Nine Mile Point: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) No edit summary |
StriderTol (talk | contribs) No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 8: | Line 8: | ||
|town=Scriba | |town=Scriba | ||
|mapping location=43° 31' 12.77" N, 76° 24' 23.63" W | |mapping location=43° 31' 12.77" N, 76° 24' 23.63" W | ||
|company=Exelon | |company=Constellation | ||
|company history={{company history | |||
|transfer from=Exelon | |||
|transfer to=Constellation | |||
|transfer date=February 2, 2022 | |||
|transfer record=ML22021B659 | |||
}} | |||
|wikipedia=Nine Mile Point Nuclear Generating Station | |wikipedia=Nine Mile Point Nuclear Generating Station | ||
|site unit={{Site unit | |site unit={{Site unit | ||
Line 34: | Line 40: | ||
|Ultimate heat sink=Cooling Tower | |Ultimate heat sink=Cooling Tower | ||
|url=https://www.nrc.gov/info-finder/reactors/nmp2.html | |url=https://www.nrc.gov/info-finder/reactors/nmp2.html | ||
}}{{Site unit | |||
|Unit number=3 | |||
|Docket=05200038 | |||
|is cancelled=Yes | |||
|Reactor type=European Pressurized Reactor | |||
}} | }} | ||
}} | }} |
Latest revision as of 20:11, 22 March 2022
Plant | |
---|---|
Company | Constellation |
Where | Scriba, New York |
Regulatory | |
Region | NRC Region 1 |
ISFSI docket | |
Company History | |
Exelon->Constellation (February 2, 2022) | |
wikipedia link | |
Docket | 05000220 |
---|---|
License | DPR-63 |
Licensed Power Level (Thermal) | 1,850 MWt |
Unit type | GE-2 |
Containment | Mark I |
Ultimate Heat Sink | Lake Ontario |
Status | |
Commission | 12/26/1974 |
Renewal | 10/31/2006 |
NRC Website | |
Docket | 05000410 |
---|---|
License | NPF-69 |
Licensed Power Level (Thermal) | 3,988 MWt |
Unit type | GE-5 |
Containment | Mark II |
Ultimate Heat Sink | Cooling Tower |
Status | |
Commission | 07/02/1987 |
Renewal | 10/31/2006 |
NRC Website | |
Docket | 05200038-Canceled |
---|---|
Unit type | European Pressurized Reactor |
Status | |