ML21313A009: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION November 5, 2021 Mr. Mike Annacone Vice President, Columbia Fuel Operations and Manager, Columbia Plant Westinghouse Electric Company 5801 Bluff Road Hopkins, SC 29061
{{#Wiki_filter:}}
 
==SUBJECT:==
COLUMBIA FUEL FABRICATION FACILITY - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 07001151/2021401
 
==Dear Mr. Annacone:==
 
On October 21, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Columbia Fuel Fabrication Facility and discussed the results of this inspection with Ms. A.
Pope and other members of your staff. The results of this inspection are documented in the enclosed report.
No violations of more than minor significance were identified during this inspection.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
                                                /RA/
Eric C. Michel, Chief Projects Branch 2 Division of Fuel Facility Inspection Enclosure(s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s), this transmittal document is decontrolled.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
 
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION M. Annacone                            2 Docket No. 07001151 License No. SNM-1107
 
==Enclosure:==
 
As stated cc w/o encl: Distribution via LISTSERV OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
 
ML21313A009 (Cover letter)
Cover Letter Only:          x Non-Sensitive                          x Publicly Available x SUNSI Review              Sensitive                              Non-Publicly Available OFFICE          RII/DFFI  RII/DRS        RII/DFFI      RII/DFFI NAME            M. Romano  K. Kirchbaum    T. Vukovinsky E. Michel DATE            10/28/2021 10/29/2021      10/29/2021    10/29/2021}}

Revision as of 17:16, 16 January 2022

Fuel Fabrication Facility - Material Control and Accounting Program Inspection Report 07001151/2021401
ML21313A009
Person / Time
Site: Westinghouse
Issue date: 11/05/2021
From: Eric Michel
NRC/RGN-II/DFFI
To: Annacone M
Westinghouse
References
IR 2021401
Download: ML21313A009 (3)


Text