ML21039A251: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:Entergy Operations, Inc. | ||
PO Box756 Port Gibson, M1SS1SS1pp1 39150 Robert Franssen Srte Vice Prement Grand Gulf Nuclear Stsbon Tel 601-437-7500 Withhold from Public Disclosure under 10 CFR 2.390 10 CFR 50.71 r | |||
GNRO2021 /00002 January 27, 2021 ATTN: Document Gontrol Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 | |||
==SUBJECT:== | |||
Updated Final Safety Analysis Report Submittal Gran.d Gulf Nuclear Station, Unit 1 Dock.et No. 50-416 Renewed License No. NPF-29 Pursuant to the §1 O CFR 50.71 (e) and 50.4(b)(6), Entergy Operations Inc. (Entergy) hereby submits one pdf copy on CD-ROM (Enclosure 1) of the Grand Gulf Nuclear Station (GGNS) Updated Final Safety Analysis Report (UFSAR) by chapter. | |||
Additionally, GGNS is submitting on pdf copy on CD-ROM (Enclosure 2) of the GGNS UFSAR (redacted) by chapter. The U FSAR pdfs are complete copy of the 10 CFR 50 Appendix 8 controlled copy of the UFSAR. This revision of the UFSAR includes changes made in the facility as described in the UFSAR during the period of November 30, 2018 through November 17, 2020 and includes changes from Refueling Outage 22 which ended on May 23, 2020. lnclucted on Enclosure 1 included is a file named "Grand Gulf UFSARby .Chapter," and included on Enclosure 2 is a file named "Grand Gulf Redacted UFSAR by Chapter.D In addition, pursuant to the requirements of §10 CFR 54.37(b) and the guidance specified in Regulatory Issue Summary 2007-16, Revision 1, "Implementation of the Requirements of §10 CFR 50.71 (e) must include any Structures, system, or Components (SSCs) newly identified Aging Analyses in accordance with §10 CFR 54.21. There were no newly identified SSCs subject to aging management review or evaluation during the specified period. | |||
GNRO2021/00002 Page 2 of 2 This letter contains no new commitments and no revisions to existing commitments. If you have any questions or require additional information, please contact Jeffery Hardy at 1-269-764-2011. | |||
Sincerely, | |||
/~ | |||
Robert Franssen RF/saw | |||
==Enclosure:== | |||
1 Grand Gulf UFSAR by Chapter | |||
: 2. Grand Gulf Redacted UFSAR by Chapter Enclosure 1 of this letter contains confidential information - | |||
Enclosure 1 is withheld from public disclosure per 10 CFR 2.390. | |||
cc (w/o enclosure): NRR ProJect Manager | |||
bee: | |||
OUTLOOK MAIL: DISTRIBUTION IS ALL ELECTRONIC Byars D. (GG-MAINTI Couture I P. (ECH-NS&L) | |||
I Franssen R. (GG-VP) | |||
Gaston R. W. (ECH-RA) | |||
Gibson R. L. GG-TRN) | |||
Halter M (ECH-VP-RA) | |||
Huff B. K. (GG-OPS) | |||
Keele RD. (ANO-RA) | |||
Kirwin T. (GG-Assist GMPO) | |||
Lindsey B. A. (W3-R&PI) | |||
OTHER - Licensing Files LRS DOCS (GNRI or GNRO) | |||
GGN CENTRAL FILE ( ) | |||
GGN PLANT LICENSING GGN\RBS SRC ALL LER's ALL RESPONSE TO VIOLATIONS Lewis M. L. (GG-EP) | |||
LinQenfelter M (GG-ENG) | |||
Mccloud T. (GG- R&PI) | |||
Melton R. (GG-R&PI) | |||
Patrick B (ANO-R&PI) | |||
Pyle S. L. (ECH-NS&L) | |||
Reynolds J.W. (RB-R&PI) | |||
Schenk T.A (RB-RA) | |||
Hardy J. (GG-RA) | |||
Wertz B. (GG-GMPO) | |||
Wood J.P. (W3-RA) | |||
OTHER: File (LRS_DOCS Directory - GNRI or GNRO)}} |
Latest revision as of 19:21, 20 January 2022
ML21039A251 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 01/27/2021 |
From: | Franssen R Entergy Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML21039A278 | List:
|
References | |
GNRO2021/00002 | |
Download: ML21039A251 (3) | |
Text
Entergy Operations, Inc.
PO Box756 Port Gibson, M1SS1SS1pp1 39150 Robert Franssen Srte Vice Prement Grand Gulf Nuclear Stsbon Tel 601-437-7500 Withhold from Public Disclosure under 10 CFR 2.390 10 CFR 50.71 r
GNRO2021 /00002 January 27, 2021 ATTN: Document Gontrol Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Updated Final Safety Analysis Report Submittal Gran.d Gulf Nuclear Station, Unit 1 Dock.et No. 50-416 Renewed License No. NPF-29 Pursuant to the §1 O CFR 50.71 (e) and 50.4(b)(6), Entergy Operations Inc. (Entergy) hereby submits one pdf copy on CD-ROM (Enclosure 1) of the Grand Gulf Nuclear Station (GGNS) Updated Final Safety Analysis Report (UFSAR) by chapter.
Additionally, GGNS is submitting on pdf copy on CD-ROM (Enclosure 2) of the GGNS UFSAR (redacted) by chapter. The U FSAR pdfs are complete copy of the 10 CFR 50 Appendix 8 controlled copy of the UFSAR. This revision of the UFSAR includes changes made in the facility as described in the UFSAR during the period of November 30, 2018 through November 17, 2020 and includes changes from Refueling Outage 22 which ended on May 23, 2020. lnclucted on Enclosure 1 included is a file named "Grand Gulf UFSARby .Chapter," and included on Enclosure 2 is a file named "Grand Gulf Redacted UFSAR by Chapter.D In addition, pursuant to the requirements of §10 CFR 54.37(b) and the guidance specified in Regulatory Issue Summary 2007-16, Revision 1, "Implementation of the Requirements of §10 CFR 50.71 (e) must include any Structures, system, or Components (SSCs) newly identified Aging Analyses in accordance with §10 CFR 54.21. There were no newly identified SSCs subject to aging management review or evaluation during the specified period.
GNRO2021/00002 Page 2 of 2 This letter contains no new commitments and no revisions to existing commitments. If you have any questions or require additional information, please contact Jeffery Hardy at 1-269-764-2011.
Sincerely,
/~
Robert Franssen RF/saw
Enclosure:
1 Grand Gulf UFSAR by Chapter
- 2. Grand Gulf Redacted UFSAR by Chapter Enclosure 1 of this letter contains confidential information -
Enclosure 1 is withheld from public disclosure per 10 CFR 2.390.
cc (w/o enclosure): NRR ProJect Manager
bee:
OUTLOOK MAIL: DISTRIBUTION IS ALL ELECTRONIC Byars D. (GG-MAINTI Couture I P. (ECH-NS&L)
I Franssen R. (GG-VP)
Gaston R. W. (ECH-RA)
Gibson R. L. GG-TRN)
Halter M (ECH-VP-RA)
Huff B. K. (GG-OPS)
Keele RD. (ANO-RA)
Kirwin T. (GG-Assist GMPO)
Lindsey B. A. (W3-R&PI)
OTHER - Licensing Files LRS DOCS (GNRI or GNRO)
GGN CENTRAL FILE ( )
GGN PLANT LICENSING GGN\RBS SRC ALL LER's ALL RESPONSE TO VIOLATIONS Lewis M. L. (GG-EP)
LinQenfelter M (GG-ENG)
Mccloud T. (GG- R&PI)
Melton R. (GG-R&PI)
Patrick B (ANO-R&PI)
Pyle S. L. (ECH-NS&L)
Reynolds J.W. (RB-R&PI)
Schenk T.A (RB-RA)
Hardy J. (GG-RA)
Wertz B. (GG-GMPO)
Wood J.P. (W3-RA)
OTHER: File (LRS_DOCS Directory - GNRI or GNRO)