The U.S. Nuclear Regulatory Commission has granted the enclosed partial exemption from the recordkeeping requirements of Title 10 of the Code of Federal Regulations (10 CFR)
The U.S. Nuclear Regulatory Commission has granted the enclosed partial exemption from the recordkeeping requirements of Title 10 of the Code of Federal Regulations (10 CFR)
Sections 50.71(c) and 50.59(d)(3) and Criterion XVII of Appendix B to 10 CFR Part 50, as requested in your letter dated October 22, 2019. The partial exemption granted will eliminate the requirements to maintain records for certain systems, structures, and components associated with the Indian Point Nuclear Generating (Indian Point) Unit Nos. 2 and 3 that are no longer necessary when the respective units are permanently shut down and certification of permanent fuel removal is submitted in accordance with 10 CFR 50.82(a)(1).
Sections 50.71(c) and 50.59(d)(3) and Criterion XVII of Appendix B to 10 CFR Part 50, as requested in your {{letter dated|date=October 22, 2019|text=letter dated October 22, 2019}}. The partial exemption granted will eliminate the requirements to maintain records for certain systems, structures, and components associated with the Indian Point Nuclear Generating (Indian Point) Unit Nos. 2 and 3 that are no longer necessary when the respective units are permanently shut down and certification of permanent fuel removal is submitted in accordance with 10 CFR 50.82(a)(1).
This partial exemption is effective for Indian Point Unit No. 2 as of the date of its issuance; however, the actions permitted by the exemption for Indian Point Unit No. 3 may not be implemented until the docketing of the licensees certification of permanent cessation of operations and permanent removal of fuel from the Indian Point Unit No. 3 reactor vessel in accordance with 10 CFR 50.82(a)(1).
This partial exemption is effective for Indian Point Unit No. 2 as of the date of its issuance; however, the actions permitted by the exemption for Indian Point Unit No. 3 may not be implemented until the docketing of the licensees certification of permanent cessation of operations and permanent removal of fuel from the Indian Point Unit No. 3 reactor vessel in accordance with 10 CFR 50.82(a)(1).
A copy of the partial exemption is enclosed. The partial exemption has been forwarded to the Office of the Federal Register for publication.
A copy of the partial exemption is enclosed. The partial exemption has been forwarded to the Office of the Federal Register for publication.

Latest revision as of 05:34, 20 March 2021

Transmittal Letter with Partial Exemption from Record Retention Requirements
ML20236J852
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 09/28/2020
From: Richard Guzman
NRC/NRR/DORL/LPL1
To: Vitale A
Entergy Nuclear Operations
Guzman R, NRR/DORL/LPL1, 415-1030
Shared Package
ML20236K168 List:
References
EPID L-2019-LLE-0028
Download: ML20236J852 (3)


Text

September 28, 2020 Mr. Anthony J. Vitale Site Vice President Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249

SUBJECT:

INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 - PARTIAL EXEMPTION FROM RECORD RETENTION REQUIREMENTS (EPID L-2019-LLE-0028)

Dear Mr. Vitale:

The U.S. Nuclear Regulatory Commission has granted the enclosed partial exemption from the recordkeeping requirements of Title 10 of the Code of Federal Regulations (10 CFR)

Sections 50.71(c) and 50.59(d)(3) and Criterion XVII of Appendix B to 10 CFR Part 50, as requested in your letter dated October 22, 2019. The partial exemption granted will eliminate the requirements to maintain records for certain systems, structures, and components associated with the Indian Point Nuclear Generating (Indian Point) Unit Nos. 2 and 3 that are no longer necessary when the respective units are permanently shut down and certification of permanent fuel removal is submitted in accordance with 10 CFR 50.82(a)(1).

This partial exemption is effective for Indian Point Unit No. 2 as of the date of its issuance; however, the actions permitted by the exemption for Indian Point Unit No. 3 may not be implemented until the docketing of the licensees certification of permanent cessation of operations and permanent removal of fuel from the Indian Point Unit No. 3 reactor vessel in accordance with 10 CFR 50.82(a)(1).

A copy of the partial exemption is enclosed. The partial exemption has been forwarded to the Office of the Federal Register for publication.

Sincerely,

/RA/

Richard V. Guzman, Senior Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286

Enclosure:

Exemption cc: Listserv

ML20236J852 (Letter) ML20236K130 (FRN)

ML20236K168 (Package) ML20236K000 (Exemption)

OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA OGC - NLO NAME RGuzman LRonewicz MWoods DATE 8/27/2020 8/26/2020 9/11/2020 OFFICE NRR/DORL/LPL1/BC NRR/DORL/D NRR/DORL/LPL1/PM NAME JDanna CErlanger RGuzman DATE 9/21/2020 9/28/2020 9/28/2020 ENCLOSURE EXEMPTION