05000456/FIN-2011010-01: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 9: Line 9:
| significance = Severity level IV
| significance = Severity level IV
| cornerstone = Mitigating Systems
| cornerstone = Mitigating Systems
| violation of = None
| violation of =  
| identified by = NRC
| identified by = NRC
| Inspection procedure =  
| Inspection procedure =  
| Inspector = B Jose, C Tilton, D Szwarc, J Chiloyan, M Munir, N Valos, W Sherbina, Garmoe B, Jose E, Duncan J, Benjamin J, Gilliam M, Holmberg M, Perrya Stone, J Coroju,_Sandi
| Inspector = A Garmoe, B Jose, E Duncan, J Benjamin, J Gilliam, M Holmberg, M Perrya, Stone J, Coroju_Sandinb Jose, C Tilton, D Szwarc, J Chiloyan, M Munir, N Valos, W Sherbin
| CCA = N/A for ROP
| CCA = N/A for ROP
| INPO aspect =  
| INPO aspect =  

Revision as of 18:48, 20 February 2018

01
Site: Braidwood Constellation icon.png
Report IR 05000456/2011010 Section 4OA5
Date counted Jun 30, 2011 (2011Q2)
Type: TEV: Severity level IV
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure:
Inspectors (proximate) A Garmoe
B Jose
E Duncan
J Benjamin
J Gilliam
M Holmberg
M Perrya
Stone J
Coroju_Sandinb Jose
C Tilton
D Szwarc
J Chiloyan
M Munir
N Valos
W Sherbin
INPO aspect
'