ML23036A002: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 13: Line 13:
| page count = 3
| page count = 3
| project =  
| project =  
| stage = Other
| stage = Approval
}}
}}


=Text=
=Text=
{{#Wiki_filter:From:                     Billy Gleaves Sent:                     Sunday, February 5, 2023 10:44 AM To:                       Barty.simonton1@dnr.ga.gov Cc:                       Cayetano Santos; Victor Hall; Dave Matos (david.matos@dnr.ga.gov); Vogtle PEmails; Michael Spencer; Garry Armstrong
{{#Wiki_filter:From: Billy Gleaves Sent: Sunday, February 5, 2023 10:44 AM To: Barty.simonton1@dnr.ga.gov Cc: Cayetano Santos; Victor Hall; Dave Matos (david.matos@dnr.ga.gov); Vogtle PEmails; Michael Spencer; Garry Armstrong


==Subject:==
==Subject:==
ACTION : Request for State of Georgia Comment by 5pm Monday, February 6, 2023 - Vogtle Unit 3 (Exigent Technical Specification Change Request (LAR                           004))
ACTION : Request for State of Georgia Comment by 5pm Monday, February 6, 2023 - Vogtle Unit 3 (Exigent Technical Specification Change Request (LAR 004))
Importance:               High Follow Up Flag:           Follow up Due By:                   Monday, February 6, 2023 3:00 PM Flag Status:             Flagged Mr. Simonton, I hope this email finds you well.
 
Importance: High
 
Follow Up Flag: Follow up Due By: Monday, February 6, 2023 3:00 PM Flag Status: Flagged
 
Mr. Simonton,
 
I hope this email finds you well.
 
The subject urgent license amendment request (LAR) from Southern Nuclear for Vogtle Unit 3 is dated January 31, 2023 (ADAMS Accession No. ML23031A359), Technical Specification Exceptions for In-containment Refueling Water Storage Tank Operability Prior to Initial Criticality (LAR 004), and requested that the U.S. NRC amend the combined license (COL) for Vogtle Electric Generating Plant (VEGP) Unit 3, COL Number NPF-91.
The subject urgent license amendment request (LAR) from Southern Nuclear for Vogtle Unit 3 is dated January 31, 2023 (ADAMS Accession No. ML23031A359), Technical Specification Exceptions for In-containment Refueling Water Storage Tank Operability Prior to Initial Criticality (LAR 004), and requested that the U.S. NRC amend the combined license (COL) for Vogtle Electric Generating Plant (VEGP) Unit 3, COL Number NPF-91.
The LAR involves changes in order to facilitate a repair to VEGP Unit 3 in-containment refueling water storage tank (IRWST) injection isolation valve 3-PXS-V123A. The TS changes allow SNC to drain down the coolant in the reactor coolant system (RCS) to conduct the repair in lieu of the current TS requirement which would require a total core offload, or defueling, of the reactor.
The LAR involves changes in order to facilitate a repair to VEGP Unit 3 in-containment refueling water storage tank (IRWST) injection isolation valve 3-PXS-V123A. The TS changes allow SNC to drain down the coolant in the reactor coolant system (RCS) to conduct the repair in lieu of the current TS requirement which would require a total core offload, or defueling, of the reactor.
SNC requested NRC review completion in 8 days from receipt which means that SNC wants to receive this amendment, if approved, by 8 pm Wednesday, February 8th, 2023.
SNC requested NRC review completion in 8 days from receipt which means that SNC wants to receive this amendment, if approved, by 8 pm Wednesday, February 8th, 2023.
Unlike the usual license amendment process, the NRCs Exigent LAR process does not require an initial Notice of Consideration of Issuance for this LAR to be published in the Federal Register. The NRCs process for an Exigent LAR review, in this case, is to publish in a newspaper media ad, local to the facility, to request comment. That notice was published in the Augusta Chronicle on February 5 and 6, 2023.
Unlike the usual license amendment process, the NRCs Exigent LAR process does not require an initial Notice of Consideration of Issuance for this LAR to be published in the Federal Register. The NRCs process for an Exigent LAR review, in this case, is to publish in a newspaper media ad, local to the facility, to request comment. That notice was published in the Augusta Chronicle on February 5 and 6, 2023.
The NRC is in process of finalizing its review of this LAR. Please provide your comments to me by 5pm Monday, February 6, 2023, if thats not possible, please let me know what is practical.
The NRC is in process of finalizing its review of this LAR. Please provide your comments to me by 5pm Monday, February 6, 2023, if thats not possible, please let me know what is practical.
Respectfully, Billy William (Billy) Gleaves Senior Project Manager NRR/Vogtle Project Office US Nuclear Regulatory Commission


The contents of this message may be sensitive. If this message has been received in error, please delete it without reading it. Your receipt of this message is not intended to waive any applicable privilege. Do not disseminate this message without the permission of the author. Communications by this author do not represent NRC policy or staff positions and are not binding on the Commission.
Respectfully,
 
Billy
 
William (Billy) Gleaves Senior Project Manager NRR/Vogtle Project Office US Nuclear Regulatory Commission The contents of this message may be sensitive. If this message has been received in error, please delete it without reading it. Your receipt of this message is not intended to waive any applicable privilege. Do not disseminate this message without the permission of the author. Communications by this author do not represent NRC policy or staff positions and are not binding on the Commission.
 
Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 651


Hearing Identifier:      Vogtle_COL_Docs_Public Email Number:            651 Mail Envelope Properties       (DM6PR09MB483905FC85B82CB1A514E9C79FD59)
Mail Envelope Properties (DM6PR09MB483905FC85B82CB1A514E9C79FD59)


==Subject:==
==Subject:==
ACTION Request for State of Georgia Comment by 5pm Monday, February 6, 2023 - Vogtle Unit 3 (Exigent Technical Specification Change Request (LAR-23-004))
ACTION Request for State of Georgia Comment by 5pm Monday, February 6, 2023 - Vogtle Unit 3 (Exigent Technical Specification Change Request (LAR-23-004))
Sent Date:               2/5/2023 10:44:19 AM Received Date:           2/5/2023 10:44:23 AM From:                     Billy Gleaves Created By:               Bill.Gleaves@nrc.gov Recipients:
Sent Date: 2/5/2023 10:44:19 AM Received Date: 2/5/2023 10:44:23 AM From: Billy Gleaves
 
Created By: Bill.Gleaves@nrc.gov
 
Recipients:
"Cayetano Santos" <Cayetano.Santos@nrc.gov>
"Cayetano Santos" <Cayetano.Santos@nrc.gov>
Tracking Status: None "Victor Hall" <Victor.Hall@nrc.gov>
Tracking Status: None "Victor Hall" <Victor.Hall@nrc.gov>
Line 43: Line 63:
Tracking Status: None "Garry Armstrong" <Garry.Armstrong@nrc.gov>
Tracking Status: None "Garry Armstrong" <Garry.Armstrong@nrc.gov>
Tracking Status: None "Barty.simonton1@dnr.ga.gov" <barty.simonton1@dnr.ga.gov>
Tracking Status: None "Barty.simonton1@dnr.ga.gov" <barty.simonton1@dnr.ga.gov>
Tracking Status: None Post Office:             DM6PR09MB4839.namprd09.prod.outlook.com Files                             Size                   Date & Time MESSAGE                           2248                   2/5/2023 10:44:23 AM Options Priority:                         High Return Notification:               No Reply Requested:                   Yes Sensitivity:                       Normal Expiration Date:}}
Tracking Status: None
 
Post Office: DM6PR09MB4839.namprd09.prod.outlook.com
 
Files Size Date & Time MESSAGE 2248 2/5/2023 10:44:23 AM
 
Options Priority: High Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date:}}

Latest revision as of 09:51, 15 November 2024

COL Docs - Action Request for State of Georgia Comment by 5pm Monday, February 6, 2023 - Vogtle Unit 3 (Exigent Technical Specification Change Request (LAR-23-004))
ML23036A002
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/05/2023
From:
NRC
To:
NRC/NRR/DNRL
References
Download: ML23036A002 (3)


Text

From: Billy Gleaves Sent: Sunday, February 5, 2023 10:44 AM To: Barty.simonton1@dnr.ga.gov Cc: Cayetano Santos; Victor Hall; Dave Matos (david.matos@dnr.ga.gov); Vogtle PEmails; Michael Spencer; Garry Armstrong

Subject:

ACTION : Request for State of Georgia Comment by 5pm Monday, February 6, 2023 - Vogtle Unit 3 (Exigent Technical Specification Change Request (LAR 004))

Importance: High

Follow Up Flag: Follow up Due By: Monday, February 6, 2023 3:00 PM Flag Status: Flagged

Mr. Simonton,

I hope this email finds you well.

The subject urgent license amendment request (LAR) from Southern Nuclear for Vogtle Unit 3 is dated January 31, 2023 (ADAMS Accession No. ML23031A359), Technical Specification Exceptions for In-containment Refueling Water Storage Tank Operability Prior to Initial Criticality (LAR 004), and requested that the U.S. NRC amend the combined license (COL) for Vogtle Electric Generating Plant (VEGP) Unit 3, COL Number NPF-91.

The LAR involves changes in order to facilitate a repair to VEGP Unit 3 in-containment refueling water storage tank (IRWST) injection isolation valve 3-PXS-V123A. The TS changes allow SNC to drain down the coolant in the reactor coolant system (RCS) to conduct the repair in lieu of the current TS requirement which would require a total core offload, or defueling, of the reactor.

SNC requested NRC review completion in 8 days from receipt which means that SNC wants to receive this amendment, if approved, by 8 pm Wednesday, February 8th, 2023.

Unlike the usual license amendment process, the NRCs Exigent LAR process does not require an initial Notice of Consideration of Issuance for this LAR to be published in the Federal Register. The NRCs process for an Exigent LAR review, in this case, is to publish in a newspaper media ad, local to the facility, to request comment. That notice was published in the Augusta Chronicle on February 5 and 6, 2023.

The NRC is in process of finalizing its review of this LAR. Please provide your comments to me by 5pm Monday, February 6, 2023, if thats not possible, please let me know what is practical.

Respectfully,

Billy

William (Billy) Gleaves Senior Project Manager NRR/Vogtle Project Office US Nuclear Regulatory Commission The contents of this message may be sensitive. If this message has been received in error, please delete it without reading it. Your receipt of this message is not intended to waive any applicable privilege. Do not disseminate this message without the permission of the author. Communications by this author do not represent NRC policy or staff positions and are not binding on the Commission.

Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 651

Mail Envelope Properties (DM6PR09MB483905FC85B82CB1A514E9C79FD59)

Subject:

ACTION Request for State of Georgia Comment by 5pm Monday, February 6, 2023 - Vogtle Unit 3 (Exigent Technical Specification Change Request (LAR-23-004))

Sent Date: 2/5/2023 10:44:19 AM Received Date: 2/5/2023 10:44:23 AM From: Billy Gleaves

Created By: Bill.Gleaves@nrc.gov

Recipients:

"Cayetano Santos" <Cayetano.Santos@nrc.gov>

Tracking Status: None "Victor Hall" <Victor.Hall@nrc.gov>

Tracking Status: None "Dave Matos (david.matos@dnr.ga.gov)" <david.matos@dnr.ga.gov>

Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@usnrc.onmicrosoft.com>

Tracking Status: None "Michael Spencer" <Michael.Spencer@nrc.gov>

Tracking Status: None "Garry Armstrong" <Garry.Armstrong@nrc.gov>

Tracking Status: None "Barty.simonton1@dnr.ga.gov" <barty.simonton1@dnr.ga.gov>

Tracking Status: None

Post Office: DM6PR09MB4839.namprd09.prod.outlook.com

Files Size Date & Time MESSAGE 2248 2/5/2023 10:44:23 AM

Options Priority: High Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date: