TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR FLANT FUNCTION RESTORATION GUIDELINES FR-H.2 RESPONSE TO STEAM GENERATOR OVERPRESSURE t
Revision 0 l
PREPARED BY:
G.
Strickland RESPONSIBLE SECTION:
Of;erations /7 REVISED BY:
SUBMITTED BY:
//NY be ResI'fofisiblp ' e'cpion Supervisor S
.e AUG 2y1985 PORC PEVIEW DATE:
APPROVED BY:
%cd.
t (o~
Plant Manager DATE APPROVED:
'AUB 211985 Reason for revision (include all Instruction Change Form Nos.):
New Instruction written per commitment to NUREG 0737.
The last page of this instruction is number:
3 8708170296 870811 PDR ADG0K 050 37 P
d SEQUOYAH NUCLEAR PLANT PLANT INSTRUCTION REVISION LOG FUNCTION RESTORATION GUIDELINES FR-H.2 PEVISION Date
-Pages -
-REASON FOR-REVISION (INCLUDE COMMIT-LEVEL Approved Affected MENTS AND ALL ICF FORM NUMBERS)
~New instruction written per commitment 0
A!JG 211985 All to NUREG 0737
(
f' I.L l
0262L/mbs i
1 I
j
SQNP FR-H.2 Unit 1 or 2 Page 1 of 3 Rev. O RESPONSE TO STEAM GENERATOR OVERPRESSURE
^
A.
PURPOSE This guideline provides actions to respond to a steam generator pressure above the highest safety valve setpoint.
B.
SYMPTOMS S/G press great r than 1117 psig C.
TRANSITION FROM OTHER INSTRUCTIONS Status Tree I
e m
1 l l
1 L-J
I i
~
SQNP FR-H.2 Unit 1 or 2 Page 2 of 3 Rev. 0 1
RESPONSE TO STEAM GENERATOR OVERPRESSURE
~
STEP
__ ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED l
1 Identify Affected S/G a.
S/G press > 1117 psig a.
IF ull S/G press
< 111.7 psig, T_lfM return to instruction in effect 2
Verify MFW Isolation To Affected S/G a.
MFW isolation valve - CLOSED b.
MFW reg valve - CLOSED c.
MFW bypass valve - CLOSED 3
Verify AFW Isolation To Affected S/G a.
Motor-driven AFW 1evel control valve - CLOSED b.
Turbine-driven AFW level control valve - CLOSED c.
Affected S/G AFW flow 0 gpm l
.- t
~
SQNP FR-H.2 Unit 1 or 2 Page 3 of 3 Rev. O lI(
RESPONSE TO STEAM GENERATOR OVERPRESSURE STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 4
Depressurize Affected S/G a.
IF water is NOT in main a.
IF water is in main steamline (< 90% S/G narrow steamline (> 90% S/G range level),
narrow range level),
THEN depressurize S/G THEN do NOT from one of the following:
depressurize affected 1
S/G.
Refer to
- FR-H.3,
- 1) S/G PORV RESPONSE TO STEAM GENERATOR HIGH LEVEL
- 2) MSIV bypass valve
- 3) Steam supply to turbine driven AFW pump 5
Restore Normal S/G Operation
/
ar Affected S/G press s equal to intact S/G press h
b.
Control AFW flow to maintain S/G narrow range levels between 25% and 50%
6 Check T-Hot < 550 F l
a.
Cooldown RCS < 550 F a.
E condenser steam using condenser dumps dumps NOT available, THEN use intact S/G PORVs 7
Return To Instruction In Effect
- END -