'k, TENNESSEE VALLEY AUTHORITY SEQUOYAF NUCLEAR PLANT
(
L EMERGENCY INSTRUCTION
^
ES-0.3 NATURAL CIRCULATION COOLDOWN
^
s Revision 1 PREPARED BY:
G. Stric"kland RESPONSIBLE SECTION:/ Operatiodh REVISED BY:
G. 5 nd SUBMITTED BY:
.//b l
Res'p6n blej ection Supervisor PORC REVIEW DATE:
APPROVED BY:
3:owk a l T T,r s %
l P l a n't M a n a g e r 21 E DATE APPROVED:
Reason for revision (include all Instruction Change Form.Nos.):
Revised to add transitions from other instructions and to delete reference to SI-48.
I om...
The last page of this instruction is number:
9 r
lC 8708170333 87[PDRh7 PDR ADOCK O P
4 SEQUOYAH NUCLEAR PLANT.
PLANT INSTRUCTION REVISION LOG EMERGENCY INSTRUCTION ES-0.3 REVISION Date Pages REASON FOR REVISION (INCLUDE COMMIT-LEVEL Approved Affected MENTS AND ALL ICF FORM NUMBERS) 0 10/04/84 ALL Revised to add trar.sitions f rom other 1
A JG 21 E instructions and delete reference to I,4 SI-48.
e s
f
~
l 0272L/mbs N
~
SQNP v
ES-0.3 Unit 1 or 2 Page 1 of 9 Rev. 1
'4 l
NATURAL CIRCULATION COOLDOWN A.
PURPOSE This guideline provides actions to perform a natural circulation RCS cooldown and depressurization to cold shutdown.
B.
SYMPTOMS None C.
TRANSITION FROM OTHER INSTRUCTIONS 1.
ES-0.1, Reactor Trip Response i
2.
- \\-
3.
ECA-0.1, Recovery From Loss Of All AC Power Without SI Required l
t L
l l
l l
5 I
)
>(-
- u a
-1 w
_______.__________J
SQNP ES-0.3 Unit 1 or 2 Page 2 of 9 Rev. 0 NATURAL CIRCULATION COOLDOWN STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION:
If SI actuation occurs, then E-0, Reactor Trip Or Safety Injection, should be used.
t Note:
If at any time nn RCP. can be restarted, then go to appropriate rdrTnal cdoldown instruction 1
Try To Restart An RCP E an RCP can NOT be started, a.
Loop 2 preferred THEN verify natural circulation b.
Refer to SOI-68.2 RCS subcooling c.
Start an RCP and go to appropriate plant S/G press stable or instruction decreasing T-hot stable or decreasing Core exit T/C stable or decreasing
~
T-cold at saturation temp for S/G press E natural circulation NOT verified, THEN increase dumping steam l
+
l L_._______._
SQNP ES-0.3 Unit 1 or 2 Page 3 of 9 Rev. O F-NATURAL CIRCULATION COOL DOWN STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED i
2 Borate RCS To Cold Shutdown Boron Concentration a.
Determine boron concentration per TI b.
Increase the RCS boric acid addition by 15% to compensate for the inability to borate the pzr 3
Verify Cold Shutdown Concentration By Sampling a
RCS hot leg b.
Letdown line l(
.<e q 4
Check VCT Makeup System a.
Makeup set for cold shutdown boron concentration 5
Start All CRDM And Lower Compartment Fans a.
AUgn CRDM dampers to the shroud and in manual (Not P-Auto) b.
IF_ 3 or 4 CRDM fans are b.
IF less than 3 CRDM running,
are running, THEN RCS subcooling THEN RCS subcooling must must be maintained > 50 F be maintained > 100 F c.
Maintain entmt within Tech Spec air temp limit
(
lk ',
I l
l
[
SQNP l
ES-0.3 Unit 1 or 2 Page 4 of 9 Rev. 1 NATUR.AL CIRCULATION COOLDOWN STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 6
Check CST Level a.
CST level > 3 ft a.
IF CST level < 3 ft, TIIEN verify ERCW l
aligned to AFW t
b.
CST level > 17 f t b.
IF CST level < 17 ft, THEN attempt to refill e
CST while co itinuing with this instruction
.I 7
Initiate RCS Cooldown To C613 Shutdown
)f-a.
Start SI-127 j,/
b.
Maintain T-cold cooldown
)y rate < 50 F/hr c.
Dump steam to condenser c.
IF condenser NOT I
- Eailable, t
d.
Maintain S/G narrow THEN use S/G PORV range level s 33%
l e.
Refer to GOI-3 as required
[
8 Check T-hot < 540 F Do not proceed untu T-hot < 540 F 9
Depressurize RCS To 1920 psig a.
IF letdown is in service, a.
IF letdown or aux TIIEN use aux spray s" pray NOT available, -
THEN itse one pzr PORV l
lIt
SQNP ES-0.3 Unit 1 or 2 Page 5 of 9 Rev. O NATURAL CIRCULATION COOLDOWN
~
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION:
SI actuation circuits will autoraatically unblock if RCS press increases above 1970 psig or if RCS temp increases above 540 F l
t 10 Block SI Actuation a.
Block low pzr press SI signal, P-11 b.
Block high steam flow SI signal, P 12 l
j 11 Depresaurize RCS To 1800 - 1900 psi-t 12 Isolate UHI m
a.
Close the 4 UHI isolation valves b.
Gag isolation valves c.
Tag out UHI 13 Maintain Following RCS Condition.
a.
RCS press s 1800 - 1900 psig b.
Pzr level
- 25%
c.
T-cold cooldown rate
< Su 'F/hr d.
RCS within normal cooldown
~
curve SQNP ES-0. 3 Unit 1 or 2 Page 6 of 9 Rev. O NATUR AL CIRCULATION COOLDOWN l
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 14 Monitor RCS Cooldown a.
Core exit T/C -
DECREASING
~
t b.
T-hot - DECREASING c.
RCS subcooling - INCREASING CAUTION: During RCS depressurizatio:, periodically check the pzr level response for signs of RCS void formation 15 Initiate RCS Depressurization f
a, IF 3 or 4 CRDM fans are a.
IF less than 3 CRDM
- {(
running fans are running, THEN maintain 50 F THEN RCS subcooling subcooling must be maintained
> 100 F i
b.
IF letdown is in service, b.
IF letdown or aux THEN use aux spray spray NOT available, THEN use one pzr PORV j
i I
s..
SQNP ES-0.3 Unit 1 or 2
~
Page 7 of 9 Rev. O NATURAL CIRCULATION COOLDOWN STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 16 Continue RCS Cooldown And Depressurization a.
Maintain T-cold cooldown rate < 50 F/hr b.
Maintain subcooling b.
IF subcooling requirement requirement NOT met, TIIEN stop depressurization and reestablish subcooling c.
Maintain RCS within normal cooldown curve
(
17 Check Pzr Level a$ No unexpected changes a,, I_F pzr level response in level
Continue RCS cooldown 18 Maintain Letdown Flow a.
Open letdown orifice l
valves as necessary
)
b.
Adjust letdown press control valve as necessary
)
I l
l l - _ _ _ _ _ _ _
SQNP ES-0.3 Unit I or 2
{
.Page 8 of 9 i
Rev. O F
NATURAL CIRCULATION COOLDOWN
' STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 19 Maintain ItCP Seal Injection Flow I
a.
Adjust FCV-62-89 'as necessary
\\
b.
Maintain seal injection flow
- 8 gpm per RCP 20 At 1000 psig, Isolate Cold Leg Accumulators a.
Restore power to isolation valves b.
Close and tag out isolation valves
(
(
21 At 350 F, Lock Out ECCS Systems Not Required a.
Place non-operating CCP in PULL TO LOCK b.
Place SI Pumps in PULL TO LOCK c.
Close and tag out BIT inlet and outlet valves 1
1
, 1 L
SQNP ES-0.3 Unit 1 or 2 Page 9 of 9 Rev. O I
(
){
NATURAL CIRCULATION COOLDOWN STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 22 Check If RIIR Can Be Placed In Service a.
Check the following:
- 1) RCS temp 1350 F
- 2) RCS press 5 380 psig l
b.
Place RHR in service per SOI-74.1 A c.
Use RHR and S/G for cooldown 23 Continue RCS Cooldown To 200 F b
.e CAUTION:
Depressurizing the RCS before the entire RCS temp is less than 212 F may result in void formation in the RCS.
24 Continue Cooldown Of Inactive Portion Of RCS a.
Maintain CRDM and lower compartment fans running b.
Cool S/G U-tubes by dumping steam from all S/Gs 25 Determine If RCS Depressurization Do not depressurire RCS Is Permitted a.
All S/Gs depressurized b.
T-hot $ 200 F c.
Avg core exit T/C 5 212 F d.
Go to appropriate plant instruction