ML24213A141: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:
{{#Wiki_filter:B. Berryman
{{#Wiki_filter:B. Berryman


UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE RD, S                                         TE 102 KING OF PRUSSIA, PENNSYLVANIA 19406-1415
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE RD, S TE 102 KING OF PRUSSIA, PENNSYLVANIA 19406-1415


July 31, 2024
July 31, 2024


David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)
David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)
Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555
Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
NINE MILE POINT NUCLEAR STATION, UNIT 1                                 - R         EQUALIFICATION PROGRAM I                                                           NSPECTION
NINE MILE POINT NUCLEAR STATION, UNIT 1 - R EQUALIFICATION PROGRAM I NSPECTION


==Dear David Rhoades:==
==Dear David Rhoades:==
In a telephone conversation on July 18, 2024, Todd Fish, Senior Operations Engineer, and Michael Dougherty, Licensed Operator Requalification Program Lead, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Nine Mile Point Nuclear Station, Unit 1 facility. The inspection is planned for the week of October 28, 2024, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.


In a telephone conversation on July                                                                                                              18, 2024,                                                                                                              Todd Fish, Senior Operations Engineer, and Michael Dougherty, Licensed Operator Requalification Program Lead,                                                                                                                          made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the                                                       Nine Mile Point Nuclear Station, Unit 1 facility                                                    . The inspection is planned for the week of                                           October 28                                , 2024,                                                                                        which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR ) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: (1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; ( 2) an index or summary of condition reports written in the past two years on simulator performance problems; (3) an index or summary of simulator performance test results in the past two years; and (4) the examination schedule, sample plan, written examinations, and operating test scheduled for the week of the inspection to the NRC by the week of October 14, 2024. Michael Dougherty has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.


In accordance with Title 10 of the Code of Federal Regulations (10 CFR                                                                                                                                                                                              ) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: (1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; (                                            2) an index or summary of condition reports written in the past two years on simulator performance problems; (3) an index or summary of simulator performance test results in the past two years; and (4) the examination schedule, sample plan, written examinations , and operating test scheduled for the week of the inspection to the NRC by the week of            October 14,                                                       2024                                                                  . Michael Dougherty has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB), approval number 3150-0018.


This letter contains information collections that are subject to the Paperwork  Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB), approval number 3150-0018.
The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions D. Rhoades 2
 
The public reporting burden for this collection of information is estimated to average four                                                                               hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information                                             collections, including suggestions D. Rhoades                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   2


for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52),
for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52),
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV                                                     ; and to the Desk Officer, Office of Information and Regulatory Affairs,   NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC                                                         20503.
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV ; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.


The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.


In accordance with 10                                                                                         CFR                             2.390 of the NRCs                                 Rules of Practice,                                   a copy of this letter will be available electronically for public inspection in the NRC s Public Document Room or from the Publicly Available Records (PARS) component of the NRC s document system, Agencywide Documents Access and Management System                                                                   (ADAMS). ADAMS is accessible from the NRC website                                 at http://www.nrc.gov/reading-rm/adams.html                                     (The Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC s Public Document Room or from the Publicly Available Records (PARS) component of the NRC s document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).


Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Todd                                                                   Fish at (610) 337-5369.
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Todd Fish at (610) 337-5369.


Sincerely,
Sincerely,


Donald E. Jackson           , Chief Operations Branch Division of Operating Reactor Safety
Donald E. Jackson, Chief Operations Branch Division of Operating Reactor Safety


Docket No.50-220 License No.                                   DPR-63
Docket No.50-220 License No. DPR-63


cc: Distribution via ListServ
cc: Distribution via ListServ


D. Rhoades                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   3
D. Rhoades 3


==SUBJECT:==
==SUBJECT:==
NINE MILE POINT NUCLEAR STATION, UNIT 1                                 -           REQUALIFICATION PROGRAM INSPECTION DATED J   U LY   3   1, 2024
NINE MILE POINT NUCLEAR STATION, UNIT 1 - REQUALIFICATION PROGRAM INSPECTION DATED J U LY 3 1, 2024


DISTRIBUTION:
DISTRIBUTION:
TFish, DORS DJackson, DORS LPinkham, DORS, OLA ECarfang, DORS EEve, DORS KSmetana, DORS EAdams, DORS CKline, DORS, SRI BSienel, DORS, RI ATrudell,   DORS, AA RidsNrrPMNineMilePoint Resource RidsNrrDorlLpl1 Resource
TFish, DORS DJackson, DORS LPinkham, DORS, OLA ECarfang, DORS EEve, DORS KSmetana, DORS EAdams, DORS CKline, DORS, SRI BSienel, DORS, RI ATrudell, DORS, AA RidsNrrPMNineMilePoint Resource RidsNrrDorlLpl1 Resource


DOCUMENT NAME: G:\\DRS\\Operations Branch\\FISH\\Requal FY25 NMP1 Oct 2024\\                                                                               NMP1 LOR Corp Letter.docx ADAMS ACCESSION NO. ML24213A141
DOCUMENT NAME: G:\\DRS\\Operations Branch\\FISH\\Requal FY25 NMP1 Oct 2024\\ NMP1 LOR Corp Letter.docx ADAMS ACCESSION NO. ML24213A141


SUNSI Review                                                                                         N       -Sensitive                                                                   Publiclyvlae Sensitive                                                                             N       -Publiclyvlae
SUNSI Review N -Sensitive Publiclyvlae Sensitive N -Publiclyvlae


OFFICE                                                                 RI/DO     RS/OB                                                                                                               RI/DO     RS/OB N                                                                                                     TFish/TF                                                                                                                                                                                                                                                                 DEJackson/DEJ D AT E                               7/31/24                                                         7/31/24 OFFICIAL RECORD COPY}}
OFFICE RI/DO RS/OB RI/DO RS/OB N TFish/TF DEJackson/DEJ D AT E 7/31/24 7/31/24 OFFICIAL RECORD COPY}}

Latest revision as of 10:52, 4 October 2024

Requalification Program Inspection
ML24213A141
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/31/2024
From: Diane Jackson
NRC/RGN-I/DORS/OB
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
Download: ML24213A141 (1)


Text

B. Berryman

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE RD, S TE 102 KING OF PRUSSIA, PENNSYLVANIA 19406-1415

July 31, 2024

David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)

Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

NINE MILE POINT NUCLEAR STATION, UNIT 1 - R EQUALIFICATION PROGRAM I NSPECTION

Dear David Rhoades:

In a telephone conversation on July 18, 2024, Todd Fish, Senior Operations Engineer, and Michael Dougherty, Licensed Operator Requalification Program Lead, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Nine Mile Point Nuclear Station, Unit 1 facility. The inspection is planned for the week of October 28, 2024, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR ) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: (1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; ( 2) an index or summary of condition reports written in the past two years on simulator performance problems; (3) an index or summary of simulator performance test results in the past two years; and (4) the examination schedule, sample plan, written examinations, and operating test scheduled for the week of the inspection to the NRC by the week of October 14, 2024. Michael Dougherty has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB), approval number 3150-0018.

The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions D. Rhoades 2

for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52),

U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV ; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC s Public Document Room or from the Publicly Available Records (PARS) component of the NRC s document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Todd Fish at (610) 337-5369.

Sincerely,

Donald E. Jackson, Chief Operations Branch Division of Operating Reactor Safety

Docket No.50-220 License No. DPR-63

cc: Distribution via ListServ

D. Rhoades 3

SUBJECT:

NINE MILE POINT NUCLEAR STATION, UNIT 1 - REQUALIFICATION PROGRAM INSPECTION DATED J U LY 3 1, 2024

DISTRIBUTION:

TFish, DORS DJackson, DORS LPinkham, DORS, OLA ECarfang, DORS EEve, DORS KSmetana, DORS EAdams, DORS CKline, DORS, SRI BSienel, DORS, RI ATrudell, DORS, AA RidsNrrPMNineMilePoint Resource RidsNrrDorlLpl1 Resource

DOCUMENT NAME: G:\\DRS\\Operations Branch\\FISH\\Requal FY25 NMP1 Oct 2024\\ NMP1 LOR Corp Letter.docx ADAMS ACCESSION NO. ML24213A141

SUNSI Review N -Sensitive Publiclyvlae Sensitive N -Publiclyvlae

OFFICE RI/DO RS/OB RI/DO RS/OB N TFish/TF DEJackson/DEJ D AT E 7/31/24 7/31/24 OFFICIAL RECORD COPY