Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000220/2023004 | 1 February 2024 | Integrated Inspection Report 05000220/2023004 and 05000410/2023004 | Stroke time Functionality Assessment Missed surveillance Operability Determination Through Wall Leak Fire Protection Program Downpower |
NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation | 1 February 2024 | Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation | |
ML24030A714 | 30 January 2024 | Single Positive Test Form Collected on 06/05/2023 | |
ML24030A711 | 30 January 2024 | Single Positive Test Form Collected on 03/17/2023 | |
ML24030A709 | 30 January 2024 | Single Positive Test Form Collected on 03/07/2023 | |
ML24030A705 | 30 January 2024 | Single Positive Test Form Collected on 02/28/2023 | |
ML24030A715 | 30 January 2024 | Single Positive Test Form Collected on 08/03/2023 | |
ML24030A712 | 30 January 2024 | Single Positive Test Form Collected on 03/21/2023 | |
ML24030A706 | 30 January 2024 | Single Positive Test Form Collected on 03/02/2023 | |
ML24029A174 | 30 January 2024 | Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion | |
ML24030A707 | 30 January 2024 | Single Positive Test Form Collected on 03/02/2023 | |
ML24030A704 | 30 January 2024 | Single Positive Test Form Collected on 02/28/2023 | |
ML24030A710 | 30 January 2024 | Single Positive Test Form Collected on 03/02/2023 | |
ML24030A702 | 30 January 2024 | Single Positive Test Form Collected on 02/17/2023 | |
ML24030A703 | 30 January 2024 | Single Positive Test Form Collected on 02/20/2023 | |
ML24030A716 | 30 January 2024 | Single Positive Test Form Collected on 09/12/2023 | |
ML24030A713 | 30 January 2024 | Single Positive Test Form Collected on 04/11/2023 | |
ML24030A708 | 30 January 2024 | Single Positive Test Form Collected on 03/07/2023 | |
PMNS20240007, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-932 | 29 January 2024 | Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-932 | |
NMP1L3569, CFR 50.46 Annual Report | 26 January 2024 | CFR 50.46 Annual Report | |
ML23354A003 | 19 January 2024 | Authorization and Safety Evaluation for Alternative Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations | |
ML24008A059 | 8 January 2024 | E-mail Dated 1-8-2024 from R. Guzman to R. Reynolds Correct TS Page 204 for License Amendment No. 250 Adoption of TSTF-505 | Surveillance Frequency Control Program |
ML24004A212 | 8 January 2024 | Senior Reactor and Reactor Operator Initial License Examinations | |
ML24008A262 | 8 January 2024 | Acceptance Review Determination for Relief Request I5R-12, Concerning Installation of a FSWOL on RPV Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld | Weld Overlay Dissimilar Metal Weld |
ML23354A001 | 4 January 2024 | Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) | |
ML24002B085 | 2 January 2024 | FY24 NMP2 Final QA Forms | |
NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station | 14 December 2023 | Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station | Safe Shutdown Health Physics Network Grab sample Offsite Dose Calculation Manual Emergency Lighting Severe Accident Management Guideline Minimum staff Scaffolding Siren Overexposure |
ML23278A129 | 14 December 2023 | Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines | |
IR 05000410/2024301 | 14 December 2023 | Initial Operator Licensing Examination Report 05000410/2024301 | |
ML23347A063 | 13 December 2023 | NMP1 Retake FY23 Examination Files | Job Performance Measure |
ML23305A140 | 13 December 2023 | Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 | Hydrostatic Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan |
NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements | 7 December 2023 | Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements | Time of Discovery Fitness for Duty Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
ML23291A464 | 7 December 2023 | Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants | Safe Shutdown High winds Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Cyber Security Incorporated by reference FLEX Fukushima Dai-Ichi Large early release frequency Safeguards Contingency Plan Preemption Authority License Renewal |
ML23289A012 | 6 December 2023 | Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown High winds Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Cyber Security FLEX Fukushima Dai-Ichi Surveillance Frequency Control Program Large early release frequency Safeguards Contingency Plan Tornado Missile Risk Evaluator Flooding Focused Evaluation Preemption Authority Maintenance Rule Program Power-Operated Valves |
NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | 4 December 2023 | Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) | Weld Overlay Nondestructive Examination VT-2 Stress corrosion cracking Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld DM weld |
IR 05000220/2023402 | 28 November 2023 | Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 | |
NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 22 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Fitness for Duty Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
ML23320A247 | 17 November 2023 | Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 | Probabilistic Risk Assessment |
ML23317A071 | 14 November 2023 | NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) |