| Q | CCA | Title |
---|
05000456/FIN-2010010-02 | 2010Q3 | P.3 | Failure to replace low margin fuses in MCC131X1 |
05000456/FIN-2010004-03 | 2010Q3 | H.11 H.12 | Unplanned Cooling Water Flow Reduction during Essential Service Water IST Surveillance |
05000456/FIN-2010006-01 | 2010Q3 | H.13 | Failure to Follow the Operability Determination Procedure |
05000456/FIN-2010004-04 | 2010Q3 | | Potentially Inadequate Emergency Preparedness Critique |
05000456/FIN-2010004-02 | 2010Q3 | | Temporary Scaffold Quality Control Process |
05000456/FIN-2010006-02 | 2010Q3 | H.2(a) H.6 | Untimely Corrective Action for Lack of Water Hammer Analysis on the Recycle Holdup Tank |
05000456/FIN-2010004-01 | 2010Q3 | H.13 | Failure to Follow Procedure for Temporary Scaffolds |
05000456/FIN-2010010-04 | 2010Q3 | | Evaluation of Operating Experience concerning Reactor Building Flashing |
05000456/FIN-2010010-03 | 2010Q3 | P.1 | Failure to identify and correct water discharged to the turbine building floor during condensate reject |
05000456/FIN-2010010-01 | 2010Q3 | H.13 | Forebay inspect-and-clean activities did not ensure that SSCs will be capable of performing their safety function |
05000456/FIN-2010005-02 | 2010Q4 | | Failure to Submit a Licensee Event Report per 10 CFR 50.73(a)(2)(v) |
05000456/FIN-2010005-01 | 2010Q4 | P.1 P.1(a) | Degraded Fire Seal Between Two Fire Zones |
05000456/FIN-2010201-01 | 2010Q4 | H.12 | Security |
05000456/FIN-2010005-03 | 2010Q4 | | Inadequate Evaluation of Operating Experience Contributes to a Unit 2 Reactor Trip |
05000456/FIN-2010503-02 | 2011Q1 | H.14 | Changes Made to EAL Basis that Decreased the Effectiveness |
05000456/FIN-2011002-02 | 2011Q1 | | Failure to Account for Vortexing When Calculating the Maximum Available Time to Secure the Containment Spray Additive Tank |
05000456/FIN-2011002-03 | 2011Q1 | P.5 | Inadequate Instructions for Measuring ECCS Voids |
05000456/FIN-2011002-04 | 2011Q1 | P.5 | Failure To Evaluate The Effects Of Dynamic Loads At The Containment Spray Discharge Piping |
05000456/FIN-2011002-01 | 2011Q1 | | Failure to Provide Complete and Accurate Information in an LER |
05000456/FIN-2011403-01 | 2011Q1 | H.2 | Security |
05000456/FIN-2011403-02 | 2011Q1 | H.8 | Security |
05000456/FIN-2010503-01 | 2011Q1 | H.14 | (Traditional Enforcement) Changes to EAL basis Decreases the Effectiveness of the Plan without Prior NRC Approval (Tradiional Enforcement |
05000456/FIN-2011009-01 | 2011Q1 | | Concerns with Licensees Margin to Overfill (MTO) Analysis Related to Steam Generator Tube Rupture (SGTR) Event |