ML16173A269: Difference between revisions
From kanterella
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 13: | Line 13: | ||
| document type = Fuel Cycle Reload Report, Letter | | document type = Fuel Cycle Reload Report, Letter | ||
| page count = 29 | | page count = 29 | ||
}} | }} |
Revision as of 05:24, 27 February 2018
ML16173A269 | |
Person / Time | |
---|---|
Site: | Clinton |
Issue date: | 06/16/2016 |
From: | Stoner T R Exelon Generation Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
U-604284 | |
Download: ML16173A269 (29) | |
Similar Documents at Clinton | |
---|---|
Category:Fuel Cycle Reload Report
MONTHYEARU-604662, Submittal of the Core Operating Limits Report for Clinton Power Station, Unit 1, Cycle 21, Revision 172021-10-23023 October 2021
[Table view]Submittal of the Core Operating Limits Report for Clinton Power Station, Unit 1, Cycle 21, Revision 17 U-604510, Submittal of the Core Operating Limits Report Cycle 20; Revision 152019-10-13013 October 2019 Submittal of the Core Operating Limits Report Cycle 20; Revision 15 U-604458, Submittal of the Core Operating Limits Report, Cycle 19, Revision 142018-12-18018 December 2018 Submittal of the Core Operating Limits Report, Cycle 19, Revision 14 U-604424, Submittal of the Core Operating Limits Report for Clinton Power Station, Unit 1, Cycle 19, Revision 132018-05-15015 May 2018 Submittal of the Core Operating Limits Report for Clinton Power Station, Unit 1, Cycle 19, Revision 13 U-604353, Submittal of the Core Operating Limits Report Cycle 18, Revision 122017-06-16016 June 2017 Submittal of the Core Operating Limits Report Cycle 18, Revision 12 U-604284, Core Operating Limits Report for Cycle 17, Revision 112016-06-16016 June 2016 Core Operating Limits Report for Cycle 17, Revision 11 U-604219, Submittal of the Core Operating Limits Report, Cycle 16, Revision 102015-06-0303 June 2015 Submittal of the Core Operating Limits Report, Cycle 16, Revision 10 U-604201, Core Operating Limits Report Cycle 15, Revision 92015-02-27027 February 2015 Core Operating Limits Report Cycle 15, Revision 9 U-604047, Submittal of the Core Operating Limits Report for Clinton Power Station, Unit 1, Cycle 142012-01-0404 January 2012 Submittal of the Core Operating Limits Report for Clinton Power Station, Unit 1, Cycle 14 U-604038, Submittal of the Core Operating Limits Report for Clinton Power Station, Unit 1, Cycle 13 Revision. Cover Letter and (Non-Proprietary Version)2011-09-16016 September 2011 Submittal of the Core Operating Limits Report for Clinton Power Station, Unit 1, Cycle 13 Revision. Cover Letter and (Non-Proprietary Version) U-603955, Core Operating Limits Report, Cycle 132010-04-19019 April 2010 Core Operating Limits Report, Cycle 13 U-603926, Submittal of the Core Operating Limits Report, Cycle 10 Revision 12009-11-0303 November 2009 Submittal of the Core Operating Limits Report, Cycle 10 Revision 1 U-603845, Issuance of the Core Operating Limits Report Cycle 122008-01-30030 January 2008 Issuance of the Core Operating Limits Report Cycle 12 U-603759, Issuance of the Core Operating Limits Report for Clinton Power Station, Unit 1, Cycle 112006-02-23023 February 2006 Issuance of the Core Operating Limits Report for Clinton Power Station, Unit 1, Cycle 11 ML0605504032006-02-23023 February 2006 Issuance of the Core Operating Limits Report for Clinton Power Station, Unit 1, Cycle 11 ML0405805622004-02-18018 February 2004 Core Operating Limits Report for Clinton, Unit 1, Cycle 10, Revision 0 U-603647, Issuance of the Core Operating Limits Report for Reload 8, Cycle 9, Revision 12004-01-16016 January 2004 Issuance of the Core Operating Limits Report for Reload 8, Cycle 9, Revision 1 U-603553, Core Operating Limits Report for Clinton Power Station, Unit 1, Cycle 92002-05-0202 May 2002 Core Operating Limits Report for Clinton Power Station, Unit 1, Cycle 9 2021-10-23 Category:Letter MONTHYEARML24285A1422024-10-24024 October 2024
[Table view]Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Re CPS Section 106 Consultation ML24285A1462024-10-24024 October 2024 Ltr. to Gena Kakkak, Chairwoman, Menominee Indian Tribe of Wisconsin Re CPS Section 106 Consultation IR 05000461/20244032024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024403 ML24285A1482024-10-24024 October 2024 Ltr. to Joseph Rupnick, Chairman, Prairie Band Potawatomi Nation Re CPS Section 106 Consultation ML24285A1472024-10-24024 October 2024 Ltr. to Geoffrey M. Standing Bear, Principal Chief, Osage Nation Re CPS Section 106 Consultation ML24285A1442024-10-24024 October 2024 Ltr. to Estavio Elizondo, Sr., Chairman, Kickapoo Traditional Tribe of Texas Re CPS Section 106 Consultation IR 05000461/20244022024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024402 ML24285A1452024-10-24024 October 2024 Ltr. to Gail Cheatham, Kickapoo Tribe of Indians of the Kickapoo Reservation in Ks Re CPS Sect 106 Consult ML24283A1642024-10-23023 October 2024 Summary of the 2024 Environmental Audit Related to the Review of the License Renewal Application Environmental Report (EPID Number L-2024-LNE-0000)(Docket Number:50-461) ML24285A1432024-10-21021 October 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma Re CPS Section 106 Consultation ML24285A1412024-10-21021 October 2024 Ltr. to Craig Harper, Chief, Peoria Tribe of Oklahoma Re CPS Section 106 Consultation RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24215A2932024-09-27027 September 2024 Scoping Summary Letter 05000461/LER-2023-002-01, Reactor Core Isolation Cooling Inoperable Prior to Mode Change2024-09-24024 September 2024 Reactor Core Isolation Cooling Inoperable Prior to Mode Change ML24211A2302024-09-11011 September 2024 – Request for Partial Site Release for Facility Operating License No. NPF-62 IR 05000461/20240112024-09-0909 September 2024 Commercial Grade Dedication Inspection Report 05000461/2024011 RS-24-087, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2024-09-0909 September 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station IR 05000461/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2024005) ML24222A3952024-08-23023 August 2024 Regulatory Audit Report to Support the Review of the Amendments to Revise Reactor Water Cleanup Valve Isolation Timing ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000461/20240022024-08-0909 August 2024 Integrated Inspection Report 05000461/2024002 ML24220A2772024-08-0707 August 2024 Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000461/2025010 ML24212A2212024-08-0202 August 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-LNE-0000) (Docket Number: 50-461) ML24157A3242024-07-11011 July 2024 Issuance of Amendment No. 254 Revision of Reactor Water Cleanup Isolation Valve Timing ML24158A0772024-07-0303 July 2024 Notice of Consideration of Approval of Partial Site Release, Public Meeting, and Request for Comments (EPID L-2023-LLA-0088) - Letter ML24163A3252024-06-28028 June 2024 Aging Management Regulatory Audit Plan ML24163A3242024-06-28028 June 2024 LRA - Portal Letter ML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes ML24290A0942024-05-21021 May 2024 Letter from Rachael Mangum (Achp) to Stephen Koenick (NRC) License Renewal Application for the Clinton Power Station Unit 1 Dewitt County, Il, Achp Project Number: 020924 IR 05000461/20240122024-05-20020 May 2024 Biennial Problem Identification and Resolution Inspection Report Report 05000461/2024012 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-050, Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2024-05-0909 May 2024 Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation IR 05000461/20240012024-05-0707 May 2024 Integrated Inspection Report 05000461/2024001 ML24103A1032024-05-0101 May 2024 SHPO Consultation Letter for Clinton License Renewal ML24120A3462024-04-30030 April 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma; Re., CPS Section 106 Consultation ML24120A3432024-04-30030 April 2024 Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma; Re., CPS Section 106 Consultation ML24120A3442024-04-30030 April 2024 Ltr. to Gena Kakkak, Chairman, Menominee Indian Tribe of Wisconsin; Re., CPS Section 106 Consultation ML24120A3452024-04-30030 April 2024 Ltr. to Lester Randell, Chairman, Kickapoo Tribe of Indians of the Kickapoo Reservation in Kansas; Re., CPS Section 106 Consultation ML24103A1152024-04-30030 April 2024 Ltr. to Geoffrey Standing Bear, Principal Chief, the Osage Nation; Re., CPS Section 106 Consultation ML24103A0992024-04-30030 April 2024 Achp Scoping Letter for Clinton License Renewal RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24107B0312024-04-29029 April 2024 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24089A2222024-04-11011 April 2024 LRA - Acceptance and Opportunity for Hearing - Letter ML24092A3452024-04-0101 April 2024 Updated Safety Analysis Report (Usar), Revision 23 2024-09-09 |
Retrieved from "https://kanterella.com/w/index.php?title=ML16173A269&oldid=379950"