ML22186A118: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:July 6, 2022 | {{#Wiki_filter:July 6, 2022 | ||
M r. David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO) | |||
Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555 | Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555 | ||
Line 22: | Line 24: | ||
CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 - SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS | CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 - SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS | ||
==Dear Mr. Rhoades:== | ==Dear Mr. Rhoades :== | ||
In a telephone conversation on June 28, 2022, between Mr. Kevin Swiger, Exam Author; Ms. Megan Parlett, Exam Author; and Mr. Thomas Setzer, Senior Operations Engineer; arrangements were made for the administration of operator licensing examinations at Calvert Cliffs Nuclear Power Plant during the week of June 5, 2023. | |||
As agreed upon during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 12 to NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered. | As agreed upon during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 12 to NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered. | ||
To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by January 6, 2023. The written examination outline will be provided to your staff by November 22, 2022. The written examinations, operating tests, and supporting reference materials identified in NUREG-1021, Examination Standard (ES)-2.1, Preparing for Operator Licensing Initial Examinations, will be due by March 22, 2023. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(3), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. | To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by January 6, 2023. The written examination outline will be provided to your staff by November 22, 2022. The written examinations, operating tests, and supporting reference materials identified in NUREG-1021, Examination Standard (ES)-2.1, Preparing for Operator Licensing Initial Examinations, will be due by March 22, 2023. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(3), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. | ||
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be cancelled or rescheduled. | We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be cancelled or rescheduled. | ||
D. Rhoades | D. Rhoades 2 | ||
To conduct the requested written examinations and operating tests, your staff will need to provide adequate space and accommodations and to make the simulation facility available on the dates noted above. In accordance with ES-3.5, Administering Operating Tests, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the NRC takes licensing action on all the applications and any adjudicatory actions on any hearing demands are complete. | |||
ES-1.2, Guidelines for Taking NRC Examinations, contains a number of NRC guidelines for the written examinations and operating tests as they are being administered. | ES-1.2, Guidelines for Taking NRC Examinations, contains a number of NRC guidelines for the written examinations and operating tests as they are being administered. | ||
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) control number 3150-0090) at least 60 days before the first examination date (if possible). Contact Mr. Thomas Setzer to determine the method for submission of the waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024) should be submitted at least 30 days before the first examination date. If the NRC does not receive the preliminary applications at least 30 days before the examination date, a postponement may be necessary. Final, signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date. | |||
Although the guidelines for waiver or excusal requests call for their receipt at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline above). Resolutions resulting from verbal inquiries by the facility licensee to the NRC are not binding. Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398 or as directed by Mr. Setzer when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency. | To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) control number 3150- 0090) at least 60 days before the first examination date (if possible). Contact Mr. Thomas Setzer to determine the method for submission of the waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB control number 3150- 0090) and medical certifications (OMB control number 3150- 0024) should be submitted at least 30 days before the first examination date. If the NRC does not receive the preliminary applications at least 30 days before the examination date, a postponement may be necessary. Final, signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date. | ||
Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the OMB, approval number 3150-0018. | |||
Although the guidelines for waiver or excusal requests call for their receipt at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60- day guideline above). Resolutions resulting from verbal inquiries by the facility licensee to the NRC are not binding. Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398 or as directed by Mr. Setzer when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency. | |||
Paperwork Reduction Act Statement | |||
This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the OMB, approval number 3150- 0018. | |||
The burden to the public for these mandatory information collections is estimated to average 400 hours per examination or response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. Send comments regarding this information collection to the Freedom of Information Act, Library, and Information Collections Branch (T6-A10M), | The burden to the public for these mandatory information collections is estimated to average 400 hours per examination or response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. Send comments regarding this information collection to the Freedom of Information Act, Library, and Information Collections Branch (T6-A10M), | ||
U.S. Nuclear Regulatory Commission, Washington, DC 20555 0001, or by | U.S. Nuclear Regulatory Commission, Washington, DC 20555 0001, or by emailto Infocollects.Resource@nrc.gov, and to the OMB reviewer at: OMB Office of Information and Regulatory Affairs (3150-0018), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street, NW Washington, DC 20503; email: oira_submission@omb.eop.gov. | ||
D. Rhoades 3 | |||
Public Protection Notification | |||
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number. | |||
In accordance with 10 CFR 2.390, Public inspections, exemptions, requests for withholding, a copy of this letter and its enclosures will be available electronically for public inspection through the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible on the NRCs w ebsite at http://www.nrc.gov/reading-rm/adams.html. | |||
After you have been notified by the NRC chief examiner or b ranch chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation o f certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one - | |||
month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates. | |||
Thank you for your cooperation in this matter. Mr. Swiger and M s. Parlett and have been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC s examination procedures and guidelines, please contact Mr. Thomas Setzer at (610) 337-5165 or me at (610) 337-5306. | |||
Sincerely, | |||
Donald E. Jackson, Chief Operations Branch Division of Operating Reactor Safety | |||
Docket Nos. 50- 317 and 50- 318 License Nos. DPR-53 and DPR-69 | |||
cc: Distribution via ListServ | |||
D. Rhoades 4 | |||
==SUBJECT:== | |||
CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 - SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS DATED JULY 6, 2022 | |||
DISTRIBUTION: | |||
BBickett, DORS PFinney, DORS GWalbert, DORS LDumont, DORS, SRI SObadina, DORS, RI CFragman, DORS, AA ROrlikowski, RI OEDO RidsNrrPMCalvertCliffs Resource RidsNrrDorlLpl1 Resource | |||
DOCUMENT NAME: G:\\DRS\\Operations Branch\\SETZER\\ Exam FY23 - Calvert Cliffs\\CC Corp Notify Letter 2023.docx ADAMS Accession No. ML22063A088 (Package) ADAMS Accession No. ML22186A118 (Letter) | |||
Neview Non-Sensitive Public ly Available Sensitive N -Publvaab | |||
OFFICE RI/DO RI/DO NE TSz CS DEn /D D E 30/ 22 OFFIALE COPY}} | |||
Revision as of 18:03, 17 November 2024
ML22186A118 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 07/06/2022 |
From: | Diane Jackson NRC/RGN-I/DORS |
To: | Rhoades D Constellation Energy Company, Constellation Nuclear |
Jackson D | |
Shared Package | |
ML22063A088 | List: |
References | |
Download: ML22186A118 (4) | |
Text
July 6, 2022
M r. David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)
Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 - SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS
Dear Mr. Rhoades :
In a telephone conversation on June 28, 2022, between Mr. Kevin Swiger, Exam Author; Ms. Megan Parlett, Exam Author; and Mr. Thomas Setzer, Senior Operations Engineer; arrangements were made for the administration of operator licensing examinations at Calvert Cliffs Nuclear Power Plant during the week of June 5, 2023.
As agreed upon during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 12 to NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by January 6, 2023. The written examination outline will be provided to your staff by November 22, 2022. The written examinations, operating tests, and supporting reference materials identified in NUREG-1021, Examination Standard (ES)-2.1, Preparing for Operator Licensing Initial Examinations, will be due by March 22, 2023. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(3), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be cancelled or rescheduled.
D. Rhoades 2
To conduct the requested written examinations and operating tests, your staff will need to provide adequate space and accommodations and to make the simulation facility available on the dates noted above. In accordance with ES-3.5, Administering Operating Tests, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the NRC takes licensing action on all the applications and any adjudicatory actions on any hearing demands are complete.
ES-1.2, Guidelines for Taking NRC Examinations, contains a number of NRC guidelines for the written examinations and operating tests as they are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) control number 3150- 0090) at least 60 days before the first examination date (if possible). Contact Mr. Thomas Setzer to determine the method for submission of the waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB control number 3150- 0090) and medical certifications (OMB control number 3150- 0024) should be submitted at least 30 days before the first examination date. If the NRC does not receive the preliminary applications at least 30 days before the examination date, a postponement may be necessary. Final, signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.
Although the guidelines for waiver or excusal requests call for their receipt at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60- day guideline above). Resolutions resulting from verbal inquiries by the facility licensee to the NRC are not binding. Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398 or as directed by Mr. Setzer when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency.
Paperwork Reduction Act Statement
This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the OMB, approval number 3150- 0018.
The burden to the public for these mandatory information collections is estimated to average 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> per examination or response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. Send comments regarding this information collection to the Freedom of Information Act, Library, and Information Collections Branch (T6-A10M),
U.S. Nuclear Regulatory Commission, Washington, DC 20555 0001, or by emailto Infocollects.Resource@nrc.gov, and to the OMB reviewer at: OMB Office of Information and Regulatory Affairs (3150-0018), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street, NW Washington, DC 20503; email: oira_submission@omb.eop.gov.
D. Rhoades 3
Public Protection Notification
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, Public inspections, exemptions, requests for withholding, a copy of this letter and its enclosures will be available electronically for public inspection through the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible on the NRCs w ebsite at http://www.nrc.gov/reading-rm/adams.html.
After you have been notified by the NRC chief examiner or b ranch chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation o f certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one -
month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.
Thank you for your cooperation in this matter. Mr. Swiger and M s. Parlett and have been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC s examination procedures and guidelines, please contact Mr. Thomas Setzer at (610) 337-5165 or me at (610) 337-5306.
Sincerely,
Donald E. Jackson, Chief Operations Branch Division of Operating Reactor Safety
Docket Nos. 50- 317 and 50- 318 License Nos. DPR-53 and DPR-69
cc: Distribution via ListServ
D. Rhoades 4
SUBJECT:
CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 - SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS DATED JULY 6, 2022
DISTRIBUTION:
BBickett, DORS PFinney, DORS GWalbert, DORS LDumont, DORS, SRI SObadina, DORS, RI CFragman, DORS, AA ROrlikowski, RI OEDO RidsNrrPMCalvertCliffs Resource RidsNrrDorlLpl1 Resource
DOCUMENT NAME: G:\\DRS\\Operations Branch\\SETZER\\ Exam FY23 - Calvert Cliffs\\CC Corp Notify Letter 2023.docx ADAMS Accession No. ML22063A088 (Package) ADAMS Accession No. ML22186A118 (Letter)
Neview Non-Sensitive Public ly Available Sensitive N -Publvaab
OFFICE RI/DO RI/DO NE TSz CS DEn /D D E 30/ 22 OFFIALE COPY