{{#Wiki_filter:..__ -     -    _      ..          _                          -. __ _
{{#Wiki_filter:..__ -
k  '*'#'
-.h' k
  -.h'                                         ,
e i
e i
TENNESSEE VALLEY AUTHDRITY                                         1 L.                                           SEQUOYAH NUCLEAR PLANT                                     ...    )
TENNESSEE VALLEY AUTHDRITY 1
L                                                                                                             1 l
)
ABNORMAL OPERATING INSTRUCTION A01-13
L.
                                                              -                                              1 r
SEQUOYAH NUCLEAR PLANT 1
LOSS OF ESSENTIAL RAW COOLING. WATER Units 1 and 2 Revision 10 PREPARED BY:               George Wilson                               . -
L l
RESPONSIBLE SECTION: Operations REVISED BY:               Gary L. Terpstra SUBMITTED BY:              .h .i A       v1 f-                                                                   ~
ABNORMAL OPERATING INSTRUCTION A01-13 1
p SupervisoF "
r LOSS OF ESSENTIAL RAW COOLING. WATER Units 1 and 2 Revision 10 PREPARED BY:
                                                                ~
George Wilson RESPONSIBLE SECTION: Operations REVISED BY:
PORC Review:                 lPR 231987                                       i ate APPROVED BY:
Gary L. Terpstra
                                                      ' ' Plant Manager                                     ,
.h.i A f-SUBMITTED BY:
DATE APPROVED:                 TsiY3IS87                                      i
v1 p SupervisoF "
                  - Reason fo'r revision (include all Instruction Change Form Nos.):
~
~
PORC Review:
lPR 231987 i
ate APPROVED BY:
' ' Plant Manager TsiY3IS87 i
DATE APPROVED:
Reason fo'r revision (include all Instruction Change Form Nos.):
Revised to reduce immediate operator actions; combine pump trip /
Revised to reduce immediate operator actions; combine pump trip /
casing failure sections; delete loss of all ERCW pumps and operating requirements for various plant site conditions                               j sections; and add Appendix R valye information.
casing failure sections; delete loss of all ERCW pumps and operating requirements for various plant site conditions j
The last page of this instruction is Number:             20 u.
sections; and add Appendix R valye information.
      '-i             8708170120 B70811 PDR   ADOCK 05000327                                         -
The last page of this instruction is Number:
      -                P                  PDR
20 u.
                                                                                                  . w ...
8708170120 B70811
' '-i PDR ADOCK 05000327 P
PDR
. w...


L             ..-                                                                                                        J
J L
                                                  .                                                                          i SEQUOYAH NUCLEAR PLANT                                                   .]
i SEQUOYAH NUCLEAR PLANT
.]
PLANT INSTRUCTION REVISION LOG 1
PLANT INSTRUCTION REVISION LOG 1
                                                                                                                      ~
~
A8 NORMAL OPERATING INSTRUCTION ~               A0I-13                                     i REVISION   Date       Pages     REASON FOR REVISION (INCLUDE COMMIT-LEVEL     Approved   Affected   MENTS'AND ALL ICF FORM NUMBERS)
A8 NORMAL OPERATING INSTRUCTION ~
                                                          /
A0I-13 i
2       08/27/79 ~All 7-Added 18A
REVISION Date Pages REASON FOR REVISION (INCLUDE COMMIT-LEVEL Approved Affected MENTS'AND ALL ICF FORM NUMBERS)
  <                                        2,4,6-16, l                   3       09/11/80 18 All 4       10/14/80                                                                 .
/
5      07/13/81   All 1, added 6       08/18/81   22,23                                                                       ,
2 08/27/79
7      02/16/82   23 F
~All Added 18A 7-2,4,6-16, l
8       03/30/83 18                                                                             '
3 09/11/80 18 4
Deleted 9       09/21/84 22,23 Revised to reduce i'mmediate operator actions; combine pump trip /
10/14/80 All 5
casing. failure sections; delete. loss of                           .
07/13/81 All 1, added 6
all ERCW pumps and operating re;; ire-                               I ments for various plant site conditions I
08/18/81 22,23 7
sections; and add Appendix R valve:
02/16/82 23 F
10 APR 2 31980' All           information.                                                         4 L               .
8 03/30/83 18 Deleted 9
        ~
09/21/84 22,23 Revised to reduce i'mmediate operator actions; combine pump trip /
casing. failure sections; delete. loss of all ERCW pumps and operating re;; ire-I I
ments for various plant site conditions sections; and add Appendix R valve:
10 APR 2 31980' All information.
4 L
~
1262C/ldw i
1262C/ldw i
9
9
                                                                                            ,                . ..! r ed
...! r ed


SQN AOI-13                 ~
SQN AOI-13 Page 1
Page 1 Revision 10
~
                                                                                                    ~.
Revision 10
(
(
LOSS OF ESSENTIAL RAW COOLING HATER                                 ' #
~.
Page 1 of 1 I. PURPOSE The purpose of this instruction is to provide operator actions for the following events:
LOSS OF ESSENTIAL RAW COOLING HATER Page 1 of 1 I.
: 1. Section A: Running Pump Trip or Casing Failure
PURPOSE The purpose of this instruction is to provide operator actions for the following events:
: 2. Section B: Supply Header Pipe Rupture                                             -
1.
                                                                                                          ~
Section A:
a) Part 1:   In Yard Area b) Part 2:   In Auxiliary Building c) Part 3:   In ERCH Pumping Station ~
Running Pump Trip or Casing Failure 2.
      ,          3. Section C: Discharge Header Pipe Rupture a) Part 1:   In Yard Area I                   b) Part 2:   In Auxiliary Building l
Section B:
Supply Header Pipe Rupture
~
a) Part 1:
In Yard Area b) Part 2:
In Auxiliary Building c) Part 3:
In ERCH Pumping Station ~
3.
Section C:
Discharge Header Pipe Rupture a) Part 1:
In Yard Area I
b) Part 2:
In Auxiliary Building l
was.
was.
OlS88/wjs bm, l'   hM
OlS88/wjs bm, l'
hM


o SQN
o SQN AOI-13 Page 2 Revision 10 SECTION A: RUNNING PUMP TRIP OR CASING FAILURE Page 1 of 2 I.
                                                        ,              AOI-13                 ,
SYMPTOMS A.
Page 2 Revision 10 SECTION A: RUNNING PUMP TRIP OR CASING FAILURE Page 1 of 2 I. SYMPTOMS A. Possible Alarms:
Possible Alarms:
l                       1. "ERCW SUPPLY HDR A LOW" (12,000 gpm dec), XA-55-27A, Windows 1                           15 and/or 20.                                             ,
l 1.
: 2. "ERCW SUPPLY HOR B LOW" (12,000 gpm dec), XA-55-27A, Windows 22 and/or 27.
"ERCW SUPPLY HDR A LOW" (12,000 gpm dec), XA-55-27A, Windows 1
        -                3. "ERCH HDR A PRESSURE LOW" (50 psig dec), XA-55-27A, Windows 16 and/or 28.
15 and/or 20.
: 4. "ERCH HDR 8 PRESSURE LOW" (50 psig' dec), XA-55-27A, Windows 23 and/or 35.
2.
: 5. "ERCH PUMP K (J, L, M, N, P, Q, R) DISCH PRESS LOW",
"ERCW SUPPLY HOR B LOW" (12,000 gpm dec), XA-55-27A, Windows 22 and/or 27.
XA-55-27A, Windows 24, 17, 4, 31, 25, 32, 11, 18
3.
: 6. " MOTOR TRIPOUT" XA-55-278-A, Window 32
"ERCH HDR A PRESSURE LOW" (50 psig dec), XA-55-27A, Windows 16 and/or 28.
: 7. " MOTOR OVERLOAD" XA-55-278-A, Window 25 B. Possible Indications l                         1. PI-67-493A (488A) ERCH header A(B) showing low pressure
4.
: 2. Disagreement light on relative to tripped pump
"ERCH HDR 8 PRESSURE LOW" (50 psig' dec), XA-55-27A, Windows 23 and/or 35.
: 3. PI-67-437A (433A, 445A, 441A, 461A, 465A, 453A, 457A) on pump K-A (J-A, M-8, L-B, Q-A, R-A, N-B, P-B) tripped showing low pressure.
5.
: 4. FI-67-61 or FI-67-62 showing low flow on header A or header B II. AUTOMATIC ACTIONS None 0158B/wjs                                                                       .
"ERCH PUMP K (J, L, M, N, P, Q, R) DISCH PRESS LOW",
E
XA-55-27A, Windows 24, 17, 4, 31, 25, 32, 11, 18 6.
                                                                                                  . aJ e eE
" MOTOR TRIPOUT" XA-55-278-A, Window 32 7.
" MOTOR OVERLOAD" XA-55-278-A, Window 25 B.
Possible Indications l
1.
PI-67-493A (488A) ERCH header A(B) showing low pressure 2.
Disagreement light on relative to tripped pump 3.
PI-67-437A (433A, 445A, 441A, 461A, 465A, 453A, 457A) on pump K-A (J-A, M-8, L-B, Q-A, R-A, N-B, P-B) tripped showing low pressure.
4.
FI-67-61 or FI-67-62 showing low flow on header A or header B II. AUTOMATIC ACTIONS None 0158B/wjs E
. aJ e eE


n r           . .
n;'
4 -
r 4 -
SQN
SQN A01-13
                                                                            .          A01-13                 ,      ,
-Page 3 Revision 10 a
                                                                                      -Page 3
      -                                                                                Revision 10 a
SECTION A: RUNNING PUMP TRIP OR CASING FAILURE Page 2 of 2 i
SECTION A: RUNNING PUMP TRIP OR CASING FAILURE Page 2 of 2 i
III.       IMMEDIATE OPERATOR ACTION A. StartredundantERCHpuNp.
III.
IV. SUBSEQUENT OPERATOR ACTION A. Ensure header pressures and flows return to' normal.       t B. Ensure pump; loading is normal (amperesLat normal expected valve).
IMMEDIATE OPERATOR ACTION StartredundantERCHpuNp.
C. Determine cause of pump trip and have corrective maintenance performed.
A.
    . l-
IV. SUBSEQUENT OPERATOR ACTION A.
* D. Ensure that the remaining OPERABLE pumps are aligned for automatic loading on emergency power.
Ensure header pressures and flows return to' normal.
E. Refer to TS 3.7.4.1. Implement REP per IP-1 (Engineered Safety features) as required.                     ,
t B.
      ' GD
Ensure pump; loading is normal (amperesLat normal expected valve).
      -                                                                                                                  l 01588/wj s                                                                           .
C.
    /
Determine cause of pump trip and have corrective maintenance
                .-.--..-_-_-_--_-___________._____.~..._.._._. _
. l-performed.
D.
Ensure that the remaining OPERABLE pumps are aligned for automatic loading on emergency power.
E.
Refer to TS 3.7.4.1.
Implement REP per IP-1 (Engineered Safety features) as required.
' GD l
01588/wj s
/
. -. - -.. - _ - _ - _ - - _ - _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _. ~... _.. _. _.


                                                                                                                                                  -SQN
-SQN A0I-13 Page 4 Revision'10 SECTION B:. SUPPLY HEADER PIPE RUPTURE
                                                                                                                                ,-                    A0I-13                                               '
~
Page 4
PART 1:
    ..                                                                                                                                                  Revision'10
"IN YARD AREA" Page 1 of 4
  ~
'I.
SECTION B: . SUPPLY HEADER PIPE RUPTURE PART 1: "IN YARD AREA" Page 1 of 4
SYMPTOMS A.
                                            'I. SYMPTOMS                                                         ,
Probable Alarms h.
A. Probable Alarms
1.
: h.                                                   1.                               "ERCH SUPPLY HDR A(B) LOW" (12,000 gpm dec.), XA-55-27A, ,
"ERCH SUPPLY HDR A(B) LOW" (12,000 gpm dec.), XA-55-27A,,
Windows 15, 20, 22, 27.                                                       -
Windows 15, 20, 22, 27.
                                                    - 2.                               "ERCH HDR A(B) PRESSURE LOW" (50 psig dec.), XA-55-27A, Windows 16, 28, 23,-35.
- 2.
: 3.                               "ERCW HDR 1A-A (18-8, 2A-A, 28-B) STR DIFF PRESS HI" (25 psid                                                                 ;
"ERCH HDR A(B) PRESSURE LOW" (50 psig dec.), XA-55-27A, Windows 16, 28, 23,-35.
inc.), XA-55-27A, Windows 2, 9, 14., 21.   ,
3.
: 8. Probaule Indications q
"ERCW HDR 1A-A (18-8, 2A-A, 28-B) STR DIFF PRESS HI" (25 psid inc.), XA-55-27A, Windows 2, 9, 14., 21.
l'   .                        PI-67-493A (488A) ERCH header A(B) showing low pressure
8.
: 2.                             PI-67-437A (433A, 445A, 441A, 461A, 465A, 453A, 457A) on pump               .
Probaule Indications q
K-A (J-A, M-8, L-8, Q-A, R-A, N-8, P-B) supplying ruptured                                                                     !
l' PI-67-493A (488A) ERCH header A(B) showing low pressure 2.
header showing low pressure                                                                                                     !
PI-67-437A (433A, 445A, 441A, 461A, 465A, 453A, 457A) on pump K-A (J-A, M-8, L-8, Q-A, R-A, N-8, P-B) supplying ruptured header showing low pressure 3.
: 3.                             FI-67-61(62) showing low flow on header A(B) that is ruptured.
FI-67-61(62) showing low flow on header A(B) that is ruptured.
: 4.                             Visual observation of washed-out area around break (may be                                                                       j
4.
      ,                                                                              only symptom of a small break).
Visual observation of washed-out area around break (may be j
II. AUTOMATIC ACTIONS None III. IMMEDIATE OPERATOR ACTION A. Dispatch personnel to determine break location.
only symptom of a small break).
IV. SUBSEQUENT OPERATOR ACTION A. Start spare pumps as needed to maintain header pressure B. Begin reducing non-essential loads.
II. AUTOMATIC ACTIONS None III.
IMMEDIATE OPERATOR ACTION A.
Dispatch personnel to determine break location.
IV. SUBSEQUENT OPERATOR ACTION A.
Start spare pumps as needed to maintain header pressure B.
Begin reducing non-essential loads.
01588/wjs j
01588/wjs j
W
W
                                                                                                                                                                      ^
^
___.______._m____m___._                          _ _ _ _ _ _ _ . . _ _                                                                                                                              _
___.______._m____m___._


l     .
l SQN o
o                                                                                                                                                                                   SQN
AOI-13 Page 5 Revision 10 SECTION B: SUPPLY HEADER PIPE RUPTURE
                                                                                                                                                                          ,          AOI-13 Page 5 Revision 10 SECTION B: SUPPLY HEADER PIPE RUPTURE
~
    ~
PART 1:
PART 1: "IN YARD AREA" Page 2 of 4 9
"IN YARD AREA" Page 2 of 4 9
IV. SUBSEQUENT OPERATOR ACTION -(continued)
IV.
NOTE:                   It will be necessary to energize ACBs to Appendix P valves NOTE:                   This procedure isolates normal ERCW supply to diesels lA-A and 2A-A. If in modes 5 or 6, then lockout these diesels.                                                                                 If'in modes 1, 2, 3, or 4; then station an operator to open the alternate ERCH supplies if the diesels start. The alternate supplies are:
SUBSEQUENT OPERATOR ACTION -(continued)
NOTE:
It will be necessary to energize ACBs to Appendix P valves NOTE:
This procedure isolates normal ERCW supply to diesels lA-A and 2A-A.
If in modes 5 or 6, then lockout these diesels.
If'in modes 1, 2, 3, or 4; then station an operator to open the alternate ERCH supplies if the diesels start.
The alternate supplies are:
1-FCV-67-68 (IA-A diesel), and 2-FCV-67-68 (2A-A diesel)
1-FCV-67-68 (IA-A diesel), and 2-FCV-67-68 (2A-A diesel)
                                                                                                                                                                                    ~
~
C. For lA supply header:
C.
For lA supply header:
: 1. Open 1-FCV-67-147, Sup Hdr lA to Hdr 2B (Rx MOV Bd 1A2-A)
: 1. Open 1-FCV-67-147, Sup Hdr lA to Hdr 2B (Rx MOV Bd 1A2-A)
: 2. Ensure 2-FCV-67-147 OPEN, Sup Hdr 2B to Hdr lA (Rx MOV Bd 2B2-B)
: 2. Ensure 2-FCV-67-147 OPEN, Sup Hdr 2B to Hdr lA (Rx MOV Bd 2B2-B)
Line 154: Line 210:
l I4 0158B/wjs c
l I4 0158B/wjs c


SQN
SQN AOI-13 Page 6 Revision 10 SECTION B: ' SUPPLY HEADER PIPE RUPTURE
                                                                                        ,                            AOI-13                                         ,,
'PART 1:
Page 6
"IN YARD AREA" Page 3 of 4 h
_.                                                                                                        Revision 10 SECTION B: ' SUPPLY HEADER PIPE RUPTURE
IV.' LSUBSEQUENT OPERATOR ACTION s(continued)'
                                                                          'PART 1: "IN YARD AREA" Page 3 of 4                                                                               ,
NOTE:
h          IV.' LSUBSEQUENT OPERATOR ACTION s(continued)'
It will be necessary to energize ACBs to Appendix R, valves
NOTE:   It will be necessary to energize ACBs to Appendix R, valves
~
    ~
' NOTE:
                          ' NOTE:   This procedure isolates normal ERCH supply to diesels.18-B.and 2B-B. If in modes 5 or 6, then lockout these. diesels.                                           If.in
This procedure isolates normal ERCH supply to diesels.18-B.and 2B-B.
      -("                           modes 1,'2, 3, or 4, then station an operator to open the j                             alternate ERCH supplies if the diesels start.                                         The alternate supplies are: 1-FCV-67-65 (lB-B diesel), and 2-FCV-67-65 (28-8                                                                         1 y                      diesel).     -
If in modes 5 or 6, then lockout these. diesels.
                          ~D. For 18 supply header:                                   .
If.in
                              '1. Ensure 1-FCV-67-223 OPEN, Sup Hdr 18 to Hdr 2A (Rx MOV Bd 1A2-A)-
-("
                              - 2. Ensure 2-FCV-67-223.0 PEN, Sup Hdr 2A to H'ir 1B (Rx MOV Bd 2A2-A)
modes 1,'2, 3, or 4, then station an operator to open the j
          ~
alternate ERCH supplies if the diesels start.
The alternate supplies are:
1-FCV-67-65 (lB-B diesel), and 2-FCV-67-65 (28-8 1
diesel).
y
~D.
For 18 supply header:
'1. Ensure 1-FCV-67-223 OPEN, Sup Hdr 18 to Hdr 2A (Rx MOV Bd 1A2-A)-
- 2. Ensure 2-FCV-67-223.0 PEN, Sup Hdr 2A to H'ir 1B (Rx MOV Bd 2A2-A)
~
3.'Open 1-FCV-67-424, Sup Hdr 1B to CCS Hx A (Rx MOV Bd 1A2-A)
3.'Open 1-FCV-67-424, Sup Hdr 1B to CCS Hx A (Rx MOV Bd 1A2-A)
: 4. Close 1-FCV-67-82, Aux Bldg Hdr 1B Isol (Rx MOV Bd 182-B)                                                                               ;
: 4. Close 1-FCV-67-82, Aux Bldg Hdr 1B Isol (Rx MOV Bd 182-B)
: 5. Close.1-FCV-67-489, Hdr 1B Sup Isolation before strainer NOTE:   It will be necessary to energize ACBs to Appendix R valves.
: 5. Close.1-FCV-67-489, Hdr 1B Sup Isolation before strainer NOTE:
E. For 2A supply header:
It will be necessary to energize ACBs to Appendix R valves.
E.
For 2A supply header:
r
r
: 1. Ensure 1-FCV-67-223 OPEN, Sup Hdr IB to Hdr 2A (Rx MOV Bd 1A2-A)
: 1. Ensure 1-FCV-67-223 OPEN, Sup Hdr IB to Hdr 2A (Rx MOV Bd 1A2-A)
: 2. Ensure 2-FCV-67-223 OPEN, Sup Hdr 2A to Hdr IB (Rx MOV Bd 2A2-A)                                                                         j
: 2. Ensure 2-FCV-67-223 OPEN, Sup Hdr 2A to Hdr IB (Rx MOV Bd 2A2-A) j
          .-                  3. Open 1-FCV-67-424, Sup Hdr 18 to CCS Hx A (Rx MOV Bd 1A2-A)
: 3. Open 1-FCV-67-424, Sup Hdr 18 to CCS Hx A (Rx MOV Bd 1A2-A)
: 4. Close 2-FCV-67-81, Aux Bldg Hdr 2A Isol (Rx MOV Bd 2A2-A)                                                                               ,
: 4. Close 2-FCV-67-81, Aux Bldg Hdr 2A Isol (Rx MOV Bd 2A2-A)
: 5. Close 2-FCV-67-492, Hdr 2A Sup Isolation before strainer                                                                                 j 01588/wjs s.
: 5. Close 2-FCV-67-492, Hdr 2A Sup Isolation before strainer j
      , && =
01588/wjs s.
, && =


SQN
SQN A01-13 Page 7 Revision 10-SECTION B:. SUPPLY HEADER PIPE RUPTURE
                                                                                                ,      A01-13                                 "
' l '-
Page 7   .
PART 1:
      -                                                                                                Revision 10-
"IN YARD AREA" Page 4 of 4 IV. -SUBSEQUENT OPERATOR ACTION g(continued)
* SECTION B: . SUPPLY HEADER PIPE RUPTURE PART 1: "IN YARD AREA"
NOTE:
  ' l '-                                                                                  Page 4 of 4 IV. -SUBSEQUENT OPERATOR ACTION g(continued)
It will be necessary to energize ACBs to Appendix R valves.
NOTE:     It will be necessary to energize ACBs to Appendix R valves.
F.
F. For 28 supply header:                                                                 ,
For 28 supply header:
: 1. Open 1-FCV-67-147, Sup Hdr 1A to Hdr 2B (Rx MOV Bd 1A2-A)
: 1. Open 1-FCV-67-147, Sup Hdr 1A to Hdr 2B (Rx MOV Bd 1A2-A)
: 2. Ensure 2-FCV-67-147 OPEN, Sup Hdr 28 to Hdr 1A (Rx MOV Bd 2B2-8)
: 2. Ensure 2-FCV-67-147 OPEN, Sup Hdr 28 to Hdr 1A (Rx MOV Bd 2B2-8) 1-.
: 3. Close 2-FCV-67-82, Aux Bldg Hdr 2B Isol (Rx MOV Bd 2B2-B) 1   1-.                                                                                              .
: 3. Close 2-FCV-67-82, Aux Bldg Hdr 2B Isol (Rx MOV Bd 2B2-B) l 1
l
: 4. Close 2-FCV-67-489, Hdr 2B Sup Isolation before strainer u
: 4. Close 2-FCV-67-489, Hdr 2B Sup Isolation before strainer                                           u NOTE:     It may be necessary to reduce:ERCH loads due to loss of ERCW header.
NOTE:
G. Ensure header pressures and flows return to normal.
It may be necessary to reduce:ERCH loads due to loss of ERCW header.
H. Ensure pump loading is normal (amperes at normal expected valve).
G.
I. Refer to Technical Specification 3.7.4.1. Implement REP per IP                                       l (Engineered Safety Features) as required.
Ensure header pressures and flows return to normal.
H.
Ensure pump loading is normal (amperes at normal expected valve).
I.
Refer to Technical Specification 3.7.4.1. Implement REP per IP l (Engineered Safety Features) as required.
~
~
1 1
1 1
1 1
1 1o l
o l
l i
l i
      ~
~
0158B/wjs.                                                                                              .
0158B/wjs.
o-L           _ _ _ _ _ - _ _ _ _ _ _
o-L


SQN A01-13                                                                     ,_
SQN A01-13 Page 8 Revision 10
Page 8 Revision 10
~
            ~
SECTION B: SUPPLY HEADER PIPE RUPTURE PART 2:
SECTION B: SUPPLY HEADER PIPE RUPTURE PART 2: "IN AUX BLDG" Page 1 of 3
"IN AUX BLDG" Page 1 of 3 1.
: 1. SYMPTOMS                                                                                                                                           -
SYMPTOMS A.
        ,                                                          A. Probable Alarms f
Probable Alarms f
: 1. "ERCH HDR A(B) PRESSURE LOW" (50 psig dec.), XA-55-27A, .
1.
"ERCH HDR A(B) PRESSURE LOW" (50 psig dec.), XA-55-27A,.
Windows 15, 20, 22, 27.
Windows 15, 20, 22, 27.
: 2. "El'CW HDR 1 A-A (18-B, 2A-A, 28-B) STR DIFF PRESS HI" (25 psid inc.), XA-55-27A, Windows 2, 9, 14, 21.
2.
: 3. "TURB, AUX OR REAC BLDG FLOODED", 1-XA-55-158 Window 24.
"El'CW HDR 1 A-A (18-B, 2A-A, 28-B) STR DIFF PRESS HI" (25 psid inc.), XA-55-27A, Windows 2, 9, 14, 21.
B. Probable Indications
3.
: 1. PI-67-493A (488A) ERCH header A(B) showing low pressure.
"TURB, AUX OR REAC BLDG FLOODED", 1-XA-55-158 Window 24.
: 2. PI-67-437A (433A, 445A, 441A, 461A, 465A, 453A, 457A) on pump K-A (J-A, M-8, L-8, Q-A, R-A, N-8, P-B) supplying ruptured header showing low pressure.
B.
: 3. 1-FI-67-61(62) showing high on header 1A(IB) or 2-FI-67-61(62) on header 2A(28).
Probable Indications 1.
: 4. Visual observation of break (may be only symptom of a small break).
PI-67-493A (488A) ERCH header A(B) showing low pressure.
2.
PI-67-437A (433A, 445A, 441A, 461A, 465A, 453A, 457A) on pump K-A (J-A, M-8, L-8, Q-A, R-A, N-8, P-B) supplying ruptured header showing low pressure.
3.
1-FI-67-61(62) showing high on header 1A(IB) or 2-FI-67-61(62) on header 2A(28).
4.
Visual observation of break (may be only symptom of a small break).
II. AUTOMATIC ACTIONS None
II. AUTOMATIC ACTIONS None
                                                          ==
0158B/wjs                                                                                                                                                                                                                                                        .
4 e


SQN
==
                                                                                                                ,          AOI-13            ''
0158B/wjs 4
Page 9 Revision 10            _
e
1 SECTION B: SUPPLY HEADER PIPE RUPTURE
[~.                                                                                    PART 2: "IN AUX BLDG"=
l                                                                                          Page 2 of 3
                                      ' III. .IMMEDIATE OPERATOR' ACTION .s.
A. Dispatch personnel to determine break location.
I V .~ SUBSEQUENT OPERATOR ACTION NOTE:        It will be necessary to energize ACBs to Appendix R valves A. For.1A supply header:
: 1.      Refer to loss of equipment list A01-138.2-1, prior to l-                                              isolating.                                            ,
: 2.      Close'l-FCV-67-81 (Rx MOV Bd 1A2-A).
L                                                  3.      Ensure 1-FCV-67-147 CLOSED (Rx MOV Bd 1A2-A).
i                                  NOTE:        It will be necessary to energize ACBs to Appendix R valves B. For 18 supply header up to 1-FCV-67-424:
1.-      Refer to loss of equipment list A01-138.2-2, prior to isolating.
: 2.      Close 1-FCV-67-82 (Rx MOV Bd 1B2-B).
                        ~
r                                    3.      Ensure 1-FCV-67-424 CLOSED (Rx MOV Bd 1A2-A).
NOTE:        It will be necessary to energize ACBs to Appendix R valves C. For 1B supply header between 1-FCV-67-424 and 1-FCV-67-223:
: 1.      CCS heat exchanger A will be lost which will effect multiple systems.
: 2.      Ensure 1-FCV-67-424 CLOSED (Rx MOV Bd 1A2-A).
: 3.      Close 1-FCV-67-223 (Rx MOV Bd 1A2-A).
s, OlS8B/wjs                                                                                           .
I t                    ,
                                                                                                                                              ^~ '"


[                 '
SQN AOI-13 Page 9 Revision 10 SECTION B: SUPPLY HEADER PIPE RUPTURE
* s SQN.
[~.
                                                                                                                                                                              ,      .A01-13             "
1 PART 2:
Page'10 Revision 10
"IN AUX BLDG"=
                                                                                  -SECTION B: SUPPLY HEADER PIPE RUPTURE
l Page 2 of 3
          ~
' III..IMMEDIATE OPERATOR' ACTION.s.
PART 2: "IN AUX BLDG" Page 3 of 3' IV. SUBSEQUENT OPERATOR ACTION ,,(continued)
A.
  ,                                      NOTE:                             It will be necessary to energize ACBs to Appendix R valves D. For 2A supply header:                                                                                                                                   ~
Dispatch personnel to determine break location.
                                            ,1.                           Refer to loss of equipment list AOI-13B.2-3, prior to                                                             ~
I V.~ SUBSEQUENT OPERATOR ACTION NOTE:
l isolating.
It will be necessary to energize ACBs to Appendix R valves A.
: 2.                            Close 2-FCV-67-81 (Rx HOV Bd 2A2-A).
For.1A supply header:
: 3.                           Close 2-FCV-67-223 (Rx MOV Bd 2,A2-A).
l-1.
                                            .4. .Open.1-FCV-67-424 (Rx MOV Bd 1A2-A).
Refer to loss of equipment list A01-138.2-1, prior to isolating.
E. For:28 supply header:
2.
1.,                           Refer to~ loss of equipment list AOI-13B.2-4, prior to
Close'l-FCV-67-81 (Rx MOV Bd 1A2-A).
,"                                    ~
3.
isolating.
Ensure 1-FCV-67-147 CLOSED (Rx MOV Bd 1A2-A).
L, J                                           2.                           Close 2-FCV-67-82 (Rx H0V Bd 2B2-B).
L i
: 3.                           Close 2-FCV-67-147 (Rx MOV Bd 2B2-B).
NOTE:
1 j                                      4.                           Open 1-FCV-67-147 (Rx H0V Bd 1A2-A).
It will be necessary to energize ACBs to Appendix R valves B.
F. Implement REP per IP-1 (Engineered Safety Features) as required.
For 18 supply header up to 1-FCV-67-424:
G. Determine cause of line failure through corrective maintenance performed.
1.- Refer to loss of equipment list A01-138.2-2, prior to isolating.
H. Possible unit shutdown due to loss of cooling to reactor coolant-                                                                                                   !
2.
pump motor coolers and/or loss of coolant to containment rod drive vent coolers, depending on ambient temperature in containment.
Close 1-FCV-67-82 (Rx MOV Bd 1B2-B).
                                  ~
~
I. In the event of a change in the rated thermal power level-exceeding 15% in one hour, notify the chem lab to initiate the conditional portions of SI-407.2, and SI-415 due to the thermal power change.
3.
01588/wjs                                                                                                                                                               ,
Ensure 1-FCV-67-424 CLOSED (Rx MOV Bd 1A2-A).
i 4-
r NOTE:
_______2____                 _ _ _ - _ _ _ _ _ _ _ - _ .
It will be necessary to energize ACBs to Appendix R valves C.
For 1B supply header between 1-FCV-67-424 and 1-FCV-67-223:
1.
CCS heat exchanger A will be lost which will effect multiple systems.
2.
Ensure 1-FCV-67-424 CLOSED (Rx MOV Bd 1A2-A).
3.
Close 1-FCV-67-223 (Rx MOV Bd 1A2-A).
s, OlS8B/wjs I
t
^~ '"
 
[
s SQN.
.A01-13 Page'10 Revision 10
-SECTION B: SUPPLY HEADER PIPE RUPTURE
~
PART 2:
"IN AUX BLDG" Page 3 of 3' IV. SUBSEQUENT OPERATOR ACTION,,(continued)
NOTE:
It will be necessary to energize ACBs to Appendix R valves D.
For 2A supply header:
~
,1.
Refer to loss of equipment list AOI-13B.2-3, prior to isolating.
~
l 2.
Close 2-FCV-67-81 (Rx HOV Bd 2A2-A).
3.
Close 2-FCV-67-223 (Rx MOV Bd 2,A2-A).
.4.
.Open.1-FCV-67-424 (Rx MOV Bd 1A2-A).
E.
For:28 supply header:
1.,
Refer to~ loss of equipment list AOI-13B.2-4, prior to isolating.
L,
~
J 2.
Close 2-FCV-67-82 (Rx H0V Bd 2B2-B).
3.
Close 2-FCV-67-147 (Rx MOV Bd 2B2-B).
1 4.
Open 1-FCV-67-147 (Rx H0V Bd 1A2-A).
j F.
Implement REP per IP-1 (Engineered Safety Features) as required.
G.
Determine cause of line failure through corrective maintenance performed.
H.
Possible unit shutdown due to loss of cooling to reactor coolant-pump motor coolers and/or loss of coolant to containment rod drive vent coolers, depending on ambient temperature in containment.
~
I.
In the event of a change in the rated thermal power level-exceeding 15% in one hour, notify the chem lab to initiate the conditional portions of SI-407.2, and SI-415 due to the thermal power change.
01588/wjs i
4-
_______2____


        ~
~
SQN A01-13               ~
SQN A01-13
Page 11
~
        ~                                                                                                              Revision 10               )
Page 11 Revision 10
                                                                                                                                                .. j LOSS OF EQUIPMENT LIST A01-138.2-1 (HEADER 1A) i f                                1.
)
~
j LOSS OF EQUIPMENT LIST A01-138.2-1 (HEADER 1A) f i
1.
Turbine-driven auxiliary feedwater pump 1 A-S"'
Turbine-driven auxiliary feedwater pump 1 A-S"'
: 2.                         -Lower containment vent coolprs 1A and IC'**
2.
: 3.                         Instrument room water cooler 1A'**
-Lower containment vent coolprs 1A and IC'**
: 4.                           Upper containment vent coolers 1A and 1C'''
3.
: 5.                           Containment spray heat' exchanger 1A'''
Instrument room water cooler 1A'**
: 6.                           Emergency makeup'to CCS surge tank A")
4.
i 7.*                         Soace and room cooling equipment 1A and station-service air l' f.                                                              compressor''' (supply available from 18).. ,
Upper containment vent coolers 1A and 1C'''
K                             8.                           ERCW supply to motor-driven auxiliar l                                                                  return header A is out of service."y feedwater
5.
                                                                                                            '          pump 1A only if ERCW 9..                         Shutdown board room air-conditioning water chiller A")
Containment spray heat' exchanger 1A'''
: 10.                                   Control rod drive vent coolers 1A and IC")
6.
: 11.                                   Reactor coolant pump motor coolers 1 and 3"'
Emergency makeup'to CCS surge tank A")
12.-                                 Back'up' to header 2B"'
f.
13.*                                   Aux. control air compressor A"'
i 7.*
: 14. -                                 Electric board room A/C condenser A")
Soace and room cooling equipment 1A and station-service air compressor''' (supply available from 18)..
: 15.                                   Main control room A/C condenser A")
l' K
16.*                                   Centrifugal charging pump oil cooler 1A"'
8.
17.*                                   Safety injection pump oil cooler 1 A")
return header A is out of service."y feedwater pump 1A only if ERCW ERCW supply to motor-driven auxiliar l
                            * ''' NOTE: Damage is imminent unless equipment is stopped.
9..
                                                " ) NOTE : Redundant counterpart must be operating to prevent equipment damage.
Shutdown board room air-conditioning water chiller A")
                                                " 'NOT E :                   ERCW not normally required.
10.
Control rod drive vent coolers 1A and IC")
11.
Reactor coolant pump motor coolers 1 and 3"'
12.-
Back'up' to header 2B"'
13.*
Aux. control air compressor A"'
: 14. -
Electric board room A/C condenser A")
15.
Main control room A/C condenser A")
16.*
Centrifugal charging pump oil cooler 1A"'
17.*
Safety injection pump oil cooler 1 A")
* ''' NOTE: Damage is imminent unless equipment is stopped.
" ) NOTE : Redundant counterpart must be operating to prevent equipment damage.
" 'NOT E :
ERCW not normally required.
01588/wjs
01588/wjs


l E        .          ._                                          ,
E l
4 SQN
4 SQN A01-13 Page 12 Revision 10 LOSS OF-EQUIPMENT LIST AOI-138.2-2 (HEADER 18) 1 1.
                                                                                                                      ,                          A01-13                                         ''
Turbine-driven auxiliary feedwater pump 1 A-S")
Page 12
h 2.
                  .                                                                                                                              Revision 10 LOSS OF-EQUIPMENT LIST AOI-138.2-2 (HEADER 18) 1
Lower containment vent cooless 18 and 1D'''
: 1. Turbine-driven auxiliary feedwater pump 1 A-S")
: 3.. Instrument room water cooler IB'''
: 2. Lower containment vent cooless 18 and 1D'''
4.
h
Upper containment vent coolers 18 and ID(*'
: 3. . Instrument room water cooler IB'''
5.
: 4. Upper containment vent coolers 18 and ID(*'                                                                           ,
Containment spray heat exchanger 1B'*'
: 5. Containment spray heat exchanger 1B'*'
6.
: 6. Emergency makeup to CCS surge tanh A'*)
Emergency makeup to CCS surge tanh A'*)
: 7. ERCW supply to motor-driven auxiliary feedwater pump 1B, only if ERCH
- l-7.
      - l-                            return header B is out of service.'''                                           ,
ERCW supply to motor-driven auxiliary feedwater pump 1B, only if ERCH return header B is out of service.'''
      -(                       8.* Space and room cooling equipment IB and station-service air il                                compressor''' (supply available from 1A).
- (
: 9. Control-rod drive vent coolers 18 and 1D"'
8.* Space and room cooling equipment IB and station-service air i l compressor''' (supply available from 1A).
                                                                ~
9.
Control-rod drive vent coolers 18 and 1D"'
10.. Reactor coolant pump motor coolers 2 and 4'*)
10.. Reactor coolant pump motor coolers 2 and 4'*)
: 11. Backup to header 2A")                                                           -
~
: 11. Backup to header 2A")
: 12. Electric board room A/C cosidenser B"'
: 12. Electric board room A/C cosidenser B"'
: 13. Main control room A/C condenser B"'
: 13. Main control room A/C condenser B"'
Line 331: Line 464:
15
15
* Safety injection pump oil cooler IB(')
* Safety injection pump oil cooler IB(')
                              * ''' NOTE: Damage is imminent unless equipment is stopped.
* ''' NOTE: Damage is imminent unless equipment is stopped.
                                  " ' NOTE : Redundant counterpart must be operating to prevent equipment damage.
" ' NOTE : Redundant counterpart must be operating to prevent equipment damage.
                                  " ) NOTE : Multiple systems are affected if lost.
" ) NOTE : Multiple systems are affected if lost.
                                  " 'NOT E : ERCH not normally required.
" 'NOT E :
    - l.
ERCH not normally required.
    .i 0158B/wjs                                                                                                                                           .
- l.
I
. i 0158B/wjs I
______._.m               __      _
______._.m


SQN
SQN AOI-13 Page 13 Revision 10 LOSS OF EQUIPMENT LIST A01-138.2-3 (HEADER 2A) r
                                                                  ,                                AOI-13                                                     "
.I r/
Page 13
    . ..                                                                                            Revision 10 LOSS OF EQUIPMENT LIST A01-138.2-3 (HEADER 2A)                                                               r r/
      .I
: 1. ' Turbine-driven auxiliary feedwater pump 2A-S'''
: 1. ' Turbine-driven auxiliary feedwater pump 2A-S'''
: 2. Lower containment vent coolers 2A and 2C'*)'
2.
            ,    3. Instrument room cooler 2A'*)
Lower containment vent coolers 2A and 2C'*)'
: 4. Upper containment vent coolers 2A and 2C'**                                                                               ,
3.
: 5. Containment spray heat exchanger 2A")
Instrument room cooler 2A'*)
: 6. Emergency system to CCS surge: tank       B'''
4.
Upper containment vent coolers 2A and 2C'**
5.
Containment spray heat exchanger 2A")
6.
Emergency system to CCS surge: tank B'''
h
: 7. ~ Space and room cooling e'quipment 2A'*)
: 7. ~ Space and room cooling e'quipment 2A'*)
h                                                                          ~
~
: 8. ERCH supply to motor-driven auxiliary feedwater pump 2A, only if ERCH
8.
                        . return header A is out of service.'"
ERCH supply to motor-driven auxiliary feedwater pump 2A, only if ERCH
: 9. CCS heat exchanger A' & B"'
. return header A is out of service.'"
9.
CCS heat exchanger A' & B"'
: 10. Backup to header 1B")
: 10. Backup to header 1B")
: 11. Control rod drive bent coolers 2A and 2C'*)
: 11. Control rod drive bent coolers 2A and 2C'*)
Line 361: Line 499:
13.* Centrifugal charging pump oil cooler 2A'''
13.* Centrifugal charging pump oil cooler 2A'''
14.* Safety injection pump oil cooler 2A'''
14.* Safety injection pump oil cooler 2A'''
                * ''' NOTE: Damage is imminent unless equipment is stopped.
* ''' NOTE: Damage is imminent unless equipment is stopped.
                    '*) NOTE: Redundant counterpart must be operating to prevent equipment damage.
'*) NOTE:
                    " 'NOT E: Multiple systems are affected if lost.
Redundant counterpart must be operating to prevent equipment damage.
                    ") NOTE:         ERCH not normally required.
" 'NOT E: Multiple systems are affected if lost.
0158B/wjs                                                                                                                                                     !
") NOTE:
                                                                                                                                                              . .% %  .ne.
ERCH not normally required.
0158B/wjs
.ne.


p                     ,
p SQN A01-13 Page-14 Revision 10 LOSS OF EQUIPMENT LIST A0I-138.2-4 (HEADER 28) 1.
SQN A01-13                 "
Turbine-driven auxiliary feedwater pump 2A-S(*)
Page-14 Revision 10             .
2.' Lower containment vent cooleys 28 and 2D
LOSS OF EQUIPMENT LIST A0I-138.2-4 (HEADER 28)
(*)
: 1.                                   Turbine-driven auxiliary feedwater pump 2A-S(*)
i 3.
2 .' Lower containment vent cooleys 28 and 2D                                                                                         (*)
Upper containment vent coolers 28 and 2Dcr>
i             ,
4.
: 3.                                     Upper containment vent coolers 28 and 2Dcr>
Containment spray heat exchanger 2B(*)
: 4.                                     Containment spray heat exchanger 2B(*)                                                                               -
l l.
l l.                                   5.                                     CCS surge tank B emergency supply (''
5.
l               ',
CCS surge tank B emergency supply (''
: 6.                                     Space and room cooling equipment 2B(*)
l 6.
: 7.                                     ERCW supply to motor-driven auxiliary feedwater pump 28 only if ERCH Lf.                                                                                                    .
Space and room cooling equipment 2B(*)
return header 8 out of service.(*)                                                       .
Lf.
'F                                     8.                                     Shutdown board room air-conditioning water chiller B(*'                                                             ;
7.
s t'
ERCW supply to motor-driven auxiliary feedwater pump 28 only if ERCH return header 8 out of service.(*)
: 9.                                   CCS heat exchanger C")                                                                                   s
'F 8.
              -1             10. Backup to header 1A(*)                                                                                                                                         g
Shutdown board room air-conditioning water chiller B(*'
t' s
9.
CCS heat exchanger C")
s
-1
: 10. Backup to header 1A(*)
g
: 11. Control rod drive vent coolors 28 and 2D")
: 11. Control rod drive vent coolors 28 and 2D")
I               12. Reactor coolant pump motor coolers 2 and                                                                                                     4'''
I
: 12. Reactor coolant pump motor coolers 2 and 4'''
13.* Centrifugal charging pump oil cooler 28")
13.* Centrifugal charging pump oil cooler 28")
14.* Safety injection pump ob cooler 2B")
14.* Safety injection pump ob cooler 2B")
Line 393: Line 541:
: 16. Instrument room wate'r cooler 2B(*)
: 16. Instrument room wate'r cooler 2B(*)
n
n
                            * ''' NOTE: Damage is imminen't ur,less equipment is stopped.
* ''' NOTE: Damage is imminen't ur,less equipment is stopped.
_(*) NOTE: Redundant counterpart must be operating to prevent equipment damage.                     3 4
_(*) NOTE:
                                                "' NOTE: Multiple systems are affected if lost.
Redundant counterpart must be operating to prevent equipment damage.
4 3
"' NOTE: Multiple systems are affected if lost.
(*' NOTE:
(*' NOTE:
ERCW not normally\ required,                                                   s 0158B/wjs s                       -
ERCW not normally\\ required, s
0158B/wjs s
e
e
                                                                                                                                                                                                              . ant
. ant


r-_          _    _ .. __-_                                              _      .      . _ _ _  __ _ _ _ _ _ _ _      _ _ _ - _ - - _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ - - _ _ - _ _ - _ _ _ _ _ - _ - _ _ _ _ _ _ _
r-_
  ~             ,                                ,
~
t SQN
t SQN A01-13 Page 15 Revision 10-SECTION B:
                                                                                                                      ,                                A01-13                                                               ,,
SUPPLY HEADER PIPE RUPTURE PART 3:
Page 15
"IN ERCH PUMPING STATION" Page 1 of 3 I.
      .                                                                                                                                                Revision 10-SECTION B:         SUPPLY HEADER PIPE RUPTURE PART 3:       "IN ERCH PUMPING STATION" Page 1 of 3 I.                               SYMPTOMS                               s A. Probable Alarms
SYMPTOMS s
        .                                                          1.   "ERCH HDR A(B) PRESS LOW" (50 psig dec.), XA-55-27A, Windows 16, 28, 23, 35.                                                                                                                             -
A.
: 2.   "ERCH SUPPLY HDR A(B) LOW" (12,000 gpm dec.), XA-55-27A, Windows 15, 20, 22, 27.
Probable Alarms 1.
3 .' "ERCW PUMP K (3, M, L, Q, R, N, P) DISCH PRESS LOH" (65 psig h                                                                      dec.), XA-55-27A, Windows 24, 17, 4, 31, 25, 32, 11, 18.                                                                                             - *
"ERCH HDR A(B) PRESS LOW" (50 psig dec.), XA-55-27A, Windows 16, 28, 23, 35.
: 4. ERCH DECK SUMP LEVEL HI", XA-55-158, Window 3.
2.
: 5. MECH EQUIP SUMP ERCH PMP STAT LVL HI, XA-55-15A, Window 13.
"ERCH SUPPLY HDR A(B) LOW" (12,000 gpm dec.), XA-55-27A, Windows 15, 20, 22, 27.
B. Probable Indications
h 3.' "ERCW PUMP K (3, M, L, Q, R, N, P) DISCH PRESS LOH" (65 psig dec.), XA-55-27A, Windows 24, 17, 4, 31, 25, 32, 11, 18.
: 1. PI-67-493A'(488A) ERCH header A(B) showing low pressure.
4.
: 2. PI-67-437A (433A, 445A, 441 A, 461 A, 465A, 453A, 457A) on purap
ERCH DECK SUMP LEVEL HI", XA-55-158, Window 3.
                                                                          'K-A (J-A, M-8, C-B, Q-A, R-A, N-8, P-B) supplying ruptured header showing low pressure.
5.
: 3. 1-FI-67-61(62) showing low flow on header 1.A(18) and on 2-FI-61(62) for header 2A(28).
MECH EQUIP SUMP ERCH PMP STAT LVL HI, XA-55-15A, Window 13.
B.
Probable Indications 1.
PI-67-493A'(488A) ERCH header A(B) showing low pressure.
2.
PI-67-437A (433A, 445A, 441 A, 461 A, 465A, 453A, 457A) on purap
'K-A (J-A, M-8, C-B, Q-A, R-A, N-8, P-B) supplying ruptured header showing low pressure.
3.
1-FI-67-61(62) showing low flow on header 1.A(18) and on 2-FI-61(62) for header 2A(28).
II. AUTOMATIC ACTION None I*
II. AUTOMATIC ACTION None I*
l 1
l 1
0158B/wjs                                                                                                                                                                                     .
0158B/wjs L
L                                                                                                                                                                                             .
a
a                             _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _


I SQN AOI-13               ,
I SQN AOI-13 Page 16 Revision 10 SECTION B:
Page 16 Revision 10 SECTION B:   SUPPLY HEADER PIPE RUPTURE PART 3: "IN ERCH PUMPING STATION" f                                                   Page 2 of 3 III. IMMEDIATE OPERATOR ACTION                                                       l A. Dispatch personnel to determine break location.
SUPPLY HEADER PIPE RUPTURE PART 3:
IV. SUBCEQUENT OPERATOR ACTION                                                       1 CAUTION:     Follow this instruction only if rupture is on main header between pumps and first isolation valve upstream of strainers.
"IN ERCH PUMPING STATION" f
A. Begin reducing non-essential loads ,     .
Page 2 of 3 III. IMMEDIATE OPERATOR ACTION l
NOTE:   It will be necessary to energize ACBs to Appendix R valves.
A.
B. IF supply header "A" is ruptured, THEN:
Dispatch personnel to determine break location.
: l. Trip and ?ockout pumps K-A, 0-A, R-A, and Q-A.
IV. SUBCEQUENT OPERATOR ACTION 1
: 2. Close 1-FCV-67-492 and 2-FCV-67-492.
CAUTION:
: 3. Open 1-FCV-67-147 (Rx MOV Bd 1A2-A) and 1-FCV-67-424 (Rx MOV Bd E
Follow this instruction only if rupture is on main header between pumps and first isolation valve upstream of strainers.
1A2-A).
A.
: 4. Ensure 1-FCV-67-223 (Rx MOV Bd 1 A2-A) and 2-FCV-67-223 (Rx MOV Bd 2A2-A) and 2-FCV-67-147 (Rx HOV Bd 282-B) - OPEN
Begin reducing non-essential loads,
: 5. Run pumps M-B, L-B, P-B and N-B 0158b/wjs
NOTE:
It will be necessary to energize ACBs to Appendix R valves.
B.
IF supply header "A" is ruptured, THEN:
l.
Trip and ?ockout pumps K-A, 0-A, R-A, and Q-A.
2.
Close 1-FCV-67-492 and 2-FCV-67-492.
3.
Open 1-FCV-67-147 (Rx MOV Bd 1A2-A) and 1-FCV-67-424 (Rx MOV Bd 1A2-A).
E 4.
Ensure 1-FCV-67-223 (Rx MOV Bd 1 A2-A) and 2-FCV-67-223 (Rx MOV Bd 2A2-A) and 2-FCV-67-147 (Rx HOV Bd 282-B) - OPEN 5.
Run pumps M-B, L-B, P-B and N-B 0158b/wjs
.._m....
.._m....


SQN
SQN A01-13 Page 17 Revision 10
                                                                                                                                              ,            A01-13         ,,
.SECTION B:
Page 17 Revision 10
SUPPLY HEADER PIPE RUPTURE
                              -                                                                              .SECTION B: SUPPLY HEADER PIPE RUPTURE
[
[                                                                                                             PART 3: "IN ERCW PUMPING STATION" Page 3 of 3
PART 3: "IN ERCW PUMPING STATION"
    . t ..
. t..
                                                                                      .C.     ,I_F supply header "B" is , ruptured, THEN*
Page 3 of 3
: 1. Trip and lockout pumps M-B, L-B, P-8, and N-B'
.C.
: 2. Close 1-FCV-67-489 and 2-FCV-67-489
,I_F supply header "B" is, ruptured, THEN*
: 3. Open 1-FCV-67-147 (Rx MOV Bd 1A2-A) and 1-FCV-67-424 (Rx MOV' Bd 1A2-A)
1.
: 4. Ensure 1-FCV-67-223 (Rx MOV Bd 1A2-A) and 2-FCV-67-223 (Rx MOV Bd'lA2-A) and 2-FCV-67-147 (Rx MOV Bd 2H2-B) - OPEN
Trip and lockout pumps M-B, L-B, P-8, and N-B' 2.
: f.                                                                                                                                      .
Close 1-FCV-67-489 and 2-FCV-67-489 3.
: 5. Run pumps K-A, Q-A, J-A, and R-A
Open 1-FCV-67-147 (Rx MOV Bd 1A2-A) and 1-FCV-67-424 (Rx MOV' Bd 1A2-A) 4.
                                                                                    - 0.       Ensure inservice header pressures return to normal.
Ensure 1-FCV-67-223 (Rx MOV Bd 1A2-A) and 2-FCV-67-223 (Rx MOV f.
l                                                                                         E. Ensure pump ~1oading on inservice header is normal.
Bd'lA2-A) and 2-FCV-67-147 (Rx MOV Bd 2H2-B) - OPEN 5.
                    ~
Run pumps K-A, Q-A, J-A, and R-A
l l                                                                                         F. Have pipe rupture repaired.
- 0.
i-P. Implement _ REP per IP-1 (Engineered Safety Features) and TS 3.7.4.1 as required.
Ensure inservice header pressures return to normal.
l
~
E.
Ensure pump ~1oading on inservice header is normal.
l l
F.
Have pipe rupture repaired.
i-P.
Implement _ REP per IP-1 (Engineered Safety Features) and TS 3.7.4.1 as required.
l
l
                                                                                                                                                                                  )
)
                                                                                                                                                                                  )
)
l-L' 0158B/wjs h_                               ___m.m__-___----- - - - - - - - - - - _ _ _ _ _ - _ _                  - _ - - - _ - - _
l-L' 0158B/wjs h_
___m.m__-___----- - - - - - - - - - - _ _ _ _ _ - _ _


                    ~
~
L                         .
L f'-
SQN A0I-13 f'-                                                              ,
SQN A0I-13 jJ Page 18 Revision 10 SECTION C: DISCHARGE HEADER PIPE RUPTURE PART 1: "IN YARD AREA"'
Page 18 jJ Revision 10 SECTION C: DISCHARGE HEADER PIPE RUPTURE
.f._
        .f._                                                      PART 1: "IN YARD AREA"'
Page 1 of 1 l7 f
l7                                                        Page 1 of 1 f               _I.     SYMPTOMS                       s
_I.
                                      .A. Probable' Indications
SYMPTOMS s
: 1. Bad wash in yard area near leak                                                                                                                       ,
.A.
                              .II. AUTOMATIC ACTION None
Probable' Indications
        'I-                   III. IMMEDIATE OPERATOR ACTION
: 1. Bad wash in yard area near leak
[                                                                       '
.II.
                                      .A.. Dispatch personnel to determine brdak location IV. SUBSE0UENT OPERATOR ACTION A. Because of loss of A or B train on both units, plant loading and condition will be used to decide steps to take to initiate maintenance.
AUTOMATIC ACTION None
B. Implement REP per IP-1 (Engineered Safety Features) and refer to TS 3.7.4.1 as required.
'I-III. IMMEDIATE OPERATOR ACTION
01583/wjs                                                                                                                                                                 .
[
4
.A..
    - , - - - - - - .                                          --                  2 .  - - - - _ - - - _ _ _ _ . - - - - _ _ - - . - _ - - . _ - - - _ _ - . - - _ _ _ _ _ . - _ _ - _ - . _ _ -              -
Dispatch personnel to determine brdak location IV. SUBSE0UENT OPERATOR ACTION A.
Because of loss of A or B train on both units, plant loading and condition will be used to decide steps to take to initiate maintenance.
B.
Implement REP per IP-1 (Engineered Safety Features) and refer to TS 3.7.4.1 as required.
01583/wjs 4
2


4 .
4.
4 SON
4 SON ACI-13
                                                                                                                              ,                                                      ACI-13       ~~
~~
Page 19 Revision 10
Page 19 Revision 10
                                                                                                                                                                                                      .s SECTION C: DISCHARGE HEADER PIPE RUPTURE PART 2: "IN AUX BLDG" f:-                                                                                                                 Page 1 of 2 I.       SYMPTOMS                                         ,
.s SECTION C: DISCHARGE HEADER PIPE RUPTURE PART 2:
A. Probable Alarms
"IN AUX BLDG" f:-
: 1. "TURB, AUX OR REAC BLDG FLOODED", 1-XA-55-158, Hindow 24 ,
Page 1 of 2 I.
SYMPTOMS A.
Probable Alarms
: 1. "TURB, AUX OR REAC BLDG FLOODED", 1-XA-55-158, Hindow 24,
II. AUTOMATIC ACTION None
II. AUTOMATIC ACTION None
                                                ' III. IMMEDIATE OPERATOR ACTION
' III. IMMEDIATE OPERATOR ACTION
                                                                                                                                                                    ~
~
                                                                'A. Dispatch personnel to determine break location IV.     SUBSEQUENT OPERATOR ACTION NOTE:     It will be necessary to energize ACDs to Appendix R valves A. Isolate affected train by closing 1-FCV-67-81 (Rx MOV Bd 1A2-A) and 2-FCV-67-81 (Rx MOV Bd 2A2-A) for A header or 1-FCV-67-82 (Rx MOV Bd IB2-B),and 2-FCV-67-82 (Rx M0V.Bd 282-B) for B header.
'A.
B. Ensure FCV-67-151 (Rx MOV Bd 1A2-A) closed and close 2-FCV-67-146
Dispatch personnel to determine break location IV.
    !                                                                  for A header ruptured. Close FCV-67-152 and 1-FCV-67-146 for B
SUBSEQUENT OPERATOR ACTION NOTE:
(                                                                 header ruptured.
It will be necessary to energize ACDs to Appendix R valves A.
C. After determining which headar is ruptured and isolated, refer to
Isolate affected train by closing 1-FCV-67-81 (Rx MOV Bd 1A2-A) and 2-FCV-67-81 (Rx MOV Bd 2A2-A) for A header or 1-FCV-67-82 (Rx MOV Bd IB2-B),and 2-FCV-67-82 (Rx M0V.Bd 282-B) for B header.
                                                                      " Loss of Equipment List" AOI-138.2-1 for header IA
B.
                                                                    ~
Ensure FCV-67-151 (Rx MOV Bd 1A2-A) closed and close 2-FCV-67-146 for A header ruptured. Close FCV-67-152 and 1-FCV-67-146 for B
(
header ruptured.
C.
After determining which headar is ruptured and isolated, refer to
" Loss of Equipment List" AOI-138.2-1 for header IA
~
AOI-138.2-2 for header 1B A01-138.2-3 for header 2A A01-138.2-4 for header 28.
AOI-138.2-2 for header 1B A01-138.2-3 for header 2A A01-138.2-4 for header 28.
0158B/wjs 0
0158B/wjs 0
                    . - _ - - - _ _ _ _ _ _ _ . _ _ . _ _ _ - -                ~ . _ , . . _
~. _,.. _


SQN AOI-13                 '
SQN AOI-13 Page 20 Revision 10 SECTION C: DISCHARGE HEADER PIPE RUPTURE F
Page 20 Revision 10 SECTION C: DISCHARGE HEADER PIPE RUPTURE F                                             PART 2: "IN AUX BLOG" l                                                   Page 2 of 2 D. Have repairs initiated ,immediately.
PART 2:
f E. In the event of a change in the rated thermal power level
"IN AUX BLOG" l
[                         exceeding 157. in one hour, notify the chem lab to initiate the I                         conditional portions of SI-407.2 and SI-415 due to the thermal*
Page 2 of 2 f
power change.
D.
F. Refer to TS 3.7.4.1 and implement REP per IP-1 (Engineered Safety Features) as required.
Have repairs initiated,immediately.
E.
In the event of a change in the rated thermal power level
[
exceeding 157. in one hour, notify the chem lab to initiate the I
conditional portions of SI-407.2 and SI-415 due to the thermal power change.
F.
Refer to TS 3.7.4.1 and implement REP per IP-1 (Engineered Safety Features) as required.
I 0158B/wjs
I 0158B/wjs
                                                                                                * *J}}
*J}}

Latest revision as of 07:19, 2 December 2024

Rev 10 to Abnormal Operating Instruction AOI-13, Loss of Ercw
ML20237H257
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/23/1987
From: Jacqwan Walker, George Wilson
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20237H133 List: ... further results
References
AOI-13, NUDOCS 8708170120
Download: ML20237H257 (22)


Text

..__ -

-.h' k

e i

TENNESSEE VALLEY AUTHDRITY 1

)

L.

SEQUOYAH NUCLEAR PLANT 1

L l

ABNORMAL OPERATING INSTRUCTION A01-13 1

r LOSS OF ESSENTIAL RAW COOLING. WATER Units 1 and 2 Revision 10 PREPARED BY:

George Wilson RESPONSIBLE SECTION: Operations REVISED BY:

Gary L. Terpstra

.h.i A f-SUBMITTED BY:

v1 p SupervisoF "

~

~

PORC Review:

lPR 231987 i

ate APPROVED BY:

' ' Plant Manager TsiY3IS87 i

DATE APPROVED:

Reason fo'r revision (include all Instruction Change Form Nos.):

Revised to reduce immediate operator actions; combine pump trip /

casing failure sections; delete loss of all ERCW pumps and operating requirements for various plant site conditions j

sections; and add Appendix R valye information.

The last page of this instruction is Number:

20 u.

8708170120 B70811

' '-i PDR ADOCK 05000327 P

PDR

. w...

J L

i SEQUOYAH NUCLEAR PLANT

.]

PLANT INSTRUCTION REVISION LOG 1

~

A8 NORMAL OPERATING INSTRUCTION ~

A0I-13 i

REVISION Date Pages REASON FOR REVISION (INCLUDE COMMIT-LEVEL Approved Affected MENTS'AND ALL ICF FORM NUMBERS)

/

2 08/27/79

~All Added 18A 7-2,4,6-16, l

3 09/11/80 18 4

10/14/80 All 5

07/13/81 All 1, added 6

08/18/81 22,23 7

02/16/82 23 F

8 03/30/83 18 Deleted 9

09/21/84 22,23 Revised to reduce i'mmediate operator actions; combine pump trip /

casing. failure sections; delete. loss of all ERCW pumps and operating re;; ire-I I

ments for various plant site conditions sections; and add Appendix R valve:

10 APR 2 31980' All information.

4 L

~

1262C/ldw i

9

...! r ed

SQN AOI-13 Page 1

~

Revision 10

(

~.

LOSS OF ESSENTIAL RAW COOLING HATER Page 1 of 1 I.

PURPOSE The purpose of this instruction is to provide operator actions for the following events:

1.

Section A:

Running Pump Trip or Casing Failure 2.

Section B:

Supply Header Pipe Rupture

~

a) Part 1:

In Yard Area b) Part 2:

In Auxiliary Building c) Part 3:

In ERCH Pumping Station ~

3.

Section C:

Discharge Header Pipe Rupture a) Part 1:

In Yard Area I

b) Part 2:

In Auxiliary Building l

was.

OlS88/wjs bm, l'

hM

o SQN AOI-13 Page 2 Revision 10 SECTION A: RUNNING PUMP TRIP OR CASING FAILURE Page 1 of 2 I.

SYMPTOMS A.

Possible Alarms:

l 1.

"ERCW SUPPLY HDR A LOW" (12,000 gpm dec), XA-55-27A, Windows 1

15 and/or 20.

2.

"ERCW SUPPLY HOR B LOW" (12,000 gpm dec), XA-55-27A, Windows 22 and/or 27.

3.

"ERCH HDR A PRESSURE LOW" (50 psig dec), XA-55-27A, Windows 16 and/or 28.

4.

"ERCH HDR 8 PRESSURE LOW" (50 psig' dec), XA-55-27A, Windows 23 and/or 35.

5.

"ERCH PUMP K (J, L, M, N, P, Q, R) DISCH PRESS LOW",

XA-55-27A, Windows 24, 17, 4, 31, 25, 32, 11, 18 6.

" MOTOR TRIPOUT" XA-55-278-A, Window 32 7.

" MOTOR OVERLOAD" XA-55-278-A, Window 25 B.

Possible Indications l

1.

PI-67-493A (488A) ERCH header A(B) showing low pressure 2.

Disagreement light on relative to tripped pump 3.

PI-67-437A (433A, 445A, 441A, 461A, 465A, 453A, 457A) on pump K-A (J-A, M-8, L-B, Q-A, R-A, N-B, P-B) tripped showing low pressure.

4.

FI-67-61 or FI-67-62 showing low flow on header A or header B II. AUTOMATIC ACTIONS None 0158B/wjs E

. aJ e eE

n;'

r 4 -

SQN A01-13

-Page 3 Revision 10 a

SECTION A: RUNNING PUMP TRIP OR CASING FAILURE Page 2 of 2 i

III.

IMMEDIATE OPERATOR ACTION StartredundantERCHpuNp.

A.

IV. SUBSEQUENT OPERATOR ACTION A.

Ensure header pressures and flows return to' normal.

t B.

Ensure pump; loading is normal (amperesLat normal expected valve).

C.

Determine cause of pump trip and have corrective maintenance

. l-performed.

D.

Ensure that the remaining OPERABLE pumps are aligned for automatic loading on emergency power.

E.

Refer to TS 3.7.4.1.

Implement REP per IP-1 (Engineered Safety features) as required.

' GD l

01588/wj s

/

. -. - -.. - _ - _ - _ - - _ - _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _. ~... _.. _. _.

-SQN A0I-13 Page 4 Revision'10 SECTION B:. SUPPLY HEADER PIPE RUPTURE

~

PART 1:

"IN YARD AREA" Page 1 of 4

'I.

SYMPTOMS A.

Probable Alarms h.

1.

"ERCH SUPPLY HDR A(B) LOW" (12,000 gpm dec.), XA-55-27A,,

Windows 15, 20, 22, 27.

- 2.

"ERCH HDR A(B) PRESSURE LOW" (50 psig dec.), XA-55-27A, Windows 16, 28, 23,-35.

3.

"ERCW HDR 1A-A (18-8, 2A-A, 28-B) STR DIFF PRESS HI" (25 psid inc.), XA-55-27A, Windows 2, 9, 14., 21.

8.

Probaule Indications q

l' PI-67-493A (488A) ERCH header A(B) showing low pressure 2.

PI-67-437A (433A, 445A, 441A, 461A, 465A, 453A, 457A) on pump K-A (J-A, M-8, L-8, Q-A, R-A, N-8, P-B) supplying ruptured header showing low pressure 3.

FI-67-61(62) showing low flow on header A(B) that is ruptured.

4.

Visual observation of washed-out area around break (may be j

only symptom of a small break).

II. AUTOMATIC ACTIONS None III.

IMMEDIATE OPERATOR ACTION A.

Dispatch personnel to determine break location.

IV. SUBSEQUENT OPERATOR ACTION A.

Start spare pumps as needed to maintain header pressure B.

Begin reducing non-essential loads.

01588/wjs j

W

^

___.______._m____m___._

l SQN o

AOI-13 Page 5 Revision 10 SECTION B: SUPPLY HEADER PIPE RUPTURE

~

PART 1:

"IN YARD AREA" Page 2 of 4 9

IV.

SUBSEQUENT OPERATOR ACTION -(continued)

NOTE:

It will be necessary to energize ACBs to Appendix P valves NOTE:

This procedure isolates normal ERCW supply to diesels lA-A and 2A-A.

If in modes 5 or 6, then lockout these diesels.

If'in modes 1, 2, 3, or 4; then station an operator to open the alternate ERCH supplies if the diesels start.

The alternate supplies are:

1-FCV-67-68 (IA-A diesel), and 2-FCV-67-68 (2A-A diesel)

~

C.

For lA supply header:

1. Open 1-FCV-67-147, Sup Hdr lA to Hdr 2B (Rx MOV Bd 1A2-A)
2. Ensure 2-FCV-67-147 OPEN, Sup Hdr 2B to Hdr lA (Rx MOV Bd 2B2-B)
3. Close 1-FCV-67-81, Aux Bldg Hdr lA Isol (Rx MOV Bd 1A2-A)
4. Ensure 1-FCV-67-492 CLOSED, Hdr. lA Sup. Isolation before strainer l

l I4 0158B/wjs c

SQN AOI-13 Page 6 Revision 10 SECTION B: ' SUPPLY HEADER PIPE RUPTURE

'PART 1:

"IN YARD AREA" Page 3 of 4 h

IV.' LSUBSEQUENT OPERATOR ACTION s(continued)'

NOTE:

It will be necessary to energize ACBs to Appendix R, valves

~

' NOTE:

This procedure isolates normal ERCH supply to diesels.18-B.and 2B-B.

If in modes 5 or 6, then lockout these. diesels.

If.in

-("

modes 1,'2, 3, or 4, then station an operator to open the j

alternate ERCH supplies if the diesels start.

The alternate supplies are:

1-FCV-67-65 (lB-B diesel), and 2-FCV-67-65 (28-8 1

diesel).

y

~D.

For 18 supply header:

'1. Ensure 1-FCV-67-223 OPEN, Sup Hdr 18 to Hdr 2A (Rx MOV Bd 1A2-A)-

- 2. Ensure 2-FCV-67-223.0 PEN, Sup Hdr 2A to H'ir 1B (Rx MOV Bd 2A2-A)

~

3.'Open 1-FCV-67-424, Sup Hdr 1B to CCS Hx A (Rx MOV Bd 1A2-A)

4. Close 1-FCV-67-82, Aux Bldg Hdr 1B Isol (Rx MOV Bd 182-B)
5. Close.1-FCV-67-489, Hdr 1B Sup Isolation before strainer NOTE:

It will be necessary to energize ACBs to Appendix R valves.

E.

For 2A supply header:

r

1. Ensure 1-FCV-67-223 OPEN, Sup Hdr IB to Hdr 2A (Rx MOV Bd 1A2-A)
2. Ensure 2-FCV-67-223 OPEN, Sup Hdr 2A to Hdr IB (Rx MOV Bd 2A2-A) j
3. Open 1-FCV-67-424, Sup Hdr 18 to CCS Hx A (Rx MOV Bd 1A2-A)
4. Close 2-FCV-67-81, Aux Bldg Hdr 2A Isol (Rx MOV Bd 2A2-A)
5. Close 2-FCV-67-492, Hdr 2A Sup Isolation before strainer j

01588/wjs s.

, && =

SQN A01-13 Page 7 Revision 10-SECTION B:. SUPPLY HEADER PIPE RUPTURE

' l '-

PART 1:

"IN YARD AREA" Page 4 of 4 IV. -SUBSEQUENT OPERATOR ACTION g(continued)

NOTE:

It will be necessary to energize ACBs to Appendix R valves.

F.

For 28 supply header:

1. Open 1-FCV-67-147, Sup Hdr 1A to Hdr 2B (Rx MOV Bd 1A2-A)
2. Ensure 2-FCV-67-147 OPEN, Sup Hdr 28 to Hdr 1A (Rx MOV Bd 2B2-8) 1-.
3. Close 2-FCV-67-82, Aux Bldg Hdr 2B Isol (Rx MOV Bd 2B2-B) l 1
4. Close 2-FCV-67-489, Hdr 2B Sup Isolation before strainer u

NOTE:

It may be necessary to reduce:ERCH loads due to loss of ERCW header.

G.

Ensure header pressures and flows return to normal.

H.

Ensure pump loading is normal (amperes at normal expected valve).

I.

Refer to Technical Specification 3.7.4.1. Implement REP per IP l (Engineered Safety Features) as required.

~

1 1

1 1o l

l i

~

0158B/wjs.

o-L

SQN A01-13 Page 8 Revision 10

~

SECTION B: SUPPLY HEADER PIPE RUPTURE PART 2:

"IN AUX BLDG" Page 1 of 3 1.

SYMPTOMS A.

Probable Alarms f

1.

"ERCH HDR A(B) PRESSURE LOW" (50 psig dec.), XA-55-27A,.

Windows 15, 20, 22, 27.

2.

"El'CW HDR 1 A-A (18-B, 2A-A, 28-B) STR DIFF PRESS HI" (25 psid inc.), XA-55-27A, Windows 2, 9, 14, 21.

3.

"TURB, AUX OR REAC BLDG FLOODED", 1-XA-55-158 Window 24.

B.

Probable Indications 1.

PI-67-493A (488A) ERCH header A(B) showing low pressure.

2.

PI-67-437A (433A, 445A, 441A, 461A, 465A, 453A, 457A) on pump K-A (J-A, M-8, L-8, Q-A, R-A, N-8, P-B) supplying ruptured header showing low pressure.

3.

1-FI-67-61(62) showing high on header 1A(IB) or 2-FI-67-61(62) on header 2A(28).

4.

Visual observation of break (may be only symptom of a small break).

II. AUTOMATIC ACTIONS None

==

0158B/wjs 4

e

SQN AOI-13 Page 9 Revision 10 SECTION B: SUPPLY HEADER PIPE RUPTURE

[~.

1 PART 2:

"IN AUX BLDG"=

l Page 2 of 3

' III..IMMEDIATE OPERATOR' ACTION.s.

A.

Dispatch personnel to determine break location.

I V.~ SUBSEQUENT OPERATOR ACTION NOTE:

It will be necessary to energize ACBs to Appendix R valves A.

For.1A supply header:

l-1.

Refer to loss of equipment list A01-138.2-1, prior to isolating.

2.

Close'l-FCV-67-81 (Rx MOV Bd 1A2-A).

3.

Ensure 1-FCV-67-147 CLOSED (Rx MOV Bd 1A2-A).

L i

NOTE:

It will be necessary to energize ACBs to Appendix R valves B.

For 18 supply header up to 1-FCV-67-424:

1.- Refer to loss of equipment list A01-138.2-2, prior to isolating.

2.

Close 1-FCV-67-82 (Rx MOV Bd 1B2-B).

~

3.

Ensure 1-FCV-67-424 CLOSED (Rx MOV Bd 1A2-A).

r NOTE:

It will be necessary to energize ACBs to Appendix R valves C.

For 1B supply header between 1-FCV-67-424 and 1-FCV-67-223:

1.

CCS heat exchanger A will be lost which will effect multiple systems.

2.

Ensure 1-FCV-67-424 CLOSED (Rx MOV Bd 1A2-A).

3.

Close 1-FCV-67-223 (Rx MOV Bd 1A2-A).

s, OlS8B/wjs I

t

^~ '"

[

s SQN.

.A01-13 Page'10 Revision 10

-SECTION B: SUPPLY HEADER PIPE RUPTURE

~

PART 2:

"IN AUX BLDG" Page 3 of 3' IV. SUBSEQUENT OPERATOR ACTION,,(continued)

NOTE:

It will be necessary to energize ACBs to Appendix R valves D.

For 2A supply header:

~

,1.

Refer to loss of equipment list AOI-13B.2-3, prior to isolating.

~

l 2.

Close 2-FCV-67-81 (Rx HOV Bd 2A2-A).

3.

Close 2-FCV-67-223 (Rx MOV Bd 2,A2-A).

.4.

.Open.1-FCV-67-424 (Rx MOV Bd 1A2-A).

E.

For:28 supply header:

1.,

Refer to~ loss of equipment list AOI-13B.2-4, prior to isolating.

L,

~

J 2.

Close 2-FCV-67-82 (Rx H0V Bd 2B2-B).

3.

Close 2-FCV-67-147 (Rx MOV Bd 2B2-B).

1 4.

Open 1-FCV-67-147 (Rx H0V Bd 1A2-A).

j F.

Implement REP per IP-1 (Engineered Safety Features) as required.

G.

Determine cause of line failure through corrective maintenance performed.

H.

Possible unit shutdown due to loss of cooling to reactor coolant-pump motor coolers and/or loss of coolant to containment rod drive vent coolers, depending on ambient temperature in containment.

~

I.

In the event of a change in the rated thermal power level-exceeding 15% in one hour, notify the chem lab to initiate the conditional portions of SI-407.2, and SI-415 due to the thermal power change.

01588/wjs i

4-

_______2____

~

SQN A01-13

~

Page 11 Revision 10

)

~

j LOSS OF EQUIPMENT LIST A01-138.2-1 (HEADER 1A) f i

1.

Turbine-driven auxiliary feedwater pump 1 A-S"'

2.

-Lower containment vent coolprs 1A and IC'**

3.

Instrument room water cooler 1A'**

4.

Upper containment vent coolers 1A and 1C

5.

Containment spray heat' exchanger 1A

6.

Emergency makeup'to CCS surge tank A")

f.

i 7.*

Soace and room cooling equipment 1A and station-service air compressor (supply available from 18)..

l' K

8.

return header A is out of service."y feedwater pump 1A only if ERCW ERCW supply to motor-driven auxiliar l

9..

Shutdown board room air-conditioning water chiller A")

10.

Control rod drive vent coolers 1A and IC")

11.

Reactor coolant pump motor coolers 1 and 3"'

12.-

Back'up' to header 2B"'

13.*

Aux. control air compressor A"'

14. -

Electric board room A/C condenser A")

15.

Main control room A/C condenser A")

16.*

Centrifugal charging pump oil cooler 1A"'

17.*

Safety injection pump oil cooler 1 A")

  • NOTE: Damage is imminent unless equipment is stopped.

" ) NOTE : Redundant counterpart must be operating to prevent equipment damage.

" 'NOT E :

ERCW not normally required.

01588/wjs

E l

4 SQN A01-13 Page 12 Revision 10 LOSS OF-EQUIPMENT LIST AOI-138.2-2 (HEADER 18) 1 1.

Turbine-driven auxiliary feedwater pump 1 A-S")

h 2.

Lower containment vent cooless 18 and 1D

3.. Instrument room water cooler IB

4.

Upper containment vent coolers 18 and ID(*'

5.

Containment spray heat exchanger 1B'*'

6.

Emergency makeup to CCS surge tanh A'*)

- l-7.

ERCW supply to motor-driven auxiliary feedwater pump 1B, only if ERCH return header B is out of service.

- (

8.* Space and room cooling equipment IB and station-service air i l compressor (supply available from 1A).

9.

Control-rod drive vent coolers 18 and 1D"'

10.. Reactor coolant pump motor coolers 2 and 4'*)

~

11. Backup to header 2A")
12. Electric board room A/C cosidenser B"'
13. Main control room A/C condenser B"'

14.* Centrifugal charging pump oil cooler IB(

15

  • Safety injection pump oil cooler IB(')
  • NOTE: Damage is imminent unless equipment is stopped.

" ' NOTE : Redundant counterpart must be operating to prevent equipment damage.

" ) NOTE : Multiple systems are affected if lost.

" 'NOT E :

ERCH not normally required.

- l.

. i 0158B/wjs I

______._.m

SQN AOI-13 Page 13 Revision 10 LOSS OF EQUIPMENT LIST A01-138.2-3 (HEADER 2A) r

.I r/

1. ' Turbine-driven auxiliary feedwater pump 2A-S

2.

Lower containment vent coolers 2A and 2C'*)'

3.

Instrument room cooler 2A'*)

4.

Upper containment vent coolers 2A and 2C'**

5.

Containment spray heat exchanger 2A")

6.

Emergency system to CCS surge: tank B

h

7. ~ Space and room cooling e'quipment 2A'*)

~

8.

ERCH supply to motor-driven auxiliary feedwater pump 2A, only if ERCH

. return header A is out of service.'"

9.

CCS heat exchanger A' & B"'

10. Backup to header 1B")
11. Control rod drive bent coolers 2A and 2C'*)
12. Reactor' coolant pump motor coolers 1 and 3")

13.* Centrifugal charging pump oil cooler 2A

14.* Safety injection pump oil cooler 2A

  • NOTE: Damage is imminent unless equipment is stopped.

'*) NOTE:

Redundant counterpart must be operating to prevent equipment damage.

" 'NOT E: Multiple systems are affected if lost.

") NOTE:

ERCH not normally required.

0158B/wjs

.ne.

p SQN A01-13 Page-14 Revision 10 LOSS OF EQUIPMENT LIST A0I-138.2-4 (HEADER 28) 1.

Turbine-driven auxiliary feedwater pump 2A-S(*)

2.' Lower containment vent cooleys 28 and 2D

(*)

i 3.

Upper containment vent coolers 28 and 2Dcr>

4.

Containment spray heat exchanger 2B(*)

l l.

5.

CCS surge tank B emergency supply (

l 6.

Space and room cooling equipment 2B(*)

Lf.

7.

ERCW supply to motor-driven auxiliary feedwater pump 28 only if ERCH return header 8 out of service.(*)

'F 8.

Shutdown board room air-conditioning water chiller B(*'

t' s

9.

CCS heat exchanger C")

s

-1

10. Backup to header 1A(*)

g

11. Control rod drive vent coolors 28 and 2D")

I

12. Reactor coolant pump motor coolers 2 and 4

13.* Centrifugal charging pump oil cooler 28")

14.* Safety injection pump ob cooler 2B")

15.*' Aux. control air ccsmprdsor B(

16. Instrument room wate'r cooler 2B(*)

n

  • NOTE: Damage is imminen't ur,less equipment is stopped.

_(*) NOTE:

Redundant counterpart must be operating to prevent equipment damage.

4 3

"' NOTE: Multiple systems are affected if lost.

(*' NOTE:

ERCW not normally\\ required, s

0158B/wjs s

e

. ant

r-_

~

t SQN A01-13 Page 15 Revision 10-SECTION B:

SUPPLY HEADER PIPE RUPTURE PART 3:

"IN ERCH PUMPING STATION" Page 1 of 3 I.

SYMPTOMS s

A.

Probable Alarms 1.

"ERCH HDR A(B) PRESS LOW" (50 psig dec.), XA-55-27A, Windows 16, 28, 23, 35.

2.

"ERCH SUPPLY HDR A(B) LOW" (12,000 gpm dec.), XA-55-27A, Windows 15, 20, 22, 27.

h 3.' "ERCW PUMP K (3, M, L, Q, R, N, P) DISCH PRESS LOH" (65 psig dec.), XA-55-27A, Windows 24, 17, 4, 31, 25, 32, 11, 18.

4.

ERCH DECK SUMP LEVEL HI", XA-55-158, Window 3.

5.

MECH EQUIP SUMP ERCH PMP STAT LVL HI, XA-55-15A, Window 13.

B.

Probable Indications 1.

PI-67-493A'(488A) ERCH header A(B) showing low pressure.

2.

PI-67-437A (433A, 445A, 441 A, 461 A, 465A, 453A, 457A) on purap

'K-A (J-A, M-8, C-B, Q-A, R-A, N-8, P-B) supplying ruptured header showing low pressure.

3.

1-FI-67-61(62) showing low flow on header 1.A(18) and on 2-FI-61(62) for header 2A(28).

II. AUTOMATIC ACTION None I*

l 1

0158B/wjs L

a

I SQN AOI-13 Page 16 Revision 10 SECTION B:

SUPPLY HEADER PIPE RUPTURE PART 3:

"IN ERCH PUMPING STATION" f

Page 2 of 3 III. IMMEDIATE OPERATOR ACTION l

A.

Dispatch personnel to determine break location.

IV. SUBCEQUENT OPERATOR ACTION 1

CAUTION:

Follow this instruction only if rupture is on main header between pumps and first isolation valve upstream of strainers.

A.

Begin reducing non-essential loads,

NOTE:

It will be necessary to energize ACBs to Appendix R valves.

B.

IF supply header "A" is ruptured, THEN:

l.

Trip and ?ockout pumps K-A, 0-A, R-A, and Q-A.

2.

Close 1-FCV-67-492 and 2-FCV-67-492.

3.

Open 1-FCV-67-147 (Rx MOV Bd 1A2-A) and 1-FCV-67-424 (Rx MOV Bd 1A2-A).

E 4.

Ensure 1-FCV-67-223 (Rx MOV Bd 1 A2-A) and 2-FCV-67-223 (Rx MOV Bd 2A2-A) and 2-FCV-67-147 (Rx HOV Bd 282-B) - OPEN 5.

Run pumps M-B, L-B, P-B and N-B 0158b/wjs

.._m....

SQN A01-13 Page 17 Revision 10

.SECTION B:

SUPPLY HEADER PIPE RUPTURE

[

PART 3: "IN ERCW PUMPING STATION"

. t..

Page 3 of 3

.C.

,I_F supply header "B" is, ruptured, THEN*

1.

Trip and lockout pumps M-B, L-B, P-8, and N-B' 2.

Close 1-FCV-67-489 and 2-FCV-67-489 3.

Open 1-FCV-67-147 (Rx MOV Bd 1A2-A) and 1-FCV-67-424 (Rx MOV' Bd 1A2-A) 4.

Ensure 1-FCV-67-223 (Rx MOV Bd 1A2-A) and 2-FCV-67-223 (Rx MOV f.

Bd'lA2-A) and 2-FCV-67-147 (Rx MOV Bd 2H2-B) - OPEN 5.

Run pumps K-A, Q-A, J-A, and R-A

- 0.

Ensure inservice header pressures return to normal.

l

~

E.

Ensure pump ~1oading on inservice header is normal.

l l

F.

Have pipe rupture repaired.

i-P.

Implement _ REP per IP-1 (Engineered Safety Features) and TS 3.7.4.1 as required.

l

)

)

l-L' 0158B/wjs h_

___m.m__-___----- - - - - - - - - - - _ _ _ _ _ - _ _

~

L f'-

SQN A0I-13 jJ Page 18 Revision 10 SECTION C: DISCHARGE HEADER PIPE RUPTURE PART 1: "IN YARD AREA"'

.f._

Page 1 of 1 l7 f

_I.

SYMPTOMS s

.A.

Probable' Indications

1. Bad wash in yard area near leak

.II.

AUTOMATIC ACTION None

'I-III. IMMEDIATE OPERATOR ACTION

[

.A..

Dispatch personnel to determine brdak location IV. SUBSE0UENT OPERATOR ACTION A.

Because of loss of A or B train on both units, plant loading and condition will be used to decide steps to take to initiate maintenance.

B.

Implement REP per IP-1 (Engineered Safety Features) and refer to TS 3.7.4.1 as required.

01583/wjs 4

2

4.

4 SON ACI-13

~~

Page 19 Revision 10

.s SECTION C: DISCHARGE HEADER PIPE RUPTURE PART 2:

"IN AUX BLDG" f:-

Page 1 of 2 I.

SYMPTOMS A.

Probable Alarms

1. "TURB, AUX OR REAC BLDG FLOODED", 1-XA-55-158, Hindow 24,

II. AUTOMATIC ACTION None

' III. IMMEDIATE OPERATOR ACTION

~

'A.

Dispatch personnel to determine break location IV.

SUBSEQUENT OPERATOR ACTION NOTE:

It will be necessary to energize ACDs to Appendix R valves A.

Isolate affected train by closing 1-FCV-67-81 (Rx MOV Bd 1A2-A) and 2-FCV-67-81 (Rx MOV Bd 2A2-A) for A header or 1-FCV-67-82 (Rx MOV Bd IB2-B),and 2-FCV-67-82 (Rx M0V.Bd 282-B) for B header.

B.

Ensure FCV-67-151 (Rx MOV Bd 1A2-A) closed and close 2-FCV-67-146 for A header ruptured. Close FCV-67-152 and 1-FCV-67-146 for B

(

header ruptured.

C.

After determining which headar is ruptured and isolated, refer to

" Loss of Equipment List" AOI-138.2-1 for header IA

~

AOI-138.2-2 for header 1B A01-138.2-3 for header 2A A01-138.2-4 for header 28.

0158B/wjs 0

~. _,.. _

SQN AOI-13 Page 20 Revision 10 SECTION C: DISCHARGE HEADER PIPE RUPTURE F

PART 2:

"IN AUX BLOG" l

Page 2 of 2 f

D.

Have repairs initiated,immediately.

E.

In the event of a change in the rated thermal power level

[

exceeding 157. in one hour, notify the chem lab to initiate the I

conditional portions of SI-407.2 and SI-415 due to the thermal power change.

F.

Refer to TS 3.7.4.1 and implement REP per IP-1 (Engineered Safety Features) as required.

I 0158B/wjs