ML033010239: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:QF-1030-11 Rev. 1 (FP-T-SAT-30)
JOB PERFORMANCE MEASURE (JPM)
SITE:                        PBNP TASK TITLE:                  MANUALLY MAKEUP TO THE VCT/RWST JPM NUMBER:                  P004.027b.COT                    REV. 0 RELATED PRA                  None INFORMATION:
TASK NUMBERS:                P004.027.COT K/A NUMBERS:                  004.A4.12 (3.8/3.3)
APPLICABLE METHOD OF TESTING:
Discussion:                Simulate/walkthrough:            Perform:    X EVALUATION LOCATION:              In-Plant:                          Control Room:
Simulator:                X        Other:
Lab:
Time for Completion:          15    Minutes                  Time Critical:      NO Alternate Path / Faulted:    YES TASK APPLICABILITY:            SRO/RO Additional signatures may be added as needed.
Developed by:
Instructor                                Date Validated by:
Validation Instructor                          Date (See JPM Validation Checklist, Attachment 1)
Approved by:
Training Supervisor                            Date Retention: Life of policy + 10yrs.                                          Disposition: Reviewer and Approver Retain in: Training Program File Page 1 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM Number: P004.027b.COT JPM
 
==Title:==
MANUALLY MAKEUP TO THE VCT/RWST Examinee:                                              Evaluator:
Job
 
==Title:==
Date:
Start Time                                          Finish Time PERFORMANCE RESULTS:                              SAT:                    UNSAT:
Delete this table if not required X  Procedure adequately addresses task elements.
OP 5B, Blender Operation / Dilution / Boration, Enter Identifier here:
Rev. 22 Other document adequately describes necessary task elements.
Enter Identifier here:
Task elements described as attached.
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Page 2 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.
After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.
You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.
For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
* You are the Unit 1 Operator at the Controls.
* Leakage at the Charging Pump seals has resulted in the need to manually blend to the VCT to maintain normal VCT level.
* Several blends have been performed and the CVCS system was left with the blend in the piping.
* The Chemical and Volume Control System is in its normal at-power alignment with a single letdown orifice in service.
* Unit 1 RCS boron concentration is 875 ppm.
* The on-service boric acid storage tank concentration is 3.75%.
INITIATING CUES (IF APPLICABLE):
* The DOS directs you to:
* Raise VCT level by approximately 10% at the current boron concentration in the RCS by use of manual blend, and
* Realign the makeup system for normal automatic operations. NOTE: The blend may be left in the CVCS piping since frequent blends are currently required.
Page 3 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM PERFORMANCE INFORMATION Required Materials:        OP 5B, Blender Operation / Dilution / Boration.
General
 
==References:==
Blender Data Manual.
Task Standards:            The Examinee raises VCT level by 10%, determines failure of 1CV-111 to auto-close and manually closes the valve.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1            Determine the desired blender output concentration, AND the corresponding acid Critical N (SEQ-1)            and water flow setpoints from operating experience, OR using the Blender Data Manual.
Standard:                      The Examinee determines that the existing acid and water flow setpoints are adequate for the present boron concentration by referencing:
o Operating experience, or o Using the Blender Data Manual.
NO adjust of controls is necessary.
Evaluator Note:              The RMW/boric acid ratio for the existing boron concentration is 6.5 gallons of RMW for each gallon of acid.
Performance:                  SATISFACTORY          UNSATISFACTORY Comments:
Page 4 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 2        Place the REACTOR MAKEUP MODE SELECTOR switch in BLEND.
Critical Y (SEQ-1)
Standard:                  The Examinee places the REACTOR MAKEUP MODE SELECTOR switch to the BLEND position.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Performance Step: 3        Set HC-111, RX MAKEUP WATER FLOW CONTROLLER, to the value Critical N (SEQ-1)        determined in Step 4.1.1.
Standard:                  The Examinee determines that no adjustment of controller HC-111 is necessary.
Evaluator Note:            The RMW/boric acid ratio for the existing boron concentration is 6.5 gallons of RMW for each gallon of acid.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Performance Step: 4        Set HC-110, BORIC ACID FLOW CONTROLLER, to the value determined in Step Critical N (SEQ-1)        4.1.1.
Standard:                  The Examinee determines that no adjustment of controller HC-110 is necessary.
Evaluator Note:            The RMW/boric acid ratio for the existing boron concentration is 6.5 gallons of RMW for each gallon of acid.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Page 5 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 5        IF VCT is NOT bypassed, THEN ensure CV-110B, Z-1 BA BLENDER TO CHG Critical N (SEQ-1)        PUMP SUCT FCV, is in AUTO to supply the VCT outlet from the blender.
Standard:                  The Examinee determines CV-110B control switch is already in AUTO.
Performance:              SATISFACTORY              UNSATISFACTORY Comments:
Performance Step: 6        IF VCT is bypassed, THEN ensure CV-110B, Z-1 BA BLENDER TO CHG PUMP Critical N (SEQ-1)        SUCT FCV is OPEN.
Standard:                  The Examinee determines step is N/A, proceeds to Step 4.1.7.
Performance:              SATISFACTORY              UNSATISFACTORY Comments:
Performance Step: 7        Place the REACTOR MAKEUP control switch in START, AND ensure the red light Critical Y (SEQ-2)        is lit.
Standard:
* The Examinee places the REACTOR MAKEUP control switch to the Start position and
* Ensures that the red light is lit.
Evaluator Note:            Verification of red light is NOT critical.
Performance:              SATISFACTORY              UNSATISFACTORY Comments:
Page 6 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 8        Monitor the following as applicable:
Critical N (SEQ-3)
* RMW and boric acid flows
* VCT level and pressure
* RCS temperature
* Reactor power Standard:                  The Examinee monitors all of the following parameters:
* RMW and boric acid flows
* VCT level and pressure
* RCS temperature
* Reactor power Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 9        WHEN it is desired to secure MANUAL BLEND, THEN:
Critical Y (SEQ-3)        Place the REACTOR MAKEUP control switch to STOP.
Standard:                  The Examinee places the REACTOR MAKEUP control switch to the Stop position after VCT level has risen at least 10%.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Page 7 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 10      Place the REACTOR MAKEUP MODE SELECTOR switch to AUTO.
Critical Y (SEQ-4)
Standard:                  The Examinee places the REACTOR MAKEUP MODE SELECTOR switch to the AUTO position.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 11      Ensure the following:
Critical N (SEQ-5)        CV-110A, BA TO Z-1 BLENDER FLOW CONTROL VALVE, opens.
Standard:                  The Examinee determines that CV-110A is open (green light off, red light on).
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 12      Ensure the following:
Critical Y (SEQ-5)        CV-111, RMW TO Z-1 BLENDER FLOW CONTROL VALVE, closes.
Standard:                  The Examinee determines that CV-111 is OPEN, and closes the valve by placing the control switch for CV-111 to the Close position.
Evaluator Cue:            If Examinee informs the DOS of the failure and requests direction, indicate that the valve should be placed in its required position.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Page 8 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 13      IF VCT is NOT bypassed, THEN ensure CV-110B, Z-1 BA BLENDER TO CHG Critical N (SEQ-5)        PUMP SUCT FCV, is CLOSED.
Standard:                  The Examinee determines that CV-110B is Closed (green light on, red light off).
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Performance Step: 14      IF VCT is bypassed, THEN ensure CV-110B, Z-1 BA BLENDER TO CHG PUMP Critical N (SEQ-5)        SUCT FCV, is OPEN.
Standard:                  The Examinee determines step is N/A and proceeds to Step 4.2.4.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Performance Step: 15      Ensure that the blender is set to match the current RCS boron concentration.
Critical N (SEQ-5)
Standard:                  The Examinee determines that the blender controls are adequate for the existing boron concentration.
No adjustment of controls is necessary.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Page 9 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 16        Arm the system as follows:
Critical N (SEQ-6)
* Place the REACTOR MAKEUP control switch in START
* ENSURE the red light is lit.
Standard:
* The Examinee places the REACTOR MAKEUP control switch to the Start position and
* Ensures that the red light is lit.
Evaluator Note:            The Examinee may recommend troubleshooting of the 1CV-111 failure prior to Arming the system. If Examinee suggests this, concur with the recommendation.
Performance:                SATISFACTORY          UNSATISFACTORY Comments:
Performance Step: 17        Inform the DOS of plant status.
Critical N (SEQ-7)
Standard:                  The Examinee informs the DOS that VCT level has been raised approximately 10% using manual blend and that CV-111 failed to automatically re-position when the blend was secured.
Evaluator Cue:              The DOS acknowledges your report.
Performance:                SATISFACTORY          UNSATISFACTORY Comments:
Terminating Cues:      The JPM is complete.
Stop Time:
Page 10 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
SIMULATOR SET UP: (Modify table as necessary)
Initial Setup:
* Load an IC where conditions support Unit 1 steady-state operations.
* Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
* Ensure RMW/boric acid flow controllers are set at a 6.5:1 ratio.
* Make any necessary adjustments or corrections.
* Update documentation if required.
* Save to an IC for multiple use (if necessary).
Multiple Use:
* Load the saved IC for this JPM.
* Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
* Make any necessary adjustments or corrections.
* Update documentation if required.
SIMULATOR INFORMATION:
Initiation  Action or      Action      Malf. Ramp Time Delay Time          Trigger          Verification Cue      Component      Tagname      Value                                                  Performed Description                                                Event          Oper. Ready    Inserted Criteria      Init. #
PRELOAD      1-CV-111    VLV1CVC005        1        -          -    X14I161S          -
                                                                        .EQ. 1 RMW TO BLENDER                                                  (Trigger 1)
FCV (FAIL OPEN)
EVENT TRIGGERS EVENT LINE            COMMAND LINE PRELOAD      1-CV-111        X14I253C .EQ. 1        DMF VLV1CVC005        2            -
RMW TO BLENDER FCV ISOL (CLOSE)
Retention: Life of policy + 10yrs.                                              Disposition: Reviewer and Approver Retain in: Training Program File Page 11 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
TURNOVER SHEET INITIAL CONDITIONS:
* You are the Unit 1 Operator at the Controls.
* Leakage at the Charging Pump seals has resulted in the need to manually blend to the VCT to maintain normal VCT level.
* Several blends have been performed and the CVCS system was left with the blend in the piping.
* The Chemical and Volume Control System is in its normal at-power alignment with a single letdown orifice in service.
* Unit 1 RCS boron concentration is 875 ppm.
* The on-service boric acid storage tank concentration is 3.75%.
INITIATING CUES (IF APPLICABLE):
* The DOS directs you to:
* Raise VCT level by approximately 10% at the current boron concentration in the RCS by use of manual blend, and
* Realign the makeup system for normal automatic operations. NOTE: The blend may be left in the CVCS piping since frequent blends are currently required.
Retention: Life of policy + 10yrs.                                      Disposition: Reviewer and Approver Retain in: Training Program File Page 12 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS                                                                YES      NO      N/A
: 1. Are all items on the signature page filled in correctly?
: 2. Has the JPM been reviewed and validated by SMEs?
: 3. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 4. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 6. Has the completion time been established based on validation data or incumbent experience?
: 7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 8. Is the Licensee level appropriate for the task being evaluated if required?
: 9. Is the K/A appropriate to the task and to the licensee level if required?
: 10. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
: 11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 12. Are all references identified, current, accurate, and available to the trainee?
: 13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Retention: Life of policy + 10yrs.                                          Disposition: Reviewer and Approver Retain in: Training Program File Page 13 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JOB PERFORMANCE MEASURE (JPM)
SITE:                        PBNP TASK TITLE:                  MANUALLY MAKEUP TO THE VCT/RWST JPM NUMBER:                  P004.027b.COT                    REV. 0 RELATED PRA                  None INFORMATION:
TASK NUMBERS:                P004.027.COT K/A NUMBERS:                  006.A1.13 (3.5/3.7)
APPLICABLE METHOD OF TESTING:
Discussion:                Simulate/walkthrough:            Perform:    X EVALUATION LOCATION:              In-Plant:                          Control Room:
Simulator:                X        Other:
Lab:
Time for Completion:          15    Minutes                  Time Critical:      NO Alternate Path / Faulted:    NO TASK APPLICABILITY:            SRO/RO Additional signatures may be added as needed.
Developed by:
Instructor                                Date Validated by:
Validation Instructor                          Date (See JPM Validation Checklist, Attachment 1)
Approved by:
Training Supervisor                            Date Retention: Life of policy + 10yrs.                                          Disposition: Reviewer and Approver Retain in: Training Program File Page 14 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM Number: P004.027b.COT JPM
 
==Title:==
MANUALLY MAKEUP TO THE VCT/RWST Examinee:                                              Evaluator:
Job
 
==Title:==
Date:
Start Time                                            Finish Time PERFORMANCE RESULTS:                              SAT:                  UNSAT:
Delete this table if not required X  Procedure adequately addresses task elements.
OI 100, Adjusting SI Accumulator Level and Enter Identifier here:
Pressure, Rev. 21 Other document adequately describes necessary task elements.
Enter Identifier here:
Task elements described as attached.
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Page 15 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.
After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.
You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.
For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
* Unit 1 is at 100% steady-state conditions.
* Annunciator 1T-34A Accumulator Pressure High or Low has just alarmed.
INITIATING CUES (IF APPLICABLE):
* The DOS directs you to raise 1T-34A accumulator pressure to clear the alarm (and maintain pressure in the normal band) in accordance with OI 100, Adjusting SI Accumulator Level and Pressure, Section 5.4.
Page 16 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM PERFORMANCE INFORMATION Required Materials:        OI 100, Adjusting SI Accumulator Level and Pressure.
General
 
==References:==
None.
Task Standards:            The Examinee raises pressure in 1T-34A to clear the associated alarm on panel C01.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1            Perform Attachment A, Accumulator Level/Pressure Change Data Sheet, Critical N (SEQ-1)            Sections 1.0 and 2.0.
Standard:                      The Examinee completes Attachment A, Accumulator Level/Pressure Change Data Sheet, Sections 1.0 and 2.0. based on present plant conditions.
Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
Page 17 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 2        IF RCS pressure is less than 760 psig, THEN ensure the following valves Shut:
Critical N (SEQ-1)        (Mark this step N/A if RCS pressure is greater than or equal to 760 psig.)
Standard:
* The Examinee marks Step 5.4.2 N/A and
* Proceeds to Step 5.4.3.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 3        Ensure 1SI-957, N2 Supply Line Vent, is SHUT using 1HIC-957 Accumulator Vent Critical N (SEQ-1)        Controller. (C01R)
Standard:                  The Examinee determines that 1SI-957 is shut by observing accumulator vent controller, 1HIC-957, setpoint controller at zero and output at zero (closed).
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 4        Open the SI accumulator nitrogen inlet valve for the accumulator to be filled:
Critical Y (SEQ-1)        (Mark the valve NOT used N/A.)
* 1SI-834A, T34A Accumulator Nitrogen Inlet AOV
* 1SI-834B, T34B Accumulator Nitrogen Inlet AOV Standard:
* The Examinee places the control switch for 1SI-834A to the Open position.
and
* N/As the Step for the valve not used,1SI-834B (N/A is NOT critical).
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Page 18 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 5        Align a Nitrogen 12 pack to Unit 1 SI accumulators by opening 12 pack isolations.
Critical Y (SEQ-1)
Standard:                  The Examinee dispatches the Primary Auxiliary Building Auxiliary Operator to align a Nitrogen 12 pack to the Unit 1 SI accumulators.
Evaluator Cue:            The Primary Auxiliary Building Auxiliary Operator reports that a nitrogen 12 pack is aligned to the Unit 1 SI accumulators.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 6        Open 1SI-846, 1T-34A&B Accumulator Nitrogen Inlet CIV. (C01)
Critical Y (SEQ-1)
Standard:                  The Examinee places the control switch for 1SI-846 to the Open position.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Page 19 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 7        Locally open the valve aligned to the Nitrogen 12 pack: (Mark the valve NOT Critical Y (SEQ-1)        used N/A).
* 1SI-838A, Accumulator Nitrogen Supply
* 1SI-838B, Accumulator Nitrogen Supply Standard:
* The Examinee dispatches the Primary Auxiliary Building Auxiliary Operator to locally open the accumulator nitrogen supply valve for the aligned 12 pack.
* N/As the Step for the valve not used (N/A of step is NOT critical).
Evaluator Cue:
* The Primary Auxiliary Building Auxiliary Operator reports that the Accumulator Nitrogen Supply Valve, 1SI-838A, is open and flow can be heard.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Page 20 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 8        Pressurize accumulator to desired pressure as indicated on one of the following Critical N (SEQ-1)        indicators: (Mark the indicators NOT used N/A).
* 1PI-941, 1T34A Accumulator Pressure (C01R)
* 1PI-940, 1T-34A Accumulator Pressure (C01)
* 1PI-936, 1T-34B Accumulator Pressure (C01)
* 1PI-937, 1T34B Accumulator Pressure (C01R)
Standard:                  The Examinee monitors pressurization of the accumulator on ONE of the following instruments:
* 1PI-941, 1T34A Accumulator Pressure (C01R)
* 1PI-940, 1T-34A Accumulator Pressure (C01)
And N/As the indicators not used:
* 1PI-936, 1T-34B Accumulator Pressure (C01)
* 1PI-937, 1T34B Accumulator Pressure (C01R).
Evaluator Cue:            When Annunciator 1T-34A Accumulator Pressure High or Low clears, inform the Examinee that the Accumulator is at the desired pressure and the fill may be secured.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 9        WHEN the desired pressure in the accumulator is achieved THEN shut 1SI-846, Critical Y (SEQ-2)        1T-34A&B Accumulator Nitrogen Inlet CIV. (C01)
Standard:                  After Annunciator 1T-34A Accumulator Pressure High or Low is clear, the Examinee places the control switch for 1SI-846 to the Close position.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Page 21 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 10      Locally isolate Nitrogen 12 pack to Unit 1 SI accumulators by shutting 12 pack Critical N (SEQ-2)        isolation.
Standard:                  The Examinee dispatches the Primary Auxiliary Building Auxiliary Operator to locally isolate the Nitrogen 12 pack to the Unit 1 SI accumulators by shutting the 12 pack isolation.
Evaluator Cue:            The Primary Auxiliary Building Auxiliary Operator reports that the Nitrogen 12 pack to the Unit 1 SI accumulators has been isolated.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 11      Locally isolate the Nitrogen 12 pack used to fill the accumulator: (Mark the valve Critical N (SEQ-2)        NOT used N/A.)
* 1SI-838A, Accumulator Nitrogen Supply
* 1SI-838B, Accumulator Nitrogen Supply Standard:
* The Examinee dispatches the Primary Auxiliary Building Auxiliary Operator to locally isolate 1SI-838A.
* N/As the Step for the valve not used (1SI-838B).
Evaluator Cue:            The Primary Auxiliary Building Auxiliary Operator primary auxiliary building Auxiliary Operator reports that 1SI-838A is shut.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Page 22 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 12        Shut the accumulator nitrogen inlet valve previously opened: (C01R) (Mark the Critical N (SEQ-2)          valve NOT used N/A.)
: a.      1SI-834A, T34A Accumulator Nitrogen Inlet AOV
: b.      1SI-834B, T34B Accumulator Nitrogen Inlet AOV Standard:
* The Examinee places the control switch for T-34A Accumulator Nitrogen Inlet AOV, 1SI-834A, to the Close position and
* N/As the valve not used (1SI-834B).
Performance:                SATISFACTORY          UNSATISFACTORY Comments:
Performance Step: 13        Perform Attachment A, Accumulator Level/Pressure Change Data Sheet, Critical N (SEQ-3)          Sections 5.0 and 7.0.
Standard:                  The Examinee completes Attachment A, Accumulator Level/Pressure Change Data Sheet, Sections 5.0 and 7.0 using present plant data.
Evaluator Cue:              The Unit 1 CO will make the appropriate Narrative Log entries.
Performance:                SATISFACTORY          UNSATISFACTORY Comments:
Page 23 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 14        Ensure accumulator level between 15 to 40% as indicated on one of the following Critical N (SEQ-3)          indicators: (Mark the indicators NOT used N/A.)
* 1LI-939, 1T-34A Accumulator Level (C01R)
* 1LI-938, 1T-34A Accumulator Level (C01)
* 1LI-934, 1T-34B Accumulator Level (C01)
* 1LI-935, 1T-34B Accumulator Level (C01R)
Standard:                  The Examinee determines that level is within the required band of 15 to 40% as indicated on one of the following indicators:
* 1LI-939, 1T-34A Accumulator Level (C01R)
* 1LI-938, 1T-34A Accumulator Level (C01)
And N/As the indicators not used:
* 1LI-934, 1T-34B Accumulator Level (C01)
* 1LI-935, 1T-34B Accumulator Level (C01R)
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 15        Inform the DOS of plant status.
Critical N (SEQ-3)
Standard:                  The Examinee informs the DOS that Unit 1 SI A accumulator, 1T-34A, pressure has been raised and the alarm is clear.
Evaluator Cue:              The DOS acknowledges your report.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Terminating Cues:      The JPM is complete.
Stop Time:
Page 24 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
SIMULATOR SET UP: (Modify table as necessary)
Simulator Setup Instructions:
Initial Setup:
* Load an IC where conditions support Unit 1 at 100% steady-state conditions
* Vent Unit 1 1T-34A Accumulator until low pressure annunciator alarm is in, then immediately secure vent.
* Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
* Make any necessary adjustments or corrections.
* Update documentation if required.
* Save to an IC for multiple use.
Multiple Use:
* Load the saved IC for this JPM.
* Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
* Make any necessary adjustments or corrections.
* Update documentation if required.
* Resave if required.
Additional Simulator Operator Instructions From the SI Accumulator Simulator drawing, open valve 1SI-838A when requested by Examinee.
(Trigger may be used for convenience.)
Retention: Life of policy + 10yrs.                                        Disposition: Reviewer and Approver Retain in: Training Program File Page 25 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
TURNOVER SHEET INITIAL CONDITIONS:
* Unit 1 is at 100% steady-state conditions.
* Annunciator 1T-34A Accumulator Pressure High or Low has just alarmed.
INITIATING CUES (IF APPLICABLE):
* The DOS directs you to raise 1T-34A accumulator pressure to clear the alarm (and maintain pressure in the normal band) in accordance with OI 100, Adjusting SI Accumulator Level and Pressure, Section 5.4.
Retention: Life of policy + 10yrs.                                      Disposition: Reviewer and Approver Retain in: Training Program File Page 26 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS                                                                YES      NO      N/A
: 14. Are all items on the signature page filled in correctly?
: 15. Has the JPM been reviewed and validated by SMEs?
: 16. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 17. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 18. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 19. Has the completion time been established based on validation data or incumbent experience?
: 20. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 21. Is the Licensee level appropriate for the task being evaluated if required?
: 22. Is the K/A appropriate to the task and to the licensee level if required?
: 23. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
: 24. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 25. Are all references identified, current, accurate, and available to the trainee?
: 26. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Retention: Life of policy + 10yrs.                                          Disposition: Reviewer and Approver Retain in: Training Program File Page 27 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JOB PERFORMANCE MEASURE (JPM)
SITE:                        PBNP TASK TITLE:                  PERFORM ACTIONS TO STOP A CONTINUOUS ROD WITHDRAWALMANUALLY MAKEUP TO THE VCT/RWST JPM NUMBER:                  P.000.008b.COTP004.027B.          REV.      00 COT RELATED PRA                  None INFORMATION:
TASK NUMBERS:                P000.008B.COTP004.027.COT 001.AA1.005194 001 A1.01 (3.3/3.4) / 194 001 A1.02 (4.1/3.9) / 194 001 A1.04 (3.0/3.2) / 194 001 A1.05 (3.6/3.8) / 194 001 A1.10 (2.9/3.9) / 194 001 A1.12 K/A NUMBERS:
(3.1/4.1) / 194 001 A1.13 (4.3/4.1) / 194 001 A1.14 (2.5/2.9) / 004 000 A4.01 (3.8/3.9) /
APPLICABLE METHOD OF TESTING:
Discussion:                Simulate/walkthrough:              Perform:    X EVALUATION LOCATION:              In-Plant:                            Control Room:
Simulator:                X        Other:
Lab:
Time for Completion:          1515    Minutes                  Time Critical:      NO Alternate Path / Faulted:    YES TASK APPLICABILITY:            SRO/ROSRO/RO Additional signatures may be added as needed.
Developed by:
Instructor                                  Date Validated by:
Validation Instructor                            Date (See JPM Validation Checklist, Attachment 1)
Approved by:
Retention: Life of policy + 10yrs.                                            Disposition: Reviewer and Approver Retain in: Training Program File Page 28 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Training Supervisor                Date Retention: Life of policy + 10yrs.                        Disposition: Reviewer and Approver Retain in: Training Program File Page 29 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM Number: P000.008b.COTP004.027b.COT JPM
 
==Title:==
RESPOND TO UNCONTROLLED ROD MOTIONMANUALLY MAKEUP TO THE VCT/RWST Examinee:                                              Evaluator:
Job
 
==Title:==
Date:
Start Time                                            Finish Time PERFORMANCE RESULTS:                              SAT:                  UNSAT:
Delete this table if not required X  Procedure adequately addresses task elements.
AOP 6C Unit 1, Uncontrolled Motion of RCCA(s),
Enter Identifier here:
Rev. 11 Other document adequately describes necessary task elements.
Enter Identifier here:
X  Task elements described as attached.
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Page 30 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.
After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.
You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.
For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
* You are the Operator at the Controls for Unit 1.
* Unit 1 is at the 28% chemistry hold following reactor startup.
* Rod Control has been placed in Auto due to the extended chemistry hold.
INITIATING CUES (IF APPLICABLE):
* The DOS directs you to insert control rods two (2) steps for flux control.
Page 31 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM PERFORMANCE INFORMATION Required Materials:        None.
General
 
==References:==
AOP 6C Unit 1, Uncontrolled Motion of RCCA(s).
Task Standards:            The Examinee terminates the uncontrolled rod motion by tripping the reactor.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1            The Control Rod Bank Selector switch is placed in Manual.
Critical N (SEQ-1)
Standard:                      The Examinee places the Control Rod Bank Selector switch to the Manual position.
Performance:                  SATISFACTORY          UNSATISFACTORY Comments:
Page 32 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 2        Control Bank D rods are withdrawn two (2) steps.
Critical N (SEQ-2)
Standard:                  The Examinee:
* Positions the IN-HOLD-OUT switch to the IN position until Control Bank D inserts two (2) steps from 172 to 170 and
* Checks Bank Demand, IRPIs, PPCS indications, and RCS temperature response consistent for the rod withdrawal.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 3        The Control Rod Bank Selector switch is returned to Auto.
Critical N (SEQ-3)
Standard:                  The Examinee places the Control Rod Bank Selector switch to the Auto position.
Evaluator Cue:            If Examinee requests direction on whether to leave Rod Control in Manual or Auto, indicate that Rod Control should be returned to Auto.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Page 33 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 4        Inform the DOS that Control Bank D has been inserted two (2) steps.
Critical N (SEQ-4)
Standard:                  The Examinee informs the DOS that Control Bank D has been inserted two (2) steps.
Evaluator Note:            After the Control Rod Bank Selector switch is returned to the Auto position, a failure of Power Range Nuclear Instrument N-41 will occur causing automatic rod withdrawal.
Evaluator Cue:            The DOS acknowledges your report.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Performance Step: 5        Check Rod Motion Required:
Critical Y (SEQ-5)        o Change in turbine load OR o Change in steam demand OR o Tave/Tref mismatch greater than 1.5 °F Standard:                  The Operator at the Controls:
* Identifies automatic rod movement of Control Bank D is not required.
Evaluator Cue:            If informed, the DOS acknowledges your report.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Page 34 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 6        Place the Control Rod Bank Selector switch to Manual.
Critical N (SEQ-6)
Standard:                  The Examinee places the Control Rod Bank Selector switch to the Manual position.
Evaluator Note:            Control Bank D will continue to withdraw.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Performance Step: 7        IF any control rod continues to step, THEN perform the following:
Critical Y (SEQ-7)
* Trip the reactor Standard:                  The Examinee depresses either or both Reactor Trip pushbuttons on either 1C04 or C01.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Terminating Cues:      When the Reactor Trip pushbuttons are depressed, the JPM may be terminated.
Stop Time:
Page 35 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
SIMULATOR SET UP: (Modify table as necessary)
Simulator Setup Instructions:
Initial Setup:
* Load an IC where conditions support a startup with a chemistry hold at 28% with CBD rods at 170.
* Load the preloads.
* Start the simulation.
* Insert CBD four steps to obtain approximately 1 degree Tavg-Tref mismatch.
* Ensure the rod control selector switch is in Automatic.
* Freeze the simulator.
* Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
* Make any necessary adjustments or corrections.
* Update documentation if required.
* Save to an IC for multiple use.
Multiple Use:
* Load the saved IC for this JPM.
* Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
* Make any necessary adjustments or corrections.
* Update documentation if required.
* Resave if required.
MORE ON NEXT PAGE Retention: Life of policy + 10yrs.                                    Disposition: Reviewer and Approver Retain in: Training Program File Page 36 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
SIMULATOR INFORMATION:
Initiation        Action or        Action    Malf. Ramp Time        Delay Time        Trigger          Verification Cue          Component        Tagname    Value                                                          Performed Description                                                        Event        Oper. Ready    Inserted Criteria      Init. #
This JPM is based upon IC-6, where:
* Unit 1 is at the 28% Chemistry hold
* CBD at 170 steps
* Boron concentration is at 1535 ppm.
Raise RCS temperature by withdrawing CBD from 170 to 172. Let plant stabilize.
Activate Trigger 1 AFTER rods are moved two steps AND rod control is returned AUTO.
PRELOAD                P.R.      MAL1NIS007A    300          -              -          -          1 CHANNEL N41 HIGH VOLTAGE FAILURE PRELOAD          ROD JOYSTK          OVER-      ON            -              -    ZT:RPC          2 OUT          CRF010A                                          7 .EQ.
POSITION                                                            172 CONTROL ROD MOTION IN OUT JOYST (ON)
PRELOAD          ROD JOYSTK          OVER-      OFF          -              -    ZT:RPC          2 IN POSITION        CRF010B                                          7 .EQ.
CONTROL                                                              172 ROD MOTION IN OUT JOYST (OFF)
Retention: Life of policy + 10yrs.                                                            Disposition: Reviewer and Approver Retain in: Training Program File Page 37 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
TURNOVER SHEET INITIAL CONDITIONS:
* You are the Operator at the Controls for Unit 1.
* Unit 1 is at the 28% chemistry hold following reactor startup.
* Rod Control has been placed in Auto due to the extended chemistry hold.
INITIATING CUES (IF APPLICABLE):
* The DOS directs you to insert control rods two (2) steps for flux control.
Retention: Life of policy + 10yrs.                                            Disposition: Reviewer and Approver Retain in: Training Program File Page 38 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS                                                                YES      NO      N/A
: 27. Are all items on the signature page filled in correctly?
: 28. Has the JPM been reviewed and validated by SMEs?
: 29. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 30. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 31. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 32. Has the completion time been established based on validation data or incumbent experience?
: 33. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 34. Is the Licensee level appropriate for the task being evaluated if required?
: 35. Is the K/A appropriate to the task and to the licensee level if required?
: 36. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
: 37. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 38. Are all references identified, current, accurate, and available to the trainee?
: 39. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Retention: Life of policy + 10yrs.                                          Disposition: Reviewer and Approver Retain in: Training Program File Page 39 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JOB PERFORMANCE MEASURE (JPM)
SITE:                        PBNP TASK TITLE:                  MANUALLY MAKEUP TO THE VCT/RWST JPM NUMBER:                  P004.027B.COT                    REV.      0 RELATED PRA                  AFW issues similar to this JPM have resulted in elevated CDF risk.
INFORMATION:
TASK NUMBERS:                P004.027.COT 061.A2.05 (3.1/3.4)194 001 A1.01 (3.3/3.4) / 194 001 A1.02 (4.1/3.9) / 194 001 A1.04 (3.0/3.2) / 194 001 A1.05 (3.6/3.8) / 194 001 A1.10 (2.9/3.9) / 194 001 A1.12 K/A NUMBERS:
(3.1/4.1) / 194 001 A1.13 (4.3/4.1) / 194 001 A1.14 (2.5/2.9) / 004 000 A4.01 (3.8/3.9) /
APPLICABLE METHOD OF TESTING:
Discussion:                Simulate/walkthrough:              Perform:    X EVALUATION LOCATION:              In-Plant:                            Control Room:
Simulator:                X        Other:
Lab:
Time for Completion:          15      Minutes                  Time Critical:      NO Alternate Path / Faulted:    YES TASK APPLICABILITY:            SRO/RO Additional signatures may be added as needed.
Developed by:
Instructor                                Date Validated by:
Validation Instructor                            Date (See JPM Validation Checklist, Attachment 1)
Approved by:
Training Supervisor                            Date Retention: Life of policy + 10yrs.                                            Disposition: Reviewer and Approver Retain in: Training Program File Page 40 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Retention: Life of policy + 10yrs.                Disposition: Reviewer and Approver Retain in: Training Program File Page 41 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM Number: P004.027b.COT JPM
 
==Title:==
MANUALLY MAKEUP TO THE VCT/RWST Examinee:                                              Evaluator:
Job
 
==Title:==
Date:
Start Time                                            Finish Time PERFORMANCE RESULTS:                              SAT:                  UNSAT:
Delete this table if not required X  Procedure adequately addresses task elements.
OI 62A, Motor-Driven Auxiliary Feedwater System Enter Identifier here:
(P-38A &P-38B), Rev. 24 Other document adequately describes necessary task elements.
Enter Identifier here:
Task elements described as attached.
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Page 42 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.
After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.
You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.
For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
* You are the Balance Of Plant Operator.
* Unit 1 is in Mode 5, Cold Shutdown.
* Chemistry requests that Steam Generator A level be raised to support placing the S/G in wet lay-up.
INITIATING CUES (IF APPLICABLE):
* The DOS directs you to raise Unit 1 A Steam Generator level to 90-95% NR in accordance with OI 62A, Motor-Driven Auxiliary Feedwater System (P-38A & P-38B), Section 5.3.
* All applicable Initial Conditions in Section 4.0 are met.
* Starting duty limitations for P-38A, Motor Driven Auxiliary Feedwater Pump, are met.
* A flow rate of 100 to 200 gpm is desired when raising level.
Page 43 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM PERFORMANCE INFORMATION Required Materials:        OI 62A, Motor-Driven Auxiliary Feedwater System (P-38A & P-38B).
General
 
==References:==
None.
Task Standards:            The Examinee establishes a flow rate of 100-200 gpm using Motor Driven AFW Pump P-38A and then secures P-38A when there is no indication of forward flow or recirculation flow due to system failures.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1            Assign a Level 3 Dedicated Operator in accordance with OM 3.26, Use of Critical N (SEQ-1)            Dedicated Operators, to align the applicable AFW control switches per step 5.3.14 if a valid AFW signal occurs for either Unit.
Standard:                      The Examinee assumes the role of the Level 3 Dedicated Operator or requests Supervision assign another operator as the Level 3 D.O.
Evaluator Cue:                Indicate that the EXAMINEE should assume the role of the Level 3 Dedicated Operator.
Performance:                  SATISFACTORY            UNSATISFACTORY Comments:
Page 44 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 2        IF at any time, P-38A AFW Pump Flow is adjusted to less than 50 gpm, THEN the Critical N (SEQ-1)        associated AFW Pump must be secured, OR a level 3 dedicated operator must be stationed to continuously monitor recirc flow per Attachment B.
Standard:                  Examinee reviews criteria in step for securing P-38A (see Evaluator Note), and proceeds to next step.
Evaluator Note:            A Level 3 Dedicated Operator is NOT required for this evolution. However, if one is requested, inform Examinee that a Level 3 D.O is stationed.
This procedural guidance will be utilized later in the JPM when the valve failures result in no AFW forward or recirculation line flow, requiring the pump to be stopped.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Performance Step: 3        IF the RCS is greater than 200°F, THEN document feedwater addition on PBF-Critical N (SEQ-1)        2027, Feedwater Addition Log.
Standard:                  The Examinee determines this step is N/A due to present plant conditions.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Page 45 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 4        OPEN AF-4023, P-38A AFP Discharge to 1HX-1A Steam Generator.
Critical Y (SEQ-1)
Standard:                  The Examinee places the control switch for AF-4023 to the Open position.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Performance Step: 5        Verify AF-4022, P-38A AFP Discharge to 2HX-1A Steam Generator, is shut.
Critical N (SEQ-1)
Standard:                  The Examinee verifies AF-4022 is shut by observing its green light on, red light off.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Performance Step: 6        Place PC-4012, P-38A AFP Discharge Control valve controller in MANUAL and Critical N (SEQ-1)        SHUT.
Standard:
* The Examinee places the control switch for controller PC-4012 to the Manual position, and
* Then to the Close position until the output indication shows the valve closed.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Page 46 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 7        Station an operator locally to monitor the recirc flow during startup operation.
Critical N (SEQ-1)
Standard:                  The Examinee contacts an Auxiliary Operator and requests that recirc flow be monitored during startup of P-38A.
Evaluator Cue:            The local operator (Level 3 D.O if previously requested) reports that he is in position to continuously monitor P-38A recirc flow.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Performance Step: 8        Start P-38A, Motor-Driven Aux Feed Pump. (C01).
Critical Y (SEQ-2)
Standard:                  The Examinee places the control switch for P-38A to the Start position.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Performance Step: 9        IMMEDIATELY CHECK the following:
Critical N (SEQ-3)
* AF-4007, P-38A AFP Mini Recirc Control valve OPENS.
Standard:                  The Examinee checks the C01 control board indication for AF-4007 and determines the valve is open (red light on, green light off).
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Page 47 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 10      IMMEDIATELY CHECK the following:
Critical N (SEQ-3)
* Recirc flow greater than 50 gpm.
Standard:                  The Examinee contacts the local operator to check that the P-38A AFP recirc flow is greater than 50 gpm.
Evaluator Cue:            The local operator reports that P-38A recirc flow is 65 gpm.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 11      Adjust PC-4012, P-38A AFP Discharge Control valve controller in MANUAL for Critical Y (SEQ-4)        the proper flow rate.
Standard:                  The Examinee places the control switch for PC-4012 to the Open position to establish a flow rate of 100-200 gpm as specified in the Initiating Cue. (flow rate indicated on FI-4007).
Evaluator Note:            The simulator booth operator will monitor the evolution. Upon the closure of AFW Recirc Valve AF-4007, the local operator will report that AF-4007 recirc valve is shut and recirc flow is zero. After the report, the malfunctions for AF-4007 and Pressure Controller PC-4012 will be inserted.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Page 48 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 12      Monitor P-38A, Motor Driven Aux Feed Pump for proper operation:
Critical Y (SEQ-5)
* FI-4007, P-38A AFP Discharge Flow Indicator.
* PI-4012, P-38A AFP Discharge Pressure Indicator.
* Bearing Temperatures on 1TR-2000B. (see Cue)
* Point 25, P-38A Inboard Pump Bearing.
* Point 26, P-38A Outboard Pump Bearing.
Standard:
* The Examinee recognizes that both PC-4012 and AF-4007 have failed closed and
* Places the control switch for P-38A to the Stop position PRIOR to the pump tripping.
Evaluator Note:            Engineering evaluation has determined that unrecoverable pump failure will occur 30 seconds after flow decreases below 6 gpm. This failure is modeled on the simulator as a pump trip and inability to re-start.
Evaluator Cue:            Inform Examinee that another operator will monitor bearing temperatures on 1TR-2000B (recorder is on a backpanel).
If the local operator at P-38A is contacted, indicate that Recirc flow is zero and Recirc valve AF-4007 is shut.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 13      Inform the DOS of present plant conditions.
Critical N (SEQ-6)
Standard:                  The Examinee informs the DOS that:
* P-38A AFP discharge pressure controller, PC-4012 failed shut, and
* P-38A mini recirc valve, AF-4007 failed to open, and
* Motor-Driven Auxiliary Feedwater Pump, P-38A, was secured.
Evaluator Cue:            The DOS acknowledges your report.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Page 49 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Terminating Cues:      The JPM is complete.
Stop Time:
Page 50 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
SIMULATOR SET UP: (Modify table as necessary)
Initial Setup:
* Load an IC where conditions support Unit 1 in cold shutdown (IC 18).
* Ensure Steam Generator A level is approximately 80% NR.
* Load the preloads.
* Start the simulation.
* Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
* Make any necessary adjustments or corrections.
* Update documentation if required.
* Save to an IC for multiple use.
Multiple Use:
* Load the saved IC for this JPM.
* Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
* Make any necessary adjustments or corrections.
* Update documentation if required.
* Resave if required.
SIMULATOR INFORMATION:
Initiation  Action or      Action    Malf. Ramp Time Delay Time        Trigger          Verification Cue      Component      Tagname  Value                                                Performed Description                                          Event        Oper. Ready    Inserted Criteria      Init. #
PLE      0-PIC4012  CNH1AFW001    100    00:01:00                            1 P38A DISCH        B PRESS                (Ensure  1 minute CNTROLLER                  start FIXED                value is 91%)
PLE      0-AF-4007    VLV1AFW010    2                                        1 AUX FWP 38A RECIRC VALVE (CLOSE)
Retention: Life of policy + 10yrs.                                        Disposition: Reviewer and Approver Retain in: Training Program File Page 51 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
TURNOVER SHEET INITIAL CONDITIONS:
* You are the Balance Of Plant Operator.
* Unit 1 is in Mode 5, Cold Shutdown.
* Chemistry requests that Steam Generator A level be raised to support placing the S/G in wet lay-up INITIATING CUES (IF APPLICABLE):
* The DOS directs you to raise Unit 1 A Steam Generator level to 90-95% NR in accordance with OI 62A, Motor-Driven Auxiliary Feedwater System (P-38A & P-38B), Section 5.3.
* All applicable Initial Conditions in Section 4.0 are met.
* Starting duty limitations for P-38A, Motor Driven Auxiliary Feedwater Pump, are met.
* A flow rate of 100 to 200 gpm is desired when raising level.
Retention: Life of policy + 10yrs.                                        Disposition: Reviewer and Approver Retain in: Training Program File Page 52 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS                                                                YES      NO      N/A
: 40. Are all items on the signature page filled in correctly?
: 41. Has the JPM been reviewed and validated by SMEs?
: 42. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 43. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 44. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 45. Has the completion time been established based on validation data or incumbent experience?
: 46. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 47. Is the Licensee level appropriate for the task being evaluated if required?
: 48. Is the K/A appropriate to the task and to the licensee level if required?
: 49. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
: 50. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 51. Are all references identified, current, accurate, and available to the trainee?
: 52. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Retention: Life of policy + 10yrs.                                          Disposition: Reviewer and Approver Retain in: Training Program File Page 53 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JOB PERFORMANCE MEASURE (JPM)
SITE:                        PBNP TASK TITLE:                  MANUALLY MAKEUP TO THE VCT/RWST JPM NUMBER:                  P004.027B.COT                    REV. 0 RELATED PRA                  None INFORMATION:
TASK NUMBERS:                P004.027.COT K/A NUMBERS:                  026.A4.01 (4.5/4.3)
APPLICABLE METHOD OF TESTING:
Discussion:                Simulate/walkthrough:            Perform:    X EVALUATION LOCATION:              In-Plant:                          Control Room:
Simulator:                X        Other:
Lab:
Time for Completion:          15    Minutes                  Time Critical:      NO Alternate Path / Faulted:    NO TASK APPLICABILITY:            SRO/RO Additional signatures may be added as needed.
Developed by:
Instructor                                Date Validated by:
Validation Instructor                          Date (See JPM Validation Checklist, Attachment 1)
Approved by:
Training Supervisor                            Date Retention: Life of policy + 10yrs.                                          Disposition: Reviewer and Approver Retain in: Training Program File Page 54 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM Number: P004.027b.COT JPM
 
==Title:==
MANUALLY MAKEUP TO THE VCT/RWST Examinee:                                              Evaluator:
Job
 
==Title:==
Date:
Start Time                                            Finish Time PERFORMANCE RESULTS:                              SAT:                    UNSAT:
Delete this table if not required X  Procedure adequately addresses task elements.
Enter Identifier here: EOP-1.1 Unit 1, SI Termination, Rev. 30 Other document adequately describes necessary task elements.
Enter Identifier here:
Task elements described as attached.
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Page 55 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.
After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.
You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.
For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
* A Unit 1 steam line break occurred inside containment resulting in a Reactor Trip and initiation of Safety Injection and Containment Spray.
* Actions of EOP-0, EOP-2, and EOP-1 have been successfully performed.
* One train of Containment Spray was previously stopped in EOP-0, Attachment A.
* The procedure currently in effect is EOP-1.1 Unit 1, SI Termination, and step 10 has just been reached.
INITIATING CUES (IF APPLICABLE):
* The DOS directs you to secure Containment Spray in accordance with EOP-1.1 Unit 1, SI Termination, Step 10.
Page 56 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM PERFORMANCE INFORMATION Required Materials:        EOP-1.1 Unit 1, SI Termination.
General
 
==References:==
None.
Task Standards:            The Examinee secures Containment Spray and realigns the system for standby operation.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1            Check containment spray pumps - ANY RUNNING Critical N (SEQ-1)
* 1P-14A, train A
* 1P-14B, train B Standard:                      The Examinee determines that Containment Spray Pump 1P-14B is running and 1P-14A is stopped.
Evaluator Note:                Containment Spray Pump 1P-14A was previously placed in pullout (with suction valve shut) in EOP-0 Attachment A.
Performance:                  SATISFACTORY          UNSATISFACTORY Comments:
Page 57 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 2        Check containment pressure - LESS THAN 15 PSIG.
Critical N (SEQ-1)
Standard:                  The Examinee determines that containment pressure is less than 15 psig via indications on panels C01 and/or 1C20 (multiple indications available).
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Performance Step: 3        Reset Containment Spray signal.
Critical Y (SEQ-1)
Standard:                  The Examinee depresses both Unit 1 Containment Spray reset pushbuttons on C01R.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Page 58 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 4        Stop both Containment Spray Pumps and place in auto-after stop Critical Y (SEQ-2)
* 1P-14A, train A
* 1P-14B, train B Standard:                  The Examinee:
* places the control switch for Containment Spray Pump 1P-14B to the stop position, allowing switch to spring return to auto-after-stop position.
* pushes in the control switch for Containment Spray Pump 1P-14A, allowing the switch to spring return to auto-after-stop position.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 5        Shut containment spray pump discharge valves:
Critical Y (SEQ-3)
* 1SI-860A for 1P-14A
* 1SI-860B for 1P-14A
* 1SI-860C for 1P-14B
* 1SI-860D for 1P-14B Standard:                  The Examinee places the control switches to the Close position (spring return to Auto) for Containment Spray Pump Discharge Valves 1SI-860A, B, C, and D.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Page 59 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 6        Ensure both Spray Additive Tank Discharge Valves - SHUT Critical N (SEQ-3)
* 1SI-836A, train A
* 1SI-836B, train B Standard:                  The Examinee ensures both 1SI-836A and 1SI-836B are shut by checking the Output indicators on 1YIC-926A and 1YIC-926B. (Status light indication for both valves is also available on Unit 1 SI-Spray Active status panel.)
Performance:              SATISFACTORY              UNSATISFACTORY Comments:
Performance Step: 7        Ensure Containment Spray Pump RWST Suction MOVs - OPEN Critical Y (SEQ-3)
* 1SI-870A for 1P-14A
* 1SI-870B for 1P-14B Standard:                  The Examinee places the control switch for 1SI-870A to the OPEN position, spring return to Auto. Also, determines 1SI-870B is open by observing red light on, green light off. (Note: verification of 1SI-870B is not critical).
Evaluator Note:            1SI-870A was previously closed during EOP-0 Attachment A.
Performance:              SATISFACTORY              UNSATISFACTORY Comments:
Page 60 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 8        Inform the DOS of plant status.
Critical N (SEQ-4)
Standard:                  Examinee informs DOS that step 10 of EOP-1.1 has been completed and the Containment Spray System has been returned to a normal line-up.
Evaluator Cue:              The DOS acknowledges your report.
Performance:                SATISFACTORY          UNSATISFACTORY Comments:
Terminating Cues:      The JPM is complete.
Stop Time:
Page 61 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
SIMULATOR SET UP: (Modify table as necessary)
Simulator Setup Instructions:
Initial Setup:
* Load an IC where conditions support Unit 1 at 100 steady-state conditions
* Load the preload.
* Start the simulation.
* Implement the actions of EOP-0, EOP-2, EOP-1 Unit 1 (first 13 steps) and EOP-1.1 up to and including step 9; then freeze the simulator.
* Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
* Make any necessary adjustments or corrections.
* Update documentation if required.
* Save to an IC for multiple use.
Multiple Use:
* Load the saved IC for this JPM.
* Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
* Make any necessary adjustments or corrections.
* Update documentation if required.
* Resave if required.
SIMULATOR INFORMATION:
Initiation    Action or    Action    Malf. Ramp Time Delay Time        Trigger          Verification Cue        Component    Tagname    Value                                              Performed Description                                          Event        Oper. Ready    Inserted Criteria      Init. #
Preload      SG A MAIN  MAL1SGN003    5E6                15 STEAM LINE        A BREAK INSIDE CNMT Retention: Life of policy + 10yrs.                                          Disposition: Reviewer and Approver Retain in: Training Program File Page 62 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
TURNOVER SHEET INITIAL CONDITIONS:
* A Unit 1 steam line break occurred inside containment resulting in a Reactor Trip and initiation of Safety Injection and Containment Spray.
* Actions of EOP-0, EOP-2, and EOP-1 have been successfully performed.
* One train of Containment Spray was previously stopped in EOP-0, Attachment A.
* The procedure currently in effect is EOP-1.1 Unit 1, SI Termination, and step 10 has just been reached.
INITIATING CUES (IF APPLICABLE):
* The DOS directs you to secure Containment Spray in accordance with EOP-1.1 Unit 1, SI Termination, Step 10.
Retention: Life of policy + 10yrs.                                          Disposition: Reviewer and Approver Retain in: Training Program File Page 63 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS                                                                YES      NO      N/A
: 53. Are all items on the signature page filled in correctly?
: 54. Has the JPM been reviewed and validated by SMEs?
: 55. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 56. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 57. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 58. Has the completion time been established based on validation data or incumbent experience?
: 59. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 60. Is the Licensee level appropriate for the task being evaluated if required?
: 61. Is the K/A appropriate to the task and to the licensee level if required?
: 62. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
: 63. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 64. Are all references identified, current, accurate, and available to the trainee?
: 65. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Retention: Life of policy + 10yrs.                                          Disposition: Reviewer and Approver Retain in: Training Program File Page 64 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JOB PERFORMANCE MEASURE (JPM)
SITE:                        PBNP TASK TITLE:                  MANUALLY MAKEUP TO THE VCT/RWST JPM NUMBER:                  P004.027B.COT                    REV.      0 RELATED PRA                  None INFORMATION:
TASK NUMBERS:                P004.027.COT 194 001 A1.01 (3.3/3.4) / 194 001 A1.02 (4.1/3.9) / 194 001 A1.04 (3.0/3.2) / 194 K/A NUMBERS:                  001 A1.05 (3.6/3.8) / 194 001 A1.10 (2.9/3.9) / 194 001 A1.12 (3.1/4.1) / 194 001 A1.13 (4.3/4.1) / 194 001 A1.14 (2.5/2.9) / 004 000 A4.01 (3.8/3.9) /
APPLICABLE METHOD OF TESTING:
Discussion:                Simulate/walkthrough:              Perform:      X EVALUATION LOCATION:              In-Plant:                          Control Room:
Simulator:                X        Other:
Lab:
Time for Completion:          15      Minutes                  Time Critical:      NO Alternate Path / Faulted:    NO TASK APPLICABILITY:            SRO/RO Additional signatures may be added as needed.
Developed by:
Instructor                                Date Validated by:
Validation Instructor                            Date (See JPM Validation Checklist, Attachment 1)
Approved by:
Training Supervisor                              Date Retention: Life of policy + 10yrs.                                            Disposition: Reviewer and Approver Retain in: Training Program File Page 65 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Retention: Life of policy + 10yrs.                Disposition: Reviewer and Approver Retain in: Training Program File Page 66 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM Number: P004.027b.COT JPM
 
==Title:==
MANUALLY MAKEUP TO THE VCT/RWST Examinee:                                              Evaluator:
Job
 
==Title:==
Date:
Start Time                                          Finish Time PERFORMANCE RESULTS:                              SAT:                  UNSAT:
Delete this table if not required X  Procedure adequately addresses task elements.
Enter Identifier here: OP 4B, Reactor Coolant Pump Operation, Rev. 44 Other document adequately describes necessary task elements.
Enter Identifier here:
Task elements described as attached.
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Page 67 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.
After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.
You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.
For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
* You are the Operator at the Controls for Unit 1.
* Unit 1 is in Mode 3, Hot Standby.
* Reactor Coolant Pump, 1P-1A has been secured for breaker inspection.
* The inspection has since been completed and permission has been granted to restart 1P-1A.
* OP 4B, Reactor Coolant Pump Operations, has been completed up to step 5.0.
* Charging and letdown flow have been balanced.
* No CVCS demineralizers are currently in service.
* All appropriate precautions, limitations, and prerequisites have been met.
* The BOP operator is available to respond to any alarms unrelated to the task.
INITIATING CUES (IF APPLICABLE):
* The DOS directs you to start 1P-1A per OP 4B, Reactor Coolant Pump Operations, Section 5.1.
Page 68 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM PERFORMANCE INFORMATION Required Materials:        OP 4B, Reactor Coolant Pump Operation.
General
 
==References:==
None.
Task Standards:            The Examinee successfully starts Reactor Coolant Pump, 1P-1A.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1          Check that starting duty limits will not be exceeded.
Critical N (SEQ-1)
Standard:                      The Examinee checks that the starting duty limits of P&L 3.6 will not be exceeded.
Evaluator Cue:                If asked, 1P-1A was last run 72 hours ago.
Performance:                  SATISFACTORY          UNSATISFACTORY Comments:
Page 69 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 2        Start RCP Oil Lift Pump for RCP to be started.
Critical Y (SEQ-1)
Standard:                  The Examinee places the control switch for the 1P-1A RCP Oil Lift Pump, 1P-74A to the Start position (spring return to Auto).
Evaluator Note:            Evaluator should make note of the time the lift oil pump was started to ensure a minimum of two minutes elapses before pump start.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 3        Check that amber P-1A/B RCP Lift Pressure light illuminates.
Critical N (SEQ-1)
Standard:                  The Examinee checks that the amber P-1A/B Lift Pressure light is illuminated.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 4        Check No. 1 seal leakoff flow within the normal operating range of Figure 1.
Critical N (SEQ-1)
Standard:                  The Examinee checks that the No. 1 seal leakoff flow and determines that it is within the normal operating range of Figure 1.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Page 70 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 5        IF RCP seal injection flow and charging/letdown flow have NOT been balanced, Critical N (SEQ-1)        THEN balance seal injection and charging/letdown flow.
Standard:                  The Examinee marksstep 5.1.5 N/A and proceeds to step 5.1.6.
Evaluator Cue:            If necessary, inform Examinee that seal injection and charging/letdown were balanced in the Initial Conditions.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 6        Adjust Charging Pump(s) speed and letdown as necessary to maintain letdown Critical N (SEQ-1)        flow at 35 to 40 gpm.
Standard:                  The Examinee adjusts charging pump(s) speed and letdown as necessary to maintain letdown flow at 35 to 40 gpm.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Page 71 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 7        IF necessary to preclude excessive flow through demineralizers, THEN bypass Critical N (SEQ-1)        affected demineralizers.
Standard:                  Examinee marks step 5.1.7 N/A and proceeds to Step 5.1.8.
Evaluator Cue:            If necessary, inform Examinee that no demineralizers are in service as part of the Initial Conditions.
Performance:              SATISFACTORY              UNSATISFACTORY Comments:
Performance Step: 8        AFTER RCP Oil Lift Pump has run a minimum of two minutes, THEN start RCP Critical Y (SEQ-2)        AND record time.
Time: __________
Standard:                  After verifying the RCP Lift Oil Pump has been running for at least two minutes:
* The Examinee places the control switch for Reactor Coolant Pump, 1P-1A to the Start position (spring return to center) and
* Records the time.
Evaluator Note:            Waiting the two minutes and recording the start time are NOT critical.
Performance:              SATISFACTORY              UNSATISFACTORY Comments:
Page 72 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 9        Check the following:
Critical N (SEQ-3)
* RCP running current normal
                                              - Less than 820 amps with RCS cold
                                              - Less than 620 amps for normal RCS operating temperature
                                              - Nominally less than 760 amps for anticipated plant conditions
* Labyrinth seal delta-pressure greater than 15 inches
* No. 1 seal delta-pressure greater than 200 psid
* Seal water inlet/Bearing temp less than 150°F
* Seal water outlet temp less than 170°F
* RCP motor bearing temps (upper and lower) less than 90°C
* VCT pressure greater than 15 psig
* RCS pressure has stabilized
* CC Return temps (TI-612/608) less than 120°F
* Digital Metal Impact Monitoring System (DMIMS) - no alarms Standard:                  The Examinee checks RCP conditions and determines they are within the normal limits indicated above.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 10      AFTER RCP has run at speed a minimum of one minute, THEN stop RCP Oil Lift Critical N (SEQ-3)        Pump.
Standard:                  The Examinee places the control switch for the 1P-1A RCP Oil Lit Pump, 1P-74A to the Stop position (spring return to Auto) after 1P-1A has run for a minimum of one minute.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Page 73 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 11        Check that RCP 1A/B (2A/B) Loss of Power bistable is OFF (Reactor Critical N (SEQ-3)          Protection/Safeguards status panel).
Standard:                  The Examinee checks that the RCP 1A/B (2A/B) Loss of Power bistable is off on the Reactor Protection/Safeguards status panel.
Evaluator Note:            The last two steps of the procedure section (adjust RCS pressure and restore demins) are not applicable due to given plant conditions.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 12        Inform DOS of plant status.
Critical N (SEQ-3)
Standard:                  DOS is informed that Reactor Coolant Pump 1P-1A has been started and is operating normally.
Evaluator Cue:              The DOS acknowledges your report.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Terminating Cues:      The JPM is complete.
Stop Time:
Page 74 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
SIMULATOR SET UP: (Modify table as necessary)
Simulator Setup Instructions:
Initial Setup:
* Load an IC where conditions support HOT STANDBY on Unit 1
* Start the simulation.
* Manually trip the Unit 1 reactor by depressing both reactor trip breakers on either 1C04 or C01.
* Place the control switch for Reactor Coolant Pump, 1P-1A to the Stop position.
* Freeze the simulator.
* Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
* Make any necessary adjustments or corrections.
* Update documentation if required.
* Save to an IC for multiple use.
Multiple Use:
* Load the saved IC for this JPM.
* Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
* Make any necessary adjustments or corrections.
* Update documentation if required.
* Resave if required.
Retention: Life of policy + 10yrs.                                      Disposition: Reviewer and Approver Retain in: Training Program File Page 75 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
TURNOVER SHEET INITIAL CONDITIONS:
* You are the Operator at the Controls for Unit 1.
* Unit 1 is in Mode 3, Hot Standby.
* Reactor Coolant Pump, 1P-1A has been secured for breaker inspection.
* The inspection has since been completed and permission has been granted to restart 1P-1A.
* OP 4B, Reactor Coolant Pump Operations, has been completed up to step 5.0.
* Charging and letdown flow have been balanced.
* No CVCS demineralizers are currently in service.
* All appropriate precautions, limitations, and prerequisites have been met.
* The BOP operator is available to respond to any alarms unrelated to the task.
INITIATING CUES (IF APPLICABLE):
* The DOS directs you to start 1P-1A per OP 4B, Reactor Coolant Pump Operations, Section 5.1.
Retention: Life of policy + 10yrs.                                          Disposition: Reviewer and Approver Retain in: Training Program File Page 76 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS                                                                YES      NO      N/A
: 66. Are all items on the signature page filled in correctly?
: 67. Has the JPM been reviewed and validated by SMEs?
: 68. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 69. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 70. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 71. Has the completion time been established based on validation data or incumbent experience?
: 72. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 73. Is the Licensee level appropriate for the task being evaluated if required?
: 74. Is the K/A appropriate to the task and to the licensee level if required?
: 75. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
: 76. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 77. Are all references identified, current, accurate, and available to the trainee?
: 78. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Retention: Life of policy + 10yrs.                                          Disposition: Reviewer and Approver Retain in: Training Program File Page 77 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JOB PERFORMANCE MEASURE (JPM)
SITE:                        PBNP TASK TITLE:                  MANUALLY MAKEUP TO THE VCT/RWST JPM NUMBER:                  P004.027b.COT                    REV.      0 RELATED PRA                  None INFORMATION:
TASK NUMBERS:                P004.027.COT 064.A4.06 (3.9/3.9)194 001 A1.01 (3.3/3.4) / 194 001 A1.02 (4.1/3.9) / 194 001 A1.04 (3.0/3.2) / 194 001 A1.05 (3.6/3.8) / 194 001 A1.10 (2.9/3.9) / 194 001 A1.12 K/A NUMBERS:
(3.1/4.1) / 194 001 A1.13 (4.3/4.1) / 194 001 A1.14 (2.5/2.9) / 004 000 A4.01 (3.8/3.9) /
APPLICABLE METHOD OF TESTING:
Discussion:                Simulate/walkthrough:              Perform:    X EVALUATION LOCATION:              In-Plant:                            Control Room:
Simulator:                X        Other:
Lab:
Time for Completion:          15      Minutes                  Time Critical:      NO Alternate Path / Faulted:    YES TASK APPLICABILITY:            SRO/RO Additional signatures may be added as needed.
Developed by:
Instructor                                Date Validated by:
Validation Instructor                            Date (See JPM Validation Checklist, Attachment 1)
Approved by:
Training Supervisor                            Date Retention: Life of policy + 10yrs.                                            Disposition: Reviewer and Approver Retain in: Training Program File Page 78 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Retention: Life of policy + 10yrs.                Disposition: Reviewer and Approver Retain in: Training Program File Page 79 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM Number: P004.027b.COT JPM
 
==Title:==
MANUALLY MAKEUP TO THE VCT/RWST Examinee:                                              Evaluator:
Job
 
==Title:==
Date:
Start Time                                            Finish Time PERFORMANCE RESULTS:                              SAT:                  UNSAT:
Delete this table if not required X  Procedure adequately addresses task elements.
AOP 19A Unit 1, Train A Safeguards Bus Enter Identifier here:
Restoration, Rev. 7 Other document adequately describes necessary task elements.
Enter Identifier here:
Task elements described as attached.
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Page 80 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.
After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.
You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.
For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
* You are the third license.
* Unit 1 is in Mode 3, Hot Standby.
* 4160 Volt AC Bus 1A-05 has lost power.
INITIATING CUES (IF APPLICABLE):
* The DOS directs you to restore power to 4160 Volt Bus 1A-05 in accordance with AOP 19A Unit 1, Train A Safeguards Bus Restoration, beginning at Step 6.
Page 81 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM PERFORMANCE INFORMATION Required Materials:        AOP 19A Unit 1, Train A Safeguards Bus Restoration.
General
 
==References:==
None Task Standards:            The Examinee restores power to safeguards bus 1A-05 in accordance with AOP 19A Unit 1, Train A Safeguards Bus Restoration.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1          Check annunciator UNIT 1 4.16 kV BUS LOCKOUT - CLEAR Critical N (SEQ-1)
* C02 D 3-4 Standard:                    The Examinee checks annunciator Unit 1 4.16 kV BUS LOCKOUT (C02 D 3-4) and determines it is clear (not lit).
Performance:                  SATISFACTORY            UNSATISFACTORY Comments:
Page 82 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 2        Check G-01 to bus 1A-05 breaker in AUTO Critical N (SEQ-1)
* 1A52-60 Standard:                  The Examinee checks breaker 1A62-60 and determines it is in the Auto position.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Performance Step: 3        Check G RUNNING Critical N (SEQ-1)
Standard:                  The Examinee checks G-01 and determines it is NOT running, transitions to RNO column. Indications of Diesel NOT running are listed below:
* The amber G-01 Diesel Generator Started light is NOT lit.
* The Green G-01 Diesel Generator Ready For Load Light is NOT lit.
* Diesel Generator G01 Voltmeter indicates zero.
* Diesel Generator Frequency Meter indicates zero.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Performance Step: 4        Ensure G-01 diesel mode selector switch is in Auto.
Critical N (SEQ-1)
Standard:                  The Examinee checks G-01 Diesel Mode Selector Switch and determines it is in Auto.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Page 83 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 5        Turn G-01 Diesel Generator Control Switch to START.
Critical Y (SEQ-1)
Standard:                  The Examinee turns the G-01 Diesel Generator Control Switch to START, observes G-01 start. Available indications of G-01 starting are:
* The amber G-01 Diesel Generator Started light is lit.
* The Green G-01 Diesel Generator Ready For Load Light is lit.
* Diesel Generator G01 Voltmeter indicates approximately 4160 volts.
* Diesel Generator Frequency Meter indicates 60 Hz.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 6        Ensure 1A-03 to 1A-05 bus tie breaker - OPEN Critical N (SEQ-1)
* 1A52-57 Standard:                  The Examinee checks the 1A-03 to 1A-05 bus tie breaker, 1A52-57, and determines it is open (green light is lit).
Evaluator Note:            The white trip light is also lit. Examinee may place switch in the open position in order to clear white light.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Page 84 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 7        Check G-01 to bus 1A-05 breaker - CLOSED Critical N (SEQ-1)
* 1A52-60 Standard:                  The Examinee checks breaker 1A52-60 and determines it is NOT closed (green light is lit), transitions to RNO column.
Performance:              SATISFACTORY                UNSATISFACTORY Comments:
Performance Step: 8        Try to auto-close breaker 1A52-60 by placing control switch to trip position and Critical N (SEQ-1)        then release.
Standard:                  Examinee places the control switch for breaker 1A52-60 to the trip position and releases, and determines that 1A52-60 did not auto-close.
Performance:              SATISFACTORY                UNSATISFACTORY Comments:
Page 85 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 9        IF breaker will NOT auto-close, THEN perform the following:
Critical Y (SEQ-2)
: a. Place G-01 mode selector switch to EXERCISE.
: b. Turn on synch switch for G-01 to bus 1A-05 breaker.
: c. Manually close G-01 to bus 1A-05 breaker 1A52-60 Standard:                  The Examinee:
* Places the G-01 mode selector switch to the EXERCISE position,
* Inserts the synchronizing switch handle into the G-01 diesel generator to bus 1A-05 synchroscope switch,
* Places the control switch for the G-01 diesel generator to bus 1A-05 synchroscope to the On position, and
* Places the control switch for the G-01 diesel generator to bus 1A-05 breaker, 1A62-60 to the Close position.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Performance Step: 10      Check Bus 1A-05 Energized.
Critical N (SEQ-3)
Standard:                  The Examinee checks bus 1A-05 voltmeter and determines the bus is energized.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Page 86 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 11        The DOS is informed of plant status.
Critical N (SEQ-4)
Standard:                  Examinee informs DOS that G-01 EDG was manually started and manually synchronized to Bus 1A-05 per AOP-19A.
Evaluator Cue:              The DOS acknowledges your report.
Performance:                SATISFACTORY        UNSATISFACTORY Comments:
Terminating Cues:      The JPM is complete.
Stop Time:
Page 87 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
SIMULATOR SET UP: (Modify table as necessary)
Initial Setup:
* Load an IC where conditions support Unit 1 at 100% steady-state conditions.
* Load the preloads.
* Start the simulation.
* Stabilize the plant and then freeze the simulator.
* Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
* Make any necessary adjustments or corrections.
* Update documentation if required.
* Save to an IC for multiple use.
Multiple Use:
* Load the saved IC for this JPM.
* Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
* Make any necessary adjustments or corrections.
* Update documentation if required.
* Resave if required.
SIMULATOR INFORMATION:
Initiation    Action or  Action Tagname  Malf. Ramp Time  Delay Time        Trigger          Verification Cue        Component                  Value                                                Performed Description                                              Event        Oper. Ready    Inserted Criteria      Init. #
Preload        EDG      MAL1DSG007A      -      -          -          -            -
G01(G02 FAILURE TO AUTO START Preload      1-A5260    BKR1DSG001      4      -          -          -            -
DIESEL GEN NO. GO1 TO BUS 1-A05 (FAIL AUTO CLOSE)
Preload      1-A5257    BKR1EPS012      1      -          15          -            -
4160V BUS TIE 1-A03 TO 1-A05 (TRIP0 Retention: Life of policy + 10yrs.                                              Disposition: Reviewer and Approver Retain in: Training Program File Page 88 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
TURNOVER SHEET INITIAL CONDITIONS:
* You are the third license.
* Unit 1 is in Mode 3, Hot Standby.
* 4160 Volt AC Bus 1A-05 has lost power.
INITIATING CUES (IF APPLICABLE):
* The DOS directs you to restore power to 4160 Volt Bus 1A-05 in accordance with AOP 19A Unit 1, Train A Safeguards Bus Restoration, beginning at Step 6.
Retention: Life of policy + 10yrs.                                      Disposition: Reviewer and Approver Retain in: Training Program File Page 89 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS                                                                YES      NO      N/A
: 79. Are all items on the signature page filled in correctly?
: 80. Has the JPM been reviewed and validated by SMEs?
: 81. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 82. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 83. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 84. Has the completion time been established based on validation data or incumbent experience?
: 85. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 86. Is the Licensee level appropriate for the task being evaluated if required?
: 87. Is the K/A appropriate to the task and to the licensee level if required?
: 88. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
: 89. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
: 90. Are all references identified, current, accurate, and available to the trainee?
: 91. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Retention: Life of policy + 10yrs.                                          Disposition: Reviewer and Approver Retain in: Training Program File Page 90 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JOB PERFORMANCE MEASURE (JPM)
SITE:                        PBNP TASK TITLE:                  MANUALLY MAKEUP TO THE VCT/RWST JPM NUMBER:                  P004.027B.COT                    REV.      0 RELATED PRA                  None INFORMATION:
TASK NUMBERS:                P004.027.COT 015.A4.03 (3.8/3.9)194 001 A1.01 (3.3/3.4) / 194 001 A1.02 (4.1/3.9) / 194 001 A1.04 (3.0/3.2) / 194 001 A1.05 (3.6/3.8) / 194 001 A1.10 (2.9/3.9) / 194 001 A1.12 K/A NUMBERS:
(3.1/4.1) / 194 001 A1.13 (4.3/4.1) / 194 001 A1.14 (2.5/2.9) / 004 000 A4.01 (3.8/3.9) /
APPLICABLE METHOD OF TESTING:
Discussion:                Simulate/walkthrough:              Perform:    X EVALUATION LOCATION:              In-Plant:                            Control Room:
Simulator:                X        Other:
Lab:
Time for Completion:          15      Minutes                  Time Critical:      NO Alternate Path / Faulted:      NO TASK APPLICABILITY:            SRO/RO Additional signatures may be added as needed.
Developed by:
Instructor                                Date Validated by:
Validation Instructor                            Date (See JPM Validation Checklist, Attachment 1)
Approved by:
Training Supervisor                            Date Retention: Life of policy + 10yrs.                                            Disposition: Reviewer and Approver Retain in: Training Program File Page 91 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Retention: Life of policy + 10yrs.                Disposition: Reviewer and Approver Retain in: Training Program File Page 92 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM Number: P004.027b.COT JPM
 
==Title:==
MANUALLY MAKEUP TO THE VCT/RWST Examinee:                                              Evaluator:
Job
 
==Title:==
Date:
Start Time                                            Finish Time PERFORMANCE RESULTS:                              SAT:                  UNSAT:
Delete this table if not required X  Procedure adequately addresses task elements.
0-SOP-IC-001, Routine Maintenance Procedure Enter Identifier here: Removal of Safeguards or Protection Sensor From Service, Rev. 4 Other document adequately describes necessary task elements.
Enter Identifier here:
Task elements described as attached.
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Page 93 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.
After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.
You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.
For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
* You are the fourth license.
* Unit 1 is operating at 100% steady-state conditions.
* Power Range Nuclear Instrument, N-41, has been out of service for the last eight hours to support troubleshooting and repair of a suspected summing and level amp failure.
* I&C has completed repairs, re-installed the Instrument Power fuses, and requested Operations to return Power Range Nuclear Instrument, N-41, back to service.
* Steps 5.2.1, 5.2.2 and 5.2.3 of 0-SOP-IC-001, Routine Maintenance Procedure Removal of Safeguards or Protection Sensor From Service, have been completed.
* Step 5.2.4 of 0-SOP-IC-001 has just been reached.
INITIATING CUES (IF APPLICABLE):
* The DOS directs you to complete Attachment A of 0-SOP-IC-001 for returning Power Range Nuclear Instrument, N-41, to service. Previously completed paperwork that removed the channel from service is provided.
Page 94 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM PERFORMANCE INFORMATION Required Materials:        0-SOP-IC-001, Routine Maintenance Procedure Removal of Safeguards or Protection Sensor From Service.
General
 
==References:==
None.
Task Standards:            The Examinee returns Power Range Nuclear Instrument, N-41 to an operable status.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1          Verify instrument power fuses are installed.
Critical N (SEQ-1)
Standard:                    The Examinee visually observes that the Instrument Power fuses are installed for N-41.
Performance:                  SATISFACTORY          UNSATISFACTORY Comments:
Page 95 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 2        In the RED protection channel, place the following bistable trip switches in Critical Y (SEQ-1)        NORMAL: (C-111)
* Overtemperature Trip
* Overtemperature Rod Stop Standard:                  The Examinee places the bistable trip switches for Overtemperature Trip and Overtemperature Rod Stop to the NORMAL position in C-111.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 3        Perform Section 3.0 of Attachment B. IF Section 2.0 was NOT completed, THEN Critical N (SEQ-1)        NA steps NOT required in Section 3.0 on Attachment B. Remove all operator aids placed per Attachment B Section 1.0 or 2.0.
Standard:
* The Examinee determines from previously completed paperwork that only the Operator Aid on 1C03 needs to be removed per step 3.5 of Attachment B.
All other steps are N/A.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Page 96 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 4        Place the power mismatch bypass, rod stop bypass, and comparator Critical Y (SEQ-1)        channel defeat switches in NORMAL. (1C-130)
Standard:                  The Examinee places the following switches in the NORMAL (Operate) position on panel C-130:
* power mismatch (Operate position)
* rod-stop bypass (Operate position)
* comparator channel defeat (Normal position)
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Performance Step: 5        Ensure the dropped rod alarm indicator is NOT illuminated and return the Critical Y (SEQ-1)        dropped mode switch to NORMAL. (1C-133)
Standard:
* The Examinee ensures the dropped rod alarm indicator is not lit and
* Places the dropped rod mode switch to the NORMAL position (1C-133).
Evaluator Note:            Only the switch manipulation is critical.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Page 97 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 6        Place the rod control selector switch in AUTO, unless directed otherwise Critical N (SEQ-6)          by the DSS.
Standard:                  The Examinee places the Rod Control Selector Switch to the AUTO position.
Evaluator Cue:              Inform Examinee that the DSS directs that rod control be returned to AUTO. After the Rod Control Selector Switch is in AUTO, inform the Examinee that another CO will return the PPCS point to service. The JPM may be terminated.
Performance:                SATISFACTORY          UNSATISFACTORY Comments:
Terminating Cues:      The JPM may be terminated when the Rod Control Selector Switch is returned to AUTO.
Stop Time:
Page 98 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
SIMULATOR SET UP: (Modify table as necessary)
Initial Setup:
* Load an IC where conditions support Unit 1 at 100% steady-state conditions
* Start the simulation.
* Remove power range nuclear instrument, N-41 from service in accordance with 0-SOP-IC-001, Routine Maintenance Procedure Removal of Safeguards or Protection Sensor From Service with the exception of removing the instrument power fuses.
* Place appropriate Operator Aid on C-03.
* Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
* Make any necessary adjustments or corrections.
* Update documentation if required.
* Save to an IC for multiple use.
Multiple Use:
* Load the saved IC for this JPM.
* Place appropriate Operator Aid on C-03.
* Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
* Make any necessary adjustments or corrections.
* Update documentation if required.
* Resave if required.
Retention: Life of policy + 10yrs.                                      Disposition: Reviewer and Approver Retain in: Training Program File Page 99 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
TURNOVER SHEET INITIAL CONDITIONS:
* You are the fourth license.
* Unit 1 is operating at 100% steady-state conditions.
* Power Range Nuclear Instrument, N-41, has been out of service for the last eight hours to support troubleshooting and repair of a suspected summing and level amp failure.
* I&C has completed repairs, re-installed the Instrument Power fuses, and requested Operations to return Power Range Nuclear Instrument, N-41, back to service.
* Steps 5.2.1, 5.2.2 and 5.2.3 of 0-SOP-IC-001, Routine Maintenance Procedure Removal of Safeguards or Protection Sensor From Service, have been completed.
* Step 5.2.4 of 0-SOP-IC-001 has just been reached.
INITIATING CUES (IF APPLICABLE):
* The DOS directs you to complete Attachment A of 0-SOP-IC-001 for returning Power Range Nuclear Instrument, N-41, to service. Previously completed paperwork that removed the channel from service is provided.
Retention: Life of policy + 10yrs.                                        Disposition: Reviewer and Approver Retain in: Training Program File Page 100 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS                                                                YES      NO      N/A
: 92. Are all items on the signature page filled in correctly?
: 93. Has the JPM been reviewed and validated by SMEs?
: 94. Can the required conditions for the JPM be appropriately established in the simulator if required?
: 95. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
: 96. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
: 97. Has the completion time been established based on validation data or incumbent experience?
: 98. If the task is time critical, is the time critical portion based upon actual task performance requirements?
: 99. Is the Licensee level appropriate for the task being evaluated if required?
100. Is the K/A appropriate to the task and to the licensee level if required?
101. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
102. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
103. Are all references identified, current, accurate, and available to the trainee?
104. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Retention: Life of policy + 10yrs.                                          Disposition: Reviewer and Approver Retain in: Training Program File Page 101 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JOB PERFORMANCE MEASURE (JPM)
SITE:                        PBNP TASK TITLE:                  MANUALLY MAKEUP TO THE VCT/RWST JPM NUMBER:                  P004.027b.COT                    REV.      0 RELATED PRA                  None INFORMATION:
TASK NUMBERS:                P004.027.COT 062.K4.07 (2.7/3.1)194 001 A1.01 (3.3/3.4) / 194 001 A1.02 (4.1/3.9) / 194 001 A1.04 (3.0/3.2) / 194 001 A1.05 (3.6/3.8) / 194 001 A1.10 (2.9/3.9) / 194 001 A1.12 K/A NUMBERS:
(3.1/4.1) / 194 001 A1.13 (4.3/4.1) / 194 001 A1.14 (2.5/2.9) / 004 000 A4.01 (3.8/3.9) /
APPLICABLE METHOD OF TESTING:
Discussion:                Simulate/walkthrough:        X      Perform:
EVALUATION LOCATION:              In-Plant:                  X        Control Room:
Simulator:                          Other:
Lab:
Time for Completion:          15      Minutes                  Time Critical:      NO Alternate Path / Faulted:      NO TASK APPLICABILITY:            SRO/RO Additional signatures may be added as needed.
Developed by:
Instructor                                Date Validated by:
Validation Instructor                          Date (See JPM Validation Checklist, Attachment 1)
Approved by:
Training Supervisor                            Date Retention: Life of policy + 10yrs.                                            Disposition: Reviewer and Approver Retain in: Training Program File Page 102 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Retention: Life of policy + 10yrs.                Disposition: Reviewer and Approver Retain in: Training Program File Page 103 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM Number: P004.027b.COT JPM
 
==Title:==
MANUALLY MAKEUP TO THE VCT/RWST Examinee:                                              Evaluator:
Job
 
==Title:==
Date:
Start Time                                            Finish Time PERFORMANCE RESULTS:                              SAT:                  UNSAT:
Delete this table if not required X  Procedure adequately addresses task elements.
OI 112, Aligning Equipment To Appendix R Power Enter Identifier here:
Supply, Rev. 2 Other document adequately describes necessary task elements.
Enter Identifier here:
Task elements described as attached.
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Page 104 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.
After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.
You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.
For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
* You are an extra Auxiliary Operator.
* Unit 1 is in cold shutdown.
* Unit 2 is at 100% steady-state conditions.
* A number of equipment malfunctions necessitates aligning and starting the Residual Heat Removal Pump, 1P-10A, from its Appendix R power supply.
INITIATING CUES (IF APPLICABLE):
* The DOS directs you to align and start 1P-10A from its Appendix R power supply in accordance with OI 112, Aligning Equipment To Appendix R Power Supply, Section 5.1.
Page 105 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM PERFORMANCE INFORMATION Required Materials:        OI 112, Aligning Equipment To Appendix R Power Supply.
General
 
==References:==
None.
Task Standards:            The Examinee aligns and starts 1P-10A in accordance with OI 112.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1            Verify 1P-10A control switch is in pullout on 1C03.
Critical N (SEQ-1)
Standard:                      The Examinee verifies that the control switch for the Residual Heat Removal Pump, 1P-10A is in pullout on 1C-03 by either:
* Going to the Control Room and verifying or
* Contacting the Unit 1 Control Operator.
Evaluator Cue:                After going to the Control Room or contacting the Unit 1 CO, inform the Examinee that the control switch for 1P-10A is in the pullout position.
Performance:                  SATISFACTORY                  UNSATISFACTORY Comments:
Page 106 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 2        Verify the control switch for breaker B52-55B, 1P-10A/B alternate power supply, Critical N (SEQ-1)        is in pullout on C-45.
Standard:                  The Examinee verifies that the control switch for breaker B52-55B, 1P-10A/B alternate power supply is in pullout on C-45.
Evaluator Cue:            The control switch for 1P-10A/B alternate power supply breaker, B52-55B is in the pullout position.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 3        Align transfer switch 1B312A-B855B, 1P-10A power supply, to B08. (located in Critical Y (SEQ-1)        P-5, P-9 area).
Standard:                  The Examinee aligns the 1P-10A power supply transfer switch, 1B312A-B855B to the B-08 position.
Evaluator Cue:
* The 1P-10A power supply transfer switch, 1B312A-B855B is aligned to the B-08 position.
* The Control Room indicates that the ALTERNATE SHUTDOWN SYSTEM ENABLED alarm has been received.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Page 107 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 4        Align transfer switch B855B, 1P-10A/B alternate power supply to the 1P-10A Critical Y (SEQ-2)        position. (located in U-2 façade)
Standard:                  The Examinee aligns the 1P-10A/B alternate power supply transfer switch, B855B to the 1P-10A position.
Evaluator Cue:            The 1P-10A/B alternate power supply transfer switch, B855B is in the 1P-10A position.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 5        At C-045, communicate with Control, and with the U1 Control Operators Critical Y (SEQ-3)        concurrence, CLOSE breaker B52-55B, 1P-10A/B alternate power supply.
Standard:
* The Examinee obtains concurrence from the Unit 1 Control Operator prior to closing breaker B52-55B and
* Places the control switch for the 1P-10A/B alternate power supply breaker, B52-55B to the Close position (spring-return-to-auto).
Evaluator Cue:
* When the Unit 1 CO is contacted, inform Examinee that breaker B52-55B may be closed.
* After correctly manipulating the control switch for B52-55B, inform Examinee that the green light is off and the red light is on for breaker B52-55B. Also, the Unit 1 CO reports that discharge pressure and flow is indicated for 1P-10A RHR Pump.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Page 108 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 6        Inform the DOS of plant status.
Critical N (SEQ-4)
Standard:                  Examinee informs the DOS that 1P-10A RHR Pump has been aligned to its Appendix R power supply and is currently running.
Evaluator Cue:              The DOS acknowledges your report. If requested, inform Examinee that the Unit 1 CO will hang the temporary information tag.
Performance:                SATISFACTORY          UNSATISFACTORY Comments:
Terminating Cues:      The JPM is complete.
Stop Time:
Page 109 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
TURNOVER SHEET INITIAL CONDITIONS:
* You are an extra Auxiliary Operator.
* Unit 1 is in cold shutdown.
* Unit 2 is at 100% steady-state conditions.
* A number of equipment malfunctions necessitates aligning and starting the Residual Heat Removal Pump, 1P-10A, from its Appendix R power supply.
INITIATING CUES (IF APPLICABLE):
* The DOS directs you to align and start 1P-10A from its Appendix R power supply in accordance with OI 112, Aligning Equipment To Appendix R Power Supply, Section 5.1.
Retention: Life of policy + 10yrs.                                        Disposition: Reviewer and Approver Retain in: Training Program File Page 110 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS                                                              YES      NO      N/A 105. Are all items on the signature page filled in correctly?
106. Has the JPM been reviewed and validated by SMEs?
107. Can the required conditions for the JPM be appropriately established in the simulator if required?
108. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
109. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
110. Has the completion time been established based on validation data or incumbent experience?
111. If the task is time critical, is the time critical portion based upon actual task performance requirements?
112. Is the Licensee level appropriate for the task being evaluated if required?
113. Is the K/A appropriate to the task and to the licensee level if required?
114. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
115. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
116. Are all references identified, current, accurate, and available to the trainee?
117. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Retention: Life of policy + 10yrs.                                          Disposition: Reviewer and Approver Retain in: Training Program File Page 111 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JOB PERFORMANCE MEASURE (JPM)
SITE:                        PBNP TASK TITLE:                  MANUALLY MAKEUP TO THE VCT/RWST JPM NUMBER:                  P004.027B.COT                    REV.      0 RELATED PRA                  None INFORMATION:
TASK NUMBERS:                P004.027.COT 011.A2.02 (3.2/3.2)194 001 A1.01 (3.3/3.4) / 194 001 A1.02 (4.1/3.9) / 194 001 A1.04 (3.0/3.2) / 194 001 A1.05 (3.6/3.8) / 194 001 A1.10 (2.9/3.9) / 194 001 A1.12 K/A NUMBERS:
(3.1/4.1) / 194 001 A1.13 (4.3/4.1) / 194 001 A1.14 (2.5/2.9) / 004 000 A4.01 (3.8/3.9) /
APPLICABLE METHOD OF TESTING:
Discussion:                Simulate/walkthrough:              Perform:    X EVALUATION LOCATION:              In-Plant:                  X        Control Room:
Simulator:                X        Other:
Lab:
Time for Completion:          15      Minutes                  Time Critical:      NO Alternate Path / Faulted:      NO TASK APPLICABILITY:            SRO/RO Additional signatures may be added as needed.
Developed by:
Instructor                                Date Validated by:
Validation Instructor                            Date (See JPM Validation Checklist, Attachment 1)
Approved by:
Training Supervisor                            Date Retention: Life of policy + 10yrs.                                            Disposition: Reviewer and Approver Retain in: Training Program File Page 112 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Retention: Life of policy + 10yrs.                Disposition: Reviewer and Approver Retain in: Training Program File Page 113 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
P004.010.AOT            LOCALLY OPERATE A CHARGING PUMP Rev. 1 JPM Number: P004.027b.COT JPM
 
==Title:==
MANUALLY MAKEUP TO THE VCT/RWST Examinee:                                                Evaluator:
Job
 
==Title:==
Date:
Start Time                                              Finish Time PERFORMANCE RESULTS:                                SAT:                  UNSAT:
Delete this table if not required X    Procedure adequately addresses task elements.
Enter Identifier here:  OI 15, Locally Operate A Charging Pump, Rev. 9 Other document adequately describes necessary task elements.
Enter Identifier here:
Task elements described as attached.
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
NOTE: This JPM is written to be performed using the available simulator equipment on the 6th floor of the North Service Building. It is considered an In-plant JPM for exam purposes. Examiner may request that the actual location of equipment in the plant be identified.
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Page 114 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
P004.010.AOT            LOCALLY OPERATE A CHARGING PUMP Rev. 1 JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.
After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.
You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.
For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
* You are the PAB Auxiliary Operator.
* Unit 1 is in Mode 3, Hot Standby.
* Letdown has been secured due to a suspected leak on the Letdown Line.
* While attempting to reduce charging to minimum, 1P-2B Charging Pump would not respond from the Control Room.
* 1P-2B is currently the only Charging Pump running and Charging Line flow is approximately 30 gpm.
INITIATING CUES (IF APPLICABLE):
* The DOS directs you to take local control of 1P-2B Charging Pump in accordance with OI 15, Charging Pump Local Control Station Operation, and reduce charging to minimum per Section 5.1. The Unit 1 CO will close 1HC-142 as charging is lowered.
NOTE: This activity shall be performed using available simulator equipment located on the 6th floor of the North Service Building.
Page 115 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
P004.010.AOT            LOCALLY OPERATE A CHARGING PUMP Rev. 1 JPM PERFORMANCE INFORMATION Required Materials:        OI 15, Charging Pump Local Control Station Operation.
General
 
==References:==
None.
Task Standards:            The Examinee takes local control of Charging Pump 1P-2B and reduces Charging Flow to minimum.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1          Match the local load regulator (red pointer) with the remote load regulator (black Critical N (SEQ-1)            pointer) by adjusting the manual load regulator or by adjusting pump speed with the C-04 controller.
Standard:                    The Examinee matches the local load regulator (red pointer) with the remote load regulator (black pointer) by adjusting the manual load regulator for Charging Pump 1P-2B.
Evaluator Cue:                If Examinee requests that the Control Room manipulate the C-04 controller, inform Examinee that the controller will not respond.
Performance:                  SATISFACTORY            UNSATISFACTORY Comments:
Page 116 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
P004.010.AOT          LOCALLY OPERATE A CHARGING PUMP Rev. 1 Performance Step: 2        Close vent valve (V-1) for the selected pump.
Critical Y (SEQ-1)
Standard:                  The Examinee shuts vent valve (V-1) for Charging Pump 1P-2B by rotating the valve knob clockwise until the valve knob/stem is inserted and there is no further knob movement.
Evaluator Note:            Actual plant location of valves V-1, V-2, and the local load regulators are located on panel 1RK-24, (1P-2A, B, & C Charging Pumps Instrumentation Rack) located just outside the Unit 1 Charging Pump cubicles.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 3        Open valve (V-2) to connect manual (local) load regulator.
Critical Y (SEQ-1)
Standard:                  The Examinee opens valve (V-2) for Charging Pump 1P-2B by rotating the valve knob counter-clockwise until the valve knob/stem is extended and there is no further knob movement.
Performance:                SATISFACTORY            UNSATISFACTORY Comments:
Page 117 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
P004.010.AOT            LOCALLY OPERATE A CHARGING PUMP Rev. 1 Performance Step: 4        Place the transfer switch to LOCAL to de-energize the (V-3) solenoid and Critical Y (SEQ-1)          complete the manual load regulator connection.
Standard:                  The Examinee places the transfer switch for Charging Pump, 1P-2B to LOCAL.
Evaluator Note:            The actual plant location of the 1P-2A & B transfer switches are located inside panel 1N-04, between 1P-2A & B Charging Pumps.
Performance:                SATISFACTORY              UNSATISFACTORY Comments:
Performance Step: 5        Control charging flow as required using the manual load regulator but maintain Critical Y (SEQ-2)          RCP Labyrinth Seal DP on scale (local indication in pipe way 1) and throttle charging flow as necessary.
Standard:                  The Examinee rotates the knob on the manual load regulator counter-clockwise until there is no further movement, reducing Charging Flow to minimum.
Evaluator Note:            Indication of Charging Line Flow is available locally on panel RK-24.
Evaluator Cue:              Inform Examinee that the Unit 1 CO will close 1HC-142 to maintain RCP Labyrinth Seal DP as Charging Flow is lowered.
Performance:                SATISFACTORY              UNSATISFACTORY Comments:
Page 118 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
P004.010.AOT          LOCALLY OPERATE A CHARGING PUMP Rev. 1 Performance Step: 6        Inform the DOS of plant status.
Critical N (SEQ-3)
Standard:                  The Examinee informs Control Room personnel that Charging Pump 1P-2B has been transferred to local control and reduced to minimum.
Evaluator Cue:              The Control Room acknowledges your report.
Performance:                SATISFACTORY          UNSATISFACTORY Comments:
Terminating Cues:      The JPM is complete.
Stop Time:
Page 119 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
TURNOVER SHEET INITIAL CONDITIONS:
* You are the PAB Auxiliary Operator.
* Unit 1 is in Mode 3, Hot Stanby.
* Letdown has been secured due to a suspected leak on the Letdown Line.
* While attempting to reduce charging to minimum, 1P-2B Charging Pump would not respond from the Control Room.
* 1P-2B is currently the only Charging Pump running and Charging Line flow is approximately 30 gpm.
INITIATING CUES (IF APPLICABLE):
* The DOS directs you to take local control of 1P-2B Charging Pump in accordance with OI 15, Charging Pump Local Control Station Operation, and reduce charging to minimum. The Unit 1 CO will close 1HC-142 as charging is lowered.
* NOTE: This activity shall be performed using available simulator equipment located on the 6th floor of the North Service Building.
Retention: Life of policy + 10yrs.                                        Disposition: Reviewer and Approver Retain in: Training Program File Page 120 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
SIMULATOR SET UP: (Modify table as necessary)
Initial Setup:
* Load an IC where conditions support Unit 1 at 100% steady-state conditions.
* Start the simulation.
* Secure Charging Pumps as necessary to ensure only 1P-2B is running.
* Balance Charging/Letdown and ensure Pressurizer level is at program (46%).
* Freeze the simulator.
* Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
* Make any necessary adjustments or corrections.
* Update documentation if required.
* Save to an IC for multiple use.
Multiple Use:
* Load the saved IC for this JPM.
* Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
* Make any necessary adjustments or corrections.
* Update documentation if required.
* Resave if required.
Retention: Life of policy + 10yrs.                                        Disposition: Reviewer and Approver Retain in: Training Program File Page 121 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS                                                              YES      NO      N/A 118. Are all items on the signature page filled in correctly?
119. Has the JPM been reviewed and validated by SMEs?
120. Can the required conditions for the JPM be appropriately established in the simulator if required?
121. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
122. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
123. Has the completion time been established based on validation data or incumbent experience?
124. If the task is time critical, is the time critical portion based upon actual task performance requirements?
125. Is the Licensee level appropriate for the task being evaluated if required?
126. Is the K/A appropriate to the task and to the licensee level if required?
127. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
128. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
129. Are all references identified, current, accurate, and available to the trainee?
130. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Retention: Life of policy + 10yrs.                                          Disposition: Reviewer and Approver Retain in: Training Program File Page 122 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JOB PERFORMANCE MEASURE (JPM)
SITE:                        PBNP TASK TITLE:                  MANUALLY MAKEUP TO THE VCT/RWST JPM NUMBER:                  P004.027b.COT                    REV. 0 RELATED PRA                  None INFORMATION:
TASK NUMBERS:                P004.027.COT K/A NUMBERS:                  033.K1.02 (2.5/2.7)
APPLICABLE METHOD OF TESTING:
Discussion:                Simulate/walkthrough:      X    Perform:
EVALUATION LOCATION:              In-Plant:                X        Control Room:
Simulator:                        Other:
Lab:
Time for Completion:          15    Minutes                  Time Critical:      NO Alternate Path / Faulted:    NO TASK APPLICABILITY:            SRO/RO Additional signatures may be added as needed.
Developed by:                            Michael J. Vana                            06/13/2003 Instructor                                Date Validated by:
Validation Instructor                          Date (See JPM Validation Checklist, Attachment 1)
Approved by:
Training Supervisor                            Date Retention: Life of policy + 10yrs.                                          Disposition: Reviewer and Approver Retain in: Training Program File Page 123 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM Number: P004.027b.COT JPM
 
==Title:==
MANUALLY MAKEUP TO THE VCT/RWST Examinee:                                              Evaluator:
Job
 
==Title:==
Date:
Start Time                                            Finish Time PERFORMANCE RESULTS:                              SAT:                  UNSAT:
Delete this table if not required X  Procedure adequately addresses task elements.
SEP-1 Unit 2, Degraded RHR System Capability, Enter Identifier here:
Rev. 3 Other document adequately describes necessary task elements.
Enter Identifier here:
Task elements described as attached.
COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).
EVALUATORS SIGNATURE:
NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.
Page 124 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.
After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.
You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.
EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.
For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.
INITIAL CONDITIONS:
* You are the PAB Auxiliary Operator.
* Unit 2 is at reduced inventory.
* Both RHR pumps have been secured due to erratic hydraulic operation.
* Refueling Water Circulating Pump, P-33, is tagged out for motor replacement.
* Neither the RWST nor the SFP is on purification.
* The Spent Fuel Pool Cooling system is in operation.
INITIATING CUES (IF APPLICABLE):
* The DOS directs you to align the Spent Fuel Pool Cooling system to reflood the RHR pump suction per SEP-1 Unit 2, Degraded RHR System Capability, Attachment A, RHR Suction Line Reflood.
NOTE: To avoid un-necessary risk, do NOT access any scaffolding. All identification of components and required actions may be done at floor level.
Page 125 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
JPM PERFORMANCE INFORMATION Required Materials:        SEP-1 Unit 2, Degraded RHR System Capability General
 
==References:==
None.
Task Standards:            The Examinee establishes reflood alignment of the Spent Fuel Pool Cooling system to the RHR system.
Start Time:
NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).
NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.
Performance Step: 1            Check RWST Or SFP On Purification Critical Y (SEQ-1)
* FI-636 Standard:                      The Examinee determines from the Initial Conditions or by checking F-6 SFP Filter Outlet Flow Indicator, FI-636 that neither the RWST nor the SFP is on purification.
Evaluator Cue:                If checked, F-6 SFP Filter Outlet Flow Indicator, FI-636 indicates zero.
Performance:                  SATISFACTORY            UNSATISFACTORY Comments:
Page 126 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 2        IF refueling water circulating pump P-33 is secured AND operable, THEN locally Critical Y (SEQ-2)        perform the following:
Standard:                  The Examinee determines from the Initial Conditions that the steps to align P-33 should not be performed since it is not operable, proceeds to step dealing with aligning the Spent Fuel Pool Cooling system.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 3        IF spent fuel pool cooling pump P-12A/B is available, THEN locally perform the Critical Y (SEQ-3)        following:
* Ensure P-12A/B SFP cooling pumps to U6 SFP demineralizer open, SF-27.
Standard:                  The Examinee ensures that valve SF-27 is open by operating the chain to obtain rotation of the valve hand-wheel in the counter-clockwise direction until the valve stem is extended and there is no hand-wheel (chain) movement.
Evaluator Cue:            SF-27 valve stem is extended and there is no further counter-clockwise hand-wheel (chain) movement.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Page 127 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 4        AT PAB 26 elevation outside U6 SFP demineralizer cubicle, shut U6 SFP Critical Y (SEQ-3)        demineralizer inlet valve, SF-804B.
Standard:                  The Examinee shuts valve SF-804B by rotating the valve hand-wheel clockwise until the valve stem is inserted and there is no further hand-wheel movement.
Evaluator Cue:            SF-804B valve stem is inserted and there is no further hand-wheel movement in the clockwise direction.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 5        AT PAB 46 elevation outside waste gas compressor, open U6 SFP demineralizer Critical Y (SEQ-3)        bypass valve, SF-804A.
Standard:                  The Examinee opens valve SF-804A by rotating the valve hand-wheel counter-clockwise until the valve stem is extended and there is no further hand-wheel movement.
Evaluator Cue:            SF-804A valve stem is extended and there is no further hand-wheel movement in the counter-clockwise direction.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Page 128 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 6        Locally Fill RHR Pump Suction Line: At PAB 46 elevation above SFP HXs Critical Y (SEQ-3)        West end, open SFP to RHR valve 2SF-819.
Standard:                  The Examinee opens valve 2SF-819 by rotating the valve hand-wheel in the counter-clockwise direction until the valve stem is extended and there is no hand-wheel movement.
Evaluator Cue:            2SF-819 valve stem is fully extended and there is no further counter-clockwise hand-wheel movement.
If flow indicator FI-636 is checked ANY TIME after opening 2SF-819, it should be cued that FI-636 reads 30 gpm.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Performance Step: 7        At PAB 46 elevation above HX-13B East end, shut F-6 SFP filter return to SFP, Critical N (SEQ-3)        SF-812A.
Standard:                  The Examinee shuts valve SF-812A by operating the chain to obtain rotation of the valve hand-wheel in a clockwise direction until the valve stem is inserted and there is no further hand-wheel (chain) movement.
Evaluator Cue:            SF-812A valve stem is inserted and there is no further clockwise hand-wheel (chain) movement.
Performance:              SATISFACTORY            UNSATISFACTORY Comments:
Page 129 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 8        At PAB 46 elevation above HX-13A West end, shut SFP to 2T-13 RWST valve, Critical N (SEQ-3)        2SF-811.
Standard:                  The Examinee shuts valve 2SF-811 by operating the chain to obtain rotation of the valve hand-wheel in a clockwise direction until the valve stem is inserted and there is no further hand-wheel (chain) movement.
Evaluator Cue:            2SF-811 valve stem is inserted and there is no further clockwise hand-wheel (chain) movement.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Performance Step: 9        At PAB 46 elevation above HX-13A West end, shut SFP to 1T-13 RWST valve, Critical N (SEQ-3)        1SF-811.
Standard:                  The Examinee shuts valve 1SF-811 by operating the chain to obtain rotation of the valve hand-wheel in a clockwise direction until the valve stem is inserted and there is no further hand-wheel (chain) movement.
Evaluator Cue:            1SF-811 valve stem is inserted and there is no further clockwise hand-wheel (chain) movement.
Performance:              SATISFACTORY          UNSATISFACTORY Comments:
Page 130 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
Performance Step: 10        Inform Control Room Suction Line Reflood Has Begun.
Critical N (SEQ-4)
Standard:                    The Examinee contacts the control room and informs them that RHR suction line reflood has begun in accordance with SEP-1 Unit 2.
Evaluator Cue:              The Control Room acknowledges your report.
Performance:                SATISFACTORY          UNSATISFACTORY Comments:
Terminating Cues:      After the Control Room is notified that RHR suction reflood has begun, the JPM may be terminated.
Stop Time:
Page 131 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
TURNOVER SHEET INITIAL CONDITIONS:
* You are the PAB Auxiliary Operator.
* Unit 2 is at reduced inventory.
* Both RHR pumps have been secured due to erratic hydraulic operation.
* Refueling Water Circulating Pump, P-33, is tagged out for motor replacement.
* Neither the RWST nor the SFP is on purification.
* The Spent Fuel Pool Cooling system is in operation.
INITIATING CUES (IF APPLICABLE):
* The DOS directs you to align the Spent Fuel Pool Cooling system to reflood the RHR pump suction per SEP-1 Unit 2, Degraded RHR System Capability, Attachment A, RHR Suction Line Reflood.
NOTE: To avoid un-necessary risk, do NOT access any scaffolding. All identification of components and required actions may be done at floor level.
Page 132 of 133
 
QF-1030-11 Rev. 1 (FP-T-SAT-30)
ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.
REVIEW STATEMENTS                                                          YES        NO      N/A 131. Are all items on the signature page filled in correctly?
132. Has the JPM been reviewed and validated by SMEs?
133. Can the required conditions for the JPM be appropriately established in the simulator if required?
134. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
135. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
136. Has the completion time been established based on validation data or incumbent experience?
137. If the task is time critical, is the time critical portion based upon actual task performance requirements?
138. Is the Licensee level appropriate for the task being evaluated if required?
139. Is the K/A appropriate to the task and to the licensee level if required?
140. Have the performance steps been identified and typed (Critical /
Sequence / Time Critical) appropriately?
141. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
142. Are all references identified, current, accurate, and available to the trainee?
143. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?
All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.
Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Validation Personnel /Date                  Validation Personnel/Date Page 133 of 133}}

Latest revision as of 08:39, 25 March 2020

Initial Submittal of the Walkthrough Jpms for the Point Beach Initial Examination - Sep/Oct 2003
ML033010239
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/29/2003
From: Short P
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML032890563 List:
References
50-266/03-301, 50-301/02-301
Download: ML033010239 (134)


Text

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: PBNP TASK TITLE: MANUALLY MAKEUP TO THE VCT/RWST JPM NUMBER: P004.027b.COT REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS: P004.027.COT K/A NUMBERS: 004.A4.12 (3.8/3.3)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 15 Minutes Time Critical: NO Alternate Path / Faulted: YES TASK APPLICABILITY: SRO/RO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 1 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM Number: P004.027b.COT JPM

Title:

MANUALLY MAKEUP TO THE VCT/RWST Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required X Procedure adequately addresses task elements.

OP 5B, Blender Operation / Dilution / Boration, Enter Identifier here:

Rev. 22 Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 2 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Unit 1 Operator at the Controls.
  • Leakage at the Charging Pump seals has resulted in the need to manually blend to the VCT to maintain normal VCT level.
  • Several blends have been performed and the CVCS system was left with the blend in the piping.
  • The Chemical and Volume Control System is in its normal at-power alignment with a single letdown orifice in service.
  • Unit 1 RCS boron concentration is 875 ppm.
  • The on-service boric acid storage tank concentration is 3.75%.

INITIATING CUES (IF APPLICABLE):

  • The DOS directs you to:
  • Raise VCT level by approximately 10% at the current boron concentration in the RCS by use of manual blend, and
  • Realign the makeup system for normal automatic operations. NOTE: The blend may be left in the CVCS piping since frequent blends are currently required.

Page 3 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM PERFORMANCE INFORMATION Required Materials: OP 5B, Blender Operation / Dilution / Boration.

General

References:

Blender Data Manual.

Task Standards: The Examinee raises VCT level by 10%, determines failure of 1CV-111 to auto-close and manually closes the valve.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Determine the desired blender output concentration, AND the corresponding acid Critical N (SEQ-1) and water flow setpoints from operating experience, OR using the Blender Data Manual.

Standard: The Examinee determines that the existing acid and water flow setpoints are adequate for the present boron concentration by referencing:

o Operating experience, or o Using the Blender Data Manual.

NO adjust of controls is necessary.

Evaluator Note: The RMW/boric acid ratio for the existing boron concentration is 6.5 gallons of RMW for each gallon of acid.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 4 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 2 Place the REACTOR MAKEUP MODE SELECTOR switch in BLEND.

Critical Y (SEQ-1)

Standard: The Examinee places the REACTOR MAKEUP MODE SELECTOR switch to the BLEND position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Set HC-111, RX MAKEUP WATER FLOW CONTROLLER, to the value Critical N (SEQ-1) determined in Step 4.1.1.

Standard: The Examinee determines that no adjustment of controller HC-111 is necessary.

Evaluator Note: The RMW/boric acid ratio for the existing boron concentration is 6.5 gallons of RMW for each gallon of acid.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Set HC-110, BORIC ACID FLOW CONTROLLER, to the value determined in Step Critical N (SEQ-1) 4.1.1.

Standard: The Examinee determines that no adjustment of controller HC-110 is necessary.

Evaluator Note: The RMW/boric acid ratio for the existing boron concentration is 6.5 gallons of RMW for each gallon of acid.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 5 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 5 IF VCT is NOT bypassed, THEN ensure CV-110B, Z-1 BA BLENDER TO CHG Critical N (SEQ-1) PUMP SUCT FCV, is in AUTO to supply the VCT outlet from the blender.

Standard: The Examinee determines CV-110B control switch is already in AUTO.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 IF VCT is bypassed, THEN ensure CV-110B, Z-1 BA BLENDER TO CHG PUMP Critical N (SEQ-1) SUCT FCV is OPEN.

Standard: The Examinee determines step is N/A, proceeds to Step 4.1.7.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Place the REACTOR MAKEUP control switch in START, AND ensure the red light Critical Y (SEQ-2) is lit.

Standard:

  • The Examinee places the REACTOR MAKEUP control switch to the Start position and
  • Ensures that the red light is lit.

Evaluator Note: Verification of red light is NOT critical.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 6 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 8 Monitor the following as applicable:

Critical N (SEQ-3)

  • VCT level and pressure
  • RCS temperature
  • Reactor power Standard: The Examinee monitors all of the following parameters:
  • VCT level and pressure
  • RCS temperature
  • Reactor power Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 WHEN it is desired to secure MANUAL BLEND, THEN:

Critical Y (SEQ-3) Place the REACTOR MAKEUP control switch to STOP.

Standard: The Examinee places the REACTOR MAKEUP control switch to the Stop position after VCT level has risen at least 10%.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 7 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 10 Place the REACTOR MAKEUP MODE SELECTOR switch to AUTO.

Critical Y (SEQ-4)

Standard: The Examinee places the REACTOR MAKEUP MODE SELECTOR switch to the AUTO position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 Ensure the following:

Critical N (SEQ-5) CV-110A, BA TO Z-1 BLENDER FLOW CONTROL VALVE, opens.

Standard: The Examinee determines that CV-110A is open (green light off, red light on).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 Ensure the following:

Critical Y (SEQ-5) CV-111, RMW TO Z-1 BLENDER FLOW CONTROL VALVE, closes.

Standard: The Examinee determines that CV-111 is OPEN, and closes the valve by placing the control switch for CV-111 to the Close position.

Evaluator Cue: If Examinee informs the DOS of the failure and requests direction, indicate that the valve should be placed in its required position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 8 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 13 IF VCT is NOT bypassed, THEN ensure CV-110B, Z-1 BA BLENDER TO CHG Critical N (SEQ-5) PUMP SUCT FCV, is CLOSED.

Standard: The Examinee determines that CV-110B is Closed (green light on, red light off).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 14 IF VCT is bypassed, THEN ensure CV-110B, Z-1 BA BLENDER TO CHG PUMP Critical N (SEQ-5) SUCT FCV, is OPEN.

Standard: The Examinee determines step is N/A and proceeds to Step 4.2.4.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 15 Ensure that the blender is set to match the current RCS boron concentration.

Critical N (SEQ-5)

Standard: The Examinee determines that the blender controls are adequate for the existing boron concentration.

No adjustment of controls is necessary.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 9 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 16 Arm the system as follows:

Critical N (SEQ-6)

  • Place the REACTOR MAKEUP control switch in START
  • ENSURE the red light is lit.

Standard:

  • The Examinee places the REACTOR MAKEUP control switch to the Start position and
  • Ensures that the red light is lit.

Evaluator Note: The Examinee may recommend troubleshooting of the 1CV-111 failure prior to Arming the system. If Examinee suggests this, concur with the recommendation.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 17 Inform the DOS of plant status.

Critical N (SEQ-7)

Standard: The Examinee informs the DOS that VCT level has been raised approximately 10% using manual blend and that CV-111 failed to automatically re-position when the blend was secured.

Evaluator Cue: The DOS acknowledges your report.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The JPM is complete.

Stop Time:

Page 10 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

SIMULATOR SET UP: (Modify table as necessary)

Initial Setup:

  • Load an IC where conditions support Unit 1 steady-state operations.
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Ensure RMW/boric acid flow controllers are set at a 6.5:1 ratio.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.
  • Save to an IC for multiple use (if necessary).

Multiple Use:

  • Load the saved IC for this JPM.
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.

SIMULATOR INFORMATION:

Initiation Action or Action Malf. Ramp Time Delay Time Trigger Verification Cue Component Tagname Value Performed Description Event Oper. Ready Inserted Criteria Init. #

PRELOAD 1-CV-111 VLV1CVC005 1 - - X14I161S -

.EQ. 1 RMW TO BLENDER (Trigger 1)

FCV (FAIL OPEN)

EVENT TRIGGERS EVENT LINE COMMAND LINE PRELOAD 1-CV-111 X14I253C .EQ. 1 DMF VLV1CVC005 2 -

RMW TO BLENDER FCV ISOL (CLOSE)

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 11 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Unit 1 Operator at the Controls.
  • Leakage at the Charging Pump seals has resulted in the need to manually blend to the VCT to maintain normal VCT level.
  • Several blends have been performed and the CVCS system was left with the blend in the piping.
  • The Chemical and Volume Control System is in its normal at-power alignment with a single letdown orifice in service.
  • Unit 1 RCS boron concentration is 875 ppm.
  • The on-service boric acid storage tank concentration is 3.75%.

INITIATING CUES (IF APPLICABLE):

  • The DOS directs you to:
  • Raise VCT level by approximately 10% at the current boron concentration in the RCS by use of manual blend, and
  • Realign the makeup system for normal automatic operations. NOTE: The blend may be left in the CVCS piping since frequent blends are currently required.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 12 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 13 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: PBNP TASK TITLE: MANUALLY MAKEUP TO THE VCT/RWST JPM NUMBER: P004.027b.COT REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS: P004.027.COT K/A NUMBERS: 006.A1.13 (3.5/3.7)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 15 Minutes Time Critical: NO Alternate Path / Faulted: NO TASK APPLICABILITY: SRO/RO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 14 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM Number: P004.027b.COT JPM

Title:

MANUALLY MAKEUP TO THE VCT/RWST Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required X Procedure adequately addresses task elements.

OI 100, Adjusting SI Accumulator Level and Enter Identifier here:

Pressure, Rev. 21 Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 15 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Unit 1 is at 100% steady-state conditions.

INITIATING CUES (IF APPLICABLE):

  • The DOS directs you to raise 1T-34A accumulator pressure to clear the alarm (and maintain pressure in the normal band) in accordance with OI 100, Adjusting SI Accumulator Level and Pressure, Section 5.4.

Page 16 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM PERFORMANCE INFORMATION Required Materials: OI 100, Adjusting SI Accumulator Level and Pressure.

General

References:

None.

Task Standards: The Examinee raises pressure in 1T-34A to clear the associated alarm on panel C01.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Perform Attachment A, Accumulator Level/Pressure Change Data Sheet, Critical N (SEQ-1) Sections 1.0 and 2.0.

Standard: The Examinee completes Attachment A, Accumulator Level/Pressure Change Data Sheet, Sections 1.0 and 2.0. based on present plant conditions.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 17 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 2 IF RCS pressure is less than 760 psig, THEN ensure the following valves Shut:

Critical N (SEQ-1) (Mark this step N/A if RCS pressure is greater than or equal to 760 psig.)

Standard:

  • The Examinee marks Step 5.4.2 N/A and
  • Proceeds to Step 5.4.3.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Ensure 1SI-957, N2 Supply Line Vent, is SHUT using 1HIC-957 Accumulator Vent Critical N (SEQ-1) Controller. (C01R)

Standard: The Examinee determines that 1SI-957 is shut by observing accumulator vent controller, 1HIC-957, setpoint controller at zero and output at zero (closed).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Open the SI accumulator nitrogen inlet valve for the accumulator to be filled:

Critical Y (SEQ-1) (Mark the valve NOT used N/A.)

  • The Examinee places the control switch for 1SI-834A to the Open position.

and

  • N/As the Step for the valve not used,1SI-834B (N/A is NOT critical).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 18 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 5 Align a Nitrogen 12 pack to Unit 1 SI accumulators by opening 12 pack isolations.

Critical Y (SEQ-1)

Standard: The Examinee dispatches the Primary Auxiliary Building Auxiliary Operator to align a Nitrogen 12 pack to the Unit 1 SI accumulators.

Evaluator Cue: The Primary Auxiliary Building Auxiliary Operator reports that a nitrogen 12 pack is aligned to the Unit 1 SI accumulators.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Open 1SI-846, 1T-34A&B Accumulator Nitrogen Inlet CIV. (C01)

Critical Y (SEQ-1)

Standard: The Examinee places the control switch for 1SI-846 to the Open position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 19 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 7 Locally open the valve aligned to the Nitrogen 12 pack: (Mark the valve NOT Critical Y (SEQ-1) used N/A).

  • The Examinee dispatches the Primary Auxiliary Building Auxiliary Operator to locally open the accumulator nitrogen supply valve for the aligned 12 pack.
  • N/As the Step for the valve not used (N/A of step is NOT critical).

Evaluator Cue:

  • The Primary Auxiliary Building Auxiliary Operator reports that the Accumulator Nitrogen Supply Valve, 1SI-838A, is open and flow can be heard.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 20 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 8 Pressurize accumulator to desired pressure as indicated on one of the following Critical N (SEQ-1) indicators: (Mark the indicators NOT used N/A).

Standard: The Examinee monitors pressurization of the accumulator on ONE of the following instruments:

And N/As the indicators not used:

Evaluator Cue: When Annunciator 1T-34A Accumulator Pressure High or Low clears, inform the Examinee that the Accumulator is at the desired pressure and the fill may be secured.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 WHEN the desired pressure in the accumulator is achieved THEN shut 1SI-846, Critical Y (SEQ-2) 1T-34A&B Accumulator Nitrogen Inlet CIV. (C01)

Standard: After Annunciator 1T-34A Accumulator Pressure High or Low is clear, the Examinee places the control switch for 1SI-846 to the Close position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 21 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 10 Locally isolate Nitrogen 12 pack to Unit 1 SI accumulators by shutting 12 pack Critical N (SEQ-2) isolation.

Standard: The Examinee dispatches the Primary Auxiliary Building Auxiliary Operator to locally isolate the Nitrogen 12 pack to the Unit 1 SI accumulators by shutting the 12 pack isolation.

Evaluator Cue: The Primary Auxiliary Building Auxiliary Operator reports that the Nitrogen 12 pack to the Unit 1 SI accumulators has been isolated.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 Locally isolate the Nitrogen 12 pack used to fill the accumulator: (Mark the valve Critical N (SEQ-2) NOT used N/A.)

  • The Examinee dispatches the Primary Auxiliary Building Auxiliary Operator to locally isolate 1SI-838A.
  • N/As the Step for the valve not used (1SI-838B).

Evaluator Cue: The Primary Auxiliary Building Auxiliary Operator primary auxiliary building Auxiliary Operator reports that 1SI-838A is shut.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 22 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 12 Shut the accumulator nitrogen inlet valve previously opened: (C01R) (Mark the Critical N (SEQ-2) valve NOT used N/A.)

a. 1SI-834A, T34A Accumulator Nitrogen Inlet AOV
b. 1SI-834B, T34B Accumulator Nitrogen Inlet AOV Standard:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 Perform Attachment A, Accumulator Level/Pressure Change Data Sheet, Critical N (SEQ-3) Sections 5.0 and 7.0.

Standard: The Examinee completes Attachment A, Accumulator Level/Pressure Change Data Sheet, Sections 5.0 and 7.0 using present plant data.

Evaluator Cue: The Unit 1 CO will make the appropriate Narrative Log entries.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 23 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 14 Ensure accumulator level between 15 to 40% as indicated on one of the following Critical N (SEQ-3) indicators: (Mark the indicators NOT used N/A.)

Standard: The Examinee determines that level is within the required band of 15 to 40% as indicated on one of the following indicators:

And N/As the indicators not used:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 15 Inform the DOS of plant status.

Critical N (SEQ-3)

Standard: The Examinee informs the DOS that Unit 1 SI A accumulator, 1T-34A, pressure has been raised and the alarm is clear.

Evaluator Cue: The DOS acknowledges your report.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The JPM is complete.

Stop Time:

Page 24 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

SIMULATOR SET UP: (Modify table as necessary)

Simulator Setup Instructions:

Initial Setup:

  • Load an IC where conditions support Unit 1 at 100% steady-state conditions
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.
  • Save to an IC for multiple use.

Multiple Use:

  • Load the saved IC for this JPM.
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.
  • Resave if required.

Additional Simulator Operator Instructions From the SI Accumulator Simulator drawing, open valve 1SI-838A when requested by Examinee.

(Trigger may be used for convenience.)

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 25 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

  • Unit 1 is at 100% steady-state conditions.

INITIATING CUES (IF APPLICABLE):

  • The DOS directs you to raise 1T-34A accumulator pressure to clear the alarm (and maintain pressure in the normal band) in accordance with OI 100, Adjusting SI Accumulator Level and Pressure, Section 5.4.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 26 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

14. Are all items on the signature page filled in correctly?
15. Has the JPM been reviewed and validated by SMEs?
16. Can the required conditions for the JPM be appropriately established in the simulator if required?
17. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
18. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
19. Has the completion time been established based on validation data or incumbent experience?
20. If the task is time critical, is the time critical portion based upon actual task performance requirements?
21. Is the Licensee level appropriate for the task being evaluated if required?
22. Is the K/A appropriate to the task and to the licensee level if required?
23. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

24. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
25. Are all references identified, current, accurate, and available to the trainee?
26. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 27 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: PBNP TASK TITLE: PERFORM ACTIONS TO STOP A CONTINUOUS ROD WITHDRAWALMANUALLY MAKEUP TO THE VCT/RWST JPM NUMBER: P.000.008b.COTP004.027B. REV. 00 COT RELATED PRA None INFORMATION:

TASK NUMBERS: P000.008B.COTP004.027.COT 001.AA1.005194 001 A1.01 (3.3/3.4) / 194 001 A1.02 (4.1/3.9) / 194 001 A1.04 (3.0/3.2) / 194 001 A1.05 (3.6/3.8) / 194 001 A1.10 (2.9/3.9) / 194 001 A1.12 K/A NUMBERS:

(3.1/4.1) / 194 001 A1.13 (4.3/4.1) / 194 001 A1.14 (2.5/2.9) / 004 000 A4.01 (3.8/3.9) /

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 1515 Minutes Time Critical: NO Alternate Path / Faulted: YES TASK APPLICABILITY: SRO/ROSRO/RO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 28 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 29 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM Number: P000.008b.COTP004.027b.COT JPM

Title:

RESPOND TO UNCONTROLLED ROD MOTIONMANUALLY MAKEUP TO THE VCT/RWST Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required X Procedure adequately addresses task elements.

AOP 6C Unit 1, Uncontrolled Motion of RCCA(s),

Enter Identifier here:

Rev. 11 Other document adequately describes necessary task elements.

Enter Identifier here:

X Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 30 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Operator at the Controls for Unit 1.
  • Unit 1 is at the 28% chemistry hold following reactor startup.
  • Rod Control has been placed in Auto due to the extended chemistry hold.

INITIATING CUES (IF APPLICABLE):

Page 31 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM PERFORMANCE INFORMATION Required Materials: None.

General

References:

AOP 6C Unit 1, Uncontrolled Motion of RCCA(s).

Task Standards: The Examinee terminates the uncontrolled rod motion by tripping the reactor.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 The Control Rod Bank Selector switch is placed in Manual.

Critical N (SEQ-1)

Standard: The Examinee places the Control Rod Bank Selector switch to the Manual position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 32 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 2 Control Bank D rods are withdrawn two (2) steps.

Critical N (SEQ-2)

Standard: The Examinee:

  • Positions the IN-HOLD-OUT switch to the IN position until Control Bank D inserts two (2) steps from 172 to 170 and
  • Checks Bank Demand, IRPIs, PPCS indications, and RCS temperature response consistent for the rod withdrawal.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 The Control Rod Bank Selector switch is returned to Auto.

Critical N (SEQ-3)

Standard: The Examinee places the Control Rod Bank Selector switch to the Auto position.

Evaluator Cue: If Examinee requests direction on whether to leave Rod Control in Manual or Auto, indicate that Rod Control should be returned to Auto.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 33 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 4 Inform the DOS that Control Bank D has been inserted two (2) steps.

Critical N (SEQ-4)

Standard: The Examinee informs the DOS that Control Bank D has been inserted two (2) steps.

Evaluator Note: After the Control Rod Bank Selector switch is returned to the Auto position, a failure of Power Range Nuclear Instrument N-41 will occur causing automatic rod withdrawal.

Evaluator Cue: The DOS acknowledges your report.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Check Rod Motion Required:

Critical Y (SEQ-5) o Change in turbine load OR o Change in steam demand OR o Tave/Tref mismatch greater than 1.5 °F Standard: The Operator at the Controls:

  • Identifies automatic rod movement of Control Bank D is not required.

Evaluator Cue: If informed, the DOS acknowledges your report.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 34 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 6 Place the Control Rod Bank Selector switch to Manual.

Critical N (SEQ-6)

Standard: The Examinee places the Control Rod Bank Selector switch to the Manual position.

Evaluator Note: Control Bank D will continue to withdraw.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 IF any control rod continues to step, THEN perform the following:

Critical Y (SEQ-7)

  • Trip the reactor Standard: The Examinee depresses either or both Reactor Trip pushbuttons on either 1C04 or C01.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When the Reactor Trip pushbuttons are depressed, the JPM may be terminated.

Stop Time:

Page 35 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

SIMULATOR SET UP: (Modify table as necessary)

Simulator Setup Instructions:

Initial Setup:

  • Load an IC where conditions support a startup with a chemistry hold at 28% with CBD rods at 170.
  • Load the preloads.
  • Start the simulation.
  • Insert CBD four steps to obtain approximately 1 degree Tavg-Tref mismatch.
  • Ensure the rod control selector switch is in Automatic.
  • Freeze the simulator.
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.
  • Save to an IC for multiple use.

Multiple Use:

  • Load the saved IC for this JPM.
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.
  • Resave if required.

MORE ON NEXT PAGE Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 36 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

SIMULATOR INFORMATION:

Initiation Action or Action Malf. Ramp Time Delay Time Trigger Verification Cue Component Tagname Value Performed Description Event Oper. Ready Inserted Criteria Init. #

This JPM is based upon IC-6, where:

  • Unit 1 is at the 28% Chemistry hold
  • CBD at 170 steps
  • Boron concentration is at 1535 ppm.

Raise RCS temperature by withdrawing CBD from 170 to 172. Let plant stabilize.

Activate Trigger 1 AFTER rods are moved two steps AND rod control is returned AUTO.

PRELOAD P.R. MAL1NIS007A 300 - - - 1 CHANNEL N41 HIGH VOLTAGE FAILURE PRELOAD ROD JOYSTK OVER- ON - - ZT:RPC 2 OUT CRF010A 7 .EQ.

POSITION 172 CONTROL ROD MOTION IN OUT JOYST (ON)

PRELOAD ROD JOYSTK OVER- OFF - - ZT:RPC 2 IN POSITION CRF010B 7 .EQ.

CONTROL 172 ROD MOTION IN OUT JOYST (OFF)

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 37 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Operator at the Controls for Unit 1.
  • Unit 1 is at the 28% chemistry hold following reactor startup.
  • Rod Control has been placed in Auto due to the extended chemistry hold.

INITIATING CUES (IF APPLICABLE):

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 38 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

27. Are all items on the signature page filled in correctly?
28. Has the JPM been reviewed and validated by SMEs?
29. Can the required conditions for the JPM be appropriately established in the simulator if required?
30. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
31. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
32. Has the completion time been established based on validation data or incumbent experience?
33. If the task is time critical, is the time critical portion based upon actual task performance requirements?
34. Is the Licensee level appropriate for the task being evaluated if required?
35. Is the K/A appropriate to the task and to the licensee level if required?
36. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

37. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
38. Are all references identified, current, accurate, and available to the trainee?
39. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 39 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: PBNP TASK TITLE: MANUALLY MAKEUP TO THE VCT/RWST JPM NUMBER: P004.027B.COT REV. 0 RELATED PRA AFW issues similar to this JPM have resulted in elevated CDF risk.

INFORMATION:

TASK NUMBERS: P004.027.COT 061.A2.05 (3.1/3.4)194 001 A1.01 (3.3/3.4) / 194 001 A1.02 (4.1/3.9) / 194 001 A1.04 (3.0/3.2) / 194 001 A1.05 (3.6/3.8) / 194 001 A1.10 (2.9/3.9) / 194 001 A1.12 K/A NUMBERS:

(3.1/4.1) / 194 001 A1.13 (4.3/4.1) / 194 001 A1.14 (2.5/2.9) / 004 000 A4.01 (3.8/3.9) /

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 15 Minutes Time Critical: NO Alternate Path / Faulted: YES TASK APPLICABILITY: SRO/RO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 40 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 41 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM Number: P004.027b.COT JPM

Title:

MANUALLY MAKEUP TO THE VCT/RWST Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required X Procedure adequately addresses task elements.

OI 62A, Motor-Driven Auxiliary Feedwater System Enter Identifier here:

(P-38A &P-38B), Rev. 24 Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 42 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Balance Of Plant Operator.
  • Unit 1 is in Mode 5, Cold Shutdown.
  • Chemistry requests that Steam Generator A level be raised to support placing the S/G in wet lay-up.

INITIATING CUES (IF APPLICABLE):

  • All applicable Initial Conditions in Section 4.0 are met.
  • A flow rate of 100 to 200 gpm is desired when raising level.

Page 43 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM PERFORMANCE INFORMATION Required Materials: OI 62A, Motor-Driven Auxiliary Feedwater System (P-38A & P-38B).

General

References:

None.

Task Standards: The Examinee establishes a flow rate of 100-200 gpm using Motor Driven AFW Pump P-38A and then secures P-38A when there is no indication of forward flow or recirculation flow due to system failures.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Assign a Level 3 Dedicated Operator in accordance with OM 3.26, Use of Critical N (SEQ-1) Dedicated Operators, to align the applicable AFW control switches per step 5.3.14 if a valid AFW signal occurs for either Unit.

Standard: The Examinee assumes the role of the Level 3 Dedicated Operator or requests Supervision assign another operator as the Level 3 D.O.

Evaluator Cue: Indicate that the EXAMINEE should assume the role of the Level 3 Dedicated Operator.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 44 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 2 IF at any time, P-38A AFW Pump Flow is adjusted to less than 50 gpm, THEN the Critical N (SEQ-1) associated AFW Pump must be secured, OR a level 3 dedicated operator must be stationed to continuously monitor recirc flow per Attachment B.

Standard: Examinee reviews criteria in step for securing P-38A (see Evaluator Note), and proceeds to next step.

Evaluator Note: A Level 3 Dedicated Operator is NOT required for this evolution. However, if one is requested, inform Examinee that a Level 3 D.O is stationed.

This procedural guidance will be utilized later in the JPM when the valve failures result in no AFW forward or recirculation line flow, requiring the pump to be stopped.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 IF the RCS is greater than 200°F, THEN document feedwater addition on PBF-Critical N (SEQ-1) 2027, Feedwater Addition Log.

Standard: The Examinee determines this step is N/A due to present plant conditions.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 45 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 4 OPEN AF-4023, P-38A AFP Discharge to 1HX-1A Steam Generator.

Critical Y (SEQ-1)

Standard: The Examinee places the control switch for AF-4023 to the Open position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Verify AF-4022, P-38A AFP Discharge to 2HX-1A Steam Generator, is shut.

Critical N (SEQ-1)

Standard: The Examinee verifies AF-4022 is shut by observing its green light on, red light off.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Place PC-4012, P-38A AFP Discharge Control valve controller in MANUAL and Critical N (SEQ-1) SHUT.

Standard:

  • The Examinee places the control switch for controller PC-4012 to the Manual position, and
  • Then to the Close position until the output indication shows the valve closed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 46 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 7 Station an operator locally to monitor the recirc flow during startup operation.

Critical N (SEQ-1)

Standard: The Examinee contacts an Auxiliary Operator and requests that recirc flow be monitored during startup of P-38A.

Evaluator Cue: The local operator (Level 3 D.O if previously requested) reports that he is in position to continuously monitor P-38A recirc flow.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Start P-38A, Motor-Driven Aux Feed Pump. (C01).

Critical Y (SEQ-2)

Standard: The Examinee places the control switch for P-38A to the Start position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 IMMEDIATELY CHECK the following:

Critical N (SEQ-3)

  • AF-4007, P-38A AFP Mini Recirc Control valve OPENS.

Standard: The Examinee checks the C01 control board indication for AF-4007 and determines the valve is open (red light on, green light off).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 47 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 10 IMMEDIATELY CHECK the following:

Critical N (SEQ-3)

  • Recirc flow greater than 50 gpm.

Standard: The Examinee contacts the local operator to check that the P-38A AFP recirc flow is greater than 50 gpm.

Evaluator Cue: The local operator reports that P-38A recirc flow is 65 gpm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 Adjust PC-4012, P-38A AFP Discharge Control valve controller in MANUAL for Critical Y (SEQ-4) the proper flow rate.

Standard: The Examinee places the control switch for PC-4012 to the Open position to establish a flow rate of 100-200 gpm as specified in the Initiating Cue. (flow rate indicated on FI-4007).

Evaluator Note: The simulator booth operator will monitor the evolution. Upon the closure of AFW Recirc Valve AF-4007, the local operator will report that AF-4007 recirc valve is shut and recirc flow is zero. After the report, the malfunctions for AF-4007 and Pressure Controller PC-4012 will be inserted.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 48 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 12 Monitor P-38A, Motor Driven Aux Feed Pump for proper operation:

Critical Y (SEQ-5)

  • FI-4007, P-38A AFP Discharge Flow Indicator.
  • PI-4012, P-38A AFP Discharge Pressure Indicator.
  • Point 25, P-38A Inboard Pump Bearing.
  • Point 26, P-38A Outboard Pump Bearing.

Standard:

  • The Examinee recognizes that both PC-4012 and AF-4007 have failed closed and
  • Places the control switch for P-38A to the Stop position PRIOR to the pump tripping.

Evaluator Note: Engineering evaluation has determined that unrecoverable pump failure will occur 30 seconds after flow decreases below 6 gpm. This failure is modeled on the simulator as a pump trip and inability to re-start.

Evaluator Cue: Inform Examinee that another operator will monitor bearing temperatures on 1TR-2000B (recorder is on a backpanel).

If the local operator at P-38A is contacted, indicate that Recirc flow is zero and Recirc valve AF-4007 is shut.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 13 Inform the DOS of present plant conditions.

Critical N (SEQ-6)

Standard: The Examinee informs the DOS that:

  • P-38A AFP discharge pressure controller, PC-4012 failed shut, and
  • P-38A mini recirc valve, AF-4007 failed to open, and

Evaluator Cue: The DOS acknowledges your report.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 49 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Terminating Cues: The JPM is complete.

Stop Time:

Page 50 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

SIMULATOR SET UP: (Modify table as necessary)

Initial Setup:

  • Load an IC where conditions support Unit 1 in cold shutdown (IC 18).
  • Load the preloads.
  • Start the simulation.
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.
  • Save to an IC for multiple use.

Multiple Use:

  • Load the saved IC for this JPM.
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.
  • Resave if required.

SIMULATOR INFORMATION:

Initiation Action or Action Malf. Ramp Time Delay Time Trigger Verification Cue Component Tagname Value Performed Description Event Oper. Ready Inserted Criteria Init. #

PLE 0-PIC4012 CNH1AFW001 100 00:01:00 1 P38A DISCH B PRESS (Ensure 1 minute CNTROLLER start FIXED value is 91%)

PLE 0-AF-4007 VLV1AFW010 2 1 AUX FWP 38A RECIRC VALVE (CLOSE)

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 51 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Balance Of Plant Operator.
  • Unit 1 is in Mode 5, Cold Shutdown.
  • Chemistry requests that Steam Generator A level be raised to support placing the S/G in wet lay-up INITIATING CUES (IF APPLICABLE):
  • All applicable Initial Conditions in Section 4.0 are met.
  • A flow rate of 100 to 200 gpm is desired when raising level.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 52 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

40. Are all items on the signature page filled in correctly?
41. Has the JPM been reviewed and validated by SMEs?
42. Can the required conditions for the JPM be appropriately established in the simulator if required?
43. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
44. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
45. Has the completion time been established based on validation data or incumbent experience?
46. If the task is time critical, is the time critical portion based upon actual task performance requirements?
47. Is the Licensee level appropriate for the task being evaluated if required?
48. Is the K/A appropriate to the task and to the licensee level if required?
49. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

50. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
51. Are all references identified, current, accurate, and available to the trainee?
52. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 53 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: PBNP TASK TITLE: MANUALLY MAKEUP TO THE VCT/RWST JPM NUMBER: P004.027B.COT REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS: P004.027.COT K/A NUMBERS: 026.A4.01 (4.5/4.3)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 15 Minutes Time Critical: NO Alternate Path / Faulted: NO TASK APPLICABILITY: SRO/RO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 54 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM Number: P004.027b.COT JPM

Title:

MANUALLY MAKEUP TO THE VCT/RWST Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required X Procedure adequately addresses task elements.

Enter Identifier here: EOP-1.1 Unit 1, SI Termination, Rev. 30 Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 55 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • The procedure currently in effect is EOP-1.1 Unit 1, SI Termination, and step 10 has just been reached.

INITIATING CUES (IF APPLICABLE):

Page 56 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM PERFORMANCE INFORMATION Required Materials: EOP-1.1 Unit 1, SI Termination.

General

References:

None.

Task Standards: The Examinee secures Containment Spray and realigns the system for standby operation.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Check containment spray pumps - ANY RUNNING Critical N (SEQ-1)

Evaluator Note: Containment Spray Pump 1P-14A was previously placed in pullout (with suction valve shut) in EOP-0 Attachment A.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 57 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 2 Check containment pressure - LESS THAN 15 PSIG.

Critical N (SEQ-1)

Standard: The Examinee determines that containment pressure is less than 15 psig via indications on panels C01 and/or 1C20 (multiple indications available).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Reset Containment Spray signal.

Critical Y (SEQ-1)

Standard: The Examinee depresses both Unit 1 Containment Spray reset pushbuttons on C01R.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 58 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 4 Stop both Containment Spray Pumps and place in auto-after stop Critical Y (SEQ-2)

  • 1P-14B, train B Standard: The Examinee:
  • places the control switch for Containment Spray Pump 1P-14B to the stop position, allowing switch to spring return to auto-after-stop position.
  • pushes in the control switch for Containment Spray Pump 1P-14A, allowing the switch to spring return to auto-after-stop position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Shut containment spray pump discharge valves:

Critical Y (SEQ-3)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 59 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 6 Ensure both Spray Additive Tank Discharge Valves - SHUT Critical N (SEQ-3)

  • 1SI-836B, train B Standard: The Examinee ensures both 1SI-836A and 1SI-836B are shut by checking the Output indicators on 1YIC-926A and 1YIC-926B. (Status light indication for both valves is also available on Unit 1 SI-Spray Active status panel.)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Ensure Containment Spray Pump RWST Suction MOVs - OPEN Critical Y (SEQ-3)

  • 1SI-870B for 1P-14B Standard: The Examinee places the control switch for 1SI-870A to the OPEN position, spring return to Auto. Also, determines 1SI-870B is open by observing red light on, green light off. (Note: verification of 1SI-870B is not critical).

Evaluator Note: 1SI-870A was previously closed during EOP-0 Attachment A.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 60 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 8 Inform the DOS of plant status.

Critical N (SEQ-4)

Standard: Examinee informs DOS that step 10 of EOP-1.1 has been completed and the Containment Spray System has been returned to a normal line-up.

Evaluator Cue: The DOS acknowledges your report.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The JPM is complete.

Stop Time:

Page 61 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

SIMULATOR SET UP: (Modify table as necessary)

Simulator Setup Instructions:

Initial Setup:

  • Load an IC where conditions support Unit 1 at 100 steady-state conditions
  • Load the preload.
  • Start the simulation.
  • Implement the actions of EOP-0, EOP-2, EOP-1 Unit 1 (first 13 steps) and EOP-1.1 up to and including step 9; then freeze the simulator.
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.
  • Save to an IC for multiple use.

Multiple Use:

  • Load the saved IC for this JPM.
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.
  • Resave if required.

SIMULATOR INFORMATION:

Initiation Action or Action Malf. Ramp Time Delay Time Trigger Verification Cue Component Tagname Value Performed Description Event Oper. Ready Inserted Criteria Init. #

Preload SG A MAIN MAL1SGN003 5E6 15 STEAM LINE A BREAK INSIDE CNMT Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 62 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

  • The procedure currently in effect is EOP-1.1 Unit 1, SI Termination, and step 10 has just been reached.

INITIATING CUES (IF APPLICABLE):

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 63 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

53. Are all items on the signature page filled in correctly?
54. Has the JPM been reviewed and validated by SMEs?
55. Can the required conditions for the JPM be appropriately established in the simulator if required?
56. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
57. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
58. Has the completion time been established based on validation data or incumbent experience?
59. If the task is time critical, is the time critical portion based upon actual task performance requirements?
60. Is the Licensee level appropriate for the task being evaluated if required?
61. Is the K/A appropriate to the task and to the licensee level if required?
62. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

63. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
64. Are all references identified, current, accurate, and available to the trainee?
65. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 64 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: PBNP TASK TITLE: MANUALLY MAKEUP TO THE VCT/RWST JPM NUMBER: P004.027B.COT REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS: P004.027.COT 194 001 A1.01 (3.3/3.4) / 194 001 A1.02 (4.1/3.9) / 194 001 A1.04 (3.0/3.2) / 194 K/A NUMBERS: 001 A1.05 (3.6/3.8) / 194 001 A1.10 (2.9/3.9) / 194 001 A1.12 (3.1/4.1) / 194 001 A1.13 (4.3/4.1) / 194 001 A1.14 (2.5/2.9) / 004 000 A4.01 (3.8/3.9) /

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 15 Minutes Time Critical: NO Alternate Path / Faulted: NO TASK APPLICABILITY: SRO/RO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 65 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 66 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM Number: P004.027b.COT JPM

Title:

MANUALLY MAKEUP TO THE VCT/RWST Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required X Procedure adequately addresses task elements.

Enter Identifier here: OP 4B, Reactor Coolant Pump Operation, Rev. 44 Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 67 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Operator at the Controls for Unit 1.
  • Unit 1 is in Mode 3, Hot Standby.
  • The inspection has since been completed and permission has been granted to restart 1P-1A.
  • Charging and letdown flow have been balanced.
  • No CVCS demineralizers are currently in service.
  • All appropriate precautions, limitations, and prerequisites have been met.
  • The BOP operator is available to respond to any alarms unrelated to the task.

INITIATING CUES (IF APPLICABLE):

Page 68 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM PERFORMANCE INFORMATION Required Materials: OP 4B, Reactor Coolant Pump Operation.

General

References:

None.

Task Standards: The Examinee successfully starts Reactor Coolant Pump, 1P-1A.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Check that starting duty limits will not be exceeded.

Critical N (SEQ-1)

Standard: The Examinee checks that the starting duty limits of P&L 3.6 will not be exceeded.

Evaluator Cue: If asked, 1P-1A was last run 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> ago.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 69 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 2 Start RCP Oil Lift Pump for RCP to be started.

Critical Y (SEQ-1)

Standard: The Examinee places the control switch for the 1P-1A RCP Oil Lift Pump, 1P-74A to the Start position (spring return to Auto).

Evaluator Note: Evaluator should make note of the time the lift oil pump was started to ensure a minimum of two minutes elapses before pump start.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Check that amber P-1A/B RCP Lift Pressure light illuminates.

Critical N (SEQ-1)

Standard: The Examinee checks that the amber P-1A/B Lift Pressure light is illuminated.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Check No. 1 seal leakoff flow within the normal operating range of Figure 1.

Critical N (SEQ-1)

Standard: The Examinee checks that the No. 1 seal leakoff flow and determines that it is within the normal operating range of Figure 1.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 70 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 5 IF RCP seal injection flow and charging/letdown flow have NOT been balanced, Critical N (SEQ-1) THEN balance seal injection and charging/letdown flow.

Standard: The Examinee marksstep 5.1.5 N/A and proceeds to step 5.1.6.

Evaluator Cue: If necessary, inform Examinee that seal injection and charging/letdown were balanced in the Initial Conditions.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Adjust Charging Pump(s) speed and letdown as necessary to maintain letdown Critical N (SEQ-1) flow at 35 to 40 gpm.

Standard: The Examinee adjusts charging pump(s) speed and letdown as necessary to maintain letdown flow at 35 to 40 gpm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 71 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 7 IF necessary to preclude excessive flow through demineralizers, THEN bypass Critical N (SEQ-1) affected demineralizers.

Standard: Examinee marks step 5.1.7 N/A and proceeds to Step 5.1.8.

Evaluator Cue: If necessary, inform Examinee that no demineralizers are in service as part of the Initial Conditions.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 AFTER RCP Oil Lift Pump has run a minimum of two minutes, THEN start RCP Critical Y (SEQ-2) AND record time.

Time: __________

Standard: After verifying the RCP Lift Oil Pump has been running for at least two minutes:

  • The Examinee places the control switch for Reactor Coolant Pump, 1P-1A to the Start position (spring return to center) and
  • Records the time.

Evaluator Note: Waiting the two minutes and recording the start time are NOT critical.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 72 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 9 Check the following:

Critical N (SEQ-3)

  • RCP running current normal

- Less than 820 amps with RCS cold

- Less than 620 amps for normal RCS operating temperature

- Nominally less than 760 amps for anticipated plant conditions

  • Labyrinth seal delta-pressure greater than 15 inches
  • No. 1 seal delta-pressure greater than 200 psid
  • Seal water inlet/Bearing temp less than 150°F
  • Seal water outlet temp less than 170°F
  • RCP motor bearing temps (upper and lower) less than 90°C
  • VCT pressure greater than 15 psig
  • RCS pressure has stabilized
  • CC Return temps (TI-612/608) less than 120°F
  • Digital Metal Impact Monitoring System (DMIMS) - no alarms Standard: The Examinee checks RCP conditions and determines they are within the normal limits indicated above.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 AFTER RCP has run at speed a minimum of one minute, THEN stop RCP Oil Lift Critical N (SEQ-3) Pump.

Standard: The Examinee places the control switch for the 1P-1A RCP Oil Lit Pump, 1P-74A to the Stop position (spring return to Auto) after 1P-1A has run for a minimum of one minute.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 73 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 11 Check that RCP 1A/B (2A/B) Loss of Power bistable is OFF (Reactor Critical N (SEQ-3) Protection/Safeguards status panel).

Standard: The Examinee checks that the RCP 1A/B (2A/B) Loss of Power bistable is off on the Reactor Protection/Safeguards status panel.

Evaluator Note: The last two steps of the procedure section (adjust RCS pressure and restore demins) are not applicable due to given plant conditions.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 12 Inform DOS of plant status.

Critical N (SEQ-3)

Standard: DOS is informed that Reactor Coolant Pump 1P-1A has been started and is operating normally.

Evaluator Cue: The DOS acknowledges your report.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The JPM is complete.

Stop Time:

Page 74 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

SIMULATOR SET UP: (Modify table as necessary)

Simulator Setup Instructions:

Initial Setup:

  • Load an IC where conditions support HOT STANDBY on Unit 1
  • Start the simulation.
  • Manually trip the Unit 1 reactor by depressing both reactor trip breakers on either 1C04 or C01.
  • Freeze the simulator.
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.
  • Save to an IC for multiple use.

Multiple Use:

  • Load the saved IC for this JPM.
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.
  • Resave if required.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 75 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Operator at the Controls for Unit 1.
  • Unit 1 is in Mode 3, Hot Standby.
  • The inspection has since been completed and permission has been granted to restart 1P-1A.
  • Charging and letdown flow have been balanced.
  • No CVCS demineralizers are currently in service.
  • All appropriate precautions, limitations, and prerequisites have been met.
  • The BOP operator is available to respond to any alarms unrelated to the task.

INITIATING CUES (IF APPLICABLE):

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 76 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

66. Are all items on the signature page filled in correctly?
67. Has the JPM been reviewed and validated by SMEs?
68. Can the required conditions for the JPM be appropriately established in the simulator if required?
69. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
70. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
71. Has the completion time been established based on validation data or incumbent experience?
72. If the task is time critical, is the time critical portion based upon actual task performance requirements?
73. Is the Licensee level appropriate for the task being evaluated if required?
74. Is the K/A appropriate to the task and to the licensee level if required?
75. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

76. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
77. Are all references identified, current, accurate, and available to the trainee?
78. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 77 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: PBNP TASK TITLE: MANUALLY MAKEUP TO THE VCT/RWST JPM NUMBER: P004.027b.COT REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS: P004.027.COT 064.A4.06 (3.9/3.9)194 001 A1.01 (3.3/3.4) / 194 001 A1.02 (4.1/3.9) / 194 001 A1.04 (3.0/3.2) / 194 001 A1.05 (3.6/3.8) / 194 001 A1.10 (2.9/3.9) / 194 001 A1.12 K/A NUMBERS:

(3.1/4.1) / 194 001 A1.13 (4.3/4.1) / 194 001 A1.14 (2.5/2.9) / 004 000 A4.01 (3.8/3.9) /

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 15 Minutes Time Critical: NO Alternate Path / Faulted: YES TASK APPLICABILITY: SRO/RO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 78 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 79 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM Number: P004.027b.COT JPM

Title:

MANUALLY MAKEUP TO THE VCT/RWST Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required X Procedure adequately addresses task elements.

AOP 19A Unit 1, Train A Safeguards Bus Enter Identifier here:

Restoration, Rev. 7 Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 80 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the third license.
  • Unit 1 is in Mode 3, Hot Standby.
  • 4160 Volt AC Bus 1A-05 has lost power.

INITIATING CUES (IF APPLICABLE):

  • The DOS directs you to restore power to 4160 Volt Bus 1A-05 in accordance with AOP 19A Unit 1, Train A Safeguards Bus Restoration, beginning at Step 6.

Page 81 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM PERFORMANCE INFORMATION Required Materials: AOP 19A Unit 1, Train A Safeguards Bus Restoration.

General

References:

None Task Standards: The Examinee restores power to safeguards bus 1A-05 in accordance with AOP 19A Unit 1, Train A Safeguards Bus Restoration.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Check annunciator UNIT 1 4.16 kV BUS LOCKOUT - CLEAR Critical N (SEQ-1)

  • C02 D 3-4 Standard: The Examinee checks annunciator Unit 1 4.16 kV BUS LOCKOUT (C02 D 3-4) and determines it is clear (not lit).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 82 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 2 Check G-01 to bus 1A-05 breaker in AUTO Critical N (SEQ-1)

  • 1A52-60 Standard: The Examinee checks breaker 1A62-60 and determines it is in the Auto position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Check G RUNNING Critical N (SEQ-1)

Standard: The Examinee checks G-01 and determines it is NOT running, transitions to RNO column. Indications of Diesel NOT running are listed below:

  • The amber G-01 Diesel Generator Started light is NOT lit.
  • The Green G-01 Diesel Generator Ready For Load Light is NOT lit.
  • Diesel Generator G01 Voltmeter indicates zero.
  • Diesel Generator Frequency Meter indicates zero.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Ensure G-01 diesel mode selector switch is in Auto.

Critical N (SEQ-1)

Standard: The Examinee checks G-01 Diesel Mode Selector Switch and determines it is in Auto.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 83 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 5 Turn G-01 Diesel Generator Control Switch to START.

Critical Y (SEQ-1)

Standard: The Examinee turns the G-01 Diesel Generator Control Switch to START, observes G-01 start. Available indications of G-01 starting are:

  • The amber G-01 Diesel Generator Started light is lit.
  • The Green G-01 Diesel Generator Ready For Load Light is lit.
  • Diesel Generator G01 Voltmeter indicates approximately 4160 volts.
  • Diesel Generator Frequency Meter indicates 60 Hz.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Ensure 1A-03 to 1A-05 bus tie breaker - OPEN Critical N (SEQ-1)

  • 1A52-57 Standard: The Examinee checks the 1A-03 to 1A-05 bus tie breaker, 1A52-57, and determines it is open (green light is lit).

Evaluator Note: The white trip light is also lit. Examinee may place switch in the open position in order to clear white light.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 84 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 7 Check G-01 to bus 1A-05 breaker - CLOSED Critical N (SEQ-1)

  • 1A52-60 Standard: The Examinee checks breaker 1A52-60 and determines it is NOT closed (green light is lit), transitions to RNO column.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 8 Try to auto-close breaker 1A52-60 by placing control switch to trip position and Critical N (SEQ-1) then release.

Standard: Examinee places the control switch for breaker 1A52-60 to the trip position and releases, and determines that 1A52-60 did not auto-close.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 85 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 9 IF breaker will NOT auto-close, THEN perform the following:

Critical Y (SEQ-2)

a. Place G-01 mode selector switch to EXERCISE.
b. Turn on synch switch for G-01 to bus 1A-05 breaker.
c. Manually close G-01 to bus 1A-05 breaker 1A52-60 Standard: The Examinee:
  • Places the G-01 mode selector switch to the EXERCISE position,
  • Inserts the synchronizing switch handle into the G-01 diesel generator to bus 1A-05 synchroscope switch,
  • Places the control switch for the G-01 diesel generator to bus 1A-05 synchroscope to the On position, and
  • Places the control switch for the G-01 diesel generator to bus 1A-05 breaker, 1A62-60 to the Close position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 10 Check Bus 1A-05 Energized.

Critical N (SEQ-3)

Standard: The Examinee checks bus 1A-05 voltmeter and determines the bus is energized.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 86 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 11 The DOS is informed of plant status.

Critical N (SEQ-4)

Standard: Examinee informs DOS that G-01 EDG was manually started and manually synchronized to Bus 1A-05 per AOP-19A.

Evaluator Cue: The DOS acknowledges your report.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The JPM is complete.

Stop Time:

Page 87 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

SIMULATOR SET UP: (Modify table as necessary)

Initial Setup:

  • Load an IC where conditions support Unit 1 at 100% steady-state conditions.
  • Load the preloads.
  • Start the simulation.
  • Stabilize the plant and then freeze the simulator.
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.
  • Save to an IC for multiple use.

Multiple Use:

  • Load the saved IC for this JPM.
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.
  • Resave if required.

SIMULATOR INFORMATION:

Initiation Action or Action Tagname Malf. Ramp Time Delay Time Trigger Verification Cue Component Value Performed Description Event Oper. Ready Inserted Criteria Init. #

Preload EDG MAL1DSG007A - - - - -

G01(G02 FAILURE TO AUTO START Preload 1-A5260 BKR1DSG001 4 - - - -

DIESEL GEN NO. GO1 TO BUS 1-A05 (FAIL AUTO CLOSE)

Preload 1-A5257 BKR1EPS012 1 - 15 - -

4160V BUS TIE 1-A03 TO 1-A05 (TRIP0 Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 88 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the third license.
  • Unit 1 is in Mode 3, Hot Standby.
  • 4160 Volt AC Bus 1A-05 has lost power.

INITIATING CUES (IF APPLICABLE):

  • The DOS directs you to restore power to 4160 Volt Bus 1A-05 in accordance with AOP 19A Unit 1, Train A Safeguards Bus Restoration, beginning at Step 6.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 89 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

79. Are all items on the signature page filled in correctly?
80. Has the JPM been reviewed and validated by SMEs?
81. Can the required conditions for the JPM be appropriately established in the simulator if required?
82. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
83. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
84. Has the completion time been established based on validation data or incumbent experience?
85. If the task is time critical, is the time critical portion based upon actual task performance requirements?
86. Is the Licensee level appropriate for the task being evaluated if required?
87. Is the K/A appropriate to the task and to the licensee level if required?
88. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

89. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
90. Are all references identified, current, accurate, and available to the trainee?
91. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 90 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: PBNP TASK TITLE: MANUALLY MAKEUP TO THE VCT/RWST JPM NUMBER: P004.027B.COT REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS: P004.027.COT 015.A4.03 (3.8/3.9)194 001 A1.01 (3.3/3.4) / 194 001 A1.02 (4.1/3.9) / 194 001 A1.04 (3.0/3.2) / 194 001 A1.05 (3.6/3.8) / 194 001 A1.10 (2.9/3.9) / 194 001 A1.12 K/A NUMBERS:

(3.1/4.1) / 194 001 A1.13 (4.3/4.1) / 194 001 A1.14 (2.5/2.9) / 004 000 A4.01 (3.8/3.9) /

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 15 Minutes Time Critical: NO Alternate Path / Faulted: NO TASK APPLICABILITY: SRO/RO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 91 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 92 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM Number: P004.027b.COT JPM

Title:

MANUALLY MAKEUP TO THE VCT/RWST Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required X Procedure adequately addresses task elements.

0-SOP-IC-001, Routine Maintenance Procedure Enter Identifier here: Removal of Safeguards or Protection Sensor From Service, Rev. 4 Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 93 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the fourth license.
  • Unit 1 is operating at 100% steady-state conditions.
  • Power Range Nuclear Instrument, N-41, has been out of service for the last eight hours to support troubleshooting and repair of a suspected summing and level amp failure.
  • I&C has completed repairs, re-installed the Instrument Power fuses, and requested Operations to return Power Range Nuclear Instrument, N-41, back to service.
  • Steps 5.2.1, 5.2.2 and 5.2.3 of 0-SOP-IC-001, Routine Maintenance Procedure Removal of Safeguards or Protection Sensor From Service, have been completed.
  • Step 5.2.4 of 0-SOP-IC-001 has just been reached.

INITIATING CUES (IF APPLICABLE):

  • The DOS directs you to complete Attachment A of 0-SOP-IC-001 for returning Power Range Nuclear Instrument, N-41, to service. Previously completed paperwork that removed the channel from service is provided.

Page 94 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM PERFORMANCE INFORMATION Required Materials: 0-SOP-IC-001, Routine Maintenance Procedure Removal of Safeguards or Protection Sensor From Service.

General

References:

None.

Task Standards: The Examinee returns Power Range Nuclear Instrument, N-41 to an operable status.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Verify instrument power fuses are installed.

Critical N (SEQ-1)

Standard: The Examinee visually observes that the Instrument Power fuses are installed for N-41.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 95 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 2 In the RED protection channel, place the following bistable trip switches in Critical Y (SEQ-1) NORMAL: (C-111)

  • Overtemperature Trip
  • Overtemperature Rod Stop Standard: The Examinee places the bistable trip switches for Overtemperature Trip and Overtemperature Rod Stop to the NORMAL position in C-111.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Perform Section 3.0 of Attachment B. IF Section 2.0 was NOT completed, THEN Critical N (SEQ-1) NA steps NOT required in Section 3.0 on Attachment B. Remove all operator aids placed per Attachment B Section 1.0 or 2.0.

Standard:

  • The Examinee determines from previously completed paperwork that only the Operator Aid on 1C03 needs to be removed per step 3.5 of Attachment B.

All other steps are N/A.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 96 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 4 Place the power mismatch bypass, rod stop bypass, and comparator Critical Y (SEQ-1) channel defeat switches in NORMAL. (1C-130)

Standard: The Examinee places the following switches in the NORMAL (Operate) position on panel C-130:

  • power mismatch (Operate position)
  • rod-stop bypass (Operate position)
  • comparator channel defeat (Normal position)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Ensure the dropped rod alarm indicator is NOT illuminated and return the Critical Y (SEQ-1) dropped mode switch to NORMAL. (1C-133)

Standard:

  • The Examinee ensures the dropped rod alarm indicator is not lit and
  • Places the dropped rod mode switch to the NORMAL position (1C-133).

Evaluator Note: Only the switch manipulation is critical.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 97 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 6 Place the rod control selector switch in AUTO, unless directed otherwise Critical N (SEQ-6) by the DSS.

Standard: The Examinee places the Rod Control Selector Switch to the AUTO position.

Evaluator Cue: Inform Examinee that the DSS directs that rod control be returned to AUTO. After the Rod Control Selector Switch is in AUTO, inform the Examinee that another CO will return the PPCS point to service. The JPM may be terminated.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The JPM may be terminated when the Rod Control Selector Switch is returned to AUTO.

Stop Time:

Page 98 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

SIMULATOR SET UP: (Modify table as necessary)

Initial Setup:

  • Load an IC where conditions support Unit 1 at 100% steady-state conditions
  • Start the simulation.
  • Remove power range nuclear instrument, N-41 from service in accordance with 0-SOP-IC-001, Routine Maintenance Procedure Removal of Safeguards or Protection Sensor From Service with the exception of removing the instrument power fuses.
  • Place appropriate Operator Aid on C-03.
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.
  • Save to an IC for multiple use.

Multiple Use:

  • Load the saved IC for this JPM.
  • Place appropriate Operator Aid on C-03.
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.
  • Resave if required.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 99 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the fourth license.
  • Unit 1 is operating at 100% steady-state conditions.
  • Power Range Nuclear Instrument, N-41, has been out of service for the last eight hours to support troubleshooting and repair of a suspected summing and level amp failure.
  • I&C has completed repairs, re-installed the Instrument Power fuses, and requested Operations to return Power Range Nuclear Instrument, N-41, back to service.
  • Steps 5.2.1, 5.2.2 and 5.2.3 of 0-SOP-IC-001, Routine Maintenance Procedure Removal of Safeguards or Protection Sensor From Service, have been completed.
  • Step 5.2.4 of 0-SOP-IC-001 has just been reached.

INITIATING CUES (IF APPLICABLE):

  • The DOS directs you to complete Attachment A of 0-SOP-IC-001 for returning Power Range Nuclear Instrument, N-41, to service. Previously completed paperwork that removed the channel from service is provided.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 100 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

92. Are all items on the signature page filled in correctly?
93. Has the JPM been reviewed and validated by SMEs?
94. Can the required conditions for the JPM be appropriately established in the simulator if required?
95. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
96. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
97. Has the completion time been established based on validation data or incumbent experience?
98. If the task is time critical, is the time critical portion based upon actual task performance requirements?
99. Is the Licensee level appropriate for the task being evaluated if required?

100. Is the K/A appropriate to the task and to the licensee level if required?

101. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

102. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?

103. Are all references identified, current, accurate, and available to the trainee?

104. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 101 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: PBNP TASK TITLE: MANUALLY MAKEUP TO THE VCT/RWST JPM NUMBER: P004.027b.COT REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS: P004.027.COT 062.K4.07 (2.7/3.1)194 001 A1.01 (3.3/3.4) / 194 001 A1.02 (4.1/3.9) / 194 001 A1.04 (3.0/3.2) / 194 001 A1.05 (3.6/3.8) / 194 001 A1.10 (2.9/3.9) / 194 001 A1.12 K/A NUMBERS:

(3.1/4.1) / 194 001 A1.13 (4.3/4.1) / 194 001 A1.14 (2.5/2.9) / 004 000 A4.01 (3.8/3.9) /

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: X Perform:

EVALUATION LOCATION: In-Plant: X Control Room:

Simulator: Other:

Lab:

Time for Completion: 15 Minutes Time Critical: NO Alternate Path / Faulted: NO TASK APPLICABILITY: SRO/RO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 102 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 103 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM Number: P004.027b.COT JPM

Title:

MANUALLY MAKEUP TO THE VCT/RWST Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required X Procedure adequately addresses task elements.

OI 112, Aligning Equipment To Appendix R Power Enter Identifier here:

Supply, Rev. 2 Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 104 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are an extra Auxiliary Operator.
  • Unit 1 is in cold shutdown.
  • Unit 2 is at 100% steady-state conditions.
  • A number of equipment malfunctions necessitates aligning and starting the Residual Heat Removal Pump, 1P-10A, from its Appendix R power supply.

INITIATING CUES (IF APPLICABLE):

  • The DOS directs you to align and start 1P-10A from its Appendix R power supply in accordance with OI 112, Aligning Equipment To Appendix R Power Supply, Section 5.1.

Page 105 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM PERFORMANCE INFORMATION Required Materials: OI 112, Aligning Equipment To Appendix R Power Supply.

General

References:

None.

Task Standards: The Examinee aligns and starts 1P-10A in accordance with OI 112.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Verify 1P-10A control switch is in pullout on 1C03.

Critical N (SEQ-1)

Standard: The Examinee verifies that the control switch for the Residual Heat Removal Pump, 1P-10A is in pullout on 1C-03 by either:

  • Going to the Control Room and verifying or
  • Contacting the Unit 1 Control Operator.

Evaluator Cue: After going to the Control Room or contacting the Unit 1 CO, inform the Examinee that the control switch for 1P-10A is in the pullout position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 106 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 2 Verify the control switch for breaker B52-55B, 1P-10A/B alternate power supply, Critical N (SEQ-1) is in pullout on C-45.

Standard: The Examinee verifies that the control switch for breaker B52-55B, 1P-10A/B alternate power supply is in pullout on C-45.

Evaluator Cue: The control switch for 1P-10A/B alternate power supply breaker, B52-55B is in the pullout position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Align transfer switch 1B312A-B855B, 1P-10A power supply, to B08. (located in Critical Y (SEQ-1) P-5, P-9 area).

Standard: The Examinee aligns the 1P-10A power supply transfer switch, 1B312A-B855B to the B-08 position.

Evaluator Cue:

  • The Control Room indicates that the ALTERNATE SHUTDOWN SYSTEM ENABLED alarm has been received.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 107 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 4 Align transfer switch B855B, 1P-10A/B alternate power supply to the 1P-10A Critical Y (SEQ-2) position. (located in U-2 façade)

Standard: The Examinee aligns the 1P-10A/B alternate power supply transfer switch, B855B to the 1P-10A position.

Evaluator Cue: The 1P-10A/B alternate power supply transfer switch, B855B is in the 1P-10A position.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 At C-045, communicate with Control, and with the U1 Control Operators Critical Y (SEQ-3) concurrence, CLOSE breaker B52-55B, 1P-10A/B alternate power supply.

Standard:

  • The Examinee obtains concurrence from the Unit 1 Control Operator prior to closing breaker B52-55B and
  • Places the control switch for the 1P-10A/B alternate power supply breaker, B52-55B to the Close position (spring-return-to-auto).

Evaluator Cue:

  • When the Unit 1 CO is contacted, inform Examinee that breaker B52-55B may be closed.
  • After correctly manipulating the control switch for B52-55B, inform Examinee that the green light is off and the red light is on for breaker B52-55B. Also, the Unit 1 CO reports that discharge pressure and flow is indicated for 1P-10A RHR Pump.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 108 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 6 Inform the DOS of plant status.

Critical N (SEQ-4)

Standard: Examinee informs the DOS that 1P-10A RHR Pump has been aligned to its Appendix R power supply and is currently running.

Evaluator Cue: The DOS acknowledges your report. If requested, inform Examinee that the Unit 1 CO will hang the temporary information tag.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The JPM is complete.

Stop Time:

Page 109 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are an extra Auxiliary Operator.
  • Unit 1 is in cold shutdown.
  • Unit 2 is at 100% steady-state conditions.
  • A number of equipment malfunctions necessitates aligning and starting the Residual Heat Removal Pump, 1P-10A, from its Appendix R power supply.

INITIATING CUES (IF APPLICABLE):

  • The DOS directs you to align and start 1P-10A from its Appendix R power supply in accordance with OI 112, Aligning Equipment To Appendix R Power Supply, Section 5.1.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 110 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A 105. Are all items on the signature page filled in correctly?

106. Has the JPM been reviewed and validated by SMEs?

107. Can the required conditions for the JPM be appropriately established in the simulator if required?

108. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

109. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

110. Has the completion time been established based on validation data or incumbent experience?

111. If the task is time critical, is the time critical portion based upon actual task performance requirements?

112. Is the Licensee level appropriate for the task being evaluated if required?

113. Is the K/A appropriate to the task and to the licensee level if required?

114. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

115. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?

116. Are all references identified, current, accurate, and available to the trainee?

117. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 111 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: PBNP TASK TITLE: MANUALLY MAKEUP TO THE VCT/RWST JPM NUMBER: P004.027B.COT REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS: P004.027.COT 011.A2.02 (3.2/3.2)194 001 A1.01 (3.3/3.4) / 194 001 A1.02 (4.1/3.9) / 194 001 A1.04 (3.0/3.2) / 194 001 A1.05 (3.6/3.8) / 194 001 A1.10 (2.9/3.9) / 194 001 A1.12 K/A NUMBERS:

(3.1/4.1) / 194 001 A1.13 (4.3/4.1) / 194 001 A1.14 (2.5/2.9) / 004 000 A4.01 (3.8/3.9) /

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: X Control Room:

Simulator: X Other:

Lab:

Time for Completion: 15 Minutes Time Critical: NO Alternate Path / Faulted: NO TASK APPLICABILITY: SRO/RO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 112 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 113 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

P004.010.AOT LOCALLY OPERATE A CHARGING PUMP Rev. 1 JPM Number: P004.027b.COT JPM

Title:

MANUALLY MAKEUP TO THE VCT/RWST Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required X Procedure adequately addresses task elements.

Enter Identifier here: OI 15, Locally Operate A Charging Pump, Rev. 9 Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

NOTE: This JPM is written to be performed using the available simulator equipment on the 6th floor of the North Service Building. It is considered an In-plant JPM for exam purposes. Examiner may request that the actual location of equipment in the plant be identified.

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 114 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

P004.010.AOT LOCALLY OPERATE A CHARGING PUMP Rev. 1 JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the PAB Auxiliary Operator.
  • Unit 1 is in Mode 3, Hot Standby.
  • Letdown has been secured due to a suspected leak on the Letdown Line.
  • While attempting to reduce charging to minimum, 1P-2B Charging Pump would not respond from the Control Room.
  • 1P-2B is currently the only Charging Pump running and Charging Line flow is approximately 30 gpm.

INITIATING CUES (IF APPLICABLE):

  • The DOS directs you to take local control of 1P-2B Charging Pump in accordance with OI 15, Charging Pump Local Control Station Operation, and reduce charging to minimum per Section 5.1. The Unit 1 CO will close 1HC-142 as charging is lowered.

NOTE: This activity shall be performed using available simulator equipment located on the 6th floor of the North Service Building.

Page 115 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

P004.010.AOT LOCALLY OPERATE A CHARGING PUMP Rev. 1 JPM PERFORMANCE INFORMATION Required Materials: OI 15, Charging Pump Local Control Station Operation.

General

References:

None.

Task Standards: The Examinee takes local control of Charging Pump 1P-2B and reduces Charging Flow to minimum.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Match the local load regulator (red pointer) with the remote load regulator (black Critical N (SEQ-1) pointer) by adjusting the manual load regulator or by adjusting pump speed with the C-04 controller.

Standard: The Examinee matches the local load regulator (red pointer) with the remote load regulator (black pointer) by adjusting the manual load regulator for Charging Pump 1P-2B.

Evaluator Cue: If Examinee requests that the Control Room manipulate the C-04 controller, inform Examinee that the controller will not respond.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 116 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

P004.010.AOT LOCALLY OPERATE A CHARGING PUMP Rev. 1 Performance Step: 2 Close vent valve (V-1) for the selected pump.

Critical Y (SEQ-1)

Standard: The Examinee shuts vent valve (V-1) for Charging Pump 1P-2B by rotating the valve knob clockwise until the valve knob/stem is inserted and there is no further knob movement.

Evaluator Note: Actual plant location of valves V-1, V-2, and the local load regulators are located on panel 1RK-24, (1P-2A, B, & C Charging Pumps Instrumentation Rack) located just outside the Unit 1 Charging Pump cubicles.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Open valve (V-2) to connect manual (local) load regulator.

Critical Y (SEQ-1)

Standard: The Examinee opens valve (V-2) for Charging Pump 1P-2B by rotating the valve knob counter-clockwise until the valve knob/stem is extended and there is no further knob movement.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 117 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

P004.010.AOT LOCALLY OPERATE A CHARGING PUMP Rev. 1 Performance Step: 4 Place the transfer switch to LOCAL to de-energize the (V-3) solenoid and Critical Y (SEQ-1) complete the manual load regulator connection.

Standard: The Examinee places the transfer switch for Charging Pump, 1P-2B to LOCAL.

Evaluator Note: The actual plant location of the 1P-2A & B transfer switches are located inside panel 1N-04, between 1P-2A & B Charging Pumps.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Control charging flow as required using the manual load regulator but maintain Critical Y (SEQ-2) RCP Labyrinth Seal DP on scale (local indication in pipe way 1) and throttle charging flow as necessary.

Standard: The Examinee rotates the knob on the manual load regulator counter-clockwise until there is no further movement, reducing Charging Flow to minimum.

Evaluator Note: Indication of Charging Line Flow is available locally on panel RK-24.

Evaluator Cue: Inform Examinee that the Unit 1 CO will close 1HC-142 to maintain RCP Labyrinth Seal DP as Charging Flow is lowered.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 118 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

P004.010.AOT LOCALLY OPERATE A CHARGING PUMP Rev. 1 Performance Step: 6 Inform the DOS of plant status.

Critical N (SEQ-3)

Standard: The Examinee informs Control Room personnel that Charging Pump 1P-2B has been transferred to local control and reduced to minimum.

Evaluator Cue: The Control Room acknowledges your report.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The JPM is complete.

Stop Time:

Page 119 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the PAB Auxiliary Operator.
  • Unit 1 is in Mode 3, Hot Stanby.
  • Letdown has been secured due to a suspected leak on the Letdown Line.
  • While attempting to reduce charging to minimum, 1P-2B Charging Pump would not respond from the Control Room.
  • 1P-2B is currently the only Charging Pump running and Charging Line flow is approximately 30 gpm.

INITIATING CUES (IF APPLICABLE):

  • The DOS directs you to take local control of 1P-2B Charging Pump in accordance with OI 15, Charging Pump Local Control Station Operation, and reduce charging to minimum. The Unit 1 CO will close 1HC-142 as charging is lowered.
  • NOTE: This activity shall be performed using available simulator equipment located on the 6th floor of the North Service Building.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 120 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

SIMULATOR SET UP: (Modify table as necessary)

Initial Setup:

  • Load an IC where conditions support Unit 1 at 100% steady-state conditions.
  • Start the simulation.
  • Secure Charging Pumps as necessary to ensure only 1P-2B is running.
  • Balance Charging/Letdown and ensure Pressurizer level is at program (46%).
  • Freeze the simulator.
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.
  • Save to an IC for multiple use.

Multiple Use:

  • Load the saved IC for this JPM.
  • Walk down the control boards to ensure plant conditions accurately reflect the JPMs initial conditions.
  • Make any necessary adjustments or corrections.
  • Update documentation if required.
  • Resave if required.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 121 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A 118. Are all items on the signature page filled in correctly?

119. Has the JPM been reviewed and validated by SMEs?

120. Can the required conditions for the JPM be appropriately established in the simulator if required?

121. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

122. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

123. Has the completion time been established based on validation data or incumbent experience?

124. If the task is time critical, is the time critical portion based upon actual task performance requirements?

125. Is the Licensee level appropriate for the task being evaluated if required?

126. Is the K/A appropriate to the task and to the licensee level if required?

127. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

128. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?

129. Are all references identified, current, accurate, and available to the trainee?

130. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 122 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: PBNP TASK TITLE: MANUALLY MAKEUP TO THE VCT/RWST JPM NUMBER: P004.027b.COT REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS: P004.027.COT K/A NUMBERS: 033.K1.02 (2.5/2.7)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: X Perform:

EVALUATION LOCATION: In-Plant: X Control Room:

Simulator: Other:

Lab:

Time for Completion: 15 Minutes Time Critical: NO Alternate Path / Faulted: NO TASK APPLICABILITY: SRO/RO Additional signatures may be added as needed.

Developed by: Michael J. Vana 06/13/2003 Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 123 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM Number: P004.027b.COT JPM

Title:

MANUALLY MAKEUP TO THE VCT/RWST Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required X Procedure adequately addresses task elements.

SEP-1 Unit 2, Degraded RHR System Capability, Enter Identifier here:

Rev. 3 Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 124 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the PAB Auxiliary Operator.
  • Unit 2 is at reduced inventory.
  • Both RHR pumps have been secured due to erratic hydraulic operation.
  • Refueling Water Circulating Pump, P-33, is tagged out for motor replacement.
  • Neither the RWST nor the SFP is on purification.
  • The Spent Fuel Pool Cooling system is in operation.

INITIATING CUES (IF APPLICABLE):

  • The DOS directs you to align the Spent Fuel Pool Cooling system to reflood the RHR pump suction per SEP-1 Unit 2, Degraded RHR System Capability, Attachment A, RHR Suction Line Reflood.

NOTE: To avoid un-necessary risk, do NOT access any scaffolding. All identification of components and required actions may be done at floor level.

Page 125 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM PERFORMANCE INFORMATION Required Materials: SEP-1 Unit 2, Degraded RHR System Capability General

References:

None.

Task Standards: The Examinee establishes reflood alignment of the Spent Fuel Pool Cooling system to the RHR system.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Check RWST Or SFP On Purification Critical Y (SEQ-1)

  • FI-636 Standard: The Examinee determines from the Initial Conditions or by checking F-6 SFP Filter Outlet Flow Indicator, FI-636 that neither the RWST nor the SFP is on purification.

Evaluator Cue: If checked, F-6 SFP Filter Outlet Flow Indicator, FI-636 indicates zero.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 126 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 2 IF refueling water circulating pump P-33 is secured AND operable, THEN locally Critical Y (SEQ-2) perform the following:

Standard: The Examinee determines from the Initial Conditions that the steps to align P-33 should not be performed since it is not operable, proceeds to step dealing with aligning the Spent Fuel Pool Cooling system.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 IF spent fuel pool cooling pump P-12A/B is available, THEN locally perform the Critical Y (SEQ-3) following:

  • Ensure P-12A/B SFP cooling pumps to U6 SFP demineralizer open, SF-27.

Standard: The Examinee ensures that valve SF-27 is open by operating the chain to obtain rotation of the valve hand-wheel in the counter-clockwise direction until the valve stem is extended and there is no hand-wheel (chain) movement.

Evaluator Cue: SF-27 valve stem is extended and there is no further counter-clockwise hand-wheel (chain) movement.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 127 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 4 AT PAB 26 elevation outside U6 SFP demineralizer cubicle, shut U6 SFP Critical Y (SEQ-3) demineralizer inlet valve, SF-804B.

Standard: The Examinee shuts valve SF-804B by rotating the valve hand-wheel clockwise until the valve stem is inserted and there is no further hand-wheel movement.

Evaluator Cue: SF-804B valve stem is inserted and there is no further hand-wheel movement in the clockwise direction.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 AT PAB 46 elevation outside waste gas compressor, open U6 SFP demineralizer Critical Y (SEQ-3) bypass valve, SF-804A.

Standard: The Examinee opens valve SF-804A by rotating the valve hand-wheel counter-clockwise until the valve stem is extended and there is no further hand-wheel movement.

Evaluator Cue: SF-804A valve stem is extended and there is no further hand-wheel movement in the counter-clockwise direction.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 128 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 6 Locally Fill RHR Pump Suction Line: At PAB 46 elevation above SFP HXs Critical Y (SEQ-3) West end, open SFP to RHR valve 2SF-819.

Standard: The Examinee opens valve 2SF-819 by rotating the valve hand-wheel in the counter-clockwise direction until the valve stem is extended and there is no hand-wheel movement.

Evaluator Cue: 2SF-819 valve stem is fully extended and there is no further counter-clockwise hand-wheel movement.

If flow indicator FI-636 is checked ANY TIME after opening 2SF-819, it should be cued that FI-636 reads 30 gpm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 At PAB 46 elevation above HX-13B East end, shut F-6 SFP filter return to SFP, Critical N (SEQ-3) SF-812A.

Standard: The Examinee shuts valve SF-812A by operating the chain to obtain rotation of the valve hand-wheel in a clockwise direction until the valve stem is inserted and there is no further hand-wheel (chain) movement.

Evaluator Cue: SF-812A valve stem is inserted and there is no further clockwise hand-wheel (chain) movement.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 129 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 8 At PAB 46 elevation above HX-13A West end, shut SFP to 2T-13 RWST valve, Critical N (SEQ-3) 2SF-811.

Standard: The Examinee shuts valve 2SF-811 by operating the chain to obtain rotation of the valve hand-wheel in a clockwise direction until the valve stem is inserted and there is no further hand-wheel (chain) movement.

Evaluator Cue: 2SF-811 valve stem is inserted and there is no further clockwise hand-wheel (chain) movement.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 At PAB 46 elevation above HX-13A West end, shut SFP to 1T-13 RWST valve, Critical N (SEQ-3) 1SF-811.

Standard: The Examinee shuts valve 1SF-811 by operating the chain to obtain rotation of the valve hand-wheel in a clockwise direction until the valve stem is inserted and there is no further hand-wheel (chain) movement.

Evaluator Cue: 1SF-811 valve stem is inserted and there is no further clockwise hand-wheel (chain) movement.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 130 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 10 Inform Control Room Suction Line Reflood Has Begun.

Critical N (SEQ-4)

Standard: The Examinee contacts the control room and informs them that RHR suction line reflood has begun in accordance with SEP-1 Unit 2.

Evaluator Cue: The Control Room acknowledges your report.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: After the Control Room is notified that RHR suction reflood has begun, the JPM may be terminated.

Stop Time:

Page 131 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the PAB Auxiliary Operator.
  • Unit 2 is at reduced inventory.
  • Both RHR pumps have been secured due to erratic hydraulic operation.
  • Refueling Water Circulating Pump, P-33, is tagged out for motor replacement.
  • Neither the RWST nor the SFP is on purification.
  • The Spent Fuel Pool Cooling system is in operation.

INITIATING CUES (IF APPLICABLE):

  • The DOS directs you to align the Spent Fuel Pool Cooling system to reflood the RHR pump suction per SEP-1 Unit 2, Degraded RHR System Capability, Attachment A, RHR Suction Line Reflood.

NOTE: To avoid un-necessary risk, do NOT access any scaffolding. All identification of components and required actions may be done at floor level.

Page 132 of 133

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A 131. Are all items on the signature page filled in correctly?

132. Has the JPM been reviewed and validated by SMEs?

133. Can the required conditions for the JPM be appropriately established in the simulator if required?

134. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

135. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

136. Has the completion time been established based on validation data or incumbent experience?

137. If the task is time critical, is the time critical portion based upon actual task performance requirements?

138. Is the Licensee level appropriate for the task being evaluated if required?

139. Is the K/A appropriate to the task and to the licensee level if required?

140. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

141. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?

142. Are all references identified, current, accurate, and available to the trainee?

143. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Page 133 of 133