ML23036A002: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(One intermediate revision by the same user not shown) | |||
Line 13: | Line 13: | ||
| page count = 3 | | page count = 3 | ||
| project = | | project = | ||
| stage = | | stage = Approval | ||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:From: | {{#Wiki_filter:From: Billy Gleaves Sent: Sunday, February 5, 2023 10:44 AM To: Barty.simonton1@dnr.ga.gov Cc: Cayetano Santos; Victor Hall; Dave Matos (david.matos@dnr.ga.gov); Vogtle PEmails; Michael Spencer; Garry Armstrong | ||
==Subject:== | ==Subject:== | ||
ACTION : Request for State of Georgia Comment by 5pm Monday, February 6, 2023 - Vogtle Unit 3 (Exigent Technical Specification Change Request (LAR | ACTION : Request for State of Georgia Comment by 5pm Monday, February 6, 2023 - Vogtle Unit 3 (Exigent Technical Specification Change Request (LAR 004)) | ||
Importance: | |||
Importance: High | |||
Follow Up Flag: Follow up Due By: Monday, February 6, 2023 3:00 PM Flag Status: Flagged | |||
Mr. Simonton, | |||
I hope this email finds you well. | |||
The subject urgent license amendment request (LAR) from Southern Nuclear for Vogtle Unit 3 is dated January 31, 2023 (ADAMS Accession No. ML23031A359), Technical Specification Exceptions for In-containment Refueling Water Storage Tank Operability Prior to Initial Criticality (LAR 004), and requested that the U.S. NRC amend the combined license (COL) for Vogtle Electric Generating Plant (VEGP) Unit 3, COL Number NPF-91. | The subject urgent license amendment request (LAR) from Southern Nuclear for Vogtle Unit 3 is dated January 31, 2023 (ADAMS Accession No. ML23031A359), Technical Specification Exceptions for In-containment Refueling Water Storage Tank Operability Prior to Initial Criticality (LAR 004), and requested that the U.S. NRC amend the combined license (COL) for Vogtle Electric Generating Plant (VEGP) Unit 3, COL Number NPF-91. | ||
The LAR involves changes in order to facilitate a repair to VEGP Unit 3 in-containment refueling water storage tank (IRWST) injection isolation valve 3-PXS-V123A. The TS changes allow SNC to drain down the coolant in the reactor coolant system (RCS) to conduct the repair in lieu of the current TS requirement which would require a total core offload, or defueling, of the reactor. | The LAR involves changes in order to facilitate a repair to VEGP Unit 3 in-containment refueling water storage tank (IRWST) injection isolation valve 3-PXS-V123A. The TS changes allow SNC to drain down the coolant in the reactor coolant system (RCS) to conduct the repair in lieu of the current TS requirement which would require a total core offload, or defueling, of the reactor. | ||
SNC requested NRC review completion in 8 days from receipt which means that SNC wants to receive this amendment, if approved, by 8 pm Wednesday, February 8th, 2023. | SNC requested NRC review completion in 8 days from receipt which means that SNC wants to receive this amendment, if approved, by 8 pm Wednesday, February 8th, 2023. | ||
Unlike the usual license amendment process, the NRCs Exigent LAR process does not require an initial Notice of Consideration of Issuance for this LAR to be published in the Federal Register. The NRCs process for an Exigent LAR review, in this case, is to publish in a newspaper media ad, local to the facility, to request comment. That notice was published in the Augusta Chronicle on February 5 and 6, 2023. | Unlike the usual license amendment process, the NRCs Exigent LAR process does not require an initial Notice of Consideration of Issuance for this LAR to be published in the Federal Register. The NRCs process for an Exigent LAR review, in this case, is to publish in a newspaper media ad, local to the facility, to request comment. That notice was published in the Augusta Chronicle on February 5 and 6, 2023. | ||
The NRC is in process of finalizing its review of this LAR. Please provide your comments to me by 5pm Monday, February 6, 2023, if thats not possible, please let me know what is practical. | The NRC is in process of finalizing its review of this LAR. Please provide your comments to me by 5pm Monday, February 6, 2023, if thats not possible, please let me know what is practical. | ||
The contents of this message may be sensitive. If this message has been received in error, please delete it without reading it. Your receipt of this message is not intended to waive any applicable privilege. Do not disseminate this message without the permission of the author. Communications by this author do not represent NRC policy or staff positions and are not binding on the Commission. | Respectfully, | ||
Billy | |||
William (Billy) Gleaves Senior Project Manager NRR/Vogtle Project Office US Nuclear Regulatory Commission The contents of this message may be sensitive. If this message has been received in error, please delete it without reading it. Your receipt of this message is not intended to waive any applicable privilege. Do not disseminate this message without the permission of the author. Communications by this author do not represent NRC policy or staff positions and are not binding on the Commission. | |||
Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 651 | |||
Mail Envelope Properties (DM6PR09MB483905FC85B82CB1A514E9C79FD59) | |||
==Subject:== | ==Subject:== | ||
ACTION Request for State of Georgia Comment by 5pm Monday, February 6, 2023 - Vogtle Unit 3 (Exigent Technical Specification Change Request (LAR-23-004)) | ACTION Request for State of Georgia Comment by 5pm Monday, February 6, 2023 - Vogtle Unit 3 (Exigent Technical Specification Change Request (LAR-23-004)) | ||
Sent Date: | Sent Date: 2/5/2023 10:44:19 AM Received Date: 2/5/2023 10:44:23 AM From: Billy Gleaves | ||
Created By: Bill.Gleaves@nrc.gov | |||
Recipients: | |||
"Cayetano Santos" <Cayetano.Santos@nrc.gov> | "Cayetano Santos" <Cayetano.Santos@nrc.gov> | ||
Tracking Status: None "Victor Hall" <Victor.Hall@nrc.gov> | Tracking Status: None "Victor Hall" <Victor.Hall@nrc.gov> | ||
Line 43: | Line 63: | ||
Tracking Status: None "Garry Armstrong" <Garry.Armstrong@nrc.gov> | Tracking Status: None "Garry Armstrong" <Garry.Armstrong@nrc.gov> | ||
Tracking Status: None "Barty.simonton1@dnr.ga.gov" <barty.simonton1@dnr.ga.gov> | Tracking Status: None "Barty.simonton1@dnr.ga.gov" <barty.simonton1@dnr.ga.gov> | ||
Tracking Status: None Post Office: | Tracking Status: None | ||
Post Office: DM6PR09MB4839.namprd09.prod.outlook.com | |||
Files Size Date & Time MESSAGE 2248 2/5/2023 10:44:23 AM | |||
Options Priority: High Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date:}} |
Latest revision as of 09:51, 15 November 2024
ML23036A002 | |
Person / Time | |
---|---|
Site: | Vogtle |
Issue date: | 02/05/2023 |
From: | NRC |
To: | NRC/NRR/DNRL |
References | |
Download: ML23036A002 (3) | |
Text
From: Billy Gleaves Sent: Sunday, February 5, 2023 10:44 AM To: Barty.simonton1@dnr.ga.gov Cc: Cayetano Santos; Victor Hall; Dave Matos (david.matos@dnr.ga.gov); Vogtle PEmails; Michael Spencer; Garry Armstrong
Subject:
ACTION : Request for State of Georgia Comment by 5pm Monday, February 6, 2023 - Vogtle Unit 3 (Exigent Technical Specification Change Request (LAR 004))
Importance: High
Follow Up Flag: Follow up Due By: Monday, February 6, 2023 3:00 PM Flag Status: Flagged
Mr. Simonton,
I hope this email finds you well.
The subject urgent license amendment request (LAR) from Southern Nuclear for Vogtle Unit 3 is dated January 31, 2023 (ADAMS Accession No. ML23031A359), Technical Specification Exceptions for In-containment Refueling Water Storage Tank Operability Prior to Initial Criticality (LAR 004), and requested that the U.S. NRC amend the combined license (COL) for Vogtle Electric Generating Plant (VEGP) Unit 3, COL Number NPF-91.
The LAR involves changes in order to facilitate a repair to VEGP Unit 3 in-containment refueling water storage tank (IRWST) injection isolation valve 3-PXS-V123A. The TS changes allow SNC to drain down the coolant in the reactor coolant system (RCS) to conduct the repair in lieu of the current TS requirement which would require a total core offload, or defueling, of the reactor.
SNC requested NRC review completion in 8 days from receipt which means that SNC wants to receive this amendment, if approved, by 8 pm Wednesday, February 8th, 2023.
Unlike the usual license amendment process, the NRCs Exigent LAR process does not require an initial Notice of Consideration of Issuance for this LAR to be published in the Federal Register. The NRCs process for an Exigent LAR review, in this case, is to publish in a newspaper media ad, local to the facility, to request comment. That notice was published in the Augusta Chronicle on February 5 and 6, 2023.
The NRC is in process of finalizing its review of this LAR. Please provide your comments to me by 5pm Monday, February 6, 2023, if thats not possible, please let me know what is practical.
Respectfully,
Billy
William (Billy) Gleaves Senior Project Manager NRR/Vogtle Project Office US Nuclear Regulatory Commission The contents of this message may be sensitive. If this message has been received in error, please delete it without reading it. Your receipt of this message is not intended to waive any applicable privilege. Do not disseminate this message without the permission of the author. Communications by this author do not represent NRC policy or staff positions and are not binding on the Commission.
Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 651
Mail Envelope Properties (DM6PR09MB483905FC85B82CB1A514E9C79FD59)
Subject:
ACTION Request for State of Georgia Comment by 5pm Monday, February 6, 2023 - Vogtle Unit 3 (Exigent Technical Specification Change Request (LAR-23-004))
Sent Date: 2/5/2023 10:44:19 AM Received Date: 2/5/2023 10:44:23 AM From: Billy Gleaves
Created By: Bill.Gleaves@nrc.gov
Recipients:
"Cayetano Santos" <Cayetano.Santos@nrc.gov>
Tracking Status: None "Victor Hall" <Victor.Hall@nrc.gov>
Tracking Status: None "Dave Matos (david.matos@dnr.ga.gov)" <david.matos@dnr.ga.gov>
Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@usnrc.onmicrosoft.com>
Tracking Status: None "Michael Spencer" <Michael.Spencer@nrc.gov>
Tracking Status: None "Garry Armstrong" <Garry.Armstrong@nrc.gov>
Tracking Status: None "Barty.simonton1@dnr.ga.gov" <barty.simonton1@dnr.ga.gov>
Tracking Status: None
Post Office: DM6PR09MB4839.namprd09.prod.outlook.com
Files Size Date & Time MESSAGE 2248 2/5/2023 10:44:23 AM
Options Priority: High Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date: