Line 12: Line 12:
| identified by = NRC
| identified by = NRC
| Inspection procedure = IP 71153
| Inspection procedure = IP 71153
| Inspector = J Laughlin, M Bates, M Catts, M Schwieg, P Lessard, D Jackson, G Hopper, J Austin, J Dodsonm, Catts M, Schwieg R, Taylor G, Hopper J, Dodso
| Inspector = J Laughlin, M Bates, M Catts, M Schwieg, P Lessard, D Jackson, G Hopper, J Austin, J Dodsonm, Cattsm Schwieg, R Taylor, G Hopper, J Dodson
| CCA = N/A for ROP
| CCA = N/A for ROP
| INPO aspect =  
| INPO aspect =  
| description = In accordance with the NRCs NOED process, the inspectors are opening a URI to facilitate prompt tracking, documentation, and closure of inspection, verification, and resolution activities, including enforcement action determinations, associated with the NOED. The inspectors are opening the URI to determine if a performance deficiency exists. On April 15, 2013, due to the inoperability of Division II emergency buses E4/E8, the licensee requested the NRC not enforce compliance with TS 3.7.3, Required Action A.1; TS 3.8.1, Required Action B.3; TS 3.8.4, Required Action A.1; and TS 3.8.7, Required Action A1 until April 17, 2013 at 3:15 am. The licensee requested and was granted the NOED on April 15, 2013 at 2:05 pm. The LCO extension allowed the site time to complete the replacement of and test the E8 transformer to restore operability. The inspectors are opening an URI to determine if a performance deficiency exists. The licensee entered this issue in the CAP as NCR 601376. This issue is being tracked as a URI: (URI) 5000325/2013003-10; Notice of Enforcement Discretion for Replacement of the E8 Transformer.  
| description = In accordance with the NRCs NOED process, the inspectors are opening a URI to facilitate prompt tracking, documentation, and closure of inspection, verification, and resolution activities, including enforcement action determinations, associated with the NOED. The inspectors are opening the URI to determine if a performance deficiency exists. On April 15, 2013, due to the inoperability of Division II emergency buses E4/E8, the licensee requested the NRC not enforce compliance with TS 3.7.3, Required Action A.1; TS 3.8.1, Required Action B.3; TS 3.8.4, Required Action A.1; and TS 3.8.7, Required Action A1 until April 17, 2013 at 3:15 am. The licensee requested and was granted the NOED on April 15, 2013 at 2:05 pm. The LCO extension allowed the site time to complete the replacement of and test the E8 transformer to restore operability. The inspectors are opening an URI to determine if a performance deficiency exists. The licensee entered this issue in the CAP as NCR 601376. This issue is being tracked as a URI: (URI) 5000325/2013003-10; Notice of Enforcement Discretion for Replacement of the E8 Transformer.  
}}
}}

Latest revision as of 20:48, 20 February 2018

10
Site: Brunswick Duke Energy icon.png
Report IR 05000324/2013003 Section 4OA3
Date counted Jun 30, 2013 (2013Q2)
Type: URI:
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71153
Inspectors (proximate) J Laughlin
M Bates
M Catts
M Schwieg
P Lessard
D Jackson
G Hopper
J Austin
J Dodsonm
Cattsm Schwieg
R Taylor
G Hopper
J Dodson
INPO aspect
'