QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: PBNP TASK TITLE: Perform Control Room Shift Turnover Checklist JPM NUMBER: XXXXXXX REV. 0 RELATED PRA INFORMATION:

TASK NUMBERS:

K/A NUMBERS: Generic 2.1.3 (3.0/3.4)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 20 Minutes Time Critical: No Alternate Path / Faulted: Yes TASK APPLICABILITY: RO/SRO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 1 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM Number: XXXXXXX JPM

Title:

Perform Control Room Shift Turnover Checklist Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required X Procedure adequately addresses task elements.

PBF 2061, Control Room Shift Turnover Checklist Enter Identifier here:

Unit 1 Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 2 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Unit 1 Control Operator.
  • Unit 1 is at 100% power with no testing or other evolutions in progress.
  • It is nearing the end of the mid-shift, and you have started to complete the Unit 1 Control Room Shift Turnover Checklist.
  • The checklist has been completed up to and including page 4.

INITIATING CUES (IF APPLICABLE):

  • You are to continue completion of the Control Room Shift Turnover Checklist for Unit 1 by performing pages 5 through 15. When you are finished, discuss all discrepancies or deficiencies, if any, found while performing the checklist.

Page 3 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM PERFORMANCE INFORMATION Required Materials: PBF 2061, Control Room Shift Turnover Checklist Unit 1 General

References:

None Task Standards: All 3 control board misalignments identified and impact on plant identified (as appropriate for license level).

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Identify loss of control power on 1P-10A, Residual Heat Removal Pump.

Critical Y (SEQ-1)

Standard: Loss of control power on 1P-10A identified by lack of indicating lights (green light and red light off).

For Reactor Operator examinees, this item identified as impacting Technical Specifications (TS 3.5.2).

For Senior Reactor Operator examinees, this item identified as impacting TS 3.5.2 and causing entry to TSAC 3.5.2.A.

Evaluator Note: It is not the intent of this administrative JPM that the Examinee re-position any of the equipment found misaligned during this JPM.

Examinee may attempt to remove green indicating bulb to see if it is burnt out.

Inform examinee that the bulb has been checked and the bulb is good.

Evaluator Cue: As necessary, request the examinee identify any TS impact as appropriate for the license level.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 4 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 2 Identify misalignment of Safety Injection Pump 1P-15B Suction Valve, 1SI-896B.

Critical Y (SEQ-1)

Standard: Misalignment of 1SI-896B identified by observing green light on, red light off OR by identification of status light on Unit 1 SI/Spray Ready Panel.

For Reactor Operator examinees, this item identified as impacting Technical Specifications (TS 3.5.2).

For Senior Reactor Operator examinees, this item identified as impacting TS 3.5.2 and causing entry to TSAC 3.5.2.A. (NOTE: The given TS evaluation of TSAC 3.5.2.A for items in Steps 1 and 2 were evaluated independently. Together, the two items require entry to LCO 3.0.3 since no TSAC exists that covers two inoperable ECCS Trains.)

Evaluator Cue: As necessary, request the examinee identify any TS impact as appropriate for the license level.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 5 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 3 Identify misalignment of 1P-29 AFP Discharge Valves, 1AF-4000 and 1AF-4001.

Critical Y (SEQ-1)

Standard: 1AF-4000 and 1AF-4001 identified via meter indication for each valve on panel 1C03 that both valves are closed.

For Reactor Operator examinees, this item identified as impacting Technical Specifications (TS 3.7.5).

For Senior Reactor Operator examinees, this item identified as impacting TS 3.7.5 and causing entry to TSAC 3.7.5.B.

Evaluator Cue: If examinee requests a local operator to check position, inform examinee that the local position of both valves indicate shut.

As necessary, request the examinee identify any TS impact as appropriate for the license level.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When page 15 is completed, the JPM may be terminated.

Stop Time:

Page 6 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

SIMULATOR SET UP: (Modify table as necessary)

Simulator Setup Instructions:

  • Reset to a Unit 1 / Unit 2 100% power IC (IC-2) or exam specific saved IC.
  • Enter Sim code from table below.
  • Ensure conditions reflect the failures identified in JPM.

SIMULATOR MALFUNCTIONS:

TIME MALFUNCTION MALFUNCTION ET DELAY f. SERV RAMP I.SEV.

No. TITLE Preload BKR1RHR001 1B5212A P-10A - - - - 6 - Fail RH REMOVAL Cntrl PUMP CKTBKR Fuse Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 7 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Unit 1 Control Operator.
  • Unit 1 is at 100% power with no testing or other evolutions in progress.
  • It is nearing the end of the mid-shift, and you have started to complete the Unit 1 Control Room Shift Turnover Checklist.
  • The checklist has been completed up to and including page 4 INITIATING CUES (IF APPLICABLE):
  • You are to continue completion of the Control Room Shift Turnover Checklist for Unit 1 by performing pages 5 through 15. When you are finished, discuss all discrepancies or deficiencies, if any, found while performing the checklist.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 8 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 9 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: PBNP TASK TITLE: Perform a Pressurizer Heater Group Input Test Calculation JPM NUMBER: XXXXXXX REV. 0 RELATED PRA INFORMATION:

TASK NUMBERS:

K/A NUMBERS: Generic 2.1.25 (2.8/3.1)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: X Control Room: X Simulator: X Other:

Lab:

Time for Completion: 15 Minutes Time Critical: No Alternate Path / Faulted: No TASK APPLICABILITY: RO/SRO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 10 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM Number: XXXXXXX JPM

Title:

Perform a Pressurizer Heater Group Input Test Calculation Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required X Procedure adequately addresses task elements.

Enter Identifier here: TS 43, Pressurizer Heater Group Energy Input Test Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 11 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Unit 1 CO.
  • Unit 1 is currently in Mode 2 with a reactor startup in progress.
  • Pressurizer Heater Group 1T-1C failed on the previous shift.
  • Engineering has determined that a potential common mode failure exists (applicable only to Unit 1), and has recommended that TS 43, Pressurizer Heater Group Energy Input Test, be performed on Unit 1 Pressurizer Heater Group 1T-1D in order to verify its operability.
  • The test is in progress, voltage and current readings have been taken by maintenance, and the procedure is complete up to and including step 5.2.9.

INITIATING CUES (IF APPLICABLE):

  • You are to complete section 5.2 (1T-1D Pressurizer Heater Group Test) of TS-43 beginning at step 5.2.10.

Page 12 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM PERFORMANCE INFORMATION Required Materials: TS-43, Pressurizer Heater Group Energy Input Test (as provided), Calculator.

General

References:

None Task Standards: Pressurizer Heater Group 1T-1D is identified as NOT meeting its Technical Specification requirement of ³ 100 kW.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Calculate the average voltage and average current for each breaker.

Critical N (SEQ-1)

Standard: Average voltage and average current is calculated and recorded in Table PP-13 1T-1D. (see attached grading sheet for correct values)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Calculate the power for each breaker using provided formula.

Critical N (SEQ-2)

Standard: Power for each breaker is calculated and recorded in Table PP-13 1T-1D. (see attached grading sheet for correct values)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 13 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 3 Total power of Heater Group is determined by summing power of each breaker.

Critical N (SEQ-3)

Standard: Power of each breaker is added together to determine total power of Pressurizer Heater Group 1T-1D. (see attached grading sheet for correct value)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Apply uncertainty factor to the total power value of Pressurizer Heater Group Critical Y (SEQ-4) 1T-1D and record result.

Standard: The total power of the heater Group obtained in the previous step is multiplied by 0.9335 and recorded in section 6.0. Final value is 96.2 (+/-3 kW).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 The total power of Pressurizer Heater Group 1T-1D is compared with the Critical Y (SEQ-5) Technical Specification Acceptance Criteria.

Standard: Total power of Pressurizer Heater Group 1T-1D is determined to NOT meet Technical Specification requirements of ³ 100 kW.

Evaluator Cue: If examinee asks for an Independent Review (as required by procedure), indicate that the review has been completed and no discrepancies noted.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: JPM may be terminated after completion of above step.

Stop Time:

Page 14 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Unit 1 CO.
  • Unit 1 is currently in Mode 2 with a reactor startup in progress.
  • Pressurizer Heater Group 1T-1C failed on the previous shift.
  • Engineering has determined that a potential common mode failure exists (applicable only to Unit 1), and has recommended that TS 43, Pressurizer Heater Group Energy Input Test, be performed on Unit 1 Pressurizer Heater Group 1T-1D in order to verify its operability.
  • The test is in progress, voltage and current readings have been taken by maintenance, and the procedure is complete up to and including step 5.2.9 INITIATING CUES (IF APPLICABLE):
  • You are to complete section 5.2 (1T-1D Pressurizer Heater Group Test) of TS-43 beginning at step 5.2.10.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 15 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

14. Are all items on the signature page filled in correctly?
15. Has the JPM been reviewed and validated by SMEs?
16. Can the required conditions for the JPM be appropriately established in the simulator if required?
17. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
18. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
19. Has the completion time been established based on validation data or incumbent experience?
20. If the task is time critical, is the time critical portion based upon actual task performance requirements?
21. Is the Licensee level appropriate for the task being evaluated if required?
22. Is the K/A appropriate to the task and to the licensee level if required?
23. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

24. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
25. Are all references identified, current, accurate, and available to the trainee?
26. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 16 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: PBNP TASK TITLE: Review A Tag Series For Accuracy JPM NUMBER: XXXXXXX REV. 0 RELATED PRA INFORMATION:

TASK NUMBERS:

K/A NUMBERS: Generic 2.2.13 (3.6/3.8)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: X Control Room: X Simulator: X Other:

Lab:

Time for Completion: 20 Minutes Time Critical: No Alternate Path / Faulted: No TASK APPLICABILITY: RO/SRO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 17 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM Number: XXXXXXX JPM

Title:

Review A Tag Series For Accuracy Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required X Procedure adequately addresses task elements.

NP 1.9.15, Tagging Procedure Enter Identifier here: OI-50, Charging Pump Isolation Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 18 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the CO assigned to the Work Control Center. 2P-2C, Unit 2 Charging Pump, needs to be isolated and danger tagged per OI-50, Charging Pump Isolation, due to excessive seal leakage.
  • A Tag Series has been pulled from the archived database to use as a guide in preparing the Danger Tag Series.

INITIATING CUES (IF APPLICABLE):

  • You are to review the Tag Series provided for adequacy.
  • If the Tag Series is satisfactory, then inform the WCC Supervisor.
  • If the Tag Series in NOT adequate, then you are to inform the WCC Supervisor of the changes needed to correct ALL deficiencies.

Page 19 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM PERFORMANCE INFORMATION Required Materials: 2P-2C Danger Tag Series as provided.

General

References:

NP 1.9.15, Tagging Procedure, OI-50, Charging Pump Isolation, Master Data Book, Drawing WEST 684J741 sh.2, Westinghouse Elementary Drawings.

Task Standards: Tag series is reviewed and the three errors noted in this JPM are identified.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Obtain and review references as needed to determine tag series adequacy.

Critical N (SEQ-1)

Standard: References (as indicated on tag series coversheet) are obtained and reviewed as needed.

Evaluator Note: The examiner should keep the examinee focused on the tag series review using references in the simulator (i.e. plant walk-down, review of requesting individual documentation, and review of specific tags is not necessary, etc.)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 20 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 2 Determine if specified tag series boundaries are adequate for worker safety and Critical Y (SEQ-1) scope of work.

Standard: Breaker for 2P-2C determined to be incorrect, breaker should be 2B52-28A.

Evaluator Note: Incorrect breaker listed on tag series (2B52-37A) is for Charging Pump 2P-2A.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Determine if specified tag series placement sequence is adequate to ensure Critical Y (SEQ-1) system integrity is not challenged.

Standard: Sequence placement for valves 2CV-291 and 2CV-399 determined to be reversed. 2CV-291 must be SHUT prior to 2CV-399 to avoid over-pressurization of the suction piping.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Determine if specified tag series boundaries are adequate for worker safety and Critical Y (SEQ-1) scope of work.

Standard: Drain valve 2CV-262C, 2P-2C Chg Pump Discharge Header Drain First Off Isol, is identified as being SHUT on the tag series. 2CV-262C should be listed as OPEN.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When examinee indicates that all deficiencies have been identified OR indicates the Tag Series is adequate, the JPM may be terminated.

Stop Time:

Page 21 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the CO assigned to the Work Control Center. 2P-2C, Unit 2 Charging Pump, needs to be isolated and danger tagged per OI-50, Charging Pump Isolation, due to excessive seal leakage.
  • A Tag Series has been pulled from the archived database to use as a guide in preparing the Danger Tag Series INITIATING CUES (IF APPLICABLE):
  • You are to review the Tag Series provided for adequacy.
  • If the Tag Series is satisfactory, then inform the WCC Supervisor.
  • If the Tag Series in NOT adequate, then you are to inform the WCC Supervisor of the changes needed to correct ALL deficiencies.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 22 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

27. Are all items on the signature page filled in correctly?
28. Has the JPM been reviewed and validated by SMEs?
29. Can the required conditions for the JPM be appropriately established in the simulator if required?
30. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
31. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
32. Has the completion time been established based on validation data or incumbent experience?
33. If the task is time critical, is the time critical portion based upon actual task performance requirements?
34. Is the Licensee level appropriate for the task being evaluated if required?
35. Is the K/A appropriate to the task and to the licensee level if required?
36. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

37. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
38. Are all references identified, current, accurate, and available to the trainee?
39. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 23 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: PBNP TASK TITLE: Determine a Stay Time For A High Radiation Area JPM NUMBER: XXXXXXX REV. 0 RELATED PRA INFORMATION:

TASK NUMBERS:

K/A NUMBERS: Generic 2.3.1 (2.6/3.0)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: X Control Room: X Simulator: X Other:

Lab:

Time for Completion: 10 Minutes Time Critical: No Alternate Path / Faulted: No TASK APPLICABILITY: RO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 24 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM Number: XXXXXXX JPM

Title:

Determine a Stay Time For A High Radiation Area Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required Procedure adequately addresses task elements.

Enter Identifier here:

Other document adequately describes necessary task elements.

Enter Identifier here:

X Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 25 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Reference the attached radiological survey map.
  • A tag series is required to be hung in the Unit 1 Non-Regenerative Heat Exchanger Room which is posted as a High Radiation Area (HRA).
  • The first valve on the tag series is 1CV-371, and it is estimated that 5 minutes will be required to perform all activities to tag the valve. This estimate is based on previous performance history.
  • The remaining valves on the tag series are indicated by unlabeled valve symbols on the survey map.
  • Radiation Protection (RP) has placed a dose limit of 50 mR to perform the entire tag series.

INITIATING CUES (IF APPLICABLE):

  • Assuming you have just tagged 1CV-371, you are to determine the maximum time (in minutes) that can be spent tagging all other valves indicated on the survey map without exceeding the dose limit for this task. Assume the time for access and egress of the room is negligible.

Page 26 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM PERFORMANCE INFORMATION Required Materials: Calculator (if desired)

General

References:

None Task Standards: The maximum time that can be spent hanging tags in the General Area is determined to be 45 minutes.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Determine total dose received closing the valve in the HRA (240 mR/hr field).

Critical Y (SEQ-1)

Standard: The total dose received to close the first valve is determined to be 20 mR. (240 mR/hr

  • 5 min / 60 min/hr = 20 mR).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Available dose for hanging tags in the General Area is determined.

Critical Y (SEQ-2)

Standard: Dose available for hanging tags in the General Area is determined to be 30 mR.

(50 mR - 20 mR = 30 mR)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 27 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 3 Determine maximum time to hang tags in the General Area.

Critical Y (SEQ-3)

Standard: Maximum time to be spent in the General Area is determined to be 45 minutes.

(30 mR / 40 mR/hr

  • 60 min/hr = 45 min)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: This JPM is complete when the examinee provides an answer for the assigned task to the examiner.

Stop Time:

Page 28 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

  • Reference the attached radiological survey map.
  • A tag series is required to be hung in the Unit 1 Non-Regenerative Heat Exchanger Room which is posted as a High Radiation Area (HRA).
  • The first valve on the tag series is 1CV-371, and it is estimated that 5 minutes will be required to perform all activities to tag the valve. This estimate is based on previous performance history.
  • The remaining valves on the tag series are indicated by unlabeled valve symbols on the survey map.
  • Radiation Protection (RP) has placed a dose limit of 50 mR to perform the entire tag series.

INITIATING CUES (IF APPLICABLE):

  • Assuming you have just tagged 1CV-371, you are to determine the maximum time (in minutes) that can be spent tagging all other valves indicated on the survey map without exceeding the dose limit for this task. Assume the time for access and egress of the room is negligible.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 29 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

40. Are all items on the signature page filled in correctly?
41. Has the JPM been reviewed and validated by SMEs?
42. Can the required conditions for the JPM be appropriately established in the simulator if required?
43. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
44. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
45. Has the completion time been established based on validation data or incumbent experience?
46. If the task is time critical, is the time critical portion based upon actual task performance requirements?
47. Is the Licensee level appropriate for the task being evaluated if required?
48. Is the K/A appropriate to the task and to the licensee level if required?
49. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

50. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
51. Are all references identified, current, accurate, and available to the trainee?
52. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 30 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: PBNP TASK TITLE: Classify An Event Per The Emergency Plan JPM NUMBER: XXXXXXX REV. 0 RELATED PRA INFORMATION:

TASK NUMBERS:

K/A NUMBERS: Generic - 2.4.41 (2.3/4.1), 2.4.44 (2.1/4.0)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room: X Simulator: X Other:

Lab:

Time for Completion: 30 Minutes Time Critical: Yes Alternate Path / Faulted: No TASK APPLICABILITY: SRO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 31 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM Number: XXXXXXX JPM

Title:

Classify An Event Per The Emergency Plan Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required X Procedure adequately addresses task elements.

Enter Identifier here: EPIP 1.1, 1.2, and 2.1 Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 32 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Operating Supervisor (OS) when the following sequence of events occurred:
  • A Unit 1 Technical Specification required shutdown was in progress per TSAC 3.4.16.B due to increasing reactor coolant activity. Fuel cladding damage is suspected as a result of foreign material in the primary.
  • During the shutdown, the reactor was manually tripped due to indications of a Steam Generator Tube Rupture on Steam Generator A which exceeded the makeup capacity of the 3 operable Charging Pumps.
  • Several minutes after the trip, the PAB AO reports a large steam line leak located on Steam Line A, located somewhere between the Containment penetration and the MSIV.
  • RCS pressure is 1500 psig and slowly lowering.
  • RCS Cold Leg temperatures are 490 ºF and lowering.
  • Pressurizer level is off-scale low.
  • Containment High Range Radiation monitors indicate 10 R/hr.
  • All other Containment parameters are normal.
  • S/G A Narrow Range Level is 15% and lowering, S/G A Pressure is at 400 psig and lowering.
  • S/G B Narrow Range Level is 45% and slowly rising, S/G B Pressure is at 610 psig and slowly lowering.
  • Wind speed and direction (15 minute average, both inland and at the site) is 8 mph and 110º.
  • A Stability Class of D is indicated on PPCS for these conditions.
  • The control room is implementing the appropriate emergency procedures.

Page 33 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

INITIATING CUES (IF APPLICABLE):

  • The Shift Manager is implementing EPIP 1.1 and has requested your assistance. You are to perform the following:
1. Per step 5.3 of EPIP 1.1, classify the event based only on the above conditions.
2. After classifying the event, perform step 5.6.2 of EPIP 1.1 for notification of the State & Counties. Another SRO will perform all other steps in EPIP 1.1. This JPM is time critical.

Page 34 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM PERFORMANCE INFORMATION Required Materials: Blank copy of EPIP 2.1 Attachment B (NARS Form).

General

References:

EPIP 1.1, 1.2, and 2.1.

Task Standards: A General Emergency is declared.

The identified critical sections of EPIP 2.1 Attachment B (NARS Form) are completed correctly and within the required time frame.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Determine the category of the event using Attachment A, B, and C of EPIP 1.2.

Critical Y (SEQ-1)

Standard: Examinee determines that a General Emergency declaration is required based on EAL 1.1.1.4 due to the following:

  • Loss of RCS Integrity due to indications of A SGTR > 50 gpm.
  • Loss of Containment Integrity due to indications of an unisolable steam leak, also on S/G A.
  • Fuel clad challenge due to entering TSAC 3.4.16.B.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 35 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 2 Appropriate sections of EPIP 2.1 Attachment B (NARS Form) filled out Critical Y (SEQ-2) correctly.

Standard: NARS Form completed consistent with given conditions and within required time frame (< 30 minutes).

A completed NARS Form is attached for grading purposes. Critical step items of the NARS Form include items in blocks 3, 4, 5 (EAL only), 6, 7, and 10.

Evaluator Note: The Liquid box may be checked in Block 7 in addition to Airborne due to the type of release in progress (steam).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When the examinee requests approval of the NARS Form from the Emergency Director, the JPM is complete.

Stop Time:

Page 36 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Operating Supervisor (OS) when the following sequence of events occurred:
  • A Unit 1 Technical Specification required shutdown was in progress per TSAC 3.4.16.B due to increasing reactor coolant activity. Fuel cladding damage is suspected as a result of foreign material in the primary.
  • During the shutdown, the reactor was manually tripped due to indications of a Steam Generator Tube Rupture on Steam Generator A which exceeded the makeup capacity of the 3 operable Charging Pumps.
  • Several minutes after the trip, the PAB AO reports a large steam line leak located on Steam Line A, located somewhere between the Containment penetration and the MSIV.
  • RCS pressure is 1500 psig and slowly lowering.
  • RCS Cold Leg temperatures are 490 ºF and lowering.
  • Pressurizer level is off-scale low.
  • Containment High Range Radiation monitors indicate 10 R/hr.
  • All other Containment parameters are normal.
  • S/G A Narrow Range Level is 15% and lowering, S/G A Pressure is at 400 psig and lowering.
  • S/G B Narrow Range Level is 45% and slowly rising, S/G B Pressure is at 610 psig and slowly lowering.
  • Wind speed and direction (15 minute average, both inland and at the site) is 8 mph and 110º.
  • A Stability Class of D is indicated on PPCS for these conditions.
  • The control room is implementing the appropriate emergency procedures.

INITIATING CUES (IF APPLICABLE):

  • The Shift Manager is implementing EPIP 1.1 and has requested your assistance. You are to perform the following:
1. Per step 5.3 of EPIP 1.1, classify the event based only on the above conditions.
2. After classifying the event, perform step 5.6.2 of EPIP 1.1 for notification of the State & Counties.

Another SRO will perform all other steps in EPIP 1.1. This JPM is time critical.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 37 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

53. Are all items on the signature page filled in correctly?
54. Has the JPM been reviewed and validated by SMEs?
55. Can the required conditions for the JPM be appropriately established in the simulator if required?
56. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
57. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
58. Has the completion time been established based on validation data or incumbent experience?
59. If the task is time critical, is the time critical portion based upon actual task performance requirements?
60. Is the Licensee level appropriate for the task being evaluated if required?
61. Is the K/A appropriate to the task and to the licensee level if required?
62. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

63. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
64. Are all references identified, current, accurate, and available to the trainee?
65. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 38 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: PBNP TASK TITLE: Personnel Emergency Dose Authorization JPM NUMBER: XXXXXXX REV. 0 RELATED PRA INFORMATION:

TASK NUMBERS:

K/A NUMBERS: Generic 2.3.4 (2.5/3.1)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room: X Simulator: X Other:

Lab:

Time for Completion: 10 Minutes Time Critical: No Alternate Path / Faulted: No TASK APPLICABILITY: SRO Additional signatures may be added as needed.

Developed by:

Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 39 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM Number: XXXXXXX JPM

Title:

Personnel Emergency Dose Authorization Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required X Procedure adequately addresses task elements.

Enter Identifier here: EPIP 5.1, Personnel Emergency Dose Authorization Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 40 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM BRIEFING/TURNOVER THIS SECTION IS READ ONCE FOR THE ENTIRE PACKAGE OF JPMS. IT IS NOT REQUIRED TO REVIEW THIS SECTION FOR EVERY JPM BEING PERFORMED IN THE PACKAGE. THE INITIAL CONDITIONS AND INITIATING CUE(S)/TASKS TO BE PERFORMED SHOULD BE READ AND THEN PROVIDED TO THE EXAMINEE.

After I read you the initial conditions and initiating cue(s)/task to be performed for this JPM and provide you a copy of the same, you may review and begin. Once you have completed the task, indicate completion by handing back this form to the evaluator unless otherwise told.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate actions steps without using the procedure, you may then use any approved reference materials.

For all two and three-way communications, make your report to me, the JPM evaluator. I will reply to your reports with the statement, acknowledge. All actions in the plant are to be simulated and all actions in the simulator will be performed. Ensure you make it clear to me, the evaluator, of all actions you are taking so that credit may be given for completing each step of the task.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Shift Manager.
  • A fuel handling accident has occurred in the PAB.
  • Radiation levels are steadily rising in the general areas surrounding the spent fuel pool.
  • An ALERT Emergency Classification has been declared.
  • The TSC and EOF have not yet been activated, but all required ERO personnel have arrived at their emergency facilities.
  • An equipment vendor, whose truck is parked in the PAB truck bay for unloading, has requested that his truck be moved as soon as possible. The truck driver has indicated that high radiation levels can damage some of the expensive electronic test equipment on the truck.
  • An RP tech has volunteered to move the truck.
  • The general area dose rate near the cab of the truck is estimated to be 240 R/hr.
  • It is estimated that it will take 3 minutes to move the truck.
  • An Emergency Dose Authorization has been requested.

INITIATING CUES (IF APPLICABLE):

  • You are to evaluate these conditions and approve or deny the dose extension.

Page 41 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JPM PERFORMANCE INFORMATION Required Materials: EPIP 5.1 Attachment C, Emergency Plan Dose Authorization General

References:

EPIP 5.1, Personnel Emergency Dose Authorization Task Standards: The Emergency Dose Authorization is NOT approved due to the high dose expected to be received for the given activity.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Calculate total dose to perform activity.

Critical Y (SEQ-1)

Standard: Total dose received for activity determined to be 12 Rem. (240 R/hr

  • 3 min / 60 =

12 Rem)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 42 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Performance Step: 2 Compare dose for the task to the limits of EPIP 5.1 (Reference Table 2-2, EPA-Critical Y (SEQ-2) 400-R-92-001)

Standard: Determines that the exposure limit for protection of valuable property is 10 Rem from Table 2-2. Dose estimated for the task (12 Rem) is GREATER than the allowed limit.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Evaluate approval of EPIP 5.1 Attachment C, Emergency Plan Dose Critical Y (SEQ-3) Authorization.

Standard: The Emergency Dose Authorization is DENIED based on the radiation levels exceeding the allowable level for protection of valuable property. (EPIP 5.1 Attachment C is NOT approved).

Evaluator Cue: If examinee denies approval without providing justification (step 2), request that the justification for denial be explained.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The JPM is complete when the examinee approves/disapproves the dose authorization and justification is provided.

Stop Time:

Page 43 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Shift Manager.
  • A fuel handling accident has occurred in the PAB.
  • Radiation levels are steadily rising in the general areas surrounding the spent fuel pool.
  • An ALERT Emergency Classification has been declared.
  • The TSC and EOF have not yet been activated, but all required ERO personnel have arrived at their emergency facilities.
  • An equipment vendor, whose truck is parked in the PAB truck bay for unloading, has requested that his truck be moved as soon as possible. The truck driver has indicated that high radiation levels can damage some of the expensive electronic test equipment on the truck.
  • An RP tech has volunteered to move the truck.
  • The general area dose rate near the cab of the truck is estimated to be 240 R/hr.
  • It is estimated that it will take 3 minutes to move the truck.
  • An Emergency Dose Authorization has been requested INITIATING CUES (IF APPLICABLE):
  • You are to evaluate these conditions and approve or deny the dose extension.

Page 44 of 45

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

66. Are all items on the signature page filled in correctly?
67. Has the JPM been reviewed and validated by SMEs?
68. Can the required conditions for the JPM be appropriately established in the simulator if required?
69. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
70. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
71. Has the completion time been established based on validation data or incumbent experience?
72. If the task is time critical, is the time critical portion based upon actual task performance requirements?
73. Is the Licensee level appropriate for the task being evaluated if required?
74. Is the K/A appropriate to the task and to the licensee level if required?
75. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

76. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
77. Are all references identified, current, accurate, and available to the trainee?
78. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Page 45 of 45