MONTHYEARML20217F9701999-10-14014 October 1999 Proposed Tech Specs,Incorporating ARC for Axial Primary Water Stress Corrosion Cracking at Dented Tube Support Plate Intersections ML20217E4301999-10-12012 October 1999 Proposed Tech Specs,Revising Requirements for Containment Penetrations During Refueling Operations ML20211M7341999-08-30030 August 1999 Marked-up & Revised TS Pages,Providing Alternative to Requirement of Actually Measuring Response Times ML20211K1721999-08-30030 August 1999 Proposed Tech Specs,Providing Clarification to Current TS Requirements for Containment Isolation Valves ML20209B7731999-06-30030 June 1999 Proposed Tech Specs Updating Requirmements for RCS Leakage Detection & RCS Operational Leakage Specifications to Be Consistent with NUREG-1431 ML20196F2211999-06-24024 June 1999 Proposed Tech Specs Pages for Amend to Licenses DPR-77 & DPR-79,allowing Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20196G4701999-06-24024 June 1999 Proposed Tech Specs Pages Re Amends to Licenses DPR-77 & DPR-79,revising TS to Be Consistent with Rev to ISTS Presently Submitted to NEI TSTF for Submittal as Rev to NUREG-1431 ML20196G7961999-06-22022 June 1999 Proposed Tech Specs Bases,Clarifying Proper Application of TS Requirements for Power Distribution Systems & Functions That Inverters Provide to Maintain Operability & Providing Updated Info on Cold Leg Injection Accumulators ML20195E9841999-06-0707 June 1999 Proposed Tech Specs,Increasing Max Allowed Specific Activity of Primary Coolant from 0.35 Microcuries/Gram Dose Equivalent I-131 to 1.0 Microcuries/Gram Dose Equivalent I-131 for Plant Cycle 10 (U2C10) Core ML20206E1391999-04-29029 April 1999 Proposed Tech Spec Change 99-03, Main Control Room Emergency Ventilation Sys Versus Radiation Monitors. Changes Add LCOs 3.3.3.1 & 3.7.7 to Address Inoperability of Radiation Monitoring CREVS & NUREG-1431 Recommendations ML20206E1611999-04-29029 April 1999 Proposed Tech Spec Change 99-04, Auxiliary Suction Pressure Low Surveillance Frequency Rev. Change Deletes Surveillance ML20204H4081999-03-19019 March 1999 Proposed Tech Specs,Relocating TS 3.8.3.1,3.8.3.2,3.8.3.3 & Associated Bases Associated with Electrical Equipment Protective Devices to Technical Requirements Manual ML20207D6011999-02-26026 February 1999 Proposed Tech Specs Relocating TS 3.7.6, Flood Protection Plan & Associated Bases from TS to Plant TRM ML20207D6331999-02-26026 February 1999 Proposed Tech Specs Providing for Consistency When Exiting Action Statements Associated with EDG Sets ML20206S0131999-01-15015 January 1999 Proposed Tech Specs 3.3.3.3, Seismic Instrumentation & Associated Bases,Relocated to Plant Technical Requirements Manual ML20199K6001999-01-15015 January 1999 Proposed Tech Specs Adding New Action Statement to 3.1.3.2 That Would Eliminate Need to Enter TS 3.0.3 Whenever Two or More Individual RPIs Per Bank May Be Inoperable,While Maintaining Appropriate Overall Level of Protection ML20195H6111998-11-16016 November 1998 Proposed Tech Specs Revising EDG SRs by Adding Note That Allows SR to Be Performed in Modes 1,2,3 or 4 If Associated Components Are Already OOS for Testing or Maint & Removing SR Verifying Certain Lockout Features Prevent EDG Starting ML20154H7251998-10-0808 October 1998 Proposed Tech Specs Pages,Supplementing Proposed TS Change 96-08,rev 1 to Add CRMP to Administrative Controls Section & Bases of TS ML20238F1091998-08-27027 August 1998 Proposed Tech Specs Providing for Insertion of Limited Number of Lead Test Assemblies,Beginning W/Unit 2 Operating Cycle 10 Core ML20238F3001998-08-27027 August 1998 Proposed Tech Specs Replacing 72 H AOT of TS 3.8.1.1,Action b,w/7 Day AOT Requirement for Inoperability of One EDG or One Train of EDGs ML20236G5961998-06-29029 June 1998 Proposed Tech Specs Typed Pages for TS Change 95-19, Section 6 - Administrative Controls Deletions ML20249C6371998-06-26026 June 1998 Proposed Tech Specs Lowering Specific Activity of Primary Coolant from 1.0 Uci/G Dose Equivalent I-131 to 0.35 Uci/G Dose Equivalent I-131,as Provided in GL 95-05 ML20248F0051998-05-28028 May 1998 Proposed Tech Specs for Section 6, Administrative Controls Deletions ML20217N3511998-04-30030 April 1998 Proposed Tech Specs Pages,Modifying Surveillance Requirement 4.4.3.2.1.b to Change Mode Requirement to Allow PORV Stroke Testing in Modes 3,4 & 5 W/Steam Bubble in Pressurizer Rather than Only in Mode 4 ML20203J1681998-02-25025 February 1998 Proposed Tech Specs Pages,Revising EDG Surveillance Requirements to Delete Requirement for 18-month Insp IAW Procedures Prepared in Conjunction W/Vendor Recommendations & Modify SRs Associated W/Verifying Capability of DGs ML20202J7601998-02-13013 February 1998 Proposed Tech Specs Section 3.7.9 Re Relocation of Snubber Requirements ML20202J7141998-02-13013 February 1998 Proposed Tech Specs Adding New LCO That Addresses Requirements for Main Feedwater Isolation,Regulating & Bypass Valves ML20202J6961998-02-13013 February 1998 Proposed Tech Specs Incorporating MSIV Requirements to Be Consistent W/Std TS (NUREG-1431) ML20198T4311998-01-21021 January 1998 Proposed Tech Specs Re New Position Title & Update of Description of Nuclear Organization ML20199K4571997-11-21021 November 1997 Proposed Tech Specs Adding one-time Allowance Through Operating Cycle 9 to Surveillance Requirement 4.4.3.2.1.b to Perform Stroke Testing of PORVs in Mode 5 Rather than Mode 4,as Currently Required ML20211A3191997-09-17017 September 1997 Proposed Tech Specs Re Pressure Differential Surveillance Requirements for Containment Spray Pumps ML20137T0871997-04-0909 April 1997 Proposed Tech Specs Re Elimination of Cycle 8 Limitation for SG Alternate Plugging Criteria ML20137M8581997-04-0101 April 1997 Proposed Tech Specs 2.1 Re Safety Limits & TS 3/4.2 Re Power Distribution Limits ML20137C8421997-03-19019 March 1997 Proposed Tech Specs Re Conversion from Westinghouse Electric Corp Fuel to Framatome Cogema Fuel ML20136J0381997-03-13013 March 1997 Proposed Tech Specs Section 5.6.1.2,revising Enrichment of Fuel for New Fuel Pit Storage Racks ML20134P8631997-02-14014 February 1997 Proposed Tech Specs Requesting Discretionary Enforcement for 48 Hours Which Is in Addition to 72 Hours Allowed Outage Time Provided by TS Action 3.8.1.1.b ML20134K9981997-02-0707 February 1997 Proposed Tech Specs Revising TS Change Request 96-01, Conversion from W Electric Corp Fuel to Framatome Cogema Fuel (MARK-BW-17), to Ensure That Core Analysis Computer Code Output Actions Are Consistent W/Hot Channel Factor SRs ML20134L9261996-11-0808 November 1996 Proposed Tech Specs Re Placing of Channel in Trip for Reactor Trip & Engineered Safety Feature Instrumentation Sys Solely to Perform Testing as Not Requiring Channel to Be Declared Inoperable ML20129D2661996-10-18018 October 1996 Proposed Tech Specs,Removing Existing Footnotes That Limit Application of Apc for Plant S/G Tubes to Cycle 8 Operation for Both Units ML20129G7301996-09-26026 September 1996 Proposed Tech Specs 3/4.3.3 Re Fire Detection instrumentation,3/4.7.11 Re Fire Suppression Systems & 3/4.7.12 Re Fire Protection Penetrations ML20113G2691996-09-20020 September 1996 Proposed Tech Specs Change 96-09, Clarification of Work Shift Durations for Overtime Limits ML20117J3391996-08-28028 August 1996 Proposed Tech Specs Revising Psv & MSSV Setpoint Tolerance from Plus or Minus 1% to Plus or Minus 3% ML20117D1651996-08-22022 August 1996 Proposed Tech Specs of SQN Units 1 & 2,deleting Table 4.8.1, DG Reliability, & Revising Section 3.8.1 to Allow Once Per 18 month,7 Day AOT for EDGs ML20117D3121996-08-22022 August 1996 Proposed Tech Specs,Lowering Minimum TS ice-basket Weight of 1,155 Lbs to 1,071 Lbs.Reduced Overall Ice Weight from 2,245,320 Lbs to 2,082,024 Lbs ML20117D3141996-08-21021 August 1996 Proposed TS 3.7.1.3 Re Condensate Storage Tank ML20117D3341996-08-21021 August 1996 Proposed Tech Specs Re Deletion of Surveillance Requirement 4.8.1.1.1.b ML20112H0431996-06-0707 June 1996 Proposed Tech Specs,Revising Section 6, Administrative Controls, to Be More Closely Aligned W/Requirements of STSs ML20101N7071996-04-0404 April 1996 Proposed Tech Specs,Allowing Conversion from Westinghouse Fuel to Fuel Provided by Framatome Cogema Fuels ML20096B3761996-01-0404 January 1996 Proposed Tech Specs Extending Radiation Monitoring Instrumentation Surveillance Period Per GL 93-05 ML20096C2481996-01-0303 January 1996 Proposed Tech Specs,Revising Bases Section 3/4.7.1.2 to Indicate Current Operational Functions of turbine-driven AFW Level Control Valves Modified During Unit 1 Cycle 7 Refueling Outage 1999-08-30
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217F9701999-10-14014 October 1999 Proposed Tech Specs,Incorporating ARC for Axial Primary Water Stress Corrosion Cracking at Dented Tube Support Plate Intersections ML20217E4301999-10-12012 October 1999 Proposed Tech Specs,Revising Requirements for Containment Penetrations During Refueling Operations ML20211M7341999-08-30030 August 1999 Marked-up & Revised TS Pages,Providing Alternative to Requirement of Actually Measuring Response Times ML20211K1721999-08-30030 August 1999 Proposed Tech Specs,Providing Clarification to Current TS Requirements for Containment Isolation Valves ML20209B7731999-06-30030 June 1999 Proposed Tech Specs Updating Requirmements for RCS Leakage Detection & RCS Operational Leakage Specifications to Be Consistent with NUREG-1431 ML20196F2211999-06-24024 June 1999 Proposed Tech Specs Pages for Amend to Licenses DPR-77 & DPR-79,allowing Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20196G4701999-06-24024 June 1999 Proposed Tech Specs Pages Re Amends to Licenses DPR-77 & DPR-79,revising TS to Be Consistent with Rev to ISTS Presently Submitted to NEI TSTF for Submittal as Rev to NUREG-1431 ML20196G7961999-06-22022 June 1999 Proposed Tech Specs Bases,Clarifying Proper Application of TS Requirements for Power Distribution Systems & Functions That Inverters Provide to Maintain Operability & Providing Updated Info on Cold Leg Injection Accumulators ML20196G8071999-06-22022 June 1999 Revs to Technical Requirements Manual ML20195E9841999-06-0707 June 1999 Proposed Tech Specs,Increasing Max Allowed Specific Activity of Primary Coolant from 0.35 Microcuries/Gram Dose Equivalent I-131 to 1.0 Microcuries/Gram Dose Equivalent I-131 for Plant Cycle 10 (U2C10) Core ML20206E1611999-04-29029 April 1999 Proposed Tech Spec Change 99-04, Auxiliary Suction Pressure Low Surveillance Frequency Rev. Change Deletes Surveillance ML20206E1391999-04-29029 April 1999 Proposed Tech Spec Change 99-03, Main Control Room Emergency Ventilation Sys Versus Radiation Monitors. Changes Add LCOs 3.3.3.1 & 3.7.7 to Address Inoperability of Radiation Monitoring CREVS & NUREG-1431 Recommendations ML20204E8501999-03-21021 March 1999 Plant,Four Yr Simulator Test Rept for Period Ending 990321 ML20204H4081999-03-19019 March 1999 Proposed Tech Specs,Relocating TS 3.8.3.1,3.8.3.2,3.8.3.3 & Associated Bases Associated with Electrical Equipment Protective Devices to Technical Requirements Manual ML20207D6331999-02-26026 February 1999 Proposed Tech Specs Providing for Consistency When Exiting Action Statements Associated with EDG Sets ML20207D6011999-02-26026 February 1999 Proposed Tech Specs Relocating TS 3.7.6, Flood Protection Plan & Associated Bases from TS to Plant TRM ML20206S0131999-01-15015 January 1999 Proposed Tech Specs 3.3.3.3, Seismic Instrumentation & Associated Bases,Relocated to Plant Technical Requirements Manual ML20199K6001999-01-15015 January 1999 Proposed Tech Specs Adding New Action Statement to 3.1.3.2 That Would Eliminate Need to Enter TS 3.0.3 Whenever Two or More Individual RPIs Per Bank May Be Inoperable,While Maintaining Appropriate Overall Level of Protection ML20195H6111998-11-16016 November 1998 Proposed Tech Specs Revising EDG SRs by Adding Note That Allows SR to Be Performed in Modes 1,2,3 or 4 If Associated Components Are Already OOS for Testing or Maint & Removing SR Verifying Certain Lockout Features Prevent EDG Starting ML20154H7251998-10-0808 October 1998 Proposed Tech Specs Pages,Supplementing Proposed TS Change 96-08,rev 1 to Add CRMP to Administrative Controls Section & Bases of TS ML20238F1091998-08-27027 August 1998 Proposed Tech Specs Providing for Insertion of Limited Number of Lead Test Assemblies,Beginning W/Unit 2 Operating Cycle 10 Core ML20238F3001998-08-27027 August 1998 Proposed Tech Specs Replacing 72 H AOT of TS 3.8.1.1,Action b,w/7 Day AOT Requirement for Inoperability of One EDG or One Train of EDGs ML20209J1631998-08-0707 August 1998 Rev 41 to Sequoyah Nuclear Plant Odcm ML20236G5961998-06-29029 June 1998 Proposed Tech Specs Typed Pages for TS Change 95-19, Section 6 - Administrative Controls Deletions ML20249C6371998-06-26026 June 1998 Proposed Tech Specs Lowering Specific Activity of Primary Coolant from 1.0 Uci/G Dose Equivalent I-131 to 0.35 Uci/G Dose Equivalent I-131,as Provided in GL 95-05 ML20248F0051998-05-28028 May 1998 Proposed Tech Specs for Section 6, Administrative Controls Deletions ML20217N3511998-04-30030 April 1998 Proposed Tech Specs Pages,Modifying Surveillance Requirement 4.4.3.2.1.b to Change Mode Requirement to Allow PORV Stroke Testing in Modes 3,4 & 5 W/Steam Bubble in Pressurizer Rather than Only in Mode 4 ML20203J1681998-02-25025 February 1998 Proposed Tech Specs Pages,Revising EDG Surveillance Requirements to Delete Requirement for 18-month Insp IAW Procedures Prepared in Conjunction W/Vendor Recommendations & Modify SRs Associated W/Verifying Capability of DGs ML20202J7651998-02-13013 February 1998 Technical Requirements Manual ML20202J7141998-02-13013 February 1998 Proposed Tech Specs Adding New LCO That Addresses Requirements for Main Feedwater Isolation,Regulating & Bypass Valves ML20202J6961998-02-13013 February 1998 Proposed Tech Specs Incorporating MSIV Requirements to Be Consistent W/Std TS (NUREG-1431) ML20202J7601998-02-13013 February 1998 Proposed Tech Specs Section 3.7.9 Re Relocation of Snubber Requirements ML20198T4311998-01-21021 January 1998 Proposed Tech Specs Re New Position Title & Update of Description of Nuclear Organization ML20199F8231997-11-30030 November 1997 Cycle 9 Restart Physics Test Summary, for 971011-971130 ML20199K4571997-11-21021 November 1997 Proposed Tech Specs Adding one-time Allowance Through Operating Cycle 9 to Surveillance Requirement 4.4.3.2.1.b to Perform Stroke Testing of PORVs in Mode 5 Rather than Mode 4,as Currently Required ML20211A3191997-09-17017 September 1997 Proposed Tech Specs Re Pressure Differential Surveillance Requirements for Containment Spray Pumps ML20203B9731997-08-0505 August 1997 Rev 1 to RD-466, Test & Calculated Results Pressure Locking ML20217J5581997-07-31031 July 1997 Cycle Restart Physics Test Summary, for Jul 1997 ML20210J1671997-04-30030 April 1997 Snp Unit 1 Cycle 8 Refueling Outage Mar-Apr 1997,Results of SG Tube ISI as Required by TS Section 4.4.5.5.b & Results of Alternate Plugging Criteria Implementation as Required by Commitment from TS License Condition 2C(9)(d) ML20137T0871997-04-0909 April 1997 Proposed Tech Specs Re Elimination of Cycle 8 Limitation for SG Alternate Plugging Criteria ML20137M8581997-04-0101 April 1997 Proposed Tech Specs 2.1 Re Safety Limits & TS 3/4.2 Re Power Distribution Limits ML20137C8421997-03-19019 March 1997 Proposed Tech Specs Re Conversion from Westinghouse Electric Corp Fuel to Framatome Cogema Fuel ML20136J0381997-03-13013 March 1997 Proposed Tech Specs Section 5.6.1.2,revising Enrichment of Fuel for New Fuel Pit Storage Racks ML20134P8631997-02-14014 February 1997 Proposed Tech Specs Requesting Discretionary Enforcement for 48 Hours Which Is in Addition to 72 Hours Allowed Outage Time Provided by TS Action 3.8.1.1.b ML20134K9981997-02-0707 February 1997 Proposed Tech Specs Revising TS Change Request 96-01, Conversion from W Electric Corp Fuel to Framatome Cogema Fuel (MARK-BW-17), to Ensure That Core Analysis Computer Code Output Actions Are Consistent W/Hot Channel Factor SRs ML20138F2581997-01-17017 January 1997 Rev 39 to Sequoyah Nuclear Plant Odcm ML20134L9261996-11-0808 November 1996 Proposed Tech Specs Re Placing of Channel in Trip for Reactor Trip & Engineered Safety Feature Instrumentation Sys Solely to Perform Testing as Not Requiring Channel to Be Declared Inoperable ML20129D2661996-10-18018 October 1996 Proposed Tech Specs,Removing Existing Footnotes That Limit Application of Apc for Plant S/G Tubes to Cycle 8 Operation for Both Units ML20129G7301996-09-26026 September 1996 Proposed Tech Specs 3/4.3.3 Re Fire Detection instrumentation,3/4.7.11 Re Fire Suppression Systems & 3/4.7.12 Re Fire Protection Penetrations ML20134J9991996-09-23023 September 1996 Fuel Assembly Insp Program 1999-08-30
[Table view] |
Text
._ - _ - ____ - - _ _ _
. . . . s.
e 1
I i ENCLOSURE 1 l
1 PROPOSED TECHNICAL SPECIFICATION CHANGE SEQUOYAH NUCLt.xR PLANT (SON) UNITS 1 AND 2 DOCKET NOS. 50-327 AND 50-328 (TVS-SON-TS-93-21)
LIST OF AFFECTED PAGES Unit 1 3/4 3-65 Unit 2 3/4 3-64 1
j l
9402160162 940209 iik
-PDR- ADOCK 05000327 P PDR- js
N ..
,,, TABLE 3.3-11 (Continued) g . <
8 FIRE DETECTI0ft IttSTRUMENTS 1 "
I Fire Minimum Instruments Operable
' Zone Instrument'tocation* Ionization Photoelectric Thermal Infrared E
y 174 Mech. Eqpt. Rm. El. 734 1 175c Mech.'Eqpt. Rm. El. 734 1 176- 480-V Shtdn. Bd. Rm. IA1 2 El. 734 177 480-V Shtdn. Bd. Rm. 1A1 2 E1. 734
.178
-480-V Shtdn. Bd. Rm. IA2 2 El.'734 179 480-V Shtdn. Bd. Rm. IA2 2 El. 734 w 180 480-V Shtdn. Bd. Rm. 1B1 2 1- .
El. 734 w -181- 480-V Shtdn. Bd. Rm. 181 2
'a El. 734
- 182 480-V Shtdn. Bd. Rm. 1B2 3 El. 734 183 480-V Shtdn. Bd. Rm. 182 3 El. 734 7 184 6.9-KV Shtdn. Bd. Rm. A.
El. 734 7
-185 6.9-KV Shtdn. Bd. Rm. A
.El. 734 186 6.9-KV Shtdn, Bd. Rm. B.
El. 734
[77
. p_187 6.9-KV Shtdn. Bd. Rm. B El. 734 h
& 188. 480-V Shtdn..Bd. Rm. 2A1 2 B El. 734
' ?. 189- 480-V Shtdn. Bd. R'm. 2A1 2.
z El.-734 P 190 480-V Shtdn. Bd.'Rm. 2A2 3
- El. 734
? --.191. -480-V Shtdn. Bd. Rm. 2A2 3
. El. 734 192' 480-V Shtdn. Bd. Rm. 2B1 2 E1. /34 g
. .- - - - - . - - . . . - - - - . _ ~ . - _ - . . . _ - . - _ _ _ . - . - - - . _ - - _ . , ____._-_._,.L
_ n,, =,,',w,-. , ,- rs-,, a-w , r -v - ----.-n w- - . s.
m
~
, TABLE 3.3-11 (Continued) .
FIRE DETECTION INSTRUMENTS x
5 i FIRE MINIMUM INSTRUMENTS OPERABLE ZONE' INSTRUMENT LOCATION Photoelectric Ioniza ti_on Thermal Infrared
~t 153 Add. Equip. Bldg., El. 740.5 4
154- Add. Equip. Bldg., El. 740.5 -6 R86 155 Refuel Rm. El. 734 19 158 RB Access Rm. El. 734 2 159' RB Access Rm. E1. 734 2 160 SG B1wdn. Rm. El. 734 4 161 - SG B1wdn. Rm. E1. 734 4 162 EGTS Rm. El. 734 3 163 EGTS Rm. El. 734 3 164 EGTS' Filter A, E1. 734 1 2 10 165 EGTS Filter A, E1. 734 1 2 166 EGTS Filter B, E1. 734 1 2 Y 167- EGTS Filter B, E1.'734 1 2 3: 172 Mech. Equip. Rm., E1. 734 1 173 iiech.. Equip. Rm., El. 734 1 174 Mech. Eqpt. Rm. El. 7?- R86 1
175 Mech. Eqpt. Rm. E1.734 1 176 480-V SD Bd. Rm. lA1, El. 734 2 177 - 480-V SD Bd. Rm. 1A1, E1. 734 2 178 480-V SD'Bd. Rm. lA2, El. 734 2 179 480-V SO Bd. Rm. lA2, El. 734 2
-180 480-V-SD Bd. Rm. 181, El. 734 2 181 480-V SD Bd. Rm. 181 El. 734 2 182 480-V SD Bd. Rm. 182 E1. 734 3 b& 183 480-V SD Bd. Rm. 182 E1. 734 3 ef g@ 184 6.9KV SD Bd. Rm. A El. 734 ,7 g Et '185- 6.9XV SD Bd. Rm. A El. 734 x s' 186 6.9KV SD Bd. Rm. B El. 734 'I y" 187 - 6.9KV SD Bd. Rm. B El. 734 7
- EF 188 480-V.SD Bd. Rm._2Al E1. 734- 2 g' 189 - 480-V SD Bd. Rm'. 2A1 E1.'734 2
' g @? 190' . 480-V SD Bd. Rm. 2A2 E1. 734 3 191 -480-V SD Bd. Rm. 2A2 El. 734 . 3.
1
_..___..m..-__.____.__._____m____.__.__mmmm_____,_a_m-_________mm a________ u__ m-m._ _ wm e-_=-6m<w .~ w .._ s _v. *- m._&w e__m _-_e- _m- -A---_ m_.u_ . _ _ _ _. m. _-m-_.m.,u,_.- -_ _ . = __m-. --m
'I-9 i
i ENCLOSURE 2 -j I
PROPOSED TECHNICAL SPECIFICATION CHANGE ' !
i SEQUOYAH NUCLEAR PLANT (SON) UNITS 1' AND 2 ;
i DOCKET NOS, 50-327 AND 50-328 - -i
- , (TVS-SON-TS-93-21) - 1 I
i s DESCRIPTION AND JUSTIFICATION FOR :
3 REVISION OF FIRE DETECTION INSTRUMENTATION ,
i I
I
.i i
.i i
t f
9 1
e l
1 o
I
3.' g Descrintion of Chanag ' !
TVA proposes to modify the Sequoyah Neclear Plant (SON) Units 1 and 2 technical l specifications (TSs) to add one additional ionization detector to Fire Zones 184,185,186, and 187.~ This change affects TS Table 3.3-11, " Fire Detection instruments,". for both !
units at SON. !
Reason for Chanag i National Fire Protection Association (NFPA) 72E requires ceiling obstructions and potential .
changes in air movement to be considered in the spacing of detectors. At SON, the ; !
Units 1 and 2 6900-volt (V) shutdown board room corridors on Elevation 734 of the. '
auxiliary building are not within the range of coverage for the associated shutdown board !
room detectors in accordance with NFPA 72E. Specifically, the corridor ceiling is :
separated from the general room area ceiling by a concrete beam. This could result in the .;
smoke associated with a fire in the corridor being blocknd by the concrete beam during j conditions of low air flow, such as when the general room area fans are not operational.
- Based on the NFPA requirements, TVA has added two additional cross-zone detectors in ;
each of the Units 1 and 2 6900-V shutdown board room corridors on Elevation 734 of the auxiliary building. This modification affects the TSs for both units at SON since the fire detection instrumentation is considered to be common equipment.
l The proposed changes will ensure that SON Units 1 and 2 are in compliance with NFPA 72E code requirements.
Justification for Chanaes !
1 The fire protection instrumentation at SON provides an early warning fire detection system to notify personnel of a fire, actuate automatic suppression systems, and control auxiliary- l equipment. The added detectors provide additional assurance that the fire detection instrumentation associated with the auxiliary building shutdown board rooms will operate l as required in the event of a fire. Specifically, the functions of the detectors that were l added to the shutdown board room corridors include:
- 1. Alarms in the control room and at the local fire detection alarm panel
- 2. Charging of the sp.ay headers for the shutdown board room ,
- 3. Actuation of the fire dampers in the shutdown board room 5
These functions do not directly affect electrical equipment located in the shutdown board ,
room since the spray headers will not discharge until the fusible link located at each spray header is directly affected by the heat associated with a fire.
l The changes discussed above increase conservatism through the use of additional l detectors. These changes do not affect any safety analysis conclusions because the fire '
detection instrumentation is not taken credit for in the SON design for design-basis )
accidents. In addition, the implementation of additional detectors enhances the reliability "I of the fire protection system and ensures cross-zone protection within the 6900-V .{
shutdown board room corridors. j
I < .- l l
Environmental Imoact Evaluation :
t 1
q ., The proposed change does not involve an unreviewed environmental question because the - '
j i, operation of SON Units 1 and 2 in accordance with this change would not:
'16 "
- 1. Result in a significant increase in any adverse environmental impact previously evaluated in the Final Environmental Statement (FES) as modified by NRC's testimony ;
to the Atomic Safety and Licensing Board, supplements to the FES, environmental ~ ;
impact appraisals, or decisions of the Atomic Safety and Licensing Board. l 1
i
- 2. Result in a significant change in effluents or power levels.
- 3. Result in matters not previously reviewed in the licensing basis for SON that may have a significant environmental impact.
Ii
.q l
1 I
J
~!
i
- m. ..
3
- .';q ...: .
l
..r =l 4
/ 6 t.- ...-
j !
1: ENCLOSURE 3 I
PROPOSED TECHNICAL SPECIFICATION CHANGE 'l-I-
l^ SEQUOYAH NUCLEAR PLANT (SON) UNITS 1 AND 2 rl j --- .
- i 4- DOCKET NOS. 50-327 AND 50-328 i
- ( .;
I (TVS-SON TS-93-21) i:
i DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION i !
E 8
r ,
l I
! i l
f l
i
.i 8
L l.
b i
f
_j l
l c ,
i.
i-E.
j.' - . ..._ ,
l: ; s',
- s. ,
Significant Hazards Evaluation -
4 TVA has evaluated the proposed technical specification (TS) change and has determined that it does not represent a significant hazards consideration based on criteria established in 10 CFR 50.92(cl. The operation of Sequoyah Nuclear Plant (SON) in accordance with the proposed amendment will not:
- 1. Involve a significant increase in the probability or consequences of an accident ' ,
previously evaluated.
The proposed change to the fire detection instrumentation adds two additional cross-rone detectors in each of the Units 1 and 2 6900-volt shutdown board room corridors on Elevation 734 of the auxiliary building. The additional fire detection ,
instrumentation provides additional assurance that the fire detection instrumentation l will operate as required in the event of a fire. However, neither the fire detection instrumentation nor the equipment associated with this instrumentation is considered ';
to be the source of an accident. In addition, this equipment is not taken credit for in .j the safety analysis. Therefore, there is no increase in the probability or i consequences of a previously evaluated accident.
- 2. Create the possibility of a new or different kind of accident from any previously .
analyzed.
The fire detection and/or suppression functions affected by this change enhance fire mitigation functions only and do not result in a change in plant functions. Therefore, -
the proposed change does not create the possibility of a new or different kind of -
accident from any previously analyzed.
3, involve a significant reduction in a margin of safety.
The equipment functions affected by the proposed changes are not assumed for any
~
accident in the SON safety analysis and are not an input to the TS margin of safety. l Therefore, the proposed change will not result in a reduction in the margin of safety, j s