Calvert Cliffs: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) No edit summary |
StriderTol (talk | contribs) No edit summary |
||
Line 9: | Line 9: | ||
|ISFSI docket=07200008 | |ISFSI docket=07200008 | ||
|mapping location=38° 26' 3.35" N, 76° 26' 31.91" W | |mapping location=38° 26' 3.35" N, 76° 26' 31.91" W | ||
|company=Exelon | |company=Constellation | ||
|company history={{company history | |||
|transfer from=Exelon | |||
|transfer to=Constellation | |||
|transfer date=February 2, 2022 | |||
|transfer record=ML22021B659 | |||
}} | |||
|wikipedia=Calvert Cliffs Nuclear Power Plant | |wikipedia=Calvert Cliffs Nuclear Power Plant | ||
|site unit={{Site unit | |site unit={{Site unit |
Latest revision as of 19:04, 22 March 2022
Plant | |
---|---|
Company | Constellation |
Where | Lusby, Maryland |
Regulatory | |
Region | NRC Region 1 |
ISFSI docket | 07200008 |
Company History | |
Exelon->Constellation (February 2, 2022) | |
wikipedia link | |
Docket | 05000317 |
---|---|
License | DPR-53 |
Licensed Power Level (Thermal) | 2,737 MWt |
Unit type | CE |
Containment | Ambient Pressure |
Ultimate Heat Sink | Chesapeake Bay |
Status | |
Commission | 07/31/1974 |
Renewal | 03/23/2000 |
NRC Website | |
Docket | 05000318 |
---|---|
License | DPR-69 |
Licensed Power Level (Thermal) | 2,737 MWt |
Unit type | CE |
Containment | Ambient Pressure |
Ultimate Heat Sink | Chesapeake Bay |
Status | |
Commission | 08/13/1976 |
Renewal | 03/23/2000 |
NRC Website | |