ML20134M227: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:. . - .            -
1                                                                                                                i
}  i Attackment 3 TecidicalSpecification Mark-Up j    Page1of1                                                                                                    j
]            2.0 SAFETY LIMITS (SLs)                                                              .              l 1
1
)
i 2.1 Sts
                                                                                                                  )
l                          2.1.1 Reactor Core SLs 1                                      2.1.1.1 With the reactor steam dome pressure < 785 psig or core j                                                flow < 105 rated core flow:                                      j I
l THERMAL POWER shall be s 255 RTP.
2.1.1.2 With the reactor steam dome pressure a: 785 psig and core        ;
1                                                flow a: 105 rated          flow:                                '
l
:                                                                        .30 i                                                MCPR shall be              or two recirculation loop
!                                                operation or l
operation.          .h.- or single recirculation loop l                                      2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.
:                                    a i                          2.1.2 Reactor Coolant System Pressure SL i
Reactor steam dome pressure shall be s 1325 psig.
l i
1
!            2.2 SL Violations j                          Wit.h any SL violation, the following actions shall be completed:
a                          2.2.1 Within I hour, notify the NRC Operations Center, in accordance
!                                      with 10 CFR 50.72.
1 l                          2.2.2 Within 2 hours:
l                                      2.2.2.1 Restore compliance with all SLs; and l                                      2.2.2.2  Insert all insertable control rods.
I
:                          2.2.3 Within 24 hours, notify the plant manager and the corporate j                                      executive responsible for overall plant nuclear safety.
i                                                                                                    (continuedl i
$                        9611220278 96111S
:                        PDR      ADOCK 05000458 j                        P                          PDR 1
i
)            RIVER BEND                                              2.0-1                    Amendment No. 81 i
i l
                  - - - -                  ,, -                  ..}}

Latest revision as of 18:28, 22 July 2020

Proposed Tech Specs,Changing TS SL 2.1.1.2, Reactor Core (Sl), Which Increases Two Recirculation Loop MCPR Limit from 1.07 to 1.10 & Single Recirculation Loop MCPR from 1.08 to 1.12
ML20134M227
Person / Time
Site: River Bend Entergy icon.png
Issue date: 11/15/1996
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20134M224 List:
References
NUDOCS 9611220278
Download: ML20134M227 (1)


Text

. . - . -

1 i

} i Attackment 3 TecidicalSpecification Mark-Up j Page1of1 j

] 2.0 SAFETY LIMITS (SLs) . l 1

1

)

i 2.1 Sts

)

l 2.1.1 Reactor Core SLs 1 2.1.1.1 With the reactor steam dome pressure < 785 psig or core j flow < 105 rated core flow: j I

l THERMAL POWER shall be s 255 RTP.

2.1.1.2 With the reactor steam dome pressure a: 785 psig and core  ;

1 flow a: 105 rated flow: '

l

.30 i MCPR shall be or two recirculation loop

! operation or l

operation. .h.- or single recirculation loop l 2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.

a i 2.1.2 Reactor Coolant System Pressure SL i

Reactor steam dome pressure shall be s 1325 psig.

l i

1

! 2.2 SL Violations j Wit.h any SL violation, the following actions shall be completed:

a 2.2.1 Within I hour, notify the NRC Operations Center, in accordance

! with 10 CFR 50.72.

1 l 2.2.2 Within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:

l 2.2.2.1 Restore compliance with all SLs; and l 2.2.2.2 Insert all insertable control rods.

I

2.2.3 Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, notify the plant manager and the corporate j executive responsible for overall plant nuclear safety.

i (continuedl i

$ 9611220278 96111S

PDR ADOCK 05000458 j P PDR 1

i

) RIVER BEND 2.0-1 Amendment No. 81 i

i l

- - - - ,, - ..