Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000317/2023004 | 1 February 2024 | Integrated Inspection Report 05000317/2023004 and 05000318/2023004 | Safe Shutdown Boric Acid Internal Flooding Enforcement Discretion Operating Basis Earthquake Functionality Assessment FLEX Significance Determination Process Surveillance Frequency Control Program Foreign Material Exclusion Operability Determination Spent Fuel Pool Instrumentation Fire Protection Program Power change |
ML24030A650 | 30 January 2024 | Single Positive Test Form Collected on 04/24/2023 | |
ML24030A640 | 30 January 2024 | Single Positive Test Form Collected on 01/10/2023 | |
ML24030A652 | 30 January 2024 | Single Positive Test Form Collected on 07/26/2023 | |
ML24030A643 | 30 January 2024 | Single Positive Test Form Collected on 02/07/2023 | |
ML24029A174 | 30 January 2024 | Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion | |
ML24030A646 | 30 January 2024 | Single Positive Test Form Collected on 02/27/2023 | |
ML24030A645 | 30 January 2024 | Single Positive Test Form Collected on 02/16/2023 | |
ML24030A642 | 30 January 2024 | Single Positive Test Form Collected on 01/31/2023 | |
ML24030A681 | 30 January 2024 | Single Positive Test Form Collected on 04/25/2023 | |
ML24030A649 | 30 January 2024 | Single Positive Test Form Collected on 04/10/2023 | |
ML24030A651 | 30 January 2024 | Single Positive Test Form Collected on 05/16/2023 | |
ML24030A654 | 30 January 2024 | Single Positive Test Form Collected on 08/08/2023 | |
ML24030A648 | 30 January 2024 | Single Positive Test Form Collected on 04/10/2023 | |
ML24030A647 | 30 January 2024 | Single Positive Test Form Collected on 03/02/2023 | |
ML24030A641 | 30 January 2024 | Single Positive Test Form Collected on 01/31/2023 | |
ML24030A655 | 30 January 2024 | Single Positive Test Form Collected on 11/14/2023 | |
ML24030A644 | 30 January 2024 | Single Positive Test Form Collected on 02/08/2023 | |
ML24029A010 | 29 January 2024 | Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 | Commercial Grade Dedication Probabilistic Risk Assessment Aging Management |
ML24003A887 | 19 January 2024 | Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) | Time of Discovery Fitness for Duty Contraband Condition Adverse to Quality Safeguards Contingency Plan Exemption Request |
05000318/LER-2023-004, Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer | 16 January 2024 | Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer | |
ML24012A049 | 11 January 2024 | Request for Additional Information Regarding Final Response to Generic Letter 2004-02 | Coatings |
ML24011A073 | 11 January 2024 | Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping | |
ML23352A059 | 9 January 2024 | Summary of December 11, 2023, Meeting with Constellation on Alternative Request Involving Carbon Fiber Reinforced Polymer Composite | |
05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip | 8 January 2024 | Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip | |
05000318/LER-2023-002, Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer | 8 January 2024 | Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer | |
ML24005A023 | 5 January 2024 | Revised Steam Generator Tube Inspection Reports, Refueling Outage 25 CC1R25 | |
ML24005A022 | 5 January 2024 | Revised Steam Generator Tube Inspection Reports | |
ML24005A024 | 5 January 2024 | Revised Steam Generator Tube Inspection Reports, Refueling Outage 23 CC2R23 | |
ML23304A064 | 2 January 2024 | Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program | |
RS-23-125, Request for Exemption from 10 CFR 2.109(b) | 7 December 2023 | Request for Exemption from 10 CFR 2.109(b) | License Renewal Exemption Request Subsequent License Renewal Fuel cladding |
ML23331A299 | 27 November 2023 | Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank | |
PMNS20231326, Meeting Between NRC and Constellation to Discuss Constellation'S Carbon-Fiber-Reinforced Polymer Alternative Request | 22 November 2023 | Meeting Between NRC and Constellation to Discuss Constellation'S Carbon-Fiber-Reinforced Polymer Alternative Request | |
IR 05000317/2023010 | 20 November 2023 | Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 | Offsite Dose Calculation Manual Cyber Security Condition Adverse to Quality Operability Determination |
ML23320A247 | 17 November 2023 | Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 | Probabilistic Risk Assessment |
ML23317A071 | 14 November 2023 | NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) | |
ML23318A472 | 14 November 2023 | Supplement to License Amendment Request to Adopt TSTF-59-A | Internal Flooding Probabilistic Risk Assessment Large early release frequency |
PMNS20231227, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 | 13 November 2023 | Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 | |
ML23317A119 | 10 November 2023 | Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums | Affidavit |
ML23317A103 | 10 November 2023 | Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | Time of Discovery Fitness for Duty Contraband Exemption Request |
ML23311A169 | 7 November 2023 | NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 |