|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217F9701999-10-14014 October 1999 Proposed Tech Specs,Incorporating ARC for Axial Primary Water Stress Corrosion Cracking at Dented Tube Support Plate Intersections ML20217E4301999-10-12012 October 1999 Proposed Tech Specs,Revising Requirements for Containment Penetrations During Refueling Operations ML20211K1201999-08-30030 August 1999 Proposed Tech Specs,Adding New Specification That Addresses Use of Interim Provisions Upon Discovery of Unintended TS Action ML20211M7341999-08-30030 August 1999 Marked-up & Revised TS Pages,Providing Alternative to Requirement of Actually Measuring Response Times ML20211K1721999-08-30030 August 1999 Proposed Tech Specs,Providing Clarification to Current TS Requirements for Containment Isolation Valves ML20209B7731999-06-30030 June 1999 Proposed Tech Specs Updating Requirmements for RCS Leakage Detection & RCS Operational Leakage Specifications to Be Consistent with NUREG-1431 ML20196F2211999-06-24024 June 1999 Proposed Tech Specs Pages for Amend to Licenses DPR-77 & DPR-79,allowing Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20196G4701999-06-24024 June 1999 Proposed Tech Specs Pages Re Amends to Licenses DPR-77 & DPR-79,revising TS to Be Consistent with Rev to ISTS Presently Submitted to NEI TSTF for Submittal as Rev to NUREG-1431 ML20196G7961999-06-22022 June 1999 Proposed Tech Specs Bases,Clarifying Proper Application of TS Requirements for Power Distribution Systems & Functions That Inverters Provide to Maintain Operability & Providing Updated Info on Cold Leg Injection Accumulators ML20196G8071999-06-22022 June 1999 Revs to Technical Requirements Manual ML20195E9841999-06-0707 June 1999 Proposed Tech Specs,Increasing Max Allowed Specific Activity of Primary Coolant from 0.35 Microcuries/Gram Dose Equivalent I-131 to 1.0 Microcuries/Gram Dose Equivalent I-131 for Plant Cycle 10 (U2C10) Core ML20206E1611999-04-29029 April 1999 Proposed Tech Spec Change 99-04, Auxiliary Suction Pressure Low Surveillance Frequency Rev. Change Deletes Surveillance ML20206E1391999-04-29029 April 1999 Proposed Tech Spec Change 99-03, Main Control Room Emergency Ventilation Sys Versus Radiation Monitors. Changes Add LCOs 3.3.3.1 & 3.7.7 to Address Inoperability of Radiation Monitoring CREVS & NUREG-1431 Recommendations ML20204E8501999-03-21021 March 1999 Plant,Four Yr Simulator Test Rept for Period Ending 990321 ML20204H4081999-03-19019 March 1999 Proposed Tech Specs,Relocating TS 3.8.3.1,3.8.3.2,3.8.3.3 & Associated Bases Associated with Electrical Equipment Protective Devices to Technical Requirements Manual ML20207F7631999-03-0202 March 1999 Proposed Tech Specs Pages Re Application for Amends to Licenses DPR-77 & DPR-79,deleting Iseg from License Conditions ML20207D6011999-02-26026 February 1999 Proposed Tech Specs Relocating TS 3.7.6, Flood Protection Plan & Associated Bases from TS to Plant TRM ML20207D6331999-02-26026 February 1999 Proposed Tech Specs Providing for Consistency When Exiting Action Statements Associated with EDG Sets ML20199K6001999-01-15015 January 1999 Proposed Tech Specs Adding New Action Statement to 3.1.3.2 That Would Eliminate Need to Enter TS 3.0.3 Whenever Two or More Individual RPIs Per Bank May Be Inoperable,While Maintaining Appropriate Overall Level of Protection ML20206S0131999-01-15015 January 1999 Proposed Tech Specs 3.3.3.3, Seismic Instrumentation & Associated Bases,Relocated to Plant Technical Requirements Manual ML20195H6111998-11-16016 November 1998 Proposed Tech Specs Revising EDG SRs by Adding Note That Allows SR to Be Performed in Modes 1,2,3 or 4 If Associated Components Are Already OOS for Testing or Maint & Removing SR Verifying Certain Lockout Features Prevent EDG Starting ML20154H7251998-10-0808 October 1998 Proposed Tech Specs Pages,Supplementing Proposed TS Change 96-08,rev 1 to Add CRMP to Administrative Controls Section & Bases of TS ML20238F3001998-08-27027 August 1998 Proposed Tech Specs Replacing 72 H AOT of TS 3.8.1.1,Action b,w/7 Day AOT Requirement for Inoperability of One EDG or One Train of EDGs ML20238F1091998-08-27027 August 1998 Proposed Tech Specs Providing for Insertion of Limited Number of Lead Test Assemblies,Beginning W/Unit 2 Operating Cycle 10 Core ML20209J1631998-08-0707 August 1998 Rev 41 to Sequoyah Nuclear Plant Odcm ML20236G5961998-06-29029 June 1998 Proposed Tech Specs Typed Pages for TS Change 95-19, Section 6 - Administrative Controls Deletions ML20249C6371998-06-26026 June 1998 Proposed Tech Specs Lowering Specific Activity of Primary Coolant from 1.0 Uci/G Dose Equivalent I-131 to 0.35 Uci/G Dose Equivalent I-131,as Provided in GL 95-05 ML20248F0051998-05-28028 May 1998 Proposed Tech Specs for Section 6, Administrative Controls Deletions ML20217N3511998-04-30030 April 1998 Proposed Tech Specs Pages,Modifying Surveillance Requirement 4.4.3.2.1.b to Change Mode Requirement to Allow PORV Stroke Testing in Modes 3,4 & 5 W/Steam Bubble in Pressurizer Rather than Only in Mode 4 ML20203J1681998-02-25025 February 1998 Proposed Tech Specs Pages,Revising EDG Surveillance Requirements to Delete Requirement for 18-month Insp IAW Procedures Prepared in Conjunction W/Vendor Recommendations & Modify SRs Associated W/Verifying Capability of DGs ML20202J7141998-02-13013 February 1998 Proposed Tech Specs Adding New LCO That Addresses Requirements for Main Feedwater Isolation,Regulating & Bypass Valves ML20202J7651998-02-13013 February 1998 Technical Requirements Manual ML20202J6961998-02-13013 February 1998 Proposed Tech Specs Incorporating MSIV Requirements to Be Consistent W/Std TS (NUREG-1431) ML20202J7601998-02-13013 February 1998 Proposed Tech Specs Section 3.7.9 Re Relocation of Snubber Requirements ML20198T4311998-01-21021 January 1998 Proposed Tech Specs Re New Position Title & Update of Description of Nuclear Organization ML20199F8231997-11-30030 November 1997 Cycle 9 Restart Physics Test Summary, for 971011-971130 ML20199K4571997-11-21021 November 1997 Proposed Tech Specs Adding one-time Allowance Through Operating Cycle 9 to Surveillance Requirement 4.4.3.2.1.b to Perform Stroke Testing of PORVs in Mode 5 Rather than Mode 4,as Currently Required ML20211A3191997-09-17017 September 1997 Proposed Tech Specs Re Pressure Differential Surveillance Requirements for Containment Spray Pumps ML20203B9731997-08-0505 August 1997 Rev 1 to RD-466, Test & Calculated Results Pressure Locking ML20217J5581997-07-31031 July 1997 Cycle Restart Physics Test Summary, for Jul 1997 ML20210J1671997-04-30030 April 1997 Snp Unit 1 Cycle 8 Refueling Outage Mar-Apr 1997,Results of SG Tube ISI as Required by TS Section 4.4.5.5.b & Results of Alternate Plugging Criteria Implementation as Required by Commitment from TS License Condition 2C(9)(d) ML20137T0871997-04-0909 April 1997 Proposed Tech Specs Re Elimination of Cycle 8 Limitation for SG Alternate Plugging Criteria ML20137M8581997-04-0101 April 1997 Proposed Tech Specs 2.1 Re Safety Limits & TS 3/4.2 Re Power Distribution Limits ML20137C8421997-03-19019 March 1997 Proposed Tech Specs Re Conversion from Westinghouse Electric Corp Fuel to Framatome Cogema Fuel ML20136J0381997-03-13013 March 1997 Proposed Tech Specs Section 5.6.1.2,revising Enrichment of Fuel for New Fuel Pit Storage Racks ML20134P8631997-02-14014 February 1997 Proposed Tech Specs Requesting Discretionary Enforcement for 48 Hours Which Is in Addition to 72 Hours Allowed Outage Time Provided by TS Action 3.8.1.1.b ML20134K9981997-02-0707 February 1997 Proposed Tech Specs Revising TS Change Request 96-01, Conversion from W Electric Corp Fuel to Framatome Cogema Fuel (MARK-BW-17), to Ensure That Core Analysis Computer Code Output Actions Are Consistent W/Hot Channel Factor SRs ML20138F2581997-01-17017 January 1997 Rev 39 to Sequoyah Nuclear Plant Odcm ML20134L9261996-11-0808 November 1996 Proposed Tech Specs Re Placing of Channel in Trip for Reactor Trip & Engineered Safety Feature Instrumentation Sys Solely to Perform Testing as Not Requiring Channel to Be Declared Inoperable ML20129D2661996-10-18018 October 1996 Proposed Tech Specs,Removing Existing Footnotes That Limit Application of Apc for Plant S/G Tubes to Cycle 8 Operation for Both Units 1999-08-30
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20196G8071999-06-22022 June 1999 Revs to Technical Requirements Manual ML20209J1631998-08-0707 August 1998 Rev 41 to Sequoyah Nuclear Plant Odcm ML20202J7651998-02-13013 February 1998 Technical Requirements Manual ML20138F2581997-01-17017 January 1997 Rev 39 to Sequoyah Nuclear Plant Odcm ML20134J9991996-09-23023 September 1996 Fuel Assembly Insp Program ML20138F2531996-02-23023 February 1996 Rev 38 to Sequoyah Nuclear Plant Odcm ML20108B4121995-11-0303 November 1995 Rev 37 to Sequoyah Nuclear Plant Odcm ML20094Q2111995-10-30030 October 1995 Rev 1 to ASME ISI Pump Testing Program Basis Document ML20094Q1971995-10-30030 October 1995 Rev 1 to SG Tubing ISI & Augmented Insps, Rev 1 to 0-SI-SXI-068-114.2 ML20094Q2301995-10-30030 October 1995 ASME ISI Valve Testing Program Basis Document, Rev 0 ML20094Q1931995-10-30030 October 1995 Rev 1 to ASME Sys Pressure Testing Program Basis Document ML20094Q1761995-10-13013 October 1995 ASME Section XI Isi/Nde & Augmented Nondestructive Exam Programs, SSP-6.10,rev 2 ML20094Q1841995-10-13013 October 1995 ASME Section XI Isi/Nde Program Units 1 & 2, Rev 0 to 0-SI-DXI-000-114.2 ML20149L6811994-09-30030 September 1994 Concerns Resolution Program - Sequoyah Nuclear Plant ML20063D6691994-01-24024 January 1994 Rev 4 to Sequoyah Nuclear Plant Restart Plan ML20065Q6251993-10-13013 October 1993 Rev 31 to Sequoyah Nuclear Plant Odcm ML20056F3181993-08-20020 August 1993 Rev 0 of Post-Restart Plan ML20056G1841993-08-10010 August 1993 Rev 2 to Sequoyah Nuclear Plant Restart Plan ML20044F3081993-05-20020 May 1993 Rev 0 to Sequoyah Nuclear Plant Restart Plan ML20034F3191993-02-26026 February 1993 Rev 26 to Offsite Dose Calculation/Environ Monitoring Methodologies ML18036B1961993-01-27027 January 1993 Rev 2 to Nuclear Power Training Procedure TRN-31, Fire Brigade Training. ML20127P5461992-12-16016 December 1992 Rev 20 to Surveillance Instruction SI-114.1, ASME Section XI ISI Program,Unit 1 ML20127P6361992-12-16016 December 1992 Rev 19 to Surveillance Instruction SI-114.2, ASME Section XI ISI Program,Unit 2 ML20114C8131992-04-17017 April 1992 Rev 27 to Odcm ML20101F2011992-02-0808 February 1992 Rev 17 to Surveillance Instruction SI-114.1, ASME Section XI ISI Program Unit 1 ML20101F2081992-02-0808 February 1992 Rev 16 to Surveillance Instruction SI-114.2, ASME Section XI ISI Program Unit 2 ML20034C7451990-03-14014 March 1990 Rev 24 to ODCM ML20033F2631990-02-27027 February 1990 Rev 24 to Odcm ML19332D2241989-09-22022 September 1989 Rev 23 to Odcm. ML20245H1421989-08-15015 August 1989 Rev 22 to Offsite Dose Calculation Manual Changes ML20246H4861989-05-16016 May 1989 Rev 1 to Technical Instruction TI-115, Instructions for Sewage Mgt ML20244E2521989-04-28028 April 1989 Rev 14 to Surveillance Instruction SI-114.2, ASME Section XI Inservice Insp Program ML20246E7771989-04-25025 April 1989 Rev 14 to Surveillance Instruction SI-114.1, ASME Section XI Inservice Insp Program ML20206D3421988-10-15015 October 1988 Rev 13 to Surveillance Instruction SI-114.2, Inservice Insp Program ML20154J3221988-09-0909 September 1988 Procedure EA-OR-003-S, Sequoyah Nuclear Plant - Unit 1 Design Baseline & Verification Program,Supplemental Engineering Assurance Oversight Review Rept ML20150F9291988-06-17017 June 1988 Diesel Generator Voltage Response Improvement Plan ML20154L1421988-05-0909 May 1988 Rev 3 to Revised Sequoyah Nuclear Performance Plan ML20153H3891988-03-30030 March 1988 Rev 19 to Sequoyah Nuclear Plant Offsite Dose Calculation Manual ML20196G3301988-02-24024 February 1988 Limited Test Program for Determining Axial Load Capacity of Cast One-Hole Conduit Clamps ML20147E9511988-01-21021 January 1988 Revised, Procedures Generation Package ML20153H3851988-01-0505 January 1988 Rev 18 to Sequoyah Nuclear Plant Offsite Dose Calculation Manual ML20147E5691987-12-17017 December 1987 Rev 4 to Special Maint Instruction SMI-0-317-61, Instrumentation Features Walkdown,Rework & Insp Instructions for CAR 87-014 ML20148L9741987-11-0404 November 1987 Instruction Change 2172,Rev 8 to Essential Instrumentation Operability Verification ML20237C5451987-10-28028 October 1987 Rev 17 to Offsite Dose Calculation Manual ML20236E6931987-10-17017 October 1987 Rev 2 to Engineering Organization & Operating Procedures, TVA Employee Concerns Special Program ML20235X0651987-10-10010 October 1987 Rev 0 to Special Maint Instruction SMI-2-74-1, Repair of 2-FCV-74-2 ML20235X0551987-10-10010 October 1987 Rev 0 to Sys Operating Instruction SOI-74.2, Removal of RHR for Repair of 2-FCV-74-2 ML20245D0661987-09-15015 September 1987 Rev 4 to Surveillance Instruction SI-673, RCS Level Verification Using Sight Glass or Tygon Hose ML20148M0661987-09-11011 September 1987 Rev 8 to SI-604, Essential Instrumentation Operability Verification ML20245D0591987-08-29029 August 1987 Rev 40 to Sys Operating Instruction SOI-74.1, RHR Sys 1999-06-22
[Table view] |
Text
_ - -______
.)-
i.
TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT ABNORMAL OPERATING INSTRUCTION A01-25.2 LOSS OF 120V AC VITAL INSTRUMENT POWER BOARD 1-11 Unit 1 Revision S
. PREPARED BY:
J. M. Anthony RESPONSIBLE SECTION: Operations REVISED BY:
Jeff Epperson SUBMITTED BY:
- b. k u aI s.
gagtpons~ibleSectionSupervisor PORC REVIEW DATE:
JUN 191987 APPROVED BY:
W Plant Manager 0
DATE APPROVED:
Reason for revision (include all Instruction Change Form Nos.):
Revised to delete reference to AOI-l and E0I b.
Streamline Operator actions, and delete erroneous appendices A and 8.
This revision constitutes a biennial review in accordance with
- AI-4. Appendix H.
The last page of this instruction is number:
4 W
ae 8708170215 87 h7 PDR ADOCK O PDR '
P i
s g
t s
SEQUOYAH NUGLEAR PLANT PLANT INSTRUCTION REVISION LOG ABNORMAL OPERATING INSTRUCTION A0I-25.2 REVISION Date Pages REASON FOR REVISION (INCLUDE COMMIT-LEVEL Approved Affected MENTS AND ALL ICF FORM NUMBERS) 0 09/3/80 All 1
12/23/83 2,3,9, i
l 2
09/12/83 All 3
0'//31/84 1,10 4
10/04/84 2
l Revised to delete reference to AOI-l and E0I-0.
Streamline Operator actions, and l
delete erroneous appendices A and B.
This revision constitutes a biennial review in accordance with AI-4, 4
5 ii i M., i Q iCf((
All Appendix H.
w-e x;;.
0079H/ sat /mbs
~
t
~
SQN AOI-25.2 Page 1
~
Revision 5
~
I.
SYMPTOMS A.
Alarms 1.
120V AC VITAL PHR BD l-II UV OR BREAKER TRIP 2.
120V AC VITAL INVERTER 1-II ABNORMAL B.
Indications 1.
Power Range N-42 failure.
2.
Auto and manual Rod Block and Rod Stop due to High Flux Rod Stop.
3.
Loss of Steam Flow Portion of Signal to Feedwater control system resulting in failure to control steam generator
" level, if channel II is selected.
4.
Loss of Steam Generator Level Control due to Loss of Input signal to program on steam generators 1 and 4.
5.
Possible Reactor Trip due to Steam Generator Level.
6.
Malfunction of trip status lights and safeguards systems annunciators.
7.
Loss of Auto-Makeup to Volume Control Tank.
C.
System Partial failures 1.
Reduction of Feedwater flow due to demand signal from steam generator 2 falling low.
2.
If a centrifugal charging pump is in operation, charging flow will increase due to failure of FT-62-93 opening FCV-62-93 and an increase lh seal injection flow will occur'.
3.
Loss of power to Solid State Protection system output relays (Train B) and Channel II input relays (Trains A and B).
4.
If pressurizer level is selected to LT-68-335 for control, pressurizer low level auto actions will occur.
~
0150H/ SAT /rdh
}
SQN j
A01-25.2 i
Page 2 Revision 5
(
I.'
SYMPTOMS (Continued)
C.
System Partial Failures (Continued) 5.
If Pressurizer Press. is selected to channel PT-68-334 the sprays will be closed and back-up heaters energized until locked-out by low level signal if LT-68-335 was selected for
. l-level control.
6.
Loss of Automatic control in AFH System of LCV-3-148, 171 I-(Level control for steam generators 3 and 4) for motor I
driven AFH pump 1B-B.
- 7.. Loss of Automatic control in Auxiliary Feed System of 1
LCV-3-173, 174 (Level control for steam generators 1 and 2) for turbine driven AFH pump 1A-S.
I 1
f
' NOTE:
The above failures are of greatest immediate consequence, for complete loads list of vital board 1-II see Appendix A.
II. AUTOMATIC ACTIONS A.
Possible reactor trip due to low-low S/G 1evel.
III.
IMMEDIATE OPERATOR ACTIONS A.
None IV.
SUBSEQUENT OPERATOR ACTIONS A.
If reactor trip occurs then refer to emergency instructions.
B.
If reactor oces not trip, then, at the NIS panel, defeat the PR rod stop.
C.
Assume and maintain manual rod control as required.
NOTE:
Do not use bank select, use of bank select will cause the bank overlap program to be lost.
~
Olspatch operator to restore power to failed board (transfer to D.
auxiliary power supply).
0150H/ SAT /deh
~
SQN A0I-25.2 Page 3
~
Revision 5 IV.
SUBSEQUENT OPERATOR ACTIONS (cont)
Assume Manual control of steam generator water level on the E.
affected steam generators.
F.
Verify Positive Displacement charging pump is not in service since speed controller is failed, shift charging to centrifugal r
pump if necessary.
Transfer control of FCV-62-93 to Auxiliary
[.
control room.
G.
Verify Pressurizer Level and Pressure are not selected to l
LT-68-335 and PT-68-334.
H.
If power is restored to the failed boards, return systems to normal operating mode.
NOTE:
Oue to feedback signals and time delays in circuitry, controllers may not control immediately.
I.
Evaluate need to shutdown per T.S. 3.8.2.1 if power cannot be restored to the affected board.
If necessary, commence orderly
(-
shutdown to the hot standby condition per GOI-5 and G01-3.
Initiate REP pr IP-1 (Engineered Safety Features) as required.
Refer to TS 3.8.2.2.
NOTE:
Operation may be continued at the discretion of the Manager, Operations Group, with respect to l
Tech. Spec. section 3.
t 1.
If shutdown is to continue to mode 5, follow GOI-3 with exception:
74-2 valve will require placing Bkr. transfer switch to Aux. to open valve when RCS pressure is below 380 psig.
2.
Transfer FCV-74-28 to aux. incide if B train RHR is' required
~
for cooldown.
~
j V.
REFERENCES l
A.
TS 3.8.2.1, 3.8.2.2 B.
SOI-55 Series C.
45N706-2 4
0150H/ SAT /rdh
____._u___..______
\\
SQN AOI-25.2 Page 4 Revision 5 APPENDIX A Page ' of 1 Load List: 120V AC Vital Inst. Power Bd. I-II SSPS (A) CH II input relays (1-R-46)
SSPS (B) CH II input and train B output relays (1-R-51)
NIS instr. power CH II NIS control power CH II Process protection set II (1-R-5)
UHI accumulator CH II isol. valve FCV-87-22 ERCH and containment rad. monitor 0-RE-90-134, 1-RE-90-112 Instrument Bus B Aux. relay rack SSPS aux. relays (1-R-78)
RB isol. valve FCV-32-102A, 102B Aux. compressor B, AB isol. valve FCV-32-85
~
Rad. rate meters and 1-RI-90-112 Rad. monitor 0-RE-90-126 125V de vital battery board II instruments i
Chlorine detector CLAN-43-205B l
Post accident sampling solenoid valves PC0-65-83 and 87 aux. relays (1-R-78)
Toilet, locker, spreading, and cont rooms isol. dampers FCO-31A-102,104 l
FCV-31A-106A, 106B (1-R-78)
B0P process instr. control rack (1-R-131)
AB instr. Bus B 0-FCV-12-79 Containment purge air exhaust rad. monitor 1-RE-90-131 NSSS aux. relay rack, 8 bus (1-R-55)
Aux. relay rack sep. and aux. relays (1-R-78)
Aux, control panel, B relay bus Aux. control panel, B instr. bus Reactor vessel level instrumentation system (1-R-148)
Aux. dryer Train B
~
Aux. relay rack sep and aux. relays (1-R-77)-
BAT A htr. B-B controller TIT-62-245 AB gas treatment fan B-B press. controller BAT C htr. B-B controller TIT-62-246 Rad. monitor 0-RE-90-206 RCP 2 UV and UF relays Process control group 2 (1-R-17)
Instrument bus 2 (0-M-278)
Plugmold instr. bus 2 (1-M-3, 1-M-6)
Acoustic flow monitoring Fire pump 2B-B sep. relays AB general exhaust fan IB flow controller UHI instr. bus 2
~
0150H/ SAT /deh
_