TENNESSEE VALLEY AUTHORITY
~SEQUOYAH NUCLEAR PLANT FUNCTION RESTORATION GUIDELINES FR-C.2 RESPONSE Tb SATURATED CORE COOLING
(
Revision 0 PREPARED BY:
G. Stric.kland RESPONSIBLE SECTION:
O rations
/
REVISED BY:
AfgM SUBMITTED BY:
/
Respfodifible[Secti n' ' Supervisor
.e AUG 2 BB5 PORC REVIEW DATE:
bu@ hrM(h APPROVED BY:
Plant Manager DATE APPROVED:
AUG 211985 Reason for revision (include all Instruction Change Form Nos.):
New Instruction written ~per commitment to NUREG 0737.
The last page of this instruction is number:
3 8708170287 870811 PDR ADOCK 05000327 P
g SEQUOYAH NUCLEAR PLANT
(
PLANT INSTRUCTION REVISION LOG FUNCTION RESTORATION GUIDELINES FR-C.2 REVISION Date Pages REASON FOR REVISION (INCLUDE COMMIT-LEVEL Approved Affected ~MENTS AND ALL ICF FORM NUMBERS)
New instruction written per commitment 0
AtIG 211935 A11 eo NuREo 0737 s
/
0261L/mbs I
l l
'/
SQNP FR-C.2 Unit 1 or 2 Page 1 of 3 Rev. O RESPONSE TO SATURATED CORE COOLING
~
A.
PURPOSE This guideline provides actions to restore subcooled core cooling B.
SYMPTOMS Refer to Status Tree C.
TRANSITION FROM OTHER INSTRUCTIONS Status Tree P
I,L '
~
W 1
l i l
e SQNP FR-C. 2 Unit 1 or 2 Page 2 of 3 Rev. O r
RESPONSE TO SATURATED CORE COOLING STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED CAUTION: If RWST level decreases to less than 29%, then align ECCS suction to the entmt sump using ES-1.2, Transfer.
Verify ECCS Status a.
CCPs - RUNNING b.
3I Pumps - RUNNING c.
RHR Pumps - RUNNING d.
Flow through BIT c.
IF RCS press < 1500 psig, j
THEN verify SI Pump flow f.
IF RCS press < 180 psig, THEN verify RHR Pump flow IF RHR aligned to entmt F
g.
ES-1.2, Transfer To RHR Cntmt Sump Appendix ES-1.3, Transfer To Hot Leg Recire - Appendix i
i l
)
2-
au*'
SQNP FR-C.2 Unit 1 or 2 Page 3 of 3 Rev. O i
RESPONSE TO SATURATED CORE COOLING
~
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED
~
2 Check Source Of RCS Depressurization a.
Pzr PORVs - CLOSED a.
IF RCS press < 2335 psig, 1
THEN close pzr PORV OR block valve b.
Letdown isolated
- 1) FCV-62-69, 70, 72, 73, and 74 c.
Excess letdown isolated
- 1) FCV-62-54 or 55 d.
Pzr normal sprays - CLOSED
(
e.
Aux spray valve - CLOSED f.
Pzr safety valves - CLOSED f.
Cooldown RCS and depressurize to allow safety valve to reseat g.
Reactor vessel head vent -
CLOSED h.
RCS sample valves - CLOSED
- 1) FCV-43-2 or 3
- 2) FCV-43-11 or 12 i
- 3) FCV-43-22 or 23 i.
Post accident sample valves
- CLOSED
- 1) FSV-43-250 or 251 1
- 2) FSV-43-309 or 310 3
Return To Instruction In Effect I
~
- END -