| Title | Forebay inspect-and-clean activities did not ensure that SSCs will be capable of performing their safety function |
| Description | The inspectors identified a Green finding and an associated non-cited violation of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to establish adequate controls to ensure that forebay inspect-and-clean activities provided assurance that systems, structures, and components would be capable of performing their safety function during inspect-and-clean intervals. Specifically, the inspectors noted that during the event on August 16, 2010, the operability margin of one train of the essential service water system decreased to zero under forebay fouling conditions that were less than the pre-established limiting conditions. The licensee entered this issue into its corrective action program (CAP). The finding was determined to be more than minor because, if left uncorrected, it would have the potential to lead to a more significant safety concern. Specifically, forebay conditions would have been allowed to degrade between inspect-and-clean intervals and the potential adverse impact to the essential service water system and its supported equipment was not evaluated. The finding screened as very low safety significance because it was a design deficiency that was confirmed not to result in an actual loss of operability or functionality. The inspectors determined that this finding had a cross-cutting aspect in the area of human performance, decision-making component, because the licensee did not make safety-significant or risk-significant decisions using a systematic process, especially when faced with uncertain or unexpected plant conditions, to ensure safety was maintained. |
| Site: | Braidwood |
|---|---|
| Report | IR 05000456/2010010 Section 4OA5 |
| Date counted | Sep 30, 2010 (2010Q3) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 93812 |
| Inspectors (proximate) | G Shear J Jandovitz M Thorpe Kavanaugh N Feliz Adomo T Go |
| Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion V |
| CCA | H.13, Consistent Process |
| INPO aspect | DM.1 |
| ' | |