{{#Wiki_filter:Part 53 Rulemaking:
{{#Wiki_filter:Part 53 Rulemaking:
Industry Perspectives ACRS Future Plant Subcommittee December 17, 2021 Marc Nichol, NEI Senior Director, New Reactors Cyril Draffin, USNIC Senior Fellow, Advanced Nuclear
Industry Perspectives ACRS Future Plant Subcommittee December 17, 2021
  ©2021 Nuclear Energy Institute


Agenda Risk-Informed Licensing Approaches (NEI)                               11:45 AM
Marc Nichol, NEI Senior Director, New Reactors
 
Cyril Draffin, USNIC Senior Fellow, Advanced Nuclear
 
©2021 Nuclear Energy Institute Agenda
 
Risk-Informed Licensing Approaches (NEI) 11:45 AM
* QHOs
* QHOs
* PRA
* PRA
* September white paper Lunch                                                                     1:00 PM Standards and Atomic Energy Act (USNIC)                                 2:00 PM Increasing Regulatory Burden without Commensurate Safety Increase (NEI) 2:20 PM
* September white paper
 
Lunch 1:00 PM
 
Standards and Atomic Energy Act (USNIC) 2:00 PM
 
Increasing Regulatory Burden without Commensurate Safety Increase (NEI) 2:20 PM
* ALARA design requirement
* ALARA design requirement
* BDBE in design basis
* BDBE in design basis
* Redundant Programs Improving Clarity and Efficiency (USNIC)                               3:10 PM
* Redundant Programs
 
Improving Clarity and Efficiency (USNIC) 3:10 PM
* Technology-inclusive
* Technology-inclusive
* Goals for Regulatory Efficiency
* Goals for Regulatory Efficiency
* Similar ACRS and Industry Input Adjourn                                                                3:50 PM
* Similar ACRS and Industry Input
                                                                                    ©2021 Nuclear Energy Institute 2


Risk-Informed Licensing Approaches Marc Nichol, NEI 3
Adjourn 3:50 PM©2021 Nuclear Energy Institute 2 Risk-Informed Licensing Approaches Marc Nichol, NEI


Risk-informed Licensing Approaches Overview of Industry Goals for Part 53 Usefulness
3 Risk-informed Licensing Approaches Overview of Industry Goals for Part 53 Usefulness
* All licensing approaches are viable
* All licensing approaches are viable
* Less burdensome over the lifecycle of activities
* Less burdensome over the lifecycle of activities
Line 42: Line 54:
* Primary expectation is that decisions are informed by the use of a PRA
* Primary expectation is that decisions are informed by the use of a PRA
* In some cases alternatives to a PRA may provide equivalent benefits
* In some cases alternatives to a PRA may provide equivalent benefits
                                                                ©2021 Nuclear Energy Institute 4


Industry Concerns on Part 53 Rule Language Subsequent slides present details of industrys perspective on these concerns
©2021 Nuclear Energy Institute 4 Industry Concerns on Part 53 Rule Language Subsequent slides present details of industrys perspective on these concerns
: 1. NRC has stated that performance-based design requirements are not dependent on how PRA is used, but NRC has stated that only LMP and other methods using PRA in a leading role can use Part 53
: 1. NRC has stated that performance-based design requirements are not dependent on how PRA is used, but
: 2. NRC has stated that use of PRA in leading role is required because QHOs are in the rule, but NRC has not explained why QHOs must be in the rule
 
: 3. NRC has stated they are developing Part 5X in response to industrys request to use other risk-informed approaches, but Industry has requested straightforward changes to Part 53 to accomplish this goal, and industry did not ask for a parallel Part 5X              ©2021 Nuclear Energy Institute 5
NRC has stated that only LMP and other methods using PRA in a leading role can use Part 53
: 2. NRC has stated that use of PRA in leading role is required because QHOs are in the rule, but


Benefits of Part 53 Why Part 53 benefits should be available for all risk-informed licensing approaches Benefits of Part 53 - performance-based design requirements
NRC has not explained why QHOs must be in the rule
: 3. NRC has stated they are developing Part 5X in response to industrys request to use other risk-informed approaches, but
 
Industry has requested straightforward changes to Part 53 to accomplish this goal, and industry did not ask for a parallel Part 5X ©2021 Nuclear Energy Institute 5 Benefits of Part 53 Why Part 53 benefits should be available for all risk-informed licensing approaches Benefits of Part 53 - performance-based design requirements
* All requirements are focused back to their relevance to safety criteria
* All requirements are focused back to their relevance to safety criteria
* Integrated framework of design requirements (see NRCs graphic on next slide)
* Integrated framework of design requirements (see NRCs graphic on next slide)
* Performance-based acceptance criteria (examples):
* Performance-based acceptance criteria (examples):
53.210 - {dose} to individualat EAB {will not exceed} 25 rem TEDE {for DBA}
53.210 - {dose} to individualat EAB {will not exceed} 25 rem TEDE {for DBA}
53.230 - primary safety function is limiting release of radioactive materialadditional safety functionsmust be defined 53.240 - LBEs must be identifiedmust address combinations of malfunctionshuman errorsexternal hazards{ from AOO to very unlikely}
53.400 - design features must be provided {that}...satisfy the safety criteria 53.410 - FDC must be definedto demonstrate compliance with safety criteria We agree with NRC that Part 53 performance-based requirements for plant design are not dependent on how PRA is used
                                                                                    ©2021 Nuclear Energy Institute 6


NRCs Integrated Framework
53.230 - primary safety function is limiting release of radioactive materialadditional safety functionsmust be defined
                          ©2021 Nuclear Energy Institute 7
 
53.240 - LBEs must be identifiedmust address combinations of malfunctionshuman errorsexternal hazards{ from AOO to very unlikely}
 
53.400 - design features must be provided {that}...satisfy the safety criteria
 
53.410 - FDC must be definedto demonstrate compliance with safety criteria We agree with NRC that Part 53 performance-based requirements for plant design are not dependent on how PRA is used
 
©2021 Nuclear Energy Institute 6 NRCs Integrated Framework


Risk-informed Approach Desired by Industry Why Part 53 must be inclusive in how PRA is used in the design and analysis NEI/USNIC has been asking for a rule that accommodates all risk-informed approaches since mid-2020
©2021 Nuclear Energy Institute 7 Risk-informed Approach Desired by Industry Why Part 53 must be inclusive in how PRA is used in the design and analysis NEI/USNIC has been asking for a rule that accommodates all risk -
informed approaches since mid-2020
* We wanted Part 53 requirements to be more inclusive, with guidance to address details where necessary
* We wanted Part 53 requirements to be more inclusive, with guidance to address details where necessary
* We did not want multiple parallel frameworks of requirements in order to enable flexibility
* We did not want multiple parallel frameworks of requirements in order to enable flexibility
* Currently Part 50 and 52 requirements achieve inclusiveness through a single design/analysis framework without a reduction in predictability
* Currently Part 50 and 52 requirements achieve inclusiveness through a single design/analysis framework without a reduction in predictability
* We believe NRC should establish criteria that demonstrates safety, and does not need to require specific methods for design and analysis We do not agree with the NRC that only LMP and other methods using PRA in a leading role should be able to use Part 53
* We believe NRC should establish criteria that demonstrates safety, and does not need to require specific methods for design and analysis We do not agree with the NRC that only LMP and other methods using PRA in a leading role should be able to use Part 53
                                                                            ©2021 Nuclear Energy Institute 8


Accomplishing Risk-informing Benefits of Risk-informing
©2021 Nuclear Energy Institute 8 Accomplishing Risk-informing
                            =
 
* Integrated approach of PRA Deterministic      Risk        Risk-    complements deterministic Criteria    Information    Informed
Benefits of Risk-informing Deterministic Risk Risk-
* Integrated approach of PRA Criteria =InformationInformedcomplements deterministic
* Characterize the overall residual risks of a design
* Characterize the overall residual risks of a design
* Can help focus on issues of
* Can help focus on issues of Risk Deterministic Risk-safety significance Information Criteria =Informed* Should yield greater operational flexibility after licensing
                            =
 
safety significance Risk     Deterministic     Risk-Information     Criteria     Informed
©2020 Nuclear Energy Institute 9 Spectrum of Risk-informed Approaches Parts 53 and 5X dont align with how plants are actually designed and analyzed
* Should yield greater operational flexibility after licensing
                                                    ©2020 Nuclear Energy Institute 9


Spectrum of Risk-informed Approaches Parts 53 and 5X dont align with how plants are actually designed and analyzed How Nuclear Plants Part 5X Incentivizes                 are Actually Designed                             Part 53 Requires Risk-informed Continuum
How Nuclear Plants Part 5X Incentivizes are Actually Designed Part 53 Requires
                                                                                ©2020 Nuclear Energy Institute 10


NEI September 2021 Paper Technology-Inclusive, Performance-Based and Risk-Informed Approaches for Assessing the Safety Adequacy of the Design for Part 53 Goals:
Risk-informed Continuum
 
©2020 Nuclear Energy Institute 10 NEI September 2021 Paper Technology -Inclusive, Performance -Based and Risk-Informed Approaches for Assessing the Safety Adequacy of the Design for Part 53 Goals:
* Advance discussion of how different approaches may fit under Part 53
* Advance discussion of how different approaches may fit under Part 53
* More clearly illuminate the role of PRA and risk information Approach:
* More clearly illuminate the role of PRA and risk information Approach:
Line 89: Line 109:
* Demonstrate how each example meets the guiding principles
* Demonstrate how each example meets the guiding principles
* Each example has a different balance between deterministic safety analyses and risk information in what is always a risk-informed process
* Each example has a different balance between deterministic safety analyses and risk information in what is always a risk-informed process
                                                                            ©2021 Nuclear Energy Institute 11


Key Elements of Part 53 Addressed Limits for protecting the public health and safety Safety functions Licensing basis events Defense-in-depth Design features Functional design criteria Safety categorization Notes
©2021 Nuclear Energy Institute 11 Key Elements of Part 53 Addressed
 
Limits for protecting the public health and safety Safety functions Licensing basis events Defense-in-depth Design features Functional design criteria Safety categorization
 
Notes
* The paper does not imply an endorsement of the NRC preliminary rule text, but acknowledges that these key elements are important to the safety case
* The paper does not imply an endorsement of the NRC preliminary rule text, but acknowledges that these key elements are important to the safety case
* Other Part 53 elements are important to the licensing basis, but are not included since they do not have a primary effect on the TI-RIPB process
* Other Part 53 elements are important to the licensing basis, but are not included since they do not have a primary effect on the TI-RIPB process
* It is envisioned that the TI-RIPB process in the paper will inform future changes to
* It is envisioned that the TI-RIPB process in the paper will inform future changes to ©2021 Nuclear Energy Institute 12 the Part 53 requirements Principles for TI -RIPB Process
                                                                        ©2021 Nuclear Energy Institute 12 the Part 53 requirements
 
Principles for TI-RIPB Process
: 1. The plant meets the established limits for the adequate protection of the public health and safety.
: 1. The plant meets the established limits for the adequate protection of the public health and safety.
: 2. The safety functions, design features and functional design criteria relied upon to meet the safety criteria are established.
: 2. The safety functions, design features and functional design criteria relied upon to meet the safety criteria are established.
Line 104: Line 124:
: 5. The design reflects the application of an appropriate philosophy of defense-in-depth.
: 5. The design reflects the application of an appropriate philosophy of defense-in-depth.
: 6. The special treatment for SSCs, and associated programmatic controls and human actions, provide reasonable assurance that the SSCs will perform the safety functions for which they are relied upon.
: 6. The special treatment for SSCs, and associated programmatic controls and human actions, provide reasonable assurance that the SSCs will perform the safety functions for which they are relied upon.
: 7. The scope and level of detail for the design and analysis of the plant in the licensing basis information adequately describes the safety case. (Not addressed at this time)                                       ©2021 Nuclear Energy Institute 13
: 7. The scope and level of detail for the design and analysis of the plant in the licensing basis information adequately describes the safety case. (Not addressed at this time) ©2021 Nuclear Energy Institute 13 Examples of Risk-Informed Licensing Approaches


Examples of Risk-Informed Licensing Approaches Four Examples evaluated
Four Examples evaluated
* A: Licensing Modernization Project (NEI 18-04)
* A: Licensing Modernization Project (NEI 18- 04)
* B: NEI 18-04 with PRA in a complementary role
* B: NEI 18- 04 with PRA in a complementary role
* C: Approach compatible with IAEA safety standards
* C: Approach compatible with IAEA safety standards
* D: Bounding Analysis
* D: Bounding Analysis
Line 118: Line 138:
* All can utilize the Frequency-Consequence curve
* All can utilize the Frequency-Consequence curve
* Specific use of PRA is related to how the designer wishes to approach the design and analysis of the plant
* Specific use of PRA is related to how the designer wishes to approach the design and analysis of the plant
                                                                      ©2021 Nuclear Energy Institute 14
©2021 Nuclear Energy Institute 14 Safety Criteria and QHOs There has been little discussion of whether QHOs are more appropriate in Policy or the Rule NRC has said QHOs must be in the rule, and asked if not the QHOs, then what?
 
Safety Criteria and QHOs There has been little discussion of whether QHOs are more appropriate in Policy or the Rule NRC has said QHOs must be in the rule, and asked if not the QHOs, then what?
* This is the wrong way to frame the consideration of QHOs and BDBE The right framing is why should QHOs be in the rule?
* This is the wrong way to frame the consideration of QHOs and BDBE The right framing is why should QHOs be in the rule?
* QHOs have been in Policy Statement for decades, and BDBE is addressed by mitigation requirement
* QHOs have been in Policy Statement for decades, and BDBE is addressed by mitigation requirement
Line 128: Line 146:
The NRC has not provided a basis for having QHOs in the rule
The NRC has not provided a basis for having QHOs in the rule
* We provided an assessment of QHOs in rule vs. Policy Statement as early as January 2021, but did not receive any feedback from NRC
* We provided an assessment of QHOs in rule vs. Policy Statement as early as January 2021, but did not receive any feedback from NRC
                                                                                  ©2021 Nuclear Energy Institute 15
©2021 Nuclear Energy Institute 15 Quantitative Health Objectives (1/3)
 
Industrys Evaluation of advantages/disadvantages of putting QHOs in the rule Advantages Disadvantages
Quantitative Health Objectives (1/3)
: 1. Enhances regulatory stability by making it harder for the NRC 1. Increases regulatory uncertainty by establishing requirements to change the limits, or make arbitrary judgements. without specifying the consequence limits (i.e., dose for immediate fatalities and latent cancers).
Industrys Evaluation of advantages/disadvantages of putting QHOs in the rule Advantages                                                       Disadvantages
: 2. Enhanced clarity by providing specific limits of acceptable risk 2. Reduces regulatory stability since changes to the to the public for beyond design basis events (BDBEs). consequence limits (i.e., risk for immediate fatalities and latent cancers) will now be regulatory limits instead of policy goals.
: 1. Enhances regulatory stability by making it harder for the NRC   1. Increases regulatory uncertainty by establishing requirements to change the limits, or make arbitrary judgements.                 without specifying the consequence limits (i.e., dose for immediate fatalities and latent cancers).
: 3. Ensures that regulations explicitly result in risk levels that 3. Is counter to Commissions intent that the QHOs are goals, comply with the QHO limits. and not limits.
: 2. Enhanced clarity by providing specific limits of acceptable risk 2. Reduces regulatory stability since changes to the to the public for beyond design basis events (BDBEs).               consequence limits (i.e., risk for immediate fatalities and latent cancers) will now be regulatory limits instead of policy goals.
: 4. The QHOs are more understandable to the public because 4. Not having consequence limits, and the complexity of they are expressed in terms of public health effects. demonstrating the QHOs are met, increases licensing risk.
: 3. Ensures that regulations explicitly result in risk levels that   3. Is counter to Commissions intent that the QHOs are goals, comply with the QHO limits.                                         and not limits.
: 5. The QHOs are the maximum acceptable consequences, and 5. Changes to societal risks can result in changes to the therefore avoid more conservative surrogate requirements. requirements that can force changes to the facility design.
: 4. The QHOs are more understandable to the public because           4. Not having consequence limits, and the complexity of they are expressed in terms of public health effects.               demonstrating the QHOs are met, increases licensing risk.
: 6. Potential to eliminate the need for some other requirements 6. Analyses and calculations related to demonstrating the QHOs (e.g., mitigation of beyond design basis events). are met are now used for legal compliance with requirements.
: 5. The QHOs are the maximum acceptable consequences, and           5. Changes to societal risks can result in changes to the therefore avoid more conservative surrogate requirements.           requirements that can force changes to the facility design.
: 7. Risks a revision to the QHOs. The NRC discontinued its efforts circa 2000 to update the safety goals so that improvements can be more significant and incorporate experience with risk-informed decision making. ©2021 Nuclear Energy Institute 16 Quantitative Health Objectives (2/3)
: 6. Potential to eliminate the need for some other requirements     6. Analyses and calculations related to demonstrating the QHOs (e.g., mitigation of beyond design basis events).                   are met are now used for legal compliance with requirements.
: 7. Risks a revision to the QHOs. The NRC discontinued its efforts circa 2000 to update the safety goals so that improvements can be more significant and incorporate experience with risk-informed decision making.
                                                                                                            ©2021 Nuclear Energy Institute 16
 
Quantitative Health Objectives (2/3)
QHOs in the rule do not improve safety, but do create complications Safety is the same whether QHOs are in Rule language or the Policy statement
QHOs in the rule do not improve safety, but do create complications Safety is the same whether QHOs are in Rule language or the Policy statement
* Both approaches demonstrate that design meets the QHOs
* Both approaches demonstrate that design meets the QHOs
Line 150: Line 163:
* Evaluate adequacy of requirements to achieve acceptable risk to the public
* Evaluate adequacy of requirements to achieve acceptable risk to the public
* Objectives not to be used as requirements, but useful as basis for guidance
* Objectives not to be used as requirements, but useful as basis for guidance
* Useful, in a generic sense, in making regulatory decision for an ©2021 application Nuclear Energy Institute 17
* Useful, in a generic sense, in making regulatory decision for an application©2021 Nuclear Energy Institute 17 Quantitative Health Objectives (3/3)
 
Quantitative Health Objectives (3/3)
Industrys Proposal for QHOs in Part 53 to Achieve acceptable risk to the public Apply consistent with the Safety Goal Policy Statement Ensure requirements achieve acceptable risk to the public
Industrys Proposal for QHOs in Part 53 to Achieve acceptable risk to the public Apply consistent with the Safety Goal Policy Statement Ensure requirements achieve acceptable risk to the public
* Dose to the public less than 1 rem (§53.260)
* Dose to the public less than 1 rem (§53.260)
Line 163: Line 174:
* Can use QHOs directly for comparison (as in LMP)
* Can use QHOs directly for comparison (as in LMP)
* Can use QHOs to develop surrogates (e.g., core damage frequency)
* Can use QHOs to develop surrogates (e.g., core damage frequency)
                                                                                ©2021 Nuclear Energy Institute 18


Performance-Based Requirements for PRA Why NRC prescriptive use of PRA in the Rules is not necessary
©2021 Nuclear Energy Institute 18 Performance-Based Requirements for PRA Why NRC prescriptive use of PRA in the Rules is not necessary
* NRC Part 52 requirement:
* NRC Part 52 requirement:
* Applicants to provide a description of the plant-specific PRA and its results.
* Applicants to provide a description of the plant-specific PRA and its results.
Line 176: Line 186:
* Support development of specifications for ITAAC, TS, etc.
* Support development of specifications for ITAAC, TS, etc.
* Scope: Level 1 and 2 including internal and external events and all modes
* Scope: Level 1 and 2 including internal and external events and all modes
* Risk insights: SSC most effective at reducing risk, major contributors of risk and uncertainty                                                       ©2021 Nuclear Energy Institute 19
* Risk insights: SSC most effective at reducing risk, major contributors of risk and uncertainty ©2021 Nuclear Energy Institute 19 Prescriptive Requirements for PRA Why NRC prescriptive use of PRA in the Rules is not necessary
 
Prescriptive Requirements for PRA Why NRC prescriptive use of PRA in the Rules is not necessary
* NRC Part 53 PRA requirements (red are not in Part 50/52 rule language):
* NRC Part 53 PRA requirements (red are not in Part 50/52 rule language):
* Consider events that challenge plant control and safety (internal and external)
* Consider events that challenge plant control and safety (internal and external)
Line 187: Line 195:
* Used for classifying SSCs and human actions according to safety significance, and environmental conditions
* Used for classifying SSCs and human actions according to safety significance, and environmental conditions
* Evaluate adequacy of defense-in-depth measures
* Evaluate adequacy of defense-in-depth measures
* Assess all plant operating states where there is a potential for uncontrolled release                                                           ©2021 Nuclear Energy Institute 20
* Assess all plant operating states where there is a potential for uncontrolled release ©2021 Nuclear Energy Institute 20 Industry Proposed Requirements for Part 53 Why NRC prescriptive use of PRA in the Rules is not necessary
 
Industry Proposed Requirements for Part 53 Why NRC prescriptive use of PRA in the Rules is not necessary
* Performance-based analysis requirements:
* Performance-based analysis requirements:
* Analyses of licensing basis events must be performed
* Analyses of licensing basis events must be performed
Line 201: Line 207:
* Performance-based requirements achieve same outcome as NRCs prescriptive requirements (e.g., rigor, confidence)
* Performance-based requirements achieve same outcome as NRCs prescriptive requirements (e.g., rigor, confidence)
* They are also inclusive to accommodate all roles of the PRA
* They are also inclusive to accommodate all roles of the PRA
                                                                        ©2021 Nuclear Energy Institute 21
©2021 Nuclear Energy Institute 21 NRCs Prescriptive Requirements for PRA Concern that NRC will require more of the PRA to be submitted as part of licensing basis
 
NRCs Prescriptive Requirements for PRA Concern that NRC will require more of the PRA to be submitted as part of licensing basis
* Industry concern has been that QHOs in the rule and more prescriptive PRA requirements will lead to NRC requiring more of the PRA to be submitted in the licensing basis
* Industry concern has been that QHOs in the rule and more prescriptive PRA requirements will lead to NRC requiring more of the PRA to be submitted in the licensing basis
* NRC stated at December 9, 2021 Commission briefing, that it is not their intent to require the PRA to be submitted to and reviewed by the NRC
* NRC stated at December 9, 2021 Commission briefing, that it is not their intent to require the PRA to be submitted to and reviewed by the NRC
* We support this intention and do not think the PRA should be part of the licensing basis, but is available for NRC inspection
* We support this intention and do not think the PRA should be part of the licensing basis, but is available for NRC inspection
* However, the preliminary rule language and staff statements have not reflected this intention
* However, the preliminary rule language and staff statements have not reflected this intention
* 53.1185: The SAR must includean analysis of {all} LBEsto determine compliance with53.220 {QHOs}must address elements in 53.450(e) and (f)
* 53.1185: The SAR must includean analysis of { all} LBEsto determine compliance with53.220 { QHOs}must address elements in 53.450(e) and (f)
{PRA requirements}
{PRA requirements}
* NRC statement at 5/27/21 meeting that NRC would need to review PRA
* NRC statement at 5/27/21 meeting that NRC would need to review PRA
* NRCs endorsement of TICAP must include more PRA details (e.g., reliability
* NRCs endorsement of TICAP must include more PRA details (e.g., reliability
                                                                                  ©2021 Nuclear Energy Institute 22 and capability targets for SSCs)
©2021 Nuclear Energy Institute 22 and capability targets for SSCs)
 
A Part 53 Inclusive of All Licensing Approaches Why pursuit of Part 5X is not necessary, inefficient and increasing confusion NRCs Approach Industrys Proposal Approach to include all risk-Two+ Rigid frameworks (53, Single inclusive framework (Part informed approaches 5X, maybe MA) 53)
A Part 53 Inclusive of All Licensing Approaches Why pursuit of Part 5X is not necessary, inefficient and increasing confusion NRCs Approach                   Industrys Proposal Approach to include all risk-     Two+ Rigid frameworks (53,         Single inclusive framework (Part informed approaches               5X, maybe MA)                     53)
Proposal for Part 53 Only allowed for LMP and Straightforward changes to QHO leading PRA role and PRA requirements to allow all risk-informed approaches Proposal for Part 5X 80%-90% of Part 50/52 Delete and abandon requirements, attempt to make tech-inclusive Proposal for TIRIMA Considering whether to Potential use for guidance, may include need exemptions to Part 53 Level of effort and clarity Significant effort needed, Very little effort needed, clear complex and confusing and straightforward
Proposal for Part 53               Only allowed for LMP and           Straightforward changes to QHO leading PRA role                   and PRA requirements to allow all risk-informed approaches Proposal for Part 5X               80%-90% of Part 50/52             Delete and abandon requirements, attempt to make tech-inclusive Proposal for TIRIMA               Considering whether to             Potential use for guidance, may include                           need exemptions to Part 53 Level of effort and clarity       Significant effort needed,         Very little effort needed, clear complex and confusing             and straightforward
* NRC should revise Part 53 to be inclusive of all risk -informed approaches, abandon Part 5X
* NRC should revise Part 53 to be inclusive of all risk-informed approaches, abandon Part 5X
* Industry is developing guidance that would implement the inclusive Pa r t 53 recommended ©2021 Nuclear Energy Institute 23 in 11/5/21 comments Standards and AEA Cyril Draffin, USNIC
* Industry is developing guidance that would implement the inclusive Part 53 recommended
                                                                                      ©2021 Nuclear Energy Institute 23 in 11/5/21 comments


Standards and AEA Cyril Draffin, USNIC 24
2424 Standards and AEA - NRC I te rat i o n s


Standards and AEA - NRC Iterations Standards in statutory requirements in Atomic Energy Act
Standards in statutory requirements in Atomic Energy Act
* Section 182, adequate protection to the health and safety of the public
* Section 182, adequate protection to the health and safety of the public
* Section 161, to protect health or to minimize danger to life or property.
* Section 161, to protect health or to minimize danger to life or property.
NRC 1st iteration of preliminary rule language established the AEA statutory standards identified above as basis for Part 53 (ML20311A004) for 53.200 NRC 2nd & 3rd iteration of preliminary rule language reduces regulatory clarity
NRC 1st iteration of preliminary rule language established the AEA statutory standards identified above as basis for Part 53 (ML20311A004) for 53.200 NRC 2nd & 3rd iteration of preliminary rule language reduces regulatory clarity
* Current version replaces AEA language with different safety standards that do not clearly relate back to the AEA and have no regulatory precedent
* Current version replaces AEA language with different safety standards that do not clearly relate back to the AEA and have no regulatory precedent
* 53.200, limit the possibility of an immediate threat to the public health and safety and considering potential risks to public health and safety 25
* 53.200, limit the possibility of an immediate threat to the public health and safety and considering potential risks to public health and safety
 
2525 Standards and AEA - NRC Perspective - written (in NRC Discussion of 2nd Iteration of Subpart B,
§ 53.200 Safety Objectives)


Standards and AEA - NRC Perspective - written (in NRC Discussion of 2nd Iteration of Subpart B,
The change is to revise the first objective from providing reasonable assurance of adequate protection to limiting the possibility of an immediate threat to the public health and safety. This language generally aligns with standards the Commission has used for determining the content of technical specifications. The change also revises the second objective from protect public health and minimize danger to as may be appropriate when considering potential risks to public health and safety. The purpose of these objectives is clarified by adding the statement that they will be carried out by meeting the safety criteria identified in this subpart ( §§ 53.210 and 53.220).
      § 53.200 Safety Objectives)
The change is to revise the first objective from providing reasonable assurance of adequate protection to limiting the possibility of an immediate threat to the public health and safety. This language generally aligns with standards the Commission has used for determining the content of technical specifications. The change also revises the second objective from protect public health and minimize danger to as may be appropriate when considering potential risks to public health and safety. The purpose of these objectives is clarified by adding the statement that they will be carried out by meeting the safety criteria identified in this subpart (§§ 53.210 and 53.220).
This change resulted from stakeholder comments and internal NRC discussions regarding the difficulties in using the Atomic Energy Act (AEA) Sections 182 and 161 authorities as the safety objectives for part 53, and in turn as the bases for the two-tier safety criteria framework. Instead, the use of adequate protection is expected to be used in its traditional role as an NRC regulatory finding, which is presumed through compliance with NRC regulations including part 53 or other license requirements. While Sections 182 and 161 of the AEA will be cited as enabling legislation within the rule package (e.g., in the Federal Register Notice), the staff does not foresee incorporating language from the AEA into the safety objectives or tiers in part 53.
This change resulted from stakeholder comments and internal NRC discussions regarding the difficulties in using the Atomic Energy Act (AEA) Sections 182 and 161 authorities as the safety objectives for part 53, and in turn as the bases for the two-tier safety criteria framework. Instead, the use of adequate protection is expected to be used in its traditional role as an NRC regulatory finding, which is presumed through compliance with NRC regulations including part 53 or other license requirements. While Sections 182 and 161 of the AEA will be cited as enabling legislation within the rule package (e.g., in the Federal Register Notice), the staff does not foresee incorporating language from the AEA into the safety objectives or tiers in part 53.
26
2626 Standards and AEA - NRC Perspective -verbal
 
During public meeting discussing change in safety objectives, NRC staff explained that because entirety of Part 53 satisfies the AEA, AEA standards do not need to be referenced in Part 53, and NRC thus should establish new standards to frame the Part 53 requirements.
 
2727 Standards and AEA - Obser vations


Standards and AEA - NRC Perspective -verbal During public meeting discussing change in safety objectives, NRC staff explained that because entirety of Part 53 satisfies the AEA, AEA standards do not need to be referenced in Part 53, and NRC thus should establish new standards to frame the Part 53 requirements.
NRC change seemed to be in support of two tier structure - that has now been dropped responsive to ACRS and Industry comments NRC refers to stakeholder input Approach inconsistent with longstanding practice of NRC and appears to reject decades of Commission precedent, with no compelling benefit or indication of Commissioners approval
27


Standards and AEA - Observations NRC change seemed to be in support of two tier structure - that has now been dropped responsive to ACRS and Industry comments NRC refers to stakeholder input Approach inconsistent with longstanding practice of NRC and appears to reject decades of Commission precedent, with no compelling benefit or indication of Commissioners approval 28
2828 Standards and AEA - Concerns with 3rd I te rat i on


Standards and AEA - Concerns with 3rd Iteration New approach requires extra resources
New approach requires extra resources
* NRC would need to invest significant resources in defining these new standards, to ensure consistency with the AEA New approach reduces regulatory clarity and efficiency
* NRC would need to invest significant resources in defining these new standards, to ensure consistency with the AEA New approach reduces regulatory clarity and efficiency
* No clear connection between the Part 53 requirements and the AEA safety standards.
* No clear connection between the Part 53 requirements and the AEA safety standards.
* No equivalent in Parts 50 and 52, no regulatory precedent Could greatly expand NRCs regulatory control beyond what is in place for existing reactors without increase to safety
* No equivalent in Parts 50 and 52, no regulatory precedent Could greatly expand NRC s regulatory control beyond what is in place for existing reactors without increase to safety
* Appears to be regulatory overreach that contravenes longstanding safety policy embraced by the Commission for decades consistent with safety standards established by AEA
* Appears to be regulatory overreach that contravenes longstanding safety policy embraced by the Commission for decades consistent with safety standards established by AEA
* No explanation on what new safety standards mean, how they can be met, or how they relate to all requirements in Part 53                                                 29
* No explanation on what new safety standards mean, how they can be met, or how they relate to all requirements in Part 53 2929 Standards and AEA - Lack of Clarity


Standards and AEA - Lack of Clarity Lack of clarity on how requirements relate back to AEA safety standards
Lack of clarity on how requirements relate back to AEA safety standards
* Even after decades of implementing standard of adequate protection NRC had to issue multiple recent memos to staff to avoid misapplication of this standard in application reviews (ML19015A290, ML18240A410, and ML19260E683)
* Even after decades of implementing standard of adequate protection NRC had to issue multiple recent memos to staff to avoid misapplication of this standard in application reviews (ML19015A290, ML18240A410, and ML19260E683)
* Such challenges will be exacerbated in Part 53 if it introduces new standards rather than providing clarity on how requirements relate back to AEA standards NRC should utilize the safety standards from the AEA, as done in 1st iteration, rather than creating new standards (2nd/3rd iterations) 30
* Such challenges will be exacerbated in Part 53 if it introduces new standards rather than providing clarity on how requirements relate back to AEA standards NRC should utilize the safety standards from the AEA, as done in 1 st iterat io n,
rather than creating new standards (2 nd/3rd iterations)


Increasing Regulatory Burden without Commensurate Increase in Safety Marc Nichol, NEI 31
3030 Increasing Regulatory Burden without Commensurate Increase in Safety Marc Nichol, NEI


Achieving Safety More Efficiently Overview of Industry Goals for Part 53 Usefulness
31 Achieving Safety More Efficiently Overview of Industry Goals for Part 53 Usefulness
* Less burdensome over the lifecycle of activities
* Less burdensome over the lifecycle of activities
* Performance-based requirements with clear/objective acceptance criteria
* Performance-based requirements with clear/objective acceptance criteria
Line 263: Line 270:
* NRC imposes requirements that are effective even after the NRC issues a license
* NRC imposes requirements that are effective even after the NRC issues a license
* Licensee is competent in fulfilling their responsibility to meet programmatic requirements
* Licensee is competent in fulfilling their responsibility to meet programmatic requirements
                                                                          ©2021 Nuclear Energy Institute 32
©2021 Nuclear Energy Institute 32
* NRC oversight and inspection to ensure compliance
* NRC oversight and inspection to ensure compliance Industry Concerns on Part 53 Rule Language Subsequent slides present details of industrys perspective on these concerns ALARA design requirement
 
BDBE in design basis


Industry Concerns on Part 53 Rule Language Subsequent slides present details of industrys perspective on these concerns ALARA design requirement BDBE in design basis Proliferation of Redundant and unnecessary Programs Facility safety program
Proliferation of Redundant and unnecessary Programs
                                                                              ©2021 Nuclear Energy Institute 33


As-Low-As Reasonably Achievable (1/3)
Facility safety program
 
©2021 Nuclear Energy Institute 33 As-Low-As Reasonably Achievable (1/3)
NRC including design requirement, beyond the currently requirement program requirement Part 53 doesnt need to have any requirement for ALARA
NRC including design requirement, beyond the currently requirement program requirement Part 53 doesnt need to have any requirement for ALARA
* Part 20 ALARA requirements will still apply Part 20 Requirements on ALARA, Subpart B (20.1101):
* Part 20 ALARA requirements will still apply Part 20 Requirements on ALARA, Subpart B (20.1101):
Line 276: Line 286:
* No requirement for design to consider ALARA NRCs Part 53 requirement for ALARA is clearly expanding to include design :
* No requirement for design to consider ALARA NRCs Part 53 requirement for ALARA is clearly expanding to include design :
* 53.260(b): Design features and programmatic controls must be established such that the TEDEare ALARA in accordance with Part 20
* 53.260(b): Design features and programmatic controls must be established such that the TEDEare ALARA in accordance with Part 20
* 53.270(b): As required by Subpart B of Part 20, design features and programmatic controls, to the extent practical, be based on RP principles to achieve occupational doses that are ALARA.                           ©2021 Nuclear Energy Institute 34
* 53.270(b): As required by Subpart B of Part 20, design features and programmatic controls, to the extent practical, be based on RP principles to achieve occupational doses that are ALARA. ©2021 Nuclear Energy Institute 34 As-Low-As Reasonably Achievable (2/3)


As-Low-As Reasonably Achievable (2/3)
ALARA design requirements not consistent with past Commission decisions*
ALARA design requirements not consistent with past Commission decisions*
* the ALARA concept is intended to be an operating principle rather than an absolute.
* the ALARA concept is intended to be an operating principle rather than an absolute.
Line 287: Line 296:
* Addressing ALARA through programs has been effective for decades
* Addressing ALARA through programs has been effective for decades
* Inconsistent with the development of more risk-informed, performance-based and efficient regulatory framework for advanced reactors
* Inconsistent with the development of more risk-informed, performance-based and efficient regulatory framework for advanced reactors
*See: Standards for Protection Against Radiation; Final Rule, 56 Fed. Reg. 23359, 23366, 23367 (May 21, 1991)
* See: Standards for Protection Against Radiation; Final Rule, 56 Fed. Reg. 23359, 23366, 23367 (May 21, 1991) ©2021 Nuclear Energy Institute 35 As-Low-As Reasonably Achievable (3/3)
                                                                                                        ©2021 Nuclear Energy Institute 35
 
As-Low-As Reasonably Achievable (3/3)
NRC stated in December 9, 2021 Commission briefing on Part 53
NRC stated in December 9, 2021 Commission briefing on Part 53
* Not intent to elevate ALARA as a design requirement
* Not intent to elevate ALARA as a design requirement
Line 299: Line 305:
* Without ALARA design requirement: Developer can still optimize design for addressing ALARA in RP program.
* Without ALARA design requirement: Developer can still optimize design for addressing ALARA in RP program.
* What flexibility does an ALARA design requirement provide?
* What flexibility does an ALARA design requirement provide?
Best solution is to delete the ALARA requirement from Part 53 ©2021 Nuclear Energy Institute 36
Best solution is to delete the ALARA requirement from Part 53©2021 Nuclear Energy Institute 36 Beyond Design Basis in the Design Basis NRC expanding requirements for BDBE NRC stated in December 9, 2021 Commission briefing on Part 53
 
Beyond Design Basis in the Design Basis NRC expanding requirements for BDBE NRC stated in December 9, 2021 Commission briefing on Part 53
* Part 53 benefit is more up front {BDBE requirements}, downstream flexibility
* Part 53 benefit is more up front {BDBE requirements}, downstream flexibility
* Not intent to include BDBE in design basis
* Not intent to include BDBE in design basis
* Treated the same as today, BDBE doesnt need to rely on safety-related SSCs Part 50/52 requires mitigation for BDBEs - 10 CFR 50.155 Part 53 requirements do not achieve NRCs intentions
* Treated the same as today, BDBE doesnt need to rely on safety-related SSCs Part 50/52 requires mitigation for BDBEs - 10 CFR 50.155 Part 53 requirements do not achieve NRCs intentions
* Part 53 requires mitigation for BDBEs in 53.450(g)(3)
* Part 53 requires mitigation for BDBEs in 53.450(g)(3)
* Part 53 also establishes requirements for BDBE design through QHOs in the rule 53.400 requires design features to meet 53.220 53.420 requires functional design criteria to meet 53.220 53.440 establishes design requirements to meet 53.220 53.460 requires special treatment for NSRST similar to SR to meet 53.220 53.220 includes BDBE through QHOs in the rule Part 5X also includes BDBE in design basis                            ©2021 Nuclear Energy Institute 37
* Part 53 also establishes requirements for BDBE design through QHOs in the rule
 
53.400 requires design features to meet 53.220
 
53.420 requires functional design criteria to meet 53.220
 
53.440 establishes design requirements to meet 53.220
 
53.460 requires special treatment for NSRST similar to SR to meet 53.220


Beyond Design Basis in the Licensing Basis BDBE in design basis is inconsistent with Commission decisions to treat through mitigation Commission directed the staff to remove design requirements for BDBE for new reactors in the Proposed Rulemaking for Mitigation of Beyond Design Basis Events in SRM-SECY-15-0065 (ML15239A767).
53.220 includes BDBE through QHOs in the rule Part 5X also includes BDBE in design basis ©2021 Nuclear Energy Institute 37 Beyond Design Basis in the Licensing Basis BDBE in design basis is inconsistent with Commission decisions to treat through mitigation Commission directed the staff to remove design requirements for BDBE for new reactors in the Proposed Rulemaking for Mitigation of Beyond Design Basis Events in SRM-SECY 0065 (ML15239A767).
* Commission recognized the NRC ability to provide oversight for mitigation Commission specifically noted that requirements should not establish a separate standard for new reactors
* Commission recognized the NRC ability to provide oversight for mitigation Commission specifically noted that requirements should not establish a separate standard for new reactors
* A more flexible approach for new reactor applicants [mitigation] is preferred Advanced reactor policy statement has led to designs with reduced reliance on human actions
* A more flexible approach for new reactor applicants [mitigation] is preferred Advanced reactor policy statement has led to designs with reduced reliance on human actions
* this rule allows an applicant for a new reactor licenseto provide innovative solutions to address the need to effectively prioritize event mitigation and recovery actions
* this rule allows an applicant for a new reactor licenseto provide innovative solutions to address the need to effectively prioritize event mitigation and recovery actions
* regulatory requirements should not impose unnecessary burden or divert attention from more important safety objectives                         ©2021 Nuclear Energy Institute 38
* regulatory requirements should not impose unnecessary burden or divert attention from more important safety objectives ©2021 Nuclear Energy Institute 38 Beyond Design Basis in the Licensing Basis Industrys proposal for a more technology-inclusive mitigation requirement Keep QHOs in Policy, do not include in rule, since they drive the BDBE design basis requirements, Replace 53.220 with the following (technology-inclusive version of 50.155):
 
Beyond Design Basis in the Licensing Basis Industrys proposal for a more technology-inclusive mitigation requirement Keep QHOs in Policy, do not include in rule, since they drive the BDBE design basis requirements, Replace 53.220 with the following (technology-inclusive version of 50.155):
For BDBEs, each applicant or licensee shall develop, implement, and maintain mitigation strategies and guidance that are capable of being implemented site-wide and must include the following:
For BDBEs, each applicant or licensee shall develop, implement, and maintain mitigation strategies and guidance that are capable of being implemented site-wide and must include the following:
(a) The capability to maintain or restore the safety functions necessary to meet the safety criteria in 53.210.
(a) The capability to maintain or restore the safety functions necessary to meet the safety criteria in 53.210.
(b) The acquisition and use of offsite assistance and resources to support the functions required by paragraph (a) of this section indefinitely, or until sufficient site functional capabilities can be maintained without the need for the mitigation strategies (c) Strategies and guidance to provide the capabilities in (a) under the circumstances associated with loss of large areas of the plant impacted by the event, due to explosions or fire, to minimize radiological releases.
(b) The acquisition and use of offsite assistance and resources to support the functions required by paragraph (a) of this section indefinitely, or until sufficient site functional capabilities can be maintained without the need for the mitigation strategies (c) Strategies and guidance to provide the capabilities in (a) under the circumstances associated with loss of large areas of the plant impacted by the event, due to explosions or fire, to minimize radiological releases.
                                                                            ©2021 Nuclear Energy Institute 39
©2021 Nuclear Energy Institute 39 Operational Programs Overview of industrys perspective


Operational Programs Overview of industrys perspective NRCs prior assertions that: increased design and analysis burden would lead to a reduction in operational burden does not appear accurate NRC needs to reassess the program requirements in Part 53
NRCs prior assertions that: increased design and analysis burden would lead to a reduction in operational burden does not appear accurate NRC needs to reassess the program requirements in Part 53
* 11 program areas have equivalents in Part 50/52
* 11 program areas have equivalents in Part 50/52
* 13 program areas do not have a Part 50/52 equivalent or duplicate others
* 13 program areas do not have a Part 50/52 equivalent or duplicate others
* Over 20 instances of open ended requirements for programmatic controls NRC needs to establish a regulatory philosophy for Part 53 that defines the regulatory purpose of programs
* Over 20 instances of open ended requirements for programmatic controls NRC needs to establish a regulatory philosophy for Part 53 that defines the regulatory purpose of programs
* Having clarity on why programs are needed will ensure that the program requirements are efficient NRC should ensure needed programs are performance-based, graded and appropriately scoped with entry criteria
* Having clarity on why programs are needed will ensure that the program requirements are efficient NRC should ensure needed programs are performance-based, graded and appropriately scoped with entry criteria
* Some programs (with Part 50/52 equivalents) are more burdensome, without increasing safety, than Parts 50/52                           ©2021 Nuclear Energy Institute 40
* Some programs (with Part 50/52 equivalents) are more burdensome, without increasing safety, than Parts 50/52 ©2021 Nuclear Energy Institute 40 Evaluating NRC Proposed Part 53 Programs Programs with a Part 50/52 Equivalent Required in NRC Part 53 Preliminary Language Part 50/52 Equivalent Requirements 53.710(a)* - Initial Startup Testing 50.34(b)(6(iii) 53.870 Inservice Inspection/Inservice Testing 50.55a 53.730 Maintenance, repair, and inspection programs 50.65 - although some elements may not have Part 50/52 counterpart 53.720 Maintaining capabilities and availability of SSCs 50.36 and 50.69 53.710(b)* - Training (Expected in future Subpart F requirements 50.2, Part 55, 50.120 on human actions) 53.710(c)* - Operating Plans (Expected in future Subpart F 50.34(b)(6)(iv and v) requirements on human actions) 53.860 Fire Protection 50.48 53.810 Radiation Protection Part 20 53.820 Emergency Preparedness 50.47 or 50.160 (in development) 53.830 Security Programs Part 73 (73.54, 73.55, 73.56) and Part 26 53.550 Environmental Considerations - Points to Part 51 50.36b - Points to Part 51 (if applicable)
*Note that at the time this slide was developed the NRC has not yet released the Subpart F regulations for human actions, which could include duplicative requirements
 
©2021 Nuclear Energy Institute 41 Evaluating NRC Proposed Part 53 Programs Programs that duplicate the Quality Assurance Program


Evaluating NRC Proposed Part 53 Programs Programs with a Part 50/52 Equivalent Required in NRC Part 53 Preliminary Language                                   Part 50/52 Equivalent Requirements 53.710(a)* - Initial Startup Testing                                                                  50.34(b)(6(iii) 53.870 Inservice Inspection/Inservice Testing                                                              50.55a 53.730 Maintenance, repair, and inspection programs                            50.65 - although some elements may not have Part 50/52 counterpart 53.720 Maintaining capabilities and availability of SSCs                                            50.36 and 50.69 53.710(b)* - Training (Expected in future Subpart F requirements                                  50.2, Part 55, 50.120 on human actions) 53.710(c)* - Operating Plans (Expected in future Subpart F                                        50.34(b)(6)(iv and v) requirements on human actions) 53.860 Fire Protection                                                                                      50.48 53.810 Radiation Protection                                                                                Part 20 53.820 Emergency Preparedness                                                              50.47 or 50.160 (in development) 53.830 Security Programs                                                            Part 73 (73.54, 73.55, 73.56) and Part 26 53.550 Environmental Considerations - Points to Part 51                              50.36b - Points to Part 51 (if applicable)
Required in NRC Part 53 Preliminary Language Part 50/52 Equivalent Requirements 53.840 Quality Assurance Most of Appendix B QA Program 53.480 Design Control Quality Assurance None - Duplicates QA Program 53.610(a)(1&7) and 53.620(a)(1&6) Construction and None - Duplicates QA Program Manufacturing Quality Assurance 53.490 Design and Analyses Interfaces None - Duplicates QA Program 53.740 Design Control None - Duplicates QA Program 53.620(b)(1)(IV)(vii) - Manufacturing, Manufacturing Activities None - Duplicates QA Program
*Note that at the time this slide was developed the NRC has not yet released the Subpart F regulations for human actions, which could include duplicative requirements
                                                                                                                  ©2021 Nuclear Energy Institute 41


Evaluating NRC Proposed Part 53 Programs Programs that duplicate the Quality Assurance Program Required in NRC Part 53 Preliminary Language            Part 50/52 Equivalent Requirements 53.840 Quality Assurance                                          Most of Appendix B QA Program 53.480 Design Control Quality Assurance                            None - Duplicates QA Program 53.610(a)(1&7) and 53.620(a)(1&6) Construction and                None - Duplicates QA Program Manufacturing Quality Assurance 53.490 Design and Analyses Interfaces                              None - Duplicates QA Program 53.740 Design Control                                              None - Duplicates QA Program 53.620(b)(1)(IV)(vii) - Manufacturing, Manufacturing Activities    None - Duplicates QA Program NRC should eliminate requirements that duplicate the QA Program NRC should put all of the QA Requirements together similar to Appendix B
NRC should eliminate requirements that duplicate the QA Program NRC should put all of the QA Requirements together similar to Appendix B
* Preserve the ability to use Appendix B QA program for those that wish to
* Preserve the ability to use Appendix B QA program for those that wish to
* Enable the use of ISO-9001 and other commercial QA standards NRC does not need to specify QA requirements for non-safety-related but safety significant SSCs
* Enable the use of ISO-9001 and other commercial QA standards NRC does not need to specify QA requirements for non-safety -related but safety significant SSCs
                                                                                      ©2021 Nuclear Energy Institute 42
 
Evaluating NRC Proposed Part 53 Programs NRC Required Programs without any Part 50/52 equivalent Required in NRC Part 53 Preliminary Language                    Part 50/52 Equivalent Requirements 53.700 Operational Objectives                                    None - Duplicates most other operational programs 53.800 Operational Programs                                      None - Duplicates most other operational programs 53.850 Integrity Assessment Programs                              None - Duplicates Maintenance, ISI/IST, Technical Specifications, and creates an aging management program from Day 1 53.890, 53.892, and 53.894 Facility Safety Program, Criteria and None - Duplicates other programs, codifies periodic Plan                                                              safety review, and circumvents backfit protection 53.880 Criticality Safety Program                                  None - Not necessary to require a program for compliance with each requirement. 50.68 is a better model for Part 53 requirement.
53.610 (a)(2-5), (c&d) and 53.620(a)(2-4), Construction and        None - Not necessary for NRC to approve the Manufacturing Organization and Procedures                          organization and plan during construction and manufacturing 53.1225 PRA Maintenance Program for 53.450(c)                      None - Not necessary for NRC to approve the controls for updating the PRA 53.460(c) Human Action Performance Program                      None - Duplicates the training and other operational programs related to performance of human actions NRC should eliminate all of these programs as they are not needed for reasonable assurance of adequate protection                                                ©2021 Nuclear Energy Institute 43


NRC Approach to Programs in Part 53 An unstructured approach is inefficient and creates unintentional challenges NRCs approach to administrative controls results in:
©2021 Nuclear Energy Institute 42 Evaluating NRC Proposed Part 53 Programs NRC Required Programs without any Part 50/52 equivalent Required in NRC Part 53 Preliminary Language Part 50/52 Equivalent Requirements 53.700 Operational Objectives None - Duplicates most other operational programs 53.800 Operational Programs None - Duplicates most other operational programs 53.850 Integrity Assessment Programs None - Duplicates Maintenance, ISI/IST, Technical Specifications, and creates an aging management program from Day 1 53.890, 53.892, and 53.894 Facility Safety Program, Criteria and None - Duplicates other programs, codifies periodic Plan safety review, and circumvents backfit protection 53.880 Criticality Safety Program None - Not necessary to require a program for compliance with each requirement. 50.68 is a better model for Part 53 requirement.
53.610 (a)(2-5), (c&d) and 53.620(a)(2-4), Construction and None - Not necessary for NRC to approve the Manufacturing Organization and Procedures organization and plan during construction and manufacturing 53.1225 PRA Maintenance Program for 53.450(c) None - Not necessary for NRC to approve the controls for updating the PRA 53.460(c) Human Action Performance Program None - Duplicates the training and other operational programs related to performance of human actions NRC should eliminate all of these programs as they are not needed for reasonable assurance of adequate protection ©2021 Nuclear Energy Institute 43 NRC Approach to Programs in Part 53 An unstructured approach is inefficient and creates unintentional challenges NRCs approach to administrative controls results in:
* Dramatic expansion of NRC regulatory footprint over licensee controls
* Dramatic expansion of NRC regulatory footprint over licensee controls
* An unclear and unbounded set of programmatic information subject to NRC approval Part 53 requires more programs and administrative controls be approved by the NRC, as compared to Parts 50/52 Part 53 requires approval of programmatic controls not required by Part 50/52
* An unclear and unbounded set of programmatic information subject to NRC approval Part 53 requires more programs and administrative controls be approved by the NRC, as compared to Parts 50/52 Part 53 requires approval of programmatic controls not required by Part 50/52
Line 345: Line 353:
* Required in 53.210, 53.220, 53.230, 53.240, 53.250, 53.260, 53.270, 53.400, 53.410, 53.420, 53.425, 53.430, 53.440, 53.460, 53.470, 53.490, 53.500, 53.510, 53.540, 53.610, 53.1225, etc.
* Required in 53.210, 53.220, 53.230, 53.240, 53.250, 53.260, 53.270, 53.400, 53.410, 53.420, 53.425, 53.430, 53.440, 53.460, 53.470, 53.490, 53.500, 53.510, 53.540, 53.610, 53.1225, etc.
* Typically stated as Design features and programmatic controls must be provided for - Not performance-based, clear or predictable
* Typically stated as Design features and programmatic controls must be provided for - Not performance-based, clear or predictable
                                                                            ©2021 Nuclear Energy Institute 44
©2021 Nuclear Energy Institute 44 Programs Need to be Created with the Broader Regulatory Framework in Mind Programs work together with design features and human actions to for the technical basis for protecting the public
 
Programs Need to be Created with the Broader Regulatory Framework in Mind Programs work together with design features and human actions to for the technical basis for protecting the public
* The role of programs is to provide reasonable assurance that the design features and human actions will perform the actions described in the licensing basis
* The role of programs is to provide reasonable assurance that the design features and human actions will perform the actions described in the licensing basis
* Not all of the programs used by the licensee need to be required to be approved by the NRC The NRC imposes requirements that are effective even after the NRC issues a license for a new reactor
* Not all of the programs used by the licensee need to be required to be approved by the NRC The NRC imposes requirements that are effective even after the NRC issues a license for a new reactor
Line 353: Line 359:
* NRC does not need to approve licensee controls related to compliance The licensee is competent in fulfilling their responsibility to perform administrative controls
* NRC does not need to approve licensee controls related to compliance The licensee is competent in fulfilling their responsibility to perform administrative controls
* QA Program permeates the plant at each stage; comprises all those planned and systematic actions necessary to provide adequate confidence that a structure, system, or component will perform satisfactorily in service
* QA Program permeates the plant at each stage; comprises all those planned and systematic actions necessary to provide adequate confidence that a structure, system, or component will perform satisfactorily in service
* Very little need for NRC approval of other administrative controls to achieve reasonable assurance that design features and human actions will perform functions in the licensing basis                                                                     ©2021 Nuclear Energy Institute 45
* Very little need for NRC approval of other administrative controls to achieve reasonable assurance that design features and human actions will perform functions in the licensing basis ©2021 Nuclear Energy Institute 45 Performance-Based Approach to Part 53 Programs Leads to a clear, predictable and flexible regulatory framework Recognize that the QA Program provides substantial assurance that design features and human actions will perform functions in the licensing basis Establish the purpose for programs (e.g., by stage)
 
Performance-Based Approach to Part 53 Programs Leads to a clear, predictable and flexible regulatory framework Recognize that the QA Program provides substantial assurance that design features and human actions will perform functions in the licensing basis Establish the purpose for programs (e.g., by stage)
* Design - Provide reasonable assurance that the plant design is in accordance with the license and regulations.
* Design - Provide reasonable assurance that the plant design is in accordance with the license and regulations.
* Manufacturing and Construction - Provide reasonable assurance that the plant is constructed and manufactured according to the license and regulations.
* Manufacturing and Construction - Provide reasonable assurance that the plant is constructed and manufactured according to the license and regulations.
Line 361: Line 365:
* Operations - Provide reasonable assurance that the plant is operated according to the license and regulations.
* Operations - Provide reasonable assurance that the plant is operated according to the license and regulations.
Establish performance criteria for each program, and entry criteria (graded)
Establish performance criteria for each program, and entry criteria (graded)
Evaluate suitability of historical programs required by Part 50/52 Identify historical administrative controls not required to have NRC         approval
Evaluate suitability of historical programs required by Part 50/52 Identify historical administrative controls not required to have NRC approval©2021 Nuclear Energy Institute 46 Performance-Based Approach to Part 53 Programs Leads to a clear, predictable and flexible regulatory framework
                                                                        ©2021 Nuclear Energy Institute 46


Performance-Based Approach to Part 53 Programs Leads to a clear, predictable and flexible regulatory framework Performance Criteria                         Part 50 Programs         Programs not needing Requiring NRC Approval           NRC Approval Design       Provide reasonable assurance that the plant design is in
Performance Criteria Part 50 Programs Programs not needing Requiring NRC Approval NRC Approval Design Provide reasonable assurance that the plant design is in
* Criterion III - Design
* Criterion III - Design
* Change Control accordance with the license and regulations.                 Control (Appendix B)           (50.59)
* Change Control accordance with the license and regulations. Control (Appendix B) (50.59)
: 1. Applicable regulatory requirements and the design
: 1. Applicable regulatory requirements and the design
* Records, reports and basis specified in the license are correctly translated
* Records, reports and basis specified in the license are correctly translated
* FSAR Update (50.71) into specifications, drawings and procedures.
* FSAR Update (50.71) into specifications, drawings and procedures.
* Reliability Assurance
* Reliability Assurance
: 2. The design process used appropriate quality                                               Program (SRM-standards, selected materials, parts and processes,                                     SECY-95-132) controlled interfaces among participating
: 2. The design process used appropriate quality Program (SRM-standards, selected materials, parts and processes, SECY 132) controlled interfaces among participating
* Environmental organizations, suitable to the safety significance of                                   Qualification the SSCs, and provided for verifying the adequacy of                                     (50.49(a))
* Environmental organizations, suitable to the safety significance of Qualification the SSCs, and provided for verifying the adequacy of (50.49(a))
the design.
the design.
: 3. Performance characteristics of SSCs that serve as the basis for the design and analyses are supported by validation data.
: 3. Performance characteristics of SSCs that serve as the basis for the design and analyses are supported by validation data.
: 4. Design changes are subject to the same design control measures and approved by the same design organization used for the original design.
: 4. Design changes are subject to the same design control measures and approved by the same design organization used for the original design.
                                                                                                ©2021 Nuclear Energy Institute 47


Performance-Based Approach to Part 53 Programs Leads to a clear, predictable and flexible regulatory framework Performance Criteria                       Part 50 Programs             Programs not needing Requiring NRC Approval               NRC Approval Manufacturing Provide reasonable assurance that the plant is
©2021 Nuclear Energy Institute 47 Performance-Based Approach to Part 53 Programs Leads to a clear, predictable and flexible regulatory framework
* Criteria IV, VI thru XV -
 
* NSR SSC - Any and           constructed and manufactured according to the license     for safety-related SSCs         commercial quality Construction and regulations                                             (Quality Assurance -           program
Performance Criteria Part 50 Programs Programs not needing Requiring NRC Approval NRC Approval Manufacturing Provide reasonable assurance that the plant is
: 1. As-built SSCs are consistent with their as-designed     Appendix B)
* Criteria IV, VI thru XV -* NSR SSC - Any and constructed and manufactured according to the license for safety-related SSCs commercial quality Construction and regulations (Quality Assurance - program
: 1. As-built SSCs are consistent with their as -designed Appendix B)
* Procurement program specifications.
* Procurement program specifications.
* Defined   by Applicant - for
* Defined by Applicant - for
* Receipt and verification
* Receipt and verification
: 2. The applicable regulatory requirements are             non-safety related but risk programs referenced in the procurement documents.             important (50.69
: 2. The applicable regulatory requirements are non-safety related but risk programs referenced in the procurement documents. important (50.69
* Turnover and routine Augmented Quality)              startup program
* Turnover and routine
: 3. Procured material, equipment and services conform
: 3. Procured material, equipment and services conform Augmented Quality) startup program to the procurement specifications.
* Initial startup testing
* Initial startup testing
* Reporting of Defects to the procurement specifications.
* Reporting of Defects
program (50.34(b)(6(iii))      and Nonconformances
: 4. As-built SSCs, prior to operation, are capable of program (50.34(b)(6(iii)) and Nonconformances performing the functions described in the license. (Part 21)
: 4. As-built SSCs, prior to operation, are capable of                                       (Part 21) performing the functions described in the license.
                                                                                                  ©2021 Nuclear Energy Institute 48


Performance-Based Approach to Part 53 Programs Leads to a clear, predictable and flexible regulatory framework Performance Criteria                   Part 50 Programs Requiring Programs not needing NRC Approval                   NRC Approval Maintenance Provide reasonable assurance that the SSCs are capable
©2021 Nuclear Energy Institute 48 Performance-Based Approach to Part 53 Programs Leads to a clear, predictable and flexible regulatory framework Performance Criteria Part 50 Programs Requiring Programs not needing NRC Approval NRC Approval Maintenance Provide reasonable assurance that the SSCs are capable
* Maintenance
* Maintenance
* FLEX Equipment -
* FLEX Equipment -
of performing their intended functions described in the         Monitoring Program               if applicable SAR.                                                             (50.65)                           (50.155)
of performing their intended functions described in the Monitoring Program if applicable SAR. (50.65) (50.155)
: 1. SSCs, during operations, continue to be capable of
: 1. SSCs, during operations, continue to be capable of
* ISI/IST (50.55a)
* ISI/IST (50.55a)* Maintenance performing the functions described in the license.
* Maintenance performing the functions described in the license.
* Material Surveillance procedure
* Material Surveillance             procedure
: 2. SSCs, for which the code or regulations require Program - if applicable development periodic inspection or testing, are confirmed to have (Part 50 Appendix H) not experienced unexpected degradation.
: 2. SSCs, for which the code or regulations require               Program - if applicable           development periodic inspection or testing, are confirmed to have       (Part 50 Appendix H) not experienced unexpected degradation.
                                                                                                  ©2021 Nuclear Energy Institute 49


Performance-Based Approach to Part 53 Programs Leads to a clear, predictable and flexible regulatory framework Performance Criteria                   Part 50 Programs Requiring NRC           Programs not needing Approval                           NRC Approval Operations Provide reasonable assurance that the plant is
©2021 Nuclear Energy Institute 49 Performance-Based Approach to Part 53 Programs Leads to a clear, predictable and flexible regulatory framework Performance Criteria Part 50 Programs Requiring NRC Programs not needing Approval NRC Approval Operations Provide reasonable assurance that the plant is
* Technical specifications (50.36)
* Technical specifications (50.36)* Effluent release operated according to the license and
* Effluent release operated according to the license and
* Training and Requalification program regulations. Programs for Operators, Fuel
* Training and Requalification                 program regulations.                                         Programs for Operators, Fuel
* Worker safety
* Worker safety
: 1. Plant stays within the licensed conditions         Handlers and Other Identified                 training programs of operations.                                   Positions (50.2, Part 55, 50.120)             and effectiveness
: 1. Plant stays within the licensed conditions Handlers and Other Identified training programs of operations. Positions (50.2, Part 55, 50.120) and effectiveness
: 2. Administrative controls provide
: 2. Administrative controls provide
* Operating Plans, Normal and                   assessments reasonable assurance that human actions         Emergency (50.34(b)(6)(iv and v))
* Operating Plans, Normal and assessments reasonable assurance that human actions Emergency (50.34(b)(6)(iv and v))
* OSHA worker credited for protection of public health and
* OSHA worker credited for protection of public health and
* Fire Protection Plan (50.48)                 safety safety will be performed when needed.
* Fire Protection Plan (50.48)safety safety will be performed when needed.
* Radiation Protection (Part 20)
* Radiation Protection (Part 20)* Procedure
* Procedure
: 3. Humans relied upon are trained and
: 3. Humans relied upon are trained and
* Emergency Planning (50.47 or                 development for capable of performing assigned actions as       50.160)                                       operations and described in the license.
* Emergency Planning (50.47 or development for capable of performing assigned actions as 50.160) operations and described in the license.
* Security (Physical, cyber, access             emergencies and FFD) (Part 73, Part 26)
* Security (Physical, cyber, access emergencies and FFD) (Part 73, Part 26)
* Event Reporting
* Event Reporting
* Environmental Protection - if                 (50.72/50.73) applicable (51.50)
* Environmental Protection - if (50.72/50.73) applicable (51.50)
                                                                                                  ©2021 Nuclear Energy Institute 50


Operational Programs NRC creating duplicative and unnecessary programs Industry presented the preceding to NRC on September 15, 2021 NRC response during the meeting
©2021 Nuclear Energy Institute 50 Operational Programs NRC creating duplicative and unnecessary programs Industry presented the preceding to NRC on September 15, 2021 NRC response during the meeting
* Cant compare Part 53 requirements with Part 50/52 requirements
* Cant compare Part 53 requirements with Part 50/52 requirements
* Industry doesnt understand that NRC requirements are reducing regulatory burden
* Industry doesnt understand that NRC requirements are reducing regulatory burden
* Regulatory burden within each program is less, so shouldnt be concerned that there are more programs NRC has not provided a basis for requiring any of the programs in Part 53 that duplicate other programs or have no equivalent in Parts 50/52
* Regulatory burden within each program is less, so shouldnt be concerned that there are more programs NRC has not provided a basis for requiring any of the programs in Part 53 that duplicate other programs or have no equivalent in Parts 50/52
                                                                      ©2021 Nuclear Energy Institute 51


Improving Clarity and Efficiency:
©2021 Nuclear Energy Institute 51 Improving Clarity and Efficiency:
Technology Inclusive Cyril Draffin, USNIC 52
Technology Inclusive Cyril Draffin, USNIC


Technology Inclusive - All types of reactors
5252 Technology Inclusive - All types of reactors
* During October 26, 2021 NRC Part 53 public meeting, NRC stated that they intend to revise preliminary language so that Part 53 is not restricted to only being used by advanced reactors
* During October 26, 2021 NRC Part 53 public meeting, NRC stated that they intend to revise preliminary language so that Part 53 is not restricted to only being used by advanced reactors
* We agree this should be the intention
* We agree this should be the intention
Line 439: Line 434:
* Avoid parallel rule frameworks for different technologies
* Avoid parallel rule frameworks for different technologies
* Have separate guidance if necessary
* Have separate guidance if necessary
* Exclusion of any nuclear plant that is not considered advanced might unnecessarily exclude technologies that could meet Part 53 safety 53
* Exclusion of any nuclear plant that is not considered advanced might unnecessarily exclude technologies that could meet Part 53 safety


Technology Inclusive - All developers
5353 Technology Inclusive - All developers
* Apply to all reactor developers and applications
* Apply to all reactor developers and applications
* Part 53 requirements are screening criteria determining if developer would use (and applicant would meet relevant safety requirements)
* Part 53 requirements are screening criteria determining if developer would use (and applicant would meet relevant safety requirements)
* May be used for electricity, process heat, hydrogen production, and other applications
* May be used for electricity, process heat, hydrogen production, and other applications
* Part 53 does not need to be limited in scope, and rule could easily be applicable to all production and utilization facilities licensed under AEA Section 103 or 104 54
* Part 53 does not need to be limited in scope, and rule could easily be applicable to all production and utilization facilities licensed under AEA Section 103 or 104


Technology Inclusive - Consistent with NEIMA
5454 Technology Inclusive - Consistent with NEIMA
* While NEIMA defined advanced nuclear reactor when it provided statutory requirements for NRC to develop Technology-Inclusive Regulatory Framework, it did not limit such framework only to advanced reactors, but rather stated that it should be flexible and practicable for application to a variety of reactor technologies
* While NEIMA defined advanced nuclear reactor when it provided statutory requirements for NRC to develop Technology-Inclusive Regulatory Framework, it did not limit such framework only to advanced reactors, but rather stated that it should be flexible and practicable for application to a variety of reactor technologies
* NRC should not limit use of Part 53 to facilities according to features defined as advanced nuclear reactor in the NEIMA (B thru H), such as lower levelized cost of electricity, increased thermal efficiency and ability to integrate into electric and nonelectric applications, because these fall outside NRCs authority of regulating nuclear safety
* NRC should not limit use of Part 53 to facilities according to features defined as advanced nuclear reactor in the NEIMA (B thru H), such as lower levelized cost of electricity, increased thermal efficiency and ability to integrate into electric and nonelectric applications, because these fall outside NRC s authority of regulating nuclear safety
* NRC should not limit use of Part 53 to reactors that have additional inherent or passive safety features because that establishes a moving target for applicability that could disrupt regulatory stability
* NRC should not limit use of Part 53 to reactors that have additional inherent or passive safety features because that establishes a moving target for applicability that could disrupt regulatory stability
* No benefit for NRC to create artificial screening criterion to compare Part 53 applicants use of inherent or passive safety features in design to significant improvements compared to commercial nuclear reactors under construction as of the date of enactment of this Act. If proposed design can meet Part 53 requirements for safety, that should be sufficient justification for utilizing Part 53
* No benefit for NRC to create artificial screening criterion to compare Part 53 applicant s use of inherent or passive safety features in design to significant improvements compared to commercial nuclear reactors under construction as of the date of enactment of this Act. If proposed design can meet Part 53 requirements for safety, that should be sufficient justification for utilizing Part 53
* Creating screening criterion to use Part 53 based on increased use of inherent or passive safety features is unnecessary, and is contrary to NRCs Advanced Reactor Policy Statement, which encourages but does not 55 require enhanced safety of advanced reactors
* Creating screening criterion to use Part 53 based on increased use of inherent or passive safety features is unnecessary, and is contrary to NRC s Advanced Reactor Policy Statement, which encourages but does not 5555 require enhanced safety of advanced reactors Part 53 regulations can balance certainty and flexibility across multiple characteristics
 
Technology Single Technology Any Technology Technology Requirements Requirements Prescriptive Performance Based
 
Methods Prescribed Method Any Method Methods Existing LWR regulation
 
Released NRC Part 53 draft text Goal for a flexible regulatory framework
 
source: Nuclear Innovation Alliance, 9 December 2021 presentation to NRC Commissioners 5656 Goals for Regulatory Efficiency Cyril Draffin, USNIC
 
5757 Complexity Creates Problems - guidance might help resolve (1/2)
* For effective licensing, NRC needs to have high-level plan on how Part 53 will integrate all aspects of regulation
 
o Including rules, guidance, staff interpretations, and oversight during operations o To date, Part 53 guidance limited (other than TICAP designed for Part 50/52)
* Without guidance (e. g. for preliminary approachchange control) not possible to fully assess NRC
* NRC provided list of needed guidance earlier in 2021, and 9 month delay offers time


Part 53 regulations can balance certainty and flexibility across multiple characteristics Technology Single Technology                                Any Technology Technology                Requirements                                          Requirements Prescriptive                              Performance Based Methods Prescribed Method                                  Any Method Methods Existing LWR regulation Released NRC Part 53 draft text Goal for a flexible regulatory framework source: Nuclear Innovation Alliance, 9 December 2021 presentation to NRC Commissioners                            56
o Limited clarity on how to have timely reviews and avoid submission of unnecessary information in applications under Part 53 o Limited clarity on scope and extent of inspections during operations, and what operational flexibility will be allowed


Goals for Regulatory Efficiency Cyril Draffin, USNIC 57
5858 Complexity Creates Problems - guidance might help resolve (2/2)
* Without clarity, overlapping requirements and programs may make it harder for NRC staff to approve applications and implement rule


Complexity Creates Problems - guidance might help resolve (1/2)
o Goal is to focus on safety significant aspects of technology, and not be distracted by minor issues with very limited impact on safety
* For effective licensing, NRC needs to have high-level plan on how Part 53 will integrate all aspects of regulation o  Including rules, guidance, staff interpretations, and oversight during operations o  To date, Part 53 guidance limited (other than TICAP designed for Part 50/52)
* Without guidance (e.g. for change control) not possible to fully assess NRC preliminary approach
* NRC provided list of needed guidance earlier in 2021, and 9 month delay offers time o  Limited clarity on how to have timely reviews and avoid submission of unnecessary information in applications under Part 53 o  Limited clarity on scope and extent of inspections during operations, and what operational flexibility will be allowed 58


Complexity Creates Problems - guidance might help resolve (2/2)
o Rapid scale up of advanced reactor applications could challenge the staff's ability to make timely regulatory decisions
* Without clarity, overlapping requirements and programs may make it harder for NRC staff to approve applications and implement rule o Goal is to focus on safety significant aspects of technology, and not be distracted by minor issues with very limited impact on safety o Rapid scale up of advanced reactor applications could challenge the staff's ability to make timely regulatory decisions 59


NRC Internal Goals for Part 53 Regulatory Efficiency
5959 NRC Internal Goals for Part 53 Regulatory Efficiency
* With potential order of magnitude increase in applications, NRC needs metrics to judge their internal regulatory efficiency o Shorter and predicable timeframes (e.g. number of months) to review license applications o Effective use of prior Topical Reports and other approvals (include documentation submitted and approved by other regulatory organizations) o Lessons learned o RAIs (reduce requests for additional information, especially for non safety-significant matters) o Benefits of pre-application reviews focused on key issues; early escalation of key policy issues o Effectiveness of core teams for licensing reviews of FOAK and subsequent applications o Constraints on unnecessary oversight reviews and inspections o Long term regulatory stability o Develop scalable process o Eliminating inefficiency and making best use of NRC staff resources (importance of both efficiency and effectiveness)
* With potential order of magnitude increase in applications, NRC needs metrics to judge their internal regulatory efficiency
NIA Dec 2021, Promoting Efficient NRC Advance Reactor Licensing Reviews to Enable Rapid Decarbonization                                                                                      60


Clear Vision and Specific Goals for Final Rule (1/2)
o Shorter and predicable timeframes (e.g. number of months) to review license applications o Effective use of prior Topical Reports and other approvals (include documentation submitted and approved by other regulatory organizations) o Lessons learned o RAIs (reduce requests for additional information, especially for non safety-significant matters) o Benefits of pre-application reviews focused on key issues; early escalation of key policy issues o Effectiveness of core teams for licensing reviews of FOAK and subsequent applications o Constraints on unnecessary oversight reviews and inspections o Long term regulatory stability o Develop scalable process o Eliminating inefficiency and making best use of NRC staff resources (importance of both efficiency and effectiveness)
NIA Dec 2021, Promoting Efficient NRC Advance Reactor Licensing Reviews to Enable Rapid Decarbonization 6060 Clear Vision and Specific Goals for Final Rule (1/2)
* Encourage NRC to establish clear vision and specific goals for the final Part 53 rule, and to utilize systematic approach to developing rule
* Encourage NRC to establish clear vision and specific goals for the final Part 53 rule, and to utilize systematic approach to developing rule
* From Unified Industry Position ({{letter dated|date=July 14, 2021|text=letter dated July 14, 2021}}) re Part 53
* From Unified Industry Position ({{letter dated|date=July 14, 2021|text=letter dated July 14, 2021}}) re Part 53
: 1. Available for use by all technologies and risk-informed licensing approaches
: 1. Available for use by all technologies and risk-informed licensing approaches
: 2. Less burdensome over the lifecycle of activities (e.g., licensing, construction, operations, oversight), than regulating under the existing Parts 50 and 52
: 2. Less burdensome over the lifecycle of activities (e. g., licensing, construction, operations, oversight), than regulating under the existing Parts 50 and 52
: 3. Built upon performance-based requirements that define clear and objective acceptance criteria
: 3. Built upon performance-based requirements that define clear and objective acceptance criteria
* Vision, goals and systematic approach are important to ensure that the final rule will be successful o Rule to effectively accommodate large number of reactor applications o Provide different pathway for new reactor designs 61
* Vision, goals and systematic approach are important to ensure that the final rule will be successful
 
o Rule to effectively accommodate large number of reactor applications o Provide different pathway for new reactor designs 6161 Clear Vision and Specific Goals for Final Rule (2/2)


Clear Vision and Specific Goals for Final Rule (2/2)
Industry has proposed Principles in Adopting New Part 53 as far back as 10 October 2019 NRC public meeting-- USNIC 10CFR Part 53: Ideas for Risk-informed, Technology Inclusive Regulatory Framework for Advanced Reactors Rulemaking
Industry has proposed Principles in Adopting New Part 53 as far back as 10 October 2019 NRC public meeting-- USNIC 10CFR Part 53: Ideas for Risk-informed, Technology Inclusive Regulatory Framework for Advanced Reactors Rulemaking
* New Part 53 should be focused on technical requirements and should minimize administrative requirements inconsistent with efficient licensing
* New Part 53 should be focused on technical requirements and should minimize administrative requirements inconsistent with efficient licensing
Line 484: Line 492:
* Need to avoid putting too much detail in FSAR - simplicity is the key
* Need to avoid putting too much detail in FSAR - simplicity is the key
* Revisit content of application requirements to right-size FSAR to reflect safety-significance of systems, structures or components (also applies to operational programs like maintenance rule, QA, radiation protection, in-service inspection, startup)
* Revisit content of application requirements to right-size FSAR to reflect safety-significance of systems, structures or components (also applies to operational programs like maintenance rule, QA, radiation protection, in-service inspection, startup)
* Consider required reviews in fixed period of time (e.g. 2-3 years for Small Modular Reactors; 6 months for micro-reactors) once initial SMRs and micro-reactors have been approved
* Consider required reviews in fixed period of time (e.g. 2 -3 years for Small Modular Reactors; 6 months for micro-reactors) once initial SMRs and micro-reactors have been approved
* Commission needs to address ongoing policy questions associated with security and emergency planning zone requirements to recognize the reduced source term and size of these designs, in order to avoid potential conflicts in a future Part 53 62 and NEIs {{letter dated|date=October 21, 2020|text=October 21, 2020 letter}} - ML20296A398
* Commission needs to address ongoing policy questions associated with security and emergency planning zone requirements to recognize the reduced source term and size of these designs, in order to avoid potential conflicts in a future Part 53 and NEIs {{letter dated|date=October 21, 2020|text=October 21, 2020 letter}} - ML20296A398 6262 Path for Exemptions in Part 53
* For non-LWRs, substantively fewer Part 53 exemptions likely to be required vs. Part 50 & 52
* But smooth process for Part 53 exemptions also may be needed
 
o Many potential applications might be presented to NRC (with different coolants, fuels, technology designs and sizes)
 
o NRC could make process easier in Part 53, and proactively recommend exemptions


Path for Exemptions in Part 53
6363 Part 53 Coordination with other Rulemakings
* For non-LWRs, substantively fewer Part 53 exemptions likely to be required vs. Part 50 & 52
* But smooth process for Part 53 exemptions also may be needed o Many potential applications might be presented to NRC (with different coolants, fuels, technology designs and sizes) o NRC could make process easier in Part 53, and proactively recommend exemptions 63


Part 53 Coordination with other Rulemakings Important contemporaneous efforts underway:
Important contemporaneous efforts underway:
* Emergency planning
* Emergency planning
* Security
* Security
* GEIS (Environmental reviews)
* GEIS (Environmental reviews)
As appropriate, NRC should better integrate safety, security, EP, and siting 64


Similar ACRS and Industry Input Cyril Draffin, USNIC 65
As appropriate, NRC should better integrate safety, security, EP, and siting
 
6464 Similar ACRS and Industry Input Cyril Draffin, USNIC


Similar ACRS and Industry input on Part 53 (1/2)
6565 Similar ACRS and Industry input on Part 53 (1/2)
* Drop two tier structure
* Drop two tier structure
* Flow of objectives, safety criteria, safety functions
* Flow of objectives, safety criteria, safety functions
Line 506: Line 519:
* Part 53 can be methodology neutral, and PRA language should be modified to enable use of PRA in ways applicants expect to use the tool
* Part 53 can be methodology neutral, and PRA language should be modified to enable use of PRA in ways applicants expect to use the tool
* Applicants use spectrum of risk-based and deterministic approaches
* Applicants use spectrum of risk-based and deterministic approaches
* Part 53 should be risk-informed not risk-based
* Part 53 should be risk -informed not risk-based
* Broad interpretation of credible event increases regulatory uncertainty 66
* Broad interpretation of credible event increases regulatory uncertainty 6666 Similar ACRS and Industry input on Part 53 (2/2)
 
Similar ACRS and Industry input on Part 53 (2/2)
* Add requirements for safe, stable end state conditions
* Add requirements for safe, stable end state conditions
* Unify QA requirements (allow broader set of codes and standards)
* Unify QA requirements (allow broader set of codes and standards)
Line 515: Line 526:
* Duplication in draft
* Duplication in draft
* More guidance is needed to clarify regulations
* More guidance is needed to clarify regulations
* Questioned ALARA in rule 67
* Questioned ALARA in rule


Other topics Cyril Draffin, USNIC 68
6767 Other topics Cyril Draffin, USNIC


Quality Assurance Requirements
6868 Quality Assurance Requirements
* Unify all QA references in single location in Part 53
* Unify all QA references in single location in Part 53
* Opportunity for fresh look at alternatives to NQA-1 o Commercially available components quality may meet/exceed nuclear standards with reduced artificial burden o Rule should require quality control program, but not specify approach
* Opportunity for fresh look at alternatives to NQA -1 o Commercially available components quality may meet/exceed nuclear standards with reduced artificial burden o Rule should require quality control program, but not specify approach
* Guidance should support broad standards and approaches, e.g., ISO 9000 series, IAEA, commercial dedication o Reduce barriers to commercial competition, and facilitate licensing abroad- recognizing greater supply chain base can improve quality o International acceptance of a single approval could be important in international marketability o Guidance should show ISO standards and IAEA approaches meet requirements o Guidance could address topic of universal acceptance of codes and standards (mechanical, electrical)
* Guidance should support broad standards and approaches, e. g., ISO 9000 series, IAEA, commercial dedication
* NEI is developing guidance on using ISO-9001 to meet Appendix B QA requirements o Available to operating fleet, new reactors licensing under Parts 50/52, and for Part 53 (if Part 53 QA requirements consistent with Appendix B) 69
 
o Reduce barriers to commercial competition, and facilitate licensing abroad-recognizing greater supply chain base can improve quality o International acceptance of a single approval could be important in international marketability o Guidance should show ISO standards and IAEA approaches meet requirements o Guidance could address topic of universal acceptance of codes and standards (mechanical, electrical)
* NEI is developing guidance on using ISO -9001 to meet Appendix B QA requirements o Available to operating fleet, new reactors licensing under Parts 50/52, and for Part 53 (if Part 53 QA requirements consistent with Appendix B) 6969 5 November 2021 NEI/USNIC letter & attachments


5 November 2021 NEI/USNIC letter & attachments Goal for Part 53 consolidated industry comments:
Goal for Part 53 consolidated industry comments:
Provide clarity and detail on perspectives provided to NRC in meetings and letters over the past year, especially in areas where NRC has not addressed our concerns or described why they arent addressing our concerns
Provide clarity and detail on perspectives provided to NRC in meetings and letters over the past year, especially in areas where NRC has not addressed our concerns or described why they arent addressing our concerns
* Attachment A: Comments by specific topical areas; addresses beneficial features and significant challenges (22 pages)
* Attachment A: Comments by specific topical areas; addresses beneficial features and significant challenges (22 pages)
* Attachment B: Detailed comments on nearly all of preliminary Part 53 rule language, regulation-by-regulation; specific proposed revisions provided (83 page table)
* Attachment B: Detailed comments on nearly all of preliminary Part 53 rule language, regulation-by-regulation; specific proposed revisions provided (83 page table)
* Attachment C: Prior submissions made by USNIC/NEI since 2019 (4 pages; 40 submissions) 70
* Attachment C: Prior submissions made by USNIC/NEI since 2019 (4 pages; 40 submissions)
 
7070 Backup or reserve slides Example A: NEI 18- 04 (Leading Role)


Backup or reserve slides Example A: NEI 18-04 (Leading Role)
TI-RIPB Principle Approach to Meet Principle in Example A
TI-RIPB Principle                             Approach to Meet Principle in Example A
: 1. Meet established limits for adequate
: 1. Meet established limits for adequate
* PRA frequencies and consequences ensure LBEs are within the F-C protection                                   curve, and QHOs are not challenged
* PRA frequencies and consequences ensure LBEs are within the F -C protection curve, and QHOs are not challenged
* Deterministic safety analyses for DBAs validate safety case made by PRA
* Deterministic safety analyses for DBAs validate safety case made by PRA
: 2. Establish the safety functions, design PRA delineates the relevant safety functions, which define safety features and functional design criteria features, which are used to select functional design criteria for each type of LBE
: 2. Establish the safety functions, design PRA delineates the relevant safety functions, which define safety features and functional design criteria features, which are used to select functional design criteria for each type of LBE
: 3. Selected LBEs adequately cover the
: 3. Selected LBEs adequately cover the
* PRA is the primary component of an iterative process to select the range of hazards                             LBEs in a systematic and comprehensive manner
* PRA is the primary component of an iterative process to select the range of hazards LBEs in a systematic and comprehensive manner
* Deterministic methods are used to support the iterative process to select LBEs based on the PRA
* Deterministic methods are used to support the iterative process to select LBEs based on the PRA
: 4. SSCs are categorized according to       PRA is used to categorize SSCs according to the roles they play in their safety significance               satisfying the safety functions
: 4. SSCs are categorized according to PRA is used to categorize SSCs according to the roles they play in their safety significance satisfying the safety functions
: 5. Design reflects the application of an   PRA is used to establish DID through systematic evaluation of LBEs, with appropriate philosophy of defense-in-   systematic determinations of adequacy, including the need to account for depth                                   uncertainties
: 5. Design reflects the application of an PRA is used to establish DID through systematic evaluation of LBEs, with appropriate philosophy of defense -in-systematic determinations of adequacy, including the need to account for depth uncertainties
: 6. Special treatment for SSCs,
: 6. Special treatment for SSCs,
* PRA input to integrated decision-making panel to identify special programmatic controls and human           treatment beyond safety-related SSCs actions are appropriate
* PRA input to integrated decision -making panel to identify special programmatic controls and human treatment beyond safety -related SSCs actions are appropriate
* Quantitative reliability targets set for significant SSCs
* Quantitative reliability targets set for significant SSCs
                                                                                                ©2021 Nuclear Energy Institute 72


Example B: NEI 18-04 (Confirmatory Role)
©2021 Nuclear Energy Institute 72 Example B: NEI 18- 04 (Confirmatory Role)
TI-RIPB Principle                         Approach to Meet Principle in Example B
 
TI-RIPB Principle Approach to Meet Principle in Example B
: 1. Meet established limits for adequate
: 1. Meet established limits for adequate
* Deterministic analyses determine the limits are met protection
* Deterministic analyses determine the limits are met protection
* PRA confirms F-C curve and the QHOs are not challenged
* PRA confirms F-C curve and the QHOs are not challenged
: 2. Establish the safety functions, design
: 2. Establish the safety functions, design
* Deterministic analyses systematically establish safety functions, features and functional design criteria   safety features and functional design criteria (e.g., use of ARDC)
* Deterministic analyses systematically establish safety functions, features and functional design criteria safety features and functional design criteria (e.g., use of ARDC)
* PRA confirms or identifies vulnerabilities to address
* PRA confirms or identifies vulnerabilities to address
: 3. Selected LBEs adequately cover the
: 3. Selected LBEs adequately cover the
* Deterministic methods are primary component of iterative and range of hazards                         systematic process to select the LBEs
* Deterministic methods are primary component of iterative and range of hazards systematic process to select the LBEs
* PRA supports deterministic methods in iterative process
* PRA supports deterministic methods in iterative process
: 4. SSCs are categorized according to
: 4. SSCs are categorized according to
* Deterministic methods used to categorize SSCs according to the their safety significance                 roles they play in the DBA analysis
* Deterministic methods used to categorize SSCs according to the their safety significance roles they play in the DBA analysis
* PRA determines additional SSCs with special treatment
* PRA determines additional SSCs with special treatment
: 5. Design reflects the application of an
: 5. Design reflects the application of an
* Deterministic methods systematically establish DID and adequacy, appropriate philosophy of defense-in-     including the accounting for uncertainties depth
* Deterministic methods systematically establish DID and adequacy, appropriate philosophy of defense -in-including the accounting for uncertainties depth
* PRA confirms or adjusts DID to establish adequacy
* PRA confirms or adjusts DID to establish adequacy
: 6. Special treatment for SSCs,
: 6. Special treatment for SSCs,
* Categorization establishes need for special treatments programmatic controls and human
* Categorization establishes need for special treatments programmatic controls and human
* PRA input to integrated decision-making to identify ST for SSCs other actions are appropriate                   than SR
* PRA input to integrated decision -making to identify ST for SSCs other actions are appropriate than SR
                                                                                            ©2021 Nuclear Energy Institute 73
 
©2021 Nuclear Energy Institute 73 Example C: IAEA


Example C: IAEA TI-RIPB Principle                         Approach to Meet Principle in Example C
TI-RIPB Principle Approach to Meet Principle in Example C
: 1. Meet established limits for adequate
: 1. Meet established limits for adequate
* Deterministic analyses determine the limits are met protection
* Deterministic analyses determine the limits are met protection
* PRA searches for cliff-edge effects, and can be used to confirm F-C curve and the QHOs are not challenged
* PRA searches for cliff -edge effects, and can be used to confirm F -C curve and the QHOs are not challenged
: 2. Establish the safety functions, design
: 2. Establish the safety functions, design
* Deterministic assessments and requirements establish safety features and functional design criteria   functions, principal technical requirements and design requirements (equivalent to NRC)
* Deterministic assessments and requirements establish safety features and functional design criteria functions, principal technical requirements and design requirements (equivalent to NRC)
* PRA is used to confirm deterministic results
* PRA is used to confirm deterministic results
: 3. Selected LBEs adequately cover the
: 3. Selected LBEs adequately cover the
* Deterministic methods establish LBEs (Normal, AOO, DBA, and range of hazards                         BDBE) and characterize plant response
* Deterministic methods establish LBEs (Normal, AOO, DBA, and range of hazards BDBE) and characterize plant response
* PRA informs through systematic search and perspective on frequencies
* PRA informs through systematic search and perspective on frequencies
: 4. SSCs are categorized according to
: 4. SSCs are categorized according to
* Deterministic assessments are primary means of categorizing SSCs their safety significance                 and are informed by PRA insights
* Deterministic assessments are primary means of categorizing SSCs their safety significance and are informed by PRA insights
: 5. Design reflects the application of an
: 5. Design reflects the application of an
* Deterministic assessment of DID adequacy through formal framework appropriate philosophy of defense-in-
* Deterministic assessment of DID adequacy through formal framework appropriate philosophy of defense -in-
* PRA results provide further assurance of DID adequacy depth
* PRA results provide further assurance of DID adequacy depth
: 6. Special treatment for SSCs,
: 6. Special treatment for SSCs,
* Deterministic engineering analyses and judgement programmatic controls and human
* Deterministic engineering analyses and judgement programmatic controls and human
* PRA insights to confirm and inform actions are appropriate                                                                 ©2021 Nuclear Energy Institute 74
* PRA insights to confirm and inform actions are appropriate ©2021 Nuclear Energy Institute 74 Example D: Bounding Analysis TI-RIPB Principle Approach to Meet Principle in Example B
 
Example D: Bounding Analysis TI-RIPB Principle                               Approach to Meet Principle in Example B
: 1. Meet established limits for adequate
: 1. Meet established limits for adequate
* Deterministic analyses determine the limits are met protection
* Deterministic analyses determine the limits are met protection
* Risk information* provides perspective on the margin and demonstrates that the QHOs are not challenged
* Risk information* provides perspective on the margin and demonstrates that the QHOs are not challenged
: 2. Establish the safety functions, design
: 2. Establish the safety functions, design
* Deterministic analyses systematically establish safety functions, features and functional design criteria         safety features and functional design criteria (e.g., use of ARDC)
* Deterministic analyses systematically establish safety functions, features and functional design criteria safety features and functional design criteria (e.g., use of ARDC)
* Risk information in limited role to confirm most challenging accidents included
* Risk information in limited role to confirm most challenging accidents included
: 3. Selected LBEs adequately cover the
: 3. Selected LBEs adequately cover the
* Deterministic methods identify and confirm adequacy of events (one range of hazards                                 or small set) with bounding consequences
* Deterministic methods identify and confirm adequacy of events (one range of hazards or small set) with bounding consequences
* Risk information in limited role confirm events are bounding
* Risk information in limited role confirm events are bounding
: 4. SSCs are categorized according to
: 4. SSCs are categorized according to
* Deterministic assessments conservatively categorize SSCs their safety significance
* Deterministic assessments conservatively categorize SSCs their safety significance
: 5. Design reflects the application of an
: 5. Design reflects the application of an
* Deterministic methods systematically and conservatively establish appropriate philosophy of defense-in-           DID and adequacy depth
* Deterministic methods systematically and conservatively establish appropriate philosophy of defense -in-DID and adequacy depth
* Risk information provide additional assurance of DID adequacy
* Risk information provide additional assurance of DID adequacy
: 6. Special treatment for SSCs,
: 6. Special treatment for SSCs,
* Deterministic engineering analyses programmatic controls and human actions are appropriate
* Deterministic engineering analyses programmatic controls and human actions are appropriate
  *Risk information includes a PRA; however, the PRA would be simplified and limited in scope       ©2021 Nuclear Energy Institute 75}}
* Risk information includes a PRA; however, the PRA would be simplified and limited in scope ©2021 Nuclear Energy Institute 75}}

Revision as of 03:16, 19 November 2024

Slide Presentation: ACRS Future Plant Designs Subcommittee Meeting, 10 CFR Part 53, Licensing and Regulation of Advanced Nuclear Reactors - Presentation by Nuclear Energy Institute and Us Nuclear Industry Council
ML21350A212
Person / Time
Site: Nuclear Energy Institute
Issue date: 12/17/2021
From: Draffin C, Nichol M
Nuclear Energy Institute
To:
Advisory Committee on Reactor Safeguards
Widmayer D
References
Download: ML21350A212 (75)


Text

Part 53 Rulemaking:

Industry Perspectives ACRS Future Plant Subcommittee December 17, 2021

Marc Nichol, NEI Senior Director, New Reactors

Cyril Draffin, USNIC Senior Fellow, Advanced Nuclear

©2021 Nuclear Energy Institute Agenda

Risk-Informed Licensing Approaches (NEI) 11:45 AM

  • September white paper

Lunch 1:00 PM

Standards and Atomic Energy Act (USNIC) 2:00 PM

Increasing Regulatory Burden without Commensurate Safety Increase (NEI) 2:20 PM

  • BDBE in design basis
  • Redundant Programs

Improving Clarity and Efficiency (USNIC) 3:10 PM

  • Technology-inclusive
  • Goals for Regulatory Efficiency
  • Similar ACRS and Industry Input

Adjourn 3:50 PM©2021 Nuclear Energy Institute 2 Risk-Informed Licensing Approaches Marc Nichol, NEI

3 Risk-informed Licensing Approaches Overview of Industry Goals for Part 53 Usefulness

  • All licensing approaches are viable
  • Less burdensome over the lifecycle of activities
  • Guidance will be important to explain how to meet the regulation Risk-Informed
  • NRC PRA policy statement: use of PRA to the extent it is practical
  • Part 53 should allow a variety of roles and uses of the PRA
  • Allow for both leading and confirmatory/supporting roles
  • Primary expectation is that decisions are informed by the use of a PRA
  • In some cases alternatives to a PRA may provide equivalent benefits

©2021 Nuclear Energy Institute 4 Industry Concerns on Part 53 Rule Language Subsequent slides present details of industrys perspective on these concerns

1. NRC has stated that performance-based design requirements are not dependent on how PRA is used, but

NRC has stated that only LMP and other methods using PRA in a leading role can use Part 53

2. NRC has stated that use of PRA in leading role is required because QHOs are in the rule, but

NRC has not explained why QHOs must be in the rule

3. NRC has stated they are developing Part 5X in response to industrys request to use other risk-informed approaches, but

Industry has requested straightforward changes to Part 53 to accomplish this goal, and industry did not ask for a parallel Part 5X ©2021 Nuclear Energy Institute 5 Benefits of Part 53 Why Part 53 benefits should be available for all risk-informed licensing approaches Benefits of Part 53 - performance-based design requirements

  • All requirements are focused back to their relevance to safety criteria
  • Integrated framework of design requirements (see NRCs graphic on next slide)
  • Performance-based acceptance criteria (examples):

53.210 - {dose} to individualat EAB {will not exceed} 25 rem TEDE {for DBA}

53.230 - primary safety function is limiting release of radioactive materialadditional safety functionsmust be defined

53.240 - LBEs must be identifiedmust address combinations of malfunctionshuman errorsexternal hazards{ from AOO to very unlikely}

53.400 - design features must be provided {that}...satisfy the safety criteria

53.410 - FDC must be definedto demonstrate compliance with safety criteria We agree with NRC that Part 53 performance-based requirements for plant design are not dependent on how PRA is used

©2021 Nuclear Energy Institute 6 NRCs Integrated Framework

©2021 Nuclear Energy Institute 7 Risk-informed Approach Desired by Industry Why Part 53 must be inclusive in how PRA is used in the design and analysis NEI/USNIC has been asking for a rule that accommodates all risk -

informed approaches since mid-2020

  • We wanted Part 53 requirements to be more inclusive, with guidance to address details where necessary
  • We did not want multiple parallel frameworks of requirements in order to enable flexibility
  • Currently Part 50 and 52 requirements achieve inclusiveness through a single design/analysis framework without a reduction in predictability
  • We believe NRC should establish criteria that demonstrates safety, and does not need to require specific methods for design and analysis We do not agree with the NRC that only LMP and other methods using PRA in a leading role should be able to use Part 53

©2021 Nuclear Energy Institute 8 Accomplishing Risk-informing

Benefits of Risk-informing Deterministic Risk Risk-

  • Integrated approach of PRA Criteria =InformationInformedcomplements deterministic
  • Characterize the overall residual risks of a design
  • Can help focus on issues of Risk Deterministic Risk-safety significance Information Criteria =Informed* Should yield greater operational flexibility after licensing

©2020 Nuclear Energy Institute 9 Spectrum of Risk-informed Approaches Parts 53 and 5X dont align with how plants are actually designed and analyzed

How Nuclear Plants Part 5X Incentivizes are Actually Designed Part 53 Requires

Risk-informed Continuum

©2020 Nuclear Energy Institute 10 NEI September 2021 Paper Technology -Inclusive, Performance -Based and Risk-Informed Approaches for Assessing the Safety Adequacy of the Design for Part 53 Goals:

  • Advance discussion of how different approaches may fit under Part 53
  • More clearly illuminate the role of PRA and risk information Approach:
  • Establish an inclusive framework of principles for a sufficient safety case
  • Build on elements of a TI-RIPB process for assessing safety adequacy
  • Present four examples across the spectrum of potential approaches
  • Demonstrate how each example meets the guiding principles
  • Each example has a different balance between deterministic safety analyses and risk information in what is always a risk-informed process

©2021 Nuclear Energy Institute 11 Key Elements of Part 53 Addressed

Limits for protecting the public health and safety Safety functions Licensing basis events Defense-in-depth Design features Functional design criteria Safety categorization

Notes

  • The paper does not imply an endorsement of the NRC preliminary rule text, but acknowledges that these key elements are important to the safety case
  • Other Part 53 elements are important to the licensing basis, but are not included since they do not have a primary effect on the TI-RIPB process
  • It is envisioned that the TI-RIPB process in the paper will inform future changes to ©2021 Nuclear Energy Institute 12 the Part 53 requirements Principles for TI -RIPB Process
1. The plant meets the established limits for the adequate protection of the public health and safety.
2. The safety functions, design features and functional design criteria relied upon to meet the safety criteria are established.
3. The systematic selection of LBEs adequately cover the range of hazards that a specific design is exposed to.
4. The SSCs are categorized according to their safety significance.
5. The design reflects the application of an appropriate philosophy of defense-in-depth.
6. The special treatment for SSCs, and associated programmatic controls and human actions, provide reasonable assurance that the SSCs will perform the safety functions for which they are relied upon.
7. The scope and level of detail for the design and analysis of the plant in the licensing basis information adequately describes the safety case. (Not addressed at this time) ©2021 Nuclear Energy Institute 13 Examples of Risk-Informed Licensing Approaches

Four Examples evaluated

  • A: Licensing Modernization Project (NEI 18- 04)
  • B: NEI 18- 04 with PRA in a complementary role
  • C: Approach compatible with IAEA safety standards
  • D: Bounding Analysis

Conclusions:

  • All utilize PRA, some use it a little, some use it a lot
  • Use of the PRA in all examples is able to demonstrate safety
  • All can meet Part 53 design requirements, and less prescriptive versions of the PRA requirements
  • All can utilize the Frequency-Consequence curve
  • Specific use of PRA is related to how the designer wishes to approach the design and analysis of the plant

©2021 Nuclear Energy Institute 14 Safety Criteria and QHOs There has been little discussion of whether QHOs are more appropriate in Policy or the Rule NRC has said QHOs must be in the rule, and asked if not the QHOs, then what?

  • This is the wrong way to frame the consideration of QHOs and BDBE The right framing is why should QHOs be in the rule?
  • QHOs have been in Policy Statement for decades, and BDBE is addressed by mitigation requirement
  • What problem is solved by having QHOs in the rule?
  • Are there benefits to QHOs in the rule?
  • Are the disadvantages and risks, of QHOs in the rule, reasonable and being mitigated?

The NRC has not provided a basis for having QHOs in the rule

  • We provided an assessment of QHOs in rule vs. Policy Statement as early as January 2021, but did not receive any feedback from NRC

©2021 Nuclear Energy Institute 15 Quantitative Health Objectives (1/3)

Industrys Evaluation of advantages/disadvantages of putting QHOs in the rule Advantages Disadvantages

1. Enhances regulatory stability by making it harder for the NRC 1. Increases regulatory uncertainty by establishing requirements to change the limits, or make arbitrary judgements. without specifying the consequence limits (i.e., dose for immediate fatalities and latent cancers).
2. Enhanced clarity by providing specific limits of acceptable risk 2. Reduces regulatory stability since changes to the to the public for beyond design basis events (BDBEs). consequence limits (i.e., risk for immediate fatalities and latent cancers) will now be regulatory limits instead of policy goals.
3. Ensures that regulations explicitly result in risk levels that 3. Is counter to Commissions intent that the QHOs are goals, comply with the QHO limits. and not limits.
4. The QHOs are more understandable to the public because 4. Not having consequence limits, and the complexity of they are expressed in terms of public health effects. demonstrating the QHOs are met, increases licensing risk.
5. The QHOs are the maximum acceptable consequences, and 5. Changes to societal risks can result in changes to the therefore avoid more conservative surrogate requirements. requirements that can force changes to the facility design.
6. Potential to eliminate the need for some other requirements 6. Analyses and calculations related to demonstrating the QHOs (e.g., mitigation of beyond design basis events). are met are now used for legal compliance with requirements.
7. Risks a revision to the QHOs. The NRC discontinued its efforts circa 2000 to update the safety goals so that improvements can be more significant and incorporate experience with risk-informed decision making. ©2021 Nuclear Energy Institute 16 Quantitative Health Objectives (2/3)

QHOs in the rule do not improve safety, but do create complications Safety is the same whether QHOs are in Rule language or the Policy statement

  • Both approaches demonstrate that design meets the QHOs
  • The applicants design and analysis are the same
  • The NRC scope of review is the same The difference is in the legal compliance
  • QHO in policy statement: staff confirm applicants conclusions that QHOs are met
  • QHO in rule: applicant must demonstrate legal compliance, subject to hearing contention NRC stated that QHOs in the rule requires a leading PRA approach QHOs in the rule is not an evolution of the PRA Policy Statement, but far exceeds the envisioned application of them (SECY 89-102):
  • Evaluate adequacy of requirements to achieve acceptable risk to the public
  • Objectives not to be used as requirements, but useful as basis for guidance
  • Useful, in a generic sense, in making regulatory decision for an application©2021 Nuclear Energy Institute 17 Quantitative Health Objectives (3/3)

Industrys Proposal for QHOs in Part 53 to Achieve acceptable risk to the public Apply consistent with the Safety Goal Policy Statement Ensure requirements achieve acceptable risk to the public

  • Dose to the public less than 1 rem (§53.260)
  • Occupational exposures less than 5 rem (§53.270)
  • Design Basis Accidents, dose less than 25 rem (§53.210)
  • Beyond Design Basis events: Mitigation similar to 10 CFR 50.155 (§53.220)
  • Establish requirements for systematic search for events (§53.240, 53.450)

Inform basis for guidance to establish risk-based metrics

  • Can use QHOs directly for comparison (as in LMP)
  • Can use QHOs to develop surrogates (e.g., core damage frequency)

©2021 Nuclear Energy Institute 18 Performance-Based Requirements for PRA Why NRC prescriptive use of PRA in the Rules is not necessary

  • NRC Part 52 requirement:
  • Applicants to provide a description of the plant-specific PRA and its results.
  • Practical use of the PRA in Part 52:
  • Identify and address potential design and operational vulnerabilities (e.g., assumed individual or common-cause failures could drive plant risk to unacceptable levels with respect to the Commissions goals)
  • Demonstrate how risk compares against the Commissions Policy Goals (e.g.,

QHOs)

  • Demonstrate whether RTNSS is sufficient
  • Support regulatory oversight
  • Support development of specifications for ITAAC, TS, etc.
  • Scope: Level 1 and 2 including internal and external events and all modes
  • Risk insights: SSC most effective at reducing risk, major contributors of risk and uncertainty ©2021 Nuclear Energy Institute 19 Prescriptive Requirements for PRA Why NRC prescriptive use of PRA in the Rules is not necessary
  • NRC Part 53 PRA requirements (red are not in Part 50/52 rule language):
  • Consider events that challenge plant control and safety (internal and external)
  • Conform with generally accepted methods
  • Be maintained and upgraded every two years
  • Identify potential failures, degradation mechanisms, susceptibility to internal and external hazards, other contributing factors to unplanned events that might challenge safety functions
  • Determine licensing basis events
  • Used for classifying SSCs and human actions according to safety significance, and environmental conditions
  • Evaluate adequacy of defense-in-depth measures
  • Assess all plant operating states where there is a potential for uncontrolled release ©2021 Nuclear Energy Institute 20 Industry Proposed Requirements for Part 53 Why NRC prescriptive use of PRA in the Rules is not necessary
  • Performance-based analysis requirements:
  • Analyses of licensing basis events must be performed
  • Must systematically identify event sequences from initiation to safe stable end state
  • Must demonstrate compliance with safety criteria
  • May perform a single of multiple bounding analyses
  • Performance-based PRA requirement:
  • Must perform PRA to incorporate risk insights into the design, as appropriate
  • PRA completeness commensurate with completeness of design
  • Be maintained and upgraded every four years
  • Performance-based requirements achieve same outcome as NRCs prescriptive requirements (e.g., rigor, confidence)
  • They are also inclusive to accommodate all roles of the PRA

©2021 Nuclear Energy Institute 21 NRCs Prescriptive Requirements for PRA Concern that NRC will require more of the PRA to be submitted as part of licensing basis

  • Industry concern has been that QHOs in the rule and more prescriptive PRA requirements will lead to NRC requiring more of the PRA to be submitted in the licensing basis
  • NRC stated at December 9, 2021 Commission briefing, that it is not their intent to require the PRA to be submitted to and reviewed by the NRC
  • We support this intention and do not think the PRA should be part of the licensing basis, but is available for NRC inspection
  • However, the preliminary rule language and staff statements have not reflected this intention
  • 53.1185: The SAR must includean analysis of { all} LBEsto determine compliance with53.220 { QHOs}must address elements in 53.450(e) and (f)

{PRA requirements}

  • NRC statement at 5/27/21 meeting that NRC would need to review PRA
  • NRCs endorsement of TICAP must include more PRA details (e.g., reliability

©2021 Nuclear Energy Institute 22 and capability targets for SSCs)

A Part 53 Inclusive of All Licensing Approaches Why pursuit of Part 5X is not necessary, inefficient and increasing confusion NRCs Approach Industrys Proposal Approach to include all risk-Two+ Rigid frameworks (53, Single inclusive framework (Part informed approaches 5X, maybe MA) 53)

Proposal for Part 53 Only allowed for LMP and Straightforward changes to QHO leading PRA role and PRA requirements to allow all risk-informed approaches Proposal for Part 5X 80%-90% of Part 50/52 Delete and abandon requirements, attempt to make tech-inclusive Proposal for TIRIMA Considering whether to Potential use for guidance, may include need exemptions to Part 53 Level of effort and clarity Significant effort needed, Very little effort needed, clear complex and confusing and straightforward

  • NRC should revise Part 53 to be inclusive of all risk -informed approaches, abandon Part 5X
  • Industry is developing guidance that would implement the inclusive Pa r t 53 recommended ©2021 Nuclear Energy Institute 23 in 11/5/21 comments Standards and AEA Cyril Draffin, USNIC

2424 Standards and AEA - NRC I te rat i o n s

Standards in statutory requirements in Atomic Energy Act

  • Section 182, adequate protection to the health and safety of the public
  • Section 161, to protect health or to minimize danger to life or property.

NRC 1st iteration of preliminary rule language established the AEA statutory standards identified above as basis for Part 53 (ML20311A004) for 53.200 NRC 2nd & 3rd iteration of preliminary rule language reduces regulatory clarity

  • Current version replaces AEA language with different safety standards that do not clearly relate back to the AEA and have no regulatory precedent
  • 53.200, limit the possibility of an immediate threat to the public health and safety and considering potential risks to public health and safety

2525 Standards and AEA - NRC Perspective - written (in NRC Discussion of 2nd Iteration of Subpart B,

§ 53.200 Safety Objectives)

The change is to revise the first objective from providing reasonable assurance of adequate protection to limiting the possibility of an immediate threat to the public health and safety. This language generally aligns with standards the Commission has used for determining the content of technical specifications. The change also revises the second objective from protect public health and minimize danger to as may be appropriate when considering potential risks to public health and safety. The purpose of these objectives is clarified by adding the statement that they will be carried out by meeting the safety criteria identified in this subpart ( §§ 53.210 and 53.220).

This change resulted from stakeholder comments and internal NRC discussions regarding the difficulties in using the Atomic Energy Act (AEA) Sections 182 and 161 authorities as the safety objectives for part 53, and in turn as the bases for the two-tier safety criteria framework. Instead, the use of adequate protection is expected to be used in its traditional role as an NRC regulatory finding, which is presumed through compliance with NRC regulations including part 53 or other license requirements. While Sections 182 and 161 of the AEA will be cited as enabling legislation within the rule package (e.g., in the Federal Register Notice), the staff does not foresee incorporating language from the AEA into the safety objectives or tiers in part 53.

2626 Standards and AEA - NRC Perspective -verbal

During public meeting discussing change in safety objectives, NRC staff explained that because entirety of Part 53 satisfies the AEA, AEA standards do not need to be referenced in Part 53, and NRC thus should establish new standards to frame the Part 53 requirements.

2727 Standards and AEA - Obser vations

NRC change seemed to be in support of two tier structure - that has now been dropped responsive to ACRS and Industry comments NRC refers to stakeholder input Approach inconsistent with longstanding practice of NRC and appears to reject decades of Commission precedent, with no compelling benefit or indication of Commissioners approval

2828 Standards and AEA - Concerns with 3rd I te rat i on

New approach requires extra resources

  • NRC would need to invest significant resources in defining these new standards, to ensure consistency with the AEA New approach reduces regulatory clarity and efficiency
  • No clear connection between the Part 53 requirements and the AEA safety standards.
  • No equivalent in Parts 50 and 52, no regulatory precedent Could greatly expand NRC s regulatory control beyond what is in place for existing reactors without increase to safety
  • Appears to be regulatory overreach that contravenes longstanding safety policy embraced by the Commission for decades consistent with safety standards established by AEA
  • No explanation on what new safety standards mean, how they can be met, or how they relate to all requirements in Part 53 2929 Standards and AEA - Lack of Clarity

Lack of clarity on how requirements relate back to AEA safety standards

  • Even after decades of implementing standard of adequate protection NRC had to issue multiple recent memos to staff to avoid misapplication of this standard in application reviews (ML19015A290, ML18240A410, and ML19260E683)
  • Such challenges will be exacerbated in Part 53 if it introduces new standards rather than providing clarity on how requirements relate back to AEA standards NRC should utilize the safety standards from the AEA, as done in 1 st iterat io n,

rather than creating new standards (2 nd/3rd iterations)

3030 Increasing Regulatory Burden without Commensurate Increase in Safety Marc Nichol, NEI

31 Achieving Safety More Efficiently Overview of Industry Goals for Part 53 Usefulness

  • Less burdensome over the lifecycle of activities
  • Performance-based requirements with clear/objective acceptance criteria
  • Guidance will be important to explain how to meet the regulation Efficiency
  • Achieve equivalent level of safely more efficiently than Parts 50 and 52
  • Reduced cost and schedule in licensing and oversight
  • Do not include requirements that Part 50/52 have shown are not needed to protect the public
  • Do not include new requirements that are not needed to protect the public Recognize confidence in licensee controls
  • NRC imposes requirements that are effective even after the NRC issues a license
  • Licensee is competent in fulfilling their responsibility to meet programmatic requirements

©2021 Nuclear Energy Institute 32

  • NRC oversight and inspection to ensure compliance Industry Concerns on Part 53 Rule Language Subsequent slides present details of industrys perspective on these concerns ALARA design requirement

BDBE in design basis

Proliferation of Redundant and unnecessary Programs

Facility safety program

©2021 Nuclear Energy Institute 33 As-Low-As Reasonably Achievable (1/3)

NRC including design requirement, beyond the currently requirement program requirement Part 53 doesnt need to have any requirement for ALARA

  • Part 20 ALARA requirements will still apply Part 20 Requirements on ALARA, Subpart B (20.1101):
  • Must use, to the extent practical, procedures and engineering controls to achieve ALARA
  • Must implement an RP program to ensure compliance with Part 20, including achieving ALARA
  • No requirement for design to consider ALARA NRCs Part 53 requirement for ALARA is clearly expanding to include design :
  • 53.260(b): Design features and programmatic controls must be established such that the TEDEare ALARA in accordance with Part 20
  • 53.270(b): As required by Subpart B of Part 20, design features and programmatic controls, to the extent practical, be based on RP principles to achieve occupational doses that are ALARA. ©2021 Nuclear Energy Institute 34 As-Low-As Reasonably Achievable (2/3)

ALARA design requirements not consistent with past Commission decisions*

  • the ALARA concept is intended to be an operating principle rather than an absolute.
  • ALARA can be achieved solely through the implementation of the licensees radiation protection program, required by Part 20
  • expressly intended that the level of this program and efforts to document it are commensurate with the size of the licensed facility and the potential hazards from radiation exposure and the intake of radioactive materials.

ALARA as a design requirement increases regulatory burden without a safety benefit

  • No practical endpoint for additional measures, and it is left to negotiation between the NRC and the designer as to how much is good enough
  • Addressing ALARA through programs has been effective for decades
  • Inconsistent with the development of more risk-informed, performance-based and efficient regulatory framework for advanced reactors
  • See: Standards for Protection Against Radiation; Final Rule, 56 Fed. Reg. 23359, 23366, 23367 (May 21, 1991) ©2021 Nuclear Energy Institute 35 As-Low-As Reasonably Achievable (3/3)

NRC stated in December 9, 2021 Commission briefing on Part 53

  • Not intent to elevate ALARA as a design requirement
  • Perhaps more of an option during the design, provides flexibility Part 53 requirements do not achieve NRC intention
  • 53.260(b) and 53.270(b) require design features and programmatic controls for ALARA, they dont allow an option It is unclear how an option for ALARA design requirement would work
  • If applicant meets requirements for design to achieve ALARA, would they not be required to consider ALARA in their radiation protection program?
  • Who would want to meet a voluntary design requirement for ALARA if they are still required to meet ALARA in RP program?
  • Without ALARA design requirement: Developer can still optimize design for addressing ALARA in RP program.
  • What flexibility does an ALARA design requirement provide?

Best solution is to delete the ALARA requirement from Part 53©2021 Nuclear Energy Institute 36 Beyond Design Basis in the Design Basis NRC expanding requirements for BDBE NRC stated in December 9, 2021 Commission briefing on Part 53

  • Part 53 benefit is more up front {BDBE requirements}, downstream flexibility
  • Not intent to include BDBE in design basis
  • Treated the same as today, BDBE doesnt need to rely on safety-related SSCs Part 50/52 requires mitigation for BDBEs - 10 CFR 50.155 Part 53 requirements do not achieve NRCs intentions
  • Part 53 requires mitigation for BDBEs in 53.450(g)(3)
  • Part 53 also establishes requirements for BDBE design through QHOs in the rule

53.400 requires design features to meet 53.220

53.420 requires functional design criteria to meet 53.220

53.440 establishes design requirements to meet 53.220

53.460 requires special treatment for NSRST similar to SR to meet 53.220

53.220 includes BDBE through QHOs in the rule Part 5X also includes BDBE in design basis ©2021 Nuclear Energy Institute 37 Beyond Design Basis in the Licensing Basis BDBE in design basis is inconsistent with Commission decisions to treat through mitigation Commission directed the staff to remove design requirements for BDBE for new reactors in the Proposed Rulemaking for Mitigation of Beyond Design Basis Events in SRM-SECY 0065 (ML15239A767).

  • Commission recognized the NRC ability to provide oversight for mitigation Commission specifically noted that requirements should not establish a separate standard for new reactors
  • A more flexible approach for new reactor applicants [mitigation] is preferred Advanced reactor policy statement has led to designs with reduced reliance on human actions
  • this rule allows an applicant for a new reactor licenseto provide innovative solutions to address the need to effectively prioritize event mitigation and recovery actions
  • regulatory requirements should not impose unnecessary burden or divert attention from more important safety objectives ©2021 Nuclear Energy Institute 38 Beyond Design Basis in the Licensing Basis Industrys proposal for a more technology-inclusive mitigation requirement Keep QHOs in Policy, do not include in rule, since they drive the BDBE design basis requirements, Replace 53.220 with the following (technology-inclusive version of 50.155):

For BDBEs, each applicant or licensee shall develop, implement, and maintain mitigation strategies and guidance that are capable of being implemented site-wide and must include the following:

(a) The capability to maintain or restore the safety functions necessary to meet the safety criteria in 53.210.

(b) The acquisition and use of offsite assistance and resources to support the functions required by paragraph (a) of this section indefinitely, or until sufficient site functional capabilities can be maintained without the need for the mitigation strategies (c) Strategies and guidance to provide the capabilities in (a) under the circumstances associated with loss of large areas of the plant impacted by the event, due to explosions or fire, to minimize radiological releases.

©2021 Nuclear Energy Institute 39 Operational Programs Overview of industrys perspective

NRCs prior assertions that: increased design and analysis burden would lead to a reduction in operational burden does not appear accurate NRC needs to reassess the program requirements in Part 53

  • 11 program areas have equivalents in Part 50/52
  • 13 program areas do not have a Part 50/52 equivalent or duplicate others
  • Over 20 instances of open ended requirements for programmatic controls NRC needs to establish a regulatory philosophy for Part 53 that defines the regulatory purpose of programs
  • Having clarity on why programs are needed will ensure that the program requirements are efficient NRC should ensure needed programs are performance-based, graded and appropriately scoped with entry criteria
  • Some programs (with Part 50/52 equivalents) are more burdensome, without increasing safety, than Parts 50/52 ©2021 Nuclear Energy Institute 40 Evaluating NRC Proposed Part 53 Programs Programs with a Part 50/52 Equivalent Required in NRC Part 53 Preliminary Language Part 50/52 Equivalent Requirements 53.710(a)* - Initial Startup Testing 50.34(b)(6(iii) 53.870 Inservice Inspection/Inservice Testing 50.55a 53.730 Maintenance, repair, and inspection programs 50.65 - although some elements may not have Part 50/52 counterpart 53.720 Maintaining capabilities and availability of SSCs 50.36 and 50.69 53.710(b)* - Training (Expected in future Subpart F requirements 50.2, Part 55, 50.120 on human actions) 53.710(c)* - Operating Plans (Expected in future Subpart F 50.34(b)(6)(iv and v) requirements on human actions) 53.860 Fire Protection 50.48 53.810 Radiation Protection Part 20 53.820 Emergency Preparedness 50.47 or 50.160 (in development) 53.830 Security Programs Part 73 (73.54, 73.55, 73.56) and Part 26 53.550 Environmental Considerations - Points to Part 51 50.36b - Points to Part 51 (if applicable)
  • Note that at the time this slide was developed the NRC has not yet released the Subpart F regulations for human actions, which could include duplicative requirements

©2021 Nuclear Energy Institute 41 Evaluating NRC Proposed Part 53 Programs Programs that duplicate the Quality Assurance Program

Required in NRC Part 53 Preliminary Language Part 50/52 Equivalent Requirements 53.840 Quality Assurance Most of Appendix B QA Program 53.480 Design Control Quality Assurance None - Duplicates QA Program 53.610(a)(1&7) and 53.620(a)(1&6) Construction and None - Duplicates QA Program Manufacturing Quality Assurance 53.490 Design and Analyses Interfaces None - Duplicates QA Program 53.740 Design Control None - Duplicates QA Program 53.620(b)(1)(IV)(vii) - Manufacturing, Manufacturing Activities None - Duplicates QA Program

NRC should eliminate requirements that duplicate the QA Program NRC should put all of the QA Requirements together similar to Appendix B

  • Preserve the ability to use Appendix B QA program for those that wish to
  • Enable the use of ISO-9001 and other commercial QA standards NRC does not need to specify QA requirements for non-safety -related but safety significant SSCs

©2021 Nuclear Energy Institute 42 Evaluating NRC Proposed Part 53 Programs NRC Required Programs without any Part 50/52 equivalent Required in NRC Part 53 Preliminary Language Part 50/52 Equivalent Requirements 53.700 Operational Objectives None - Duplicates most other operational programs 53.800 Operational Programs None - Duplicates most other operational programs 53.850 Integrity Assessment Programs None - Duplicates Maintenance, ISI/IST, Technical Specifications, and creates an aging management program from Day 1 53.890, 53.892, and 53.894 Facility Safety Program, Criteria and None - Duplicates other programs, codifies periodic Plan safety review, and circumvents backfit protection 53.880 Criticality Safety Program None - Not necessary to require a program for compliance with each requirement. 50.68 is a better model for Part 53 requirement.

53.610 (a)(2-5), (c&d) and 53.620(a)(2-4), Construction and None - Not necessary for NRC to approve the Manufacturing Organization and Procedures organization and plan during construction and manufacturing 53.1225 PRA Maintenance Program for 53.450(c) None - Not necessary for NRC to approve the controls for updating the PRA 53.460(c) Human Action Performance Program None - Duplicates the training and other operational programs related to performance of human actions NRC should eliminate all of these programs as they are not needed for reasonable assurance of adequate protection ©2021 Nuclear Energy Institute 43 NRC Approach to Programs in Part 53 An unstructured approach is inefficient and creates unintentional challenges NRCs approach to administrative controls results in:

  • Dramatic expansion of NRC regulatory footprint over licensee controls
  • An unclear and unbounded set of programmatic information subject to NRC approval Part 53 requires more programs and administrative controls be approved by the NRC, as compared to Parts 50/52 Part 53 requires approval of programmatic controls not required by Part 50/52
  • Programmatic controls mean administrative procedures that govern the actions of equipment and personnel of an advanced nuclear plant.
  • Required in 53.210, 53.220, 53.230, 53.240, 53.250, 53.260, 53.270, 53.400, 53.410, 53.420, 53.425, 53.430, 53.440, 53.460, 53.470, 53.490, 53.500, 53.510, 53.540, 53.610, 53.1225, etc.
  • Typically stated as Design features and programmatic controls must be provided for - Not performance-based, clear or predictable

©2021 Nuclear Energy Institute 44 Programs Need to be Created with the Broader Regulatory Framework in Mind Programs work together with design features and human actions to for the technical basis for protecting the public

  • The role of programs is to provide reasonable assurance that the design features and human actions will perform the actions described in the licensing basis
  • Not all of the programs used by the licensee need to be required to be approved by the NRC The NRC imposes requirements that are effective even after the NRC issues a license for a new reactor
  • NRC has an oversight and inspection program to ensure compliance
  • NRC does not need to approve licensee controls related to compliance The licensee is competent in fulfilling their responsibility to perform administrative controls
  • QA Program permeates the plant at each stage; comprises all those planned and systematic actions necessary to provide adequate confidence that a structure, system, or component will perform satisfactorily in service
  • Very little need for NRC approval of other administrative controls to achieve reasonable assurance that design features and human actions will perform functions in the licensing basis ©2021 Nuclear Energy Institute 45 Performance-Based Approach to Part 53 Programs Leads to a clear, predictable and flexible regulatory framework Recognize that the QA Program provides substantial assurance that design features and human actions will perform functions in the licensing basis Establish the purpose for programs (e.g., by stage)
  • Design - Provide reasonable assurance that the plant design is in accordance with the license and regulations.
  • Manufacturing and Construction - Provide reasonable assurance that the plant is constructed and manufactured according to the license and regulations.
  • Maintenance - Provide reasonable assurance that the SSCs are capable of performing their intended functions described in the SAR.
  • Operations - Provide reasonable assurance that the plant is operated according to the license and regulations.

Establish performance criteria for each program, and entry criteria (graded)

Evaluate suitability of historical programs required by Part 50/52 Identify historical administrative controls not required to have NRC approval©2021 Nuclear Energy Institute 46 Performance-Based Approach to Part 53 Programs Leads to a clear, predictable and flexible regulatory framework

Performance Criteria Part 50 Programs Programs not needing Requiring NRC Approval NRC Approval Design Provide reasonable assurance that the plant design is in

  • Criterion III - Design
  • Change Control accordance with the license and regulations. Control (Appendix B) (50.59)
1. Applicable regulatory requirements and the design
  • Records, reports and basis specified in the license are correctly translated
  • FSAR Update (50.71) into specifications, drawings and procedures.
  • Reliability Assurance
2. The design process used appropriate quality Program (SRM-standards, selected materials, parts and processes, SECY 132) controlled interfaces among participating
  • Environmental organizations, suitable to the safety significance of Qualification the SSCs, and provided for verifying the adequacy of (50.49(a))

the design.

3. Performance characteristics of SSCs that serve as the basis for the design and analyses are supported by validation data.
4. Design changes are subject to the same design control measures and approved by the same design organization used for the original design.

©2021 Nuclear Energy Institute 47 Performance-Based Approach to Part 53 Programs Leads to a clear, predictable and flexible regulatory framework

Performance Criteria Part 50 Programs Programs not needing Requiring NRC Approval NRC Approval Manufacturing Provide reasonable assurance that the plant is

  • Criteria IV, VI thru XV -* NSR SSC - Any and constructed and manufactured according to the license for safety-related SSCs commercial quality Construction and regulations (Quality Assurance - program
1. As-built SSCs are consistent with their as -designed Appendix B)
  • Procurement program specifications.
  • Defined by Applicant - for
  • Receipt and verification
2. The applicable regulatory requirements are non-safety related but risk programs referenced in the procurement documents. important (50.69
  • Turnover and routine
3. Procured material, equipment and services conform Augmented Quality) startup program to the procurement specifications.
  • Initial startup testing
  • Reporting of Defects
4. As-built SSCs, prior to operation, are capable of program (50.34(b)(6(iii)) and Nonconformances performing the functions described in the license. (Part 21)

©2021 Nuclear Energy Institute 48 Performance-Based Approach to Part 53 Programs Leads to a clear, predictable and flexible regulatory framework Performance Criteria Part 50 Programs Requiring Programs not needing NRC Approval NRC Approval Maintenance Provide reasonable assurance that the SSCs are capable

  • Maintenance

of performing their intended functions described in the Monitoring Program if applicable SAR. (50.65) (50.155)

1. SSCs, during operations, continue to be capable of
  • ISI/IST (50.55a)* Maintenance performing the functions described in the license.
  • Material Surveillance procedure
2. SSCs, for which the code or regulations require Program - if applicable development periodic inspection or testing, are confirmed to have (Part 50 Appendix H) not experienced unexpected degradation.

©2021 Nuclear Energy Institute 49 Performance-Based Approach to Part 53 Programs Leads to a clear, predictable and flexible regulatory framework Performance Criteria Part 50 Programs Requiring NRC Programs not needing Approval NRC Approval Operations Provide reasonable assurance that the plant is

  • Technical specifications (50.36)* Effluent release operated according to the license and
  • Training and Requalification program regulations. Programs for Operators, Fuel
  • Worker safety
1. Plant stays within the licensed conditions Handlers and Other Identified training programs of operations. Positions (50.2, Part 55, 50.120) and effectiveness
2. Administrative controls provide
  • Operating Plans, Normal and assessments reasonable assurance that human actions Emergency (50.34(b)(6)(iv and v))
  • OSHA worker credited for protection of public health and
  • Fire Protection Plan (50.48)safety safety will be performed when needed.
  • Radiation Protection (Part 20)* Procedure
3. Humans relied upon are trained and
  • Emergency Planning (50.47 or development for capable of performing assigned actions as 50.160) operations and described in the license.
  • Security (Physical, cyber, access emergencies and FFD) (Part 73, Part 26)
  • Event Reporting
  • Environmental Protection - if (50.72/50.73) applicable (51.50)

©2021 Nuclear Energy Institute 50 Operational Programs NRC creating duplicative and unnecessary programs Industry presented the preceding to NRC on September 15, 2021 NRC response during the meeting

  • Cant compare Part 53 requirements with Part 50/52 requirements
  • Industry doesnt understand that NRC requirements are reducing regulatory burden
  • Regulatory burden within each program is less, so shouldnt be concerned that there are more programs NRC has not provided a basis for requiring any of the programs in Part 53 that duplicate other programs or have no equivalent in Parts 50/52

©2021 Nuclear Energy Institute 51 Improving Clarity and Efficiency:

Technology Inclusive Cyril Draffin, USNIC

5252 Technology Inclusive - All types of reactors

  • During October 26, 2021 NRC Part 53 public meeting, NRC stated that they intend to revise preliminary language so that Part 53 is not restricted to only being used by advanced reactors
  • We agree this should be the intention
  • Part 53 allows all types of nuclear reactor technologies
  • Avoid parallel rule frameworks for different technologies
  • Have separate guidance if necessary
  • Exclusion of any nuclear plant that is not considered advanced might unnecessarily exclude technologies that could meet Part 53 safety

5353 Technology Inclusive - All developers

  • Apply to all reactor developers and applications
  • Part 53 requirements are screening criteria determining if developer would use (and applicant would meet relevant safety requirements)
  • May be used for electricity, process heat, hydrogen production, and other applications
  • Part 53 does not need to be limited in scope, and rule could easily be applicable to all production and utilization facilities licensed under AEA Section 103 or 104

5454 Technology Inclusive - Consistent with NEIMA

  • While NEIMA defined advanced nuclear reactor when it provided statutory requirements for NRC to develop Technology-Inclusive Regulatory Framework, it did not limit such framework only to advanced reactors, but rather stated that it should be flexible and practicable for application to a variety of reactor technologies
  • NRC should not limit use of Part 53 to facilities according to features defined as advanced nuclear reactor in the NEIMA (B thru H), such as lower levelized cost of electricity, increased thermal efficiency and ability to integrate into electric and nonelectric applications, because these fall outside NRC s authority of regulating nuclear safety
  • NRC should not limit use of Part 53 to reactors that have additional inherent or passive safety features because that establishes a moving target for applicability that could disrupt regulatory stability
  • No benefit for NRC to create artificial screening criterion to compare Part 53 applicant s use of inherent or passive safety features in design to significant improvements compared to commercial nuclear reactors under construction as of the date of enactment of this Act. If proposed design can meet Part 53 requirements for safety, that should be sufficient justification for utilizing Part 53
  • Creating screening criterion to use Part 53 based on increased use of inherent or passive safety features is unnecessary, and is contrary to NRC s Advanced Reactor Policy Statement, which encourages but does not 5555 require enhanced safety of advanced reactors Part 53 regulations can balance certainty and flexibility across multiple characteristics

Technology Single Technology Any Technology Technology Requirements Requirements Prescriptive Performance Based

Methods Prescribed Method Any Method Methods Existing LWR regulation

Released NRC Part 53 draft text Goal for a flexible regulatory framework

source: Nuclear Innovation Alliance, 9 December 2021 presentation to NRC Commissioners 5656 Goals for Regulatory Efficiency Cyril Draffin, USNIC

5757 Complexity Creates Problems - guidance might help resolve (1/2)

  • For effective licensing, NRC needs to have high-level plan on how Part 53 will integrate all aspects of regulation

o Including rules, guidance, staff interpretations, and oversight during operations o To date, Part 53 guidance limited (other than TICAP designed for Part 50/52)

  • Without guidance (e. g. for preliminary approachchange control) not possible to fully assess NRC
  • NRC provided list of needed guidance earlier in 2021, and 9 month delay offers time

o Limited clarity on how to have timely reviews and avoid submission of unnecessary information in applications under Part 53 o Limited clarity on scope and extent of inspections during operations, and what operational flexibility will be allowed

5858 Complexity Creates Problems - guidance might help resolve (2/2)

  • Without clarity, overlapping requirements and programs may make it harder for NRC staff to approve applications and implement rule

o Goal is to focus on safety significant aspects of technology, and not be distracted by minor issues with very limited impact on safety

o Rapid scale up of advanced reactor applications could challenge the staff's ability to make timely regulatory decisions

5959 NRC Internal Goals for Part 53 Regulatory Efficiency

  • With potential order of magnitude increase in applications, NRC needs metrics to judge their internal regulatory efficiency

o Shorter and predicable timeframes (e.g. number of months) to review license applications o Effective use of prior Topical Reports and other approvals (include documentation submitted and approved by other regulatory organizations) o Lessons learned o RAIs (reduce requests for additional information, especially for non safety-significant matters) o Benefits of pre-application reviews focused on key issues; early escalation of key policy issues o Effectiveness of core teams for licensing reviews of FOAK and subsequent applications o Constraints on unnecessary oversight reviews and inspections o Long term regulatory stability o Develop scalable process o Eliminating inefficiency and making best use of NRC staff resources (importance of both efficiency and effectiveness)

NIA Dec 2021, Promoting Efficient NRC Advance Reactor Licensing Reviews to Enable Rapid Decarbonization 6060 Clear Vision and Specific Goals for Final Rule (1/2)

  • Encourage NRC to establish clear vision and specific goals for the final Part 53 rule, and to utilize systematic approach to developing rule
1. Available for use by all technologies and risk-informed licensing approaches
2. Less burdensome over the lifecycle of activities (e. g., licensing, construction, operations, oversight), than regulating under the existing Parts 50 and 52
3. Built upon performance-based requirements that define clear and objective acceptance criteria
  • Vision, goals and systematic approach are important to ensure that the final rule will be successful

o Rule to effectively accommodate large number of reactor applications o Provide different pathway for new reactor designs 6161 Clear Vision and Specific Goals for Final Rule (2/2)

Industry has proposed Principles in Adopting New Part 53 as far back as 10 October 2019 NRC public meeting-- USNIC 10CFR Part 53: Ideas for Risk-informed, Technology Inclusive Regulatory Framework for Advanced Reactors Rulemaking

  • New Part 53 should be focused on technical requirements and should minimize administrative requirements inconsistent with efficient licensing
  • Eliminating or streamlining requirements that are overly prescriptive or not relevant will reduce need for future exemptions
  • Need to avoid putting too much detail in FSAR - simplicity is the key
  • Revisit content of application requirements to right-size FSAR to reflect safety-significance of systems, structures or components (also applies to operational programs like maintenance rule, QA, radiation protection, in-service inspection, startup)
  • Consider required reviews in fixed period of time (e.g. 2 -3 years for Small Modular Reactors; 6 months for micro-reactors) once initial SMRs and micro-reactors have been approved
  • Commission needs to address ongoing policy questions associated with security and emergency planning zone requirements to recognize the reduced source term and size of these designs, in order to avoid potential conflicts in a future Part 53 and NEIs October 21, 2020 letter - ML20296A398 6262 Path for Exemptions in Part 53
  • For non-LWRs, substantively fewer Part 53 exemptions likely to be required vs. Part 50 & 52
  • But smooth process for Part 53 exemptions also may be needed

o Many potential applications might be presented to NRC (with different coolants, fuels, technology designs and sizes)

o NRC could make process easier in Part 53, and proactively recommend exemptions

6363 Part 53 Coordination with other Rulemakings

Important contemporaneous efforts underway:

  • Emergency planning
  • Security
  • GEIS (Environmental reviews)

As appropriate, NRC should better integrate safety, security, EP, and siting

6464 Similar ACRS and Industry Input Cyril Draffin, USNIC

6565 Similar ACRS and Industry input on Part 53 (1/2)

  • Drop two tier structure
  • Flow of objectives, safety criteria, safety functions
  • Decouple requirement for normal operation
  • Not require or rely on just LMP approach or IAEA approach
  • Part 53 can be methodology neutral, and PRA language should be modified to enable use of PRA in ways applicants expect to use the tool
  • Applicants use spectrum of risk-based and deterministic approaches
  • Part 53 should be risk -informed not risk-based
  • Broad interpretation of credible event increases regulatory uncertainty 6666 Similar ACRS and Industry input on Part 53 (2/2)
  • Add requirements for safe, stable end state conditions
  • Unify QA requirements (allow broader set of codes and standards)
  • Provide detailed explanation of the integrated intent of the rule
  • Duplication in draft
  • More guidance is needed to clarify regulations

6767 Other topics Cyril Draffin, USNIC

6868 Quality Assurance Requirements

  • Unify all QA references in single location in Part 53
  • Opportunity for fresh look at alternatives to NQA -1 o Commercially available components quality may meet/exceed nuclear standards with reduced artificial burden o Rule should require quality control program, but not specify approach
  • Guidance should support broad standards and approaches, e. g., ISO 9000 series, IAEA, commercial dedication

o Reduce barriers to commercial competition, and facilitate licensing abroad-recognizing greater supply chain base can improve quality o International acceptance of a single approval could be important in international marketability o Guidance should show ISO standards and IAEA approaches meet requirements o Guidance could address topic of universal acceptance of codes and standards (mechanical, electrical)

  • NEI is developing guidance on using ISO -9001 to meet Appendix B QA requirements o Available to operating fleet, new reactors licensing under Parts 50/52, and for Part 53 (if Part 53 QA requirements consistent with Appendix B) 6969 5 November 2021 NEI/USNIC letter & attachments

Goal for Part 53 consolidated industry comments:

Provide clarity and detail on perspectives provided to NRC in meetings and letters over the past year, especially in areas where NRC has not addressed our concerns or described why they arent addressing our concerns

  • Attachment A: Comments by specific topical areas; addresses beneficial features and significant challenges (22 pages)
  • Attachment B: Detailed comments on nearly all of preliminary Part 53 rule language, regulation-by-regulation; specific proposed revisions provided (83 page table)
  • Attachment C: Prior submissions made by USNIC/NEI since 2019 (4 pages; 40 submissions)

7070 Backup or reserve slides Example A: NEI 18- 04 (Leading Role)

TI-RIPB Principle Approach to Meet Principle in Example A

1. Meet established limits for adequate
  • PRA frequencies and consequences ensure LBEs are within the F -C protection curve, and QHOs are not challenged
  • Deterministic safety analyses for DBAs validate safety case made by PRA
2. Establish the safety functions, design PRA delineates the relevant safety functions, which define safety features and functional design criteria features, which are used to select functional design criteria for each type of LBE
3. Selected LBEs adequately cover the
  • PRA is the primary component of an iterative process to select the range of hazards LBEs in a systematic and comprehensive manner
  • Deterministic methods are used to support the iterative process to select LBEs based on the PRA
4. SSCs are categorized according to PRA is used to categorize SSCs according to the roles they play in their safety significance satisfying the safety functions
5. Design reflects the application of an PRA is used to establish DID through systematic evaluation of LBEs, with appropriate philosophy of defense -in-systematic determinations of adequacy, including the need to account for depth uncertainties
6. Special treatment for SSCs,
  • PRA input to integrated decision -making panel to identify special programmatic controls and human treatment beyond safety -related SSCs actions are appropriate
  • Quantitative reliability targets set for significant SSCs

©2021 Nuclear Energy Institute 72 Example B: NEI 18- 04 (Confirmatory Role)

TI-RIPB Principle Approach to Meet Principle in Example B

1. Meet established limits for adequate
  • Deterministic analyses determine the limits are met protection
  • PRA confirms F-C curve and the QHOs are not challenged
2. Establish the safety functions, design
  • Deterministic analyses systematically establish safety functions, features and functional design criteria safety features and functional design criteria (e.g., use of ARDC)
  • PRA confirms or identifies vulnerabilities to address
3. Selected LBEs adequately cover the
  • Deterministic methods are primary component of iterative and range of hazards systematic process to select the LBEs
  • PRA supports deterministic methods in iterative process
4. SSCs are categorized according to
  • Deterministic methods used to categorize SSCs according to the their safety significance roles they play in the DBA analysis
  • PRA determines additional SSCs with special treatment
5. Design reflects the application of an
  • Deterministic methods systematically establish DID and adequacy, appropriate philosophy of defense -in-including the accounting for uncertainties depth
  • PRA confirms or adjusts DID to establish adequacy
6. Special treatment for SSCs,
  • Categorization establishes need for special treatments programmatic controls and human
  • PRA input to integrated decision -making to identify ST for SSCs other actions are appropriate than SR

©2021 Nuclear Energy Institute 73 Example C: IAEA

TI-RIPB Principle Approach to Meet Principle in Example C

1. Meet established limits for adequate
  • Deterministic analyses determine the limits are met protection
  • PRA searches for cliff -edge effects, and can be used to confirm F -C curve and the QHOs are not challenged
2. Establish the safety functions, design
  • Deterministic assessments and requirements establish safety features and functional design criteria functions, principal technical requirements and design requirements (equivalent to NRC)
  • PRA is used to confirm deterministic results
3. Selected LBEs adequately cover the
  • Deterministic methods establish LBEs (Normal, AOO, DBA, and range of hazards BDBE) and characterize plant response
  • PRA informs through systematic search and perspective on frequencies
4. SSCs are categorized according to
  • Deterministic assessments are primary means of categorizing SSCs their safety significance and are informed by PRA insights
5. Design reflects the application of an
  • Deterministic assessment of DID adequacy through formal framework appropriate philosophy of defense -in-
  • PRA results provide further assurance of DID adequacy depth
6. Special treatment for SSCs,
  • Deterministic engineering analyses and judgement programmatic controls and human
  • PRA insights to confirm and inform actions are appropriate ©2021 Nuclear Energy Institute 74 Example D: Bounding Analysis TI-RIPB Principle Approach to Meet Principle in Example B
1. Meet established limits for adequate
  • Deterministic analyses determine the limits are met protection
  • Risk information* provides perspective on the margin and demonstrates that the QHOs are not challenged
2. Establish the safety functions, design
  • Deterministic analyses systematically establish safety functions, features and functional design criteria safety features and functional design criteria (e.g., use of ARDC)
  • Risk information in limited role to confirm most challenging accidents included
3. Selected LBEs adequately cover the
  • Deterministic methods identify and confirm adequacy of events (one range of hazards or small set) with bounding consequences
  • Risk information in limited role confirm events are bounding
4. SSCs are categorized according to
  • Deterministic assessments conservatively categorize SSCs their safety significance
5. Design reflects the application of an
  • Deterministic methods systematically and conservatively establish appropriate philosophy of defense -in-DID and adequacy depth
  • Risk information provide additional assurance of DID adequacy
6. Special treatment for SSCs,
  • Deterministic engineering analyses programmatic controls and human actions are appropriate
  • Risk information includes a PRA; however, the PRA would be simplified and limited in scope ©2021 Nuclear Energy Institute 75