ML20207E224: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 13: Line 13:
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| page count = 1
| page count = 1
| project = TAC:48736, TAC:51477, TAC:54498
| stage = Other
}}
}}



Latest revision as of 23:28, 5 December 2021

Discusses OL Review Cost Adjustment for Facility.Total Review Costs Reflected in 850913 OL Costs Summary Revised
ML20207E224
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/17/1986
From: Diggs R
NRC OFFICE OF ADMINISTRATION (ADM)
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
TAC-48736, TAC-51477, TAC-54498, NUDOCS 8607220278
Download: ML20207E224 (1)


Text

DISTRIBUTION:

PDR LPDR g y7 g Docket File 50-416 Docket No. 50-416 CJHolloway RMDiggs MEMORANDUM FOR: Files 50-416 Actual Manpower DWeiss Manpower File THRU: C. James Holloway, Jr., Acting Director LFMS R/F License Fee Management Staff, ADM FROM: Reba M. Diggs, Facilities Program Coordinator License Fee Management Staff, ADM

SUBJECT:

GRAND GULF 1 OPERATING LICENSE REVIEW COST ADJUSTMENT In a memorandum dated September 13, 1985, to Files from C. James Holloway, Jr.,on the Grand Gulf OL review costs, the cost summary sheet includes 2,039 hours4.513889e-4 days <br />0.0108 hours <br />6.448413e-5 weeks <br />1.48395e-5 months <br /> of NRR review time from June 24, 1984 through August 31, 1984 (issuance of license for full power operation (100%)). Of these 2,039 hours4.513889e-4 days <br />0.0108 hours <br />6.448413e-5 weeks <br />1.48395e-5 months <br />, a total of 210.5 nours equalling $13,051 should be excluded from the final OL review costs because these hours pertain to applications for license amendments or other required approvals for which we are required to assess separate fees based on fee determinations by the NRR Project Manager. These hours / costs were as follows:

Application Date TAC No. Hours & Costs 2/9/84 48736 187 hrs. x $62 = $11,594 8/26/83 51477 1 hr. x $62 = 62 3/9/84 54498 22.5 hrs x $62 = 1,395 Totals 210.5 hrs x $62 = $13,051 Since Mississippi Power and Light received their initial license for Grand Gulf 1 on June 16, 1982, and paid the maximum fee required at that time ($1,024,500), they have not been billed for the $13,051. Therefore, there is no basis for not collecting the fees for applications to which these hours pertain. The sole purpose of this memorandum is to document the fact that the total review costs of $3,156,557 reflected in our previous OL costs summary of September 13, 1985, is now revised to make the $13,051 adjustment. Consequently, the OL review costs for Grand Gulf 1 should read $3,143,506.

-,gg, .

1sbx E pyg,3

?

Reba M. Diggs Facilities Program Coordinator License Fee Management Staff 8607220278 860717 Office of Administration PDR ADOCK 05000416 p PDR

- - --: -lW$f@d--f------------l------------l------------:------------

SURNAME :RMDiggs:jp : CJ 910way :  :  :  :  :

DATE :7//6/86  : 7/ 6 /86  :

:  :