Rev 1 to Function Restoration Guidelines FR-H.3, Response to Steam Generator High Level
ML20237H641
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/19/1987
From: Strickland G, Terpstra G
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20237H133 List: ... further results
References
FR-H.3, NUDOCS 8708170299
Download: ML20237H641 (6)


Text

___ _.___

up l'

s.

TENNESSEE VALLEY AUTHORITY

~

SEQUOYAH NUCLEAR PLANT FUNCTION RESTORATION GUIDELINES FR-H.3 RESPONSE TO' STEAM GENERATOR HIGH LEVEL

.i Revision 1 PREPARED BY:

G. Strictland RESPONSIBLE SECTION: Operations REVISED BY:

Gm t. TespareA SUBMITTED BY:,

,1

/1

- s esponsible Section Supervisor PORC REVIEW DAT.

MAY 191987 APPROVED BY:_

[

Plant Manager

'N I O IS N DATE APPROVED:

L Reason for revision (include all Instruction Change Form Nos.):

Revi;ed to make minor organization name change - step 4 changed HP to RAD CON.

i The last page of this instruction is number:

4

]

1

$h81 O$c $o 27 D

PDR p

n.

f[_.

s SEQUOYAH NUCLEAR PLANT

~

PLANT INSTRUCTION REVISION LOG l

f FUNCTION RESTORATION GUIDELINES FR-H.3 ~

~

REVISION Date Pages REASON FOR REVISION (INCLudC COMMIT-LEVEL Approved Affected MENTS AND ALL ICF FORM NUMBERS)

New instruction written per commitment 0

08/21/85 All to NUREG 0737

[

lgj g jgg7 Revised to make minor organization name 3

3' change - step 4 changed PP to RAD CON.

1.

~

l-t'

- x I

t l

L 4-0264L/pah 1l m

9 m

_m_ _ _ _.

SQNP FR-H.3 Unit 1 or 2 Page 1 of 4 R ev, O f

Ik RESPONSE TO STEAM GENERATOR HIGH LEVEL

~

A.

PURPOSE This guideline provides actions to respond to a steam generator high level B.

SYMPTOMS S/G level greater than 75%

C.

TRANSITION FROM OTHER INSTRUCTIONS 1.

FR-H.2, Response To Steam Generator Overpressure FR-H.4, Response To Loss of Normal Steam Release Capabilities 3.

Status Tree l(

..A e

k e i

SQNP FH-H.3 Unit 1 or 2 Page 2 of 4 Rev. O f

1(

RESP 5NSE TO STEAM GENERATOR HIGH LEVEL S_TEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED g.-

1 Identify Affected S/G a.

Narrow range S/G '

a.

IF all S/G levels <. 75%,

level > 75%

THEN return to instruction in effect 2

Verify MFW Isolation a.

MFW isolation valves - CLOSED b.

MFW reg valves - CLOSED c.

MFW bypass valves - CLOSED d.

MFW Pumps - TRIPPED 3

Verify AFW Isolation To Affected S/G a.

Motor-driven AFW level control valve - CLOSED b.

Turbine-driven AFW level control valve - CLOSED c.

Affected S/G AFW flow 0 gpm c

l

SQNP FR-H.3 Unit 1 or 2 Page 3 of 4 Rev. 1 RESPONSE TO STEAM GENERATOR HIGH LEVEL STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTkINED i

4 Check Affected S/G Radiation -

IF affected S/G radiation is f

NORMAL

Eigh, i

THEN consult with TSC to a.

Condenser exhaust monitors evaluate the following bptions:

b.

S/G blowckown monitors Increase supports for the main steamlines Pin or block the pipe hangers I

Drain the main steamlines following Rad Con controls l

Establish S/G blowdown following Rad Con l

controls x

Go to

IF condenser exhaust and 57G blowdown monitors NOT available, i

THEN:

{

Notify Rad Con l

to survey main j

steamlines and S/G blowdown lines l

Notify chem lab to sample a

S/G activity

{

Check RM-90-124 Aux Bldg 690 Y

L~

RESPS/I aac

t SQNP FR-H. 3 Unit 1 or 2 Page 4 of 4 Rev. O RESP 5NSE TO STEAM GENERATOR HIGH LEVEL

^

i i

STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 5

Establish Blowdown From Affected S/G 6

Check Affected S/G Level a.

Narrow range S/G level -

DECREASING f

~

l b.

I_F affected S/G level has

{

reached the main steamline

(> 90% S/G narrow range level),,

THEN:

1 l

1) Do NOT depressurize affected S/G
2) Close affected S/G MSIV and bypass valve

{

l

3) Close steam supply from affected S/G to turbine-driven AFW pump
4) Drain main steamline 7

Return To Instruction In Effect i

~

i

- END -

1

/

.- 4 1

_______A