Line 2: |
Line 2: |
| | number = ML20065J615 | | | number = ML20065J615 |
| | issue date = 03/31/1994 | | | issue date = 03/31/1994 |
| | title = Monthly Operating Rept for Mar 1994 for Seabrook Station.W/ 940413 Ltr | | | title = Monthly Operating Rept for Mar 1994 for Seabrook Station.W/ |
| | author name = Feigenbaum T, Nardone P | | | author name = Feigenbaum T, Nardone P |
| | author affiliation = NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO) | | | author affiliation = NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO) |
Line 11: |
Line 11: |
| | contact person = | | | contact person = |
| | document report number = NYN-94040, NUDOCS 9404180327 | | | document report number = NYN-94040, NUDOCS 9404180327 |
| | | title reference date = 04-13-1994 |
| | document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT | | | document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT |
| | page count = 5 | | | page count = 5 |
|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217H2841999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Seabrook Station. with ML20212B8671999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Seabrook Station. with ML20210R6001999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With ML20209H1371999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With ML20195G5391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With ML20206N1751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With ML20205L8141999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Seabrook Station. with ML20207F4941999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Seabrook Station. with ML20199E6731998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With ML20198B8661998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Seabrook Station, Unit 1.With ML20195D0311998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Seabrook Station, Unit 1.With ML20154M8421998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Seabrook Generating Station,Unit 1.With ML20151V5951998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Seabrook Station, Unit 1.With ML20237B4501998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Seabrook Station ML20236M3591998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Seabrook Station, Unit 1 ML20248M2951998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Seabrook Station, Unit 1 ML20247G2641998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Seabrook Station ML20216F8891998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Seabrook Station ML20248L2811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Seabrook Station, Unit 1 ML20202G3701998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Seabrook Station ML20198N7021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Seabrook Station, Unit 1 ML20203D6311997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Seabrook Station, Unit 1 ML20198Q2591997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Seabrook Station ML20217H6101997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Seabrook Station, Unit 1 ML20216H6141997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Seabrook Station ML20210K6011997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Seabrook Nuclear Station,Unit 1 ML20141H1031997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Seabrook Station ML20148K6791997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Seabrook Station ML20141F3331997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Seabrook Station Unit 1 ML20137V9651997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Seabrook Station Unit 1 ML20147E5891997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Seabrook Station Unit 1 ML20134M2261997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Sns ML20133M6221996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Seabrook Station Unit 1 ML20132D6251996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Seabrook Station Unit 1 ML20134H3721996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Seabrook Station Unit 1 ML20128N5241996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Seabrook Station Unit 1 ML20117N1551996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Seabrook Station ML20116J0761996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Seabrook Station, Unit 1 ML20115B1061996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Seabrook Station Unit 1 ML20117K4941996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Seabrook Station, Unit 1 ML20111B0361996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Seabrook Station.W/ ML20101R2261996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Seabrook Station Unit 1 ML20106G8461996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Seabrook Station, Unit 1 ML20100G8611996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Seabrook Station Unit 1 ML20096B9021995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Seabrook Station Unit 1 ML20095C1071995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Seabrook Station Unit 1 ML20094L1381995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Seabrook Station Unit 1 ML20093F5431995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Seabrook Station Unit 1 ML20092G2781995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Seabrook Station Unit 1 ML20087F1521995-07-31031 July 1995 Monthly Operating Rept for Jul 1995 for Seabrook Station Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H2841999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Seabrook Station. with ML20212D1461999-09-17017 September 1999 SER Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20216F5141999-08-31031 August 1999 Rept on Status of Public Petitions Under 10CFR2.206 ML20212B8671999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Seabrook Station. with ML20210Q7581999-08-11011 August 1999 SER Approving Proposed Merger of CES & Bec,Which Will Create New Parent Company of Canal ML20210R9781999-08-0606 August 1999 ISI Exam Rept of Seabrook Station, for RFO 6,period 3 ML20210J8681999-08-0303 August 1999 SER Approving License Transfer from Montaup Electric Co to Little Bay Power Corp & Approval of Conforming Amend for Seabrook Station Unit 1 ML20210R6001999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With ML20210H1151999-06-30030 June 1999 Naesc Semi-Annual Fitness-for-Duty Rept for 990101-0630 ML20209H1371999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With ML20195G5391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With ML20195C0491999-05-25025 May 1999 Offshore Intake Seal Deterrent Barrier Design ML20206E4761999-04-30030 April 1999 LER 99-S01-00:on 990408,contractor Employee Was Granted Temporary Unescorted Access to Seabrook Station Protected Area.Caused by Failure of Contractor Employee to Provide Accurate Info.Individual Access Revoked.With ML20206N1751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With ML20196L2081999-04-19019 April 1999 Rev 01-07-00 to RE-21, Cycle 7 Colr ML20205K5441999-03-31031 March 1999 Decommissioning Update ML20205L8141999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Seabrook Station. with ML20205C1981999-03-24024 March 1999 Safety Evaluation Concluding That Proposed Relief Request IR-8,Rev 1,provides Acceptable Alternative to ASME Code Requirements.Recommends Authorization of Proposed Alternative Pursuant to 10CFR50.55a(a)(3)(i) ML20207F4941999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Seabrook Station. with ML20199E6731998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With ML20198P1831998-12-31031 December 1998 LER 98-S01-00:on 981214,incomplete pre-employment Screening Records Was Noted.Caused by Failure of Contractor Employee to Provide Accurate Info.Subject Contractor Employees Employment Was Terminated.With ML20202E8241998-12-31031 December 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980701-981231 ML20196F5741998-12-0202 December 1998 Safety Evaluation Concluding That Licensee Has Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Seabrook ML20198B8661998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Seabrook Station, Unit 1.With ML20195D0311998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Seabrook Station, Unit 1.With ML20154H5291998-10-0808 October 1998 Special Rept:On 980928,meteorological Monitoring Instrumentation Channel Inoperable for Period Greater than 7 Days.Caused by Vendor to Follow Std Industry Practice for Calibr of Instrumentation.Instruments Installed ML20154M8421998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Seabrook Generating Station,Unit 1.With ML20151V5951998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Seabrook Station, Unit 1.With ML20237B4501998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Seabrook Station ML20236R1781998-06-30030 June 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980101-0630 ML20236M3591998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Seabrook Station, Unit 1 ML20237A4871998-06-0303 June 1998 North Atlantic Seabrook Station 1998 Exercise on 980603 ML20248M2951998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Seabrook Station, Unit 1 ML20247G2641998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Seabrook Station ML20247H3171998-04-27027 April 1998 Rev 1 to Seabrook Station SGs B & C Isi,May/June 1997 ML20216F8891998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Seabrook Station 05000443/LER-1998-002, Re Potential Safety Injection Pump Runout Conditions Identified on 980113.LER 98-002-00 Retracted1998-03-20020 March 1998 Re Potential Safety Injection Pump Runout Conditions Identified on 980113.LER 98-002-00 Retracted ML20216H9211998-03-13013 March 1998 Fitness for Duty Program Performance Data Personnel Subject to 10CFR26 ML20248L2811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Seabrook Station, Unit 1 ML20197A7531998-02-27027 February 1998 Safety Evaluation Accepting License Request for Relief from ASME Code,Section IX Requirements Re Inservice Insp of RHR Heat Exchanger Nozzle Welds & Reactor Vessel Closure Head Nuts ML20202G3701998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Seabrook Station ML20198G0271997-12-31031 December 1997 Commonwealth Energy Sys 1997 Annual Rept ML20248L7711997-12-31031 December 1997 Western Massachusetts Electric 1997 Annual Rept. Supporting Info,Encl ML20198G1021997-12-31031 December 1997 Baycorp Holdings 1997 Annual Rept ML20198N7021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Seabrook Station, Unit 1 ML20198G0351997-12-31031 December 1997 Eastern Edison Co 1997 Annual Rept ML20198G0681997-12-31031 December 1997 Taunton Municipal Lighting Plant 1997 Annual Rept ML20248L7671997-12-31031 December 1997 North Atlantic 1997 Annual Rept ML20198F9511997-12-31031 December 1997 United Illuminating Co 1997 Annual Rept ML20236M9561997-12-31031 December 1997 Amended Public Service of New Hampshire 1997 Annual Rept 1999-09-30
[Table view] |
Text
. s
'/*
4Nyu,,,,
b' . i M' nOr a1 North Atlantic Energy Service Corporation P.O. nox 300 Atlantic Scabrook, N1103874 o (603) 474 9521,- Fax (603) 474 2987 The Northeast Utilitien System Ted C. Feigenbaum NYN- 94040 Senior Vice President &
Chief Nuclear Officer
' April 13,1994 United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk
References:
Facility Operating License NPF-86, Docket No. 50-443
Subject:
Monthly Operating Report Gentlemen:
Enclosed please find Monthly Operating Report 94-03. This report addresses the operating and shutdown experience relating to Seabrook Station Unit I for the month of March,1994 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
Very truly yours,
[ &/ '
Ted C. Feigenbam Enclosure ec: Mr. Thomas T. Martin Regional Administrator United States Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 i Mr. Albert W. De Agazio, Sr. Project Manager ;
Project Directorate I-4 Division of Reactor Projects ]
U.S. Nuclear Regulatory Commission I
' Washington, DC 20555 Mr. Antone C. Cerne NRC Senior Resident Inspector P.O. Box 1149 Seabrook, Nil 03874 9404100327 940331 PDR ADOCK 05000443 j 1..R . .
PDR- O
- - m _
OPERATING DATA REPORT DOCKET NO. 50-443 UNIT Seabrook 1 DATE 14/13/94 COMPLETED BY >. E Nardone TELEPHONE (603) 474-9521 Ext. 40/4 OPERATING STATUS q
- 1. Unit Name: Seabrook Station Unit 1
- 2. Reporting Period: MARCH 1994
- 3. Licensed Thermal Power (MWt): 3411
- 4. Nameplate Rating (Gross MWe): 1197
- 5. Design Electrical Rating (Net MWe): 1148
- 6. Maximum Dependable Capacity (Gross MWe): 1200
- 7. Maxtmum-Dependable Capacity (Net MWe): 1150
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report. Give Reasons: Not Applicable
- 9. Power Level 10 Which Restricted, If Any: None
- 10. Reasons for Restrictions, If Any: Not Anolicable This Month Yr.-to-Date Cumulative
- 11. Hours in Reporting Period -
744 0 2160.0 65353.0
- 12. Number Of Hours Reactor Was Critical 744.0 1646 4 29347.5
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 953.3 14, Hours Generator.On Line 744.0 1606./ 27283.9- '
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 16, Gross Thermal Energy Generated (MWH) 2637652 544318/ 888/S633
- 17. Gross Elec Energy Generated (MWH) - 890 11 900860 ._30874603
- 18. Net Electrical Energy Generated (MWH) 866 87 : 827322 296S0940 -
- 19. Untt Service factor . 00 . 0~ 74.4 8-.8-
- 20. Unit Availability factor 00.0 74.4 8'.8_
- 21. Unit Capacity Factor (Using MOC Net) 00.1 73 6 78.5-
- 22. Unit Capacity Factor (Using DER Net) .00.2 73 7- 78.7
- 23. Unit Forced Outage Rate. 0.0 25.6 7.7
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
REFUEL LNG. 04/09/94. 57 DAYS
- 25. If Shut Down At End Of Report Period. Estimated Date Of Startup: Not Anolicabli
- N01E: " Cumulative" values based on total hours starting 08/19/90, date Regular' '
Full Power Operation began. ,
1 of 4
.l
)
_a - . , , . _ . . -. - - .- , - . . . ,
. . o 1
AVERAGE DAILY UNIT POWER LEVEL
. DOCKET NO. 50 443 UNIT Seabrook 1-DATE 04/13/94 COMPLETED BY P. L. Nardone TELEPHONE (603) 47L 9521 Ext. 4074 MONTil MARCH. 1994 OAY. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) -(MWe-Net) 1 1149 17 1150 2 1150 18 1151' 3 1150 19 1150 4 1150 20 1152 5 1150 21 '1151 6 1150 22 1151
-7 1150 23 1152 8 1150 24 1152 9 1150 25 1152 10 1150 26 1152 11 1150 27 1152 12 1150 28 '1152 13' 1151 29 1152 14 1151 30 1152 15 1150 31 1152 16 1151' i
i INSTRUCTIONS
.00 this format, list the average daily unit power level in MWe Net for each day in the reporting' month. Compute to the nearest whole megawatt.
i 2 of 4
9 UNIT SHUTD021NS AND PCdR REDUCTIONS DOCKET NO. 50-443 UNIT Saabrook 1 DATE 04/13r94 REPORT MONTH MARCH. 1994 CCHPLETED BY P. E. Nardone TELEPHONE M03) 474-95?1 Ext.4074 2
No. Date Type Duration Reason Method of Licensee Cause & Corrective (Hours) Shutting Event Action to Down Reactor 3 Report y Prevent Recurrence Page 1 of 1-NO ENTRIES FOR THIS MGNTH 1 2 3 F: Forced Reason: Method:
S: Scheduled A-Equipment Failure (Explain) 1-Manual B Nintenance or Test 2-Manual Scram
.-Refueling 3-Autcmatic Scram D-Regulatory Restriction . 4-Centinued from E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction G-Operational Error (Explain) (Duration - 0)
H-Other (Explain) Other (Explain) f 3 of 4 l'
l.
1;
.._ _---- _--__-- - -. - . - ._-_ = __ ---.-_.- -
4 v
. . - . . - - - _ - , _ . - - - . . - . . ~ . . - . . . . . .-
DOCKET NO. 50-443 UNIT Seabrook 1
. DATE 04/11/94
. COMPLETED BY P. E. Nardone TELEPHONE (603) 474-9521 Ext. 4074 ;
, REFUELING INFORMATION REQUEST
- 1. Name of facility: Seabrook Unit 1
- 2. Schecaled date for next refueling shutdown:
Refueling Outage 3, 04/09/94 3, Scheduled date for restart following refueling:
Refueling Outage 3. 06/04/94
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? .,
No
- 5. Scheduled date(s) for submitting licensing action and supporting information:
N/A
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel l
- design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design. new operating procedures
None
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) In Core: 193 (b) 207
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: I Present licensed capacity: 1236 . .
No increase in storage capacity requested or planned.
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
~
Licensed capacity of 1236 fuel assemblies based on two' annual and twelve eighteen-month refuelings with full core offload capability.
The current licensed capacity.is adequate until at least the year 2010.
d 3
1 4 of 4
.. ,_ .. __ _ ...... ,_ _ , ._ .-_._ __ __ .-