd bonel pages as necessary and idenfrfy the seern seemipbon beeng conhnverf)

Exhibit 4, attached, summarizes the performance testing scheduled to be performed on the LGS Unit I simulator over the next four year period, ending 01/31/2003.

The scheduled testing is in accordance with the requirements of ANSI /ANS 3.5 - 1985.

g PERFORMANCE TESTING PLAN CHANGC (Fa eny modAcahon 80 e paiemence seskng psen subm.ned on a preveous certothcekon)

DESCRIPTION OF PERFORMANCE TESTING PL AN CHANGE (Afraca nodrhonalpopes as necessay and asen6ry fne rium descnphon borng con 6nued)

Exhibit 2, attached, documents performance tests deleted and/or other changes to the performance test plan, submitted with the previous Quadrennial Report.

RECE RTIFICATION (Descrabe semw>ve echons unen errech results of composed petamence seshng an occareence wrth 10 CFR SS dS(kKSXv)

(Afteca addskonelpages es necessery and noentify me nem descnchon borng conhnued)

Any esse stemment or omission m the encument. meluemo anschments may e e suefect to cani and enmmai sanctions I certify unow penatry of pequry that mformetson m the document sad en.cr. ment. m

.n. correct SIGNAYURE

- AUTHORIZED RE RESEMTATIVE TITLE DATE Vice President.

01/31/99 D

Limerick Generating Station in.ecohete.nn so CFR ss s. Communceuona ihm eorm sh.li n. suomiei.d io ih. NRC a. miio s BY MAIL ADDRESSEDTO DIRECTOR, OFFICE OF NUCLE #t REACTOR REOULATION BY DELIVERY IN PERSON ONE WHITE FLINT NORTH U.S NUCLEAR REOULATORY COeset&&&fDN TO THE NRC OFFICE AT 11666 ROCKVILLE PtKE WASH 4NOTON UC 309964001 ROCetVILLE, htD NNC f ONM 474 (ik1eW8)

PRINTED ON RECYCLLD PAPER

PCCO NUCLEAR CORPORATION LIMERIC1'. GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT Table of Contents Exhibit 1:

Exceptions to ANSI /ANS 3.5-1985 Test Requirements Exhibit 2:

Simulator Tests Deleted (Test Plan Changes)

Exhibit 3:

Simulator Test Reports (Simulator Testing Completed in 1995 through 1998)

{

Exhibit 4:

Simulator Test Commitments (Simulator Testing to be Performed in 1999 through 2003) l

\\

-L

PECO NUCLEAR CORPORATION LIMERICK GEhTRATING STATION TRAINING SIMULATOR SIMITLATOR QUADRENNIAL REPORT l

EXHIBIT 1 EXCEPTIONS TO ANSI / ANS 3.5-1985 TESTING REQUIREMENTS e

i i

?

\\

PCCO ENERGY CORPORATION LIMERICK GENERATING STATION TRAINING SINULATOR SIMULATOR QUADRENNIAL REPORT ANSI REQUIREMENT EXCEPTION RECGRD ANSI Requirement:

ANSI 3. 5-1985, Section 3.1.1 (9)

F

Title:

Core performance testing:

Reactivity coefficient measurements EXCEPTION:

PECO Energy Corporation takes exception to this requirement.

There is no performance test for this requirement which is performed as part of the Limerick Simulator Certification process.

JUSTIFICATION:

Determination of reactivity coefficients is not an operator function at the Limerick Generating Station.

The LGS Simulator is not used to train operators in the determination of reactivity coefficients.

l l

1 L

w v

-,----..n,e

PECO ENER8Y CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT ANSI REQUIREMENT EXCEPTION RECORD ANSI Requirement:

ANSI 3.5-1985, Section 3.1.1 (9)

Title:

Core performance testing:

Control rod worth using I

permanently installed instrumentation.

,s EXCEPTION:

t PECO Energy Corporation takes exception to this requirement.

There is no performance test for this requirement which is performed as part of the Limerick Simulator Certification process.

i t

1 I

1 2

l.

6 JUSTIFICATION:

i Determination of control rod worth is not an operator j

function at the Limerick Generating Station.

The LGS Simulator is not used to train operators in the determination of control rod worth.

I f

_.m i

PECO ENERGY CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMUI ATOR QUADRENNIAL REPORT i

ANSI REQUIREMENT EXCEPTION RECORD f

ANSI Requirement:

ANSI 3.5-1985, Section 3.1.2 (1) (a)

Title:

Loss of coolant, Significant PWR steam separator leaks.

i EXCEPTION:

1 PECO Energy Corporation takes exception to this requirement.

There is no perforr.4ance test for this requirement which is performed as part of the Limerick Simulator certiification p.:ocess.

1 i

I 4

d i

JUSTIFICATION:

The Limerick Generating Station is a General Electric Boiling Water Reactor (BWR).

This requirement is not applicable to the LGS Simulator.

y

,.,.1e.

PECO ENERGY CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT l

ANSI REQUIREMENT EXCEPTION RECORD ANSI Requirement:

ANSI 3.5-1985, Section 3.1 2 (18)

Title:

Failure of Reactor Coolant Pressure and volume control systems.

EXCEPTION:

PECO Energy Corporation takes exception to this requirement.

There is no performance test for this requirement which is performed as part of the Limerick Simulator Certification process.

JUSTIFICATION:

The Limerick Generating Station is a General Electric Boiling Water Reactor (BWR).

This requirement is not applicable to the LGS Simulator.

1 PECO ENERGY CORPORATION LIMERICK GENERATIN3 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT ANSI REQUIREMENT EXCEPTION RECORD i

ANSI Requirement:

ANSI 3.5-1985, Appendix Bl.2 (7) j i

]

Title:

Transient Performance:

Maximum rate power ramp (master

^

recirculation flow controller)in

" manual" down to

)

approximately 75% and back up to 100%.

i EXCEPTION:

PECO Energy Corporation takes exception to this requirement.

The performance test to satisfy this requirement has been deleted from the LGS Simulator Certification testing program.

k i

i i

s 4

J f

JUSTIFICATION:

This test was deleted since it is not possible to perform.

)

To run this test and satisfy this requirement requires that the Recirc M/A stations both be operated in AUTO and manipulations be done to the Recirc Master Flow Controller.

LGS is not permitted I

to operate in this configuration, and the Recirc Master Flow Controller has been removed from the Control Room Panels.

Therefore there is no benefit of performing simulator testing in this mode.

PECO ENERGY CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT ANSI REQUIREMENT EXCEPTION RECORD ANSI Requirement:

ANSI 3. 5-1985, Appendix Bl.2 (10)

Title:

Simultaneous closure of all main steam isolation valves combined with single stuck open safety / relief valve.

(Inhibit activation of high pressure emergency core cooling systems).

EXCEPTION:

PECO Energy Corporation takes exception to this requirement.

The performance test to satisfy this requirement has been d2leted from the LGS Simulator Certification testing program.

JUSTIFICATION:

This test was dr leted since other Malfunction Performance and Transient Performar..:e tests on the Limerick Simulator serve to exercise the simulation models in similar or more extensive fashion.

In particular, Malfunction Performance Test 5.18, Loss of All Feedwater Resulting in ADS Blowdown, is similar, but provides for more dramatic changes in simulated p.lant parameters, thus exercising the simulator models to a greater degree.

l

PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 SIMULATOR TESTS DELETED (TEST PLAN CHANGES)

(

PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 SIMULATOR TESTS DELETED (With Justification)

Malfunction Performance Test 5.01, Loss of Coolant Outside Primary Containment.

This test was originally developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (1) (b), " Loss of Coolant:

outside primary containment."

This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary due to only minor parameter changes.

This requirement is now satisfied by the performance of the following test, which does not utilize automated data collection, z.at does verify simulator functionality.

3.441 Reactor Water Cleanup Leak Outside Primary Containment Malfunction Performance Test 5.04A, SRV Fails Open Electrically.

This test was originally developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (1) (d), " failure of safety and relief valves."

This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to i

be unnecessary due to only minor parameter changes.

Simulator response t

to this failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality.

The ANSI Requirement continues to be l

l satisfied by these and other tests:

i I

J 3.137C-150C SRV 1F013 (A-S) Fails Open Electrically Page: 1

PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING dINULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 L

Simulator Tests Deleted (Continued)

Malfunction Performance Test 5.04C, SRV Leaks.

This test was originally developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (1) (d), " failure of safety and relief valves."

This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary due to only minor parameter changes.

Simulator response to this failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:

3.137A-150A SRV 1F013(A-S) Leaks Malfunction Performance Test 5.06A, Loss of Offsite Power at Startuo l

Test Conditions.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (3), " Loss or degraded electrical power to the station, including loss of offsite power."

This test was deleted due to the fact that it is no longer practical or useful to compare simulator response to reference plant response during Startup Test Conditions.

Many plant configuration changes, including retuning of the feedwater control system, feedwater heater and Main Condenser retubing, power rerate and retrofit of the Main Turbine, have made comparison of simulator response to reference plant startup test response meaningless.

Malfunction Performance Test 5.06B, Loss of Offsite Power at 100%

Power, still serves to satisfy this ANSI requirement.

i i

Page: 2 l

l i

PECO NUCLEAR CORPORATION LIMERICK GENERATING CTATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued) t e

Malfunction Performance Test 5.08. Loss of Emeroency Power.

This test was originally developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (3),

" Loss or degraded electrical

power, loss of emergency generators."

This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary.

This ANSI requirement is now satisfied by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality:

3.418A Diesel Generator D11 Trip 3.418B Diesel Generator D12 Trip 3.418C Diesel Generator D13 Trip 3.418D Diesel Generator D14 Trip 3.419A Diesel Generator D11 Fails to Start 3.419B Diesel Generator D12 Fails to Start 3.419C Diesel Generator D13 Fails to Start 3.419D Diesel Generator D14 Fails to Start Malfunction Performance Test 5.12A. Recire Pumo Seizure.

l This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (4), " Loss of forced coolant flow due to single or multiple pump failure."

This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary.

Simulator response to this failure is now verified j

using the following

tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:

3.430A, Recirc Pump A Seizure 3.430B, Recirc Pump B Seizure Page: 3

)

- =_.

~

PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued) l Malfunction Performance Test 5.12B. Calibrated Jet Pump Failure.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (4), " Loss of forced coolant flow due to single or multiple pump failure."

i This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary.

Simulator response to this failure is now verified using the following

tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:

i 3.500A Jet Pump No. 1 Fails - Displaced Jet Pump Mixer 3.500B Jet Pump No. 16 Fails - Displaced Jet Pump Mixer i

3.501A Jet Pump No. 7/8 Fails - Plugged Jet Pump Riser i

3.501B Jet Pump No. 19/20 Fails - Plugged Jet Pump Riser 3.502A Jet Pump No.

13 Failure Broken Jet Pump i

Instrument Line i

3.502B Jet Pump No.

5 Failure Broken Jet Jump Instrument Line l

3.503A Jet Pump No. 17/18 Failure - Break in Riser

)

3.503B Jet Pump No. 9/10 Failure - Break in Riser I

i d

Page: 4

(

PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)

MS.lfunction Performance Test 5.12C. Recire Pumo Field Breaker Trio.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (4), " Loss of forced coolant flow due to single or multiple pump failure."

This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be redundant.

The integrated plant effects of a Recirc Pump Field Breaker are identical to the effects of a Recirc Pump M-G Set Drive Motor Breaker trip, since a drive motor breaker trip also results in a field breaker trip.

The primary effects of a recire pump field breaker trip are still verified using the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:

3.436A, Recirc Pump A Field Breaker Trip 3.436B, Recirc Pump B Field Breaker Trip Malfunction Performance Test 5.13B, Main Condenser Hotwell Level Control.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (5), " Loss of condenser vacuum including loss of condenser level control."

This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary.

The primary effects of main condenser hotwell level control failure are still verified using the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:

3.077A Hotwell Level Control Fails High 3.077B Hotwell Level Control Fails Low Page: 5

-~

PECO NUCLEAR CORPORATION LIMERICK GENERATIN3 STATION TRAINING SIMULATOR l

SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued) i Malfunction Performance Test 5.15, Loss of Shutdown Coolino.

This test was originally developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (7), " Loss of shutdown cooling."

l

.nis requirement was initially satisfied by a

Malfunction i

Performance Test, utilizing automated data collection.

This proved to i

be unnecessary.

This requirement is now satisfied by the performance i

)

of the following tests, which do not utilize automated data collection but do verify simulator functionality:

i 3.171A-D RHR Pump (A-D) Trip

]

3.173 RHR Shutdown Cooling Suction Line Break 3.175A-D RHR Pump Suction Valve (F004A-D) Fails 3.176A-B RHR Loap Shutdown Cooling Valve (F006A-B) Fails As Is i

3.176C-D RHR Shutdown Cooling Suction Valve (F008, F009) Fails

}

As Is l

3.176E-F RHR Shutdown Cooling Injection Valve (F015A-B) Fails As l

Is 1

3.177A-D RHR Hx (A-B) Bypass Controller Fails High/Lo 3.571A RHR Shutdown Cooling Valve HV51-1F008 Trip of Thermal Overload 3.571B RHR Shutdown Cooling Valve HV51-1F008 Trip of Magnetic Overload 3.572A RHR Shutdown Cooling Valve HV51-1F009 Trip of Thermal i

Overload J

3.572B RHR Shutdown Cooling Valve HV51-1F009 Trip of Magnetic Overload l

i h

i Page: 6 i

l

PECO NUCLEAR CORPORATION LIMERICK CENERATIN3 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EEHIBIT 2 I

. Simulator Tests Deleted (Continued)

)

Malfunction Performance Test 5.17C.

Loss of Feedwater Heatino at Startuo Test Conditions.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (9),

" Loss of normal feedwater or normal feedwater system l

failure."

This test was deleted due to the fact that it is no longer practical or useful to compare simulator response to reference plant response during Startup Test Conditions.

Many plant configuration changes, including retuning of the feedwater control system, feedwater heater and Main Condenser retubing, power rerate and main turbine retrofit, have made comparison of simulator response to reference plant startup test response meaningless.

Malfunction Performance Test 5.17H, Loss of Feedwater Heating at Full Power, still serves to verify simulator response to this scenario.

The ANSI Requirement continues to be satisfied by this and other tests.

l l

1 i

l 1,

I r

i l

f l

)

Page: 7

J PECO NUCLEAR CORPORATION LINERICK GENERATIN3 STATION TRAINING SINULATOR SINULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)

J Malfunction Performance Test 5.19A, RPS Channel Trios; and 5.19B, RPS t

Channel Fails to Scram.

4 These tests originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (11), " Loss of a protective system channel. "

This requirement was initially satisfied by 2

Malfunction Performance Tests, utilizing automated data collection.

This proved to be unnecessary.

This requirement is now satisfied by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement c.atinues to be satisfied by these and other tests:

I 3.027A Loss of Normal Power to RPS Channel A i

3.027B Loss of Normal Power to RPS Channel B 3.028A Full Reactor Scram l

3.028B Reactor Scram Bank 1 i

3.028C Reactor Scram Bank 2 3.028D Reactor Scram Bank 3 s

3.028E Reactor Scram Bank 4 3.029A RPS Fails to Scram (AUTO only) 3.029B RPS Fails to Scram (Complete) 3.029C RPS Fails to Scram Channel A 3.029D RPS Fails to Scram Channel B l

4 P g e: 8 i

4

- ~. - -. -

PECO NUCLEAR CORPORATION LIMERICK CENERATIN3 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)

Malfunction Performance Test 5.20A, Stuck Control Rod.

This test previously helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (12), " Control rod failure including stuck rods, uncoupled rods, j

drifting rods, rod drops and misaligned rods."

+

This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary.

Simulator response to a stuck control rod is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:

3.016D Control Rod (XX-YY) Stuck 3.017D Control Rod (XX-YY) Stuck 3.018D Control Rod (XX-YY) Stuck 3.019D Control Rod (XX-YY) Stuck Malfunction Performance Test 5.20B, Uncoupled Control Rods.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (12), " Control rod failure including stuck rods, uncoupled rods, drifting rods, rod drops and misaligned rods."

This requirement was initially satisfied by a

Malfunction i

Performance Test, utilizing automated data collection.

This proved to be unnecessary.

Simulator response to uncoupled control rods is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator l

functionality. The ANSI Requirement continues to be satir,fied by these and other tests:

3.016E Control Rod (XX-YY) Uncoupled l

3.017E Control Rod (XX-YY) Uncoupled l

3.018E Control Rod (XX-YY) Uncoupled i

3.019E Control Rod (XX-YY) Uncoupled i

Page: 9 i

i

PECO NUCLEAR CORPORATION LIMERICK GENERATIND STATION TRAININD SINULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued) j r

Malfunt :fon Performance Test 5.20C. Control Rod Drifts Out.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (12), " Control rod failure including stuck rods, uncoupled rods, j

drifting rods, rod drops and misaligned rods."

This requirement was initially satisfied by a

Malfunction 1

Performance Test, utilizing automated data collection.

This proved to be unnecessary.

Simulator response to a control rod drifting out is now verified the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:

3.016B Control Rod (XX-YY) Drifts Out i

3.017B Control Rod (XX-YY) Drifts Out 3.018B Control Rod (XX-YY) Drifts Out 3.019B Control Rod (XX-YY) Drifts Out i

l Malfunction Performance Test 5.20D. Control Rod Drifts In.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (12), " Control rod failure including stuck rods, uncoupled rods, drifting rods, rod drops and misaligned rods."

t This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary.

Simulator response to a control rod drifting in, is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:

3.016A Control Rod (XX-YY) Drifts In 3.017A Control Rod (XX-YY) Drifts In

+

3.018A Control Rod (XX-YY) Drifts In i

3.019A Control Rod (XX-YY) Drifts In' Page: 10

- ~ __

PECO NUCLEAR CORPORATION I

2 LIMERICK @ENERATING STATIC'J TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued) l t

4 a

Malfunction Performance Test 5.20G. Individual Control Rod Scram.

1 i

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (12), " Control rod failure including stuck rods, uncoupled rods, i

drifting rods, rod drops and misaligned rods."

t This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to 4

be unnecessary.

Simulator response to an individual control rod scram is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator

~

functionality. The ANSI Requirement continues to be satisfied by these i

and other tests-t 3.016F Control Rod (XX-YY) Scrammed j

3.017F Control Rod (XX-YY) Scrammed 3.018F Control Rod (XX-YY) Scrammed 3.019F Control Rod (XX-YY) Scrammed 1

Malfunction Performance Test 5.21A. Control Rod Drive Pumo Trio.

t i

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (13), " Inability to drive control rods."

i This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary.

Simulator response to this failure is now verified by

)

the performance of the following tests, which do not utilize automated

]

data collection but do verify simulator functionality.

The ANSI Requirement continues to be satisfied by these and other tests:

3.412A CRD Pump A Trips l

3.412B CRD Pump B Trips 3.412C Both CRD Pumps Trip Page: 11 I

PECO NUCLEAR CORPORATION T IMERICK CENERATING STATION TRAININ3 SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)_

Malfunction Performance Test 5.21B, CRD Flow Control Valve Fails Closed.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (13), " Inability to drive control rods."

This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary.

Simulator response to this failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality.

The ANSI Requirement continues to be satisfied by these and other tests:

3.411A CRD Flow Control Valve A Fails Closed 3.411B CRD Flow Control Valve B Fails Closed 3.411C Both CRD Flow Control Valves Fails Closed 1

Malfunction Performance Test 5.22A and 5.22B, Fuel Claddino Failure (at low and hiah severities).

These tests originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (14),

" Fuel cladding failure resulting in high activity in i

reactor coolant or off gas and the associated high radiation alarms."

This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary.

This requirement is now satisfied by the performance of the following test, which does not utilize automated data collection j

but does verify simulator functionality i

3-MRT001 Fuel Cladding Failure (0-100%)

d

)

Page: 12 1

.__.__ j

- =

e PECO NUCLEAR CORPORATION 3

LIMERICK GENERATIN3 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 l

Simulator Tests Deleted (Continued) 1 Malfunction Performance Test 5.24, Main Generator Trio.

f This test was previously developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (16), " Generator Trip. "

This test was deleted due to the fact that integrated plant response to a generator trip is identical to integrated plant response to a main turbine trip, and therefore the test was redundant.

This requirement is now satisfied by the following tests:

3.110 Turbine-Generator Trip 5.23 Turbine-Generator Trip at Rated Power Malfunction Performance Test 5.26, Reactor Trio.

This test was originally developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (19), " Reactor Trip."

This test was deleted due to the fact that this requirement is redundant with ANSI 3.5-1985, Appendix Bl.2) (1), Manual Scram.

I i

l This requirement is satisfied by the following tests:

4 3.028A Full Reactor Scram 7.01 Manual Reactor Scram 1

I J

Page: 13 I

PECO NUCLEAR CORPORATION LIMERICK GENERATIN3 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)

Malfunction Performance Test 5.27, Main Steam Line Break Incide Containment.

This test was originally developed to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (20), " Main steam line break inside containment."

This test was deleted due to the fact that this requirement is redundant with ANSI 3.5-1985, Appendix Bl.2)

(1),

ANSI 3.5-1985, Appendix Bl.2) (9), " Maximum Size Unisolable Main Steam Line Rupture."

(In order for a Steam Line Rupture to be Unisolable, it must be located inside the drywell upstream of the MSIVs.)

This requirement is satisfied by the following test:

7.09 Maximum Size Unisolable Main Steam Line Rupture Malfunction Performance Test 5.31A, APRM UDscale Failure.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "

This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary.

Simulator response to an APRM Upscale failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:

3.020A APRM Channel A Fails to Selected Value 3.020B APRM Channel B Fails to Selected Value 3.020C APRM Channel C Fails to Selected Value 3.020D APRM Channel D Fails to Selected Value 3.020E APRM Channel E Fails to Selected Value 3.020F APRM Channel F Fails to Selected Value Page: 14

~. -.

PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING DIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)

Malfunction Performance Jest 5.31B, APRM Downscale Failure.

This test originuliy helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "

This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary.

Simulator response to an APRM Downscale Failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:

3.020A APRM Channel A Fails to Selected Value 3.020B APRM Channel B Fails to Selected Value 3.020C APRM Channel C Fails to Selected Value 3.020D APRM Channel D Fails to Selected Value 3.020E APRM Channel E Fails to Selected Value 3.020F APRM Channel F Fails to Selected Value 4

T Page: 15 1

J

/

PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)

Malfunction Performance Test 5.31C, APRM Inonerative Failure.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "

This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary.

Simulator response to an APRM Inop Failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:

3.004B APRM Channel A Fails Inop 3.005B APRM Channel B Fails Inop 3.006B APRM Channel C Fails Inop 3.007B APRM Channel D Fails Inop 3.008B APRM Channel E Fails Inop 3.009B APRM Channel F Fails Inop Malfunction Performance Test 5.31D, RBM Uoscale Failure.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "

This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary.

Simulator response to an RBM Upscale Failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator j

functionality.

The ANSI Requirement continues to be satisfied by these and other tests:

3.217A RBM Channel A Fails to Selected Value 3.217B RBM Channel B Fails to Selected Value i

l Page: 16

(

l l

PECO NUCLEAR CORPORATION t

LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)

Malfunction Performance Test 5.31E. RBM Downscale Failure.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "

This requirement was initially satisfied by a

Malfunction i

Performance Test, utilizing automated data collection.

This proved to railure is now be unnecessary.

Simulator response to an RBM Downscale verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these a.nd other tests:

3.217A RBM Channel A Fails to Selected Value 3.217B RBM Channel B Fails to Selected Value Malfunction Performance Test 5.31F. IRM Uoscale Failure.

This test originally helpet

t. o satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "

This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary.

Simulator response to an IRM Upscale Failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality.

The ANSI Requirement continues to be satisfied by these and other tests:

3.214A IRM Channel A Fails to Selected Value 3.214B IRM Channel B Fails to Selected Value 3.214C IRM Channel C Fails to Selected Value 3.214D IRM Channel D Fails to Selected Value 3.214E IRM Channel E Fails to Selected Value 3.214F IRM Channel F Fails to Selected Value 3.214G IRM Channel G Fails to Selected Value 3.214H IRM Channel H Fails to Selected Value Page: 17

(

PECO NUCLEAR CORPORATION LIMERICK GENERATINJ STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EZHIBIT 2 Simulator Tests Deleted (Continued)

Malfunction Performance Test 5.31G, IRM InoDerative Failure.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "

l This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary.

Simulator response to an IRM Inoperative Failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify siraulator functionality.

The ANSI Requirement continues to be satisfied by these and other tests:

3.205B IRM Channel A Fails Inop 3.206B IRM Channel B Fails Inop 3.207B IRM Channel C Fails Inop 3.208B IRM Channel D Fails Inop 3.209B IRM Channel E Fails Inop 3.210B IRM Channel F Fails Inop 3.211B IRM Channel G Fails Inop 3.212B IRM Channel a Fails Inop

-I l

l l

Page: 18 l

=.

PECO NUCLEAR CORPORATION LIMERICK QENERATING STATION TRAINING SIMUIJLTOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 l

Simulator Tests Deleted (Continued) i 4

l i

j Malfunction Performance Test 5.31H, SRM Uoscale Failure.

l This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 1

3.1.2 (21), " Nuclear Instrumentation Failures. "

I o

l i

This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to i

be unnecessary.

Simulator response to an SRM. Upscale Failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:

3.213A SRM Channel A Fails to Selected Value 3.213B SRM Channel B Fails to Selected Value j

3.213C SRM Channel C Fails to Selected Value 3.213D SRM Channel D Fails to Selected Value I

Malfunction Performance Test 5.31I. SRM Downscale Failure.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (21), " Nuclear Instrumentation Failures. "

j This requirement was initially satisfied by a

Malfunction l

Performance Test, utilizing automated data collection.

This proved to 1

be unnecessary.

Simulator response to an SRM Downscale Failure is now verified by the performance of the following tests, which do not j

utilize automated data collection but do verify simulator functionality.

The ANSI Requirement continues to be satisfied by these and other tests:

3.213A SRM Channel A Fails to Selected Value 3.213B SRM Channel B Fails to Selected Value 3.213C SRM Channel C Fails to Selected Value 3.213D SRM Channel D Fails to Selected Value Page: 19

PECO NUCLEAR CORPORATION LIMERICK GENERATIN3 STATION TRAINING SIMULATOR

)

SIMULATOR QUADRENNIAL P.EPORT EXHIBIT 2 F

Simulator Tests Deleted (Cc,ntinued) i Malfunction Performance Test 5.31J. SRM Inoperative Failure.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section l

3.1.2 (21), " Nuclear Instrumentation Failures. "

This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary.

Simulator response to an SRM Inoperative Failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality.

The ANSI Requirement continues to be satisfied by these and other tests:

3.201B SRM Channel A Fails Inop 3.202B SRM Channel B Fails Inop 4

3.203B SRM Channel C Fails Inop 3.204B SRM Channel D Fails Inop Malfunction Performance Test 5.32A, Rx Instrument Line Break Downstream of Check Valve F04 5A.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (22),

" Process instrumentation, alarms and control system failures."

1 This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to i

be unnecessary.

Simulator response to this failure is now verified by the performance of the following test, which does not utilize automated data collection, but does verify simulator functionality. The ANSI Requirement continues to be satisfied by this and other tests:

l 3.231A Instrument Line Break Downstream of XV42-1F045A s

i Page: 20 I

PECO NUCLEAR CORPORATION LIMERICK GENERATIN3 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)

Malfunction Performance Test 5.32B, Rx Instrument Line Break Downstream of Check Valve F047A.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (22),

" Process instrumentation, alarms and control system failures."

This requirement was initially satisfied by a

Malfunction Performance' Test, utilizing automated data collection.

This proved to be unnecessary.

Simulator response to this failure is now verified by the performance of the following test, which does not utilize automated data collection but does verify simulator functionality. The ANSI Requirement continues to be satisfied by this and other tests:

3.228A Instrument Line Break Downstream of XV42-1F047A Malfunction Performance Test 5.32C, Rx Instrument Line Break Downstream of Check Valve F065A.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (22),

" Process instrumentation, alarms and control system failures."

This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary.

Simulator response to this failure is now verified by the performance of the following test, which does not utilize automated data collection but does verify simulator functionality. The ANSI Requirement continues to be satisfied by thin and other tests:

3.230A Instrument Line Break Downstream of XV42-1F065A Page: 21 -

PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued) i V

Malfunction Performance Test 5.32C, R:: Instrument Line Break Downstream of Check Valve F045D.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (22),

" Process instrumentation, alai.ns and control system failures."

This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary.

Simulator response to this failure is now verified by the performance of the following test, which does not utilize automated data collection but does verify simulator functionality.

The ANSI Requirement continues to be satisfied by this and other tests:

3.231D Instrument Line Break Downstream of XV42-1F045D i

Malfunction Performance Test 5.33A. RHR Pumo B Fails to Auto Start.

l l

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (23), " Passive malfunctions in systems, such as engineered safety j

features, emergency feedwater system."

l This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary.

Simulator response to this failure is now verified by the performance of the following tests, which do not utilize automated i

data collection but do verify simulator functionality.

The ANSI Requirement continues to be satisfied by these and other testE :

3.172A-D RHR Pump (A-D) Fails to Auto Start j

1 l

Page: 22

PECO NUCLEAR CORPORATION LIMERICK GENERATIN8 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)

Malfunction Performance Test 5.33B. Core Sorav Iniection Valve 1F005 Fails As Is.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (23), " Passive malfunctions in systems, such as engineered safety features, emergency feedwater system. "

This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary.

Simulator response to this failure is now verified by the performance of the following tests, which do not utilize automated data collection but do verify simulator functionality.

The ANSI Requirement continues to be satisfied by these and other tests:

3.184A-B Core Spray Injection Valves Fail to Auto Open Malfunction Performance Test 5.33C. HPCI and RCIC fail to Auto Start.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (23), " Passive malfunctions in systems, such as engineered safety features, emergency feedwater system. "

This test was deleted since it was redundant with tests used to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (10), Loss of All Feedwater 4

(normal and emergency).

Malfunction Performance Test 5.18, Loss of All Feedwater Resulting in ADS Blowdown, satisfies these requirements.

4 i

f Page: 23 4

PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAININ3 SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)

Malfunction Performance Test 5.35B, EHC Pressure Reculator Fails Low.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (25), " Reactor pressure control system failure including turbine bypass failure."

This requirement was initially satisfied by a

Malfunction Performance Test, utilizing automated data collection.

This proved to be unnecessary, due to only minor changes in parameters. Simulator response to this failure is now verified by the performar.ce of the following tests, which do not utilize automated data collection but do verify simulator functionality. The ANSI Requirement continues to be satisfied by these and other tests:

3.105B EHC Pressure A Regulator Fails Low 3.106B EHC Pressure B Regulator Fails Low I

i l

Page: 24

{

PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMUL 3LTOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued) i Malfunction Performance Test 5.35C.

All Turbine Bvoass Valves Fail ODen.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Section 3.1.2 (25), " Reactor pressure control system failure including turbine bypass failure."

This test was deleted because the initiating malfunction, 108, was modified at the request of the simulator Instructors to limit Bypass Valve position instead of causing the valves to open to a specified position.

This ANSI requirement continues to be satisfied by the I

performance of the following tests; 3.105A EHC Pressure A Regulator Fails High 3.105B EHC Pressure A Regulator Fails Low 3.105C EHC Pressure A Regulator Fails Oscillates 3.106A EHC Pressure B Regulator Fails High 3.106B EHC Pressure B Regulator Fails Low i

3.106C EHC Pressure B Regulator Fails Oscillates i

3.107A-H Selected Bypass Valve Sticks Open 3.108 Turbine Bypass Valves Limited to Selected Value i

5.35A EHC Pressurc Regulator Fails High 5.35D Turbine Trip with Bypass Valves Fail to Open Page: 25

-f

PECO NUCLEAR CORPORATION LIMERICK GENERATIN8 STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)

Transient Test 7.03B, Closure of All MSIVs at Startuo Test Conditions.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Appendix Bl.2 (3) :

" Closure of All Main Steam Isolation Valves."

This test was deleted due to the fact that it is no longer practical or useful to compare simulator response to reference plant response during Startup Test Conditions.

Many plant configuration changes, including retuning of the feedwater control system, feedwater heater and Main Condenser retubing, power rerate and retrofit of the Main Turbine, have made comparison of simulator response to reference plant startup test response meaningless.

This requirement is satisfied by the following test:

7.03 Closure of All MSIVs at Rated Power Transient Test 7.04B. Simultaneous Trio of all Recirculation Dumos at Startun Test Conditions.

This test originally helped to satisfy ANSI /ANS 3.5-1985 Appendix Bl.2 (4) :

" Simultaneous Trip of all recirculation pumps. "

This test was deleted due to the fact that it is no longer practical or useful to compare simulator response to reference plant response during Startup Test Conditions.

Many plant configuration changes, including retuning of the feedwater control system, feedwater heater and Main Condenser retubing, power rerate and retrofit of the Main Turbine, have made comparison of simulator response to reference plant startup test response meaningless.

This requirement is satisfied by the following test:

7.04 Dual Recirc Pump Trip at Rated Power Page: 26

= _ _ _ -.

PECO NUCLEAR CORPORATION LIMERICK GENERATIN3 STATION TRAINING SIMULATOR SIMDLATOR QUADRENNIAL REPORT EXHIBIT 2 Simulator Tests Deleted (Continued)

Transient Test 7.07. Maximum Rate Power Ramo.

This test was originally developed to satisfy ANSI /ANS 3.5-1985 l

i Appendix 31.2 (7):

" Maximum rate power ramp (master recirculation flow controller in " manual") down to approximately 75% and back up to 100%. "

l This test was deleted since it serves no useful purpose.

To run this test and satisfy this requirement requires that the Recirc M/A stations both be operated in AUTO and manipulations be done to the Recirc Master Flow Controller.

LGS is not permitted to operate in this configuration, and the Recirc Master Flow Controller has been removed from the Control Room panels.

Therefore there is no benefit in i

performing simulator testing in this mode.

Simulator Model exercising, in an equivalent mode, is accomplished by the performance of the following tests:

3.431A Recirc Pump A M/A Station Fails High 3.431B Recirc Pump A M/A Station Fails Low 3.431C Recirc Pump B M/A Station Fails High 3.431D Recirc Pump B M/A Station Fails Low 5.25A Recirc Pump M/A Station Fails High 5.25B Recirc Pump M/A Station Fails Low PECO Nuclear takes exception to the ANSI Requirement to perform this test (Exception Record attached.)

t i

f Page: 27 l

~ = _ _ _ _ _.. ~

PECO NUCLEAR CORPORATION LIMERICK UENERATING STATION TRAINING SIMULATOR i

SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 4

Simulator Tests Deleted (Continued) 1 j

1 Transient Test 7.10. BWR TMI Scenario.

This test was originally developed to satisfy ANSI /ANS 3.5-1985 Appendix Bl.2 (10):

" Simultaneous closure of all Main Steam Isolation Valves combined with single stuck open safety / relief valve.

(Inhibit activation of high pressure Emergency Core Cooling Systems."

This test was deleted since it serves no useful purpose.

Other Malfunction Performance and Transient Performance tests on the Limerick l

Simulator serve to exercise the simulation models in equivalent or more extensive fashion.

In particular, Malfunction Performance Test 5.18, Loss of All Feedwater Resulting in ADS Blowdown, is similar, but provides for more dramatic changes in simulated plant parameters, thus exercising the simulator models to a greater degree.

i PECO Nuclear takes exception to the ANSI Requirement to perform this test (Exception Record attached.)

l l

l l

\\

Page: 28

=

PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR I

SIMULATOR QUADRENNIAL REPORT EXHIBIT 2 j

i l

Simulator Tests Deleted (Continued) l l

Miscellaneous Tests Deleted (with no specific ANSI Reauirement)-

4 s

Moisture Separator Level Control Fails Low (Malfunction Test 3.070)

This test was replaced by individual malfunctions that fail can fail each Moisture Separator Drain and Dump valves open or closed.

Trio of Stator Coolant Pumo A or Pumo B (Malfunction Tests 3.099A 4 3.099B i

These malfunctions were deleted and combined into or.e l

malfunction, with the corresponding Malfunction Test, 3.099, Trip of Both Stator Coolant Pumps Drawer Inoo. RHRSW Heat Exchancer outlet Rad Monitor (Malfunction i

Tests 3.115RC: 3.115RD; 3.115RE: 3.115RF) i These malfunctions were deleted, as the Rad Monitors were deleted in both the Reference Unit and the simulator.

E_ailure of the Process Computer (Malfunction Test 3.463) 4 This malfunction was deleted due to a plant and simulator l

modification replacing the Plant Process Computer with a Monitoring System not susceptible to the original failure mode.

5.36A. Closure of One MSIV.

This test was deleted due to the fact that it is no longer practical or useful to compare simulator response to reference plant response during Startup Test Conditions.

Many plant configuration changes, including retuning of the feedwater control system, feedwater heater and Main Condenser retubing, power rerate and retrofit of the Main Turbine, have made comparison of simulator response to reference plant startup test response meaningless.

This test was not required by the Simulator Standard.

t 1

i Page: 29

PECO NUCLRAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 3 SIMULATOR TEST REPORTS (TESTING COMPLETED 1995 - 1998)

P i

PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR 4

SIMULATOR QUADRENNIAL REPORT r

1 i

)

LGS SIMULATOR TESTING PERFORMED IN 1995 i

i

LGS Simulator Testing Completedin 1995 Test No Title Test Date Result 1.01 COMPUTER REAL TIME TEST 11/6/95 S

3.003A CORE POWER OSCILLA~CNS (IN-PHASE) 10/12/95 S

3.004A APRM CHAN A RECORDER FAILS AS-IS 2/1/95 S

3.004B APRM CHAN A FAILS INOP 2/1/95 S

3.009A APRM CHAN F RECORDER FAILS AS-IS 22/95 S

3.011 A RBM CHAN B RECORDER FAILS AS-IS 2/6/95 S

3.012A LPRM 56-17B UPSCALE FAILURE 3/3/95 S

3.012E LPRM 40-33B UPSCALE FAILURE 8/31/95 S

3.013A LPRM 24-33D DOWNSCALE FAILURE 9/9/95 S

I 3.013E LPRM 48-49D DOWNSCALE FAILURE 10/11/95 S

3.015A LPRM 16-41B DRIFT (-25 TO +25) 11/6/95 S

3.016A CONTROL ROD XX-W FAILURE (DRIFT IN) 2/10/95 S

3.016B CONTROL ROD XX-W FAILURE (DRIFT OUT) 2/10/95 S

i 3.016C CONTROL ROD XX W FAILURE (ACCUM TRBL) 2/10/95 S

3.016D CONTROL ROD XX-W FAILURE (STUCK) 2/10/95 S

t 3.016E CONTROL ROD XX-W FAILURE (UNCOUPLED) 2/10/95 S

3.016F CONTROL ROD XX-YY FAILURE (SCRAMMED) 2/10/95 S

3.016G CONTROL ROD XX-XX FAILS TO SCRAM 2/10/95 S

3.020A APRM CHANNEL A FAILS 0-125%

9/10/95 S

3.020E APRM CHANNEL E FAILS 0-125%

10/27/95 S

3.027A LOSS OF NORMAL POWER TO RPS CHANNEL A 2/9/95 S

3.028A REACTOR SCRAM (FULL) 2/17/95 S

3.0288 REACTOR SCRAM (BANK 1) 10/11/95 S

3.029C RPS FAILS TO SCRAM (CHAN A) 2/10/95 S

3.044A FW PUMP A CONTROLLER OUTPUT FAILS HIGH 2/6/95 S

3.045B FW PUMP B CONTROLLER OUTPUT FAILS LOW 2/6/95 S

i 3.046A STEAM FLOW XMITTER 1N003A FAILS 0-100%

2/17/95 S

3.047C FW FLOW XMITTER 1N002C FAILS 0-100%

8/13/95 S

Friday, December 04,1998 Page 1 of12

Test No Title Test Date Result 3.061A MSIV HV41-1F022A FAILS OPEN 2/6/95 S

3.062A MSIV HV41-1FO28A FAILS OPEN 2/6/95 S

3.063A MSIV HV41-1FO22A FAILS CLOSED 11/6/95 S

3.064A MSIV HV41 1F028A FAILS CLOSED 11/6/95 S

i 3.069 STM SEAL EVAP STM OUTLET FAILS CLOSED 2/6/95 S

3.072A SJAE STM SUPPLY PCV07-101 A FAILS CLOSED 2/8/95 S

3.073 FW CONDUCTIVITY INCREASE (1-100%)

10/27/95 S

3.077B HOTWELL LEVEL CONTROLLER FAILS LOW 2/8/95 S

3.079A COND FILTER /DEMIN A HI DIFF PRESSURE 8/13/95 S

3.079E COND FILTER /DEMIN E Hi DIFF PRESSURE 10/19/95 S

3.080A CONDENSATE RECIRC VALVE FAILS OPEN 2/9/95 S

3.086A CIRCULATING WATER PUMP A TRIP 1/20/95 S

3.096 GEN HYDROGEN COOLING SYSTEM LEAK 10/20/95 S

3 3.099 TRIP OF BOTH STATOR COOLANT PUMPS 2/17/95 S

3.100 MAIN TURBINE BRG #5 & #6 HIGH VIBRATION 9/9/95 S

3.102 MAIN TURBINE LOW BRG OIL PRESSURE 9/G/95 S

3.103 TURBINE BEARING HIGH TEMPERATURE 9/9/95 S

3.104A TURBINE CONTROL SYSTEM FAILS HIGH 8/12/95 S

3.105C EHC PRESSURE REGULATOR A OSCILLATES 8/12/95 S

3.107A BYPASS VALVE NO.1 STICKS OPEN 8/12/95 S

3.107E BYPASS VALVE NO. 5 STICKS OPEN 8/12/95 S

3.108 BYPASS VALVES Fall TO SELECTED VALUE 8/12/95 S

i 3.111 B EHC LOAD SELECTOR FAILS TO REMOTE 8/13/95 S

f 3.113 HIGH RAD LEVEL IN SE'RVICE WTR 8/31/95 S

3.115AA DRAWER INOP RX ENCLOSURE VENT EXH CHAN A 2/6/95 S

l 3.115AE DRAWER INOP REFUEL FLOOR VENT EXH CHAN A 2/6/95 S

3.115AJ CMWER INOP POST LOCA MONITOR CHAN A 2/8/95 S

3.115D DRAWER INOP WIDE RANGE ACCIDENT MONITOR 2/8/95 S

3.115H DRAWER INOP RADWASTE ENCLOSURE RAD MON 2/9/95 S

3.115M DRWR INOP UNIT 1 CONTAINMENT LEAK DETECT 10/17/95 S

~

Friday, December 04,1998 Page 2 of 12

Test No Title Test Date Result 3.115R DRAWER INOP AIR EJECTOR /OFFGAS CHAN B 2,16/95 S

3.115RC DRAWER INOP RHRSW HX 1 A OUTLET 8/13/95 S

3.115T DRAWER INOP MAIN STEAM LINE CHAN A 8/31/95 S

3.113 FUEL CLADDING FAILURE 10/17/95 S

3.137A ADS /SRV 1FO13A FAILS - LEAKS 2/15/95 S

3.1378 ADS /SRV 1FO13A FA!LS - STUCK 1/30/95 S

3.137C ADS /SRV 1FO13A FAILS - OPEN ELECT 1/30/95 S

3.137D ADS /SRV 1F013A FAILS - CLOSED 2/1/95 S

3.137E ADS /SRV 1FO13A FAILS - OPEN MECH 2/1/95 S

3.141 A ADS /SRV 1FO13E FAILS - LEAKS 2/15/95 S

3.141B ADS /SRV 1FO13E FAILS - STUCK 2/6/95 S

3.141C ADS /SRV 1FO13E FAILS - OPEN ELECT 2/8/95 S

3.141 D ADS /SRV 1FO13E FAILS - CLOSED 2/8/95 S

3.141E ADS /SRV 1FO13E FAILS - OPEN MECH 2/9/95 S

3.145A ADS /SRV 1FO13J FAILS - LEAKS 2/16/95 S

3.145B ADS /SRV 1FO13J FAILS - STUCK 2/16/95 S

3.145C ADS /SRV 1FO13J FAILS - OPEN ELECT 2/16/95 S

3.145D ADS /SRV 1FO13J FAILS - CLOSED 8/13/95 S

3.145E ADS /SRV 1FO13J FAILS - OPEN MECH 8/13/95 S

]

3.149C ADS /SRV 1FO13N FAILS - OPEN ELECT 8/31/95 S

3.150B ADS /SRV 1FO13S FAILS - STUCK 8/31/95 S

3.151 A SRV 1F013K DOWNCOMER LEAK 0-100%

8/13/95 S

3.156A NSSSS GROUP 1 A INADVERTENT ISOLATION 1/20/95 S

3.156E NSSSS GROUP 1E INADVERTENT ISOLATION 1/20/95 S

1 3.157A NSSSS GROUP 2A INADVERTENT ISOLATION 9/10/95 S

3.157E NSSSS GROUP 2E INADVERTENT ISOLATION 9/10/95 S

3.159A NSSSS GROUP 6A INADVERTENT ISOLATION 1/20/95 S

3.159E NSSSS GROUP 6E INADVERTENT ISOLATION 2/8/95 S

3.160C NSSSS GROUP 7C INADVERTENT ISOLATION 2/8/95 S

3.162A SEC CON & PCIG A INADVERTENT ISOL 2/1/95 S

Friday, December 04,1998 Page 3 of 12

Test No Title Test Date Result 3.162F SEC CON & PClG F INADVERTENTISOL 2/6/95 S

3.166B OFFGAS AFTERCOND LEVEL XMTR FAILS LOW 2/8/95 S

3.168C OFFGAS CHILLER GLYCOL PUMP TRIP (BOTH) 2/16/95 S

3.171A RHR PUMP A TRIP 1/30/95 S

i 3.172A RHR PUMP 1 A FAILo TO AUTO START 2/6/95 S

3.174A RHR INJECTION VALVE 1F017A FAILS AS IS 8/12/95 S

3.174E RHR SUPP POOL HV51-1F024A FAILS AS-IS 9/9/95 S

3.174F RHR SUPP POOL HV51-1F024B FAILS AS-IS 9/9/95 S

3.175A RHR PUMP SUCTION VALVE F004A FAILS AS IS 2/6/95 S

i 3.176C RHR SDC SUCTION VALVE 1FOO8 FAILS AS IS 10/27/95 S

[

3.177A RHR HX A BYPASS CONTROLLER FAILS HIGH 10/27/95 S

3.182A CORE SPRAY PUMP A TRIPS 2/6/95 S

3.183A CORE SPRAY PUMP A FAILS TO AUTO START 2/8/95 S

3.184A CORE SPRAY INBD VALVE 1FOO5 FAILS AS IS 2/8/95 S

3.189C REACTOR WATER CLEANUP PUMP C TRIPS 2/6/95 S

3.192 REACTOR VESSEL CONDUCTIVITY INCREASES 10/27/95 S

3.1958 RWCU ISOL VALVE HV44-1F004 FAILS AS IS 2/6/95 S

3.1988 SLC PUMP B LOSS OF CONTROL POWER 2/6/95 S

3.201A SRM CHANNEL A RECORDER FAILS AS-IS 2/9/95 S

3.201B SRM CHANNEL A FAILS INOPERATIVE 9/10/95 S

3.201C SRM CHANNEL A DETECTOR STUCK 2/15/95 S

3.205A IRM CHANNEL A RECORDER FAILS AS-IS 2/15/95 S

3.205B IRM CHANNEL A FAILS INOPERATIVE 2/15/95 S

3 205C IRM CHANNEL A DETECTOR STUCK 2/15/95 S

3.209A IRM CHANNEL E RECORDER FAILS AS-IS 9/10/95 S

3.2098 IRM CHANNEL E FAILS INOPERATIVE 9/10/95 S

3.209C IRM CHANNEL E DETECTOR STUCK 9/10/95 S

3.213A SRM CHANNEL A FAILS TO SELECTED VALUE 9/10/95 S

3.214A IRM CHANNEL A FAILS TO SELECTED VALUE 9/10/95 S

3.214E IRM CHANNEL E FAILS TO SELECTED VALUE 9/10/95 S

' Friday, Decem5r~04,1958 Page 4 of 12

~~

~~

Test No Title Test Date Result 3.217A RBM CHANNEL A FAILS TO SELECTED VALUE 10/12/95 S

3.227B RX INSTRUMENT LINE BREAK AFTER 42-F043B 2/8/95 S

3.229B RX INSTRUMENT LINE BREAK AFTER 42-F049B 2/15/95 S

3.2310 RX INSTRUMENT LINE BREAK AFTER 42-F045B 10/27/95 S

3.232A RX LEVEL XMITTER LT42-N080A FAILS HIGH 10/27/95 S

3.2328 RX LEVEL XMITTER LT42-N080A FAILS LOW 10/27/95 S

3.233A RX LEVEL XMITTER DPT42-N004A FAILS HIGH 10/27/95 S

3.233B RX LEVEL XMITTER DPT42-N004A FAILS LOW 10/27/95 S

3.234A RX PRESS XMITTER PT42-N078A FAILS HIGH 10/27/95 S

l 3.234B RX PRESS XMITTER PT42-N078A FAILS LOW 10/27/95 S

3.235B RX LEVEL / PRESS RECORDER R609 FAILS 10/20/95 S

3.236A REFERENCE LEG 1D004A FLASHES 11/12/95 S

3.237A REFERENCE LEG 1D004A LEVEL DEFECT 11/12/95 S

3.237F All. REFERENCE LEGS LEVEL DEFECT 11/12/95 S

3.242A FEEDWATER HEATER 15A TUBE LEAK 10/20/95 S

3.2448 FEEDWATER PUMP A MECHANICAL FAILURE 11/6/95 S

3.245C REACTOR FEEDPUMP B HIGH VIBRATION 11/7/95 S

3.247A FW LOW FLOW CONTROL VALVE FAILS OPEN 9/10/95 S

3.249A RX FEEDPUMP B RECIRC VALVE FAILS OPEN 2/6/95 S

t 3.251A FW S/U LEVEL CONTROL VALVE FAILS OPEN 9/10/95 S

3.252A FW LINE A RUPTURE INSIDE DRYWELL 10/17/95 S

3.260A NETWORK LOAD TRANSIENT INCREASE 11/7/95 S

3.262B 13.2KV 12 UNIT AUX BUS FAULT 11/6/95 S

3.263A 4KV SAFEGUARD BUS D11 FAULT 10/18/95 S

i l

3.265A STARTUP BUS BKR 10 TRIPS 11/6/95 S

3.270A 114A GEN AREA 440V LOAD CENTER FAULT 8/13/95 S

3.270B 124A GEN AREA 440V LOAD CENTER FAULT 10/17/95 S

3.275A D114 SAFEGUARD 440V LOAD CENTER FAULT 10/18/95 S

3.277A 120 VAC PANEL 10Y101 FAULT 2/16/95 S

3.278A 120 VAC PANEL 10Y105 FAULT 10/17/95 S

Friday, December 04,1998 Page 5 of 12 P

h Test No Title Test Date Result 3.278C 120 VAC PANEL 10Y109 FAULT 2/15/95 S

3.282A 1FA 125/250 VDC 1 AD105 FAULT 10/19/95 S

3.283 125/250 VDC 10D114 FAULT 10/27/95 S

3.284A LOSS OF DC TO SELECTED ANNUNCIATOR PNLS 2/15/95 S

3.284E LOSS OF DC TO SELECTED ANNUNCIATOR PNLS 10/20/95 S

3.285A 125/250 VDC BUS 1 AD108 FAULT 5/15/95 S

3.285B 125/250 VDC BUS 1BD108 FAULT 5/15/95 S

3.285C 125/250 VDC BUS 1CD108 FAULT 5/15/95 S

3.285D 125/250 VDC BUS 1DD108 FAULT 5/15/95 S

3.285E 125/250 VDC BUS 10D125 FAULT 5/15/95 S

3.286A 1 A APRM UPS BUS 1 AY185 FAULT 5/15/95 S

3.286B 1B APRM UPS BUS 18Y185 FAULT 5/15/95 S

3.301A RX ENCLOSURE ISOLATION CHANNEL A 10/17/95 S

3.304A SGTS FROM REFUEL FLR HV76-019 FAILS OPEN 2/8/95 S

3.306 REFUEL FLOOR FAILS TO ISOLATE 10/12/95 S

3.406A RRCS DIVISION I LOSS OF DC POWER 10/11/95 S

3.406C RRCS LOSS OF DC POWER TO BOTH DIVISIONS 10/20/95 S

3.409A CONTAINMENT INST GAS COMPRESSOR A LEAKS 10/12/95 S

3 410C CIG ISOL VLVS 129A/B BOTH Fall CLOSED 2/13/95 S

3.412A CONTROL ROD DRIVE PUMP A TRIPS 2/6/95 S

3.414A DISCH VOLUME SV4t1F180 FAILS CLOSED 10/20/95 S

3.418A DIESEL GENERATOR 11 TRIP 2/15/95 S

3 419A DIESEL GENERATOR 11 FAILS TO START 10/11/95 S

3.424A INSTRUMENT AIR COMPRESSOR 1AK101 TRIP 2/6/95 S

3.4308 RECIRC PUMP B SElZURE 8/31/95 S

3.431A RECIRC PUMP A M/A STATION FAILS HIGH 8/31/95 S

3 433A RECIRC PUMP A SEAL #1 FAILURE 10/19/95 S

3.435A RECIRC PUMP A DRIVE MOTOR BREAKER TRIP 2/6/95 S

3.440B RECIRC LOOP B RUPTURE (0100%)

10/17/95 S

3.442A RECIRC PUMP 1 A RPT BREAKER CB3A TRIP 1/30/95 S

Y5 day, D5b504,1995~~

Page 6 of12

i Test No Title Test Date Result 3.445 HPCI STEAM LINE BREAK IN PUMP RM 1-100%

11/6/95 S

l 3.447A HPCI AUX OIL PUMP FAILS TO AUTO START 2/13/95 S

3.449 HPCI TURBINE TRIP 3/3/95 S

3.452 HPCI PUMP DISCH VALVE 1F006 FAILS AS IS 2/16/95 S

3.456 RCIC FAILS TO AUTO START 1/30/95 S

3.459A RCIC STEAM SUPPLY HV49-1F008 ISOLATES 1/30/95 S

3.462 RCIC COOLING WATER VLV 1F046 FAILS AS IS 1/30/95 S

t 3.464C RCIC ISOL VLV HV49-1F076 FAILS AS-IS 2/16/95 S

3.471A DRYWELL AREA UNIT COOLER FAN 1 A1 TRIP 2/8/95 S

3.471E DRYWELL AREA UNIT COOLER FAN 1E1 TRIP 2/15/95 S

l 3.472A DRYWELL AREA UNIT COOLER FAN 1 A2 TRIP 2/16/95 S

3.472E DRYWELL AREA UNIT COOLER FAN 1E2 TRIP 10/12/95 S

3.474 SUPP POOL AIR LEAK TO REACTOR ENCLOSURE 8/31/95 S

3.483A RECW PUMP TRIP (A) 1/30/95 S

3.483C RECW PUMP TRIP -(BOTH) 2/8/95 S

3.487 LOSS OF SW TO MAIN TURB LUBE OIL COOLERS 9/9/95 S

3.488B SERVICE WATER PUMP B TRIPS 2/15/95 S

)

3.489A ESW PUMP A TRIPS 2/8/95 S

3.490A ESW VLV HV11-121 Fall TO AUTO SWAP 2/8/95 S

3.490E ESW VLV HV11-055A FAILS TO AUTO SWAP 2/15/95 S

3 492A RHR SERVICE WATER PUMP A TRIPS 8/31/95 S

3.493B FAILURE OF RHRSW HX B INLET VALVE 2/16/95 S

' 3.500A JET PUMP NO.1 DISPLACED MIXER 2/16/95 S

3.502A JET PUMP NO.13 BROKEN INSTRUMENT LINE 8/31/95 S

3.505A RECIRC PUMP A HIGH RUNBACK 1/30/95 S

3.511 PRIMARY CONTAINMENT HYDROGEN INCREASES 10/20/95 S

3.515C FW HEATER 14A DRAIN VALVE FAILS OPEN 3/17/95 S

3.5168 FW HEATER 13A DRAIN VALVE FAILS CLOSED 3/3/95 S

3.517A FW HEATER 12B DRAIN VALVE FAILS OPEN 3/3/95 S

3.517E FW HEATER 16B DRAIN VALVE FAILS OPEN 8/13/95 S

Eidly',~Oece[nbeiO4,1996 Page 7 of 12

~~

E Test No Title Test Date Result 3.518D FW HEATER 15B DRAIN VALVE FAILS CLOSED 8/13/95 S

l 3.519C FW HEATER 14C DRAIN VALVE FAILS OPEN 8/13/95 S

i 3.520A FW HEATER 12C DRAIN VALVE FAILS CLOSED 8/31/95 S

t 3.5208 FW HEATER 13C DRAIN VALVE FAILS CLOSED 8/31/95 S

3.521A FW HEATER 12A DUMP VALVE FAILS OPEN 9/9/95 S

3.521E FW HEATER 16A DUMP VALVE FAILS OPEN 9/9/95 S

3.522D FW HEATER 15A DUMP VALVE FAILS CLOSED 10/11/95 S

3.523C FW HEATER 14B DUMP VALVE FAILS OPEN 10/11/95 S

3.524B FW HEATER 13B DUMP VALVE FAILS CLOSED 10/19/95 S

3,525A FW HEATER 12C DUMP VALVE FAILS OPEN 10/12/95 S

3.525E FW HEATER 16C DUMP VALVE FAILS OPEN 10/20/95 S

3.526D FW HEATER 15C DUMP VALVE FAILS CLOSED 10/19/95 S

3.527A STEAM LEAK DET NUMAC TIS25-101 A FAILS 2/8/95 S

h 3.528A RHR CNTMNT SPRAY VALVE F016A FAILS AS-IS 2/15/95 S

3.529A RX PRESS XMITTER PT42-103A FAILS HIGH 4/5/95 S

3.5298 RX PRESS XMITTER PT42-103A FAILS LOW 4/5/95 S

3.529C RX PRESS XMITTER PT42-103B FAILS HIGH 4/5/95 S

f 3.529D RX PRESS XMITTER PT42-103B FAILS LOW 4/5/95 S

3.530 MAIN TURBINE FAILS TO TRIP 2/17/95 S

3.534 TURBINE TURNING GEAR MOTOR TRIPS 11/12/95 S

3.535A 1 A1 MOIST SEP DR TK DRN VLV FAILS CLOSED 11/12/95 S

3.535E 1C1 MOIST SEP DR TK DRN VLV FAILS CLOSED 11/12/95 S

f 3.536A 1 A1 MOIST SEP DR TK DRN VLV FAILS OPEN 11/12/95 S

3.537A 1 A1 MOIST SEP DR TK DMP VLV FAILS CLOSED 11/12/95 S

I 3.537E 1C1 MOIST SEP DR TK DMP VLV FAILS CLOSED 11/12/95 S

3.538A 1 A1 MOIST SEP DRN TK DMP VLV FAILS OPEN 11/12/95 S

3.538B 1 A2 MOIST SEP DRN TK DMP VLV FAILS OPEN 2/17/95 S

3.538C 181 MOIST SEP DRN TK DMP VLV FAILS OPEN 2/17/95 S

3.538D 182 MOIST SEP DRN TK DMP VLV FAILS OPEN 2/17/95 S

3.538E 1C1 MOIST SEP DRN TK DMP VLV FAILS OPEN 2/17/95 8

YridaylDecerbi5irr~0T4 55~

Page8of5

i Test No Title Test Date Result 3.538F 1C2 MOIST SEP DRN TK DMP VLV FAILS OPEN 2/17/95 S

3.539 GEN ALTERREX TEMPERATURE CV FAILS CLOSED 11/12/95 S

3.542 GEN AUTO VOLTAGE REGULATOR FAILS HIGH 2/17/95 S

3.543 GEN AUTO VOLTAGE REGULATOR FAILS LOW 2/17/95 S

3.544 REACTOR CAVITY SEALS NO. 3/4 LEAKAGE 10/11/95 S

3.545 STATOR COOLING WATER FLOW SWITCH FAILS 10/10/95 S

3.547 CRD PUMP TRIPS ON CLOGGED SUCTION FILTER 5/19/95 S

3.548 MAIN CONDENSER HOTWELL LEAK 10/10/95 S

3.549 COARSE HOTWELL REJECT VALVE FAILS OPEN 5/19/95 S

3.550 MS SUPPLY VLV HV01-109 FAILS AS-IS 8/13/95 S

3.551 ADS FAILS TO INITIATE 2/15/95 S

3.552A RFP DISCH CHK VLV HV06105A FAILS OPEN 8/12/95 S

3.552B RFP DISCH CHK VLV HV06-1058 FAILS OPEN 8/12/95 S

3.552C RFP DISCH CHK VLV HV06-105C FAILS OPEN 8/12/95 S

3.553A TURBINE CONTROL VALVE NO.1 FAILS OPEN 8/13/95 S

3.553B TURBINE CONTROL VALVE NO. 2 FAILS OPEN 8/13/95 S

)

3.553C TURBINE CONTROL VALVE NO. 3 FAILS OPEN 8/13/95 S

3.553D TURBINE CONTROL VALVE NO. 4 FAILS OPEN 8/13/95 S

3.554 MAIN TURBINE PMG FAILS 8/13/95 S

3.555 CONTROL RODS Fall TO SCRAM (0-120) 9/10/95 S

3.556A RFP A M/A STATION SWAPS TO MANUAL 10/19/95 S

3.556B RFP B M/A STATION SWAPS TO MANUAL 10/10/95 S

3.556C RFP C M/A STATION SWAPS TO MANUAL 10/10/95 S

3.556D RFP A. B & C M/A STATIONS SWAP TO MANUAL 10/19/95 S

3.556E FWC MASTER CONTROLLER SWAPS TO MANUAL 10/19/95 S

4.002 BUS TABLE: 12 UNIT AUXILIARY BUS 11/6/95 S

4.005 BUS TABLE: 4 KV SAFEGUARD BUS D11 10/18/95 S

4.009 BUS TABLE: 4 KV SAFEGUARD BUS D114 10/18/95 S

4.015 BUS TABLE: GEN AREA LOAD CENTER 114A 8/13/95 S

4.019 BUS TABLE: GENERATOR AREA LC 124A 10/17/95

-S Friday, December 04,1998 Page 9 of 12

Test No Title Test Date Result 4.029 BUS TABLE: 120 VAC PANEL 10Y101 2/16/95 S

4.033 BUS TABLE: 120 VAC PANEL 10Y105 10/17/95 S

4.035 BUS TABLE: 120 VAC PANEL 10Y109 2/15/95 S

4.041 BUS TABLE: 125/250 VDC BUS 1 AD105 10/19/95 S

4.045 BUS TABLE: 125/250 VDC BUS 10D114 10/27/95 S

4.046 BUS TABLE: DC BUS 1AD108 5/15/95 S

4.047 BUS TABLE: DC BUS 1BD108 5/15/95 S

4.048 BUS TABLE: DC BUS 1CD108 5/15/95 S

4.049 BUS TABLE: DC BUS 1DD108 5/15/95 S

4.053 BUS TABLE: APRM UPS BUS 1 AY185 5/15/95 S

4.054 BUS TABLE: APRM UPS BUS 1BY185 5/15/95 S

5.02A REClRC LOOP A RUPTURE PERFORMANCE TEST 5/4/95 S

5.05 TOTAL LOSS OF INSTRUMENT AIR 5/12/95 S

5.07A LOSS OF SAFEGUARD BUS D11 (EMERG POWER) 5/3/95 S

5.09A LOSS OF NON-SAFEGUARD LOAD CENTER 114A 5/3/95 S

5.09E LOSS OF NON-SAFEGUARD LOAD CENTER 124A 5/3/95 S

5.10A LOSS OF 120 VAC INSTRUMENT BUS 10Y101 5/3/95 S

5.10E LOSS OF 120 VAC INSTRUMENT BUS 10Y105 5/3/95 S

5.10G LOSS OF 120 VAC INSTRUMENT BUS 10Y109 11/26/95 S

5.11 A LOSS OF 125/250 VDC BUS 1 AD105 5/4/95 S

5.11 E LOSS OF 125/250 VDC BUS 10D114 5/3/95 6

5.16A COMPLETE LOSS OF RX ENCL COOLING WATER 10/18/95 S

5.17G TRIP OF TWO CONDENSATE PUMPS 5/4/95 S

5.25C HPCI INADVERTANT INITIATION 5/4/95 S

5.29A MAIN FEED LINE A BREAK INSIDE DRYWELL 11/26/95 S

j 5.34A RPS AND ARI Fall TO SCRAM REACTOR 5/12/95 S

6.10 STEADY STATE PERF @ 25% PWR FOR 1 HR.

10/16/95 S

6.11 STEADY STATE PERF @ 75% PWR FOR 1 HR.

10/16/95 S

6.12 STEADY STATE PERF @ 100% PWR FOR 1 HR.

10/16/95 S

7.01 MANUAL SCRAM 4/10/95 S

$15th~I5cember 04,1598 Page 10 of12

Test No Title Test Date Result 7.02 SIMULTANEOUS TRIP OF ALL FEEDWATER PUMPS 4/12/95 S

7.03 CLOSURE OF ALL MSIVS @ 100% POWER 4/12/95 S

7.04 TRIP OF BOTH RECIRC PUMPS AT RATED POWER 4/10/95 S

7.05 SINGLE RECIRC PUMP TRIP 4/10/95 S

7.06 TURBINE TRIP WITHIN BYPASS CAPABILIT(

10/16/95 S

7.08 RECIRC LOOP RUPTURE W/ LOSS OFFSITE PWR 4/12/95 S

7.09 MAX SIZE UNISOLABLE MSL RUPTURE 4/12/95 S

8.278 RHR PUMP A BREAKER RACKED OUT 5/19/95 S

8.279 RHR PUMP B BREAKER RACKED OUT 5/19/95 S

d 8.280 RHR PUMP C BREAKER RACKED OUT 5/19/95 S

8.281 RHR PUMP D BREAKER RACKED OUT 5/19/95 S

8.299 MANUAL HOTWELL MAKEUP ISOLATION VALVES 9/10/95 S

8.300 RE Manual Test Switch HSXX-198A-5 4/6/95 S

8.301 RE Manual Test Switch HSXX-1988-5 4/6/95 S

8.302 REAC ENCL SUPPLY & EXH FANS RESTART 9/10/95 S

8.303 T-217 ARI RESET WITH TRIP SIGNAL 10/10/95 S

I 8.304 MAIN STEAM BARRIER BLOCK VALVE HV41-142 9/10/95 S

8.305 MAIN STEAM BARRIER BLOCK VALVE HV41-143 9/10/95 S

8.306 RECW B/UP SUPPLY TO DWCW FDR BREAKER 7/14/95 S

8.309 T-251 HPCI CS VLV 1F006 FEEDER BREAKER 10/12/95 S

8.310 T-251 HPCI FWVLV 1F105 FEEDER BREAKER 10/12/95 S

8.323 SINGLE LOOP NEUT MONITORING OPERATIONS 10/10/95 6

8.324 COND TRANSFER PUMPS LOW LVL SELECTOR SW 10/9/95 S

8.325 RWST FILL FROM RADWASTE SAMPLE TANK 10/9/95 S

8.326 CST FILL FROM RADWASTE SAMPLE TANK 10/9/95 S

8.327 CONDENSATE TRANSFER PUMPS SUCTION SELECT 10/9/95 S

8.328 CAVITY FILL FROM CST WITH HOSES 10/10/95 S

8.329 CAVITY FILL FROM REFUEL WATER PUMPS 10/10/95 S

8.330 CAVITY FILL FROM CST W/ REFUEL WTR PUMPS 10/10/95 S

8.331 CST FILL FROM RWST W/ REFUEL WTR PUMPS 10/9/95 S

Friday, December 04,1998 Page 11 of 12

Test No Title Test Date Result 8.332 DIESEL GEN D11 FIRE ALARM DEFEAT 10/19/95 S

8.333 DIESEL GEN D12 FIRE ALARM DEFEAT 10/19/95 S

8.334 DIESEL GEN D13 FIRE ALARM DEFEAT 10/19/95 S

8.335 DIESLL GEN D14 FIRE ALARM DEFEAT 10/19/95 S

8.336 HS76-151 A RX ENCUREFUEL ISOL INTERLOCK 10/19/95 S

8.337 HS76-151B RX ENCUREFUEL ISOL INTERLOCK 10/12/95 S

8.338 HS76-152A RX ENCUREFUEL ISOL INTERLOCK 10/13/95 S

8.339 HS76-152B RX ENCUREFUEL ISOL INTERLOCK 10/19/95 S

8.344 COND TRANSFER ISOL VLVS TO RHR LOOP A 10/8/95 S

8.345 COND TRANSFER ISOL VLVS TO RHR LOOP B 10/8/95 S

e 1

Elda[D'ecember535i~

Page 12 of 12

^ ~

~'

l

PCCO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT LGS SIMULATOR TESTING PERFORMED IN 1996

(

LGS Simulator Testing Completedin 1996 Test No Title Test Date Results 1.01 COMPUTER REAL TIME TEST 11/10/96 S

1.11 SIMULATOR CORE RELOAD VERIFICATION 6/30/96 S

1.12 SIM/REF PLANT CRIT PAR COMPARISON 8/11/96 S

2.25.Ill DEAD BUS AUTO START OF DIESEL GENERATORS 4/15/96 S

2.26.l.F D11-D14 SAFEGUARD BUS BREAKER LOGIC 4/24/96 S

1 2. 2 6.111 SAFEGUARD BUS SUPPLY BREAKER LOGIC 4/24/96 S

3.003B CORE POWER OSCILLATIONS (OUT-OF-PHASE) 11/11/96 S

3.005A APRM CHAN B RECORDER FAILS AS-IS 5/1/96 S

3.005B APRM CHAN B FAILS INOP 2/12/96 S

3.009B APRM CHAN F FAILS INOP 3/26/96 S

3.011B RBM CHAN B FAILS INOP 2/13/96 S

3.012B LPRM 40-57B UPSCALE FAILURE 1/5/96 S

3.012F LPRM 32-49C UPSCALE FAILURE 2/7/96 S

3.013B LPRM 16-49A DOWNSCALE FAILURE 2/12/96 S

3.013F LPRM 48-33C DOWNSCALE FAILURE 2/13/96 S

l 3.0158 LF'RM 40-25A DRIFT (-25 TO +25) 3/26/96 S

l 3.017A CONTROL ROD XX-W FAILURE (DRIFT IN) 4/23/96 S

3.017B CONTROL ROD XX-W Fait.URE (DRIFT OUT) 4/23/96 S

3.017C CONTROL ROD XX-W FAILURE (ACCUM TRBL) 4/23/96 S

3.017D CONTROL ROD XX-W FAILURE (STUCK) 4/23/96 S

3.017E CONTROL ROD XX-W FAILURE (UNCOUPLED) 4/23/96 S

I 3.017F CONTROL ROD XX-W FAILURE (SCRAMMED) 4/23/96 S

3.017G CONTROL ROD XX-XX FAILS TO SCRAM 4/23/96 S

3.020B APRM CHANNEL B FAILS 0-125%

4/23/96 S

3.020F APRM CHANNEL F FAILS 0-125%

9/16/96 S

3.027B LOSS OF NORMAL POWER TO RPS CHANNEL B 3/26/96 S

3.028C REACTOR SCRAM (BANK 2) 11/12/96 S

3.029D RPS FAILS TO SCRAM (CHAN B) 7/28/96 S

5 day, De$e~mber 04,1998 Page 1 of12

~ ~ ~ ~

..r

i Test No Title Test Date Results 3.044B FW PUMP B CONTROLLER OUTPUT FAILS HIGH 5/8/96 S

3.045C FW PUMP C CONTROLLER OUTPUT FAILS LOW 5/8/96 S

3.046B STEAM FLOW XMITTER 1N003B FAILS 0-100%

4/29/96 S

3.061B MSIV HV41-1FO22B FAILS OPEN 2/13/96 S

3.0628 MSIV HV41-1FO28B FAILS OPEN 3/26/96 S

3.063B MSIV HV41-1FO22B FAILS CLOSED 9/16/96 S

3.064B MSIV HV41-1F028B FAILS CLOSED 9/16/96 S

3.065 STM LEAK OUTSIDE PRIMARY CONTAINMENT 9/24/96 S

3.071A LOSS OF EXTRACTION STEAM TO FW HTR 16A 2/12/96 S

j 3.072B SJAE STM SUPPLY PCV07-101B FAILS CLOSED 7/28/96 S

3.074 MAIN CONDENSER AIR INLEAKAGE 11/4/96 S

3.078A CONDENSATE PUMP ATRIP 1/5/96 S

3.079B COND FILTER /DEMIN B HI DIFF PRESSURE 4/16/96 S

3.079F COND FILTER /DEMIN F HI DIFF PRESSURE 5/7/96 S

3.080B CONDENSATE RECIRC VALVE FAILS CLOSED 9/25/96 S

3.086B CIRCULATING WATER PUMP B TRIP 2/12/96 S

3.098 MAIN TRANSFORMER LOSS OF COOLING 10/24/96 S

l 3.100 MAIN TURBINE BRG #5 & #6 HIGH VIBRATION 9/16/96 S

3.104B TURBINE CONTROL SYSTEM FAILS LOW 10/22/96 S

3.106A EHC PRESSURE REGULATOR B FAILS HIGH 10/6/96 S

3.107B BYPASS VALVE NO. 2 STICKS OPEN 2/12/96 S

3.107F BYPASS VALVE NO. 6 STICKS OPEN 2/13/96 S

3.109 TURBINE ACCELERATION CONTROL FAILURE 11/12/96 S

3.112A EHC PUMP A TRIPS 2/7/96 S

3.115A DRAWER INOP MCR FRESH AIR CHAN A & C 1/5/96 S

3.115AB DRAWER INOP RX ENCLOSURE VENT EXH CHAN B 2/13/96 S

3.115AF DRAWER INOP REFUEL FLOOR VENT EXH CHAN B 2/15/96 S

3.115AK DRAWER INOP POST LOCA MONITOR CHAN B 2/7/96 S

3.115E DRAWER INOP NORTH STACK RAD MONITOR 5/8/96 S

3.115J DRAWER INOP RECOMBINER & H2 ANALYZER RMS 2/7/96 S

FridayE5ber 04,1998 Page 2 of12

~

~ ~ ~ ~ ~

Test No Title Test Date Results 3.115N DRAWER INOP RX ENCLOSURE COOLING WATER 7/28/96 S

3.115RA DRWR INOP RHRSW UNIT 1 HX RETURN HEADER 2/12/96 S

3.115RD DRAWER INOP RHRSW HX 18 OUTLET 9/16/96 S

3.115V DRAWER INOP MAIN STEAM LINE CHAN B 7/28/96 S

3.136 STEAM LEAK OUTSIDE PRI CONT (1-100%)

9/24/96 S

3.138A ADS /SRV 1FO13B FAILS - LEAKS 1/14/96 S

l 3.1388 ADS /SRV 1FO13B FAILS - STUCK 1/5/96 S

3.138C ADS /SRV 1FO13B FAILS - OPEN ELECT 1/5/96 S

3.138D ADS /SRV 1FO13B FAILS CLOSED 1/5/96 S

3.138E ADS /SRV 1FO13B FAILS OPEti MECH 1/5/96 S

3.142A ADS /SRV 1FO13F FAILF. - LEAKS 1/14/96 S

3.142B ADS /SRV 1FO13F FA LS - STUCK 1/14/96 S

3.142C ADS /SRV 1FO13F FAILS - OPEN ELECT 2/12/96 S

3.142D ADS /SRV 1FO13F FAILS - CLOSED 2/13/96 S

3.142E ADS /SRV 1FO13F FAILS - OPEN MECH 2/15/96 S

3.146A ADS /SRV 1FO13K FAILS - LEAKS 3/25/96 S

3.146B ADS /SRV 1FO13K FAILS - STUCK 10/22/96 S

3.146C ADS /SRV 1FO13K FAILS - OPEN ELECT 10/8/96 S

3.146D ADS /SRV 1FO13K FAILS - CLOSED 9.25/96 S

3.146E ADS /SRV 1FO13K FAILS - OPEN MECH 9/25/96 S

3.149B ADS /SRV 1F013N FAILS - STUCK 10/23/96 S

3.149D ADS /SRV 1FO13N FAILS - CLOSED 10/23/96 S

3.150C ADS /SRV 1FO13S FAILS - OPEN ELECT 10/23/96 S

3.1518 SRV 1F013M DOWNCOMER LEAK 0-100%

2/13/96 S

3.156B NSSSS GROUP 1B INADVERTENT ISOLATION 1/14/96 S

3.156F NSSSS GROUP 1F INADVERTENT ISOLATION 2/7/96 S

3.1578 NSSSS GROUP 2B INADVERTENT ISOLATION 3/28/96 S

3.157F NSSSS GROUP 2F INADVERTENT ISOLATION 7/28/96 S

3.159B NSSSS GROUP 6B INADVERTENT ISOLATION 2/7/96 S

j 3.159F NSSSS GROUP 6F INADVERTENT ISOLATION 2/7/96 S

Irl5a555Inber 04,1998 Page 3 of5

~

Test No Title Test Date Results 3.161A NSSSS GROUP 8A INADVERTENT ISOLATION 9/9/96 S

3.161B NSSSS GROUP BB INADVERTENT ISOLATION 9/9/96 S

3.162B SEC CON & PClG B INADVERTENT ISOL 7/28/96 S

3.164 LOSS OF STEAM TO RECOMBINER PREHEATER 10/24/96 S

3.167 OFFGAS HEPA FILTER BLOCKAGE (1-100%)

2/13/96 S

3.171A RHR PUMP A TRIP 4/17/96 S

3.171B RHR PUMP B TRIP 4/17/96 S

3.171C RHR PUMP C TRIP 4/17/96 S

3.171D RHR PUMP D TRIP 4/17/96 S

3.172B RHR PUMP 18 FAILS TO AUTO START 9/16/96 S

3.173 RHR SHUTDOWN COOLING SUCTION LINE LEAK 10/26/96 S

3.174B RHR INJECTION VALVE 1F017B FAILS AS IS 9/17/96 S

3.175B RHR PUMP SUCTION VALVE F004B FAILS AS IS 7/28/96 S

3.176D RHR SDC SUCTION VALVE 1FOO9 FAILS AS IS 3/28/96 S

3.177B RHR HX A BYPASS CONTROLLER FAILS LOW 9/16/96 S

3.182A CORE SPRAY PUMP A TRIPS 4/17/96 S

3.182B CORE SPRAY PUMP B TRIPS 4/17/96 S

3.182C CORE SPRAY PUMP C TRIPS 4/17/96 S

3.182D CORE SPRAY PUMP D TRIPS 4/17/96 S

3.183B CORE SPRAY PUMP B FAILS TO AUTO STA.RT 9/17/96 S

3 1848 CORE SPRAY INBD VALVE 1FO37 FAILS AS IS 9/17/96 S

3.190A RWCU DRAIN FLOW CONTROLLER FAILS OPEN 3/28/96 S

3.193 RWCU NONREGEN HX LEAK TO RECW(1-100%)

10/23/96 S

3.194 RWCU SUCTION LINE COOL LEAKAGE (1-100%)

9/24/96 S

3.195C RWCU ISOL VALVE HV44-1F040 FAILS AS IS 1/14/96 S

3.197 SLC SOUlB VALVES Fall TO FIRE 3/26/96 S

3.198A SLC PUMP A LOSS OF CONTROL POWER 3/26/96 S

3.1988 SLC PUMP B LOSS OF CONTROL POWER 3/26/96 S

3.198C SLC PUMP C LOSS OF CONTROL POWER 3/26/96 S

3.202A SRM CHANNEL B RECORDER FAILS AS-IS 3/10/96 S

Eiiday, Dece5ber 04,1998 Page 4 of 12

Test No Title Test Date Results 3.202B SRM CHANNEL B FAILS INOPERATIVE 3/10/96 S

3.202C SRM CHANNEL E DETECTOR STUCK 3/10/96 S

3.206A IRM CHANNEL B RECORDER FAILS AS-IS 3/10/96 S

3.206B IRM CHANNEL B FAILS INOPERATIVE 3/10/96 S

3.206C IRM CHANNEL B DETECTOR STUCK 3/10/96 S

3.210A 1RM CHANNEL F RECORDER FAILS AS-IS 3/10/96 S

3.210B IRM CHANNEL F FAILS INOPERATIVE 3/10/96 S

3.210C IRM CHANNEL F DETECTOR STUCK 3/10/96 S

3.213B SRM CHANNEL B FAILS TO SELECTED VALUE 10/22/96 S

3.214B IRM CHANNEL B FAILS TO SELECTED VALUE 3/10/96 S

3.214F IRM CHANNEL F FAILS TO SELECTED VALUE 2/10/96 S

3.217B RBM CHANNEL B FAILS TO SELECTED VALUE 1/14/96 S

3.228A RX INSTRUMENT LINE BREAK AFTER 42-F047A 4/29/96 S

3.230A RX INSTRUMENT LINE BREAK AFTER 42-F065A 5n/96 S

3.231C RX INSTRUMENT LINE BREAK AFTER 42-F045C 5/7/96 S

3.232C RX LEVEL XMITTER LT42-N060B FAILS HIGH 3/28/96 S

3.232D RX LEVEL XMITTER LT42-N0E08 FAILS LOW 3/28/96 S

3.233C RX LEVEL XMITTER DPT42-N0048 FAILS LOW 3/28/96 S

3.233D RX LEVEL XMITTER DPT42-N004B FAILS LOW 3/28/96 S

3.234C RX PRESS XMITTER PT42-N078B FAILS HIGH 3/28/96 S

3 234D RX PRESS XMITTER PT42-N0788 FAILS LOW 3/28/96 S

~

3.2368 REFERENCE LEG 1D004B FLASHES 9/16/06 S

3.236E REFERENCE LEG 1D002 FLASHES 10/14/96

]

3.237B REFERENCE LEG 1D004B LEVEL DEFECT 9/17/96 S

i 3.241A FEEDWATER HEATER 12A TUBE LEAK 11/4/96 S

3.2428 FEEDWATER HEATER 15B TUBE LEAK 5/8/96 S

3.244C REACTOR FEEDPUMP A HIGH VIBRATION 11/12/96 S

324A REACTOR FEEDWATER PUMP C TRIPS 1/5/96 S

r 3.247B FW LOW FLOW CONTROL VALVE FAILS CLOSED 9/25/96 S

3.249B RX FEEDPUMP B RECIRC VALVE MILS CLOSED 7/28/96 S

f

[

Er~I5a55 ember 04,1998 Page 5 of12

~. -. = -.. -

1 i

Test No Title Test Date Results 3.251B FW S/U LEVEL CONTROL VALVE FAILS CLOSED 3/10/96 S

3.2528 FW LINE B RUPTURE INSIDE DRYWELL 11/18/96 S

1 3.2608 NETWORK LOAD TRANSIENT DECREASE 11/11/96 S

3.263B 4KV SAFEGUARD BUS D12 FAULT 10/23/96 S

3.264A MAIN GEN OUTPUT BKR 252-10113 TRIPS 9/24/96 S

3.265B STARTUP BUS BKR 20 TRIPS 11/5/96 S

3.266A 13.2KV SAFEGUARD XFMR BKR 101 TRIPS 4/24/96 S

3.266B 13.2KV SAFEGUARD XFMR BKR 201 TRIPS 4/30/96 S

3.267B PLANT SERVICES LOAD CENTER 222 FAULT 3/26/96 S

3.271A 114B RX AREA 440V LOAD CENTER FAULT 3/25/96 S

3.271B 124B RX AREA 440V LOAD CENTER FAULT 10/22/96 S

3.2738 214D PLANT SERVICES LOAD CENTER FAULT 10/22/96 S

]

3.275B D124 SAFEGUARD 440V LOAD CENTER FAULT 5/8/96 S

3.277B 120 VAC PANEL 10Y102 FAULT 10/7/96 S

2 3.2788 120 VAC PANEL 10Y106 FAULT 3/25/96 S

3.278D 120 VAC PANEL 10Y110 FAULT 10/6/96 S

3.282B 1FB 125/250 VDC 1BD105 FAULT 5/8/96 S

1 l

32848 LOSS OF DC TO SELECTED ANNUNCIATOR PNLS 10/8/96 S

i 3 284F LOSS OF DC TO SELECTED ANNUNCIATOR PNLS 10/23/96 S

3.299A CONTROL STRUCTURE CHILLER OAK 112 TRIP 7/28/96 S

3.3018 RX ENCLOSURE ISOLATION CHANNEL B 10/7/96 S

3.304B SGTS FROM REFUEL FLR HV76-020 FAILS OPEN 9/24/96 S

3.307 RX ENCLOSURE FAILS TO ISOLATE 2/13/96 S

3.406B RRCS DIVISION 11 LOSS OF DC POWER 10/26/96 S

3 407C RRCS ARI BOTH DIVS FAILS TO INITIATE 7/28/96 S

3.4098 CONTAINMENT INST GAS COMPRESSOR B LEAKS 10/22/96 S

3.411 A CRD FLOW CNTRL VALVE A FAILS CLOSED 3/28/96 S

3.412B CONTROL ROD DRIVE PUMP B TRIPS 3/25/96 S

3.414B DISCH VOLUME SV47-1F010 FAILS CLOSED 5/8/96 S

3.418B DIESEL GENERATOR 12 TRIP 4/29/96 S

555a55ecember5l1998

- pay,goggg

(

Test No Title Test Date Results 3.419B DIESEL GENERATOR 12 FAILS TO START 9/17/96 S

3.424B INSTRUMENT AIR COMPRESSOR 1BK101 TRIP 2/13/96 S

3.4318 RECIRC PUMP A M/A STATION FAILS LOW 10/6/96 S

3.432A RECIRC PUMP A INCOMPLETE START SEQ 7/28/96 S

3.433B RECIRC PUMP B SEAL #1 FAILURE 10/7/96 S

]

3.435A RECIRC PUMP A DRIVE MOTOR BREAKER TRIP 4/15/96 S

3.435B RECIRC PUMP B DRIVE MOTOR BREAKER TRIP 4/15/96 S

3.440B RECIRC LOOP B RUPTURE (0-100%)

5/1/96 S

3.441 COOLANT LEAKAGE IN DRYWELL (1-300 GPM) 10/22/96 S

j 3.4428 RECIRC PUMP 1 A RPT BREAKER CB4A TRIP 1/5/96 S

3.446A HPCI STM ISOL VALVE HV55-1F002 FAILS 2/13/96 S

l 3.447B HPCI AUX OIL PUMP FAILS -TRIPS 7/13/96 S

3.450 HPCI INADVERTENT START 2/13/96 S

3.453 HPCI PUMP DISCH VALVE 1F105 FAILS AS IS 3/25/96 S

i 3.457A RCIC SPEED CONT FAILS HIGH 9/17/96 S

3.4598 RCIC STEAM SUPFLY HV49-1F007 ISOLATES 2/13/96 S

3.465 RCIC ETEAM LINE BREAK IN PUMP RM 1-100%

11/19/96 S

3.471B DRYWELL AREA UNIT COOLER FAN 181 TRIP 2/13/96 S

3.471F DRYWELL AREA UNIT COOLER FAN 1F1 TRIP 4/29/96 S

3.4728 DRYWELL AREA UNIT COOLER FAN 1B2 TRIP 5/1/96 S

3.472F DRYWELL AREA UNIT COOLER FAN 1F2 TRIP 5/1/96 S

3.475 PRIMARY CONTAINMENT HYDROGEN DETONATION 10/23/96 S

i 2

l 3.482B DW CHILLER 1BK111 TRIP 4/15/96 S

3.483B RECW PUMP TRIP (B) 2/12/96 S

j 3.484C TECW PUMPS TRIP (BOTH) 10/8/96 S

3.48BC SERVICE WATER PUMP C TRIPS 1/14/96 S

3.489B ESW PUMP B TRIPS 1/14/96 S

3.490B ESW VLV HV11-054A FAILS TO AUTO SWAP 1/14/96 S

3.490F ESW VLV HV11-079 FAILS TO AUTO SWAP 1/14/96 S

3.492B RHR SERVICE WATER PUMP B TRIPS 1/14/96 S

5Ide~yTDecembelbe,1998 Page 7 of12

~~

I

. _ =.

1 t

t Test No Title Test Date Results 3.5008 JET PUMP NO.16 DISPLACED MIXER 2/13/96 S

3.502B JET PUMP NO. 5 BROKEN INSTRUMENT LINE 10/8/96 S

3.504A RECIRC PUMP 1 A SHAFT FAILURE 2/13/96 S

3.505B RECIRC PUMP A LOW RUNBACK 2/12/96 S

3.514 RHR Service Water High Radiation 10/22/96 S

3.515D FW HEATER 15A DRAIN VALVE FAILS OPEN 1/5/96 S

3.516C FW HEATER 14A DRAIN VALVE FAILS CLOSED 2/12/96 S

3.5178 FW HEATER 13B DRAIN VALVE FAILS OPEN 2/12/9S S

3.518A FW HEATER 12B DRAIN VALVE FAILS CLOSED 2/13/96 S

3.518E FW HEATER 16B DRAIN VALVE FAILS CLOSED 2/13/96 S

3.519D FW HEATER 15C DRAIN VALVE FAILS OPEN 3/26/96 S

3.520C FW HEATER 14C DRAIN VALVE FAILS CLOSED 3/26/96 S

3.521B FW HEATER 13A DUMP VALVE FAILS OPEN 4/29/96 S

3.522A FW HEATER 12A DUMP VALVE FAILS CLOSED 2/12/96 S

3.522E FW HEATER 16A DUMP VALVE FAILS CLOSED 5/1/96 S

3.523D FW HEATER 15B DUMP VALVE FAILS OPEN 4/29/96 S

3.524C FW HEATER 14B DUMP VALVE FAILS CLOSED 5/1/96 S

3.525B FW HEATER 13C DUMP VALVE FAILS OPEN 9/16/96 S

3.526A FW HEATER 12C DUMP VALVE FAILS CLOSED 10/22/96 S

3.526E FW HEATER 16C DUMP VALVE FAILS CLOSED 10/22/96 S

I i

3.527B STEAM LEAK DET NUMAC TIS 25-101B FAILS 2/12/96 S

3.5288 RHR CNTMNT SPRAY VALVE F016B FAILS AS-IS 9/16/96 S

3.529B RX PRESS XMITTER PT42-103A FAILS LOW 9/25/96 S

3.531 TURBINE MOTOR SUCTION PUMP TRIPS 11/5/96 S

3.535B 1 A2 MOIST SEP DR TK DRN VLV FAILS CLOSED 9/25/96 S

3.535F 1C2 MOIST SEP DR TK DRN VLV FAILS CLOSED 9/25/96 S

3.536B 1 A2 MOIST SEP DR TK DRN VLV FAILS OPEN 11/4/96 S

3.5378 1 A2 MOIST SEP DR TK DMP VLV FAILS CLOSED 10/22/96 S

3.537F 1C2 MOIST SEP DR TK DMP VLV FAILS CLOSED 10/22/96 S

3.5388 1 A2 MOIST SEP DRN TK DMP VLV FAILS OPEN 10/22/96 S

~

~

~ ~ ~ '

~

Friday, Dece'm5e~r"5,1558 Page 8 of 12

Test No Title Test Date Results 3.540 STATOR COOLING WATER TCV FAILS CLOSED 11/11/96 S

3.544 REACTOR CAVITY SEALS NO. 3/4 LEAKAGE 11/12/96 S

3.546A Safeguard MCC D114-G-D Fault 10/23/96 S

3.546B Safeguard MCC D124-G-D Fault 10/22/96 S

3.552A RFP DISCH CHK VLV HV06-105A FAILS OPEN 11/20/96 S

3.553A TURBINE CONTROL VALVE NO.1 FAILS OPEN 8/9/96 S

3.553B TURBINE CONTROL VALVE NO. 2 FAILS OPEN 10/22/96 S

3.553C TURBINE CONTROL VALVE NO. 3 FAILS OPEN 8/9/96 S

3.553D TURBINE CONTROL VALVE NO. 4 FAILS OPEN 8/9/96 S

3.556A RFP A M/A STATION SWAPS TO MANUAL 11/5/96 S

3.557A FWC UPS INVERTER E/S-XX-118 FAILS 2/22/96 S

3.557B FWC UPS INVERTER E/S-XX-119 FAILS 2/22/96 S

3.557C FWC UPS INVERTER E/S-XX-120 FAILS 2/22/96 S

3.557D ALL FWC UPS INVERTERS Fall 2/22/96 S

3.558A HV51-1F017A CLOSE TORQUE SWITCH TRIPS 2/29/96 S

3.558B HV51-1F017B CLOSE TOROUE SWITCH TRIPS 2/29/96 S

3.558C HV51-1F017C CLOSE TORQUE SWITCH TRIPS 2/29/96 S

3.558D HV51-1F017D CLOSE TORQUE SWITCH TRIPS 2/29/96 S

3.559 SLC INJECTION LINE BREAK IN DRYWELL 3/26/96 S

i 3 560A RHR PUMP A SUCTION STRAINER CLOGS SMALL 5/7/96 S

3.560B RHR PUMP A SUCTION STRAINER CLOGS LARGE 5/7/96 S

3.561A CORE SPRAY PUMP A SUCTION STRAINER CLOGS 5/7/96 S

3.561B CORE SPRAY PUMP B SUCTION STRAINER CLOGS 5/7/96 S

3.561C CORE SPRAY PUMP C SUCTION STRAINER CLOGS 5/7/96 S

3.561D CORE SPRAY PUMP D SUCTION STRAINER CLOGS 5/7/96 S

3.562A RHR PUMP B SUCTION STRAINER CLOGS SMALL 5/8/96 S

3.562B RHR PUMP B SUCTION STRAINER CLOGS LARGE 5/8/96 3

4.006 Load Table: 4 KV Safeguard Bus D12 10/23/96 S

4.010 Load Table: 4 KV Safeguard MCC D114-G-D 10/22/96 S

l 4.011 Load Table: 4 KV SAFEGUARD BUS D124 5/2/96 S

r Friday, December 04,1998 Page 9 of12 l

1 l

Test No Title Test Date Resu/:s 4.012 Load Table: 4 KV Safeguard MCC D124-G-D 10/22/96 S

4.016 Load Table: RX AREA LOAD CENTER 114B 3/25/96 G

4.020 Load lable: Reactor Area Load Center 1248 10/22/96 S

4.024 Load Table: Plant Se vices LC 214D 10/22/96 S

4.028 Load Table: Plant Services Bus 222 3/26/96 S

4.030 Load Table: 120 VAC PANEL 10Y102 10/6/96 S

4.034 Load Table: 120 VAC PANEL 10Y106 3/25/96 S

4.035 Load Table: 120 VAC PANEL 10Y109 2/21/96 S

4.036 Load Tabie: 120 VAC Panel 10Y110 10/6/96 S

4.037 Load Table: 120 VAC Panet 10Y201 2/22/96 S

4.042 Load Table: 125/250 VDC BUS 1BD105 5/8/96 S

4.055 Load Table: FWC UPS Inverter E/S-XX-118 2/22/96 S

4.056 Load Table: FWC UPS Inverter E/S-XX-119 10/6/96 S

4.057 Load Table: FWC UPS Inverter E/S-XX-120 2/22/96 S

4.058 Load Table: FWC 24 VDC Power Supply C32-K611 2/23/96 S

4.059 Load Table : FWC 24 VDC Power Supply C32-K612 2/23/96 S

4.060 Load Table: FWC 24 VDC Power Supply C32-K613 2/23/96 S

5.028 RECIRC LOOP B RUPTURE PERFORMANCE TEST 9/17/96 S

5.07A LOSS OF SAFEGUARD BUS D11 (EMERG POWER) 2/23/96 S

5.07B LOSS OF SAFEGUARD BUS D12 (EMERG POWER) 2/23/96 S

5.07C LOSS OF SAFEGUARD BUS D13 (EMERG POWER) 2/23/96 S

5.09B LOSS OF NON-SAFEGUARD LOAD CENTER 114B 4/24/96 S

1 i

5.09F LOSS OF NON-SAFEGUARD LOAD CENTER 124B 4/23/96 S

5.10B LOSS OF 120 VAC INSTRUMENT BUS 10Y102 4/23/96 S

5.10E LOSS OF 120 VAC INSTRUMENT BUS 10Y105 2/26/96 S

I 5.10F LOSS OF 120 VAC INSTRUMENT BUS 10Y106 2/21/96 S

5.10G LOSS OF 120 VAC INSTRUMENT BUS 10Y109 2/21/96 S

5.10H LOSS OF 120 VAC INSTRUMENT BUS 10Y110 2/21/96 S

5.10J LOSS OF 120 VAC INSTRUMENT BUS 10Y201 2/21/96 S

5.11B LOSS OF 125/250 VDC BUS 1BD105 9/17/96 S

Friday, December 04,1998 Page 10 of12 l

I

)

Test No Title -

Test Date Results 5.13A MAIN CONDENSER AIR LEAK AT LOW SEVERITY 11/4/96 S

5.16B COMPLETE LOSS OF TURB ENCL COOLING WATER 11/19/96 S

5.17D FW MASTER LVL CONTROLLER FAILS HIGH 11/4/96 S

5.17H LOSS OF FEEDWATER HEATING AT FULL POWER 9/17/96 S

5.23 MAIN TURBINE - GENERATOR TRIP.

9/17/96 S

5.28 MAIN STEAM LINE BREAK OUTSIDE DRYWELL 9/25/96 S

I 5.29B MAIN FEED LINE B BREAK INSIDE DRYWELL 9/25/96 S

5.34B TURBINE TRIP WITH ATWS (BROWN'S FERRY) 11/4/96 S

6.01 NORMOPS: PLANT S/U TO HOT STANDBY 6/11/96 S

6.02 NORMOPS: TURB/ GEN S/U AND GEN SYNCH 6/17/96 S

6.03 NORMOPS: HOT S/U FROM HOT STBY TO RATED 6/17/96 S

6.06 NORMOPS: PLT S/D FROM RATED TO HOT STBY 6/9/96 S

6.09 NORMOPS: TRIP /tND RESTART TO RATED 12/19/96 S

6.10 Steady State Performance at 25% Power 11/18/96 S

C.11 Steady State Performance at 75% Power 11/18/96 S

6.12 Steady State Performance at 100% Power for 1 Hour 6/25/96 S

7.01 MANUAL SCRAM 9/17/96 S

7.02 SIMULTANEOUS TRIP OF ALL FEEDWATER PUMPS 10/8/96 S

7.03 CLOSURE OF ALL MSIVS @ 100% POWER 11/4/96 S

7.04 TRIP OF BOTH RECIRC PUMPS AT RATED POWER 10/8/96 S

7.05 SINGLE RECIRC PUMP TRIP 10/8/96 S

7.06 TURBINE TRIP WITHIN BYPASS CAPABILITY 11/18/96 S

i 7.08 RECIRC LOOP RUPTURE W/ LOSS OFFSITE PWR 10/21/96 S

j 7.09 MAX SIZE UNISOLABLE MSL RUPTURE 10/8/96 S

8.052 HV-48-1F016 PP TEST THROTTLE VALVE 3/26/96 S

8.053 HV-48-1F036 SLC MAIN ISOLATION VALVE 3/26/96 S

8.054 SLC PUMP A LOCAL TEST START SWITCH 3/26/96 S

j 8.055 SLC PUMP B LOCAL TEST START SWITCH 3/26/96 S

8.056 SLC PUMP C LOCAL TEST START SWITCH 3/26/96 S

8.187 ALT OFFSITE PWR SUPPLY TO SAFEGUARD BUS 4/24/96 S

Eriday?D5Elmber 04,1998 Page 11 of1E

~

l I

Test No Title Test Date Results 8.188 ALT OFFSITE PWR SUPPLY TO SAFEGUARD BUS 4/30/96 S

8.194 101 SAFEGUARD BUS UNDERVOLTAGE RELAY 5/8/96 S

8.195 201 SAFEGUARD BUS UNDERVOLTAGE RELAY 5/8/96 S

8.278 RHR PUMP A BREAKER RACKED OUT 4/17/96 S

8.279 RHR PUMP B BREAKER RACKED OUT 4/17/96 S

8.280 RHR PUMP C BREAKER RACKED OUT 4/17/96 S

8.281 RHR PUMP D BREAKER RACKED OUT 4/17/96 S

8.282 CORE SPRAY PUMP A BREAKER RACK IN/OUT 4/23/96 S

8.283 CORE SPRAY PUMP B BREAKER RACK IN/OUT 4/23/96 S

8.284 CORE SPRAY PUMP C BREAKER RACK IN/OUT 4/23/96 S

8.285 CORE SPRAY PUMP D BREAKER RACK IN/OUT 4/23/96 S

8.353 RECIRC MG SET A LO COOLER OUTLET VALVE 4/15/96 S

8.354 RECIRC MG SET B LO COOLER OUTLET VALVE 4/15/96 S

8.355 RHR PUMP A LOCAL MANUAL CONTROL 4/16/96 S

8.357 RHR PUMP B LOCAL MANUAL CONTROL 4/16/96 S

8.359 RHR PUMP C LOCAL MANUAL CONTROL 4/16/96 S

8.361 RHR PUMP D LOCAL MANUAL CONTROL 4/16/96 S

8.363 CORE SPRAY PUMP A LOCAL MANUAL CONTROL 4/16/96 S

8.365 CORE SPRAY PUMP B LOCAL MANUAL CONTROL 4/16/96 S

8.367 CORE SPRAY PUMP C LOCAL MANUAL CONTROL 4/16/96 S

8.369 CORE SPRAY PUMP D LOCAL MANUAL CONTROL 4/16/96 S

l Friday, December 04,1998 Page 12 of 12

i PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT s

LGS SIMULATOR TESTING PERFORMED IN 1997 l

1 I

i

I LGS Simulator Testing Completedin 1997 Test No Title Test Date Results 1.01 COMPUTER REAL TIME TEST 12/7/97 S

3.006A APRM CHAN C RECORDER FAILS AS-IS 2/25/97 S

j 3.006B APRM CHAN C FAILS INOP 2/25/97 S

3.008A APRM CHAN E RECORDER FAILS AS-IS 2/26/97 S

3.010A RBM CHAN A RECORDER FAILS AS-IS 4/24/97 S

3.012C LPRM 16-09C UPSCALE FAILURE 316/9 7 S

')12G LPRM 56-41D UPSCALE FAILURE 6/7/97 S

3.013C LPRM 08-33B DOWNSCALE FAILURE 4/7/97 S

3 013G LPRM 32-09A DOWNSCALE FAILURE 6/22/97 S

3.014 TIP CHAMBER STUCK IN-CORE 10/26/97 S

3.015C LPRM 16-25A DRIFT ( 25 TO +25) 6/14/97 S

3.016H Control Rod (XX-YY) Fails: Double Notch on Wthdraw 10/27/97 S

I 3.017H Control Rod (XX-YY) Fails: Double Notch on Wthdraw 10/27/97 S

3.018A CONTROL ROD XX-YY FAILURE (DRIFT IN) 3/17/97 S

l 3.018B CONTROL ROD XX-YY FAILURE (DRIFT OUT) 6/22/97 S

3.018C CONTROL ROD XX-YY FAILURE (ACCUM TRBL) 10/18/97 S

3.018D CONTROL ROD XX-YY FAILURE (STUCK) 11/9/97 S

3.018E CONTROL ROD XX-YY FAILURE (UNCOUPLED) 11/9/97 S

3.018F CONTROL ROD XX-YY FAILURE (SCRAMMED) 4/24/97 S

3.018G CONTROL ROD XX-XX FAILS TO SCRAM 6/14/97 S

l 3.018H Control Rod (XX YY) Fails: Double Notch on Wthdraw 10/27/97 S

f 3.019H Control Rod (XX-YY) Fails: Double Notch on Wthdraw 10/27/97 S

3.020C APRM CHANNEL C FAILS 0-125%

1/26/97 S

i 3.023 RPIS FAILURE 4 ROD DISPLAY 2/11/97 S

3.024 RDCS FAILURE (ANALYZER CARD) 11/9/97 S

3.028D REACTOR SCRAM (BANK 3) 10/26/97 S

3.029A RPS FAILS TO SCRAM (AUTO ONLY) 2/11/97 S

3.043A FWC MASTER LEVEL CONTROLLER FAILS HIGH 2/15/97 S

.g.

_... ~

l

Test No Title Test Date Results 3.044C FW PUMP C CONTROLLER OUTPUT FAILS HIGH 2/25/97 S

3.046C STEAM FLOWXMITTER 1N003C FAILS 0-100%

5/12/97 S

3.047A FW FLOWXMITTER 1N002A FAILS 0-100%

5/7/97 S

3.061C MSIV HV41-1FO22C FAILS OPEN 2/26/97 S

3.062C MSIV HV41-1FO28C FAILS OPEN 4/24/97 S

3.063C MSIV HV41-1FO22C FAILS CLOSED 4/7/97 S

3.064C MSIV HV41 1FO28C FAILS CLOSED 5/13/97 S

3.066 STM LINE RUPTURE INSIDE DRYWELL 10/18/97 S

3.071B LOSS OF EXTRACTION STEAM TO FW HTR 16B 4/24/97 S

3.072C SJAE STM SUPPLY PCV07-101 A FAILS OPEN 12/7/97 S

3.075 EXHAUST HOOD SPRAY VALVE FAILS CLOSED 12/7/97 S

3.078B CONDENSATE PUMP B TRIP 2/15/97 S

3.079C COND FILTER /DEMIN C HI DIFF PRESSURE 4/24/97 S

3.079G COND FILTER /DEMIN G HI DIFF PRESSURE 6/14/97 S

3.085 CIRCULATING WATER EXPANSION JOINT LEAK 11/15/97 S

3.086C CIRCULATING WATER PUMP C TRIP 2/25/97 S

3.099 TRIP OF BOTH STATOR COOLANT PUMPS 5/20/97 S

3.102 MAIN TURBINE LOW BRG OlL PRESSURE 11/15/97 S

3.105A EHC PRESSURE REGULATOR A FAILS HIGH 6/22/97 S

3.106B EHC PRESSURE REGULATOR B FAILS LOW 10/18/97 S

3.107C BYPASS VALVE NO. 3 STICKS OPEN 2/25/97 S

3.107G BYPASS VALVE NO. 7 STICKS OPEN 6/7/97 S

3.110 MAIN TURBINE - GENERATOR TRIP 5/12/97 S

3.112B EHC PUMP B TRIPS 2/25/97 S

3.115AC DRAWER INOP RX ENCLOSURE VENT EXH CHAN C 2/15/97 S

3.115AG DRAWER INOP REFUEL FLOOR VENT EXH CHAN C 3/17/97 S

3.115AL DRAWER INOP POST LOCA MONITOR CHAN C 3/17/97 S

3.115B DRAWER INOP MCR FRESH AIR CHAN B & D 2/25/97 S

3.115F DRAWER INOP SOUTH STACK RAD MONITOR 2/25/97 S

3.115K DRWR INOP STM PACK EXH & VAC PMP RAD MON 3/14/97 S

SIday, Dic5EeT5I998 Page 2 of 11 i

m m

Test No Title Test Date Results 3.115P DRAWER INOP SERVICE WATER COOLING WATER 2/26/97 S

3.115RB DRWR INOP RHRSW UNIT 2 HX RETURN HEADER 6/22/97 S

3.115RE DRAWER INOP RHRSW HX 2A OUTLET 10/26/97 S

3.115W DRAWER INOP MAIN STEAM LINE CHAN C 2/25/97 S

3.139A ADS /SRV 1FO13C FAILS - LEAKS 6/14/97 S

i 3.139B ADS /SRV 1FO13C FAILS - STUCK 2/11/97 S

3.139C ADS /SRV 1FO13C FAILS - OPEN ELECT 2/11/97 S

3.139D ADS /SRV 1FO13C FAILS - CLOSED 2/11/97 S

3.139E ADS /SRV 1FO13C FAILS - OPEN MECH 2/15/97 S

3.143A ADS /SRV 1FO13G FAILS - LEAKS 6/14/97 S

3.1438 ADS /SRV 1FO13G FAILS - STUCK 3/18/97 S

3.143C ADS /SRV 1FO13G FAILS - OPEN ELECT 5/12/97 S

3.143D ADS /SRV 1FO13G FAILS - CLOSED 5/12/97 S

3.143E ADS /SRV 1F013G FAILS - OPEN MECH 5/12/97 S

3.147A ADS /SRV 1FO13L FAILS - LEAKS 6/14/97 S

3.147B ADS /SRV 1FO13L FAILS - STUCK 2/25/97 S

3.147C ADS /SRV 1FO13L FAILS - OPEN ELECT 9/21/97 S

3.147D ADS /SRV 1FO13L FAILS - CLOSED 6/14/97 S

3.147E ADS /SRV 1FO13L FAILS - OPEN MECH 6/22/97 S

3.149A ADS /SRV 1FO13N FAILS LEAKS 6/22/97 S

3.149E ADS /SRV 1FO13N FAILS - OPEN MECH 9/21/97 S

3.150D ADS /SRV 1FO13S FAILS - CLOSED 9/21/97 S

3.151C SRV 1F013H DOWNCOMER LEAK 0-100%

6/14/97 S

3.151E SRV 1F013S DOWNCOMER LEAK 0-100%

12/7/97 S

3.156C NSSSS GROUP 1C INADVERTENT ISOLATION 2/25/97 S

3.156G NSSSS GROUP 1G INADVERTENT ISOL ATION 3/18/97 S

3.157C NSSSS GROUP 2C INADVERTENT ISOLATION 2325/97 S

3.158A NSSSS GROUP 3A INADVERTENi ISOLATION 2/25/97 S

3.159C NSSSS GROUP 6C INADVERTENT ISOLATION 6/22/97 S

3.160A NSSSS GROUP 7A INADVERTENT ISOLATION 6/22/97 S

Friday, December 04,1998 Page 3 of11

i P

Test No Title Test Date Results 3.1618 NSSSS GROUP 8B INADVERTENT ISOLATION 10/18/97 S

3.162C SEC CON & PCIG C INADVERTENT ISOL 5/12/97 S

f 3.165 STEAM JET AIR EJECT DISCHARGE EXPLOSION 11/15/97 S

3.168A OFFGAS CHILLER GLYCOL PUMP A TRIP 3/17/97 S

l l

3.171C RHR PUMP C TRIP 2/25/97 S

3.172C RHR PUMP 1C FAILS TO AUTO START 10/12/97 S

3.174C RHR INJECTION VALVE 1F017C FAILS AS IS 10/12/97 S

3.175C RHR PUMP SUCTION VALVE F004C FAILS AS IS 6/22/97 S

3.176A RHR LOOP SDC VALVE 1FOO6A FAILS AS IS 4/8/97 S

3.176E RHR SDC INJECT VALVE 1FO15A FAILS AS IS 10/12/97 S

3.177C RHR HX B BYPASS CONTROLLER FAILS HIGH 10/12/97 S

3.182C CORE SPRAY PUMP C TRIPS 5/13/97 S

3.183C CORE SPRAY PUMP C FAILS TO AUTO START 9/21/97 S

3.189A REACTOR WATER CLEANUP PUMP A TRIPS 2/15/97 S

3.1900 RWCU DRAIN FLOW CONTROLLER FAILS CLOSED 3/4/97.

S

)

3.194 RWCU SUCTION LINE COOL LEAKAGE (1-100%)

10/26/97 S

3.197 SLC SQUlB VALVES FAIL TO FIRE 3/12/97 S

3.203A SRM CHANNEL C RECORDER FAILS AS-IS 3/4/97 S

3 203B SRM CHANNEL C FAILS INOPERATIVE 3/4/97 S

3.203C SRM CHANNEL C DETECTOR STUCK 3/4/97 S

3.207A IRM CHANNEL C RECORDER FAILS AS-IS 3/4/97 S

l 3.207B IRM CHANNEL C FAILS INOPERATIVE 3/4/97 S

3.207C IRM CHANNEL C DETECTOR STUCK 3/4/97 S

3.211 A IRM CHANNEL G RECORDER FAILS AS-IS 10/18/97 S

3.211B IRM CHANNEL G FAILS INOPERATIVE 10/18/97 S

i 3.211C IRM CHANNEL G DETECTOR STUCK 10/18/97 S

3.213C SRM CHANNEL C FAILS TO SELECTED VALUE 6/7/97 S

3.214C IRM CHANNEL C FAILS TO SELECTED VALUE 6/7/97 S

3.214G IRM CHANNEL G FAILS TO SELECTED VALUE 6/7/97 S

3.215 IRM OVERLAP FAILURE 12/20/97 S

YrI5a~y5 ember 04,1998 Page 4 of 11

~

l

t Test No Title Test Date Results 3.226 RX INSTRUMENT LINE BREAK AFTER 42-F041 3/18/97 S

f 3.228B RX INSTRUMENT LINE BREAK AFTER 42-F0478 6/22/97 S

3.230B RX INSTRUMENT LINE BREAK AFTER 42-F065B 6/22/97 S

3.231D RX INSTRUMENT LINE BREAK AFTER 42-F045D 12/7/97 S

3.232E RX LEVEL XMITTER LT42-N080C FAILS HIGH 3/4/97 S

3.232F RX LEVEL XMITTER LT42-N080C FAILS LOW 3/4/97 S

t 3.233E RX LEVEL XMITTER DPT42-N004C FAILS HIGH 2/25/97 S

3.233F RX LEVEL XMITTER DPT42-N004C FAILS LOW 2/25/97 S

3.234E RX PRESS XMITTER PT42-N078C FAILS HIGH 4/8/97 S

3.234F RX PRESS XMITTER PT42-N078C FAILS LOW 12/7/97 S

3 236C REFERENCE LEG 1D004C FLASHES 12/7/97 S

3.236F ALL REFERENCE LEGS FLASH 12/7/97 S

3.237C REFERENCE LEG 1D004C LEVEL DEFECT 6/22/97 S

3.2418 FEEDWATER HEATER 128 TUBE LEAK 12/7/97 S

3.242C FEEDWATER HEATER 15C TUBE LEAK 11/9/97 S

i 3.245A REACTOR FEEDWATER PUMP B TRIPS 2/15/97 S

3.246B FEEDWATER PUMP C MECHANICAL FAILURE 12/7/97 S

3.248A RX FEEDPUMP A RECIRC VALVE FAILS OPEN 3/18/97 S

j 3.250A RX FEEDPUMP C RECIRC VALVE FAILS OPEN 11/15/97 S

3.253A FW LINE A RUPTURE OUTSIDE DRYWELL 12/7/97 S

j 3.256 CAC N2 PURGE FLOW CONTROLLER FAILS HIGH 12/7/97 S

3.261 LOSS OF OFFSITE POWER (BLACKOUT) 8/23/97 S

3.263C 4KV SAFEGUARD BUS D13 FAULT 6/22/97 S

3.264B MAIN GEN OUTPUT BKR 252-10213 TRIPS 11/15/97 S

3,266A 13.2KV SAFEGUARD XFMR BKR 101 TRIPS 11/9/97 S

3.272A 114C TURB AREA 440V LOAD CENTER FAULT 4/8/97 S

3.2728 124C TURB AREA 440V LOAD CENTER FAULT 4/8/97 S

3.275C D134 SAFEGUARD 440V LOAD CENTER FAULT 6/14/97 S

3.277C 120 VAC PANEL 10Y103 FAULT 3/5/97 S

3.279A 120 VAC PANEL 10Y201 FAULT 3/18/97 S

Fr5In[Dic0m~ber 04,1998 Page 5 of11 i

l i

i

1 l

Test No Title Test Date Results 3.280A 120 VAC RPS & UPS BUS 1 AY160 FAULT 5/13/97 S

4 3.282C 1FC 125/250 VDC 1CD105 FAULT 9/28/97 S

3.284C LOSS OF DC TO SELECTED ANNUNCIATOR PNLS 10/26/97 S

3.284G LOSS OF DC TO SELECTED ANNUNCIATOR PNLS 12/7/97 S

3.299B CONTROL STRUCTURE CHILLER OBK112 TRIP 10/12/97 S

3.302A Refuel Floor isolation Channel A 6/7/97 S

1 3.305A SGTS FROM RX ENCLOS HV76-196 FAILS OPEN 4/8/97 S

l 3.310 CONTROL STRUCTURE Hi CL2 CONCENTRATION 6/14/97 S

3.407A RRCS ARI DIVISION I FAILS TO INITIATE 10/26/97 S

3.408A LEAK IN INSTRUMENT AIR HEADER A 10/12/97 S

}

3.410A CIG ISOL TO DW HV59-129A FAILS CLOSED 4/8/97 S

3.411B CRD FLOW CNTRL VALVE B FAILS CLOSED 10/17/97 S

3.412C BOTH CONTROL ROD DRIVE PUMPS TRIP 2/25/97 S

3.414C DISCH VOLUME SV47-1F181 FAILS CLOSED 11/15/97 S

]

3.418C DIESEL GENERATOR 13 TRIP 3/5/97 S

i 3.419C DIESEL GENERATOR 13 FAILS TO START 6/7/97 S

j 3 424C BOTH INSTRUMENT AIR COMPRESSORS TRIP 6/7/97 S

l 3 431C RECIRC PUMP B M/A STATION FAILS HIGH 12/7/97 S

3.432B RECIRC PUMP B INCOMPLETE START SEO 6/7/97 S

3.434A RECIRC PUMP A SEAL #2 FAILURE 12/7/97 S

]

3.436A RECIRC PUMP A GEN FIELD BREAKER TRIP 2/25/97 S

3.442C RECIRC PUMP 1 A RPT BRKR CB3A & CB4A TRIP 3/18/97 S

3 443A REC 1RC PUMP 1B RPT BREAKER CB3B TRIP 2/25/97 S

3 446B HPCI STM ISOL VALVE HV55-1F003 FAILS 5/13/97 S

3 448A HPCI SPEED CONT FAILS HIGH 9/21/97 S

l 3.451A HPCI STEAM SUPPLY HV55-1F003 ISOLATES 5/13/97 S

3.454 HPCI SUCTION VALVES FAIL TO AUTO SWAP 6/14/97 S

3.4578 RCIC SPEED CONT FAILS LOW 6/22/97 S

3.460 RCIC DISCHARGE VALVE 1F013 FAILS AS IS 6/22/97 S

3.464A RCIC ISOL VLV HV491F007 FAILS AS-IS 3/5/97 S

Friday, December 04,1998 Page 6 of11

Test No Title Test Date Results 3.466 TRIP OF RCIC OVRSPEED MECHANISM 4/7/97 S

3.471C DRYWELL AREA UNIT COOLER FAN 1C1 TRIP 4/7/97 S

3.471G DRYWELL AREA UNIT COOLER FAN 1G1 TRIP 5/13/97 S

3.472C DRYWELL AREA UNIT COOLER FAN 1C2 TRIP 6/14/97 S

3.472G DRYWELL AREA UNIT COOLER FAN 1G2 TRIP 6/22/97 S

3.482A DW CHILLER 1 AK111 TRIP 11/9/97 S

3.484A TECW PUMP A TRIP 2/25/97 S

3.487 LOSS OF SW TO MAIN TURB LUBE OIL COOLERS 9/7/97 S

3.489C ESW PUMP C TRIPS 2/26/97 S

3.490C ES$N VLV HV11225 FAILS TO AUTO SWAP 2/26/97 S

3.490G ESW VLV HV11-126 FAILS TO AUTO SWAP 3/3/97 S

3.491 ESW SYSTEM LEAK 7/26/97 S

3.492C RHR SERVICE WATER PUMP C TRIPS 6/14/97 S

3.501A JET PUMP NO. 7/8 PLUGGED RISER 6/14/97 S

3.503A JET PUMP NO.17/18 RISER BREAK 12/7/97 S

3.504B RECIRC PUMP 1B SHAFT FAILURE 12/7/97 S

3.506A RECIRC PUMP B HIGH RUNBACK 2/25/97 S

3.515A FW HEATER 12A DRAIN VALVE FAILS OPEN 2/11/97 S

3.515E FW HEATER 16A DRAIN VALVE FAILS OPEN 3/3/97 S

3.516D FW HEATER 15A DRAIN VALVE FAILS CLOSED 3/18/97 S

3.517C FW HEATER 1 IB DRAIN VALVE FAILS OPEN 3/18/97 S

3.518B FW HEATER 14B DRAIN VALVE FAILS CLOSED 5/20/97 S

3.519A FW HEATER 12C DRAIN VALVE FAILS OPEN 6/7/97 S

3.519E FW HEATER 16C DRAIN VALVE FAILS OPEN 5/20/97 S

3.520D FW HEATER 15C DRAIN VALVE FAILS CLOSED 5/20/97 S

3.521C FW HEATER 14A DUMP VALVE FAILS OPEN 5/20/97 S

3.5228 FW HEATER 13A DUMP VALVE FAILS CLOSED 5/20/97 S

3.523A FW HEATER 12B DUMP VALVE FAILS OPEN 5/20/97 S

3.523E FW HEATER 16B DUMP VALVE FAILS OPEN 6/22/97 S

3.524D FW HEATER 15B DUMP VALVE FAILS CLOSED 5/20/97 S

Friday, Deceri55er 04,1998 Page 7 of11

a f

Test No Title Test Dhte Results i

3.525C FW HEATER 14C DUMP VALVE FAILS OPEN 6/22/97 S

3.526B FW HEATER 13C DUMP VALVE FAILS CLOSED 6/7/97 S

3.527C STEAM LEAK DET NUMAC TIS 25-101C FAILS 6/7/97 S

l 3.528C RHR CNTMNT SPRAY VALVE FO21 A FAILS AS-IS 4/8/97 S

3.529C RX PRESS XMITTER PT42-103B FAILS HIGH 6/14/97 S

3.532 TURBlNE EMERGENCY BEARING OIL PUMP TRIPS 6/14/97 S

3.535C 181 MOIST SEP DR TK DRN VLV FAILS CLOSED 6/14/97 S

3.536C 1B1 MOIST SEP DR TK DRN VLV FAILS OPEN 12/7/97 S

3.536E 1C1 MOIST SEP DR TK DRN VLV FAILS OPEN 12/7/97 S

3.537C 1B1 MOIST SEP DR TK DMP VLV FAILS CLOSED 6/14/97 S

3.538C 181 MOIST SEP DRN TK DMP VLV FAILS OPEN 12/5/97 S

3.538E 1C1 MOIST SEP DRN TK DMP VLV FAILS OPEN 12/5/97 S

3.541 GEN HYDROGEN COOLERS TCV FAILS CLOSED 12/7/97 S

1 3.545 STATOR COOLING WATER FLOW SWITCH FAILS 12/7/97 S

3.549 COARSE HOTWELL REJECT VALVE FAILS OPEN 6/14/97 S

3.552A RFP DISCH CHK VLV HV06-105A FAILS OPEN 1/11/97 S

3.552B RFP DISCH CHK VLV HV06-105B FAILS OPEN 1/11/97 S

3.553C TURBINE CONTROL VALVE NO. 3 FAILS OPEN 6/22/97 S

3.554 MAIN TURBINE PMG FAILS 6/22/97 S

l 3.556B RFP B M/A STATION SWAPS TO MANUAL 6/14/97 S

j i

3.556D RFP A, B & C M/A STATIONS SWAP TO MANUAL 6/14/97 S

3.563A Fw Heater 1 A Level Sensing Line Fails Hi 4/24/97 S

3.563B Fw Heater 1B Level Sensing Line Fails Hi 4/24/97 S

3.563C Fw Heater 1C Level Sensing Line Fails Hi 4/24/97 S

3.564A Fw Heater 2A Level Sensing Line Fails Hi 4/24/97 S

3.564B Fw Heater 28 Level Sensing Line Fails Hi 4/24/97 S

3.564C Fw Heater 2C Level Sensing Line Fails Hi 4/24/97 S

3.565A Fw Heater 3A Level Sensing Line Fails Hi 4/24/97 S

3.565B Fw Heater 3B Level Sensing Line Fails Hi 4/24/97 S

3.565C Fw Heater 3C Level Sensing Line Fails Hi 4/24/97 S

hy e

h h

2

Test No Title Test Date Results 3.566A Fw Heater 4A Level Sensing Line Fails Hi 4/24/97 S

3.566B Fw Heater 4B Level Sensing Line Fails Hi 4/24/97 S

3.566C Fw Heater 4C Level Sensing Line Fails Hi 4/24/97 S

3.567A Fw Heater SA Level Sensing Line Fails Hi 4/24/97 S

4 3.5678 Fw Heater 5B Level Sensing Line Fails Hi 4/24/97 S

3.567C Fw Heater SC Level Sensing Line Fails Hi 4/24/97 S

3.568A Fw Heater 6A Level Sensing Line Fails Hi 4/24/97 S

3.568B Fw Heater 6B Level Sensing Line Fails Hi 4/24/97 S

3.568C Fw Heater 6C Level Sens,ing Line Fails Hi 4/24/97 S

4.007 Load Table: 4 KV SAFEGUARD BUS D13 6/22/97 S

4.013 Load Table: 4 KV Safeguard Bus D134 6/14/97 S

4.017 Load Table: Turbine Area Load Ctr 114C 4/8/97 S

4.021 Load Table: Turbine Area Load Ctr 124C 4/8/97 S

4.031 Load Table: 120 VAC Panel 10Y103 3/5/97 S

4.037 Load Table: 120 VAC Panel 10Y201 3/18/97 S

4.039 Load Table: 1 A RPS/UPS Bus 1 AY160 5/13/97 S

4.043 Load Table: 125/250 VDC Bus 1CD105 9/28/97 S

4.057 Load Table: FWC UPS Inverter E/S-XX-120 3/18/97 S

5.03A 10 gpm Reactor Coolant Leak In Drywell 9/28/97 S

5.03B 100 gpm Reactor Coolant Leak in Drywell 10/12/97 S

5.068 LOSS O/S POWER AT RATED POWER CONDITIONS 6/8/97 S

507C Loss of Safeguard Bus D13 (Emergency Power) 6/8/97 S

5.09C LOSS OF NON-SAFEGUARD LOAD CENTER 114C 6/8/97 S

5.09G LOSS OF NON-SAFEGUARD LOAD CENTER 124C 6/8/97 S

i 5.10C LOSS OF 120 VAC INSTRUMENT BUS 10Y103 6/8/97 S

j 5.10)

LOSS OF 120 VAC INSTRUMENT BUS 10Y201 6/8/97 S

5.10L LOSS OF 120 VAC RPS/UPS BUS 1 AY160 6/8/97 S

5.11C LOSS OF 125/250 VDC BUS 1CD105 6/8/97 S

5.13B Main Condenser Air Leak at High Severity 9/21/97 S

5.17A TRIP OF ONE REACTOR FEEDWATER PUMP 8/23/97 S

Friday, December 04,1998 Page 9 of11

Test No Title Test Date Results 5.17E Feedwater Master Controller Fails Low 6/15/97 S

5.18 Loss of All Feedwater Resulting in ADS Blowdown 9/14/97 S

5.25A Recire Pump M/A Station Fails High 9/21/97 S

5.30A Main Feedwater Line A Break Outside Drywell 8/31/97 S

i 5.34C MSIV Closure with ATWS (Brown's Ferry) 9/14/97 S

5.35D Turbine Trip with Bypass Valves Fail Closed 9/21/97 S

6.10 Steady State Performance at 25% Power 9/14/97 S

6.11 Steady State Performance at 75% Power 9/14/97 S

6.12 Steady State Performance at 100% Power for 1 Hour 9/14/97 S

7.01 MANUAL SCRAM 6/15/97 S

7.02 SIMULTANEOUS TRIP OF ALL FEEDWATER PUMPS 6/15/97 S

7.03 CLOSURE OF ALL MSIVS @ 100% POWER 8/23/97 S

7.04 TRIP OF BOTH RECIRC PUMPS AT RATED POWER 6/15/97 S

7.05 SINGLE RECIRC PUMP TRIP 6/15/97 S

7.06 TURBlNE TRIP WITHIN BYPASS CAPAB!LITY 9/21/97 S

7.08 RECIRC LOOP RUPTURE W/ LOSS OFFSITE PWR 6/15/97 S

7.09 MAX SIZE UNISOLABLE MSL RUPTURE 6/22/97 S

8.101 T-212 Byp Squib Vivs with Hi Press Hose 9/28/97 S

8.371 Local Fire Monitors Reset 1/28/97 S

8.372 Spray Pond Tempersture 7/26/97 S

[

8.373 11-0094A, ESW Loop A Unitization Jumper 7/27/97 S

8.374 11-0094B, ESW Loop B Unitization Jumper 7/27/97 S

8.375 11-0095A., ESW Loop A isolation Valve 7/27/97 S

8.376 11-00958, ESW Loop B isolation Valve 7/27/97 S

8.377 11-0123A, ESW Loop A Return Hdr Iso Viv 7/27/97 S

8.378 11-01238, ESW Loop B Return Hdr Iso Viv 7/27/97 S

8.379 ESW Loop A Header Isolation 7/29/97 S

8.380 ESW Loop B Header Isolation 7/27/97 S

8.381 RHRSW Loop A Header Isolation 7/26/97 S

l 8.382 RHRSW Loop B Header Isolation 7/20/97 S

Friday, December 04,1998 Page 10 of11 i

l

f Test No Title Test Date Results 8.383 ESW/ RHRSW Loop A Crosstie Valves 7/27/97 S

8.384 ESW/ RHRSW Loop B Crosstie Valves 7/27/97 S

8.385 12-120A, RHRSW Loop A Hdr Iso Valve 5/29/97 S

8.386 12-1208, RHRSW Loop B Hdr Iso Valve 7/26/97 S

4 8.387 12-0121/0122, RHRSW Loop Crosstie Valves 7/26/97 S

8.388 Feeder Breaker for HV12-034B 8/3/97 S

8.389 Feeder Breaker for HV12-211 8/3/97 S

8.390 Feeder Breaker for HV11-011 A 8/3/97 S

8.391 Feeder Breaker for HV11-011B 7/19/97 S

8.392 Feeder Breaker for HV11-015A 8/3/97 S

8.393 Feeder Breaker for HV11-015B 7/19/97 S

8.394 TECW Heat Exchanger Cooling Water Source 7/19/97 S

8.395 RECW Heat Exchanger Cooling Water Source 7/27/97 S

8.396 ESW Loop A Service Water Isolated?

7/27/97 S

8.397 ESW Loop B Service Water Isolated?

7/27/97 S

8.398 HV41-1F032A, FW Stop "Leakby" 9/28/97 S

8.399 HV41-1F0328, FW Stop "Leakby" 9/28/97 S

8.400 RWCU Filter / Demin A Flow Controller Setpoint 10/26/97 S

i 8.401 RWCU Filter / Demin B Flow Controller Setpoint 10/26/97 S

1 4

Friday, December 04,1998 Page 11 of 11

PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT LGS SIMULATOR TESTING PERFORMED IN 1998 i

LGS Simulator Testing Completedin 1998 Test No Title Test Date Results 1.01 Computer Real Time Test 9/9/98 S

1.04A Performance Test: Loss of 11 Unit Auxiliary Bus 6/21/98 S

i 2.02-IX.B HPCI HV55-1F011 Thermal Overload Trip on High DP 8/2/98 S 2.06-1.A ADS System Test: Division i Manualinitiation 10/31/98 S 2.064 B ADS System Test: Division 11 ManualInitiation 10/31/98 S

2. 0 6 -11 ADS Sys Test: Auto ADS Init on Low Level & High DW Pressu 10/31/98 S 2.06-IV ADS System Test: Automatic ADS Initiation inhibit 11598 S

2.06-VI ADS System Test: Overpressure Operation of SRVs 10/31/98 S

2.06-Vil SRV 1F013A, C & N Instrument Gas Accumulatcrs 9/9/98 S 2. 0 9 -11 RPS Sys Test: Manual Scrams 10/14/98 S 2.09-ill.B RPS Sys Test: RPS Trip on MSIV Position 12/23/98 S 2.09-ill.C RPS Sys Test: RPS Trip on Low Rx Water Level 10/14/98 S

l 2.09-Ill.D RPS Sys Test: RPS Trip on High Rx Pressure 10/14/98 S

2.09-ill.H RPS Sys Teat: RPS Trips on Turbine Stop Valve Closure 12/19/98 S

2. 0 9 -111.1 RPS Sys Test: RPS Trip on Control Valve Fast Closure 10/14/98 S

2.09-IV RPS Sys Test: Miscellaneous RPS Logic 12/13/98 S

2.10-IV RRCS Sys Test: Response To Instrument Line Breaks 10/22/98 S

2.15-1.H RRS Sys Test: Recire Seal Water Supply Valve Logic 11/8/98 S

2.15.l-C RRS Sys Test: Verification of Scoop Tube Locks 8/1/98 S

l 2.18-l B Cire Water Sys Test: Circ Water Pump Trips 12/12/98 S

2.21 B.lll ESW Sys Test: Auto Valve Operation on ESW Pump Start 12/19/98 S

2.218.lX ESW Sys Test: RHR Pumps A & C Compartment Cooling 1/2/98 S

2.21 B.VI ESW Sys Test: HPCI Compartment Cooling 1/2/98 S

2.21 B.Vil ESW Sys Test: RCIC Compartment Cooling 1/2198 S

2.218.X ESW Sys Test: RHR Pumps B & D Compartment Coollng 1/2/98 S

2.218.XI ESW Sys Test: Core Spray Pumps A & C Compartment Cing 1/2/98 S

2.218.XII ESW Sys Test: Core Spray Pumps B & D Compartment Cing 1/2/98 S 2.21C.11 RHRSW Sys Test: Valve Control Logic Verification 12/19/98 S

~~

Saturday, January 02,1999 Page 1 of 29 1

Test No Title Test Date Results 2.23-Ill.A Main Turbine Sys Test: Chest & Shell Warming 4/16/98 S 2.23-ill.B Main Turbine Sys Test Speed & Acceleration Control 4/14/98 S

]

2.23-Ill.F Main Turbine Sys Test: OverSpeed Trip Testing 7/18/98 S 9

2.23-Vill Main Turbine Sys Test: LP Turbine Backpressure Mon 5/8/98 S 2.31-1 Pri Contain Sys Test Drywell Purge Fan A Verification 2/8/98 S 2. 3 1 -11 Pri Contain Sys Test: Drywell Purge Fan B Verification 2/8/98 S 2.31-Vil.A Pri Contain Sys Test: Drywell De-Inerting and Purge 4/16/98 S 2.31-Vil.B Pri Contain Sys Test: Suppr Chamber De-Inerting and Purge 4/16/98 S 2.31.lX Pri Contain Sys Test: SP Gas Analyzer 206 Flowpath 4/16/98 S 2.31. Vill Pri Contain Sys Test: DW Gas Analyzer 205 Flowpath 4/16/98 S 2.328-X Ext Steam & HVD Sys Test: 1st Stg Press Isolation Logic 4/2/98 S 2.37-VI Rem S/D Panel Sys Test: Reactor Recirculation Operations 12/13/98 S 2.38C-l Rx Enci & Refuel Floor HVAC Sys Test: Sys Logic Testing 1/31/98 S 2.38C-Ill Rx Enci & Refuel Floor HVAC Sys Test: Rx Enci Ch Logic Trip 1/31/98 S 2.38C-IV Rx Enci & refuel Floor HVAC Sys Test: Refuel Floor Ch Logic 1/31/98 S 2.38D-IV TE HVAC Logic and Interlocks 7/22/98 S 2.39A-Ill. A Control Enci Chiller A Low Cooling Water Flow Trips 8/2/98 S 2.39A-lll.B Control Enci Chiller B Low Caoling Water Flow Trips 8/6/98 S 2.46-1 Steam Leak Det Sys Test: Outbd MSIV Room / Feedwater Pip 1/24/98 S 2. 4 6 -111 Steam Leak Det Sys Test: Rx Core Isolation Coollng 2/3/98 S

2.46-IV Steam Leak Det Sys Test: High Pressure Coolant injection 2/3/98 S 2.46-VI Steam Leak Det Sys Test. Residual Heat Removal Sys 2/3/98 S 3-MAD 137E SRV 1F013A Fails Open Mechanically 12/19/98 S i

3-MAD 138A SRV 1F013B Leaks 11/7/98 S 3-MAD 138B SRV 1F013B Sticks Open 11/7/98 S 3-MAD 138C SRV 1F013B Fails Open Electrically 11/11/98 S 3-MAD 138D SRV 1F013B Fails Closed 11/7/98 S

3-MAD 138E SRV 1F013B Fails Open Mechanically 12/23/98 S 3-MAD 139A SRV 1F013C Leaks 11/11/98 S 3-MAD 139B SRV 1F013C Sticks Open 11/11/98 S

Saturday, JaTuary 02,1999 Page 2 of 29

~

i I

Test No Title Test Date Results 3-MAD 139C SRV 1F013C Fails Open Electrically 11/11/98 S 3-MAD 139D SRV 1F013C Fails Closed 11/11/98 S 3-MAD 139E SRV 1F013C Fails Open Mechanically 12/23/98 S 3-MAD 140A SRV 1F013D Leaks 11/11/98 S l

3-MAD 140B SRV 1F013D Sticks Open 11/11/98 S 3-MAD 140C SRV 1F013D Fails Open Electrically 11/11/98 S 3-MAD 140D SRV 1F013D Fails Closed 11/11/98 S

3-MAD 140E SRV 1F013D Fails Open Mechanically 12/23/98 S 3-MAD 142B SRV 1F013F Sticks Open 12/23/98 S l

3-MAD 142C SRV 1F013F Fails Open Electrically 12/23/98 S 3-MAD 142D SRV 1F013F Fails Closed 12/23/98 S 3-MAD 142E SRV 1F013F Fails Open Mechanically 12/19/98 S l

3-MAD 1438 SRV 1F013G Sticks Open 12/23/98 S 3-MAD 143C SRV 1F013G Fails Open Electrically 12/23/98 S 3-MAD 143D SRV 1F013G Fails Closed 12/23/98 S 3-MAD 143E SRV 1F013G Fails Open Mechanically 12/19/98 S

3-MAD 144B SRV 1F013H Sticks Open 12/19/98 S

l 3-MAD 144C SRV 1F013H Fails Open Electrically 12/23/98 S 3-MAD 144D SRV 1F013H Fails Closed 12/23/98 S 3-MAD 144E SRV 1F013H Fails Open Electrically 12/19/98 S 3-MAD 146B SRV 1F013K Sticks Open 12/22/98 S

3-MAD 146C SRV 1F013K Fails Open Electrically 12/22/96 S 3-MAD 146D SRV 1F013K Fails Closed 12/22/98 S 3-MAD 146E SRV 1F013K Fails Open Mechanically 12/22/98 S 3-MAD 147B SRV 1F013L Sticks Open 12/22/98 S

3-MAD 147C SRV 1F013L Fails Open Electrically 12/22/98 S 3-MAD 147D SRV 1F013L Fails Closed 12/22/98 S 3 MAD 147E SRV 1F013L Fails Open Mechanically 12/12/98 S

I 3-MAD 148B SRV 1F013M Sticks Open 12/22/98 S

=

3-MAD 148C SRV 1F013M Fails Open Electrically 12/22/98 S

~

Saturday, January 02,1999 Page 3 of 29

I l

i Test No Title Test Date Results l

3-MAD 148D SRV 1F013M Fails Closed 12/22/98 S 3-MAD 148E SRV 1F013M Fails Open Mechanically 12/23/98 S 3-MAD 149B SRV 1F013N Sticks Open 12/23/98 S 3-MAD 149D SRV 1F013N Fails Closed 12/23/98 S 3-MAD 149E SRV 1F013N Fails Open Mechanically 12/23/98 S 3-MAD 150C SRV 1F013S Fails Open Electrically 12/23/98 S 3-MAD 150D SRV 1F013S Fails Closed 12/23/98 S

.i 3-MAD 150E SRV 1F013S Fails Open Mechanically 12/23/98 S l

3-MCU575 RWCU Pipe Leak in Regen Heat Exchanger Room S03 7/18/98 S 3-MCWO86A 1A Circulating Water Pump Trips 12/19/98 S 3-MCWOB6B 1B Circulating Water Pump Trips 12/19/98 S j

3-MCWO86C 1C Circulating Water Pump Trips 12/19/98 S i

3-MCWO86D 1D Circulating Water Pump Trips 12/19/98 S 3-MCW483A RECW Pump 1 A Trips 12/22/98 S 3-MCW483B RECW Pump 1B Trips 12/22/98 S 3-MCW483C Both RECW Pumps 1 A and 1B Trip 12/22/98 S 3-MHP445 HPCI Steam Line Break 7/19/98 S 3-MHP578A HV55-1F011 Fails: ThermalOverload 8/2/98 S 3-MHP578B HV55-1F011 Fails: Magnetic Overload 8/2/98 S 3-MHP578C HV55-1F011 Fails As-Is 8/2/98 S

]

3-MMC 073 Feedwater Conductivity increase (Condenser Tube Leak) 6/4/98 S 3-MMC 074 HP Condenser Air inLeakage 10/25/98 S 3-MMS 068 Main Steam Line Rupture at Main Turbine 7/19/98 ~ S 3-MNS156A NS4 Group I Inadvertent isolation 10/24/98 S 3-MNS156B NS4 Group I Inadvertent isolation 10/24/98 S 3-MNS156C NS4 Group i inadvertent isolation 12/23/98 S 3-MNS156D NS4 Group i Inadvertent Isolation 12/23/98 S 3-MNS156E NS4 Group i inadvertent isolation 10/24/98 S 3-MNS156F NS4 Group i Inadvertent isolation 12/13/98 S

)

3-MNS156G NS4 GroupIInadvertentisolation 12/13/98 S l

5t'urday, January 02,1999 Page 4 of 29

r-1 Test No Title Test Date Results 3-MNS156H NS4 Group 1Inadvertentisolation 12/13/98 S 3-MNS157A NS4 Group 11 Inadvertent isolation 12/13/98 S l

l 3-MNS1578 NS4 Group 11 Inadvertent isolation 12/13/98 S 3-MNS157C NS4 Group ll Inadvertent isolation 10/24/98 S l

l 3-MNS157D NS4 Group 11 Inadvertent isolation 11/8/98 S 3-MNS157E NS4 Group 11 Inadvertent isolation 12/13/98 S 3-MNS157F NS4 Croup 11 Inadvertent isolation 11/8/98 S 3-MNS158A NS4 Group 111 Inadvertent isolation 10/24/98 S 3-MNS158B NS4 Group lll Inadvertent isolation 10/24/98 S I

l 3-MNS159A NS4 Group VI Inadvertent isolation 10/24/98 S l

3-MNS159B NS4 Group VI Inadvertent isolation 10/24/98 S 3-MNS159C NS4 Group VI Inadvertent isolation 12/13/98 S l

3-MNS159D NS4 Group VI inadvertent isolation 12/13/98 S 3-MNS159E NS4 Group VI inadvertent Isolation 12/13/98 S 3-MNS159F NS4 Group VI Inadvertent isolation 12/23/98 S 3-MNS160A NS4 Group Vil inadvertent isolation 10/24/98 S 3-MNS1608 NS4 Group Vil Inadvertent isoletion 10/24/98 S j

3-MNS160C NS4 Group Vil Inadvertent Isolation 10/24/98 S l

3-MNS161 A NS4 Group Villa Inadvertent isolation 10/24/98 S 3-MNS161B NS4 Group Villa Inadvertent isolation 10/24/98 S 3-MNS162A Secondary Containment and PClG Inadvertent Isolation 10/24/98 S 3-MNS162B Secondary Containment and PClG Inadvertent isolation 10/24/98 S 3-MNS162C Secondary Containment and PClG Inadvertent isolation 10/31/98 S 3-MNS162D Secondary Containment and PCIG Inadvertent isolation 10/31/98 S 3-MNS162E Secondary Containment and PClG Inadvertent isolation 10/31/98 S 3-MNS162F Secondary Containment and PCIG inadvertent isolation 10/31/98 S 3-MPC482A Drywell Chiller 1 A Tnps 12/22/98 S 3-MPC482B Drywell Chiller 1B Trips 12/22/98 S 3-MRC465 RCIC Steam Line Break 7/15/98 S 3-MRE100 Duct Rupture: T-200 Suppression Pool 18 Inch Vent Line 4/7/98 S Saturday, January 02,1999 Page 5 of 29

Test No Title Test Date Results j

3-MRE102 Duct Rupture: T-200 Drywell 24 inch Vent Line 4/7/98 S

3-MRE301 A Inadvertent Rx Enclosure Isolation Chan A 2/11/98 S 3-MRE302A Refuel Floor inadvertent isolation Channel A 1/24/98 S 3-MRE302B Refuel Floor inadvertent isolation Channel B 1/24/98 S 3-MRE303 Air Leak in Rx Enclosure 4/8/98 S l

3-MRE304A SGTS Inlet Valve From Refuel Floor HV76-019 Fails Open 1/24/98 S i

3-MRE304B SGTS Inlet from Refuel Floor HV76-020 Fails Open 3/7/98 S 3-MRE305A SGTS From Reactor Enclosure HV76-196 Fails Open 1/23/98 S

3-MRE305B SGTS From Reactor Enclosure HV76-197 Fails Open 1/23/98 S

3-MRE306 Refuel Floor Fails To isolate 4/8/98 S

3-MRE307 Reactor Enclosure Fails Toisolate 4/8/98 S

3-MRE30BA Trip of 1 A REECE Fan 2/8/98 S

3-MRE3088 Trip of 18 REECE Fan 2/8/98 S

3-MRE309A Trip of 1 A Rx Enclosure HVAC Supply Fan 1/2/98 S

3-MRE309B Trip of 1B Rx Enclosure HVAC Supply Fan 1/3/98 S

3-MRE309C Trip of 1C Rx Enclosure HVAC Supply Fan 1/3/98 C

3-MRE310A Trip of 1A Rx Enclosure HVAC Exhaust Fan its/wB S 3-MRE3108 Tnp of 1B Rx Enclosure HVAC Exhaust Fan 1/3/98 S 3-MRE310C Trip of 1C Rx Enclosure HVAC Exhaust Fan 1/3/98 S

3-MRE311 A Tnp of 1 A Refuel Floor HVAC Air Supply Fan 1/3/98 S

3-MRE3113 Trip of 18 Refuel Floor HVAC Air Supply Fan 1/3/98 S

3-MRE311C Trip of 1C Refuel Floor HVAC Air Supply Fan 1/3/98 S

3-MRE312A Trip of 1 A Refuel Floor HVAC Air Exhaust Fan 1/3/98 S

3-MRE312B Trip of 1B Refuel Floor HVAC Air Exhaust Fan 1/3/98 S

3-MRE312C Trip of 1C Refuel Floor HVAC Air Exhaust Fan 1/3/98 S

3-MRM001 A Control Room Fresh Air Rad Mon Chan A Fails To Sel Value 4/14/98 S

3-MRM001B Control Room Fresh Air Rad Mon Chan B Fails To Sel Value 4/14/98 S

4 3-MRM001C Control Room Fresh Air Rad Mon Chan C Fails To Sel Value 4/14/98 S

3-MRM001D Control Room Fresh Air Rad Mon Chan D Fails To Sel Value 4/14/98 S

3-MRM002A Control Room Emerg Air Rad Mon Chan C Fails To Sel Value 4/14/98 S

Saturds[ January 02,1999 Page 6 of 29 e

4 i

l Test No Title Test Date Results 3-MRM0028 Control Room Emerg Air Rad Mon Chan D Fails To Sel Value 4/14/98 S 3-MRM003A N Stack WRAM Low Range Chan Fails To SeiValue 4/9/98 S 3-MRM003B N Stack WRAM Mid Range Chan Fails To Sel Value 4/9/98 S f

3-MRM003C N Stack WRAM High Range Chan Fails To Set Value 4/9/98 S 3-MRM004A N Stack Rad Mon A Particulate Chan Fails To Sei Value 4/6/98 S I

3-MRM0048 N Stack Rad Mon A lodine Chan (2lE075) Fails To Sel Value 4/6/98 S 3-MRM004C N Stack Rad Mon A Gaseous Chan (3GE075) Fails To Sel Val 4/6/98 S 3-MRM004D N Stack Rad Mon B Part Chan (4PE075) Fails To Sel Value 4/6/98 S

l 3-MRM004E N Stack Rad Mon B lodine Chan (SIE075) Fails To Sel Value 4/6/98 S 3-MRM004F N Stack Rad Mon B Gaseous Chan (6GE075) Fails To Sei Val 4/6/98 S

3-MRM005A U-1 S Stack Rad Mon A Part Chan (1PE185) Fails To Sel Valu 4/8/98 S

3-MRM005B U-1 S Stack Rad Mor. b lodine Chan (21E185) Fails To Sel Val 4/8/98 S

3-MRM005C U-1 S Stack Rad Mon A Gaseous Chan (3GE185) Fails To Set 4/8/98 S 3-MRM005D U-1 S Stack Rad Mon B Part Chan (4PE185) Fails To Sel Valu 4/8/98 S 3-MRM005E U-1 S Stack Rad Mon B lodine Chan (51E185) Fails To Set Val 4/8/98 S 1

3-MRM005F U-1 S Stack Rad Mon B Gaseous Chan (6GE185) Fails To Set 4/8/98 S

]

3-MRM006 RW Equip Room Vent Exh Rad Mon Fails To Sel Value 2/5/98 S 3-MRM007 Radwaste Enci Exh Rad Mon Fails To Sel Value 2/5/98 S 3-MRM008 Recombiner Rooms & H2 Analyzer Comp Rad Mon Fails To S 2/21/98 S

3-MRM009 SPE Discharge & Vacuum Pump Exh Rad Mon Fails To Sel Va 2/5/98 S

q 3-MRM010 Offgas Charcoal Treatment Rad Mon Fails To Sel Value 2/11/98 S

i 3-MRM011 Unit 1 Containment Leak Det Rad Mon Fails To Sel Value 2/5/98 S

3-MRM012 Rx Enci Cooling Water Rad Mon Fails To Sel Value 2/5/98 S 3-MRM013 Semce Water Rad Mon Fails To Sel Value 2/5/98 S

3-MRM014A Offgas Steam Jet Air Ejector Chan A Rad Mon Fails To Sel Val 2/19/98 S 3-MRM014B Offgas Steam Jet Air Ejector Chan B Rad Mon Fails To Set Val 2/19/98 S

3-MRM014C Offgas Steam Jet Air Ejector Linear Rad Mon Fails To SeiValu 4/14/98 S

3-MRM015A Main Steam Line Rad Mon Chan A Fails To Sel Value 2/11/98 S 3-MRM015B Main Steam Line Rad Mon Chan B Fails To Sel Value 2/19/98 S

3-MRM015C Main Steam Line Rad Mon Chan C Fails To SeiValue 2/19/98 S 4

A Saturday, January 02,1999

~

~

Page 7 of 29 i

i Test No Title Test Date Results r

3-MRM015D Main Steam Line Rad Mon Chan D Fails To Sel Value 2/19/98 S 3-MRM016A Rx Enci Vent Exh Rad Mon A Fails To Sel Value 2/19/98 S 3-MRM016B Rx Enc! Vent Exh Rad Mon B Fails To Sel Value 2/19/98 S 3-MRM016C Rx Enci Vent Exh Rad Mon C Fails To Sel Value 2/19/98 S 3-MRM016D Rx Enci Vent Exh Rad Mon D Fails To Sel Value 2/19/98 S 3-MRM017A Refuel Floor Vent Exh Rad Mon Chan A Fails To Set Value 2/19/98 S 3-MRM017B Refuel Floor Vent Exh Rad Mon Chan B Fails To Sel Value 2/19/98 S 3-MRM017C Refuel Floor Vent Exh Rad Mon Chan C Fails To Sel Value 3/18/98 S

j 3-MRM017D Refuel Floor Vent Exh Rad Mon Chan D Fails To Set Value 3/18/98 S

3-MRM018A Drywell Post Loca Rad Mon Chan A Fails To Sel Value 4/9/98 S 3-MRM018B Drywell Post LOCA Rad Mon Chan B Fails To Sel Value 4/9/98 S 3-MRM018C Diywell Post LOCA Rad Mon Chan C Fails To Sel Va!ue 4/9/98 S j

3-MRM018D Drywell Post LOCA Rad Mon Chan D Fails To Set Value 4/9/98 S

3-MRM019A U-1 RHRSW Hx Return Header Rad Mon Fails To SeiValue 4/16/98 S j

3-MRM019B U-2 RHRSW Hx Return Header Rad Mon Fails To SelValue 4/16/98 S

3-MRM020 RCIC Pump Room Area Rad Mon Fails To Sel Value 2/4/98 S

)

3 MRM021 HPCI Pump Room Area Rad Mon Fails To Sel Value 2/4/98 S i.

3-MRM022 Rx Encl Sumps Area Rad Mon Fails To Sel Value 2/19/98 S 3-MRM023 CRD Pump Room Area Rad Mon Fails To Sel Value 2/4/98 S 3-MRM024 Turbine Aux Hallway Area Rad Mon Fails To Sel Value 2/4/98 S 3-MRM025 Isolation Valve Compartment Area Rad Mon Fails To Sel Value 2/4/98 S 3-MRM026 Condensate Pump Rxm Area Rad Mon Fails To Sel Value 2/4/98 S

'3-MRM027 RHR Division i Room Area Rad Mon Fails To Sel Value 2/4/98 S

3-MRM028 RHR Division 11 Room Area Rad Mon Fails To Sel Value 2/4/98 S

3-MRM029 Steam Vent Area Stairwell Area Rad Mon Fails To Sel Value 2/4/98 S

3-MRM030 Rx Enct Rr Access Airlock Area Rad Mon Fails To Sel Val 2/4/98 S

3-MRM031 Hallway Cond Filters Area Rad Mon Fails To Sel Value 2/4/98 S

3-MRM032 Turbine Enci Condenser Area Rad Mon Fails To Sei Value 2/4/98 S

3-MRM033 Rx Drywell Area Rad Mon Fails To Sel Value 2/11/98 S t

3-MRM034 Rx Enci East Area Rad Mon Fails To Sel Value 2/4/98 S

' Saturday, January 02,1999 Page 8 of 29 i

l Test No Title Test Date Results 3-MRM035 Rx Encl West Area Rad Mon Fails To Sel Value 2/4/98 S 3-MRM036 Neutron Mon Sys Area Rad Mon Fails To Sel Value 2/12/98 S 3-MRM037 Neutron Mon Drive Mech Area Rad Mon Fails To Sel Value 2/12/98 S 3-MRM038 Turbine Aux Hallway East Area Rad Mon Fails To Sel Value 2/12/98 S 3-MRM039 Turbine Aux Hallway West Area Rad Mon Fails To SelValue 2/12/98 S 3-MRM040 RWCU Heat Exchanger Area Rad Mon Fails To SelValue 2/19/98 S 3-MRM041 RWCU Pump Area Rad Mon Fails To Sel Value 2/19/98 S 3-MRM042 SLC Sys Area Rad Mon Fails To Sel Value 2/12/98 S 3-MRM043 RWCU instrument Rack Area Rad Mon Fails To Set Value 2/12/98 S 3-MRM044 Turbine Aux Bay Area Rad Mon Fails To Set Value 2/12/98 S 3-MRM045 Gas Radwaste Rec Hallway Area Rad Mon Fails To Sel Valu 2/19/98 S 3-MRM045 Turbine Enct Washdown Area Rad Mon Fails To Sel Value 2/12/98 S 3-MRM046 RWCl> Filter Area Rad Mon Fails To Sel Value 2/12/98 S 3-MRM047 TEECE Filter Area Rao Mon Fails To Sel Value 2/12/98 S 3-MRM048 Drywell Head Laydown Area Rad Mon Fails To Sel Value 2/19/98 S 3-MRM049 Steam Separator Area Rad Mon Fails To Sel Value 2/12/98 S 3-MRM050 Spent Fuel Pool Area Rad Mon Fails To Sel Value 2/12/98 S 3-MRM051 New Fuel Storage Vault Area Rad Mon Fails To Sel Value 2/12/98 S 3-MRM052 Pool Plug Laydown Area Rad Mon Fails To Sel Value 2/12/98 S 3-MRM053 H2O2 Analyzers Area Rad Mon Fails To Set Value 2/12/98 S 3-MRM055 Support Ctr / Turb Encl Area Rad Mon Fails To Sel Value 2/19/98 S 3-MRM056 Sludge Disch Mixing Pump Area Rad Mon Fails To Sel Value 2/19/98 S 3-MRM057 Radwaste Building Hallway Area Rad Mon Fails To Sel Value 2/19/98 S 3-MRM058 Cond Storage Disch Pump Area Rad Mon Fails To Sei Value 2/19/98 S 3-MRM059 Laundry Drain Process Room Area Rad Mon Fails To Set Valu 2/19/98 S 3-MRM060 Floor Drain Filter Hold Pmp Area Rad Mon Fails To Sel Value 2/i9/98 S 3-MRM061 Fuel Pool Filter Hold Pump Area Rad Mon Fails To Sel Value 2/19/98 S 3-MRM062 Precoat Tank and Pmp Room Area Rad Mon Fails To Sel Valu 2/19/98 S

3-MRM003 Remote SD Control Room Area Rad Mon Fails To Sel Value 2/19/98 S 3-MRM064 Radwaste Cask Loading Area Rad Mon Fails To Sel Value 3/3/98 S

Sa5Ty, January 011999 Page 9 of 29 i

.. -. = -

i Test No Title Test Date Results I

3-M.VA065 Railroad Car Airlock Room Area Rad Mon Fails To Sel Value 2/19/98 S 3-MRM066 Radwaste Enc! Hallway Area Rad Mon Fails To SelValue 2/19/98 S 3-MRM067 Hot Maint Shop Area Rad Mon Fails To Sel Value 2/19/98 S l

3-MRM068 Turb Encl RR Entrance Area Rad Mon Fails To Sei Va!ue 2/19/98 S l

3-MRM069 Radwaste Building Area Rad Mon Fails To Sel Value 2/19/98 S I

Man ontro R Area Rad Mon Fails To Sel Value

/

3-MRM072 Turbine Operating Area Rad Mon Fails To Set Value 2/19/98 S 3-MRM073 SGTS Filter Area Rad Mon Fails To Sel Value 2/19/98 S 3-MRM074 N Stack Instrument Room Area Rad Mon Fails To Sel Value 2/19/98 S

3-MRP027A Loss of Normal Power to RPS Bus A 12/19/98 S

f 3-MRP027B Loss of Normal Power to RPS Bus B 12/22/98 S

j 3-MRP029A RPS Fails to Scram (Auto Only) 12/13/98 S 3-MRP0298 RPS Fails to Scram (Complete) 12/13/98 S

3-MRP029C RPS Channel A Fails to Scram 12/13/98 S

3-MRP029D RPS Channel B Fails to Scram 12/13/98 S

3-MRP406A RRCS Division I Loss of DC Power 10/21/98 S 3-MRP407A RRCS Div i ARI Fails To initiate 10/18/98 S

3-MRP4078 RRCS Div ll ARI Fails To initiate 10/18/98 S

t t

j 3-MRP407C RRCS Both Divisions of ARI Fail To initiate 10/18/98 S

l 3-MRR430A Reactor Recire Pump 1 A Seizure 12/11/98 S

3-MRR430B Reactor Recire Pump 1B Seizure 12/11/98 S 3-MRR431 A Recirc Pump 1 A M/A Station Fails High 12/11/98 S 3-MRR431B Recirc Pump 1 A M/A Station Fails Low 12/11/98 S 3-MRR431C Recirc Pump 1B M/A Station Fails High 12/11/98 S j

f 3-MRR431D Recirc Pump 18 M/A Station Fails Low 12/11/98 S 3-MRR435A Recire Pump 1 A Drive Motor Breaker Trips 12/20/98 S I

3-MRR435B Recirc Pump 1B Drive Motor Breaker Trips 12/20/98 S

3-MRR442A Recirc Pump 1 A RPT Breaker CB3A Trips 12/11/98 S

3-MRR4428 Recire Pump 1 A RPT Breaker CB4A Trips 12/11/98 S

Saturday, january 02,1999 Page 10 of 29

~ ~ ~

+

5 l

.=

~

l Test No Title Test Date Results 3-MRR442C Recirc Pump 1 A RPT Breakers CB3A and CB4A Trip 12/11/98 S i

3-MRR443A Recirc Pump 1B RPT Breaker CB3B Tnps 12/11/98 S 3-MRR443B Recirc Pump 1B RPT Breaker CB4B Trips 12/11/98 S 3-MRR443C Reecirc Pump 1B RPT Breakers CB3B and CB4B Trip 12/11/98 S 3-MRR505A Recirc Pump 1A inadvertent High Runback 12/10/98 S 3-MRR505B Recirc Pump 1 A inadvertent Lo Runback 12/10/98 S 3-MRR506A Recirc Pump 1B inadvertent High Runback 12/10/98 S 3-MRR506B Recirc Pump 1B Inadvertent Lo Runback 12/10/98 S 3-MRT001B Fuel Cladding Failure,0-52411 Fuel Pins 10/22/98 S 3-MRT002 RWCU F/D Resin Intrusion inTo Rx Vessel 7/26/98 S 3-MRTC04 Fuel Failure of Bundle in Rx Cavity 6/21/98 S 3-MRT005A Inadvertent Activity Release on Elevation 313 Rx Enci 6/11/98 S 3-MRT005B Inadvertent Activity Release on Elevation 253 Rx Enci 6/11/98 S

3-MRT005C Inadvertent Activity Release on Elevation 177 Rx Enci 6/11/98 S 3-MRi O10 Offgas Sys Charcoal Adsorber Trains Degraded 6/11/98 S 3-MRT011 Offgas Sys Charcoal Adsorber Guard Bed Degraded 6/11/98 S 3-MRT012 Offgas Sys HEPA Filter Degraded 6/11/98 S 3-MSD001 A Steam Flooding Damper BPD-201-21 A Fails To Trip 3/11/98 S

3-MSD001B Steam Flooding Damper BPD-201-21B Fails To Trip 3/11/98 S

3-MSD002A Steam Flooding Damper BPD-201-22A Fails To Trip 2/28/98 S 3-MSD002B Steam Flooding Damper BPD-201-22B Fails To Trip 2/28/98 S

(

3-MSD003A Steam, Flooding Damper BPD-201-23A Fails To Trip 2/28/98 S

3-MSD003B Steam Flooding Damper BPD-201-23B Fails To Trip 2/28/98 S 3-MSD004A Steam Flooding Damper BPD-202-118A Fails To Trip 3/11/08 S

3-MSD004B Steam Flooding Damper BPD-202-118B Fails To Trip 3/11/98 S 3-MSD005A Steam Flooding Damper BPD-202-67A Fails To Trip 2/28/98 S 3-MSD005B Steam Flooding Damper BPD-202-673 Fails To Trip 2/28/98 S 3-MSD006A Steam Flooding Damper BPD-202-104A Fails To Trip 2/28/98 S 3-MSD006B Steam Flooding Damper BPD-202-104B Fails To Trip 2/28/98 S 3-MSD007A Steam Flooding Damper BPD-203-1 A Fails To Trip 2/28/98 S

Saturday,.fa~nuary 02,1999 Page 11 of 29

~

d Test No Title Test Date Results 3-MSD007B Steam Flooding Damper BPD-203-1B Fails To Trip 2/28/98 S 3-MSD008A Steam Flooding Damper BPD-203-4A Fails To Trip 2/28/98 S 3-MSD008B Steam Flooding Damper BPD-203-4B Fails To Trip 2/28/98 S 3-MSD009A Steam Flooding Damper BPD-203-14A Fails To Trip 2/28/98 S 3-MSD009B Steam Flooding Damper BPD-203-14B Fails To Trip 2128/98 S 3-MSD010A Steam Flooding Damper BPD-203-16A Fails To Trip 2/28/98 S

i 3-MSD010B Steam Flooding Damper BPD-203-168 Fails To Trip 2/2&'98 S 3-MSD011 A Steam Flooding Damper BPD-203-20A Fails To Trip 2/28/98 S 3-MSD011B Steam Flooding Damper BPD-203-20B Fails To Trip 2/28/98 S

3-MSD012A Steam Flooding Damper BPD-203-3A Fails To Trip 2/28/98 S

3-MSD012A Steam Flooding Damper BPD-203-24A Fails To Trip 2/28/90 S 3-MSD012B Steam Flooding Damper BPD-203-38 Fails To Trip 2/28/98 S

3-MSD012B Steam Flooding Damper BPD-203-24B Fails To Trip 2/28/98 S 3-MSD013A Steam Flooding Damper BPD-203-37A Fails To Trip 2/28/98 S 3-MSD013B Steam Flooding Damper BPD-203-37B Fails To Trip 2/28/98 S 3-MSD014A Steam Flooding Damper BPD-203-38A Fails To Trip 2/28/98 S 3-MSD014B Steam Flooding Damper BPD-203-388 Fails To Trip 2/28/98 S

~

3-MSD015A Steam Flooding Damper BPD-203-39A Fails To Trip 2/28/98 S

' 3-MSD015B Steam Flooding Damper BPD-203-398 Fails To Trip 2/28/98 S l

3-MSD016A Steam Flooding Damper BPD-201-39A Fails To Trip 3/11/98 S

3-MSD016B Steam Flooding Damper BPD-201-398 Fails To Trip 3/11/98 S 3-MSD0i7A Steam Flooding Damper BPD-202-20A Fails To Trip 3/11/98 S 3-MSD017B Steam Flooding Damper BPD-202-20B Fails To Trip 3/11/98 S

3-MSD018A Steam Flooding Damper BPD-202-33A Fails To Trip 3/11/98 S 3-MSD018B Steam Flooding Damper BPD-202-33B Fails To Trip 3/11/98 S 3-MSD019A Steam Flooding Damper BPD-202-40A Fails To Trip 3/11/98 S

3-MSD019B Steam Flooding Damper BPD-20240B Fails To Trip 3/11/98 S

3-MSD020A Steam Flooding Damper BPD-202-41 A Fails To Trip 3/11/98 S

3-MSD020B Steam Flooding Damper BPD-202-41B Fails To Trip 3/11/98 S

3-MSD022A Steam Flooding Damper BPD-203-9A Fails To Trip 3/11/98 S

55tu'rday, Jan'uary 023999 Page 12 of 29

~

J

Test No Title Test Date Results 3-MSD022B Steam Flooding Damper BPD-203-9B Fails To Trip 3/11/98 S 3-MSD023A Steam Flooding Damper BPD-203-10A Fails To Trip 3/11/98 S 3-MSD023B Steam Flooding Damper BPD-203-10B Fails To Trip 3/11/98 S 3-MSD024A Steam Flooding Damper BPD-203-17A Fails To Trip 2/28/98 S 3-MSD024B Steam Flooding Damper BPD-203-17B Fails To Trip 2/28/98 S 3-MSD025A Steam Flooding Damper BPD-203-22A Fails To Trip 3/11/98 S 3-MSD025B Steam Flooding Damper BPD-203-22B Fails To Trip 3/11/98 S 3-MSD026A Steam Flooding Damper BPD-203-23A Fails To Trip 3/12/98 S 3-MSD026B Steam Flooding Damper BPD-203-23B Fails To Trip 3/12/98 S 3-MSD027A Steam Flooding Damper BPD-203-25A Fails To Trip 3/12/98 S 3-MSD0278 Steam Flooding Damper BPD-203-25B Fails To Trip 3/12/98 S 3-MSD028A Steam Flooding Damper BPD-203-26A Fails To Trip 3/12/98 S 3-MSD028B Steam Flooding Damper BPD-203-26B Fails To Trip 3/12/98 S 3-MSD029A Steam Flooding Damper BPD-203-27A Fails To Trip 3/12/98 S

3-MSD029B Steam Flooding Damper BPD-203-27B Fails To Trip 3/12/98 S 3-MSD030A Steam Flooding Damper BPD-203-28A Fails To Trip 3/12/98 S 3-MSD030B Steam Flooding Damper BPD-203-28B Fails To Trip 3/12/98 S 3-MSD031 A Steam Flooding Damper BPD-203-29A Fails To Trip 3/11/98 S 3-MSD031B Steam Flooding Damper BPD-203-29B Fails To Trip 3/11/98 S 3-MSD032A Steam Flooding Damper BPD-203-30A Fails To Trip 3/12/98 S 3-MSD032B Steam Flooding Damper BPD-203-30B Fails To Trip 3/12/98 S 3-MSD033A Steam Flooding Damper BPD-203-31 A Fails To Trip 3/12/98 S 3-MSD033B Steam Flooding Damper BPD-203-31B Fails To Trip 3/12/98 S

3-MSD034A Steam Flooding Damper BPD-203-42A Fails To Trip 3/12/98 S 3-MSD034B Steam Flooding Damper BPD-203-42B Fails To Trip 3/12/98 S 3-MSD035A Steam Flooding Damper BPD-203-43A Fails To Trip 3/12/98 S 3-MSD035B Steam Flooding Damper BPD-203-43B Fails To Trip 3/12/98 S 3-MSD036A Steam Flooding Damper BPD-203-44A Fails To Trip 3/12/98 S l

3-MSD036B Steam Flooding Damper BPD-203-44B Fails To Trip 3/12/98 S 3-MS$ i98A SLC Pump 1 A Loss of Control Power 10/18/98 S i5sturT15y,ianuary 02, dI9 Page 13 of 29

~

Test No Title Test Date Results 3-MSL1988 SLC Pump 1B Loss of Control Power 10/18/98 S 3-MSL198C SLC Pump 1C Loss of Control Power 10/18/98 S 3-MSW488A Trip of 1 A Service Water Pump 12/13/98 S 4

3-MSW488B Trip of 1B Service Water Pump 12/13/98 S 3-MSW488C Trip of 1C Service Water Pump 12/13/98 S 3-MSW489A ESW Pump 1 A Trips 12/12/98 S 3-MSW489B ESW Pump 1B Trips 12/12/98 S 3-MSW489C ESW Pump 1C Trips 12/12/98 S 3-MSW489D ESW Pump 1D Trips 12/12/98 S 3-MSW490A ESWValve HV11-121 Fails to Auto Swap 12/13/98 S 3-MSW490C ESWValve HV11-225 Fails to Auto Swap 12/13/98 S 3-MSW490D ESWValve HV11-047 Fails to Auto Swap 12/13/98 S 3-MSW490E ESW Valve HV11-055A Fails to Auto Swap 12/13/98 S 3-MSW490F ESW Valve HV11-079 Fails to Auto Swap 12/13/98 S 3-MSW490G ESW Valve HV11-126 Fails to duto Swap 12/13/98 S 3-MSW490H ESWValve HV11-074 Fails to Auto Swap 12/13/98 S 3-MSW514 RHR Heat Exchanger A Tube Leak 4/8/98 S 3-MSW515B RHR Hx B Service Water Outlet Pipe Rupture in RHR Room 7/26/98 S 3-MTE001A Trip of 1 A Turbine Enclosure Suppy Fan 1/18/98 S

3-WITE0018 Trip of 1B Turbine Enclosure Supply Fan 1/18/98 S 3 MTE001C Trip of 1C Turbine Enclosure Supply Fan 1/18/98 S 7

3-MTE002A Trip of 1 A Turbine Enclosure Exhaust Fan 1/18/98 S

' 3-MTE002B Trip of 18 Turbine Enclosure Exhaust Fan 1/18/98 S I

3-MTE002C Trip of 1C Turbine Enclosure Exhaust Fan 1/18/98 S 3-MTE003A Trip of 1 A Turbine Equipment Compt Exhaust Fan 1/18/98 S 3-MTR003B Trip of 1B Turbine Equipment Compt Exhaust Fan 1/18/98 S

3.007A APRM Channel D Recorder Fails As-Is 5/1/98 S j

3.007B APRM Channel D Fails Inop 5/1/98 S 3.008B APRM Channel E Fails inop 5/4/98 S

3.010B RBM Channel A Fails inop 5/4/98 S

J Saturdai5ttuary 02,1999 Page 14 of 29

~

~

Test No Title Test Date Results 3.012D LPRM 24-178 Upscale Failure 5/4/98 S 3.012H LPRM 08-17D Upscale Failure 5/4/98 S 3.013D LPRM 24-57B Downscale Failure 5/4/98 S 3.013H LPRM 40-17D Downscale Failure 5/4/98 S 3.015D LPRM 40-41B Drift (-25 To +25) 5/4/98 S 3.019A Contro: Rod XX-W Failure (Dnft in) 7/15/98 S 3.019B Control Rod XX-W Failure (Drift Out) 8/20/98 S 3.019C Control Rod XX-W Fai;ure (Accumulator Trouble) 8/13/98 S 3.019D Control Rod XX-W Failure (Stuck) 8/23/98 S "s.019E Control Rod XX-W Failure (Uncoupled) 8/23/98 S i

3.019F Control Rod XX-W Failure (Scrammed) 8/6/98 S 3.019G Control Rod XX-W Fails To Scram 8/6/98 S 3.020D APRM Channel D Fails 0-125%

6!6/98 S 3.022 Reactor Manual Control Failure To insert 5/1/98 S 3.024 RDCS Failure (Analyzer Card) 5/1/98 S 3.028E Reactor Scram (Bank 4) 5/1/98 S 3.0298 RPS Fails To Scram (Complete) 5/1/98 S 3 0438 Feedwater Master Level Controller Fails Low 7/23/98 S 3.045A Feedwater Pump A Controller Output Fails Low 7/23/98 S 3.046D Steam Flow Transmitter 1N003D Fails 0-100%

7/15/98 S 3.0478 Feedwater Flow Transmitter 1N002B Fails 0-100%

6/7/98 S 3.061D MSIV HV41-1F022D Fails Open 6/7/98 S

3.062D MSIV HV41-1F028D Fails Open 6/11/98 S i

3.063D MSIV HV41-1F022D Fails Closed 9/27/98 S 3.064D MSIV HV41-1F028D Fails Closed 9/27/98 S 3.067 Steam Leak in Drywell(0-5000 gpm) 10/25/98 S 3.071C Loss of Extraction Steam To Feedwater Heater 16C 5/1/98 S 3.072D SJAE Steam Supply PCV07-1018 Fails Open 8/6/98 S 3.073 Feedwater Conductivity increase 6/4/98 S 3.074 Main Condenser Air inleakage 10/25/98 S

Saturday, January 02,1999 Page 15 of d

=-

1 Test No Title Test Date Results 3.077A Hotwell Level Controller Fails High 10/22/98 S 3.078C Condensate Pump C Trip 6/7/98 S 3.079D Condensate Powdex Demin D High Differential Pressure 7/26/98 S 3.079H Condensate Powdex Demin H High Differential Pressure 6/21/98 S 3.086A Circulating Water Pump A Trip 4/13/98 S

~

3.086B Circulating Water Pump B Trip 4/13/98 S 3.086C Circulating Water Pump C Trip 4/13/98 S 3.086D Circulating Water Pump D Trip 4/13/98 S 3.095 Automatic Voltage Regulator Failure 7/26/98 S 3.099 Trip of Both Stator Coolant Pumps 10/12/98 S

3.100 Main Turbine Bearings 5 and 6 High Vibration 6/14/98 S 3.103 Turbine Bearing High Temperature 9/27/98 S

3.105A EHC Pressure Regulator A Fails High 6/21/98 S i

3.105B EHC Pressure Regulator A Fails Low 6/11/98 S

3.106A EHC Pressure Regulator B Fails High 6/17/98 S

3.106C EHC Pressure Regulator B Oscillates 7/23/98 S

I 3,107D Bypass Valve No. 4 Sticks Open 6/11/98 S

3.107H Bypass Valve No. 8 Sticks Open 7/23/98 S 3.111 A EHC Load Selector Fails To Local 8/20/98 S 3.112C Both EHC Pumps Trip 6/11/98 S

3.115AD DRAWER InOP RX Enci VENT EXH CHAN D 2/19/98 S

3.115AG DRAWER InOP Refuel Floor VENT EXH CHAN C 3/18/98 S

i 3.115AH DRAWER inOP Refuel Floor VENT EXH CHAN D 3/18/98 S 3.115AM DRAWER InOP POST LOCA Mon CHAN D 4/9/98 S 3.115C DRAWER InOP Control Room EMERG Air CH C 4/14/98 S 3.115G DRAWER inOP RADWASTE EQUIP Room Exh 2/5/98 S

3.115L DRAWER inOP CHARCOAL TREATMENT Sys 2/11/98 S

3.1150 DRAWER InOP Air EJECTOR /OFFGAS CHAN A 2/19/98 S

3.115S DRAWER inOP Air EJECTOR /OFFGAS Linear 4/14/98 S

3.115X DRAWER InOP Main Steam Line CHAN D 2/19/98 S Saturday, January 023999 Page 16 of 29

~

~ _.

Test No Title Test Date Results 3.140A SRV 1FO13D Fails - Leaks 5/4/98 S 3.140B SRV iFO13D Fails - Stuck 5/4/98 S 3.140C SRV 1FO13D Fails - Open Electrically 5/4/98 S 3.1400 SRV 1FO13D Fails - Closed 5/4/98 S 3.140E SRV 1FO13D Fails-Open Mechanically 5/4/98 S 3.144A SRV 1FO13H Fails - Leaks 5/4/98 S 3.144B SRV 1FO13H Fails - Stuck 5/4/98 S 3.144C SRV 1FO13H Fails - Open Electrically 5/4/98 S 3.144D SRV 1FO13H Fails - Closed 5/4/98 S 3.144E SRV 1FO13H Fails - Open Mechanically 5/4/98 S

3.148A SRV 1FO13M Fails - Leaks 5/4/98 S

3.148B SRV 1FO13M Fails - Stuck 5/4/98 S 3.148C SRV 1FO13M Fails - Open Electrically 5/4/98 S

3.148D SRV 1FO13M Fails - Closed 5/4/98 S

3.148E SRV 1FO13M Fails - Open Mechanically 5/4/98 S

3.149B SRV 1FO13N Fails - Stuck 8/6/98 S

3,150A SRV 1FO13S Fails - Leaks 7/26/98 S

3.150E SRV 1FO13S Fails - Open Mechanically 7/23/98 S 3.151 D SRV 1F013E Downcomer Leak 0-100%

6/11/98 S

3.151F SRV 1F013N Downcomer Leak 0-100%

7/15/98 S

3.156A NSSSS Group 1 A Inadvertent isolation 10/24/98 S

3.1568 NSSSS Group 1B Inadvertent Isolation 2/3/98 S

3.156C NSSSS Group 1C Inadvertent isolation 2/3/98 S 3.156D NSSSS Group 1D inadvertent isolation 1/18/98 S

3.156E NSSSS Group 1E 'nadvertent isolation 10/24/98 S 3.156F NSSSS Group 1F Inadvertent isolation 2/3/98 S

3.156G NSSSS Group 1G Inadvertent Isolation 4/8/98 S

3.156H NSSSS Group 1H Inadvertent isolation 1/24/98 S

l 3.157A NSSSS Group 2A inadvertent isolation 4/8/98 S

l 3.1578 NSSSS Group 2B inadvertent isolation 4/8/98 S

Saturday, January 02,1999 Page 17 of 29 l

4 Test No Title Test Date Results 3.157C NSSSS Group 2C Inadvertent isolation 4/8/98 S 3.157D NSSSS Group 2D inadvertent Isolation 4/8/98 S 3.157E NSSSS Group 2E inadvertent isolation 2/5/98 S 3.157F NSSSS Group 2F Inadvertent isolation 11/8/98 S 1

3.158A NSSSS Group 3A inadvertent isolation 2/5/98 S f

3.158B NSSSS Group 3B inadvertent isolation 2/5/98 S j

3.159A NSSSS Group 6A Inadvertent isolation 3/8/98 S 3.159B NSSSS Group 6B Inadvertent isolation 3/8/98 S a

3.159C NSSSS Group 6C InaJvertent isolation 4/8/98 S 3.159D NSSSS Group 6D Inadvertent Isolation 3/8/98 S 3.159E NSSSS Group 6E Inadvertent Isolation 3/8/98 S 3.159F NSSSS Group 6F Inadvertent isolation 3/8/98 S 3.160A NSSSS Group 7A inadvertent Isolation 4/8/98 S 3.160B NSSSS Group 78 Inadvertent isolation 3/8/98 S 3.160C NSSSS Group 7C Inadvertent isolation 3/8/98 S 3.161 A NSSSS Group 8A inadvertent Isolation 3/8/98 S 3.161 B NSSSS Group 8B inadvertent isolation 3/8/98 S 3.162A Secondary Containment & PCIG A Inadvertent Isolation 1/11/98 S 3.162B Secondary Containment & PClG B Inadvertent Isolation 1/15/98 S

3.162C Secondary Containment & PCIG C Inadvertent isolation 1/22/98 S

I 3.162D Secondary Containment & PCIG D inadvertent isolation 1/22/98 S

3.162E Secondary Containment & PCIG E Inadvertent isolation 2/3/98 S 3.162F Secondary Containment & PCIG F Inadvertent Isolation 2/3/98 S 3.166A Offgas AfterCondenser Level Transmitter Fails High 8/20/98 S

3.1688 Offgas Chiller Glycol Pump B Top 7/26/98 S

3.171 D RHR Pump D Trip 6/21/98 S

j 3.172D RHR Pump 1D Fails To Auto Start 7/26/98 S 3.174D RHR Injection Valve 1F017D Fails As-Is 8/6/98 S 3.175D RHR Pump Suction Valve F004D Fails As-Is 6/11/98 S 3.176B RHR Shutdown Cooling Valve 1FOO6B Fails As-Is 8/13/98 S

Saturday, January 02,1999 Page 18 of 29 i

_ _ ~

Test No Title Test Date Results 3.176F RHR SDC Injection Valve 1FO15B Fails As-Is 8/13/98 S 3.177D RHR HX B Bypass Controller Fails Low 9/9/98 S 3.182D Core Spray Pump D Trip 9/9/98 S 3.183D Core Spray Pump D Fails To Auto Start 7/26/98 S 3.189B Reactor Water Cleanup Pump B Trip 6/11/98 S a

3.191 RWCU Filter / Demin Resin Depletion 9/9/98 S 3.195A RWCU isolation Valve HV44-1F001 Fails As-is 6/11/98 S 3.198A SLC Pump A Loss of Control Power 10/18/98 S 3.204A SRM Channel D Recorder Fails As-Is 5/1/98 S 3.2048 SRM Channel D Fails inoperative 5/1/98 S 3.204C SRM Channel D Detector Stuck 5/1/98 S 3.208A 1RM Channel D Recorder Fails As-Is 5/1/98 S i

3.208B IRM Channel D Fails inoperative 5/1/98 S 3.208C IRM Channel D Detector Stuck 5/1/98 S 3.211C IRM Channel G Detector Stuck 5/1/98 S 3.212A IRM Channel H Recorder Fails As-Is 5/1/98 S 3.212B IRM Channel H Fails inoperative 5/1/98 S 3.212C IRM Channel H Detector Stuck 5/1/98 S 3.213D SRM Channel D Fails To Selecteo Value 8/13/98 S 3.214D IRM Channel D Fails To Selected Value 8/13/98 S l

3.214H IRM Channel H Fails To Selected Valu3 8/26/98 S 3 216 APRM Overlap Failure 8/23/98 S

3.227A Reactor Instrument Line Break After 42-F043A 7/26/98 S 3.229A Reactor Instrument Line Break After 42-F049A 8/6/98 S 3.231A Reactor Instrument Line Break After 42-F045A 8/23/98 S 3.232G Reactor Level Transmitter LT42-N080D Fails High 8/13/98 S 3 232H Reactor Level Transmitter LT42-N080D Fails Low 8/13/98 S 3.233A Reactor Level Transmitter DPT42-N004A Fails High 4/16/98 S r

3.233G Reactor Level Transmitter DPT42-N004D Fails High 4/16/98 S 3.233H Reactor Level Transmitter DPT42-N004D Fails Low 4/16/98 S Saturday, January 02,1999 Page 19 of 29

Test No Title Test Date Results 3.234G Reactor Pressure Transmitter PT42-N078D Fails High 8/13/98 S 3.234H Reactor Pressure Transmitter PT42-N078D Fails Low 8/6/98 S 3.235A Reactor Level / Pressure Recorder R608 Fails 8/23/98 S

3.236D Refarence Leg 1D004D Flashes 8/23/98 S

3.237D Referenco Leg 1D004D Level Defect 7/15/98 S 3.237E Reference Leg 1D002 Level Defect 7/15/98 S

3.241C Feedwater Heater 12C Tube Leak 11/4/98 S

3.244A Rx Feedwater Pump A Trips 10/12/98 S 3.244C Reactor FeedPump A High Vibration 6/14/98 S

3.245B Feedwater Pump A Mechanical Failure 10/22/98 S

3.245C Reactor FeedPump B High Vibration 6/14/98 S

3.246C Reactor FeedPump C High Vibration 6/14/98 IJ 3.248B Reactor FeedPump A Recirc Valve Fails Closed 8/6/98 S 3.250B Reactor FeedPump C Recire Valve Fails Closed 10/12/98 S

3.253B FW Line B Rupture Outside Drywell 10/25/98 S

3.257 Suppression Pool Leak (0-100,000 GPM) 4/17/98 S

3.262A 13.2KV 11 Unit Auxiliary Bus Fau't 6/21/98 S

3.263D 4KV Safeguard Bus D14 Fault 8/6/98 S

3.264C Main Generator Output Breaker Trips (Both) 9/27/98 S

3.266B 13.2KV Safeguard Transformer Breaker 201 Trips 8/26/98 S

3.267A Plant Services Load Center 122 Fault 4/21/98 S

3.273A 114D Plant Services Load Center Fault 7/5/98 S

3.274A 124D Plant Services Load Center Fault 4/17/98 S

3.2748 224D Plant Services Load Center Fault 4/17/98 S

1 t

i 3.275D D144 Safeguard 440V Load Center Fault 9/12/98 S

3.277D 120 VAC Panel 10Y104 Fault 4/16/98 S

3.279B 120 VAC Panel 10Y202 Fault 5/30/98 S

j 3.2808 120 VAC RPS & UPS Bus 1BY160 Fault 7/26/98 S

3.282D 1FD 125/250 VDC 1DD105 Fault 5/31/98 S

3.284D Loss of DC To Selected Annunciator Panels 8/23/98 S

Esturday,'.lanuary 02,199I Page 20 of 29

(

Test No Title Test Date Results 3.284H Loss of DC To Selected Annunciator Panels 9/12/98 S 3.302B Refuel Floor Isolation Chan B 1/24/98 S 3.303 Air Leak in Reactor Enclosure 4/14/98 S 3.305B SGTS From Resctor Enclosure HV76-197 Fails Open 1/23/98 S j

3.405 Service Air Compressor Trip 6/7/98 S 3.407B RRCS ARI Division 11 Fails To initiate 10/18/98 S 3.408B Leak in Instrument Air Header B 8/20/98 S q

3.410B CIG isolation To Drywell HV59-129B Fails Closed 8/13/98 S 3.411C Both CRD Flow Control Valves Fall Closed 8/13/98 S i

3.413 Control Rods Fail To Scram-Brown's Ferry 8/27/98 S

3.414D SDV Valve SV47-1F011 Fails Closed 6/7/98 S 3.418D Diesel Generator 14 Trip 8/20/98 S 3.419D Diesel Generator 14 Fails To Start 8/26/98 S 3.430A Recirc Pump A Seizure 8/30/98 S 3.431D Recirc Pump B M/A Station Fails Low 9/9/98 S

3.434B Recire Pump B Seal #2 Failure 8/13/98 S

3.436B Recire Pump B Generator Field Breaker Trip 7/23/98 S 3.440A Recire Loop A Rupture (0-100%)

8/27/98 S 3.4438 Recirc Pump 1B RPT Breaker CB4B Trip 6/7/98 S

3.443C Recirc Pump 1B RPT Breaker Both Trip 6/7/98 S

j 3.445 HPCI Steam Line Break in Pump Room 1-100%

7/19/98 S

3.446C HPCI Steam Isolation Valve HV55-1F100 Fails 6/11/98 S 3.448B HPCI Speed Control Fails Low 8/30/98 S j

i 3.451B HPCI Steam Supply HV55-1F002 Isolates 7/26/98 S 3.455 HPCI Cooling Water Valve 1F059 Fails As-Is 8/23/98 S 3.458 RCIC Turbine Trip 8/6/98 S 3.461 RCIC Pump Suction Valves Fail To Auto Start 9/9/98 S 3.464B RCIC isolation Valve HV49-1F008 Fails As-is 8/20/98 S 3.465 RCIC Steam Line Break in Pump Room 1-100%

7/15/98 S 3.471D Drywell Area Unit Cooler Fan 1D1 Trip 7/15/98 S

l Saturday, January 02,1999 Page 21 of 29

Test No Title Test Date Results 3.471H Drywell Area Unit Cooler Fan 1H1 Trip 7/23/98 S 3.472D Drywell Area Unit Cooler Fan 1D2 Trip 8/6/98 S 3.472H Drywell Area Unit Cooler Fan 1H2 Trip 8/20/98 S 3.473 Drywell Air Leak To Reactor Enclosure 7/26/98 S 3.474 Suppression Chamber Air Leak To Reactor Enclosure 7/26/98 S 3.4828 DW Chiller 1BK111 Tnp 6/21/98 S 3.484B TECW Pump B Trip 6/11/98 S 3.488A Service Water Pump A Trips 7/23/98 S 3.489D ESW Pump D Trips 8/6/9C S 3.490D ES'W Valve HV11-047 Fails To Auto Swap 8/20/98 S 3.490H ESW Valve HV11-074 Fails To Auto Swap 8/23/98 S

3.492D RHR Service Water Pump D Trips 9/27/98 S

3.493A Failure OF RHRSW HX A Inlet Valve 6/11/98 S 3.501A Jet Pump No. 7/8 Plugged Riser 7/5/98 S 3.501B Jet Pump No.19/20 Plugged Riser 7/5/98 S 3.503B Jet Pump No. 9/10 Riser Break 7/15/98 S

3.506B Recirc Pump B Low Runback 7/23/98 S

3 510 Primary Containment Oxygen increases 9/27/98 S

3.514 High Rad LevelIri RHRSW(1-100%)

4/8/98 S

3.515B Feedwater Heater 13A Drain Valve Fails Open 8/27/98 S 3.516A Feedwater Heater 12A Drain Valve Fails Closed 9/8/98 S

3.51SE Feedwater Heater 16A Drain Valve Fails Closed 8/27/98 S

3.517D Feedwater Heater 158 Drain Valve Fails Open 8/30/98 S

3.518C Feedwater Heater 14B Drain Valve Fails Closed 9/8/98 S

3.519B Feedwater Heater 13C Drain Valve Fails Open 9/8/98 S

3.520A Feedwater Heater 12C Drain Valve Fails Clos 3d 9/8/98 S

3.520E Feedwater Heater 16C Drain Valve Fails Closed 9/8/98 S

3.521D Feedwater Heater 15A Dump Valve Fails Open 8/23/98 S

3.522C Feedwater Heater 14A Dump Valve Fails Closed 7/23/98 S

3.5238 Feedwater Heater 138 Dump Valve Fails Open 9/8/98 S

StuEIy,ianuary 02,199Y~

Page 22 of 29

~

1

I Test No Title Test Date Results 3.524A Feedwater Heater 12B Dump Valve Fails Closed 7/26/98 S 3.524E Feedwater Heater 16B Dump Valve Fails Closed 8/6/98 S 3.525D Feedwater Heater 15C Dump Valve Fails Open 8/30/98 S 3.526C Feedwater Heater 16? Dump Valve Fails Closed 8/20/98 S 3.527A Steam Leak Detection NUMAC TIS25-101 A Fails 1/15/98 S 3.5278 Steam Leak Detection NUMAC TIS 25-101B Fails 1/15/98 S 3.527C Steam Leak Detection NUMAC TIS 25-101C Fails 1/15/98 S 3.527D Steam Leak Detection NUMAC TIS 25-101D Fails 1/15/98 S 3.528D RHR Containment Spray Valve FO21B Fails As-Is 7/15/98 S

3.529D Reactor Pressure Transmitter PT42-103B Fails Low 9/27/98 S

3.533 Turbine Turning Gear Oil Pump Trips 8/20/98 S 3.535D 182 Moisture Separator Drain Tank Drain Valve Fails Closed 8/13/98 S 3.536D 1B2 Moisture Separator Drain Tank Drain Valve Fails Open 9/9/98 S 3.536F 1C2 Moisture Separator Drain Tank Drain Valve Fails Open 8/20/98 S 3.537D 1B2 Moisture Separator Drain Tank Dump Valve Fails Closed 8/13/98 S 3.538D 1B2 Moisture Separa*or Drain Tank Dump Valve Fails Open 8/20/98 S

3.538F 1C2 Moisture Separator Drain Tank Dump Valve Fails Open 8/20/98 S

3.542 Generator Auto Voltage Regulator Fails High 9/12/98 S

3.547 CRD Pump Trips On Clogged Suction Filter 8/27/98 0 3.550 MS Supply Valve HV01-109 Fails As-Is 8/27/98 S 3.552C RFP Discharge Check Valve HV06-105C Fails Open 8/27/98 S 3.553D Turbine Control Valve No. 4 Fails Open 8/27/98 S

3.555 Control Rods Fail To Scram (0-120) 9/27/98 S

3.556C RFP C M/A Station Swaps To Manual 8/13/98 S

3.556E FWC Master Controller Swaps To Manual 8/13/98 S

3.571A RHR SDC Valve HV51-1F008 Trip of Thermal Overload 5/26/98 S

3.5718 RHR SDC Vaive HV51-1F008 Tnp of Magnetic Overload 5/26/98 S

3.572A RHR SDC Valve HV51-1F009 Tnp of Thermal Overload S/26/98 S

3.572B RHR SDC Valve HV51-1F009 Tnp of Magnetic Overload 5/27/98 S

3.573A RHR Valve HV51-1F024A Trip of Thermal Overload 5/26/98 S

Saturday, January 02,1999 Page 23 of 29 i

=_

Test No Title Test Date Results

)

3.573B RHR Valve HV51-1F024A Trip of Magnetic Overload 5/27/98 S 3.574A RHR Valve HV51-1F024B Trip of Thermal Overload 5/26/98 S 3.574B RHR Valve HV51-1F024B Trip of Magnetic Overload 5/27/98 S 3.579 SJAE Air Valves Close -Inadvertent Trip of tcw Steam Flow 8/20/98 S 4.014 Load Table: 4 KV Safeguard Bus D144 8/6/98 S 4.018 Load Table: Plant Services Area Load Center 114D 7/5/98 S 4.025 Load Table: Plant Servicer. Load Center 224D 4/17/98 S 4.026 Load Table: Admin Builoing Load Center 234D 5/30/98 S 4.027 Load Table: Plant Seuices Bus 122 4/21/98 S 4.032 Load Table: 120 VAC Panel 10Y104 4/16/98 S 4.038 Load Table: 120 VAC Panel 10Y202 5/30/98 S 4.040 Load Table: 1B RPS & UPS Bus 18Y160 4/21/98 S 5.04 B SRV Opens at Rated Power 8/2/98 S 5.05 Tota! Loss of instrument Air 6/4/98 S 5.06B Loss of Offsite Power at Rated Power Conditions 6/4/98 S 5.07D Loss of Safeguard Bus D14 (Emergency Power) 5/27/98 S

5.09D Loss of Non-Safeguard Load Center 114D 5/27/98 S

5.09H Loss of Non-Safeguard Load Center 124D 5/27/98 S 5 09J Loss of Non-Safeguard Load Center 122 5/27/98 S 5.10D Loss of 120 VAC Instrument Bus 10Y104 5/27/98 S 5.10K Loss of 120 VAC instrument Bus 10Y202 5/27/98 S

5.10M Loss of 120 VAC RPS/UPS Bus 18Y160 5/27/98 S

5.11 D Loss of 125/250 VDC Bus 1DD015 5/27/98 S

5.14 Total Loss of Service Water 10/25/98 S

5.17B Trip of Two Reactor Feedwater Pumps 8/2/98 S 5.17F Trip of One Condensate Pump 6/4/98 S 5.25B Recirc Pump M/A Station Fails Low 6/4/98 S 5.30B Main Feedwater Line B Rupture Outside Drywell 6/3/98 S 5.35A EHC Pressure Regulator Fails High 8/2/98 S 5.36A Closure of One MStV 10/25/98 S

Saturday, January 02,1999 Page 24 of 29

Test No Title Test Date Results l

6.10 Steady State Performance at 25% Power 9/20/98 S 6.11 Steady State Performance at 75% Power 9/20/98 S 6.12 Steady State Performance at 100% Power for 1 Hour 9/26/98 S 7.01 Reactor (Manual) Scram 5/26/98 S 7.02 Simultaneous Trip of All Reactor Feedwater Pumps 5/25/98 S 7.03 Closure of All MSIVs at Rated Power 5/25/98 S 7.04 Trip of Both Reactor Recirc Pumps at Rated Power 5/26/98 S 7.05 Single Reactor Recirc Pump Trip 5/25/98 S 7.06 Turbine Trip within Bypass Capability 5/26/98 S 7.08 Recirc Loop Rupture with Loss of Offsite Power 5/25/98 S

7.09 Maximum Size Unisolable Main Steam Line Rupture 5/26/98 S

I 8-RAD 204 SRV 1F013A Fuse 12/19/98 S 8-RAD 205 SRV 1F0138 Fuse 12/19/98 S

l 8-RAD 206 SRV 1F013C Fuse 12/19/98 S 8-RAD 207 SRV 1F013D Fuse 12/20/98 S 8-RAD 208 SRV 1F013E Fuse 12/20/98 S l

8-RAD 209 SRV 1F013F Fuse 12/22/98 S 8-RAD 210 SRV 1F013G Fuse 12/23/98 S

8-RCE405 CE Chiller Hi Condenser Pressure Trip Reset 8/1/98 S

i 8-RFC003 Spent Fuel Pool Heat Source 6/6/98 S

8-RFC007A 10-1136A, Fuel Pool Cooling Hx A Service Water inlet Valve 6/6/98 S

8-RFC007B 10-1136B, Fuel Pool Cooling Hx B Service Water inlet Valve 6/6/98 S

8-RFC007C 10-1136C, Fuel Pool Cooling Hx C Service Water Inlet Valve 6/6/98 S 8-RPC406 HV57-121 Air Supply Valve 8/8/98 S

8-RRE001 Rx Enct Door 20. HPCI Room To Corridor 111 2/15/98 S

8-RRE002 Rx Enci Door 19, HPCI To RCIC Room 2/15/98 S

8-RRE003 Rx Enci Door 18. RCIC Room To Airlock 106 2/15/98 S 8-RRE005 Rx Enci Door No.14, RHR Pump A/C Room To RHR Pump B/

2/15/98 S 8-RRE006 Rx Encl Door No.12 RHR Pump 3/D Room To Passageway 1 3/3/98 S 8-RRE007 Rx Encl Door No. 21. Core Spray Room 110 To Corridor 111 3/3/98 S

~ 's~ turd 5snuary 02,1999 Page 25 of 29

~

~

S i

a

Test No Title Test Date Results 8-RRE008 Rx Enct Door No. 23, Core Spray Room 113 To Corridor 111 3/3/98 S 8-RRE009 Rx Enci Door No. 24, Core Spray Room 114 To Passageway 1 3/3/98 S 8-RRE010 Rx Enct Door No.11, Core Spray Room 117 To Passageway 1 3/3/98 S 8-RRE011 Rx Enci Door No 424, RWCU isolation Valve Compt To RWCU 3/3/98 S 8-RRE012 Rx Enc! Door No. 425, RWCU Pump Room 509 To Corridor 50 3/3/98 S 8-RRE013 Rx Encl Door No. 423, Steam Chase 518 To Corridor 506W 3/3/98 S

l 8-RRE014 Rx Enci Door No. 314. Steam Chase 407 To Corridor 402A 3/3/98 S

8-RRE140 SGTS Filter A Slide Gate Dampers 4/2/98 S 8-RRE141 SGTS Filter B Slide Gate Dampers 4/2/98 S 4

8-RRE142 SGTS Fan A Purge in RONAN Mode 4/2/98 S

8-RRE143 SGTS Fan B Purge in RONAN Mode 4/2/98 S 8-RRR029 Recirc Pump A Scoop Tube Positioner Power Switch 12/23/98 S 8-RRR030 Recirc Pump B Scoop Tube Positioner Power Switch 12/23/98 S 8-RRR241 Normal Reactor Coolant Leakage 12/11/98 S 8-RRT001 Rx Water Cleanup Filter / Demin Backwash Event 6/13/98 S 8-RRT002 Feedwater Hydrogen injection 6/17/98 S 8-RSD001A Manual Operation of Steam Flooding Damper BPD-201-21 A 2/12/98 S 8-RSD001B Manual Operation of Steam Flooding Damper BPD-201-21B 2/12/98 S 8-RSD002A Manual Operation of Steam Flooding Damper BPD-201-22A 2/8/98 S

8-RSD002B Manual Operation of Steam Flooding Damper BPD-201-22B 2/8/98 S

8-RSD003A Manual Operation of Steam Flooding Damper BPD-201-23A 2/8/98 S

i 4

8-RSD003B Manual Operation of Steam Flooding Damper BPD-201-23B 2/8/98 S 8-RSD004A Manual Operation of Steam Flooding Damper BPD-202-118A 2/11/98 S

8-RSD004B Manual Operation of Steam Flooding Damper BPD-202-118B 2/11/98 S

8-RSD005A Manual Operation of Steam Flooding Damper BPD-202-67A 2/8/98 S 8-RSD005B Manual Operation of Steam Flooding Damper BPD-202-67B 2/8/98 S

8-RSD006A Manual Operation of Steam Flooding Damper BPD-202-104A 2/8/98 S 8-RSD006B Manual Operation of Steam Flooding Damper BPD-202-104B 2/8/98 S

8-RSD007A Manual Operation of Steam Flooding Damper BPD-203-1 A 2/12/98 S

8-RSD007B Manual Operation of Steam Flooding Damper BPD-203-1B 2/12/98 S of 29

Test No Title Test Date Results 8-RSD008A Manual Operation of Steam Flooding Damper BPD-203-4A 2/8/98 S 8-RSD008B Manual Operation of Steam Flooding Damper BPD-203-4B 2/8/98 S 8-RSD009A Manual Operation of Steam Flooding Damper BPD-203-14A 2/12/98 S 8-RSD009B Manual Operation of Steam Flooding Damper BPD-203-14B 2/12/98 S 8-RSD010B Manual Operation of Steam Flooding Damper BPD-203-16B 2/8/98 S

8-RSD011 A Manual Operation of Steam Flooding Damper BPD-203-20A 2/12/98 S 8-RSD0118 Manual Operation of Steam Flooding Damper BPD-203-20B 2/12/98 S

8-RSD012A Manual Operation of Steam Flooding Damper BPD-203-24A 2/12/98 S

8-RSD012B Manual Operation of Steam Flooding Damper BPD-203-24B 2/12/98 S

8-RSD013A Manual Operation of Steam Flooding Damper BPD-203-37A 2/12/98 S

8-RSD013B Manual Operation of Steam Flooding Damper BPD-203-37B 2/12/98 S

8-RSD014A Manual Operation of Steam Flooding Damper BPD-203-38A 2/12/98 S

B-RSD014B Manual Operation of Steam Flooding Damper BPD-203-38B 2/12/98 S

8-RSD015A Manual Operation of Steam Flooding Damper BPD-203-39A 2/12/98 S

8-RSD015B Manual Operation of Steam Flooding Damper BPD-203-39B 2/12/98 S 8-RSD016A Manual Operation of Steam Flooding Damper BPD-201-39A 2/11/98 S

8-RSD016B Manual Operation of Steam Flooding Damper BPD-201-39B 2/11/98 S

8-RSD017A Manual Operation of Steam Flooding Damper BPD-202-20A 2/11/98 S

8-RSD017B Manual Operation of Steam Flooding Damper BPD-202-208 2/11/98 S

8-RSD018A Manual Operation of Steam Flooding Damper BPD-202-33A 2/13/98 S

8-RSD018B Manual Operation of Steam Flooding Damper BPD-202-33B 2/13/98 S

8-RSD019A Manual Operation of Steam Flooding Damper BPD-202-40A 2/13/98 S

8-RSD019B Manual Operation of Steam Flooding Damper BPD-202-40B 2/13/98 S

8-RSD020A Manual Operation of Steam Flooding Damper BPD-202-41 A 2/13/98 S

8-RSD020B Manual Operation of Steam Flooding Damper BPD-202 41B 2/13/98 S

8-RSD021A Manual Operation of Steam Flooding Damper BPD-203-3B 2/8/98 S

8-RSD021A Manual Operation of Steam Flooding Damper BPD-203-3A 2/8/98 S

8-RSD022A Manual Operation of Steam Flooding Damper BPD-203-9A 2/13/98 S

8-RSD022B Manual Operation of Steam Flooding Damper BPD-203-98 2/13/98 S

j 8-RSD023A Manual Operation of Steam Flooding Damper BPD-203-10A 2/13/98 S

Saturday, January 02, i999 Page 27 of 29

Test No Title Test Date Results 8-RSD023B Manual Operation of Steam Flooding Damper BPD-203-10B 2/13/98 S 8-RSD024A Manual Operation of Steam Flooding Damper BPD-203-17A 2/8/98 S 8-RSD024B Manual Operation of Steam Flooding Damper BPD-203-17B 2/8/98 S 8-RSD025A Manual Operation of Steam Flooding Damper BPD-203-22A 2/13/98 S s

8-RSD0258 Manual Operation of Steam Flooding Damper BPD-203-22B 2/13/98 S 8-RSD026A Manual Operation of Steam Flooding Damper BPD-203-23A 2/13/98 S 8-RSD026B Manual Operation of Steam Flooding Damper BPD-203-23B 2/13/98 S 8-RSD027A Manual Operation of Steam Flooding Damper BPD-203-25A 2/11/98 S 8-RSD027B Manual Operation of Steam Flooding Damper BPD-203-25B 2/11/98 S 8-RSD028A Manual Operation of Steam Flooding Damper BPD-203-26A 2/13/98 S 8-RSD028B Manual Operation of Steam Flooding Damper BPD-203-26B 2/13i38 S 8-RSD029A Manual Operation of Steam Flooding Damper BPD-203-27A 2/13/98 S 8-RSD029B Manual Operation of Steam Flooding Damper BPD-203-27B 2/13/98 S i

8-RSD030A Manual Operation of Steam Flooding Damper BPD-203-28A 2/13/98 S 8-RSD030B Manual Operation of Steam Flooding Damper BPD-203-28B 2/13/98 S 8-RSD031A Manual Operation of Steam Flooding Damper BPD-203-29A 2/13/98 S 8-RSD031B Manual Operation of Steam Flooding Damper BPD-203-29B 2/13/98 S 8-RSD032A Manual Operation of Steam Flooding Damper BPD-203-30A 2/11/98 S 8-RSD032B Manual Operation of Steam Flooding Damper BPD-203-30B 2/11/98 S 8-RSD033A Manual Operation of Steam Flooding Damper BPD-203-31 A 2/11/98 S 8-RSD033B Manual Operation of Steam Flooding Damper BPD-203-31B 2/11/98 S 8-RSD034A Manual Operation of Steam Flooding Damper BPD-203-42A 2/11/98 S

8-RSD034B Manual Operation of Steam Flooding Damper BPD-203-42B 2/11/98 S

)

8-RSD035A Manual Operation of Steam Flooding Damper BPD-203-43A 2/13/98 S 8-RSD035B Manual Operation of Steam Flooding Damper BPD-203-43B 2/13/98 S 8-RSD036A Manual Operation of Steam Flooding Damper SPD-203-44A 2/13/98 S B-RSD036B Manual Operation of Steam Flooding Damper BPD-203-44B 2/13/98 S 8-RSLD52 48-1F016, SLC Pump Test Return Throttle Valve 11/7/98 S 8-RSLO54 SLC Pump A Start from Test Station 11/7/98 S 8-RSLO55 SLC Pump B Start from Test Station 11/7/98 S Saturday, January 02,1999 Page 28 of 29 l

i i

Test No Title Test Date Results 8-RSW154 ESW Pump B Transfer Switch 12/10/98 S 8-RSW155 ESW Pump B Local Control 12/10/98 S 8-RSW170 MCC Feeder Breaker for HV12-034A 12/10/98 S 8-RTE 010A 1 A TEECE Fan Lockout Relay 1o6-11510 Reset 4/8/98 S 8-RTE 010B 1B TEECE Fan Lockout Relay 186-11610 Reset 4/8/98 S 8-RTR010 T-214 RRCS ARI Div i Manual Initiation 10/17/98 S i

8-RTR011 T-214, RRCS ARI Div 11 Manual Initiation 10/17/98 S 8-RTR181 T-217, RPS Reset with Trip Signal Present 10/14/98 S

8-RTR303 T-217 ARI Reset with Trip Signal Present 10/21/98 S 8-RTR311 T-228 Nitrogen Purge Supply Pressure 4/8/98 S 8.148 RX Enclosure To SGTS isolation Damper SGD76-206-3 1/24/98 S 8.180 HS76-196 Test Switch 4/8/98 S 8.243 T-200 Suppression Pool 18 Inch Purge Vent 2/20/98 S 8.244 T-200 Suppression Pool Purge Supply 2/20/98 S 8.246 T-200 Drywell 24 inch Purge Exh 2/20/98 S 8.247 T-200 Drywell Purge Supply 2/20/98 S

8.248 T-200 Drywell 6 Inch ILRT Line 2/20/98 S

8.300 Reactor Enclosure Manual Test Switch HSXX-198A-5 2/3/98 S

8.301 Reactor Enclosure Manual Test Switch HSXX-198B-5 2/3/98 S

8 336 HS76-151 A RX Enclosure / Refuel Floor Isolation Interlock 1/23/98 S

8.337 HS76-151B RX Enclosure / Refue! Floor Isolation Interlock 4/6/98 S

8.338 HS76-152A RX Enclosure / Refuel Floor Isolation Interlock 1/23/98 S

8.339 HS76-152B RX Enclosure / Refuel Floor isolation Interlock 4/8/98 S

8.403 MCR Overhead Lighting Shunt Trip Reset 6/3/98 S

8.407 Defeat RHR Shutdown Cooling Auto isolations 8/30/98 S 1

~5atTrday, January 52,1999 Page 29 of 29

'~

i

=-

e J

w PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT EXHIBIT 4 SIMULATOR TEST COMMITMENTS (TESTING TO BE COMPLETED 1999 - 2003) 1 1

2 i

a i

1 l

l 1

a

r___

PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULkTOR QUADRENNIAL REPORT l

LGS SIMULATOR TESTING TO BE PERFORMED IN 1999

LGS Simulator Testing Committmentsfor 1999 Test No Title Te.it Date Committment 1.01 Computer Real Teme Test 12/31/99 3-MRE100 Duct Rupture: T-200 Suppression Pool 18 inch Vent Line 1201/99 3-MRE301A inadvertent Rx Enclosure Isolation Chan A 12/31/99 i

3-MRE304A SGTS Inlet Valve From Refuel Floor HV76-019 Fails Open 12/31/99 l

3-MRE306 Refuel Floor Fails To isolate 12/31/99 3-MRE308A Tnp of 1A REECE Fan 12/31/99 3-MRE310A Tnp of 1 A Rx Enclosure HVAC Exhaust Fan 12/31/99 3-MRE312A Tnp of 1A Refuel Floor HVAC Air Exhaust Fan 12/31/99 3-MRM001A Control Room Fresh Air Rad Mon Chan A Fails To Sel Value 12/31/99 3-MRM003A fd Stack WRAM Low Range Chan Fails To Set Value 12/31/99 3-MRM0048 N Stack Rad Mon A todine Chan (21E075) Fails To Set Value 12/31/99 3-MRM00e'F N Stack Rad Mon B Gaseous Chan (6GE075) Fails To Sel Value 12/31/99 J

l 3-MRM00$D U-1 S Stack Rad Mon B Part Chan (4PE185) Fails To Sei Value 12/31/99 3 MRM007 Radwaste Enci Exh Rad Mon Fails To Set Value 12/31/99 3-MRM011 Unit i Containment Leak Det Rad Mon Fails To Sel Value 12/31/99 3-MRM013 Service Water Rad Mon Fails To Sei value 12/31/99 3-MRM0148 Offgas Steam Jet Air Ejector Chan B Rad Mon Fails To Sel Value 12/31/99 3-MRM015A Main Steam Lsne Rad Mon Chan A Fails To Sei Value 12/31/99 3-MRM016A Rx Enc! Vent Exh Rad Mon A Fails To Sel Value 12/31/99 3-MRM017A Refuel Floor Vent Exh Rad Mon Chan A Fai!s To Sei Value 12/31/99 3-MRM018A Drywell Post Loca Rad Mon Chan A Fails To Sei Value 12/31/99 3-MRM020 RCIC Pump Room Area Rad Mon Fails To Sei Value 12/31/99 3-MRM024 Turbine Aux Hallway Area Rad Mon Fails To Set Value 12/31/99 3-MRM028 RHR Division il Room Area Rad Mon Fails To Sei Value 12/31/99 3-MRM032 Turbine Enci Condenser Area Rad Mon Fads To Sei Value 12/31/99 3-MRV 036 Neutron Mon Sys Area Rad Mon Fails To Sel Value 12/31/99 3 MRMMO RWCU Heat Exchanger Area Rad Mon Fails To Sel Value 12/31/99 3-MRM044 Turbine Aux Bay Area Rad Mon Fails To SeiValue 12/31/99 Friday DecemberN,1998 Page i of11

E l

1 Test No Title Test Date Committment 3-MRM047 TEECE Fdter Area Rad Mon Fails To Sel Value 12/31/99 3-MRM051 New Fuel 3torage Vauft Area Rad Mon Fails To Sol Value 12/31/99 3-MRM056 Studge Disch Mixing Pump Area Rad Mon Fails To Sel Value 12/31/99 3-MRM060 Floor Drain Filter Hold Pmp Area Rad Mon Fails To Sel Value 12/31/99 l

3-MRM064 Pidwaste Cask Loading Area Rad Mon Fads To Sol Value 12/31/99 4

3-MRM068 Turb Encl RR Entrance Area Rad Mon Fails To Set Value 12/31/99 3-MRM072 Turbine Operating Area Rad Mon Fans To Sel Value 12/31/99 3-MRT001B Fuel Cladding Failure. 0-52411 Fuel Pins 12/31/99 i

3-MRT005B inadvertent Activity Release on Elevation 253 Rx Encl 12/31/99 3-MRT012 Offgas Sys HEPA Fdter Degraded 12/31/99 l

3-MSD002B Staam Flooding Damper BPD-201-22B Fails To Tnp 12/31/99 l

l

[

3-MSD004B Steam Flooding Damper BPD-202-118B Fails To Trip 12/31/99 l

3-MSD006B Steam Flooding Damper BPD-202104B Fans To Tnp 12/31/99 l

l 3 MSD008B Steam Flooding Damper BPD-203-4B Fads To Tnp 12/31/99 j

3-MSD010B Steam Flooding Damper BPD 203-168 Fads To inp 12/31/99 3-MSD012A Steam Flooding Damper BPD-203-24A Fans To Trip 12/31/99 3-MSD0138 Steam Flooding Damper BPD-203-37B Fads To Tnp 12/31/99 3-MSD015B Steam Flooding Damper BPD-203-398 Fails To Tnp 12/31/99 3-MSD0170 Steam Flooding Damper BPD 202-20B Fans To Tnp 12/31/99 1

3-MSD0190 Steam Flooding Damper BPD-202-408 Fails To Trt, 12/31/99 3-MSD022B Steam Flooding Damper BPD-203-98 Fads To Tnp 12/31/99 3-MSD02;B Stearn Flooding Damper BPD-203-17B Fads To Tnp 12/31/99 3-MSD026B Steam Flooding Damper SPD-203 23B Fails To Tnp 12/31/99 3-MSD028B Steam Flooding Damper BPD-203-268 Fads To Tnp 12/31/99 3-MSD030B Steam Flooding Damper BPD-203-28B Fads To Tnp 12/31/99 3-MSD0328 Steam Flooding Damper BPD-203-30B Fans To Tnp 12/31/99 3-MSD034B Steam Flooding Damper BPD-203-42B Fails To Tnp 12/31/99 3-MSD036B Steam Flooding Damper BPD-203-448 Fans To Tnp 12/31/99 3-MTE001B Tno of 1B Turbine Enclosure Supply Fan 12/31/99 3-MTE002C Tnp of 1C Turbme Enclosure Exhaust Fan 12/31/99 555ry?Ii$ 5 5555~

page2 off

~~~

4 Test No Title Test Date Committment i

)

3.003A Core Power Oscaltations (In-Phase) 12/31/93 i

l 3 004A APRM Channel A Recorder Fails As-Is 12/31/99 3

1 3 004B APRM Channel A Fans inop 12/31/99 3 009A APRM Channel F Recorder Fails As-Is 12/31/93 3 011A RBM Channel B Recorder Fails As-is 12/31/99 3 012A LPRM 56-17B Upscale Failure 12/31/99 3 012E LPRM 40-338 Upscale Failure 12/31/99 3 013A LPRM 24-33D Downscale Failure 12/31/99 3 013E LPRM 48-49D Downscale Far -

12/31/99 3 015A LPRM 16-41B Drrft ( 25 To +25) 12/31/99 3 016A Control Rod XX-YY Failure (Drrft in) 12/31/99 3 016B Control Rod XX YY Failure (Drrft Out) 12/31/99 l

l 3 016C Control Rod XX YY Failure (Accumulator Trouble) 12/31/99 3 016D Control Rod XX-YY Failure (Stuck) 12/31/99 3 016E Control Rod XX YY Fadure (Uncoupled) 12/31/99 j

3 016F Control Rod XX YY Failure (Scrammed) 12/31/99

]

3 016G Control Rod XX-YY Fails To Scram 12/31/99 3 016H Control Rod (XX YY) Falls: Double Notch on Withdraw 12/31/99

]

3 020A APRM Channel A Fails 0125%

12/31/99 3 020E APRM Channel E Fails 0-125%

12/31/99 3 025 Control Rod XX-YY Reed Switch Failure 12/31/99 3 027A Loss of Normal Power To RPS Channel A 12/31/99 l

3 028A Reactor Scram (Full) 12/31/99

~

3 028B Reactor Scram (Bank 1) 12/31/99 J029C RPS Fails To Scram (Channel A) 12/31/99 3 044A Feedwater Pump A Controller Output Fails High 12/31/99 3 045B Feedwater Pump B Controller Output Fails Low 12/31/99 t

3 046A Steam Flow Transmitter 1N003A Fails 0-100%

12/31/99 3 04'TC Feedwater Flow Transmitter 1N002C Fails 0-100%

12/31/99 3 061 A MSlV HV41-1F022A Fails Open 12/31/99 l

IWday. December N,1998 Page 3 of1I f

I Test No Title Test Date Committment 3.062A MSIV HV41 1F028A Fails Open 12/31/99 3 063A MSIV HV41-1F022A Fails Closed 12/31/99 3.064A MSfV HV41 1F028A Fails Closed 12/31/99 3 069 Steam Seal Evaporator Outlet Valve Fails Closed 12/31/99 3.072A SJAE Steam Supply PCV07101 A Fails Closed 12/31/99 3 073 Feedwater Conductrvity increase 12/31/99 3 077B Hotwell Level Controher Fails Low 12/31/99 3.079A Condensate Powdex Demm A Hgh Differential Pressure 12/31/99 3 079E Condensate Powdex Domin E Hgh Differential Pressu'e 12/31/99 3 080A Condensato Recire Valve Fails Open 12/31/99 3 086A Circulating Water Pump A Tnp 12/31/99 3 096 Generator Hydrogen Cooling System Leakage 12/31/99 3 099 Tnp of Both Stator Coolant Pumps 12/31/99 3104A Main Turtune Control System Fails Hgh 12/31/99 3.105C EHC Pressure Regulator A Osci!!ates 12/31/99 3107A Bypass Vatve No.1 Sticks Open 12/31/99 3.107E Bypass Valve No. 5 Sticks Open 12/31/99 3 108 Bypass Valves Limited To Selected Value 12/31/99 3111B EHC Lead Selector Fails To Remote 12/31/99 4

3137A SRV 1FO13A Fails Leaks 12/31/99 3137B SRV 1FO13A Fails Stuck 12/31/99 3137C SRV 1FO13A Fails Open Electncally 12/31/99 3137D SRV 1FO13A Fails Closed 12/31/99 3137E SRV 1F013A Fails Open Mechanically 12/31/99 3141 A SRV 1F013E Fails Leaks 12/31/99 3.141B SRV 1FO13E Fails Stuck 12/31/99 3141C SRV 1FO13E Fails Open Electncally 12/31/99 31410 SRV 1FO13E Falls Closed 12/31/99 3.141E SRV 1F013E Fails Open Mechanically 12/31/99 3145A SRV 1F013J Fails - Leaks e

12/31/99 feiday, December N,1998 Page 4 ofIi

Test No Title Test Date Committment 3145B SRV 1F013J Fails Stuck 12/31/99 3.145C SRV 1FO13J Fails Open Electncally 12/31/99 I

3.145D SRV 1FO13J Fails - Closed 12/31/99 I

3.145E SRV 1F013J Fails Open Mechanically 12/31/99 3.149C SRV 1FO13N Fails Open Electncally 12/31/99 3150B SRV 1FO13S Fails - Stuck 12/31/99 f

3151A SRV 1F013K Downcomer Leak 0-100%

12/31/99 3.156A NSSSS Group 1 A inadvertent isolation 12/31/99 3156E NSSSS Group 1E inadvertent isolaton 12/31/99 3.157A NSSSS Group 2A inadvertent isolaton 12/31/99 3157E NSSSS Group 2E inadvertent isolaton 12/31/99 3159A NSSSS Group 6A inadvertent isolaton 12/31/99 3159E NSSSS Group 6E inadvertent isolation 12/31/99 3.160C NSSSS Group 7C Inadvertent isolation 12/31/99 4

3162A Secondary Containment & PCIG A inadvertent isolaton 12/31/99 3.162F Secondary Containment & PCIG F Inadvertent isolation 12/31/99 3.166B Offgas AfterCondenser Level Transmmer Fails Low 12/31/99 3.168C Offgas Chiller Glycol Pump Tnp (Both) 12/31/99 3171 A RHR Pump A Tnp 12/31/99 3172A RHR Pump 1 A Fails To Auto Start 12/31/99 4

3.174A RHR Injection Valve 1F017A Fails As-Is 12/31/99 3175A RHR Pump Sucten Valve F004A Fails As-is 12/31/99 3176C RHR SDC Suction Valve 1FOO8 Fails As-Is 12/31/99 3177A RHR HX A Bypass Controiner Fails High 12/31/99 3182A Core Spray Pump A Tnp 12/31/99 3183A Cove Spray Pump A Fails To Auto Start 12/31/99 3184A Core Soray inboard Vaive 1FOO5 Fails As-is 12/31/99 3.189C Reactor Water Cleanup Pump C Tnp 12/31/99 3195B RWCU isolation Valve HV441F004 Fails As-is 12/31/99 3198B SLC Pump B Loss of Control Power 12/31/99 L

l'riday, December M, IV98 Page5ofIi 1

i l

Test No Title Test Date Committment 3.201 A SRM Chan A Recorder Fails As-ts 12/31/99 3.201B SRM Channel A Fails inoperative 12/31/99 l

3.201C SRM Channel A Detector Stuck 12/31/99 3 205A BRM Channel A Recorder Fails As-Is 12/~MJ9 l

3 205B IRM Channel A Fails :noperative 12/31/99 i

3 205C IRM Channel A Detector Stuck 12/31/99 3 209A 1RM Channet E Recorcer Fails As-Is 12/31/99 l

3.209B 1RM Channel E Fails inoperative 12/31/99 3 209C IRM Channel E Detector Stuck 12/31/99 3 213A SRM Channel A Fails To Selected Value 12/31/99 3 214A 1RM Channel A Fails To Se6ected Value 12/31/99 3 214E IRM Channel E Fails To Selected Value 12/31/99 3 217A RBM Channel A Fails To Selected Value 12/31/99 3 2278 Reactor Instrument Line Break After 42-F043B 12/31/99 3 229B Reactor instrument Line Break After 42 F049B 12/31/99 t

3 231B Reactor instrument Line Break After 42-F045B 12/31/99 3 232A Reactor Level Transmmer LT42-N060A Fails High 12/31/99 3 232B Reactor i evel Transmmer LT42-N080A Fails Low 12/31/99 3 233A Reac.or Level Transmitter DPT42-N004A Fails Hgh 12/31/99 3 2330 Reactor Level Transmitter DPT42-N004A Fails Lcrw 12/31/99 3 234A Reactor Prestw Transmitter PT42-N078A Fails High 12/31/99 32348 Reactor Pressure Transmitter PT42-N078A Fails Low 12/31/99 3 235B Reactor Level / Pressure Recorder R609 Fails 12/31/99 3 236A Reference Leg 1D004A Flashes 12/31/99 3 237A Referente Leg 1D004A Lwel Defect 12/31/99 3 237F ALL Reference Legs Level Defect 12/31/99 3 242A Feedwster Heater 15A Tube Leak 12/31/99 3 244B Feedwater Pump A Mechanical Failure 12/31/99 3 245C Reactor FeedPump B Hgh Vibration 12/31/99 3 247A FW Low Flow Control Valve Fails Open 12/31/99

~55dh,5~505V5~

Page 6 ofIi l

~ -

~

1 k

I i

Test No Title Test Date Committment 3 249A Reactor FeedPurnp B Reorc Valve Fails Open 12/31/99 3 251A FW S/U Level Control Valve Fails Open 12/31/99 s

f 3.252A FW Line A Rupture inside Drywell 12/31/99 1

3.260A Network Load Transent increase 12/31/99 3 262B 13.2KV 12 Unit Auxihary Bus Fault 12/31/99 3 263A 4KV Safeguard Bus D11 Fault 12/31/99 3 265A Startup Bus Breaker 10 Tnps 12/31/99 3 270A 114A Generator Area 440V Load Center Fault 12/31/99 i

3 270B 124A Generator Area 440V Load Center Fault 12/31/99 3 275A D114 Safeguard 440V Load Center Fau!t 12/31/99 3 277A 120 VAC Panet 10Y101 Fauft 12/31/99 3.278A 120 VAC Panel 10Y105 Fault 12/31/99 3 278C 120 VAC Panet 10Y109 Fault 12/31/99 3.282A 1FA 125/250 VDC 1 AD105 Fault 12/31/99 3.283 125/250 VDC 100114 Fault 12/31/99 1

3 274A Loss of DC To Selected Annunciator Panels 12/31/99 3.284E Loss of DC To Selected Annunciator Panels 12/31/99 3 285A 125/250 VDC Bus 1 AD108 Fault 12/31/99 3 285E 125/250 VDC Bus 10D125 Fault 12/31/99 3 406A RRCS Division i Loss of DC Power 12/31/99 3 406C RRCS Loss of DC Power To Both Divisions 12/31/99 3 409A Containtnent instrument Gas Compressor A Leaks 12/31/99

{

3 410C Both ClO Isolation Valves HV59-12"4A/B Fad Closed 12/31/99 3 412A Control Rod Dnve Pump A Trips 12/31/99 3 414A SDV Valve SV471F180 Fads Closed 12/31/99 3 418A Desel Generator 11 Tnp 12/31/99 3 419A Desel Generator 11 Fails To Start 12/31/99 3 424A instrument Air Compressor 1 AK101 Tnp 12/31/99 3 4300 Recarc Pump B Secure 12/31/99 3 431A Recirc Pump A M/A Station Fads High 12/31M Triday, December N, !99R Page 7ofII

P i

s Test No Title Test Date Committment

~

3 433A Recirc Pump A Seal #1 Failure 12/31/99 4

3 435A Recirc Pump A Dnve Motor Breaker Tnp 12/31/99 3 4400 Recirc Loop B Rupture (0-100%)

12/31/99 3 442A Recirc Pump 1 A RPT Breaker CB3A Tnp 12/31/99 3 445 HPCI Steam Line Break in Pump Room 1 100%

12/31/99 e

3.447A HPCI Aux Oil Pump Fails To Auto Start 12/31/99

[

3.449 HPCI Turbine Tnp 12/31/99 3 452 HPCI Pump Dischar9e Valve 1F006 Fails As-is 12/31/99 3 456 RCIC Fails To Auto Start 12/31/99 I

3 459A RCIC Steam Supply HV49-1F008 isolates 12/31/99 3 462 RCIC Cooling Water Valve HV49-1F046 Fails As-is 12/31/99 i

3 464C RCIC isolation Valve HV49-1F076 Fails As-is 12/31/99 l

3 47jA Drywell Ares Unit Cooler Fan 1 A1 Tnp 12/31E 3 471E Drywell Area Unit Cookt Fan 1E1 Tnp 12/31/99 3 472A Drywell Ares Unit Cooler Fan 1 A2 Tnp 12/31/99 3 472E Drywell Area Unit Cooler Fan IE2 Tnp 12/31/99 3 483A RECW Pump Tnp (A) 12/31/99 3 483C RECW Pump Tnp (Both) 12/31/99 3 488B Service Water Pump B Tnps 12/31/99 j

3 489A ESW Pump A Tnps 12/31/99 3 490A ESW Valve HV11 121 Fails To Auto Swap 12/31/99 3 490E ESW Valve HV11-055A Fails To Auto Swap 12/31/99 3 492A RHR Service Water Pump A Tnps 12/31/99 3 4938 Failure OF RHRSW HX B Inlet Valve 12/31/99 3 500A Jet Pump No 1 Displaced Mixer 12/31/99 3 502A Jet Pump No.13 Broken instrument Line 12/31/99 3 505A Recarc Pump A High Runback 12/31/99 3 511 Pnmary Containment Hydrogen increases 12/31/99 3 515C Feedwater Hester 14A Drain Valve Faits Open 12/31/99 3.516B Feedwater Hestet 13A Drain Valve Fails Closed 12/31/99 In5ul)(ScAnher 04,I998 Page 8 ofIi

Test No Title Test Date Committment 3 517A Feedwater Hester 12B Drain Valve Fails Open 12/31/99 3 517E Feedwater Heater 16B Drain Valve Fails Open 12/31/99 3.518D Feedwater Heater 15B Drain Valve Fails Closed 12/31/99 3 519C Feedwater Heater 14C Drain Valve Fails Open 12/31/99 3 520B Feedwater Heater 13C Drain Valve Fails Closed 12/31/99 3 521A Feedwater Heater 12A Dump Valve Fails Open 12/31/99 3 521E Feedwater Heater 16A Dump Valve Fails Open 12/31/99 3 522D Feedwater Hester 15A Dump Valve Fails Closed 12/31/99 3 523C Feedwater Hester 14B Dump Vane Fails Open 12/31/99 3 524B Feedwater Heater 13B Dump Valve Fails Closed 12/31/99 3 525A Feedwater Heater 12C Dump Vane Fails Open 12/31/99 3 525E Feedwater Heater 16C Dump Valve Fails Open 12/31/99 3 526D Feedwater Heater 15C Dump Valve Fails Closed 12/31/99 3 527A Steam Leak Detection NUMAC TIS 25-101A Fails 12/31/99 3 528A RHR Containment Spray Vane F016A Fails As-is 12/31/99 3 529A Reactor Pressure Transmitter PT42103A Fails High 12/31/99 I

3 530 Main Turbine Fails To Tnp 12/31/99 3 534 Turbine Tuming Gear Motor Tnps 12/31/99 3 SLSD 182 Moisture Separator Drain Tank Drain Valve Fails Closed 12/31/99 3 536B 1 A2 Moisture Separator Drain Tank Drain Valve Fails Open 12/31/99 3 536F 1C2 Motsture Separator Drain Tank Drain Valve Fails Open 12/31/99 3 537D 182 Moisture Separator Drain Tank Dump Valve Fails Closed 12/31/99

+ 3 5388 1 A2 Moisture Separator Drain Tank Dump Valve Fails Open 12/31/99 3 538F 1C2 Mo!sture Separator Drain Tank Dump Valve Fails Open 12/31/99 3 542 Generator Auto Voltage Regulator Fails High 12/31/99 3 546A Safeguard MCC D-114-G-D Fault 12/31/99 3 549 Coarse Hotwell Reject Valve Fails Open 12/31/99 3 551 ADS Fails To initiate 12/31/99 3 552C RFP Dischar9e Check Valve HV06-105C Fails Open 12/31/99 3 553A Turbine Control Vane No 1 Fails Open 12/31/99 Friday, December 04, i998 Page 9 ofII

Test No Title Test Date Committment 3 554 Main Turbine PMG Falls 12/31/99 3 556C RFP C M/A Station Swaps To Manual 12/31/99 3 5578 FWC UPS in%rter E/S-XX 119 Fails 12/31/99 3 558A HV51-1F017A Close Torque Switch Tnps 12/31/99 3 560A RHR Pump A Suction Strainer Clogs-Small 12/31/99 3.561 A Core Spray Pump A Suction Strainer Clogs 12/31/99 3 563A Feedwater Heater 1A Level Sensing Line Fails Hi 12/31/99 3 5648 Feedwater Heater 2B Levei Sensing Line Fails Hi 12/31/99 3 565C Feedwater Hester 3C Level Sensing Line Fails Hi 12/31/99 3 567A Feedwater Heater 5A Level Sensing Line Fails Hi 12/31/99 f

3 568B Feedwater Heater 6B Level Sensing Line Fails Hi 12/31/99 3 571 A RHR SDC Valve HV51-1F008 Tnp of Thermal Overload 12/31/99 3 573A RHR Valve HV51-1F024A Tnp of Thermal Overload 12/31/99 5 02A Recarc Loop A Rupture Performance Test 12/31/99 5 05 Total Loss of instrument Air 12/31/99 507A Loss of Safeguard Bus D11 (Emergency Power) 12/31/99 5 09A Loss of Non-Safeguard Load Center 114A 12/31/99 5 09E Loss of Non-Safeguard Load Center 124A 12/31/99 5.10A Loss of 120 VAC Instrument Bus 10Y101 12/31/99 510E Loss of 120 VAC Instrument Bus 10Y105 12/31/99 510G Loss of 120 VAC instrument Bus 10Y109 12/31/99 511 A Loss of 125/250 VOC Bus 1AD105 12/31/99 I

511E Loss of 125/250 VDC Bus 100114 12/31/99 516A Complete Loss of Reactor Enclosure Cooling Water 12/31/99 517G Tnp of Two Condensate Pumps 12/31/99 l

5 25C HPCI Inadvertent initiattor$

12/31/99 5 29A Main Feedwater Line A Rupture Insde Drywell 12/31/99 l

2 5 34A RPS and ARI Fail To insert Control Rods 12/31/99 4

6.10 Steady State Performance at 25% Power 12/31/99 6 11 Steady State Performance at 75% Power 12/31/99 l'riday, December 04, i998 Page 10 ofIi 1

I Test No Title Test Date Committment 6.12 Steady State Per"ormance at 100% Power for 1 Hour 12/31/99 7.01 Reactor (Manual) Scram 12/31/99 7.02 Simultaneous Trp of AH Reactor Feedwater Pumps 12/31/99 7.03 Closure of AH MSIVs at Rated Power 12/31/99 7.04 Tnp of Both Reactor Reorc Pumps at Rated Power 12/31/99 7.05 Single Reactor Rearc Pump Trp 12/31/99 7.06 Turbine Tnp within Bypass Capabihty 12/31/99 7.08 Recirc Loop Rupture with Loss of Offsite Power 12/31/99 7,09 Maximum Size Unisolable Main Steam Line Rupture 12/31/99 6

1 r

l "Fr5[$~ '{ bece n er 05598 y,ge j;,y)J

~ ~ ~ ~

r r

a

,u,__

_ ~,

4.

+..

a,a 4

A sa PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT t

LGS SIMULATOR TESTING 4

l TO BE PERFORMED IN 2000 3

3 4

l

LGS Simulator Testing Committmentsfor 2000 Test No Title Test Date Committment 1.01 Computer Real Time Test 12/31/2000 3-MHP578A HV551F011 Fails: Thermal Overload 12/31/2000 3-MMC 074 HP Condenser Air inteakage 12/31/2000 3-MRE301B inadvertent Rx Enclosure isolata>n Chan B 12/31/2000 3-MRE3048 SGTS Inlet from Refuel Floor HV76-020 Fails Open 12/31/2000 3-MRE307 Reactor Enclosure Fails To laolate 12/31/2000 3-MRE308B Tnp of 1B REECE Fan 12/31/2000 3-MRE309A Tnp of 1 A Rx Enclosure HVAC Supply Fan 12/31/2000 3-MRE310B Tnp of 1B Rx Enclosure HVAC Exhaust Fan 12/31/2000 3-MRE311 A Tnp of 1 A Refuel Floor HVAC Air Supply Fan 12/31/2000 3-MRE312B Tnp of 1B Refuel Floor HVAC Air Exhaust Fan 12/31/2000 3-MRM001B Control Room Fresh Air Rad Mon Chan B Fails To SeiValue 12/31/2000 3-MRM003B N Stack WRAM Mid Range Chan Fails To Sel Value 12/31/2000 3-MRM004C N Stack Rad Mon A Gaseous Chan (3GE075) Fails To Sel Value 12/31/2000 3-MRM005A U-1 S Stack Rad Mon A Part Chan (1PE185) Fails To Sel Value 12/31/2000 3-MRM005E U-1 S Stack Rad Mon B lodine Chan (SIE185) Fails To Sei Value 12/31/2000 3-MRM008 Recombiner Rooms & H2 Analyzer Comp Rad Mon Fails To Sel Valu 12/31/2000 3-MRM012 Rx Enci Cooling Water Rad Mon Fails To Sel Value 12/31/2000 3-MRM015B Main Steam Line Rad Mon Chan B Fails To Sei Value 12/31/2000 3-MRM016B Rx Enci Vent Exh Rad Mon B Fails To Sel Value 12/31/2000 3-MRM0178 Refuel Floor Vent Exh Rad Mon Chan B Fails To Sel Value 12/31/2000 3-MRM018B Drywell Post LOCA Rad Mon Chan B Fails To Sel Value 12/31/2000 3-MRM019A U-1 RHRSW Hx Retum Header Rad Mon Fails To Set Value 12/31/2000 3-MRM021 HPCI Pump Room Area Rad Mon Fails To Sel Value 12/31/2000 3-MRM025 Isolation Valve Compartment Area Rad Mon Fails To Sei Value 12/31/2000 3-MRM329 Steam Vent Area Stairwell Area Rad Mon Fails To Sel Value 12/31/2000 3-MRM033 Rx Drywell Area Rad Mon Falls To SelValue 12/31/2000 3-MRM037 Neutron Mon Dnve Mech Area Rad Mon Fails To Sei Value 12/31/2000 Friday.1)ecember 04. I998 Page i ofI1

Test No Title Test Date Committment 3-MRM041 RWCU Pump Area Rad Mon Fails To Sei Value 12/31/2000 3-MRM045 Turbine EnciWashdown Area Red Mon Fails To SeiValue 12/31/2000 3-MRM048 Drywell Head Laydown Area Rad Mon Fails To Sel Value 12/31/2000 SMRM052 Pool Plug Laydown Area Rad Mon Fails To Sel Value 12/31/2000 3-MRM057 Radweste Building HalNvay Area Rad Mon Fails To Sel Value 12/31/2000 3-MRM061 Fuel Pool Filter Hold Pump Area Rad Mon Fails To Sei Value 12/31/2000 3-MRM065 Railroad Car Airlock Room Area Rad Mon Fails To Sel Value 12/31/2000 3-MRM069 Radweste Building Area Rad Mon Falls To Sel Value 12/31/2000 3-MRM073 SGTS Filter Area Rad Mon Fails To Sei Value 12/31/2000 SMRT002 RWCU F/D Resin intrusion InTo Rx Vessel 12/31/2000 3-MRT005C Inadvertent Activity Release on Elevation 177 Rx Encl 12/31/2000 3-MSD001A Steam Flooding Damper BPD-201-21 A Fails To Tnp 12/31/2000 3-MSD003A Steam Flooding Damper BPD-20123A Fails To Tnp 12/31/2000 3-MSD005A Steam Flooding Damper BPD-202 67A Fails To Trip 12/31/2000 3-MSD007A Steam Flooding Damper BPD-203-1 A Fails To Tnp 12/31/2000 3-MSD009A Steam Flooding Damper BPD-203-14A Fads To Tnp 12/31/2000 3-MSD011 A Steam Flooding Damper BPD 203-20A Fails To inp 12/31/2000 3-MSD0128 Steam Flooding Damper BPD-203-38 Fails To Trip 12/31/2000 3-MSD014A Steam Flooding Camper BPD 203-38A Fails To Tnp 12/31/2000 3-MSD016A Steam Flooding Damper BPD-201-39A Fails To Tnp 12/31/2000

)

3-MSD018A Steam Flooding Damper BPD-202-33A Fails To Tnp 12/31/2000 3-MSD020A Steam Flooding Damper BPD-202-41 A Fails To Tnp 12/31/2000 3-MSD023A Steam Flooding Damper BPD-20310A Fads To Tnp 12/31/2000 l

3-MSD025A Steam Flooding Damper BPD-203-22A Fails To Tnp 12/31/2000 3-MSD027A Steam Flooding Damper BPD-203-25A Fails To Tnp 12/31/2000 l

3-MSD029A Steam Flooding Damper BPD 203-27A Fails To Tnp 12/31/2000 3-MSD031A Steam Flooding Damper BPD-203-29A Fails To Tnp 12/31/2000 3-MSD033A Steam Flooding Damper BPD-203-31 A Fails To Tno 12/31/2000 3-MSD035A Steam Flooding Damper BPD-203-43A Fails To Tnp 12/31/2000 3-MSW514 RHR Heat Exchanger A Tube Leak 12/31/2000 t

Friday, December N,1998 Page 2 ofi1

1 Test No Title Test Date Committment 3-MTE001C Tnp of 1C Turbine Enclosure Supply Fan 12/31/2000 3-MTE003A Tnp of 1A Turbine Equipment Compt Exhaust Fan 12/31/2000 3.003B Core Power Oscillations (Out-of-Phase) 12/31/2000 3 005A APRM Channel B Recorder Fails As-Is 12/31/2000 3 005B APRM Channel B Fails inop 12/31/2000 3 009B APRM Channel F Fails inop 12/31/2000 3 0118 RBM Channel B Falls Inop 12/31/2000 3 0128 LPRM 40-578 Upscale Failure 12/31/2000 3 012F LPRM 32 49C Upscale Failure 12/31/2000 3 013B LPRM 16-49A Downscale Failure 12/31/2000 3 013F LPRM 48-33C Downscale Failure 12/31/2000 3 0158 LPRM 40-25A Dnft (-25 To +25) 12/31/2000 3 017A Control Rod XX YY Failure (Onft in) 12/31/2000 3 0170 Control Rod XX-YY Failure (Dnft Out) 12/31/2000 3 017C Control Rod XX YY Failure (Accumulator Trouble) 12/31/2000 3 017D Control Rod XX-YY Failure (Stuck) 12/31/2000 3 017E Control Rod XX YY Failure (Uncoupled) 12/31/2000 3 017F Control Rod XX YY Failure (Scrammed) 12/31/2000 3 017G Control Rod XX-YY Fails To Scram 12/31/2000 3 017H Control Rod (XX YY) Fails: Double Notch on Withdraw 12/31/2000 3 020B APRM Channel B Faits 0-125%

12/31/2000 4

3 020F APRM Channel F Fails 0-125%

12/31/2000 3 027B Loss of Nortmal Power To RPS Channel B 12/31/2000 3 028C Reactor Scram (Bank 2) 12/31/2000 i

3 029D RPS Fails To Scram (Channel B) 12/31/2000 3 044B Feedwater Pump B Controller Output Fails Hgh 12/31/2000 3 045C Feedwater Pump C Controller Output Fails Low 12/31/2000 i

3 046B Steam Flow Transmitter 1N0038 Fails 0-100%

12/31/2000 3 061B MSIV HV41 1F022B Fails Open 12/31/2000 3 062B MSIV HV41 1F028B Fails Open 12/31/2000 Friday, LOcember 04, !998 Page 3 ofIi

.~

Test No Title Test Date Committment i

3.063B MSIV HV41 1F022B Fails Closed 12/31/2000 3.0648 MSfV HV41-1F028B Fails Closed 12/31/2000 3 065 Steam Leak Outside Pnmary Containment 12/31/2000 i

3 071 A Loss of Extraction Steam To Feedwater Heater 16A 12/31/2000 3 072B SJAE Steam Supply PCV07101B Fails Closed 12/31/2000 3 078A Condensate Pump A Tnp 12/31/2000 3 079B Condensate Powdex Demin B Hgh Differential Pressure 12/31/2000 3 079F Condensate Powdex Domin F Hgh Differental Pressure 12/31/2000 3.080B Condensate Recarc Valve Fails Closed 12/31/2000 3 08SB Circulating Waier Pump B Trip 12/31/2000 j

3 096 Main Transformer Loss of Cooling 12/31/2000 3.100 Main Turbine Beanngs 5 and 6 Hgh Vibration 12/31/2000 3104B Main Turbine Control System Fails Low 12/31/2000 3.106A EHC Pressure Regulator B Fails Hgh 12/31/2000 i

3.107B Bypass Valve No. 2 Sticks Open 12/31/2000 3.107F Bypass Valve No 6 Sticks Open 12/31/2000 3 109 Turbine Acceleration Control Failure 12/31/2000 3.112A EHC Pump A Tnps 12/31/2000 3 136 Steam Leak Outside Pnmary Containment (0-100%)

12/31/2000 3138A SRV 1FO13B Fails - Leaks 12/31/2000 3138B SRV 1F013B Fails Stuck 12/31/2000 3138C SRV 1F0136 Fails Open Electncally 12/31/2000 3138D SRV 1FO138 Fails Closed 12/31/2000 3138E SRV 1FO13B Fails - Open Mechanically 12/31/2000 3142A SRV 1FO13F Fails - Leaks 12/31/2000 3142B SRV 1FO13F Fails Stuck 12/31/2000 3142C SRV 1F013F Fails Open Electncally 12/31/2000 3142D SRV 1F013F Fails - Closed 12/31/2000 3.142E SRV 1FO13F Fails Open Mechanically 12/31/2000 3146A SRV 1F013K Fails Leaks 12/31/2000 55555ecembTe 55,!58 rage 4 ofIi

~~

l t

_m f

j l

I Test No Title Test Date Committment 3146B SRV 1FO13K Fails. Stuck 12/31/2000 3.146C SRV 1FO13K Fails Open Electncally 12/31/2000 3.146D SRV 1FO13K Fails. Closed 12/31/2000 3.146E Sr!V 1FO13K Fails Open Mechanscally 12/31/2000 3.149D SRV 1F013N Fails Closed 12/31/2000 3150C SRV 1F013S Fails Open Electncally 12/31/2000 3 1518 SRV 1F013M Downcomer Leak 0100%

12/31/2000 3.156B NSSSS Group 1B Inadvertent isolation 12/31/2000 3.156F NSSSS Group 1F inadvertent isolation 12/31/2000 3157B NSSSS Group 2B inadvertent isolation 12/31/2000

,1 3.157F NSSSS Group 2F Inadvertent isolation 12/31/2000 i

J 3 1580 NSSSS Group 6B inadvertent isolation 12/31/2000 3.159F NSSSS Group 6F Inadvertent isolation 12/31/2000 3161 A NSSSS Group BA inadvertent isolation 12/S1/2000 i

i 3162E Secondary Containment & PCIG B Inadvertent isolation 12/31/2000 a

3 167 Offgas HEPA Filter Blockage (0-100%)

12/31/2000 3171B RHR Pump B Tnp 12/31/2000 i

3 1728 RHR Pump 1B Fails To Auto Start 12/31/2000 3.173 RHR Shutdown Cooling Suction Leak 12/31/2000 31748 RHR Injection Valve 1F0178 Fails As-is 12/31/2000 3175B RHR Pump Suction Valve F0048 Fails As-Is 12/31/2000 31760 RHR SDC Suction Valve 1FOO9 Fails As-Is 12/31/2000 3177B RHR HX A Bypass Controner Fails Low 12/31/2000 3182B Core Spray Pump B Tnp 12/31/2000 3183B Core Spray Pump B Fails To Auto Start 12/31/2000 3.184B Core Spray Outboard Valve 1FO37 Fails As-is 12/31/2000 3190A RWCU Drain Flow Controller Fails Open 12/31/2000 3 193 RWCU NonRegen Hx Leak To RECW (0-100%)

12/31/2000 3195C RWCU isolation Valve HV441F040 Fails As-Is 12/31/2000 3.198C SLC Pump C Loss of Control Power 12/31/2000 Friday, December N,1998

~

Page5of1)

~

l Test No Title Test Date Committment 3 202A SRM Channel B Recorder Fails As-is 12/31/2000 3.202B SRM Channel B Fails inoperstwo 12/31/2000 1

3.202C SRM Channel B Detector Stuck 12/31/2000 i

3 206A IRM Channel B Recorder Fails As-Is 12/31/2000 3.206B IRM Channel B Faik inoperatwe 12/31/2000 3 206C IRM Channel B Detector Stuck 12/31/2000 3 210A IRM Channel F Recorder Fails As-Is 12/31/2000 i

3 210B IRM Channel F Fails inoperstwe 12/31/2000 3

3 210C 1RM Channel F Detector Stuck 12/31/2000 i

3 213B SRM Channel B Fails To Selected Value 12/31/2000 3 214B IRM Channel B Fails To Seiected Value 12/31/2000 3 214F 1RM Channel F Fails To Selected Value 12/31/2000

{

3 217B RBM Channel B Fails To Selected Value 12/31/2000 3 228A Reactor instrument Line Break After 42-F047A 12/31/2000 3 230A Reactor instrument Line Break After 42-F065A 12/31/2000 3 231C Reactor instrument Line Break After 42-F045C 12/31/2000 3 232C Reactor Level Transmmer LT42-N0808 Fails High 12/31/2000 i

3 2320 Reactor Level Transmmer LT42-N080B Fails Low 12/31/2000

'a 133C Reactor LevelTransmmer DPT42-N004P r ils Low 12/31/2000 a

3 2330 Reactor Level Transmitter DPT42-N004B Fails Low 12/31/2000 i

3 234C Reactor Pressure Transmeer PT42-N078B Fails High 12/31/2000 3.2340 Reactor Pressure Transmeer PT42-N078B Fails Low 12/31/2000 3 236B Reference Leg 1D004B Flashes 12/31/2000 3 236E Reference Leg 1D002 Fl.sshes 12/31/2000 3 2370 Reference Leg 1D004B Level Defect 12/31/2000 3 241 A Feedwater Hester 12A Tube Leak 12/31/2000 l

3 242B Feedwater Heater ISB Tube Leak 12/31/2000 5

3 244C Reactor FeedPump A High Veration 12/31/2000 3.246A Rx Feedwater Pump C Tnps 12/31/2000 l

3 247B FW Low Flow Control Vatve Fails Closed 12/31/2000 I

1 Fridtry, December 04, I998 Page 6 of1J

\\

I

f Test No Title Test Date Committment 3 2498 Reactor FeedPump B Recire Valve Fails Closed 12/31/2000 3 251B FW S/U Level Control Valve Fails Closed 12/31/2000 3.252B FW Line B Rupture inside Drywell 12/31/2000 3.260B Network Load Transient Decrease 12/31/2000 3 263B 4KV Safeguard Bus 012 Fault 12/31/2000 3 264A Main Generator Output Breaker 252-10113 Tnps 12/31/2000 3.265B Startup Bus Breaker 20 Tnps 12/31/2000 3 267B Plant Services Load Center 222 Fault 12/31/2000 3 271 A 114B Reactor Area 440V Load Center Fault 12/31/2000 3 271B 1248 Reactor Area 440V Load Center Fault 12/31/2000 3.273B 214D Plant Services Load Center Fault 12/31/2000 3 2758 D124 Safeguard 440V Load Center Fault 12/31/2000 3 277B 120 VAC Panet 10Y102 Fault 12/31/2000 3 278B 120 VAC Panel 10Y106 Fault 12/31/2000 3 278D 1D VAC Panel 10Y110 Fault 12/31/2000 3 2828 1FB 125/250 VDC 180105 Fault 12/31/2000 3 284B Loss of DC To Selected Annunciator Panels 12/31/2000 3 284F Loss of DC To Selected Annunciator Panels 12/31/2000 3 2858 125/250 VDC Bus 1BD108 Fault 12/31/2000 3 286A 1A APRM UPS Bus 1AY185 Fault 12/31/2000 3 299A Control Enclosure Chiller OAK 112 Tnp 12/31/2000 3 406B RRCS Division il Loss of DC Power 12/31/2000 3 407C RRCS Both ARI Divisions Fail To initiate 12/31/2000 3 409B Containment instrument Gas Compressor B Leaks 12/31/2000 3 411 A CRD Flow Control Valve A Fails Closed 12/31/2000 3 412B Control Rod Dnve Pump B Tnps 12/31/2000 34148 SDV Valve SV47-1F010 Fails Closed 12/31/2000 3 418B Desel Generator 12 Tnp 12/31/2000 3 419B Desel Generator 12 Fails To Start 12/31/2000 3 4248 Instrument Air Compressor 1BK101 Tnp 12/31/2000 ErlIn)5[55r"5558

~

Page 7ofi1

i Test No Title Test Date Committment 3 431B Recire Pump A M/A Station Fails Low 12/31/2000 3 432A Recare Pump A incomplete Startup Sequence 12/31/2000 3 433B Recarc Pump B Sea! #1 Failure 12/31/2000 3 435B Recarc Pump B Drive Motor Breaker Tnp 12/31/2000 3 441 Coolant Leakage in Drywell (0-300 gpm) 12/31/??)0 3 442B Recarc Pump 1 A RPT Breaker CB4A Trip 12/31/2000 3 446A HPCI Steam isolaton Valve HV55-1F002 Fails 12/31/2000 3 447B HPCI Aux Oil Pump Fails Tnps 12/31/2000 3 450 HPCI Inadvertent Start 12/31/2000 3 453 HPCI Pump Discharge Valve 1F105 Fails As-Is 12/31/2000 3 457A RCIC Speed Control Fails Hegh 12/31/2000 3 4598 RCIC Steam Suppy HV49-1F007 isolates 12/31/2000 3 465 RCIC Steam Line Break in Pump Room 1-1uo%

12/31/2000 l

3 471B Drywell Area Unit Cooler Fan 1B1 Tnp 12/31/2000 3 471F DryweB Area Unit Cocier Fan 1F1 Tnp 12/31/2000 3 472B Drywell Area Unit Cooler Fan 182 Tnp 12/31/2000 3 472F Drywell Area Unit Cooler Fan 1F2 Tnp 12/31/2000 3 475 Pnmary Containment Hydrogen Detonation 12/31/2000 j

3 483B RECW Pump Trip (B) 12/31/2000 3 484C TECW Pumps Tnp (Both) 12/31/2000 3 488C Service Water Pump C Tnps 12/31/2000 3 4898 ESW Pump B Tnps 12/31/2000 3 490B ESW Valve HV11-054A Fails To Auto Swap 12/31/2000 3 490F ESW Valve HV11-079 Faits To Auto Swap 12/31/2000 3 4928 RHR Service Water Pump B Tnps 12/31/2000 I

3 5006 Jet Pump No.16 Displaced Mixer 12/31/2000 3 502B Jet Pump No 5 Broken instrument Line 12/31/2000 3 504A Recarc Pump 1 A Shait Failuia 12/31/2000

.35058 Recirc Pump A Low Runback 12/31/2000 3 515D Feedwater Heater 15A Dram Vatve Fails Open 12/31/2000 YN5t[5iec^e'N5erN,1998 Page 8 ofIl

Test No Title Test Date Committment 3 516C Feedwater Heater 14A Drain Valve Falls Closed 12/31/2000 3 517B Feedwater Heater 13B Drain Valve Fails Open 12/31/2000 3 518A Feedwater Heater 12B Drain Valve Fails Closed 12/31/2000 3 518E Feedwater Heater 168 Drain Valve Fails Closed 12/31/2000 3 5190 Feedwater Heater 15C Drain Valve Fails Open 12/31/2000 i

3 520C Feedwater Hester 14C Drain Valve Fails Closed 12/31/2000 3 521B Feedwater Heater 13A Dump Valve Fails Open 12/31/2000 3 522A Feedwater Hea'er 12A Dump Valve Fails Closed 12/31/2000 3.522E Feedwater Heater 16A Dump Valve Faits Closed 12/31/2000 3 523D Feedwater Heater 15B Dump Valve Fails Open 12/31/2000 3 524C Feedwater Heater 14B Dump Valve Fails Closed 12/31/2000 3 525B Feedwater Heater 13C Dump Valve Fails Open 12/31/2000 3 526A Feedwater Hester 12C Dump Valve Fails Closed 12/31/2000 3 526E Feedwater Hester 16C Dump Valve Fails Closed 12/31/2000 3 527B Steam Leak Detection NUMAC TIS 25101B Fails 12/31/2000 3 528B RHR Containment Spray Valve F016B Fails As-is 12/31/2000 3 5298 Reactor Pressure Transmiter PT42-103A Fails Low 12/31/2000 1

3 531 Turbine Motor Suction Pump Tnps 12/31/2000 3 535A 1 A1 Moisture Separator Drain Tank Drain Valve Fails Closed 12/31/2000 3 535E 1C1 Moisture Separator Drain Tank Drain Valve Fails Closed 12/31/2000 l

3 536C 181 Moisture Separator Drain Tank Drain Valve Fails Open 12/31/2000 3 537A 1 A1 Moisture Separator Drain Tank Dump Valve Fails Closed 12/31/2000 3 537E 1C1 Moisture Separator Drain Tank Dump Valve Fails Closed 12/31/2000 3 538C 1B1 Moisture Separator Drain Tank Dump Valve Fails Open 12/31/2000 3 539 Generator Afterrex Temperature Control Valve Fails Closed 12/31/2000 3 543 Generator Auto Voltage Regulator Fails Low 12/31/2000 3 5468 Safeguard MCC D-124-G-D Fauft 12/31/2000 3 550 MS Supply Valve HV01 109 Fails As-is 12/31/2000 l

3 553B Turbine Control Valve No. 2 Fails Open 12/31/2000 3 555 Control Rods Fail To Scram (0-120) 12/31/2000 Iuday, specember N, IV98 Page 9 ofi1 l

1

)

w A

+

Test No Title Test Date Committment 3.556D RFP A, B & C M/A Stations Swap To Manual 12/31/2000 3.557C FWC UPS inverter E/S-XX-120 Fails 12/31/2000 3 558B HV51-1F017B Close Torque Switch Tnps 12/31/2000 3 5608 RHR Pump A Suction Strainer Clogs-Large 12/31/2000 3 561B Core Spray Pump B Suction Strainer Clogs 12/31/2000 3 563B Feedwater Heater 1B L.evel Sensing Line Fails Hi 12/31/2000 3 564C Feedwater Hester 2C Level Sensing Line Fails Hi 12/31/2000 3 566A Feedwater Heater 4A Level Sensing Line Fails Hi 12/31/2000 3 567B Feedwater Hester 5B Level Sensing Line Fails Hi 12/31/2000 3 568C Feedwater Heater 6C Level Sensing Line Faits Hi 12/31/2000 3 5718 RHR SDC Valve HV51 1F000 Tnp of Magnetic Overload 12/31/2000 3 5738 RHR Valve HV51-1F024A Tnp of Magnetic Overload 12/31/2000 5 02B Recirc Loop B Rupture Performance Test 12/31/2000 5 07B Loss of Safeguard Bus D12 (Emergency Power) 12/31/2000 5 09B Loss of Non-Safeguard Load Center 114B 12/31/2000 5 09F Loss of Non-Safeguard Load Center 124B 12/31/2000 510B Loss of 120 VAC instrument Bus 10Y102 12/31/2000 1

510F Loss of 120 VAC Instrument Bus 10Y106 12/31/2000 510H Loss of 120 VAC Instrument Bus 10Y110 12/31/2000 511B Loss of 125/250 VDC Bus 18D105 12/31/2000 I

513A Main Condenser Air Leak at Low Seventy 12/31/2000 516B Complete Loss of Turtune Enclosure Cooling Water 12/31/2000 517D Feedwater Master Level Controller Fails High 12/31/2000 517H Loss of Feedwater Heating at Rated Power 12/31/2000 5 23 Main Turtune-Generator Tnp 12/31/2000 l

5 28 Main Steam Line Break Outside Drywell 12/31/2000 j

5 29B Main Feedwater Lsne B Rupture inside Drywell 12/31/2000 5 34B Turbine Trip with Brown's Ferry ATWS 12/31/2000 6 10 Steady State Performance at 25% Power 12/31/2000

)

6 11 Steady State Performance at 75% Power 12/31/2000

~ ~ ~ ~

^

~

l'rlday, lhecember N, IV98 Page 15f]

I I

I

Test No Title Test Date Committment i

6.12 Steady State Performance at 100% Power for 1 Hour 12/31/2000 i

7.01 Reactor (Manual) Scram 12/31/2000 7.02 Sanuttaneous Tnp of All Reactor Feedwater Pumps 12/31/2000 l

7.03 Closure of All MSIVs at Rated Power 12/31/2000

)

7.04 Tnp of Both Reactor Recirc Pumps at Rated Power 12/31/2000 7.05 Single Reactor Reorc Pump Tnp 12/31/2000 i

7.06 Turbine Tnp within Bypass Capabiltty 12/31/2000 7.08 Recirc Loop Rupture with Loss of C$ rte Power 12/31/2000 7.09 Maximum Size Unisolable Main Steam Line Rupture 12/31/2000 i

i lhday, December N, I998 Page Ii ofII h

PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR i

SIMULATOR QUADRENNIAL REPORT 1

i 1

LGS SIMULATOR TESTING TO BE PERFORMED IN 2001 i

l l

l l

l l

l

-x-

LGS Simulator Testing Committmentsfor 2001 Test No Title Test Date Committment 1.01 Computer Real Time Test 12/31/2001 3-MHP5788 HV551F011 Fails: Magnetic Overtokd 12/31/2001 3-MMS 068 Main Steam Line Rupture at Main Turt one 12/31/2001 3-MRE302A Refuel Floor inadvertent Isolation Chrnnel A 12/31/2001 3-MRE305A SGTS From Reactor Enclosure HV76196 Fails Open 12/31/2001 3-MRE309B Tnp of 1B Rx Enclosure HVAC Supply Fan 12/31/2001 3-MRE311B Trip of 1B Refuel Floor HVAC Air Supply Fan 12/31/2001 3-MRE312C Tnp of 1C Refuel Floor HVAC Air Exhaust Fan 12/31/2001 l

3-MRM001C Control Room Fresh Air Rad Mon Chan C Fails To Sel Value 12/31/2001 3-MRM001D Control Room Fresh Air Rad Mon Chan D Fails To Sel Value 12/31/2001 3-MRM003C N Stack WRAM High Range Chan Fails To Sel Value 12/31/2001 3-MRM004D N Stack Rad Mon B Part Chan (4PE075) Fails To Sel Value 12/31/2001 3

3-MRM005B U 1 S Stack Rad Mon B lodine Chan (2iE185) Fails To Sel Value 12/31/2001 3-MRM005F U-1 S Stack Rad Mon B Gaseous Chan (6GE185) Fails To Sei Value 12/31/2001 3-MRM009 SPE Discharge & Vacuum Pump Exh Rad Mon Fads To Sel Value 12/31/2001 3-MRM015C Main Steam Line Rad Mon Chan C Fails To Sei Value 12/31/2001 3-MRM016C Rx Enct Vent Exh Rad Mon C Fails To Sel Value 12/31/2001 3-MRM017C Refuel Floor Vent Exh Rad Mon Chan C Fails To Sel Value 12/31/2001 3-MRM018C Drywell Post LOCA Rad Mon Chan C Fails To Set Value 12/31/2001 3-MRM019B U-2 RHRSW Hx Return Header Rad Mon Fa:Is To Sel Value 12/31/2001 3-MRM022 Rx Enci Sumps Area Rad Mon Fads To Sei Value 12/31/2001

'3-MRM026 Condensate Pump Room Area Rad Mon Fads To Sei Value 12/31/2001 3-MRM030 Rx Enct Rr Access Airlock Area Rad Mon Fails To Set Val 12/31/2001 3-MRM034 Rx Enct East Area Rad Mon Fails To Sei Value 12/31/2001 3-MRM038 Turbine Aux Hallway East Area Rad Mon Fails To SeiValue 12/31/2001 3-MRM042 SLC Sys Area Rad Mon Fads To SeiValue 12/31/2001 3-MRM045 Gas Radwaste Rec Hallway Area Rad Mon Fails To Set Valu 12/31/2001 3-MRM049 Steam Separator Area Rad Mon F&ils To Sei Value 12/31/2001 3-MRM053 H202 Analyzers Area Rad Mon Fads To Sel Value 12/31/2001 3-MRM058 Cond Storage Disch Pump Area Rad Mon Fails To Set Value 12/31/2001 Friday. December 04,1998 Page i of10

i Test No Title Test Date Committment t

e 3-MRM062 Procost Tank and Pmp Room Area Rad Mon Fails To Sel Value 12/31/2001 3-MRM066 Radweste Enct Hallway Area Rad Mon Falls To Sol Value '

12/31/2001 3-MRM070 Radweste Exh Fan Area Rad Mon Fails To Sei Value 12/31/2001 3-MRM074 N Stack Instrument Room Area Rad Mon Fails To Sol Value 12/31/2001 L

3-MRT004 Fuel Failure of Bund 6e in Rx Cavity 12/31/2001 3-MRT010 Offges Sys Charcoal Adsorber Trains Degraded 12/31/2001 3-MSD001B Steam Flooding Damper BPD-20121B Fails To Tnp 12/31/2001 3-MSD003B Steam Flooding Damper BPD 201-238 Fails To Tnp 12/31/2001 3-MSD005B Steam Flooding Damper BPD-202-67B Fails To Trip 12/31/2001 I

i 3-MSD007B Steam Flooding Damper BPD-203-1B Fails To Tnp 12/31/2001

{

3-MSD009B Steam Flooding Damper BPD-203-148 Fails To Trip 12/31/2001 3-MSD0118 Steam Flooding Damper BPD-203-208 Fails To Tnp 12/31/2001 I

3-MSD012B Steam Flooding Damper BPD-203-24B Fails To Trip 12/31/2001 f

3-MSD014B Steam Flooding Damper BPD-203-38B Fails To Trip 12/31/2001 3-MSD016B Steam Flooding Damper BPD-201398 Fails To Trip 12/31/2001 3-MSD018B Steam Flooding Damper BPD-202 338 Fails To Trip 12/31/2001 3-MSD020B Steam Flooding Damper BPD-202-418 Fails To Trip 12/31/2001 3-MSD023B Steam Flooding Damper BPD-203-10B Fails To Trip 12/31/2001 I

3-MSD025B Steam Flooding Damper BPD-203-22B Fails To Tnp 12/31/2001 j

3-MSD027B Steam Flooding Damper BPD-203-25B Fails To Tnp 12/31/2001 l

3-MSD0298 Steam Flooding Damper BPD-203-27B Fails To Tnp 12/31/2001 e

3-MSD0318 Steam Flooding Damper BPD-203-29B Fails To Tnp 12/31/2001 l

3-MSD033B Steam Flooding Damper BPD-203-31B Fails To Tnp 12/31/2001 l

f 3-MSD0350 Steam Flooding Damper BPD 203-438 Fails To Trip 12/31/2001 I

3-MSW515B RHR Hx B Service Water Outlet Pipe Rupture in RHR Room 12/31/2001 3-MTE002A Tnp of 1 A Turbine Enclosure Exhaust Fan 12/31/2001 i

d 3-MTR0038 Tnp of 1B Turbine Equipment Compt Exhaust Fan 12/31/2001 3 006A APRM Channel C Recorder Fails As-is 12/31/2001 j

3.0068 APRM Channel C Fails inop 12/31/2001 l

3 008A APRM Channel E Recorder Fails As-is 12/31/2001 3 010A RBM Channel A Recorder Fails As-is 12/31/2001 3 012C LPRM 16-09C Upscale Failure 12/31/2001 3 012G LPRM 56-41D Upscale Failure 12/31/2001

=

i Yr[5y.' lien 5eberN,15I

~

Pqe20fl0 I

Test No Title Test Date Committment 3.013C LPRM 06 338 Downscale Failure 1201/2001 3 013G LPRM 32 09A Downscale Failure 12/31/2001 3 014 TIP Chamber Stuck in Core 12 41/2001 3 015C LPRM 16-25A Dnft (-25 To +25) 12/31/2001 l

3 018A Control Rod XX-YY Failure (Drrft in) 12/31/2001 3.018B Control Rod XX-YY Failure (Dnft Out) 12/31/2001 3 018C Control Rod XX YY Failure (Accumulator Trouble) 12/31/2001 3.0180 Control Rod XX-YY Failure (Stuck) 12/31/2001 3.018E Control Rod XX YY Failure (Uncoupled) 12/31/2001 3018F Control Rod XX YY Failure (Scrammed) 12/31/2001 3.018G Control Rod XX-YY Fails To Scram 12/31/2001 3.018H Control Rod (XX YY) Fails: Double Notch on Withdraw 12/31/2001 3.020C APRM Channel C Fails 0-125%

12/31/2001 3 023 RPIS Failure 4 Rod Display 12/31/2001 3 028D Reactor Scram (Bank 3) 12/31/2001 3.029A RPS Fails To Scram (Auto Only) 12/31/2001 3.043A Feedwater Master Level Controher Fails Hgh 12/31/2001 3 044C Feedwater Pump C Controller Output Fails Hgh 12/31/2001 j

3 046C Steam Flow Transmitter 1N003C Falls 0-100%

12/31/2001 3 047A Feedwater Flow Transmitter 1N002A Fails 0-100%

12/31/2001 3 061C MSIV HV41 1F022C Fails Open 12/31/2001 3 062C MSIV HV41 1F028C Fails Open 12/31/2001 I

1 3 063C MSfV HV41 1F022C Fails Closed 12/31/2001 l

3.064C MSIV HV41-1F028C Fails Closed 12/31/2001 j

3 066 Steam Line Rupture inside Drywell 12/31/2001 3 071B Loss of Extracton Steam To Feedwater Heater 16B 12/31/2001 3 072C SJAE Steam Supply PCV07101 A Fails Open 12/31/2001 3 075 Turbine Exhaust Hood Spray Valve Fails Closed 12/31/2001 3 078B Condensate Pump B Tnp 12/31/2001 3 079C Condensate Powdex Demsn C Hgh Differential Pressure 12/31/2001 3.079G Condensate Powdex Domin G Hgh Different:al Pressure 12/31/2001 3 085 Circulating Water Expansen Joint Leak 12.'31/2001 3 086C Circulating Water Pump C Tnp 12/31/2001 Friday. Detmber N, IV96 l' age 3 ofI0

Test No Title Test Date Committment 3 102 Main TurtMne Low Beanng Oil Pressure 12/31/2001 3135A EHC Pressure Regulator A Fails High 12/31/2001 3.106B EHC Pressure Regulator B Fails Low 12/31/2001 3.107C Bypass Valve No. 3 Sticks Open 12/31/2001 3.107G Bypass Valve No. 7 Sticks Open 12/31/2001 3.110 Main Turbine-Generator Tnp 12/31/2001 3.1120 EHC Purno B Tnps 12/31/2001 3139A SRV 1F013C Fails Leaks 12/31/2001 3.139B SRV 1F013C Fails Stuck 12/31/2001 3.139C SRV 1FO13C Fails - Open Electncally 12/31/2001 3.1390 SRV 1FO13C Fails - Closed 12/31/2001 3.139E SRV 1F0120 Fails Open Mechanically 12/31/2001 3143A SRV 1F013G Fails Leaks 12/31/2001 3.143B SRV 1F013G Fails Stuck 12/31/2001 3143C SRV 1F013G Fails Open Electrically 12/31/2001 3143D SRV 1FO13G Fails - Closed 12/31/2001 3.143E SRV 1FO13G Fails - Open Mechanically 12/31/2001 3.147A SRV 1FO13L Fails - Leaks 12/31/2001 j

l

3. I47B SRV 1F013L Fails - Stuck 12/31/2001 3147C SRV 1F013L Fails - Open Electncally 12/31/2001 3147D SRV 1F013L Fails - Closed 12/31/2001 1

3147E SRV 1FO13L Fails - Open Mechanically 12/31/2001 l

3.149A SRV 1F013N Fails - Leaks 12/31/2001 3.149E SRV 1F013N Fsb Open Mechanically 12/31/2001 3 1500 SRV 1FO133 F.v.s - Closed 12/31/2001 3.151C SRV 1F013H Downcorner Leak 0-100%

12/31/2001 3.151E SRV 1F013S Downcomer Leak 0100%

12/31/2001 3256C NSSSS Group 1C Inadvertent Isoiston 12/31/2001 3156G NSSSS Group 1G inadvertent isolaton 12/31/2001 3157C NSSSS Group 2C Inadvertent isolaten 12/31/2001 3158A NSSSS Group 3A inadvertent isolaton 12/31/2001 3.159C NSSSS Group 6C Inadvertent isolaton 12/31/2001 3.160A NSSSS Group 7A inadvertent isolaten 12/31/2001 YrId'lDece55II98 Page 4 of16 a

l l

i Test No Title Test Date Committment i

1 3.161B NSSSS Group 88 Inadvertent isolation 12/31/2001 3.162C Secondary Containment & PCIG C ins wrtent isolation 12/31/2001 l

3.165 Steam Jet Air Ejector Discharge Explosion 12/31/2001 3.168A Offgas Chiller Glycol Pump A Tnp 12/31/2001 3.171C RHR Pump C Tnp 12/31/2001 3.172C RHR Pump 1C Fails To Auto Start 12/31/2001 3174C RHR ingetion Valve 1F017C Fails As-is 12/31/2001 3.174E RHR Full Flow Test Valve HV51-1F024A Fails As-Is 12/31/2001

]

3.175C RHR Pump Suction Vmive F004C Fads As-is 12/31/2001 3.176A RHR Shutdown Cooling Valve 1FOO6A Fads As-Is 12/31/2001 3.176E RHR SDC injection Valve 1FO15A Fails As-Is 12/31/2001 3.177C RHR HX B Bypass Controller Fails ingh 12/31/2001 3.182C Core Spray Pump C Tnp 12/31/2001 3183C Core Spray Pump C Fads To Auto Start 12/31/2001 3.189A Reae or Water Cleanup Pump A Tnp 12/31/2001 3.1908 RWCU Drain Flow Controller Fads Closed 12/31/2001 3.104 RWCU Suction Line Coolant Leakage (1 100%)

12/31/2001 3 197 SLC Squib Valves Fail To Fire 12/31/2001 3.203A SRM Channel C Recorder Fails As-Is 12/31/2001 j

, 3 203B SRM Channel C Fads inoperative 12/31/2001 3 203C SRM Channel C Detector Stuck 12/31/2001 3 207A 1RM Channel C Recorder Fads As-Is 12/31/2001 3 2078 IRM Channel C Fads inoperative 12/31/2001 3 207C 1RM Channel C Detector Stuck 12/31/2001 3 211 A IRM Channel G Recorder Fads As-is 12/31/2bO1 3.211B IRM Channel G Fads inoperative 12/31/2001 3.211C 1RM Channel G Detector Stuck 12/31/2001 3 213C SRM Channel C Fods To Selected Value 12/31/2001 3 214C IRM Channel C Fads To Selected Value 12/31/2001 3 214G IRM Channel G Fads To Selected Value 12/31/2001 3.215 IRM Overlap Fadure 12/31/2001 3.226 Reactor instrument Line Break After 42-F041 12/31/2001 f

3.2288 Reactor instrument Line Break After 42 F0478 12/31/2001 f

Friday, December 04,1998 Page$ of10

Test No Title Test Date Committment 3.2308 Reactor irrstrument Line Break After 42-F0658 12/31/2001 3.231D Reactor instrument Line Break After 42-F045D 12/31/2001 3 232E Reactor Level Transmdter LT42-N080C Fails High 12/31/2001 3.232F Reactor Level Transmitter LT42-N080C Fails Low 12/31/2001 3.233E Reactor Level Transmitter DPT42-N004C Fails Hgh 12/31/2001 3 233F Reactor Level Transmrtter DPT42-N004C Fails Low 12/31/2001 3.234E Reactor Pressure Transmater PT42-N078C Fails Hgh 12/31/2001 3.234F Reactor Pressure Transmdter PT42-N078C Fails Low 12/31/2001 3.236C Reference Leg 1D004C Flashes 12/31/2001 3.236F ALL Reference Legs Flash 12/31/2001 3.237C Reference Leg 1D004C Level Defect 12/31/2001 3 241B Feedwater Hester 12B Tube Leak 12/31/2001 3.242C Feedwater Hester 15C Tube Leak 12/31/2001 3 245A Rx Feedwater Pump B Tnos 12/31/2001 3 246B Feedwater Pump C Mechanical Failure 12/31/2001 3 248A Reactor FeedPump A Recire Valve Fails Open 12/31/2001 3 250A Reactor FeedPump C Recirc Valve Fails Open 12/31/2001 3 253A FW Lme A Rupture Outside Drywell 12/31/2001 3.256 CAC N2 Purge Flow Controller Fails Hgh 12/31/2001 3 261 Lcss of Offsde Power (Station Blackout) 12/31/2001 3 263C 4KV Safeguard Bus 013 Fault 12/31/2001 3 264B Main Generator Output Breaker 252-10213 Tnps 12/31/2001 3 266A 13 2KV Safeguard Transformer Breaker 101 Tnps 12/31/2001 3 272A 114C Turbine Area 440V Load Center Fault 12/31/2001 3 272B 124C Turbine Area 440V Load Center Fault 12/31/2001 3 275C D134 Safeguard 440V Load Center Fauft 12/31/2001 3 277C 120 VAC Panel 10Y103 Fault 12/31/2001 3.279A 120 VAC Panel 10Y201 Fault 12/31/2001 3 280A 120 VAC RPS & UPS Bus 1 AY160 Fault 12/31/2001 3.282C 1FC 125/250 VDC 1CD105 Fault 12/31/2001 3 284C Loss of DC To Soleded Annunciator Panels 12/31/2001 3.284G Loss of DC To Selected Annunciator Panels 12/31/2001 3.285C 125/250 VDC Bus 1CD108 Fault 12/31/2001 ErYi ) S 5 r N,1998 Page 6 of10

r l

i i

l Test No Title

. Test Date Committment I

i

?

3.2868 18 APRM UPS Bus 18Y185 Fault 12/31/2001 f

I' 3.2998 Control Enclosure Chiller OSK112 Trip 12/31/2001 i

3.310 Control Enclosure Hi Chlonne Concentraten 31/2001 3 407A RRCS ARI Division i Fails To Inniste 12/31/2001 k

l 3.406A Loait in instrument Air Header A 12/31/2001 i

4 i

]

3.410A CIG isolaten To Drywell HV59129A Fails Closed 12/31/2001 3 411B CP9 Flow Control Valve B Fails Closed 12/31/2001 t

3 412C Both Control Rod Dnve Pumps Tnp 12/31/2001 4

i

-l j

3 414C SDV Valve SV47-1F181 Fails Closed 12/31/2001 j

3 41tC Desel Generator 13 Tnp 12/31/2001 i

3.419C Desel Generator 13 Fails To Start 12/31/2001 3.424C Both Instrument Air Compressors Tnp 12/31/2001 i

j 3 431C Recuc Pump B M/A Staten Fails High 12/31/2001

)

i 34328 Recirc Pump B incomplete Startup Sequence 12/31/2001 l

3 434A Recirc Pump A Seal #2 Failure 12/31/2001 l

1 3 436A Recac Pump A Generator Feld Breaker Tnp 12/31/2001 3 442C Recue Pump 1 A RPT Breaker CB3A & CB4A Tnp 12/31/2001 3 443A Recirc Pump 1B RPT Breaker CB3B Tnp 12/31/2001 3 446B HPCl Steam isolaten Valve HV55-1F003 Fails 12/31/2001 3 448A HPCI Speed Control Fails High 12/31/2001 3 451 A HPCI Steam Supply HV55-1F003 isolates 12/31/2001 3454 HPCI Suction Valves Fail To Auto Swap 12/31/2001 3 4578 RCIC Speed Control Fails Low 12/31/2001 3 460 RCIC Descharge Vahe 1F013 Fails As-is 12/31/2001 3 464A RCIC isolaten Valve HV49-1F007 Fails As-Is 12/31/2001 3 466 Tnp of RCIC Overspeed Tnp Mechanism 12/31/2001 3 471C Drywell Area Und Cooier Fan 1C1 Tnp 12/31/2001 3 471G Drywell Area Una Cooier Fan 1G1 Tnp 12/31/2001 3 472C Drywell Area Unit Cooier Fan 1C2 Tnp 12/31/2001 3 472G Drywell Ares Una Cooler Fan 1G2 Tnp 12/31/2001 3 482A DW Chiller 1AK111 Tnp 12/31/2001 3484 TECW Pump A Tnp 12/31/2001 3 487 Loss of Serves Water To Main Turbine Lube Oil Coolers 12/31/2001 YrId]nSc'eAher 04,1998 Page 7of10 I

1 i

.-l

i l

Test No Title Test Date Committment i

3 489C ESW Pump C Tnps 12/31/2001 l

d l

3 490C ESW VaNo HV11225 Fails To Auto Swap 12/31/2001 l

?

3 490G ESW Valve HV11-126 Fails To Auto Swap 12/31/2001 3 491 ESW System Leak 12/31/2001 3 492C RHR Service Water Pump C Trips 12/31/2001 l

3.501A Jet Pump No. 7/8 Pluggod Roer 12/31/2001 4

3 3.503A Jet Pump No.17/18 Reser Break 12131/2001 3.504B Recare Pump 1B Shaft Failure 12/31/2001 3 506A Recirc Pump B High Runback 12/31/2001 4

3.515A Feedwater Hester 12A Drain Valve Fails Open 12/31/2001 3.515E Feedwater Heater 16A Dran Valve Fails Open 12/31/2001 I

i 3.516D Feedwater Heater 15A Dram Valve Feels Closed 12/31/2001 3.517C Foodwater Hester 14B Drain Valve Fails Open 12/31/2001 3.518B Feedwater Hester 13B Drain Valve Fails Closed 12/31/2001 j

l 3 519A Feedwater Heater 12C Drain Valve Fails Open 12/31/2001 l

3.519E Feedwater Heater 16C Drain Vane Fails Open 12/31/2001 3 5200 Feedwater Hester 15C Drain Valve Fails Closed 12/31/2001 3 521C Feedwater Heater 14A Dump Valve Fails Open 12/31/2001 3.5228 Feedwater Hester 13A Dump Valve Fails Closed 12/31/2001

{

3.523A Feedwater Hester 12B Dump Valve Fails Open 12/31/2001 i

3 523E Feedwater Heater 16B Dump Valve Fails Open 12/31/2001 3 524D Feedwata Heater 158 Dump Valve Fails Closed 12/31/20C1 3.525C Fcedwater Heater 14C Dump Vane Fails Open 12/31/2001 3 526B Feedwater Hester 13C Dump Valve Fails Closed 12/31/2001 3 527C Steam Leak Detection NUMAC TIS 25-101C Fails 12/31/2001 t

3 528C RHR Containment Spray Valve F021 A Fails As ls 12/31/2001 3 529C Reactor Pressure Transmitter PT42-103B Fails High 12/31/2001 3 532 Turbine Emergency Beanng Oil Pump Tnps 12/31/2001 l

l 3.535B 1 A2 Moisture Separator Dram Tank Dram Valve Fails Closed 12/31/2001 l

3 535F 1C2 Mosture Separator Dram Tank Drain Valve Fails Cicaed 12/31/2001 i

3.5360 1B2 Mooture Separator Drain Tank Drain Valv i Fails Open 12/31/2001 3.5378 1A2 Mosture Separator Dram Tank Dump V )Ne Fails Closed 12/31/2001 3 537F "C2 Mosture Separator Drain Tank Dump Valve Fails Closed 12/31/2001 YrI5)(lieTc m$eTN 598 Page 8 of1il i

Test No Title Test Date Commi/tment 3.5380 182 Moisture Separator Drain Tank Dump Vatve Fails Open 12/31/2001 3 540 Stator Cooling Water Temperature Control Valve Fails Closed,.

12/31/2001 3 544 Reactor Cavity Seals No. 3/4 Leakage 1?/31/2001 3547 CRD Pump Tnps On Clogged Sucten Filter 12/31/2001 3 552A RFP Discharge Check Valve HV06-105A Fails Open 12/31/2001 3 553C Turtune Control Valve No. 3 Fails Open 12/31/2001 3 556A RFP A M/A Staten Swaps To Manual 12/31/2001 3 556E FWC Master Controller Swaps To Manual 12/31/2001 3.557D ALL FWC UPS Inverters Fall 12/31/2001 3 558C HV51 1F017C Close Torque Switch Tnps 12/31/2001 3 561C Core Spray Pump C Suctm Strainer Clogs 12/31/2001 3562A RHR Pump B Suction Strainer Clogs-Small 12/31/2001 3 563C Feedwater Heater 1C Level Sensing Line Fails Hi 12/31/2001 3.565A Feedwater Hester 3A Level Sensing Line Fails Hi 12/31/2001 3 566B Feedwater Heater 4B Levet Sensing Line Fails Hi 12/31/2001 i

3 567C Feedwater Heater SC Level Sensing Line Fails Hi 12/31/2001

)

3.572A RHR SDC Valve HV51 1F009 Tnp of Thermal Overload 12/31/2001 3 574A RHR Valve HV51-1F024B Tnp of Thermal Overload 12/31/2001 5 03A 4 gpm Rx Coolant Leak in Drywell 12/31/2001 5 068 Loss of Offsite Power at Rated Power Conditions 12/31/2001 5 07C Loss of Sa'eguard Bus D13 (Emergency Power) 12/31/2001 509C Loss of Non-Safeguard Load Center 114C 12/31/2001 5 09G Loss of Non-Safeguard Load Center 124C 12/31/2001 510C Loss of 120 VAC Instrument Bus 10Y103 12/31/2001 5 10)

Loss of 120 VAC instrument Bus 10Y201 12/31/2001 510L Loss of 120 VAC RPS/UPS Bus 1 AY160 12/31/2001 5.11C Loss of 125/250 VDC Bus 1CD105 12/31/2001 513B Main Condenser Air Leak at Hgh Seventy 12/31/2001 5.17A Tnp of One Reactor Feedwater Pump 12/31/2001 5.17E Feedwater Master Level Controller Fails Low 12/31/2001 1

5 18 Loss of All Feedwater Resulting in ADS Blowdown 12/31/2001 525A Recarc Pump MiA Station Fails Hgh 12/31/2001 5 30A Main Feedwater Line A Rupture Outside Drywell 12/31/2001 Ibba].i55Ec 5 5(558

~ ~ ~ ~

Page 9 ofi0

Test No Title Test Date Committment 5.34C MSIV Closure wth Brown's Ferry ATWS 12/31/2001 5.35D Turbine Tnp with Bypass Valves Fail Closed 12/31/2001 6.10 Str. ty State Performance at 25% Power 12/31/2001 6.11 diesdy State Performance at 75% Power 12/31/2001 6.12 Steady State Performance at 100% Power for 1 Hour 12/31/2001 7.01 Reactor (Manual) Scram 12/31/2001 7.02 Swnultaneous Tnp of All Reactor Feedwater Pumps 12/31/2001 7.03 Closure of All MSlVs at Rated Power 12/31/2001 7.04 Tnp of Both Reactor Reorc Pumps at Rated Power 12/31/2001 7.05 Single Reactor Recarc Pump Tnp 12/31/2001 f

7.06 Turbine Trip within Bypass Capabihty 12/31/2001 7.08 Rocerc Loop Rupture with Loss of Offsite Power 12/31/2001 7.09 Maxrnum Size Unisolable Main Steam Line Rupture 12/31/2001 i

1 l

4 i

a i

a N

1

~

^

Friday, December N,1998 Page lo ofl0 i

I PECO NUCLEAR CORPORATION LIMERICK GENERATING STATION TRAINING SIMULATOR SIMULATOR QUADRENNIAL REPORT t

LGS SIMULATOR TESTING TO BE PERFORMED IN 2002 t

i

LGS Simulator Testing Committmentsfor 2002 Test No Title Test Date Committment 1.01 Computer Real Time Test 12/31/2002 3-MCUf75 RWCU Pepe Leak in Regen Hea: Exchanger Room 503 12/31/2002 3.MHP578C HV55-1F011 Fails As-Is 12/31/2002 3-MRE102 Duct Rupture: T-200 Drywell 24 inch Vent Line 12/31/2002 3-MRE302B Refuel Floor inadvertent isolation Channel 8 12/31/2002 3-MRE303 Air Leak in Rx Enclosure 12/31/2002 3-MRE305B SGTS From Reactor Enclosure HV76197 Fails Open 12/31/2002 3-MRE309C Tnp of 1C Rx Enclosure HVAC Supply Fan 12/31/2002 3-MRE310C Tnp of 1C Rx Enclosure HVAC Exhaust Fan 12/31/2002 3-MRE311C Trip of 1C Refuel Floor HVAC Air Supply Fan 12/31/2002 3-MRM002A Control Room Emerg Air Rad Mon Chan C Fails To Sel Value 12/31/2002 3-MRM002B Control Room Emerg Air Rad Mon Chan D Fails To Sei Value 12/31/2002 3-MRM004A N Stack Rad Mon A Particulate Chan Fails To SelValue 12/31/2002 3-MRM004E N Stack Rad Mon B lodine Chan (5tE075) Fails To Sei Value 12/31/2002 3-MRM005C U-1 S Stack Rad Mon A Gaseous Chan (3GE185) Fails To Sel Value 12/31/2002 3-MRM006 RW Equip Room Vent Exh Rad Mon Fails To Sel Value 12/31/2002 3-MRM010 Offgas Charcoat Treatment Rad Mon Fails To Sei Value 12/31/2002 3-MRM014A Offgas Steam Jet Air Ejector Chan A Rad Mon Fails To Sel Value 12/31/2002 3-MRM014C Offgas Steam Jet Air Elector Linear Rad Mon Fails To Sei Value 12/31/2002 3-MRM015D Main Steam Line Rad Mon Chan D Fails To Sel Value 12/31/2002 3-MRM016D Rx Enci Vent Exh Rad Mon D Fails To Sel Value 12/31/2002 3-MRM017D Refuel Floor Vent Exh Rad Mon Chan D Fails To Set Value 12/31/2002 3-MRM0180 Drywell Post LOCA Rad Mon Chan D Fails To Set Value 12/31/2002 3-MRM023 CRD Pump Room Area Rad Mon Fails To Sel Value 12/31/2002 3-MRM027 RHR Division 1 Room Area Rad Mon Fails To Set Value 12/31/2002 3-MRM031 Hallway Cond Fdters Area Rad Mon Fails To S68 Value 12/31/2002 3-MRM035 Rx Enct West Area Rad Mon Fails To Sel Value 12/31/2002 3-MRM039 Turbine Aux Hallway West Area Rad Mon Fails To Sei Value 12/31/2002 Friday, December N. I998 Page i ofII

l i

i Test No Title Test Date Committment 3-MRM043 RWCU Instrument Rack Area Rad Mon Fails To Sel Value 12/31/2002 3-MRM046 RWCU Fitter Area Rad Mon Fails To Sel Value 12/31/2002 3-MRM050 Spent Fuel Pool Area Rad Mon Fails To Sei Value 12/31/2002 3-MRM055 Support Ctr / Turb Enct Area Rad Mon Fails To Sel Value 12/31/2002 4

3-MRM05g Laundry Drain Process Room Area Rad Mon Fails To Sel Value 12/31/2002 3-MRM063 Remote SD Control Room Area Rad Mon Fails To Sel Value 12/31/2002 3-MRM067 Hot Maint Shop Area Rad Mon Fails To Sel Value 12/31/2002 3-MRM071 Main Control Room Area Rad Mon Fails To Set Value 12/31/2002 3-MRT001A Fuel Cladding Failure, Failure of 0100% of One Pin 12/31/2002 3-MRT005A inadvertent Actrvity Release on Elevation 313 Rx Encl 12/31/2002 3-MRT011 Offgas Sys Charcoal Adsorber Guard Bed Degraded 12/31/2002 3-MSD002A Steam Flooding Damper BPD-20122A Fails To Trip 12/31/2002 3-MSD004A Steam Flooding Damper BPD-202118A Fails To TnP 12/31/2002 3-MSD006A Steam Flooding Damper BPD-202104A Fails To Tnp 12/31/2002 3-MSD008A Steam Flooding Damper BPD-203-4A Fails To Tnp 12/31/2002 i

3-MSD010A Steam Flooding Damper BPD-203-16A Fails To Tnp 12/31G002 3-MSD012A Steam Flooding Damper BPD-203-3A Fails To Trip 12/31/2002 3 MSD013A Steam Flooding Damper BPD-203-37A Fails To Tnp 12/31/2002 3-MSD015A Steam Flooding Damper BPD-203-39A Fails To Tnp 12/31/2002 l

3-MSD017A Steam Flooding Damper BPD-202-20A Fails To Trip 12/31/2002 l

3-MSD019A Steam Flooding Damper BPD-202-40A Fails To Tno 12/31/2002 3-MSD022A Steam Flooding Damper BPD-203-9A Fails To Tnp 12/31/2002 3-MSD024A Steam Flooding Damper BPD-203-17A Fails To Tnp 12/31/2002 3-MSD026A Steam Flooding Damper BPD 203-23A Fails To Tnp 12/31/2002 i

3-MSD028A Steam Flooding Damper BPD-203-26A Fails To Trip 12/31/2002 3-MSD030A Steam Flooriang Damper BPD-203-28A Fails To Tnp 12/31/2002 1

3-MSD032A Steam Flooding Damper BPD-203-30A Fails To Trip 12/31G002 3-MSD034A Steam Flooding Damper BPD-203-42A Fails To Trip 12/31G002 3-MSD0XA Steam Flooding Damper BPD-203-44A Fails To Trip 12/31Q002 3-MTE001A Tnp of 1 A Turbine Enclosure Suppy Fan 12/31G002 I

Friday. December 04, i998 Page 2 of11 l

l l

i

Test No Title Test Date Committment t

3-MTE0028 Tnp of 1B Turt>ine Enclosure Exhaust Fan 12/31/2002 3 007A APRM Channel D Recorder Fails As-Is 12/31/2002 3 0078 APRM Channel D Fails Inop 12/31/2002 3 008B APRM Channel E Fails inop 12/31/2002 i

3.010B RBM Channel A Fails inop 12/31/2002 3 012D LPRM 2417B Upscale Failure 12/31/2002 3.012H LPRM 061*D Upscale Failure 12/31/2002 i

t 3 013D LPRM 24-578 Downscale Failure 12/31/2002 3 013H LPRM 40-17D Downscale Failure 12/31/2002 3 0150 LPRM 40-41B Drrft ( 25 To +25) 12/31/2002 f

3 019A Control Rod XX YY Failure (Dnft in) 12/31/2002 3 019B Control Rod XX-YY Failure (Dnft Out) 12/31/2002 3 010C Control Rod XX YY Failure (Accumulator Trouble) 12/31/2002 3 019D Control Rod XX-YY Failure (Stuck) 12/31/2002

}

3 019E Control Rod XX YY Failure (Uncoupied) 12/31/2002 3 019F Control Rod XX-YY Failure (Scrammed) 12/31/2002 3 019G Control Rod XX YY Fails To Scram 12/31/2002 3 019H Control Rod (XX YY) Fails Double Notch on Withdraw 12f33/2002 3 020D APRM Channel D Fails 0125%

12/31/2002 3 022 Reactof Manual Control Failure To insert 12/31/2002 3 024 RDCS Failure (Analyzer Card) 12/31/2002 3 028E Reactor Scram (Bank 4) 12/31/2002 3 029B RPS Fails To Scram (Complete) 12/31/2002 i

3 043D Feedwater Master Level Controller Fails Low 12/31/2002 3 045A Feedwater Pump A Controller Output Fails Low 12/31/2002 3 0460 Steam Flow Transmitter 1N003D Fails 0-100%

12/31/2002 l

3 0478 Feedwater Flow Transmitter 1N002B Fails 0-100%

12/31/2002 i

3 061D MStV HV41 1F0220 Fails Open l

12/31/2002 3 062D MSIV HV41 1F0280 Fails Open 12/31/2002 3 063D MSIV HV41-1F022D Fails Closed 12/31/2002 i

Friday. December 04, I998 Page3 ofII

Test No Title Test Date Committment 3 064D MSIV HV41 1F028D Fans Closed 12/31/2002 3 067 Steam Leak in Drywell(0-5000 gpm) 12/31/2002 3 071C Loss of Extraction Steam To Feedwater Hester 16C 12/31/2002 3 072D SJAE Sto:n Supply PCV07-101B Fails Open 12/31/2002 3 077A Hotwell Level Controller Fails High 12/31/2002 3 07BC Condensate Pump C Tnp 12/31/2002 3.079D Condensate Powdex Demin D Hgh Differential Pressure 12/31/2002 3 079H Condensate Powdex Domin H High Driferential Pressure 12/31/2002 3 086D Circulating Water Pump D Tnp 12/31/2002 3 095 Automatic Voltage Regulator Failure 12/31/2002 3 103 Turtune Beanng Hgh Temperature 12/31/2002 3.105B EHC Pressure Regulator A Fails Low 12/31/2002 3.106C EHC Pressure Regulator B Oscillates 12/31/2002 3.107D Bypass Valve No. 4 Sticks Open 12/31/2002 3107H Bypass Valve No. 8 Sticks Open 12/31/2002 3.111 A EHC Load Selector Fails To Local 12/31/2002 3.112C Both EHC Pumps Tnp 12/31/2002 3.140A SRV 1F013D Fails Leaks 12/31/2002 3140B SRV 1FO13D Fails - Stuck 12/31/2002 3140C SRV 1F0130 Fails - Open Electncally 12/31/2002 3140D SRV 1F013D Fails - Closed 12/31/2002 3140E SRV 1FO13D Fa:Is - Open Mechanically 12/31/2002 3144A SRV 1FO13H Fails - Leaks 12/31/2002 31440 SRV 1FO13H Fads - Stuck 12/31/2002 3.144C SRV 1F013H Fails Open Electncally 12/31/2002 31440 SRV 1F013H Fads Closed 12/31/2002 3144E SRV 1FO13H Fails Open Mechancally 12/31/2002 3148A SRV 1F013M Fails Leaks 12/31/2002 3.148B SRV 1F013M Fails Stuck 12/31/2002 3.148C SRV 1F013M Fails Open Electncally 12/31/2002 Triday,1)ecemIAr~0T4 IT9'8 F*Re 4 of11

~

~

~

Test No Title Test Date Committment 3.140D SRV 1F013M Fails - Closed 1201/2002 4

3.148E SRV 1FO13M Fails - Open Mechanically 12/31/2002 3.1498 SRV 1FO13N Fails - Stuck 1201/2002 l

3.150A SRV 1FO13S Fails Leaks 12/31/2002 3.150E SRV 1F013S Fails - Open MechanicalV 12/31/2002 3151D SRV 1F013E Downcomer Leak 0-100%

12/31/2002 3.151 F SRV 1F013N Downcomer Leak 0-100%

12/31/2002 3.156D NSSSS Group 1D inadvertent iso ation 12/31/2002 3.156H NSSSS Group 1H inadvertent isolation 12 0 1/2002 3.157D NSSSS Group 2D Inadvertent isolation 12/31/2002 4

3158B NSSSS Group 3B inadvertent isolation 12/31/2002 3.159D NSSSS Group 6D inadvertent isolation 12/31/2002 3 1608 NSSSS Group 7B inadvertent isolation 12G1/2002 4

3.162D Secondary Containment & PClG D inadvertent isolation 12/31/2002 3162E Secondary Containment & PCIG E Inadvertent isolation 12/31/2002 3166A Offgas AfterCondenser Level Transmitter Fails High 12/3tr2002 4

31680 Offgas Chiller Glycol Pump B Tnp 12/31/2002 3.171D RHR Pump D Tnp 12/31/2002 31720 RHR Pump 1D Fails To Auto Start 12/31/2002 3174D RHR injection Valve 1F017D Fails As-is 12/31/2002 3174F RHR Full Flow Test Valve HV51 1F024B Fails As-Is 12/31/2002 3.175D RHR Pump Suction Valve F004D Fails As-Is 12/31/2002 3.176B RHR Shutdown Cooling Valve 1FOO68 Fails As-is 12/31/2002 3.176F RHR SDC injection Valve 1FO15B Fails As-Is 12/31t2002 3177D RHR HX B Bypass Controller Fails Low 12/31/2002 3.182D Core Spray Pump D Trip 12/31/2002 3183D Core Spray Pump D Fails To Auto Start

' 3 1/2002 3 1898 Reactor Water Cleanup Pump B Tnp 12/31/2002 3.191 RWCU Filter i Domin Resen Depletion 12/31/2002 3195A RWCU isolation Valve HV441F001 Fails As-is 12/31/2002 Friday, December N,1998 Page 5 ofII

~

Test No Title Test Date Committment 3.198A SLC Pump A Loss of Control Power 12/31/2002 3.204A SRM Channel D Recorder Fails As-Is 12/31/2002 1

3.204B SRM Channel D Fails inoperative 12/31/2002 3.204C SRM Channel D Detector Stuck 12/31/2002 3 208A 1RM Channel D Recorder Fails As-Is 12/31/2002 3.208B IRM Channel D Fails inoperative 12/31/2002 3.208C 1RM Channel D Detector Stuck 12/31/2002 3 212A IRM Channel H Recorder Fails As-Is 12/31/2002 3 212B IRM Channel H Fails inoperatrve 12/31/2002 3 212C 1RM Channel H Detector Stuck 4

12/31/2002 3 213D SRM Channel D Fails To Selected Value 12/31/2002 3 214D IRM Channel D Fails To Selected Value 12/31/2002 1

3 214H IRM Channel H Fails To Selected Value 12/31/2002 3 216 APRM Overlap Failure 12/31/2002 A

3.227A Reactor instrument Line Break After 42-F043A 12/31/2002 3 229A Reactor instrument Line Break After 42-F049A 12/31/2002 4

3 231A Reactor instrument Line Break After 42-F045A 1

12/31/2002 3 232G Reactor Level Transmitter LT42-N080D Fails High 12/31/2002 3 232H Reactor Level Transmitter LT42-N0800 Fails Low 12/31/2002 1

3.233G Reactor Level Transmater DPT42-N004D Fails Hgh 12/31/2002 i

l 3 233H Reactor Level Transmitter DPT42-N004D Fails Low 12/31/2002 4

3 234G Reactor Pressure Transmitter PT42-N0780 Fails Hgh 12/31/2002 3 234H Reactor Pressure Transmitter PT42-N078D Fails Low 12/31/2002 3 235A Reactor Level / Pressure Recorder R608 Fails 12/31/2002 3 236D Reference Leg 1D004D Flashes 12/31/2002 3 237D Reference Leg 1D004D Level Defect 12/31/2002 3 237E Reference Leg 1D002 Level Defect 12/31/2002 3 241C Feedwater Hester 12C Tube Leak 12/31/2002 5

3 244A Rx Feedwater Pump A Tnps 12/31/2002 3.245B Feedwater Pump A Mechanical Failure 12/31/2002 "Fl1Id&55555997~

~

Page 6 of11 w

t-

- - +, '

Test No Title Test Date Committment

..=

3.246C Reactor FeedPump C High Vibration 12/31/2002 3 248B Reactor FeedPump A Recirc Valve Fails Closed 12/31/2002 3.250B Reactor FeedPump C Recirc Valve Fails Closed 12/31/2002 3.253B FW Line B Rupture Outside Drywell 12/31/2002 3 257 Suppression Pool Leak (0-100,000 GPM) 12/31/2002 3 262A 13.2KV 11 Unit Auxiliary Bus Fault 12/31/2002 3.263D 4KV Safeguard Bus D14 Fault 12/31/2002 3 264C Main Generator Output Breaker Tnps (Both) 12/31/2002 3.266B 13.2KV Safeguard Transfo:mer Breaker 201 Trips 12/31/2002 3 267A Plant Services Load Center 122 Fault 12/31/2002 3 273A 114D Plant Services Load Center Fault 12/31/2002 3 274A 1240 Plant Services Load Center Fault 12/31/2002 3 274B 224D Plant Services Load Center Fault 12/31/2002 1

3 275D D144 Safeguard 440V Load Center Fault 12/31/2002 3 2770 120 VAC Panel 10Y104 Fault 12/31/2002 3 2798 120 VAC Panel 10Y202 Fault 12/31/2002 3.280B 120 VAC RPS & UPS Bus 18Y160 Fault 12/31/2002 3 282D 1FD 125/250 VDC 1DD105 Fault 12/31/2002 32840 Loss of DC To Selected Annunciator Panels 12/31/2002 3 284H Loss of DC To Selected Annunciator Panels 12/31/2002 3 2850 125/250 VDC Bus 1DD108 Fault 12/31/2002 3 405 Service Air Compressor Trip 12/31/2002

'3 407B RRCS ARI Division 11 Fails To initiate 12/31/2002 3 406B Leak in instrument Air Header B 12/31/2002 i

3 410B ClG isolation To Drywell HV59-129B Fails Closed 12/31/2002 3 411C Both CRD Flow Control Valves Fall Closed 12/31/2002 3 413 Control Rods Fail To Scram-Brown's Ferry 12/31/2002 k

3 414D SDV Valve SV471F011 Fails Closed 12/31/2002 3 418D Desel Generator 14 Tnp 12/31/2002 3 419D Desel Generator 14 Fails To Start 12/31/2002 IMday, December 04, I998 hrte 7of1i i

e m

1 TestNo Title Test Date Committment l

3 430A Recire Pump A Seizure 12/31/2002 1

3.431D Recire Pump B M/A Station Fails Low 12/31/2002 34348 Recirc Pump B Seal #2 Failure 12/31/2002 3 4368 Recirc Pump B Generator Field Breaker Tnp 12/31/2002 i

3 440A Recirc Looo A Rupture (0100%)

12/31/2002 3 4438 Recire Pump 1B RPT Breaker CB4B Tnp 12/31/2002 3 443C Recirc Pump 1B RPT Breaker Both Tnp 12/31/2002 3 446C HPCI Steam isolation Valve HV551F100 Fails 12/31/2002 3 448B HPCI Speed Control Fails Low 12/31/2002 3 4518 HPCI Steam Supply HV55-1F002 Isolates 12/31/2002 i

3 455 HPCI Cooling Water Valve 1F059 Fails As-Is 12/31/2002 3 458 RCIC Turbine Trip 12/31/2002 3 461 RCIC Pump Suction Valves Fail To Auto Start 12/31/2002 34648 RCIC isolation Valve HV49-1F008 Fails As-is 12/31/2002 3 471D Drywell Area Unit Cooler Fan 1D1 Tnp 12/31/2002 3 471H Drywell Area Unit Cooler Fan 1H1 Tnp 12/31/2002 3 472D Drywell Area Unit Cooler Fan 1D2 Tnp 12/31/2002 3 472H Drywell Ares Unit Cooler Fan 1H2 Tnp 12/31/2002 3 473 Drywell Air Leak To Reactor Enclosure 12/31/2002 3 474 Suppression Chamber Air Leak To Reactor Enclosure 12/31/2002 3 4828 DW Chiller 1BK111 Tnp 12/31/2002 34848 TECW Pump B Tnp 12/31/2002 3 488A Service Water Pump A Tnps 12/31/2002 3 4890 ESW Pump D Tnps 12/31/2002 3 490D ESW Valve HV11047 Fails To Auto Swap 12/31/2002 3 490H ESW Valve HV11-074 Fails To Auto Swap 12/31/2002 34920 RHR Service Water Pump D Tnps 12/31/2002 3 493A Failure OF RHRSW HX A Inlet Vane 12/31/2002 3 501B Jet Pump No.19/20 Plugged Reser 12/31/2002 f

3 5038 Jet Pump No. 9/10 Reser Break 12/31/2002

^

friday. December 04, !998 Page 8 ofii i

Test No Title Test Date Committment 3?n>6B Recirc Pump B Low Runback 12/31/2002 l

3.510 Pnmary Containment Oxygen increases 12/31/2002 3 5158 Feedwater Heater 13A Drain Valve Fails Open 1201/2002 3.516A Feedwater Heater 12A Drain Valve Fails Closed 12/31/2002 3 516E Feedwater Hester 16A Drain Valve Fails Closed 12/31/2002 3.517D Feedwater Heater ISB Drain Valve Fails Open 12/31/2002 3 518C Feedwater Hester 148 Drain Valve Fails Closed 12/31/2002 3.519B Fesdwater Heater 13C Drain Valve Fails Open 12/31/2002 3 520A Feedwater Heater 12C Drain Valve Fails Closed 12/31/2002 3 520E Feedwater Heater 16C Drain Valve Fails Closed 12/31/2002 3.5210 Feedwater Hester 15A Dump Valve Fails Open 12/31/2002 3 522C Feedwater Heater 14A Dump Valve fails Closed 12r31f2002 3 523B Feedwater Heater 13B Dump Valve Fails Open 12/31/2002 3.524A Feedwater Heater 12B Dump Valve Fails Closed 12/31/2002 3 524E Feedwater Heater 16B Dump Valve Fails Closed 12/31/2002 3 525D Feedwater Heater 15C Dump Valve Fails Open 12/31/2002 3.526C Feedwater Heater 14C Dump Valve Fails Closed 12/31/2002 3 527D Steam Leak Detection NUMAC TIS 25-101D Fails 1201/2002 3 528D RHR Containment Spray Valve FO218 Fails As-Is 12/31/2002 3 529D Reactor Pressure Transmitter PT42-103B Fails Low 12/31/2002 3 533 Turtune Tuming Gear Oil Pump Tnps 1201/2002 3 535C 1B1 Moisture Separator Drain Tank Drain Valve Fails Closed 12/31/2002 3.536A 1 A1 Moisture Separator Drain Tank Drain Valve Fails Open 12/31/2002 3 536E 1C1 Monsture Separator Drain Tank Drain Valve Fails Open 12/31/2002 3 537C 181 Moisture Separator Drain Tank Dump Valve Fails Closed 12/31/2002 3 538A 1A1 Moisture Separator Drain Tank Dump Valve Fails Open 12/31/2002 3.538E 1C1 Moisture Separator Drain Tank Dump Valve Fails Open 12/31/2002 3 541 Generator H2 Coolers Temperature Control Vdve Fails Closed 12/31/2002 3 545 Stator Cooling Water Flow Switch Fails 12f31f2002 3 548 Main Condenser Hotwell Leak 12/31/2002 1

Triday DermberM,!998 Page 9 of11

Test No Title Test Date Committment 3.552B RFP Descharge Check Valve HV06-105B Fails Open 12/31/2002 3.553D Turbine Control Valve No. 4 Fails Open 12/31/2002 3.556B RFP B M/A Staten Swaps To Manual 12/31/2002 i

3.557A FWC UPS inverter E/S-XX 118 Fails 12/31/2002 3.5580 HV51 1F017D Close Torque Switch Trips 1?/31/2002 3 559 SLC injecten Line Rupture in Drywell 12/31/2002 3.561D Core Spray Pump D Suction Strainer Clogs 12/31/2002 3.562B RHR Pump B Suction Strainer Clogs-Large 12/31/2002 3.564A Feedwater Heater 2A Level Sensing Line Fails Hi 12/31/2002 3 565B Feedwater Hester 3B Level Sensing Line Fails Hi 12/31/2002 3.566C Feedwater Heater 4C Level Sensing Line Fails Hi 12/31/2002 3.568A Feedwater Heater 6A Level Sensing Line Fails Hi 12/31/2002 3 5728 RHR SDC Valve HV51 1F009 Tnp of Magnetic Overload 12/31/2002 3.574B RHR Valve HV51-1F024B Tnp of Magnetic Overload 12/31/2002 5 03B 100 gpm Rx Coolant Leak in Drywell 12/31/2002 5 048 SRV Opens at Rated Power 12/31/2002 507D Loss of Safeguard Bus D14 (Emergency Power) 12/3jf2002 5 09D Loss of Non-Safeguard Load Center 1140 12/31/2002 5 09H Loss of Non-Safeguard Load Center 124D 12/31/2002 5 09J Loss of Non-Safeguard Load Center 122 12/31/2002 5100 Loss of 120 VAC Instrument Bus 10Y104 12/31/2002 5.10K Loss of 120 VAC instrument Bus 10Y202 12/31/2002 5.10M Loss of 120 VAC RPS/UPS Bus 1BY160 12/31/2002 i

5.11D Loss of 125/250 VDC Bus 10D015 12/31/2002 l

5.14 Total Loss of Service Water 12/31/2002 1

5.178 Tnp of Two Reactor Feedwater Pumps 12/31/2002 5.17F Tnp of One Condensate Pump 12/31/2002 5 25B Recirc Pump M/A Station Fails Low 12/31/2002 5.30B Main Feedwater Line B Rupture Outside D'ywell 12/31/2002 5.35A EHC Pressure Regulator Fans High 12/31/2002

$'rlday, December N, I998 Page 10 of1!

~~

~

Test No Title Test Date Committment 6.10 Steady State Performance at 25% Power 12/31/2002 6.11 Steady State Performance at 75% Power 12/31/2002 6.12 Steady State Performance at 100% Power for 1 Hour 12f31/2002 7.01 Reactos (Mayal) Scram 12/31/2002 7.02 Simultaneous Tnp of All Reactor Feedwater Pumps 12/31/2002 7.03 Closure of All MSIVs at Rated Power 12/31/2002 7.04 Tnp of Both Reactor Recarc Pumps at Rated Power 12/31/2002 7.05 Single Reactor Reorc Pump Tnp 12/31/2002 7.06 Turbine Tnp within Bypass Capabihty 12/31/2002 7.08 Recrc Loop Rupture with Loss of Offsite Power 12/31/2002 7.09 Maximum See Unisolable Main Steam Line Rupture 12/31/2002 l

l Friday, December N,1998 Page 11 of11

..