05000456/FIN-2011010-01: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 12: | Line 12: | ||
| identified by = NRC | | identified by = NRC | ||
| Inspection procedure = | | Inspection procedure = | ||
| Inspector = A Garmoe, B Jose, E Duncan, J Benjamin, J Gilliam, M Holmberg, M Perrya, | | Inspector = A Garmoe, B Jose, E Duncan, J Benjamin, J Gilliam, M Holmberg, M Perrya, Stonej Coroju Sandinb, Josec Tilton, D Szwarc, J Chiloyan, M Munir, N Valos, W Sherbin | ||
| CCA = N/A for ROP | | CCA = N/A for ROP | ||
| INPO aspect = | | INPO aspect = |
Latest revision as of 19:44, 20 February 2018
Site: | Braidwood |
---|---|
Report | IR 05000456/2011010 Section 4OA5 |
Date counted | Jun 30, 2011 (2011Q2) |
Type: | TEV: Severity level IV |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | |
Inspectors (proximate) | A Garmoe B Jose E Duncan J Benjamin J Gilliam M Holmberg M Perrya Stonej Coroju Sandinb Josec Tilton D Szwarc J Chiloyan M Munir N Valos W Sherbin |
INPO aspect | |
' | |